{"feed_info":{"update_date":"2026-04-22T18:35:16.5853592+00:00","publisher":"Arcadis","version":"4.1","data_sources":[{"data_source_id":"TRANSCOM","organization_name":"TRANSCOM","update_date":"2026-04-22T18:35:16Z"}]},"type":"FeatureCollection","features":[{"id":"5sJBw7xtxobEFBZ06poYiIIyJXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northeast Corridor Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Northeast Corridor Line at Metropark (Woodbridge Twp) the sidewalk leading to Wood Avenue will be closed due to the enhancement of Metropark Station, including the installation of a new shared pedestrian and bicycle path. During this time, we ask that customers be aware of the construction activity and follow all posted signage. The pedestrian tunnel will remain open to access the southbound platform and all points north of Metropark Station, as well as sidewalks along Middlesex Turnpike, Wood Avenue, and Lincoln Highway. Please allow for extra travel time. We appreciate your patience during this adjustment., Continuous Monday May 19th, 2025 09:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-05-13T14:10:51Z"},"road_event_id":"5sJBw7xtxobEFBZ06poYiIIyJXM=","beginning_cross_street":"Metropark","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.329394,40.56864]]}},{"id":"uNYDaTjsipVnrxaee/ahHni9oKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Traffic shift on I-95 northbound between Exit 91 - CT 234 (Stonington) The I-95 northbound lane shift beginning before Exit 91 and extending for approximately 2,200 feet will guide traffic to the left side while construction work is being performed along the right side of the Bridge over Taugwonk Road, Continuous Monday May 6th, 2024 12:00 AM thru Friday May 1st, 2026 11:59 PM All lanes open","update_date":"2024-04-26T19:59:03Z"},"road_event_id":"uNYDaTjsipVnrxaee/ahHni9oKU=","beginning_cross_street":"Exit 91 - CT 234","ending_cross_street":"Exit 91 - CT 234","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.91173,41.375567]]}},{"id":"Jozk4JIY54o4wANAzHu1xoPi9l4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Traffic shift on I-95 northbound between Exit 93 - CT 216 (North Stonington) I-95 northbound lane shift beginning before Exit 93 and extending for approximately 1,600 feet will guide traffic to the left side while construction work is being performed along the right side of the Bridge over Route 216., Continuous Monday May 6th, 2024 12:00 AM thru Friday May 1st, 2026 11:59 PM All lanes open","update_date":"2024-04-26T20:02:06Z"},"road_event_id":"Jozk4JIY54o4wANAzHu1xoPi9l4=","beginning_cross_street":"Exit 93 - CT 216","ending_cross_street":"Exit 93 - CT 216","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.802082,41.438087]]}},{"id":"2TZXSLzJUwnl/3++CCnB8V43FCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATERSIDE DR"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on WATERSIDE DR both directions between US-6 (Farmington) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:37:22Z"},"road_event_id":"2TZXSLzJUwnl/3++CCnB8V43FCI=","beginning_cross_street":"US-6","ending_cross_street":"US-6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.814566,41.707049]]}},{"id":"HcOR7ekhKH74tZ5bZ7hy+gPzZWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHURCH ST N"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CHURCH ST N both directions between CENTRAL AVE (New Hartford) and BRIDGE ST at CENTRAL AVE (New Hartford) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:37:50Z"},"road_event_id":"HcOR7ekhKH74tZ5bZ7hy+gPzZWs=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"CENTRAL AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.980474,41.878083]]}},{"id":"asfm5QPK9/LH73OByTZpNd1vsuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAIL RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on VAIL RD both directions between GARELLA RD (Bethel) and US-6 (Bethel) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:36:09Z"},"road_event_id":"asfm5QPK9/LH73OByTZpNd1vsuY=","beginning_cross_street":"GARELLA RD","ending_cross_street":"US-6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.393217,41.420046]]}},{"id":"RHIEI8FrMkNHVqsI8xPWFSneE8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SEYMOUR RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on SEYMOUR RD both directions between HATCHETT HILL RD (East Granby) and INTERNATIONAL DR (East Granby) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone., Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:36:39Z"},"road_event_id":"RHIEI8FrMkNHVqsI8xPWFSneE8M=","beginning_cross_street":"HATCHETT HILL RD","ending_cross_street":"INTERNATIONAL DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.73938,41.917057]]}},{"id":"bi/AXk/3E2Yjq421fG+1fPBdmlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xw98WD1x3SD8DreP1IcT8axVqiQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"bi/AXk/3E2Yjq421fG+1fPBdmlY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"xw98WD1x3SD8DreP1IcT8axVqiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"WbSCslcUeVm4dNocJ87W9Z5/WmE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"xw98WD1x3SD8DreP1IcT8axVqiQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"WbSCslcUeVm4dNocJ87W9Z5/WmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"wwXQOpfsm6/Z/hLp7aPv3yG4uYI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"WbSCslcUeVm4dNocJ87W9Z5/WmE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"wwXQOpfsm6/Z/hLp7aPv3yG4uYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"cneU/L7EMLlovNyjRjSal8kOCK4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"wwXQOpfsm6/Z/hLp7aPv3yG4uYI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"cneU/L7EMLlovNyjRjSal8kOCK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"K84FcJYCWTyt3sj5UbYSfubftgY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"cneU/L7EMLlovNyjRjSal8kOCK4=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"K84FcJYCWTyt3sj5UbYSfubftgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"Ve6eHuxfGR1ksjv/pRGqRH32rYQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"K84FcJYCWTyt3sj5UbYSfubftgY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"Ve6eHuxfGR1ksjv/pRGqRH32rYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"eL/eISFKt0xYfYTdx1cT9gvOEwM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"Ve6eHuxfGR1ksjv/pRGqRH32rYQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"eL/eISFKt0xYfYTdx1cT9gvOEwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"WoqDDwjLdznw45S18ftZ5BiC73E="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"eL/eISFKt0xYfYTdx1cT9gvOEwM=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"WoqDDwjLdznw45S18ftZ5BiC73E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"tNEIR8Fj2A3C96D+H3arQqXG82c="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"WoqDDwjLdznw45S18ftZ5BiC73E=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"tNEIR8Fj2A3C96D+H3arQqXG82c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"iJJhKpzYH38vNQ+dL3HFEBGKy6c="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"tNEIR8Fj2A3C96D+H3arQqXG82c=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"iJJhKpzYH38vNQ+dL3HFEBGKy6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"rEOfWQiqrVLQ74a0bAjAmpypGIU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"iJJhKpzYH38vNQ+dL3HFEBGKy6c=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"rEOfWQiqrVLQ74a0bAjAmpypGIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"OZTOOiTacNZt7X8A5n6qmI0UgY8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"rEOfWQiqrVLQ74a0bAjAmpypGIU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"OZTOOiTacNZt7X8A5n6qmI0UgY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"YM6TPj2tvVdth/wAX67fskBFDEk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"OZTOOiTacNZt7X8A5n6qmI0UgY8=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"YM6TPj2tvVdth/wAX67fskBFDEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"KMbjBxGE745BZBq08Lw5izjjE3k="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"YM6TPj2tvVdth/wAX67fskBFDEk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"KMbjBxGE745BZBq08Lw5izjjE3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"eSGbs3rc3Q2G/YamgXNEHfsWujU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"KMbjBxGE745BZBq08Lw5izjjE3k=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"eSGbs3rc3Q2G/YamgXNEHfsWujU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"nxmr8XPvw61dP3FWjQAi/3oMGtA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"eSGbs3rc3Q2G/YamgXNEHfsWujU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"nxmr8XPvw61dP3FWjQAi/3oMGtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"FRFvVFK1r5xAunqOZFuuQuZ+7zA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"nxmr8XPvw61dP3FWjQAi/3oMGtA=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"FRFvVFK1r5xAunqOZFuuQuZ+7zA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"XNWFrM4zz19UEZ8GrRKTWIeETCs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"FRFvVFK1r5xAunqOZFuuQuZ+7zA=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"XNWFrM4zz19UEZ8GrRKTWIeETCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"q9JLWrfXvAus7TSPYrJHZTYLm5Q="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"XNWFrM4zz19UEZ8GrRKTWIeETCs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"q9JLWrfXvAus7TSPYrJHZTYLm5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"cEuHihA3R7dRN1kRlO+yUmxmVxo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"q9JLWrfXvAus7TSPYrJHZTYLm5Q=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"cEuHihA3R7dRN1kRlO+yUmxmVxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="},{"type":"next-occurrence","id":"SDnbZ284grE3RQNMApKaqzLs7MY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"cEuHihA3R7dRN1kRlO+yUmxmVxo=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"SDnbZ284grE3RQNMApKaqzLs7MY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bi/AXk/3E2Yjq421fG+1fPBdmlY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 both directions between Exit 45 - CT 140 (East Windsor) and Exit 49 - US 5 (Enfield) There will be lanes closed on I-91 north and southbound from Exit 45-49 nightly, Sunday through Friday from 7:00 p.m. to 6:00 a.m. There will also be lane and shoulder closures daily Monday through Friday from 9:00 a.m. to 1:00 p.m, Monday April 21st, 2025 thru Thursday April 1st, 2027, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM All lanes open, Monday April 21st, 2025 thru Thursday April 1st, 2027, Monday thru Friday, 09:00 AM thru 01:00 PM All lanes open","update_date":"2025-04-18T19:43:06Z"},"road_event_id":"SDnbZ284grE3RQNMApKaqzLs7MY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 49 - US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608632,41.930132]]}},{"id":"ORC300447958","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","description":"Roadwork on US 9 Northbound between North of CR 571/Indian Head Rd (Toms River Twp) and CR 620/Church Rd (Toms River Twp) Monday June 9, 2025 09:00 PM thru Saturday June 14, 2025 05:00 AM, All lanes closed and detoured","update_date":"2025-06-14T09:00:01Z"},"road_event_id":"ORC300447958","beginning_cross_street":"North of CR 571/Indian Head Rd","ending_cross_street":"CR 620/Church Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-06T20:39:28Z","end_date":"2025-06-14T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.211662,39.99551]]}},{"id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6HPigfXvrLNv+V+zFOA6JAxILnc="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:01:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"6HPigfXvrLNv+V+zFOA6JAxILnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"K2eqzirFdRdM3HYPYh3+UhOiJzg="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"6HPigfXvrLNv+V+zFOA6JAxILnc=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"K2eqzirFdRdM3HYPYh3+UhOiJzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"nZGfIuOSTzpzrVgvX9xgcNNGMc8="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"K2eqzirFdRdM3HYPYh3+UhOiJzg=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"nZGfIuOSTzpzrVgvX9xgcNNGMc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"kMG4hlILZHySlKtLdHNv6hpz+uA="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"nZGfIuOSTzpzrVgvX9xgcNNGMc8=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"kMG4hlILZHySlKtLdHNv6hpz+uA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"BUcphA13yaGV/OCS9HCzm+Jsb48="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"kMG4hlILZHySlKtLdHNv6hpz+uA=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:10:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"BUcphA13yaGV/OCS9HCzm+Jsb48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"Ydo0A3MWMwtqMDzBFLNempNFP0c="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"BUcphA13yaGV/OCS9HCzm+Jsb48=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T04:10:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"Ydo0A3MWMwtqMDzBFLNempNFP0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"UTGkIIpS0Psyi4fugCSmOdCfQx8="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"Ydo0A3MWMwtqMDzBFLNempNFP0c=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"UTGkIIpS0Psyi4fugCSmOdCfQx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"9af7w3Ql38+9O1IpugOkQppd2e0="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"UTGkIIpS0Psyi4fugCSmOdCfQx8=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"9af7w3Ql38+9O1IpugOkQppd2e0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"lbxTECOs+JepYW0i6DO4qkhAPtY="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"9af7w3Ql38+9O1IpugOkQppd2e0=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"lbxTECOs+JepYW0i6DO4qkhAPtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"QXT3kSz32Ub6t3BaPdG0nBN3jqs="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"lbxTECOs+JepYW0i6DO4qkhAPtY=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"QXT3kSz32Ub6t3BaPdG0nBN3jqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"/rSwF4NnjXuMmyYa8K8Tu/Me67I="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"QXT3kSz32Ub6t3BaPdG0nBN3jqs=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"/rSwF4NnjXuMmyYa8K8Tu/Me67I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"8RlNsFxDoqrASy9W5lPZaPsc3cg="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"/rSwF4NnjXuMmyYa8K8Tu/Me67I=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T04:10:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"8RlNsFxDoqrASy9W5lPZaPsc3cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"uK57a8DZ/Q/PINHL2D59aAjkvHo="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"8RlNsFxDoqrASy9W5lPZaPsc3cg=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T04:10:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"uK57a8DZ/Q/PINHL2D59aAjkvHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"vWTVdfVEfVZxO6siVAh+tWtRXwo="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"uK57a8DZ/Q/PINHL2D59aAjkvHo=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"vWTVdfVEfVZxO6siVAh+tWtRXwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="},{"type":"next-occurrence","id":"CcC9yYSG9ci7rqzbTn0ry2gAYCM="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"vWTVdfVEfVZxO6siVAh+tWtRXwo=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"CcC9yYSG9ci7rqzbTn0ry2gAYCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTGOMERY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JTXga/hoQ4H0ZAGMICXpCRfrTVg="}],"description":"Longterm construction on MONTGOMERY ST northbound between SOUTH ST (New York) and Franklin D. Roosevelt Drive at Exit 7 - Avenue C (New York), Wednesday November 16th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed, Thursday November 17th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2022-11-16T15:50:32Z"},"road_event_id":"CcC9yYSG9ci7rqzbTn0ry2gAYCM=","beginning_cross_street":"SOUTH ST","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T04:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984663,40.710515]]}},{"id":"tbjdYlYLCN1ISuTBthXQwvj7eM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BVEQFBn5ZKlmlXffr+HI9bVDL/o="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"tbjdYlYLCN1ISuTBthXQwvj7eM4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"BVEQFBn5ZKlmlXffr+HI9bVDL/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"pCKHNAFWQm9X+dwlRa2AZqci5iE="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"BVEQFBn5ZKlmlXffr+HI9bVDL/o=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"pCKHNAFWQm9X+dwlRa2AZqci5iE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"ygs9xyj08TOQ3GAXkaRgN0B7rBo="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"pCKHNAFWQm9X+dwlRa2AZqci5iE=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"ygs9xyj08TOQ3GAXkaRgN0B7rBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"Sw5OVT1qF9m6OLUAkICBeBMmzXY="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"ygs9xyj08TOQ3GAXkaRgN0B7rBo=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"Sw5OVT1qF9m6OLUAkICBeBMmzXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"O7D7vUQvfbQwEnN85mTbTXOHuxc="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"Sw5OVT1qF9m6OLUAkICBeBMmzXY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T04:10:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"O7D7vUQvfbQwEnN85mTbTXOHuxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"a7Gdj1WnyTCH0HOZPNviwGwyoZM="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"O7D7vUQvfbQwEnN85mTbTXOHuxc=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"a7Gdj1WnyTCH0HOZPNviwGwyoZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"JhZUWSq1+oIKAlzUzrauEZhgAgo="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"a7Gdj1WnyTCH0HOZPNviwGwyoZM=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"JhZUWSq1+oIKAlzUzrauEZhgAgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"f4R60ucYFqY3rdR7BCqsthVs3EY="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"JhZUWSq1+oIKAlzUzrauEZhgAgo=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"f4R60ucYFqY3rdR7BCqsthVs3EY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"MFQdIwemM2ext264X98YoupMQRQ="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"f4R60ucYFqY3rdR7BCqsthVs3EY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"MFQdIwemM2ext264X98YoupMQRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"VIHJu6JIjrJEYfZwdAuscAPnuag="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"MFQdIwemM2ext264X98YoupMQRQ=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"VIHJu6JIjrJEYfZwdAuscAPnuag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"XCmyP3yCBasAsjV6X7+ZYKR6iKI="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"VIHJu6JIjrJEYfZwdAuscAPnuag=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T04:10:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"XCmyP3yCBasAsjV6X7+ZYKR6iKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"gk+FOX0AQC8DHIcvZuiuxU6wG5w="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"XCmyP3yCBasAsjV6X7+ZYKR6iKI=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"gk+FOX0AQC8DHIcvZuiuxU6wG5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="},{"type":"next-occurrence","id":"B4eYvMHxbvPbEYoIiLjAFUYYPz4="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"gk+FOX0AQC8DHIcvZuiuxU6wG5w=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"B4eYvMHxbvPbEYoIiLjAFUYYPz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tbjdYlYLCN1ISuTBthXQwvj7eM4="}],"description":"Longterm construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York), Tuesday November 15th, 2022 thru Saturday August 15th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Monday November 14th, 2022 thru Saturday August 15th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 12:10 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday November 19th, 2022 thru Saturday August 15th, 2026, Saturday/ Sunday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed","update_date":"2024-07-09T12:49:26Z"},"road_event_id":"B4eYvMHxbvPbEYoIiLjAFUYYPz4=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971833,40.727804]]}},{"id":"TGuQezXQJBjxN9OrzuhzHdkImZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 9W both directions between Hickory Circle and Pictuay Rd (Bethlehem) one lane open in both directions, NB lane shift in place, Continuous Tuesday August 5th, 2025 04:00 PM thru Friday July 3rd, 2026 05:00 PM All lanes open","update_date":"2025-08-06T13:45:02Z"},"road_event_id":"TGuQezXQJBjxN9OrzuhzHdkImZQ=","beginning_cross_street":"between Hickory Circle and Pictuay Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805826,42.534051]]}},{"id":"4w5jctuGfbs03YgTmHgDtdxUCUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["South Ave"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on South Ave southbound ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed and detoured","update_date":"2026-01-27T12:13:56Z"},"road_event_id":"4w5jctuGfbs03YgTmHgDtdxUCUY=","beginning_cross_street":"I-490 Eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607328,43.152443]]}},{"id":"/jmlGsZqxh9vtQxKCc+btV+0KPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-99"],"direction":"unknown","related_road_events":[],"description":"Traffic signal repairs on CT-99 southbound between CT-314 (Wethersfield) and PARSONAGE ST (Rocky Hill) Intermittent lane closures may be expected, Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-01-30T17:52:30Z"},"road_event_id":"/jmlGsZqxh9vtQxKCc+btV+0KPM=","beginning_cross_street":"CT-314","ending_cross_street":"PARSONAGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.668152,41.723666]]}},{"id":"9XpceKkekmo5qewceWOWSbDD1L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-99"],"direction":"unknown","related_road_events":[],"description":"Traffic signal repairs on CT-99 northbound between PARSONAGE ST (Rocky Hill) and CT-314 (Wethersfield), Thursday January 30th, 2025 thru Friday November 20th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-01-30T17:50:20Z"},"road_event_id":"9XpceKkekmo5qewceWOWSbDD1L4=","beginning_cross_street":"PARSONAGE ST","ending_cross_street":"CT-314","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.645502,41.672583]]}},{"id":"ORC300365075","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","description":"Bridge work and roadwork on I-86 both directions Exit 25 - NY 953E Buffalo Street; Ramp (Olean) to Exit 27 - NY 16 (Hinsdale) Not currently Scheduled","update_date":"2024-11-23T22:00:00Z"},"road_event_id":"ORC300365075","beginning_cross_street":"Exit 25 - NY 953E Buffalo Street; Ramp","ending_cross_street":"Exit 27 - NY 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-04-25T11:13:40Z","end_date":"2024-11-24T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-78.458461,42.088168]]}},{"id":"FJeNR/gGq+ovwylghwomEySn4mE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US-44 both directions between ASHPOHTAG RD (Norfolk) and RIVER PL (Norfolk) There will be a temporary signal installed to coordinate one-way alternating traffic on Route 44 in Norfolk , Continuous Monday December 2nd, 2024 12:00 AM thru Wednesday September 16th, 2026 11:59 PM All lanes open","update_date":"2024-12-10T21:01:50Z"},"road_event_id":"FJeNR/gGq+ovwylghwomEySn4mE=","beginning_cross_street":"ASHPOHTAG RD","ending_cross_street":"RIVER PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220881,42.001768]]}},{"id":"7qFWEYrO0JkornkPajHIFZB07mU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-87 Major Deegan Expressway northbound at East 138th Street; Ramp (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday June 26th, 2026 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-15T16:31:28Z"},"road_event_id":"7qFWEYrO0JkornkPajHIFZB07mU=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931267,40.813337]]}},{"id":"pnDs9Gufv1QUKFKalssuNu6THNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-87 Major Deegan Expressway southbound at East 138th Street (New York), Continuous Monday April 25th, 2022 12:00 AM thru Friday June 26th, 2026 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-15T16:32:29Z"},"road_event_id":"pnDs9Gufv1QUKFKalssuNu6THNc=","beginning_cross_street":"East 138th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931187,40.813903]]}},{"id":"ySoUKKGs1e/5cTGV2M0TqZ212Dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 eastbound ramp to Exit 9 closed. Use Exit 10. (Ellery), Continuous Wednesday April 3rd, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes closed","update_date":"2024-04-11T14:09:59Z"},"road_event_id":"ySoUKKGs1e/5cTGV2M0TqZ212Dc=","beginning_cross_street":"ramp to Exit 9 closed.  Use Exit 10.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.382971,42.152015]]}},{"id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S/HQaTSO2jYgiG92+I1C63fLAgM="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"S/HQaTSO2jYgiG92+I1C63fLAgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"fogU7ZL+bgvmorI6uT5CdtmqOlE="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"S/HQaTSO2jYgiG92+I1C63fLAgM=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"fogU7ZL+bgvmorI6uT5CdtmqOlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"EbfZXML4ugMM9yt9YK8hGWRR90A="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"fogU7ZL+bgvmorI6uT5CdtmqOlE=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"EbfZXML4ugMM9yt9YK8hGWRR90A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"azjLgM7Mv6lEuB6rI7hN2KOo3nw="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"EbfZXML4ugMM9yt9YK8hGWRR90A=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"azjLgM7Mv6lEuB6rI7hN2KOo3nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"OBEnOPP2+xQsGBLykaQybpSBlqs="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"azjLgM7Mv6lEuB6rI7hN2KOo3nw=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"OBEnOPP2+xQsGBLykaQybpSBlqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"uWYPNfOIbBSTp8ix+wHw5/hII3Q="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"OBEnOPP2+xQsGBLykaQybpSBlqs=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"uWYPNfOIbBSTp8ix+wHw5/hII3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"s89oBRnqjImYl+bn/clnxMysEmE="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"uWYPNfOIbBSTp8ix+wHw5/hII3Q=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"s89oBRnqjImYl+bn/clnxMysEmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"ZpCq89eKo7Emz/fTZIWX9WRL3O0="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"s89oBRnqjImYl+bn/clnxMysEmE=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"ZpCq89eKo7Emz/fTZIWX9WRL3O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"dzuiv6/7YTWMoBbXGqocINjtMZg="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"ZpCq89eKo7Emz/fTZIWX9WRL3O0=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"dzuiv6/7YTWMoBbXGqocINjtMZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"XIZ/EXo2dbwiyBJbm4gdJiXJkBk="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"dzuiv6/7YTWMoBbXGqocINjtMZg=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"XIZ/EXo2dbwiyBJbm4gdJiXJkBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"4LQ3wgMLYyo3ETBLu4JY/PK0TX4="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"XIZ/EXo2dbwiyBJbm4gdJiXJkBk=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"4LQ3wgMLYyo3ETBLu4JY/PK0TX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="},{"type":"next-occurrence","id":"BIkmOs15fz46ckfzN/T5U+Mj5UI="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"4LQ3wgMLYyo3ETBLu4JY/PK0TX4=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"BIkmOs15fz46ckfzN/T5U+Mj5UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SLoBQcA1Df+PB/QF1kEe3xlQlcw="}],"description":"Construction on CT 9 both directions Exit 15 - CT 66 (Middletown) temporary shoulder and lane closures, Monday August 7th, 2023 thru Thursday October 15th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2023-08-03T14:57:45Z"},"road_event_id":"BIkmOs15fz46ckfzN/T5U+Mj5UI=","beginning_cross_street":"Exit 15 - CT 66","ending_cross_street":"Exit 15 - CT 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.647893,41.563434]]}},{"id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FE3yPnaFNi9CEhCU0/Lhztd48Go="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"FE3yPnaFNi9CEhCU0/Lhztd48Go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"MC3gQk+JyKdRhQc8py8PsQ7eAjk="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"FE3yPnaFNi9CEhCU0/Lhztd48Go=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"MC3gQk+JyKdRhQc8py8PsQ7eAjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"o+kwEe1XwkGQfBj/S+9YqOzyJv0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"MC3gQk+JyKdRhQc8py8PsQ7eAjk=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"o+kwEe1XwkGQfBj/S+9YqOzyJv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"oUIsuTC+WBWn/xGA5fV/HYVEgdg="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"o+kwEe1XwkGQfBj/S+9YqOzyJv0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"oUIsuTC+WBWn/xGA5fV/HYVEgdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"7slNm91D3j1vFmGYg+nyv45T+Kw="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"oUIsuTC+WBWn/xGA5fV/HYVEgdg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"7slNm91D3j1vFmGYg+nyv45T+Kw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"ElbRkFnuiMVWCi11bRCKg4FMQqk="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"7slNm91D3j1vFmGYg+nyv45T+Kw=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"ElbRkFnuiMVWCi11bRCKg4FMQqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"Q8iIRzJDsJNizLMoJxqYI5pYIw0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"ElbRkFnuiMVWCi11bRCKg4FMQqk=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"Q8iIRzJDsJNizLMoJxqYI5pYIw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"W3FXpZohRmTtxrTDTL0fD1ZC39Y="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"Q8iIRzJDsJNizLMoJxqYI5pYIw0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"W3FXpZohRmTtxrTDTL0fD1ZC39Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"ecvpjl2Oy7UxINRkU0d8pR+2VtU="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"W3FXpZohRmTtxrTDTL0fD1ZC39Y=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"ecvpjl2Oy7UxINRkU0d8pR+2VtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"2YQtxi0CD8H+MFsNeEONkIV5zXQ="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"ecvpjl2Oy7UxINRkU0d8pR+2VtU=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"2YQtxi0CD8H+MFsNeEONkIV5zXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"3J00KyKs9ipvvwKK6+3fHKNFBNA="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"2YQtxi0CD8H+MFsNeEONkIV5zXQ=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"3J00KyKs9ipvvwKK6+3fHKNFBNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"UEeuJapRm0f78/+t3v6zEYG2NT4="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"3J00KyKs9ipvvwKK6+3fHKNFBNA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"UEeuJapRm0f78/+t3v6zEYG2NT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"HDlsX4USOTMmoilKPOWblOzhyMs="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"UEeuJapRm0f78/+t3v6zEYG2NT4=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"HDlsX4USOTMmoilKPOWblOzhyMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"zqI/mOevCp02cx6GR2VAoM9hmAA="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"HDlsX4USOTMmoilKPOWblOzhyMs=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"zqI/mOevCp02cx6GR2VAoM9hmAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"P7GxOcuVQ9S2IryZxs0C/C6RRbk="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"zqI/mOevCp02cx6GR2VAoM9hmAA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"P7GxOcuVQ9S2IryZxs0C/C6RRbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"E60ISJKUF/AbMJlEW4T1Hs4y5ZQ="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"P7GxOcuVQ9S2IryZxs0C/C6RRbk=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"E60ISJKUF/AbMJlEW4T1Hs4y5ZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"qHUSc5TAy9Dywfj0KHDC+X21bF0="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"E60ISJKUF/AbMJlEW4T1Hs4y5ZQ=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"qHUSc5TAy9Dywfj0KHDC+X21bF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"XYXa7kzM6imA+oFJZpONETCTcnA="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"qHUSc5TAy9Dywfj0KHDC+X21bF0=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"XYXa7kzM6imA+oFJZpONETCTcnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"Bc57hLPB5hxir1SjGif1laeTZjU="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"XYXa7kzM6imA+oFJZpONETCTcnA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"Bc57hLPB5hxir1SjGif1laeTZjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"A806SoHxXBacMqKBzyP8kXVNgBg="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"Bc57hLPB5hxir1SjGif1laeTZjU=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"A806SoHxXBacMqKBzyP8kXVNgBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="},{"type":"next-occurrence","id":"XDCsgJ53NiqBAuIG9+N1Fu7cODY="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"A806SoHxXBacMqKBzyP8kXVNgBg=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"XDCsgJ53NiqBAuIG9+N1Fu7cODY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cnr+jl8jRCJWl1HXdD8y4rMh/lI="}],"description":"Safety improvements on PADDOCK AVE both directions between OVERLOOK RD (Meriden) and BARR RD (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Tuesday November 28th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:20:03Z"},"road_event_id":"XDCsgJ53NiqBAuIG9+N1Fu7cODY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"BARR RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776068,41.517459]]}},{"id":"NuSuSwApZq6DYMG63sFuhgSmKkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WNV42Kzr4CjPpatshhnSQbkaykg="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"NuSuSwApZq6DYMG63sFuhgSmKkY=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"WNV42Kzr4CjPpatshhnSQbkaykg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"obkmwSG4IFtGL//gfbjA8SCvH/U="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"WNV42Kzr4CjPpatshhnSQbkaykg=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"obkmwSG4IFtGL//gfbjA8SCvH/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"NeIhS7iCmVJmVXbfEwAot4GzDTA="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"obkmwSG4IFtGL//gfbjA8SCvH/U=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"NeIhS7iCmVJmVXbfEwAot4GzDTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"FY+YloARNBbQm4hDkEQBWQ0B3Ck="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"NeIhS7iCmVJmVXbfEwAot4GzDTA=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"FY+YloARNBbQm4hDkEQBWQ0B3Ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"nretOmYZEL61jOrMQ9jK2Bocs5E="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"FY+YloARNBbQm4hDkEQBWQ0B3Ck=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"nretOmYZEL61jOrMQ9jK2Bocs5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"cwpMSRVQwpt0sqz9K//s00zjrIA="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"nretOmYZEL61jOrMQ9jK2Bocs5E=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"cwpMSRVQwpt0sqz9K//s00zjrIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"FGmwgT+JE1RVxTYUvlTZdzTs+lI="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"cwpMSRVQwpt0sqz9K//s00zjrIA=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"FGmwgT+JE1RVxTYUvlTZdzTs+lI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"nyNNbrVxrgkOGoBfCahsBrEvbRo="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"FGmwgT+JE1RVxTYUvlTZdzTs+lI=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"nyNNbrVxrgkOGoBfCahsBrEvbRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"SRkj04JqmuPUjPP95+BITNLo4EU="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"nyNNbrVxrgkOGoBfCahsBrEvbRo=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"SRkj04JqmuPUjPP95+BITNLo4EU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"D+FPjvpIO++RKsURIwmySnb70PA="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"SRkj04JqmuPUjPP95+BITNLo4EU=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"D+FPjvpIO++RKsURIwmySnb70PA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"aOfDTth8gQpq1ajJcfls2G0POlU="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"D+FPjvpIO++RKsURIwmySnb70PA=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"aOfDTth8gQpq1ajJcfls2G0POlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"DdVX/S2zrYC3NzLbAh05D18ctDs="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"aOfDTth8gQpq1ajJcfls2G0POlU=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"DdVX/S2zrYC3NzLbAh05D18ctDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"TQxlrCu79IDmm0+KUaQNkfI1FEU="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"DdVX/S2zrYC3NzLbAh05D18ctDs=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"TQxlrCu79IDmm0+KUaQNkfI1FEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="},{"type":"next-occurrence","id":"eey6iD9/2GTimOfbqRfgpHDINnY="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"TQxlrCu79IDmm0+KUaQNkfI1FEU=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"eey6iD9/2GTimOfbqRfgpHDINnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuSuSwApZq6DYMG63sFuhgSmKkY="}],"description":"Safety improvements on Wilbur Cross Parkway southbound between Exit 67 - I-91 (Meriden) and Exit 66 - CT 68 (Wallingford) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday/Saturday, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:16:00Z"},"road_event_id":"eey6iD9/2GTimOfbqRfgpHDINnY=","beginning_cross_street":"Exit 67 - I-91","ending_cross_street":"Exit 66 - CT 68","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.811179,41.490333]]}},{"id":"TnZBinqGgGUoPzLd1hHOXONhWbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fC30vQOSlRkaelpr+rpPeY7auY0="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"TnZBinqGgGUoPzLd1hHOXONhWbg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"fC30vQOSlRkaelpr+rpPeY7auY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"AcXMc+PyQOLwrjKvt7FC2QW4y8Y="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"fC30vQOSlRkaelpr+rpPeY7auY0=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"AcXMc+PyQOLwrjKvt7FC2QW4y8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"62FU2V+jlziN7o5zAnXPiqbkwS0="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"AcXMc+PyQOLwrjKvt7FC2QW4y8Y=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"62FU2V+jlziN7o5zAnXPiqbkwS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"z34mw8Hn8sK8hFw6/p3yVrpHlNE="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"62FU2V+jlziN7o5zAnXPiqbkwS0=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"z34mw8Hn8sK8hFw6/p3yVrpHlNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"/b2yvdZAh9AQIP4k/5VCqp6kOG4="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"z34mw8Hn8sK8hFw6/p3yVrpHlNE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"/b2yvdZAh9AQIP4k/5VCqp6kOG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"s9qha1Jf27oFIgakvmrwemwt2xM="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"/b2yvdZAh9AQIP4k/5VCqp6kOG4=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"s9qha1Jf27oFIgakvmrwemwt2xM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"nXdv5GYAqZU5KECXsLyUs7evFZc="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"s9qha1Jf27oFIgakvmrwemwt2xM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"nXdv5GYAqZU5KECXsLyUs7evFZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"TjDvuiUqSCffoUg340M/mAUMgxQ="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"nXdv5GYAqZU5KECXsLyUs7evFZc=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"TjDvuiUqSCffoUg340M/mAUMgxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"sGquwSnZVB9L5/4yWZN1BNrOBNE="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"TjDvuiUqSCffoUg340M/mAUMgxQ=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"sGquwSnZVB9L5/4yWZN1BNrOBNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"2e8a4R6uhk1QALBbu/Dr+kVCVKM="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"sGquwSnZVB9L5/4yWZN1BNrOBNE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"2e8a4R6uhk1QALBbu/Dr+kVCVKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"ePoNIOkRn6jINHUWvAXd0lg1diE="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"2e8a4R6uhk1QALBbu/Dr+kVCVKM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"ePoNIOkRn6jINHUWvAXd0lg1diE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"EIPB5Ja2qQH/l4UtLwu1r6mPq70="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"ePoNIOkRn6jINHUWvAXd0lg1diE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"EIPB5Ja2qQH/l4UtLwu1r6mPq70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"gYf4BkUrNZSYgPyfnhtN9f0JstA="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"EIPB5Ja2qQH/l4UtLwu1r6mPq70=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"gYf4BkUrNZSYgPyfnhtN9f0JstA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"1AFb7YzxG5PLv9GGe/WxT8AGq5Q="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"gYf4BkUrNZSYgPyfnhtN9f0JstA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"1AFb7YzxG5PLv9GGe/WxT8AGq5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"dQl29I6DiXcl9UeVv4ur3SByzbI="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"1AFb7YzxG5PLv9GGe/WxT8AGq5Q=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"dQl29I6DiXcl9UeVv4ur3SByzbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"MYb8d7+NU16vPwT8hv4uIW1c5Xs="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"dQl29I6DiXcl9UeVv4ur3SByzbI=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"MYb8d7+NU16vPwT8hv4uIW1c5Xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"YKLyk3Eq6wW44TotbD0kY6DrJkI="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"MYb8d7+NU16vPwT8hv4uIW1c5Xs=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"YKLyk3Eq6wW44TotbD0kY6DrJkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"jYZnnsrq5pwCQ51BXVFExF04VIg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"YKLyk3Eq6wW44TotbD0kY6DrJkI=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"jYZnnsrq5pwCQ51BXVFExF04VIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"FjASPfrzbyXSljb5eGw0Cnqz8dU="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"jYZnnsrq5pwCQ51BXVFExF04VIg=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"FjASPfrzbyXSljb5eGw0Cnqz8dU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"ClPZ2qQua4cKVsmj/mzXQJMBIlI="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"FjASPfrzbyXSljb5eGw0Cnqz8dU=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"ClPZ2qQua4cKVsmj/mzXQJMBIlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="},{"type":"next-occurrence","id":"I1McEXR30W0ls7s66/kiAfoDR+Q="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"ClPZ2qQua4cKVsmj/mzXQJMBIlI=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"I1McEXR30W0ls7s66/kiAfoDR+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TnZBinqGgGUoPzLd1hHOXONhWbg="}],"description":"Safety improvements on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:24:46Z"},"road_event_id":"I1McEXR30W0ls7s66/kiAfoDR+Q=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773927,41.539681]]}},{"id":"ZZudfTOZXW3g0yX/E76V+cMv/B0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wgBxaNhow7q8k6mvu2T/2uH9Rqs="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"ZZudfTOZXW3g0yX/E76V+cMv/B0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"wgBxaNhow7q8k6mvu2T/2uH9Rqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"QDgZfrwxvDj+qZyw8gk6oYXZjcA="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"wgBxaNhow7q8k6mvu2T/2uH9Rqs=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"QDgZfrwxvDj+qZyw8gk6oYXZjcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"ps7dTQ/FKVRuOut1/671I6w882Y="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"QDgZfrwxvDj+qZyw8gk6oYXZjcA=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"ps7dTQ/FKVRuOut1/671I6w882Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"79scJ5nU/YUXt/BtVdBHl2N07z4="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"ps7dTQ/FKVRuOut1/671I6w882Y=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"79scJ5nU/YUXt/BtVdBHl2N07z4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"zacL1wsx8GfSXNUMivERtv2VL8U="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"79scJ5nU/YUXt/BtVdBHl2N07z4=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"zacL1wsx8GfSXNUMivERtv2VL8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"/WbmgxfUDe38h7gRpY3qrmGmokg="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"zacL1wsx8GfSXNUMivERtv2VL8U=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"/WbmgxfUDe38h7gRpY3qrmGmokg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"WcOZWcUH5TyAgj31+nVWwa2Y03w="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"/WbmgxfUDe38h7gRpY3qrmGmokg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"WcOZWcUH5TyAgj31+nVWwa2Y03w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"0K49dcFb7rdZXBwomJfmL28dZKQ="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"WcOZWcUH5TyAgj31+nVWwa2Y03w=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"0K49dcFb7rdZXBwomJfmL28dZKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"rxEsKUMecr9DBDVcOsajB7X1fy0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"0K49dcFb7rdZXBwomJfmL28dZKQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"rxEsKUMecr9DBDVcOsajB7X1fy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"gjoDlMkHtSkKEMy41uhFxRfqYe8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"rxEsKUMecr9DBDVcOsajB7X1fy0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"gjoDlMkHtSkKEMy41uhFxRfqYe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"NmHdDIjVWb2zGLWrOWaB4Ur3e10="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"gjoDlMkHtSkKEMy41uhFxRfqYe8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"NmHdDIjVWb2zGLWrOWaB4Ur3e10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"9+7ldEDqrcAE2Xon86LHR620jHQ="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"NmHdDIjVWb2zGLWrOWaB4Ur3e10=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"9+7ldEDqrcAE2Xon86LHR620jHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"gFR0pb6FWGJu0aW0MVaYA0kUWc8="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"9+7ldEDqrcAE2Xon86LHR620jHQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"gFR0pb6FWGJu0aW0MVaYA0kUWc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"nNqcKZJzkRqqMCKHr561gQi1CjA="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"gFR0pb6FWGJu0aW0MVaYA0kUWc8=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"nNqcKZJzkRqqMCKHr561gQi1CjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"vzRiD8GavrrWrYV2ZvU1BwdAhoo="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"nNqcKZJzkRqqMCKHr561gQi1CjA=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"vzRiD8GavrrWrYV2ZvU1BwdAhoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"Uej7F7tcNmT2lmyBp8ZKqdwLKYg="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"vzRiD8GavrrWrYV2ZvU1BwdAhoo=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"Uej7F7tcNmT2lmyBp8ZKqdwLKYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"vs6AoCE2tWESPyfKtDd//1l+QfE="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"Uej7F7tcNmT2lmyBp8ZKqdwLKYg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"vs6AoCE2tWESPyfKtDd//1l+QfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"QIjrb0HmQYS9gHiJGdzAqvUcui0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"vs6AoCE2tWESPyfKtDd//1l+QfE=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"QIjrb0HmQYS9gHiJGdzAqvUcui0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"fWB4LQGdifiN3Vwa6wSqINT7v2A="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"QIjrb0HmQYS9gHiJGdzAqvUcui0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"fWB4LQGdifiN3Vwa6wSqINT7v2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"YxZg6zt6p37493XwnVPWjq37v1Q="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"fWB4LQGdifiN3Vwa6wSqINT7v2A=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"YxZg6zt6p37493XwnVPWjq37v1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="},{"type":"next-occurrence","id":"YcLrk717XVQ+49H8EagyWIvtmxI="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"YxZg6zt6p37493XwnVPWjq37v1Q=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"YcLrk717XVQ+49H8EagyWIvtmxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZZudfTOZXW3g0yX/E76V+cMv/B0="}],"description":"Safety improvements on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2024-03-07T20:22:17Z"},"road_event_id":"YcLrk717XVQ+49H8EagyWIvtmxI=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771867,41.526925]]}},{"id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+zctKXwSfMdMVxPX1EzYJraIZkc="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"+zctKXwSfMdMVxPX1EzYJraIZkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"FQtDb680VhDgTAS3xRBhRYwaTd4="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"+zctKXwSfMdMVxPX1EzYJraIZkc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"FQtDb680VhDgTAS3xRBhRYwaTd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"/w+qc44ootESqD7lcAfMGWHBZXE="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"FQtDb680VhDgTAS3xRBhRYwaTd4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"/w+qc44ootESqD7lcAfMGWHBZXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"MOzVnkaGNo6p55Etz4wvqahryC4="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"/w+qc44ootESqD7lcAfMGWHBZXE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"MOzVnkaGNo6p55Etz4wvqahryC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"nbaEMUo47lCCDKjfXfcxZvfTTPo="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"MOzVnkaGNo6p55Etz4wvqahryC4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"nbaEMUo47lCCDKjfXfcxZvfTTPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"ZxYOAU+/BN1/VGiCaY3TwSouSQg="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"nbaEMUo47lCCDKjfXfcxZvfTTPo=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"ZxYOAU+/BN1/VGiCaY3TwSouSQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"KnOj/aQOy/Fnh+swUXjjPMAhuGg="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"ZxYOAU+/BN1/VGiCaY3TwSouSQg=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"KnOj/aQOy/Fnh+swUXjjPMAhuGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"Ymc9SJqdKm3mzsbtZhrtjruMnL4="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"KnOj/aQOy/Fnh+swUXjjPMAhuGg=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"Ymc9SJqdKm3mzsbtZhrtjruMnL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"vhC0dnBfaJBpSq6jTyvq/uDiX1Q="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"Ymc9SJqdKm3mzsbtZhrtjruMnL4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"vhC0dnBfaJBpSq6jTyvq/uDiX1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"NQRn5ofLoF+Jg8MVBjJxgIh6LxE="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"vhC0dnBfaJBpSq6jTyvq/uDiX1Q=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"NQRn5ofLoF+Jg8MVBjJxgIh6LxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"27qCWTbtEFxGry6dtNglVprZJP4="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"NQRn5ofLoF+Jg8MVBjJxgIh6LxE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"27qCWTbtEFxGry6dtNglVprZJP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"Rw48uQMfMqFxq6O3DBcn7C5+BIE="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"27qCWTbtEFxGry6dtNglVprZJP4=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"Rw48uQMfMqFxq6O3DBcn7C5+BIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"7k1cggUJVkMcz3LuFX9JcSbLxEc="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"Rw48uQMfMqFxq6O3DBcn7C5+BIE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"7k1cggUJVkMcz3LuFX9JcSbLxEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="},{"type":"next-occurrence","id":"tNr+bUFE+hINvGzrpzm5icLHXPA="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"7k1cggUJVkMcz3LuFX9JcSbLxEc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"tNr+bUFE+hINvGzrpzm5icLHXPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xg7GvtFVyWkwxtIRrWIeYFDKO6g="}],"description":"Safety improvements on Wilbur Cross Parkway northbound between Exit 66 - CT 68 (Wallingford) and Exit 68W (Meriden) lane closures and shoulder closures, Monday March 4th, 2024 thru Thursday November 30th, 2028, Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 09:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 08:00 PM thru 08:00 AM All lanes open","update_date":"2024-03-07T20:12:32Z"},"road_event_id":"tNr+bUFE+hINvGzrpzm5icLHXPA=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 68W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.812014,41.489589]]}},{"id":"AcS3BICY4liZABwpw1IvQjZbt9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hLXZXZSaiYehaHiBsuk5eHikNQw="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"AcS3BICY4liZABwpw1IvQjZbt9Q=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"hLXZXZSaiYehaHiBsuk5eHikNQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"bgT1Z05lU1KR4sXigTJgumkyERQ="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"hLXZXZSaiYehaHiBsuk5eHikNQw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"bgT1Z05lU1KR4sXigTJgumkyERQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"t+nAkyNf1U2V3Dles846z9BqlW0="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"bgT1Z05lU1KR4sXigTJgumkyERQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"t+nAkyNf1U2V3Dles846z9BqlW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"a/3HBd9NuUqv/vJ426xwt3yrXAE="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"t+nAkyNf1U2V3Dles846z9BqlW0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"a/3HBd9NuUqv/vJ426xwt3yrXAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"o/dei9ru8xXBY466rm+r4jCRzks="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"a/3HBd9NuUqv/vJ426xwt3yrXAE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"o/dei9ru8xXBY466rm+r4jCRzks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"cNdlAekriNF9ToBaYOCY9mv0pIw="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"o/dei9ru8xXBY466rm+r4jCRzks=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"cNdlAekriNF9ToBaYOCY9mv0pIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"YJBNFGqORzPexJ1JViU9BGwIWYk="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"cNdlAekriNF9ToBaYOCY9mv0pIw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"YJBNFGqORzPexJ1JViU9BGwIWYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"2hDL5k/EgthNndn+5OMbhjTO2QQ="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"YJBNFGqORzPexJ1JViU9BGwIWYk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"2hDL5k/EgthNndn+5OMbhjTO2QQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"TatZRu8ruxrnWDt/ahsxyHqCanM="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"2hDL5k/EgthNndn+5OMbhjTO2QQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"TatZRu8ruxrnWDt/ahsxyHqCanM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"6MHVc07pYvOS2yArgOmaxmYwLZ0="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"TatZRu8ruxrnWDt/ahsxyHqCanM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"6MHVc07pYvOS2yArgOmaxmYwLZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"6QHzcyeMXlek4zXTwXDAHtvAJpk="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"6MHVc07pYvOS2yArgOmaxmYwLZ0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"6QHzcyeMXlek4zXTwXDAHtvAJpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"TEuVyyTB80aSr6YcucRWta+NA90="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"6QHzcyeMXlek4zXTwXDAHtvAJpk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"TEuVyyTB80aSr6YcucRWta+NA90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"ntfibQUw3NKf4OFTOQAvbyhw89c="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"TEuVyyTB80aSr6YcucRWta+NA90=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"ntfibQUw3NKf4OFTOQAvbyhw89c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"F7sQNhFsZSEkdVZ0sfq2Tm1l4gc="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"ntfibQUw3NKf4OFTOQAvbyhw89c=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"F7sQNhFsZSEkdVZ0sfq2Tm1l4gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"kP6JhKwzJW38bJbNESYv2fspRmE="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"F7sQNhFsZSEkdVZ0sfq2Tm1l4gc=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"kP6JhKwzJW38bJbNESYv2fspRmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"lT01wTjrXFAu1MUMkUCwKS8fbxQ="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"kP6JhKwzJW38bJbNESYv2fspRmE=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"lT01wTjrXFAu1MUMkUCwKS8fbxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"s8HD1LWUnpMJ6IP1PcPPqe/kN5s="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"lT01wTjrXFAu1MUMkUCwKS8fbxQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"s8HD1LWUnpMJ6IP1PcPPqe/kN5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"iad/f0uHyZ9OncfcPFiVf0QyswQ="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"s8HD1LWUnpMJ6IP1PcPPqe/kN5s=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"iad/f0uHyZ9OncfcPFiVf0QyswQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"MrDhrGE9lLIA632fSkyrh3P0bME="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"iad/f0uHyZ9OncfcPFiVf0QyswQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"MrDhrGE9lLIA632fSkyrh3P0bME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"kU4X7wv1XvSVpn5Oho/00DRoGoA="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"MrDhrGE9lLIA632fSkyrh3P0bME=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"kU4X7wv1XvSVpn5Oho/00DRoGoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"WtgGMpCEqXh7Ryfhj1B1jka88io="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"kU4X7wv1XvSVpn5Oho/00DRoGoA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"WtgGMpCEqXh7Ryfhj1B1jka88io=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"P4pQosV17VzSRcEWsLu1ZZiTmJ0="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"WtgGMpCEqXh7Ryfhj1B1jka88io=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"P4pQosV17VzSRcEWsLu1ZZiTmJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="},{"type":"next-occurrence","id":"49/DWAhQ2eHi2qzSFRgBNfyJoB8="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"P4pQosV17VzSRcEWsLu1ZZiTmJ0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"49/DWAhQ2eHi2qzSFRgBNfyJoB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcS3BICY4liZABwpw1IvQjZbt9Q="}],"description":"Safety improvements on I-91 both directions Exit 15 - CT 68 (Wallingford) to Exit 18 - I-691 (Meriden), Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 4th, 2024 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2024-03-07T20:00:12Z"},"road_event_id":"49/DWAhQ2eHi2qzSFRgBNfyJoB8=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"ORC300447034","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","description":"Construction on NJ 70 Westbound between East of CR 674/Greentree Rd (Cherry Hill Twp) and East of New Jersey Turnpike (Cherry Hill Twp) Wednesday June 4, 2025 07:00 AM thru 03:30 PM, 1 right lane of 4 lanes closed","update_date":"2025-06-04T19:30:01Z"},"road_event_id":"ORC300447034","beginning_cross_street":"East of CR 674/Greentree Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-03T19:06:31Z","end_date":"2025-06-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.971145,39.90459]]}},{"id":"8OeMQZwgHbIka+2UaKnNZ1QZ3r4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, BxM11 Bus between Bronx River Pky/Boston Rd (New York) and Madison Av/E 99 St (New York) are detouring from E 177th St at Bronx River Parkway to Bruckner Blvd at Bruckner Expy - no stops will be missed. , Continuous Saturday May 24th, 2025 12:00 AM thru Friday December 31st, 2027 11:59 PM","update_date":"2025-05-23T18:34:58Z"},"road_event_id":"8OeMQZwgHbIka+2UaKnNZ1QZ3r4=","beginning_cross_street":"Bronx River Pky/Boston Rd","ending_cross_street":"Madison Av/E 99 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872369,40.853637]]}},{"id":"+46/flLJntAEZLsDOxewNz2FFQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SSNC9wW3nB43kaBZqhxugm9Ovs0="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"+46/flLJntAEZLsDOxewNz2FFQY=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"SSNC9wW3nB43kaBZqhxugm9Ovs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"if8qTsmTO2YqKR9oRakFWZfqoik="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"SSNC9wW3nB43kaBZqhxugm9Ovs0=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"if8qTsmTO2YqKR9oRakFWZfqoik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"Wly+rm87TN7cPt57qIwVLV3mcEo="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"if8qTsmTO2YqKR9oRakFWZfqoik=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"Wly+rm87TN7cPt57qIwVLV3mcEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"JvTkby8txc3SHeXLNRWPjjLLIeE="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"Wly+rm87TN7cPt57qIwVLV3mcEo=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"JvTkby8txc3SHeXLNRWPjjLLIeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"FuE+M1ksVNdcM/LmHLyK61M+HNM="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"JvTkby8txc3SHeXLNRWPjjLLIeE=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"FuE+M1ksVNdcM/LmHLyK61M+HNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"pflt9PU+ZfdsChOp2UOhU/rKJtU="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"FuE+M1ksVNdcM/LmHLyK61M+HNM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"pflt9PU+ZfdsChOp2UOhU/rKJtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"oCkOj/HwfMpSZzLfHu1fFHU2vis="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"pflt9PU+ZfdsChOp2UOhU/rKJtU=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"oCkOj/HwfMpSZzLfHu1fFHU2vis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"LtmLMCyXFAIQSZlDYYuNBPh1lqM="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"oCkOj/HwfMpSZzLfHu1fFHU2vis=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"LtmLMCyXFAIQSZlDYYuNBPh1lqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"VHktRpTHrqBH96iiPWFzfLFNw+E="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"LtmLMCyXFAIQSZlDYYuNBPh1lqM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"VHktRpTHrqBH96iiPWFzfLFNw+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="},{"type":"next-occurrence","id":"+MYpDAFCSuxtMVt2yCOB8Wz9B0I="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"VHktRpTHrqBH96iiPWFzfLFNw+E=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"+MYpDAFCSuxtMVt2yCOB8Wz9B0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+46/flLJntAEZLsDOxewNz2FFQY="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/DAY/32220509 - Plan travel accordingly; delays may exist, Monday January 19th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-16T17:30:38Z"},"road_event_id":"+MYpDAFCSuxtMVt2yCOB8Wz9B0I=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997522,41.102241]]}},{"id":"8WgxNorLhWwh5SGXHbNTjWOOUrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XQ1c5uaaSAA4rxOSrm5/YHmPtO0="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"8WgxNorLhWwh5SGXHbNTjWOOUrk=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"XQ1c5uaaSAA4rxOSrm5/YHmPtO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"j3Pbgz2Yh3vQ6z6fAbHEqdb8zP4="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"XQ1c5uaaSAA4rxOSrm5/YHmPtO0=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"j3Pbgz2Yh3vQ6z6fAbHEqdb8zP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"C85PRQFVsQSYAzBaZAaOUwRQ1WI="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"j3Pbgz2Yh3vQ6z6fAbHEqdb8zP4=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"C85PRQFVsQSYAzBaZAaOUwRQ1WI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"MoaJfI0Z1Ly9IhgPb96OIXIlBWA="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"C85PRQFVsQSYAzBaZAaOUwRQ1WI=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"MoaJfI0Z1Ly9IhgPb96OIXIlBWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"MZBo7MfV4jbujiqfAUBU3ohIgJ4="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"MoaJfI0Z1Ly9IhgPb96OIXIlBWA=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"MZBo7MfV4jbujiqfAUBU3ohIgJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"c2cr1WfRjd8lMYdBvWDDSeR5/Hs="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"MZBo7MfV4jbujiqfAUBU3ohIgJ4=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"c2cr1WfRjd8lMYdBvWDDSeR5/Hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"nJTh/EIBDRdS0iEIyniaQ7QQFEA="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"c2cr1WfRjd8lMYdBvWDDSeR5/Hs=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"nJTh/EIBDRdS0iEIyniaQ7QQFEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"x8Zw8jzY0PcyPrNY7nh9Gbl5huE="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"nJTh/EIBDRdS0iEIyniaQ7QQFEA=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"x8Zw8jzY0PcyPrNY7nh9Gbl5huE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"AbL/PDQQwIUxyVw3vMHKoLfJ3TY="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"x8Zw8jzY0PcyPrNY7nh9Gbl5huE=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"AbL/PDQQwIUxyVw3vMHKoLfJ3TY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="},{"type":"next-occurrence","id":"Q0d/pkEyFDvW/fNkZLtvIbjnWr4="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"AbL/PDQQwIUxyVw3vMHKoLfJ3TY=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"Q0d/pkEyFDvW/fNkZLtvIbjnWr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8WgxNorLhWwh5SGXHbNTjWOOUrk="}],"description":"Bridge rehabilitation on Wilbur Cross Parkway northbound between Exit 65 - Hall Avenue (Wallingford) Motorists can expect nighttime lane closures, Thursday January 30th, 2025 thru Monday November 9th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-01-30T19:37:32Z"},"road_event_id":"Q0d/pkEyFDvW/fNkZLtvIbjnWr4=","beginning_cross_street":"Exit 65 - Hall Avenue","ending_cross_street":"Exit 65 - Hall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.826175,41.474041]]}},{"id":"bCEguvfSEycprbsB2oDRncv+EC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 207"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on NY 207 westbound between Hatfield Lane (Goshen) and Matthews Street (Goshen) D265186/B1003160/32532809 - 24/7 LANE CLOSURE - This work is weather permitting. Plan travel accordingly; delays may exist, Continuous Monday October 20th, 2025 12:00 AM thru Monday May 11th, 2026 12:00 AM right lane closed to traffic","update_date":"2026-04-21T11:21:42Z"},"road_event_id":"bCEguvfSEycprbsB2oDRncv+EC0=","beginning_cross_street":"Hatfield Lane","ending_cross_street":"Matthews Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.333429,41.395266]]}},{"id":"vI2w9HXC9znEArEl0Rj/fs4Xc4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Traffic shift on I-95 northbound between Exit 73 - Society Road (East Lyme), Continuous Monday December 9th, 2024 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes shift","update_date":"2024-11-26T21:04:12Z"},"road_event_id":"vI2w9HXC9znEArEl0Rj/fs4Xc4g=","beginning_cross_street":"Exit 73 - Society Road","ending_cross_street":"Exit 73 - Society Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.214689,41.356571]]}},{"id":"ORC300428891","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONROE AVE"],"direction":"unknown","description":"Crane operations on MONROE AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Not currently Scheduled","update_date":"2025-02-24T19:00:02Z"},"road_event_id":"ORC300428891","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-02-17T19:56:48Z","end_date":"2025-02-25T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.906672,40.844662]]}},{"id":"kgxFXbwTaiDteggd7ySQMzRi0wI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Construction on I-95 northbound Entrance ramp Exit 43 - CT 122/First Avenue (West Haven) The Exit 43 on-ramp to I-95 northbound which is located on First Avenue in West Haven will be closed on July 21, 2025, until November 2027. Motorists traveling to I-95 northbound may take the detour route to Interchange 44 via First Avenue southbound, Route 122 (Kimberly Avenue), and Ella T. Grasso Boulevard in New Haven. Alternatively, motorists traveling to I-95 northbound may take the detour route to Interchange 44 via Campbell Avenue northbound, Boston Post Road, and Ella T. Grasso Boulevard in New Haven., Continuous Monday July 21st, 2025 12:00 AM thru Monday November 1st, 2027 11:59 PM All lanes closed","update_date":"2025-07-23T15:56:14Z"},"road_event_id":"kgxFXbwTaiDteggd7ySQMzRi0wI=","beginning_cross_street":"Exit 43 - CT 122/First Avenue","ending_cross_street":"Exit 43 - CT 122/First Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.950021,41.283375]]}},{"id":"LdVvI5EwZR0jD6MIhxqyRfaph9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IG6Zs4lGR6wPoUVJ8ZzgUSFTN+Q="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"LdVvI5EwZR0jD6MIhxqyRfaph9o=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"IG6Zs4lGR6wPoUVJ8ZzgUSFTN+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"xQrDNs5arphTniXxLw+Indc4WFI="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"IG6Zs4lGR6wPoUVJ8ZzgUSFTN+Q=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"xQrDNs5arphTniXxLw+Indc4WFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"ubxWcQWSe1SI0n5OobvdK3NeAL4="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"xQrDNs5arphTniXxLw+Indc4WFI=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"ubxWcQWSe1SI0n5OobvdK3NeAL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"7tieRL/S1VPE3h6lut1jKxYRsHw="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"ubxWcQWSe1SI0n5OobvdK3NeAL4=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"7tieRL/S1VPE3h6lut1jKxYRsHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"2NH9nYe4ZELbLMDl8wQkPdFUTYI="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"7tieRL/S1VPE3h6lut1jKxYRsHw=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"2NH9nYe4ZELbLMDl8wQkPdFUTYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"y6/w6ixBZlAi3J0Mk+NQMSErhyU="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"2NH9nYe4ZELbLMDl8wQkPdFUTYI=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"y6/w6ixBZlAi3J0Mk+NQMSErhyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"JXJoOn7T3Hs0lgZ3uCS5URzu+Us="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"y6/w6ixBZlAi3J0Mk+NQMSErhyU=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"JXJoOn7T3Hs0lgZ3uCS5URzu+Us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"1WWUhIu0sjLtN98t9KuQ4P+ES2s="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"JXJoOn7T3Hs0lgZ3uCS5URzu+Us=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"1WWUhIu0sjLtN98t9KuQ4P+ES2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"hSuZ37fJRhofKTScB3LXYF8n128="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"1WWUhIu0sjLtN98t9KuQ4P+ES2s=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"hSuZ37fJRhofKTScB3LXYF8n128=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="},{"type":"next-occurrence","id":"JORZ3SWgOUma+ghhxZo8V/S3G4Y="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"hSuZ37fJRhofKTScB3LXYF8n128=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"JORZ3SWgOUma+ghhxZo8V/S3G4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-44"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LdVvI5EwZR0jD6MIhxqyRfaph9o="}],"description":"Drainage improvements and tree trimming on US-44 both directions between OLD COLONY RD (Norfolk) Motorists can expect alternating lanes to be closed, Monday August 19th, 2024 thru Sunday October 1st, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2024-08-06T18:27:16Z"},"road_event_id":"JORZ3SWgOUma+ghhxZo8V/S3G4Y=","beginning_cross_street":"OLD COLONY RD","ending_cross_street":"OLD COLONY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.208461,41.995743]]}},{"id":"ORC300448420","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","description":"Roadwork on NJ 18 Northbound between South of Exit 19 - NJ 34 (Colts Neck Twp) and South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp), Thursday June 12, 2025 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2025-06-12T19:00:12Z"},"road_event_id":"ORC300448420","beginning_cross_street":"South of Exit 19 - NJ 34","ending_cross_street":"South of Exit 29 - Tennent Rd/CR 3/CR 520","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-09T20:06:10Z","end_date":"2025-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.134445,40.281414]]}},{"id":"ORC300448421","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","description":"Roadwork on NJ 18 Southbound between South of Exit 29 - Tennent Rd/CR 3/CR 520 (Marlboro Twp) and South of Exit 19 - NJ 34 (Colts Neck Twp), left shoulder","update_date":"2025-06-12T19:00:12Z"},"road_event_id":"ORC300448421","beginning_cross_street":"South of Exit 29 - Tennent Rd/CR 3/CR 520","ending_cross_street":"South of Exit 19 - NJ 34","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-09T20:06:09Z","end_date":"2025-06-12T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.280418,40.341743]]}},{"id":"NwczeEwBBbu70P6aE33IHI3HCcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RHFpOGKI84aUvEysPN28GUfNBH8="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"NwczeEwBBbu70P6aE33IHI3HCcs=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:00:00Z","end_date":"2026-04-22T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"RHFpOGKI84aUvEysPN28GUfNBH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"ZfOtsgm4fPedMcR9C5HAczPMUBY="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"RHFpOGKI84aUvEysPN28GUfNBH8=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"ZfOtsgm4fPedMcR9C5HAczPMUBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"WrW8IBGcimj3OHiPz2n+updDa70="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"ZfOtsgm4fPedMcR9C5HAczPMUBY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"WrW8IBGcimj3OHiPz2n+updDa70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"N1aBRgXGDNcn7qm3V+s6zNJBx74="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"WrW8IBGcimj3OHiPz2n+updDa70=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"N1aBRgXGDNcn7qm3V+s6zNJBx74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"Lwm3tcdJiS15KXy+1IZdis3UbUY="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"N1aBRgXGDNcn7qm3V+s6zNJBx74=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T05:00:00Z","end_date":"2026-04-26T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"Lwm3tcdJiS15KXy+1IZdis3UbUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"ioUJSI60VpXnYVmQdsuRXkbhlEc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"Lwm3tcdJiS15KXy+1IZdis3UbUY=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T05:00:00Z","end_date":"2026-04-27T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"ioUJSI60VpXnYVmQdsuRXkbhlEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"mLok7D0NLHxNHtJPK4JnQSndoFk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"ioUJSI60VpXnYVmQdsuRXkbhlEc=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"mLok7D0NLHxNHtJPK4JnQSndoFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"1y9KWa44mEM3vBKJT2V1Xwt4PqA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"mLok7D0NLHxNHtJPK4JnQSndoFk=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"1y9KWa44mEM3vBKJT2V1Xwt4PqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"mM1zl1i1bEa+n1kZzqnYSVoDimQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"1y9KWa44mEM3vBKJT2V1Xwt4PqA=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"mM1zl1i1bEa+n1kZzqnYSVoDimQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"mJRTI+wOIZtoqhqqIMkIXYanBfs="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"mM1zl1i1bEa+n1kZzqnYSVoDimQ=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"mJRTI+wOIZtoqhqqIMkIXYanBfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"oiH7n6eU7WBaZhs06n2K9T2xPWM="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"mJRTI+wOIZtoqhqqIMkIXYanBfs=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"oiH7n6eU7WBaZhs06n2K9T2xPWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"Q1BqYMat0kOy4hsECQEQ5Q5l/9g="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"oiH7n6eU7WBaZhs06n2K9T2xPWM=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T05:00:00Z","end_date":"2026-05-03T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"Q1BqYMat0kOy4hsECQEQ5Q5l/9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"UAXCXGt9KgFUmYjscJNFtZrq5Mw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"Q1BqYMat0kOy4hsECQEQ5Q5l/9g=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T05:00:00Z","end_date":"2026-05-04T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"UAXCXGt9KgFUmYjscJNFtZrq5Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"uXI0N8SKE6in8g8FlyZ+r5HT7uU="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"UAXCXGt9KgFUmYjscJNFtZrq5Mw=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"uXI0N8SKE6in8g8FlyZ+r5HT7uU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="},{"type":"next-occurrence","id":"r/WMJQ6ZgFhoB83nJ9iXZoQG+dI="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"uXI0N8SKE6in8g8FlyZ+r5HT7uU=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"r/WMJQ6ZgFhoB83nJ9iXZoQG+dI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NwczeEwBBbu70P6aE33IHI3HCcs="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Exit 7 - Avenue C (New York) and Marginal Street (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, Sunday thru Saturday, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:03:51Z"},"road_event_id":"r/WMJQ6ZgFhoB83nJ9iXZoQG+dI=","beginning_cross_street":"Exit 7 - Avenue C","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971835,40.727792]]}},{"id":"BIEinmvpb/Jq5kRyxfiErKW5jqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4VlOv2ItvE+y2FShoaoSrJdV6EQ="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"BIEinmvpb/Jq5kRyxfiErKW5jqA=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"4VlOv2ItvE+y2FShoaoSrJdV6EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"K8mw6gRwn7VDOxlja2n2zy+Zsvs="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"4VlOv2ItvE+y2FShoaoSrJdV6EQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"K8mw6gRwn7VDOxlja2n2zy+Zsvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"CqQqEa7hYUyfzEAbzZS7pLQ+lGs="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"K8mw6gRwn7VDOxlja2n2zy+Zsvs=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"CqQqEa7hYUyfzEAbzZS7pLQ+lGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"oT8Tb7IiBXGSGK3vZ51uibMaqeA="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"CqQqEa7hYUyfzEAbzZS7pLQ+lGs=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"oT8Tb7IiBXGSGK3vZ51uibMaqeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"TudgQ4JB6UxQ5qImfStsbJGTS7o="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"oT8Tb7IiBXGSGK3vZ51uibMaqeA=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T05:00:00Z","end_date":"2026-04-26T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"TudgQ4JB6UxQ5qImfStsbJGTS7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"FseOefDiahbveZ2XGq0xEQRPFog="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"TudgQ4JB6UxQ5qImfStsbJGTS7o=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T05:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"FseOefDiahbveZ2XGq0xEQRPFog=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"F70oiKmdaWTceSWPgnFwHq7E9UI="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"FseOefDiahbveZ2XGq0xEQRPFog=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"F70oiKmdaWTceSWPgnFwHq7E9UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"mMBFrDxAde8h0OWBiPrgNFydM+Y="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"F70oiKmdaWTceSWPgnFwHq7E9UI=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"mMBFrDxAde8h0OWBiPrgNFydM+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"vtJqxiQ6IhzU9OROGpeI9sV+pFI="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"mMBFrDxAde8h0OWBiPrgNFydM+Y=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"vtJqxiQ6IhzU9OROGpeI9sV+pFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"m2P820BDUqAx3+aLPE0LSG6rRe8="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"vtJqxiQ6IhzU9OROGpeI9sV+pFI=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"m2P820BDUqAx3+aLPE0LSG6rRe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"3vDCwwamvk8SPjmY/Jx4STIFGJY="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"m2P820BDUqAx3+aLPE0LSG6rRe8=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"3vDCwwamvk8SPjmY/Jx4STIFGJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"8XRmeLVnFPh+6Prvvyvso4NF6GM="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"3vDCwwamvk8SPjmY/Jx4STIFGJY=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T05:00:00Z","end_date":"2026-05-03T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"8XRmeLVnFPh+6Prvvyvso4NF6GM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"MnCvv2olFxSp5VBB8Z8bsS13Xco="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"8XRmeLVnFPh+6Prvvyvso4NF6GM=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T05:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"MnCvv2olFxSp5VBB8Z8bsS13Xco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"Ohvq9Ky9crPkGgbw1V5Q4MeMEUI="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"MnCvv2olFxSp5VBB8Z8bsS13Xco=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"Ohvq9Ky9crPkGgbw1V5Q4MeMEUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="},{"type":"next-occurrence","id":"xSs83b93haN9vlf1deb3pbF5TNg="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"Ohvq9Ky9crPkGgbw1V5Q4MeMEUI=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"xSs83b93haN9vlf1deb3pbF5TNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIEinmvpb/Jq5kRyxfiErKW5jqA="}],"description":"Construction on Franklin D. Roosevelt Drive northbound between Marginal Street (New York) and Exit 7 - Avenue C (New York) These closures are necessary to facilitate median reconstruction, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday August 14th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 12:00 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday August 15th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday August 9th, 2026, 07:00 AM thru 11:00 AM 1 Left lane of 3 lanes closed","update_date":"2024-07-09T13:11:46Z"},"road_event_id":"xSs83b93haN9vlf1deb3pbF5TNg=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984467,40.710514]]}},{"id":"7XDvcNlFOuevncIp4+rTN06LvSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"s0WkYpN/Fl+7S7vNOcLWabMkit8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"7XDvcNlFOuevncIp4+rTN06LvSU=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"s0WkYpN/Fl+7S7vNOcLWabMkit8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"6/0JsmE28bVTYI4SYUzXUCcPv/s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"s0WkYpN/Fl+7S7vNOcLWabMkit8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"6/0JsmE28bVTYI4SYUzXUCcPv/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"SuTk7oe/sr429dofdU2zGhmppR0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"6/0JsmE28bVTYI4SYUzXUCcPv/s=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"SuTk7oe/sr429dofdU2zGhmppR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"DhdfPHktORG6Hmf0fxAxzRHcHyk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"SuTk7oe/sr429dofdU2zGhmppR0=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"DhdfPHktORG6Hmf0fxAxzRHcHyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"K8NeaLm2SIJOxaKFaV+RCMlpefw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"DhdfPHktORG6Hmf0fxAxzRHcHyk=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"K8NeaLm2SIJOxaKFaV+RCMlpefw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"YQ8Ud5c4XUpsmpdh2dM3w6zu5ys="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"K8NeaLm2SIJOxaKFaV+RCMlpefw=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"YQ8Ud5c4XUpsmpdh2dM3w6zu5ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"0GUGp/dF1yuGnPp2DG82IH+B4Zs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"YQ8Ud5c4XUpsmpdh2dM3w6zu5ys=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"0GUGp/dF1yuGnPp2DG82IH+B4Zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"w9506MD4lfrKForq6RK/7hl8wMM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"0GUGp/dF1yuGnPp2DG82IH+B4Zs=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"w9506MD4lfrKForq6RK/7hl8wMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"b1O+92+AvnhjkWE28Fki22MCLsI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"w9506MD4lfrKForq6RK/7hl8wMM=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"b1O+92+AvnhjkWE28Fki22MCLsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"dy+TMef55qrZuvEd+hZOYUCHIJE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"b1O+92+AvnhjkWE28Fki22MCLsI=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"dy+TMef55qrZuvEd+hZOYUCHIJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"e/ocGryBCdOAWUKstK8NwNcYxzk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"dy+TMef55qrZuvEd+hZOYUCHIJE=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"e/ocGryBCdOAWUKstK8NwNcYxzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"XIBJHRyjW/+O4zL6QR6NOVApvSA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"e/ocGryBCdOAWUKstK8NwNcYxzk=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"XIBJHRyjW/+O4zL6QR6NOVApvSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"8NCDh548+owXq96BIrJhpbhTWSU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"XIBJHRyjW/+O4zL6QR6NOVApvSA=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"8NCDh548+owXq96BIrJhpbhTWSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="},{"type":"next-occurrence","id":"bix1TwtnXXH0bMcQaIYEI8zqwxg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"8NCDh548+owXq96BIrJhpbhTWSU=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"bix1TwtnXXH0bMcQaIYEI8zqwxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7XDvcNlFOuevncIp4+rTN06LvSU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:05:00Z"},"road_event_id":"bix1TwtnXXH0bMcQaIYEI8zqwxg=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.43034,41.141617]]}},{"id":"Tr6uesgkIkoFyunIs5fN832QMtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R8jgBNcz2fqV6mkXmURWw0lMaYE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"Tr6uesgkIkoFyunIs5fN832QMtE=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"R8jgBNcz2fqV6mkXmURWw0lMaYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"TjjdmscOJioaQqumVCCmkDamnrw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"R8jgBNcz2fqV6mkXmURWw0lMaYE=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"TjjdmscOJioaQqumVCCmkDamnrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"edEjH+Rl4pMgAvIEcSwtjGguS4Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"TjjdmscOJioaQqumVCCmkDamnrw=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"edEjH+Rl4pMgAvIEcSwtjGguS4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"+rvSc8IRqkb1xghOyJZXMPSi70Y="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"edEjH+Rl4pMgAvIEcSwtjGguS4Q=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T21:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"+rvSc8IRqkb1xghOyJZXMPSi70Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"V5YN7KxPMFrt9Bpcjfh4kS/2zqw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"+rvSc8IRqkb1xghOyJZXMPSi70Y=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"V5YN7KxPMFrt9Bpcjfh4kS/2zqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"aWodh8QatC/zSanlhoTe4NV4odM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"V5YN7KxPMFrt9Bpcjfh4kS/2zqw=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"aWodh8QatC/zSanlhoTe4NV4odM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"cMqU/nUxDA4H6NKJ+reTLZD+LNw="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"aWodh8QatC/zSanlhoTe4NV4odM=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"cMqU/nUxDA4H6NKJ+reTLZD+LNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"Wjl3868N49Ck2TkHY6ciNnX1/w8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"cMqU/nUxDA4H6NKJ+reTLZD+LNw=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"Wjl3868N49Ck2TkHY6ciNnX1/w8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"D3irMbBHDQIWmyLDglXlkzyi9Es="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"Wjl3868N49Ck2TkHY6ciNnX1/w8=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"D3irMbBHDQIWmyLDglXlkzyi9Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"ChhCSDjrwLhWerV25UuP+aSy1cM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"D3irMbBHDQIWmyLDglXlkzyi9Es=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"ChhCSDjrwLhWerV25UuP+aSy1cM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"BP+W7nf3FuUJwdTvWtaxZy/xWR4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"ChhCSDjrwLhWerV25UuP+aSy1cM=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T21:00:00Z","end_date":"2026-05-03T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"BP+W7nf3FuUJwdTvWtaxZy/xWR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"MOczxJq+I+6XPPut3COH8xqTVXQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"BP+W7nf3FuUJwdTvWtaxZy/xWR4=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T20:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"MOczxJq+I+6XPPut3COH8xqTVXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"vkjQdUvbRLpK53trjXwEjFGqCBQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"MOczxJq+I+6XPPut3COH8xqTVXQ=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"vkjQdUvbRLpK53trjXwEjFGqCBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="},{"type":"next-occurrence","id":"ZFs14iIrUIwB7z0N8KnQYGm1O0U="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"vkjQdUvbRLpK53trjXwEjFGqCBQ=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"ZFs14iIrUIwB7z0N8KnQYGm1O0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tr6uesgkIkoFyunIs5fN832QMtE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:18:36Z"},"road_event_id":"ZFs14iIrUIwB7z0N8KnQYGm1O0U=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.270699,41.202566]]}},{"id":"VED/SMRDMYdXCaAR1NO/bDI26FY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TBo8toDYR5EYFKSseAMbWdPA/Lk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"VED/SMRDMYdXCaAR1NO/bDI26FY=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"TBo8toDYR5EYFKSseAMbWdPA/Lk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"6QZL0QKkOqnkSR7ImkfaLRibefA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"TBo8toDYR5EYFKSseAMbWdPA/Lk=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"6QZL0QKkOqnkSR7ImkfaLRibefA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"Yjqn3Z41o19wvSq4sI3bD7ffWBM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"6QZL0QKkOqnkSR7ImkfaLRibefA=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"Yjqn3Z41o19wvSq4sI3bD7ffWBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"FThrRNaM1myt2gG98BFriLX4xxE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"Yjqn3Z41o19wvSq4sI3bD7ffWBM=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T21:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"FThrRNaM1myt2gG98BFriLX4xxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"5+jsLC9DIXHMKgwZuVD3rcdupLc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"FThrRNaM1myt2gG98BFriLX4xxE=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"5+jsLC9DIXHMKgwZuVD3rcdupLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"wIgG3vxnkRIOdQza/dGKuk0Lmr4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"5+jsLC9DIXHMKgwZuVD3rcdupLc=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"wIgG3vxnkRIOdQza/dGKuk0Lmr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"9FoUR0OLNtsJooZGSUAkhTRYkm0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"wIgG3vxnkRIOdQza/dGKuk0Lmr4=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"9FoUR0OLNtsJooZGSUAkhTRYkm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"bMNyv4ekAY6JYbQ2kIZThdzrc1I="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"9FoUR0OLNtsJooZGSUAkhTRYkm0=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"bMNyv4ekAY6JYbQ2kIZThdzrc1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"SuIJ3REg0luGot89nGoj9wWnta8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"bMNyv4ekAY6JYbQ2kIZThdzrc1I=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"SuIJ3REg0luGot89nGoj9wWnta8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"OM5o28QPZ4WUFucVDte2ZZdZJm8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"SuIJ3REg0luGot89nGoj9wWnta8=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"OM5o28QPZ4WUFucVDte2ZZdZJm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"ZQaf5iFc9Kndpj80hgsdp5DL7Fo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"OM5o28QPZ4WUFucVDte2ZZdZJm8=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T21:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"ZQaf5iFc9Kndpj80hgsdp5DL7Fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"MLvVrwoX0U7GXmUkzYaIKBqLerg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"ZQaf5iFc9Kndpj80hgsdp5DL7Fo=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"MLvVrwoX0U7GXmUkzYaIKBqLerg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"guXTjQhDGt9zJJZHhR0ZrOvZYV0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"MLvVrwoX0U7GXmUkzYaIKBqLerg=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"guXTjQhDGt9zJJZHhR0ZrOvZYV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="},{"type":"next-occurrence","id":"0r/gtJ5kHEwOvtPO48uj6QQ9jqI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"guXTjQhDGt9zJJZHhR0ZrOvZYV0=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"0r/gtJ5kHEwOvtPO48uj6QQ9jqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VED/SMRDMYdXCaAR1NO/bDI26FY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 44 - CT 58/Black Rock Turnpike (Westport) and Exit 41 - CT 33/Wilton Road (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:15:15Z"},"road_event_id":"0r/gtJ5kHEwOvtPO48uj6QQ9jqI=","beginning_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","ending_cross_street":"Exit 41 - CT 33/Wilton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.27077,41.202637]]}},{"id":"WO9ZuCagYuO+gOjtGg2Swu94VkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nm8+lAaHeEL7ymgCWHiwK1uziGQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"WO9ZuCagYuO+gOjtGg2Swu94VkI=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"Nm8+lAaHeEL7ymgCWHiwK1uziGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"g1m4ngu4Ycy+2SyQgnlq7IxAogU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"Nm8+lAaHeEL7ymgCWHiwK1uziGQ=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"g1m4ngu4Ycy+2SyQgnlq7IxAogU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"liHxF0Tfv/MKf0fga+s194xDXXo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"g1m4ngu4Ycy+2SyQgnlq7IxAogU=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"liHxF0Tfv/MKf0fga+s194xDXXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"tusC3UIYaI+xAHF1AyWD4GCAllQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"liHxF0Tfv/MKf0fga+s194xDXXo=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"tusC3UIYaI+xAHF1AyWD4GCAllQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"8sO/eVR7RHedxKav2Rm3Kb7LW5s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"tusC3UIYaI+xAHF1AyWD4GCAllQ=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"8sO/eVR7RHedxKav2Rm3Kb7LW5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"lnxsVq7A002GhGixwf8IFgEySh8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"8sO/eVR7RHedxKav2Rm3Kb7LW5s=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"lnxsVq7A002GhGixwf8IFgEySh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"U5dlVys+5SFSRQwEDLKXEzYvEV8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"lnxsVq7A002GhGixwf8IFgEySh8=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"U5dlVys+5SFSRQwEDLKXEzYvEV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"dcwHa2umIY0UItlkmPcG5FYAPHk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"U5dlVys+5SFSRQwEDLKXEzYvEV8=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"dcwHa2umIY0UItlkmPcG5FYAPHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"0FsSF8wp1c9p6im4KECU1fckz5U="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"dcwHa2umIY0UItlkmPcG5FYAPHk=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"0FsSF8wp1c9p6im4KECU1fckz5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"zOaKVQwlrBzScuxbYaCJcqhgSdE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"0FsSF8wp1c9p6im4KECU1fckz5U=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"zOaKVQwlrBzScuxbYaCJcqhgSdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="},{"type":"next-occurrence","id":"2SAeY23p8s6FgtZw2GCfHWD8Y0o="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"zOaKVQwlrBzScuxbYaCJcqhgSdE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"2SAeY23p8s6FgtZw2GCfHWD8Y0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WO9ZuCagYuO+gOjtGg2Swu94VkI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:12:13Z"},"road_event_id":"2SAeY23p8s6FgtZw2GCfHWD8Y0o=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.37652,41.163986]]}},{"id":"OUi+yE5WZiXPFskNnfQGIlPIi3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TzOQCdyKMhGlKNDeN5fg1jiRpuY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"OUi+yE5WZiXPFskNnfQGIlPIi3c=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"TzOQCdyKMhGlKNDeN5fg1jiRpuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"SJxFVItMc5yZ6wWO25am3C9RGeY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"TzOQCdyKMhGlKNDeN5fg1jiRpuY=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"SJxFVItMc5yZ6wWO25am3C9RGeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"rv3PZD2WfY0jbm2m0nFCipX9kZ0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"SJxFVItMc5yZ6wWO25am3C9RGeY=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"rv3PZD2WfY0jbm2m0nFCipX9kZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"2VEKFVeliNhqcT61fgjblgebT20="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"rv3PZD2WfY0jbm2m0nFCipX9kZ0=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T21:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"2VEKFVeliNhqcT61fgjblgebT20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"N/SPWjIZ5YbES+BtSh+DiLaK6bE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"2VEKFVeliNhqcT61fgjblgebT20=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"N/SPWjIZ5YbES+BtSh+DiLaK6bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"Sacn3E5M/gB5p7fYRDbI42YFIeQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"N/SPWjIZ5YbES+BtSh+DiLaK6bE=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"Sacn3E5M/gB5p7fYRDbI42YFIeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"wjfAYxONrrsVyPUbkwaMX7ypPoA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"Sacn3E5M/gB5p7fYRDbI42YFIeQ=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"wjfAYxONrrsVyPUbkwaMX7ypPoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"2R0tgVzx1xjHr2vk/6yRpy5ixII="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"wjfAYxONrrsVyPUbkwaMX7ypPoA=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"2R0tgVzx1xjHr2vk/6yRpy5ixII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"DlBTCFwj6VWjYrU5f64kRTVDLoI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"2R0tgVzx1xjHr2vk/6yRpy5ixII=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"DlBTCFwj6VWjYrU5f64kRTVDLoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"nLxoqTaCnVZyiMOMwRgw0iwv3p0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"DlBTCFwj6VWjYrU5f64kRTVDLoI=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"nLxoqTaCnVZyiMOMwRgw0iwv3p0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"o+3S/lqVdfQIxfgmmwXVb/Jgx2U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"nLxoqTaCnVZyiMOMwRgw0iwv3p0=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T21:00:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"o+3S/lqVdfQIxfgmmwXVb/Jgx2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"0euESO0CKqAmo/RyoTcSQaNeJek="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"o+3S/lqVdfQIxfgmmwXVb/Jgx2U=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"0euESO0CKqAmo/RyoTcSQaNeJek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"ckS4IPEI9Hv1qeR+NXOmxt+AWHo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"0euESO0CKqAmo/RyoTcSQaNeJek=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"ckS4IPEI9Hv1qeR+NXOmxt+AWHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="},{"type":"next-occurrence","id":"e71GB8jEMAEOrzIstjmSrCX6NTw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"ckS4IPEI9Hv1qeR+NXOmxt+AWHo=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"e71GB8jEMAEOrzIstjmSrCX6NTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OUi+yE5WZiXPFskNnfQGIlPIi3c="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 41 - CT 33/Wilton Road (Norwalk) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T18:09:22Z"},"road_event_id":"e71GB8jEMAEOrzIstjmSrCX6NTw=","beginning_cross_street":"Exit 41 - CT 33/Wilton Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.376525,41.163836]]}},{"id":"jnmT13MRGjVpKjJ9hN0iqdohiAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6AyfMW9Z9V9ga57vhQGzwNXc53I="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"jnmT13MRGjVpKjJ9hN0iqdohiAk=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"6AyfMW9Z9V9ga57vhQGzwNXc53I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"O+hpIuU24AnebEntiD838dwEXao="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"6AyfMW9Z9V9ga57vhQGzwNXc53I=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"O+hpIuU24AnebEntiD838dwEXao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"d4ciZsgW5YZ6gbu2zIK2zk7BGPE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"O+hpIuU24AnebEntiD838dwEXao=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"d4ciZsgW5YZ6gbu2zIK2zk7BGPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"HQ1eA9Jt6t+Lx5+t30yy8iJC9ZE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"d4ciZsgW5YZ6gbu2zIK2zk7BGPE=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"HQ1eA9Jt6t+Lx5+t30yy8iJC9ZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"y0aOaNIXwfsCu6tmw42OGmAadJ4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"HQ1eA9Jt6t+Lx5+t30yy8iJC9ZE=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T02:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"y0aOaNIXwfsCu6tmw42OGmAadJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"7SBQMmMwNxALi5Q1H9vvRPk0dok="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"y0aOaNIXwfsCu6tmw42OGmAadJ4=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"7SBQMmMwNxALi5Q1H9vvRPk0dok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"36vKJdMDkT/B0/NlBFVr59oPCxc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"7SBQMmMwNxALi5Q1H9vvRPk0dok=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"36vKJdMDkT/B0/NlBFVr59oPCxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"X3qkAhTJBc+cpzqXJvVqEVYY1bQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"36vKJdMDkT/B0/NlBFVr59oPCxc=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"X3qkAhTJBc+cpzqXJvVqEVYY1bQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"aZIKpwZQY6ZvLOmvBD0jZDSzWIA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"X3qkAhTJBc+cpzqXJvVqEVYY1bQ=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"aZIKpwZQY6ZvLOmvBD0jZDSzWIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"aWl0oIC8xcyNUAWwUJTsZlCoKFg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"aZIKpwZQY6ZvLOmvBD0jZDSzWIA=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"aWl0oIC8xcyNUAWwUJTsZlCoKFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"yiBvUy7HZ0IwljvkHoqgMWQu0vQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"aWl0oIC8xcyNUAWwUJTsZlCoKFg=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T02:00:00Z","end_date":"2026-05-03T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"yiBvUy7HZ0IwljvkHoqgMWQu0vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"H+VN7Wl3yCtcS/BcHhGtKg89co8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"yiBvUy7HZ0IwljvkHoqgMWQu0vQ=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T02:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"H+VN7Wl3yCtcS/BcHhGtKg89co8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"R71tdANdNoW84h3seK6F1vf953c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"H+VN7Wl3yCtcS/BcHhGtKg89co8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"R71tdANdNoW84h3seK6F1vf953c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="},{"type":"next-occurrence","id":"yVgBDdwIU5WA48KPJlNmZ2FFwJ0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"R71tdANdNoW84h3seK6F1vf953c=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"yVgBDdwIU5WA48KPJlNmZ2FFwJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jnmT13MRGjVpKjJ9hN0iqdohiAk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Wilbur Cross Parkway at Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 10:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:36:44Z"},"road_event_id":"yVgBDdwIU5WA48KPJlNmZ2FFwJ0=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.153745,41.237262]]}},{"id":"OyrN5E5BwuOaqq0vvfCdO99SMaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lcW9XBw07F8fi+/6N+9KjvpquXU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"OyrN5E5BwuOaqq0vvfCdO99SMaA=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"lcW9XBw07F8fi+/6N+9KjvpquXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"CwtDBwn4HLqOxjZ2Q8EP0ny5DLQ="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"lcW9XBw07F8fi+/6N+9KjvpquXU=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"CwtDBwn4HLqOxjZ2Q8EP0ny5DLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"awaPaXakVjLQGtJz6Ta4YrYiCg4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"CwtDBwn4HLqOxjZ2Q8EP0ny5DLQ=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"awaPaXakVjLQGtJz6Ta4YrYiCg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"ukH/sBAMR+xgZqjoYPsi9ZrNO3Y="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"awaPaXakVjLQGtJz6Ta4YrYiCg4=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"ukH/sBAMR+xgZqjoYPsi9ZrNO3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"LYie56ugDhqMsEIEnqxOwbhbol8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"ukH/sBAMR+xgZqjoYPsi9ZrNO3Y=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"LYie56ugDhqMsEIEnqxOwbhbol8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"EURan8NEehboLgSIM2J0PYutSR4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"LYie56ugDhqMsEIEnqxOwbhbol8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"EURan8NEehboLgSIM2J0PYutSR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"Kh4BfiGVs5yFtm6p+PY5UK84kJs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"EURan8NEehboLgSIM2J0PYutSR4=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"Kh4BfiGVs5yFtm6p+PY5UK84kJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"yBWWO+KmF47WFrCnYNHZ8z0aqYc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"Kh4BfiGVs5yFtm6p+PY5UK84kJs=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"yBWWO+KmF47WFrCnYNHZ8z0aqYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"oqTOWSwRM9wix+qHUgDF/f7FvY8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"yBWWO+KmF47WFrCnYNHZ8z0aqYc=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"oqTOWSwRM9wix+qHUgDF/f7FvY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"c/WSXP0t8GNU3pHV8eiIQA/bdbg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"oqTOWSwRM9wix+qHUgDF/f7FvY8=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"c/WSXP0t8GNU3pHV8eiIQA/bdbg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"GS2PNI4/bfq61wfucVDNI38177w="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"c/WSXP0t8GNU3pHV8eiIQA/bdbg=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"GS2PNI4/bfq61wfucVDNI38177w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"Jvykrad6581nMIi0xQdmeMxTEuM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"GS2PNI4/bfq61wfucVDNI38177w=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"Jvykrad6581nMIi0xQdmeMxTEuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"3ULmlzqULStrWJZtUDvDUZnm/Do="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"Jvykrad6581nMIi0xQdmeMxTEuM=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"3ULmlzqULStrWJZtUDvDUZnm/Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="},{"type":"next-occurrence","id":"N7nWEFxJ6J9Sxr/6yjq1GY3kxTU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"3ULmlzqULStrWJZtUDvDUZnm/Do=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"N7nWEFxJ6J9Sxr/6yjq1GY3kxTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OyrN5E5BwuOaqq0vvfCdO99SMaA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 52 - CT 8/Bridgeport Avenue (Trumbull) and Exit 48 - Main Street (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Sunday/Monday/Tuesday/Friday/Saturday, 08:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday, 08:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T18:32:11Z"},"road_event_id":"N7nWEFxJ6J9Sxr/6yjq1GY3kxTU=","beginning_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","ending_cross_street":"Exit 48 - Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.1537,41.23714]]}},{"id":"cixRF4soQMtOvApTg+eHlPvXrX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FbQv/1+6Bz2/Unr5PDp9bFEYmb0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"cixRF4soQMtOvApTg+eHlPvXrX0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"FbQv/1+6Bz2/Unr5PDp9bFEYmb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"HY9OtZKwIEjvIybGhPi8i/9UlnM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"FbQv/1+6Bz2/Unr5PDp9bFEYmb0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"HY9OtZKwIEjvIybGhPi8i/9UlnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"sV39H2oKVDQl1nEhGJbjrBbsZ3k="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"HY9OtZKwIEjvIybGhPi8i/9UlnM=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"sV39H2oKVDQl1nEhGJbjrBbsZ3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"eqQw0VQgBL5Lt7jC/0JYOBel0Qc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"sV39H2oKVDQl1nEhGJbjrBbsZ3k=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"eqQw0VQgBL5Lt7jC/0JYOBel0Qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"+XJYtxURNfKnQ6tS7lv6kyIR5kc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"eqQw0VQgBL5Lt7jC/0JYOBel0Qc=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"+XJYtxURNfKnQ6tS7lv6kyIR5kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"+WHFt28uGJBB6bL4+Gmm9Dv8fdM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"+XJYtxURNfKnQ6tS7lv6kyIR5kc=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"+WHFt28uGJBB6bL4+Gmm9Dv8fdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"yuj9KpUCztrBGxCjoP/CVSDsHdE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"+WHFt28uGJBB6bL4+Gmm9Dv8fdM=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"yuj9KpUCztrBGxCjoP/CVSDsHdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"PNUSkWDWc+aJQ6Z0EPYtHj+7xOs="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"yuj9KpUCztrBGxCjoP/CVSDsHdE=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"PNUSkWDWc+aJQ6Z0EPYtHj+7xOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"mg5MZjhu38DZlJQyS1dP6lEYSHQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"PNUSkWDWc+aJQ6Z0EPYtHj+7xOs=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"mg5MZjhu38DZlJQyS1dP6lEYSHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"pCVliqYqwkdsfA02HTMzcMuGGec="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"mg5MZjhu38DZlJQyS1dP6lEYSHQ=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"pCVliqYqwkdsfA02HTMzcMuGGec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"15kA2KbE7rg5walJqGvLHpcDbcE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"pCVliqYqwkdsfA02HTMzcMuGGec=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"15kA2KbE7rg5walJqGvLHpcDbcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"XWzsWVmBBQKhAS2du0MlKtqMLz8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"15kA2KbE7rg5walJqGvLHpcDbcE=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"XWzsWVmBBQKhAS2du0MlKtqMLz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"zTV35NqxSZI+Akx6UJ0+q203sbc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"XWzsWVmBBQKhAS2du0MlKtqMLz8=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"zTV35NqxSZI+Akx6UJ0+q203sbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="},{"type":"next-occurrence","id":"EqnHtTuVSUpXSi6fYtEJmzd65IA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"zTV35NqxSZI+Akx6UJ0+q203sbc=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"EqnHtTuVSUpXSi6fYtEJmzd65IA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cixRF4soQMtOvApTg+eHlPvXrX0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 48 - Main Street (Trumbull) and Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:28:29Z"},"road_event_id":"EqnHtTuVSUpXSi6fYtEJmzd65IA=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220287,41.232251]]}},{"id":"5VMPDO9QfGAWAtrYk23JNlLUNTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ee9vzK/hVGVCRMq61100VW9We6A="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"5VMPDO9QfGAWAtrYk23JNlLUNTI=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"Ee9vzK/hVGVCRMq61100VW9We6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"SGdQYVWt294sBkVqYnPwhptpw4Y="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"Ee9vzK/hVGVCRMq61100VW9We6A=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"SGdQYVWt294sBkVqYnPwhptpw4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"BzVg/LTtkfwPR65cmcFU5/7V1Ow="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"SGdQYVWt294sBkVqYnPwhptpw4Y=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"BzVg/LTtkfwPR65cmcFU5/7V1Ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"dsj6bEBgfVjuThpdcrG5fX/gGqA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"BzVg/LTtkfwPR65cmcFU5/7V1Ow=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"dsj6bEBgfVjuThpdcrG5fX/gGqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"jcRoBAs6GrgJmYjiV8o5CO4zFHo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"dsj6bEBgfVjuThpdcrG5fX/gGqA=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"jcRoBAs6GrgJmYjiV8o5CO4zFHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"eAPMvA0gLVe76Eb0PNj/FX1mtj8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"jcRoBAs6GrgJmYjiV8o5CO4zFHo=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"eAPMvA0gLVe76Eb0PNj/FX1mtj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"VQhRxSyshRowyYAzUcFZ/YJsyjE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"eAPMvA0gLVe76Eb0PNj/FX1mtj8=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"VQhRxSyshRowyYAzUcFZ/YJsyjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"m7mU5NPM2FP5CK6s125M+O9to/4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"VQhRxSyshRowyYAzUcFZ/YJsyjE=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"m7mU5NPM2FP5CK6s125M+O9to/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"IdPh6TgNxvJEGkyhF0enh4txtg8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"m7mU5NPM2FP5CK6s125M+O9to/4=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"IdPh6TgNxvJEGkyhF0enh4txtg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"gdzfA6jfyBS3dVPmNB6v56T+hQo="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"IdPh6TgNxvJEGkyhF0enh4txtg8=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"gdzfA6jfyBS3dVPmNB6v56T+hQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"EdL6p8a262qrYn57vadNaajhYBw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"gdzfA6jfyBS3dVPmNB6v56T+hQo=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"EdL6p8a262qrYn57vadNaajhYBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"wM4QGE12cbt3hhhm7U+FW+fXD38="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"EdL6p8a262qrYn57vadNaajhYBw=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"wM4QGE12cbt3hhhm7U+FW+fXD38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"PHRxcQ3jLQe3ejOGg2rRTI+QaWg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"wM4QGE12cbt3hhhm7U+FW+fXD38=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"PHRxcQ3jLQe3ejOGg2rRTI+QaWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="},{"type":"next-occurrence","id":"APWHewekt8BMeFIfrq3zlDsluU0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"PHRxcQ3jLQe3ejOGg2rRTI+QaWg=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"APWHewekt8BMeFIfrq3zlDsluU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5VMPDO9QfGAWAtrYk23JNlLUNTI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 48 - Main Street (Trumbull) and Exit 44 - CT 58/Black Rock Turnpike (Westport) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 02:00 AM All lanes open","update_date":"2024-08-30T18:22:09Z"},"road_event_id":"APWHewekt8BMeFIfrq3zlDsluU0=","beginning_cross_street":"Exit 48 - Main Street","ending_cross_street":"Exit 44 - CT 58/Black Rock Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.220354,41.232259]]}},{"id":"y3yEn6kILJsMe4hF///95D4b8NE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nweHSNWoX03f1meA2i/Lqb6Leyw="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"y3yEn6kILJsMe4hF///95D4b8NE=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"nweHSNWoX03f1meA2i/Lqb6Leyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"3tCLiQu2rn/3A1tzUlmEMOaLGZo="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"nweHSNWoX03f1meA2i/Lqb6Leyw=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"3tCLiQu2rn/3A1tzUlmEMOaLGZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"u1yx5e/eURIKOFZb8nRvySLlhT8="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"3tCLiQu2rn/3A1tzUlmEMOaLGZo=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"u1yx5e/eURIKOFZb8nRvySLlhT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"EbrN6HX7zqq1KkNcm6wjYhQWthg="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"u1yx5e/eURIKOFZb8nRvySLlhT8=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:00:00Z","end_date":"2026-04-26T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"EbrN6HX7zqq1KkNcm6wjYhQWthg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"zqrAopWmGATwwYPs25U/UR3Pb7g="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"EbrN6HX7zqq1KkNcm6wjYhQWthg=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"zqrAopWmGATwwYPs25U/UR3Pb7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"+asp1/Dl4kguA2wtd7SWhb5eHBU="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"zqrAopWmGATwwYPs25U/UR3Pb7g=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"+asp1/Dl4kguA2wtd7SWhb5eHBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"54tMc2grux8rwPefeu/rT/3yvYE="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"+asp1/Dl4kguA2wtd7SWhb5eHBU=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"54tMc2grux8rwPefeu/rT/3yvYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"TRnEXOOZJe3yNYOQDIGgYGYymwg="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"54tMc2grux8rwPefeu/rT/3yvYE=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"TRnEXOOZJe3yNYOQDIGgYGYymwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"6KSRzrBk55J8e+LiqUhchPswu/o="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"TRnEXOOZJe3yNYOQDIGgYGYymwg=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"6KSRzrBk55J8e+LiqUhchPswu/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"kI3Fzp4FYSFdqrpCf83M9qRMeXY="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"6KSRzrBk55J8e+LiqUhchPswu/o=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:00:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"kI3Fzp4FYSFdqrpCf83M9qRMeXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"L1OlAs1YHCpqyBGuihQP9mH/L1Y="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"kI3Fzp4FYSFdqrpCf83M9qRMeXY=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:00:00Z","end_date":"2026-05-03T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"L1OlAs1YHCpqyBGuihQP9mH/L1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"ZEIlvFz9O+JJM6dTG9zH3tBbB/4="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"L1OlAs1YHCpqyBGuihQP9mH/L1Y=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"ZEIlvFz9O+JJM6dTG9zH3tBbB/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"TWj+BofIlmHYo2ZS5MCgCIn95+4="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"ZEIlvFz9O+JJM6dTG9zH3tBbB/4=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"TWj+BofIlmHYo2ZS5MCgCIn95+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="},{"type":"next-occurrence","id":"iUhqo+7+fXTyn+kIAH/NXbvcu1Y="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"TWj+BofIlmHYo2ZS5MCgCIn95+4=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"iUhqo+7+fXTyn+kIAH/NXbvcu1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y3yEn6kILJsMe4hF///95D4b8NE="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 59 - CT 69 (New Haven) and Exit 54 - Milford Connector (Milford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:55:55Z"},"road_event_id":"iUhqo+7+fXTyn+kIAH/NXbvcu1Y=","beginning_cross_street":"Exit 59 - CT 69","ending_cross_street":"Exit 54 - Milford Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.976865,41.339227]]}},{"id":"X7gzZYOFtKD35Saccl1QTnppUiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ksBiR+MLy5zwH+lsIYmkoOw9d7U="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"X7gzZYOFtKD35Saccl1QTnppUiA=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"ksBiR+MLy5zwH+lsIYmkoOw9d7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"lRO8Zgg7D+Uv4pb1/WuWE/KEwls="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"ksBiR+MLy5zwH+lsIYmkoOw9d7U=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"lRO8Zgg7D+Uv4pb1/WuWE/KEwls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"556OcKjLpcL1NllH+loRR+8qlxk="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"lRO8Zgg7D+Uv4pb1/WuWE/KEwls=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"556OcKjLpcL1NllH+loRR+8qlxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"LhgCW3j/WZiCRtKGddWODUqGueY="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"556OcKjLpcL1NllH+loRR+8qlxk=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:00:00Z","end_date":"2026-04-26T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"LhgCW3j/WZiCRtKGddWODUqGueY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"/OUYFka4TvAGGz57CpOrpFEG13k="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"LhgCW3j/WZiCRtKGddWODUqGueY=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"/OUYFka4TvAGGz57CpOrpFEG13k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"xMOnhGRzM21IIoyczvAHjru561U="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"/OUYFka4TvAGGz57CpOrpFEG13k=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"xMOnhGRzM21IIoyczvAHjru561U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"yc3uKz/1XMp1CV150AFCQZNGn/E="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"xMOnhGRzM21IIoyczvAHjru561U=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"yc3uKz/1XMp1CV150AFCQZNGn/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"taq/fH7vvO2l9t99LDT5UvuLcCg="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"yc3uKz/1XMp1CV150AFCQZNGn/E=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"taq/fH7vvO2l9t99LDT5UvuLcCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"WlGWyaa2+ht7qttD3gfRE0hM9AU="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"taq/fH7vvO2l9t99LDT5UvuLcCg=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"WlGWyaa2+ht7qttD3gfRE0hM9AU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"YS1tWb2IC76iyge/GbA47T99Nzg="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"WlGWyaa2+ht7qttD3gfRE0hM9AU=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:00:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"YS1tWb2IC76iyge/GbA47T99Nzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"TKLTgXHGP2O5/G3cZKibmM2kASI="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"YS1tWb2IC76iyge/GbA47T99Nzg=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:00:00Z","end_date":"2026-05-03T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"TKLTgXHGP2O5/G3cZKibmM2kASI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"/qBam5vseOCGgv7elSh4G2vla2w="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"TKLTgXHGP2O5/G3cZKibmM2kASI=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"/qBam5vseOCGgv7elSh4G2vla2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"STc1yOv/tex47Bnds3MU3vHtgqc="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"/qBam5vseOCGgv7elSh4G2vla2w=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"STc1yOv/tex47Bnds3MU3vHtgqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="},{"type":"next-occurrence","id":"oEQPzPevq7t8O+akev5JoALoPdk="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"STc1yOv/tex47Bnds3MU3vHtgqc=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"oEQPzPevq7t8O+akev5JoALoPdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X7gzZYOFtKD35Saccl1QTnppUiA="}],"description":"Sign work on Wilbur Cross Parkway northbound between Exit 54 - Milford Connector (Milford) and Exit 59 - CT 69 (New Haven) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:52:29Z"},"road_event_id":"oEQPzPevq7t8O+akev5JoALoPdk=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 59 - CT 69","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.084168,41.246939]]}},{"id":"ebEtpnRUZxPL5a1udKiqXmTXNlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fOFCFG/QaKM9f+jo4GRzlN06y6Y="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"ebEtpnRUZxPL5a1udKiqXmTXNlA=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"fOFCFG/QaKM9f+jo4GRzlN06y6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"5AjFtlLGn5LwrlAqpjLP3w53WIQ="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"fOFCFG/QaKM9f+jo4GRzlN06y6Y=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"5AjFtlLGn5LwrlAqpjLP3w53WIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"FXVI93AXbtS0+DONw0tbLibCbRc="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"5AjFtlLGn5LwrlAqpjLP3w53WIQ=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"FXVI93AXbtS0+DONw0tbLibCbRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"/ecUatnxpDkkDCw8YDhCWfisv9A="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"FXVI93AXbtS0+DONw0tbLibCbRc=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:00:00Z","end_date":"2026-04-26T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"/ecUatnxpDkkDCw8YDhCWfisv9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"jPGVqKjYeFh996IpkGJGEvJpQmo="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"/ecUatnxpDkkDCw8YDhCWfisv9A=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"jPGVqKjYeFh996IpkGJGEvJpQmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"3Knf/GldfJro09zVwWK47c+1kIc="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"jPGVqKjYeFh996IpkGJGEvJpQmo=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"3Knf/GldfJro09zVwWK47c+1kIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"WQ5A5x9eAtMkaQ5Y6qwsJ8nkgRY="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"3Knf/GldfJro09zVwWK47c+1kIc=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"WQ5A5x9eAtMkaQ5Y6qwsJ8nkgRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"rW/q2BwXe70TLNeZEaoM/DEbMOI="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"WQ5A5x9eAtMkaQ5Y6qwsJ8nkgRY=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"rW/q2BwXe70TLNeZEaoM/DEbMOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"M+3xpOfwuf1O8Fqd90hrY22dbGc="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"rW/q2BwXe70TLNeZEaoM/DEbMOI=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"M+3xpOfwuf1O8Fqd90hrY22dbGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"aV1iltz+89aDzlWlzIe+CvzppPE="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"M+3xpOfwuf1O8Fqd90hrY22dbGc=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:00:00Z","end_date":"2026-05-02T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"aV1iltz+89aDzlWlzIe+CvzppPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"i/zwAsZxE/YmfX9KwbOhcsnB6do="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"aV1iltz+89aDzlWlzIe+CvzppPE=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:00:00Z","end_date":"2026-05-03T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"i/zwAsZxE/YmfX9KwbOhcsnB6do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"yCtoROCBItVSylAJhL60savTzLs="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"i/zwAsZxE/YmfX9KwbOhcsnB6do=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"yCtoROCBItVSylAJhL60savTzLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"egG3XNBe+Pw33wkmUpdOylcvrQA="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"yCtoROCBItVSylAJhL60savTzLs=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"egG3XNBe+Pw33wkmUpdOylcvrQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="},{"type":"next-occurrence","id":"uWeqADQKwFMNuiGTzxbPIFUly44="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"egG3XNBe+Pw33wkmUpdOylcvrQA=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"uWeqADQKwFMNuiGTzxbPIFUly44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ebEtpnRUZxPL5a1udKiqXmTXNlA="}],"description":"Sign work on Wilbur Cross Parkway southbound between Exit 54 - Milford Connector (Milford) and Merritt Parkway/CT 15 at Exit 52 - CT 8/Bridgeport Avenue (Trumbull) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 09:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 11:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T18:49:22Z"},"road_event_id":"uWeqADQKwFMNuiGTzxbPIFUly44=","beginning_cross_street":"Exit 54 - Milford Connector","ending_cross_street":"Exit 52 - CT 8/Bridgeport Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.0842,41.247142]]}},{"id":"I312MqcCjeuK4BJtfsHQA3eaF4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/ZTswo2bT/FAedJ6MIHfUCSKL7c="}],"description":"Bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays , Monday April 21st, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:41Z"},"road_event_id":"I312MqcCjeuK4BJtfsHQA3eaF4Y=","beginning_cross_street":"CHAMPION ST","ending_cross_street":"Town of Wilna; Town of Champion Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.614861,43.974362]]}},{"id":"/ZTswo2bT/FAedJ6MIHfUCSKL7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I312MqcCjeuK4BJtfsHQA3eaF4Y="},{"type":"next-occurrence","id":"P0nR0F0LCPvybLFmAkj+w6zWD0c="}],"description":"Bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays , Monday April 21st, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:41Z"},"road_event_id":"/ZTswo2bT/FAedJ6MIHfUCSKL7c=","beginning_cross_street":"CHAMPION ST","ending_cross_street":"Town of Wilna; Town of Champion Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.614861,43.974362]]}},{"id":"P0nR0F0LCPvybLFmAkj+w6zWD0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"I312MqcCjeuK4BJtfsHQA3eaF4Y="}],"description":"Bridge rehabilitation and longterm construction on BRIDGE ST eastbound CHAMPION ST (West Carthage) to NY 126 at Town of Wilna; Town of Champion Line (Wilna) All lanes and shoulders are open to traffic. Motorists can expect occasional lane/shoulder closures on weekdays , Monday April 21st, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:41Z"},"road_event_id":"P0nR0F0LCPvybLFmAkj+w6zWD0c=","beginning_cross_street":"CHAMPION ST","ending_cross_street":"Town of Wilna; Town of Champion Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.614861,43.974362]]}},{"id":"cQp6RMgQxF+x0ZGr8Qx2kFVeAfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Wt2qZlu+Xo9PdLavZJ3vtToqJmM="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"cQp6RMgQxF+x0ZGr8Qx2kFVeAfI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"Wt2qZlu+Xo9PdLavZJ3vtToqJmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cQp6RMgQxF+x0ZGr8Qx2kFVeAfI="},{"type":"next-occurrence","id":"7Xn8ckVis70hJ6+aFDhODkCpw6M="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"Wt2qZlu+Xo9PdLavZJ3vtToqJmM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"7Xn8ckVis70hJ6+aFDhODkCpw6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cQp6RMgQxF+x0ZGr8Qx2kFVeAfI="}],"description":"Drainage improvements and longterm construction and road rehabilitation on NY 3 both directions (Piercefield) No active work at this time. All lanes and shoulders open to traffic, Wednesday April 2nd, 2025 thru Tuesday June 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:19:05Z"},"road_event_id":"7Xn8ckVis70hJ6+aFDhODkCpw6M=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.593809,44.24]]}},{"id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ogdMl/8/dVh2kCczMYty88p4IHo="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"ogdMl/8/dVh2kCczMYty88p4IHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"KHJGVIvr+gGiCixSrRyEbxqCUqQ="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"ogdMl/8/dVh2kCczMYty88p4IHo=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"KHJGVIvr+gGiCixSrRyEbxqCUqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"q43hee/e2V1UGOniUO01wTt4vUI="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"KHJGVIvr+gGiCixSrRyEbxqCUqQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"q43hee/e2V1UGOniUO01wTt4vUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"6Z69R5XeMUpI1oKgTpUOjiC+Eu0="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"q43hee/e2V1UGOniUO01wTt4vUI=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"6Z69R5XeMUpI1oKgTpUOjiC+Eu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"3/mVixGLt2CDYd+PLv4e8dr8Wws="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"6Z69R5XeMUpI1oKgTpUOjiC+Eu0=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T05:00:00Z","end_date":"2026-04-26T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"3/mVixGLt2CDYd+PLv4e8dr8Wws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"/UGuXG8Rfh69g9DicirlCGOj9Ck="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"3/mVixGLt2CDYd+PLv4e8dr8Wws=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"/UGuXG8Rfh69g9DicirlCGOj9Ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"5EqmCpC8fnmsZBBE1Bp+2ZYK3BQ="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"/UGuXG8Rfh69g9DicirlCGOj9Ck=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"5EqmCpC8fnmsZBBE1Bp+2ZYK3BQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"AYyT3iu8DbUtwdyNtYpOh+mDYY0="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"5EqmCpC8fnmsZBBE1Bp+2ZYK3BQ=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"AYyT3iu8DbUtwdyNtYpOh+mDYY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"LANwJVscsBhDzWVF5Y+wH1h5OVM="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"AYyT3iu8DbUtwdyNtYpOh+mDYY0=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"LANwJVscsBhDzWVF5Y+wH1h5OVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"n0ELpB18ubzrg4xpAc+PoP2EJB0="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"LANwJVscsBhDzWVF5Y+wH1h5OVM=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"n0ELpB18ubzrg4xpAc+PoP2EJB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"T0QSEjc0giknoMvKPi5BSM/ANs8="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"n0ELpB18ubzrg4xpAc+PoP2EJB0=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T05:00:00Z","end_date":"2026-05-03T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"T0QSEjc0giknoMvKPi5BSM/ANs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"YSuC3suWHoCZlNVOS2bA1uCLxig="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"T0QSEjc0giknoMvKPi5BSM/ANs8=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"YSuC3suWHoCZlNVOS2bA1uCLxig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="},{"type":"next-occurrence","id":"/mTheSj6+9h5iM4fn4zwTxR/xYM="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"YSuC3suWHoCZlNVOS2bA1uCLxig=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"/mTheSj6+9h5iM4fn4zwTxR/xYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"efdRRt/X9ZmfnxPBaYYpZOXL3qQ="}],"description":"Construction on Franklin D. Roosevelt Drive both directions between Marginal Street (New York) and Exit 7 - Avenue C (New York) to facilitate median reconstruction and will continue through August 15, 2026., Monday February 17th, 2025 thru Friday August 14th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday August 14th, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 12:01 AM thru 01:00 AM 1 Left lane of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday August 15th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 01:00 AM thru 02:00 AM 1 Left lane of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 02:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday August 9th, 2026, 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed","update_date":"2025-02-17T17:22:20Z"},"road_event_id":"/mTheSj6+9h5iM4fn4zwTxR/xYM=","beginning_cross_street":"Marginal Street","ending_cross_street":"Exit 7 - Avenue C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984589,40.710504]]}},{"id":"qYWJhb5y+GIyDinLD0OgJx3Nuno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QJXdqRLhchmPRvCPM6vLyOgpEbc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"qYWJhb5y+GIyDinLD0OgJx3Nuno=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"QJXdqRLhchmPRvCPM6vLyOgpEbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"aiUP576rQj4ux2aZh0trj6X1Qnk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"QJXdqRLhchmPRvCPM6vLyOgpEbc=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T05:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"aiUP576rQj4ux2aZh0trj6X1Qnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"P6HSTrIuDle9xhBTDA/fASRlrrg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"aiUP576rQj4ux2aZh0trj6X1Qnk=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T05:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"P6HSTrIuDle9xhBTDA/fASRlrrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"04fiFdOSxF9pOHkx1sic7GJKNAs="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"P6HSTrIuDle9xhBTDA/fASRlrrg=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"04fiFdOSxF9pOHkx1sic7GJKNAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"+YjXWsT+lhnMcQrAxhqY6y+e+dM="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"04fiFdOSxF9pOHkx1sic7GJKNAs=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T05:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"+YjXWsT+lhnMcQrAxhqY6y+e+dM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"n84IHTWlPXfOLM93z8Q4QARhmTk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"+YjXWsT+lhnMcQrAxhqY6y+e+dM=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:00:00Z","end_date":"2026-04-27T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"n84IHTWlPXfOLM93z8Q4QARhmTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"KUY9RhPeJD8s1MXGULwkP1ZqJa0="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"n84IHTWlPXfOLM93z8Q4QARhmTk=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T05:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"KUY9RhPeJD8s1MXGULwkP1ZqJa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"Py8hBlOoqDEKtlQgFq/mmotU3JA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"KUY9RhPeJD8s1MXGULwkP1ZqJa0=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T05:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"Py8hBlOoqDEKtlQgFq/mmotU3JA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"OiLBd6346W0pyDzFXII7lDMARvk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"Py8hBlOoqDEKtlQgFq/mmotU3JA=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T05:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"OiLBd6346W0pyDzFXII7lDMARvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"fYsmHZs3Arb1GGgXQtCm4OqOwGQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"OiLBd6346W0pyDzFXII7lDMARvk=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T05:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"fYsmHZs3Arb1GGgXQtCm4OqOwGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"ubG6YYGLUbl5t77OHuonVdky91Q="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"fYsmHZs3Arb1GGgXQtCm4OqOwGQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:00:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"ubG6YYGLUbl5t77OHuonVdky91Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"kjupwHPxaf0hvF74uZ1nC3Dux28="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"ubG6YYGLUbl5t77OHuonVdky91Q=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T05:00:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"kjupwHPxaf0hvF74uZ1nC3Dux28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"T9eLhaPtJlhZJHsC35VU1Uk93zw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"kjupwHPxaf0hvF74uZ1nC3Dux28=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:00:00Z","end_date":"2026-05-04T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"T9eLhaPtJlhZJHsC35VU1Uk93zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="},{"type":"next-occurrence","id":"lO7dfkjxCD+8a210LhJdRTmAFe4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"T9eLhaPtJlhZJHsC35VU1Uk93zw=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T05:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"lO7dfkjxCD+8a210LhJdRTmAFe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qYWJhb5y+GIyDinLD0OgJx3Nuno="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side coastal resiliency project ., Friday February 21st, 2025 thru Saturday September 5th, 2026, 11:00 PM thru 07:00 AM 1 Right lane of 3 lanes closed, Sunday February 23rd, 2025 thru Monday September 7th, 2026, 11:00 PM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday February 18th, 2025 thru Friday September 11th, 2026, Sunday thru Saturday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday February 22nd, 2025 thru Saturday September 5th, 2026, 01:00 AM thru 06:00 AM 2 Right lanes of 3 lanes closed, Sunday February 23rd, 2025 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed","update_date":"2025-02-17T17:34:50Z"},"road_event_id":"lO7dfkjxCD+8a210LhJdRTmAFe4=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T05:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977816,40.712369]]}},{"id":"tTG3fynz81d/yFMomGAfGhVR+wA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q1EWSGiLbGgN9PoNlMmGC2JQ3rg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"tTG3fynz81d/yFMomGAfGhVR+wA=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"q1EWSGiLbGgN9PoNlMmGC2JQ3rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"K7Q2ChQhflldGvFbquDhoagtUi0="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"q1EWSGiLbGgN9PoNlMmGC2JQ3rg=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"K7Q2ChQhflldGvFbquDhoagtUi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"vcM82TIOFutejiz0yqaQlpqSVxI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"K7Q2ChQhflldGvFbquDhoagtUi0=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"vcM82TIOFutejiz0yqaQlpqSVxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"tk1qXqCk49iVRlt/jBJuwcbVshY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"vcM82TIOFutejiz0yqaQlpqSVxI=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"tk1qXqCk49iVRlt/jBJuwcbVshY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"InRll0dPRKntwO+rjLbKYGU6byk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"tk1qXqCk49iVRlt/jBJuwcbVshY=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"InRll0dPRKntwO+rjLbKYGU6byk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"9d/4+yiPyGXGiub6C+9XXbxr4sg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"InRll0dPRKntwO+rjLbKYGU6byk=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"9d/4+yiPyGXGiub6C+9XXbxr4sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"BZkQfAncfG5tz/yGlqK5zZB5+7Y="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"9d/4+yiPyGXGiub6C+9XXbxr4sg=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"BZkQfAncfG5tz/yGlqK5zZB5+7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"MMerJwY0xJRvgzX1kVLMou23tqM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"BZkQfAncfG5tz/yGlqK5zZB5+7Y=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"MMerJwY0xJRvgzX1kVLMou23tqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"ivGWBJQytM6afDbKSoAbmaA1nxI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"MMerJwY0xJRvgzX1kVLMou23tqM=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"ivGWBJQytM6afDbKSoAbmaA1nxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"BQVIxInFApVaa4OVH/xZc0XkvaI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"ivGWBJQytM6afDbKSoAbmaA1nxI=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"BQVIxInFApVaa4OVH/xZc0XkvaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"Cy2gI0ec5oo812ZPEALFq+tZm8A="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"BQVIxInFApVaa4OVH/xZc0XkvaI=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"Cy2gI0ec5oo812ZPEALFq+tZm8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"I+EWdPZbGdU5FffIi//Ijr3omVM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"Cy2gI0ec5oo812ZPEALFq+tZm8A=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"I+EWdPZbGdU5FffIi//Ijr3omVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"goNa651dPYSn8kxOzqNIKzqAwD8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"I+EWdPZbGdU5FffIi//Ijr3omVM=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"goNa651dPYSn8kxOzqNIKzqAwD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="},{"type":"next-occurrence","id":"C3LM3btpPsDryUPvbaATQC8RJ/o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"goNa651dPYSn8kxOzqNIKzqAwD8=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"C3LM3btpPsDryUPvbaATQC8RJ/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tTG3fynz81d/yFMomGAfGhVR+wA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 33 - Den Road (Stamford) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 04:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 03:00 AM All lanes open","update_date":"2024-08-30T16:11:29Z"},"road_event_id":"C3LM3btpPsDryUPvbaATQC8RJ/o=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.599344,41.099039]]}},{"id":"63PLrr+Amt62QsP7E4WZV8BVwD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"op4qlb4iUCv2WP5RcY/RZfdvY4Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"63PLrr+Amt62QsP7E4WZV8BVwD8=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"op4qlb4iUCv2WP5RcY/RZfdvY4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"0AjO4t43tHYQPj3WXplG1XQnu5U="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"op4qlb4iUCv2WP5RcY/RZfdvY4Q=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"0AjO4t43tHYQPj3WXplG1XQnu5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"0yHnRiwMPUmO2GXXD+rsxsKbZow="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"0AjO4t43tHYQPj3WXplG1XQnu5U=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"0yHnRiwMPUmO2GXXD+rsxsKbZow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"jIemIMrmdygUKnm1wSRd170zIKc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"0yHnRiwMPUmO2GXXD+rsxsKbZow=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"jIemIMrmdygUKnm1wSRd170zIKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"5xTIRkwnKT0rhBJzaOu/U9hzKsk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"jIemIMrmdygUKnm1wSRd170zIKc=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"5xTIRkwnKT0rhBJzaOu/U9hzKsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"EJ7V5gmpmA+YnT+DCigIxIfz0vg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"5xTIRkwnKT0rhBJzaOu/U9hzKsk=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"EJ7V5gmpmA+YnT+DCigIxIfz0vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"kjQkhEFKzdxyoXmAs1/Ec53yLEQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"EJ7V5gmpmA+YnT+DCigIxIfz0vg=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"kjQkhEFKzdxyoXmAs1/Ec53yLEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"I4cwMcJ9wiLGqYLgij2JAavmh+0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"kjQkhEFKzdxyoXmAs1/Ec53yLEQ=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"I4cwMcJ9wiLGqYLgij2JAavmh+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"hy/lub3N+XZewR2uyUUYH2sAWBo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"I4cwMcJ9wiLGqYLgij2JAavmh+0=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"hy/lub3N+XZewR2uyUUYH2sAWBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"naI+EMAv8AO0dIt+IXHNtpHlvxE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"hy/lub3N+XZewR2uyUUYH2sAWBo=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"naI+EMAv8AO0dIt+IXHNtpHlvxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"o97fVeRGNNgi6IO+Z05uNRlpAU0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"naI+EMAv8AO0dIt+IXHNtpHlvxE=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"o97fVeRGNNgi6IO+Z05uNRlpAU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"Za2tyngScKRX5/o9LMfVybCoDeM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"o97fVeRGNNgi6IO+Z05uNRlpAU0=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"Za2tyngScKRX5/o9LMfVybCoDeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"hz7ntz0T9e7jZblD5xSsNqgvYCA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"Za2tyngScKRX5/o9LMfVybCoDeM=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"hz7ntz0T9e7jZblD5xSsNqgvYCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="},{"type":"next-occurrence","id":"UIYB+ZPwhcA19igjC2urimumulI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"hz7ntz0T9e7jZblD5xSsNqgvYCA=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"UIYB+ZPwhcA19igjC2urimumulI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"63PLrr+Amt62QsP7E4WZV8BVwD8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 28 - Round Hill Road (Greenwich) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Wednesday/Thursday/Friday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T16:11:55Z"},"road_event_id":"UIYB+ZPwhcA19igjC2urimumulI=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.665274,41.083546]]}},{"id":"S5x5ynEI5DiBzYJvrC8l9MO97DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"44N1PQSnR6r6ZAkiuEgp5rQEyZk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"S5x5ynEI5DiBzYJvrC8l9MO97DY=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"44N1PQSnR6r6ZAkiuEgp5rQEyZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"Zv3s9laNwTxyqCTGZh8fIwABi4o="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"44N1PQSnR6r6ZAkiuEgp5rQEyZk=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"Zv3s9laNwTxyqCTGZh8fIwABi4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"AaXr0zCUhAhMDB0syCUWBEijm2g="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"Zv3s9laNwTxyqCTGZh8fIwABi4o=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"AaXr0zCUhAhMDB0syCUWBEijm2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"sSTusnL0SedGptt4wqlM0NIvZ1E="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"AaXr0zCUhAhMDB0syCUWBEijm2g=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"sSTusnL0SedGptt4wqlM0NIvZ1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"2g5HUDRtEMrbTwzC2NTWBaxBrJs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"sSTusnL0SedGptt4wqlM0NIvZ1E=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"2g5HUDRtEMrbTwzC2NTWBaxBrJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"RZOGAqYQ8olu79j86V+6mmGnZZE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"2g5HUDRtEMrbTwzC2NTWBaxBrJs=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"RZOGAqYQ8olu79j86V+6mmGnZZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"ne/SGrIDO8nt2t9lXp7ehCoo1t8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"RZOGAqYQ8olu79j86V+6mmGnZZE=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"ne/SGrIDO8nt2t9lXp7ehCoo1t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"DCxNA5pjcUf8zesJ1KzzD5xcmxM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"ne/SGrIDO8nt2t9lXp7ehCoo1t8=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"DCxNA5pjcUf8zesJ1KzzD5xcmxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"rPK0wYOoi5sypfq5SpLwfsFDb44="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"DCxNA5pjcUf8zesJ1KzzD5xcmxM=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"rPK0wYOoi5sypfq5SpLwfsFDb44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"x6JtwW0UF/URo40UQgkypaybN0E="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"rPK0wYOoi5sypfq5SpLwfsFDb44=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"x6JtwW0UF/URo40UQgkypaybN0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"4oP/1yfM4OfXUh+R/pFHdVfHGCA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"x6JtwW0UF/URo40UQgkypaybN0E=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"4oP/1yfM4OfXUh+R/pFHdVfHGCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"/yObJqj6TIp3XHuwjpAG1y2iP2g="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"4oP/1yfM4OfXUh+R/pFHdVfHGCA=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"/yObJqj6TIp3XHuwjpAG1y2iP2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"xwMYzckmmiEXwoi5e8VAhh7DNIw="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"/yObJqj6TIp3XHuwjpAG1y2iP2g=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"xwMYzckmmiEXwoi5e8VAhh7DNIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="},{"type":"next-occurrence","id":"/BCHHfwtLPH8wf8cfwbGRKxYEpg="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"xwMYzckmmiEXwoi5e8VAhh7DNIw=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"/BCHHfwtLPH8wf8cfwbGRKxYEpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S5x5ynEI5DiBzYJvrC8l9MO97DY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 28 - Round Hill Road (Greenwich) and Exit 27 - King Street (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 07:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T15:59:13Z"},"road_event_id":"/BCHHfwtLPH8wf8cfwbGRKxYEpg=","beginning_cross_street":"Exit 28 - Round Hill Road","ending_cross_street":"Exit 27 - King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.664626,41.085414]]}},{"id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7d3bv+GciJQ3HV1RXWg4sAIz28Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"7d3bv+GciJQ3HV1RXWg4sAIz28Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"DrhZCQTz2EYgk2uuBedst+/1tmA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"7d3bv+GciJQ3HV1RXWg4sAIz28Q=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"DrhZCQTz2EYgk2uuBedst+/1tmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"URp1weFEDx+OVJCR6Ne4IMU1IMY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"DrhZCQTz2EYgk2uuBedst+/1tmA=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"URp1weFEDx+OVJCR6Ne4IMU1IMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"v49mDCv/N9at2ZblgHFgwPMgvMA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"URp1weFEDx+OVJCR6Ne4IMU1IMY=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"v49mDCv/N9at2ZblgHFgwPMgvMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"vuATyoipoalp719ytACPRZomkIQ="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"v49mDCv/N9at2ZblgHFgwPMgvMA=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"vuATyoipoalp719ytACPRZomkIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"+1Ys+NtR7IEj7QZr+QhoEpPolUU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"vuATyoipoalp719ytACPRZomkIQ=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"+1Ys+NtR7IEj7QZr+QhoEpPolUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"lTWG/Z6lWQQUZMvwCdq0PLfZSko="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"+1Ys+NtR7IEj7QZr+QhoEpPolUU=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"lTWG/Z6lWQQUZMvwCdq0PLfZSko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"D1JN+zAA1n//+80fAMsM7sl2lPI="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"lTWG/Z6lWQQUZMvwCdq0PLfZSko=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"D1JN+zAA1n//+80fAMsM7sl2lPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"0ReBuR8Ba4CLGJoq/M8KOV9NZsA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"D1JN+zAA1n//+80fAMsM7sl2lPI=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"0ReBuR8Ba4CLGJoq/M8KOV9NZsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"KjQj15ooT4Il6bxX2QHInyvtXqo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"0ReBuR8Ba4CLGJoq/M8KOV9NZsA=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"KjQj15ooT4Il6bxX2QHInyvtXqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"eLHjxLgbJoptN4fQaLya1JLSpoY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"KjQj15ooT4Il6bxX2QHInyvtXqo=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"eLHjxLgbJoptN4fQaLya1JLSpoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"B91ZNLN4X7eUF8l8YYatkwMO0Fg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"eLHjxLgbJoptN4fQaLya1JLSpoY=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"B91ZNLN4X7eUF8l8YYatkwMO0Fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"YmQ2UEZz2TZYHzF9l77vi+P6H5s="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"B91ZNLN4X7eUF8l8YYatkwMO0Fg=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"YmQ2UEZz2TZYHzF9l77vi+P6H5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="},{"type":"next-occurrence","id":"he7AIRpHj5cZbi97qL5magAaXSY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"YmQ2UEZz2TZYHzF9l77vi+P6H5s=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"he7AIRpHj5cZbi97qL5magAaXSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mUd+d0rS4Mu4kHP22rM6SbpKJpM="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 27 - King Street (Greenwich) and Exit 28 - Round Hill Road (Greenwich) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T15:59:55Z"},"road_event_id":"he7AIRpHj5cZbi97qL5magAaXSY=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 28 - Round Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674238,41.038652]]}},{"id":"Y6uIGdaN3HdWZaDe/NuYrk55REs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lKKL2KwzZD68YZYRm3xYBSjvIvc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"Y6uIGdaN3HdWZaDe/NuYrk55REs=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"lKKL2KwzZD68YZYRm3xYBSjvIvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"UgUQAUXgqDeP5WQX72SZ1vAFM6w="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"lKKL2KwzZD68YZYRm3xYBSjvIvc=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"UgUQAUXgqDeP5WQX72SZ1vAFM6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"y20e+zBmPO1OEfFZjoJ4pdQXg5c="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"UgUQAUXgqDeP5WQX72SZ1vAFM6w=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"y20e+zBmPO1OEfFZjoJ4pdQXg5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"IcKQ1y/SPAOQUOGQ//6gKBsdkLM="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"y20e+zBmPO1OEfFZjoJ4pdQXg5c=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"IcKQ1y/SPAOQUOGQ//6gKBsdkLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"SwIJHJ8uUinfBdUZQJVvvAVIyIU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"IcKQ1y/SPAOQUOGQ//6gKBsdkLM=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"SwIJHJ8uUinfBdUZQJVvvAVIyIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"9D37uKj441EgZBGN/iFeNEAJJ+w="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"SwIJHJ8uUinfBdUZQJVvvAVIyIU=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"9D37uKj441EgZBGN/iFeNEAJJ+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"05yD+Qo8IjE3G1+2wnHrtloO0O4="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"9D37uKj441EgZBGN/iFeNEAJJ+w=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"05yD+Qo8IjE3G1+2wnHrtloO0O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"69gwvqqtEG9/eBC7F3nXrncf8WE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"05yD+Qo8IjE3G1+2wnHrtloO0O4=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"69gwvqqtEG9/eBC7F3nXrncf8WE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"3yMFJ4QDAKu3z3GXfo8iWBza31M="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"69gwvqqtEG9/eBC7F3nXrncf8WE=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"3yMFJ4QDAKu3z3GXfo8iWBza31M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"GTo2OpVov9AHOB1FA3bwoP3jNEE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"3yMFJ4QDAKu3z3GXfo8iWBza31M=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"GTo2OpVov9AHOB1FA3bwoP3jNEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"84Dw+I838R1gn9mEAuwhrFmPMUE="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"GTo2OpVov9AHOB1FA3bwoP3jNEE=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"84Dw+I838R1gn9mEAuwhrFmPMUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"DttZj7axUqMRJSptE+rhikc13Js="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"84Dw+I838R1gn9mEAuwhrFmPMUE=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"DttZj7axUqMRJSptE+rhikc13Js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"eO4f8l+NGMi0TvwY2iyWMhA41U8="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"DttZj7axUqMRJSptE+rhikc13Js=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"eO4f8l+NGMi0TvwY2iyWMhA41U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="},{"type":"next-occurrence","id":"vWTD4SuPejvtdyz66ZaI/wMAb1s="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"eO4f8l+NGMi0TvwY2iyWMhA41U8=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"vWTD4SuPejvtdyz66ZaI/wMAb1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y6uIGdaN3HdWZaDe/NuYrk55REs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 39 - US 7/Main Avenue (Norwalk) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 08:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 07:00 PM thru 05:00 AM All lanes open","update_date":"2024-08-30T17:50:59Z"},"road_event_id":"vWTD4SuPejvtdyz66ZaI/wMAb1s=","beginning_cross_street":"Exit 39 - US 7/Main Avenue","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.428232,41.142275]]}},{"id":"kBs96rX0VE8pOQ/CdmcXME+6TXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Tc3eVA4miK5FvWsbJgruo8QzpnY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"kBs96rX0VE8pOQ/CdmcXME+6TXo=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"Tc3eVA4miK5FvWsbJgruo8QzpnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"ZXRBm9R/QyJkSBH8+LqNAgSesLY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"Tc3eVA4miK5FvWsbJgruo8QzpnY=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"ZXRBm9R/QyJkSBH8+LqNAgSesLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"jhYc3LB9E4iPz57ym4kg8+O1So0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"ZXRBm9R/QyJkSBH8+LqNAgSesLY=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"jhYc3LB9E4iPz57ym4kg8+O1So0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"5IQopv3SU78tAi4XWDVnKk+EuIk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"jhYc3LB9E4iPz57ym4kg8+O1So0=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"5IQopv3SU78tAi4XWDVnKk+EuIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"oRip6YuelyZFE+0K+nZswW08KZo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"5IQopv3SU78tAi4XWDVnKk+EuIk=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"oRip6YuelyZFE+0K+nZswW08KZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"+zM0HPA6bP4Mr+7KNPfCDq4F558="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"oRip6YuelyZFE+0K+nZswW08KZo=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"+zM0HPA6bP4Mr+7KNPfCDq4F558=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"6o7UoqZoy1cLV7UiExinv60kOYY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"+zM0HPA6bP4Mr+7KNPfCDq4F558=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"6o7UoqZoy1cLV7UiExinv60kOYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"fkXpEDVOouj2RxlmeoZAqyy9uLU="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"6o7UoqZoy1cLV7UiExinv60kOYY=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"fkXpEDVOouj2RxlmeoZAqyy9uLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"GsO0iraXnvy3sXNZ5oGGUGebkY8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"fkXpEDVOouj2RxlmeoZAqyy9uLU=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"GsO0iraXnvy3sXNZ5oGGUGebkY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"BoBOWG7iwL4siWKpvOMItkB1RyA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"GsO0iraXnvy3sXNZ5oGGUGebkY8=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"BoBOWG7iwL4siWKpvOMItkB1RyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"Q7JgmcDRu3keHxjsYznJdGgy2PA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"BoBOWG7iwL4siWKpvOMItkB1RyA=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"Q7JgmcDRu3keHxjsYznJdGgy2PA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"zyJvuCjqzKq+Nth2KvIFmO+PhNg="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"Q7JgmcDRu3keHxjsYznJdGgy2PA=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"zyJvuCjqzKq+Nth2KvIFmO+PhNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"iEuYDC540FyqkvPso88wvBm5BFc="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"zyJvuCjqzKq+Nth2KvIFmO+PhNg=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"iEuYDC540FyqkvPso88wvBm5BFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="},{"type":"next-occurrence","id":"ggYXPE/1+2OIRFpwnh9ArFsZ7B4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"iEuYDC540FyqkvPso88wvBm5BFc=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"ggYXPE/1+2OIRFpwnh9ArFsZ7B4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kBs96rX0VE8pOQ/CdmcXME+6TXo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 35 - CT 137/High Ridge Road (Stamford) and Exit 39 - US 7/Main Avenue (Norwalk) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 02:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:46:55Z"},"road_event_id":"ggYXPE/1+2OIRFpwnh9ArFsZ7B4=","beginning_cross_street":"Exit 35 - CT 137/High Ridge Road","ending_cross_street":"Exit 39 - US 7/Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.546589,41.111894]]}},{"id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"67vblCC7FWMsLpn5GqHIlG1ej5M="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"67vblCC7FWMsLpn5GqHIlG1ej5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"EOQEbFztX2Cgwp2g/h9WsU89xLY="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"67vblCC7FWMsLpn5GqHIlG1ej5M=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"EOQEbFztX2Cgwp2g/h9WsU89xLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"X5iignNl+Rmad2UQpslJsHcZ018="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"EOQEbFztX2Cgwp2g/h9WsU89xLY=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"X5iignNl+Rmad2UQpslJsHcZ018=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"w1e4ZfXo4kbPgQn8aEgLKXNHnOU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"X5iignNl+Rmad2UQpslJsHcZ018=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T21:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"w1e4ZfXo4kbPgQn8aEgLKXNHnOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"LA3KZLokWC5EYsjQwWmxGPqDu+c="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"w1e4ZfXo4kbPgQn8aEgLKXNHnOU=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"LA3KZLokWC5EYsjQwWmxGPqDu+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"in5ISYEaHmtk5CWcq+W1C1m/A1E="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"LA3KZLokWC5EYsjQwWmxGPqDu+c=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"in5ISYEaHmtk5CWcq+W1C1m/A1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"x0it9fY+Woi+hgJfL5u/JxPDh+Y="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"in5ISYEaHmtk5CWcq+W1C1m/A1E=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"x0it9fY+Woi+hgJfL5u/JxPDh+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"16zaa6DFrr0qsmKeW/MvroSqqlI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"x0it9fY+Woi+hgJfL5u/JxPDh+Y=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"16zaa6DFrr0qsmKeW/MvroSqqlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"szHEeDLe97TlOtdhmKIrgmMLr2U="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"16zaa6DFrr0qsmKeW/MvroSqqlI=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"szHEeDLe97TlOtdhmKIrgmMLr2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"tNMIvO8zfauGY7ETgmVMZuZBCcs="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"szHEeDLe97TlOtdhmKIrgmMLr2U=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"tNMIvO8zfauGY7ETgmVMZuZBCcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"3i1jNKeKydvSm7ZfQCjYUFpjfnU="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"tNMIvO8zfauGY7ETgmVMZuZBCcs=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T21:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"3i1jNKeKydvSm7ZfQCjYUFpjfnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"5ARclA+myue6Z/O5cIXMdthyQkk="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"3i1jNKeKydvSm7ZfQCjYUFpjfnU=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"5ARclA+myue6Z/O5cIXMdthyQkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"/Vn4RgD/azsVVnjeQRr/YMIo5YA="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"5ARclA+myue6Z/O5cIXMdthyQkk=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"/Vn4RgD/azsVVnjeQRr/YMIo5YA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="},{"type":"next-occurrence","id":"OMLx2CxzhhCSVV5ULqEKaivriuc="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"/Vn4RgD/azsVVnjeQRr/YMIo5YA=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"OMLx2CxzhhCSVV5ULqEKaivriuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UL1/3zKPe+ISNxjl+LNx6+dX7aI="}],"description":"Sign work on Merritt Parkway/CT 15 southbound between Exit 36 - CT 106/Weed Street (New Canaan) and Exit 33 - Den Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 04:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 06:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 04:00 AM All lanes open","update_date":"2024-08-30T17:44:07Z"},"road_event_id":"OMLx2CxzhhCSVV5ULqEKaivriuc=","beginning_cross_street":"Exit 36 - CT 106/Weed Street","ending_cross_street":"Exit 33 - Den Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.518591,41.118888]]}},{"id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8cLneeMGouJ7t9mW5odlu+N+/d8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"8cLneeMGouJ7t9mW5odlu+N+/d8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"Ps6StTZJFBEFAX86qNllK1SBG6Q="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"8cLneeMGouJ7t9mW5odlu+N+/d8=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"Ps6StTZJFBEFAX86qNllK1SBG6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"u6ipsxKs2TXe6xE12KAk1uUvsqE="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"Ps6StTZJFBEFAX86qNllK1SBG6Q=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"u6ipsxKs2TXe6xE12KAk1uUvsqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"CzJFKY7wTbf3OvrdSRER0o2HET0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"u6ipsxKs2TXe6xE12KAk1uUvsqE=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"CzJFKY7wTbf3OvrdSRER0o2HET0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"ouqbjL0w+pFltVw4MmSgYmvoT8c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"CzJFKY7wTbf3OvrdSRER0o2HET0=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T21:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"ouqbjL0w+pFltVw4MmSgYmvoT8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"gK+BMhIGUy4UcFMzpZ9HSZKgZUk="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"ouqbjL0w+pFltVw4MmSgYmvoT8c=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"gK+BMhIGUy4UcFMzpZ9HSZKgZUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"87STaTMtXN5QCe+vlNDnkkGA9K8="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"gK+BMhIGUy4UcFMzpZ9HSZKgZUk=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"87STaTMtXN5QCe+vlNDnkkGA9K8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"TUzLtRUXWhusTCOF51PJMcUKUGA="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"87STaTMtXN5QCe+vlNDnkkGA9K8=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"TUzLtRUXWhusTCOF51PJMcUKUGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"TWWxfPBlRCeISv0EDO42VPNuFC0="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"TUzLtRUXWhusTCOF51PJMcUKUGA=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"TWWxfPBlRCeISv0EDO42VPNuFC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"QFX0y6SSUt86b8vWXLM9DbkzB4c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"TWWxfPBlRCeISv0EDO42VPNuFC0=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"QFX0y6SSUt86b8vWXLM9DbkzB4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"CjVtc36cxOdZ09wtNOAKWWcD1XY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"QFX0y6SSUt86b8vWXLM9DbkzB4c=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"CjVtc36cxOdZ09wtNOAKWWcD1XY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"r9SKO9EpW2ic8qbwQTQ3Z9MiKY4="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"CjVtc36cxOdZ09wtNOAKWWcD1XY=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T21:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"r9SKO9EpW2ic8qbwQTQ3Z9MiKY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"37nfXikRoIN/7tcmPGXm9HmJ8xY="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"r9SKO9EpW2ic8qbwQTQ3Z9MiKY4=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"37nfXikRoIN/7tcmPGXm9HmJ8xY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="},{"type":"next-occurrence","id":"V2N+8TNaxVuiPL4wsN63XMzEu6c="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"37nfXikRoIN/7tcmPGXm9HmJ8xY=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"V2N+8TNaxVuiPL4wsN63XMzEu6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GwBu8jWLlm6+j7wVVNHnUNJ28mo="}],"description":"Sign work on Merritt Parkway/CT 15 northbound between Exit 33 - Den Road (Stamford) and Exit 35 - CT 137/High Ridge Road (Stamford) There will be lane closures, Monday September 9th, 2024 thru Saturday July 11th, 2026, Monday/Tuesday, 08:00 PM thru 06:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 08:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, Thursday/Friday/Saturday, 06:00 PM thru 03:00 AM All lanes open, Monday September 9th, 2024 thru Saturday July 11th, 2026, 05:00 PM thru 06:00 AM All lanes open","update_date":"2024-08-30T17:39:22Z"},"road_event_id":"V2N+8TNaxVuiPL4wsN63XMzEu6c=","beginning_cross_street":"Exit 33 - Den Road","ending_cross_street":"Exit 35 - CT 137/High Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.575583,41.10099]]}},{"id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"we/3tkFEdZjOqz56bCOSsvYj7wk="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"we/3tkFEdZjOqz56bCOSsvYj7wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"zzhBkr7tV4PzxRs/skyaUJYG2ts="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"we/3tkFEdZjOqz56bCOSsvYj7wk=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"zzhBkr7tV4PzxRs/skyaUJYG2ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"9kGphF/zLf6mgtuUwRj+3XQ/lPo="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"zzhBkr7tV4PzxRs/skyaUJYG2ts=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"9kGphF/zLf6mgtuUwRj+3XQ/lPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"yA8N8dQ8TsU7DxiKrrzzBX/KqtQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"9kGphF/zLf6mgtuUwRj+3XQ/lPo=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"yA8N8dQ8TsU7DxiKrrzzBX/KqtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"Pi2wQy8KFYIJ+KSkMVsxdEHu1Rw="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"yA8N8dQ8TsU7DxiKrrzzBX/KqtQ=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T05:00:00Z","end_date":"2026-04-26T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"Pi2wQy8KFYIJ+KSkMVsxdEHu1Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"y02V50sSkHhGLL2zHD8JTOMm/BA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"Pi2wQy8KFYIJ+KSkMVsxdEHu1Rw=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T05:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"y02V50sSkHhGLL2zHD8JTOMm/BA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"r8oH0v0jX1wrXgDSNt2VGEGa9Bc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"y02V50sSkHhGLL2zHD8JTOMm/BA=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"r8oH0v0jX1wrXgDSNt2VGEGa9Bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"IlwmxVKyYjpYXiRfn8b5bjBGjMg="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"r8oH0v0jX1wrXgDSNt2VGEGa9Bc=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"IlwmxVKyYjpYXiRfn8b5bjBGjMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"wdXxGojdxmuypa669BIywyqp1CA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"IlwmxVKyYjpYXiRfn8b5bjBGjMg=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"wdXxGojdxmuypa669BIywyqp1CA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"so/OYHkEFf11IEUtl6ebbaRIJvM="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"wdXxGojdxmuypa669BIywyqp1CA=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"so/OYHkEFf11IEUtl6ebbaRIJvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"jKvUe2AMNeCfQvVRo2cvAZzGa1I="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"so/OYHkEFf11IEUtl6ebbaRIJvM=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"jKvUe2AMNeCfQvVRo2cvAZzGa1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"qv3Ki/BlrxNh2EiLQzi/PykyoRc="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"jKvUe2AMNeCfQvVRo2cvAZzGa1I=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T05:00:00Z","end_date":"2026-05-03T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"qv3Ki/BlrxNh2EiLQzi/PykyoRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"ow2xvchFRY2yUHVeEmBRm5Jx6ek="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"qv3Ki/BlrxNh2EiLQzi/PykyoRc=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T05:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"ow2xvchFRY2yUHVeEmBRm5Jx6ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"EHAr5N03CO84Z+aF65mAOcaLGwA="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"ow2xvchFRY2yUHVeEmBRm5Jx6ek=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"EHAr5N03CO84Z+aF65mAOcaLGwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="},{"type":"next-occurrence","id":"OmEEUbtt+HT+lwA8EMEfPLzXWG4="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"EHAr5N03CO84Z+aF65mAOcaLGwA=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"OmEEUbtt+HT+lwA8EMEfPLzXWG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KDLqQzqyUsS9OwJyhAan8bSLWfQ="}],"description":"Construction on Franklin D. Roosevelt Drive southbound between Williamsburg Bridge (New York) and Marginal Street (New York) These closures are necessary to facilitate East Side Coastal Resiliency Project ., Saturday July 13th, 2024 thru Saturday September 5th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Tuesday July 9th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 10:00 PM thru 01:00 AM 1 Right lane of 3 lanes closed, Wednesday July 10th, 2024 thru Friday September 11th, 2026, Monday thru Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 3 lanes closed, Saturday July 13th, 2024 thru Saturday September 5th, 2026, 12:01 AM thru 01:00 AM 1 Right lane of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 01:00 AM thru 07:00 AM 2 Right lanes of 3 lanes closed, Sunday July 14th, 2024 thru Sunday September 6th, 2026, 07:00 AM thru 11:00 AM 1 Right lane of 3 lanes closed","update_date":"2024-07-09T13:07:41Z"},"road_event_id":"OmEEUbtt+HT+lwA8EMEfPLzXWG4=","beginning_cross_street":"Williamsburg Bridge","ending_cross_street":"Marginal Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977832,40.712345]]}},{"id":"6idtcG2dJBGsXfFqI6S3KAyKY7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HOLABIRD AVE"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on HOLABIRD AVE both directions between WHITING ST (Winchester) and CT-8 (Winchester) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T02:07:15Z"},"road_event_id":"6idtcG2dJBGsXfFqI6S3KAyKY7k=","beginning_cross_street":"WHITING ST","ending_cross_street":"CT-8","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.059289,41.923719]]}},{"id":"ZMicVOOughhZGeu300SIPjWdBJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLAY ST"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CLAY ST both directions between RANDOLPH AVE (Thomaston) and UNION ST at ELM ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:50:21Z"},"road_event_id":"ZMicVOOughhZGeu300SIPjWdBJk=","beginning_cross_street":"RANDOLPH AVE","ending_cross_street":"ELM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.077,41.677265]]}},{"id":"SDtIFHHBsJAdyYO6cXGLdMNdf2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-262"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on CT-262 eastbound between FERN HILL RD (Watertown) and CT-262 (Watertown) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T02:02:58Z"},"road_event_id":"SDtIFHHBsJAdyYO6cXGLdMNdf2w=","beginning_cross_street":"FERN HILL RD","ending_cross_street":"CT-262","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107738,41.621755]]}},{"id":"WA/ODO+Mgvli0ktN8Ogw/dvPJjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ELM ST"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on ELM ST both directions between UNION ST (Thomaston) and MEADOW ST at CENTER ST (Thomaston) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:48:12Z"},"road_event_id":"WA/ODO+Mgvli0ktN8Ogw/dvPJjE=","beginning_cross_street":"UNION ST","ending_cross_street":"CENTER ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.07382,41.671079]]}},{"id":"ORC300447549","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","description":"Roadwork on NJ 38 Eastbound At Cherry Hill Mall (Cherry Hill Twp) Friday June 6, 2025 09:00 AM thru 03:00 PM, 1 left lane of 3 lanes closed","update_date":"2025-06-06T19:00:18Z"},"road_event_id":"ORC300447549","beginning_cross_street":"Cherry Hill Mall","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-05T21:01:14Z","end_date":"2025-06-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.022666,39.939041]]}},{"id":"c2i+tjLJzLUGU6WrhzF53oFyOE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOUNTAIN RD"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on MOUNTAIN RD both directions between CT-189 (Simsbury) and CT-189 (Bloomfield) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:35:42Z"},"road_event_id":"c2i+tjLJzLUGU6WrhzF53oFyOE4=","beginning_cross_street":"CT-189","ending_cross_street":"CT-189","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.761415,41.908119]]}},{"id":"Bq+JEwr+4Q0posZXsvml5qnGwFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q32 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q32 Bus at Roosevelt Av/61 St (New York) stop has been relocated through September 2026. Buses are making a temporary stop on Roosevelt Ave at 61st St before the intersection., Continuous Friday September 15th, 2023 11:45 AM thru Wednesday September 30th, 2026 11:59 PM","update_date":"2026-01-07T13:19:57Z"},"road_event_id":"Bq+JEwr+4Q0posZXsvml5qnGwFQ=","beginning_cross_street":"Roosevelt Av/61 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903548,40.745562]]}},{"id":"WCECka4IjXYnUESNUPGwwB36lsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M20 Bus and M55 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M20 Bus and M55 Bus at State St/Bridge St (New York) stop is closed. Use the temporary stop on State St before the intersection instead., Continuous Monday April 14th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-04-13T22:07:57Z"},"road_event_id":"WCECka4IjXYnUESNUPGwwB36lsE=","beginning_cross_street":"State St/Bridge St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014524,40.70335]]}},{"id":"N9eOE9pb08DiphUsEMqsFky6jLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LtgSFODuoLAOTirIjVNTK3DTm6U="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for East Side Coast Resiliency., Saturday March 8th,2025 thru Saturday April 1st,2028, Saturday, 08:00 AM thru 04:00 PM All lanes closed eastbound,","update_date":"2025-03-28T20:00:04Z"},"road_event_id":"N9eOE9pb08DiphUsEMqsFky6jLI=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975417,40.73297]]}},{"id":"LtgSFODuoLAOTirIjVNTK3DTm6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N9eOE9pb08DiphUsEMqsFky6jLI="}],"description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for East Side Coast Resiliency., Saturday March 8th,2025 thru Saturday April 1st,2028, Saturday, 08:00 AM thru 04:00 PM All lanes closed eastbound,","update_date":"2025-03-28T20:00:04Z"},"road_event_id":"LtgSFODuoLAOTirIjVNTK3DTm6U=","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975417,40.73297]]}},{"id":"rwcVl2kRDce7vtGF7AjydtVynE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hudson"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Hudson bypassing Breakneck Ridge (Fishkill), Continuous Monday April 21st, 2025 12:00 AM thru Wednesday April 21st, 2027 11:59 PM bypassing","update_date":"2025-04-14T15:42:22Z"},"road_event_id":"rwcVl2kRDce7vtGF7AjydtVynE0=","beginning_cross_street":"Breakneck Ridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.982449,41.450181]]}},{"id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W9Ip7vj10N13I0VRMWAHT8YXYZg="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"W9Ip7vj10N13I0VRMWAHT8YXYZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"F/iWgQFbRMAxf3K1SwvA54EiK1M="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"W9Ip7vj10N13I0VRMWAHT8YXYZg=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"F/iWgQFbRMAxf3K1SwvA54EiK1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"myIYDyk2Ls+R8KdcEz6IREwxR70="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"F/iWgQFbRMAxf3K1SwvA54EiK1M=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"myIYDyk2Ls+R8KdcEz6IREwxR70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"+nbVizO/4CkN5tfUO/7C7uzhsBQ="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"myIYDyk2Ls+R8KdcEz6IREwxR70=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"+nbVizO/4CkN5tfUO/7C7uzhsBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"Gtmeitk+43WH6OPB978t18VpT9Y="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"+nbVizO/4CkN5tfUO/7C7uzhsBQ=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"Gtmeitk+43WH6OPB978t18VpT9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"d8jUPzwE3c5wxRRVGg1OrCMSfMQ="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"Gtmeitk+43WH6OPB978t18VpT9Y=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"d8jUPzwE3c5wxRRVGg1OrCMSfMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"/BH9Cy5nEMmKIBfIq3670D+SBvA="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"d8jUPzwE3c5wxRRVGg1OrCMSfMQ=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"/BH9Cy5nEMmKIBfIq3670D+SBvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"2/ESLZKPJbGiTYuy9PIXXkTTZKc="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"/BH9Cy5nEMmKIBfIq3670D+SBvA=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"2/ESLZKPJbGiTYuy9PIXXkTTZKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"Z6cvyjWmLDcqAFE7Ma2RoEKcx2k="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"2/ESLZKPJbGiTYuy9PIXXkTTZKc=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"Z6cvyjWmLDcqAFE7Ma2RoEKcx2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"K/Bc417N3oTuXAFDxe3XYjL4ib8="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"Z6cvyjWmLDcqAFE7Ma2RoEKcx2k=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"K/Bc417N3oTuXAFDxe3XYjL4ib8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"kHBdWModOmtMI5ge094GddE4jMA="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"K/Bc417N3oTuXAFDxe3XYjL4ib8=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"kHBdWModOmtMI5ge094GddE4jMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"BiI0C+LeowxRW3PXCoGhAFx5KAY="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"kHBdWModOmtMI5ge094GddE4jMA=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"BiI0C+LeowxRW3PXCoGhAFx5KAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"/3/CVAZWQYweHk0GQsDpyPP7J74="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"BiI0C+LeowxRW3PXCoGhAFx5KAY=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"/3/CVAZWQYweHk0GQsDpyPP7J74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="},{"type":"next-occurrence","id":"1F9bW2aDcoLvSZeRso6sXOaqwd0="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"/3/CVAZWQYweHk0GQsDpyPP7J74=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"1F9bW2aDcoLvSZeRso6sXOaqwd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WSSnQRiI8hvhXNDEgmlfmOu0zs8="}],"description":"Construction on 16TH ST eastbound between 5TH AVE (New York) and 6TH AVE (New York) for delivery and rebar., Friday August 8th, 2025 thru Thursday May 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T17:54:22Z"},"road_event_id":"1F9bW2aDcoLvSZeRso6sXOaqwd0=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989738,40.664916]]}},{"id":"zsC4mO6QzbZWrOdtyKcDpyL2Xqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"T7xe/W9dYGsDZ89o2e/Jq2jwPZg="}],"description":"Intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:19:24Z"},"road_event_id":"zsC4mO6QzbZWrOdtyKcDpyL2Xqg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.609625,43.977898]]}},{"id":"T7xe/W9dYGsDZ89o2e/Jq2jwPZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zsC4mO6QzbZWrOdtyKcDpyL2Xqg="},{"type":"next-occurrence","id":"bRxsbj2h/csEHwhpZmt3xnyBgf4="}],"description":"Intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:19:24Z"},"road_event_id":"T7xe/W9dYGsDZ89o2e/Jq2jwPZg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.609625,43.977898]]}},{"id":"bRxsbj2h/csEHwhpZmt3xnyBgf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zsC4mO6QzbZWrOdtyKcDpyL2Xqg="}],"description":"Intersection improvements on NY 126 both directions (Wilna) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:19:24Z"},"road_event_id":"bRxsbj2h/csEHwhpZmt3xnyBgf4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.609625,43.977898]]}},{"id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hyCvX5UL3CwA8rL0NKA8YxHYae8="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"hyCvX5UL3CwA8rL0NKA8YxHYae8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"wn22Hcolakh1XMyJnsXbhpJYguo="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"hyCvX5UL3CwA8rL0NKA8YxHYae8=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"wn22Hcolakh1XMyJnsXbhpJYguo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"u7H7RmfGoJhuXgLgScqFI1a2lWA="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"wn22Hcolakh1XMyJnsXbhpJYguo=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"u7H7RmfGoJhuXgLgScqFI1a2lWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"qtHE60ml79/zxAh05CaFlpndv4Q="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"u7H7RmfGoJhuXgLgScqFI1a2lWA=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"qtHE60ml79/zxAh05CaFlpndv4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"Jksv2x0+rHrkNquHcipf54gNhZ8="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"qtHE60ml79/zxAh05CaFlpndv4Q=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"Jksv2x0+rHrkNquHcipf54gNhZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"sNjlaU/kgWBJlEpZgZ6unYlOvck="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"Jksv2x0+rHrkNquHcipf54gNhZ8=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"sNjlaU/kgWBJlEpZgZ6unYlOvck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"jmmcTvgYsqEGcVPZe7xNdpjI1AQ="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"sNjlaU/kgWBJlEpZgZ6unYlOvck=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"jmmcTvgYsqEGcVPZe7xNdpjI1AQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"dItunyhPZCwvtmBV0fu2GWDx6XM="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"jmmcTvgYsqEGcVPZe7xNdpjI1AQ=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"dItunyhPZCwvtmBV0fu2GWDx6XM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"ifsZ2S05Vaz/xo0zhQkp2MN/3uI="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"dItunyhPZCwvtmBV0fu2GWDx6XM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"ifsZ2S05Vaz/xo0zhQkp2MN/3uI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="},{"type":"next-occurrence","id":"2Tts8aEeUSIFtewqCAw8iA48Px4="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"ifsZ2S05Vaz/xo0zhQkp2MN/3uI=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"2Tts8aEeUSIFtewqCAw8iA48Px4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUW/ZvpOjuHjSLlfQNNxevNXPy4="}],"description":"Bridge rehabilitation on NY 304 both directions between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/NIGHT/B1045400/32254609 - Plan travel accordingly; delays may exist, Monday January 12th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-16T17:28:49Z"},"road_event_id":"2Tts8aEeUSIFtewqCAw8iA48Px4=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997524,41.102213]]}},{"id":"nu18hspJUB9CdiMhx+AiNExUYcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1XvkkFQ+jGepIC5OywVOQ9aqaCc="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"nu18hspJUB9CdiMhx+AiNExUYcQ=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"1XvkkFQ+jGepIC5OywVOQ9aqaCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"DvrhlDFgs8P2OPhd0ZV3q9Y/OzM="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"1XvkkFQ+jGepIC5OywVOQ9aqaCc=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"DvrhlDFgs8P2OPhd0ZV3q9Y/OzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"Zag6sMwdWsOakfi84/OxF/qn1NM="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"DvrhlDFgs8P2OPhd0ZV3q9Y/OzM=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"Zag6sMwdWsOakfi84/OxF/qn1NM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"1IXkz84DKtJRvV6yFMthB5wEx58="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"Zag6sMwdWsOakfi84/OxF/qn1NM=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"1IXkz84DKtJRvV6yFMthB5wEx58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"9C90mbcHbJm3yaWX4Nvy53xvbzU="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"1IXkz84DKtJRvV6yFMthB5wEx58=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"9C90mbcHbJm3yaWX4Nvy53xvbzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"7+9hyxBey8n2+P7//6OpYvhl048="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"9C90mbcHbJm3yaWX4Nvy53xvbzU=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"7+9hyxBey8n2+P7//6OpYvhl048=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"bJdL0PjQwYAJGc36XpD1SglqqLU="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"7+9hyxBey8n2+P7//6OpYvhl048=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"bJdL0PjQwYAJGc36XpD1SglqqLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"NHz9V2Rnt0CdX/U/C3LhI5chy/s="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"bJdL0PjQwYAJGc36XpD1SglqqLU=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"NHz9V2Rnt0CdX/U/C3LhI5chy/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"ohCNAgiymrXemLOy08A4qao5Too="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"NHz9V2Rnt0CdX/U/C3LhI5chy/s=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"ohCNAgiymrXemLOy08A4qao5Too=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="},{"type":"next-occurrence","id":"Llm998waflZa5Q23z3dPyuyVFNE="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"ohCNAgiymrXemLOy08A4qao5Too=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"Llm998waflZa5Q23z3dPyuyVFNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-213"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nu18hspJUB9CdiMhx+AiNExUYcQ="}],"description":"Traffic signal repairs on CT-213 both directions between BLYDENBURG AVE (New London) and MAHAN ST (New London) there will be various lane closures., Tuesday April 1st, 2025 thru Thursday August 27th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:05:23Z"},"road_event_id":"Llm998waflZa5Q23z3dPyuyVFNE=","beginning_cross_street":"BLYDENBURG AVE","ending_cross_street":"MAHAN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.108255,41.342952]]}},{"id":"6m+4YGiRL8aBEGrRx+To0vw57D8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"263cZDMJVFwUFNhns4PUvM+wEhY="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"6m+4YGiRL8aBEGrRx+To0vw57D8=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"263cZDMJVFwUFNhns4PUvM+wEhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"cZnKwFGqSA7v4cH3SVt8VrwA6Lg="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"263cZDMJVFwUFNhns4PUvM+wEhY=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"cZnKwFGqSA7v4cH3SVt8VrwA6Lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"466uWgQshi3U1U6dTvmcxEoRY4I="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"cZnKwFGqSA7v4cH3SVt8VrwA6Lg=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"466uWgQshi3U1U6dTvmcxEoRY4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"5c8TFWj0OVCWnANOH+sxaQc7gWI="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"466uWgQshi3U1U6dTvmcxEoRY4I=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"5c8TFWj0OVCWnANOH+sxaQc7gWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"AtIarXW3gULbcRV/38igGk0vwL8="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"5c8TFWj0OVCWnANOH+sxaQc7gWI=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"AtIarXW3gULbcRV/38igGk0vwL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"aAJeq5Nj3UiCTwRSBzpfT60aKyI="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"AtIarXW3gULbcRV/38igGk0vwL8=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"aAJeq5Nj3UiCTwRSBzpfT60aKyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"xQGCQN0/eqzx/HepzLwffjREXk0="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"aAJeq5Nj3UiCTwRSBzpfT60aKyI=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"xQGCQN0/eqzx/HepzLwffjREXk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"mjCT54ezSrWSPSz8QS94/jJo5dY="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"xQGCQN0/eqzx/HepzLwffjREXk0=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"mjCT54ezSrWSPSz8QS94/jJo5dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"k4MMBNoN9ZYS5B7kB6BmOunz1e4="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"mjCT54ezSrWSPSz8QS94/jJo5dY=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"k4MMBNoN9ZYS5B7kB6BmOunz1e4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="},{"type":"next-occurrence","id":"vW0Zym/z9Ptl4Dc+PEbte0MZv2w="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"k4MMBNoN9ZYS5B7kB6BmOunz1e4=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"vW0Zym/z9Ptl4Dc+PEbte0MZv2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-205"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6m+4YGiRL8aBEGrRx+To0vw57D8="}],"description":"Traffic signal repairs on CT-205 both directions between ATWOOD LN (Plainfield) and MOOSUP POND RD at ALL HALLOWS RD (Plainfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:10:07Z"},"road_event_id":"vW0Zym/z9Ptl4Dc+PEbte0MZv2w=","beginning_cross_street":"ATWOOD LN","ending_cross_street":"ALL HALLOWS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.908464,41.743398]]}},{"id":"BIf0Smjvf5Dh64eObBOjAsVQjgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q68lXK4nBw3UdXzyhqoAO94nCzk="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"BIf0Smjvf5Dh64eObBOjAsVQjgU=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"q68lXK4nBw3UdXzyhqoAO94nCzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"CBjqaRoLaGAcGJnzEwGMhTVyDsU="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"q68lXK4nBw3UdXzyhqoAO94nCzk=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"CBjqaRoLaGAcGJnzEwGMhTVyDsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"bQWWIyzitA/Qi2YjWEsMuunzTps="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"CBjqaRoLaGAcGJnzEwGMhTVyDsU=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"bQWWIyzitA/Qi2YjWEsMuunzTps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"UbHoPDuWKfXdsLXa35Q5/I2xaEU="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"bQWWIyzitA/Qi2YjWEsMuunzTps=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"UbHoPDuWKfXdsLXa35Q5/I2xaEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"tKRO7ZD4kxohCrLPQoeJvttVfKk="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"UbHoPDuWKfXdsLXa35Q5/I2xaEU=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"tKRO7ZD4kxohCrLPQoeJvttVfKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"jCvRrNXMu6ysRCDgwwP5vr1FKYA="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"tKRO7ZD4kxohCrLPQoeJvttVfKk=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"jCvRrNXMu6ysRCDgwwP5vr1FKYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"b4YczuDYqV+8VB0vx+QANlSRjyA="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"jCvRrNXMu6ysRCDgwwP5vr1FKYA=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"b4YczuDYqV+8VB0vx+QANlSRjyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"i/XuI6+t/4BNKKIBgxqFGZ6kWzA="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"b4YczuDYqV+8VB0vx+QANlSRjyA=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"i/XuI6+t/4BNKKIBgxqFGZ6kWzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"77QqFbc+uvSWrZjdStHTWX11qS0="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"i/XuI6+t/4BNKKIBgxqFGZ6kWzA=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"77QqFbc+uvSWrZjdStHTWX11qS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="},{"type":"next-occurrence","id":"37foWXCcGjF2Nv3s3sWh8UVndcw="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"77QqFbc+uvSWrZjdStHTWX11qS0=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"37foWXCcGjF2Nv3s3sWh8UVndcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIf0Smjvf5Dh64eObBOjAsVQjgU="}],"description":"Traffic signal repairs on CT-195 both directions between RIVERVIEW RD (Mansfield) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T17:06:23Z"},"road_event_id":"37foWXCcGjF2Nv3s3sWh8UVndcw=","beginning_cross_street":"RIVERVIEW RD","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.198587,41.736799]]}},{"id":"4lBEWMpKm9Arpd3xBerkLiIFCb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zH/hn+FtghYV497LJwaEgYLbrc0="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"4lBEWMpKm9Arpd3xBerkLiIFCb4=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"zH/hn+FtghYV497LJwaEgYLbrc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"wz0lqRKZ+FBwbZL3/XNdZocfOSA="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"zH/hn+FtghYV497LJwaEgYLbrc0=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"wz0lqRKZ+FBwbZL3/XNdZocfOSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"qNdf2P4SkBM8mesosaIe434j3DI="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"wz0lqRKZ+FBwbZL3/XNdZocfOSA=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"qNdf2P4SkBM8mesosaIe434j3DI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"HnIP2eubMn13hKH+RKXFbZQ5OuA="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"qNdf2P4SkBM8mesosaIe434j3DI=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"HnIP2eubMn13hKH+RKXFbZQ5OuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"pfFMwuv0yaG3jT7wWr4aP4Imork="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"HnIP2eubMn13hKH+RKXFbZQ5OuA=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"pfFMwuv0yaG3jT7wWr4aP4Imork=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"ds6kvgwuj1tIe6gRtmvPOqP0KYo="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"pfFMwuv0yaG3jT7wWr4aP4Imork=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"ds6kvgwuj1tIe6gRtmvPOqP0KYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"CIP78z8Oe7tt2p4LGtQEaKYQ5O8="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"ds6kvgwuj1tIe6gRtmvPOqP0KYo=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"CIP78z8Oe7tt2p4LGtQEaKYQ5O8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"9Q3HFQJ3TqDFfjRI1DRl8YMdKJU="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"CIP78z8Oe7tt2p4LGtQEaKYQ5O8=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"9Q3HFQJ3TqDFfjRI1DRl8YMdKJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"s6fT8xwTAFPLx9jUJvKZPfi15DM="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"9Q3HFQJ3TqDFfjRI1DRl8YMdKJU=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"s6fT8xwTAFPLx9jUJvKZPfi15DM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"79nPgd9gwu86uLN5P8zy0FNM1tk="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"s6fT8xwTAFPLx9jUJvKZPfi15DM=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"79nPgd9gwu86uLN5P8zy0FNM1tk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"9LBfu1C0++2CJzmhdit5q7GQpZ0="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"79nPgd9gwu86uLN5P8zy0FNM1tk=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"9LBfu1C0++2CJzmhdit5q7GQpZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"FL69rT1s1ZZHFoBjzH9lrDiUtXs="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"9LBfu1C0++2CJzmhdit5q7GQpZ0=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"FL69rT1s1ZZHFoBjzH9lrDiUtXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"FxQH3hjA2wyH9IMGnlZLziEV5XI="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"FL69rT1s1ZZHFoBjzH9lrDiUtXs=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"FxQH3hjA2wyH9IMGnlZLziEV5XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="},{"type":"next-occurrence","id":"RT7kzVtElEeFS/Ji3/gWk+vxNUo="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"FxQH3hjA2wyH9IMGnlZLziEV5XI=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"RT7kzVtElEeFS/Ji3/gWk+vxNUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 430"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4lBEWMpKm9Arpd3xBerkLiIFCb4="}],"description":"Roadwork on NY 430 both directions between Thum Rd (Chautauqua) and Oneida Dr (Chautauqua), Monday August 25th, 2025 thru Sunday May 31st, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2025-08-21T19:29:31Z"},"road_event_id":"RT7kzVtElEeFS/Ji3/gWk+vxNUo=","beginning_cross_street":"Thum Rd","ending_cross_street":"Oneida Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.437626,42.228271]]}},{"id":"FAo5uV9S+97prClxIyubnQkTMTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xMKOToip/5uR/U///TU1eWXvsJo="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"FAo5uV9S+97prClxIyubnQkTMTg=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"xMKOToip/5uR/U///TU1eWXvsJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"+smXZbCAdQw7OER6EhqdCBMPRnA="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"xMKOToip/5uR/U///TU1eWXvsJo=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"+smXZbCAdQw7OER6EhqdCBMPRnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"yxPOx/BvNiYK9iz6iiwwNg8UONQ="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"+smXZbCAdQw7OER6EhqdCBMPRnA=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"yxPOx/BvNiYK9iz6iiwwNg8UONQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"HGPFGkV65JVOhWy+z1ILOkojxkk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"yxPOx/BvNiYK9iz6iiwwNg8UONQ=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"HGPFGkV65JVOhWy+z1ILOkojxkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"lENnL2l4/Z7/joq+YZ/XR6fygHY="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"HGPFGkV65JVOhWy+z1ILOkojxkk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"lENnL2l4/Z7/joq+YZ/XR6fygHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"5yJFhOwXAFFxYCyA+/91Rt57dK0="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"lENnL2l4/Z7/joq+YZ/XR6fygHY=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"5yJFhOwXAFFxYCyA+/91Rt57dK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"8D4CRl53QY4yu3fGIQhvQ1c16qM="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"5yJFhOwXAFFxYCyA+/91Rt57dK0=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"8D4CRl53QY4yu3fGIQhvQ1c16qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"sEhYR4IMXdUYq7AvZPwfNQWSsRI="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"8D4CRl53QY4yu3fGIQhvQ1c16qM=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"sEhYR4IMXdUYq7AvZPwfNQWSsRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"yN7toWQJpNMfyr/diYb9TuoU4rQ="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"sEhYR4IMXdUYq7AvZPwfNQWSsRI=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"yN7toWQJpNMfyr/diYb9TuoU4rQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"/kwknw1Y9i7es8m0g924F4z04G0="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"yN7toWQJpNMfyr/diYb9TuoU4rQ=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"/kwknw1Y9i7es8m0g924F4z04G0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"dLZZIi6PitMkWPfvaWkZr4J7ToI="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"/kwknw1Y9i7es8m0g924F4z04G0=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"dLZZIi6PitMkWPfvaWkZr4J7ToI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"CLW8pbNX+KUfAcb4IXhVZ+eEqp0="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"dLZZIi6PitMkWPfvaWkZr4J7ToI=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"CLW8pbNX+KUfAcb4IXhVZ+eEqp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"dXTchFb6TRfqx1Sl9tHVWXPDFwk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"CLW8pbNX+KUfAcb4IXhVZ+eEqp0=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"dXTchFb6TRfqx1Sl9tHVWXPDFwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="},{"type":"next-occurrence","id":"DRWRN6WFCwb2HrhlNTIQbqGSEyQ="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"dXTchFb6TRfqx1Sl9tHVWXPDFwk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"DRWRN6WFCwb2HrhlNTIQbqGSEyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FAo5uV9S+97prClxIyubnQkTMTg="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/DAY/32545209 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday March 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday May 31st, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-20T16:57:26Z"},"road_event_id":"DRWRN6WFCwb2HrhlNTIQbqGSEyQ=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928083,41.154567]]}},{"id":"Asyt8IVgWiN2yPncAdyQdJqU5vY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v8HxW3UDUjQBthQPuCDanCXzmO4="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"Asyt8IVgWiN2yPncAdyQdJqU5vY=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"v8HxW3UDUjQBthQPuCDanCXzmO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"I6yDxgOuI7MmJvkRq+E7cy56+e0="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"v8HxW3UDUjQBthQPuCDanCXzmO4=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"I6yDxgOuI7MmJvkRq+E7cy56+e0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"qlXEAjyEP0UoDHpEczj488MaFcI="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"I6yDxgOuI7MmJvkRq+E7cy56+e0=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"qlXEAjyEP0UoDHpEczj488MaFcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"MwZaXtdvHuuQEemEJmQL+kkseb8="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"qlXEAjyEP0UoDHpEczj488MaFcI=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"MwZaXtdvHuuQEemEJmQL+kkseb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"BVeg/kpMwtod8zhtz9tC48uFL84="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"MwZaXtdvHuuQEemEJmQL+kkseb8=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"BVeg/kpMwtod8zhtz9tC48uFL84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"xWzbc46S8w+qa71khAwgMZud3Fc="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"BVeg/kpMwtod8zhtz9tC48uFL84=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"xWzbc46S8w+qa71khAwgMZud3Fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"l6sy3QWNGZROThC//q7QfQd5fjs="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"xWzbc46S8w+qa71khAwgMZud3Fc=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"l6sy3QWNGZROThC//q7QfQd5fjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"NmxbAUlt/XUkp4jHq73nWkV+lYQ="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"l6sy3QWNGZROThC//q7QfQd5fjs=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"NmxbAUlt/XUkp4jHq73nWkV+lYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"DwBsgjPFvoj2xp0ZGeOvQurh/Fg="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"NmxbAUlt/XUkp4jHq73nWkV+lYQ=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"DwBsgjPFvoj2xp0ZGeOvQurh/Fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="},{"type":"next-occurrence","id":"Qr0EssbswclB6RSEGdpTUp9Mp+o="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"DwBsgjPFvoj2xp0ZGeOvQurh/Fg=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"Qr0EssbswclB6RSEGdpTUp9Mp+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Asyt8IVgWiN2yPncAdyQdJqU5vY="}],"description":"Traffic signal repairs on CT-195 both directions between CT-195 (Mansfield) There will be various lane closures, Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:51:17Z"},"road_event_id":"Qr0EssbswclB6RSEGdpTUp9Mp+o=","beginning_cross_street":"CT-195","ending_cross_street":"CT-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200794,41.730363]]}},{"id":"19ngYoMYWAzOqD9ZjofBg3bnIsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4Qkvse3bEFgMKWg9EywKU8jsEYk="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"19ngYoMYWAzOqD9ZjofBg3bnIsE=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"4Qkvse3bEFgMKWg9EywKU8jsEYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"BfdQY1Ccnr9v0Z7mUDMdrmh7Tjc="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"4Qkvse3bEFgMKWg9EywKU8jsEYk=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"BfdQY1Ccnr9v0Z7mUDMdrmh7Tjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"sPDinG5IxfT1UVvMOFQQoecclWQ="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"BfdQY1Ccnr9v0Z7mUDMdrmh7Tjc=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"sPDinG5IxfT1UVvMOFQQoecclWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"jAmgemZU5lIgzc6nQTfH/U3/3bc="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"sPDinG5IxfT1UVvMOFQQoecclWQ=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"jAmgemZU5lIgzc6nQTfH/U3/3bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"6O6GK1ykBQvF+pbKVDaVqxtlXRY="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"jAmgemZU5lIgzc6nQTfH/U3/3bc=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"6O6GK1ykBQvF+pbKVDaVqxtlXRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"WGbpd97zlo2ZmcI25A1gAagM3Hw="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"6O6GK1ykBQvF+pbKVDaVqxtlXRY=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"WGbpd97zlo2ZmcI25A1gAagM3Hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"zVaADU/f1s0SWL9gg0jqkMyayV8="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"WGbpd97zlo2ZmcI25A1gAagM3Hw=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"zVaADU/f1s0SWL9gg0jqkMyayV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"PfV2HceW++a/X0Jpfq0+vtIj9tk="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"zVaADU/f1s0SWL9gg0jqkMyayV8=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"PfV2HceW++a/X0Jpfq0+vtIj9tk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"ywNq01G7Di8tVPAgR8SWHHN2vDA="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"PfV2HceW++a/X0Jpfq0+vtIj9tk=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"ywNq01G7Di8tVPAgR8SWHHN2vDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="},{"type":"next-occurrence","id":"5v4PmQV8qXiAQ2fBWO6sHrmPyS4="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"ywNq01G7Di8tVPAgR8SWHHN2vDA=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"5v4PmQV8qXiAQ2fBWO6sHrmPyS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-195"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"19ngYoMYWAzOqD9ZjofBg3bnIsE="}],"description":"Traffic signal repairs on CT-195 both directions between CT-632 (Mansfield) and RIVERVIEW RD (Mansfield) There will be various lane closures, Tuesday March 18th, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T13:53:33Z"},"road_event_id":"5v4PmQV8qXiAQ2fBWO6sHrmPyS4=","beginning_cross_street":"CT-632","ending_cross_street":"RIVERVIEW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.200015,41.732753]]}},{"id":"iwJoSskZmNfEDPWUmECqSp6mEsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UFyK9DFNxL4XM90ye1+qRazkKzs="}],"description":"Intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:26Z"},"road_event_id":"iwJoSskZmNfEDPWUmECqSp6mEsM=","beginning_cross_street":"Route 26 at Trinity Ave and Parkway Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.493499,43.788297]]}},{"id":"UFyK9DFNxL4XM90ye1+qRazkKzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iwJoSskZmNfEDPWUmECqSp6mEsM="},{"type":"next-occurrence","id":"zi52ty3+b1Qtrw9kDFbRoAlY0SM="}],"description":"Intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:26Z"},"road_event_id":"UFyK9DFNxL4XM90ye1+qRazkKzs=","beginning_cross_street":"Route 26 at Trinity Ave and Parkway Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.493499,43.788297]]}},{"id":"zi52ty3+b1Qtrw9kDFbRoAlY0SM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iwJoSskZmNfEDPWUmECqSp6mEsM="}],"description":"Intersection improvements on NY 26 both directions Route 26 at Trinity Ave and Parkway Drive (Lowville) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:26Z"},"road_event_id":"zi52ty3+b1Qtrw9kDFbRoAlY0SM=","beginning_cross_street":"Route 26 at Trinity Ave and Parkway Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.493499,43.788297]]}},{"id":"hgawFqgy7zx+o792y/RXq6saJfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DIV4pybJL5fQJfmma4FortM8nnI="}],"description":"Intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:13:20Z"},"road_event_id":"hgawFqgy7zx+o792y/RXq6saJfA=","beginning_cross_street":"Route 3 - Arsenal Street at North Meadow Street","ending_cross_street":"Route 3 - Arsenal Street at North Meadow Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.920656,43.97639]]}},{"id":"DIV4pybJL5fQJfmma4FortM8nnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hgawFqgy7zx+o792y/RXq6saJfA="},{"type":"next-occurrence","id":"c9EfpU3nb4TcVRD+7aK/KlRHViE="}],"description":"Intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:13:20Z"},"road_event_id":"DIV4pybJL5fQJfmma4FortM8nnI=","beginning_cross_street":"Route 3 - Arsenal Street at North Meadow Street","ending_cross_street":"Route 3 - Arsenal Street at North Meadow Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.920656,43.97639]]}},{"id":"c9EfpU3nb4TcVRD+7aK/KlRHViE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hgawFqgy7zx+o792y/RXq6saJfA="}],"description":"Intersection improvements on NY 3 both directions Route 3 - Arsenal Street at North Meadow Street (Watertown) Minor work remains to be completed, weather permitting. Motorists may encounter brief episodes of traffic being controlled by flaggers., Friday December 5th, 2025 thru Sunday May 31st, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open to traffic","update_date":"2026-04-17T19:13:20Z"},"road_event_id":"c9EfpU3nb4TcVRD+7aK/KlRHViE=","beginning_cross_street":"Route 3 - Arsenal Street at North Meadow Street","ending_cross_street":"Route 3 - Arsenal Street at North Meadow Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.920656,43.97639]]}},{"id":"alxUnTnXikz16My6nWVRck8gDZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vrmVhAkm4LHbi7OdlNvY9VAL7UI="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"alxUnTnXikz16My6nWVRck8gDZE=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"vrmVhAkm4LHbi7OdlNvY9VAL7UI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"HV4P+UU+Zyclk0DC64d3Vo5eDds="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"vrmVhAkm4LHbi7OdlNvY9VAL7UI=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"HV4P+UU+Zyclk0DC64d3Vo5eDds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"oP1SrWTkHvP8MLLKRicODbiQn18="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"HV4P+UU+Zyclk0DC64d3Vo5eDds=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"oP1SrWTkHvP8MLLKRicODbiQn18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"2v/YfcmJbCM+gfdl5fwYRn0xKhQ="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"oP1SrWTkHvP8MLLKRicODbiQn18=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"2v/YfcmJbCM+gfdl5fwYRn0xKhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"pp1+CjCIRfRNhTXDX7JmNw7JyPU="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"2v/YfcmJbCM+gfdl5fwYRn0xKhQ=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"pp1+CjCIRfRNhTXDX7JmNw7JyPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"kk+CY0JE79xifhOc4ZCjs6o81qA="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"pp1+CjCIRfRNhTXDX7JmNw7JyPU=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"kk+CY0JE79xifhOc4ZCjs6o81qA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"khBAhN+2/u0i0rCPAXLAQDigMh4="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"kk+CY0JE79xifhOc4ZCjs6o81qA=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"khBAhN+2/u0i0rCPAXLAQDigMh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"XkX/l4tIeUb/ElcEM+26sxlhk8g="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"khBAhN+2/u0i0rCPAXLAQDigMh4=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"XkX/l4tIeUb/ElcEM+26sxlhk8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"ybKwOr/wZHUbIeexRWNSGsrw0lI="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"XkX/l4tIeUb/ElcEM+26sxlhk8g=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"ybKwOr/wZHUbIeexRWNSGsrw0lI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="},{"type":"next-occurrence","id":"+uOK8SDJefI/V1v7Qnf2ggz6Vcc="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"ybKwOr/wZHUbIeexRWNSGsrw0lI=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"+uOK8SDJefI/V1v7Qnf2ggz6Vcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alxUnTnXikz16My6nWVRck8gDZE="}],"description":"Traffic signal repairs on CT-80 both directions between WESTBROOK RD (Deep River) and PINEWOOD TRL (Deep River) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:15:23Z"},"road_event_id":"+uOK8SDJefI/V1v7Qnf2ggz6Vcc=","beginning_cross_street":"WESTBROOK RD","ending_cross_street":"PINEWOOD TRL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.489046,41.361885]]}},{"id":"OW+gZJqY9HN9qljEsDfxXUWhM1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r/d0R07EmrFsNdOx/PzrT0G+seM="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"OW+gZJqY9HN9qljEsDfxXUWhM1g=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"r/d0R07EmrFsNdOx/PzrT0G+seM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"JJllibgm2LJDYdYhg79tuR9Ud7Q="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"r/d0R07EmrFsNdOx/PzrT0G+seM=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"JJllibgm2LJDYdYhg79tuR9Ud7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"sc1ot8lv9dO61S6XhUYm2WMB8ZU="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"JJllibgm2LJDYdYhg79tuR9Ud7Q=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"sc1ot8lv9dO61S6XhUYm2WMB8ZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"TW+wFq+vm2I9xIEUs/RebpwnNcc="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"sc1ot8lv9dO61S6XhUYm2WMB8ZU=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"TW+wFq+vm2I9xIEUs/RebpwnNcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"h14TLqmBEeieP55IftzJfP43Zq4="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"TW+wFq+vm2I9xIEUs/RebpwnNcc=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"h14TLqmBEeieP55IftzJfP43Zq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"8kc57PAgdEhSCJpTP1D1mBQ7WGI="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"h14TLqmBEeieP55IftzJfP43Zq4=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"8kc57PAgdEhSCJpTP1D1mBQ7WGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"i5dBCEcvK/HBn//8Lfmcek7C5dM="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"8kc57PAgdEhSCJpTP1D1mBQ7WGI=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"i5dBCEcvK/HBn//8Lfmcek7C5dM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"9uk3KXM8y9PBFr5r91Zp6CTZ7CM="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"i5dBCEcvK/HBn//8Lfmcek7C5dM=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"9uk3KXM8y9PBFr5r91Zp6CTZ7CM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"N5KPipNqsWNx263z1uDnoK6n8FA="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"9uk3KXM8y9PBFr5r91Zp6CTZ7CM=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"N5KPipNqsWNx263z1uDnoK6n8FA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="},{"type":"next-occurrence","id":"pcPyRrcaxOS6nV2wW00d93PtZuw="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"N5KPipNqsWNx263z1uDnoK6n8FA=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"pcPyRrcaxOS6nV2wW00d93PtZuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OW+gZJqY9HN9qljEsDfxXUWhM1g="}],"description":"Traffic signal repairs on CT-27 both directions between CT-27 (Stonington) There will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:18:10Z"},"road_event_id":"pcPyRrcaxOS6nV2wW00d93PtZuw=","beginning_cross_street":"CT-27","ending_cross_street":"CT-27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959781,41.373917]]}},{"id":"RQgLguHyFDnqK5DQE03eyxrHzlM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FOFv0WvuLfPMzyBBrq+dcoFmO4U="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"RQgLguHyFDnqK5DQE03eyxrHzlM=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"FOFv0WvuLfPMzyBBrq+dcoFmO4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"v5w69u57YPPt4i9fWaV7LjReu58="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"FOFv0WvuLfPMzyBBrq+dcoFmO4U=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"v5w69u57YPPt4i9fWaV7LjReu58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"PloTClwagS9AxFHFem6+4HeXxmM="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"v5w69u57YPPt4i9fWaV7LjReu58=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"PloTClwagS9AxFHFem6+4HeXxmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"m0L2PQAGwYNKrR7cFAY1m/QnFkI="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"PloTClwagS9AxFHFem6+4HeXxmM=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"m0L2PQAGwYNKrR7cFAY1m/QnFkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"RWF604ySmD0dAtLeVXDetsjOZiE="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"m0L2PQAGwYNKrR7cFAY1m/QnFkI=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"RWF604ySmD0dAtLeVXDetsjOZiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"uZcP65wzD+18v1AsCsQEeC2JclI="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"RWF604ySmD0dAtLeVXDetsjOZiE=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"uZcP65wzD+18v1AsCsQEeC2JclI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"f9UR2JHRv5wvLd5fXx0z6TwVRf0="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"uZcP65wzD+18v1AsCsQEeC2JclI=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"f9UR2JHRv5wvLd5fXx0z6TwVRf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"y/r94ArQm4iV1Yc5ahZNBi0zYNc="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"f9UR2JHRv5wvLd5fXx0z6TwVRf0=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"y/r94ArQm4iV1Yc5ahZNBi0zYNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"W2rhUl4/ImFOtH/N5Hm+fJacyOE="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"y/r94ArQm4iV1Yc5ahZNBi0zYNc=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"W2rhUl4/ImFOtH/N5Hm+fJacyOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="},{"type":"next-occurrence","id":"IsZzbXmetpLD9gtySFUYeG3M8zE="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"W2rhUl4/ImFOtH/N5Hm+fJacyOE=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"IsZzbXmetpLD9gtySFUYeG3M8zE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RQgLguHyFDnqK5DQE03eyxrHzlM="}],"description":"Traffic signal repairs on CT-27 both directions between COOGAN BLVD (Stonington) there will be various lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:20:27Z"},"road_event_id":"IsZzbXmetpLD9gtySFUYeG3M8zE=","beginning_cross_street":"COOGAN BLVD","ending_cross_street":"COOGAN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.960743,41.37238]]}},{"id":"liCc3tvFEHfbVhb0F75xv/LAf5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VU89KfdsxAdPCG+HQqfv7v8zNgE="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"liCc3tvFEHfbVhb0F75xv/LAf5U=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"VU89KfdsxAdPCG+HQqfv7v8zNgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"2OlUtJIu5GS1bEQkt4PCixMd8aI="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"VU89KfdsxAdPCG+HQqfv7v8zNgE=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"2OlUtJIu5GS1bEQkt4PCixMd8aI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"PjLwr2omrYfUlTX8fYNfoiqBn38="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"2OlUtJIu5GS1bEQkt4PCixMd8aI=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"PjLwr2omrYfUlTX8fYNfoiqBn38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"LpWCojiHDAZkvUp1pfcbpgJdlhQ="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"PjLwr2omrYfUlTX8fYNfoiqBn38=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"LpWCojiHDAZkvUp1pfcbpgJdlhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"AZ08OHbwhRfI6jgPAuCOmxVY2wE="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"LpWCojiHDAZkvUp1pfcbpgJdlhQ=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"AZ08OHbwhRfI6jgPAuCOmxVY2wE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"WhSP1rLx6vFnNG04Lt2+a0gIN1A="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"AZ08OHbwhRfI6jgPAuCOmxVY2wE=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"WhSP1rLx6vFnNG04Lt2+a0gIN1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"qP2WMVMagapeX+BxzWiA+oE0Htc="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"WhSP1rLx6vFnNG04Lt2+a0gIN1A=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"qP2WMVMagapeX+BxzWiA+oE0Htc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"Dzif7ONQiIUKexKnhaMkX97iELk="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"qP2WMVMagapeX+BxzWiA+oE0Htc=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"Dzif7ONQiIUKexKnhaMkX97iELk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"thrzjaN6XdTOzC0gBO20PBC+jvk="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"Dzif7ONQiIUKexKnhaMkX97iELk=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"thrzjaN6XdTOzC0gBO20PBC+jvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="},{"type":"next-occurrence","id":"RvMPyOUNtWEm2idnnn8Xzn/DkUM="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"thrzjaN6XdTOzC0gBO20PBC+jvk=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"RvMPyOUNtWEm2idnnn8Xzn/DkUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"liCc3tvFEHfbVhb0F75xv/LAf5U="}],"description":"Traffic signal repairs on CT-17 both directions between BARRY AVE (Portland) and AIRLINE AVE (Portland) There will be lane closures., Tuesday April 1st, 2025 thru Saturday August 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2025-03-18T18:13:25Z"},"road_event_id":"RvMPyOUNtWEm2idnnn8Xzn/DkUM=","beginning_cross_street":"BARRY AVE","ending_cross_street":"AIRLINE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.633231,41.569995]]}},{"id":"IHx8vLMRUj5fQTzRZdiWjb3P4TA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[],"description":"Bridge work and traffic shift on PADDOCK AVE both directions between OVERLOOK RD (Meriden) Motorists can expect the continuation of alternating one-way traffic (on the Paddock Avenue Bridge in Meriden, however, traffic will shift to the newly constructed side of the bridge. The shift is anticipated to take place on Thursday night, September 18, 2025, and continue for a year and a half. Traffic signal control will be in place to guide motorists through the work zone. Note that the temporary sidewalk will shift as well on the outside of the bridge., Continuous Thursday September 18th, 2025 09:00 PM thru Thursday March 18th, 2027 11:59 PM All lanes open","update_date":"2025-09-17T14:00:53Z"},"road_event_id":"IHx8vLMRUj5fQTzRZdiWjb3P4TA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776113,41.516559]]}},{"id":"C0G8ATiy6FSgkr6dRtAcwL4c+eU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at State St/Bridge St (New York) is closed. Use the temporary stop on State St closer to Bridge St instead., Continuous Friday May 2nd, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2025-05-01T21:11:26Z"},"road_event_id":"C0G8ATiy6FSgkr6dRtAcwL4c+eU=","beginning_cross_street":"State St/Bridge St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014192,40.704209]]}},{"id":"9fmWfv1nwtsq0gV/ubV/Y+dR+wA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations both directions, City Zone at Forest Hills (New York) You must be in the first four cars to exit westbound trains., Continuous Saturday May 3rd, 2025 01:29 AM thru Friday December 31st, 2027 11:59 PM","update_date":"2025-06-11T13:41:12Z"},"road_event_id":"9fmWfv1nwtsq0gV/ubV/Y+dR+wA=","beginning_cross_street":"Forest Hills","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.844814,40.719575]]}},{"id":"1EYcDonozwK0UKm4WsXSYGGcrQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-91 southbound Entrance ramp Exit 31 - Founders Bridge/Asylum Avenue (Hartford) The State Street on-ramp to I-91 southbound at the Founders Bridge will be closed for the duration of the project to facilitate the temporary traffic patterns on I-91 southbound during staged construction. Detours will be posted to direct motorists seeking I-91 southbound to use either the South Morgan Street on-ramp to I-91 southbound at Columbus Boulevard, or the Sheldon Street on-ramp to the Whitehead Highway at Columbus Boulevard where they can access I-91 southbound. Motorists on I-84 eastbound seeking I-91 southbound will be required to merge with I-91 southbound traffic due to the temporary traffic patterns on I-91 southbound during staged construction. Currently, I-84 eastbound motorists entering I-91 southbound traffic have a dedicated lane provided., Continuous Monday March 10th, 2025 12:00 AM thru Wednesday September 30th, 2026 11:59 PM All lanes closed","update_date":"2025-02-26T21:18:30Z"},"road_event_id":"1EYcDonozwK0UKm4WsXSYGGcrQ4=","beginning_cross_street":"Exit 31 - Founders Bridge/Asylum Avenue","ending_cross_street":"Exit 31 - Founders Bridge/Asylum Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66881,41.765463]]}},{"id":"pmP7OvgFap2PDMVNR27xNRqT9hU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uxPMPFQ6+NbHA81zjUuzKb8xoxo="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"pmP7OvgFap2PDMVNR27xNRqT9hU=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"uxPMPFQ6+NbHA81zjUuzKb8xoxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"6b3T77JrXEB+cU0m8dxPRrMDPqY="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"uxPMPFQ6+NbHA81zjUuzKb8xoxo=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"6b3T77JrXEB+cU0m8dxPRrMDPqY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"uub7dI4bnekS8/uNNZvY91S2HqI="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"6b3T77JrXEB+cU0m8dxPRrMDPqY=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"uub7dI4bnekS8/uNNZvY91S2HqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"L5cZCDtvBESYw7+ecqwtUYugM4M="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"uub7dI4bnekS8/uNNZvY91S2HqI=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"L5cZCDtvBESYw7+ecqwtUYugM4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"fsYHjSkAm8255Yl1/leNTGlDLu0="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"L5cZCDtvBESYw7+ecqwtUYugM4M=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"fsYHjSkAm8255Yl1/leNTGlDLu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"QNl/qAaBADdo950UtQ6VqEVHnZI="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"fsYHjSkAm8255Yl1/leNTGlDLu0=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"QNl/qAaBADdo950UtQ6VqEVHnZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"cJKZFeUpYWzGASOgv2FX3udiGlA="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"QNl/qAaBADdo950UtQ6VqEVHnZI=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"cJKZFeUpYWzGASOgv2FX3udiGlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"mAsuF3224nFWdi0YcNslrNMKeYM="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"cJKZFeUpYWzGASOgv2FX3udiGlA=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"mAsuF3224nFWdi0YcNslrNMKeYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"9loXW9dj0AHaMmmTq6j3mRi+rh0="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"mAsuF3224nFWdi0YcNslrNMKeYM=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"9loXW9dj0AHaMmmTq6j3mRi+rh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"uhrR7CogU2CIKqGoyme9KKdFQfE="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"9loXW9dj0AHaMmmTq6j3mRi+rh0=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"uhrR7CogU2CIKqGoyme9KKdFQfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"X88GHZGs6F59gr/6Kduu77DrICE="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"uhrR7CogU2CIKqGoyme9KKdFQfE=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"X88GHZGs6F59gr/6Kduu77DrICE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"+OKhg9Ndm36LS68xsIlYpXBwWuc="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"X88GHZGs6F59gr/6Kduu77DrICE=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"+OKhg9Ndm36LS68xsIlYpXBwWuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"hvO24Z81+VzoAGcHCk3V6nCfVIs="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"+OKhg9Ndm36LS68xsIlYpXBwWuc=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"hvO24Z81+VzoAGcHCk3V6nCfVIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="},{"type":"next-occurrence","id":"zufnm7+8gMb9f69NRQalyWBjlN0="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"hvO24Z81+VzoAGcHCk3V6nCfVIs=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"zufnm7+8gMb9f69NRQalyWBjlN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pmP7OvgFap2PDMVNR27xNRqT9hU="}],"description":"Bridge rehabilitation on I-91 southbound between Exit 30 - Whitehead Highway (Hartford) and Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford) There will be lane closures across one of three lanes of I-91 southbound at a time through the work zone for the duration of the project. The project will be constructed in three stages. Stage 1 construction will begin on March 10, 2025, with Stage 3 construction scheduled to be completed in September 2026., Monday March 10th, 2025 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2025-02-26T21:15:59Z"},"road_event_id":"zufnm7+8gMb9f69NRQalyWBjlN0=","beginning_cross_street":"Exit 30 - Whitehead Highway","ending_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.666223,41.761293]]}},{"id":"D3Yz6qoh9LeRJTAkO9AxqcA+8FI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-86 both directions Exit 7 - CR 33 Panama-Stedman Road (North Harmony) to Strunk Road (Ellicott), Tuesday February 27th, 2024 thru Monday November 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-10T11:04:59Z"},"road_event_id":"D3Yz6qoh9LeRJTAkO9AxqcA+8FI=","beginning_cross_street":"Exit 7 - CR 33 Panama-Stedman Road","ending_cross_street":"Strunk Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.475119,42.157516]]}},{"id":"JeNhM0omrmTkNzymrwxPqDmUwbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on NY 31 ramp to I-490 Eastbound (Rochester) RAMP CLOSED, Continuous Thursday August 15th, 2024 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed and detoured","update_date":"2026-01-27T12:14:30Z"},"road_event_id":"JeNhM0omrmTkNzymrwxPqDmUwbs=","beginning_cross_street":"I-490 Eastbound","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607298,43.151186]]}},{"id":"YWxpszZAhtaMt1P8DbxwxNpWq7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 126"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 126 both directions Town of New Bremen; Village of Croghan (New Bremen) Route 126 now open to two way traffic. , Continuous Friday December 5th, 2025 12:00 AM thru Thursday April 30th, 2026 11:59 PM All lanes open","update_date":"2025-12-05T17:17:19Z"},"road_event_id":"YWxpszZAhtaMt1P8DbxwxNpWq7Q=","beginning_cross_street":"Town of New Bremen; Village of Croghan","ending_cross_street":"Town of New Bremen; Village of Croghan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.402784,43.889413]]}},{"id":"ORC300488454","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bruckner Boulevard"],"direction":"unknown","description":"Construction on Bruckner Boulevard eastbound between Cypress Avenue (New York) and East 138th Street (New York) Subject to change without notice. Bridge Washing. Not currently Scheduled","update_date":"2025-10-02T07:00:01Z"},"road_event_id":"ORC300488454","beginning_cross_street":"Cypress Avenue","ending_cross_street":"East 138th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-09-30T14:50:51Z","end_date":"2025-10-03T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.91664,40.803178]]}},{"id":"byruB6mqcrQbolXvcRm361BpXAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on VAN WYCK EXPY northbound from 107TH AVE (New York) to LIBERTY AVE (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-02-27T18:35:06Z"},"road_event_id":"byruB6mqcrQbolXvcRm361BpXAg=","beginning_cross_street":"107TH AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808397,40.688858]]}},{"id":"qzv7utOcUM5Y3+SpuHHOksAIWUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[],"description":"Construction on VAN WYCK EXPY northbound from 130TH AVE (New York) to ROCKAWAY BLVD (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-02-27T18:35:54Z"},"road_event_id":"qzv7utOcUM5Y3+SpuHHOksAIWUs=","beginning_cross_street":"130TH AVE","ending_cross_street":"ROCKAWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800682,40.671532]]}},{"id":"4kIsSLVh4r3NLvTCWAzxuGeF4D4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 southbound ramp to Exit 1B-2 - North Conduit Avenue; NY 27 (New York) Subject to change without notice., Continuous Wednesday October 1st, 2025 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-02-27T18:44:40Z"},"road_event_id":"4kIsSLVh4r3NLvTCWAzxuGeF4D4=","beginning_cross_street":"Exit 1B-2 - North Conduit Avenue; NY 27","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801971,40.667921]]}},{"id":"5SRDG2yD5RV6Vt2+vUtyD5bHXCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT 9 northbound Exit ramp Exit 28 - CT 72 (New Britain) There will be a lane closure for the duration of the project on the Route 9 northbound off-ramp to Route 72 westbound, from April 28, 2025, to Fall/Winter of 2025, Continuous Monday April 28th, 2025 12:00 AM thru Thursday August 27th, 2026 11:59 PM All lanes open","update_date":"2025-10-15T16:00:31Z"},"road_event_id":"5SRDG2yD5RV6Vt2+vUtyD5bHXCU=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 28 - CT 72","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773132,41.66795]]}},{"id":"2GqGRwNdHyf9B/5lb589p71QxiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Reconstruction on I-87 Northway northbound (Champlain) delays due to construction, Continuous Monday October 20th, 2025 12:00 AM thru Friday May 1st, 2026 11:59 PM 2 lanes of 3 lanes closed","update_date":"2025-10-20T15:47:57Z"},"road_event_id":"2GqGRwNdHyf9B/5lb589p71QxiA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.45112,45.008725]]}},{"id":"GaKDxnynqmveoESRskdhjogJ7Wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4Ob9hEnffejppLKIshsD6pdtepw="}],"description":"Guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-03-31T18:30:19Z"},"road_event_id":"GaKDxnynqmveoESRskdhjogJ7Wo=","beginning_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","ending_cross_street":"Exit 58 - Ludingtonville Road - CR 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88935,41.523427]]}},{"id":"4Ob9hEnffejppLKIshsD6pdtepw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GaKDxnynqmveoESRskdhjogJ7Wo="},{"type":"next-occurrence","id":"dVAk+QdcQJztfMi2t3VdWQag20k="}],"description":"Guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-03-31T18:30:19Z"},"road_event_id":"4Ob9hEnffejppLKIshsD6pdtepw=","beginning_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","ending_cross_street":"Exit 58 - Ludingtonville Road - CR 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88935,41.523427]]}},{"id":"dVAk+QdcQJztfMi2t3VdWQag20k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GaKDxnynqmveoESRskdhjogJ7Wo="},{"type":"next-occurrence","id":"cu55u6kykedAuRh+3zxq2tBWGmI="}],"description":"Guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-03-31T18:30:19Z"},"road_event_id":"dVAk+QdcQJztfMi2t3VdWQag20k=","beginning_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","ending_cross_street":"Exit 58 - Ludingtonville Road - CR 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88935,41.523427]]}},{"id":"cu55u6kykedAuRh+3zxq2tBWGmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GaKDxnynqmveoESRskdhjogJ7Wo="},{"type":"next-occurrence","id":"NAQsggO2NVCV9E8K1UciNN5QlPA="}],"description":"Guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-03-31T18:30:19Z"},"road_event_id":"cu55u6kykedAuRh+3zxq2tBWGmI=","beginning_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","ending_cross_street":"Exit 58 - Ludingtonville Road - CR 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88935,41.523427]]}},{"id":"NAQsggO2NVCV9E8K1UciNN5QlPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GaKDxnynqmveoESRskdhjogJ7Wo="},{"type":"next-occurrence","id":"W42SUDfDG72IkaF+Kqo2CycAg4o="}],"description":"Guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-03-31T18:30:19Z"},"road_event_id":"NAQsggO2NVCV9E8K1UciNN5QlPA=","beginning_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","ending_cross_street":"Exit 58 - Ludingtonville Road - CR 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88935,41.523427]]}},{"id":"W42SUDfDG72IkaF+Kqo2CycAg4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GaKDxnynqmveoESRskdhjogJ7Wo="},{"type":"next-occurrence","id":"sztKvIQCea+O24wHMbN67iMdMrE="}],"description":"Guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-03-31T18:30:19Z"},"road_event_id":"W42SUDfDG72IkaF+Kqo2CycAg4o=","beginning_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","ending_cross_street":"Exit 58 - Ludingtonville Road - CR 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88935,41.523427]]}},{"id":"sztKvIQCea+O24wHMbN67iMdMrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GaKDxnynqmveoESRskdhjogJ7Wo="}],"description":"Guard rail repairs on I-84 eastbound between Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) and Exit 58 - Ludingtonville Road - CR 43 (Kent) D265499/DAY/32611709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-03-31T18:30:19Z"},"road_event_id":"sztKvIQCea+O24wHMbN67iMdMrE=","beginning_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","ending_cross_street":"Exit 58 - Ludingtonville Road - CR 43","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88935,41.523427]]}},{"id":"s1iX8Ug1HzQfyq0B7eUwKrFm8I8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["City Zone"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations eastbound, City Zone at Forest Hills (New York) the ramp on the eastbound side of the Forest Hills station, located along Burns Street, will be closed until May 2026 for accessibility upgrades. While the work is underway, customers that need elevator or ramp access should use the Forest Hills-71 Av subway station at Queens Boulevard and Continental Avenue., Continuous Monday October 27th, 2025 12:00 AM thru Friday May 1st, 2026 11:59 PM","update_date":"2025-10-23T15:45:34Z"},"road_event_id":"s1iX8Ug1HzQfyq0B7eUwKrFm8I8=","beginning_cross_street":"Forest Hills","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.844814,40.719575]]}},{"id":"bFe3dGKJkIiibHOVKSGrzMtsrgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["13 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 13 Bus Clinton Ave At Bergen St (Newark) The following bus stop will be temporarily deactivated until April 2027: Deactivated Bus Stop: Route 99 Only: Bergen Street, northbound, at Clinton Avenue, Far Side (MyBus #18263) Route 13 Only: Clinton Avenue, westbound, at Bergen Street, Near Side (MyBus #18474) Alternate Bus Stop: Route 99 Only: Bergen Street, northbound, at West Bigelow Street, Near Side (MyBus #18261) Route 13 Only: Clinton Avenue, westbound at Peshine Avenue, Near Side (MyBus #18475), Continuous Thursday October 9th, 2025 12:00 AM thru Thursday April 1st, 2027 11:59 PM","update_date":"2025-10-24T18:25:02Z"},"road_event_id":"bFe3dGKJkIiibHOVKSGrzMtsrgs=","beginning_cross_street":"Clinton Ave At Bergen St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.20033,40.721459]]}},{"id":"OnXk3Zu2HETAmbHMnjshWzEUcAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["99 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, 99 Bus at Bergen St At Clinton Ave (Newark) The following bus stop will be temporarily deactivated until April 2027: Deactivated Bus Stop: Route 99 Only: Bergen Street, northbound, at Clinton Avenue, Far Side (MyBus #18263) Route 13 Only: Clinton Avenue, westbound, at Bergen Street, Near Side (MyBus #18474) Alternate Bus Stop: Route 99 Only: Bergen Street, northbound, at West Bigelow Street, Near Side (MyBus #18261) Route 13 Only: Clinton Avenue, westbound at Peshine Avenue, Near Side (MyBus #18475), Continuous Sunday November 9th, 2025 12:00 AM thru Thursday April 1st, 2027 11:59 PM","update_date":"2025-10-24T18:26:15Z"},"road_event_id":"OnXk3Zu2HETAmbHMnjshWzEUcAM=","beginning_cross_street":"Bergen St At Clinton Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.200231,40.721588]]}},{"id":"yUurimYGwz0omnpjwjovOPlhQOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/EuhkJvToBl5raY00N7IgW7Jktg="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"yUurimYGwz0omnpjwjovOPlhQOA=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"/EuhkJvToBl5raY00N7IgW7Jktg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"viSmemHDr1KvjAamlBKp9sHdfJY="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"/EuhkJvToBl5raY00N7IgW7Jktg=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"viSmemHDr1KvjAamlBKp9sHdfJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"DOcCU9JMGwbj2img6z2KFAL7Cpo="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"viSmemHDr1KvjAamlBKp9sHdfJY=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"DOcCU9JMGwbj2img6z2KFAL7Cpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"mHhIV0jElOHnwnkVkxHBmKfY+kw="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"DOcCU9JMGwbj2img6z2KFAL7Cpo=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"mHhIV0jElOHnwnkVkxHBmKfY+kw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"YioK7ZyEvgAtsI+dhHoTkClB1mE="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"mHhIV0jElOHnwnkVkxHBmKfY+kw=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"YioK7ZyEvgAtsI+dhHoTkClB1mE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"I12S+70mFBNGsPv67B4kB+o9Xls="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"YioK7ZyEvgAtsI+dhHoTkClB1mE=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"I12S+70mFBNGsPv67B4kB+o9Xls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"zr640Eniel6wajUbqkgoiULbEe4="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"I12S+70mFBNGsPv67B4kB+o9Xls=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"zr640Eniel6wajUbqkgoiULbEe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"+9YSNFLRRGFn/oXcbU6W1oNQ80I="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"zr640Eniel6wajUbqkgoiULbEe4=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"+9YSNFLRRGFn/oXcbU6W1oNQ80I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"MdfYkED89yqV9hjKhc1RyqeboeU="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"+9YSNFLRRGFn/oXcbU6W1oNQ80I=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"MdfYkED89yqV9hjKhc1RyqeboeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"1jFXp3PCI2oFYCv84g0ad/zlsmk="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"MdfYkED89yqV9hjKhc1RyqeboeU=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"1jFXp3PCI2oFYCv84g0ad/zlsmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"GhEmr7CciUpREW5yUt9Yc/FRq+c="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"1jFXp3PCI2oFYCv84g0ad/zlsmk=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"GhEmr7CciUpREW5yUt9Yc/FRq+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="},{"type":"next-occurrence","id":"UFOU1od1WJaV8I5TehZ2z537rxs="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"GhEmr7CciUpREW5yUt9Yc/FRq+c=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"UFOU1od1WJaV8I5TehZ2z537rxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUurimYGwz0omnpjwjovOPlhQOA="}],"description":"Due to Construction eastbound, B65 Bus between Boerum Pl/Joralemon St (New York) and St Marks Av/Ralph Av (New York) stops on Dean St from 4th Ave to Carlton Ave are closed. For service, use the stops on Dean St at 3rd Ave or Vanderbilt Ave. Buses also make requested stops along Atlantic Ave in the B45 stops., Wednesday November 5th, 2025 thru Friday January 1st, 2027, 08:00 AM thru 06:00 PM, Wednesday November 5th, 2025 thru Friday January 1st, 2027, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-01-07T14:08:34Z"},"road_event_id":"UFOU1od1WJaV8I5TehZ2z537rxs=","beginning_cross_street":"Boerum Pl/Joralemon St","ending_cross_street":"St Marks Av/Ralph Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989228,40.692022]]}},{"id":"Iec5xbdBW2CbcOYJh5v0FNxfyv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and safety improvements on CT 2 westbound between Exit 20 - CT 354/Parum Road (Colchester) and Exit 21 - CT 11 (Colchester), Continuous Monday October 27th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM 1 Right lane of 2 lanes closed","update_date":"2025-11-07T20:51:45Z"},"road_event_id":"Iec5xbdBW2CbcOYJh5v0FNxfyv8=","beginning_cross_street":"Exit 20 - CT 354/Parum Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.311926,41.56519]]}},{"id":"fXsZaM4AmjYsEMOecMqMhur6qjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GWUvvaDMSC2j3cNTBoUJTRZb7lE="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"fXsZaM4AmjYsEMOecMqMhur6qjY=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"GWUvvaDMSC2j3cNTBoUJTRZb7lE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"r1FSvo8pL9lzdxJphmvzaRYInNo="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"GWUvvaDMSC2j3cNTBoUJTRZb7lE=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"r1FSvo8pL9lzdxJphmvzaRYInNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"rH9OUnunnPQBK8f6vAdJLfEatQA="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"r1FSvo8pL9lzdxJphmvzaRYInNo=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"rH9OUnunnPQBK8f6vAdJLfEatQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"4/oZnrXHGZ4RnNPiniP0ev/Pe+s="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"rH9OUnunnPQBK8f6vAdJLfEatQA=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T16:00:00Z","end_date":"2026-04-28T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"4/oZnrXHGZ4RnNPiniP0ev/Pe+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"7aYFN1UnPr2QDS3QEKAmYYp09vM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"4/oZnrXHGZ4RnNPiniP0ev/Pe+s=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T16:00:00Z","end_date":"2026-04-29T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"7aYFN1UnPr2QDS3QEKAmYYp09vM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"w+F8XEJLBMGQQ/K41924i+Y52MQ="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"7aYFN1UnPr2QDS3QEKAmYYp09vM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T16:00:00Z","end_date":"2026-04-30T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"w+F8XEJLBMGQQ/K41924i+Y52MQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"D8L3nlURpw8iIm4lsz9WFXq/q9A="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"w+F8XEJLBMGQQ/K41924i+Y52MQ=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T16:00:00Z","end_date":"2026-05-01T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"D8L3nlURpw8iIm4lsz9WFXq/q9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"chM6gnbjgaVi6iUXSd6frpRDvo8="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"D8L3nlURpw8iIm4lsz9WFXq/q9A=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T16:00:00Z","end_date":"2026-05-02T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"chM6gnbjgaVi6iUXSd6frpRDvo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"rUF4Frx6ZdscszcwuaL3+99yQew="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"chM6gnbjgaVi6iUXSd6frpRDvo8=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T16:00:00Z","end_date":"2026-05-05T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"rUF4Frx6ZdscszcwuaL3+99yQew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="},{"type":"next-occurrence","id":"QvQjLtiyYwKS0HVqWj7oqsn5HvA="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"rUF4Frx6ZdscszcwuaL3+99yQew=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T16:00:00Z","end_date":"2026-05-06T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"QvQjLtiyYwKS0HVqWj7oqsn5HvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fXsZaM4AmjYsEMOecMqMhur6qjY="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/DAY/32645609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-16T16:49:23Z"},"road_event_id":"QvQjLtiyYwKS0HVqWj7oqsn5HvA=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T16:00:00Z","end_date":"2026-05-07T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807227,41.22765]]}},{"id":"eruiNoyL4iFa87RM5jCCi+ZdVDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 304 northbound between Demarest Mill Road (Clarkstown) and Village Green (Clarkstown) D265160/B1045400/32646509 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday November 17th, 2025 12:00 AM thru Friday May 22nd, 2026 12:00 AM left lane closed to traffic","update_date":"2026-04-16T17:26:52Z"},"road_event_id":"eruiNoyL4iFa87RM5jCCi+ZdVDM=","beginning_cross_street":"Demarest Mill Road","ending_cross_street":"Village Green","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99742,41.102213]]}},{"id":"4dZzmHCYwdbrKglObV+Rf+mlZ2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 304"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 304 southbound between Village Green (Clarkstown) and Demarest Mill Road (Clarkstown) D265160/B1045400/32646609 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday November 17th, 2025 12:00 AM thru Friday May 22nd, 2026 12:00 AM right lane closed to traffic","update_date":"2026-04-16T17:29:44Z"},"road_event_id":"4dZzmHCYwdbrKglObV+Rf+mlZ2U=","beginning_cross_street":"Village Green","ending_cross_street":"Demarest Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.997537,41.102252]]}},{"id":"Os+GH/bcpBRhN2pjsWHqkZU2SiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-684 both directions between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) D265186/B1077550/32651809 - This work is weather permitting. Plan travel accordingly; delays may exist, Continuous Monday February 9th, 2026 12:00 AM thru Sunday December 20th, 2026 12:00 AM right shoulder closure","update_date":"2026-02-25T14:13:40Z"},"road_event_id":"Os+GH/bcpBRhN2pjsWHqkZU2SiY=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674585,41.303207]]}},{"id":"P6XBY/IhHMikxgN2txcM6tcx5mQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Construction on I-80 eastbound Exit ramp Exit 56 - Squirrelwood Rd (Woodland Park) Exit 56B ramp., Continuous Monday November 24th, 2025 10:48 AM thru Monday June 1st, 2026 03:00 PM All lanes closed","update_date":"2025-12-01T14:21:01Z"},"road_event_id":"P6XBY/IhHMikxgN2txcM6tcx5mQ=","beginning_cross_street":"Exit 56 - Squirrelwood Rd","ending_cross_street":"Exit 56 - Squirrelwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19329,40.904046]]}},{"id":"TsUHp+z2hQuULqSROV9PA0jbUh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-636"],"direction":"unknown","related_road_events":[],"description":"Construction on CR-636 northbound between JACKSON AVE (Woodland Park) and CR-636 (Woodland Park), Continuous Monday November 24th, 2025 10:49 AM thru Monday June 1st, 2026 03:00 PM All lanes closed","update_date":"2025-11-24T15:51:01Z"},"road_event_id":"TsUHp+z2hQuULqSROV9PA0jbUh8=","beginning_cross_street":"JACKSON AVE","ending_cross_street":"CR-636","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192236,40.902586]]}},{"id":"Fjb66RWVwm21e3/jLqzsSadLV0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CR-636"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on CR-636 northbound between 56A (Woodland Park) and CR-636 (Woodland Park) Southbound traffic operate in the Northbound lane. Northbound traffic is detoured., Continuous Monday December 1st, 2025 12:00 AM thru Monday June 1st, 2026 11:59 PM All lanes closed","update_date":"2025-12-01T14:28:11Z"},"road_event_id":"Fjb66RWVwm21e3/jLqzsSadLV0k=","beginning_cross_street":"56A","ending_cross_street":"CR-636","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192553,40.902987]]}},{"id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S4yU3e7opqU42AhhANTa7hJ8ZIM="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-23T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"S4yU3e7opqU42AhhANTa7hJ8ZIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"lbPQkccu8DP6T2UYCmCDKT5mHyI="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"S4yU3e7opqU42AhhANTa7hJ8ZIM=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-24T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"lbPQkccu8DP6T2UYCmCDKT5mHyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"OlB9iN6Jw3tSTIwmQnh4hLMG+4Q="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"lbPQkccu8DP6T2UYCmCDKT5mHyI=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-25T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"OlB9iN6Jw3tSTIwmQnh4hLMG+4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"mQs0pPslckPJOZOdK8cbuqGrK3g="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"OlB9iN6Jw3tSTIwmQnh4hLMG+4Q=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:00:00Z","end_date":"2026-04-26T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"mQs0pPslckPJOZOdK8cbuqGrK3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"cNDh+O9TP2jMaQi3lSwMxXb3S+4="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"mQs0pPslckPJOZOdK8cbuqGrK3g=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T10:00:00Z","end_date":"2026-04-27T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"cNDh+O9TP2jMaQi3lSwMxXb3S+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"YTZ+ZFBhcJ3IdoSKEQ88AyIU8VU="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"cNDh+O9TP2jMaQi3lSwMxXb3S+4=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-28T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"YTZ+ZFBhcJ3IdoSKEQ88AyIU8VU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"oMkGOBlvlunxy9TKloVYoHihpSA="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"YTZ+ZFBhcJ3IdoSKEQ88AyIU8VU=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-29T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"oMkGOBlvlunxy9TKloVYoHihpSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"beO5aRfQw1AlVYpVZFT8qWWYnE4="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"oMkGOBlvlunxy9TKloVYoHihpSA=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-30T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"beO5aRfQw1AlVYpVZFT8qWWYnE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"n9fg/SiIYR3or3WL/a+NMoCbLps="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"beO5aRfQw1AlVYpVZFT8qWWYnE4=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-05-01T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"n9fg/SiIYR3or3WL/a+NMoCbLps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"e1UDp0kPqXxe8mMk0GAlmPKfUhg="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"n9fg/SiIYR3or3WL/a+NMoCbLps=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-02T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"e1UDp0kPqXxe8mMk0GAlmPKfUhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"+cJYGvdWt7Va36Rsj6mlg32OYPY="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"e1UDp0kPqXxe8mMk0GAlmPKfUhg=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T10:00:00Z","end_date":"2026-05-03T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"+cJYGvdWt7Va36Rsj6mlg32OYPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"bJpeJihtFIBIYt4ksGwwatMxFvU="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"+cJYGvdWt7Va36Rsj6mlg32OYPY=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T10:00:00Z","end_date":"2026-05-04T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"bJpeJihtFIBIYt4ksGwwatMxFvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"2CQ+LtB+GHDg78AOZLvb9DnWKMM="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"bJpeJihtFIBIYt4ksGwwatMxFvU=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-05T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"2CQ+LtB+GHDg78AOZLvb9DnWKMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="},{"type":"next-occurrence","id":"zHVtDbQhPV/77nsQeqVbPYzSAjI="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"2CQ+LtB+GHDg78AOZLvb9DnWKMM=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-06T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"zHVtDbQhPV/77nsQeqVbPYzSAjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TOWN LINE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YbR2w6JqoyHm7YXvzYcZ1+au/Rw="}],"description":"Construction on TOWN LINE RD both directions between BROOKSIDE DR (Southington) and RED STONE HL at CHIMNEY CREST LN (Bristol) There may be lane and shoulder closures on Town Line Road and Red Stone Hill Road , Thursday December 18th, 2025 thru Friday May 14th, 2027, Sunday thru Saturday, 06:00 AM thru 09:00 PM All lanes open","update_date":"2025-12-04T15:31:45Z"},"road_event_id":"zHVtDbQhPV/77nsQeqVbPYzSAjI=","beginning_cross_street":"BROOKSIDE DR","ending_cross_street":"CHIMNEY CREST LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-07T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.881894,41.649712]]}},{"id":"q2cyAh3HXFIBxwPFjWjWj5flFiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12F"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hhD9FYocJKWdhDdy+2ZcZgZvY0w="}],"description":"Bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements, Friday December 5th, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:13Z"},"road_event_id":"q2cyAh3HXFIBxwPFjWjWj5flFiA=","beginning_cross_street":"NY 971H; Paddy Hill Road","ending_cross_street":"NY 971H; Paddy Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.983093,43.999423]]}},{"id":"hhD9FYocJKWdhDdy+2ZcZgZvY0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q2cyAh3HXFIBxwPFjWjWj5flFiA="},{"type":"next-occurrence","id":"+PvMAcX/bE3yzrL4ef0usco3YIs="}],"description":"Bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements, Friday December 5th, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:13Z"},"road_event_id":"hhD9FYocJKWdhDdy+2ZcZgZvY0w=","beginning_cross_street":"NY 971H; Paddy Hill Road","ending_cross_street":"NY 971H; Paddy Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.983093,43.999423]]}},{"id":"+PvMAcX/bE3yzrL4ef0usco3YIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q2cyAh3HXFIBxwPFjWjWj5flFiA="}],"description":"Bridge demolition on NY 12F both directions NY 971H; Paddy Hill Road (Hounsfield) Motorists may experience minor disruptions on Rte. 12F near the Bridge St. intersection due to equipment and/or material movements, Friday December 5th, 2025 thru Saturday May 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-17T19:13:13Z"},"road_event_id":"+PvMAcX/bE3yzrL4ef0usco3YIs=","beginning_cross_street":"NY 971H; Paddy Hill Road","ending_cross_street":"NY 971H; Paddy Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.983093,43.999423]]}},{"id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AEAqgEHS+L7jBFDfow8dNNfR7CY="}],"description":"Construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2025-12-09T17:02:29Z"},"road_event_id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8=","beginning_cross_street":"E KINGSBRIDGE RD","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896238,40.867126]]}},{"id":"AEAqgEHS+L7jBFDfow8dNNfR7CY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8="},{"type":"next-occurrence","id":"Ms79urpWIT/pN1hOWwLndfV9RIc="}],"description":"Construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2025-12-09T17:02:29Z"},"road_event_id":"AEAqgEHS+L7jBFDfow8dNNfR7CY=","beginning_cross_street":"E KINGSBRIDGE RD","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896238,40.867126]]}},{"id":"Ms79urpWIT/pN1hOWwLndfV9RIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8="},{"type":"next-occurrence","id":"8zLmp6Ots6/HcglF3liSgwNsrSw="}],"description":"Construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2025-12-09T17:02:29Z"},"road_event_id":"Ms79urpWIT/pN1hOWwLndfV9RIc=","beginning_cross_street":"E KINGSBRIDGE RD","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896238,40.867126]]}},{"id":"8zLmp6Ots6/HcglF3liSgwNsrSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8="},{"type":"next-occurrence","id":"a1KXlZ6G8SVO2FJ50k7+fZ3IEUY="}],"description":"Construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2025-12-09T17:02:29Z"},"road_event_id":"8zLmp6Ots6/HcglF3liSgwNsrSw=","beginning_cross_street":"E KINGSBRIDGE RD","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896238,40.867126]]}},{"id":"a1KXlZ6G8SVO2FJ50k7+fZ3IEUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8="},{"type":"next-occurrence","id":"rPlzwUbfdCC4h2qTY9q8NT/gXzI="}],"description":"Construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2025-12-09T17:02:29Z"},"road_event_id":"a1KXlZ6G8SVO2FJ50k7+fZ3IEUY=","beginning_cross_street":"E KINGSBRIDGE RD","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896238,40.867126]]}},{"id":"rPlzwUbfdCC4h2qTY9q8NT/gXzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8="},{"type":"next-occurrence","id":"CoNUJ1PClTK4HrigPTHmdkricfk="}],"description":"Construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2025-12-09T17:02:29Z"},"road_event_id":"rPlzwUbfdCC4h2qTY9q8NT/gXzI=","beginning_cross_street":"E KINGSBRIDGE RD","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896238,40.867126]]}},{"id":"CoNUJ1PClTK4HrigPTHmdkricfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B/X64Ctxx/9uc1+XZ46z7T+jc+8="}],"description":"Construction on MORRIS AVE northbound between E KINGSBRIDGE RD (New York) and E 196TH ST (New York) for boom truck delivery., Tuesday December 9th, 2025 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2025-12-09T17:02:29Z"},"road_event_id":"CoNUJ1PClTK4HrigPTHmdkricfk=","beginning_cross_street":"E KINGSBRIDGE RD","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896238,40.867126]]}},{"id":"6PqVvXcfVAm/otG4fGZ++PMI4OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OwWBPep562vlAMiSaI5RuorUhNw="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"6PqVvXcfVAm/otG4fGZ++PMI4OU=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"OwWBPep562vlAMiSaI5RuorUhNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"K/ir0yBGev/cEXVWGmlQHflHJM4="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"OwWBPep562vlAMiSaI5RuorUhNw=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"K/ir0yBGev/cEXVWGmlQHflHJM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"IDsTIuKtNY+g0UZNSKQe7F1Jwi8="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"K/ir0yBGev/cEXVWGmlQHflHJM4=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"IDsTIuKtNY+g0UZNSKQe7F1Jwi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"a/KFPh8+ZgzI1Jb0O+dwU9HOQU8="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"IDsTIuKtNY+g0UZNSKQe7F1Jwi8=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"a/KFPh8+ZgzI1Jb0O+dwU9HOQU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"QEI6nrikrSTjG7zH+Gd+U14RrbM="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"a/KFPh8+ZgzI1Jb0O+dwU9HOQU8=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"QEI6nrikrSTjG7zH+Gd+U14RrbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"NJgSOi70XZog+q0Fq6c/mwHQzaw="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"QEI6nrikrSTjG7zH+Gd+U14RrbM=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"NJgSOi70XZog+q0Fq6c/mwHQzaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"YQO9vrFpF4ScdUDFpNplxvPKSwk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"NJgSOi70XZog+q0Fq6c/mwHQzaw=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"YQO9vrFpF4ScdUDFpNplxvPKSwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"ttiesNUxF7bSq0+Gc3gm08YYZOk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"YQO9vrFpF4ScdUDFpNplxvPKSwk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"ttiesNUxF7bSq0+Gc3gm08YYZOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"tL0wQtqiJrsY4KfOAEOjplKgSCM="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"ttiesNUxF7bSq0+Gc3gm08YYZOk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"tL0wQtqiJrsY4KfOAEOjplKgSCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"RAB5XwcpSFJpkItZLL55jhGHxPk="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"tL0wQtqiJrsY4KfOAEOjplKgSCM=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"RAB5XwcpSFJpkItZLL55jhGHxPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"+ho4pTwH1dffkom2NL9cTLAGKwo="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"RAB5XwcpSFJpkItZLL55jhGHxPk=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"+ho4pTwH1dffkom2NL9cTLAGKwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="},{"type":"next-occurrence","id":"iLGnq7t3Qm4NsZ605T3G89uZ1Zs="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"+ho4pTwH1dffkom2NL9cTLAGKwo=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"iLGnq7t3Qm4NsZ605T3G89uZ1Zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6PqVvXcfVAm/otG4fGZ++PMI4OU="}],"description":"Longterm construction on US 9W both directions between Lakewood Drive (Clarkstown) and Park Road (Stony Point) 202308107656/202508112934/NIGHT/32545309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM, alternating traffic, Tuesday May 26th, 2026 thru Sunday May 31st, 2026 Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 07:00 PM thru 05:00 AM,","update_date":"2026-04-20T16:52:59Z"},"road_event_id":"iLGnq7t3Qm4NsZ605T3G89uZ1Zs=","beginning_cross_street":"Lakewood Drive","ending_cross_street":"Park Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927978,41.155234]]}},{"id":"0TDHgfVYEMdj+rK29K6H0YCl0zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 northbound ramp from Archer Avenue (New York) Subject to change without notice., Continuous Monday December 22nd, 2025 07:00 AM thru Thursday April 30th, 2026 11:59 PM All lanes closed","update_date":"2026-03-26T17:32:01Z"},"road_event_id":"0TDHgfVYEMdj+rK29K6H0YCl0zo=","beginning_cross_street":"Archer Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814459,40.699019]]}},{"id":"UYhfWZdOY5tmDuPkln0AtnAXS0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["181 Bus and 182 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, 181 Bus and 182 Bus area of G W Bridge Plaza West (Fort Lee) the Bridge Plaza West Bus Slip will be closed between the Ramp to Center Avenue and Center Avenue for construction. During this time, NJ TRANSIT Bus Route Nos. 181 and 182 in Fort Lee will operate on a detour as follows: Buses traveling toward Union City and Hackensack will travel from the upper level of the George Washington Bridge and Exit 73, take exit 73 (67, 9W Fort Lee), keep right to take the exit for Hudson Terrace, make a right on Hudson Terrace, right on Bruce Reynolds Boulevard, left on Lemoine Avenue, and then continue the regular route. Bus stops may be lost, and minor delays are expected during this detour. Please read the above detour directions carefully and allow for extra travel time., Continuous Friday January 2nd, 2026 11:59 PM thru Thursday April 30th, 2026 12:00 AM","update_date":"2025-12-18T19:01:40Z"},"road_event_id":"UYhfWZdOY5tmDuPkln0AtnAXS0c=","beginning_cross_street":"G W Bridge Plaza West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968221,40.854968]]}},{"id":"Bh+WFVN8VzM0yJivzXbt65BOu60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["188 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, 188 Bus area of G W Bridge Plaza West (Fort Lee) the Bridge Plaza West Bus Slip will be closed between the ramp to Center Avenue and Center Avenue for construction. During this time, NJ TRANSIT Bus Route No. 188 in Fort Lee will operate on a detour as follows: Buses traveling toward West New York will travel from the upper level of GWB and Exit 73, take exit 73, keep right to take the exit for Hudson Terrace, make a right on Hudson Terrace, right on Bruce Reynolds Boulevard, left on Park Avenue (Martha Washington Way), and then continue the regular route. Bus stops may be lost, and minor delays are expected during this detour. Please read the above detour directions carefully and allow for extra travel tim, Continuous Friday January 2nd, 2026 11:59 PM thru Thursday April 30th, 2026 12:00 AM","update_date":"2025-12-18T19:19:01Z"},"road_event_id":"Bh+WFVN8VzM0yJivzXbt65BOu60=","beginning_cross_street":"G W Bridge Plaza West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968221,40.854968]]}},{"id":"Kfedqj39R1gljadj8h7g7V5LXFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["186 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 186 Bus G W Bridge Plaza West (Fort Lee) the Bridge Plaza West bus slip will be closed between the ramp to Center Avenue and Center Avenue for construction. During this time, NJ TRANSIT Bus Route No. 186 in Fort Lee will operate on a detour as follows: Buses traveling toward the George Washington Bridge will travel from Lemoine Avenue and Bruce Reynolds Boulevard, continue on Lemoine Avenue, make a right on Main Street, right on Center Avenue, and then continue the regular route. Buses traveling toward Dumont will travel from the upper level of the George Washington Bridge and Exit 73, take Exit 73, keep right to take the exit for Hudson Terrace, make a right on Hudson Terrace, right on Bruce Reynolds Boulevard, right on Lemoine Avenue (Route 67 North), and then continue the regular route. Bus stops may be lost, and minor delays are expected during this detour. Please read the above detour directions carefully and allow for extra travel time., Continuous Friday January 2nd, 2026 11:59 PM thru Thursday April 30th, 2026 12:00 AM","update_date":"2025-12-18T19:22:05Z"},"road_event_id":"Kfedqj39R1gljadj8h7g7V5LXFo=","beginning_cross_street":"G W Bridge Plaza West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968221,40.854968]]}},{"id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zt8FdXW5lup8u4wnL50YAgb4yUo="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"zt8FdXW5lup8u4wnL50YAgb4yUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"HHZWOxz1pXPAJqHGUR4i1uO0sJ8="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"zt8FdXW5lup8u4wnL50YAgb4yUo=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"HHZWOxz1pXPAJqHGUR4i1uO0sJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"s3IOoXQwTKEDeuMrUm+//PbtMus="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"HHZWOxz1pXPAJqHGUR4i1uO0sJ8=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"s3IOoXQwTKEDeuMrUm+//PbtMus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"xUEOFb0dTuuoqScpPjuYchvMRc0="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"s3IOoXQwTKEDeuMrUm+//PbtMus=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"xUEOFb0dTuuoqScpPjuYchvMRc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"EavKX1/jP+bwtaXXKSZ7cDwHNvA="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"xUEOFb0dTuuoqScpPjuYchvMRc0=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"EavKX1/jP+bwtaXXKSZ7cDwHNvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"RfKGbWe8bZ766SDhK6wGXFXa6kk="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"EavKX1/jP+bwtaXXKSZ7cDwHNvA=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"RfKGbWe8bZ766SDhK6wGXFXa6kk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"z/0FKDryXtgWfQTR9gDOJG4ckIg="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"RfKGbWe8bZ766SDhK6wGXFXa6kk=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"z/0FKDryXtgWfQTR9gDOJG4ckIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"p4cu6bS4Se4aS2z5SX8mhIhRIZg="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"z/0FKDryXtgWfQTR9gDOJG4ckIg=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"p4cu6bS4Se4aS2z5SX8mhIhRIZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"97Bm5Aw69y0cHqsVAjGs+eEskZU="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"p4cu6bS4Se4aS2z5SX8mhIhRIZg=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"97Bm5Aw69y0cHqsVAjGs+eEskZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"pCGNLIDitdvXpytH4m9IJ8mYYGs="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"97Bm5Aw69y0cHqsVAjGs+eEskZU=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"pCGNLIDitdvXpytH4m9IJ8mYYGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"zzPcGa06S1Q0aDvBal5C31II+Ao="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"pCGNLIDitdvXpytH4m9IJ8mYYGs=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"zzPcGa06S1Q0aDvBal5C31II+Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"f06wlddyrGX0YUgLD38whU/3x8A="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"zzPcGa06S1Q0aDvBal5C31II+Ao=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"f06wlddyrGX0YUgLD38whU/3x8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"zuvqMQL3bIwdR1zGexppO+z13uk="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"f06wlddyrGX0YUgLD38whU/3x8A=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"zuvqMQL3bIwdR1zGexppO+z13uk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="},{"type":"next-occurrence","id":"7XkcUWQYIM0IbHLCqN4e3cZQAD4="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"zuvqMQL3bIwdR1zGexppO+z13uk=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"7XkcUWQYIM0IbHLCqN4e3cZQAD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COOK ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQstBO0Qs7eDg5H32Ds6zpXOMe0="}],"description":"Construction on COOK ST westbound between AVENUE OF PUERTO RICO (New York) and MANHATTAN AVE (New York) for boom and knuckle boom to work on major alteration., Friday December 19th, 2025 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-04T19:16:04Z"},"road_event_id":"7XkcUWQYIM0IbHLCqN4e3cZQAD4=","beginning_cross_street":"AVENUE OF PUERTO RICO","ending_cross_street":"MANHATTAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94242,40.702325]]}},{"id":"mPy68oVh+2IyFjaKZYfCDUbEWLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WikSDaDT6LGJGKJKh6pm9Y9/7Yo="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"mPy68oVh+2IyFjaKZYfCDUbEWLE=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"WikSDaDT6LGJGKJKh6pm9Y9/7Yo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"Sa84pQO7n2nM0sMPgdYochVE/AI="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"WikSDaDT6LGJGKJKh6pm9Y9/7Yo=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"Sa84pQO7n2nM0sMPgdYochVE/AI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"cfVeWCizFvO+u8QZk3C4VCy3XhY="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"Sa84pQO7n2nM0sMPgdYochVE/AI=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"cfVeWCizFvO+u8QZk3C4VCy3XhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"5LGFEDnIHRbxv5cnhOCu2ogYJ5U="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"cfVeWCizFvO+u8QZk3C4VCy3XhY=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"5LGFEDnIHRbxv5cnhOCu2ogYJ5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"onCPcJ85eQcfySNsWpYoLKmDYw8="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"5LGFEDnIHRbxv5cnhOCu2ogYJ5U=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"onCPcJ85eQcfySNsWpYoLKmDYw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"54eKBu6Oem0ZCMoOezCPxhdkeCU="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"onCPcJ85eQcfySNsWpYoLKmDYw8=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"54eKBu6Oem0ZCMoOezCPxhdkeCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"IcZLrUhX+WQa6rDJmIq8qnuUJos="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"54eKBu6Oem0ZCMoOezCPxhdkeCU=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"IcZLrUhX+WQa6rDJmIq8qnuUJos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"KZU1L1Vsqk2qVp3ug7n03fYK1bU="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"IcZLrUhX+WQa6rDJmIq8qnuUJos=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"KZU1L1Vsqk2qVp3ug7n03fYK1bU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"zAVUTZcsU1PM52GX/EssOFLb8G4="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"KZU1L1Vsqk2qVp3ug7n03fYK1bU=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"zAVUTZcsU1PM52GX/EssOFLb8G4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="},{"type":"next-occurrence","id":"gUjQzk31+yMMngQyiw5+/W35Nwk="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"zAVUTZcsU1PM52GX/EssOFLb8G4=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"gUjQzk31+yMMngQyiw5+/W35Nwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LODI ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mPy68oVh+2IyFjaKZYfCDUbEWLE="}],"description":"Bridge work and drainage improvements on LODI ST both directions between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Thursday January 1st, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-27T17:50:14Z"},"road_event_id":"gUjQzk31+yMMngQyiw5+/W35Nwk=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13064,43.051105]]}},{"id":"xuhP0aLXU8Wfom2z+wq+k8nAPeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 5 both directions between Almond Street (Syracuse) and University Ave (Syracuse), Continuous Thursday January 1st, 2026 07:00 AM thru Wednesday July 1st, 2026 03:30 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-27T17:43:45Z"},"road_event_id":"xuhP0aLXU8Wfom2z+wq+k8nAPeM=","beginning_cross_street":"Almond Street","ending_cross_street":"University Ave ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.141945,43.050785]]}},{"id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8mRChoS7jEIivsgaYxx9USlol2I="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"8mRChoS7jEIivsgaYxx9USlol2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"dCXecmZsvJclyJWlyKoBsdwmBQ4="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"8mRChoS7jEIivsgaYxx9USlol2I=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"dCXecmZsvJclyJWlyKoBsdwmBQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"mQcoelA7LZN0pYNXJcdsT3GiI7s="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"dCXecmZsvJclyJWlyKoBsdwmBQ4=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"mQcoelA7LZN0pYNXJcdsT3GiI7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"ESU0865HDmou6MKvf8vNSzN1OGY="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"mQcoelA7LZN0pYNXJcdsT3GiI7s=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:30:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"ESU0865HDmou6MKvf8vNSzN1OGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"EsGAYPvDHJJ314LI4W91VXUPg6U="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"ESU0865HDmou6MKvf8vNSzN1OGY=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"EsGAYPvDHJJ314LI4W91VXUPg6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"BX1DZGnelrxP/akx97IHSoWAcYE="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"EsGAYPvDHJJ314LI4W91VXUPg6U=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"BX1DZGnelrxP/akx97IHSoWAcYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"tku2JUtNKvgVIIgOXYbVe6OMAg0="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"BX1DZGnelrxP/akx97IHSoWAcYE=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"tku2JUtNKvgVIIgOXYbVe6OMAg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"zk8dNHHg109/AGDbzGKGY2H3FGE="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"tku2JUtNKvgVIIgOXYbVe6OMAg0=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"zk8dNHHg109/AGDbzGKGY2H3FGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"CsNVz0G7vfCHEPNONgZHG5LSIyY="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"zk8dNHHg109/AGDbzGKGY2H3FGE=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"CsNVz0G7vfCHEPNONgZHG5LSIyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"ImIY8iGTf9Yy4HhFHCDyvGHv5Wo="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"CsNVz0G7vfCHEPNONgZHG5LSIyY=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T10:30:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"ImIY8iGTf9Yy4HhFHCDyvGHv5Wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"yLUZHoqMl+f6ISqO/dhYfY27xNk="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"ImIY8iGTf9Yy4HhFHCDyvGHv5Wo=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"yLUZHoqMl+f6ISqO/dhYfY27xNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="},{"type":"next-occurrence","id":"2gg2u6jcC7MKmcQcTdS29V3HRUA="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"yLUZHoqMl+f6ISqO/dhYfY27xNk=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"2gg2u6jcC7MKmcQcTdS29V3HRUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iuH2JU7KOvq++F7x2x+7Xb4KWIo="}],"description":"Construction on I-81 southbound Exit 98 - NY 31; Cicero; Bridgeport (Cicero) to Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:08Z"},"road_event_id":"2gg2u6jcC7MKmcQcTdS29V3HRUA=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"GpvzXPQ6jXSledv2CW0vBYMozzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) NB lane shift to SB side for 81 project, Continuous Thursday January 1st, 2026 09:00 AM thru Sunday May 31st, 2026 03:30 PM All lanes open","update_date":"2026-03-12T10:52:11Z"},"road_event_id":"GpvzXPQ6jXSledv2CW0vBYMozzY=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140383,43.019988]]}},{"id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E+a/hg9iI+S/L52vRttp4LNv7p4="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"E+a/hg9iI+S/L52vRttp4LNv7p4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"kRByzdTt6OveEOaXEesJsLQTaeE="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"E+a/hg9iI+S/L52vRttp4LNv7p4=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"kRByzdTt6OveEOaXEesJsLQTaeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"1z9mJiqagOsjMwN2doRjbM06aMc="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"kRByzdTt6OveEOaXEesJsLQTaeE=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"1z9mJiqagOsjMwN2doRjbM06aMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"g+9dNv7YP4dKAoOiCLqce8DiPsQ="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"1z9mJiqagOsjMwN2doRjbM06aMc=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:30:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"g+9dNv7YP4dKAoOiCLqce8DiPsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"8Egwwlp5gtV4jIOKlU3x/yQX+ZQ="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"g+9dNv7YP4dKAoOiCLqce8DiPsQ=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"8Egwwlp5gtV4jIOKlU3x/yQX+ZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"iAYkp03fhMbvN3NlFwbIGkB6aHU="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"8Egwwlp5gtV4jIOKlU3x/yQX+ZQ=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"iAYkp03fhMbvN3NlFwbIGkB6aHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"ZiOTKwBq1OV1CJ+/4nvoHvD7eZM="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"iAYkp03fhMbvN3NlFwbIGkB6aHU=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"ZiOTKwBq1OV1CJ+/4nvoHvD7eZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"KjdBpWcgjj2GKtabLC16KGuHkls="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"ZiOTKwBq1OV1CJ+/4nvoHvD7eZM=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"KjdBpWcgjj2GKtabLC16KGuHkls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"U8LLHOLwIjlPNwBIgvQV78nDMI0="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"KjdBpWcgjj2GKtabLC16KGuHkls=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"U8LLHOLwIjlPNwBIgvQV78nDMI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"Dk2n1/3AfwEMOZcHIhzzsCCtRjQ="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"U8LLHOLwIjlPNwBIgvQV78nDMI0=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T10:30:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Dk2n1/3AfwEMOZcHIhzzsCCtRjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"Twm2wcKrTRALV114ziPKl3f/9ag="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"Dk2n1/3AfwEMOZcHIhzzsCCtRjQ=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Twm2wcKrTRALV114ziPKl3f/9ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="},{"type":"next-occurrence","id":"sjKNlLuZngfR+g9cLIeuIzzKpkQ="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"Twm2wcKrTRALV114ziPKl3f/9ag=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"sjKNlLuZngfR+g9cLIeuIzzKpkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jvmkeO5bHgg62ZWJS8RKO/VsxAY="}],"description":"Construction on I-481 northbound between Exit 5W - Kirkville Road; CR 53 (De Witt) and Exit 10 (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:54:07Z"},"road_event_id":"sjKNlLuZngfR+g9cLIeuIzzKpkQ=","beginning_cross_street":"Exit 5W - Kirkville Road; CR 53","ending_cross_street":"Exit 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"EuYdOR9F5hwGFpkSX06fPsWzYa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"naBgao3uQTpqJC9gg4c/6mUBjq0="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"EuYdOR9F5hwGFpkSX06fPsWzYa0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"naBgao3uQTpqJC9gg4c/6mUBjq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"c/Q9M6OMz1sRmSE5MhJePb+a7lo="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"naBgao3uQTpqJC9gg4c/6mUBjq0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"c/Q9M6OMz1sRmSE5MhJePb+a7lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"GiN1CZgM40iy1tQIJsvpWxVznco="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"c/Q9M6OMz1sRmSE5MhJePb+a7lo=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"GiN1CZgM40iy1tQIJsvpWxVznco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"gvNTyr/zA0njpN499Rwqxwm8n/I="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"GiN1CZgM40iy1tQIJsvpWxVznco=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"gvNTyr/zA0njpN499Rwqxwm8n/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"eKom3dg5+PSEZ74Qo3n5ixqYNC4="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"gvNTyr/zA0njpN499Rwqxwm8n/I=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"eKom3dg5+PSEZ74Qo3n5ixqYNC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"Tfhxiw3YqSWNOKsIrNkci0Xje+o="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"eKom3dg5+PSEZ74Qo3n5ixqYNC4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Tfhxiw3YqSWNOKsIrNkci0Xje+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"b6itpvsDa84aqIaPQiBB3deDPxA="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"Tfhxiw3YqSWNOKsIrNkci0Xje+o=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"b6itpvsDa84aqIaPQiBB3deDPxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"cjRw5VfsVcd4AF5YLqs1fYJ5Na8="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"b6itpvsDa84aqIaPQiBB3deDPxA=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"cjRw5VfsVcd4AF5YLqs1fYJ5Na8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"dK+2T3/psUnqeeX3iKhDHyfdJXQ="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"cjRw5VfsVcd4AF5YLqs1fYJ5Na8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"dK+2T3/psUnqeeX3iKhDHyfdJXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="},{"type":"next-occurrence","id":"suYghAyaFbJ1zsPLh/54jIQBZt4="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"dK+2T3/psUnqeeX3iKhDHyfdJXQ=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"suYghAyaFbJ1zsPLh/54jIQBZt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EuYdOR9F5hwGFpkSX06fPsWzYa0="}],"description":"Longterm construction on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:53:41Z"},"road_event_id":"suYghAyaFbJ1zsPLh/54jIQBZt4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"0arzI+AtOV23ob2YEdIdv48CYMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m0DC0rJTSTSrL9QzP4RFGfE5Dbk="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"0arzI+AtOV23ob2YEdIdv48CYMM=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"m0DC0rJTSTSrL9QzP4RFGfE5Dbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"Hlrcqq+mNYB0qwd1H7hfomxo97o="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"m0DC0rJTSTSrL9QzP4RFGfE5Dbk=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"Hlrcqq+mNYB0qwd1H7hfomxo97o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"E6/+kMqaMW6bm7IaUoBP+g40RJU="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"Hlrcqq+mNYB0qwd1H7hfomxo97o=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"E6/+kMqaMW6bm7IaUoBP+g40RJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"oiVYkjuXXdekuKviaQVLis75eT4="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"E6/+kMqaMW6bm7IaUoBP+g40RJU=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"oiVYkjuXXdekuKviaQVLis75eT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"LaDtQ6mIDkbct65k4/tdTKNfLNw="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"oiVYkjuXXdekuKviaQVLis75eT4=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"LaDtQ6mIDkbct65k4/tdTKNfLNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"JyLgiAp9EOMQPdGb64j8TpVS2PE="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"LaDtQ6mIDkbct65k4/tdTKNfLNw=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"JyLgiAp9EOMQPdGb64j8TpVS2PE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"KV6T5Ys6LZ7l707WAFLVhzXaGVA="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"JyLgiAp9EOMQPdGb64j8TpVS2PE=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"KV6T5Ys6LZ7l707WAFLVhzXaGVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"CzOYzvOlzsxvpdX4DbRh5SVRm1U="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"KV6T5Ys6LZ7l707WAFLVhzXaGVA=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"CzOYzvOlzsxvpdX4DbRh5SVRm1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"7q7Qbg2qk2OYrMq9HO8drMMvwKY="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"CzOYzvOlzsxvpdX4DbRh5SVRm1U=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"7q7Qbg2qk2OYrMq9HO8drMMvwKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"GcIxkYqiXoFxcwxZlxM9Ukva5C0="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"7q7Qbg2qk2OYrMq9HO8drMMvwKY=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"GcIxkYqiXoFxcwxZlxM9Ukva5C0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"eI8DcY1RZuP+rUuWwgHPxlaQz6U="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"GcIxkYqiXoFxcwxZlxM9Ukva5C0=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"eI8DcY1RZuP+rUuWwgHPxlaQz6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="},{"type":"next-occurrence","id":"cy3CbUImpPGJ2/PWIr/QnRkW/fk="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"eI8DcY1RZuP+rUuWwgHPxlaQz6U=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"cy3CbUImpPGJ2/PWIr/QnRkW/fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0arzI+AtOV23ob2YEdIdv48CYMM="}],"description":"Roadwork on I-481 northbound between Exit 88 (Old Exit 4) - I-690 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-12T11:04:09Z"},"road_event_id":"cy3CbUImpPGJ2/PWIr/QnRkW/fk=","beginning_cross_street":"Exit 88 (Old Exit 4) - I-690","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05162,43.043175]]}},{"id":"THmJeH6d5VKseIvVsiHdCuNvpu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9QEMB8aF7CuxL+1L5RS2uDgAUq0="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"THmJeH6d5VKseIvVsiHdCuNvpu4=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"9QEMB8aF7CuxL+1L5RS2uDgAUq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"sysCHu/eAO90a3999Isi69M2E0Y="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"9QEMB8aF7CuxL+1L5RS2uDgAUq0=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"sysCHu/eAO90a3999Isi69M2E0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"s3liCYFZt508q6e+WgoA2Sn39fM="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"sysCHu/eAO90a3999Isi69M2E0Y=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"s3liCYFZt508q6e+WgoA2Sn39fM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"4W9JHHIWlrm99rNjKpovv4xaXxY="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"s3liCYFZt508q6e+WgoA2Sn39fM=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"4W9JHHIWlrm99rNjKpovv4xaXxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"dFisdssbro3ZncPWbc829jxekDo="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"4W9JHHIWlrm99rNjKpovv4xaXxY=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"dFisdssbro3ZncPWbc829jxekDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"IrFBbEk6biIugFg/9JnNiaJe9jM="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"dFisdssbro3ZncPWbc829jxekDo=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"IrFBbEk6biIugFg/9JnNiaJe9jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"q2A9+PGegSAVCwCY76qXdVbAF+8="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"IrFBbEk6biIugFg/9JnNiaJe9jM=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"q2A9+PGegSAVCwCY76qXdVbAF+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"uMG+jgDyi3RxQtiLNo8bL30uoTg="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"q2A9+PGegSAVCwCY76qXdVbAF+8=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"uMG+jgDyi3RxQtiLNo8bL30uoTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"1xUD+QpAE4tLPw+TJ0dIY2jUEww="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"uMG+jgDyi3RxQtiLNo8bL30uoTg=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"1xUD+QpAE4tLPw+TJ0dIY2jUEww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"PMY0OPffu9EEvZErHSOMTxNdsN4="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"1xUD+QpAE4tLPw+TJ0dIY2jUEww=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"PMY0OPffu9EEvZErHSOMTxNdsN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"LxordtJNUSSJnl7xNLCdizPwNFw="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"PMY0OPffu9EEvZErHSOMTxNdsN4=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"LxordtJNUSSJnl7xNLCdizPwNFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="},{"type":"next-occurrence","id":"DkGkoTg14YwVw0KxE7FMe5OxY4I="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"LxordtJNUSSJnl7xNLCdizPwNFw=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"DkGkoTg14YwVw0KxE7FMe5OxY4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"THmJeH6d5VKseIvVsiHdCuNvpu4="}],"description":"Roadwork on I-481 northbound between Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) and Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:03:39Z"},"road_event_id":"DkGkoTg14YwVw0KxE7FMe5OxY4I=","beginning_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92    ","ending_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.060574,43.0321]]}},{"id":"PLhvy/55a+7D9rzvZkEDA6vF1cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GKK2XyLeeUhk8pIG7to9cr99iM4="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"PLhvy/55a+7D9rzvZkEDA6vF1cg=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"GKK2XyLeeUhk8pIG7to9cr99iM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"msT9Mjb0ROwM3yZnhkGG6b+AirQ="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"GKK2XyLeeUhk8pIG7to9cr99iM4=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"msT9Mjb0ROwM3yZnhkGG6b+AirQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"LjyL7aiYeGXFBiYW4hbNuxYLRdk="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"msT9Mjb0ROwM3yZnhkGG6b+AirQ=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"LjyL7aiYeGXFBiYW4hbNuxYLRdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"Ts0sCLVafplrNPi2A2ov1Zxf0/E="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"LjyL7aiYeGXFBiYW4hbNuxYLRdk=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"Ts0sCLVafplrNPi2A2ov1Zxf0/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"qUPrFSmB31TkGlGS+Yah7a8fqTU="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"Ts0sCLVafplrNPi2A2ov1Zxf0/E=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"qUPrFSmB31TkGlGS+Yah7a8fqTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"lcN5HRw1ZMbVnIXlAeOYEviJdXU="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"qUPrFSmB31TkGlGS+Yah7a8fqTU=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"lcN5HRw1ZMbVnIXlAeOYEviJdXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"/3is987Qpm5KDijY1I9zwubnX/k="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"lcN5HRw1ZMbVnIXlAeOYEviJdXU=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"/3is987Qpm5KDijY1I9zwubnX/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"0G8Scpx6ncNorhKFDMILXJlxrxs="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"/3is987Qpm5KDijY1I9zwubnX/k=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"0G8Scpx6ncNorhKFDMILXJlxrxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"fKo5zvKIyfCKa08ggSvsC5Yj3tY="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"0G8Scpx6ncNorhKFDMILXJlxrxs=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"fKo5zvKIyfCKa08ggSvsC5Yj3tY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"zG1s+KUPdrTz+kCUyjN+GD7Y4SA="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"fKo5zvKIyfCKa08ggSvsC5Yj3tY=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"zG1s+KUPdrTz+kCUyjN+GD7Y4SA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"jrUdFmikUhqZqzMuFD4owGqDw3A="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"zG1s+KUPdrTz+kCUyjN+GD7Y4SA=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"jrUdFmikUhqZqzMuFD4owGqDw3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="},{"type":"next-occurrence","id":"BjQ+9vrGe7kxi1D4RNRrCwWl5i0="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"jrUdFmikUhqZqzMuFD4owGqDw3A=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"BjQ+9vrGe7kxi1D4RNRrCwWl5i0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PLhvy/55a+7D9rzvZkEDA6vF1cg="}],"description":"Installation of sign structure and roadwork on I-481 northbound between START ROUTE I-481; I-81 (Syracuse) and Exit 86B (Old Exit 3W) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:41:29Z"},"road_event_id":"BjQ+9vrGe7kxi1D4RNRrCwWl5i0=","beginning_cross_street":"START ROUTE I-481; I-81","ending_cross_street":"Exit 86B (Old Exit 3W) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.12994,43.007106]]}},{"id":"igG1pRR2URVcaw8Q+3aFRLYkVvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yW3GZLe4wivkXudIo7bHFEzKvvg="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"igG1pRR2URVcaw8Q+3aFRLYkVvM=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"yW3GZLe4wivkXudIo7bHFEzKvvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"zOjysPjofgIIpIUHFdGKiaEQWJM="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"yW3GZLe4wivkXudIo7bHFEzKvvg=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"zOjysPjofgIIpIUHFdGKiaEQWJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"0xZYeO4SbsZ0eS7qm+GZX3bD+kg="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"zOjysPjofgIIpIUHFdGKiaEQWJM=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"0xZYeO4SbsZ0eS7qm+GZX3bD+kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"uHTzvEca2miTCYXxOhStd30pb60="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"0xZYeO4SbsZ0eS7qm+GZX3bD+kg=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"uHTzvEca2miTCYXxOhStd30pb60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"zchKnrDq2RWQMnWVFZZ4vb3fwCQ="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"uHTzvEca2miTCYXxOhStd30pb60=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"zchKnrDq2RWQMnWVFZZ4vb3fwCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"MSKAcx791kFGiH8CTmqweqbQAQA="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"zchKnrDq2RWQMnWVFZZ4vb3fwCQ=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"MSKAcx791kFGiH8CTmqweqbQAQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"hH5DUKHkhqALft6NmRKsdXM1V78="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"MSKAcx791kFGiH8CTmqweqbQAQA=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"hH5DUKHkhqALft6NmRKsdXM1V78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"q2+EoUR09voeACRna3oYCd9KGuw="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"hH5DUKHkhqALft6NmRKsdXM1V78=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"q2+EoUR09voeACRna3oYCd9KGuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"WX9HsBl5deabuginhn0MqtBBVaU="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"q2+EoUR09voeACRna3oYCd9KGuw=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"WX9HsBl5deabuginhn0MqtBBVaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"HzJh76Wt02IpWL+yr+Fei4r+NJw="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"WX9HsBl5deabuginhn0MqtBBVaU=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"HzJh76Wt02IpWL+yr+Fei4r+NJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"/P1RHbHx2lEebpqO8ijf5B5bkhc="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"HzJh76Wt02IpWL+yr+Fei4r+NJw=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"/P1RHbHx2lEebpqO8ijf5B5bkhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="},{"type":"next-occurrence","id":"bH5WNWlPt1nqUlxME1Nj/knhq+A="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"/P1RHbHx2lEebpqO8ijf5B5bkhc=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"bH5WNWlPt1nqUlxME1Nj/knhq+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"igG1pRR2URVcaw8Q+3aFRLYkVvM="}],"description":"Installation of sign structure and roadwork on I-481 southbound between Exit 86 (Old Exit 3W) - NY 5; NY 92 (De Witt) and I-481; I-81 (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-08T12:40:40Z"},"road_event_id":"bH5WNWlPt1nqUlxME1Nj/knhq+A=","beginning_cross_street":"Exit 86 (Old Exit 3W) - NY 5; NY 92","ending_cross_street":" I-481; I-81   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.056181,43.037636]]}},{"id":"K6kpKm0XhDn8y9ljwTiENLGaFNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZOipRlaYypkaXsSIb2GsNlP2TA4="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"K6kpKm0XhDn8y9ljwTiENLGaFNo=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"ZOipRlaYypkaXsSIb2GsNlP2TA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K6kpKm0XhDn8y9ljwTiENLGaFNo="},{"type":"next-occurrence","id":"awcXHqdd+ABnL6+qhdmNE7qhv5A="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"ZOipRlaYypkaXsSIb2GsNlP2TA4=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"awcXHqdd+ABnL6+qhdmNE7qhv5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K6kpKm0XhDn8y9ljwTiENLGaFNo="},{"type":"next-occurrence","id":"JsRe75Onn82Z9Ev5Kkfw53nwsaw="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"awcXHqdd+ABnL6+qhdmNE7qhv5A=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"JsRe75Onn82Z9Ev5Kkfw53nwsaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K6kpKm0XhDn8y9ljwTiENLGaFNo="},{"type":"next-occurrence","id":"cHW6zzLInFMu+d+HNt/2NP2p3sw="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"JsRe75Onn82Z9Ev5Kkfw53nwsaw=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"cHW6zzLInFMu+d+HNt/2NP2p3sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K6kpKm0XhDn8y9ljwTiENLGaFNo="},{"type":"next-occurrence","id":"EHLOyU+5Haoh5mHXnotx8O7/iOQ="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"cHW6zzLInFMu+d+HNt/2NP2p3sw=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"EHLOyU+5Haoh5mHXnotx8O7/iOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K6kpKm0XhDn8y9ljwTiENLGaFNo="},{"type":"next-occurrence","id":"acOX4f4yuGpuINZ17G0SodMertE="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"EHLOyU+5Haoh5mHXnotx8O7/iOQ=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"acOX4f4yuGpuINZ17G0SodMertE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K6kpKm0XhDn8y9ljwTiENLGaFNo="},{"type":"next-occurrence","id":"GEAS5mQdh54Q015Gs+nuMWkzKBY="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"acOX4f4yuGpuINZ17G0SodMertE=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"GEAS5mQdh54Q015Gs+nuMWkzKBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K6kpKm0XhDn8y9ljwTiENLGaFNo="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 6A - NY 22 - NY 138 (Lewisboro) and Exit 7 - NY 116 (North Salem) D265186/B1077550/32650809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T13:19:59Z"},"road_event_id":"GEAS5mQdh54Q015Gs+nuMWkzKBY=","beginning_cross_street":"Exit 6A - NY 22 - NY 138","ending_cross_street":"Exit 7 - NY 116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674579,41.303215]]}},{"id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pS966QHQpWTVjC12X6xghYXjKoY="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"pS966QHQpWTVjC12X6xghYXjKoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4="},{"type":"next-occurrence","id":"Yhg6a033gwdrG0QNEMFg+/qSpKQ="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"pS966QHQpWTVjC12X6xghYXjKoY=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"Yhg6a033gwdrG0QNEMFg+/qSpKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4="},{"type":"next-occurrence","id":"sT4+WH84yW5oEOVUNdgX3aB7nrU="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"Yhg6a033gwdrG0QNEMFg+/qSpKQ=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"sT4+WH84yW5oEOVUNdgX3aB7nrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4="},{"type":"next-occurrence","id":"v3DF/IiNL51Ql+K0wB46OYQULmY="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"sT4+WH84yW5oEOVUNdgX3aB7nrU=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"v3DF/IiNL51Ql+K0wB46OYQULmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4="},{"type":"next-occurrence","id":"msr/rUkb/qcTRZpcGXRJLBvwg8E="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"v3DF/IiNL51Ql+K0wB46OYQULmY=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"msr/rUkb/qcTRZpcGXRJLBvwg8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4="},{"type":"next-occurrence","id":"8F++23M1DqBuzgK/63VlLpHFQ5E="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"msr/rUkb/qcTRZpcGXRJLBvwg8E=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"8F++23M1DqBuzgK/63VlLpHFQ5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4="},{"type":"next-occurrence","id":"efNSceVZPUeRywfKQBEXYKAmz/o="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"8F++23M1DqBuzgK/63VlLpHFQ5E=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"efNSceVZPUeRywfKQBEXYKAmz/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VE/Mf/jKtl9NZQUVpaoxhNIYJo4="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) D265186/B1077550/32650909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 04:00 PM, right lane closure","update_date":"2026-04-21T13:19:13Z"},"road_event_id":"efNSceVZPUeRywfKQBEXYKAmz/o=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.674846,41.303209]]}},{"id":"Z2IbZbWXkzGa2d69uq19XoyI/I8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-81 southbound ramp to Exit 1A (Old Exit 16A) - I-481 (Syracuse) ; follow detour, Continuous Thursday January 1st, 2026 12:00 AM thru Friday September 4th, 2026 03:00 PM All lanes closed","update_date":"2026-03-12T11:03:11Z"},"road_event_id":"Z2IbZbWXkzGa2d69uq19XoyI/I8=","beginning_cross_street":"Exit 1A (Old Exit 16A) - I-481  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135376,43.00864]]}},{"id":"e8eX7/pgULL0oOr4JqcPs4cdRZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"55b+6x1ahZzfnHWaYhvmO7VXyFU="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"e8eX7/pgULL0oOr4JqcPs4cdRZY=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"55b+6x1ahZzfnHWaYhvmO7VXyFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"6+e0Nd1v3hrJZ8NutjfFQ353RYM="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"55b+6x1ahZzfnHWaYhvmO7VXyFU=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"6+e0Nd1v3hrJZ8NutjfFQ353RYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"c4eN8adwEWgTZyfJbkLksENd7bk="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"6+e0Nd1v3hrJZ8NutjfFQ353RYM=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"c4eN8adwEWgTZyfJbkLksENd7bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"PkaRUox8gpDUp1srI9cjBGQ0Vkw="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"c4eN8adwEWgTZyfJbkLksENd7bk=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"PkaRUox8gpDUp1srI9cjBGQ0Vkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"/FJl6uQSSJlMTByHzBNyr6kPUhA="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"PkaRUox8gpDUp1srI9cjBGQ0Vkw=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"/FJl6uQSSJlMTByHzBNyr6kPUhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"xYFjR+wEA6S0g42W0mJf2oZTu8s="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"/FJl6uQSSJlMTByHzBNyr6kPUhA=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"xYFjR+wEA6S0g42W0mJf2oZTu8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"4U8Uhf5dxp3YPz6ZoNlts/F4F64="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"xYFjR+wEA6S0g42W0mJf2oZTu8s=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"4U8Uhf5dxp3YPz6ZoNlts/F4F64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"+SFqDalQd5WLjnpqaNrTGeQAt0U="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"4U8Uhf5dxp3YPz6ZoNlts/F4F64=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"+SFqDalQd5WLjnpqaNrTGeQAt0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"II65enC/zwK5ooo2CKRNoCHRuec="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"+SFqDalQd5WLjnpqaNrTGeQAt0U=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"II65enC/zwK5ooo2CKRNoCHRuec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"HP0sNAVe5hgpd9My9nru7tednnU="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"II65enC/zwK5ooo2CKRNoCHRuec=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"HP0sNAVe5hgpd9My9nru7tednnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"o0bbU1wMJWyE3+DKTxRwVsZCivA="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"HP0sNAVe5hgpd9My9nru7tednnU=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"o0bbU1wMJWyE3+DKTxRwVsZCivA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="},{"type":"next-occurrence","id":"Y9nAYQojePXukXgIBTDlm1WB190="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"o0bbU1wMJWyE3+DKTxRwVsZCivA=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"Y9nAYQojePXukXgIBTDlm1WB190=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e8eX7/pgULL0oOr4JqcPs4cdRZY="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 southbound between Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-03-12T11:02:03Z"},"road_event_id":"Y9nAYQojePXukXgIBTDlm1WB190=","beginning_cross_street":"Exit 1C (Old Exit 17) - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"vYkGB/V6XIYXIk0zDqau5u3lFx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IHz2qgFZpQGI+MyRAESOQs93csM="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"vYkGB/V6XIYXIk0zDqau5u3lFx8=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"IHz2qgFZpQGI+MyRAESOQs93csM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"ppCJN4Es3NGTDhsyC/JmDaUXcRc="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"IHz2qgFZpQGI+MyRAESOQs93csM=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"ppCJN4Es3NGTDhsyC/JmDaUXcRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"wfcihuuztV+hTjSfB9HC2YoU6xE="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"ppCJN4Es3NGTDhsyC/JmDaUXcRc=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"wfcihuuztV+hTjSfB9HC2YoU6xE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"gfT+dVsXuiBfzq4ezK7FpLtGhJE="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"wfcihuuztV+hTjSfB9HC2YoU6xE=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"gfT+dVsXuiBfzq4ezK7FpLtGhJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"Mpd0DPG1vKW9STD1D4qbFeG/3wk="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"gfT+dVsXuiBfzq4ezK7FpLtGhJE=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"Mpd0DPG1vKW9STD1D4qbFeG/3wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"+vJRmuuGWNhYE05jtK9Et2vXV2A="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"Mpd0DPG1vKW9STD1D4qbFeG/3wk=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"+vJRmuuGWNhYE05jtK9Et2vXV2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"OwIC3MlomcCUK9fWzevXYKFUSVk="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"+vJRmuuGWNhYE05jtK9Et2vXV2A=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"OwIC3MlomcCUK9fWzevXYKFUSVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"i+838oaqMp5d7wBoVvgL5oKGEps="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"OwIC3MlomcCUK9fWzevXYKFUSVk=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"i+838oaqMp5d7wBoVvgL5oKGEps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"b1IY1O34PlHUzylQqYqLGzfM19A="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"i+838oaqMp5d7wBoVvgL5oKGEps=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"b1IY1O34PlHUzylQqYqLGzfM19A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"YiQu+yVwR7Xu5DZb+ylrp/QiGu4="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"b1IY1O34PlHUzylQqYqLGzfM19A=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"YiQu+yVwR7Xu5DZb+ylrp/QiGu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"kKIpneg4qBrQHyyieLz6e31Iyjc="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"YiQu+yVwR7Xu5DZb+ylrp/QiGu4=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"kKIpneg4qBrQHyyieLz6e31Iyjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="},{"type":"next-occurrence","id":"IGToSEMZVdC8yj/Yt1F5w+c3Guw="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"kKIpneg4qBrQHyyieLz6e31Iyjc=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"IGToSEMZVdC8yj/Yt1F5w+c3Guw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vYkGB/V6XIYXIk0zDqau5u3lFx8="}],"description":"Drainage improvements and installation of sign structure and roadwork on I-81 northbound between Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 16A - I-481 (Syracuse) ; Alternating left and right lane closures, Thursday January 1st, 2026 thru Friday September 4th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 05:00 PM All lanes open","update_date":"2026-03-12T11:00:28Z"},"road_event_id":"IGToSEMZVdC8yj/Yt1F5w+c3Guw=","beginning_cross_street":"Exit 78 (Old Exit 16) - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 16A - I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138355,42.952435]]}},{"id":"cR+n/tuIPVmKjbZUxVu6JTBH99I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 88 (Old Exit 4) - I-690 (De Witt) ; Lane Shift, Continuous Thursday January 1st, 2026 09:00 AM thru Friday September 11th, 2026 06:00 PM All lanes open","update_date":"2026-03-16T12:59:23Z"},"road_event_id":"cR+n/tuIPVmKjbZUxVu6JTBH99I=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 88 (Old Exit 4) - I-690     ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053712,43.083097]]}},{"id":"oRmVdytbt/lWbKQZKU9VatkZMaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; follow detour, Continuous Thursday January 1st,2026 09:00 AM thru Friday September 11th,2026 06:00 PM All lanes closed ,","update_date":"2026-04-11T21:30:01Z"},"road_event_id":"oRmVdytbt/lWbKQZKU9VatkZMaM=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055974,43.076862]]}},{"id":"NF63CuAGHNkN/bSU0mNPBK3HgM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Continuous Wednesday December 31st, 2025 12:00 AM thru Thursday August 27th, 2026 11:59 PM All lanes closed","update_date":"2025-12-31T15:12:21Z"},"road_event_id":"NF63CuAGHNkN/bSU0mNPBK3HgM0=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855797,41.675278]]}},{"id":"3HVxByLnYCUKQpkQyQE8wgME690=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on US 11 both directions between Bennett St (Cicero) and River Rd (Hastings) ; Alternating one-way traffic with temporary signals, Continuous Monday January 12th, 2026 09:00 AM thru Thursday December 31st, 2026 03:30 PM All lanes open","update_date":"2026-04-09T17:20:27Z"},"road_event_id":"3HVxByLnYCUKQpkQyQE8wgME690=","beginning_cross_street":"Bennett St","ending_cross_street":"River Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140613,43.239408]]}},{"id":"hhUxD7JZYTg7k+6kvRGR+yzbUNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 34 both directions between Trombley Rd (Brutus) and Emerson Rd (Cato) ; follow detour, Continuous Thursday January 1st, 2026 07:00 AM thru Sunday November 1st, 2026 06:00 AM All lanes closed","update_date":"2026-03-12T10:52:38Z"},"road_event_id":"hhUxD7JZYTg7k+6kvRGR+yzbUNI=","beginning_cross_street":"Trombley Rd","ending_cross_street":"Emerson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.559128,43.06476]]}},{"id":"RwRgQz0SQROBkarVfVLaS2i5iLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Fg6CfRJkkZKHSXLaxSLvK8ZbH7w="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"RwRgQz0SQROBkarVfVLaS2i5iLI=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T17:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Fg6CfRJkkZKHSXLaxSLvK8ZbH7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"aBCaQar1u7SA7ifoVMieuiPUAe4="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"Fg6CfRJkkZKHSXLaxSLvK8ZbH7w=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T17:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"aBCaQar1u7SA7ifoVMieuiPUAe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"Msngu8jMtJZROpkPtmOkTDnGN74="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"aBCaQar1u7SA7ifoVMieuiPUAe4=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T17:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Msngu8jMtJZROpkPtmOkTDnGN74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"jq42E9qFEuA118J+j4/v0EWVoGk="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"Msngu8jMtJZROpkPtmOkTDnGN74=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T17:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"jq42E9qFEuA118J+j4/v0EWVoGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"Q8uxEeAF9HyD+cu5FQd7YEIdOG4="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"jq42E9qFEuA118J+j4/v0EWVoGk=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T17:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Q8uxEeAF9HyD+cu5FQd7YEIdOG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"ShrIcE5g+Ocdo/UVi/E15MTx0U8="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"Q8uxEeAF9HyD+cu5FQd7YEIdOG4=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T17:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"ShrIcE5g+Ocdo/UVi/E15MTx0U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"X41G1H/2aJc/zFRa3+gcXWW74iM="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"ShrIcE5g+Ocdo/UVi/E15MTx0U8=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T17:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"X41G1H/2aJc/zFRa3+gcXWW74iM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"uqBknpougxDuGKegl2nRL2P8xHQ="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"X41G1H/2aJc/zFRa3+gcXWW74iM=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T17:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"uqBknpougxDuGKegl2nRL2P8xHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"yXy82XMuEh/fOzQlQS1J3Q++wPE="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"uqBknpougxDuGKegl2nRL2P8xHQ=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T17:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"yXy82XMuEh/fOzQlQS1J3Q++wPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="},{"type":"next-occurrence","id":"/C4JFSuXWOLxvAradRAdl/nKvC0="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"yXy82XMuEh/fOzQlQS1J3Q++wPE=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T17:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"/C4JFSuXWOLxvAradRAdl/nKvC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RwRgQz0SQROBkarVfVLaS2i5iLI="}],"description":"Longterm construction on NY 79 westbound between N Corn Street (Ithaca) and South Meadow Street; NY 13 (Ithaca), Thursday January 1st, 2026 thru Thursday December 31st, 2026, Monday thru Friday, 01:00 PM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-12T10:59:27Z"},"road_event_id":"/C4JFSuXWOLxvAradRAdl/nKvC0=","beginning_cross_street":"N Corn Street","ending_cross_street":"South Meadow Street; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T17:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.50627,42.440147]]}},{"id":"Q1TPLmX2NCBLfvi7pxj7EsY2z5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 28 both directions area of South Inlet Raquette Lake (Raquette Lake) Motorists will encounter lane closures in both directions with the use of temporary signals, Continuous Thursday January 2nd, 2025 6:00 AM thru Wednesday September 30th, 2026 6:00 PM","update_date":"2026-02-13T10:49:56Z"},"road_event_id":"Q1TPLmX2NCBLfvi7pxj7EsY2z5Q=","beginning_cross_street":"South Inlet Raquette Lake","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.609983,43.807112]]}},{"id":"Z08w03KBojkKD81vxgUr6CG/5fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B12 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, B12 Bus area of East New York Av/Rockaway Av (New York) Eastbound buses operate via Pitkin Ave, Rockaway Ave, Eastern Parkway and Dean St. Westbound buses operate via Pacific St, Eastern Pkwy, Rockaway Ave and Pitkin Ave, Continuous Monday January 5th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-01-05T16:22:49Z"},"road_event_id":"Z08w03KBojkKD81vxgUr6CG/5fo=","beginning_cross_street":"East New York Av/Rockaway Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911737,40.671959]]}},{"id":"M0jkVKKy12sEiB1V3+qv9e8U41w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-317"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on CT-317 both directions between BEAR HILL RD (Woodbury) and HOLLOW RD (Woodbury), Continuous Monday January 12th, 2026 12:00 AM thru Friday May 15th, 2026 11:59 PM All lanes closed","update_date":"2026-01-06T19:42:10Z"},"road_event_id":"M0jkVKKy12sEiB1V3+qv9e8U41w=","beginning_cross_street":"BEAR HILL RD","ending_cross_street":"HOLLOW RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.216396,41.540584]]}},{"id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dsybm84sn/QP8wLKi8v67pn4esE="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:54:00Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"dsybm84sn/QP8wLKi8v67pn4esE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"nlM1QzNE/B4xuZmg7S4RykN2TII="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"dsybm84sn/QP8wLKi8v67pn4esE=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:54:00Z","end_date":"2026-04-24T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"nlM1QzNE/B4xuZmg7S4RykN2TII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"tmzonf+dThB5jDRpLsNvf9dlrb8="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"nlM1QzNE/B4xuZmg7S4RykN2TII=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:54:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"tmzonf+dThB5jDRpLsNvf9dlrb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"3VKbdI3P/AuTxTTqiK7G+Y70000="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"tmzonf+dThB5jDRpLsNvf9dlrb8=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:54:00Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"3VKbdI3P/AuTxTTqiK7G+Y70000=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"ky/igIz4cb7paKKCl9KBSEN8TRE="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"3VKbdI3P/AuTxTTqiK7G+Y70000=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:54:00Z","end_date":"2026-04-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"ky/igIz4cb7paKKCl9KBSEN8TRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"agFVn3yvJfRfanCla3oqq7ldDAI="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"ky/igIz4cb7paKKCl9KBSEN8TRE=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:54:00Z","end_date":"2026-04-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"agFVn3yvJfRfanCla3oqq7ldDAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"dghx1+OY8ruhTox8yF+4NspERZI="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"agFVn3yvJfRfanCla3oqq7ldDAI=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:54:00Z","end_date":"2026-04-29T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"dghx1+OY8ruhTox8yF+4NspERZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"7o1Z9Idv3W/RPzScbjikys5hLes="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"dghx1+OY8ruhTox8yF+4NspERZI=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:54:00Z","end_date":"2026-04-30T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"7o1Z9Idv3W/RPzScbjikys5hLes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"J1T99kmi+VkQcFR5Fou2YElzbfs="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"7o1Z9Idv3W/RPzScbjikys5hLes=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:54:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"J1T99kmi+VkQcFR5Fou2YElzbfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"qBNiIss+4t9HTfUhU2DWa/+Jecc="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"J1T99kmi+VkQcFR5Fou2YElzbfs=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:54:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"qBNiIss+4t9HTfUhU2DWa/+Jecc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"9VWkB/U2mkv9+03AdYSxQvNf8x8="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"qBNiIss+4t9HTfUhU2DWa/+Jecc=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:54:00Z","end_date":"2026-05-03T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"9VWkB/U2mkv9+03AdYSxQvNf8x8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"1/UionhRt2FClQdmtCuAphEL1+g="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"9VWkB/U2mkv9+03AdYSxQvNf8x8=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T12:54:00Z","end_date":"2026-05-04T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"1/UionhRt2FClQdmtCuAphEL1+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"KgQV6q9h/dBK0mA5/A/U9f/409E="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"1/UionhRt2FClQdmtCuAphEL1+g=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:54:00Z","end_date":"2026-05-05T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"KgQV6q9h/dBK0mA5/A/U9f/409E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="},{"type":"next-occurrence","id":"2cpE0l55HgmpZgV7Jp8YaGWLtLM="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"KgQV6q9h/dBK0mA5/A/U9f/409E=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:54:00Z","end_date":"2026-05-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"2cpE0l55HgmpZgV7Jp8YaGWLtLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B16 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OTrcG+PD9OxzBH0CIjcHTn3VlCg="}],"description":"Due to Construction northbound, B16 Bus at Caton Av/Ocean Py (New York) stop is closed until further notice.; buses will make a stop on Caton Ave between Ocean Pkwy and E 7th St instead, Wednesday January 7th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:54 AM thru 11:59 PM","update_date":"2026-01-07T13:54:54Z"},"road_event_id":"2cpE0l55HgmpZgV7Jp8YaGWLtLM=","beginning_cross_street":"Caton Av/Ocean Py","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:54:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975405,40.647749]]}},{"id":"QV3XXSo//tKTJn14DGjDHPd/1Fs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B63 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, B63 Bus between 5 Av/64 St (New York) and 5 Av/65 St (New York) may experience delays and will wait out any temporary closures. Please allow additional travel time, Continuous Wednesday January 7th, 2026 09:15 AM thru Friday June 19th, 2026 11:59 PM","update_date":"2026-01-07T14:15:57Z"},"road_event_id":"QV3XXSo//tKTJn14DGjDHPd/1Fs=","beginning_cross_street":"5 Av/64 St","ending_cross_street":"5 Av/65 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.018242,40.637578]]}},{"id":"yWHGX9VB3y2dUq7rKewJieHWcLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8UoNrK93vregxuu5L9uTGXpoksk="}],"description":"Safety improvements on NY 306 southbound between Viola Road - CR 74 (Ramapo) and Rita Avenue (Ramapo) 8761.31/32675109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday January 5th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-01-07T20:48:03Z"},"road_event_id":"yWHGX9VB3y2dUq7rKewJieHWcLc=","beginning_cross_street":"Viola Road - CR 74","ending_cross_street":"Rita Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066595,41.135246]]}},{"id":"8UoNrK93vregxuu5L9uTGXpoksk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yWHGX9VB3y2dUq7rKewJieHWcLc="},{"type":"next-occurrence","id":"qUEfbxgG9bZZEwCJLVO3bKXWhso="}],"description":"Safety improvements on NY 306 southbound between Viola Road - CR 74 (Ramapo) and Rita Avenue (Ramapo) 8761.31/32675109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday January 5th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-01-07T20:48:03Z"},"road_event_id":"8UoNrK93vregxuu5L9uTGXpoksk=","beginning_cross_street":"Viola Road - CR 74","ending_cross_street":"Rita Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066595,41.135246]]}},{"id":"qUEfbxgG9bZZEwCJLVO3bKXWhso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yWHGX9VB3y2dUq7rKewJieHWcLc="},{"type":"next-occurrence","id":"jsLP2j5JYGpQRs88xHelJkyv7qo="}],"description":"Safety improvements on NY 306 southbound between Viola Road - CR 74 (Ramapo) and Rita Avenue (Ramapo) 8761.31/32675109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday January 5th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-01-07T20:48:03Z"},"road_event_id":"qUEfbxgG9bZZEwCJLVO3bKXWhso=","beginning_cross_street":"Viola Road - CR 74","ending_cross_street":"Rita Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066595,41.135246]]}},{"id":"jsLP2j5JYGpQRs88xHelJkyv7qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yWHGX9VB3y2dUq7rKewJieHWcLc="},{"type":"next-occurrence","id":"SxIqnfvMfURqK9XltKJ4awDfi3U="}],"description":"Safety improvements on NY 306 southbound between Viola Road - CR 74 (Ramapo) and Rita Avenue (Ramapo) 8761.31/32675109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday January 5th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-01-07T20:48:03Z"},"road_event_id":"jsLP2j5JYGpQRs88xHelJkyv7qo=","beginning_cross_street":"Viola Road - CR 74","ending_cross_street":"Rita Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066595,41.135246]]}},{"id":"SxIqnfvMfURqK9XltKJ4awDfi3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yWHGX9VB3y2dUq7rKewJieHWcLc="},{"type":"next-occurrence","id":"hNw/WH/TT6Czg2eGMEldK8RPLnI="}],"description":"Safety improvements on NY 306 southbound between Viola Road - CR 74 (Ramapo) and Rita Avenue (Ramapo) 8761.31/32675109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday January 5th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-01-07T20:48:03Z"},"road_event_id":"SxIqnfvMfURqK9XltKJ4awDfi3U=","beginning_cross_street":"Viola Road - CR 74","ending_cross_street":"Rita Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066595,41.135246]]}},{"id":"hNw/WH/TT6Czg2eGMEldK8RPLnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yWHGX9VB3y2dUq7rKewJieHWcLc="},{"type":"next-occurrence","id":"S0NTsu38+7Ep/45sY4Rv9eNXVD4="}],"description":"Safety improvements on NY 306 southbound between Viola Road - CR 74 (Ramapo) and Rita Avenue (Ramapo) 8761.31/32675109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday January 5th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-01-07T20:48:03Z"},"road_event_id":"hNw/WH/TT6Czg2eGMEldK8RPLnI=","beginning_cross_street":"Viola Road - CR 74","ending_cross_street":"Rita Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066595,41.135246]]}},{"id":"S0NTsu38+7Ep/45sY4Rv9eNXVD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 306"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yWHGX9VB3y2dUq7rKewJieHWcLc="}],"description":"Safety improvements on NY 306 southbound between Viola Road - CR 74 (Ramapo) and Rita Avenue (Ramapo) 8761.31/32675109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday January 5th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-01-07T20:48:03Z"},"road_event_id":"S0NTsu38+7Ep/45sY4Rv9eNXVD4=","beginning_cross_street":"Viola Road - CR 74","ending_cross_street":"Rita Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.066595,41.135246]]}},{"id":"kBLpZRrOWzwrbQP9iUsMhFOSA9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M5 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M5 Bus at 6 Av/W 31 St (New York) stop is closed; for service, consider the southbound stop on 5th Ave at W 33rd St or the northbound stop on 6th Ave at W 31st St. Buses detour via 23rd S, Continuous Friday January 9th, 2026 08:35 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-01-09T13:35:35Z"},"road_event_id":"kBLpZRrOWzwrbQP9iUsMhFOSA9Y=","beginning_cross_street":"6 Av/W 31 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988957,40.748042]]}},{"id":"vmbQsZczQavkdMy8cyU1pKvu3Zg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M8 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M8 Bus at Av D/Loop (New York) stop is closed until further notice. The first and last stops will be made on E 10th St at Avenue D in both directions, Continuous Friday January 9th, 2026 08:51 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-03-09T12:27:19Z"},"road_event_id":"vmbQsZczQavkdMy8cyU1pKvu3Zg=","beginning_cross_street":"Av D/Loop","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974548,40.724689]]}},{"id":"8uSvi03najFZHVBgzJJh1BDI+N8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M35 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M35 Bus at Main Roadway/ Manhattan Psyc Ctr (New York) stop is closed until further notice. For service, use the stop on Main Roadway at Manhattan Psych Center instead, Continuous Friday January 9th, 2026 08:57 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-03-09T12:27:01Z"},"road_event_id":"8uSvi03najFZHVBgzJJh1BDI+N8=","beginning_cross_street":"Main Roadway/ Manhattan Psyc Ctr","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926839,40.789168]]}},{"id":"ssGFEH9mbLjsyYDTud4OZvG3g3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zW+hcL//G2KVvy1VH8lwdK7BAwE="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"ssGFEH9mbLjsyYDTud4OZvG3g3I=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:10:00Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"zW+hcL//G2KVvy1VH8lwdK7BAwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"KePCNGfd/ST0jJw0Z7bk9Fhb8m8="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"zW+hcL//G2KVvy1VH8lwdK7BAwE=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:10:00Z","end_date":"2026-04-24T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"KePCNGfd/ST0jJw0Z7bk9Fhb8m8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"vmLNVzrW4OICsjgRjB45kAGJi3c="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"KePCNGfd/ST0jJw0Z7bk9Fhb8m8=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:10:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"vmLNVzrW4OICsjgRjB45kAGJi3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"HCSjX0fprSgt2iFmLk3UFyDOoJQ="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"vmLNVzrW4OICsjgRjB45kAGJi3c=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:10:00Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"HCSjX0fprSgt2iFmLk3UFyDOoJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"Kh3PI8pw9M/ltKnDCS5/l/9jLMA="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"HCSjX0fprSgt2iFmLk3UFyDOoJQ=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:10:00Z","end_date":"2026-04-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"Kh3PI8pw9M/ltKnDCS5/l/9jLMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"dcNoPYWYZMjT9lskS/k+HCsNKCE="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"Kh3PI8pw9M/ltKnDCS5/l/9jLMA=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:10:00Z","end_date":"2026-04-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"dcNoPYWYZMjT9lskS/k+HCsNKCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"dAYPkMyAgI5BvJ86bIPFMDt/CDA="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"dcNoPYWYZMjT9lskS/k+HCsNKCE=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:10:00Z","end_date":"2026-04-29T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"dAYPkMyAgI5BvJ86bIPFMDt/CDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"K12MtT7uNCrhGifWa+n8Qvo3J2k="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"dAYPkMyAgI5BvJ86bIPFMDt/CDA=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:10:00Z","end_date":"2026-04-30T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"K12MtT7uNCrhGifWa+n8Qvo3J2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"FO/8ptZ7rPsWarsH+SqXLGJmd+I="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"K12MtT7uNCrhGifWa+n8Qvo3J2k=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:10:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"FO/8ptZ7rPsWarsH+SqXLGJmd+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"JcUb12XKoUzOI9lJCRQMMKdtEf0="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"FO/8ptZ7rPsWarsH+SqXLGJmd+I=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:10:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"JcUb12XKoUzOI9lJCRQMMKdtEf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"H2Fsz6lL3T9/CqaH84oRmSdZgRM="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"JcUb12XKoUzOI9lJCRQMMKdtEf0=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:10:00Z","end_date":"2026-05-03T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"H2Fsz6lL3T9/CqaH84oRmSdZgRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"tWaMLMYl+7v1Z+geRTWJsk6akKU="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"H2Fsz6lL3T9/CqaH84oRmSdZgRM=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:10:00Z","end_date":"2026-05-04T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"tWaMLMYl+7v1Z+geRTWJsk6akKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"vLOIM7ikvXsoG6qZN9XkiN5R1aU="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"tWaMLMYl+7v1Z+geRTWJsk6akKU=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:10:00Z","end_date":"2026-05-05T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"vLOIM7ikvXsoG6qZN9XkiN5R1aU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="},{"type":"next-occurrence","id":"9qwfTqV9+HTwE3pcK6uo0EUACSM="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"vLOIM7ikvXsoG6qZN9XkiN5R1aU=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:10:00Z","end_date":"2026-05-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"9qwfTqV9+HTwE3pcK6uo0EUACSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M98 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssGFEH9mbLjsyYDTud4OZvG3g3I="}],"description":"Due to Construction southbound, M98 Bus between W 178 St/Audubon Av (New York) and Park Av/E 125 St (New York) are detouring in Harlem; you will experience a few extra turns, but no stops are missed. Buses operate via 5th Ave from W 142nd St to W 125th St. Please allow additional travel time, Friday January 9th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:10 AM thru 11:59 PM","update_date":"2026-01-09T14:10:18Z"},"road_event_id":"9qwfTqV9+HTwE3pcK6uo0EUACSM=","beginning_cross_street":"W 178 St/Audubon Av","ending_cross_street":"Park Av/E 125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:10:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933445,40.84655]]}},{"id":"q78z2jEUzlQDX1dOBuMZxEJF3a4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q33 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, Q33 Bus at Roosevelt Av/82 St (New York) stop is closed until further notice; please use the temporary stop on 83rd St at Roosevelt Ave for service instead, Continuous Friday January 9th, 2026 09:27 AM thru Friday May 15th, 2026 11:59 PM","update_date":"2026-01-09T14:28:51Z"},"road_event_id":"q78z2jEUzlQDX1dOBuMZxEJF3a4=","beginning_cross_street":"Roosevelt Av/82 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883784,40.747602]]}},{"id":"JllimY7vG9ziZlFpS4OGPj2+Y8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q38 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q38 Bus at 63 Dr/Austin St (New York) stop on 63rd Dr at Austin St has been temporarily relocated north between Wetherole St and Austin St through the Fall of 2027, Continuous Friday January 9th, 2026 09:33 AM thru Friday October 1st, 2027 11:59 PM","update_date":"2026-03-09T12:26:03Z"},"road_event_id":"JllimY7vG9ziZlFpS4OGPj2+Y8w=","beginning_cross_street":"63 Dr/Austin St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863947,40.727478]]}},{"id":"BTac9LFSkXPH+3XZlu1waoHzEAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m70Rx0Q8dcCDIrSPUrPtGUt9iSA="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"BTac9LFSkXPH+3XZlu1waoHzEAs=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T09:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"m70Rx0Q8dcCDIrSPUrPtGUt9iSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"b/cTUiO1KX/ESvqDHi4DaQwkriI="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"m70Rx0Q8dcCDIrSPUrPtGUt9iSA=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T09:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"b/cTUiO1KX/ESvqDHi4DaQwkriI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"YG3+q3wZNgFneMGQA1HVcE7YftI="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"b/cTUiO1KX/ESvqDHi4DaQwkriI=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T09:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"YG3+q3wZNgFneMGQA1HVcE7YftI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"+c6pTsua8/x27hZgserALfv9UIg="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"YG3+q3wZNgFneMGQA1HVcE7YftI=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T09:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"+c6pTsua8/x27hZgserALfv9UIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"KSRahAdfyxZLmr14Rr3m/9Uzoes="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"+c6pTsua8/x27hZgserALfv9UIg=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T09:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"KSRahAdfyxZLmr14Rr3m/9Uzoes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"tq9lynG2r1SfB+qY19zsSZ21lgI="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"KSRahAdfyxZLmr14Rr3m/9Uzoes=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T09:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"tq9lynG2r1SfB+qY19zsSZ21lgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"HKBYeqj145DoCdylUNM4vZzABUg="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"tq9lynG2r1SfB+qY19zsSZ21lgI=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T09:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"HKBYeqj145DoCdylUNM4vZzABUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"vrWsp0BAlJFR/JPAzvnSg+xp6kM="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"HKBYeqj145DoCdylUNM4vZzABUg=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T09:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"vrWsp0BAlJFR/JPAzvnSg+xp6kM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"r+ZA8dlR4SKokLGcQ0H09zijbzY="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"vrWsp0BAlJFR/JPAzvnSg+xp6kM=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T09:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"r+ZA8dlR4SKokLGcQ0H09zijbzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="},{"type":"next-occurrence","id":"ZRMDQIemUOfuKLxKR5VtA0qgeW4="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"r+ZA8dlR4SKokLGcQ0H09zijbzY=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T09:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"ZRMDQIemUOfuKLxKR5VtA0qgeW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BTac9LFSkXPH+3XZlu1waoHzEAs="}],"description":"Station Rehabilitation on Newark AirTrain both directions between Newark Liberty Airport Station (Newark) and P4 Daily Parking Garage/Courtesy Vans (Newark) AirTrain service to/from the Airport Train Station will be unavailable, Shuttle Buses will provide transportation for customers arriving via NJ Transit or Amtrak., Thursday January 15th,2026 thru Friday May 22nd,2026, Monday thru Friday, 05:00 AM thru 03:00 PM","update_date":"2026-01-19T20:00:20Z"},"road_event_id":"ZRMDQIemUOfuKLxKR5VtA0qgeW4=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"P4 Daily Parking Garage/Courtesy Vans","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T09:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"dDRXA3xDZEUWe3IlDk0102ojxrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NEs3mhVkKiBRaalDub5hRwSFypM="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"dDRXA3xDZEUWe3IlDk0102ojxrk=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"NEs3mhVkKiBRaalDub5hRwSFypM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dDRXA3xDZEUWe3IlDk0102ojxrk="},{"type":"next-occurrence","id":"WT3vcrwZOsh/VNAO0Hu2mzwiWDo="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"NEs3mhVkKiBRaalDub5hRwSFypM=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"WT3vcrwZOsh/VNAO0Hu2mzwiWDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dDRXA3xDZEUWe3IlDk0102ojxrk="}],"description":"Drainage improvements on WEST AVE both directions between N WATER ST (Norwalk) and CONNECTICUT AVE (Norwalk) West Avenue will have various daytime and nighttime lane closures Monday-Friday. Traffic control personnel and signing patterns will guide motorists through the work zone., Sunday February 8th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-01-14T16:09:13Z"},"road_event_id":"WT3vcrwZOsh/VNAO0Hu2mzwiWDo=","beginning_cross_street":"N WATER ST","ending_cross_street":"CONNECTICUT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419777,41.104532]]}},{"id":"iULBhmxBKaLaR103BNvVKzXcF0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CROOKED ST"],"direction":"unknown","related_road_events":[],"description":"Construction on CROOKED ST both directions between CT-372 (Plainville) and 34 (Plainville) Traffic on the Crooked Street bridge in Plainville will be restricted to one lane in each direction, Continuous Wednesday January 14th, 2026 12:00 AM thru Thursday July 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-01-14T16:18:30Z"},"road_event_id":"iULBhmxBKaLaR103BNvVKzXcF0c=","beginning_cross_street":"CT-372","ending_cross_street":"34","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.838354,41.671495]]}},{"id":"US8vrDzntHlu3jrGhlxVJRWOByw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OUvKN/gIusPjD/YcBQshcFN/e2U="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"US8vrDzntHlu3jrGhlxVJRWOByw=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:15:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"OUvKN/gIusPjD/YcBQshcFN/e2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="},{"type":"next-occurrence","id":"p3tI9+7LKKHAWIJShUxMfreGlu4="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"OUvKN/gIusPjD/YcBQshcFN/e2U=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:15:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"p3tI9+7LKKHAWIJShUxMfreGlu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="},{"type":"next-occurrence","id":"6G6GwBreJtYIUGrbrthkTME+Oss="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"p3tI9+7LKKHAWIJShUxMfreGlu4=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:15:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"6G6GwBreJtYIUGrbrthkTME+Oss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="},{"type":"next-occurrence","id":"7PwRNOIfcAwohkM3T88f/RHQc6Y="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"6G6GwBreJtYIUGrbrthkTME+Oss=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:30:00Z","end_date":"2026-04-29T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"7PwRNOIfcAwohkM3T88f/RHQc6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="},{"type":"next-occurrence","id":"qrl90VpBsAq1u4aB5iFQpz8OOfg="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"7PwRNOIfcAwohkM3T88f/RHQc6Y=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:30:00Z","end_date":"2026-04-30T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"qrl90VpBsAq1u4aB5iFQpz8OOfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="},{"type":"next-occurrence","id":"vww+GKEaF0C4lwZ5BxDSDxleQRE="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"qrl90VpBsAq1u4aB5iFQpz8OOfg=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:30:00Z","end_date":"2026-05-01T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"vww+GKEaF0C4lwZ5BxDSDxleQRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="},{"type":"next-occurrence","id":"1YVIXIbgdCX6dJmRZnVEEbi8qtc="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"vww+GKEaF0C4lwZ5BxDSDxleQRE=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:30:00Z","end_date":"2026-05-02T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"1YVIXIbgdCX6dJmRZnVEEbi8qtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="},{"type":"next-occurrence","id":"xxEXRXuseIWoxCx3Uou8wT3d4F8="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"1YVIXIbgdCX6dJmRZnVEEbi8qtc=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:30:00Z","end_date":"2026-05-06T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"xxEXRXuseIWoxCx3Uou8wT3d4F8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"US8vrDzntHlu3jrGhlxVJRWOByw="}],"description":"Track replacement on J Line northbound between Broadway Jct (New York) and Myrtle Av (New York) (except Thu, May 14th) skips Chauncey St, Halsey St, Gates Av, and Kosciuszko St. For service to these stations, take the J line to Myrtle Av and transfer to a Jamaica Center-bound J line. For service from these stations, take the J line to Broadway Junction and transfer to a Manhattan-bound J line., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"xxEXRXuseIWoxCx3Uou8wT3d4F8=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Myrtle Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:30:00Z","end_date":"2026-05-07T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904512,40.679498]]}},{"id":"o8be2MRSKLp7pR7gRwKlo61IRqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Sd4fFbBdwbTvYMsvbw55O1IioEE="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"o8be2MRSKLp7pR7gRwKlo61IRqc=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:15:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"Sd4fFbBdwbTvYMsvbw55O1IioEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="},{"type":"next-occurrence","id":"Kidbp/TNKotV3FSk0ZkduaYDfB0="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"Sd4fFbBdwbTvYMsvbw55O1IioEE=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:15:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"Kidbp/TNKotV3FSk0ZkduaYDfB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="},{"type":"next-occurrence","id":"exVHIUt+PpUwXKoXFggT6Y+tWn4="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"Kidbp/TNKotV3FSk0ZkduaYDfB0=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:15:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"exVHIUt+PpUwXKoXFggT6Y+tWn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="},{"type":"next-occurrence","id":"hRY3VZlFO1VZnh7PZnQ4P0CdKCs="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"exVHIUt+PpUwXKoXFggT6Y+tWn4=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:30:00Z","end_date":"2026-04-29T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"hRY3VZlFO1VZnh7PZnQ4P0CdKCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="},{"type":"next-occurrence","id":"oIR3ktlw/NIsxKmkwoY51XLSt2s="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"hRY3VZlFO1VZnh7PZnQ4P0CdKCs=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:30:00Z","end_date":"2026-04-30T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"oIR3ktlw/NIsxKmkwoY51XLSt2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="},{"type":"next-occurrence","id":"Xk8fKGF1SB8i6w0VJZ9a3i+M5+o="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"oIR3ktlw/NIsxKmkwoY51XLSt2s=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:30:00Z","end_date":"2026-05-01T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"Xk8fKGF1SB8i6w0VJZ9a3i+M5+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="},{"type":"next-occurrence","id":"Pnipa3ss1PqQ82KHl3kH7E7a5gQ="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"Xk8fKGF1SB8i6w0VJZ9a3i+M5+o=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:30:00Z","end_date":"2026-05-02T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"Pnipa3ss1PqQ82KHl3kH7E7a5gQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="},{"type":"next-occurrence","id":"dqovE2soD0ix0XQTotl2s2Ay0YY="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"Pnipa3ss1PqQ82KHl3kH7E7a5gQ=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:30:00Z","end_date":"2026-05-06T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"dqovE2soD0ix0XQTotl2s2Ay0YY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["J Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o8be2MRSKLp7pR7gRwKlo61IRqc="}],"description":"Track replacement on J Line both directions between Jamaica Center - Parsons/Archer (New York) and Broad St (New York) (except Thu, May 14th) run every 10 minutes., Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday April 28th,2026 thru Friday May 1st,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 5th,2026 thru Friday May 8th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 12th,2026 thru Friday May 15th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 19th,2026 thru Friday May 22nd,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM, Tuesday May 26th,2026 thru Friday May 29th,2026, Tuesday/Wednesday/Thursday/Friday, 09:15 AM thru 03:30 PM","update_date":"2026-04-17T19:30:20Z"},"road_event_id":"dqovE2soD0ix0XQTotl2s2Ay0YY=","beginning_cross_street":"Jamaica Center - Parsons/Archer","ending_cross_street":"Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:30:00Z","end_date":"2026-05-07T04:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801109,40.702147]]}},{"id":"3MPfu1PL5PdobwbKaQRVaRTk6XU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uyq3TBsaZAkWxkA2UEZaWez+cpc="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"3MPfu1PL5PdobwbKaQRVaRTk6XU=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"uyq3TBsaZAkWxkA2UEZaWez+cpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"t2snWTLbEglj/vpdzdeYg1WQ1Fo="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"uyq3TBsaZAkWxkA2UEZaWez+cpc=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"t2snWTLbEglj/vpdzdeYg1WQ1Fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"O0ZavRem6zsEbXH7yLJ6/+hpVkM="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"t2snWTLbEglj/vpdzdeYg1WQ1Fo=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"O0ZavRem6zsEbXH7yLJ6/+hpVkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"+CeUl1zMxfsWx0xSoncyvZEsy7s="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"O0ZavRem6zsEbXH7yLJ6/+hpVkM=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"+CeUl1zMxfsWx0xSoncyvZEsy7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"C/oRNBtqAHb62FU20jZ1bFb8eeU="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"+CeUl1zMxfsWx0xSoncyvZEsy7s=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"C/oRNBtqAHb62FU20jZ1bFb8eeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"dg46q4pi/O+/iv/fUbfz96A/KxI="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"C/oRNBtqAHb62FU20jZ1bFb8eeU=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"dg46q4pi/O+/iv/fUbfz96A/KxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"d4voJpJXt0DGSmQv61Y5xw43nFk="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"dg46q4pi/O+/iv/fUbfz96A/KxI=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"d4voJpJXt0DGSmQv61Y5xw43nFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"6uR92RAWC0Jsxa/kxvQ3IQ1TK1o="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"d4voJpJXt0DGSmQv61Y5xw43nFk=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"6uR92RAWC0Jsxa/kxvQ3IQ1TK1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"is2sNLtgexW5+zKSpBmsqtusevU="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"6uR92RAWC0Jsxa/kxvQ3IQ1TK1o=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"is2sNLtgexW5+zKSpBmsqtusevU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"CgL/QvS08dspOjl9/sx5kwkGyT0="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"is2sNLtgexW5+zKSpBmsqtusevU=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"CgL/QvS08dspOjl9/sx5kwkGyT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"b7JtmpLPjUkakbNlYoRrevk1P7o="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"CgL/QvS08dspOjl9/sx5kwkGyT0=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"b7JtmpLPjUkakbNlYoRrevk1P7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="},{"type":"next-occurrence","id":"duc2caN52qpZ9TPdiKfswym+o2A="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"b7JtmpLPjUkakbNlYoRrevk1P7o=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"duc2caN52qpZ9TPdiKfswym+o2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3MPfu1PL5PdobwbKaQRVaRTk6XU="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Friday January 16th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed, Friday January 16th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:18:51Z"},"road_event_id":"duc2caN52qpZ9TPdiKfswym+o2A=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903822,40.661729]]}},{"id":"08+VrvRH+oXUoGsrVxh2DDgZGSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM3 Bus and BxM4 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, BxM3 Bus and BxM4 Bus at Madison Av/E 46 St (New York) stop is closed. Please use the M3 bus stop on Madison Ave at E 45th St instead. Through 2028., Continuous Thursday January 22nd, 2026 12:00 AM thru Saturday December 30th, 2028 11:59 PM","update_date":"2026-01-22T18:55:38Z"},"road_event_id":"08+VrvRH+oXUoGsrVxh2DDgZGSU=","beginning_cross_street":"Madison Av/E 46 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97695,40.755797]]}},{"id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"czeH61LtSI7mEK1BdN83vqTlTVY="}],"description":"Crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday January 30th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-01-28T17:23:01Z"},"road_event_id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k=","beginning_cross_street":"E 196TH ST","ending_cross_street":"E KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894196,40.868338]]}},{"id":"czeH61LtSI7mEK1BdN83vqTlTVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k="},{"type":"next-occurrence","id":"BbOwOGz96iP93MVLzLn/e4DB3zU="}],"description":"Crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday January 30th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-01-28T17:23:01Z"},"road_event_id":"czeH61LtSI7mEK1BdN83vqTlTVY=","beginning_cross_street":"E 196TH ST","ending_cross_street":"E KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894196,40.868338]]}},{"id":"BbOwOGz96iP93MVLzLn/e4DB3zU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k="},{"type":"next-occurrence","id":"ve/DC94q9vKjIlAXHItYHMcIG/o="}],"description":"Crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday January 30th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-01-28T17:23:01Z"},"road_event_id":"BbOwOGz96iP93MVLzLn/e4DB3zU=","beginning_cross_street":"E 196TH ST","ending_cross_street":"E KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894196,40.868338]]}},{"id":"ve/DC94q9vKjIlAXHItYHMcIG/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k="},{"type":"next-occurrence","id":"qUNWiDkKj89ULS4LaJoqiBu6dQ0="}],"description":"Crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday January 30th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-01-28T17:23:01Z"},"road_event_id":"ve/DC94q9vKjIlAXHItYHMcIG/o=","beginning_cross_street":"E 196TH ST","ending_cross_street":"E KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894196,40.868338]]}},{"id":"qUNWiDkKj89ULS4LaJoqiBu6dQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k="},{"type":"next-occurrence","id":"tYQNxuE99G2hRkHoYeJdAwKOMyo="}],"description":"Crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday January 30th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-01-28T17:23:01Z"},"road_event_id":"qUNWiDkKj89ULS4LaJoqiBu6dQ0=","beginning_cross_street":"E 196TH ST","ending_cross_street":"E KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894196,40.868338]]}},{"id":"tYQNxuE99G2hRkHoYeJdAwKOMyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k="},{"type":"next-occurrence","id":"zpvMfduxyo16XEIO6NhfwJEkcWQ="}],"description":"Crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday January 30th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-01-28T17:23:01Z"},"road_event_id":"tYQNxuE99G2hRkHoYeJdAwKOMyo=","beginning_cross_street":"E 196TH ST","ending_cross_street":"E KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894196,40.868338]]}},{"id":"zpvMfduxyo16XEIO6NhfwJEkcWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4VbuzP1ppYLPZcUVV2mMbfOIe4k="}],"description":"Crane operations on CRESTON AVE southbound between E 196TH ST (New York) and E KINGSBRIDGE RD (New York), Friday January 30th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-01-28T17:23:01Z"},"road_event_id":"zpvMfduxyo16XEIO6NhfwJEkcWQ=","beginning_cross_street":"E 196TH ST","ending_cross_street":"E KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894196,40.868338]]}},{"id":"lY4N6pQTN6PtE/HsePQ74stZZxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CmrMVmqLHhjD8KIt7Y7UskX4mqs="}],"description":"Construction on CHAMBERS ST eastbound at N END AVE (New York), Wednesday January 28th, 2026 thru Thursday April 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Wednesday January 28th, 2026 thru Thursday April 23rd, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-20T19:57:07Z"},"road_event_id":"lY4N6pQTN6PtE/HsePQ74stZZxU=","beginning_cross_street":"N END AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01497,40.718116]]}},{"id":"CmrMVmqLHhjD8KIt7Y7UskX4mqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lY4N6pQTN6PtE/HsePQ74stZZxU="}],"description":"Construction on CHAMBERS ST eastbound at N END AVE (New York), Wednesday January 28th, 2026 thru Thursday April 23rd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Wednesday January 28th, 2026 thru Thursday April 23rd, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-20T19:57:07Z"},"road_event_id":"CmrMVmqLHhjD8KIt7Y7UskX4mqs=","beginning_cross_street":"N END AVE","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.01497,40.718116]]}},{"id":"ORC300517002","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","description":"Construction on Jackie Robinson Parkway westbound between Queens-Kings County Line (New York) and Highland Boulevard; Ramp (New York) Subject to change without notice. Not currently Scheduled","update_date":"2026-04-03T19:00:32Z"},"road_event_id":"ORC300517002","beginning_cross_street":"Queens-Kings County Line","ending_cross_street":"Highland Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-01-29T17:06:30Z","end_date":"2026-04-04T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.894927,40.684589]]}},{"id":"JjYC9jjrlX+yBquAxdZs43TSYZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M15-SBS Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M15-SBS Bus at Water St/Wall St (New York) The M15 and M15-SBS stop has been temporarily moved to the far side of Pine St., Continuous Thursday February 5th, 2026 07:27 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-04-17T16:54:16Z"},"road_event_id":"JjYC9jjrlX+yBquAxdZs43TSYZE=","beginning_cross_street":"Water St/Wall St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.007109,40.705287]]}},{"id":"7bL7/l6H/dcrbhKaQd0UksCvMbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S40 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, S40 Bus between South Av/Arlington Pl (New York) and South Av/Richmond Ter (New York) buses are detoured. For eastbound service, use the stops on South Ave at Brabant St or Richmond Terrace at South Ave. For westbound service, use the stops on Richmond Terrace at Grandview Ave or South Ave at Arlington Place. Buses operate via Richmond Terrace, Arlington Ave and Arlington Place. , Continuous Saturday January 31st, 2026 12:00 AM thru Thursday April 30th, 2026 11:59 PM","update_date":"2026-03-09T12:25:29Z"},"road_event_id":"7bL7/l6H/dcrbhKaQd0UksCvMbU=","beginning_cross_street":"South Av/Arlington Pl","ending_cross_street":"South Av/Richmond Ter","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166098,40.636117]]}},{"id":"6akVVI34UgggaxdRWgazIL+W9M4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM33C Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, SIM33C Bus between SOUTH AV/RICHMOND TER (New York) and SOUTH AV/ARLINGTON PL (New York) will be detoured. For eastbound service, use the temporary stop on Richmond Terrace at South Ave or South Ave at Arlington Place For westbound service, use the stops on South Ave at Brabant St or Richmond Terrace at South Ave., Continuous Saturday January 31st, 2026 12:00 AM thru Thursday April 30th, 2026 11:59 PM","update_date":"2026-03-09T12:24:14Z"},"road_event_id":"6akVVI34UgggaxdRWgazIL+W9M4=","beginning_cross_street":"SOUTH AV/RICHMOND TER","ending_cross_street":"SOUTH AV/ARLINGTON PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166126,40.640133]]}},{"id":"0RjFT7XBpR0PLluZqoGX/OzWhGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure and noise wall construction and roadwork on I-690 westbound between Exit 15 - Midler Avenue (Syracuse) and Exit 14 - Teall Avenue (Syracuse), Continuous Tuesday February 3rd, 2026 09:00 AM thru Monday June 1st, 2026 03:00 PM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-03-12T11:07:45Z"},"road_event_id":"0RjFT7XBpR0PLluZqoGX/OzWhGU=","beginning_cross_street":"Exit 15 - Midler Avenue","ending_cross_street":"Exit 14 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.098535,43.058932]]}},{"id":"GEbDqZCN4hC/LFv+pPTHTg7vRmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Bridge work and roadwork on I-690 westbound between Exit 14 - Teall Avenue (Syracuse) and Exit 13 - Townsend Street (Syracuse), Continuous Tuesday February 3rd, 2026 09:00 AM thru Monday June 1st, 2026 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-03-12T11:05:57Z"},"road_event_id":"GEbDqZCN4hC/LFv+pPTHTg7vRmA=","beginning_cross_street":"Exit 14 - Teall Avenue","ending_cross_street":"Exit 13 - Townsend Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.117594,43.054455]]}},{"id":"tXi9qA4o5xy7v7+GzKLbDuIt91Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 40 Bus area of Kellogg St 290' E Of Corbin St (Newark) Kellogg Street and Marlin Street will be closed between Corbin Street and Distribution Street due to construction. During this time, NJ TRANSIT Bus Route No. 40 in Newark will operate on a detour as follows: Buses traveling toward Jersey Garden Mall will travel from Doremus Avenue and Distribution Street, continue on Distribution Street, make a right on Marlin Street, left on Port Street, bear right on Corbin Street, and then continue the regular route. Pick-up and drop-off are only permitted at the bus stop on Distribution Street during the detour., Continuous Friday February 6th, 2026 12:00 AM thru Thursday August 6th, 2026 11:59 PM","update_date":"2026-02-06T22:05:15Z"},"road_event_id":"tXi9qA4o5xy7v7+GzKLbDuIt91Q=","beginning_cross_street":"Kellogg St 290' E Of Corbin St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.15065,40.702269]]}},{"id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"euLwBJRcG27UMh2WYkXwi/MQKOA="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"euLwBJRcG27UMh2WYkXwi/MQKOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"gAHpulMlgF8pulXUQmZZMX4omsM="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"euLwBJRcG27UMh2WYkXwi/MQKOA=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"gAHpulMlgF8pulXUQmZZMX4omsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"osD/pGTbcHdy0B1CGHz64QWSSew="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"gAHpulMlgF8pulXUQmZZMX4omsM=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"osD/pGTbcHdy0B1CGHz64QWSSew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"mF+Xbz5/X7zwMg02Epi4hBkz1w4="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"osD/pGTbcHdy0B1CGHz64QWSSew=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"mF+Xbz5/X7zwMg02Epi4hBkz1w4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"8A/VygIdsojaZFphd2/VUFCathk="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"mF+Xbz5/X7zwMg02Epi4hBkz1w4=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"8A/VygIdsojaZFphd2/VUFCathk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"ro3ux28lECfhyDAV0RoeuEKKPnw="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"8A/VygIdsojaZFphd2/VUFCathk=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"ro3ux28lECfhyDAV0RoeuEKKPnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"51n7SMLzj+TFyMVd8kQD90rywAs="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"ro3ux28lECfhyDAV0RoeuEKKPnw=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"51n7SMLzj+TFyMVd8kQD90rywAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"hhP80ByuGVzvKBAvUArTZO7I0IA="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"51n7SMLzj+TFyMVd8kQD90rywAs=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"hhP80ByuGVzvKBAvUArTZO7I0IA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"xs6bqW/xGw1FGEucrUKp6lXfD40="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"hhP80ByuGVzvKBAvUArTZO7I0IA=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"xs6bqW/xGw1FGEucrUKp6lXfD40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"BvPW6t8+fl86pbFSSZ40FDmrgnw="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"xs6bqW/xGw1FGEucrUKp6lXfD40=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"BvPW6t8+fl86pbFSSZ40FDmrgnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"U0XrXMpG95MRlItfcgNnLae76qk="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"BvPW6t8+fl86pbFSSZ40FDmrgnw=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"U0XrXMpG95MRlItfcgNnLae76qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"ijLdFpuCnSrYsU/bV9OMQUahjNM="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"U0XrXMpG95MRlItfcgNnLae76qk=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"ijLdFpuCnSrYsU/bV9OMQUahjNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"sNX1YFIfiHr2tFuqEY/YWASkY1o="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"ijLdFpuCnSrYsU/bV9OMQUahjNM=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"sNX1YFIfiHr2tFuqEY/YWASkY1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="},{"type":"next-occurrence","id":"MeKkAbRmqlqjPPJjjkIkVbUb+8s="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"sNX1YFIfiHr2tFuqEY/YWASkY1o=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"MeKkAbRmqlqjPPJjjkIkVbUb+8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALWORTH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tVJ8e3xGDV03UqopwLl1iRTOs5Y="}],"description":"Crane operations on WALWORTH ST northbound between PARK AVE (New York) and FLUSHING AVE (New York), Friday February 13th, 2026 thru Tuesday May 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:39:26Z"},"road_event_id":"MeKkAbRmqlqjPPJjjkIkVbUb+8s=","beginning_cross_street":"PARK AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954768,40.697119]]}},{"id":"Q/HpGzYfXx2M3FHaZqw432nSNwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HILL ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on HILL ST both directions between PATTERSON ST (Torrington) Traffic will be detoured to Laurel Hill Road. Traffic control signing patterns will guide motorists through the work zone., Continuous Friday February 20th, 2026 12:00 AM thru Wednesday April 22nd, 2026 11:59 PM All lanes closed","update_date":"2026-02-10T19:17:30Z"},"road_event_id":"Q/HpGzYfXx2M3FHaZqw432nSNwQ=","beginning_cross_street":"PATTERSON ST","ending_cross_street":"PATTERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.113424,41.801223]]}},{"id":"ULT6OVkXmxSKDNpUy0w1V09gd6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"chZWE3CfXB4/Zab1yTDgY5hbYD4="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"ULT6OVkXmxSKDNpUy0w1V09gd6c=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"chZWE3CfXB4/Zab1yTDgY5hbYD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"SqS4WPgjJ68PPCfO2xKT3T1+d3s="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"chZWE3CfXB4/Zab1yTDgY5hbYD4=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"SqS4WPgjJ68PPCfO2xKT3T1+d3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"tOrduznC/RjC4Y1afLqpacQLv8g="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"SqS4WPgjJ68PPCfO2xKT3T1+d3s=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"tOrduznC/RjC4Y1afLqpacQLv8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"VD7Ylh/Qt24Dkb8Gjj4aFejKW2M="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"tOrduznC/RjC4Y1afLqpacQLv8g=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"VD7Ylh/Qt24Dkb8Gjj4aFejKW2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"VxuMTiYL9YE3vQy1NWEhIXgcgJE="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"VD7Ylh/Qt24Dkb8Gjj4aFejKW2M=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"VxuMTiYL9YE3vQy1NWEhIXgcgJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"M7G9dDM/uKZ8lu+wITZsl8qg+54="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"VxuMTiYL9YE3vQy1NWEhIXgcgJE=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"M7G9dDM/uKZ8lu+wITZsl8qg+54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"pHf6YNnaZRoT3Eb0gTaX8U7XIuk="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"M7G9dDM/uKZ8lu+wITZsl8qg+54=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"pHf6YNnaZRoT3Eb0gTaX8U7XIuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"HS4ZtGJqEEPvUHxTDtbv4vR8KU8="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"pHf6YNnaZRoT3Eb0gTaX8U7XIuk=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"HS4ZtGJqEEPvUHxTDtbv4vR8KU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"2DuZsuBxlrxav4GNE8OlrhgUfhQ="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"HS4ZtGJqEEPvUHxTDtbv4vR8KU8=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"2DuZsuBxlrxav4GNE8OlrhgUfhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"zxFdFuakaPL262X5604BGqfywS8="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"2DuZsuBxlrxav4GNE8OlrhgUfhQ=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"zxFdFuakaPL262X5604BGqfywS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"TjE0krgBvArVP5o5PNNiyT5SYNo="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"zxFdFuakaPL262X5604BGqfywS8=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"TjE0krgBvArVP5o5PNNiyT5SYNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="},{"type":"next-occurrence","id":"hnOxKwpQXeByk9YUVxAP5DyeIXM="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"TjE0krgBvArVP5o5PNNiyT5SYNo=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"hnOxKwpQXeByk9YUVxAP5DyeIXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ULT6OVkXmxSKDNpUy0w1V09gd6c="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/DAY/32075009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, left lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, left lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-18T18:00:48Z"},"road_event_id":"hnOxKwpQXeByk9YUVxAP5DyeIXM=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.048028,41.514116]]}},{"id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Vkjln1JWzNbwEvzOuztSq40LEBI="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"Vkjln1JWzNbwEvzOuztSq40LEBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"KyexD0B5OTe7c7IN5I6cU2Mwec8="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"Vkjln1JWzNbwEvzOuztSq40LEBI=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"KyexD0B5OTe7c7IN5I6cU2Mwec8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"qqdcI2/ErP5uycgFT1L5wbTEQDE="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"KyexD0B5OTe7c7IN5I6cU2Mwec8=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"qqdcI2/ErP5uycgFT1L5wbTEQDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"Boo5/GqQQH+6XYGBiklKuKBkQaQ="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"qqdcI2/ErP5uycgFT1L5wbTEQDE=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"Boo5/GqQQH+6XYGBiklKuKBkQaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"FcVrwrMJIgEqjm2obUL1SZANWxY="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"Boo5/GqQQH+6XYGBiklKuKBkQaQ=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"FcVrwrMJIgEqjm2obUL1SZANWxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"Iwcpl6yv7d7T/P/sQQ99VpwRIT4="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"FcVrwrMJIgEqjm2obUL1SZANWxY=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"Iwcpl6yv7d7T/P/sQQ99VpwRIT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"X+aaz8d7ZCkHxtU4QIEjJDEbL5I="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"Iwcpl6yv7d7T/P/sQQ99VpwRIT4=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"X+aaz8d7ZCkHxtU4QIEjJDEbL5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"RQEkRUyQkLDKJVB1wAph7L4BL4U="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"X+aaz8d7ZCkHxtU4QIEjJDEbL5I=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"RQEkRUyQkLDKJVB1wAph7L4BL4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"XLrYQvoJ4tut2BKuAKwNM36uqjI="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"RQEkRUyQkLDKJVB1wAph7L4BL4U=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T20:00:00Z","end_date":"2026-05-04T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"XLrYQvoJ4tut2BKuAKwNM36uqjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="},{"type":"next-occurrence","id":"4VcRbLGQzYywYSMjEu3HQku0Nuk="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"XLrYQvoJ4tut2BKuAKwNM36uqjI=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T20:00:00Z","end_date":"2026-05-06T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"4VcRbLGQzYywYSMjEu3HQku0Nuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GIH+hzKVLx9MVW+Bv6+XYYN0r1c="}],"description":"Bridge rehabilitation on I-84 westbound ramp to Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32074909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:23:23Z"},"road_event_id":"4VcRbLGQzYywYSMjEu3HQku0Nuk=","beginning_cross_street":"Exit 37 - NY 52 - Walden","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T20:00:00Z","end_date":"2026-05-07T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.047954,41.514123]]}},{"id":"r4JxvOK62wPt1hyyAM1r3DTfD9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6rDAkReuFCatGSJ9F8tif5krmC8="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"r4JxvOK62wPt1hyyAM1r3DTfD9k=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"6rDAkReuFCatGSJ9F8tif5krmC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"MiVU/5TgODVepyNToTyhRTcFrBI="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"6rDAkReuFCatGSJ9F8tif5krmC8=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"MiVU/5TgODVepyNToTyhRTcFrBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"Ecj0XLHfCPz9+1Nf9SelBLotXOA="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"MiVU/5TgODVepyNToTyhRTcFrBI=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"Ecj0XLHfCPz9+1Nf9SelBLotXOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"L6x8IMs0fIAGlEAtLmhD62wX5Co="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"Ecj0XLHfCPz9+1Nf9SelBLotXOA=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"L6x8IMs0fIAGlEAtLmhD62wX5Co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"DiwCqKdbiY65b9DrLN4WWL1rMWQ="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"L6x8IMs0fIAGlEAtLmhD62wX5Co=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"DiwCqKdbiY65b9DrLN4WWL1rMWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"LoW1i419aj4J5jeIyn601WsBmzk="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"DiwCqKdbiY65b9DrLN4WWL1rMWQ=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"LoW1i419aj4J5jeIyn601WsBmzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"MurBipva5oSwHSWN9j4SFvTifOA="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"LoW1i419aj4J5jeIyn601WsBmzk=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"MurBipva5oSwHSWN9j4SFvTifOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"aPKckZhTOpUGg0mFkuHMjYN1T1Q="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"MurBipva5oSwHSWN9j4SFvTifOA=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"aPKckZhTOpUGg0mFkuHMjYN1T1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"m5z5ykEefh2tYt1VYJm9Xtub3mY="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"aPKckZhTOpUGg0mFkuHMjYN1T1Q=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"m5z5ykEefh2tYt1VYJm9Xtub3mY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"14LoUrTohjw65rsihQXhbt3BGVk="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"m5z5ykEefh2tYt1VYJm9Xtub3mY=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"14LoUrTohjw65rsihQXhbt3BGVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"+CuV2l1ZoNJ8y/B1hKSf3z793u8="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"14LoUrTohjw65rsihQXhbt3BGVk=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"+CuV2l1ZoNJ8y/B1hKSf3z793u8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="},{"type":"next-occurrence","id":"n9VVk+XVXfx0kHiTOK3bBnfxke0="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"+CuV2l1ZoNJ8y/B1hKSf3z793u8=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"n9VVk+XVXfx0kHiTOK3bBnfxke0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r4JxvOK62wPt1hyyAM1r3DTfD9k="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/DAY/32075309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, right lane closure, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, right lane closure, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-18T18:00:50Z"},"road_event_id":"n9VVk+XVXfx0kHiTOK3bBnfxke0=","beginning_cross_street":"Exit 36A -  I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051865,41.513213]]}},{"id":"+O9qr92S4mlivCVecGR7eErSP0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sZQGDfyYZZr3TLcOGbboagVsBYA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"+O9qr92S4mlivCVecGR7eErSP0E=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"sZQGDfyYZZr3TLcOGbboagVsBYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"2s0d9WlU/lNo8aQ+D1ua/QohFfE="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"sZQGDfyYZZr3TLcOGbboagVsBYA=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"2s0d9WlU/lNo8aQ+D1ua/QohFfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"rspNFC/TuF0Qw6ezZhooIsI+kq4="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"2s0d9WlU/lNo8aQ+D1ua/QohFfE=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"rspNFC/TuF0Qw6ezZhooIsI+kq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"kZZPupozB+U9nO5MVjQXnOJP7DI="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"rspNFC/TuF0Qw6ezZhooIsI+kq4=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"kZZPupozB+U9nO5MVjQXnOJP7DI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"WiHdZLYCRvNbCPriPOtO8ZdWWKs="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"kZZPupozB+U9nO5MVjQXnOJP7DI=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"WiHdZLYCRvNbCPriPOtO8ZdWWKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"cMbj376IqJI2FWSG4bO04XXoORA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"WiHdZLYCRvNbCPriPOtO8ZdWWKs=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"cMbj376IqJI2FWSG4bO04XXoORA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"WsD+ciokIYZcbFfPTmexMvjBPNs="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"cMbj376IqJI2FWSG4bO04XXoORA=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"WsD+ciokIYZcbFfPTmexMvjBPNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"Kmp+5PojqSHnLv75PQe+xF45hXc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"WsD+ciokIYZcbFfPTmexMvjBPNs=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"Kmp+5PojqSHnLv75PQe+xF45hXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"Itbw/8PyzWnae/BOp1hPxYgv6Qs="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"Kmp+5PojqSHnLv75PQe+xF45hXc=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"Itbw/8PyzWnae/BOp1hPxYgv6Qs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="},{"type":"next-occurrence","id":"OAqGjyzk/szsVXFgIjZfbkwW65Q="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"Itbw/8PyzWnae/BOp1hPxYgv6Qs=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"OAqGjyzk/szsVXFgIjZfbkwW65Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+O9qr92S4mlivCVecGR7eErSP0E="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 36 - NY 300 (Newburgh) and Exit 37 - NY 52 - Walden (Gardnertown) D265160/B1026780/NIGHT/32135409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-17T10:45:25Z"},"road_event_id":"OAqGjyzk/szsVXFgIjZfbkwW65Q=","beginning_cross_street":"Exit 36 - NY 300","ending_cross_street":"Exit 37 - NY 52 - Walden","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049488,41.513499]]}},{"id":"DEwohDrr1lIGMGRCysFyaX3H8xM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iinE9QGnEg6RLWdB5emKbjpyz4A="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"DEwohDrr1lIGMGRCysFyaX3H8xM=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"iinE9QGnEg6RLWdB5emKbjpyz4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"xH5KcgChDLQURRlTF6uIbv3UsRc="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"iinE9QGnEg6RLWdB5emKbjpyz4A=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"xH5KcgChDLQURRlTF6uIbv3UsRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"a2WmwONdJaZLzsTJYoGfEwBUM74="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"xH5KcgChDLQURRlTF6uIbv3UsRc=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"a2WmwONdJaZLzsTJYoGfEwBUM74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"gLtpqXqpMIpJ1RF8mbfnqVP4XlQ="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"a2WmwONdJaZLzsTJYoGfEwBUM74=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"gLtpqXqpMIpJ1RF8mbfnqVP4XlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"oBkyWVIZw5QKzEMLnZbJmiCk2es="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"gLtpqXqpMIpJ1RF8mbfnqVP4XlQ=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T13:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"oBkyWVIZw5QKzEMLnZbJmiCk2es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"0jKqZKxY/arL3vEvrfLU2QiwcCM="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"oBkyWVIZw5QKzEMLnZbJmiCk2es=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T13:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"0jKqZKxY/arL3vEvrfLU2QiwcCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"tm/gvAFGEcWun4vL/RVy31LM21o="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"0jKqZKxY/arL3vEvrfLU2QiwcCM=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T13:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"tm/gvAFGEcWun4vL/RVy31LM21o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"/Vur4bcqOTl50L8qs5WMRXJrXyc="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"tm/gvAFGEcWun4vL/RVy31LM21o=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T13:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"/Vur4bcqOTl50L8qs5WMRXJrXyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"lw0DYusKLa+3yD/pvZinjOet53M="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"/Vur4bcqOTl50L8qs5WMRXJrXyc=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T13:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"lw0DYusKLa+3yD/pvZinjOet53M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"NxYKcPWV8Zi2EibrR0os2sYNFuU="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"lw0DYusKLa+3yD/pvZinjOet53M=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"NxYKcPWV8Zi2EibrR0os2sYNFuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"W2b8rnY8QL0IaF8dV0DXKT3Jwwc="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"NxYKcPWV8Zi2EibrR0os2sYNFuU=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"W2b8rnY8QL0IaF8dV0DXKT3Jwwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="},{"type":"next-occurrence","id":"YLxPmG4Z/TelJQMchlWZ0+3lhbc="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"W2b8rnY8QL0IaF8dV0DXKT3Jwwc=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"YLxPmG4Z/TelJQMchlWZ0+3lhbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DEwohDrr1lIGMGRCysFyaX3H8xM="}],"description":"Bridge rehabilitation on I-84 westbound between Exit 37 - NY 52 (Gardnertown) and Exit 36B - NY 300 (Newburgh) D265160/B1026780/DAY/32075209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 11:59 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"YLxPmG4Z/TelJQMchlWZ0+3lhbc=","beginning_cross_street":"Exit 37 - NY 52","ending_cross_street":"Exit 36B - NY 300","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049562,41.513713]]}},{"id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BHbjS4aBooSwErnT+yGqJKvAh8c="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"BHbjS4aBooSwErnT+yGqJKvAh8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"aHsXf4ra7SPXn1YF15OHkpJ8C8E="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"BHbjS4aBooSwErnT+yGqJKvAh8c=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"aHsXf4ra7SPXn1YF15OHkpJ8C8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"L1hSArVbQyv1U+iH7J/uKfu6yNo="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"aHsXf4ra7SPXn1YF15OHkpJ8C8E=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"L1hSArVbQyv1U+iH7J/uKfu6yNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"s6PyavWp1Om4sZ5WbianwcT3dNQ="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"L1hSArVbQyv1U+iH7J/uKfu6yNo=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"s6PyavWp1Om4sZ5WbianwcT3dNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"XpHdS8fVBT+KD4C8CQyE9FeqZnQ="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"s6PyavWp1Om4sZ5WbianwcT3dNQ=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"XpHdS8fVBT+KD4C8CQyE9FeqZnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"cnwWnpD5is8cLFJubhXsfnDmck8="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"XpHdS8fVBT+KD4C8CQyE9FeqZnQ=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"cnwWnpD5is8cLFJubhXsfnDmck8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"KAPZYBHxX1/8JmrGNntDKW+TR6Y="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"cnwWnpD5is8cLFJubhXsfnDmck8=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"KAPZYBHxX1/8JmrGNntDKW+TR6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"hnXekm/INNXepx5a38xIXaFRs+I="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"KAPZYBHxX1/8JmrGNntDKW+TR6Y=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"hnXekm/INNXepx5a38xIXaFRs+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"0nlEe2PwSfUv8HMXrQ+xn47CEQs="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"hnXekm/INNXepx5a38xIXaFRs+I=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"0nlEe2PwSfUv8HMXrQ+xn47CEQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"vZ3fSxYbFavpkWd9ZaU+9iCX+TM="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"0nlEe2PwSfUv8HMXrQ+xn47CEQs=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"vZ3fSxYbFavpkWd9ZaU+9iCX+TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"Xwnk1ktUr1SOSJYRDIrkKkSjPTM="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"vZ3fSxYbFavpkWd9ZaU+9iCX+TM=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"Xwnk1ktUr1SOSJYRDIrkKkSjPTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="},{"type":"next-occurrence","id":"aB8NPrCLCYLsutBNWPADN9+UmmM="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"Xwnk1ktUr1SOSJYRDIrkKkSjPTM=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"aB8NPrCLCYLsutBNWPADN9+UmmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"koZBVZ/VnoKbCDAPDXdRM7l7Lyo="}],"description":"Reconstruction on US 20 both directions Leydecker Road (Orchard Park) to Exit - Aurora Expressway (Elma), Thursday February 12th, 2026 thru Friday October 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-12T13:39:05Z"},"road_event_id":"aB8NPrCLCYLsutBNWPADN9+UmmM=","beginning_cross_street":"Leydecker Road","ending_cross_street":"Exit   - Aurora Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.711273,42.81125]]}},{"id":"hIn8jrVM/PmG2Sb2IJwwnnQdiwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["South Bay Rd"],"direction":"unknown","related_road_events":[],"description":"Bridge work on South Bay Rd both directions between CIRCLE DR E (Cicero) and PINE GROVE RD E (Cicero), Continuous Sunday March 1st, 2026 06:00 AM thru Friday May 15th, 2026 06:00 PM All lanes closed westbound","update_date":"2026-03-12T11:08:48Z"},"road_event_id":"hIn8jrVM/PmG2Sb2IJwwnnQdiwc=","beginning_cross_street":"CIRCLE DR E","ending_cross_street":"PINE GROVE RD E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.113421,43.14672]]}},{"id":"yZwbp1jkCdRYvrdSbXFxwJkQ1JE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HRTBpa5OwLLVjCsV3aUK8tx/xhE="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Monday February 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:47:38Z"},"road_event_id":"yZwbp1jkCdRYvrdSbXFxwJkQ1JE=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810317,40.692125]]}},{"id":"HRTBpa5OwLLVjCsV3aUK8tx/xhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yZwbp1jkCdRYvrdSbXFxwJkQ1JE="},{"type":"next-occurrence","id":"cGWJqSmSsQBm99I0qcg6HSdd+Qs="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Monday February 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:47:38Z"},"road_event_id":"HRTBpa5OwLLVjCsV3aUK8tx/xhE=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810317,40.692125]]}},{"id":"cGWJqSmSsQBm99I0qcg6HSdd+Qs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yZwbp1jkCdRYvrdSbXFxwJkQ1JE="},{"type":"next-occurrence","id":"II0VQtdji8axBKFM/SmYhSjg5H0="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Monday February 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:47:38Z"},"road_event_id":"cGWJqSmSsQBm99I0qcg6HSdd+Qs=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810317,40.692125]]}},{"id":"II0VQtdji8axBKFM/SmYhSjg5H0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yZwbp1jkCdRYvrdSbXFxwJkQ1JE="},{"type":"next-occurrence","id":"aL3GoeFlFYTg/l1Yz0W3hlQcNkE="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Monday February 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:47:38Z"},"road_event_id":"II0VQtdji8axBKFM/SmYhSjg5H0=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810317,40.692125]]}},{"id":"aL3GoeFlFYTg/l1Yz0W3hlQcNkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yZwbp1jkCdRYvrdSbXFxwJkQ1JE="},{"type":"next-occurrence","id":"lrZHNvr+0CIGidSlDbZzVJYwzDQ="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Monday February 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:47:38Z"},"road_event_id":"aL3GoeFlFYTg/l1Yz0W3hlQcNkE=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810317,40.692125]]}},{"id":"lrZHNvr+0CIGidSlDbZzVJYwzDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VAN WYCK EXPY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yZwbp1jkCdRYvrdSbXFxwJkQ1JE="}],"description":"Construction on VAN WYCK EXPY northbound from LIBERTY AVE (New York) to 101ST AVE (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road, Monday February 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:47:38Z"},"road_event_id":"lrZHNvr+0CIGidSlDbZzVJYwzDQ=","beginning_cross_street":"LIBERTY AVE","ending_cross_street":"101ST AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810317,40.692125]]}},{"id":"dZPQrkvfZEXhTs+blne3BnKhbfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 southbound ramp to Exit 1B-2 - North Conduit Avenue; NY 27 (New York) Subject to change without notice., Continuous Thursday January 1st, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-26T17:35:40Z"},"road_event_id":"dZPQrkvfZEXhTs+blne3BnKhbfQ=","beginning_cross_street":"Exit 1B-2 - North Conduit Avenue; NY 27","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801918,40.667966]]}},{"id":"pBTbmn0StfiJGxLbm+s9P2TMNrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JrdJxDchxaQOxDNASuUXe2JNhF4="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed northbound, southbound","update_date":"2026-04-18T12:00:03Z"},"road_event_id":"pBTbmn0StfiJGxLbm+s9P2TMNrw=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"JrdJxDchxaQOxDNASuUXe2JNhF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pBTbmn0StfiJGxLbm+s9P2TMNrw="},{"type":"next-occurrence","id":"xltxs+q7FJWIlFX7awr0PJOBg8o="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed northbound, southbound","update_date":"2026-04-18T12:00:03Z"},"road_event_id":"JrdJxDchxaQOxDNASuUXe2JNhF4=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"xltxs+q7FJWIlFX7awr0PJOBg8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pBTbmn0StfiJGxLbm+s9P2TMNrw="}],"description":"Construction on I-87 Major Deegan Expressway both directions in the vicinity of East 138th Street; Ramp (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 08:00 AM 1 Center lane of 3 lanes closed northbound, southbound","update_date":"2026-04-18T12:00:03Z"},"road_event_id":"xltxs+q7FJWIlFX7awr0PJOBg8o=","beginning_cross_street":"East 138th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931203,40.813506]]}},{"id":"R2d+u2xSlivWasRy8ISpu50QyjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Yh2LnRz6Km5Kee1bCStJJedQ2Bg="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"R2d+u2xSlivWasRy8ISpu50QyjI=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"Yh2LnRz6Km5Kee1bCStJJedQ2Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"b8B2ZSa3pfBNqmJjw7rWwtkur5o="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"Yh2LnRz6Km5Kee1bCStJJedQ2Bg=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"b8B2ZSa3pfBNqmJjw7rWwtkur5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"YtTQrsZzsd6gvTiaupRjYEvtKvE="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"b8B2ZSa3pfBNqmJjw7rWwtkur5o=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"YtTQrsZzsd6gvTiaupRjYEvtKvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"ZblA9o0sS/I0GsrIc/tbgtdFMBw="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"YtTQrsZzsd6gvTiaupRjYEvtKvE=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"ZblA9o0sS/I0GsrIc/tbgtdFMBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"2BwVIToSM1I2kO8k6I/FV4f9Ajs="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"ZblA9o0sS/I0GsrIc/tbgtdFMBw=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"2BwVIToSM1I2kO8k6I/FV4f9Ajs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"8aXKFBjTqXcEIeOpzFoUx+wfA08="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"2BwVIToSM1I2kO8k6I/FV4f9Ajs=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"8aXKFBjTqXcEIeOpzFoUx+wfA08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"BNklaEeH/QepPdbYeuknO/IQcXM="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"8aXKFBjTqXcEIeOpzFoUx+wfA08=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"BNklaEeH/QepPdbYeuknO/IQcXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"PY1obwhG8cgq9cjb5fkz0dX3cxU="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"BNklaEeH/QepPdbYeuknO/IQcXM=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"PY1obwhG8cgq9cjb5fkz0dX3cxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"xMPQxbH0+cTLZrYxVZJ61KrN+1M="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"PY1obwhG8cgq9cjb5fkz0dX3cxU=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"xMPQxbH0+cTLZrYxVZJ61KrN+1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"XzXpQq8k7NmLde2AQHZPEvFb43g="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"xMPQxbH0+cTLZrYxVZJ61KrN+1M=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"XzXpQq8k7NmLde2AQHZPEvFb43g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"8Xf7w70l1wO7ABHu1ec/CFXfysg="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"XzXpQq8k7NmLde2AQHZPEvFb43g=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"8Xf7w70l1wO7ABHu1ec/CFXfysg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="},{"type":"next-occurrence","id":"nqDSYCV+0QBeAvEc/8mTWG++fAE="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"8Xf7w70l1wO7ABHu1ec/CFXfysg=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"nqDSYCV+0QBeAvEc/8mTWG++fAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R2d+u2xSlivWasRy8ISpu50QyjI="}],"description":"Gas main work on NY 133 both directions between Calam Avenue (Ossining) and Iroquois Road (Ossining) 2024081733525/32636309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 08:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-18T18:00:52Z"},"road_event_id":"nqDSYCV+0QBeAvEc/8mTWG++fAE=","beginning_cross_street":"Calam Avenue","ending_cross_street":"Iroquois Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847125,41.166981]]}},{"id":"sPjs7CD/C4ZmoGth+I3/FNXAffA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Zlgx6JciQELawWPE6vFuXHmptNA="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"sPjs7CD/C4ZmoGth+I3/FNXAffA=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"Zlgx6JciQELawWPE6vFuXHmptNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"T4VXkEIyACIByZNmY+e2MqUsJBs="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"Zlgx6JciQELawWPE6vFuXHmptNA=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"T4VXkEIyACIByZNmY+e2MqUsJBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"SlwY1m6Fc2b94Py9//qEh7DyBHY="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"T4VXkEIyACIByZNmY+e2MqUsJBs=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"SlwY1m6Fc2b94Py9//qEh7DyBHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"C7SvzNcnoaxx8M6jCYqTxyxb21Y="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"SlwY1m6Fc2b94Py9//qEh7DyBHY=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"C7SvzNcnoaxx8M6jCYqTxyxb21Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"F0ay8FDtHDDnj1/MDYpuqco4+4w="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"C7SvzNcnoaxx8M6jCYqTxyxb21Y=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"F0ay8FDtHDDnj1/MDYpuqco4+4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"wdCavMGpKPhrW42VKfWjBzActFQ="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"F0ay8FDtHDDnj1/MDYpuqco4+4w=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"wdCavMGpKPhrW42VKfWjBzActFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"RWS6lrZ210TngksEL5uLut++oPU="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"wdCavMGpKPhrW42VKfWjBzActFQ=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"RWS6lrZ210TngksEL5uLut++oPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"6zeQxcVssalDuDoKZrcQ86dri04="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"RWS6lrZ210TngksEL5uLut++oPU=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"6zeQxcVssalDuDoKZrcQ86dri04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"eEu+S70Ut/EBm+KegPwrek+6W/w="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"6zeQxcVssalDuDoKZrcQ86dri04=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"eEu+S70Ut/EBm+KegPwrek+6W/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="},{"type":"next-occurrence","id":"8eHCRCiV26KpSjWvDW+uIxfEWg8="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"eEu+S70Ut/EBm+KegPwrek+6W/w=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"8eHCRCiV26KpSjWvDW+uIxfEWg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sPjs7CD/C4ZmoGth+I3/FNXAffA="}],"description":"Roadwork on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 22 - Hiawatha Blvd (Syracuse), Thursday February 19th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM left shoulder closed","update_date":"2026-03-26T22:34:15Z"},"road_event_id":"8eHCRCiV26KpSjWvDW+uIxfEWg8=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 22 - Hiawatha Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.173756,43.080087]]}},{"id":"PCu3payFkabYsLvDFYa4sFzRAeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y2mCegTZR+i5jVwDUSGDwhTNcTo="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"PCu3payFkabYsLvDFYa4sFzRAeo=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"Y2mCegTZR+i5jVwDUSGDwhTNcTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"hW7IGHWhPJLjtAbsM+dsURtJ7NU="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"Y2mCegTZR+i5jVwDUSGDwhTNcTo=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"hW7IGHWhPJLjtAbsM+dsURtJ7NU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"sJyBKDlXqsIYi+tDwSKJMF+JLwM="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"hW7IGHWhPJLjtAbsM+dsURtJ7NU=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"sJyBKDlXqsIYi+tDwSKJMF+JLwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"iva04BBP+8rrzSqT/E9WBQDMm+4="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"sJyBKDlXqsIYi+tDwSKJMF+JLwM=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"iva04BBP+8rrzSqT/E9WBQDMm+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"/ZHMgp+OIGAwKHaSAc0eUroaan4="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"iva04BBP+8rrzSqT/E9WBQDMm+4=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"/ZHMgp+OIGAwKHaSAc0eUroaan4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"G3wO5Nvc79bCFi9pkW4kyeh+zB0="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"/ZHMgp+OIGAwKHaSAc0eUroaan4=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"G3wO5Nvc79bCFi9pkW4kyeh+zB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"/rhHBomUQ5fNurCntElDiGpa0NU="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"G3wO5Nvc79bCFi9pkW4kyeh+zB0=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"/rhHBomUQ5fNurCntElDiGpa0NU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"zCOE+em8ydp+bkFgnWrGPA+DSps="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"/rhHBomUQ5fNurCntElDiGpa0NU=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"zCOE+em8ydp+bkFgnWrGPA+DSps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"CKhCsKgLnjfxZtGIKbPlxAOQ/mU="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"zCOE+em8ydp+bkFgnWrGPA+DSps=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"CKhCsKgLnjfxZtGIKbPlxAOQ/mU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"secLL66kLgk1KxDk93vXh8ksD+4="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"CKhCsKgLnjfxZtGIKbPlxAOQ/mU=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"secLL66kLgk1KxDk93vXh8ksD+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"Youj2vGPOQBQ/J9r5YSIyTsfpUM="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"secLL66kLgk1KxDk93vXh8ksD+4=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"Youj2vGPOQBQ/J9r5YSIyTsfpUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"/awUkrthhlLusDq279S6WSHN9ko="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"Youj2vGPOQBQ/J9r5YSIyTsfpUM=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T12:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"/awUkrthhlLusDq279S6WSHN9ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"RUkt0BkeW7jm8An+w5ninypP51k="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"/awUkrthhlLusDq279S6WSHN9ko=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"RUkt0BkeW7jm8An+w5ninypP51k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="},{"type":"next-occurrence","id":"7rxRzhJmCAJHanZ75BgjPQ9HmAc="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"RUkt0BkeW7jm8An+w5ninypP51k=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"7rxRzhJmCAJHanZ75BgjPQ9HmAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu3payFkabYsLvDFYa4sFzRAeo="}],"description":"Construction on 41ST ST westbound between 13TH AVE (New York) and 12TH AVE (New York) for boom, knuckle boom, and concrete pump to work on new building., Saturday February 21st, 2026 thru Wednesday May 27th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-24T20:30:51Z"},"road_event_id":"7rxRzhJmCAJHanZ75BgjPQ9HmAc=","beginning_cross_street":"13TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987511,40.639531]]}},{"id":"pRDluFMUzucmvlVcASTtY6WubA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Genesee Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"18OTlFO9R8tMCj7rkSSDKeZVisA="}],"description":"Utility work on North Genesee Street both directions between Auert Avenue (Utica) and Lee Street (Utica) Motorists may encounter lane closures in both directions, Monday February 23rd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 06:00 AM thru 12:00 PM,","update_date":"2026-04-17T10:31:10Z"},"road_event_id":"pRDluFMUzucmvlVcASTtY6WubA8=","beginning_cross_street":"Auert Avenue","ending_cross_street":"Lee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.2112,43.1158]]}},{"id":"18OTlFO9R8tMCj7rkSSDKeZVisA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Genesee Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pRDluFMUzucmvlVcASTtY6WubA8="},{"type":"next-occurrence","id":"fpaaH85lkRHlJayO8+7dRe9GLdA="}],"description":"Utility work on North Genesee Street both directions between Auert Avenue (Utica) and Lee Street (Utica) Motorists may encounter lane closures in both directions, Monday February 23rd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 06:00 AM thru 12:00 PM,","update_date":"2026-04-17T10:31:10Z"},"road_event_id":"18OTlFO9R8tMCj7rkSSDKeZVisA=","beginning_cross_street":"Auert Avenue","ending_cross_street":"Lee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.2112,43.1158]]}},{"id":"fpaaH85lkRHlJayO8+7dRe9GLdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Genesee Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pRDluFMUzucmvlVcASTtY6WubA8="},{"type":"next-occurrence","id":"6R+rkIETlcsYN+6PTGrfrSHscGs="}],"description":"Utility work on North Genesee Street both directions between Auert Avenue (Utica) and Lee Street (Utica) Motorists may encounter lane closures in both directions, Monday February 23rd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 06:00 AM thru 12:00 PM,","update_date":"2026-04-17T10:31:10Z"},"road_event_id":"fpaaH85lkRHlJayO8+7dRe9GLdA=","beginning_cross_street":"Auert Avenue","ending_cross_street":"Lee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.2112,43.1158]]}},{"id":"6R+rkIETlcsYN+6PTGrfrSHscGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Genesee Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pRDluFMUzucmvlVcASTtY6WubA8="},{"type":"next-occurrence","id":"UHDqZBnLZM3ywLs1yMgnp+QKR44="}],"description":"Utility work on North Genesee Street both directions between Auert Avenue (Utica) and Lee Street (Utica) Motorists may encounter lane closures in both directions, Monday February 23rd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 06:00 AM thru 12:00 PM,","update_date":"2026-04-17T10:31:10Z"},"road_event_id":"6R+rkIETlcsYN+6PTGrfrSHscGs=","beginning_cross_street":"Auert Avenue","ending_cross_street":"Lee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.2112,43.1158]]}},{"id":"UHDqZBnLZM3ywLs1yMgnp+QKR44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Genesee Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pRDluFMUzucmvlVcASTtY6WubA8="},{"type":"next-occurrence","id":"en8UzVn9rtWsTWaKTTLpI+vIYHk="}],"description":"Utility work on North Genesee Street both directions between Auert Avenue (Utica) and Lee Street (Utica) Motorists may encounter lane closures in both directions, Monday February 23rd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 06:00 AM thru 12:00 PM,","update_date":"2026-04-17T10:31:10Z"},"road_event_id":"UHDqZBnLZM3ywLs1yMgnp+QKR44=","beginning_cross_street":"Auert Avenue","ending_cross_street":"Lee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.2112,43.1158]]}},{"id":"en8UzVn9rtWsTWaKTTLpI+vIYHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Genesee Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pRDluFMUzucmvlVcASTtY6WubA8="}],"description":"Utility work on North Genesee Street both directions between Auert Avenue (Utica) and Lee Street (Utica) Motorists may encounter lane closures in both directions, Monday February 23rd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 06:00 AM thru 12:00 PM,","update_date":"2026-04-17T10:31:10Z"},"road_event_id":"en8UzVn9rtWsTWaKTTLpI+vIYHk=","beginning_cross_street":"Auert Avenue","ending_cross_street":"Lee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.2112,43.1158]]}},{"id":"ORC300519661","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Exit C - Federal Circle (New York) Not currently Scheduled","update_date":"2026-04-09T03:59:00Z"},"road_event_id":"ORC300519661","beginning_cross_street":"Exit C - Federal Circle ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-02-20T22:57:15Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.805964,40.66074]]}},{"id":"9yPMb0EiJ/3a7169KmWstmTLAJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Babylon and Montauk"],"direction":"unknown","related_road_events":[],"description":"Due to Platform Repairs eastbound, Babylon and Montauk at Babylon (Babylon) You must be in the last six cars to exit eastbound trains at Babylon The eastern half of both platforms are closed for replacement. Use the stairs by North Carll Ave or the elevator to reach the platforms. Customers on Montauk Branch diesel trains with six or more cars, listen for announcements or ask a crew member to see if your car will open at Babylon., Continuous Sunday February 22nd, 2026 02:30 AM thru Sunday May 31st, 2026 11:59 PM","update_date":"2026-02-21T22:32:24Z"},"road_event_id":"9yPMb0EiJ/3a7169KmWstmTLAJ4=","beginning_cross_street":"Babylon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.324055,40.700689]]}},{"id":"uvQEzVktfyauhFjdWpltEGJvZ5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fQc5ERpFleELWRcWA2c20qrHlO4="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"uvQEzVktfyauhFjdWpltEGJvZ5o=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"fQc5ERpFleELWRcWA2c20qrHlO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"mZWNsm+6eAcwM3ZB5nhv1MF1XIY="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"fQc5ERpFleELWRcWA2c20qrHlO4=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"mZWNsm+6eAcwM3ZB5nhv1MF1XIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"DpNTNuiSiCLlMNmI9+zRjdNZHfg="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"mZWNsm+6eAcwM3ZB5nhv1MF1XIY=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"DpNTNuiSiCLlMNmI9+zRjdNZHfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"u4WNDjNyx6dNbkxEG98gq33uTw4="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"DpNTNuiSiCLlMNmI9+zRjdNZHfg=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"u4WNDjNyx6dNbkxEG98gq33uTw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"4vFFA1YizcNDGQx+DNQH7debE0g="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"u4WNDjNyx6dNbkxEG98gq33uTw4=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"4vFFA1YizcNDGQx+DNQH7debE0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"hn5g9z8pDR5cB44pxh3SJg6W5c0="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"4vFFA1YizcNDGQx+DNQH7debE0g=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"hn5g9z8pDR5cB44pxh3SJg6W5c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"PhuM83wYonSge6VcP6Ozg8RZsro="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"hn5g9z8pDR5cB44pxh3SJg6W5c0=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"PhuM83wYonSge6VcP6Ozg8RZsro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"572cfhbKwKg1RKC6z/7kbxcanKU="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"PhuM83wYonSge6VcP6Ozg8RZsro=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"572cfhbKwKg1RKC6z/7kbxcanKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"YwkKauUe3vrqZlsEvuUyCXgxG74="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"572cfhbKwKg1RKC6z/7kbxcanKU=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"YwkKauUe3vrqZlsEvuUyCXgxG74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="},{"type":"next-occurrence","id":"8dNpwtFL+pEGxdcqPXsf/T2R9GU="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"YwkKauUe3vrqZlsEvuUyCXgxG74=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"8dNpwtFL+pEGxdcqPXsf/T2R9GU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uvQEzVktfyauhFjdWpltEGJvZ5o="}],"description":"Roadwork on I-481 northbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Friday February 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-04-02T17:37:51Z"},"road_event_id":"8dNpwtFL+pEGxdcqPXsf/T2R9GU=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108879,43.143678]]}},{"id":"XsjnJPND8hyQXTXuR94ePpID/w8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RgO6A33sj3opCZZ3SLLbbPGMVys="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"XsjnJPND8hyQXTXuR94ePpID/w8=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"RgO6A33sj3opCZZ3SLLbbPGMVys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"kqjnjnPeHE7dUXUMIz/5GwhbMrk="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"RgO6A33sj3opCZZ3SLLbbPGMVys=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"kqjnjnPeHE7dUXUMIz/5GwhbMrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"KpeJ8jDHXiBG2xfEDwb156f8G1w="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"kqjnjnPeHE7dUXUMIz/5GwhbMrk=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"KpeJ8jDHXiBG2xfEDwb156f8G1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"Wi1Pz7xXBxT9LnDxt3PJEU9U2sI="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"KpeJ8jDHXiBG2xfEDwb156f8G1w=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"Wi1Pz7xXBxT9LnDxt3PJEU9U2sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"INyOYtVwj0X5z+sWkTD0RnItzfg="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"Wi1Pz7xXBxT9LnDxt3PJEU9U2sI=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"INyOYtVwj0X5z+sWkTD0RnItzfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"cqeFT10+D6Z9y0C/2fY/u6Pp4H4="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"INyOYtVwj0X5z+sWkTD0RnItzfg=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"cqeFT10+D6Z9y0C/2fY/u6Pp4H4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"4ZLPx7RuwUG2jaxC2eN2Hkg5j1Q="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"cqeFT10+D6Z9y0C/2fY/u6Pp4H4=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"4ZLPx7RuwUG2jaxC2eN2Hkg5j1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"KzouxRqWTR82bkvFNooTN7iCs2M="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"4ZLPx7RuwUG2jaxC2eN2Hkg5j1Q=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"KzouxRqWTR82bkvFNooTN7iCs2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"9SaMJ61x71FbdDj+Th4XnllV+Fc="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"KzouxRqWTR82bkvFNooTN7iCs2M=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"9SaMJ61x71FbdDj+Th4XnllV+Fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="},{"type":"next-occurrence","id":"hdaiW7NZjA5SQcwQqonbNLI+vug="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"9SaMJ61x71FbdDj+Th4XnllV+Fc=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"hdaiW7NZjA5SQcwQqonbNLI+vug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINGSBRIDGE TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XsjnJPND8hyQXTXuR94ePpID/w8="}],"description":"Construction on KINGSBRIDGE TER eastbound between HEATH AVE (New York) and W KINGSBRIDGE RD (New York), Wednesday February 25th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-02-25T16:44:11Z"},"road_event_id":"hdaiW7NZjA5SQcwQqonbNLI+vug=","beginning_cross_street":"HEATH AVE","ending_cross_street":"W KINGSBRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906358,40.86953]]}},{"id":"rs3IyqNPQk1UH+2gvNrnaGKYw0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 298"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 298 both directions between Pulaski St (Syracuse) and Solar St (Syracuse), Continuous Monday March 2nd, 2026 07:00 AM thru Thursday April 30th, 2026 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T11:10:20Z"},"road_event_id":"rs3IyqNPQk1UH+2gvNrnaGKYw0g=","beginning_cross_street":"Pulaski St","ending_cross_street":"Solar St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172551,43.059463]]}},{"id":"0o5WcMpXz2oGpEj+yZP65ytILwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and drainage improvements on NY 284 both directions between Langlitz Road (Minisink) and CR 1 Pine Island Turnpike (Minisink) D265386/32597309 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday March 16th, 2026 12:00 AM thru Tuesday June 30th, 2026 12:00 AM all lanes closed and detoured","update_date":"2026-03-27T17:25:36Z"},"road_event_id":"0o5WcMpXz2oGpEj+yZP65ytILwM=","beginning_cross_street":"Langlitz Road","ending_cross_street":"CR 1 - Pine Island Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552716,41.328515]]}},{"id":"iZBO1cfBEYYcrnj4OaIZ+cOoxMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UEjuMzM/6TVi/9XGKGP6bnXRbl0="}],"description":"Roadwork on NY 240 both directions NY 400; Aurora Expressway (West Seneca) to Mineral Springs Road (West Seneca), Monday March 16th, 2026 thru Friday December 4th, 2026, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-26T16:13:00Z"},"road_event_id":"iZBO1cfBEYYcrnj4OaIZ+cOoxMQ=","beginning_cross_street":"NY 400; Aurora Expressway","ending_cross_street":"Mineral Springs Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.787995,42.849281]]}},{"id":"UEjuMzM/6TVi/9XGKGP6bnXRbl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iZBO1cfBEYYcrnj4OaIZ+cOoxMQ="}],"description":"Roadwork on NY 240 both directions NY 400; Aurora Expressway (West Seneca) to Mineral Springs Road (West Seneca), Monday March 16th, 2026 thru Friday December 4th, 2026, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-02-26T16:13:00Z"},"road_event_id":"UEjuMzM/6TVi/9XGKGP6bnXRbl0=","beginning_cross_street":"NY 400; Aurora Expressway","ending_cross_street":"Mineral Springs Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.787995,42.849281]]}},{"id":"HksmQWNcdgegVSxePk7+4yLLtLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xn17XM3OoM9Lq1Yde9jHM3e9LvA="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"HksmQWNcdgegVSxePk7+4yLLtLc=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"xn17XM3OoM9Lq1Yde9jHM3e9LvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"s16qWhxhdd5A5cVp69Yibfbif1I="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"xn17XM3OoM9Lq1Yde9jHM3e9LvA=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"s16qWhxhdd5A5cVp69Yibfbif1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"0eDUpTXcUH10v9+js8g20Q6z+vA="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"s16qWhxhdd5A5cVp69Yibfbif1I=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"0eDUpTXcUH10v9+js8g20Q6z+vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"Nn7hB6W2ns33ROvioh46eFf29dc="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"0eDUpTXcUH10v9+js8g20Q6z+vA=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"Nn7hB6W2ns33ROvioh46eFf29dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"NtjuQKMk5HmUfM1ygiQdvo6+j5s="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"Nn7hB6W2ns33ROvioh46eFf29dc=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"NtjuQKMk5HmUfM1ygiQdvo6+j5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"pVIeqAjVWeLo38cBLdrJv8NqccE="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"NtjuQKMk5HmUfM1ygiQdvo6+j5s=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"pVIeqAjVWeLo38cBLdrJv8NqccE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"g7XnqJiXpuc7CrI1+rtbRaHGEd8="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"pVIeqAjVWeLo38cBLdrJv8NqccE=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"g7XnqJiXpuc7CrI1+rtbRaHGEd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"gimoIg9+MfRLh2rtqxVMYcYRHMA="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"g7XnqJiXpuc7CrI1+rtbRaHGEd8=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"gimoIg9+MfRLh2rtqxVMYcYRHMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"ndcPet06JMhqUEAIVBpaQ1axuD8="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"gimoIg9+MfRLh2rtqxVMYcYRHMA=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"ndcPet06JMhqUEAIVBpaQ1axuD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="},{"type":"next-occurrence","id":"DKRokvd+eAPc+MtEboRxrMtOzhg="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"ndcPet06JMhqUEAIVBpaQ1axuD8=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"DKRokvd+eAPc+MtEboRxrMtOzhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HksmQWNcdgegVSxePk7+4yLLtLc="}],"description":"Pothole repair on I-81 northbound between Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 18 - Adams Street; Harrison Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open northbound,","update_date":"2026-03-31T19:30:01Z"},"road_event_id":"DKRokvd+eAPc+MtEboRxrMtOzhg=","beginning_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 18 - Adams Street; Harrison Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13835,43.013311]]}},{"id":"UQPLE2zQb1EjEzD7vDFgUtMImWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3ChVE7L84wjItBGVs/22B1zyJ8A="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"UQPLE2zQb1EjEzD7vDFgUtMImWA=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"3ChVE7L84wjItBGVs/22B1zyJ8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"YI+vZ6KbqC99DNamziybWoI9LWo="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"3ChVE7L84wjItBGVs/22B1zyJ8A=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"YI+vZ6KbqC99DNamziybWoI9LWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"l8nFIRT7NCeV+Xv+1/kVFPisQXI="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"YI+vZ6KbqC99DNamziybWoI9LWo=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"l8nFIRT7NCeV+Xv+1/kVFPisQXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"pXginC5fYeqHjgA6y/b82cxQIm4="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"l8nFIRT7NCeV+Xv+1/kVFPisQXI=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"pXginC5fYeqHjgA6y/b82cxQIm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"ZblhH6FqY9WRyoIzq+dnQ+/irSc="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"pXginC5fYeqHjgA6y/b82cxQIm4=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"ZblhH6FqY9WRyoIzq+dnQ+/irSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"BjWKwZ7/thMas/wBw59zwqXrFs8="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"ZblhH6FqY9WRyoIzq+dnQ+/irSc=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"BjWKwZ7/thMas/wBw59zwqXrFs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"qhmZgntOldBWxbdtm7KN+jo8Tqo="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"BjWKwZ7/thMas/wBw59zwqXrFs8=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"qhmZgntOldBWxbdtm7KN+jo8Tqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"9YTFhdWY5YiNKKoK02n9RjpSPjw="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"qhmZgntOldBWxbdtm7KN+jo8Tqo=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"9YTFhdWY5YiNKKoK02n9RjpSPjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"LsIprb5UTmr3bjsAg6lSkpGnlio="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"9YTFhdWY5YiNKKoK02n9RjpSPjw=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"LsIprb5UTmr3bjsAg6lSkpGnlio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="},{"type":"next-occurrence","id":"4MKw3ZOPuEoDOtLo/rpmkSFM6UQ="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"LsIprb5UTmr3bjsAg6lSkpGnlio=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"4MKw3ZOPuEoDOtLo/rpmkSFM6UQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQPLE2zQb1EjEzD7vDFgUtMImWA="}],"description":"Pothole repair on I-81 southbound between Exit 18 - Adams Street; Harrison Street (Syracuse) and Exit 17 - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating left and right lane closures, Thursday February 26th,2026 thru Sunday May 31st,2026, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes of 2 lanes open southbound,","update_date":"2026-03-31T19:30:02Z"},"road_event_id":"4MKw3ZOPuEoDOtLo/rpmkSFM6UQ=","beginning_cross_street":"Exit 18 - Adams Street; Harrison Street","ending_cross_street":"Exit 17 - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142734,43.048249]]}},{"id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4cjIS2yyuqNbq2ieN9SNN7uccVY="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"4cjIS2yyuqNbq2ieN9SNN7uccVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"n26cH42hEQykT2j0lHmk7Yu1rfI="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"4cjIS2yyuqNbq2ieN9SNN7uccVY=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"n26cH42hEQykT2j0lHmk7Yu1rfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"clLa85c1Ap5YAh2Mrp1kwGtbX5c="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"n26cH42hEQykT2j0lHmk7Yu1rfI=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"clLa85c1Ap5YAh2Mrp1kwGtbX5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"uwORI1BzWhLRWm03nxMRFVoeq5Y="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"clLa85c1Ap5YAh2Mrp1kwGtbX5c=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"uwORI1BzWhLRWm03nxMRFVoeq5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"YVKwYHCqMIjOAbEgDcXIJ4tr8RM="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"uwORI1BzWhLRWm03nxMRFVoeq5Y=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"YVKwYHCqMIjOAbEgDcXIJ4tr8RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"gS4ID7haquvlp4fBipfwufcxLV4="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"YVKwYHCqMIjOAbEgDcXIJ4tr8RM=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"gS4ID7haquvlp4fBipfwufcxLV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"1xl3Hjjz7a0ouiiaoVj+PwYDxFk="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"gS4ID7haquvlp4fBipfwufcxLV4=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"1xl3Hjjz7a0ouiiaoVj+PwYDxFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"C4gBKMthyEBD/osziYYP/i5cdkw="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"1xl3Hjjz7a0ouiiaoVj+PwYDxFk=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"C4gBKMthyEBD/osziYYP/i5cdkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"C/DtuvYCnhAsIPcD/lZvN2Vn710="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"C4gBKMthyEBD/osziYYP/i5cdkw=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"C/DtuvYCnhAsIPcD/lZvN2Vn710=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="},{"type":"next-occurrence","id":"IBYOfiDJt0ghoKq9q/0lz2697AA="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"C/DtuvYCnhAsIPcD/lZvN2Vn710=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"IBYOfiDJt0ghoKq9q/0lz2697AA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1Bb/mWSCmetyW1VpyxOFqgR/lI="}],"description":"Signal repair and survey work on NY 17A both directions between Iron Forge Road (Warwick) and Dikeman Drive (Goshen) D265402/32356509 - TEMPORARY SIGNAL IN PLACE - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:00:50Z"},"road_event_id":"IBYOfiDJt0ghoKq9q/0lz2697AA=","beginning_cross_street":"Iron Forge Road","ending_cross_street":"Dikeman Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.31137,41.250787]]}},{"id":"sUnv3XPz/zy1m1iI6DyatIyCEFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-690 eastbound between I-81 Northbound (Syracuse) and Exit 14 - Teall Avenue (Syracuse), Continuous Monday March 2nd, 2026 07:00 AM thru Friday May 1st, 2026 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-03-12T10:46:56Z"},"road_event_id":"sUnv3XPz/zy1m1iI6DyatIyCEFk=","beginning_cross_street":"I-81 Northbound","ending_cross_street":"Exit 14 - Teall Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145696,43.051162]]}},{"id":"k+VHGFbtdL2DwvVHlQMB8ZhuQQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Noise wall construction on I-690 westbound ramp from Teall Avenue (Syracuse), Continuous Monday March 2nd, 2026 07:00 AM thru Friday May 1st, 2026 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T10:49:06Z"},"road_event_id":"k+VHGFbtdL2DwvVHlQMB8ZhuQQo=","beginning_cross_street":"Teall Avenue    ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.123075,43.053253]]}},{"id":"c28zAWAkHnzG0PZQeW9FdKVuLHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["TEALL AVE"],"direction":"unknown","related_road_events":[],"description":"Noise wall construction on TEALL AVE northbound between CANAL ST (Syracuse) and BURNET AVE (Syracuse), Continuous Monday March 2nd, 2026 07:00 AM thru Friday May 1st, 2026 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-03-12T10:48:29Z"},"road_event_id":"c28zAWAkHnzG0PZQeW9FdKVuLHE=","beginning_cross_street":"CANAL ST","ending_cross_street":"BURNET AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.121832,43.05247]]}},{"id":"KK2hCR8h1EKpx7fikuaP85OCH+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hIJsGteDINYJ1miUbaxfamPqD+o="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-03-30T13:07:11Z"},"road_event_id":"KK2hCR8h1EKpx7fikuaP85OCH+s=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"hIJsGteDINYJ1miUbaxfamPqD+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KK2hCR8h1EKpx7fikuaP85OCH+s="},{"type":"next-occurrence","id":"vpk5yc93/NOhp7WytR+CNSikM5A="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-03-30T13:07:11Z"},"road_event_id":"hIJsGteDINYJ1miUbaxfamPqD+o=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"vpk5yc93/NOhp7WytR+CNSikM5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KK2hCR8h1EKpx7fikuaP85OCH+s="},{"type":"next-occurrence","id":"oIokPdzvTdTBzXgr8lHpm5KdrbI="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-03-30T13:07:11Z"},"road_event_id":"vpk5yc93/NOhp7WytR+CNSikM5A=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"oIokPdzvTdTBzXgr8lHpm5KdrbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KK2hCR8h1EKpx7fikuaP85OCH+s="},{"type":"next-occurrence","id":"ppATOcDV5SdnYK+15nYId38OQ1A="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-03-30T13:07:11Z"},"road_event_id":"oIokPdzvTdTBzXgr8lHpm5KdrbI=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"ppATOcDV5SdnYK+15nYId38OQ1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KK2hCR8h1EKpx7fikuaP85OCH+s="},{"type":"next-occurrence","id":"pjlIRPm5aQp7d8oThC1PP4u13Fo="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-03-30T13:07:11Z"},"road_event_id":"ppATOcDV5SdnYK+15nYId38OQ1A=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"pjlIRPm5aQp7d8oThC1PP4u13Fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KK2hCR8h1EKpx7fikuaP85OCH+s="},{"type":"next-occurrence","id":"c5Ci/kxjrXnxH5ZUdbfOyk9EUME="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-03-30T13:07:11Z"},"road_event_id":"pjlIRPm5aQp7d8oThC1PP4u13Fo=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"c5Ci/kxjrXnxH5ZUdbfOyk9EUME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KK2hCR8h1EKpx7fikuaP85OCH+s="}],"description":"Water main work on NY 983B - Nepperhan Avenue between Elm Street (Yonkers) and Riverdale Avenue (Yonkers) 202508112176/32463509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, right lane closure","update_date":"2026-03-30T13:07:11Z"},"road_event_id":"c5Ci/kxjrXnxH5ZUdbfOyk9EUME=","beginning_cross_street":"","ending_cross_street":"Riverdale Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892778,40.933906]]}},{"id":"nK9q2RyyvtoPHK1ievU1OJTBRe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mqBSA+Sb0G/B99SZH+/qZ6aVYyc="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"nK9q2RyyvtoPHK1ievU1OJTBRe8=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"mqBSA+Sb0G/B99SZH+/qZ6aVYyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"vVe0tvPLClJIj+QGNuDsSR3LhUM="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"mqBSA+Sb0G/B99SZH+/qZ6aVYyc=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"vVe0tvPLClJIj+QGNuDsSR3LhUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"j+LcRQxOrFuMA+qo3wRIE4+MQGQ="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"vVe0tvPLClJIj+QGNuDsSR3LhUM=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"j+LcRQxOrFuMA+qo3wRIE4+MQGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"Jk3h12AU6a1+IcpGVGNe7mXz0R8="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"j+LcRQxOrFuMA+qo3wRIE4+MQGQ=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"Jk3h12AU6a1+IcpGVGNe7mXz0R8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"kqro6OP6/8PvTYQlh+66V2N8X/g="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"Jk3h12AU6a1+IcpGVGNe7mXz0R8=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"kqro6OP6/8PvTYQlh+66V2N8X/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"dB8fzM2tKPCOE2KURM1ziXoPItY="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"kqro6OP6/8PvTYQlh+66V2N8X/g=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"dB8fzM2tKPCOE2KURM1ziXoPItY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"MC03Mv2wrumCbkTTDEsAxqZ0ljw="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"dB8fzM2tKPCOE2KURM1ziXoPItY=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"MC03Mv2wrumCbkTTDEsAxqZ0ljw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"PanMY38dI/QbA7OLqQbFVJs4bTw="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"MC03Mv2wrumCbkTTDEsAxqZ0ljw=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"PanMY38dI/QbA7OLqQbFVJs4bTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"6U4jW7zjQJZBdwYCwKGkJI0jdTw="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"PanMY38dI/QbA7OLqQbFVJs4bTw=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"6U4jW7zjQJZBdwYCwKGkJI0jdTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"HwbqCLzGe1yd1XIFn0GhAO+kiOI="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"6U4jW7zjQJZBdwYCwKGkJI0jdTw=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"HwbqCLzGe1yd1XIFn0GhAO+kiOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"U7B8eA7VsWGiU/of41d4jFrxK9c="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"HwbqCLzGe1yd1XIFn0GhAO+kiOI=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"U7B8eA7VsWGiU/of41d4jFrxK9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"dcBAhAnflqnMc492A1lVSFBdzj4="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"U7B8eA7VsWGiU/of41d4jFrxK9c=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"dcBAhAnflqnMc492A1lVSFBdzj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"Z3/O4WchBcamPYXoYv74GPQ5eWo="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"dcBAhAnflqnMc492A1lVSFBdzj4=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"Z3/O4WchBcamPYXoYv74GPQ5eWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="},{"type":"next-occurrence","id":"rrZsv0GHZ3ZASbVHDqwHMNG9F1c="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"Z3/O4WchBcamPYXoYv74GPQ5eWo=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"rrZsv0GHZ3ZASbVHDqwHMNG9F1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-372"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nK9q2RyyvtoPHK1ievU1OJTBRe8="}],"description":"Construction on CT-372 both directions between HOOKER ST (Plainville) and BURNHAM ST (Plainville), Monday March 16th, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:36:37Z"},"road_event_id":"rrZsv0GHZ3ZASbVHDqwHMNG9F1c=","beginning_cross_street":"HOOKER ST","ending_cross_street":"BURNHAM ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.855838,41.675265]]}},{"id":"DmMBBLLreVZlWJF5yflHL3uCGa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h1Gv+GSDJLlOOH19h27RdIC+Dhs="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"DmMBBLLreVZlWJF5yflHL3uCGa0=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"h1Gv+GSDJLlOOH19h27RdIC+Dhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"llE56rj//iD2ESdfTSGq2RPYaok="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"h1Gv+GSDJLlOOH19h27RdIC+Dhs=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"llE56rj//iD2ESdfTSGq2RPYaok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"j9SFvIL8sa0YQD6DRtxQxIExLwA="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"llE56rj//iD2ESdfTSGq2RPYaok=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"j9SFvIL8sa0YQD6DRtxQxIExLwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"UVl5sQpOFNO4qwcoKljj7K9ZFyI="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"j9SFvIL8sa0YQD6DRtxQxIExLwA=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"UVl5sQpOFNO4qwcoKljj7K9ZFyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"sTX+gUAkljMaqGrl5XBnYMMmgts="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"UVl5sQpOFNO4qwcoKljj7K9ZFyI=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"sTX+gUAkljMaqGrl5XBnYMMmgts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"kNzmjQ3/3RSBXeNd0fTm6ma8lr0="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"sTX+gUAkljMaqGrl5XBnYMMmgts=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"kNzmjQ3/3RSBXeNd0fTm6ma8lr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"wo5vbav3ldN9t3JP8Mb+lkw44Aw="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"kNzmjQ3/3RSBXeNd0fTm6ma8lr0=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"wo5vbav3ldN9t3JP8Mb+lkw44Aw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"rY9LcqtbcD2PQihn9Fgkj7ddhPY="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"wo5vbav3ldN9t3JP8Mb+lkw44Aw=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"rY9LcqtbcD2PQihn9Fgkj7ddhPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"KCjIAAefoXbN81sG0XgeWMRMOvc="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"rY9LcqtbcD2PQihn9Fgkj7ddhPY=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"KCjIAAefoXbN81sG0XgeWMRMOvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"0yOeBN+WT1duMFyWuZfv8ttpab4="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"KCjIAAefoXbN81sG0XgeWMRMOvc=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"0yOeBN+WT1duMFyWuZfv8ttpab4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"SOqv9rvtIbQu7t2mnjOLS1jgLYE="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"0yOeBN+WT1duMFyWuZfv8ttpab4=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"SOqv9rvtIbQu7t2mnjOLS1jgLYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"mWIFKX01X6VS8t08EgFBVSjhTlQ="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"SOqv9rvtIbQu7t2mnjOLS1jgLYE=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"mWIFKX01X6VS8t08EgFBVSjhTlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"bbpFiDIpHQhoU28Enq7M2CDVsbs="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"mWIFKX01X6VS8t08EgFBVSjhTlQ=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"bbpFiDIpHQhoU28Enq7M2CDVsbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="},{"type":"next-occurrence","id":"XlgYOWGRBtX3obGRgFCAHu/8LX4="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"bbpFiDIpHQhoU28Enq7M2CDVsbs=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"XlgYOWGRBtX3obGRgFCAHu/8LX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DmMBBLLreVZlWJF5yflHL3uCGa0="}],"description":"Bridge work on CT 9 southbound between Exit 28 - CT 72 (New Britain) and Exit 25 - Ellis Street (New Britain), Monday March 23rd, 2026 thru Thursday August 27th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-03T17:40:59Z"},"road_event_id":"XlgYOWGRBtX3obGRgFCAHu/8LX4=","beginning_cross_street":"Exit 28 - CT 72","ending_cross_street":"Exit 25 - Ellis Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773977,41.666164]]}},{"id":"FlOAFCClB4sBJscLYSZLbgNYkrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dNBj39VSB1rAsMBIy5GZFf9BjKQ="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"FlOAFCClB4sBJscLYSZLbgNYkrM=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"dNBj39VSB1rAsMBIy5GZFf9BjKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"MCtNiKKXapJyoYNt+qP8WfmLSi0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"dNBj39VSB1rAsMBIy5GZFf9BjKQ=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"MCtNiKKXapJyoYNt+qP8WfmLSi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"3+Mtqdo7B2eQJbjv/JtYwr+TrHQ="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"MCtNiKKXapJyoYNt+qP8WfmLSi0=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"3+Mtqdo7B2eQJbjv/JtYwr+TrHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"PmEzAZuGjGbCaMIhteC7eh5nxRk="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"3+Mtqdo7B2eQJbjv/JtYwr+TrHQ=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"PmEzAZuGjGbCaMIhteC7eh5nxRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"IBejHP34c6gvIByUH+f5RlWQO08="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"PmEzAZuGjGbCaMIhteC7eh5nxRk=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"IBejHP34c6gvIByUH+f5RlWQO08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"82DbEqhKj7Fj3BanPJQu/9I2hdg="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"IBejHP34c6gvIByUH+f5RlWQO08=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"82DbEqhKj7Fj3BanPJQu/9I2hdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"/bhmdKwjdATA1uZqFKLTYNubH34="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"82DbEqhKj7Fj3BanPJQu/9I2hdg=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"/bhmdKwjdATA1uZqFKLTYNubH34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"zvbM234mIbZ7bb08ufEdXczHm/8="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"/bhmdKwjdATA1uZqFKLTYNubH34=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"zvbM234mIbZ7bb08ufEdXczHm/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"McuOUHKwF22FgSDqh06Jptyhiz0="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"zvbM234mIbZ7bb08ufEdXczHm/8=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"McuOUHKwF22FgSDqh06Jptyhiz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"ZRoypodOHco2ZBpfXbcrcY/JKNA="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"McuOUHKwF22FgSDqh06Jptyhiz0=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"ZRoypodOHco2ZBpfXbcrcY/JKNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"VC3H/5LzhGV6tVC4fKd1lrvbPJM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"ZRoypodOHco2ZBpfXbcrcY/JKNA=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"VC3H/5LzhGV6tVC4fKd1lrvbPJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"3ExkEYRrWWCC/ZPuGzFtM6Zb38Y="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"VC3H/5LzhGV6tVC4fKd1lrvbPJM=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"3ExkEYRrWWCC/ZPuGzFtM6Zb38Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"jy5Tul0d3gLaBpPhSm7EVxsd0do="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"3ExkEYRrWWCC/ZPuGzFtM6Zb38Y=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"jy5Tul0d3gLaBpPhSm7EVxsd0do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="},{"type":"next-occurrence","id":"4GN7sITInAvG/jWCJDDEWrAkHdY="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"jy5Tul0d3gLaBpPhSm7EVxsd0do=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"4GN7sITInAvG/jWCJDDEWrAkHdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FlOAFCClB4sBJscLYSZLbgNYkrM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 16 (Middlebury) Intermittent nightly lane closures will begin Monday, March 9, 2026, and will end on September 10, 2027. Generally, east and westbound traffic under the South Street Bridge may be reduced to one lane by way of rolling roadblock between the hours of 8:00 p.m. to 6:00 a.m. on eastbound and 9:00 p.m. to 6:00 a.m. westbound. Occasional 10 minute or less �Halt Traffic� operations may occur from 12:01 a.m. to 5:00 a.m. during this period., Monday March 9th, 2026 thru Thursday September 10th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-03T17:47:28Z"},"road_event_id":"4GN7sITInAvG/jWCJDDEWrAkHdY=","beginning_cross_street":"Exit 16","ending_cross_street":"Exit 16","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.125974,41.512522]]}},{"id":"zzu/UjBgO0UjrLEp7tDbJkfApEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SOUTH ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on SOUTH ST both directions between DWYER RD (Middlebury) and SANDY HILL RD (Middlebury), Continuous Monday March 2nd, 2026 12:00 AM thru Friday September 10th, 2027 11:59 PM All lanes closed","update_date":"2026-03-03T18:06:13Z"},"road_event_id":"zzu/UjBgO0UjrLEp7tDbJkfApEM=","beginning_cross_street":"DWYER RD","ending_cross_street":"SANDY HILL RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.122891,41.516388]]}},{"id":"kb3YctqMmUbaLyU+SrI/hyMdtKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xLv2+NWtFDkWmYu9QHZYpVs+ayE="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"kb3YctqMmUbaLyU+SrI/hyMdtKI=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"xLv2+NWtFDkWmYu9QHZYpVs+ayE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"hG7OzJEug2Ns8iMdtsMgcMTBS9s="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"xLv2+NWtFDkWmYu9QHZYpVs+ayE=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"hG7OzJEug2Ns8iMdtsMgcMTBS9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"NuaBUBakFAfWWkIk0CcJkRSEk2w="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"hG7OzJEug2Ns8iMdtsMgcMTBS9s=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"NuaBUBakFAfWWkIk0CcJkRSEk2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"qJGghiZ8brW0QSI8Kuuba5lvppQ="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"NuaBUBakFAfWWkIk0CcJkRSEk2w=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"qJGghiZ8brW0QSI8Kuuba5lvppQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"2asCtqdVpoMhC30REc0U3RsFs3g="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"qJGghiZ8brW0QSI8Kuuba5lvppQ=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"2asCtqdVpoMhC30REc0U3RsFs3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"1VYgG8IhxvvTA/iSpoZEN1uyLMA="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"2asCtqdVpoMhC30REc0U3RsFs3g=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"1VYgG8IhxvvTA/iSpoZEN1uyLMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"KBQoSQ7wdOzcXIjX8bKmbATYdMc="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"1VYgG8IhxvvTA/iSpoZEN1uyLMA=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"KBQoSQ7wdOzcXIjX8bKmbATYdMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"OvuLPA1hcu52sCl+quI/uI2aELw="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"KBQoSQ7wdOzcXIjX8bKmbATYdMc=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"OvuLPA1hcu52sCl+quI/uI2aELw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"7i09qFOnyqZdBUH61dnjuvdx22A="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"OvuLPA1hcu52sCl+quI/uI2aELw=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"7i09qFOnyqZdBUH61dnjuvdx22A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="},{"type":"next-occurrence","id":"9pwYkl6lCZDUR2vGYSPoPpHzKrs="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"7i09qFOnyqZdBUH61dnjuvdx22A=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"9pwYkl6lCZDUR2vGYSPoPpHzKrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kb3YctqMmUbaLyU+SrI/hyMdtKI="}],"description":"Roadwork on I-690 eastbound ramp to Exit 14 - NY 298; Bear Street (Syracuse), Wednesday March 4th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-12T10:32:59Z"},"road_event_id":"9pwYkl6lCZDUR2vGYSPoPpHzKrs=","beginning_cross_street":"Exit 14 - NY 298; Bear Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.180289,43.057319]]}},{"id":"r0JPGT7PulARMpe36KxdYpizVPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound near North of I-80 (Maywood), Continuous Friday March 6, 2026 11:00 PM thru Friday May 8, 2026 05:00 AM, right shoulder closed","update_date":"2026-03-04T13:49:42Z"},"road_event_id":"r0JPGT7PulARMpe36KxdYpizVPU=","beginning_cross_street":"North of I-80","ending_cross_street":"South of Central Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071495,40.893257]]}},{"id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+uco3soiozyAW96J4FrKp1kDLyk="}],"description":"Crane operations on BROADWAY southbound between W 48TH ST (New York) and W 47TH ST (New York), Wednesday March 4th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 11:59 PM thru 07:00 AM All lanes closed","update_date":"2026-03-04T20:59:33Z"},"road_event_id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q=","beginning_cross_street":"W 48TH ST","ending_cross_street":"W 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:59:00Z","end_date":"2026-04-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984841,40.760049]]}},{"id":"+uco3soiozyAW96J4FrKp1kDLyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q="},{"type":"next-occurrence","id":"sklSyqLFd9prOqaj2SNqhuAmBF8="}],"description":"Crane operations on BROADWAY southbound between W 48TH ST (New York) and W 47TH ST (New York), Wednesday March 4th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 11:59 PM thru 07:00 AM All lanes closed","update_date":"2026-03-04T20:59:33Z"},"road_event_id":"+uco3soiozyAW96J4FrKp1kDLyk=","beginning_cross_street":"W 48TH ST","ending_cross_street":"W 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:59:00Z","end_date":"2026-04-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984841,40.760049]]}},{"id":"sklSyqLFd9prOqaj2SNqhuAmBF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q="},{"type":"next-occurrence","id":"Ro8n7e00y5u+jnUNZHVOuDWmHME="}],"description":"Crane operations on BROADWAY southbound between W 48TH ST (New York) and W 47TH ST (New York), Wednesday March 4th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 11:59 PM thru 07:00 AM All lanes closed","update_date":"2026-03-04T20:59:33Z"},"road_event_id":"sklSyqLFd9prOqaj2SNqhuAmBF8=","beginning_cross_street":"W 48TH ST","ending_cross_street":"W 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:59:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984841,40.760049]]}},{"id":"Ro8n7e00y5u+jnUNZHVOuDWmHME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q="},{"type":"next-occurrence","id":"ta1iBLgmEzH2hWcygEhp/MdVNok="}],"description":"Crane operations on BROADWAY southbound between W 48TH ST (New York) and W 47TH ST (New York), Wednesday March 4th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 11:59 PM thru 07:00 AM All lanes closed","update_date":"2026-03-04T20:59:33Z"},"road_event_id":"Ro8n7e00y5u+jnUNZHVOuDWmHME=","beginning_cross_street":"W 48TH ST","ending_cross_street":"W 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:59:00Z","end_date":"2026-04-28T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984841,40.760049]]}},{"id":"ta1iBLgmEzH2hWcygEhp/MdVNok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q="},{"type":"next-occurrence","id":"CGCcwwuqkjTd0NVcymu8U/Dvb/o="}],"description":"Crane operations on BROADWAY southbound between W 48TH ST (New York) and W 47TH ST (New York), Wednesday March 4th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 11:59 PM thru 07:00 AM All lanes closed","update_date":"2026-03-04T20:59:33Z"},"road_event_id":"ta1iBLgmEzH2hWcygEhp/MdVNok=","beginning_cross_street":"W 48TH ST","ending_cross_street":"W 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:59:00Z","end_date":"2026-04-29T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984841,40.760049]]}},{"id":"CGCcwwuqkjTd0NVcymu8U/Dvb/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q="},{"type":"next-occurrence","id":"rRn4t7vH1GPyaW/bxf/pDeK0dDY="}],"description":"Crane operations on BROADWAY southbound between W 48TH ST (New York) and W 47TH ST (New York), Wednesday March 4th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 11:59 PM thru 07:00 AM All lanes closed","update_date":"2026-03-04T20:59:33Z"},"road_event_id":"CGCcwwuqkjTd0NVcymu8U/Dvb/o=","beginning_cross_street":"W 48TH ST","ending_cross_street":"W 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:59:00Z","end_date":"2026-04-30T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984841,40.760049]]}},{"id":"rRn4t7vH1GPyaW/bxf/pDeK0dDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BROADWAY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7GJFB9yRDGaGLhvgB0voTgX1H9Q="}],"description":"Crane operations on BROADWAY southbound between W 48TH ST (New York) and W 47TH ST (New York), Wednesday March 4th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 11:59 PM thru 07:00 AM All lanes closed","update_date":"2026-03-04T20:59:33Z"},"road_event_id":"rRn4t7vH1GPyaW/bxf/pDeK0dDY=","beginning_cross_street":"W 48TH ST","ending_cross_street":"W 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:59:00Z","end_date":"2026-05-01T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984841,40.760049]]}},{"id":"0KPBdyOZbaOpErDyS+GYIgHdUr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P8kzsFTQR9AgqBh8eapys3lriiE="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"0KPBdyOZbaOpErDyS+GYIgHdUr0=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"P8kzsFTQR9AgqBh8eapys3lriiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0KPBdyOZbaOpErDyS+GYIgHdUr0="},{"type":"next-occurrence","id":"sJXJDxQ+dEsthxam3P/yTiiB6J4="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"P8kzsFTQR9AgqBh8eapys3lriiE=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"sJXJDxQ+dEsthxam3P/yTiiB6J4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0KPBdyOZbaOpErDyS+GYIgHdUr0="},{"type":"next-occurrence","id":"NaPwBGP5nVDS+AxVYC0bGq2C9eI="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"sJXJDxQ+dEsthxam3P/yTiiB6J4=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"NaPwBGP5nVDS+AxVYC0bGq2C9eI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0KPBdyOZbaOpErDyS+GYIgHdUr0="},{"type":"next-occurrence","id":"RykCzlEJjE/Bg/4AlHgDOI55IVY="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"NaPwBGP5nVDS+AxVYC0bGq2C9eI=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"RykCzlEJjE/Bg/4AlHgDOI55IVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0KPBdyOZbaOpErDyS+GYIgHdUr0="},{"type":"next-occurrence","id":"qPDKrxM97+lA4XTQmxPMFFbKr/I="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"RykCzlEJjE/Bg/4AlHgDOI55IVY=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"qPDKrxM97+lA4XTQmxPMFFbKr/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0KPBdyOZbaOpErDyS+GYIgHdUr0="},{"type":"next-occurrence","id":"pDi9nsS2OXFqV2S6kqFm0rdPqqg="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"qPDKrxM97+lA4XTQmxPMFFbKr/I=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"pDi9nsS2OXFqV2S6kqFm0rdPqqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0KPBdyOZbaOpErDyS+GYIgHdUr0="},{"type":"next-occurrence","id":"DM8OHbrhiOrsiZk53K8Vz3mQOUE="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"pDi9nsS2OXFqV2S6kqFm0rdPqqg=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"DM8OHbrhiOrsiZk53K8Vz3mQOUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0KPBdyOZbaOpErDyS+GYIgHdUr0="}],"description":"Roadwork on NY 17 [Orange] eastbound between Exit 116 - NY 17K (Wallkill) and Exit 118 - Fair Oaks (Wallkill) D265594/32703109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:07:38Z"},"road_event_id":"DM8OHbrhiOrsiZk53K8Vz3mQOUE=","beginning_cross_street":"Exit 116 - NY 17K","ending_cross_street":"Exit 118 - Fair Oaks","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.425472,41.552026]]}},{"id":"71nvNcvtUMisv3HA17LzQeEynp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YqtJqCCaNzciW6pJlQpYeNpEpjc="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"71nvNcvtUMisv3HA17LzQeEynp4=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"YqtJqCCaNzciW6pJlQpYeNpEpjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"AoJjMkG6xPkFLenSd9LHZqgiGUU="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"YqtJqCCaNzciW6pJlQpYeNpEpjc=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"AoJjMkG6xPkFLenSd9LHZqgiGUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"HCLjC/7XKye+gVy603dMeAVeB5c="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"AoJjMkG6xPkFLenSd9LHZqgiGUU=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"HCLjC/7XKye+gVy603dMeAVeB5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"sf2YhwDBTLQalAyZ01JejgQuI0s="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"HCLjC/7XKye+gVy603dMeAVeB5c=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"sf2YhwDBTLQalAyZ01JejgQuI0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"cJrE+lRBLBUq2m3aPrXHKwQxjqw="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"sf2YhwDBTLQalAyZ01JejgQuI0s=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"cJrE+lRBLBUq2m3aPrXHKwQxjqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"F8mIzpNonA+TxrSFybfmdYMx8sI="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"cJrE+lRBLBUq2m3aPrXHKwQxjqw=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"F8mIzpNonA+TxrSFybfmdYMx8sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"Y2V0BY1NiN05PmrPmM/wYaSQMA4="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"F8mIzpNonA+TxrSFybfmdYMx8sI=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"Y2V0BY1NiN05PmrPmM/wYaSQMA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"l9u1kkNHRwEQ3b0d12JG3xssUWs="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"Y2V0BY1NiN05PmrPmM/wYaSQMA4=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"l9u1kkNHRwEQ3b0d12JG3xssUWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"kHS7yMHm9meXR+CBiwPSXTWiGr0="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"l9u1kkNHRwEQ3b0d12JG3xssUWs=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"kHS7yMHm9meXR+CBiwPSXTWiGr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"gCV6ZzDxbWsk1m82QeZpIQHR1kg="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"kHS7yMHm9meXR+CBiwPSXTWiGr0=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"gCV6ZzDxbWsk1m82QeZpIQHR1kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"BLxrirBF+YH4gMhHHg5o6dKQUCo="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"gCV6ZzDxbWsk1m82QeZpIQHR1kg=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"BLxrirBF+YH4gMhHHg5o6dKQUCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"9gAuPsrFNkAYfqqLa0WpfrYLu54="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"BLxrirBF+YH4gMhHHg5o6dKQUCo=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"9gAuPsrFNkAYfqqLa0WpfrYLu54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"EjL4RU7W/vno4Qw85d8IM/kBRKQ="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"9gAuPsrFNkAYfqqLa0WpfrYLu54=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"EjL4RU7W/vno4Qw85d8IM/kBRKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="},{"type":"next-occurrence","id":"O/gwslILzX4btPNkb5Q0jmePQ7s="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"EjL4RU7W/vno4Qw85d8IM/kBRKQ=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"O/gwslILzX4btPNkb5Q0jmePQ7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Court Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"71nvNcvtUMisv3HA17LzQeEynp4="}],"description":"Bridge work on Court Street both directions between Genant Drive (Syracuse) and Sunset Avenue (Syracuse) ; follow detour, Monday March 16th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-12T10:45:59Z"},"road_event_id":"O/gwslILzX4btPNkb5Q0jmePQ7s=","beginning_cross_street":"Genant Drive","ending_cross_street":"Sunset Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160457,43.064379]]}},{"id":"DoZ0Ay9GI5uYfUtjSOitczL3G34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/JRMWXfWccBnyNxamI9DPsYiwa4="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"DoZ0Ay9GI5uYfUtjSOitczL3G34=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"/JRMWXfWccBnyNxamI9DPsYiwa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoZ0Ay9GI5uYfUtjSOitczL3G34="},{"type":"next-occurrence","id":"NFDjUD0Sh7BdXVpCz46dOeK5xaU="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"/JRMWXfWccBnyNxamI9DPsYiwa4=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"NFDjUD0Sh7BdXVpCz46dOeK5xaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoZ0Ay9GI5uYfUtjSOitczL3G34="},{"type":"next-occurrence","id":"zRIQAUniF5bmEl00WrSMpQeJPi8="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"NFDjUD0Sh7BdXVpCz46dOeK5xaU=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"zRIQAUniF5bmEl00WrSMpQeJPi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoZ0Ay9GI5uYfUtjSOitczL3G34="},{"type":"next-occurrence","id":"Np7l9t3HtxfHkkh2Jujmv7Hk23E="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"zRIQAUniF5bmEl00WrSMpQeJPi8=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"Np7l9t3HtxfHkkh2Jujmv7Hk23E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoZ0Ay9GI5uYfUtjSOitczL3G34="},{"type":"next-occurrence","id":"OoLk81NxCfAUUhl5daRRCTb21jk="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"Np7l9t3HtxfHkkh2Jujmv7Hk23E=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"OoLk81NxCfAUUhl5daRRCTb21jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoZ0Ay9GI5uYfUtjSOitczL3G34="},{"type":"next-occurrence","id":"nbyvC+50bXJgbFbUPfgDWif0glk="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"OoLk81NxCfAUUhl5daRRCTb21jk=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"nbyvC+50bXJgbFbUPfgDWif0glk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoZ0Ay9GI5uYfUtjSOitczL3G34="},{"type":"next-occurrence","id":"YpHXwumOcoSbudnFbkezSt1TPf0="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"nbyvC+50bXJgbFbUPfgDWif0glk=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"YpHXwumOcoSbudnFbkezSt1TPf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DoZ0Ay9GI5uYfUtjSOitczL3G34="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/NIGHT/B5502190/32180009 - This work is weather permitting, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday/ Friday, 11:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-06T11:36:59Z"},"road_event_id":"YpHXwumOcoSbudnFbkezSt1TPf0=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812717,41.237455]]}},{"id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pmRBrd57dY8TOaH2/C/zgsH1a/s="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"pmRBrd57dY8TOaH2/C/zgsH1a/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"eqDgiLPzH1VbW/e4rSjpxGvLdIM="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"pmRBrd57dY8TOaH2/C/zgsH1a/s=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"eqDgiLPzH1VbW/e4rSjpxGvLdIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"lANf1QtiZJDxUougnDQEqlCiSRs="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"eqDgiLPzH1VbW/e4rSjpxGvLdIM=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:30:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"lANf1QtiZJDxUougnDQEqlCiSRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"K3tyKb37VtMy8b8/0zsvTYJ3MQo="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"lANf1QtiZJDxUougnDQEqlCiSRs=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:30:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"K3tyKb37VtMy8b8/0zsvTYJ3MQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"L+KgdnMdQImiYMQotyszZtq/fgk="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"K3tyKb37VtMy8b8/0zsvTYJ3MQo=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:30:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"L+KgdnMdQImiYMQotyszZtq/fgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"Vw/5VgSigPvnzs/UvUieisat/uI="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"L+KgdnMdQImiYMQotyszZtq/fgk=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:30:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"Vw/5VgSigPvnzs/UvUieisat/uI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"TBQTOXq+UrnkRY4DQspEjgVrJx8="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"Vw/5VgSigPvnzs/UvUieisat/uI=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:30:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"TBQTOXq+UrnkRY4DQspEjgVrJx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"7yf847GgRmX2MvtXMA88VHxw7hA="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"TBQTOXq+UrnkRY4DQspEjgVrJx8=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:30:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"7yf847GgRmX2MvtXMA88VHxw7hA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"PKTeh3RzFM8UIHQUi2x+lYZxKJE="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"7yf847GgRmX2MvtXMA88VHxw7hA=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:30:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"PKTeh3RzFM8UIHQUi2x+lYZxKJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="},{"type":"next-occurrence","id":"LZdIxPb2n+2FfVQ/vK6rjFuB/M0="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"PKTeh3RzFM8UIHQUi2x+lYZxKJE=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:30:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"LZdIxPb2n+2FfVQ/vK6rjFuB/M0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gth1YTkjI2s0/ZQ7ak5bpyUZCho="}],"description":"Road rehabilitation on NY 9D both directions between Fair Street (Philipstown) and Hartsook Lane (Fishkill) 202508113318/32414609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 16th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-31T11:28:33Z"},"road_event_id":"LZdIxPb2n+2FfVQ/vK6rjFuB/M0=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:30:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976484,41.442146]]}},{"id":"lw96OWicS8NIvQ7kjyEdps2QXYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gHO0gKt8/hp3M7XvHX8qMf/NsIw="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"lw96OWicS8NIvQ7kjyEdps2QXYU=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"gHO0gKt8/hp3M7XvHX8qMf/NsIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"ZjKIEl+94jIVOqCEPIpgEdZgvlg="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"gHO0gKt8/hp3M7XvHX8qMf/NsIw=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"ZjKIEl+94jIVOqCEPIpgEdZgvlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"KOT8M8ot4nBE/jBX+DW3o6ZYOrU="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"ZjKIEl+94jIVOqCEPIpgEdZgvlg=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"KOT8M8ot4nBE/jBX+DW3o6ZYOrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"OW7J3TnLyLliIfIGRLCtesmx8xg="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"KOT8M8ot4nBE/jBX+DW3o6ZYOrU=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"OW7J3TnLyLliIfIGRLCtesmx8xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"zmwQVTJVcrxurlDDUD8oBBy3tXo="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"OW7J3TnLyLliIfIGRLCtesmx8xg=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"zmwQVTJVcrxurlDDUD8oBBy3tXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"gsDD1Kzcc8SWewXg3hDuvkvEjMU="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"zmwQVTJVcrxurlDDUD8oBBy3tXo=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"gsDD1Kzcc8SWewXg3hDuvkvEjMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"xF0EzswJdGhJHQoQgIlMeB3umBk="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"gsDD1Kzcc8SWewXg3hDuvkvEjMU=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"xF0EzswJdGhJHQoQgIlMeB3umBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"iuZkWGsQlZnUKCcK5F5XaMWh5TQ="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"xF0EzswJdGhJHQoQgIlMeB3umBk=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"iuZkWGsQlZnUKCcK5F5XaMWh5TQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"XTKjwwDzR56lcm4Nq5yhYKiI6Pg="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"iuZkWGsQlZnUKCcK5F5XaMWh5TQ=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"XTKjwwDzR56lcm4Nq5yhYKiI6Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="},{"type":"next-occurrence","id":"E4SRtHIPeYeKjnj955ML5VIoZ5U="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"XTKjwwDzR56lcm4Nq5yhYKiI6Pg=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"E4SRtHIPeYeKjnj955ML5VIoZ5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lw96OWicS8NIvQ7kjyEdps2QXYU="}],"description":"Gas main work on NY 980P - South Street eastbound between Roosevelt Place (Newburgh) and Park Avenue (Newburgh) 2025082780465/32677509 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-21T14:53:33Z"},"road_event_id":"E4SRtHIPeYeKjnj955ML5VIoZ5U=","beginning_cross_street":"Roosevelt Place","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.024367,41.507772]]}},{"id":"5RaACDBqhSgnX9ZqvvfJdV/cp04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OvntJ2ZL2axIcNJLLQtOh2B+GQI="}],"description":"Utility work on NY 36 both directions between Village Plaza (North Dansville) and Flats Rd (West Sparta) Alternating lane closures with flaggers as needed, Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:01:29Z"},"road_event_id":"5RaACDBqhSgnX9ZqvvfJdV/cp04=","beginning_cross_street":"Village Plaza","ending_cross_street":"Flats Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.70952,42.563307]]}},{"id":"OvntJ2ZL2axIcNJLLQtOh2B+GQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5RaACDBqhSgnX9ZqvvfJdV/cp04="},{"type":"next-occurrence","id":"cf0mJaL/xBpgKKQBXgm21PRH/0o="}],"description":"Utility work on NY 36 both directions between Village Plaza (North Dansville) and Flats Rd (West Sparta) Alternating lane closures with flaggers as needed, Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:01:29Z"},"road_event_id":"OvntJ2ZL2axIcNJLLQtOh2B+GQI=","beginning_cross_street":"Village Plaza","ending_cross_street":"Flats Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.70952,42.563307]]}},{"id":"cf0mJaL/xBpgKKQBXgm21PRH/0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5RaACDBqhSgnX9ZqvvfJdV/cp04="}],"description":"Utility work on NY 36 both directions between Village Plaza (North Dansville) and Flats Rd (West Sparta) Alternating lane closures with flaggers as needed, Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:01:29Z"},"road_event_id":"cf0mJaL/xBpgKKQBXgm21PRH/0o=","beginning_cross_street":"Village Plaza","ending_cross_street":"Flats Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.70952,42.563307]]}},{"id":"idfgDrzY8pjQiUk3xEig9GGA700=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0PfAwN2EbAgInun68Xu1dawtN2E="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"idfgDrzY8pjQiUk3xEig9GGA700=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"0PfAwN2EbAgInun68Xu1dawtN2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idfgDrzY8pjQiUk3xEig9GGA700="},{"type":"next-occurrence","id":"TUehrmdm0XKkYzopz4N+KlGuKys="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"0PfAwN2EbAgInun68Xu1dawtN2E=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"TUehrmdm0XKkYzopz4N+KlGuKys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idfgDrzY8pjQiUk3xEig9GGA700="},{"type":"next-occurrence","id":"gIacjUtHO79qVimew+TzGj9+uwU="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"TUehrmdm0XKkYzopz4N+KlGuKys=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"gIacjUtHO79qVimew+TzGj9+uwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idfgDrzY8pjQiUk3xEig9GGA700="},{"type":"next-occurrence","id":"KVAGOD5ZF7TuD15jvDKeaDGIpZ8="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"gIacjUtHO79qVimew+TzGj9+uwU=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"KVAGOD5ZF7TuD15jvDKeaDGIpZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idfgDrzY8pjQiUk3xEig9GGA700="},{"type":"next-occurrence","id":"5CpdOo8MTIOnpHWkyDgkooDz5RE="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"KVAGOD5ZF7TuD15jvDKeaDGIpZ8=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"5CpdOo8MTIOnpHWkyDgkooDz5RE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idfgDrzY8pjQiUk3xEig9GGA700="},{"type":"next-occurrence","id":"ZClHpJnx7xuiZZgwsduKhBFKAW8="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"5CpdOo8MTIOnpHWkyDgkooDz5RE=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"ZClHpJnx7xuiZZgwsduKhBFKAW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idfgDrzY8pjQiUk3xEig9GGA700="},{"type":"next-occurrence","id":"Wd35PC1n+t8DbGKipfr3Aa1xorI="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"ZClHpJnx7xuiZZgwsduKhBFKAW8=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"Wd35PC1n+t8DbGKipfr3Aa1xorI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idfgDrzY8pjQiUk3xEig9GGA700="}],"description":"Road rehabilitation on NY 100B eastbound between Downing Drive W (Greenburgh) and Terrace Street (Greenburgh) 8762.562/32563709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:30:58Z"},"road_event_id":"Wd35PC1n+t8DbGKipfr3Aa1xorI=","beginning_cross_street":"Downing Drive W","ending_cross_street":"Terrace Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802403,41.040272]]}},{"id":"N7GGrhHAQRBSr3dyp1fvJLa3rEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R6ptLn9RvXmJyCxQhl+0Hhp7F34="}],"description":"Construction on Bronx River Parkway both directions between Bronx River Avenue (New York) and Exit 7E - US 1; Boston Road (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-17T17:19:46Z"},"road_event_id":"N7GGrhHAQRBSr3dyp1fvJLa3rEI=","beginning_cross_street":"Bronx River Avenue","ending_cross_street":"Exit 7E - US 1; Boston Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873739,40.836095]]}},{"id":"R6ptLn9RvXmJyCxQhl+0Hhp7F34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N7GGrhHAQRBSr3dyp1fvJLa3rEI="},{"type":"next-occurrence","id":"CpHrtGEiDua748O+GWuciOMuF/c="}],"description":"Construction on Bronx River Parkway both directions between Bronx River Avenue (New York) and Exit 7E - US 1; Boston Road (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-17T17:19:46Z"},"road_event_id":"R6ptLn9RvXmJyCxQhl+0Hhp7F34=","beginning_cross_street":"Bronx River Avenue","ending_cross_street":"Exit 7E - US 1; Boston Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873739,40.836095]]}},{"id":"CpHrtGEiDua748O+GWuciOMuF/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"N7GGrhHAQRBSr3dyp1fvJLa3rEI="}],"description":"Construction on Bronx River Parkway both directions between Bronx River Avenue (New York) and Exit 7E - US 1; Boston Road (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-17T17:19:46Z"},"road_event_id":"CpHrtGEiDua748O+GWuciOMuF/c=","beginning_cross_street":"Bronx River Avenue","ending_cross_street":"Exit 7E - US 1; Boston Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.873739,40.836095]]}},{"id":"DFSyTIz3zswkXarES5KG2y+T858=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ccbjaDDEljlu/FirD3483CCjbps="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:45:59Z"},"road_event_id":"DFSyTIz3zswkXarES5KG2y+T858=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82395,40.712755]]}},{"id":"ccbjaDDEljlu/FirD3483CCjbps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DFSyTIz3zswkXarES5KG2y+T858="},{"type":"next-occurrence","id":"UQFwHg9KilJH2+XLTfqNmTK5J3I="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:45:59Z"},"road_event_id":"ccbjaDDEljlu/FirD3483CCjbps=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82395,40.712755]]}},{"id":"UQFwHg9KilJH2+XLTfqNmTK5J3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DFSyTIz3zswkXarES5KG2y+T858="}],"description":"Construction on I-678 southbound from Hoover Avenue (New York) to Hillside Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:45:59Z"},"road_event_id":"UQFwHg9KilJH2+XLTfqNmTK5J3I=","beginning_cross_street":"Hoover Avenue","ending_cross_street":"Hillside Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82395,40.712755]]}},{"id":"napuoonYNWwOCsCFgOlcoVmMt2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I3q/QPGoKXq3RSHoLV1hmtHo0ew="}],"description":"Construction on I-678 northbound from Foch Boulevard; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:39:49Z"},"road_event_id":"napuoonYNWwOCsCFgOlcoVmMt2s=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803213,40.67781]]}},{"id":"I3q/QPGoKXq3RSHoLV1hmtHo0ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"napuoonYNWwOCsCFgOlcoVmMt2s="},{"type":"next-occurrence","id":"ZotL5mVaSAUURP1psvnO9k5PQts="}],"description":"Construction on I-678 northbound from Foch Boulevard; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:39:49Z"},"road_event_id":"I3q/QPGoKXq3RSHoLV1hmtHo0ew=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803213,40.67781]]}},{"id":"ZotL5mVaSAUURP1psvnO9k5PQts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"napuoonYNWwOCsCFgOlcoVmMt2s="}],"description":"Construction on I-678 northbound from Foch Boulevard; Ramp (New York) to Exit 5 - 101st Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:39:49Z"},"road_event_id":"ZotL5mVaSAUURP1psvnO9k5PQts=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Exit 5 - 101st Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803213,40.67781]]}},{"id":"ORC300521385","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","description":"Construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee) to Palisades Interstate Parkway (Fort Lee) Not currently Scheduled","update_date":"2026-03-22T12:00:01Z"},"road_event_id":"ORC300521385","beginning_cross_street":"Palisades Interstate Parkway","ending_cross_street":"Palisades Interstate Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-08T22:41:00Z","end_date":"2026-03-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.962982,40.854543]]}},{"id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RndGLEVfGW94AUuBRDniAnNnYmM="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"RndGLEVfGW94AUuBRDniAnNnYmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"tisNfOfzZn/p7kdGtFiG1+7vR+E="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"RndGLEVfGW94AUuBRDniAnNnYmM=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"tisNfOfzZn/p7kdGtFiG1+7vR+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"Jc+jFKlVmVGwnAU+QDTnOAmY3rk="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"tisNfOfzZn/p7kdGtFiG1+7vR+E=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"Jc+jFKlVmVGwnAU+QDTnOAmY3rk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"bARanEbHYLhIPPCKYpNMGC3JnmE="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"Jc+jFKlVmVGwnAU+QDTnOAmY3rk=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"bARanEbHYLhIPPCKYpNMGC3JnmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"qUbXc9KYok3rT0kgcNAR2h5N+eU="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"bARanEbHYLhIPPCKYpNMGC3JnmE=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"qUbXc9KYok3rT0kgcNAR2h5N+eU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"N5v2fwGcuu5IuQxMnhjH7Iq59vo="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"qUbXc9KYok3rT0kgcNAR2h5N+eU=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"N5v2fwGcuu5IuQxMnhjH7Iq59vo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"wBpq+NqsR/WFtyQYyGmil1BdpNU="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"N5v2fwGcuu5IuQxMnhjH7Iq59vo=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"wBpq+NqsR/WFtyQYyGmil1BdpNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"P/01Rfqs8LE1IROR2IbeOvwbpLM="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"wBpq+NqsR/WFtyQYyGmil1BdpNU=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"P/01Rfqs8LE1IROR2IbeOvwbpLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"iFeX8jcDyCkunEsRLUl5+nvaiB4="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"P/01Rfqs8LE1IROR2IbeOvwbpLM=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"iFeX8jcDyCkunEsRLUl5+nvaiB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="},{"type":"next-occurrence","id":"oyDUOe/tbef/yJcUbt6gApiMEao="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"iFeX8jcDyCkunEsRLUl5+nvaiB4=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"oyDUOe/tbef/yJcUbt6gApiMEao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vMPJQtfnmCh5gvQP5nlikdy7ukQ="}],"description":"Bridge replacement on US 219 both directions Town of Great Valley; City of Salamanca Line (Great Valley), Monday March 9th, 2026 thru Friday November 6th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-09T18:01:42Z"},"road_event_id":"oyDUOe/tbef/yJcUbt6gApiMEao=","beginning_cross_street":"Town of Great Valley; City of Salamanca Line","ending_cross_street":"Town of Great Valley; City of Salamanca Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.692725,42.169952]]}},{"id":"itWsWhOqAKp/Tu1MZapiSmSohac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HlIRSV9t6jM/R2BB2Xx6PwyUbZQ="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"itWsWhOqAKp/Tu1MZapiSmSohac=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"HlIRSV9t6jM/R2BB2Xx6PwyUbZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"60kiXKVyiGkxUZW218KfIl2xNh0="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"HlIRSV9t6jM/R2BB2Xx6PwyUbZQ=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"60kiXKVyiGkxUZW218KfIl2xNh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"iP5KgowGF7VAeXAE0eRfrgmOcjU="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"60kiXKVyiGkxUZW218KfIl2xNh0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"iP5KgowGF7VAeXAE0eRfrgmOcjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"tKITaVvn5Dr2BZMjE8SSeZQnw6Q="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"iP5KgowGF7VAeXAE0eRfrgmOcjU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"tKITaVvn5Dr2BZMjE8SSeZQnw6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"L2NPeIvnxKuhbCNJGliTct3nMok="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"tKITaVvn5Dr2BZMjE8SSeZQnw6Q=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"L2NPeIvnxKuhbCNJGliTct3nMok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"8KRlDfoqO+WIeGTD//Zqvp8OFdA="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"L2NPeIvnxKuhbCNJGliTct3nMok=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"8KRlDfoqO+WIeGTD//Zqvp8OFdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"8yEBiyYkm4flaofqoZLQlKxHYWE="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"8KRlDfoqO+WIeGTD//Zqvp8OFdA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"8yEBiyYkm4flaofqoZLQlKxHYWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"W1khiffXiNK0hnWhmB5p4e5VAqI="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"8yEBiyYkm4flaofqoZLQlKxHYWE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"W1khiffXiNK0hnWhmB5p4e5VAqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"W96XEX86OnBQTEdS5zhpP+sc70U="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"W1khiffXiNK0hnWhmB5p4e5VAqI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"W96XEX86OnBQTEdS5zhpP+sc70U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"9dsNiIDjMrG9Wp7sBo8zXMn3gpw="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"W96XEX86OnBQTEdS5zhpP+sc70U=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"9dsNiIDjMrG9Wp7sBo8zXMn3gpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"ujwIg9djSm/4WQZ3FGY5EGrkoD0="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"9dsNiIDjMrG9Wp7sBo8zXMn3gpw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"ujwIg9djSm/4WQZ3FGY5EGrkoD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"rL8DSqrSgJYc2ktBk74mF4Ws+w8="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"ujwIg9djSm/4WQZ3FGY5EGrkoD0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"rL8DSqrSgJYc2ktBk74mF4Ws+w8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"JB6LKc3BmOqx8/ZJMxUokpFkfyg="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"rL8DSqrSgJYc2ktBk74mF4Ws+w8=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"JB6LKc3BmOqx8/ZJMxUokpFkfyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="},{"type":"next-occurrence","id":"IUjgC4zl3YCRN1XoHLnnU3KNlls="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"JB6LKc3BmOqx8/ZJMxUokpFkfyg=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"IUjgC4zl3YCRN1XoHLnnU3KNlls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"itWsWhOqAKp/Tu1MZapiSmSohac="}],"description":"Roadwork on i86 eastbound (Elmira) 2 lanes reduced to 1, Monday March 16th, 2026 thru Monday June 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-09T21:18:20Z"},"road_event_id":"IUjgC4zl3YCRN1XoHLnnU3KNlls=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.795429,42.107531]]}},{"id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zWLCdhhMrvERs7vqvbpXkVtMRTo="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"zWLCdhhMrvERs7vqvbpXkVtMRTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"i5asJoGGM2Xg/YdT9CFLHB/1fqk="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"zWLCdhhMrvERs7vqvbpXkVtMRTo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"i5asJoGGM2Xg/YdT9CFLHB/1fqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"ykzBKClRrbjHB6/IY3bl0axHHaM="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"i5asJoGGM2Xg/YdT9CFLHB/1fqk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"ykzBKClRrbjHB6/IY3bl0axHHaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"jAaK0AejH/8TplWN37cbCyr8kBs="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"ykzBKClRrbjHB6/IY3bl0axHHaM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"jAaK0AejH/8TplWN37cbCyr8kBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"DxpE6VrhngqmP0OSTnuIX0pzhjI="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"jAaK0AejH/8TplWN37cbCyr8kBs=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"DxpE6VrhngqmP0OSTnuIX0pzhjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"dj980t3mthcbdBN4/yVJ0o+1+AU="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"DxpE6VrhngqmP0OSTnuIX0pzhjI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"dj980t3mthcbdBN4/yVJ0o+1+AU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"IX1mdBWuXJYtp230KcwC68uVRO4="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"dj980t3mthcbdBN4/yVJ0o+1+AU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"IX1mdBWuXJYtp230KcwC68uVRO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"RcgS/Bem1UkmkHqkxTvPsR9ATB8="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"IX1mdBWuXJYtp230KcwC68uVRO4=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"RcgS/Bem1UkmkHqkxTvPsR9ATB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"z7s7WQanz10SyiVijG/8qbe2hZw="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"RcgS/Bem1UkmkHqkxTvPsR9ATB8=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"z7s7WQanz10SyiVijG/8qbe2hZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"mD40tTiuXi4oKZVOQT8bIdZsbqo="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"z7s7WQanz10SyiVijG/8qbe2hZw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"mD40tTiuXi4oKZVOQT8bIdZsbqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"67mAxMNOD1wQZuBGAtuCetTHXXc="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"mD40tTiuXi4oKZVOQT8bIdZsbqo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"67mAxMNOD1wQZuBGAtuCetTHXXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"UkRSXrNzzb0w3gXAOrq9Zd4fZaw="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"67mAxMNOD1wQZuBGAtuCetTHXXc=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"UkRSXrNzzb0w3gXAOrq9Zd4fZaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"uLX8BGVp3cWe/H2k4u2tX8WpmZI="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"UkRSXrNzzb0w3gXAOrq9Zd4fZaw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"uLX8BGVp3cWe/H2k4u2tX8WpmZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="},{"type":"next-occurrence","id":"qK6HIaCF1AhsUALLOpHDS8Do+HM="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"uLX8BGVp3cWe/H2k4u2tX8WpmZI=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"qK6HIaCF1AhsUALLOpHDS8Do+HM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["i86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqeAgBn9Oz7LA+FGZKe7JRXZb+A="}],"description":"Bridge rehabilitation and deck work on i86 eastbound (Chemung) 2 lane reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-10T19:40:46Z"},"road_event_id":"qK6HIaCF1AhsUALLOpHDS8Do+HM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.599798,42.000803]]}},{"id":"7h3XYz2v/9BDewAaW+SRX4XIYXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KzpXrwTekMptmC89tBX2Ldhl71U="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"7h3XYz2v/9BDewAaW+SRX4XIYXo=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"KzpXrwTekMptmC89tBX2Ldhl71U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"V1+0gT2QMSrjC9jgn8dM7ID/RHE="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"KzpXrwTekMptmC89tBX2Ldhl71U=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"V1+0gT2QMSrjC9jgn8dM7ID/RHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"BGxO8AvwWbpaQEN+Z50FUq0vL/Q="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"V1+0gT2QMSrjC9jgn8dM7ID/RHE=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"BGxO8AvwWbpaQEN+Z50FUq0vL/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"bbgRqO/tZVejivxhnXTS4TD6C7M="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"BGxO8AvwWbpaQEN+Z50FUq0vL/Q=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"bbgRqO/tZVejivxhnXTS4TD6C7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"Oq7Wysk9WxYF/c07OlMwF/hs3+Y="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"bbgRqO/tZVejivxhnXTS4TD6C7M=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"Oq7Wysk9WxYF/c07OlMwF/hs3+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"C1MB+jWgS3dcL2bnlVJnwGFDFec="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"Oq7Wysk9WxYF/c07OlMwF/hs3+Y=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"C1MB+jWgS3dcL2bnlVJnwGFDFec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"AHYVLpi5oOnJfdZk8ZVS4cHQtY0="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"C1MB+jWgS3dcL2bnlVJnwGFDFec=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"AHYVLpi5oOnJfdZk8ZVS4cHQtY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"uPbsX70Yai9DSwZHiOQyLbh6Suo="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"AHYVLpi5oOnJfdZk8ZVS4cHQtY0=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"uPbsX70Yai9DSwZHiOQyLbh6Suo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"8xRwn7riWSpe7bylxTbN0A1OHK0="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"uPbsX70Yai9DSwZHiOQyLbh6Suo=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"8xRwn7riWSpe7bylxTbN0A1OHK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="},{"type":"next-occurrence","id":"gYOlWQMHzv4eooIkSLjQBtnJIlw="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"8xRwn7riWSpe7bylxTbN0A1OHK0=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"gYOlWQMHzv4eooIkSLjQBtnJIlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7h3XYz2v/9BDewAaW+SRX4XIYXo="}],"description":"Tree trimming on Taconic State Parkway northbound between Exit 25 - Peekskill Hollow Rd. (Putnam Valley) and Exit 37B - I-84 (East Fishkill) D265550/32706109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-10T10:51:52Z"},"road_event_id":"gYOlWQMHzv4eooIkSLjQBtnJIlw=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd.","ending_cross_street":"Exit 37B - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786118,41.41129]]}},{"id":"3t2O04pOp7KR1USTQbpxbaWQt9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"02gSPKn510O/nm7KGla2SpYT3YQ="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"3t2O04pOp7KR1USTQbpxbaWQt9g=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"02gSPKn510O/nm7KGla2SpYT3YQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"qZyK7tC24eKH1KHCXCbB8FSjYIg="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"02gSPKn510O/nm7KGla2SpYT3YQ=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"qZyK7tC24eKH1KHCXCbB8FSjYIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"bkjfNO5hHTZDWklhvItXtZqcnkQ="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"qZyK7tC24eKH1KHCXCbB8FSjYIg=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"bkjfNO5hHTZDWklhvItXtZqcnkQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"LrsHSyUFvyfMpwP2miMFQqSFz3A="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"bkjfNO5hHTZDWklhvItXtZqcnkQ=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"LrsHSyUFvyfMpwP2miMFQqSFz3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"6Erpph4yDTAcPDrBkqoavgyKQeI="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"LrsHSyUFvyfMpwP2miMFQqSFz3A=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"6Erpph4yDTAcPDrBkqoavgyKQeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"zCDTb8DHKURXtAzMtNXv5H4tcUQ="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"6Erpph4yDTAcPDrBkqoavgyKQeI=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"zCDTb8DHKURXtAzMtNXv5H4tcUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"5WLmwMXxiQhSwhFuf66nRa28cAU="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"zCDTb8DHKURXtAzMtNXv5H4tcUQ=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"5WLmwMXxiQhSwhFuf66nRa28cAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"+Scx/+TBq9zpxfXBzvFapECsdMA="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"5WLmwMXxiQhSwhFuf66nRa28cAU=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T14:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"+Scx/+TBq9zpxfXBzvFapECsdMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"4OympoerbYhHbHFS77hfiOONnJE="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"+Scx/+TBq9zpxfXBzvFapECsdMA=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T14:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"4OympoerbYhHbHFS77hfiOONnJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="},{"type":"next-occurrence","id":"XQSZ6eYYhTa2UtajxOFmdVUmT+0="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"4OympoerbYhHbHFS77hfiOONnJE=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T14:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"XQSZ6eYYhTa2UtajxOFmdVUmT+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3t2O04pOp7KR1USTQbpxbaWQt9g="}],"description":"Tree trimming on Taconic State Parkway southbound between Exit 37B - I-84 (East Fishkill) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D265550/32706209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Tuesday May 26th, 2026 thru Friday May 29th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-07T14:42:50Z"},"road_event_id":"XQSZ6eYYhTa2UtajxOFmdVUmT+0=","beginning_cross_street":"Exit 37B - I-84","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T14:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772603,41.533149]]}},{"id":"s4HKJPmvko1tyqG8E3sdOKwpunk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"C+55K+ezMnk/mqR2MmXrDNITY4Q="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"s4HKJPmvko1tyqG8E3sdOKwpunk=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"C+55K+ezMnk/mqR2MmXrDNITY4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s4HKJPmvko1tyqG8E3sdOKwpunk="},{"type":"next-occurrence","id":"zkas862tD9hV3ZKU5z6Uggp7jnw="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"C+55K+ezMnk/mqR2MmXrDNITY4Q=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"zkas862tD9hV3ZKU5z6Uggp7jnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s4HKJPmvko1tyqG8E3sdOKwpunk="},{"type":"next-occurrence","id":"/dC+TtNP/i50or5ReScDQfBqZ7A="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"zkas862tD9hV3ZKU5z6Uggp7jnw=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"/dC+TtNP/i50or5ReScDQfBqZ7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s4HKJPmvko1tyqG8E3sdOKwpunk="},{"type":"next-occurrence","id":"M+P/KFOuKAa+BpS1UK54IUyr/hA="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"/dC+TtNP/i50or5ReScDQfBqZ7A=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"M+P/KFOuKAa+BpS1UK54IUyr/hA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s4HKJPmvko1tyqG8E3sdOKwpunk="},{"type":"next-occurrence","id":"qKYgyDbZp+Q7+dOm8Tq9C99KabU="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"M+P/KFOuKAa+BpS1UK54IUyr/hA=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"qKYgyDbZp+Q7+dOm8Tq9C99KabU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s4HKJPmvko1tyqG8E3sdOKwpunk="},{"type":"next-occurrence","id":"L7+BNR217E93zgfHSWb/uguRLHs="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"qKYgyDbZp+Q7+dOm8Tq9C99KabU=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"L7+BNR217E93zgfHSWb/uguRLHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s4HKJPmvko1tyqG8E3sdOKwpunk="},{"type":"next-occurrence","id":"K021wstxeJCF4rFauA4lNgD/y04="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"L7+BNR217E93zgfHSWb/uguRLHs=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"K021wstxeJCF4rFauA4lNgD/y04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s4HKJPmvko1tyqG8E3sdOKwpunk="}],"description":"Bridge maintenance operations on NY 17 [Orange] eastbound between Exit 122A - Fletcher Street (Goshen) and Exit 124 - NY 17A (Goshen) D265186/B1003160/32610709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, various lane closures","update_date":"2026-04-21T11:23:38Z"},"road_event_id":"K021wstxeJCF4rFauA4lNgD/y04=","beginning_cross_street":"","ending_cross_street":"Exit 124 - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334426,41.394253]]}},{"id":"cFohBRmWd5K+kiMSapS8v6Fd+lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WEQxlg0vQyrtx4W8Kxf+ybIlHfM="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York), Tuesday March 10th, 2026 thru Tuesday June 2nd, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:53:18Z"},"road_event_id":"cFohBRmWd5K+kiMSapS8v6Fd+lo=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965224,40.714302]]}},{"id":"WEQxlg0vQyrtx4W8Kxf+ybIlHfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S 2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cFohBRmWd5K+kiMSapS8v6Fd+lo="}],"description":"Construction on S 2ND ST westbound between WYTHE AVE (New York) and KENT AVE (New York), Tuesday March 10th, 2026 thru Tuesday June 2nd, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:53:18Z"},"road_event_id":"WEQxlg0vQyrtx4W8Kxf+ybIlHfM=","beginning_cross_street":"WYTHE AVE","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965224,40.714302]]}},{"id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lzUDe+MY+jyzLW03uJE1fXHZXgQ="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"lzUDe+MY+jyzLW03uJE1fXHZXgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"PXp0KWmqTa96xsjthcQsdD5lr5s="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"lzUDe+MY+jyzLW03uJE1fXHZXgQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"PXp0KWmqTa96xsjthcQsdD5lr5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"fmmdUMYHHqJiWDkTKHO9hbgA+54="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"PXp0KWmqTa96xsjthcQsdD5lr5s=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"fmmdUMYHHqJiWDkTKHO9hbgA+54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"+jUILUtxJv00jn0qpzB9iJr0Sfo="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"fmmdUMYHHqJiWDkTKHO9hbgA+54=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"+jUILUtxJv00jn0qpzB9iJr0Sfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"vNZyZ1ifCyNhX/cH2nwKL+Vqi5E="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"+jUILUtxJv00jn0qpzB9iJr0Sfo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"vNZyZ1ifCyNhX/cH2nwKL+Vqi5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"xOjQaDSjt/Pn/5W+26vDNs3ImgE="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"vNZyZ1ifCyNhX/cH2nwKL+Vqi5E=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"xOjQaDSjt/Pn/5W+26vDNs3ImgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"ePlKOVt400iHaOEmbv5uSedJe0Y="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"xOjQaDSjt/Pn/5W+26vDNs3ImgE=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"ePlKOVt400iHaOEmbv5uSedJe0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"MbkOs92kKd6ibjXwyIMA2HVsEX8="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"ePlKOVt400iHaOEmbv5uSedJe0Y=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"MbkOs92kKd6ibjXwyIMA2HVsEX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"JzeMVLA6qLr65E/rlXltsixK67Q="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"MbkOs92kKd6ibjXwyIMA2HVsEX8=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"JzeMVLA6qLr65E/rlXltsixK67Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="},{"type":"next-occurrence","id":"AVJftw6gfX1liomQezAWPIKSFSQ="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"JzeMVLA6qLr65E/rlXltsixK67Q=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"AVJftw6gfX1liomQezAWPIKSFSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PALMETTO ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Xi/t4WhJA62QPUKNTv2qV0v9e8="}],"description":"Construction on PALMETTO ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T17:59:18Z"},"road_event_id":"AVJftw6gfX1liomQezAWPIKSFSQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921298,40.689091]]}},{"id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HOT3P8dTjcHwPhMxGdf9Aaf9PoU="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"HOT3P8dTjcHwPhMxGdf9Aaf9PoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"WEwohWEMKx9uMNDRLl7TOTav/ao="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"HOT3P8dTjcHwPhMxGdf9Aaf9PoU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"WEwohWEMKx9uMNDRLl7TOTav/ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"cdWID2Vk8biaBYJiTeiGB5OkhIs="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"WEwohWEMKx9uMNDRLl7TOTav/ao=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"cdWID2Vk8biaBYJiTeiGB5OkhIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"gCi/Mu3Kdh/3r3RRJRbV+T2W1Zw="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"cdWID2Vk8biaBYJiTeiGB5OkhIs=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"gCi/Mu3Kdh/3r3RRJRbV+T2W1Zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"WBQm+o2ZE19AfN0E3FwLxXY0oMM="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"gCi/Mu3Kdh/3r3RRJRbV+T2W1Zw=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"WBQm+o2ZE19AfN0E3FwLxXY0oMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"1kt2S4ZMWvBblWESC6ZqqvSMyJ0="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"WBQm+o2ZE19AfN0E3FwLxXY0oMM=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"1kt2S4ZMWvBblWESC6ZqqvSMyJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"Vehhr5r+iY52sMXRc9egs3fjh/Y="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"1kt2S4ZMWvBblWESC6ZqqvSMyJ0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"Vehhr5r+iY52sMXRc9egs3fjh/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"sScT1LMlWeKdAOH+KNblzmGVEZ4="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"Vehhr5r+iY52sMXRc9egs3fjh/Y=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"sScT1LMlWeKdAOH+KNblzmGVEZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"DaIifFyIruVmejf1PDyyzPn+cdU="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"sScT1LMlWeKdAOH+KNblzmGVEZ4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"DaIifFyIruVmejf1PDyyzPn+cdU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="},{"type":"next-occurrence","id":"fSw4Ef3pJ6Nq/Gnpsqone5NonSI="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"DaIifFyIruVmejf1PDyyzPn+cdU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"fSw4Ef3pJ6Nq/Gnpsqone5NonSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q+O/rv5d9Af/lBwqlaIDuc8mZxI="}],"description":"Construction on PUTNAM AVE southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:02:13Z"},"road_event_id":"fSw4Ef3pJ6Nq/Gnpsqone5NonSI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917687,40.689201]]}},{"id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yWGS8V866CHkJnEAKDegGHe1P/E="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"yWGS8V866CHkJnEAKDegGHe1P/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"jZTaITlbaME5cZnnknJ9OajUdBc="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"yWGS8V866CHkJnEAKDegGHe1P/E=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"jZTaITlbaME5cZnnknJ9OajUdBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"/vT5QFd534MptZcPEc2M3+QsWbE="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"jZTaITlbaME5cZnnknJ9OajUdBc=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"/vT5QFd534MptZcPEc2M3+QsWbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"L8i2JLvSfsaTAEWLRmXtsmE9hyI="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"/vT5QFd534MptZcPEc2M3+QsWbE=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"L8i2JLvSfsaTAEWLRmXtsmE9hyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"wpOioX7cih8aeuqGPmHi/Z+I5xc="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"L8i2JLvSfsaTAEWLRmXtsmE9hyI=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"wpOioX7cih8aeuqGPmHi/Z+I5xc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"fVeSta3njCvRITwiqX/mx3Wn4D0="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"wpOioX7cih8aeuqGPmHi/Z+I5xc=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"fVeSta3njCvRITwiqX/mx3Wn4D0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"0c+hj+M149lnGK3psUoZdPBDFls="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"fVeSta3njCvRITwiqX/mx3Wn4D0=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"0c+hj+M149lnGK3psUoZdPBDFls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"/W2GIEdMccr5KNWevI8nSttcEDY="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"0c+hj+M149lnGK3psUoZdPBDFls=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"/W2GIEdMccr5KNWevI8nSttcEDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"2aBeq4Mw11L+WORTW4lgAkPc2zs="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"/W2GIEdMccr5KNWevI8nSttcEDY=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"2aBeq4Mw11L+WORTW4lgAkPc2zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="},{"type":"next-occurrence","id":"t1gfSHHIFdz/K9l/cCXrJIPqw4g="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"2aBeq4Mw11L+WORTW4lgAkPc2zs=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"t1gfSHHIFdz/K9l/cCXrJIPqw4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+9SCfK3TKBKgpQLbcLxEQuN7j8U="}],"description":"Construction on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York) for concrete pumping and steel erection work., Tuesday March 10th, 2026 thru Monday June 1st, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T16:46:50Z"},"road_event_id":"t1gfSHHIFdz/K9l/cCXrJIPqw4g=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008336,40.734804]]}},{"id":"yLdmC9Jjm5uVEAHisnegtfjKV/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"25UwfDHzkf8Tw06xA9tyzYw2CLk="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"yLdmC9Jjm5uVEAHisnegtfjKV/M=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"25UwfDHzkf8Tw06xA9tyzYw2CLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"peKmpMnYyWRGLmtW2A348JHNRLs="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"25UwfDHzkf8Tw06xA9tyzYw2CLk=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"peKmpMnYyWRGLmtW2A348JHNRLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"UjTkXszsVVSud0AC1PvTqJudu9c="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"peKmpMnYyWRGLmtW2A348JHNRLs=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"UjTkXszsVVSud0AC1PvTqJudu9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"2eQD7uk8axn3U5k0qcC8FobU4Jo="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"UjTkXszsVVSud0AC1PvTqJudu9c=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"2eQD7uk8axn3U5k0qcC8FobU4Jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"jGhHJ2UMh0Su8zCpp1GWyDROfTE="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"2eQD7uk8axn3U5k0qcC8FobU4Jo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"jGhHJ2UMh0Su8zCpp1GWyDROfTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"AqLulke7+BQ/iUV7H68xh9JI4XU="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"jGhHJ2UMh0Su8zCpp1GWyDROfTE=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"AqLulke7+BQ/iUV7H68xh9JI4XU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"8PvkjoaA7ze4DH8tKJc1Y1n3Nzo="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"AqLulke7+BQ/iUV7H68xh9JI4XU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"8PvkjoaA7ze4DH8tKJc1Y1n3Nzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"CoWeW9A8WJ52O+7ykXflbraimio="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"8PvkjoaA7ze4DH8tKJc1Y1n3Nzo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"CoWeW9A8WJ52O+7ykXflbraimio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"vdaUFDUMJqzmPT0KEtBfihkvqbs="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"CoWeW9A8WJ52O+7ykXflbraimio=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"vdaUFDUMJqzmPT0KEtBfihkvqbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="},{"type":"next-occurrence","id":"/4XMA5LTzxAK6u8BVk1viBMQvP0="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"vdaUFDUMJqzmPT0KEtBfihkvqbs=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"/4XMA5LTzxAK6u8BVk1viBMQvP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MADISON ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yLdmC9Jjm5uVEAHisnegtfjKV/M="}],"description":"Construction on MADISON ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:03:50Z"},"road_event_id":"/4XMA5LTzxAK6u8BVk1viBMQvP0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919774,40.688285]]}},{"id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ECF1aFjvSCamCSa9YeK5PxPOEqs="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"ECF1aFjvSCamCSa9YeK5PxPOEqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"YLuTMYbow/4jXBWcmPRFAmhmotQ="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"ECF1aFjvSCamCSa9YeK5PxPOEqs=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"YLuTMYbow/4jXBWcmPRFAmhmotQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"vUFdtMG2l2MpIvt1vFKQ4drRS5g="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"YLuTMYbow/4jXBWcmPRFAmhmotQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"vUFdtMG2l2MpIvt1vFKQ4drRS5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"GNoAGdKWmq0UOr2qTCwLFAfS/I4="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"vUFdtMG2l2MpIvt1vFKQ4drRS5g=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"GNoAGdKWmq0UOr2qTCwLFAfS/I4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"b3eb9l/Onr7mrsBSvIZQuNRn7A0="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"GNoAGdKWmq0UOr2qTCwLFAfS/I4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T10:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"b3eb9l/Onr7mrsBSvIZQuNRn7A0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"nEz4jNcbb86CqFtLgRXD2viQcAI="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"b3eb9l/Onr7mrsBSvIZQuNRn7A0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"nEz4jNcbb86CqFtLgRXD2viQcAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"lOxuJLHW3S35yGU7RuUXAyZ3lJc="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"nEz4jNcbb86CqFtLgRXD2viQcAI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"lOxuJLHW3S35yGU7RuUXAyZ3lJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"gqY0KEDARHq/9usmmKL3TrDsJV8="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"lOxuJLHW3S35yGU7RuUXAyZ3lJc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"gqY0KEDARHq/9usmmKL3TrDsJV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"CCccBKaD3IUUhQstZ6hzUqh6ph0="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"gqY0KEDARHq/9usmmKL3TrDsJV8=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"CCccBKaD3IUUhQstZ6hzUqh6ph0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"eDFuMfqeM7kVhrP/FAU8MTMSpGU="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"CCccBKaD3IUUhQstZ6hzUqh6ph0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"eDFuMfqeM7kVhrP/FAU8MTMSpGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"rjN2Sfj/SelTka2OshCpOy4Jjfg="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"eDFuMfqeM7kVhrP/FAU8MTMSpGU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T10:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"rjN2Sfj/SelTka2OshCpOy4Jjfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"uhW7r9Zef4VtbCNSr/0Gb3kdsoY="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"rjN2Sfj/SelTka2OshCpOy4Jjfg=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T10:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"uhW7r9Zef4VtbCNSr/0Gb3kdsoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"4jumW8SIxgAxyDL6VH+6bZHFj0c="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"uhW7r9Zef4VtbCNSr/0Gb3kdsoY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"4jumW8SIxgAxyDL6VH+6bZHFj0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="},{"type":"next-occurrence","id":"6+49Em9Cr+yW1S58JR+aSjeApS4="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"4jumW8SIxgAxyDL6VH+6bZHFj0c=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"6+49Em9Cr+yW1S58JR+aSjeApS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CORNELIA ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CIIYtrHD4VZV1Ac/sIkcpjUM/LQ="}],"description":"Construction on CORNELIA ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:06:03Z"},"road_event_id":"6+49Em9Cr+yW1S58JR+aSjeApS4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918283,40.687356]]}},{"id":"2RGG/q7gl5yXcfsqSdNUCjnM62M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+yoSzacbvlqCseBxcORCbg2arIE="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"2RGG/q7gl5yXcfsqSdNUCjnM62M=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"+yoSzacbvlqCseBxcORCbg2arIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"GVOAt1awNfC/v3zaFIXylQ6h0ho="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"+yoSzacbvlqCseBxcORCbg2arIE=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"GVOAt1awNfC/v3zaFIXylQ6h0ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"8aQpJir74GC4CRzzXa7PVkUElKw="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"GVOAt1awNfC/v3zaFIXylQ6h0ho=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"8aQpJir74GC4CRzzXa7PVkUElKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"VO2cdpD0ssqoyMMJjKBDzdhm4lY="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"8aQpJir74GC4CRzzXa7PVkUElKw=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"VO2cdpD0ssqoyMMJjKBDzdhm4lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"ikixCQlt8aq6aJMzScJIfwDlaPI="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"VO2cdpD0ssqoyMMJjKBDzdhm4lY=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"ikixCQlt8aq6aJMzScJIfwDlaPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"Fq/HCEajXlLaCYH58XhmV54Pga0="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"ikixCQlt8aq6aJMzScJIfwDlaPI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"Fq/HCEajXlLaCYH58XhmV54Pga0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"PbLwYpArrVx9lz5Qmr6EJgD7mMc="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"Fq/HCEajXlLaCYH58XhmV54Pga0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"PbLwYpArrVx9lz5Qmr6EJgD7mMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"kOwApFF/xFFYL2CPdsTS8AJ7EB4="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"PbLwYpArrVx9lz5Qmr6EJgD7mMc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"kOwApFF/xFFYL2CPdsTS8AJ7EB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"Lo0uyGlDhOe/8UY1u3GRtyE1DII="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"kOwApFF/xFFYL2CPdsTS8AJ7EB4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"Lo0uyGlDhOe/8UY1u3GRtyE1DII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="},{"type":"next-occurrence","id":"LNWr6NUqhoFd5RSQ0raxdoCWpa4="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"Lo0uyGlDhOe/8UY1u3GRtyE1DII=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"LNWr6NUqhoFd5RSQ0raxdoCWpa4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2RGG/q7gl5yXcfsqSdNUCjnM62M="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:07:31Z"},"road_event_id":"LNWr6NUqhoFd5RSQ0raxdoCWpa4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919194,40.690015]]}},{"id":"pNVhFo5inlthCGKYCRjT38zNP0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q1SBv9HpdP+1nflcnkeFvu409lQ="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"pNVhFo5inlthCGKYCRjT38zNP0w=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"q1SBv9HpdP+1nflcnkeFvu409lQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pNVhFo5inlthCGKYCRjT38zNP0w="},{"type":"next-occurrence","id":"UKp+Eme4TznK0iNfgKInUEamOqc="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"q1SBv9HpdP+1nflcnkeFvu409lQ=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"UKp+Eme4TznK0iNfgKInUEamOqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pNVhFo5inlthCGKYCRjT38zNP0w="},{"type":"next-occurrence","id":"d1bvAXLJdFNYVysU/9BZjquZYDI="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"UKp+Eme4TznK0iNfgKInUEamOqc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"d1bvAXLJdFNYVysU/9BZjquZYDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pNVhFo5inlthCGKYCRjT38zNP0w="},{"type":"next-occurrence","id":"IW92eojz0he7HZWY84efPuUughM="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"d1bvAXLJdFNYVysU/9BZjquZYDI=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"IW92eojz0he7HZWY84efPuUughM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pNVhFo5inlthCGKYCRjT38zNP0w="},{"type":"next-occurrence","id":"qGpxSkDgthOHzx08GbZg+tUF8kw="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"IW92eojz0he7HZWY84efPuUughM=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"qGpxSkDgthOHzx08GbZg+tUF8kw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pNVhFo5inlthCGKYCRjT38zNP0w="},{"type":"next-occurrence","id":"ovwwmDtU06oCG1w8ISZx2L8k3o0="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"qGpxSkDgthOHzx08GbZg+tUF8kw=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"ovwwmDtU06oCG1w8ISZx2L8k3o0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pNVhFo5inlthCGKYCRjT38zNP0w="},{"type":"next-occurrence","id":"A6b8RNVxowbGIiImxulx719p7OY="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"ovwwmDtU06oCG1w8ISZx2L8k3o0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"A6b8RNVxowbGIiImxulx719p7OY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MOFFAT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pNVhFo5inlthCGKYCRjT38zNP0w="}],"description":"Construction on MOFFAT ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:08:58Z"},"road_event_id":"A6b8RNVxowbGIiImxulx719p7OY=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90944,40.684466]]}},{"id":"swXukw47XttdLDjk4M5asKjBBx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YFlUrV5ysdSNTz7l4A3Q8pMGqgM="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"swXukw47XttdLDjk4M5asKjBBx0=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"YFlUrV5ysdSNTz7l4A3Q8pMGqgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"swXukw47XttdLDjk4M5asKjBBx0="},{"type":"next-occurrence","id":"EOBP82w2OLfZiyaYxdhjlpN5dUs="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"YFlUrV5ysdSNTz7l4A3Q8pMGqgM=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"EOBP82w2OLfZiyaYxdhjlpN5dUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"swXukw47XttdLDjk4M5asKjBBx0="},{"type":"next-occurrence","id":"Oj7rVTEIiexd57xBGZyt49j16uc="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"EOBP82w2OLfZiyaYxdhjlpN5dUs=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"Oj7rVTEIiexd57xBGZyt49j16uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"swXukw47XttdLDjk4M5asKjBBx0="},{"type":"next-occurrence","id":"MT8DUDEfUCCePFlK/9O8uo+WWhU="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"Oj7rVTEIiexd57xBGZyt49j16uc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"MT8DUDEfUCCePFlK/9O8uo+WWhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"swXukw47XttdLDjk4M5asKjBBx0="},{"type":"next-occurrence","id":"7e+LNAxKFSo4/6vDZXp1/LSzLlI="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"MT8DUDEfUCCePFlK/9O8uo+WWhU=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"7e+LNAxKFSo4/6vDZXp1/LSzLlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"swXukw47XttdLDjk4M5asKjBBx0="},{"type":"next-occurrence","id":"h5K1i/g6Ovjd1mwmm+0Z4PY3ixA="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"7e+LNAxKFSo4/6vDZXp1/LSzLlI=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"h5K1i/g6Ovjd1mwmm+0Z4PY3ixA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"swXukw47XttdLDjk4M5asKjBBx0="},{"type":"next-occurrence","id":"25WD4yYsvc/lXrtyAZn/O3yCTzQ="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"h5K1i/g6Ovjd1mwmm+0Z4PY3ixA=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"25WD4yYsvc/lXrtyAZn/O3yCTzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DECATUR ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"swXukw47XttdLDjk4M5asKjBBx0="}],"description":"Construction on DECATUR ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:12:25Z"},"road_event_id":"25WD4yYsvc/lXrtyAZn/O3yCTzQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912278,40.68397]]}},{"id":"PIysxCENSOWOjc/fXd8Rz21/W/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ywFZBdstHXDZxLHKYRXxLLIGYjY="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"PIysxCENSOWOjc/fXd8Rz21/W/A=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"ywFZBdstHXDZxLHKYRXxLLIGYjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIysxCENSOWOjc/fXd8Rz21/W/A="},{"type":"next-occurrence","id":"L6RPb0ql/6y3Vdr5C4k/QFcxp7U="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"ywFZBdstHXDZxLHKYRXxLLIGYjY=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"L6RPb0ql/6y3Vdr5C4k/QFcxp7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIysxCENSOWOjc/fXd8Rz21/W/A="},{"type":"next-occurrence","id":"Z4DazooFTHiIKq6iUfRdsIxBhJc="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"L6RPb0ql/6y3Vdr5C4k/QFcxp7U=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"Z4DazooFTHiIKq6iUfRdsIxBhJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIysxCENSOWOjc/fXd8Rz21/W/A="},{"type":"next-occurrence","id":"C1jLtSsRK+GChfKq7XRI3HbXdQA="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"Z4DazooFTHiIKq6iUfRdsIxBhJc=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"C1jLtSsRK+GChfKq7XRI3HbXdQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIysxCENSOWOjc/fXd8Rz21/W/A="},{"type":"next-occurrence","id":"tfhF9s5FLXKe13I2o3TTgP5+/i4="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"C1jLtSsRK+GChfKq7XRI3HbXdQA=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"tfhF9s5FLXKe13I2o3TTgP5+/i4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIysxCENSOWOjc/fXd8Rz21/W/A="},{"type":"next-occurrence","id":"LtHhKtY/0c0melaiVLuxaFjc+/4="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"tfhF9s5FLXKe13I2o3TTgP5+/i4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"LtHhKtY/0c0melaiVLuxaFjc+/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIysxCENSOWOjc/fXd8Rz21/W/A="},{"type":"next-occurrence","id":"KD0SdIM92Iq7IrWM5R0Ti/FK/zo="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"LtHhKtY/0c0melaiVLuxaFjc+/4=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"KD0SdIM92Iq7IrWM5R0Ti/FK/zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAUNCEY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIysxCENSOWOjc/fXd8Rz21/W/A="}],"description":"Construction on CHAUNCEY ST northbound between BROADWAY (New York) and BUSHWICK AVE (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:14:56Z"},"road_event_id":"KD0SdIM92Iq7IrWM5R0Ti/FK/zo=","beginning_cross_street":"BROADWAY","ending_cross_street":"BUSHWICK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91001,40.6827]]}},{"id":"VOZu0CxInYoqsNIyNT7XQkINUAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NtfDRI1a7CQIpLTBtrgTsXJYt0M="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"VOZu0CxInYoqsNIyNT7XQkINUAA=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"NtfDRI1a7CQIpLTBtrgTsXJYt0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VOZu0CxInYoqsNIyNT7XQkINUAA="},{"type":"next-occurrence","id":"9gNEbs2nXEe8WX+pm9kg0EGmLyc="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"NtfDRI1a7CQIpLTBtrgTsXJYt0M=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"9gNEbs2nXEe8WX+pm9kg0EGmLyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VOZu0CxInYoqsNIyNT7XQkINUAA="},{"type":"next-occurrence","id":"r2vwFEEja8oAHFPOhjunUVmK5Ls="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"9gNEbs2nXEe8WX+pm9kg0EGmLyc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"r2vwFEEja8oAHFPOhjunUVmK5Ls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VOZu0CxInYoqsNIyNT7XQkINUAA="},{"type":"next-occurrence","id":"Aup1I5g7AS9VnlsszOM5SKVRLyc="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"r2vwFEEja8oAHFPOhjunUVmK5Ls=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"Aup1I5g7AS9VnlsszOM5SKVRLyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VOZu0CxInYoqsNIyNT7XQkINUAA="},{"type":"next-occurrence","id":"541tA+GGDFwWpcrqaU72RftpvLc="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"Aup1I5g7AS9VnlsszOM5SKVRLyc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"541tA+GGDFwWpcrqaU72RftpvLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VOZu0CxInYoqsNIyNT7XQkINUAA="},{"type":"next-occurrence","id":"AcsvPsn2YLoFMERckocaBTXc/qM="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"541tA+GGDFwWpcrqaU72RftpvLc=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"AcsvPsn2YLoFMERckocaBTXc/qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VOZu0CxInYoqsNIyNT7XQkINUAA="},{"type":"next-occurrence","id":"1uL6XCblN8ovZ6EOBrMWS1+intY="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"AcsvPsn2YLoFMERckocaBTXc/qM=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"1uL6XCblN8ovZ6EOBrMWS1+intY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PILLING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VOZu0CxInYoqsNIyNT7XQkINUAA="}],"description":"Construction on PILLING ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York), Tuesday March 10th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T18:18:13Z"},"road_event_id":"1uL6XCblN8ovZ6EOBrMWS1+intY=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907886,40.683652]]}},{"id":"/NfKfKpim5YrVHy7rbDPSfG4guE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 262ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yI+ef5nGpxiuhw5QDN4RL8RZlJc="}],"description":"Construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday March 10th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-10T18:26:06Z"},"road_event_id":"/NfKfKpim5YrVHy7rbDPSfG4guE=","beginning_cross_street":"RT-9A ","ending_cross_street":"HUXLEY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89665,40.910204]]}},{"id":"yI+ef5nGpxiuhw5QDN4RL8RZlJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 262ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/NfKfKpim5YrVHy7rbDPSfG4guE="},{"type":"next-occurrence","id":"kQ0hhVEaGhctfzvV5nHbo5VKGSQ="}],"description":"Construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday March 10th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-10T18:26:06Z"},"road_event_id":"yI+ef5nGpxiuhw5QDN4RL8RZlJc=","beginning_cross_street":"RT-9A ","ending_cross_street":"HUXLEY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89665,40.910204]]}},{"id":"kQ0hhVEaGhctfzvV5nHbo5VKGSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 262ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/NfKfKpim5YrVHy7rbDPSfG4guE="},{"type":"next-occurrence","id":"gawHlBVo4uYS3cQlMacinQaykxk="}],"description":"Construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday March 10th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-10T18:26:06Z"},"road_event_id":"kQ0hhVEaGhctfzvV5nHbo5VKGSQ=","beginning_cross_street":"RT-9A ","ending_cross_street":"HUXLEY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89665,40.910204]]}},{"id":"gawHlBVo4uYS3cQlMacinQaykxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 262ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/NfKfKpim5YrVHy7rbDPSfG4guE="},{"type":"next-occurrence","id":"+CkuuYj5Grc0yHjQBtv8ugJ8Dx0="}],"description":"Construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday March 10th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-10T18:26:06Z"},"road_event_id":"gawHlBVo4uYS3cQlMacinQaykxk=","beginning_cross_street":"RT-9A ","ending_cross_street":"HUXLEY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89665,40.910204]]}},{"id":"+CkuuYj5Grc0yHjQBtv8ugJ8Dx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 262ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/NfKfKpim5YrVHy7rbDPSfG4guE="},{"type":"next-occurrence","id":"5EHdTXGiMrAHGHVlLu6iHQryO1E="}],"description":"Construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday March 10th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-10T18:26:06Z"},"road_event_id":"+CkuuYj5Grc0yHjQBtv8ugJ8Dx0=","beginning_cross_street":"RT-9A ","ending_cross_street":"HUXLEY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89665,40.910204]]}},{"id":"5EHdTXGiMrAHGHVlLu6iHQryO1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 262ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/NfKfKpim5YrVHy7rbDPSfG4guE="},{"type":"next-occurrence","id":"wGArXgAIh3LEGH4qVddy+7AgZFI="}],"description":"Construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday March 10th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-10T18:26:06Z"},"road_event_id":"5EHdTXGiMrAHGHVlLu6iHQryO1E=","beginning_cross_street":"RT-9A ","ending_cross_street":"HUXLEY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89665,40.910204]]}},{"id":"wGArXgAIh3LEGH4qVddy+7AgZFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 262ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/NfKfKpim5YrVHy7rbDPSfG4guE="}],"description":"Construction on W 262ND ST westbound between RT-9A (New York) and HUXLEY AVE (New York) for use of concrete pumps, boom trucks and knuckle booms., Tuesday March 10th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-10T18:26:06Z"},"road_event_id":"wGArXgAIh3LEGH4qVddy+7AgZFI=","beginning_cross_street":"RT-9A ","ending_cross_street":"HUXLEY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.89665,40.910204]]}},{"id":"s++OlN/IQFUl8XaLOE3z4j7qQbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"k80gU4iWYlqJBbnZynLQ7k7Ozmo="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"s++OlN/IQFUl8XaLOE3z4j7qQbk=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"k80gU4iWYlqJBbnZynLQ7k7Ozmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"zxyHy6FXbTLLATjE+ixX5cAtQIo="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"k80gU4iWYlqJBbnZynLQ7k7Ozmo=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"zxyHy6FXbTLLATjE+ixX5cAtQIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"GHK8Unlby22ibm5d6JOpA+q/FVA="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"zxyHy6FXbTLLATjE+ixX5cAtQIo=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"GHK8Unlby22ibm5d6JOpA+q/FVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"+2Ws86zz+YbOuLKgE1gbhE5aoc4="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"GHK8Unlby22ibm5d6JOpA+q/FVA=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:30:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"+2Ws86zz+YbOuLKgE1gbhE5aoc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"NwOnJkuJacsKqhsFDzg7Bj4yFUU="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"+2Ws86zz+YbOuLKgE1gbhE5aoc4=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:30:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"NwOnJkuJacsKqhsFDzg7Bj4yFUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"USvvLqloM1Csyk4+2ZxGp76zbBM="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"NwOnJkuJacsKqhsFDzg7Bj4yFUU=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:30:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"USvvLqloM1Csyk4+2ZxGp76zbBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"S7u+jhJBo6Ovs/8VJh42qFaaxb8="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"USvvLqloM1Csyk4+2ZxGp76zbBM=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:30:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"S7u+jhJBo6Ovs/8VJh42qFaaxb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"xeMLMCdVEs7QE8obzp4FaUXgJAU="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"S7u+jhJBo6Ovs/8VJh42qFaaxb8=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:30:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"xeMLMCdVEs7QE8obzp4FaUXgJAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"pMGWId4uX3agb9FIDG67j+pAJB4="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"xeMLMCdVEs7QE8obzp4FaUXgJAU=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:30:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"pMGWId4uX3agb9FIDG67j+pAJB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="},{"type":"next-occurrence","id":"9nZh8LV72UQcV1YntZVIAoxWeTg="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"pMGWId4uX3agb9FIDG67j+pAJB4=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:30:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"9nZh8LV72UQcV1YntZVIAoxWeTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s++OlN/IQFUl8XaLOE3z4j7qQbk="}],"description":"Safety improvements on US 9 southbound between Pierson Avenue (Sleepy Hollow) and Pocantico Street (Sleepy Hollow) 2025082677335/32707109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM,, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-03-11T11:14:23Z"},"road_event_id":"9nZh8LV72UQcV1YntZVIAoxWeTg=","beginning_cross_street":"Pierson Avenue","ending_cross_street":"Pocantico Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:30:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861871,41.089142]]}},{"id":"nnu3SJw9e0FzOLu3Nn9/cu8yF1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Road maintenance operations on I-84 both directions between Exit 41 - NY 9D (Fishkill) and Exit 65 - NY 312 (Southeast) Res 8-3 RW/30136709 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 10:00 AM thru 02:00 PM, left lane closure","update_date":"2026-04-21T18:01:12Z"},"road_event_id":"nnu3SJw9e0FzOLu3Nn9/cu8yF1s=","beginning_cross_street":"Exit 41 - NY 9D","ending_cross_street":"Exit 65 - NY 312","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968373,41.518969]]}},{"id":"ATyNmIfMaqv9i+3sYCHkAK5E8BI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 80 both directions between Moyer Road (Stark) and East Smith Road (Stark) Motorists will encounter lane closures in both directions with temporary signals in place., Continuous Thursday March 12th, 2026 7:00 AM thru Thursday April 30th, 2026 6:00 PM","update_date":"2026-03-12T15:23:08Z"},"road_event_id":"ATyNmIfMaqv9i+3sYCHkAK5E8BI=","beginning_cross_street":"Moyer Road","ending_cross_street":"East Smith Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.758833,42.923588]]}},{"id":"pMC70ii0qH3bkIzTACqFkpCE1PE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O9mSA6ZUgdCfJJuW9gQHh/xqJzU="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"pMC70ii0qH3bkIzTACqFkpCE1PE=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"O9mSA6ZUgdCfJJuW9gQHh/xqJzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="},{"type":"next-occurrence","id":"vPGCfyXnTmHadKWW45jmo4G/9H8="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"O9mSA6ZUgdCfJJuW9gQHh/xqJzU=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"vPGCfyXnTmHadKWW45jmo4G/9H8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="},{"type":"next-occurrence","id":"RJ+AJTl0WCRhcVmfTdjK1koN5sg="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"vPGCfyXnTmHadKWW45jmo4G/9H8=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"RJ+AJTl0WCRhcVmfTdjK1koN5sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="},{"type":"next-occurrence","id":"Clxj8/KjYCiv/cfmDQv0EO++fjQ="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"RJ+AJTl0WCRhcVmfTdjK1koN5sg=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"Clxj8/KjYCiv/cfmDQv0EO++fjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="},{"type":"next-occurrence","id":"7IPa/nD0q1ZggX/4nDMZZylmEz8="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"Clxj8/KjYCiv/cfmDQv0EO++fjQ=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"7IPa/nD0q1ZggX/4nDMZZylmEz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="},{"type":"next-occurrence","id":"rHzGmkk5eZ/AdkYSYF/9JqrWbww="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"7IPa/nD0q1ZggX/4nDMZZylmEz8=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"rHzGmkk5eZ/AdkYSYF/9JqrWbww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="},{"type":"next-occurrence","id":"Uq+34I8bLLsBmVJsBXlTxNloS+A="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"rHzGmkk5eZ/AdkYSYF/9JqrWbww=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"Uq+34I8bLLsBmVJsBXlTxNloS+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="},{"type":"next-occurrence","id":"GaO46J//NnHXYt+xe8uB9mTSnOQ="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"Uq+34I8bLLsBmVJsBXlTxNloS+A=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"GaO46J//NnHXYt+xe8uB9mTSnOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pMC70ii0qH3bkIzTACqFkpCE1PE="}],"description":"Roadwork on NY 394 both directions I-86; Southern Tier Expressway (North Harmony) to Town of Chautauqua; Town of North Harmony Line (Chautauqua), Thursday March 12th, 2026 thru Sunday July 26th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 06:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-12T15:46:28Z"},"road_event_id":"GaO46J//NnHXYt+xe8uB9mTSnOQ=","beginning_cross_street":"I-86; Southern Tier Expressway","ending_cross_street":"Town of Chautauqua; Town of North Harmony Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.407169,42.154424]]}},{"id":"UXyfDFyg8Ut0zfIrmZsqLQjVgCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Palisades Interstate Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on Palisades Interstate Parkway southbound ramp to Exit 9W - I-87 - I-287 (Clarkstown) D265160/32254709 - EXIT RAMP CLOSED TO TRAFFIC - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Tuesday March 25th, 2025 12:00 AM thru Monday November 16th, 2026 12:00 AM ramp closed and detoured","update_date":"2026-03-16T10:25:02Z"},"road_event_id":"UXyfDFyg8Ut0zfIrmZsqLQjVgCo=","beginning_cross_street":"Exit 9W - I-87 - I-287","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995487,41.104079]]}},{"id":"ORC300521951","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 66TH ST"],"direction":"unknown","description":"Construction on W 66TH ST westbound at 65TH ST (New York) Not currently Scheduled","update_date":"2026-03-18T07:00:01Z"},"road_event_id":"ORC300521951","beginning_cross_street":"65TH ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-12T16:42:46Z","end_date":"2026-03-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.978875,40.772473]]}},{"id":"IdGsv4+Bn/czWcVD2Q1WacW11S8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GO6Bw/Dx5TWFozw1BHKaXls7ZtA="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"IdGsv4+Bn/czWcVD2Q1WacW11S8=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"GO6Bw/Dx5TWFozw1BHKaXls7ZtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"J7lFlLOXG7G8jebCzFfqgIuhJ74="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"GO6Bw/Dx5TWFozw1BHKaXls7ZtA=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"J7lFlLOXG7G8jebCzFfqgIuhJ74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"kGiufe+EzGK0Plkay7JY7sGU9v8="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"J7lFlLOXG7G8jebCzFfqgIuhJ74=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"kGiufe+EzGK0Plkay7JY7sGU9v8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"OoQa9SbvOCu06A1MXmPjxoh+U5Y="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"kGiufe+EzGK0Plkay7JY7sGU9v8=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"OoQa9SbvOCu06A1MXmPjxoh+U5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"kzqcVuvSntoPxDBtoFOjnUrwQtM="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"OoQa9SbvOCu06A1MXmPjxoh+U5Y=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"kzqcVuvSntoPxDBtoFOjnUrwQtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"U6YDIu2qOtLd4EgOnCtW/rWxxzQ="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"kzqcVuvSntoPxDBtoFOjnUrwQtM=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"U6YDIu2qOtLd4EgOnCtW/rWxxzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"Cbk1LK44If4bboO1wW1r5cpmnow="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"U6YDIu2qOtLd4EgOnCtW/rWxxzQ=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"Cbk1LK44If4bboO1wW1r5cpmnow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"hrU77ZYa/w5HbMs2FD2q2uXBA3E="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"Cbk1LK44If4bboO1wW1r5cpmnow=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"hrU77ZYa/w5HbMs2FD2q2uXBA3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"GaiX54hHDOFPNpXUPrpQ7bSGD3M="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"hrU77ZYa/w5HbMs2FD2q2uXBA3E=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"GaiX54hHDOFPNpXUPrpQ7bSGD3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"UtqAycMvZrGP0PE4V6kMDcMRCRA="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"GaiX54hHDOFPNpXUPrpQ7bSGD3M=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"UtqAycMvZrGP0PE4V6kMDcMRCRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"wkg6eoNRh4N2wqbkr6zl2st531I="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"UtqAycMvZrGP0PE4V6kMDcMRCRA=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"wkg6eoNRh4N2wqbkr6zl2st531I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"IUjUtZ/zEjvowUGH3UZkHC8+ELY="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"wkg6eoNRh4N2wqbkr6zl2st531I=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"IUjUtZ/zEjvowUGH3UZkHC8+ELY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"+gTU0SwKTkUAIhIgwtHmLTNQ1/c="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"IUjUtZ/zEjvowUGH3UZkHC8+ELY=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"+gTU0SwKTkUAIhIgwtHmLTNQ1/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="},{"type":"next-occurrence","id":"HbTh+T8JAiKTjOqKI+tSEkF9IwA="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"+gTU0SwKTkUAIhIgwtHmLTNQ1/c=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"HbTh+T8JAiKTjOqKI+tSEkF9IwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IdGsv4+Bn/czWcVD2Q1WacW11S8="}],"description":"Bridge rehabilitation on NY 414 both directions I-86 (Corning) Lane closure Lane and shift NB and SB, Monday March 16th, 2026 thru Saturday May 30th, 2026, Sunday thru Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T18:47:24Z"},"road_event_id":"HbTh+T8JAiKTjOqKI+tSEkF9IwA=","beginning_cross_street":"I-86","ending_cross_street":"I-86","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.053068,42.155324]]}},{"id":"NFYwnNctiwg0gjeMzVU+p71+wLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NxFJnH7tCVfbE0osgcjs0M3Vpps="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:50:05Z"},"road_event_id":"NFYwnNctiwg0gjeMzVU+p71+wLw=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813696,40.697133]]}},{"id":"NxFJnH7tCVfbE0osgcjs0M3Vpps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NFYwnNctiwg0gjeMzVU+p71+wLw="},{"type":"next-occurrence","id":"N+v39XJvZPxXa8mjhbjvnxQZf1U="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:50:05Z"},"road_event_id":"NxFJnH7tCVfbE0osgcjs0M3Vpps=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813696,40.697133]]}},{"id":"N+v39XJvZPxXa8mjhbjvnxQZf1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NFYwnNctiwg0gjeMzVU+p71+wLw="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday March 9th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T17:50:05Z"},"road_event_id":"N+v39XJvZPxXa8mjhbjvnxQZf1U=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813696,40.697133]]}},{"id":"Teq0APsWrUGMSRV82JILU6UhBnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rA3tPv0/TNOWCy6uvOGpt/LiLYY="}],"description":"Road rehabilitation on US 9W both directions between Horton Lane (Ulster) and Flatbush Road - NY 32 (Ulster) D265485/32592909 - This work is weather permitting. Plan travel accordingly; delays may exist road, Monday April 13th, 2026 thru Friday April 24th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 AM thru 04:00 PM, various lane closures, Saturday April 25th, 2026, 08:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-10T20:00:00Z"},"road_event_id":"Teq0APsWrUGMSRV82JILU6UhBnw=","beginning_cross_street":"Horton Lane","ending_cross_street":"Flatbush Road - NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97769,41.909765]]}},{"id":"rA3tPv0/TNOWCy6uvOGpt/LiLYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Teq0APsWrUGMSRV82JILU6UhBnw="},{"type":"next-occurrence","id":"8miBQS/zcUqCNu1GB7ZEetHjpek="}],"description":"Road rehabilitation on US 9W both directions between Horton Lane (Ulster) and Flatbush Road - NY 32 (Ulster) D265485/32592909 - This work is weather permitting. Plan travel accordingly; delays may exist road, Monday April 13th, 2026 thru Friday April 24th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 AM thru 04:00 PM, various lane closures, Saturday April 25th, 2026, 08:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-10T20:00:00Z"},"road_event_id":"rA3tPv0/TNOWCy6uvOGpt/LiLYY=","beginning_cross_street":"Horton Lane","ending_cross_street":"Flatbush Road - NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97769,41.909765]]}},{"id":"8miBQS/zcUqCNu1GB7ZEetHjpek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Teq0APsWrUGMSRV82JILU6UhBnw="},{"type":"next-occurrence","id":"fSDW68Iy39x6nS5H8prUZ4xdPvw="}],"description":"Road rehabilitation on US 9W both directions between Horton Lane (Ulster) and Flatbush Road - NY 32 (Ulster) D265485/32592909 - This work is weather permitting. Plan travel accordingly; delays may exist road, Monday April 13th, 2026 thru Friday April 24th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 AM thru 04:00 PM, various lane closures, Saturday April 25th, 2026, 08:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-10T20:00:00Z"},"road_event_id":"8miBQS/zcUqCNu1GB7ZEetHjpek=","beginning_cross_street":"Horton Lane","ending_cross_street":"Flatbush Road - NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97769,41.909765]]}},{"id":"fSDW68Iy39x6nS5H8prUZ4xdPvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Teq0APsWrUGMSRV82JILU6UhBnw="}],"description":"Road rehabilitation on US 9W both directions between Horton Lane (Ulster) and Flatbush Road - NY 32 (Ulster) D265485/32592909 - This work is weather permitting. Plan travel accordingly; delays may exist road, Monday April 13th, 2026 thru Friday April 24th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 AM thru 04:00 PM, various lane closures, Saturday April 25th, 2026, 08:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-10T20:00:00Z"},"road_event_id":"fSDW68Iy39x6nS5H8prUZ4xdPvw=","beginning_cross_street":"Horton Lane","ending_cross_street":"Flatbush Road - NY 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97769,41.909765]]}},{"id":"H6bMSNBy3D6Agbl377HxgsuTMNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lSDoEAx3SBBPOB2byYiWpXfCD0Y="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"H6bMSNBy3D6Agbl377HxgsuTMNw=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"lSDoEAx3SBBPOB2byYiWpXfCD0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6bMSNBy3D6Agbl377HxgsuTMNw="},{"type":"next-occurrence","id":"1sNNbSbfJiulxh3T3xwNtu52jGE="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"lSDoEAx3SBBPOB2byYiWpXfCD0Y=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"1sNNbSbfJiulxh3T3xwNtu52jGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6bMSNBy3D6Agbl377HxgsuTMNw="},{"type":"next-occurrence","id":"xeJMPP4HP9nij3aeUHztlx2asAk="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"1sNNbSbfJiulxh3T3xwNtu52jGE=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"xeJMPP4HP9nij3aeUHztlx2asAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6bMSNBy3D6Agbl377HxgsuTMNw="},{"type":"next-occurrence","id":"wSf79EiTJ8ZhRsUZFmtZ4/Cu5jE="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"xeJMPP4HP9nij3aeUHztlx2asAk=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"wSf79EiTJ8ZhRsUZFmtZ4/Cu5jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6bMSNBy3D6Agbl377HxgsuTMNw="},{"type":"next-occurrence","id":"HumBvEx7NifWfyxR1AZzcPu1SG8="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"wSf79EiTJ8ZhRsUZFmtZ4/Cu5jE=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"HumBvEx7NifWfyxR1AZzcPu1SG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6bMSNBy3D6Agbl377HxgsuTMNw="},{"type":"next-occurrence","id":"kq9O8hZvPsUqiGbqh+VWUbfhMqk="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"HumBvEx7NifWfyxR1AZzcPu1SG8=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"kq9O8hZvPsUqiGbqh+VWUbfhMqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6bMSNBy3D6Agbl377HxgsuTMNw="},{"type":"next-occurrence","id":"kOtJBHhR61XSadUInualH0fr/5I="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"kq9O8hZvPsUqiGbqh+VWUbfhMqk=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"kOtJBHhR61XSadUInualH0fr/5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6bMSNBy3D6Agbl377HxgsuTMNw="}],"description":"Utility work on NY 30 both directions at Town of Perth; Town of Amsterdam Line (Perth) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 16th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:09:42Z"},"road_event_id":"kOtJBHhR61XSadUInualH0fr/5I=","beginning_cross_street":"Town of Perth; Town of Amsterdam Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188201,42.983398]]}},{"id":"FLE4xXzyFoqMm4es2BaKVk3c9YA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4Wby8veAxbgCRDbFYDgFfd7bres="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"FLE4xXzyFoqMm4es2BaKVk3c9YA=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"4Wby8veAxbgCRDbFYDgFfd7bres=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLE4xXzyFoqMm4es2BaKVk3c9YA="},{"type":"next-occurrence","id":"hNyXHcZFSEVPFXi6Cw+HU68K7Z8="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"4Wby8veAxbgCRDbFYDgFfd7bres=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"hNyXHcZFSEVPFXi6Cw+HU68K7Z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLE4xXzyFoqMm4es2BaKVk3c9YA="}],"description":"Road rehabilitation on US 219 both directions Route 219; Sunnyside Drive (Carrollton) to Cattaraugus County Line (Carrollton), Friday March 13th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-03-13T19:33:22Z"},"road_event_id":"hNyXHcZFSEVPFXi6Cw+HU68K7Z8=","beginning_cross_street":"Route 219; Sunnyside Drive","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.635989,42.072287]]}},{"id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n8iO6WXKKl9BXSa3xrjvy0956zI="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"n8iO6WXKKl9BXSa3xrjvy0956zI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"bN+AFozm+XCx5x5CAOqrFYqrlmE="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"n8iO6WXKKl9BXSa3xrjvy0956zI=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"bN+AFozm+XCx5x5CAOqrFYqrlmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"K+hc/lfxHAP7mPzWahcZBD8MSzc="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"bN+AFozm+XCx5x5CAOqrFYqrlmE=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"K+hc/lfxHAP7mPzWahcZBD8MSzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"LgQ7q1X2jI19pQGqLlCX9S6yLsE="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"K+hc/lfxHAP7mPzWahcZBD8MSzc=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"LgQ7q1X2jI19pQGqLlCX9S6yLsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"niqNHD/5LZI+ptqJO0AWjl5MSJ8="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"LgQ7q1X2jI19pQGqLlCX9S6yLsE=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"niqNHD/5LZI+ptqJO0AWjl5MSJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"Z2gTPRHJYRB9fK7Wx6aKLs3elSc="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"niqNHD/5LZI+ptqJO0AWjl5MSJ8=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"Z2gTPRHJYRB9fK7Wx6aKLs3elSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"37vRsDq6brQ1ZsnYwPStWYbckgg="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"Z2gTPRHJYRB9fK7Wx6aKLs3elSc=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"37vRsDq6brQ1ZsnYwPStWYbckgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"Mt0QbOxBn9DOsojh36oMkqkVwqQ="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"37vRsDq6brQ1ZsnYwPStWYbckgg=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"Mt0QbOxBn9DOsojh36oMkqkVwqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"N2dqt6rIYrkSmGBDyun1Mx8zQ+E="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"Mt0QbOxBn9DOsojh36oMkqkVwqQ=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"N2dqt6rIYrkSmGBDyun1Mx8zQ+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="},{"type":"next-occurrence","id":"QsVnpXq9HM5MmY2C8PLGuR8J3G0="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"N2dqt6rIYrkSmGBDyun1Mx8zQ+E=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"QsVnpXq9HM5MmY2C8PLGuR8J3G0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3Xz8mCnvEzDMkCE8mRLf4htQYk="}],"description":"Bridge rehabilitation on I-84 eastbound Exit ramp Exit 51 - I-91 North (Hartford), Monday March 23rd, 2026 thru Friday May 29th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-13T20:26:12Z"},"road_event_id":"QsVnpXq9HM5MmY2C8PLGuR8J3G0=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 51 - I-91 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.677852,41.770606]]}},{"id":"c5YoVJTJMNKWSCsgwCY539fyBSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OlvPzLpmzcQCTQquwO4r37jiy4Q="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"c5YoVJTJMNKWSCsgwCY539fyBSs=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"OlvPzLpmzcQCTQquwO4r37jiy4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"Iqptsv4fsPlmYn16IzBgIsWF9dA="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"OlvPzLpmzcQCTQquwO4r37jiy4Q=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"Iqptsv4fsPlmYn16IzBgIsWF9dA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"0rxGiSjODjf1YgsTTwxQYBbxMt8="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"Iqptsv4fsPlmYn16IzBgIsWF9dA=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"0rxGiSjODjf1YgsTTwxQYBbxMt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"gdPkUxiDjaO7zwbpBlVztWtEyY0="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"0rxGiSjODjf1YgsTTwxQYBbxMt8=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"gdPkUxiDjaO7zwbpBlVztWtEyY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"41RIujVU4anAmum0WKg5Lbkz2KU="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"gdPkUxiDjaO7zwbpBlVztWtEyY0=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"41RIujVU4anAmum0WKg5Lbkz2KU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"xlYm6Cck3XAR6EO0Ewdwj5ERROc="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"41RIujVU4anAmum0WKg5Lbkz2KU=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"xlYm6Cck3XAR6EO0Ewdwj5ERROc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"dsv2fmcVW/jDvD6YjvARqBZpJqM="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"xlYm6Cck3XAR6EO0Ewdwj5ERROc=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"dsv2fmcVW/jDvD6YjvARqBZpJqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"PirRmwYg6ya1KSSf6rVu5ynQxg4="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"dsv2fmcVW/jDvD6YjvARqBZpJqM=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"PirRmwYg6ya1KSSf6rVu5ynQxg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"6JSJLKyAN+/cTmdx7Jg53E8rEOo="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"PirRmwYg6ya1KSSf6rVu5ynQxg4=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"6JSJLKyAN+/cTmdx7Jg53E8rEOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"ap5yYrVo6eetsXqD6dHxiShwI64="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"6JSJLKyAN+/cTmdx7Jg53E8rEOo=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"ap5yYrVo6eetsXqD6dHxiShwI64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"61MoTg/U6S4fFs0ggzuLpdNbmOA="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"ap5yYrVo6eetsXqD6dHxiShwI64=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"61MoTg/U6S4fFs0ggzuLpdNbmOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"1i+1EquqdnrKRACs02QbFkZAs+A="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"61MoTg/U6S4fFs0ggzuLpdNbmOA=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"1i+1EquqdnrKRACs02QbFkZAs+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"IAnAoER4NzudHqdjS3Wu6sL8Ros="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"1i+1EquqdnrKRACs02QbFkZAs+A=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"IAnAoER4NzudHqdjS3Wu6sL8Ros=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="},{"type":"next-occurrence","id":"mVQsOn0VPVMXZkZ2tKKt+Hm/d2E="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"IAnAoER4NzudHqdjS3Wu6sL8Ros=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"mVQsOn0VPVMXZkZ2tKKt+Hm/d2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5YoVJTJMNKWSCsgwCY539fyBSs="}],"description":"Guard rail repairs on I-84 both directions between Exit 35 - CT 72/CT 9 (New Britain) and Exit 39 - CT 508/CT4 (Farmington), Monday March 16th, 2026 thru Friday May 29th, 2026, Sunday thru Saturday, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-03-13T20:43:24Z"},"road_event_id":"mVQsOn0VPVMXZkZ2tKKt+Hm/d2E=","beginning_cross_street":"Exit 35 - CT 72/CT 9","ending_cross_street":"Exit 39 - CT 508/CT4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.823583,41.668665]]}},{"id":"7Oo2FQKeginJa0hzO1gJvpo0wNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Rd3zkdscBs+YAg59+d0fIahBc2g="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:10:42Z"},"road_event_id":"7Oo2FQKeginJa0hzO1gJvpo0wNg=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"Rd3zkdscBs+YAg59+d0fIahBc2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Oo2FQKeginJa0hzO1gJvpo0wNg="},{"type":"next-occurrence","id":"1RY6QQKJAM/rJUw7TGJXUBS8Xgc="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:10:42Z"},"road_event_id":"Rd3zkdscBs+YAg59+d0fIahBc2g=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"1RY6QQKJAM/rJUw7TGJXUBS8Xgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Oo2FQKeginJa0hzO1gJvpo0wNg="},{"type":"next-occurrence","id":"UQSAx4JYz0sxKDU7pmVnQaZTigI="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:10:42Z"},"road_event_id":"1RY6QQKJAM/rJUw7TGJXUBS8Xgc=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"UQSAx4JYz0sxKDU7pmVnQaZTigI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Oo2FQKeginJa0hzO1gJvpo0wNg="},{"type":"next-occurrence","id":"ctSCp9hQJammm7fWu2uqIOEJa2E="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:10:42Z"},"road_event_id":"UQSAx4JYz0sxKDU7pmVnQaZTigI=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"ctSCp9hQJammm7fWu2uqIOEJa2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Oo2FQKeginJa0hzO1gJvpo0wNg="},{"type":"next-occurrence","id":"dKF4LkmDWyekoEWXzSB9dOEszbQ="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:10:42Z"},"road_event_id":"ctSCp9hQJammm7fWu2uqIOEJa2E=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"dKF4LkmDWyekoEWXzSB9dOEszbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Oo2FQKeginJa0hzO1gJvpo0wNg="},{"type":"next-occurrence","id":"g6rKOHd2NKVBiKXnlCT2+dztrR8="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:10:42Z"},"road_event_id":"dKF4LkmDWyekoEWXzSB9dOEszbQ=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"g6rKOHd2NKVBiKXnlCT2+dztrR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Oo2FQKeginJa0hzO1gJvpo0wNg="}],"description":"Bridge demolition on I-81 southbound between Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Salina) and Exit 20 - Franklin Street; West Street (Syracuse) ; Alternating lane closures, Monday March 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:10:42Z"},"road_event_id":"g6rKOHd2NKVBiKXnlCT2+dztrR8=","beginning_cross_street":"Exit 23A and Exit 23B and Exit 22; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 20 - Franklin Street; West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172633,43.082423]]}},{"id":"tHYtQMAk9u23Ixmh0y4vu8G0J+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound ramp from W/B I-287 (Greenburgh) D265281/32709309 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Sunday March 1st, 2026 12:00 AM thru Tuesday June 30th, 2026 12:00 PM ramp closed and detoured","update_date":"2026-03-16T14:26:41Z"},"road_event_id":"tHYtQMAk9u23Ixmh0y4vu8G0J+o=","beginning_cross_street":"W/B I-287","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809031,41.056626]]}},{"id":"d04Hhq4NfNtQz4aCdsxsYpRgDiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US 9W both directions between NY 218 (Highlands) and Mountain Road (Cornwall) D265262/32427409 - 24/7 LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Sunday March 30th, 2025 12:00 AM thru Friday September 4th, 2026 12:00 AM right lane closed to traffic","update_date":"2026-03-16T13:43:22Z"},"road_event_id":"d04Hhq4NfNtQz4aCdsxsYpRgDiE=","beginning_cross_street":"NY 218","ending_cross_street":"Mountain Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983618,41.37714]]}},{"id":"ORC300522700","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 Arrivals (New York) Not currently Scheduled","update_date":"2026-03-19T12:30:00Z"},"road_event_id":"ORC300522700","beginning_cross_street":"Terminal 8 Arrivals ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-16T16:13:52Z","end_date":"2026-03-20T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.786656,40.647841]]}},{"id":"ORC300522702","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Van Wyck Expressway"],"direction":"unknown","description":"Scheduled roadwork on Van Wyck Expressway southbound ramp to Exit C - Federal Circle (New York) Not currently Scheduled","update_date":"2026-04-09T03:59:01Z"},"road_event_id":"ORC300522702","beginning_cross_street":"Exit C - Federal Circle ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-16T16:19:32Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.805984,40.660718]]}},{"id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4XSpSkRjTrSbw0QOb2jWxc5jLHE="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"4XSpSkRjTrSbw0QOb2jWxc5jLHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"biw0wDuekxEI0scIx2oFEggMsrE="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"4XSpSkRjTrSbw0QOb2jWxc5jLHE=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"biw0wDuekxEI0scIx2oFEggMsrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"Mpt8X54TWoYL9HCBlXUQqSN8ZHk="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"biw0wDuekxEI0scIx2oFEggMsrE=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"Mpt8X54TWoYL9HCBlXUQqSN8ZHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"lKpr+ZjRAGP0rWNWA0P1WqFZOdo="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"Mpt8X54TWoYL9HCBlXUQqSN8ZHk=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"lKpr+ZjRAGP0rWNWA0P1WqFZOdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"x+XdReV9l2ipAL0pGLr8j1sUAJ4="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"lKpr+ZjRAGP0rWNWA0P1WqFZOdo=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"x+XdReV9l2ipAL0pGLr8j1sUAJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"QIOaBbLLFmDwvC4tCQJy5uePrNg="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"x+XdReV9l2ipAL0pGLr8j1sUAJ4=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"QIOaBbLLFmDwvC4tCQJy5uePrNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"GzdL4I8fyPwIfSGYjFE+9/tY6QQ="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"QIOaBbLLFmDwvC4tCQJy5uePrNg=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"GzdL4I8fyPwIfSGYjFE+9/tY6QQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"ap5ehZm2xr7RCEBMjGLYUHe2Wgo="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"GzdL4I8fyPwIfSGYjFE+9/tY6QQ=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"ap5ehZm2xr7RCEBMjGLYUHe2Wgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"oM/dxaFN+s2r+i026RgAhzfjLDk="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"ap5ehZm2xr7RCEBMjGLYUHe2Wgo=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"oM/dxaFN+s2r+i026RgAhzfjLDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="},{"type":"next-occurrence","id":"YHLj6RMvFc4zc76gcL74McYFH6o="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"oM/dxaFN+s2r+i026RgAhzfjLDk=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"YHLj6RMvFc4zc76gcL74McYFH6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SoG/qtfOHI2Ib7mHe+04OKa6RUk="}],"description":"Roadwork on NY 481 southbound ramp to NB I-81 (Cicero) ; Alternating lane closures, Monday March 16th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:30 AM thru 06:00 PM All lanes open","update_date":"2026-03-16T17:22:33Z"},"road_event_id":"YHLj6RMvFc4zc76gcL74McYFH6o=","beginning_cross_street":"NB I-81","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.110328,43.140706]]}},{"id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IySJtqCgAB3OfvTmr8xjm+dULW0="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"IySJtqCgAB3OfvTmr8xjm+dULW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"m5NedqGG+xJLct6HxUfvviYae8o="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"IySJtqCgAB3OfvTmr8xjm+dULW0=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"m5NedqGG+xJLct6HxUfvviYae8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"A/a4/YUlG7DkV92SFVMgVtHlRwY="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"m5NedqGG+xJLct6HxUfvviYae8o=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"A/a4/YUlG7DkV92SFVMgVtHlRwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"Ch1UOz3JHME/NljoqW8AmB84hrc="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"A/a4/YUlG7DkV92SFVMgVtHlRwY=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"Ch1UOz3JHME/NljoqW8AmB84hrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"uOZALWJl/z34ZuI3n1zt6hqQYLU="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"Ch1UOz3JHME/NljoqW8AmB84hrc=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"uOZALWJl/z34ZuI3n1zt6hqQYLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"BAvspKoZ8ZLklZe3+J5VRnVs0+o="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"uOZALWJl/z34ZuI3n1zt6hqQYLU=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"BAvspKoZ8ZLklZe3+J5VRnVs0+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"6UCadKGlY6EmPMRS/7+W9inwgMA="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"BAvspKoZ8ZLklZe3+J5VRnVs0+o=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"6UCadKGlY6EmPMRS/7+W9inwgMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"Hv7RbCqD1anATsA//RmDO6e4axs="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"6UCadKGlY6EmPMRS/7+W9inwgMA=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"Hv7RbCqD1anATsA//RmDO6e4axs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"Hywuhhk0Q3NmmZBhLShuKcM8D8I="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"Hv7RbCqD1anATsA//RmDO6e4axs=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"Hywuhhk0Q3NmmZBhLShuKcM8D8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"6S0XK9IujIRlSeJyQw67n3hKpyw="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"Hywuhhk0Q3NmmZBhLShuKcM8D8I=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"6S0XK9IujIRlSeJyQw67n3hKpyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"wX29jNGM65scqjEOwvBSJWn7Fgs="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"6S0XK9IujIRlSeJyQw67n3hKpyw=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"wX29jNGM65scqjEOwvBSJWn7Fgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"RBvnFnWcq1H6Ezl5m9RQbpARJTk="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"wX29jNGM65scqjEOwvBSJWn7Fgs=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"RBvnFnWcq1H6Ezl5m9RQbpARJTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"d0VYFfsNF3cbjv/ZWgRWSD19cB0="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"RBvnFnWcq1H6Ezl5m9RQbpARJTk=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"d0VYFfsNF3cbjv/ZWgRWSD19cB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="},{"type":"next-occurrence","id":"rjG68B7YXaV+H/8xVSiw5c2tz5c="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"d0VYFfsNF3cbjv/ZWgRWSD19cB0=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"rjG68B7YXaV+H/8xVSiw5c2tz5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oDca82uS4uMYzr4xJ0PqIi9Oy3c="}],"description":"Paving operations on CT 2 both directions between Exit 18 - CT 16/Middletown Road (Colchester) and Exit 21 - CT 11 (Colchester) There will be daytime closures of the right and left lanes in both directions as needed Traffic control signing patterns and State Police will guide motorists through the work zone. During this time there will be short traffic slowdowns on Route 2 westbound in the area of the Exit 23 entrance ramp from Middletown Avenue where it is currently reduced to a single lane. , Wednesday January 14th, 2026 thru Monday November 30th, 2026, Sunday thru Saturday, 09:00 AM thru 02:00 PM All lanes open","update_date":"2026-01-14T16:15:03Z"},"road_event_id":"rjG68B7YXaV+H/8xVSiw5c2tz5c=","beginning_cross_street":"Exit 18 - CT 16/Middletown Road","ending_cross_street":"Exit 21 - CT 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.339879,41.570935]]}},{"id":"fpUQSw5YQxzMt58/4pEH6rE9R9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+c9xmVs2O0PQ3u7pkgsuIQp0g8A="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"fpUQSw5YQxzMt58/4pEH6rE9R9I=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"+c9xmVs2O0PQ3u7pkgsuIQp0g8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"DP57hINC50D+zmrg7Zo+DrppDvM="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"+c9xmVs2O0PQ3u7pkgsuIQp0g8A=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"DP57hINC50D+zmrg7Zo+DrppDvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"CHFFbK2AivPnw9wNHRFCd0d7E3s="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"DP57hINC50D+zmrg7Zo+DrppDvM=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"CHFFbK2AivPnw9wNHRFCd0d7E3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"5HaNn74IKmoPku9jKcDWGFcPdeo="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"CHFFbK2AivPnw9wNHRFCd0d7E3s=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"5HaNn74IKmoPku9jKcDWGFcPdeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"SqI1pxJOmA3G3pzMBM+AuITmWd4="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"5HaNn74IKmoPku9jKcDWGFcPdeo=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"SqI1pxJOmA3G3pzMBM+AuITmWd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"ZubsqNEa34X1hBgiyN1SUJHYJZA="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"SqI1pxJOmA3G3pzMBM+AuITmWd4=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"ZubsqNEa34X1hBgiyN1SUJHYJZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"3lhy2wASpLmiJwjRHbK/KUb5R6I="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"ZubsqNEa34X1hBgiyN1SUJHYJZA=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"3lhy2wASpLmiJwjRHbK/KUb5R6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"FMHzt+PeApa9PrITKbn/8yRZWF8="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"3lhy2wASpLmiJwjRHbK/KUb5R6I=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"FMHzt+PeApa9PrITKbn/8yRZWF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"vJgRR9LN+Mhy2EFVGnJoXFoCpaI="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"FMHzt+PeApa9PrITKbn/8yRZWF8=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"vJgRR9LN+Mhy2EFVGnJoXFoCpaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="},{"type":"next-occurrence","id":"HXJYo6ySwxwDK/zunqDpoAzh8z4="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"vJgRR9LN+Mhy2EFVGnJoXFoCpaI=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"HXJYo6ySwxwDK/zunqDpoAzh8z4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fpUQSw5YQxzMt58/4pEH6rE9R9I="}],"description":"Construction on NY 32 southbound between Sunset Ridge Road (New Paltz) and Veterans Drive (New Paltz) 202508111760/32615509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"HXJYo6ySwxwDK/zunqDpoAzh8z4=","beginning_cross_street":"Sunset Ridge Road","ending_cross_street":"Veterans Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081591,41.760382]]}},{"id":"OiLuBC4WmJjq24rijzytaitz7S0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1vrlhdflx12c3oLaWjdHKk8s4bY="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"OiLuBC4WmJjq24rijzytaitz7S0=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"1vrlhdflx12c3oLaWjdHKk8s4bY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"UEvA5UvD+35gu7FZE3ekZ+IECEE="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"1vrlhdflx12c3oLaWjdHKk8s4bY=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"UEvA5UvD+35gu7FZE3ekZ+IECEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"tHtjKoIGNXvEnRSkhn2EWBH5jv0="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"UEvA5UvD+35gu7FZE3ekZ+IECEE=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"tHtjKoIGNXvEnRSkhn2EWBH5jv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"WGN0aAQLFJ6t49D1AmXy7OCM8To="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"tHtjKoIGNXvEnRSkhn2EWBH5jv0=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"WGN0aAQLFJ6t49D1AmXy7OCM8To=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"5uVihEa8v20BROGwCZVzHRLMEVA="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"WGN0aAQLFJ6t49D1AmXy7OCM8To=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"5uVihEa8v20BROGwCZVzHRLMEVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"uzEmWqlqpXButALVZI38GDUv/UA="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"5uVihEa8v20BROGwCZVzHRLMEVA=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"uzEmWqlqpXButALVZI38GDUv/UA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"y8A4IG5kykZf9tniBb43sbmBZV0="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"uzEmWqlqpXButALVZI38GDUv/UA=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"y8A4IG5kykZf9tniBb43sbmBZV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"wwrSeQArpzkDTPQOuvJ68Xkfn48="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"y8A4IG5kykZf9tniBb43sbmBZV0=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"wwrSeQArpzkDTPQOuvJ68Xkfn48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"ZX7D+ygnPVMUhXp/7lM/YrJzSz4="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"wwrSeQArpzkDTPQOuvJ68Xkfn48=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"ZX7D+ygnPVMUhXp/7lM/YrJzSz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"JC1/QS66/BPODNIvKQ06Zms1Mxo="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"ZX7D+ygnPVMUhXp/7lM/YrJzSz4=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"JC1/QS66/BPODNIvKQ06Zms1Mxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"nxJyye6AXNTY3wdO1G7L+MYsm/Y="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"JC1/QS66/BPODNIvKQ06Zms1Mxo=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"nxJyye6AXNTY3wdO1G7L+MYsm/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"pwarx/EdnWHlz4BAUmqrVez4XR0="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"nxJyye6AXNTY3wdO1G7L+MYsm/Y=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"pwarx/EdnWHlz4BAUmqrVez4XR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"nWCpCxZvISopUYijPG6buq0UIN8="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"pwarx/EdnWHlz4BAUmqrVez4XR0=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"nWCpCxZvISopUYijPG6buq0UIN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="},{"type":"next-occurrence","id":"pGOAUvQtm49RLvUvapLczbPUHac="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"nWCpCxZvISopUYijPG6buq0UIN8=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"pGOAUvQtm49RLvUvapLczbPUHac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CODY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OiLuBC4WmJjq24rijzytaitz7S0="}],"description":"Crane operations on CODY AVE both directions between WYCKOFF AVE (New York) and CYPRESS AVE (New York), Friday March 20th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-17T18:41:29Z"},"road_event_id":"pGOAUvQtm49RLvUvapLczbPUHac=","beginning_cross_street":"WYCKOFF AVE","ending_cross_street":"CYPRESS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901116,40.693914]]}},{"id":"8pcGGKMlYidCSK5M6M6eRg9vSfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q37VT2U2JLosH+TpXHRswvkFQfA="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"8pcGGKMlYidCSK5M6M6eRg9vSfw=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"q37VT2U2JLosH+TpXHRswvkFQfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"Bre61t13a9KhQv/yUppPSv/Q61g="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"q37VT2U2JLosH+TpXHRswvkFQfA=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Bre61t13a9KhQv/yUppPSv/Q61g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"rj8Vkto9DTseS9g61kOMeftqOvA="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Bre61t13a9KhQv/yUppPSv/Q61g=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"rj8Vkto9DTseS9g61kOMeftqOvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"Pmwcet7G6xAifBbVocASc0RTKTw="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"rj8Vkto9DTseS9g61kOMeftqOvA=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Pmwcet7G6xAifBbVocASc0RTKTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"IfcdZWF60LFhIGE5XExz0jw1Xg8="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Pmwcet7G6xAifBbVocASc0RTKTw=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"IfcdZWF60LFhIGE5XExz0jw1Xg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"2UsDtUbEfQwmBHcmTTY7u5xc+Cw="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"IfcdZWF60LFhIGE5XExz0jw1Xg8=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"2UsDtUbEfQwmBHcmTTY7u5xc+Cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"Iq+prTqY2isohGajtntksvrd8xE="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"2UsDtUbEfQwmBHcmTTY7u5xc+Cw=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Iq+prTqY2isohGajtntksvrd8xE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"Lqj20B+GyrdCmQQPvSPRQIrYOfQ="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Iq+prTqY2isohGajtntksvrd8xE=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Lqj20B+GyrdCmQQPvSPRQIrYOfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"TWDgCOFLvZy3fJGEHMf836+4I88="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Lqj20B+GyrdCmQQPvSPRQIrYOfQ=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"TWDgCOFLvZy3fJGEHMf836+4I88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="},{"type":"next-occurrence","id":"Mv0uXrDQvayVj5hKXnnakt7qo+E="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"TWDgCOFLvZy3fJGEHMf836+4I88=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"Mv0uXrDQvayVj5hKXnnakt7qo+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FRONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8pcGGKMlYidCSK5M6M6eRg9vSfw="}],"description":"Construction on FRONT ST both directions between WAVE ST (New York) and MURRAY HULBERT AVE at HANNAH ST (New York) for new Stapleton Waterfront Southern Infrastructure., Tuesday March 17th, 2026 thru Saturday June 20th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-17T18:45:37Z"},"road_event_id":"Mv0uXrDQvayVj5hKXnnakt7qo+E=","beginning_cross_street":"WAVE ST","ending_cross_street":"HANNAH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.07468,40.629871]]}},{"id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5ZkIcDznlWoTOLMJbnHClzFJ/ak="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"5ZkIcDznlWoTOLMJbnHClzFJ/ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"PoUBwznO0lTppIhjavfHXrNMCjc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"5ZkIcDznlWoTOLMJbnHClzFJ/ak=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"PoUBwznO0lTppIhjavfHXrNMCjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"pQlnwAFZMR1snG6NapTR3GAR3hQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"PoUBwznO0lTppIhjavfHXrNMCjc=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"pQlnwAFZMR1snG6NapTR3GAR3hQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"+Pft5TZuRgw9JoBKX1/CX5Yf5tM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"pQlnwAFZMR1snG6NapTR3GAR3hQ=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"+Pft5TZuRgw9JoBKX1/CX5Yf5tM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"7zxMVv8tKLak9+RcBQCnZpvE/yk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"+Pft5TZuRgw9JoBKX1/CX5Yf5tM=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"7zxMVv8tKLak9+RcBQCnZpvE/yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"6LvWyIbpTnATjQaqHJfu9j3dMkM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"7zxMVv8tKLak9+RcBQCnZpvE/yk=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"6LvWyIbpTnATjQaqHJfu9j3dMkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"3ZkBfEOXj1PtqrtE9wgIqv1j0gU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"6LvWyIbpTnATjQaqHJfu9j3dMkM=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"3ZkBfEOXj1PtqrtE9wgIqv1j0gU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"bSqanBxmj9kMhIwnHeWtCevds8Y="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"3ZkBfEOXj1PtqrtE9wgIqv1j0gU=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"bSqanBxmj9kMhIwnHeWtCevds8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"XYRdBUb7/73SLzOy71B+wK87jsU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"bSqanBxmj9kMhIwnHeWtCevds8Y=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"XYRdBUb7/73SLzOy71B+wK87jsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="},{"type":"next-occurrence","id":"jRFLn80CPtOmglmhUa1DiT7t1DA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"XYRdBUb7/73SLzOy71B+wK87jsU=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"jRFLn80CPtOmglmhUa1DiT7t1DA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PV2CbHdytU3aQ6d7RLjXGHhXBR0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 86TH ST (New York) and BEACH 84TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:51:15Z"},"road_event_id":"jRFLn80CPtOmglmhUa1DiT7t1DA=","beginning_cross_street":"BEACH 86TH ST","ending_cross_street":"BEACH 84TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.811403,40.589078]]}},{"id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oq7YzS5BiaN8xMI44aneGjqiGTc="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"oq7YzS5BiaN8xMI44aneGjqiGTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"QkatAFP20AWUwsKgmDTDXSsECew="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"oq7YzS5BiaN8xMI44aneGjqiGTc=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"QkatAFP20AWUwsKgmDTDXSsECew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"yfF+dFp+UmqCFbPHn9DfAdY/FOQ="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"QkatAFP20AWUwsKgmDTDXSsECew=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"yfF+dFp+UmqCFbPHn9DfAdY/FOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"NlW57oLVfGBlaXN44jvrIQutSF0="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"yfF+dFp+UmqCFbPHn9DfAdY/FOQ=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"NlW57oLVfGBlaXN44jvrIQutSF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"1nao/mGCi0a8KFVv+gH2JVxB85k="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"NlW57oLVfGBlaXN44jvrIQutSF0=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"1nao/mGCi0a8KFVv+gH2JVxB85k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"2sUop2bswpi9asxSE+cnl2E/SDU="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"1nao/mGCi0a8KFVv+gH2JVxB85k=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"2sUop2bswpi9asxSE+cnl2E/SDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"RzRX9+vz9b9C9WR7Jr1na/+D6L4="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"2sUop2bswpi9asxSE+cnl2E/SDU=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"RzRX9+vz9b9C9WR7Jr1na/+D6L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"29vSPTOnPag7APSavVJdK4zwsL0="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"RzRX9+vz9b9C9WR7Jr1na/+D6L4=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"29vSPTOnPag7APSavVJdK4zwsL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"L0lOd5lU4j5ntlruozVcXnPzP8s="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"29vSPTOnPag7APSavVJdK4zwsL0=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"L0lOd5lU4j5ntlruozVcXnPzP8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="},{"type":"next-occurrence","id":"14vpMYXmbXF6qF2RfZ5LDi1Ah9k="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"L0lOd5lU4j5ntlruozVcXnPzP8s=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"14vpMYXmbXF6qF2RfZ5LDi1Ah9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ppC0LTiiwsCs2h0w3jOUpwUbotQ="}],"description":"Construction on ROCKAWAY FWY eastbound BEACH 87TH ST (New York) to BEACH 86TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:53:37Z"},"road_event_id":"14vpMYXmbXF6qF2RfZ5LDi1Ah9k=","beginning_cross_street":"BEACH 87TH ST","ending_cross_street":"BEACH 86TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812209,40.588692]]}},{"id":"p2NKLXeVi8/yht+7fysA/cqIa4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dTRlnjzCI7Nbe3qSSzlTL/ZBN4w="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"p2NKLXeVi8/yht+7fysA/cqIa4E=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"dTRlnjzCI7Nbe3qSSzlTL/ZBN4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"0JxhxN1EvFB7mwsRBrQHHCnmmZk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"dTRlnjzCI7Nbe3qSSzlTL/ZBN4w=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"0JxhxN1EvFB7mwsRBrQHHCnmmZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"DGpWtD7O3IZZYgBykjme7+a44Ec="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"0JxhxN1EvFB7mwsRBrQHHCnmmZk=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"DGpWtD7O3IZZYgBykjme7+a44Ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"VM4kiSkvwjZv8YlZSCY6il/5vMk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"DGpWtD7O3IZZYgBykjme7+a44Ec=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"VM4kiSkvwjZv8YlZSCY6il/5vMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"l8tAHXu6X8aomeXJRHLtzosSEy0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"VM4kiSkvwjZv8YlZSCY6il/5vMk=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"l8tAHXu6X8aomeXJRHLtzosSEy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"5fRAmxP3YM3FaIjtrdSeP8/ZYR0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"l8tAHXu6X8aomeXJRHLtzosSEy0=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"5fRAmxP3YM3FaIjtrdSeP8/ZYR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"mKWX0/zZPeF9A0hkEfI5W4ay0xo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"5fRAmxP3YM3FaIjtrdSeP8/ZYR0=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"mKWX0/zZPeF9A0hkEfI5W4ay0xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"/8C6eFQgllhDrvQr+IC0KX5d74E="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"mKWX0/zZPeF9A0hkEfI5W4ay0xo=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"/8C6eFQgllhDrvQr+IC0KX5d74E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"rSYOGoPgmeBcQA/bM6wL6cYdVx8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"/8C6eFQgllhDrvQr+IC0KX5d74E=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"rSYOGoPgmeBcQA/bM6wL6cYdVx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="},{"type":"next-occurrence","id":"+jpI3MTiqPFVXFtvjQ6soTvICps="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"rSYOGoPgmeBcQA/bM6wL6cYdVx8=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"+jpI3MTiqPFVXFtvjQ6soTvICps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p2NKLXeVi8/yht+7fysA/cqIa4E="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 88TH ST (New York) and BEACH 87TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:55:32Z"},"road_event_id":"+jpI3MTiqPFVXFtvjQ6soTvICps=","beginning_cross_street":"BEACH 88TH ST","ending_cross_street":"BEACH 87TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813105,40.588318]]}},{"id":"zHm81htlfd8NewZqcE7Y/gcMplA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lbkPA+WDKA3LSN/xhaiz80UWalQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"zHm81htlfd8NewZqcE7Y/gcMplA=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"lbkPA+WDKA3LSN/xhaiz80UWalQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"ZwuS5mToOsiWL8g0bkJEaid8/2I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"lbkPA+WDKA3LSN/xhaiz80UWalQ=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"ZwuS5mToOsiWL8g0bkJEaid8/2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"GpIW5dTtib/EeWfXmQxMn7tMTuk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"ZwuS5mToOsiWL8g0bkJEaid8/2I=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"GpIW5dTtib/EeWfXmQxMn7tMTuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"qjZJBt26nXVMoIqXonnoBEwtk10="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"GpIW5dTtib/EeWfXmQxMn7tMTuk=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"qjZJBt26nXVMoIqXonnoBEwtk10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"J1X28j0TMCZiKv6PYTKm4vkw4+k="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"qjZJBt26nXVMoIqXonnoBEwtk10=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"J1X28j0TMCZiKv6PYTKm4vkw4+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"4NTqUwKVb6V07qa8W7dU/7qwwZU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"J1X28j0TMCZiKv6PYTKm4vkw4+k=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"4NTqUwKVb6V07qa8W7dU/7qwwZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"UDWC3PawpWorsq/CCo1p51/CoVE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"4NTqUwKVb6V07qa8W7dU/7qwwZU=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"UDWC3PawpWorsq/CCo1p51/CoVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"xUMTmvUyPpKyjM+751yUp7YYCRI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"UDWC3PawpWorsq/CCo1p51/CoVE=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"xUMTmvUyPpKyjM+751yUp7YYCRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"oD0mLhwZxLI0I62GVYCtPDsTO/c="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"xUMTmvUyPpKyjM+751yUp7YYCRI=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"oD0mLhwZxLI0I62GVYCtPDsTO/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="},{"type":"next-occurrence","id":"Y5Xuw1ibTZ/xFe6BHF+X1IVrFBg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"oD0mLhwZxLI0I62GVYCtPDsTO/c=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"Y5Xuw1ibTZ/xFe6BHF+X1IVrFBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHm81htlfd8NewZqcE7Y/gcMplA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 90TH ST (New York) and BEACH 88TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:57:14Z"},"road_event_id":"Y5Xuw1ibTZ/xFe6BHF+X1IVrFBg=","beginning_cross_street":"BEACH 90TH ST","ending_cross_street":"BEACH 88TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814383,40.58781]]}},{"id":"gnDpGYOeeNHwiKPkoBqScKk/T+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NiecjNpOkRWCq3dfdWM8Ivz47s0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"gnDpGYOeeNHwiKPkoBqScKk/T+4=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"NiecjNpOkRWCq3dfdWM8Ivz47s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"fawxgDkOtOY5rCH3iVq7HCLpMWM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"NiecjNpOkRWCq3dfdWM8Ivz47s0=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"fawxgDkOtOY5rCH3iVq7HCLpMWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"Hk0r/YvAp4ui4P5pYBamIWU05z0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"fawxgDkOtOY5rCH3iVq7HCLpMWM=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"Hk0r/YvAp4ui4P5pYBamIWU05z0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"R9kcF7vbYlZCLZwG6PJn7cvX1CQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"Hk0r/YvAp4ui4P5pYBamIWU05z0=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"R9kcF7vbYlZCLZwG6PJn7cvX1CQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"WXTu3RMsPz2VM35uEI2GpMmxcHM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"R9kcF7vbYlZCLZwG6PJn7cvX1CQ=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"WXTu3RMsPz2VM35uEI2GpMmxcHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"OuwoXHwDzn1siuOGXe6ecoxADwQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"WXTu3RMsPz2VM35uEI2GpMmxcHM=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"OuwoXHwDzn1siuOGXe6ecoxADwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"GhwpTc8BfrU36m4s/owyBtzgSxs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"OuwoXHwDzn1siuOGXe6ecoxADwQ=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"GhwpTc8BfrU36m4s/owyBtzgSxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"WRniX0cDOV4FTNtBHU4vrkb+2tQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"GhwpTc8BfrU36m4s/owyBtzgSxs=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"WRniX0cDOV4FTNtBHU4vrkb+2tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"y5Tx6p7uNyznuXApbQU7zZRdANE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"WRniX0cDOV4FTNtBHU4vrkb+2tQ=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"y5Tx6p7uNyznuXApbQU7zZRdANE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="},{"type":"next-occurrence","id":"j9KnLfEt3NA2x0LTEOwFhX4IOBA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"y5Tx6p7uNyznuXApbQU7zZRdANE=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"j9KnLfEt3NA2x0LTEOwFhX4IOBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gnDpGYOeeNHwiKPkoBqScKk/T+4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 91ST ST (New York) and BEACH 90TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T18:59:05Z"},"road_event_id":"j9KnLfEt3NA2x0LTEOwFhX4IOBA=","beginning_cross_street":"BEACH 91ST ST","ending_cross_street":"BEACH 90TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815122,40.587518]]}},{"id":"zKkUToutwqDpufw7bpBcBxUYiYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fDK8BI1IhWqbTkCm83ipTw6XTrY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"zKkUToutwqDpufw7bpBcBxUYiYE=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"fDK8BI1IhWqbTkCm83ipTw6XTrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"LdwHz408sI5fX1JDUgaCdaCggyc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"fDK8BI1IhWqbTkCm83ipTw6XTrY=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"LdwHz408sI5fX1JDUgaCdaCggyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"3qzarIQbO6N9LEk2Dy7MnGURc0M="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"LdwHz408sI5fX1JDUgaCdaCggyc=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"3qzarIQbO6N9LEk2Dy7MnGURc0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"6p+Vuc/7My9vKNMvLUHpscnfbPE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"3qzarIQbO6N9LEk2Dy7MnGURc0M=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"6p+Vuc/7My9vKNMvLUHpscnfbPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"8gtR4m+o2faPRLXh8lTKBblfAGI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"6p+Vuc/7My9vKNMvLUHpscnfbPE=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"8gtR4m+o2faPRLXh8lTKBblfAGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"w3WxBWOoGdCw3ieX5LspzloaxI0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"8gtR4m+o2faPRLXh8lTKBblfAGI=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"w3WxBWOoGdCw3ieX5LspzloaxI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"/O2FlmV6/cZjsN+WVq8L9iFfPcY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"w3WxBWOoGdCw3ieX5LspzloaxI0=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"/O2FlmV6/cZjsN+WVq8L9iFfPcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"mmZtR8HHpVcG2yfYzkReDYA+C28="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"/O2FlmV6/cZjsN+WVq8L9iFfPcY=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"mmZtR8HHpVcG2yfYzkReDYA+C28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"78L3TogUQ0JNu9iH7P8b8W77mW0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"mmZtR8HHpVcG2yfYzkReDYA+C28=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"78L3TogUQ0JNu9iH7P8b8W77mW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="},{"type":"next-occurrence","id":"SlCOqLJNSObv3DS5KYt3FPlIOyQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"78L3TogUQ0JNu9iH7P8b8W77mW0=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"SlCOqLJNSObv3DS5KYt3FPlIOyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zKkUToutwqDpufw7bpBcBxUYiYE="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 92ND ST (New York) and BEACH 91ST ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:01:01Z"},"road_event_id":"SlCOqLJNSObv3DS5KYt3FPlIOyQ=","beginning_cross_street":"BEACH 92ND ST","ending_cross_street":"BEACH 91ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815931,40.587201]]}},{"id":"2uWNhmBWHydpRDHahoocKgRuYdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Uoz6W61wDjMy/1VnYL69w1vrym8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"2uWNhmBWHydpRDHahoocKgRuYdw=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"Uoz6W61wDjMy/1VnYL69w1vrym8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"rPpWnKpB6VGEdvECh3OQzntU9Xg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"Uoz6W61wDjMy/1VnYL69w1vrym8=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"rPpWnKpB6VGEdvECh3OQzntU9Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"0H0U4Ac/hZtVJrpA87Q1Ne1QS/I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"rPpWnKpB6VGEdvECh3OQzntU9Xg=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"0H0U4Ac/hZtVJrpA87Q1Ne1QS/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"SkHC8C3pbofq4QrxrsF8EGtL+H0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"0H0U4Ac/hZtVJrpA87Q1Ne1QS/I=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"SkHC8C3pbofq4QrxrsF8EGtL+H0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"zpht1NFSC74AxKpJQ8/E/aXK3Y0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"SkHC8C3pbofq4QrxrsF8EGtL+H0=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"zpht1NFSC74AxKpJQ8/E/aXK3Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"6Q87t54OexhbpFCs43n+jxs7sp0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"zpht1NFSC74AxKpJQ8/E/aXK3Y0=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"6Q87t54OexhbpFCs43n+jxs7sp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"GXyyM0GBNwRQiRbyGMmdNT6AIuQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"6Q87t54OexhbpFCs43n+jxs7sp0=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"GXyyM0GBNwRQiRbyGMmdNT6AIuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"IFvxK4Y5NeJkHIDM/yiL1xYiS7U="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"GXyyM0GBNwRQiRbyGMmdNT6AIuQ=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"IFvxK4Y5NeJkHIDM/yiL1xYiS7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"rqpQCf+hD5BVQeMCJMfk6metUsQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"IFvxK4Y5NeJkHIDM/yiL1xYiS7U=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"rqpQCf+hD5BVQeMCJMfk6metUsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="},{"type":"next-occurrence","id":"R7KlO/Ji74FVTnqPl0MhRO4+XQU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"rqpQCf+hD5BVQeMCJMfk6metUsQ=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"R7KlO/Ji74FVTnqPl0MhRO4+XQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2uWNhmBWHydpRDHahoocKgRuYdw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 94TH ST (New York) and BEACH 92ND ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Tuesday March 17th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-17T19:03:05Z"},"road_event_id":"R7KlO/Ji74FVTnqPl0MhRO4+XQU=","beginning_cross_street":"BEACH 94TH ST","ending_cross_street":"BEACH 92ND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817003,40.586788]]}},{"id":"pUqRbdD3m17BgAAiu/U0a5l4jek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 142ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tXwU1rqOwqKe93rThkDi/f3KRwY="}],"description":"Construction on E 142ND ST eastbound between WALES AVE (New York) and SOUTHERN BLVD (New York) for concrete pump., Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:33:08Z"},"road_event_id":"pUqRbdD3m17BgAAiu/U0a5l4jek=","beginning_cross_street":"WALES AVE","ending_cross_street":"SOUTHERN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909131,40.807434]]}},{"id":"tXwU1rqOwqKe93rThkDi/f3KRwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 142ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pUqRbdD3m17BgAAiu/U0a5l4jek="},{"type":"next-occurrence","id":"IF2mN7BkX7VunIB5ewTv7+BCFuQ="}],"description":"Construction on E 142ND ST eastbound between WALES AVE (New York) and SOUTHERN BLVD (New York) for concrete pump., Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:33:08Z"},"road_event_id":"tXwU1rqOwqKe93rThkDi/f3KRwY=","beginning_cross_street":"WALES AVE","ending_cross_street":"SOUTHERN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909131,40.807434]]}},{"id":"IF2mN7BkX7VunIB5ewTv7+BCFuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 142ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pUqRbdD3m17BgAAiu/U0a5l4jek="},{"type":"next-occurrence","id":"YRkIcGTt5rGScC/y7m5Z/GPgPGY="}],"description":"Construction on E 142ND ST eastbound between WALES AVE (New York) and SOUTHERN BLVD (New York) for concrete pump., Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:33:08Z"},"road_event_id":"IF2mN7BkX7VunIB5ewTv7+BCFuQ=","beginning_cross_street":"WALES AVE","ending_cross_street":"SOUTHERN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909131,40.807434]]}},{"id":"YRkIcGTt5rGScC/y7m5Z/GPgPGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 142ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pUqRbdD3m17BgAAiu/U0a5l4jek="}],"description":"Construction on E 142ND ST eastbound between WALES AVE (New York) and SOUTHERN BLVD (New York) for concrete pump., Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:33:08Z"},"road_event_id":"YRkIcGTt5rGScC/y7m5Z/GPgPGY=","beginning_cross_street":"WALES AVE","ending_cross_street":"SOUTHERN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909131,40.807434]]}},{"id":"QEgYL++S/sQO+wXHTcAH2V9R0tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kUZOSi4bYOOilGXm5Fb//vv8agY="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"QEgYL++S/sQO+wXHTcAH2V9R0tI=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"kUZOSi4bYOOilGXm5Fb//vv8agY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QEgYL++S/sQO+wXHTcAH2V9R0tI="},{"type":"next-occurrence","id":"2YeO7DRvekicPf3KzPgrNCUk2kU="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"kUZOSi4bYOOilGXm5Fb//vv8agY=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"2YeO7DRvekicPf3KzPgrNCUk2kU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QEgYL++S/sQO+wXHTcAH2V9R0tI="},{"type":"next-occurrence","id":"GuedFsLWNQ5e/u2CbtPRAGm72uA="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"2YeO7DRvekicPf3KzPgrNCUk2kU=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"GuedFsLWNQ5e/u2CbtPRAGm72uA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QEgYL++S/sQO+wXHTcAH2V9R0tI="},{"type":"next-occurrence","id":"77xv0BbyT8x8NPqoLrBh4+JD6Bs="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"GuedFsLWNQ5e/u2CbtPRAGm72uA=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"77xv0BbyT8x8NPqoLrBh4+JD6Bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QEgYL++S/sQO+wXHTcAH2V9R0tI="},{"type":"next-occurrence","id":"JGtoheTxQwWy/oq81xYxW/zRSZ4="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"77xv0BbyT8x8NPqoLrBh4+JD6Bs=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"JGtoheTxQwWy/oq81xYxW/zRSZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SHAKESPEARE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QEgYL++S/sQO+wXHTcAH2V9R0tI="}],"description":"Crane operations on SHAKESPEARE AVE northbound between W 169TH ST (New York) and W 170TH ST (New York), Tuesday March 17th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 17th, 2026 thru Friday May 15th, 2026, 09:00 AM thru 04:00 PM All lanes closed, Tuesday March 17th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:37:03Z"},"road_event_id":"JGtoheTxQwWy/oq81xYxW/zRSZ4=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W 170TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922556,40.839284]]}},{"id":"056F2BjMldtXbEVAjySjH1iBRrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YyQlWVE/lLNYcMcCsC1NnP27qhs="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"056F2BjMldtXbEVAjySjH1iBRrQ=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"YyQlWVE/lLNYcMcCsC1NnP27qhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"CgEL2RPSWrkCWgk0Fmkxcf+FFgo="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"YyQlWVE/lLNYcMcCsC1NnP27qhs=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"CgEL2RPSWrkCWgk0Fmkxcf+FFgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"Zjc35T++rLms1oofwTHFly0bXio="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"CgEL2RPSWrkCWgk0Fmkxcf+FFgo=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Zjc35T++rLms1oofwTHFly0bXio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"xgu3g4tkQIx3o4mOWxdakJAbIFY="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"Zjc35T++rLms1oofwTHFly0bXio=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"xgu3g4tkQIx3o4mOWxdakJAbIFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"KGNgoBBy2x6AL+tSbNrPoLGMBDo="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"xgu3g4tkQIx3o4mOWxdakJAbIFY=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"KGNgoBBy2x6AL+tSbNrPoLGMBDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"N8hK26NE7YjR6oUaBRX6DZrfHGM="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"KGNgoBBy2x6AL+tSbNrPoLGMBDo=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"N8hK26NE7YjR6oUaBRX6DZrfHGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"aypYLMVvUxZIJmbkBX2irYg8Qts="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"N8hK26NE7YjR6oUaBRX6DZrfHGM=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"aypYLMVvUxZIJmbkBX2irYg8Qts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"EaW2QBxbycc3PLCPrWegbX/E4H4="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"aypYLMVvUxZIJmbkBX2irYg8Qts=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"EaW2QBxbycc3PLCPrWegbX/E4H4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"3j4a1Vo02njE1TbfNAqeHcwywb8="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"EaW2QBxbycc3PLCPrWegbX/E4H4=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"3j4a1Vo02njE1TbfNAqeHcwywb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="},{"type":"next-occurrence","id":"AjNyp9gUMG43TiwDY3p1uqgvy0I="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"3j4a1Vo02njE1TbfNAqeHcwywb8=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"AjNyp9gUMG43TiwDY3p1uqgvy0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"056F2BjMldtXbEVAjySjH1iBRrQ="}],"description":"Roadwork on I-81 northbound ramp from Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T13:46:06Z"},"road_event_id":"AjNyp9gUMG43TiwDY3p1uqgvy0I=","beginning_cross_street":"Exit 5A - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"ZvKNQim+uBIoYXOVX1J17nIhzHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"saKoVwkz7SjgVSqg/ArGlJPyxdc="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"ZvKNQim+uBIoYXOVX1J17nIhzHY=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"saKoVwkz7SjgVSqg/ArGlJPyxdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="},{"type":"next-occurrence","id":"1CtAVQFf2T9oHP21Ry4ib572wxo="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"saKoVwkz7SjgVSqg/ArGlJPyxdc=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"1CtAVQFf2T9oHP21Ry4ib572wxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="},{"type":"next-occurrence","id":"tE4syqE/Oj0i28avuj8tvRVUy1g="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"1CtAVQFf2T9oHP21Ry4ib572wxo=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"tE4syqE/Oj0i28avuj8tvRVUy1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="},{"type":"next-occurrence","id":"pZt3WYt3lEwpKaEkdtYmtScw4Us="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"tE4syqE/Oj0i28avuj8tvRVUy1g=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"pZt3WYt3lEwpKaEkdtYmtScw4Us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="},{"type":"next-occurrence","id":"kJWDC57zXD1oxnAFxsPnapPH8tg="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"pZt3WYt3lEwpKaEkdtYmtScw4Us=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"kJWDC57zXD1oxnAFxsPnapPH8tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="},{"type":"next-occurrence","id":"Dyk5jusP3GH+2kFKkwC6H7ZJkws="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"kJWDC57zXD1oxnAFxsPnapPH8tg=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"Dyk5jusP3GH+2kFKkwC6H7ZJkws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="},{"type":"next-occurrence","id":"k9S88fb+6GHLwszHIyseF0E3wNQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"Dyk5jusP3GH+2kFKkwC6H7ZJkws=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"k9S88fb+6GHLwszHIyseF0E3wNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="},{"type":"next-occurrence","id":"HZOKhZAnNBtrWWXxEP0Mq15DacQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"k9S88fb+6GHLwszHIyseF0E3wNQ=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"HZOKhZAnNBtrWWXxEP0Mq15DacQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZvKNQim+uBIoYXOVX1J17nIhzHY="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 9-10 Syracuse Airport (Cicero) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday/Tuesday/Wednesday/Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-02T14:28:19Z"},"road_event_id":"HZOKhZAnNBtrWWXxEP0Mq15DacQ=","beginning_cross_street":"Exit 9-10 Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128679,43.11988]]}},{"id":"9FsSNgFaWGjzbpeMC0QccwDWgXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rh3LHewTPna5VebN09shIIKU/P8="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"9FsSNgFaWGjzbpeMC0QccwDWgXE=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"rh3LHewTPna5VebN09shIIKU/P8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"BZ1QAxgoPyzl0tJJOKobRt0ZLwY="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"rh3LHewTPna5VebN09shIIKU/P8=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"BZ1QAxgoPyzl0tJJOKobRt0ZLwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"SMucp/DgDDIE/yJMTQ+0GU1DjZk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"BZ1QAxgoPyzl0tJJOKobRt0ZLwY=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"SMucp/DgDDIE/yJMTQ+0GU1DjZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"a9H8mfjJaJqVIoqmZTeqNo6RWeU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"SMucp/DgDDIE/yJMTQ+0GU1DjZk=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"a9H8mfjJaJqVIoqmZTeqNo6RWeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"/R/LtfFmhZHXSqMHoAGCGwq195U="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"a9H8mfjJaJqVIoqmZTeqNo6RWeU=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"/R/LtfFmhZHXSqMHoAGCGwq195U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"Fz+1ZZUIrHx6E/O78ZrKDOGqAZI="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"/R/LtfFmhZHXSqMHoAGCGwq195U=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"Fz+1ZZUIrHx6E/O78ZrKDOGqAZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"AdSHPJdrJMtLJH6JApug07HvbWA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"Fz+1ZZUIrHx6E/O78ZrKDOGqAZI=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"AdSHPJdrJMtLJH6JApug07HvbWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"xs9Iey3/rUyQulwQ7LrEFAsAp9U="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"AdSHPJdrJMtLJH6JApug07HvbWA=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"xs9Iey3/rUyQulwQ7LrEFAsAp9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"kMyx8wxbRA2+gmvvfHacZWSJKYE="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"xs9Iey3/rUyQulwQ7LrEFAsAp9U=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"kMyx8wxbRA2+gmvvfHacZWSJKYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="},{"type":"next-occurrence","id":"+5jng4Il47EOMxoINzR+YmfP3mQ="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"kMyx8wxbRA2+gmvvfHacZWSJKYE=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"+5jng4Il47EOMxoINzR+YmfP3mQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9FsSNgFaWGjzbpeMC0QccwDWgXE="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-07T13:51:19Z"},"road_event_id":"+5jng4Il47EOMxoINzR+YmfP3mQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167417,43.088919]]}},{"id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O1zBs62KoiUL0Cc+0oIBAjl6CfA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"O1zBs62KoiUL0Cc+0oIBAjl6CfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"1W+QX9iiybSbDuBC7dukYfbOdLo="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"O1zBs62KoiUL0Cc+0oIBAjl6CfA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"1W+QX9iiybSbDuBC7dukYfbOdLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"yLHQTzIzwh84XHioCLKsLpoz66o="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"1W+QX9iiybSbDuBC7dukYfbOdLo=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"yLHQTzIzwh84XHioCLKsLpoz66o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"IN6G1XdvRn68KacEAUywS7vKtv0="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"yLHQTzIzwh84XHioCLKsLpoz66o=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"IN6G1XdvRn68KacEAUywS7vKtv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"bRt8JhnN7cKKzGiWDkt/i93VY8o="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"IN6G1XdvRn68KacEAUywS7vKtv0=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"bRt8JhnN7cKKzGiWDkt/i93VY8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"VvHIrBeiNxe2yaHmocxblRN87Tc="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"bRt8JhnN7cKKzGiWDkt/i93VY8o=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"VvHIrBeiNxe2yaHmocxblRN87Tc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"uCThTtt05VqM3hrMTxRx0QGLBCI="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"VvHIrBeiNxe2yaHmocxblRN87Tc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"uCThTtt05VqM3hrMTxRx0QGLBCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"bHQAF7cnK7o9Cd3iTgcYFUPHGRU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"uCThTtt05VqM3hrMTxRx0QGLBCI=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"bHQAF7cnK7o9Cd3iTgcYFUPHGRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"A3scoFD/ctUA2Wjtyt+ft8jtN5U="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"bHQAF7cnK7o9Cd3iTgcYFUPHGRU=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"A3scoFD/ctUA2Wjtyt+ft8jtN5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="},{"type":"next-occurrence","id":"wqfAJLHbcaXKXB0Ss9XFCQrlofk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"A3scoFD/ctUA2Wjtyt+ft8jtN5U=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"wqfAJLHbcaXKXB0Ss9XFCQrlofk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IpF7tpjTnhpFdmpRm+/vDXJqlqA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-19T16:10:07Z"},"road_event_id":"wqfAJLHbcaXKXB0Ss9XFCQrlofk=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162914,43.093909]]}},{"id":"x+7WjiHOW2WCV696vg3O6mUUXEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KFlypZytxaVGU/gzB5DACEsxRas="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"x+7WjiHOW2WCV696vg3O6mUUXEo=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"KFlypZytxaVGU/gzB5DACEsxRas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"y0cM8LMWnUzufCAZcmd2wbtlOaI="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"KFlypZytxaVGU/gzB5DACEsxRas=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"y0cM8LMWnUzufCAZcmd2wbtlOaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"r+h0NbP78vqtM98PmbcQu2OBhaA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"y0cM8LMWnUzufCAZcmd2wbtlOaI=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"r+h0NbP78vqtM98PmbcQu2OBhaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"u9acG59jiHGa4OkLk5rERCnj4k8="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"r+h0NbP78vqtM98PmbcQu2OBhaA=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"u9acG59jiHGa4OkLk5rERCnj4k8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"EjtKrIrwLJ1mq8Tsq5WgsClGX04="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"u9acG59jiHGa4OkLk5rERCnj4k8=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"EjtKrIrwLJ1mq8Tsq5WgsClGX04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"aSrJe1pDHWL6y3bJzWVnlzpONPk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"EjtKrIrwLJ1mq8Tsq5WgsClGX04=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"aSrJe1pDHWL6y3bJzWVnlzpONPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"TbVnOGLejJa05+AQaYEFLSgySXw="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"aSrJe1pDHWL6y3bJzWVnlzpONPk=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"TbVnOGLejJa05+AQaYEFLSgySXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"6THySG1SQkwkvVg3vbQ3cZT79Ws="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"TbVnOGLejJa05+AQaYEFLSgySXw=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"6THySG1SQkwkvVg3vbQ3cZT79Ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"gvpBu31z8AjkK52IvTVN1Zn4Zmc="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"6THySG1SQkwkvVg3vbQ3cZT79Ws=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"gvpBu31z8AjkK52IvTVN1Zn4Zmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="},{"type":"next-occurrence","id":"2g5y3TzS955K6Gp7xlVxuVlSzHU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"gvpBu31z8AjkK52IvTVN1Zn4Zmc=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"2g5y3TzS955K6Gp7xlVxuVlSzHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+7WjiHOW2WCV696vg3O6mUUXEo="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:27:52Z"},"road_event_id":"2g5y3TzS955K6Gp7xlVxuVlSzHU=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151384,43.10606]]}},{"id":"IfXLO324EcES8SQ/JHyGC8GZ5zU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Ramp widening on I-690 westbound ramp from NY-298; Bear St (Syracuse) ; follow detour, Continuous Monday March 30th, 2026 07:00 AM thru Thursday April 30th, 2026 03:00 PM All lanes closed","update_date":"2026-03-18T18:59:53Z"},"road_event_id":"IfXLO324EcES8SQ/JHyGC8GZ5zU=","beginning_cross_street":"NY-298; Bear St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.17505,43.057607]]}},{"id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5iactHUOtBr30P9IFxMJurQXgIo="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"5iactHUOtBr30P9IFxMJurQXgIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s="},{"type":"next-occurrence","id":"rUyIY9QROJyuVb2OQX2wMpF4h2M="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"5iactHUOtBr30P9IFxMJurQXgIo=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"rUyIY9QROJyuVb2OQX2wMpF4h2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s="},{"type":"next-occurrence","id":"QHZcCEomNxylaqYhqtRlLYlU/Eg="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"rUyIY9QROJyuVb2OQX2wMpF4h2M=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"QHZcCEomNxylaqYhqtRlLYlU/Eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s="},{"type":"next-occurrence","id":"4b2OrKSXudwVaYtTkRkIohXOMlU="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"QHZcCEomNxylaqYhqtRlLYlU/Eg=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:30:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"4b2OrKSXudwVaYtTkRkIohXOMlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s="},{"type":"next-occurrence","id":"4sdYMnWu5iA9DIqVtten1U1sj/g="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"4b2OrKSXudwVaYtTkRkIohXOMlU=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:30:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"4sdYMnWu5iA9DIqVtten1U1sj/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s="},{"type":"next-occurrence","id":"AxNJS2lK3l/ub/ySEkX1SAHLU+8="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"4sdYMnWu5iA9DIqVtten1U1sj/g=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:30:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"AxNJS2lK3l/ub/ySEkX1SAHLU+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s="},{"type":"next-occurrence","id":"sxESU+RCZJIcgyVHDlc6z9LdFSQ="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"AxNJS2lK3l/ub/ySEkX1SAHLU+8=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:30:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"sxESU+RCZJIcgyVHDlc6z9LdFSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aaxi6wp/mjzk+FwF6vMrZopeE7s="}],"description":"Drainage improvements and road widening on NY 17 [Rockland] both directions between Municipal Plaza (Sloatsburg) and S Side Place (Sloatsburg) 202508113210/32577909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, right lane closure","update_date":"2026-04-17T19:31:01Z"},"road_event_id":"sxESU+RCZJIcgyVHDlc6z9LdFSQ=","beginning_cross_street":"Municipal Plaza","ending_cross_street":"S Side Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:30:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192721,41.157409]]}},{"id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7yCvGqtE/cjRGeXTuPHIhuudpIw="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"7yCvGqtE/cjRGeXTuPHIhuudpIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"e7EPecvVAwcbRlNq7+O+m2YvH5k="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"7yCvGqtE/cjRGeXTuPHIhuudpIw=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"e7EPecvVAwcbRlNq7+O+m2YvH5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"QN0Q289EfscaLPk+E0P9OzbWyAY="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"e7EPecvVAwcbRlNq7+O+m2YvH5k=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"QN0Q289EfscaLPk+E0P9OzbWyAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"JTtcdzNwMqo2GPiFhoLE8QbptBE="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"QN0Q289EfscaLPk+E0P9OzbWyAY=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"JTtcdzNwMqo2GPiFhoLE8QbptBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"9n7fdfdj7kegQdoBWljX7WRHE8k="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"JTtcdzNwMqo2GPiFhoLE8QbptBE=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"9n7fdfdj7kegQdoBWljX7WRHE8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"SAYfTkg1tRo0zoR31s1XnIi3mHM="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"9n7fdfdj7kegQdoBWljX7WRHE8k=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"SAYfTkg1tRo0zoR31s1XnIi3mHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"8eqXcEefk76O5cttZ7nVYhnRS2w="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"SAYfTkg1tRo0zoR31s1XnIi3mHM=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"8eqXcEefk76O5cttZ7nVYhnRS2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"NQawKZcUGWH2uMFLevRA2f4QlBI="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"8eqXcEefk76O5cttZ7nVYhnRS2w=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"NQawKZcUGWH2uMFLevRA2f4QlBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"3tZzcrNme9cA0hgYo1c3sne5mN4="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"NQawKZcUGWH2uMFLevRA2f4QlBI=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"3tZzcrNme9cA0hgYo1c3sne5mN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="},{"type":"next-occurrence","id":"0XNctrlUUPAgwYmZ4Zaxz9wwNvs="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"3tZzcrNme9cA0hgYo1c3sne5mN4=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"0XNctrlUUPAgwYmZ4Zaxz9wwNvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oaNA9aG+ycHQbNicLuMyCEU9KyQ="}],"description":"Road rehabilitation on NY 370 both directions between Tulip Street (Salina) and Meyers Road (Salina) ; Alternating one-way traffic with flaggers, Monday March 30th, 2026 thru Saturday October 31st, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-03-19T14:57:28Z"},"road_event_id":"0XNctrlUUPAgwYmZ4Zaxz9wwNvs=","beginning_cross_street":"Tulip Street","ending_cross_street":"Meyers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.20822,43.103294]]}},{"id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7fXgWoJiKlCGTAmznzmX+Ho/gmA="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"7fXgWoJiKlCGTAmznzmX+Ho/gmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0="},{"type":"next-occurrence","id":"6XKYtatT5m6TMaDxiFFVRbO9v6I="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"7fXgWoJiKlCGTAmznzmX+Ho/gmA=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"6XKYtatT5m6TMaDxiFFVRbO9v6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0="},{"type":"next-occurrence","id":"ODwAHM7GgvbdPuJMauazUdqW5vE="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"6XKYtatT5m6TMaDxiFFVRbO9v6I=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"ODwAHM7GgvbdPuJMauazUdqW5vE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0="},{"type":"next-occurrence","id":"gcc97bx/g9N/YYkfJJBeYNtxQ1g="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"ODwAHM7GgvbdPuJMauazUdqW5vE=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"gcc97bx/g9N/YYkfJJBeYNtxQ1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0="},{"type":"next-occurrence","id":"Uh4yfM1wJUwHfuyoNmgAVU2fJZI="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"gcc97bx/g9N/YYkfJJBeYNtxQ1g=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"Uh4yfM1wJUwHfuyoNmgAVU2fJZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0="},{"type":"next-occurrence","id":"0nspL8dNe7cgUTY01luz22/4nZc="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"Uh4yfM1wJUwHfuyoNmgAVU2fJZI=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"0nspL8dNe7cgUTY01luz22/4nZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0="},{"type":"next-occurrence","id":"cF54h/3lDCqriGZOa5eb46H0jGw="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"0nspL8dNe7cgUTY01luz22/4nZc=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"cF54h/3lDCqriGZOa5eb46H0jGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SFhJ+xg8s8r9a52N6kfRKmdnl0="}],"description":"Utility work on NY 5 both directions between Olmstead Rd (West Bloomfield) and Elton Rd (West Bloomfield), Thursday March 26th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:13:27Z"},"road_event_id":"cF54h/3lDCqriGZOa5eb46H0jGw=","beginning_cross_street":"Olmstead Rd","ending_cross_street":"Elton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.550299999999993,42.907108]]}},{"id":"ORC300523224","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","description":"Construction on I-278 both directions between Drive Martin Luther King Expressway (Staten Island) and Richmond Avenue Exit (Staten Island) Not currently Scheduled","update_date":"2026-03-26T18:00:04Z"},"road_event_id":"ORC300523224","beginning_cross_street":"Drive Martin Luther King Expressway","ending_cross_street":"Richmond Avenue Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-19T16:53:31Z","end_date":"2026-03-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.153854,40.612474]]}},{"id":"bBuYYRpJPrOClk3u60RCTqG7I+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3Mot2wyTudA2q/oSnJQaDM7kUbo="}],"description":"Utility work on NY 63 both directions White Bridge Rd (Sparta) to Anderson Rd (Sparta) Alternating lane closures with flaggers as needed, Thursday March 19th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:03:44Z"},"road_event_id":"bBuYYRpJPrOClk3u60RCTqG7I+U=","beginning_cross_street":"White Bridge Rd ","ending_cross_street":"Anderson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.718534,42.594185]]}},{"id":"3Mot2wyTudA2q/oSnJQaDM7kUbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bBuYYRpJPrOClk3u60RCTqG7I+U="},{"type":"next-occurrence","id":"mIR8erhU1yzc0F0OrB7LUxTunU4="}],"description":"Utility work on NY 63 both directions White Bridge Rd (Sparta) to Anderson Rd (Sparta) Alternating lane closures with flaggers as needed, Thursday March 19th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:03:44Z"},"road_event_id":"3Mot2wyTudA2q/oSnJQaDM7kUbo=","beginning_cross_street":"White Bridge Rd ","ending_cross_street":"Anderson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.718534,42.594185]]}},{"id":"mIR8erhU1yzc0F0OrB7LUxTunU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bBuYYRpJPrOClk3u60RCTqG7I+U="}],"description":"Utility work on NY 63 both directions White Bridge Rd (Sparta) to Anderson Rd (Sparta) Alternating lane closures with flaggers as needed, Thursday March 19th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:03:44Z"},"road_event_id":"mIR8erhU1yzc0F0OrB7LUxTunU4=","beginning_cross_street":"White Bridge Rd ","ending_cross_street":"Anderson Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.718534,42.594185]]}},{"id":"g3N4whD3Ry2MU1tarInn/YFfYOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HuDJsKlRvBI4wteYts8rHb+aldU="}],"description":"Water main work on NY 120 both directions between Airport Road (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-20T10:30:59Z"},"road_event_id":"g3N4whD3Ry2MU1tarInn/YFfYOw=","beginning_cross_street":"Airport Road","ending_cross_street":"Cooney Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.723063,41.092239]]}},{"id":"HuDJsKlRvBI4wteYts8rHb+aldU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g3N4whD3Ry2MU1tarInn/YFfYOw="},{"type":"next-occurrence","id":"qSnv2q2tvdMAc4SuW/JWpPssoRs="}],"description":"Water main work on NY 120 both directions between Airport Road (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-20T10:30:59Z"},"road_event_id":"HuDJsKlRvBI4wteYts8rHb+aldU=","beginning_cross_street":"Airport Road","ending_cross_street":"Cooney Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.723063,41.092239]]}},{"id":"qSnv2q2tvdMAc4SuW/JWpPssoRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g3N4whD3Ry2MU1tarInn/YFfYOw="},{"type":"next-occurrence","id":"ClrescBis1syR4kZkpmmCh0N9zE="}],"description":"Water main work on NY 120 both directions between Airport Road (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-20T10:30:59Z"},"road_event_id":"qSnv2q2tvdMAc4SuW/JWpPssoRs=","beginning_cross_street":"Airport Road","ending_cross_street":"Cooney Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.723063,41.092239]]}},{"id":"ClrescBis1syR4kZkpmmCh0N9zE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g3N4whD3Ry2MU1tarInn/YFfYOw="},{"type":"next-occurrence","id":"Sj5agXGZ8NijpcU/pQDDGyWbHkM="}],"description":"Water main work on NY 120 both directions between Airport Road (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-20T10:30:59Z"},"road_event_id":"ClrescBis1syR4kZkpmmCh0N9zE=","beginning_cross_street":"Airport Road","ending_cross_street":"Cooney Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.723063,41.092239]]}},{"id":"Sj5agXGZ8NijpcU/pQDDGyWbHkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g3N4whD3Ry2MU1tarInn/YFfYOw="},{"type":"next-occurrence","id":"jWlMr1e0f+Pk/viowKjECYf9aLY="}],"description":"Water main work on NY 120 both directions between Airport Road (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-20T10:30:59Z"},"road_event_id":"Sj5agXGZ8NijpcU/pQDDGyWbHkM=","beginning_cross_street":"Airport Road","ending_cross_street":"Cooney Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.723063,41.092239]]}},{"id":"jWlMr1e0f+Pk/viowKjECYf9aLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g3N4whD3Ry2MU1tarInn/YFfYOw="},{"type":"next-occurrence","id":"lbESYoCgnJfmWT9ma5UqaC5Hf3k="}],"description":"Water main work on NY 120 both directions between Airport Road (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-20T10:30:59Z"},"road_event_id":"jWlMr1e0f+Pk/viowKjECYf9aLY=","beginning_cross_street":"Airport Road","ending_cross_street":"Cooney Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.723063,41.092239]]}},{"id":"lbESYoCgnJfmWT9ma5UqaC5Hf3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g3N4whD3Ry2MU1tarInn/YFfYOw="}],"description":"Water main work on NY 120 both directions between Airport Road (North Castle) and Cooney Hill Road (North Castle) 202408111677/32657509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 30th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-20T10:30:59Z"},"road_event_id":"lbESYoCgnJfmWT9ma5UqaC5Hf3k=","beginning_cross_street":"Airport Road","ending_cross_street":"Cooney Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.723063,41.092239]]}},{"id":"rd9TbE6+DGI7pPBzXvki+uFfsaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 168"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 168 both directions between END ROUTE; NY 80; Hamlet of Stark (Stark) and CR 206; Lighthall Road Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 80 and Lighthall Road., Continuous Monday April 6th, 2026 7:00 AM thru Saturday June 27th, 2026 6:00 PM all lanes closed","update_date":"2026-03-31T16:17:31Z"},"road_event_id":"rd9TbE6+DGI7pPBzXvki+uFfsaI=","beginning_cross_street":"END ROUTE; NY 80; Hamlet of Stark","ending_cross_street":"CR 206; Lighthall Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.793448,42.926459]]}},{"id":"bk4p0ULIRLuRHgu8/tOWb08bh74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 69"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 69 both directions between NY 291 (Whitestown) and NY 922A; Clinton Street; CR 30 (Whitestown) Motorists will encounter lane closures in both directions for work on the I-90 bridge, Continuous Monday March 23rd, 2026 6:00 AM thru Saturday November 21st, 2026 6:00 PM","update_date":"2026-04-10T10:02:57Z"},"road_event_id":"bk4p0ULIRLuRHgu8/tOWb08bh74=","beginning_cross_street":"NY 291","ending_cross_street":"NY 922A; Clinton Street; CR 30","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.300808,43.129911]]}},{"id":"3zEhfZE7zOiwVDO6RZjbAtqShNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"y8970A2ZpRgKCZhAUK1x9lsx0UE="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM,","update_date":"2026-04-17T10:26:40Z"},"road_event_id":"3zEhfZE7zOiwVDO6RZjbAtqShNU=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"y8970A2ZpRgKCZhAUK1x9lsx0UE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3zEhfZE7zOiwVDO6RZjbAtqShNU="},{"type":"next-occurrence","id":"zHPYeyRNSDOYc/8CJ0pYkSURV9g="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM,","update_date":"2026-04-17T10:26:40Z"},"road_event_id":"y8970A2ZpRgKCZhAUK1x9lsx0UE=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"zHPYeyRNSDOYc/8CJ0pYkSURV9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 825"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3zEhfZE7zOiwVDO6RZjbAtqShNU="}],"description":"Construction on NY 825 both directions at Perimeter Road (Rome) Motorists will encounter lane closures in both directions with flaggers in place, Monday March 23rd, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM,","update_date":"2026-04-17T10:26:40Z"},"road_event_id":"zHPYeyRNSDOYc/8CJ0pYkSURV9g=","beginning_cross_street":"Perimeter Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.425299999999993,43.2258]]}},{"id":"4YRDw3n4HAaqYC23LarUkvsMeKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound near West of US 130/Collingswood Circle (Collingswood), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 08:00 PM, right lane closed","update_date":"2026-04-22T16:51:23Z"},"road_event_id":"4YRDw3n4HAaqYC23LarUkvsMeKs=","beginning_cross_street":"West of US 130/Collingswood Circle","ending_cross_street":"CR 628/North Park Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.08757,39.920494]]}},{"id":"JiUVvH5s4PkhrvzmjBGua8YFeWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L5hn3Qg206j39zwia2/qPnDNW54="}],"description":"Safety improvements on NY 9A northbound between Catherine Street (Cortlandt) and Craft Lane (Cortlandt) 202508113798/32570309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"JiUVvH5s4PkhrvzmjBGua8YFeWU=","beginning_cross_street":"Catherine Street","ending_cross_street":"Craft Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934619,41.257998]]}},{"id":"L5hn3Qg206j39zwia2/qPnDNW54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JiUVvH5s4PkhrvzmjBGua8YFeWU="},{"type":"next-occurrence","id":"kVdzY98tkY6pe6QDZyebPMSCwp8="}],"description":"Safety improvements on NY 9A northbound between Catherine Street (Cortlandt) and Craft Lane (Cortlandt) 202508113798/32570309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"L5hn3Qg206j39zwia2/qPnDNW54=","beginning_cross_street":"Catherine Street","ending_cross_street":"Craft Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934619,41.257998]]}},{"id":"kVdzY98tkY6pe6QDZyebPMSCwp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JiUVvH5s4PkhrvzmjBGua8YFeWU="}],"description":"Safety improvements on NY 9A northbound between Catherine Street (Cortlandt) and Craft Lane (Cortlandt) 202508113798/32570309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-17T19:30:59Z"},"road_event_id":"kVdzY98tkY6pe6QDZyebPMSCwp8=","beginning_cross_street":"Catherine Street","ending_cross_street":"Craft Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934619,41.257998]]}},{"id":"Y611phTl9mGjZkxw8UFDGPABdEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-149"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on CT-149 both directions between JOHNSONVILLE RD (East Haddam) and CT-196 (East Haddam), Continuous Monday April 20th, 2026 12:00 AM thru Monday August 17th, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T11:54:08Z"},"road_event_id":"Y611phTl9mGjZkxw8UFDGPABdEU=","beginning_cross_street":"JOHNSONVILLE RD","ending_cross_street":"CT-196","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.465625,41.489618]]}},{"id":"Y8mI+yYWCz1k0ag5zy2o+J5Q5Jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WINTHROP ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on WINTHROP ST both directions between DALTON ST (Torrington) and KINNEY ST (Torrington) a lane closure will occur switching traffic from two lane to one lane alternating traffic , Continuous Wednesday April 1st, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes open","update_date":"2026-03-24T11:57:35Z"},"road_event_id":"Y8mI+yYWCz1k0ag5zy2o+J5Q5Jo=","beginning_cross_street":"DALTON ST","ending_cross_street":"KINNEY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.113072,41.812442]]}},{"id":"Ak6qfMU+K2kTpOLp6oJEz8ZvLIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KINNEY ST"],"direction":"unknown","related_road_events":[],"description":"Bridge work on KINNEY ST both directions between CALHOUN ST (Torrington) and JONES ST (Torrington) traffic will be detoured to Brightwood Ave., Continuous Wednesday April 1st, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T12:00:55Z"},"road_event_id":"Ak6qfMU+K2kTpOLp6oJEz8ZvLIs=","beginning_cross_street":"CALHOUN ST","ending_cross_street":"JONES ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.114324,41.813821]]}},{"id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WrvqAUFoUJtMYJ2mhqOPuTWOpNw="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"WrvqAUFoUJtMYJ2mhqOPuTWOpNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"Nh9YrYkrTEC4aK06spqWkgnORgM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"WrvqAUFoUJtMYJ2mhqOPuTWOpNw=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"Nh9YrYkrTEC4aK06spqWkgnORgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"pq4yW3YxWrjydl/L+aH6su5oh3I="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"Nh9YrYkrTEC4aK06spqWkgnORgM=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"pq4yW3YxWrjydl/L+aH6su5oh3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"OeuirEvDB29Cybi9h0y1osS4MbM="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"pq4yW3YxWrjydl/L+aH6su5oh3I=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"OeuirEvDB29Cybi9h0y1osS4MbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"p7wEWcTyo3ri5T1vXoILkwST2lY="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"OeuirEvDB29Cybi9h0y1osS4MbM=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"p7wEWcTyo3ri5T1vXoILkwST2lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"zKod4LxHOC5/eP9JUBBYOPYC9Qw="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"p7wEWcTyo3ri5T1vXoILkwST2lY=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"zKod4LxHOC5/eP9JUBBYOPYC9Qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"ITByjWrkFbvyfWKrb+vVThsc5p8="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"zKod4LxHOC5/eP9JUBBYOPYC9Qw=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"ITByjWrkFbvyfWKrb+vVThsc5p8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"kRQ+/VkkxeEQlMu12jfi1jxqrnk="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"ITByjWrkFbvyfWKrb+vVThsc5p8=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"kRQ+/VkkxeEQlMu12jfi1jxqrnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"ge6d8XSq+ACbKQeHRTPy0T5XAto="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"kRQ+/VkkxeEQlMu12jfi1jxqrnk=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"ge6d8XSq+ACbKQeHRTPy0T5XAto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"D7mEQg7wYGWJNDvyfJ1Lx/lY89Y="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"ge6d8XSq+ACbKQeHRTPy0T5XAto=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"D7mEQg7wYGWJNDvyfJ1Lx/lY89Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"0gNsa7rlCpD6Zyr72boXKuyxZmc="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"D7mEQg7wYGWJNDvyfJ1Lx/lY89Y=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"0gNsa7rlCpD6Zyr72boXKuyxZmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"soB0utwM82B/GmSA6IF5KTnJaBI="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"0gNsa7rlCpD6Zyr72boXKuyxZmc=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T22:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"soB0utwM82B/GmSA6IF5KTnJaBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"7NTbsmdgFj75wXlBghyR7mCFKgQ="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"soB0utwM82B/GmSA6IF5KTnJaBI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"7NTbsmdgFj75wXlBghyR7mCFKgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="},{"type":"next-occurrence","id":"wZLx1SDnghsfVoG4JqjNJ+UCjDU="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"7NTbsmdgFj75wXlBghyR7mCFKgQ=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"wZLx1SDnghsfVoG4JqjNJ+UCjDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iBUs1Ugh+2n7kvm57tQQcQ4C2Cg="}],"description":"Bridge rehabilitation on I-84 both directions between Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) and Exit 48 - Asylum Street/Capital Avenue (Hartford) There will be lane and shoulder closures , Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:06:42Z"},"road_event_id":"wZLx1SDnghsfVoG4JqjNJ+UCjDU=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 48 - Asylum Street/Capital Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.69909,41.760652]]}},{"id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a0rKlgq2nnOehzOL8VD+p7Pc3FQ="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"a0rKlgq2nnOehzOL8VD+p7Pc3FQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"8gIC1yU6KZQEg50QbMMFwOxd+RY="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"a0rKlgq2nnOehzOL8VD+p7Pc3FQ=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"8gIC1yU6KZQEg50QbMMFwOxd+RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"BM+mvfOph46p4ycmiVwJ0m7++ws="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"8gIC1yU6KZQEg50QbMMFwOxd+RY=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"BM+mvfOph46p4ycmiVwJ0m7++ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"6/BGB7GWtJ9eWQ5Ct0zDDQOPMoM="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"BM+mvfOph46p4ycmiVwJ0m7++ws=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"6/BGB7GWtJ9eWQ5Ct0zDDQOPMoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"Dv+iZU551zgryLUrypM+6QP6MDA="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"6/BGB7GWtJ9eWQ5Ct0zDDQOPMoM=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"Dv+iZU551zgryLUrypM+6QP6MDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"x3hQ2MPQHTtOSuVNj9Mnzwxjfvs="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"Dv+iZU551zgryLUrypM+6QP6MDA=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"x3hQ2MPQHTtOSuVNj9Mnzwxjfvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"xGT6pPKa4r3ah/Dx1ts/zabah98="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"x3hQ2MPQHTtOSuVNj9Mnzwxjfvs=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"xGT6pPKa4r3ah/Dx1ts/zabah98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"LfskrxhTfH/xnZsNIL3Bq7tlqpE="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"xGT6pPKa4r3ah/Dx1ts/zabah98=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"LfskrxhTfH/xnZsNIL3Bq7tlqpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"ffvkKu2STjJOegLyM7P+5FiCDfI="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"LfskrxhTfH/xnZsNIL3Bq7tlqpE=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"ffvkKu2STjJOegLyM7P+5FiCDfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"KHlL6/iAxftJ40zYPCpm5qYeb9A="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"ffvkKu2STjJOegLyM7P+5FiCDfI=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"KHlL6/iAxftJ40zYPCpm5qYeb9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"lFHi7+zxCupN5R8sgnUCaMEHBc8="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"KHlL6/iAxftJ40zYPCpm5qYeb9A=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"lFHi7+zxCupN5R8sgnUCaMEHBc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"nNZzB/zfkHO/HupHZhwsvafCqyg="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"lFHi7+zxCupN5R8sgnUCaMEHBc8=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"nNZzB/zfkHO/HupHZhwsvafCqyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"47VcAvfy/fFDoAIGSWWegOv90Qk="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"nNZzB/zfkHO/HupHZhwsvafCqyg=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"47VcAvfy/fFDoAIGSWWegOv90Qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="},{"type":"next-occurrence","id":"loQLzmuCRRdAxDfm5QnjIUVPoJw="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"47VcAvfy/fFDoAIGSWWegOv90Qk=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"loQLzmuCRRdAxDfm5QnjIUVPoJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s0b89hHBuVCRJ1wrGsZ/KcBlwkI="}],"description":"Bridge rehabilitation on I-84 eastbound Entrance ramp Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue (Hartford) will be closed on various nightsTraffic will follow the posted detoured or to seek alternate routes., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T12:11:44Z"},"road_event_id":"loQLzmuCRRdAxDfm5QnjIUVPoJw=","beginning_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","ending_cross_street":"Exit 46 - Boulevard/Capitol Avenue/Sisson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.704205,41.761927]]}},{"id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IORIoLfWdIRTmVtgaIpnHTsiKz0="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"IORIoLfWdIRTmVtgaIpnHTsiKz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"pnc31FvkK+qPliuEOMkjiogrLa0="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"IORIoLfWdIRTmVtgaIpnHTsiKz0=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"pnc31FvkK+qPliuEOMkjiogrLa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"RbGnpLUftwhzE8iH+JjyanA+71E="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"pnc31FvkK+qPliuEOMkjiogrLa0=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"RbGnpLUftwhzE8iH+JjyanA+71E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"jaqFSD+Co7Z9JcTYKXhDlU9IlDs="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"RbGnpLUftwhzE8iH+JjyanA+71E=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"jaqFSD+Co7Z9JcTYKXhDlU9IlDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"l3wYGPc5EDZbq6vuUTP+fR208i0="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"jaqFSD+Co7Z9JcTYKXhDlU9IlDs=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"l3wYGPc5EDZbq6vuUTP+fR208i0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"GCuM08g50/yCHcsUBpqF8FCFlyg="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"l3wYGPc5EDZbq6vuUTP+fR208i0=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"GCuM08g50/yCHcsUBpqF8FCFlyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"ZBH3atBkwj7jdT2rGQjuUSqyE0I="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"GCuM08g50/yCHcsUBpqF8FCFlyg=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"ZBH3atBkwj7jdT2rGQjuUSqyE0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"xV9R1ig5vBu2Oget16MRzRlEGHI="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"ZBH3atBkwj7jdT2rGQjuUSqyE0I=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"xV9R1ig5vBu2Oget16MRzRlEGHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"x6y8olOAWQG64zBUMA7OZPvX6oo="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"xV9R1ig5vBu2Oget16MRzRlEGHI=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"x6y8olOAWQG64zBUMA7OZPvX6oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"q/ldL7/LfRn+qCXLJh6dpquIIrA="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"x6y8olOAWQG64zBUMA7OZPvX6oo=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"q/ldL7/LfRn+qCXLJh6dpquIIrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"JddM27YtJKP8vz67u3V0HZrrb1Y="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"q/ldL7/LfRn+qCXLJh6dpquIIrA=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"JddM27YtJKP8vz67u3V0HZrrb1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"i6Ov51pmw/BrAKTnNWPuVvFxG7s="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"JddM27YtJKP8vz67u3V0HZrrb1Y=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"i6Ov51pmw/BrAKTnNWPuVvFxG7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"YuCi5rt25ycaPEaAFnYwjswAFyo="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"i6Ov51pmw/BrAKTnNWPuVvFxG7s=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"YuCi5rt25ycaPEaAFnYwjswAFyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="},{"type":"next-occurrence","id":"hwPUSONQb1V+pg9Cm9oXZxDBTUE="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"YuCi5rt25ycaPEaAFnYwjswAFyo=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"hwPUSONQb1V+pg9Cm9oXZxDBTUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CAPITOL AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yGr4u8vuQEqIG7fVhIF9JPL0wwU="}],"description":"Bridge rehabilitation on CAPITOL AVE both directions between LAUREL ST (Hartford) and PARK TER (Hartford) will be closed on different nights Two-way traffic will be detoured onto Laurel, Hawthorn, Sigourney streets, and Park Terrace via the roundabout., Friday April 10th, 2026 thru Friday July 16th, 2027, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T12:15:51Z"},"road_event_id":"hwPUSONQb1V+pg9Cm9oXZxDBTUE=","beginning_cross_street":"LAUREL ST","ending_cross_street":"PARK TER","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.696846,41.762558]]}},{"id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cu0qXQqXM+cKM6MoUXCcPWgxXXU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"Cu0qXQqXM+cKM6MoUXCcPWgxXXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"1NoDdA37Cx89G+8pQU1pkqSDD60="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"Cu0qXQqXM+cKM6MoUXCcPWgxXXU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"1NoDdA37Cx89G+8pQU1pkqSDD60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"eXaUQkFjlcpBqPLAWGUUScWK6rE="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"1NoDdA37Cx89G+8pQU1pkqSDD60=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"eXaUQkFjlcpBqPLAWGUUScWK6rE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"hr84r+OcL35zFZV0KKr727Or0M8="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"eXaUQkFjlcpBqPLAWGUUScWK6rE=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"hr84r+OcL35zFZV0KKr727Or0M8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"wvEU28f4OGd9WA1577vRbWmh+lY="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"hr84r+OcL35zFZV0KKr727Or0M8=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"wvEU28f4OGd9WA1577vRbWmh+lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"k+48lQn9ynbk/rajQWDxkixv06Q="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"wvEU28f4OGd9WA1577vRbWmh+lY=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"k+48lQn9ynbk/rajQWDxkixv06Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"kHWwOBF5VG+bSe/s4Lzi7IRmnu0="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"k+48lQn9ynbk/rajQWDxkixv06Q=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"kHWwOBF5VG+bSe/s4Lzi7IRmnu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"iISkdxoaNdG8ODjh6qirCXxJUZQ="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"kHWwOBF5VG+bSe/s4Lzi7IRmnu0=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"iISkdxoaNdG8ODjh6qirCXxJUZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"fgXO0rQGeDnDTuyKjpiiDV7DAFo="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"iISkdxoaNdG8ODjh6qirCXxJUZQ=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"fgXO0rQGeDnDTuyKjpiiDV7DAFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"qUk8wh0nF2QA2oY2VFmykFRRHTQ="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"fgXO0rQGeDnDTuyKjpiiDV7DAFo=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"qUk8wh0nF2QA2oY2VFmykFRRHTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"uUwp3L0KD9KRb0OFA3qLJRiNHuU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"qUk8wh0nF2QA2oY2VFmykFRRHTQ=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"uUwp3L0KD9KRb0OFA3qLJRiNHuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"Up4MDw20XCBk+xGvt0Ln0hAlVRM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"uUwp3L0KD9KRb0OFA3qLJRiNHuU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"Up4MDw20XCBk+xGvt0Ln0hAlVRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"wuHC9Sfc4wrNciRI2YS2jGSy0jU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"Up4MDw20XCBk+xGvt0Ln0hAlVRM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"wuHC9Sfc4wrNciRI2YS2jGSy0jU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="},{"type":"next-occurrence","id":"JiY2buBduFlSULRsJ5Xrn1s2UZ4="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"wuHC9Sfc4wrNciRI2YS2jGSy0jU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"JiY2buBduFlSULRsJ5Xrn1s2UZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G/5iJ7NBYLwDZ3Vr9HqbHFYNQjg="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:20:14Z"},"road_event_id":"JiY2buBduFlSULRsJ5Xrn1s2UZ4=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876403]]}},{"id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"baQe+xFKz0U1x8W0OCRuxTa5BSo="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"baQe+xFKz0U1x8W0OCRuxTa5BSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"3nlhzPyxkLUDgZG8syVpiCxnTsw="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"baQe+xFKz0U1x8W0OCRuxTa5BSo=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"3nlhzPyxkLUDgZG8syVpiCxnTsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"2z3e3jy/lbTK0COEceI1A7PhCBM="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"3nlhzPyxkLUDgZG8syVpiCxnTsw=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"2z3e3jy/lbTK0COEceI1A7PhCBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"tKgqkSuNzLBkwAffL2iBU1QJ3Jc="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"2z3e3jy/lbTK0COEceI1A7PhCBM=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"tKgqkSuNzLBkwAffL2iBU1QJ3Jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"vQ5P86RXkVCDwy1nmzoFBlpTPlc="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"tKgqkSuNzLBkwAffL2iBU1QJ3Jc=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"vQ5P86RXkVCDwy1nmzoFBlpTPlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"IDtEYgmb+94IwsmqrbWTiyXEu94="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"vQ5P86RXkVCDwy1nmzoFBlpTPlc=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"IDtEYgmb+94IwsmqrbWTiyXEu94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"hAF/1EiT6tue7rsYP4r7j5hJckI="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"IDtEYgmb+94IwsmqrbWTiyXEu94=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"hAF/1EiT6tue7rsYP4r7j5hJckI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"6sM0vzpxJMAHMsm24cSxJYavzaM="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"hAF/1EiT6tue7rsYP4r7j5hJckI=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"6sM0vzpxJMAHMsm24cSxJYavzaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"0hmz66DZ5uC8KKR6pLDCprdrC4c="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"6sM0vzpxJMAHMsm24cSxJYavzaM=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"0hmz66DZ5uC8KKR6pLDCprdrC4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"QdTJ502zWQxUaM8+omB7Myy+kEs="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"0hmz66DZ5uC8KKR6pLDCprdrC4c=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"QdTJ502zWQxUaM8+omB7Myy+kEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"Ndv+FAnAUcGNiVQKUgj6q2QOlZk="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"QdTJ502zWQxUaM8+omB7Myy+kEs=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"Ndv+FAnAUcGNiVQKUgj6q2QOlZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"ggb9lCiPw9W4ao8zSVXXA33Zn0M="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"Ndv+FAnAUcGNiVQKUgj6q2QOlZk=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"ggb9lCiPw9W4ao8zSVXXA33Zn0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"/qpoLwvxdVNbKYM+7s94HW349AY="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"ggb9lCiPw9W4ao8zSVXXA33Zn0M=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"/qpoLwvxdVNbKYM+7s94HW349AY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="},{"type":"next-occurrence","id":"n4Oc+q2ey4GdFYKfkAB8msJyDHg="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"/qpoLwvxdVNbKYM+7s94HW349AY=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"n4Oc+q2ey4GdFYKfkAB8msJyDHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LUIdi5ssLS5Nb2qCid/Rvm4KCjo="}],"description":"Safety improvements on CT-63 both directions between BROOKS RD (Litchfield) and IVY MOUNTAIN RD (Goshen) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:23:01Z"},"road_event_id":"n4Oc+q2ey4GdFYKfkAB8msJyDHg=","beginning_cross_street":"BROOKS RD","ending_cross_street":"IVY MOUNTAIN RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210518,41.789226]]}},{"id":"8UnIRulA0P/eB7mRaqufp+oBTQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WtHJ6CXnEm2CtUDmQdcpdUTeKQ8="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"8UnIRulA0P/eB7mRaqufp+oBTQM=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"WtHJ6CXnEm2CtUDmQdcpdUTeKQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"dDiFgAy2bZpVrfSU07K/uReSgJo="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"WtHJ6CXnEm2CtUDmQdcpdUTeKQ8=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"dDiFgAy2bZpVrfSU07K/uReSgJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"m9TnewSoBSXbd3W8MMvOXz5yiJc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"dDiFgAy2bZpVrfSU07K/uReSgJo=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"m9TnewSoBSXbd3W8MMvOXz5yiJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"/WBMeM/BO3QUsWyr8k7hx7NwlyY="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"m9TnewSoBSXbd3W8MMvOXz5yiJc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"/WBMeM/BO3QUsWyr8k7hx7NwlyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"XYMgepdo8aYY7EIVZYsT/InpP30="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"/WBMeM/BO3QUsWyr8k7hx7NwlyY=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"XYMgepdo8aYY7EIVZYsT/InpP30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"OygN3uWITkSehR9zpT7O//WFDq4="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"XYMgepdo8aYY7EIVZYsT/InpP30=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"OygN3uWITkSehR9zpT7O//WFDq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"mKiBX4T+htbLTqTWGOeHx/dl/tE="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"OygN3uWITkSehR9zpT7O//WFDq4=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"mKiBX4T+htbLTqTWGOeHx/dl/tE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"+lB94cR1YXcaghhxCcOBNw7Mqf0="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"mKiBX4T+htbLTqTWGOeHx/dl/tE=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"+lB94cR1YXcaghhxCcOBNw7Mqf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"LiEE/TcpO0vDOjfBOUTc6NJPXa8="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"+lB94cR1YXcaghhxCcOBNw7Mqf0=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"LiEE/TcpO0vDOjfBOUTc6NJPXa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"aUxuy6p+tWFLubSslRXuv0kqD1E="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"LiEE/TcpO0vDOjfBOUTc6NJPXa8=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"aUxuy6p+tWFLubSslRXuv0kqD1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"+VYgdRuncUisb7M16ddwY3egiTA="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"aUxuy6p+tWFLubSslRXuv0kqD1E=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"+VYgdRuncUisb7M16ddwY3egiTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"mghCRYi3wJmzmBFjpWhyz+TQx7M="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"+VYgdRuncUisb7M16ddwY3egiTA=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"mghCRYi3wJmzmBFjpWhyz+TQx7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"AqC6jeZjftWIpKM0APzrAb/vnpc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"mghCRYi3wJmzmBFjpWhyz+TQx7M=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"AqC6jeZjftWIpKM0APzrAb/vnpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="},{"type":"next-occurrence","id":"JhSKwZaFTexR2GRcW+ZziUwqyOo="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"AqC6jeZjftWIpKM0APzrAb/vnpc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"JhSKwZaFTexR2GRcW+ZziUwqyOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8UnIRulA0P/eB7mRaqufp+oBTQM="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:26:45Z"},"road_event_id":"JhSKwZaFTexR2GRcW+ZziUwqyOo=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.228539,41.683304]]}},{"id":"tNPrbatQNU1vV7TDRGzX7MzoY0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Xt7/F+44xOSWsv3BeSwfrw0ZB3s="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"tNPrbatQNU1vV7TDRGzX7MzoY0E=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"Xt7/F+44xOSWsv3BeSwfrw0ZB3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"WwfpCvl1RKQFWsxC0QKyX93gGq0="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"Xt7/F+44xOSWsv3BeSwfrw0ZB3s=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"WwfpCvl1RKQFWsxC0QKyX93gGq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"I1w60MRrUQbeA1CGDGVgjtf3N5M="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"WwfpCvl1RKQFWsxC0QKyX93gGq0=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"I1w60MRrUQbeA1CGDGVgjtf3N5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"8mHnlVoBNcD2IgZNJJDRb9XUv1w="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"I1w60MRrUQbeA1CGDGVgjtf3N5M=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"8mHnlVoBNcD2IgZNJJDRb9XUv1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"VtCJuZtRPPUWRP35KCzBxiR0JgY="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"8mHnlVoBNcD2IgZNJJDRb9XUv1w=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"VtCJuZtRPPUWRP35KCzBxiR0JgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"F5ZyXsnAnNjPCnNjJP2dHSq8rt4="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"VtCJuZtRPPUWRP35KCzBxiR0JgY=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"F5ZyXsnAnNjPCnNjJP2dHSq8rt4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"Po0ECFfUFcAQOnHA1YRclwyQy5A="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"F5ZyXsnAnNjPCnNjJP2dHSq8rt4=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"Po0ECFfUFcAQOnHA1YRclwyQy5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"FBi8Wu/HQeDeyTWwcstfiRl6Xu4="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"Po0ECFfUFcAQOnHA1YRclwyQy5A=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"FBi8Wu/HQeDeyTWwcstfiRl6Xu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"RodeFfxqNL8HY7fmEGJl4HEqNLE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"FBi8Wu/HQeDeyTWwcstfiRl6Xu4=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"RodeFfxqNL8HY7fmEGJl4HEqNLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"NkIkqGK3jP0h8AIIVp9Nf+uN4Og="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"RodeFfxqNL8HY7fmEGJl4HEqNLE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"NkIkqGK3jP0h8AIIVp9Nf+uN4Og=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"TtlY8ByU2M86z9n2Tb9pxXf1aOE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"NkIkqGK3jP0h8AIIVp9Nf+uN4Og=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"TtlY8ByU2M86z9n2Tb9pxXf1aOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"g9qq0Ci3YX1c18LDgiIxj60UkTE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"TtlY8ByU2M86z9n2Tb9pxXf1aOE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"g9qq0Ci3YX1c18LDgiIxj60UkTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"u9WgMRsn7mfxW2Yd0vE/wfti7+U="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"g9qq0Ci3YX1c18LDgiIxj60UkTE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"u9WgMRsn7mfxW2Yd0vE/wfti7+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="},{"type":"next-occurrence","id":"r9LhmDuzot/iCc/yuR/WhaIxC9Y="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"u9WgMRsn7mfxW2Yd0vE/wfti7+U=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"r9LhmDuzot/iCc/yuR/WhaIxC9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tNPrbatQNU1vV7TDRGzX7MzoY0E="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:30:16Z"},"road_event_id":"r9LhmDuzot/iCc/yuR/WhaIxC9Y=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.99038,41.897739]]}},{"id":"GW5ysA5jjO5w9HD5uYc9foru4lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CQQNjAA9wc0HUxAtlUQBkHNjatU="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"GW5ysA5jjO5w9HD5uYc9foru4lw=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"CQQNjAA9wc0HUxAtlUQBkHNjatU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"tnb7pjDi2qAZgA5rImeiFlaMYeU="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"CQQNjAA9wc0HUxAtlUQBkHNjatU=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"tnb7pjDi2qAZgA5rImeiFlaMYeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"0xp6Ydc0Oi3f9syIRlQ/WLqfVjs="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"tnb7pjDi2qAZgA5rImeiFlaMYeU=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"0xp6Ydc0Oi3f9syIRlQ/WLqfVjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"zlgWVuh0x6A4/ud5r4bcTWBphAc="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"0xp6Ydc0Oi3f9syIRlQ/WLqfVjs=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"zlgWVuh0x6A4/ud5r4bcTWBphAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"3/GXdY3U86raQaAc66WMSmsE7Ig="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"zlgWVuh0x6A4/ud5r4bcTWBphAc=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"3/GXdY3U86raQaAc66WMSmsE7Ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"NwY+KMG0rhFUxN1A/SyRM/CNkFQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"3/GXdY3U86raQaAc66WMSmsE7Ig=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"NwY+KMG0rhFUxN1A/SyRM/CNkFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"uvTKI3pZqmmTze1VCT7qXJ3POFA="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"NwY+KMG0rhFUxN1A/SyRM/CNkFQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"uvTKI3pZqmmTze1VCT7qXJ3POFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"HZBH8u8yfHLEZ2RXxCCz6d7qI0Q="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"uvTKI3pZqmmTze1VCT7qXJ3POFA=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"HZBH8u8yfHLEZ2RXxCCz6d7qI0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"HRlX3Ao1+DywFZy52j5QQXTTsRU="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"HZBH8u8yfHLEZ2RXxCCz6d7qI0Q=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"HRlX3Ao1+DywFZy52j5QQXTTsRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"yNAR1uGUEFs1luQTvNib0RK8BPs="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"HRlX3Ao1+DywFZy52j5QQXTTsRU=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"yNAR1uGUEFs1luQTvNib0RK8BPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"0zBQVpbhAMBS6sSMF1ygmMXfFzQ="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"yNAR1uGUEFs1luQTvNib0RK8BPs=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"0zBQVpbhAMBS6sSMF1ygmMXfFzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"5oHSE2jK9S9EASEZn+qvDzFcc7A="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"0zBQVpbhAMBS6sSMF1ygmMXfFzQ=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"5oHSE2jK9S9EASEZn+qvDzFcc7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"np6M3bnNdVuMxfSuCRTu6XjUShI="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"5oHSE2jK9S9EASEZn+qvDzFcc7A=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"np6M3bnNdVuMxfSuCRTu6XjUShI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="},{"type":"next-occurrence","id":"8Lvf7NLucvwClExYNkRjP2Pm8Yk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"np6M3bnNdVuMxfSuCRTu6XjUShI=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"8Lvf7NLucvwClExYNkRjP2Pm8Yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW5ysA5jjO5w9HD5uYc9foru4lw="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:33:41Z"},"road_event_id":"8Lvf7NLucvwClExYNkRjP2Pm8Yk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107638,41.809021]]}},{"id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0F/wz56+pP3P4z4th5Sl70JnvTU="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"0F/wz56+pP3P4z4th5Sl70JnvTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"NTyi9+6AvCvZB2DKMHPtI7jhdMc="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"0F/wz56+pP3P4z4th5Sl70JnvTU=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"NTyi9+6AvCvZB2DKMHPtI7jhdMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"FT+0183kiUM35QTd38lYZTxFves="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"NTyi9+6AvCvZB2DKMHPtI7jhdMc=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"FT+0183kiUM35QTd38lYZTxFves=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"h8Be4RQ34brshGTfxc9TndT7JTU="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"FT+0183kiUM35QTd38lYZTxFves=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"h8Be4RQ34brshGTfxc9TndT7JTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"uEP5GMfYUlMXEDMXABA236M0USg="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"h8Be4RQ34brshGTfxc9TndT7JTU=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"uEP5GMfYUlMXEDMXABA236M0USg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"Cm4uD7ycpAf0Dr/FpzUPPYKac8g="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"uEP5GMfYUlMXEDMXABA236M0USg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"Cm4uD7ycpAf0Dr/FpzUPPYKac8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"wdcmNVJv/IeCOICUg9A53ztL5bI="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"Cm4uD7ycpAf0Dr/FpzUPPYKac8g=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"wdcmNVJv/IeCOICUg9A53ztL5bI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"UZwVE5BXypETBhCyyt5psICnLRc="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"wdcmNVJv/IeCOICUg9A53ztL5bI=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"UZwVE5BXypETBhCyyt5psICnLRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"Yaqku6sn1SgmvRDva0mFTpKMBn0="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"UZwVE5BXypETBhCyyt5psICnLRc=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"Yaqku6sn1SgmvRDva0mFTpKMBn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"YJc57lu2bjm+h1YC85Vg15WEe7k="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"Yaqku6sn1SgmvRDva0mFTpKMBn0=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"YJc57lu2bjm+h1YC85Vg15WEe7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"VC/mwpho7Wr/V0TdngdpR0J2p58="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"YJc57lu2bjm+h1YC85Vg15WEe7k=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"VC/mwpho7Wr/V0TdngdpR0J2p58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"3vPb4aS/yabH5INBiwMXNTzAixo="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"VC/mwpho7Wr/V0TdngdpR0J2p58=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"3vPb4aS/yabH5INBiwMXNTzAixo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"L8zCGxrnR9dal6vuTcVl0YcVeVg="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"3vPb4aS/yabH5INBiwMXNTzAixo=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"L8zCGxrnR9dal6vuTcVl0YcVeVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="},{"type":"next-occurrence","id":"D/Q43p0fq7HeMtn39LgFvbX8p1s="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"L8zCGxrnR9dal6vuTcVl0YcVeVg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"D/Q43p0fq7HeMtn39LgFvbX8p1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yq7AHZTz9YlhM2+/xOghJ0iLTWw="}],"description":"Safety improvements on CT-188 both directions between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures , Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T12:43:59Z"},"road_event_id":"D/Q43p0fq7HeMtn39LgFvbX8p1s=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162238,41.464863]]}},{"id":"ayWMYSPLihsaJBDFyc8+dx9JbNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"koZ+pWfFLgjwDlxw8U/5EOCCeR4="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"ayWMYSPLihsaJBDFyc8+dx9JbNU=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"koZ+pWfFLgjwDlxw8U/5EOCCeR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"b3tgA6HntS4re9IqkgkUayeayh4="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"koZ+pWfFLgjwDlxw8U/5EOCCeR4=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"b3tgA6HntS4re9IqkgkUayeayh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"zxeAwEVw57edTOMmZHj/H0VxRok="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"b3tgA6HntS4re9IqkgkUayeayh4=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"zxeAwEVw57edTOMmZHj/H0VxRok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"x0lv+qe9AD1N7piQe+JevBeD4/8="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"zxeAwEVw57edTOMmZHj/H0VxRok=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"x0lv+qe9AD1N7piQe+JevBeD4/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"qK+bSnqLsqVIfkML0pRoSXp1TSc="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"x0lv+qe9AD1N7piQe+JevBeD4/8=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"qK+bSnqLsqVIfkML0pRoSXp1TSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"vGggmFKSVbf1g7zs85yKOWYlQx8="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"qK+bSnqLsqVIfkML0pRoSXp1TSc=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"vGggmFKSVbf1g7zs85yKOWYlQx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"XmnKdTtyAmyAd/O1bmSDIPuiM6Y="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"vGggmFKSVbf1g7zs85yKOWYlQx8=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"XmnKdTtyAmyAd/O1bmSDIPuiM6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"50YBkbE38Bw8+0JJWKprVIpqsfw="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"XmnKdTtyAmyAd/O1bmSDIPuiM6Y=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"50YBkbE38Bw8+0JJWKprVIpqsfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"pKhtt2oKFn6fKvSsv3FlpudQwWY="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"50YBkbE38Bw8+0JJWKprVIpqsfw=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"pKhtt2oKFn6fKvSsv3FlpudQwWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="},{"type":"next-occurrence","id":"khX1o5Alfr6hy9M5IE6fFQdQSjk="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"pKhtt2oKFn6fKvSsv3FlpudQwWY=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"khX1o5Alfr6hy9M5IE6fFQdQSjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ayWMYSPLihsaJBDFyc8+dx9JbNU="}],"description":"Tree trimming on Merritt Parkway/CT 15 both directions between Exit 27 - King Street (Greenwich) and Exit 34 - CT 104/Long Ridge Road (Stamford), Monday March 30th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-24T13:08:14Z"},"road_event_id":"khX1o5Alfr6hy9M5IE6fFQdQSjk=","beginning_cross_street":"Exit 27 - King Street","ending_cross_street":"Exit 34 - CT 104/Long Ridge Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675358,41.036941]]}},{"id":"++wsRLj9v1eBZXqYa4+gT5laujc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"k03BoCI7VtKYdLV9xf99mj5YJoo="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"++wsRLj9v1eBZXqYa4+gT5laujc=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"k03BoCI7VtKYdLV9xf99mj5YJoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"zsIsgveHNxvYUDlI7hmvvD3gcG4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"k03BoCI7VtKYdLV9xf99mj5YJoo=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"zsIsgveHNxvYUDlI7hmvvD3gcG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"OICoV0vxFMGGJRomynEM/YNJgIU="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"zsIsgveHNxvYUDlI7hmvvD3gcG4=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"OICoV0vxFMGGJRomynEM/YNJgIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"uBNk3ga9RdkDKE+YaNkYqVPB3qo="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"OICoV0vxFMGGJRomynEM/YNJgIU=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"uBNk3ga9RdkDKE+YaNkYqVPB3qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"TV5+jonhePtofUS5CwMfqXCnEug="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"uBNk3ga9RdkDKE+YaNkYqVPB3qo=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"TV5+jonhePtofUS5CwMfqXCnEug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"wfmwjxSHvl2vr+kbGvI/e4uID1k="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"TV5+jonhePtofUS5CwMfqXCnEug=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"wfmwjxSHvl2vr+kbGvI/e4uID1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"4OX6LvuHpY9vJMb7L3K5/C7c1KY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"wfmwjxSHvl2vr+kbGvI/e4uID1k=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"4OX6LvuHpY9vJMb7L3K5/C7c1KY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"KDBVVYyDKVzN91g7tzkLYyFnAHs="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"4OX6LvuHpY9vJMb7L3K5/C7c1KY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"KDBVVYyDKVzN91g7tzkLYyFnAHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"mJuwOZZRinXblYVKxgFlMAtTBLQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"KDBVVYyDKVzN91g7tzkLYyFnAHs=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"mJuwOZZRinXblYVKxgFlMAtTBLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"dsxeJa4LAGRc4Eqi0d/CS7HWvAE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"mJuwOZZRinXblYVKxgFlMAtTBLQ=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"dsxeJa4LAGRc4Eqi0d/CS7HWvAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"/oh3pTP5Vw5wu3xjIiyEE8V59qY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"dsxeJa4LAGRc4Eqi0d/CS7HWvAE=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"/oh3pTP5Vw5wu3xjIiyEE8V59qY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"OK877zzUPQU3vVUAIbsNK3WpCCY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"/oh3pTP5Vw5wu3xjIiyEE8V59qY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"OK877zzUPQU3vVUAIbsNK3WpCCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"+TIljfjSqrV+MuzXSanDqGmu6Bw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"OK877zzUPQU3vVUAIbsNK3WpCCY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"+TIljfjSqrV+MuzXSanDqGmu6Bw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"iI0MYi10e+SPyW5fShc57SneCFg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"+TIljfjSqrV+MuzXSanDqGmu6Bw=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"iI0MYi10e+SPyW5fShc57SneCFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"8Va+2Hpbc2YY02DKFLSabGCilWY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"iI0MYi10e+SPyW5fShc57SneCFg=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"8Va+2Hpbc2YY02DKFLSabGCilWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"FFm4x5XNE9Eu3KLzJkTYLG1RqMA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"8Va+2Hpbc2YY02DKFLSabGCilWY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"FFm4x5XNE9Eu3KLzJkTYLG1RqMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"y1JTIZlKmv4xswpdTpxWOPi0ETg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"FFm4x5XNE9Eu3KLzJkTYLG1RqMA=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"y1JTIZlKmv4xswpdTpxWOPi0ETg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"cW5jDT5DRTbVQqjJQQJ+PHqlMuI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"y1JTIZlKmv4xswpdTpxWOPi0ETg=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"cW5jDT5DRTbVQqjJQQJ+PHqlMuI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"EvYdzRurqnRqHhCN1Ri93xG79Lo="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"cW5jDT5DRTbVQqjJQQJ+PHqlMuI=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"EvYdzRurqnRqHhCN1Ri93xG79Lo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"ErfNds3eBppFioRbKF9SVTVTJEY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"EvYdzRurqnRqHhCN1Ri93xG79Lo=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"ErfNds3eBppFioRbKF9SVTVTJEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"MPXxHXYB5zwksEfQzm5D8y1/iyY="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"ErfNds3eBppFioRbKF9SVTVTJEY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"MPXxHXYB5zwksEfQzm5D8y1/iyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"6H3b1QryWPfkWoeooM197vULkb8="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"MPXxHXYB5zwksEfQzm5D8y1/iyY=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"6H3b1QryWPfkWoeooM197vULkb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"vwPbZ2wwtgmRsLZa6BpEaIGVvwM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"6H3b1QryWPfkWoeooM197vULkb8=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"vwPbZ2wwtgmRsLZa6BpEaIGVvwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"HweA54SQ2Si8iqI93340DvQmjsE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"vwPbZ2wwtgmRsLZa6BpEaIGVvwM=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"HweA54SQ2Si8iqI93340DvQmjsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"AeIcVOYYRuBhFkpE1bQUf82UtwQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"HweA54SQ2Si8iqI93340DvQmjsE=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"AeIcVOYYRuBhFkpE1bQUf82UtwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"dS6nb2wGU2ZdCpRNCgRzkf70TAw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"AeIcVOYYRuBhFkpE1bQUf82UtwQ=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"dS6nb2wGU2ZdCpRNCgRzkf70TAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"jWkZFEs0EL0KBai5xhBSmNtYZ04="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"dS6nb2wGU2ZdCpRNCgRzkf70TAw=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"jWkZFEs0EL0KBai5xhBSmNtYZ04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"khx3sHOI69YHBhrGKLg2iX9LB7E="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"jWkZFEs0EL0KBai5xhBSmNtYZ04=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"khx3sHOI69YHBhrGKLg2iX9LB7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="},{"type":"next-occurrence","id":"dqISXAbDxyb20wzNEsarqss6oGM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"khx3sHOI69YHBhrGKLg2iX9LB7E=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"dqISXAbDxyb20wzNEsarqss6oGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"++wsRLj9v1eBZXqYa4+gT5laujc="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic management systems on I-91 both directions between Exit 27(NB) - Brown Street/Airport Road (Hartford) and Exit 40 - CT 20 (Windsor/Windsor Locks) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:14:04Z"},"road_event_id":"dqISXAbDxyb20wzNEsarqss6oGM=","beginning_cross_street":"Exit 27(NB) - Brown Street/Airport Road","ending_cross_street":"Exit 40 - CT 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.66423,41.738493]]}},{"id":"4FXPoq+IWfd9bwf0/vmxTNJN+20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EuxYpkQf+ts4V4IHFly9d8eiKN0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"4FXPoq+IWfd9bwf0/vmxTNJN+20=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"EuxYpkQf+ts4V4IHFly9d8eiKN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"f+wXsRSdQL7Fyxl6SPY7u1rpBiQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"EuxYpkQf+ts4V4IHFly9d8eiKN0=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"f+wXsRSdQL7Fyxl6SPY7u1rpBiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"6CK8+s7Er+sn+W2Dhckfnzib4sQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"f+wXsRSdQL7Fyxl6SPY7u1rpBiQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"6CK8+s7Er+sn+W2Dhckfnzib4sQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"WtzLs4Z6SH882C8DyEmEymTUBXI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"6CK8+s7Er+sn+W2Dhckfnzib4sQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"WtzLs4Z6SH882C8DyEmEymTUBXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"9hIWhMIU9875YGKbMKJRB54uAZQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"WtzLs4Z6SH882C8DyEmEymTUBXI=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"9hIWhMIU9875YGKbMKJRB54uAZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"jvN5LDqC3IbT2UcuAGnepaaj/3M="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"9hIWhMIU9875YGKbMKJRB54uAZQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"jvN5LDqC3IbT2UcuAGnepaaj/3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"Tv+MBK1M+zPZGtYqn9Bl5yCRXcI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"jvN5LDqC3IbT2UcuAGnepaaj/3M=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"Tv+MBK1M+zPZGtYqn9Bl5yCRXcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"qACNggxvyaZZMVK/AI509a7YjA4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"Tv+MBK1M+zPZGtYqn9Bl5yCRXcI=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"qACNggxvyaZZMVK/AI509a7YjA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"Di5fu/EslJhtf/K/UYOTJ9cBIps="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"qACNggxvyaZZMVK/AI509a7YjA4=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"Di5fu/EslJhtf/K/UYOTJ9cBIps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"Yn7T3NfJvZ/wZXMO8xVU7zVXdHE="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"Di5fu/EslJhtf/K/UYOTJ9cBIps=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"Yn7T3NfJvZ/wZXMO8xVU7zVXdHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"b7WqKVKnNt7Y9kSWGqP6jGvCajM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"Yn7T3NfJvZ/wZXMO8xVU7zVXdHE=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"b7WqKVKnNt7Y9kSWGqP6jGvCajM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"o1l1VfieXP7NZscfqvUYOPfvOFw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"b7WqKVKnNt7Y9kSWGqP6jGvCajM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"o1l1VfieXP7NZscfqvUYOPfvOFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"3xXG4VVVWfTsHzD8hniQ24Lo2Q4="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"o1l1VfieXP7NZscfqvUYOPfvOFw=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"3xXG4VVVWfTsHzD8hniQ24Lo2Q4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"uhm6mePur2duPK5taOVDmgfPCmw="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"3xXG4VVVWfTsHzD8hniQ24Lo2Q4=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"uhm6mePur2duPK5taOVDmgfPCmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"CC+Q7EvK2keP6lcDdIi325rm3pA="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"uhm6mePur2duPK5taOVDmgfPCmw=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"CC+Q7EvK2keP6lcDdIi325rm3pA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"7AEY/E6Y8ah8/HP6sP6sEgML8ag="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"CC+Q7EvK2keP6lcDdIi325rm3pA=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"7AEY/E6Y8ah8/HP6sP6sEgML8ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"rMj0bsEfulm4ShLlsLUBgpqT9zs="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"7AEY/E6Y8ah8/HP6sP6sEgML8ag=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"rMj0bsEfulm4ShLlsLUBgpqT9zs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"g5pmwPKeDehOlgrNI0haS/BUQWo="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"rMj0bsEfulm4ShLlsLUBgpqT9zs=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"g5pmwPKeDehOlgrNI0haS/BUQWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"RJgzw+goiJ6hABvpCMcDsAl1fLI="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"g5pmwPKeDehOlgrNI0haS/BUQWo=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"RJgzw+goiJ6hABvpCMcDsAl1fLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"oaep7vALSiIZEBCLhfmsjwYFUQM="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"RJgzw+goiJ6hABvpCMcDsAl1fLI=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"oaep7vALSiIZEBCLhfmsjwYFUQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"xUEDIl1Dw6GBnpdTwiDfRrd+XI0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"oaep7vALSiIZEBCLhfmsjwYFUQM=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"xUEDIl1Dw6GBnpdTwiDfRrd+XI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"lZbVKIWSffgdxUfCtWwoZunksiQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"xUEDIl1Dw6GBnpdTwiDfRrd+XI0=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"lZbVKIWSffgdxUfCtWwoZunksiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"PLcKqcuXI7bMFBvnYp9B57kP4xg="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"lZbVKIWSffgdxUfCtWwoZunksiQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"PLcKqcuXI7bMFBvnYp9B57kP4xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"mNmFjNl1bSpHZ2neYZk75Sa6Kg0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"PLcKqcuXI7bMFBvnYp9B57kP4xg=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"mNmFjNl1bSpHZ2neYZk75Sa6Kg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"6TiVaVVW6RbVwjLx7JRDEqysFg0="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"mNmFjNl1bSpHZ2neYZk75Sa6Kg0=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"6TiVaVVW6RbVwjLx7JRDEqysFg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"G0OoPWyLEiaVbnZJmJNKv978qPQ="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"6TiVaVVW6RbVwjLx7JRDEqysFg0=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"G0OoPWyLEiaVbnZJmJNKv978qPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"xBiza56HV6Wd+agYqyxRvWSCO9c="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"G0OoPWyLEiaVbnZJmJNKv978qPQ=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"xBiza56HV6Wd+agYqyxRvWSCO9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"4NEt6fhMScdypKgoMMZ/e1D0+ZU="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"xBiza56HV6Wd+agYqyxRvWSCO9c=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"4NEt6fhMScdypKgoMMZ/e1D0+ZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="},{"type":"next-occurrence","id":"hCdQo9GOi6hAeMYC7+vIOwX/jew="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"4NEt6fhMScdypKgoMMZ/e1D0+ZU=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"hCdQo9GOi6hAeMYC7+vIOwX/jew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FXPoq+IWfd9bwf0/vmxTNJN+20="}],"description":"CCTV repairs and installation of conduits and installation of fiber optics and installation of traffic monitoring systems on I-291 both directions between Exit 2 - I-91 (Windsor) and I-84 (Manchester) There will be various shoulder closures, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open, Monday March 30th, 2026 thru Wednesday March 17th, 2027, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-24T13:17:40Z"},"road_event_id":"hCdQo9GOi6hAeMYC7+vIOwX/jew=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665442,41.818872]]}},{"id":"ugdVoMkSNklkSSw5dS44WVg1fxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UHh/7ATGhWG2rQ0sOKkasmhviZU="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"ugdVoMkSNklkSSw5dS44WVg1fxo=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"UHh/7ATGhWG2rQ0sOKkasmhviZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="},{"type":"next-occurrence","id":"6GUThA2zgugePv5uSt9TfFtSebc="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"UHh/7ATGhWG2rQ0sOKkasmhviZU=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"6GUThA2zgugePv5uSt9TfFtSebc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="},{"type":"next-occurrence","id":"NIivwXHS3IIULyrAuMFGNIgVKC0="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"6GUThA2zgugePv5uSt9TfFtSebc=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"NIivwXHS3IIULyrAuMFGNIgVKC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="},{"type":"next-occurrence","id":"AkHxcVzql1LLtPBZhqN7sY/2E/E="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"NIivwXHS3IIULyrAuMFGNIgVKC0=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"AkHxcVzql1LLtPBZhqN7sY/2E/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="},{"type":"next-occurrence","id":"4IPXIx1tvqX8rFYNZZy0WjvkcZo="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"AkHxcVzql1LLtPBZhqN7sY/2E/E=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"4IPXIx1tvqX8rFYNZZy0WjvkcZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="},{"type":"next-occurrence","id":"kn3qp9xB57Lv4KkV6mbqbkKYnrY="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"4IPXIx1tvqX8rFYNZZy0WjvkcZo=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"kn3qp9xB57Lv4KkV6mbqbkKYnrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="},{"type":"next-occurrence","id":"WkLnNaS0UwJcon1+4Z0IDD7CEoA="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"kn3qp9xB57Lv4KkV6mbqbkKYnrY=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"WkLnNaS0UwJcon1+4Z0IDD7CEoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="},{"type":"next-occurrence","id":"3g7puTcOp2AbEgjOqCGNVEgHn9c="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"WkLnNaS0UwJcon1+4Z0IDD7CEoA=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"3g7puTcOp2AbEgjOqCGNVEgHn9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugdVoMkSNklkSSw5dS44WVg1fxo="}],"description":"Tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) here will be various overnight ramp and lane closures, Monday March 30th, 2026 thru Friday June 5th, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-24T13:21:54Z"},"road_event_id":"3g7puTcOp2AbEgjOqCGNVEgHn9c=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4IUSe5k2eRTVvIAMJU98HGGhOSs="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"4IUSe5k2eRTVvIAMJU98HGGhOSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"Hz4Q/cN5nypGDmyITJA8+83XSnk="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"4IUSe5k2eRTVvIAMJU98HGGhOSs=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"Hz4Q/cN5nypGDmyITJA8+83XSnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"IG+6glLTsw5FdzrRkcPxmnwEFA4="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"Hz4Q/cN5nypGDmyITJA8+83XSnk=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"IG+6glLTsw5FdzrRkcPxmnwEFA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"qvLzbJfBwUNdQ2GgWKB5uxoIR+Q="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"IG+6glLTsw5FdzrRkcPxmnwEFA4=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"qvLzbJfBwUNdQ2GgWKB5uxoIR+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"ugHYFKilxcBaf2Gu6ZLiQUZKioI="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"qvLzbJfBwUNdQ2GgWKB5uxoIR+Q=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"ugHYFKilxcBaf2Gu6ZLiQUZKioI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"8ksjPkk4NpVU/w36w1oIDyVCcRk="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"ugHYFKilxcBaf2Gu6ZLiQUZKioI=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"8ksjPkk4NpVU/w36w1oIDyVCcRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"XviybgYacJ7mm7klqx7pEolrmVg="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"8ksjPkk4NpVU/w36w1oIDyVCcRk=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"XviybgYacJ7mm7klqx7pEolrmVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"AF03Xdqb6CUvP9Xd6e5jPbPhNIE="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"XviybgYacJ7mm7klqx7pEolrmVg=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"AF03Xdqb6CUvP9Xd6e5jPbPhNIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"RaaLAvrPJnhW9r7HOeAei7wQnw0="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"AF03Xdqb6CUvP9Xd6e5jPbPhNIE=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"RaaLAvrPJnhW9r7HOeAei7wQnw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"s5qCAO2alWABwIk626PciZX5jzo="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"RaaLAvrPJnhW9r7HOeAei7wQnw0=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"s5qCAO2alWABwIk626PciZX5jzo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"SligtOUhbvBAQOmM+T1wnLoS+/k="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"s5qCAO2alWABwIk626PciZX5jzo=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"SligtOUhbvBAQOmM+T1wnLoS+/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"VUjKhgwTJ+ICWUaz7tfpF6gPlAc="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"SligtOUhbvBAQOmM+T1wnLoS+/k=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T12:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"VUjKhgwTJ+ICWUaz7tfpF6gPlAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"6E0foQ1GDrJ3xhJCfbG/1BDe2vc="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"VUjKhgwTJ+ICWUaz7tfpF6gPlAc=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"6E0foQ1GDrJ3xhJCfbG/1BDe2vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="},{"type":"next-occurrence","id":"WVFUJlRRz4f+6kInPYXei+zztkA="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"6E0foQ1GDrJ3xhJCfbG/1BDe2vc=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"WVFUJlRRz4f+6kInPYXei+zztkA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-109"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Iw4ODEq98vNx+5+tQFRV7o0Tn0g="}],"description":"Guard rail repairs on CT-109 both directions between CT-109 (Morris) and PITCH RD (Morris) There will be various daytime lane closures , Thursday April 2nd, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-24T13:30:27Z"},"road_event_id":"WVFUJlRRz4f+6kInPYXei+zztkA=","beginning_cross_street":"CT-109","ending_cross_street":"PITCH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.179508,41.688129]]}},{"id":"hwper7I7jn6QKhCjwb9730ENIpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O6uxj2kjIzkrj2NdVZ4HZdS6wbU="}],"description":"Safety improvements on I-84 westbound Exit ramp Exit 43 - Park St (West Hartford) to PARK RD at RAYMOND RD (West Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:27:57Z"},"road_event_id":"hwper7I7jn6QKhCjwb9730ENIpw=","beginning_cross_street":"Exit 43 - Park St","ending_cross_street":"RAYMOND RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.732691,41.749362]]}},{"id":"O6uxj2kjIzkrj2NdVZ4HZdS6wbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hwper7I7jn6QKhCjwb9730ENIpw="},{"type":"next-occurrence","id":"JOzmtN4vMo5Tw3pVgJ0jyaK37SM="}],"description":"Safety improvements on I-84 westbound Exit ramp Exit 43 - Park St (West Hartford) to PARK RD at RAYMOND RD (West Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:27:57Z"},"road_event_id":"O6uxj2kjIzkrj2NdVZ4HZdS6wbU=","beginning_cross_street":"Exit 43 - Park St","ending_cross_street":"RAYMOND RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.732691,41.749362]]}},{"id":"JOzmtN4vMo5Tw3pVgJ0jyaK37SM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hwper7I7jn6QKhCjwb9730ENIpw="}],"description":"Safety improvements on I-84 westbound Exit ramp Exit 43 - Park St (West Hartford) to PARK RD at RAYMOND RD (West Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:27:57Z"},"road_event_id":"JOzmtN4vMo5Tw3pVgJ0jyaK37SM=","beginning_cross_street":"Exit 43 - Park St","ending_cross_street":"RAYMOND RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.732691,41.749362]]}},{"id":"8+bMLBmY3FXbpknMiIWpbjmdZiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r7sKIiH/e/sAwnYx7+jn0oVtCiw="}],"description":"Safety improvements on I-84 eastbound Exit ramp Exit 43 - Park St (West Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:32:46Z"},"road_event_id":"8+bMLBmY3FXbpknMiIWpbjmdZiI=","beginning_cross_street":"Exit 43 - Park St","ending_cross_street":"Exit 43 - Park St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.734932,41.743754]]}},{"id":"r7sKIiH/e/sAwnYx7+jn0oVtCiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8+bMLBmY3FXbpknMiIWpbjmdZiI="},{"type":"next-occurrence","id":"1uQd2cKHfQxF/wZnRqVSkgPUfyM="}],"description":"Safety improvements on I-84 eastbound Exit ramp Exit 43 - Park St (West Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:32:46Z"},"road_event_id":"r7sKIiH/e/sAwnYx7+jn0oVtCiw=","beginning_cross_street":"Exit 43 - Park St","ending_cross_street":"Exit 43 - Park St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.734932,41.743754]]}},{"id":"1uQd2cKHfQxF/wZnRqVSkgPUfyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8+bMLBmY3FXbpknMiIWpbjmdZiI="}],"description":"Safety improvements on I-84 eastbound Exit ramp Exit 43 - Park St (West Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:32:46Z"},"road_event_id":"1uQd2cKHfQxF/wZnRqVSkgPUfyM=","beginning_cross_street":"Exit 43 - Park St","ending_cross_street":"Exit 43 - Park St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.734932,41.743754]]}},{"id":"n69N/L87Ct3kOTkkUymsjMYpZUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ku7/6vy7LSGiXRGTP7WD49Lvl44="}],"description":"Safety improvements on I-84 eastbound Exit ramp Exit 56 - US 5/Governor Street (East Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:37:53Z"},"road_event_id":"n69N/L87Ct3kOTkkUymsjMYpZUg=","beginning_cross_street":"Exit 56 - US 5/Governor Street","ending_cross_street":"Exit 56 - US 5/Governor Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.653942,41.765338]]}},{"id":"ku7/6vy7LSGiXRGTP7WD49Lvl44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n69N/L87Ct3kOTkkUymsjMYpZUg="},{"type":"next-occurrence","id":"y+hiuTuR8V00w6I1uQuPFH15+t8="}],"description":"Safety improvements on I-84 eastbound Exit ramp Exit 56 - US 5/Governor Street (East Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:37:53Z"},"road_event_id":"ku7/6vy7LSGiXRGTP7WD49Lvl44=","beginning_cross_street":"Exit 56 - US 5/Governor Street","ending_cross_street":"Exit 56 - US 5/Governor Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.653942,41.765338]]}},{"id":"y+hiuTuR8V00w6I1uQuPFH15+t8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n69N/L87Ct3kOTkkUymsjMYpZUg="}],"description":"Safety improvements on I-84 eastbound Exit ramp Exit 56 - US 5/Governor Street (East Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:37:53Z"},"road_event_id":"y+hiuTuR8V00w6I1uQuPFH15+t8=","beginning_cross_street":"Exit 56 - US 5/Governor Street","ending_cross_street":"Exit 56 - US 5/Governor Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.653942,41.765338]]}},{"id":"WyGZo4OtTG3kJ7IPduHKrbacpeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I++FVtB5WthOafuGnjuei2N5iJw="}],"description":"Safety improvements on I-84 westbound Exit ramp Exit 56 - US 5/Governor Street (East Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:41:16Z"},"road_event_id":"WyGZo4OtTG3kJ7IPduHKrbacpeo=","beginning_cross_street":"Exit 56 - US 5/Governor Street","ending_cross_street":"Exit 56 - US 5/Governor Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.648955,41.765559]]}},{"id":"I++FVtB5WthOafuGnjuei2N5iJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WyGZo4OtTG3kJ7IPduHKrbacpeo="},{"type":"next-occurrence","id":"w0VqSuY3KIZROQAauCfVNyA1jqI="}],"description":"Safety improvements on I-84 westbound Exit ramp Exit 56 - US 5/Governor Street (East Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:41:16Z"},"road_event_id":"I++FVtB5WthOafuGnjuei2N5iJw=","beginning_cross_street":"Exit 56 - US 5/Governor Street","ending_cross_street":"Exit 56 - US 5/Governor Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.648955,41.765559]]}},{"id":"w0VqSuY3KIZROQAauCfVNyA1jqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WyGZo4OtTG3kJ7IPduHKrbacpeo="}],"description":"Safety improvements on I-84 westbound Exit ramp Exit 56 - US 5/Governor Street (East Hartford) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T14:41:16Z"},"road_event_id":"w0VqSuY3KIZROQAauCfVNyA1jqI=","beginning_cross_street":"Exit 56 - US 5/Governor Street","ending_cross_street":"Exit 56 - US 5/Governor Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.648955,41.765559]]}},{"id":"EZggBDOtBGTi+CA5rYiCQPjCdow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VZopfjghCq9YYVbLz2/iKIRw0C8="}],"description":"Safety improvements on I-291 westbound Exit ramp Exit 2 - I-91 (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:28:32Z"},"road_event_id":"EZggBDOtBGTi+CA5rYiCQPjCdow=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.660941,41.819085]]}},{"id":"VZopfjghCq9YYVbLz2/iKIRw0C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EZggBDOtBGTi+CA5rYiCQPjCdow="},{"type":"next-occurrence","id":"blff5mE385u9EY+ICU58rCcM69A="}],"description":"Safety improvements on I-291 westbound Exit ramp Exit 2 - I-91 (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:28:32Z"},"road_event_id":"VZopfjghCq9YYVbLz2/iKIRw0C8=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.660941,41.819085]]}},{"id":"blff5mE385u9EY+ICU58rCcM69A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EZggBDOtBGTi+CA5rYiCQPjCdow="}],"description":"Safety improvements on I-291 westbound Exit ramp Exit 2 - I-91 (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:28:32Z"},"road_event_id":"blff5mE385u9EY+ICU58rCcM69A=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.660941,41.819085]]}},{"id":"4FT8NVI/vpBUFZWJ7/I7bKmsBmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AOJb3l5GkQNJGHrwjfB2RKSigKw="}],"description":"Safety improvements on I-291 eastbound Entrance ramp Exit 2 - I-91 (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:32:02Z"},"road_event_id":"4FT8NVI/vpBUFZWJ7/I7bKmsBmw=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665874,41.817658]]}},{"id":"AOJb3l5GkQNJGHrwjfB2RKSigKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FT8NVI/vpBUFZWJ7/I7bKmsBmw="},{"type":"next-occurrence","id":"nm+0HLn3HzZYW+RUf81yDqx2/5k="}],"description":"Safety improvements on I-291 eastbound Entrance ramp Exit 2 - I-91 (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:32:02Z"},"road_event_id":"AOJb3l5GkQNJGHrwjfB2RKSigKw=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665874,41.817658]]}},{"id":"nm+0HLn3HzZYW+RUf81yDqx2/5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-291"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4FT8NVI/vpBUFZWJ7/I7bKmsBmw="}],"description":"Safety improvements on I-291 eastbound Entrance ramp Exit 2 - I-91 (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:32:02Z"},"road_event_id":"nm+0HLn3HzZYW+RUf81yDqx2/5k=","beginning_cross_street":"Exit 2 - I-91","ending_cross_street":"Exit 2 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665874,41.817658]]}},{"id":"eGtFiply5cmYK56qWqE66w218D4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qhdHAa2Pu3YoFATdV6HM4axRhBA="}],"description":"Safety improvements on I-91 southbound Exit ramp Exit 36 - CT 178/Park Ave (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:34:43Z"},"road_event_id":"eGtFiply5cmYK56qWqE66w218D4=","beginning_cross_street":"Exit 36 - CT 178/Park Ave","ending_cross_street":"Exit 36 - CT 178/Park Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665436,41.841596]]}},{"id":"qhdHAa2Pu3YoFATdV6HM4axRhBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGtFiply5cmYK56qWqE66w218D4="},{"type":"next-occurrence","id":"8H+pjn1yOgRUEetQUz+qPyUaRiw="}],"description":"Safety improvements on I-91 southbound Exit ramp Exit 36 - CT 178/Park Ave (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:34:43Z"},"road_event_id":"qhdHAa2Pu3YoFATdV6HM4axRhBA=","beginning_cross_street":"Exit 36 - CT 178/Park Ave","ending_cross_street":"Exit 36 - CT 178/Park Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665436,41.841596]]}},{"id":"8H+pjn1yOgRUEetQUz+qPyUaRiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eGtFiply5cmYK56qWqE66w218D4="}],"description":"Safety improvements on I-91 southbound Exit ramp Exit 36 - CT 178/Park Ave (Windsor) Traffic will follow posted detours and are advised to seek alternate routes during the ramp closures listed above, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday, 07:00 PM thru 03:00 AM All lanes closed","update_date":"2026-03-24T15:34:43Z"},"road_event_id":"8H+pjn1yOgRUEetQUz+qPyUaRiw=","beginning_cross_street":"Exit 36 - CT 178/Park Ave","ending_cross_street":"Exit 36 - CT 178/Park Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.665436,41.841596]]}},{"id":"tSPPfJJAfYqNh8D3JRsq9ngaxjw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["62ND DR"],"direction":"unknown","related_road_events":[],"description":"Crane operations on 62ND DR both directions between JUNCTION BLVD (New York) and 97TH ST (New York) to facilitate crane operation/installation of heavy-duty netting to 3 sides of the overpass., Continuous Friday March 27th, 2026 10:00 PM thru Monday April 27th, 2026 05:00 AM All lanes closed","update_date":"2026-03-24T18:24:39Z"},"road_event_id":"tSPPfJJAfYqNh8D3JRsq9ngaxjw=","beginning_cross_street":"JUNCTION BLVD","ending_cross_street":"97TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863354,40.732005]]}},{"id":"/xy10ENXBrJCt1VoFGfrGFSxxpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for gas installation/jack and bore activities., Continuous Tuesday March 24th, 2026 12:00 AM thru Thursday April 23rd, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T18:33:56Z"},"road_event_id":"/xy10ENXBrJCt1VoFGfrGFSxxpc=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021354,40.648102]]}},{"id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O0c1LFmz89Hw2Ry15TCUmXh7o+o="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York) for booming and pouring concrete., Tuesday March 24th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:38:00Z"},"road_event_id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909522,40.849094]]}},{"id":"O0c1LFmz89Hw2Ry15TCUmXh7o+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw="},{"type":"next-occurrence","id":"h1Qgg7/Xw37dkA1Ow/j6ZbCNA8A="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York) for booming and pouring concrete., Tuesday March 24th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:38:00Z"},"road_event_id":"O0c1LFmz89Hw2Ry15TCUmXh7o+o=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909522,40.849094]]}},{"id":"h1Qgg7/Xw37dkA1Ow/j6ZbCNA8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw="},{"type":"next-occurrence","id":"t+AUUxHsdyz5T99vpziWttQxus4="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York) for booming and pouring concrete., Tuesday March 24th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:38:00Z"},"road_event_id":"h1Qgg7/Xw37dkA1Ow/j6ZbCNA8A=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909522,40.849094]]}},{"id":"t+AUUxHsdyz5T99vpziWttQxus4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw="},{"type":"next-occurrence","id":"jObO/8uE1HPN7HaEv7Z23WqYpFY="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York) for booming and pouring concrete., Tuesday March 24th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:38:00Z"},"road_event_id":"t+AUUxHsdyz5T99vpziWttQxus4=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909522,40.849094]]}},{"id":"jObO/8uE1HPN7HaEv7Z23WqYpFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw="},{"type":"next-occurrence","id":"koXfth+rODJ14vY/INeb0DA+RiQ="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York) for booming and pouring concrete., Tuesday March 24th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:38:00Z"},"road_event_id":"jObO/8uE1HPN7HaEv7Z23WqYpFY=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909522,40.849094]]}},{"id":"koXfth+rODJ14vY/INeb0DA+RiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw="},{"type":"next-occurrence","id":"zJKE2NmZlAoY9SIL/zsIiooWB0I="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York) for booming and pouring concrete., Tuesday March 24th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:38:00Z"},"road_event_id":"koXfth+rODJ14vY/INeb0DA+RiQ=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909522,40.849094]]}},{"id":"zJKE2NmZlAoY9SIL/zsIiooWB0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MT HOPE PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NYiwLKQIw/Q8Brt1OjD0vZpwiMw="}],"description":"Construction on MT HOPE PL westbound between WALTON AVE (New York) and JEROME AVE (New York) for booming and pouring concrete., Tuesday March 24th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:38:00Z"},"road_event_id":"zJKE2NmZlAoY9SIL/zsIiooWB0I=","beginning_cross_street":"WALTON AVE","ending_cross_street":"JEROME AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909522,40.849094]]}},{"id":"+mTkpZ+5uu4lToAV8ZLuM1i+NPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NYEWtQFa3J+XguJKLqhGHKe+oC4="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Tuesday March 24th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:40:16Z"},"road_event_id":"+mTkpZ+5uu4lToAV8ZLuM1i+NPE=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891311,40.85154]]}},{"id":"NYEWtQFa3J+XguJKLqhGHKe+oC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+mTkpZ+5uu4lToAV8ZLuM1i+NPE="},{"type":"next-occurrence","id":"ONa2GAFZEF6dCiLbMLfguvuj7Hs="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Tuesday March 24th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:40:16Z"},"road_event_id":"NYEWtQFa3J+XguJKLqhGHKe+oC4=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891311,40.85154]]}},{"id":"ONa2GAFZEF6dCiLbMLfguvuj7Hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+mTkpZ+5uu4lToAV8ZLuM1i+NPE="},{"type":"next-occurrence","id":"MKK1l2V1hvWVyS0eiRtnUNnLGHc="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Tuesday March 24th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:40:16Z"},"road_event_id":"ONa2GAFZEF6dCiLbMLfguvuj7Hs=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891311,40.85154]]}},{"id":"MKK1l2V1hvWVyS0eiRtnUNnLGHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WADE SQ"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+mTkpZ+5uu4lToAV8ZLuM1i+NPE="}],"description":"Construction on WADE SQ northbound between OAK TREE PL (New York) and QUARRY RD (New York) for booming and concrete pour., Tuesday March 24th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-24T18:40:16Z"},"road_event_id":"MKK1l2V1hvWVyS0eiRtnUNnLGHc=","beginning_cross_street":"OAK TREE PL","ending_cross_street":"QUARRY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891311,40.85154]]}},{"id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wUJVegcLTHASQYzS//Y/NVxeCOo="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"wUJVegcLTHASQYzS//Y/NVxeCOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"dAXA1TVGb1tG076Q8ki5DKl7ws4="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"wUJVegcLTHASQYzS//Y/NVxeCOo=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"dAXA1TVGb1tG076Q8ki5DKl7ws4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"ETu/bMEUzi2BRGXBA7HB+fmoKGU="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"dAXA1TVGb1tG076Q8ki5DKl7ws4=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"ETu/bMEUzi2BRGXBA7HB+fmoKGU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"JPPNLkoYyWPEa3ahFcw6FQwSjNQ="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"ETu/bMEUzi2BRGXBA7HB+fmoKGU=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"JPPNLkoYyWPEa3ahFcw6FQwSjNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"+b9hApv96JCxOI1KYT5iG69ckyA="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"JPPNLkoYyWPEa3ahFcw6FQwSjNQ=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"+b9hApv96JCxOI1KYT5iG69ckyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"VLtf5RqemKhagI5dn/HThWbzPi4="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"+b9hApv96JCxOI1KYT5iG69ckyA=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"VLtf5RqemKhagI5dn/HThWbzPi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"0XlO5hynbN+dH2ghXCLwWZaAbn4="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"VLtf5RqemKhagI5dn/HThWbzPi4=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"0XlO5hynbN+dH2ghXCLwWZaAbn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"fEWZYAx3xZrboouigKsb22AW25E="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"0XlO5hynbN+dH2ghXCLwWZaAbn4=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"fEWZYAx3xZrboouigKsb22AW25E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"2ZwBJY0eMueGPCbPxXQSHFj3F4Y="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"fEWZYAx3xZrboouigKsb22AW25E=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"2ZwBJY0eMueGPCbPxXQSHFj3F4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"CAU+2dBU8rzWOfDJ8GkWaQw2FAQ="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"2ZwBJY0eMueGPCbPxXQSHFj3F4Y=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"CAU+2dBU8rzWOfDJ8GkWaQw2FAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"us8jTacL6ooGld2KsfTRiOVbOLM="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"CAU+2dBU8rzWOfDJ8GkWaQw2FAQ=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"us8jTacL6ooGld2KsfTRiOVbOLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"OXTHl94MOKpR5Flv/QcKA3uiXAw="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"us8jTacL6ooGld2KsfTRiOVbOLM=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"OXTHl94MOKpR5Flv/QcKA3uiXAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"I0CJ8bRBf6eFX8j0b09OE4C+CDs="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"OXTHl94MOKpR5Flv/QcKA3uiXAw=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"I0CJ8bRBf6eFX8j0b09OE4C+CDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="},{"type":"next-occurrence","id":"eNX0CFwzGvv5brKudhdXoUZGW1w="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"I0CJ8bRBf6eFX8j0b09OE4C+CDs=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"eNX0CFwzGvv5brKudhdXoUZGW1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["INWOOD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mqPvdd6iWjrcP9j6ijJn+bm9LaM="}],"description":"Construction on INWOOD AVE eastbound between W 169TH ST (New York) and W CLARKE PL (New York) for use of concrete pumps, boom trucks and knuckle boom., Tuesday March 24th, 2026 thru Sunday May 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:06:30Z"},"road_event_id":"eNX0CFwzGvv5brKudhdXoUZGW1w=","beginning_cross_street":"W 169TH ST","ending_cross_street":"W CLARKE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921001,40.838028]]}},{"id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nn555f95AJ9OIPh6r1qoijtWoTE="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"nn555f95AJ9OIPh6r1qoijtWoTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"3+MVA7oAIHeOYsgD4tN8wThSJM8="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"nn555f95AJ9OIPh6r1qoijtWoTE=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"3+MVA7oAIHeOYsgD4tN8wThSJM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"n9DBLMt0btedx0fZbo3XWQ7fKyM="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"3+MVA7oAIHeOYsgD4tN8wThSJM8=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"n9DBLMt0btedx0fZbo3XWQ7fKyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"6YchKSuxD1oK8V2FjvSuCq/yQMo="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"n9DBLMt0btedx0fZbo3XWQ7fKyM=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"6YchKSuxD1oK8V2FjvSuCq/yQMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"wLbLc07deSS8IfVc1Pj0z57dBsQ="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"6YchKSuxD1oK8V2FjvSuCq/yQMo=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"wLbLc07deSS8IfVc1Pj0z57dBsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"aomZGQmEDHPmT/d1zasokAshs2A="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"wLbLc07deSS8IfVc1Pj0z57dBsQ=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"aomZGQmEDHPmT/d1zasokAshs2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"NQpp2kkmpASNbqWRO/DZ0eYUjM8="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"aomZGQmEDHPmT/d1zasokAshs2A=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"NQpp2kkmpASNbqWRO/DZ0eYUjM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"O2tI/cQ9nUBXiiVRvlGRFsX6AoQ="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"NQpp2kkmpASNbqWRO/DZ0eYUjM8=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"O2tI/cQ9nUBXiiVRvlGRFsX6AoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"ipmj2/pF3hvvtkB4pfa09jH1hbM="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"O2tI/cQ9nUBXiiVRvlGRFsX6AoQ=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"ipmj2/pF3hvvtkB4pfa09jH1hbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"p0qMYnGVgoWwydVaEqouVJgb6DY="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"ipmj2/pF3hvvtkB4pfa09jH1hbM=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"p0qMYnGVgoWwydVaEqouVJgb6DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"XrL2p13i3oKp8sAO1TlU8gZLrhQ="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"p0qMYnGVgoWwydVaEqouVJgb6DY=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"XrL2p13i3oKp8sAO1TlU8gZLrhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"5/Rsa636OFTschw4HHKi4PyUMFk="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"XrL2p13i3oKp8sAO1TlU8gZLrhQ=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"5/Rsa636OFTschw4HHKi4PyUMFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"wBmb0wm6OT5C6cwlbsWYAeRQC0c="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"5/Rsa636OFTschw4HHKi4PyUMFk=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"wBmb0wm6OT5C6cwlbsWYAeRQC0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="},{"type":"next-occurrence","id":"ORrzn3Dz4VJUUV6cXd8w1jevA0o="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"wBmb0wm6OT5C6cwlbsWYAeRQC0c=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"ORrzn3Dz4VJUUV6cXd8w1jevA0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s9ZmsX1qY7qD0M7VaCOZmKtre8s="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:04:50Z"},"road_event_id":"ORrzn3Dz4VJUUV6cXd8w1jevA0o=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97612,40.755625]]}},{"id":"9kI4oUYbZZfvmIZIWaulTzWL+F8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/utJg5fdpj2F0H78CkvL3Fq3wf4="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"9kI4oUYbZZfvmIZIWaulTzWL+F8=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"/utJg5fdpj2F0H78CkvL3Fq3wf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"yN4djYVNDpDHiQmKwGya7+LtTuY="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"/utJg5fdpj2F0H78CkvL3Fq3wf4=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"yN4djYVNDpDHiQmKwGya7+LtTuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"4ihdHdFb+MJadNMwoueDpB8ryuQ="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"yN4djYVNDpDHiQmKwGya7+LtTuY=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"4ihdHdFb+MJadNMwoueDpB8ryuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"cBP5FcUc2NTvkJTJrknrnqLtgzc="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"4ihdHdFb+MJadNMwoueDpB8ryuQ=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"cBP5FcUc2NTvkJTJrknrnqLtgzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"QMDcMsHAgfQFx4gSWYumtU66czQ="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"cBP5FcUc2NTvkJTJrknrnqLtgzc=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"QMDcMsHAgfQFx4gSWYumtU66czQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"dqiuZS/KWaL5cgLslQuxnIqWHKw="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"QMDcMsHAgfQFx4gSWYumtU66czQ=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"dqiuZS/KWaL5cgLslQuxnIqWHKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"GX6qrNzLW8n8wevpywr/NDulBp4="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"dqiuZS/KWaL5cgLslQuxnIqWHKw=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"GX6qrNzLW8n8wevpywr/NDulBp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"eBeXVGErMy2oMcRtR+DKPue/rUQ="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"GX6qrNzLW8n8wevpywr/NDulBp4=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"eBeXVGErMy2oMcRtR+DKPue/rUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"++Dg1lolJeWg3WpdzHSXx7ip7Ew="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"eBeXVGErMy2oMcRtR+DKPue/rUQ=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"++Dg1lolJeWg3WpdzHSXx7ip7Ew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"fuZ0GKZvdP8SytDowqpgYVGhh2I="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"++Dg1lolJeWg3WpdzHSXx7ip7Ew=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"fuZ0GKZvdP8SytDowqpgYVGhh2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"mgCzg1R0Peg0xhTT7p0IgqbVU3M="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"fuZ0GKZvdP8SytDowqpgYVGhh2I=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"mgCzg1R0Peg0xhTT7p0IgqbVU3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"gC5AHJcOYUitIEfSBPaE0dMvcUE="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"mgCzg1R0Peg0xhTT7p0IgqbVU3M=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"gC5AHJcOYUitIEfSBPaE0dMvcUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"gyVg7nnP20SRbx6aW28wyPap9oI="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"gC5AHJcOYUitIEfSBPaE0dMvcUE=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"gyVg7nnP20SRbx6aW28wyPap9oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="},{"type":"next-occurrence","id":"xFURAfr2lcRexVOFOmnmUOYDkic="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"gyVg7nnP20SRbx6aW28wyPap9oI=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"xFURAfr2lcRexVOFOmnmUOYDkic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9kI4oUYbZZfvmIZIWaulTzWL+F8="}],"description":"Construction on E 47TH ST westbound between PARK AVE (New York) and VANDERBILT AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:06:18Z"},"road_event_id":"xFURAfr2lcRexVOFOmnmUOYDkic=","beginning_cross_street":"PARK AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975426,40.755354]]}},{"id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xgqEEfUQe3QESzYZN7e+FAYP7GM="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"xgqEEfUQe3QESzYZN7e+FAYP7GM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"ctFhgAOffGFH7WPYdQcTHvJzD70="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"xgqEEfUQe3QESzYZN7e+FAYP7GM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"ctFhgAOffGFH7WPYdQcTHvJzD70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"SrCs7yfWMCsuCk364sklSidg9Ag="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"ctFhgAOffGFH7WPYdQcTHvJzD70=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"SrCs7yfWMCsuCk364sklSidg9Ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"cGjJJfHby8+KdiVJrk6tvgYhhwo="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"SrCs7yfWMCsuCk364sklSidg9Ag=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"cGjJJfHby8+KdiVJrk6tvgYhhwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"0JZd78NoohwGMSLSqTeC+4USmdc="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"cGjJJfHby8+KdiVJrk6tvgYhhwo=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"0JZd78NoohwGMSLSqTeC+4USmdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"bGPbXXyUujYv3+K0off9voRFJbk="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"0JZd78NoohwGMSLSqTeC+4USmdc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"bGPbXXyUujYv3+K0off9voRFJbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"+2ISGUVlKZh4We2fHB76RV/Rqvg="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"bGPbXXyUujYv3+K0off9voRFJbk=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"+2ISGUVlKZh4We2fHB76RV/Rqvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"5ALo06EyQkybeoE7GSdldc9zkmw="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"+2ISGUVlKZh4We2fHB76RV/Rqvg=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"5ALo06EyQkybeoE7GSdldc9zkmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"Rz1NGJIr/zYJiJdRzecKN+2QCYs="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"5ALo06EyQkybeoE7GSdldc9zkmw=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"Rz1NGJIr/zYJiJdRzecKN+2QCYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"xrLakvoAND01/x9Rwx/y8frrSVc="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"Rz1NGJIr/zYJiJdRzecKN+2QCYs=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"xrLakvoAND01/x9Rwx/y8frrSVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"3QLRScP7c8KTDzSuLRdGDvHUBiU="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"xrLakvoAND01/x9Rwx/y8frrSVc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"3QLRScP7c8KTDzSuLRdGDvHUBiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"p1YcNJy1mdxb3EQ1El4F28+DrAc="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"3QLRScP7c8KTDzSuLRdGDvHUBiU=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"p1YcNJy1mdxb3EQ1El4F28+DrAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"eWxs+F0cAmepScFbH9HD9rUZi5s="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"p1YcNJy1mdxb3EQ1El4F28+DrAc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"eWxs+F0cAmepScFbH9HD9rUZi5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="},{"type":"next-occurrence","id":"6YIhmge9dSOzQGjkuZoVlnWqHxU="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"eWxs+F0cAmepScFbH9HD9rUZi5s=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"6YIhmge9dSOzQGjkuZoVlnWqHxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPgjI/SPNvXyU5aUnX2JfDZLBGY="}],"description":"Construction on E 48TH ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for Grand Central Train Shed project., Tuesday March 24th, 2026 thru Sunday June 7th, 2026, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2026-03-24T19:07:51Z"},"road_event_id":"6YIhmge9dSOzQGjkuZoVlnWqHxU=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976388,40.756554]]}},{"id":"d0Gb4AfEPUDMRzqVW306Syr/wpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-490 westbound at Bushnells Basin on ramp (Perinton) Exit 27 - I490 WB on ramp will be closed to all traffic beginning Monday March 30th. Detour will be posted Closure scheduled to be in place for the 2026 construction season. , Continuous Monday March 30th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes closed ramp","update_date":"2026-04-13T14:42:36Z"},"road_event_id":"d0Gb4AfEPUDMRzqVW306Syr/wpE=","beginning_cross_street":"Bushnells Basin on ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.47116,43.057699]]}},{"id":"K5DX3QEuR97Qud2Hmo2IzweWnIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 49TH ST"],"direction":"unknown","related_road_events":[],"description":"Crane operations on W 49TH ST westbound between 11TH AVE (New York) and 12TH AVE (New York), Continuous Saturday March 28th, 2026 12:01 AM thru Monday April 27th, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:18:08Z"},"road_event_id":"K5DX3QEuR97Qud2Hmo2IzweWnIU=","beginning_cross_street":"11TH AVE","ending_cross_street":"12TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99519,40.765292]]}},{"id":"RVma1Qb6Ty787DvqqUdPQay4BV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 50TH ST"],"direction":"unknown","related_road_events":[],"description":"Crane operations on W 50TH ST eastbound between 12TH AVE (New York) and 11TH AVE (New York), Continuous Saturday March 28th, 2026 12:01 AM thru Monday April 27th, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:19:54Z"},"road_event_id":"RVma1Qb6Ty787DvqqUdPQay4BV0=","beginning_cross_street":"12TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996591,40.766695]]}},{"id":"bhjk0uHLfukU2aw+QZAFvLZf6pI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-490 eastbound from Pittsford Palmyra Road; NY 31 (Perinton) to Bushnells Basin (Perinton) The I490 EB between Exit 26 to Exit 27. Both the EB lanes will be shifted to the right but staying in the EB travel direction beginning Monday March 30th. Lanes Shifts scheduled to be in place for the 2026 construction season., Continuous Monday March 30th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes","update_date":"2026-04-13T14:40:48Z"},"road_event_id":"bhjk0uHLfukU2aw+QZAFvLZf6pI=","beginning_cross_street":"Pittsford Palmyra Road; NY 31","ending_cross_street":"Bushnells Basin ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.485802,43.079325]]}},{"id":"upCNl6rujhXSK/hc385khjeNAFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cNtoJhkiyYfdPlCHk96eKZJSsWA="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"upCNl6rujhXSK/hc385khjeNAFA=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"cNtoJhkiyYfdPlCHk96eKZJSsWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"mionxlfIIhhXx0V5kZgjeDE01aM="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"cNtoJhkiyYfdPlCHk96eKZJSsWA=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"mionxlfIIhhXx0V5kZgjeDE01aM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"YizH2/QQmaxXgHfq1sKkV5kiGeE="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"mionxlfIIhhXx0V5kZgjeDE01aM=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"YizH2/QQmaxXgHfq1sKkV5kiGeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"CPr74oiut/rQnahmWaryB9s9sOk="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"YizH2/QQmaxXgHfq1sKkV5kiGeE=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"CPr74oiut/rQnahmWaryB9s9sOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"f0CgIIFmlXlgnEYUXTP/IbSvGTE="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"CPr74oiut/rQnahmWaryB9s9sOk=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T04:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"f0CgIIFmlXlgnEYUXTP/IbSvGTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"tGa8t5AN4VPCAvZd8BPVZuNirdA="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"f0CgIIFmlXlgnEYUXTP/IbSvGTE=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-04-27T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"tGa8t5AN4VPCAvZd8BPVZuNirdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"qXSN3p5x+eN7iesgHfcu591f04U="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"tGa8t5AN4VPCAvZd8BPVZuNirdA=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T04:00:00Z","end_date":"2026-04-28T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"qXSN3p5x+eN7iesgHfcu591f04U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"fBEXpw2YzoFDBEJLb7+96ozDtNg="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"qXSN3p5x+eN7iesgHfcu591f04U=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T04:00:00Z","end_date":"2026-04-29T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"fBEXpw2YzoFDBEJLb7+96ozDtNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"hX52n8MQ9E4VLgyf7YqSexZYits="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"fBEXpw2YzoFDBEJLb7+96ozDtNg=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T04:00:00Z","end_date":"2026-04-30T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"hX52n8MQ9E4VLgyf7YqSexZYits=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"TEs8zoX5ZQduVPWSHEm8arYmbs4="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"hX52n8MQ9E4VLgyf7YqSexZYits=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T04:00:00Z","end_date":"2026-05-01T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"TEs8zoX5ZQduVPWSHEm8arYmbs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"3yhwSLmeuJqPyUQirDvbVisWgi0="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"TEs8zoX5ZQduVPWSHEm8arYmbs4=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T04:00:00Z","end_date":"2026-05-02T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"3yhwSLmeuJqPyUQirDvbVisWgi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"PQGFes5hE0xFcSv4jYPUjebTr3A="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"3yhwSLmeuJqPyUQirDvbVisWgi0=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T04:00:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"PQGFes5hE0xFcSv4jYPUjebTr3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"WD9O8ADYZurzg+n6QMzdLxSrNjI="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"PQGFes5hE0xFcSv4jYPUjebTr3A=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-04T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"WD9O8ADYZurzg+n6QMzdLxSrNjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="},{"type":"next-occurrence","id":"pgHFnVk5l/CkQOJljqt1Y0j3jhE="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"WD9O8ADYZurzg+n6QMzdLxSrNjI=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T04:00:00Z","end_date":"2026-05-05T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"pgHFnVk5l/CkQOJljqt1Y0j3jhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"upCNl6rujhXSK/hc385khjeNAFA="}],"description":"Construction on W 52ND ST eastbound between 8TH AVE (New York) and BROADWAY (New York) to replace leak prone gas main to upgrade TEH system., Tuesday March 24th, 2026 thru Saturday May 23rd, 2026, Sunday thru Saturday, 12:00 AM thru 07:00 AM All lanes closed","update_date":"2026-03-24T19:21:40Z"},"road_event_id":"pgHFnVk5l/CkQOJljqt1Y0j3jhE=","beginning_cross_street":"8TH AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T04:00:00Z","end_date":"2026-05-06T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985064,40.763485]]}},{"id":"Wa9/Shjf//v7BjC38U4dzsPUVk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jg+cXuwaiAcLywY4WMdbeMy3Q+w="}],"description":"Construction on WHITE ST westbound between 6TH AVE (New York) and W BROADWAY (New York) for new gas services for customers located at 14 White Street., Saturday March 28th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 29th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-24T19:36:39Z"},"road_event_id":"Wa9/Shjf//v7BjC38U4dzsPUVk8=","beginning_cross_street":"6TH AVE","ending_cross_street":"W BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005294,40.719031]]}},{"id":"jg+cXuwaiAcLywY4WMdbeMy3Q+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wa9/Shjf//v7BjC38U4dzsPUVk8="}],"description":"Construction on WHITE ST westbound between 6TH AVE (New York) and W BROADWAY (New York) for new gas services for customers located at 14 White Street., Saturday March 28th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 29th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-24T19:36:39Z"},"road_event_id":"jg+cXuwaiAcLywY4WMdbeMy3Q+w=","beginning_cross_street":"6TH AVE","ending_cross_street":"W BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005294,40.719031]]}},{"id":"BjBApf+4Nrv7XoGVfrWTzYvx1cY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 128TH ST (New York) and E 129TH ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:40:05Z"},"road_event_id":"BjBApf+4Nrv7XoGVfrWTzYvx1cY=","beginning_cross_street":"E 128TH ST","ending_cross_street":"E 129TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937448,40.807004]]}},{"id":"xSRNBs5sl57Mp7o/St5uDMy8mdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 129TH ST (New York) and E 130TH ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:42:48Z"},"road_event_id":"xSRNBs5sl57Mp7o/St5uDMy8mdI=","beginning_cross_street":"E 129TH ST","ending_cross_street":"E 130TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937017,40.807596]]}},{"id":"iqauxfw3t2slnlwJH+JpwPBdzpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on PARK AVE northbound between E 130TH ST (New York) and E 131ST ST (New York) to erect the gantries for the Park Avenue Viaduct-northbound., Continuous Tuesday March 24th, 2026 12:00 AM thru Sunday June 21st, 2026 11:59 PM All lanes closed","update_date":"2026-03-24T19:44:22Z"},"road_event_id":"iqauxfw3t2slnlwJH+JpwPBdzpQ=","beginning_cross_street":"E 130TH ST","ending_cross_street":"E 131ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936571,40.808209]]}},{"id":"vLcMwNYv3nWimzimTcV5UzpDz0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z/dGv7zuU5gahfl7YoYk0o1Uc94="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:18:59Z"},"road_event_id":"vLcMwNYv3nWimzimTcV5UzpDz0k=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"Z/dGv7zuU5gahfl7YoYk0o1Uc94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLcMwNYv3nWimzimTcV5UzpDz0k="},{"type":"next-occurrence","id":"VGzK9Tf24GLHGH+U6MSNl3XClRE="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:18:59Z"},"road_event_id":"Z/dGv7zuU5gahfl7YoYk0o1Uc94=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"VGzK9Tf24GLHGH+U6MSNl3XClRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLcMwNYv3nWimzimTcV5UzpDz0k="},{"type":"next-occurrence","id":"cUz7j5CMn/Qs0HVABYvVvCKjEOI="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:18:59Z"},"road_event_id":"VGzK9Tf24GLHGH+U6MSNl3XClRE=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"cUz7j5CMn/Qs0HVABYvVvCKjEOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLcMwNYv3nWimzimTcV5UzpDz0k="},{"type":"next-occurrence","id":"6D7vmVVYyt7GPAVOZHJ95UH3LMc="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:18:59Z"},"road_event_id":"cUz7j5CMn/Qs0HVABYvVvCKjEOI=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"6D7vmVVYyt7GPAVOZHJ95UH3LMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLcMwNYv3nWimzimTcV5UzpDz0k="},{"type":"next-occurrence","id":"groo2aM8kZ2kINdYMz3zRiLdPBA="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:18:59Z"},"road_event_id":"6D7vmVVYyt7GPAVOZHJ95UH3LMc=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"groo2aM8kZ2kINdYMz3zRiLdPBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLcMwNYv3nWimzimTcV5UzpDz0k="},{"type":"next-occurrence","id":"+zLRJj8Yt/i9ogY4cbplATAvAM8="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:18:59Z"},"road_event_id":"groo2aM8kZ2kINdYMz3zRiLdPBA=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"+zLRJj8Yt/i9ogY4cbplATAvAM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vLcMwNYv3nWimzimTcV5UzpDz0k="}],"description":"Bridge demolition on I-81 northbound between I-690 West (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Alternating lane closures, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-03T15:18:59Z"},"road_event_id":"+zLRJj8Yt/i9ogY4cbplATAvAM8=","beginning_cross_street":"I-690 West","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145793,43.051427]]}},{"id":"Ckc1+dJiKJw4VGBHY8sZJ0MeO/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OeDUj31vNbh4UF7eu47TFWU848Y="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US-9W (Clarkstown) D265648/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T20:01:21Z"},"road_event_id":"Ckc1+dJiKJw4VGBHY8sZJ0MeO/s=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US-9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949898,41.079494]]}},{"id":"OeDUj31vNbh4UF7eu47TFWU848Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckc1+dJiKJw4VGBHY8sZJ0MeO/s="},{"type":"next-occurrence","id":"bTfbUgJzCVPdbeT4mRCShWlD5bw="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US-9W (Clarkstown) D265648/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T20:01:21Z"},"road_event_id":"OeDUj31vNbh4UF7eu47TFWU848Y=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US-9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949898,41.079494]]}},{"id":"bTfbUgJzCVPdbeT4mRCShWlD5bw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ckc1+dJiKJw4VGBHY8sZJ0MeO/s="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US-9W (Clarkstown) D265648/29685409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-17T20:01:21Z"},"road_event_id":"bTfbUgJzCVPdbeT4mRCShWlD5bw=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US-9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949898,41.079494]]}},{"id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c4OriHhSZEkn5XYnerG7Vg9ZgiA="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"c4OriHhSZEkn5XYnerG7Vg9ZgiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4="},{"type":"next-occurrence","id":"m24eM5+DAdAyIc0hoIejj2U7g2U="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"c4OriHhSZEkn5XYnerG7Vg9ZgiA=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"m24eM5+DAdAyIc0hoIejj2U7g2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4="},{"type":"next-occurrence","id":"oVcxdD6kzSDzl5EbhsVxKtXRvug="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"m24eM5+DAdAyIc0hoIejj2U7g2U=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"oVcxdD6kzSDzl5EbhsVxKtXRvug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4="},{"type":"next-occurrence","id":"s4QTN109fxkGqMZGQGHue/SAN9M="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"oVcxdD6kzSDzl5EbhsVxKtXRvug=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"s4QTN109fxkGqMZGQGHue/SAN9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4="},{"type":"next-occurrence","id":"57NmmifVVUlDPlSOV4JeaSz452o="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"s4QTN109fxkGqMZGQGHue/SAN9M=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"57NmmifVVUlDPlSOV4JeaSz452o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4="},{"type":"next-occurrence","id":"JZ5QyBwwZQgBMxSYT+Hbft3PPvs="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"57NmmifVVUlDPlSOV4JeaSz452o=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"JZ5QyBwwZQgBMxSYT+Hbft3PPvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4="},{"type":"next-occurrence","id":"BfdbcPujy/fszc7FhG96R5G5S0I="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"JZ5QyBwwZQgBMxSYT+Hbft3PPvs=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"BfdbcPujy/fszc7FhG96R5G5S0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OE2hbk5fYHSTN5ztFHwRaMoXXH4="}],"description":"Bridge maintenance operations on I-684 northbound between Exit 7 - NY 116 (North Salem) and Exit 8 - Hardscrabble Road (North Salem) D265281/B1016629/32558209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:28:28Z"},"road_event_id":"BfdbcPujy/fszc7FhG96R5G5S0I=","beginning_cross_street":"Exit 7 - NY 116","ending_cross_street":"Exit 8 - Hardscrabble Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658138,41.327274]]}},{"id":"wM/9ETrmaZ4lM7eokcdGLTMlf60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark - World Trade Center"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5VaTxBDET1CB7iv7z72jiAPI6lk="}],"description":"Due to Repairs both directions, Newark - World Trade Center between Harrison (Harrison) and Journal Square (Jersey City) There will be no service between Harrison & Journal Square stations, Shuttle bus service will be provided., Saturday April 25th, 2026 thru Monday April 27th, 2026, Saturday/ Sunday, 11:59 PM thru 05:00 AM","update_date":"2026-04-03T12:41:34Z"},"road_event_id":"wM/9ETrmaZ4lM7eokcdGLTMlf60=","beginning_cross_street":"Harrison","ending_cross_street":"Journal Square","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:58:00Z","end_date":"2026-04-27T08:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.1559,40.7394]]}},{"id":"5VaTxBDET1CB7iv7z72jiAPI6lk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark - World Trade Center"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wM/9ETrmaZ4lM7eokcdGLTMlf60="}],"description":"Due to Repairs both directions, Newark - World Trade Center between Harrison (Harrison) and Journal Square (Jersey City) There will be no service between Harrison & Journal Square stations, Shuttle bus service will be provided., Saturday April 25th, 2026 thru Monday April 27th, 2026, Saturday/ Sunday, 11:59 PM thru 05:00 AM","update_date":"2026-04-03T12:41:34Z"},"road_event_id":"5VaTxBDET1CB7iv7z72jiAPI6lk=","beginning_cross_street":"Harrison","ending_cross_street":"Journal Square","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:58:00Z","end_date":"2026-04-28T08:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.1559,40.7394]]}},{"id":"LZ3DMH5VZypBbYUiz8VYPeQBrQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on WATER ST southbound between COLONIE ST (Albany) and ORANGE ST (Albany) left lane closure with temporary concrete barrier, Continuous Tuesday March 31st, 2026 12:00 AM thru Thursday December 31st, 2026 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-02T16:20:46Z"},"road_event_id":"LZ3DMH5VZypBbYUiz8VYPeQBrQI=","beginning_cross_street":"COLONIE ST","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744117,42.656052]]}},{"id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u/geVual/H1BJMkpYqQxoVEifZg="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"u/geVual/H1BJMkpYqQxoVEifZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE="},{"type":"next-occurrence","id":"3Mr3ZVMoqpvyplAxREWxDfKlg1A="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"u/geVual/H1BJMkpYqQxoVEifZg=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"3Mr3ZVMoqpvyplAxREWxDfKlg1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE="},{"type":"next-occurrence","id":"YF+ghdr2IDn17ZeJzUQ8eB1PUJA="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"3Mr3ZVMoqpvyplAxREWxDfKlg1A=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"YF+ghdr2IDn17ZeJzUQ8eB1PUJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE="},{"type":"next-occurrence","id":"RLIxFki5gOSJv1ir89FEBdEGytQ="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"YF+ghdr2IDn17ZeJzUQ8eB1PUJA=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"RLIxFki5gOSJv1ir89FEBdEGytQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE="},{"type":"next-occurrence","id":"O3o2asCNNBoV14zS/OM+QZz0osQ="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"RLIxFki5gOSJv1ir89FEBdEGytQ=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"O3o2asCNNBoV14zS/OM+QZz0osQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE="},{"type":"next-occurrence","id":"hqCB3KG0iCY3pEVYWxpTtkgvQLs="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"O3o2asCNNBoV14zS/OM+QZz0osQ=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"hqCB3KG0iCY3pEVYWxpTtkgvQLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE="},{"type":"next-occurrence","id":"UDQcW9Na55GRLxxoIGBEEn1NM5U="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"hqCB3KG0iCY3pEVYWxpTtkgvQLs=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"UDQcW9Na55GRLxxoIGBEEn1NM5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TMLlKWKvUqwbfTCPFnmE9DEhMOE="}],"description":"Safety improvements on US 9W both directions between Manor Lane (Saugerties) and Mynderse Street (Saugerties) D265433/32718109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T12:59:29Z"},"road_event_id":"UDQcW9Na55GRLxxoIGBEEn1NM5U=","beginning_cross_street":"Manor Lane","ending_cross_street":"Mynderse Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94747,42.067557]]}},{"id":"kPyjuoWgaJwsJjGOTq7fKjhqc3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Jersey Coast Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs both directions, North Jersey Coast Line between New York Penn Station (New York) and Bay Head (Bay Head) delays of up to 15 minutes are possible on trains in both directions: Eastbound from Middletown, New Jersey to New York Westbound from Red Bank to Long Branch. Westbound Bay Head Shuttle trains may also be delayed up to 15 minutes leaving Long Branch. We appreciate your patience as we accommodate this temporary adjustment., Sunday April 19th, 2026 thru Sunday April 26th, 2026, 06:00 AM thru 07:00 PM","update_date":"2026-03-26T15:50:46Z"},"road_event_id":"kPyjuoWgaJwsJjGOTq7fKjhqc3g=","beginning_cross_street":"New York Penn Station","ending_cross_street":"Bay Head","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T10:00:00Z","end_date":"2026-04-26T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"duLPCSDg9tKwOlyiRmtSbe4YlmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Mid Hudson Bridge"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on Mid Hudson Bridge both directions area of Dutchess County Side (Poughkeepsie) 6PM-6AM, Thursday March 26th, 2026 thru Monday August 31st, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2026-04-06T19:30:36Z"},"road_event_id":"duLPCSDg9tKwOlyiRmtSbe4YlmI=","beginning_cross_street":"Dutchess County Side","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941247,41.702365]]}},{"id":"GzwJnjZ49r3Ulay7IP6hAsKWq3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uR/FfF8Bw+Xhq5Ib0WprKKA/1Jo="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T11:06:44Z"},"road_event_id":"GzwJnjZ49r3Ulay7IP6hAsKWq3Y=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"uR/FfF8Bw+Xhq5Ib0WprKKA/1Jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GzwJnjZ49r3Ulay7IP6hAsKWq3Y="},{"type":"next-occurrence","id":"5+g+lms8SStXG/duuWXbn3DxcoA="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T11:06:44Z"},"road_event_id":"uR/FfF8Bw+Xhq5Ib0WprKKA/1Jo=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"5+g+lms8SStXG/duuWXbn3DxcoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 12B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GzwJnjZ49r3Ulay7IP6hAsKWq3Y="}],"description":"Construction on NY 12B both directions between Harding Road; NY 233; Hamlet of Franklin Springs (Kirkland) and CR 15; Brimfield Street (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place between Furnace Street and Taylor Ave., Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T11:06:44Z"},"road_event_id":"5+g+lms8SStXG/duuWXbn3DxcoA=","beginning_cross_street":"Harding Road; NY 233; Hamlet of Franklin Springs","ending_cross_street":"CR 15; Brimfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.404403,43.032398]]}},{"id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ecVhuc33TkE7tL0YAq3xSMQKz+k="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"ecVhuc33TkE7tL0YAq3xSMQKz+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"HMgJ6KWbkRElEcT2TxGV/8mpQvE="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"ecVhuc33TkE7tL0YAq3xSMQKz+k=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"HMgJ6KWbkRElEcT2TxGV/8mpQvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"MGptr9VV6pXEdTVf9mo+xdwe95M="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"HMgJ6KWbkRElEcT2TxGV/8mpQvE=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"MGptr9VV6pXEdTVf9mo+xdwe95M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"w87iUB6Bxh2wN+FCHo+LDry6sY4="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"MGptr9VV6pXEdTVf9mo+xdwe95M=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"w87iUB6Bxh2wN+FCHo+LDry6sY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"bim9eKn3ebEvPdMmIGMngF//vBo="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"w87iUB6Bxh2wN+FCHo+LDry6sY4=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"bim9eKn3ebEvPdMmIGMngF//vBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"zPb5KU0pWlxfD9FUDZA6SQ6l/xI="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"bim9eKn3ebEvPdMmIGMngF//vBo=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"zPb5KU0pWlxfD9FUDZA6SQ6l/xI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"qiOnQLHvT1r7l2wUnr3A+v+3veA="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"zPb5KU0pWlxfD9FUDZA6SQ6l/xI=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"qiOnQLHvT1r7l2wUnr3A+v+3veA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"4NTG2l01jR00AnQCs0nivdSCAZc="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"qiOnQLHvT1r7l2wUnr3A+v+3veA=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"4NTG2l01jR00AnQCs0nivdSCAZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"jTsYz6rvhAombrLvyJMkp5hEGMg="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"4NTG2l01jR00AnQCs0nivdSCAZc=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"jTsYz6rvhAombrLvyJMkp5hEGMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="},{"type":"next-occurrence","id":"jphBuEzBZdOecLCNB7P1+kvURFQ="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"jTsYz6rvhAombrLvyJMkp5hEGMg=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"jphBuEzBZdOecLCNB7P1+kvURFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 169"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OuPqbYdFOfm9mFCdI9fgZMr6bxk="}],"description":"Culvert repairs on NY 169 both directions between Rockwell Road (Little Falls) and Eatonville Road (Little Falls) Motorists will encounter a full road closure with a signed detour in place. The detour will utilize Route 169, Route 170 and Route 29, Monday March 30th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 06:30 AM thru 04:30 PM, all lanes closed","update_date":"2026-04-13T09:48:25Z"},"road_event_id":"jphBuEzBZdOecLCNB7P1+kvURFQ=","beginning_cross_street":"Rockwell Road","ending_cross_street":"Eatonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.91903,43.0729]]}},{"id":"mzkaq0H4r2olxEkOp5BYTOuPIyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 46 both directions between Center Street (Oneida) and Cobb Street Motorists will encounter a full road closure with a signed detour in place for the replacement of the bridge over I-90. The detour will utilize Route 365A, Route 365 and Route31, Continuous Monday March 30th, 2026 6:00 AM thru Wednesday November 25th, 2026 6:00 PM all lanes closed","update_date":"2026-03-30T15:41:21Z"},"road_event_id":"mzkaq0H4r2olxEkOp5BYTOuPIyM=","beginning_cross_street":"Center Street","ending_cross_street":"Cobb Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.664703,43.110298]]}},{"id":"rxoYEZbT/tDE7fyPYwoT5ynY4f0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"myHLJA787Bx0bC5RZCoOhjXI8Gs="}],"description":"Utility work on NY 30A both directions between NY 920C; Briggs Street; End NY 29 Overlap (Johnstown) and Townsend Ave (Mayfield) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday March 31st, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:06:49Z"},"road_event_id":"rxoYEZbT/tDE7fyPYwoT5ynY4f0=","beginning_cross_street":"NY 920C; Briggs Street; End NY 29 Overlap","ending_cross_street":"Townsend Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360801,43.0135]]}},{"id":"myHLJA787Bx0bC5RZCoOhjXI8Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rxoYEZbT/tDE7fyPYwoT5ynY4f0="},{"type":"next-occurrence","id":"otnLbrIzqNJRZdxj70ZXBnZ2ty4="}],"description":"Utility work on NY 30A both directions between NY 920C; Briggs Street; End NY 29 Overlap (Johnstown) and Townsend Ave (Mayfield) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday March 31st, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:06:49Z"},"road_event_id":"myHLJA787Bx0bC5RZCoOhjXI8Gs=","beginning_cross_street":"NY 920C; Briggs Street; End NY 29 Overlap","ending_cross_street":"Townsend Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360801,43.0135]]}},{"id":"otnLbrIzqNJRZdxj70ZXBnZ2ty4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rxoYEZbT/tDE7fyPYwoT5ynY4f0="}],"description":"Utility work on NY 30A both directions between NY 920C; Briggs Street; End NY 29 Overlap (Johnstown) and Townsend Ave (Mayfield) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday March 31st, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:06:49Z"},"road_event_id":"otnLbrIzqNJRZdxj70ZXBnZ2ty4=","beginning_cross_street":"NY 920C; Briggs Street; End NY 29 Overlap","ending_cross_street":"Townsend Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360801,43.0135]]}},{"id":"eceP4qKVLGAAPBOLnaRd2E8Qkq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fGr5MFevQEdGpk8hxOQPmiFt/t4="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32455309 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 12th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-14T17:12:59Z"},"road_event_id":"eceP4qKVLGAAPBOLnaRd2E8Qkq4=","beginning_cross_street":"Exit 4 - Boston Post Road - US 1","ending_cross_street":"Exit 13 - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815727,40.891334]]}},{"id":"fGr5MFevQEdGpk8hxOQPmiFt/t4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eceP4qKVLGAAPBOLnaRd2E8Qkq4="}],"description":"Drainage improvements and survey work on Hutchinson River Parkway [Westchester] both directions between Exit 4 - Boston Post Road - US 1 (Pelham) and Exit 13 - Mamaroneck Avenue (White Plains) D265463/NIGHT/32455309 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 12th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 11:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-14T17:12:59Z"},"road_event_id":"fGr5MFevQEdGpk8hxOQPmiFt/t4=","beginning_cross_street":"Exit 4 - Boston Post Road - US 1","ending_cross_street":"Exit 13 - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.815727,40.891334]]}},{"id":"oJ7rZ2RtkRaGod+uv19Sd4YTS7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 134"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qxeDt3mYWklym8NGuPvet3qOuFQ="}],"description":"Road rehabilitation on NY 134 both directions between NY 9A (Ossining) and McDonalds Road (Yorktown) D265484/NIGHT/32514009 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday April 19th, 2025 thru Thursday April 23rd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:29:29Z"},"road_event_id":"oJ7rZ2RtkRaGod+uv19Sd4YTS7Q=","beginning_cross_street":" NY 9A","ending_cross_street":"McDonalds Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.846359,41.182641]]}},{"id":"qxeDt3mYWklym8NGuPvet3qOuFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 134"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oJ7rZ2RtkRaGod+uv19Sd4YTS7Q="}],"description":"Road rehabilitation on NY 134 both directions between NY 9A (Ossining) and McDonalds Road (Yorktown) D265484/NIGHT/32514009 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday April 19th, 2025 thru Thursday April 23rd, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:29:29Z"},"road_event_id":"qxeDt3mYWklym8NGuPvet3qOuFQ=","beginning_cross_street":" NY 9A","ending_cross_street":"McDonalds Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.846359,41.182641]]}},{"id":"wsY3mvwzImnIu2fYU0mI7cvTOk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BCNKJxVccDxrQ02wmtWxVfpvnlw="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"wsY3mvwzImnIu2fYU0mI7cvTOk8=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"BCNKJxVccDxrQ02wmtWxVfpvnlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"3JcdHP738NizUqTqiVRrNmTPGQY="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"BCNKJxVccDxrQ02wmtWxVfpvnlw=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"3JcdHP738NizUqTqiVRrNmTPGQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"bdrRbrFxOUtYp74UAiQiCXc+oKc="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"3JcdHP738NizUqTqiVRrNmTPGQY=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"bdrRbrFxOUtYp74UAiQiCXc+oKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"Z4MNelQ7GFf3J3oth8thyo20ivY="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"bdrRbrFxOUtYp74UAiQiCXc+oKc=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"Z4MNelQ7GFf3J3oth8thyo20ivY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"g2rD2V/EOK2A7MXF2CLUhv1q0OE="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"Z4MNelQ7GFf3J3oth8thyo20ivY=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"g2rD2V/EOK2A7MXF2CLUhv1q0OE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"lSrbeIMAAspqhWmis8N8v/ESV8w="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"g2rD2V/EOK2A7MXF2CLUhv1q0OE=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"lSrbeIMAAspqhWmis8N8v/ESV8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"3QNUta5vlrCSz7l7CuSUUva4aDg="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"lSrbeIMAAspqhWmis8N8v/ESV8w=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"3QNUta5vlrCSz7l7CuSUUva4aDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"eBAARc0FYXdK4hRXLPyOAFvK29E="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"3QNUta5vlrCSz7l7CuSUUva4aDg=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"eBAARc0FYXdK4hRXLPyOAFvK29E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"lPY+QtGuQfZiFdTABf3cytpQSOc="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"eBAARc0FYXdK4hRXLPyOAFvK29E=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"lPY+QtGuQfZiFdTABf3cytpQSOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="},{"type":"next-occurrence","id":"fi+wko7YAfIhv4lcFBEAEajpGq4="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"lPY+QtGuQfZiFdTABf3cytpQSOc=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"fi+wko7YAfIhv4lcFBEAEajpGq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 394"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wsY3mvwzImnIu2fYU0mI7cvTOk8="}],"description":"Traffic signal repairs on NY 394 eastbound Prendergast Avenue (Jamestown) to East 2nd Street (Jamestown), Sunday March 29th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-03-27T17:37:18Z"},"road_event_id":"fi+wko7YAfIhv4lcFBEAEajpGq4=","beginning_cross_street":"Prendergast Avenue","ending_cross_street":"East 2nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.23795,42.097821]]}},{"id":"G7DRS0n0ykniq1FC5MAl4IYU9Z4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["922A"],"direction":"unknown","related_road_events":[],"description":"Bridge work on 922A both directions between Main Street; Village of Whitesboro (Whitesboro) and Cavanaugh Road; CR 30; END ROUTE; NY 49 (Marcy) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Monday April 6th, 2026 7:00 AM thru Friday May 8th, 2026 4:00 PM","update_date":"2026-04-10T10:03:44Z"},"road_event_id":"G7DRS0n0ykniq1FC5MAl4IYU9Z4=","beginning_cross_street":"Main Street; Village of Whitesboro","ending_cross_street":"Cavanaugh Road; CR 30; END ROUTE; NY 49","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.277704,43.134706]]}},{"id":"qkOQ/dcsXum7vMqrF68Fw7C7gxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 22 both directions between Bedford Center Road (Bedford) and Maple Avenue (Katonah) D265557/32720109 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday April 6th, 2026 9:30 AM thru Friday May 15th, 2026 4:30 PM all lanes closed and detoured","update_date":"2026-04-14T00:22:18Z"},"road_event_id":"qkOQ/dcsXum7vMqrF68Fw7C7gxE=","beginning_cross_street":"Bedford Center Road","ending_cross_street":"Maple Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.657478,41.219306]]}},{"id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tWcibzDJVDn7LbWojPutW2Ry0FQ="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-14T12:11:25Z"},"road_event_id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"tWcibzDJVDn7LbWojPutW2Ry0FQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA="},{"type":"next-occurrence","id":"pNjWqZ2DmYYpOU2siMI9ptqBTmg="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-14T12:11:25Z"},"road_event_id":"tWcibzDJVDn7LbWojPutW2Ry0FQ=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"pNjWqZ2DmYYpOU2siMI9ptqBTmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA="},{"type":"next-occurrence","id":"UqoYl1EstWZnzySmG/aItF61gXA="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-14T12:11:25Z"},"road_event_id":"pNjWqZ2DmYYpOU2siMI9ptqBTmg=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"UqoYl1EstWZnzySmG/aItF61gXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA="},{"type":"next-occurrence","id":"ufciWdCWNT4ry5TA3xbA+uqLj3Y="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-14T12:11:25Z"},"road_event_id":"UqoYl1EstWZnzySmG/aItF61gXA=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:30:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"ufciWdCWNT4ry5TA3xbA+uqLj3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA="},{"type":"next-occurrence","id":"XgCnVTkL2Jzso2DOuVG/ZA4trmw="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-14T12:11:25Z"},"road_event_id":"ufciWdCWNT4ry5TA3xbA+uqLj3Y=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:30:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"XgCnVTkL2Jzso2DOuVG/ZA4trmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA="},{"type":"next-occurrence","id":"4+OOnn+LZ1e2MjRrxwPQL/C0pC4="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-14T12:11:25Z"},"road_event_id":"XgCnVTkL2Jzso2DOuVG/ZA4trmw=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:30:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"4+OOnn+LZ1e2MjRrxwPQL/C0pC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yIUyuYK/B2EysHDQMZ/h1LQ0jSA="}],"description":"Sign work on US 9 northbound between Columbia Street (Poughkeepsie) and Church Street (Champlain) D265342/32682209 - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, various lane closures","update_date":"2026-04-14T12:11:25Z"},"road_event_id":"4+OOnn+LZ1e2MjRrxwPQL/C0pC4=","beginning_cross_street":"Columbia Street","ending_cross_street":"Church Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:30:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936037,41.700723]]}},{"id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"F7kC0KMZdR3tSGdeAlBiFbGhAco="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:47:58Z"},"road_event_id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"F7kC0KMZdR3tSGdeAlBiFbGhAco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk="},{"type":"next-occurrence","id":"BLKmDn0giuVLrHPyvWe08mWHSic="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:47:58Z"},"road_event_id":"F7kC0KMZdR3tSGdeAlBiFbGhAco=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"BLKmDn0giuVLrHPyvWe08mWHSic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk="},{"type":"next-occurrence","id":"NQ6MXX38ycQ2/BtyAc/IlqYKlXg="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:47:58Z"},"road_event_id":"BLKmDn0giuVLrHPyvWe08mWHSic=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"NQ6MXX38ycQ2/BtyAc/IlqYKlXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk="},{"type":"next-occurrence","id":"Z8L4RNPQJFz7cjJd3dS81yHIb8s="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:47:58Z"},"road_event_id":"NQ6MXX38ycQ2/BtyAc/IlqYKlXg=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"Z8L4RNPQJFz7cjJd3dS81yHIb8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk="},{"type":"next-occurrence","id":"nqlwPwjDnn4QvP4QhbQqxbmHoNM="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:47:58Z"},"road_event_id":"Z8L4RNPQJFz7cjJd3dS81yHIb8s=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"nqlwPwjDnn4QvP4QhbQqxbmHoNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk="},{"type":"next-occurrence","id":"WKrd+wmECXtSE2JP+/IVvAV1ZXs="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:47:58Z"},"road_event_id":"nqlwPwjDnn4QvP4QhbQqxbmHoNM=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"WKrd+wmECXtSE2JP+/IVvAV1ZXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8zyyKXgC/zYGrdPIe5EY5usm8Qk="}],"description":"Sign work on I-684 northbound between Hutchinson River Pkwy (Harrison) and I-287 (Harrison) D265342/32349409 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:47:58Z"},"road_event_id":"WKrd+wmECXtSE2JP+/IVvAV1ZXs=","beginning_cross_street":"Hutchinson River Pkwy","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.715238,41.019747]]}},{"id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NsmVhHJqrNrd9y8juRo05EelJ5U="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-03-31T15:01:45Z"},"road_event_id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"NsmVhHJqrNrd9y8juRo05EelJ5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk="},{"type":"next-occurrence","id":"//1ePhb2T0tb/RLhMwhH4ch/OlA="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-03-31T15:01:45Z"},"road_event_id":"NsmVhHJqrNrd9y8juRo05EelJ5U=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"//1ePhb2T0tb/RLhMwhH4ch/OlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk="},{"type":"next-occurrence","id":"+cgES3DRKa+aOlRSXIWHcKZ8L/U="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-03-31T15:01:45Z"},"road_event_id":"//1ePhb2T0tb/RLhMwhH4ch/OlA=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"+cgES3DRKa+aOlRSXIWHcKZ8L/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk="},{"type":"next-occurrence","id":"fCLv0WOdthUkS4dm14++78P+b8w="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-03-31T15:01:45Z"},"road_event_id":"+cgES3DRKa+aOlRSXIWHcKZ8L/U=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"fCLv0WOdthUkS4dm14++78P+b8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk="},{"type":"next-occurrence","id":"aNcVCRntA2xwSS6PNLu3wXQDJx0="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-03-31T15:01:45Z"},"road_event_id":"fCLv0WOdthUkS4dm14++78P+b8w=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"aNcVCRntA2xwSS6PNLu3wXQDJx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk="},{"type":"next-occurrence","id":"8EUynEnoCfaO+/mR68u9WzAFsSs="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-03-31T15:01:45Z"},"road_event_id":"aNcVCRntA2xwSS6PNLu3wXQDJx0=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"8EUynEnoCfaO+/mR68u9WzAFsSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UMzj52zrWOmIOWWudQ4hmjJS0Lk="}],"description":"Sign work on I-684 southbound between Exit 8 - Hardscrabble Road - CR 138 - Croton Falls (North Salem) and Exit 6 - NY 35 (Bedford) D265342/32328909 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, right lane closure","update_date":"2026-03-31T15:01:45Z"},"road_event_id":"8EUynEnoCfaO+/mR68u9WzAFsSs=","beginning_cross_street":"Exit 8 - Hardscrabble Road - CR 138 - Croton Falls","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653387,41.344676]]}},{"id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hijcWB0VApmJLilgiXKyd9oG2Ic="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-03-31T15:09:53Z"},"road_event_id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"hijcWB0VApmJLilgiXKyd9oG2Ic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI="},{"type":"next-occurrence","id":"/KBMWI8v0Bf1YClELpkO3FUYnh4="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-03-31T15:09:53Z"},"road_event_id":"hijcWB0VApmJLilgiXKyd9oG2Ic=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"/KBMWI8v0Bf1YClELpkO3FUYnh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI="},{"type":"next-occurrence","id":"QvyppfwqjV/PAkkGSjrCQXxuUxg="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-03-31T15:09:53Z"},"road_event_id":"/KBMWI8v0Bf1YClELpkO3FUYnh4=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"QvyppfwqjV/PAkkGSjrCQXxuUxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI="},{"type":"next-occurrence","id":"w9ETr5XaVxsEUrJpKWOxTWK6VVU="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-03-31T15:09:53Z"},"road_event_id":"QvyppfwqjV/PAkkGSjrCQXxuUxg=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"w9ETr5XaVxsEUrJpKWOxTWK6VVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI="},{"type":"next-occurrence","id":"KHQcqHyEdCAR2hp+yaIaQMbcbzg="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-03-31T15:09:53Z"},"road_event_id":"w9ETr5XaVxsEUrJpKWOxTWK6VVU=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"KHQcqHyEdCAR2hp+yaIaQMbcbzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI="},{"type":"next-occurrence","id":"OinZbUodDhAiOR0srXmQp8OFCtA="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-03-31T15:09:53Z"},"road_event_id":"KHQcqHyEdCAR2hp+yaIaQMbcbzg=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"OinZbUodDhAiOR0srXmQp8OFCtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fBt9GcUp1/pRRFXu3fKl+LJ2cTI="}],"description":"Sign work on Saw Mill River Parkway southbound between I-684 (Bedford) and Exit 42 - Railroad Avenue (Bedford) D265342/32329609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 07:00 PM, various lane closures","update_date":"2026-03-31T15:09:53Z"},"road_event_id":"OinZbUodDhAiOR0srXmQp8OFCtA=","beginning_cross_street":"I-684","ending_cross_street":"Exit 42 - Railroad Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.677339,41.249824]]}},{"id":"xDBK2yvT3T99AsNiVyJ+jgksB5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-87 Northway northbound Off-ramp Exit 32 -Garvey Mill Road (Lewis) Exit 32 off-ramp closed as well as a left lane closure on the ramp bridge over Spruce Mill Brook. Traffic re-routing through the rest area on to right lane of the bridge over Spruce Mill Brook., Continuous Monday April 13th, 2026 08:00 AM thru Friday November 13th, 2026 04:00 PM All lanes closed","update_date":"2026-03-31T17:55:20Z"},"road_event_id":"xDBK2yvT3T99AsNiVyJ+jgksB5Q=","beginning_cross_street":"Exit 32 -Garvey Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.530483,44.281811]]}},{"id":"obC94NZin3XRV5o2KeTfRE1oYms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nMyFkdqlCfEZJJN3A7Ly6QqlxyE="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"obC94NZin3XRV5o2KeTfRE1oYms=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"nMyFkdqlCfEZJJN3A7Ly6QqlxyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"0c0gcZjROsEFjpkwKQDf5zF2ogs="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"nMyFkdqlCfEZJJN3A7Ly6QqlxyE=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"0c0gcZjROsEFjpkwKQDf5zF2ogs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"ciIiyXR9G1WoiWiF46kp3CrNyeY="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"0c0gcZjROsEFjpkwKQDf5zF2ogs=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"ciIiyXR9G1WoiWiF46kp3CrNyeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"DMgKryJZwB3nVNFWjnAREOb4zt8="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"ciIiyXR9G1WoiWiF46kp3CrNyeY=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"DMgKryJZwB3nVNFWjnAREOb4zt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"8NpPZrHrcb8WiMe4zAT5gPq1JLk="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"DMgKryJZwB3nVNFWjnAREOb4zt8=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"8NpPZrHrcb8WiMe4zAT5gPq1JLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"TLwvBLqrz8ECAKoPxSUX2xJ53rA="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"8NpPZrHrcb8WiMe4zAT5gPq1JLk=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"TLwvBLqrz8ECAKoPxSUX2xJ53rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"EgaMYOmrUsWmlA0eSzsLRAAxpCQ="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"TLwvBLqrz8ECAKoPxSUX2xJ53rA=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"EgaMYOmrUsWmlA0eSzsLRAAxpCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"3XsD3/KSrnp6AjzVuDBRgR79RdM="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"EgaMYOmrUsWmlA0eSzsLRAAxpCQ=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:00:00Z","end_date":"2026-05-02T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"3XsD3/KSrnp6AjzVuDBRgR79RdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"rXg8LSkbs+P7fayoyM4mZT6/dCw="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"3XsD3/KSrnp6AjzVuDBRgR79RdM=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T03:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"rXg8LSkbs+P7fayoyM4mZT6/dCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="},{"type":"next-occurrence","id":"qAy5dYJ9jrthzYU1geKIF/oVRSA="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"rXg8LSkbs+P7fayoyM4mZT6/dCw=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"qAy5dYJ9jrthzYU1geKIF/oVRSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 38TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"obC94NZin3XRV5o2KeTfRE1oYms="}],"description":"Construction on W 38TH ST eastbound between 10TH AVE (New York) and 9TH AVE (New York) for dyer deck over initial crane setup and steel deliveries., Tuesday March 31st, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 11:00 PM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:20:58Z"},"road_event_id":"qAy5dYJ9jrthzYU1geKIF/oVRSA=","beginning_cross_street":"10TH AVE","ending_cross_street":"9TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T03:00:00Z","end_date":"2026-05-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99717,40.757068]]}},{"id":"OQwvu50OV892BxwwshpAe4KACqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kI28+OBEkN4j7OncogdnNVGVfHM="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"OQwvu50OV892BxwwshpAe4KACqk=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"kI28+OBEkN4j7OncogdnNVGVfHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"OUhsaR616aceAcpnh+YoLs67kso="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"kI28+OBEkN4j7OncogdnNVGVfHM=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"OUhsaR616aceAcpnh+YoLs67kso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"ktRC3wYaac0VQb4aDJI0KYQhXRM="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"OUhsaR616aceAcpnh+YoLs67kso=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"ktRC3wYaac0VQb4aDJI0KYQhXRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"leKuI1iSoIA43L9kbIlXMbMmcwA="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"ktRC3wYaac0VQb4aDJI0KYQhXRM=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:30:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"leKuI1iSoIA43L9kbIlXMbMmcwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"Ca8S4IJ9JhjfCxgRzyJCT/KDU6U="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"leKuI1iSoIA43L9kbIlXMbMmcwA=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:30:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"Ca8S4IJ9JhjfCxgRzyJCT/KDU6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"8GQwgEYb4LTEnfuNN1S/kKYiLCk="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"Ca8S4IJ9JhjfCxgRzyJCT/KDU6U=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:30:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"8GQwgEYb4LTEnfuNN1S/kKYiLCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"JT1S49Qq4JU8SEnII+5cnSaIO6A="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"8GQwgEYb4LTEnfuNN1S/kKYiLCk=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:30:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"JT1S49Qq4JU8SEnII+5cnSaIO6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"ONrjdYeXXTlKBSZ1F7nmj/sAFMQ="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"JT1S49Qq4JU8SEnII+5cnSaIO6A=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:30:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"ONrjdYeXXTlKBSZ1F7nmj/sAFMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"457t6ebjE9WHPZeVvdXc4XjJ72o="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"ONrjdYeXXTlKBSZ1F7nmj/sAFMQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:30:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"457t6ebjE9WHPZeVvdXc4XjJ72o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="},{"type":"next-occurrence","id":"J1TkIA+2afWMcBlWGgpqF0JVGpA="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"457t6ebjE9WHPZeVvdXc4XjJ72o=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:30:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"J1TkIA+2afWMcBlWGgpqF0JVGpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 64TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OQwvu50OV892BxwwshpAe4KACqk="}],"description":"Construction on W 64TH ST eastbound between BROADWAY (New York) and CENTRAL PARK W (New York) for system upgrade., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T17:23:08Z"},"road_event_id":"J1TkIA+2afWMcBlWGgpqF0JVGpA=","beginning_cross_street":"BROADWAY","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:30:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981888,40.772097]]}},{"id":"mCnKL1xCYXT8fCMmkAKIDja1TYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rm6+4IgeEmfs5VtbCM+Oh4JFlPo="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"mCnKL1xCYXT8fCMmkAKIDja1TYs=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"rm6+4IgeEmfs5VtbCM+Oh4JFlPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mCnKL1xCYXT8fCMmkAKIDja1TYs="},{"type":"next-occurrence","id":"q49TpEE97p67es5HRMGJp14XHhw="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"rm6+4IgeEmfs5VtbCM+Oh4JFlPo=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"q49TpEE97p67es5HRMGJp14XHhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mCnKL1xCYXT8fCMmkAKIDja1TYs="},{"type":"next-occurrence","id":"Kt0yjA0TJDXJOsT3VV9dz/kv0iA="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"q49TpEE97p67es5HRMGJp14XHhw=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"Kt0yjA0TJDXJOsT3VV9dz/kv0iA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 84TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mCnKL1xCYXT8fCMmkAKIDja1TYs="}],"description":"Construction on W 84TH ST eastbound between AMSTERDAM AVE (New York) and COLUMBUS AVE (New York) for system upgrade., Saturday April 4th, 2026 thru Saturday August 29th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday August 30th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:30:31Z"},"road_event_id":"Kt0yjA0TJDXJOsT3VV9dz/kv0iA=","beginning_cross_street":"AMSTERDAM AVE","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97584,40.78631]]}},{"id":"ZeV6F3mz7eje/OBNAcIOt+/d60s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O03F0RjsBa/57A69LZAb3IfHabQ="}],"description":"Crane operations on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday March 31st, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday April 25th, 2026, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:37:11Z"},"road_event_id":"ZeV6F3mz7eje/OBNAcIOt+/d60s=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008383,40.734798]]}},{"id":"O03F0RjsBa/57A69LZAb3IfHabQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZeV6F3mz7eje/OBNAcIOt+/d60s="},{"type":"next-occurrence","id":"kkTJcjNebhR09NkS9iSuhCqIWEg="}],"description":"Crane operations on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday March 31st, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday April 25th, 2026, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:37:11Z"},"road_event_id":"O03F0RjsBa/57A69LZAb3IfHabQ=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008383,40.734798]]}},{"id":"kkTJcjNebhR09NkS9iSuhCqIWEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZeV6F3mz7eje/OBNAcIOt+/d60s="},{"type":"next-occurrence","id":"3+n/9IyWbd3BCoouqOkmxWUX+YM="}],"description":"Crane operations on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday March 31st, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday April 25th, 2026, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:37:11Z"},"road_event_id":"kkTJcjNebhR09NkS9iSuhCqIWEg=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008383,40.734798]]}},{"id":"3+n/9IyWbd3BCoouqOkmxWUX+YM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZeV6F3mz7eje/OBNAcIOt+/d60s="},{"type":"next-occurrence","id":"dnI6GRSrBdSxWqtfyfs1mgBKRNQ="}],"description":"Crane operations on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday March 31st, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday April 25th, 2026, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:37:11Z"},"road_event_id":"3+n/9IyWbd3BCoouqOkmxWUX+YM=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008383,40.734798]]}},{"id":"dnI6GRSrBdSxWqtfyfs1mgBKRNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZeV6F3mz7eje/OBNAcIOt+/d60s="},{"type":"next-occurrence","id":"1n9zSuGLIQp9sNNoix1/kXrS02A="}],"description":"Crane operations on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday March 31st, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday April 25th, 2026, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:37:11Z"},"road_event_id":"dnI6GRSrBdSxWqtfyfs1mgBKRNQ=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008383,40.734798]]}},{"id":"1n9zSuGLIQp9sNNoix1/kXrS02A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PERRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZeV6F3mz7eje/OBNAcIOt+/d60s="}],"description":"Crane operations on PERRY ST eastbound between WASHINGTON ST (New York) and GREENWICH ST (New York), Tuesday March 31st, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday April 25th, 2026, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T17:37:11Z"},"road_event_id":"1n9zSuGLIQp9sNNoix1/kXrS02A=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008383,40.734798]]}},{"id":"jFByApYHU8dMRPDtvc9pfaZFaCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Longterm construction on I-490 westbound between Exit 27 - NY 96 (Perinton) and Exit 26 - NY 31 (Pittsford), Continuous Saturday April 4th, 2026 07:00 AM thru Friday December 18th, 2026 05:00 PM All lanes shift","update_date":"2026-03-31T17:42:31Z"},"road_event_id":"jFByApYHU8dMRPDtvc9pfaZFaCA=","beginning_cross_street":"Exit 27 - NY 96","ending_cross_street":"Exit 26 - NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.471156,43.057095]]}},{"id":"EDGmtPDtDjAcAYnvnQ7c/fbcvEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RECTOR ST"],"direction":"unknown","related_road_events":[],"description":"Construction on RECTOR ST eastbound between TRINITY PL (New York) and BROADWAY (New York) for DDC reconstruction project utility installation., Continuous Tuesday March 31st, 2026 12:00 AM thru Saturday May 30th, 2026 11:59 PM All lanes closed","update_date":"2026-03-31T17:45:45Z"},"road_event_id":"EDGmtPDtDjAcAYnvnQ7c/fbcvEw=","beginning_cross_street":"TRINITY PL","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012918,40.707751]]}},{"id":"BrSY8hny3//Gyx9OruZH1TtE5KA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+Q4wUodzQx7L+EdLp2ItgfO7JEQ="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:47:30Z"},"road_event_id":"BrSY8hny3//Gyx9OruZH1TtE5KA=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"+Q4wUodzQx7L+EdLp2ItgfO7JEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrSY8hny3//Gyx9OruZH1TtE5KA="},{"type":"next-occurrence","id":"yzJYxO6WEVjQzF9W/JybLi9nQcg="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:47:30Z"},"road_event_id":"+Q4wUodzQx7L+EdLp2ItgfO7JEQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"yzJYxO6WEVjQzF9W/JybLi9nQcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrSY8hny3//Gyx9OruZH1TtE5KA="},{"type":"next-occurrence","id":"Z9ZmgrXJdTSwguVpJ17XR7u8T6A="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:47:30Z"},"road_event_id":"yzJYxO6WEVjQzF9W/JybLi9nQcg=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"Z9ZmgrXJdTSwguVpJ17XR7u8T6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrSY8hny3//Gyx9OruZH1TtE5KA="},{"type":"next-occurrence","id":"GKIEk4BVhGWmvXhtZbi1rwCjKDI="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:47:30Z"},"road_event_id":"Z9ZmgrXJdTSwguVpJ17XR7u8T6A=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"GKIEk4BVhGWmvXhtZbi1rwCjKDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrSY8hny3//Gyx9OruZH1TtE5KA="},{"type":"next-occurrence","id":"NuHy/GuutXfKCjAxgc2PymwDiOU="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:47:30Z"},"road_event_id":"GKIEk4BVhGWmvXhtZbi1rwCjKDI=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"NuHy/GuutXfKCjAxgc2PymwDiOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrSY8hny3//Gyx9OruZH1TtE5KA="},{"type":"next-occurrence","id":"p0vp+Gn+b76FOkzDofGRZkjLFZA="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:47:30Z"},"road_event_id":"NuHy/GuutXfKCjAxgc2PymwDiOU=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"p0vp+Gn+b76FOkzDofGRZkjLFZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MORRIS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrSY8hny3//Gyx9OruZH1TtE5KA="}],"description":"Construction on MORRIS ST westbound between BROADWAY (New York) and GREENWICH ST (New York) for DDC reconstruction project utility installation., Tuesday March 31st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T17:47:30Z"},"road_event_id":"p0vp+Gn+b76FOkzDofGRZkjLFZA=","beginning_cross_street":"BROADWAY","ending_cross_street":"GREENWICH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013316,40.705892]]}},{"id":"Ir181/WzkCztK/awWNE2vNYcNiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3ysmnAaR4/FNCxPqGIuetYsJ78k="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 3rd, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:52:31Z"},"road_event_id":"Ir181/WzkCztK/awWNE2vNYcNiw=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928827,40.820053]]}},{"id":"3ysmnAaR4/FNCxPqGIuetYsJ78k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GERARD AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ir181/WzkCztK/awWNE2vNYcNiw="}],"description":"Construction on GERARD AVE northbound between E 150TH ST (New York) and E 151ST ST (New York) for installation of pre-cast panels, special operations (ie; concrete)., Friday April 3rd, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:52:31Z"},"road_event_id":"3ysmnAaR4/FNCxPqGIuetYsJ78k=","beginning_cross_street":"E 150TH ST","ending_cross_street":"E 151ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928827,40.820053]]}},{"id":"K0zngcC1SMOWfnL5JNxug3eV2ME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PlMuZfPpGkykBnwyhS4kGmXnTx4="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"K0zngcC1SMOWfnL5JNxug3eV2ME=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"PlMuZfPpGkykBnwyhS4kGmXnTx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"saJa24u/eBIhsoQIxOydYSmZvQg="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"PlMuZfPpGkykBnwyhS4kGmXnTx4=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"saJa24u/eBIhsoQIxOydYSmZvQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"chuJOzcmqyQquP1bFxlwNZpytCY="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"saJa24u/eBIhsoQIxOydYSmZvQg=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"chuJOzcmqyQquP1bFxlwNZpytCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"RoogAsn97akm+N00n5SKhLiWW2w="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"chuJOzcmqyQquP1bFxlwNZpytCY=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"RoogAsn97akm+N00n5SKhLiWW2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"4yJXAKVWf3fgdJLhOBKGoaIfXFY="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"RoogAsn97akm+N00n5SKhLiWW2w=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"4yJXAKVWf3fgdJLhOBKGoaIfXFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"VzBc9RhwATgnaDajqqsH6//BJEM="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"4yJXAKVWf3fgdJLhOBKGoaIfXFY=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"VzBc9RhwATgnaDajqqsH6//BJEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"vTxZLEvFhTGC5JSGulTaeidZcmQ="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"VzBc9RhwATgnaDajqqsH6//BJEM=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"vTxZLEvFhTGC5JSGulTaeidZcmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"EUDsu8c1m1PqbpXvnRAv0siir8E="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"vTxZLEvFhTGC5JSGulTaeidZcmQ=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"EUDsu8c1m1PqbpXvnRAv0siir8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="},{"type":"next-occurrence","id":"c/sxrFDG1ecQAusyNIFcKojXmuM="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"EUDsu8c1m1PqbpXvnRAv0siir8E=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"c/sxrFDG1ecQAusyNIFcKojXmuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WALTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K0zngcC1SMOWfnL5JNxug3eV2ME="}],"description":"Construction on WALTON AVE southbound between E 177TH ST (New York) and MT HOPE PL (New York) to lift and remove materials from roof top with knuckle boom., Friday April 3rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:54:46Z"},"road_event_id":"c/sxrFDG1ecQAusyNIFcKojXmuM=","beginning_cross_street":"E 177TH ST","ending_cross_street":"MT HOPE PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909197,40.849845]]}},{"id":"sZ8xafXFkoniofZEs29F7Nyd/5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Gl0t6rkjghdr1JQ1J5O2vcrn1Hg="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"sZ8xafXFkoniofZEs29F7Nyd/5A=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"Gl0t6rkjghdr1JQ1J5O2vcrn1Hg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"teuKjw+vxbNuTRYI9GnmmRxcixs="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"Gl0t6rkjghdr1JQ1J5O2vcrn1Hg=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"teuKjw+vxbNuTRYI9GnmmRxcixs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"xn0kwuJVbVA9G6d9u5eoMVOiqkU="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"teuKjw+vxbNuTRYI9GnmmRxcixs=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"xn0kwuJVbVA9G6d9u5eoMVOiqkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"Hz1bIql+VRXAaKTnxFammhcB6oI="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"xn0kwuJVbVA9G6d9u5eoMVOiqkU=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"Hz1bIql+VRXAaKTnxFammhcB6oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"/BWwWC8XIae/rsRXQRtSPI/NJM0="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"Hz1bIql+VRXAaKTnxFammhcB6oI=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"/BWwWC8XIae/rsRXQRtSPI/NJM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"ssEuH6QFrxBr7zRVANucuvQ4IXA="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"/BWwWC8XIae/rsRXQRtSPI/NJM0=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"ssEuH6QFrxBr7zRVANucuvQ4IXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"GyYBreg0bsd4rTRek1j4pAkwxzQ="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"ssEuH6QFrxBr7zRVANucuvQ4IXA=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"GyYBreg0bsd4rTRek1j4pAkwxzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"aIAxM7yXFyt0c/oKxk/9ULY2bHY="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"GyYBreg0bsd4rTRek1j4pAkwxzQ=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"aIAxM7yXFyt0c/oKxk/9ULY2bHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"JduCWmkUaI0kN395rTi0pUJ7n1s="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"aIAxM7yXFyt0c/oKxk/9ULY2bHY=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"JduCWmkUaI0kN395rTi0pUJ7n1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="},{"type":"next-occurrence","id":"DIexlVr3FTxTU1L9CTbHaK274r0="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"JduCWmkUaI0kN395rTi0pUJ7n1s=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"DIexlVr3FTxTU1L9CTbHaK274r0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MARAN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sZ8xafXFkoniofZEs29F7Nyd/5A="}],"description":"Crane operations on MARAN PL eastbound between BRONX PARK E (New York) and WHITE PLAINS RD (New York), Tuesday March 31st, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T17:56:07Z"},"road_event_id":"DIexlVr3FTxTU1L9CTbHaK274r0=","beginning_cross_street":"BRONX PARK E","ending_cross_street":"WHITE PLAINS RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.869124,40.853669]]}},{"id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cy4hlWHIBSZlQAh+bdBJjXvhxEo="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"Cy4hlWHIBSZlQAh+bdBJjXvhxEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"kyQLa/ZAIT2vBJ7e01GAjFp2r9I="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"Cy4hlWHIBSZlQAh+bdBJjXvhxEo=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"kyQLa/ZAIT2vBJ7e01GAjFp2r9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"iHUxCAY71ci4eBJhQdbHjicCmEM="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"kyQLa/ZAIT2vBJ7e01GAjFp2r9I=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"iHUxCAY71ci4eBJhQdbHjicCmEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"kqZRPTdDZ/goPAyWTcpvWhKl+74="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"iHUxCAY71ci4eBJhQdbHjicCmEM=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"kqZRPTdDZ/goPAyWTcpvWhKl+74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"Y1iOKATzZFNO7G5xYQ4nSth1EaM="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"kqZRPTdDZ/goPAyWTcpvWhKl+74=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"Y1iOKATzZFNO7G5xYQ4nSth1EaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"V7m67EwXTok4TZQ5mLCT0jzJh5o="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"Y1iOKATzZFNO7G5xYQ4nSth1EaM=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"V7m67EwXTok4TZQ5mLCT0jzJh5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"fqC2fRqmBMtdZz2193wHzQ3B2rM="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"V7m67EwXTok4TZQ5mLCT0jzJh5o=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"fqC2fRqmBMtdZz2193wHzQ3B2rM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"LfZeUHPAPa+L/J7UGn97S1CRCxI="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"fqC2fRqmBMtdZz2193wHzQ3B2rM=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"LfZeUHPAPa+L/J7UGn97S1CRCxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"QnBRr+xhRZVOlqJLgIReuFu5K4U="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"LfZeUHPAPa+L/J7UGn97S1CRCxI=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"QnBRr+xhRZVOlqJLgIReuFu5K4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"C/y120mwDAwN5OVPJpnKRYiVNEQ="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"QnBRr+xhRZVOlqJLgIReuFu5K4U=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"C/y120mwDAwN5OVPJpnKRYiVNEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"ADWzWI8dh+dUKtaWTEmejMZp2rE="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"C/y120mwDAwN5OVPJpnKRYiVNEQ=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"ADWzWI8dh+dUKtaWTEmejMZp2rE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"m1xIQfxOJd5tonGSKburTACwJ0E="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"ADWzWI8dh+dUKtaWTEmejMZp2rE=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"m1xIQfxOJd5tonGSKburTACwJ0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"9cw8ItCsrxHPbBWFLhqmxTfvSps="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"m1xIQfxOJd5tonGSKburTACwJ0E=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"9cw8ItCsrxHPbBWFLhqmxTfvSps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="},{"type":"next-occurrence","id":"/Dy2bRzljM1Lfjn4lL2xPg5srgk="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"9cw8ItCsrxHPbBWFLhqmxTfvSps=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"/Dy2bRzljM1Lfjn4lL2xPg5srgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PUTNAM AVE W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Lu4iQZNJ1Ykr07+0ZP6kUOkqrA="}],"description":"Construction on PUTNAM AVE W both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York) for boom/pump operations for foundation and superstructure phases related to new building construction., Saturday April 4th, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-31T18:00:58Z"},"road_event_id":"/Dy2bRzljM1Lfjn4lL2xPg5srgk=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898217,40.885321]]}},{"id":"FeyvG7HK2xpoLsoT41RLEwgWSQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cwRNoxc5GEYWblb+EGVIXmom+/Y="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"FeyvG7HK2xpoLsoT41RLEwgWSQc=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"cwRNoxc5GEYWblb+EGVIXmom+/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"QqkXFXNelxMQRkR32wmLajLcK94="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"cwRNoxc5GEYWblb+EGVIXmom+/Y=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"QqkXFXNelxMQRkR32wmLajLcK94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"/tVYKu8gowpNEgqlnK+zv1q3QyU="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"QqkXFXNelxMQRkR32wmLajLcK94=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"/tVYKu8gowpNEgqlnK+zv1q3QyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"Ycm8pWGou+ercX1Leld7E7LDy7A="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"/tVYKu8gowpNEgqlnK+zv1q3QyU=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"Ycm8pWGou+ercX1Leld7E7LDy7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"/WSlu2oZPxy5iyiIoRDCl20vT38="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"Ycm8pWGou+ercX1Leld7E7LDy7A=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"/WSlu2oZPxy5iyiIoRDCl20vT38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"Mzbd9DI41G8+mdNx8awBTKfVyJ4="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"/WSlu2oZPxy5iyiIoRDCl20vT38=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"Mzbd9DI41G8+mdNx8awBTKfVyJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"LHn1hEnunSEz+Wrq0PsyywFpUeY="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"Mzbd9DI41G8+mdNx8awBTKfVyJ4=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"LHn1hEnunSEz+Wrq0PsyywFpUeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"vhnVUy5AI6FVQL1t3Lj7swxKmoU="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"LHn1hEnunSEz+Wrq0PsyywFpUeY=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"vhnVUy5AI6FVQL1t3Lj7swxKmoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"irF+USrmZM5Hy7LsNFW6Sxbzza4="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"vhnVUy5AI6FVQL1t3Lj7swxKmoU=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"irF+USrmZM5Hy7LsNFW6Sxbzza4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"hWmS8UdH05QFkuJBlkOcY2vtwF0="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"irF+USrmZM5Hy7LsNFW6Sxbzza4=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"hWmS8UdH05QFkuJBlkOcY2vtwF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"McqCH/a9g5JcKbI4McHsDcSNyQw="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"hWmS8UdH05QFkuJBlkOcY2vtwF0=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"McqCH/a9g5JcKbI4McHsDcSNyQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"blcJqBKp2WhkE9YBOOiiuWwUpD8="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"McqCH/a9g5JcKbI4McHsDcSNyQw=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"blcJqBKp2WhkE9YBOOiiuWwUpD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"C+AxMMzJNGkJ6G3TdByjaTgIUOk="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"blcJqBKp2WhkE9YBOOiiuWwUpD8=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"C+AxMMzJNGkJ6G3TdByjaTgIUOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="},{"type":"next-occurrence","id":"CDzh9bwI2MH8FGNYox73Fp0GJwg="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"C+AxMMzJNGkJ6G3TdByjaTgIUOk=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"CDzh9bwI2MH8FGNYox73Fp0GJwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DE REIMER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeyvG7HK2xpoLsoT41RLEwgWSQc="}],"description":"Construction on DE REIMER AVE both directions between ERSKINE PL (New York) and BASSETT AVE (New York) for drainage-tie in., Friday April 3rd, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:05:29Z"},"road_event_id":"CDzh9bwI2MH8FGNYox73Fp0GJwg=","beginning_cross_street":"ERSKINE PL","ending_cross_street":"BASSETT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.826265,40.859765]]}},{"id":"Dz9pE9e74jNvCW02fzT2mWD2u+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lwS6/IjyytFgf/ijoSSON0rxR6Q="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installation., Friday April 3rd, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:16:31Z"},"road_event_id":"Dz9pE9e74jNvCW02fzT2mWD2u+o=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994313,40.575518]]}},{"id":"lwS6/IjyytFgf/ijoSSON0rxR6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Dz9pE9e74jNvCW02fzT2mWD2u+o="},{"type":"next-occurrence","id":"+0mlen6hL6uCmmvMM4Lvqz34BWk="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installation., Friday April 3rd, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:16:31Z"},"road_event_id":"lwS6/IjyytFgf/ijoSSON0rxR6Q=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994313,40.575518]]}},{"id":"+0mlen6hL6uCmmvMM4Lvqz34BWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Dz9pE9e74jNvCW02fzT2mWD2u+o="},{"type":"next-occurrence","id":"od8Cr5azvkUfKN9DO6QaoAk3GDo="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installation., Friday April 3rd, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:16:31Z"},"road_event_id":"+0mlen6hL6uCmmvMM4Lvqz34BWk=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994313,40.575518]]}},{"id":"od8Cr5azvkUfKN9DO6QaoAk3GDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Dz9pE9e74jNvCW02fzT2mWD2u+o="},{"type":"next-occurrence","id":"xkWlnkGhE7lA1yS9lPrqehiE10k="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installation., Friday April 3rd, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:16:31Z"},"road_event_id":"od8Cr5azvkUfKN9DO6QaoAk3GDo=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994313,40.575518]]}},{"id":"xkWlnkGhE7lA1yS9lPrqehiE10k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Dz9pE9e74jNvCW02fzT2mWD2u+o="}],"description":"Construction on W 28TH ST southbound between MERMAID AVE (New York) and SURF AVE (New York) for new water service installation., Friday April 3rd, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:16:31Z"},"road_event_id":"xkWlnkGhE7lA1yS9lPrqehiE10k=","beginning_cross_street":"MERMAID AVE","ending_cross_street":"SURF AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994313,40.575518]]}},{"id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1b5dXnWwqZjZ4PCljMm5aNcoZKY="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"1b5dXnWwqZjZ4PCljMm5aNcoZKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"ZGC6X5KT2YdbLsyteT2VuI+z+h0="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"1b5dXnWwqZjZ4PCljMm5aNcoZKY=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"ZGC6X5KT2YdbLsyteT2VuI+z+h0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"1HvuHY2oQACGZA8XUWk/FfpkEBY="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"ZGC6X5KT2YdbLsyteT2VuI+z+h0=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"1HvuHY2oQACGZA8XUWk/FfpkEBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"2FoYmIq2fO85tFCQ2nu6PgVgQG0="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"1HvuHY2oQACGZA8XUWk/FfpkEBY=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"2FoYmIq2fO85tFCQ2nu6PgVgQG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"k6KTYKJrwmStykkkLOgPYCWlJV4="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"2FoYmIq2fO85tFCQ2nu6PgVgQG0=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"k6KTYKJrwmStykkkLOgPYCWlJV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"1VViw0uai9uv2HMw9KFQCJaC4BY="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"k6KTYKJrwmStykkkLOgPYCWlJV4=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"1VViw0uai9uv2HMw9KFQCJaC4BY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"bwvDHDe3VokYUn6gjQX5IMN4/74="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"1VViw0uai9uv2HMw9KFQCJaC4BY=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"bwvDHDe3VokYUn6gjQX5IMN4/74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"JHWwXu1Uc3LLYXAAIIyd13d2adg="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"bwvDHDe3VokYUn6gjQX5IMN4/74=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"JHWwXu1Uc3LLYXAAIIyd13d2adg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"u+n9zt3HIPdHCJNAFJ7f4ryGSEg="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"JHWwXu1Uc3LLYXAAIIyd13d2adg=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"u+n9zt3HIPdHCJNAFJ7f4ryGSEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"RqiQv6VFoB3FM+NxbCJflgBveUg="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"u+n9zt3HIPdHCJNAFJ7f4ryGSEg=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"RqiQv6VFoB3FM+NxbCJflgBveUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"pd32sU96ddRfJnzN5GzDJrJwj7M="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"RqiQv6VFoB3FM+NxbCJflgBveUg=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"pd32sU96ddRfJnzN5GzDJrJwj7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"SO/OMXO11JO0t0QwybVEGU8hkDA="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"pd32sU96ddRfJnzN5GzDJrJwj7M=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"SO/OMXO11JO0t0QwybVEGU8hkDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"WHLip5fNFXdetTeVW3WWR8h1sEA="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"SO/OMXO11JO0t0QwybVEGU8hkDA=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"WHLip5fNFXdetTeVW3WWR8h1sEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="},{"type":"next-occurrence","id":"A+Ysk8B3skGa8AsMFJ4NuXlTQSc="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"WHLip5fNFXdetTeVW3WWR8h1sEA=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"A+Ysk8B3skGa8AsMFJ4NuXlTQSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rt8FCL0Cgpa6fbHalxQh6pZx8Iw="}],"description":"Construction on 40TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Thursday June 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:18:18Z"},"road_event_id":"A+Ysk8B3skGa8AsMFJ4NuXlTQSc=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006592,40.651955]]}},{"id":"QpB0UlsVr77wEPvyXReslUB7LLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["54TH ST"],"direction":"unknown","related_road_events":[],"description":"Construction on 54TH ST eastbound between 1ST AVE (New York) and 2ND AVE (New York) for gas installation/jack and bore activities., Continuous Tuesday March 31st, 2026 12:00 AM thru Thursday April 23rd, 2026 11:59 PM All lanes closed","update_date":"2026-03-31T18:19:53Z"},"road_event_id":"QpB0UlsVr77wEPvyXReslUB7LLI=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.021387,40.648123]]}},{"id":"27u7ZD5aWUnKSygF5xT7jVukzW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Hig9VOhzW6PGTd2KVHj4AoOuNKc="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"27u7ZD5aWUnKSygF5xT7jVukzW8=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"Hig9VOhzW6PGTd2KVHj4AoOuNKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="},{"type":"next-occurrence","id":"3SPoDZD335RGIclzRsRtlsvYvnw="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"Hig9VOhzW6PGTd2KVHj4AoOuNKc=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"3SPoDZD335RGIclzRsRtlsvYvnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="},{"type":"next-occurrence","id":"N32Dk8UPGhB7ZZxVcjVvNOLs4W0="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"3SPoDZD335RGIclzRsRtlsvYvnw=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"N32Dk8UPGhB7ZZxVcjVvNOLs4W0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="},{"type":"next-occurrence","id":"UEin2frxet8cF3nTMWMyTT2Ocss="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"N32Dk8UPGhB7ZZxVcjVvNOLs4W0=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"UEin2frxet8cF3nTMWMyTT2Ocss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="},{"type":"next-occurrence","id":"iWIp7BybaKIYXoafMiPs6qCJtdM="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"UEin2frxet8cF3nTMWMyTT2Ocss=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"iWIp7BybaKIYXoafMiPs6qCJtdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="},{"type":"next-occurrence","id":"uXdGqcBTVWM2tHBqT78zp5VZtnQ="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"iWIp7BybaKIYXoafMiPs6qCJtdM=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"uXdGqcBTVWM2tHBqT78zp5VZtnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="},{"type":"next-occurrence","id":"7n/VD4HrpIjwAAa0CyXeNNXs2J8="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"uXdGqcBTVWM2tHBqT78zp5VZtnQ=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"7n/VD4HrpIjwAAa0CyXeNNXs2J8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="},{"type":"next-occurrence","id":"gJK6EXfx1V7Scjl97ZOQ7pkzCrc="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"7n/VD4HrpIjwAAa0CyXeNNXs2J8=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"gJK6EXfx1V7Scjl97ZOQ7pkzCrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["88TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"27u7ZD5aWUnKSygF5xT7jVukzW8="}],"description":"Construction on 88TH ST eastbound between 4TH AVE (New York) and 5TH AVE (New York) for use of boom truck to lift steel., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:21:34Z"},"road_event_id":"gJK6EXfx1V7Scjl97ZOQ7pkzCrc=","beginning_cross_street":"4TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.028898,40.621126]]}},{"id":"ofb9yCATjcOmOSSwBktpi2LhNis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YDGBD5mQThwf3Q1/9vwO2B6JvtI="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"ofb9yCATjcOmOSSwBktpi2LhNis=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"YDGBD5mQThwf3Q1/9vwO2B6JvtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"ZTqWHmqBLpcvlZ1Xj1sicc0vlu0="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"YDGBD5mQThwf3Q1/9vwO2B6JvtI=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"ZTqWHmqBLpcvlZ1Xj1sicc0vlu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"xAPBe0Gnyl/fNlxxHP7uEpNc2kk="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"ZTqWHmqBLpcvlZ1Xj1sicc0vlu0=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"xAPBe0Gnyl/fNlxxHP7uEpNc2kk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"5xLsr8TFzYiFwIZcT5RgDFowDRc="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"xAPBe0Gnyl/fNlxxHP7uEpNc2kk=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"5xLsr8TFzYiFwIZcT5RgDFowDRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"9m70gELDy9qoD9zntCZgaPC4434="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"5xLsr8TFzYiFwIZcT5RgDFowDRc=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"9m70gELDy9qoD9zntCZgaPC4434=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"coYSmTFN7Y0QbktzSOPqVBHotu4="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"9m70gELDy9qoD9zntCZgaPC4434=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"coYSmTFN7Y0QbktzSOPqVBHotu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"uAGDUM+gjgw9wF5WJPBDraSVaQU="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"coYSmTFN7Y0QbktzSOPqVBHotu4=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"uAGDUM+gjgw9wF5WJPBDraSVaQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"cN51CM307z6Sl4Awe96+WTiVhDQ="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"uAGDUM+gjgw9wF5WJPBDraSVaQU=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"cN51CM307z6Sl4Awe96+WTiVhDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"Ttsa7+Fsijh9+KUVBmH//l+2ioo="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"cN51CM307z6Sl4Awe96+WTiVhDQ=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"Ttsa7+Fsijh9+KUVBmH//l+2ioo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="},{"type":"next-occurrence","id":"V57z6hQXgxc5veCo0XdCwz8QkWU="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"Ttsa7+Fsijh9+KUVBmH//l+2ioo=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"V57z6hQXgxc5veCo0XdCwz8QkWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ofb9yCATjcOmOSSwBktpi2LhNis="}],"description":"Crane operations on WILLOUGHBY AVE eastbound between TAAFFE PL (New York) and KENT AVE (New York), Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Friday April 3rd, 2026 thru Friday June 26th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:25:33Z"},"road_event_id":"V57z6hQXgxc5veCo0XdCwz8QkWU=","beginning_cross_street":"TAAFFE PL","ending_cross_street":"KENT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95977,40.692525]]}},{"id":"kr/g9/zd41fHtj2sQBIy1/KqbDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"X9p3zsESDRlwfzPIi5oBj9XL2ps="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"kr/g9/zd41fHtj2sQBIy1/KqbDY=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"X9p3zsESDRlwfzPIi5oBj9XL2ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"WLR788i4tvIe+7P0M4pcTc9d7QQ="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"X9p3zsESDRlwfzPIi5oBj9XL2ps=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"WLR788i4tvIe+7P0M4pcTc9d7QQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"v2b17L6g8Zt88CoLcqAsh+/TRao="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"WLR788i4tvIe+7P0M4pcTc9d7QQ=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"v2b17L6g8Zt88CoLcqAsh+/TRao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"EVkHHSCCRKkg0neF3d1/82h2Q4o="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"v2b17L6g8Zt88CoLcqAsh+/TRao=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"EVkHHSCCRKkg0neF3d1/82h2Q4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"N0rdVEW0y7sr5v33r3wJ40hbkfE="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"EVkHHSCCRKkg0neF3d1/82h2Q4o=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"N0rdVEW0y7sr5v33r3wJ40hbkfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"hPtXWgykWGBMA0sLuafLEgydN7E="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"N0rdVEW0y7sr5v33r3wJ40hbkfE=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"hPtXWgykWGBMA0sLuafLEgydN7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"uOhF8C4tcdlysZXvWUpdJC+8dJ0="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"hPtXWgykWGBMA0sLuafLEgydN7E=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"uOhF8C4tcdlysZXvWUpdJC+8dJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"1FY2arE0kfbijWk00IzH4d+V1UM="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"uOhF8C4tcdlysZXvWUpdJC+8dJ0=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"1FY2arE0kfbijWk00IzH4d+V1UM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"PvWp/WIbIRBCKHgIty30p6YSSqo="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"1FY2arE0kfbijWk00IzH4d+V1UM=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"PvWp/WIbIRBCKHgIty30p6YSSqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="},{"type":"next-occurrence","id":"LC5omXGQufmGJJtalqYaanybhHg="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"PvWp/WIbIRBCKHgIty30p6YSSqo=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"LC5omXGQufmGJJtalqYaanybhHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kr/g9/zd41fHtj2sQBIy1/KqbDY="}],"description":"Construction on EMERSON PL southbound between MYRTLE AVE (New York) and WILLOUGHBY AVE (New York) for amendment-knuckle boom and crane operations for superstructure phase., Tuesday March 31st, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:28:09Z"},"road_event_id":"LC5omXGQufmGJJtalqYaanybhHg=","beginning_cross_street":"MYRTLE AVE","ending_cross_street":"WILLOUGHBY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962176,40.693802]]}},{"id":"iIHWGaaMsLUIYb+E0COLralneHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"clBNfaIn+OsHhAMNhgjppgviSyU="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"iIHWGaaMsLUIYb+E0COLralneHY=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"clBNfaIn+OsHhAMNhgjppgviSyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"q4BoFPupkUxF2Dwfp45XlYdyahE="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"clBNfaIn+OsHhAMNhgjppgviSyU=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"q4BoFPupkUxF2Dwfp45XlYdyahE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"ityfiUdLbBVZqflHqnDMhXEepFY="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"q4BoFPupkUxF2Dwfp45XlYdyahE=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"ityfiUdLbBVZqflHqnDMhXEepFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"nuT3RXJdu/jNhm8Szwc+imfq+TM="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"ityfiUdLbBVZqflHqnDMhXEepFY=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"nuT3RXJdu/jNhm8Szwc+imfq+TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"mYBjFxNbwKoeR0iHt2g0GP0WDgc="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"nuT3RXJdu/jNhm8Szwc+imfq+TM=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"mYBjFxNbwKoeR0iHt2g0GP0WDgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"YWA8wZr6Hk0McN5A0nsffCM58uE="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"mYBjFxNbwKoeR0iHt2g0GP0WDgc=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"YWA8wZr6Hk0McN5A0nsffCM58uE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"xRVbYYi6+BDRsNuuA8L2UmlAqKU="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"YWA8wZr6Hk0McN5A0nsffCM58uE=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"xRVbYYi6+BDRsNuuA8L2UmlAqKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"k/UviYop4/zowJVG4yMKZljxO7k="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"xRVbYYi6+BDRsNuuA8L2UmlAqKU=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"k/UviYop4/zowJVG4yMKZljxO7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"kSNZFeLzes0mcfB+8zK6fawh6+A="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"k/UviYop4/zowJVG4yMKZljxO7k=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"kSNZFeLzes0mcfB+8zK6fawh6+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"nfrHou5ggwo/q3TcpND4xra2Ytk="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"kSNZFeLzes0mcfB+8zK6fawh6+A=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"nfrHou5ggwo/q3TcpND4xra2Ytk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"RNC/9SQPWqE2xhPh7ao5sCCh+Ts="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"nfrHou5ggwo/q3TcpND4xra2Ytk=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"RNC/9SQPWqE2xhPh7ao5sCCh+Ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"P5tzgGQ/Lh0G1DUU6wlfGuthRO0="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"RNC/9SQPWqE2xhPh7ao5sCCh+Ts=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"P5tzgGQ/Lh0G1DUU6wlfGuthRO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"pDN733qCoxsAlJvfCaf2XdC+Nbc="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"P5tzgGQ/Lh0G1DUU6wlfGuthRO0=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"pDN733qCoxsAlJvfCaf2XdC+Nbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="},{"type":"next-occurrence","id":"lUGba5LgPkHQUYpXTlVMHFIuJXg="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"pDN733qCoxsAlJvfCaf2XdC+Nbc=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"lUGba5LgPkHQUYpXTlVMHFIuJXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAGUE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iIHWGaaMsLUIYb+E0COLralneHY="}],"description":"Construction on MONTAGUE ST westbound between HENRY ST (New York) and HICKS ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:30:30Z"},"road_event_id":"lUGba5LgPkHQUYpXTlVMHFIuJXg=","beginning_cross_street":"HENRY ST","ending_cross_street":"HICKS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.994381,40.694816]]}},{"id":"uEZTbG58SlpX1XmGuDVPqtiMh0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on I-84 eastbound between Exit 51 - I-91 North (Hartford) and Exit 53 - US 44 (East Hartford), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday, 08:30 PM thru 04:30 AM 1 Right lane of 2 lanes closed","update_date":"2026-03-31T18:31:27Z"},"road_event_id":"uEZTbG58SlpX1XmGuDVPqtiMh0k=","beginning_cross_street":"Exit 51 - I-91 North","ending_cross_street":"Exit 53 - US 44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:30:00Z","end_date":"2026-04-23T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.671148,41.769595]]}},{"id":"faFsiOYnVBcITU8dd95sSrvSnK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sLsL9rXyuqWIP0o4sR/+jP6lHmo="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"faFsiOYnVBcITU8dd95sSrvSnK0=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"sLsL9rXyuqWIP0o4sR/+jP6lHmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"o/0CEpVxjkzQpbyQaarbD3piwC4="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"sLsL9rXyuqWIP0o4sR/+jP6lHmo=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"o/0CEpVxjkzQpbyQaarbD3piwC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"vUvbqcN/9OG+QEdwNokFQTqUBMo="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"o/0CEpVxjkzQpbyQaarbD3piwC4=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"vUvbqcN/9OG+QEdwNokFQTqUBMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"Ws3pDIv4Z2hZ8St33gd4bI+2Ea0="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"vUvbqcN/9OG+QEdwNokFQTqUBMo=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"Ws3pDIv4Z2hZ8St33gd4bI+2Ea0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"3KoVsykP49ZHomtiESPfizXxHVE="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"Ws3pDIv4Z2hZ8St33gd4bI+2Ea0=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"3KoVsykP49ZHomtiESPfizXxHVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"b/rdYqsy5ZNoiWyZ2fNRqXcNcBc="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"3KoVsykP49ZHomtiESPfizXxHVE=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"b/rdYqsy5ZNoiWyZ2fNRqXcNcBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"pNRPlozBiSkyz3Rsd7oXd7ZyLdE="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"b/rdYqsy5ZNoiWyZ2fNRqXcNcBc=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"pNRPlozBiSkyz3Rsd7oXd7ZyLdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"Ed7zjOmZfLvhAYl/Od1FkkhHASQ="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"pNRPlozBiSkyz3Rsd7oXd7ZyLdE=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"Ed7zjOmZfLvhAYl/Od1FkkhHASQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"fYMy7QPbH56XIenS79N6AhEJs+I="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"Ed7zjOmZfLvhAYl/Od1FkkhHASQ=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"fYMy7QPbH56XIenS79N6AhEJs+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"oIlDKiZh26SyhQllvhVH4ol//Bg="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"fYMy7QPbH56XIenS79N6AhEJs+I=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"oIlDKiZh26SyhQllvhVH4ol//Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"iArDoirothwTB4AJhCrd8D+jqqM="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"oIlDKiZh26SyhQllvhVH4ol//Bg=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"iArDoirothwTB4AJhCrd8D+jqqM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"R8lHsA/md6MnfWPGpvY+K6MjN5s="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"iArDoirothwTB4AJhCrd8D+jqqM=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"R8lHsA/md6MnfWPGpvY+K6MjN5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"HyoA1CilsTO/9Mag2MqYZSAzx78="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"R8lHsA/md6MnfWPGpvY+K6MjN5s=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"HyoA1CilsTO/9Mag2MqYZSAzx78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="},{"type":"next-occurrence","id":"yTaq4mJnXmoVQSaucEgbrs+SfUI="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"HyoA1CilsTO/9Mag2MqYZSAzx78=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"yTaq4mJnXmoVQSaucEgbrs+SfUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"faFsiOYnVBcITU8dd95sSrvSnK0="}],"description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:32:22Z"},"road_event_id":"yTaq4mJnXmoVQSaucEgbrs+SfUI=","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694604]]}},{"id":"JBgNjIWG/zUsQXhHsns2qiWI1O8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eIEZEyMlgLC3guTiPPVu73jLogE="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"JBgNjIWG/zUsQXhHsns2qiWI1O8=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"eIEZEyMlgLC3guTiPPVu73jLogE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"oCniZ+urbnGfLqDmBsSwVynJe9M="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"eIEZEyMlgLC3guTiPPVu73jLogE=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"oCniZ+urbnGfLqDmBsSwVynJe9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"irbPv2GJZSOeQrtv/vwLGUh+OGA="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"oCniZ+urbnGfLqDmBsSwVynJe9M=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"irbPv2GJZSOeQrtv/vwLGUh+OGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"Hji0jHkuvw6zM+IuiPPmfbLXSsA="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"irbPv2GJZSOeQrtv/vwLGUh+OGA=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"Hji0jHkuvw6zM+IuiPPmfbLXSsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"Eb/hliJps3iNqKClFqXI7Zr2RT8="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"Hji0jHkuvw6zM+IuiPPmfbLXSsA=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"Eb/hliJps3iNqKClFqXI7Zr2RT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"YU/O/XrnUr7YV0Wfq9vHfvQxTsg="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"Eb/hliJps3iNqKClFqXI7Zr2RT8=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"YU/O/XrnUr7YV0Wfq9vHfvQxTsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"mkfDfYgQFsrah6L6BKtduRcVJg4="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"YU/O/XrnUr7YV0Wfq9vHfvQxTsg=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"mkfDfYgQFsrah6L6BKtduRcVJg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"lwFBODvTXeO7iLD1HTxuYlKAiZU="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"mkfDfYgQFsrah6L6BKtduRcVJg4=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"lwFBODvTXeO7iLD1HTxuYlKAiZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"IyCrqai83AD//SiStzfzWGDYDBQ="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"lwFBODvTXeO7iLD1HTxuYlKAiZU=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"IyCrqai83AD//SiStzfzWGDYDBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"ea0Gwm9z4tNpJM+M3wVH8IAZO4E="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"IyCrqai83AD//SiStzfzWGDYDBQ=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"ea0Gwm9z4tNpJM+M3wVH8IAZO4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"qXMMg3/OMllkQF9irYIaYOhtmcU="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"ea0Gwm9z4tNpJM+M3wVH8IAZO4E=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"qXMMg3/OMllkQF9irYIaYOhtmcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"/ue+Z4G43h+aCZ5Q+yjVlYaUQj8="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"qXMMg3/OMllkQF9irYIaYOhtmcU=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"/ue+Z4G43h+aCZ5Q+yjVlYaUQj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"62dbvbXM3dAuClLqqwi1ASMIjd8="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"/ue+Z4G43h+aCZ5Q+yjVlYaUQj8=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"62dbvbXM3dAuClLqqwi1ASMIjd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="},{"type":"next-occurrence","id":"PjGsa+yyTbVUP1N5Uuon99NvHv0="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"62dbvbXM3dAuClLqqwi1ASMIjd8=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"PjGsa+yyTbVUP1N5Uuon99NvHv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REMSEN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JBgNjIWG/zUsQXhHsns2qiWI1O8="}],"description":"Construction on REMSEN ST eastbound between HICKS ST (New York) and HENRY ST (New York) for use of knuckle boom to remove sidewalk shed and materials., Friday April 3rd, 2026 thru Wednesday June 3rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:34:00Z"},"road_event_id":"PjGsa+yyTbVUP1N5Uuon99NvHv0=","beginning_cross_street":"HICKS ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996122,40.694553]]}},{"id":"FXOaiEEaFNrLIRU+gHJplTpiab8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"++ks1GnRZFLpZ6nGRwx6IoDTfcc="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"FXOaiEEaFNrLIRU+gHJplTpiab8=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"++ks1GnRZFLpZ6nGRwx6IoDTfcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FXOaiEEaFNrLIRU+gHJplTpiab8="},{"type":"next-occurrence","id":"XE6z0K7SkIw3dXru761ORRefK1c="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"++ks1GnRZFLpZ6nGRwx6IoDTfcc=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"XE6z0K7SkIw3dXru761ORRefK1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FXOaiEEaFNrLIRU+gHJplTpiab8="},{"type":"next-occurrence","id":"XM0ircFBwSWTWGDQkcOKCqu7GEs="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"XE6z0K7SkIw3dXru761ORRefK1c=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"XM0ircFBwSWTWGDQkcOKCqu7GEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FXOaiEEaFNrLIRU+gHJplTpiab8="},{"type":"next-occurrence","id":"a7bO2nM1rllPvWGC62b7+D25gaQ="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"XM0ircFBwSWTWGDQkcOKCqu7GEs=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"a7bO2nM1rllPvWGC62b7+D25gaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FXOaiEEaFNrLIRU+gHJplTpiab8="},{"type":"next-occurrence","id":"lPN3ihEel8X2UoBZz10s2ojWNA8="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"a7bO2nM1rllPvWGC62b7+D25gaQ=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"lPN3ihEel8X2UoBZz10s2ojWNA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N HENRY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FXOaiEEaFNrLIRU+gHJplTpiab8="}],"description":"Crane operations on N HENRY ST southbound between MESEROLE AVE (New York) and NORMAN AVE (New York), Friday April 3rd, 2026 thru Friday July 3rd, 2026, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 27th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 5th, 2026 thru Sunday June 21st, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T18:38:03Z"},"road_event_id":"lPN3ihEel8X2UoBZz10s2ojWNA8=","beginning_cross_street":"MESEROLE AVE","ending_cross_street":"NORMAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944172,40.729342]]}},{"id":"hujvnrA646DiDTLtITU/JY35/Oc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rb65QU1GbnA/msIdDWR2k2i5vaU="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"hujvnrA646DiDTLtITU/JY35/Oc=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"rb65QU1GbnA/msIdDWR2k2i5vaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"mmCtvnotQvDWlC14kblEeNRfvI0="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"rb65QU1GbnA/msIdDWR2k2i5vaU=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"mmCtvnotQvDWlC14kblEeNRfvI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"jfYIEz3xVaxAtnHsolx+0FBrGbw="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"mmCtvnotQvDWlC14kblEeNRfvI0=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"jfYIEz3xVaxAtnHsolx+0FBrGbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"8rqVDr0JVAwR4zfl/FJA7vgTGfQ="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"jfYIEz3xVaxAtnHsolx+0FBrGbw=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"8rqVDr0JVAwR4zfl/FJA7vgTGfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"k9frI3VqzKHPvH82wD5jRqLXCUE="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"8rqVDr0JVAwR4zfl/FJA7vgTGfQ=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"k9frI3VqzKHPvH82wD5jRqLXCUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"auXMaNpU5vXHA1QfA2uPTFBr1Ac="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"k9frI3VqzKHPvH82wD5jRqLXCUE=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"auXMaNpU5vXHA1QfA2uPTFBr1Ac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"Sv5W6lSUp5SShrEYcf9C2jv57DY="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"auXMaNpU5vXHA1QfA2uPTFBr1Ac=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"Sv5W6lSUp5SShrEYcf9C2jv57DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"NzE1nNjU9w6zOrFpKFISpBW/nRo="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"Sv5W6lSUp5SShrEYcf9C2jv57DY=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"NzE1nNjU9w6zOrFpKFISpBW/nRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"4/G5GUXQZSatwN3ZDsW/UENNNu4="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"NzE1nNjU9w6zOrFpKFISpBW/nRo=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"4/G5GUXQZSatwN3ZDsW/UENNNu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="},{"type":"next-occurrence","id":"KmmU0SIOzyZy9MmvBwVLIassrT4="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"4/G5GUXQZSatwN3ZDsW/UENNNu4=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"KmmU0SIOzyZy9MmvBwVLIassrT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["IRVING AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hujvnrA646DiDTLtITU/JY35/Oc="}],"description":"Construction on IRVING AVE eastbound between PALMETTO ST (New York) and WOODBINE ST (New York) 9am to 4pm Friday when school is not in session for major gas installation., Tuesday March 31st, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-03-31T18:42:23Z"},"road_event_id":"KmmU0SIOzyZy9MmvBwVLIassrT4=","beginning_cross_street":"PALMETTO ST","ending_cross_street":"WOODBINE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912501,40.697942]]}},{"id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V1wCUvunOHtwyeJa79ycWRenjE4="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"V1wCUvunOHtwyeJa79ycWRenjE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"hrpB0f8V6f8WqmBBhtqMlkSqbH0="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"V1wCUvunOHtwyeJa79ycWRenjE4=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"hrpB0f8V6f8WqmBBhtqMlkSqbH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"I4wXWKMVWehB0Z5SLHbCcIz+XMc="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"hrpB0f8V6f8WqmBBhtqMlkSqbH0=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"I4wXWKMVWehB0Z5SLHbCcIz+XMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"vZb5H6i4Dyb8q20hTR/L26IxmlU="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"I4wXWKMVWehB0Z5SLHbCcIz+XMc=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"vZb5H6i4Dyb8q20hTR/L26IxmlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"m85kDr70VRjLU0075pCVjyL7PHE="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"vZb5H6i4Dyb8q20hTR/L26IxmlU=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"m85kDr70VRjLU0075pCVjyL7PHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"wLqyRkKVcMizg3LhZ3Dn3Wm2XTg="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"m85kDr70VRjLU0075pCVjyL7PHE=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"wLqyRkKVcMizg3LhZ3Dn3Wm2XTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"j55K7aOiiYRUsZBeB6cVRDavwMs="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"wLqyRkKVcMizg3LhZ3Dn3Wm2XTg=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"j55K7aOiiYRUsZBeB6cVRDavwMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"ZK8OsSGNebHldy3yJMJbUiPUjD4="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"j55K7aOiiYRUsZBeB6cVRDavwMs=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"ZK8OsSGNebHldy3yJMJbUiPUjD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"vURY442KqP68CGs5vmFM2AB4SKQ="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"ZK8OsSGNebHldy3yJMJbUiPUjD4=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"vURY442KqP68CGs5vmFM2AB4SKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"NuxHIRUFvfeDowHfLXsXOadf36M="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"vURY442KqP68CGs5vmFM2AB4SKQ=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"NuxHIRUFvfeDowHfLXsXOadf36M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"2RcNO2CIckzb5WGCQPwojedWeLo="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"NuxHIRUFvfeDowHfLXsXOadf36M=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"2RcNO2CIckzb5WGCQPwojedWeLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="},{"type":"next-occurrence","id":"mkT6lxdGwEoAt23vBFt5dcQ9weY="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"2RcNO2CIckzb5WGCQPwojedWeLo=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"mkT6lxdGwEoAt23vBFt5dcQ9weY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HMxwl2F+BrG26Swe0bdBQ5TFE9k="}],"description":"Line striping on I-395 both directions between Exit 45 - Kennedy Drive (Putnam) and Exit 46 - to CT 12/to CT 21 (Putnam) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T18:52:05Z"},"road_event_id":"mkT6lxdGwEoAt23vBFt5dcQ9weY=","beginning_cross_street":"Exit 45 - Kennedy Drive","ending_cross_street":"Exit 46 - to CT 12/to CT 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.897289,41.903171]]}},{"id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RoApRCHDV4FaOh0ggecLMEYRA7I="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"RoApRCHDV4FaOh0ggecLMEYRA7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"oMvvcJh0v4TBfw3ozgv9KGchkro="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"RoApRCHDV4FaOh0ggecLMEYRA7I=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"oMvvcJh0v4TBfw3ozgv9KGchkro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"S0+kxGAVjELWohrIsR8sY82OS1A="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"oMvvcJh0v4TBfw3ozgv9KGchkro=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"S0+kxGAVjELWohrIsR8sY82OS1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"SPvZM71ebPv4AqIYzGo2G2+2mQ8="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"S0+kxGAVjELWohrIsR8sY82OS1A=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"SPvZM71ebPv4AqIYzGo2G2+2mQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"DBAFuSunioMcq/bYi3mOxlLnO8g="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"SPvZM71ebPv4AqIYzGo2G2+2mQ8=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"DBAFuSunioMcq/bYi3mOxlLnO8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"hHETZtsu3EjmGl5gxlsiMyu0EVo="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"DBAFuSunioMcq/bYi3mOxlLnO8g=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"hHETZtsu3EjmGl5gxlsiMyu0EVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"1g59vYVzI8FkXftoPM2tpk5xGl4="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"hHETZtsu3EjmGl5gxlsiMyu0EVo=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"1g59vYVzI8FkXftoPM2tpk5xGl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"9DOTA63w0L7QyfEEdC1sCTo800M="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"1g59vYVzI8FkXftoPM2tpk5xGl4=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"9DOTA63w0L7QyfEEdC1sCTo800M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"Udi7WzT+DH+eVr8FO4yIlNnZrw0="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"9DOTA63w0L7QyfEEdC1sCTo800M=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"Udi7WzT+DH+eVr8FO4yIlNnZrw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="},{"type":"next-occurrence","id":"dDMnx4Cz6MZ8CrFsJ3/woClzBqU="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"Udi7WzT+DH+eVr8FO4yIlNnZrw0=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"dDMnx4Cz6MZ8CrFsJ3/woClzBqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOODBINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JH8eEeQKVmjDAmEMwT1P2VFqZEg="}],"description":"Construction on WOODBINE ST southbound between BUSHWICK AVE (New York) and BROADWAY (New York) for mainline track repairs., Tuesday March 31st, 2026 thru Friday May 29th, 2026, Monday thru Friday, 06:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:44:39Z"},"road_event_id":"dDMnx4Cz6MZ8CrFsJ3/woClzBqU=","beginning_cross_street":"BUSHWICK AVE","ending_cross_street":"BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919234,40.689975]]}},{"id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gfGBP1fTMo4DrbmbqkHtvs7diCU="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"gfGBP1fTMo4DrbmbqkHtvs7diCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"sLeTexudh3zr1dKyX918n7FvjwU="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"gfGBP1fTMo4DrbmbqkHtvs7diCU=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"sLeTexudh3zr1dKyX918n7FvjwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"FXlZdBT35R85S2V9Rmc+sq3RmvE="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"sLeTexudh3zr1dKyX918n7FvjwU=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"FXlZdBT35R85S2V9Rmc+sq3RmvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"sCH8OmfNsxO04+T1X3o7+Fx2qp0="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"FXlZdBT35R85S2V9Rmc+sq3RmvE=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"sCH8OmfNsxO04+T1X3o7+Fx2qp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"WroatadaAAYBXCCxKwWZiA7Ye4Y="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"sCH8OmfNsxO04+T1X3o7+Fx2qp0=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"WroatadaAAYBXCCxKwWZiA7Ye4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"Xn+TkaJ3EszfW5OCO+1X2x4TpcE="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"WroatadaAAYBXCCxKwWZiA7Ye4Y=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"Xn+TkaJ3EszfW5OCO+1X2x4TpcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"Cmz7UNS90af7s+UUMaRcwzCbJo4="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"Xn+TkaJ3EszfW5OCO+1X2x4TpcE=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"Cmz7UNS90af7s+UUMaRcwzCbJo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"T0qAo+xPrkgdmDSkUYSwtkeQIv4="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"Cmz7UNS90af7s+UUMaRcwzCbJo4=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"T0qAo+xPrkgdmDSkUYSwtkeQIv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"ox7J+P+C/nDoUZ49NbZhdLt+Aco="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"T0qAo+xPrkgdmDSkUYSwtkeQIv4=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"ox7J+P+C/nDoUZ49NbZhdLt+Aco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="},{"type":"next-occurrence","id":"3WCuA16ZoG3nXGQtExmqvAUhCuU="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"ox7J+P+C/nDoUZ49NbZhdLt+Aco=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"3WCuA16ZoG3nXGQtExmqvAUhCuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOWNING ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/Oyf4zYEMYXSNTqzG+JuYBTHHA="}],"description":"Construction on DOWNING ST southbound between PUTNAM AVE (New York) and FULTON ST (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:48:40Z"},"road_event_id":"3WCuA16ZoG3nXGQtExmqvAUhCuU=","beginning_cross_street":"PUTNAM AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960702,40.68275]]}},{"id":"ETl7DVH5gNi17Agu1N1LtffnH8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FJ5zuIeDKomtnRVDU7p6F3yI6vY="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"ETl7DVH5gNi17Agu1N1LtffnH8M=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"FJ5zuIeDKomtnRVDU7p6F3yI6vY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"ELvUkuzId0T0TotuptNJB1E8eGc="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"FJ5zuIeDKomtnRVDU7p6F3yI6vY=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"ELvUkuzId0T0TotuptNJB1E8eGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"6gkRBa1prqH/TkgZmCFUsz8QKd0="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"ELvUkuzId0T0TotuptNJB1E8eGc=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"6gkRBa1prqH/TkgZmCFUsz8QKd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"Cv5Jn7+fHpI7pwuHIhA+ZDMgbF8="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"6gkRBa1prqH/TkgZmCFUsz8QKd0=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"Cv5Jn7+fHpI7pwuHIhA+ZDMgbF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"9/ntnqLQufcsYm8LBZGh1zc0KJI="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"Cv5Jn7+fHpI7pwuHIhA+ZDMgbF8=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"9/ntnqLQufcsYm8LBZGh1zc0KJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"VPURfHyFUZFClnGoAdtVc3h/NT4="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"9/ntnqLQufcsYm8LBZGh1zc0KJI=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"VPURfHyFUZFClnGoAdtVc3h/NT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"rhOsdZfvp04AMsSmLese91ILhFg="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"VPURfHyFUZFClnGoAdtVc3h/NT4=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"rhOsdZfvp04AMsSmLese91ILhFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"9r9TpVs25fXQCUFu3pa/cmqm1qM="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"rhOsdZfvp04AMsSmLese91ILhFg=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"9r9TpVs25fXQCUFu3pa/cmqm1qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"JjX/QmdvDYpEnRRW/nMKyDOHYDU="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"9r9TpVs25fXQCUFu3pa/cmqm1qM=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"JjX/QmdvDYpEnRRW/nMKyDOHYDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"rQqydqQo1IRsDnpKqFLGiykP3ls="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"JjX/QmdvDYpEnRRW/nMKyDOHYDU=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"rQqydqQo1IRsDnpKqFLGiykP3ls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"NwBc5simXHKBqmiagFtihLpbgF8="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"rQqydqQo1IRsDnpKqFLGiykP3ls=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"NwBc5simXHKBqmiagFtihLpbgF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"FN6DIJoGhusWZefMDI+MjEPee1g="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"NwBc5simXHKBqmiagFtihLpbgF8=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"FN6DIJoGhusWZefMDI+MjEPee1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"YwnOV9j3B7v0flNOEgqlxEHkjH4="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"FN6DIJoGhusWZefMDI+MjEPee1g=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"YwnOV9j3B7v0flNOEgqlxEHkjH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="},{"type":"next-occurrence","id":"QuyLQur95Dj1xDfItPZo8jbi1VE="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"YwnOV9j3B7v0flNOEgqlxEHkjH4=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"QuyLQur95Dj1xDfItPZo8jbi1VE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKWELL PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ETl7DVH5gNi17Agu1N1LtffnH8M="}],"description":"Construction on ROCKWELL PL southbound between FULTON ST (New York) and LAFAYETTE AVE (New York) for concrete pumps and boom trucks., Friday April 3rd, 2026 thru Monday June 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:50:42Z"},"road_event_id":"QuyLQur95Dj1xDfItPZo8jbi1VE=","beginning_cross_street":"FULTON ST","ending_cross_street":"LAFAYETTE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979279,40.688164]]}},{"id":"GUz+JbTuvrdRO1GC1oJkROZQoe4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5cx/r+9w0+50I6e6lRd02dtapEI="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"GUz+JbTuvrdRO1GC1oJkROZQoe4=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"5cx/r+9w0+50I6e6lRd02dtapEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"6N8iYTnaHylGvpVmB+go/F7+7FE="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"5cx/r+9w0+50I6e6lRd02dtapEI=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"6N8iYTnaHylGvpVmB+go/F7+7FE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"QWgZJC6JzX2pT9TIsI/m55jRGJc="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"6N8iYTnaHylGvpVmB+go/F7+7FE=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"QWgZJC6JzX2pT9TIsI/m55jRGJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"kdrtcyInr8lSen97kNSPwEhMdWQ="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"QWgZJC6JzX2pT9TIsI/m55jRGJc=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"kdrtcyInr8lSen97kNSPwEhMdWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"kFWGK2Ub0fVk/kbIVMIQXU7WbuE="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"kdrtcyInr8lSen97kNSPwEhMdWQ=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"kFWGK2Ub0fVk/kbIVMIQXU7WbuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"wn5XbrEx2hHDZ2e9Y4k6QfqrKno="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"kFWGK2Ub0fVk/kbIVMIQXU7WbuE=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"wn5XbrEx2hHDZ2e9Y4k6QfqrKno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"eLKBo7gLhdyK1S4phQSjCV5l7gU="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"wn5XbrEx2hHDZ2e9Y4k6QfqrKno=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"eLKBo7gLhdyK1S4phQSjCV5l7gU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"KTpppS4bMgGOt53bquGpmWESOlE="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"eLKBo7gLhdyK1S4phQSjCV5l7gU=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"KTpppS4bMgGOt53bquGpmWESOlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"kqyh1oDhWSjQx9GcptIwm8kGuJk="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"KTpppS4bMgGOt53bquGpmWESOlE=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"kqyh1oDhWSjQx9GcptIwm8kGuJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"K6kIrStjXJAAWA3lNLK2Dg+8avk="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"kqyh1oDhWSjQx9GcptIwm8kGuJk=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"K6kIrStjXJAAWA3lNLK2Dg+8avk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"IwLw+0XFBwKbajdiLWoltBItpuY="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"K6kIrStjXJAAWA3lNLK2Dg+8avk=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"IwLw+0XFBwKbajdiLWoltBItpuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"UYCRAZzVLtm+qeMDjR99kDZrDhY="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"IwLw+0XFBwKbajdiLWoltBItpuY=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"UYCRAZzVLtm+qeMDjR99kDZrDhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"JqXorR0CWnD6x7dlPw5AdDvTnUg="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"UYCRAZzVLtm+qeMDjR99kDZrDhY=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"JqXorR0CWnD6x7dlPw5AdDvTnUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="},{"type":"next-occurrence","id":"zscZh0YFGeg/4334QJJWX1fHF/M="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"JqXorR0CWnD6x7dlPw5AdDvTnUg=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"zscZh0YFGeg/4334QJJWX1fHF/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GUz+JbTuvrdRO1GC1oJkROZQoe4="}],"description":"Construction on LINCOLN PL westbound between NOSTRAND AVE (New York) and ROGERS AVE (New York) for concrete pump, boom and knuckle boom to work on new building., Friday April 3rd, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:53:20Z"},"road_event_id":"zscZh0YFGeg/4334QJJWX1fHF/M=","beginning_cross_street":"NOSTRAND AVE","ending_cross_street":"ROGERS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.950516,40.670745]]}},{"id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"85cbvOi1x0zwwFx+Ks9zdqEAl6s="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"85cbvOi1x0zwwFx+Ks9zdqEAl6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="},{"type":"next-occurrence","id":"hlGQOZ/U1NRU1PeNH0hPplJzIeI="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"85cbvOi1x0zwwFx+Ks9zdqEAl6s=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"hlGQOZ/U1NRU1PeNH0hPplJzIeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="},{"type":"next-occurrence","id":"rdfwrDyY+0R7xI4v8HnVpWZGzLQ="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"hlGQOZ/U1NRU1PeNH0hPplJzIeI=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"rdfwrDyY+0R7xI4v8HnVpWZGzLQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="},{"type":"next-occurrence","id":"j3ywlJI1UKW2QSeniAXRt+m3nvY="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"rdfwrDyY+0R7xI4v8HnVpWZGzLQ=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"j3ywlJI1UKW2QSeniAXRt+m3nvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="},{"type":"next-occurrence","id":"nxa+UtnkURBzEB0lGNjN1qmtydw="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"j3ywlJI1UKW2QSeniAXRt+m3nvY=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"nxa+UtnkURBzEB0lGNjN1qmtydw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="},{"type":"next-occurrence","id":"Obeh+zBgtpAM3Vrv9Z+q+TcTv8M="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"nxa+UtnkURBzEB0lGNjN1qmtydw=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"Obeh+zBgtpAM3Vrv9Z+q+TcTv8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="},{"type":"next-occurrence","id":"hCU4eWhMiw+QTGLPrM1rKgQrpYk="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"Obeh+zBgtpAM3Vrv9Z+q+TcTv8M=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"hCU4eWhMiw+QTGLPrM1rKgQrpYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="},{"type":"next-occurrence","id":"0HMjqLjI00DHZWCOXwLWcLrxT0A="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"hCU4eWhMiw+QTGLPrM1rKgQrpYk=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"0HMjqLjI00DHZWCOXwLWcLrxT0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SACKETT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j/pZuKNZRuNjBLcPfOg+zMC3YkY="}],"description":"Construction on SACKETT ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for foundation work and concrete operation., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:55:01Z"},"road_event_id":"0HMjqLjI00DHZWCOXwLWcLrxT0A=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98675,40.679656]]}},{"id":"fHEwhl/T3FjpSEsPcqb2epDNarE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lZFD2n78TtmoFsIF8/ePz7j1dHw="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"fHEwhl/T3FjpSEsPcqb2epDNarE=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"lZFD2n78TtmoFsIF8/ePz7j1dHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="},{"type":"next-occurrence","id":"Vumu56puYTGzMRKLT4y2ZYMVTig="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"lZFD2n78TtmoFsIF8/ePz7j1dHw=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"Vumu56puYTGzMRKLT4y2ZYMVTig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="},{"type":"next-occurrence","id":"4krKrZg9fWEgMhhgT0qaTVrBvlQ="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"Vumu56puYTGzMRKLT4y2ZYMVTig=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"4krKrZg9fWEgMhhgT0qaTVrBvlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="},{"type":"next-occurrence","id":"DAu4Om4l0wDZKhDVnFAmBiuQ16U="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"4krKrZg9fWEgMhhgT0qaTVrBvlQ=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"DAu4Om4l0wDZKhDVnFAmBiuQ16U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="},{"type":"next-occurrence","id":"CmpAkKoSliggjsygmb50Yx84cdk="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"DAu4Om4l0wDZKhDVnFAmBiuQ16U=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"CmpAkKoSliggjsygmb50Yx84cdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="},{"type":"next-occurrence","id":"sCrXCwuRfyBp0H/XDZopWUUerdc="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"CmpAkKoSliggjsygmb50Yx84cdk=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"sCrXCwuRfyBp0H/XDZopWUUerdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="},{"type":"next-occurrence","id":"kM7f2UcZFQySvzIzWpnTEFPb1AE="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"sCrXCwuRfyBp0H/XDZopWUUerdc=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"kM7f2UcZFQySvzIzWpnTEFPb1AE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="},{"type":"next-occurrence","id":"DUEw0BbIyv+P9gzW+qXFOcVKLpk="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"kM7f2UcZFQySvzIzWpnTEFPb1AE=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"DUEw0BbIyv+P9gzW+qXFOcVKLpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fHEwhl/T3FjpSEsPcqb2epDNarE="}],"description":"Construction on DEGRAW ST westbound between 3RD AVE (New York) and NEVINS ST (New York) for concrete pumps and knuckle boom., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:56:38Z"},"road_event_id":"DUEw0BbIyv+P9gzW+qXFOcVKLpk=","beginning_cross_street":"3RD AVE","ending_cross_street":"NEVINS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984622,40.679617]]}},{"id":"RzEP2wqAj4hPbz8gnDIFpiassWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+JirURC/MHCO0NBfHWHaxBQ/7go="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"RzEP2wqAj4hPbz8gnDIFpiassWI=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"+JirURC/MHCO0NBfHWHaxBQ/7go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"CKs9e5p5MJIIGVG1jFCk6tvGKBQ="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"+JirURC/MHCO0NBfHWHaxBQ/7go=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"CKs9e5p5MJIIGVG1jFCk6tvGKBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"br4LmnHrjYe0UARKbbJB7k2WaLg="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"CKs9e5p5MJIIGVG1jFCk6tvGKBQ=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"br4LmnHrjYe0UARKbbJB7k2WaLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"rzz15/jN0RfY76VRKOcQt3GcnCA="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"br4LmnHrjYe0UARKbbJB7k2WaLg=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"rzz15/jN0RfY76VRKOcQt3GcnCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"5oqug7CmLaHA6KA69svl1AUEr+0="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"rzz15/jN0RfY76VRKOcQt3GcnCA=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"5oqug7CmLaHA6KA69svl1AUEr+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"1vsy24Rit5JKJytPGUPvO1+xgIY="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"5oqug7CmLaHA6KA69svl1AUEr+0=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"1vsy24Rit5JKJytPGUPvO1+xgIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"DS21vKeSTHy/zVDJzapMZyOkYb8="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"1vsy24Rit5JKJytPGUPvO1+xgIY=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"DS21vKeSTHy/zVDJzapMZyOkYb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"PPk9Bbr72OCSFEQiCzXVRGMjuTY="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"DS21vKeSTHy/zVDJzapMZyOkYb8=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"PPk9Bbr72OCSFEQiCzXVRGMjuTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"oycIjiRKitgsFTHXIROmcaP8MAc="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"PPk9Bbr72OCSFEQiCzXVRGMjuTY=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"oycIjiRKitgsFTHXIROmcaP8MAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"89ALFhV/xXZ/sIG633MTk++/HHs="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"oycIjiRKitgsFTHXIROmcaP8MAc=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"89ALFhV/xXZ/sIG633MTk++/HHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"aP2a6NJtx9Cmq3huApOJGT6wPh0="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"89ALFhV/xXZ/sIG633MTk++/HHs=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"aP2a6NJtx9Cmq3huApOJGT6wPh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"/Q/HjGtIymToW+EcXgoMG9FuosQ="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"aP2a6NJtx9Cmq3huApOJGT6wPh0=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"/Q/HjGtIymToW+EcXgoMG9FuosQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"ru38tBjR4ocLMaYEZCyVes/6tno="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"/Q/HjGtIymToW+EcXgoMG9FuosQ=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"ru38tBjR4ocLMaYEZCyVes/6tno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="},{"type":"next-occurrence","id":"Q8BpQ8AknFGGqCsmdX4Xq+FiLRg="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"ru38tBjR4ocLMaYEZCyVes/6tno=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"Q8BpQ8AknFGGqCsmdX4Xq+FiLRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLENMORE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RzEP2wqAj4hPbz8gnDIFpiassWI="}],"description":"Construction on GLENMORE AVE eastbound between MOTHER GASTON BLVD (New York) and CHRISTOPHER AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T18:58:58Z"},"road_event_id":"Q8BpQ8AknFGGqCsmdX4Xq+FiLRg=","beginning_cross_street":"MOTHER GASTON BLVD","ending_cross_street":"CHRISTOPHER AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907298,40.671516]]}},{"id":"W36jXy/gHf+blebFqVWfyEHuv7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/WtM7FRspyrSJdz5fom+klSOV3I="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"W36jXy/gHf+blebFqVWfyEHuv7U=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"/WtM7FRspyrSJdz5fom+klSOV3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"aJJhk7LouE381h4T33ilx54IwXs="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"/WtM7FRspyrSJdz5fom+klSOV3I=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"aJJhk7LouE381h4T33ilx54IwXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"a7TwSW6jsYjnvEvh0RGQxIIiNdM="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"aJJhk7LouE381h4T33ilx54IwXs=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"a7TwSW6jsYjnvEvh0RGQxIIiNdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"ETNUau0pOhv7ZVZZmr2lsvHr3WU="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"a7TwSW6jsYjnvEvh0RGQxIIiNdM=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"ETNUau0pOhv7ZVZZmr2lsvHr3WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"+nGUZrepsXA/rBJYzBeLN0TFXuA="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"ETNUau0pOhv7ZVZZmr2lsvHr3WU=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"+nGUZrepsXA/rBJYzBeLN0TFXuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"gwEEshik/SKV4A9ludaNbtZ7J2U="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"+nGUZrepsXA/rBJYzBeLN0TFXuA=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"gwEEshik/SKV4A9ludaNbtZ7J2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"Y97y+1NAE+GWXehum7d+wmgN3zo="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"gwEEshik/SKV4A9ludaNbtZ7J2U=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"Y97y+1NAE+GWXehum7d+wmgN3zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"SE9DGTGgvuLurvnUG8WuKluSn7s="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"Y97y+1NAE+GWXehum7d+wmgN3zo=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"SE9DGTGgvuLurvnUG8WuKluSn7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"PkRFnQcpTBR8k6lAX5z/vL1Xyy0="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"SE9DGTGgvuLurvnUG8WuKluSn7s=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"PkRFnQcpTBR8k6lAX5z/vL1Xyy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"mX6GhXTZvWBy+dasdsGbUZM4J0s="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"PkRFnQcpTBR8k6lAX5z/vL1Xyy0=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"mX6GhXTZvWBy+dasdsGbUZM4J0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"Ws956ZJRHuehP7WCqUwQPS4iV90="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"mX6GhXTZvWBy+dasdsGbUZM4J0s=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"Ws956ZJRHuehP7WCqUwQPS4iV90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"rcF3l0ekussf/Jy/YLzaRQSlAaE="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"Ws956ZJRHuehP7WCqUwQPS4iV90=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"rcF3l0ekussf/Jy/YLzaRQSlAaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"+X+6YCE1shD9UZkxUvIRcwQK7TA="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"rcF3l0ekussf/Jy/YLzaRQSlAaE=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"+X+6YCE1shD9UZkxUvIRcwQK7TA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="},{"type":"next-occurrence","id":"WsOqlW92jnGh6Vip4Ak8zc1zDAs="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"+X+6YCE1shD9UZkxUvIRcwQK7TA=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"WsOqlW92jnGh6Vip4Ak8zc1zDAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W36jXy/gHf+blebFqVWfyEHuv7U="}],"description":"Construction on CHRISTOPHER AVE northbound between GLENMORE AVE (New York) and LIBERTY AVE (New York) for booming and pumping for new building operations., Friday April 3rd, 2026 thru Monday June 29th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:01:08Z"},"road_event_id":"WsOqlW92jnGh6Vip4Ak8zc1zDAs=","beginning_cross_street":"GLENMORE AVE","ending_cross_street":"LIBERTY AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906368,40.671707]]}},{"id":"fbs6mGvAi93doAjk/QHb6D+6S/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"A3uhuQaymR7sSHpkcYIEG6j4EEo="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"fbs6mGvAi93doAjk/QHb6D+6S/g=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"A3uhuQaymR7sSHpkcYIEG6j4EEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"XmNSPoZiuBDgYQ8l6zMfRSc/u0M="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"A3uhuQaymR7sSHpkcYIEG6j4EEo=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"XmNSPoZiuBDgYQ8l6zMfRSc/u0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"REJnxnvmyiLjE/Se/uToirTgg/Y="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"XmNSPoZiuBDgYQ8l6zMfRSc/u0M=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"REJnxnvmyiLjE/Se/uToirTgg/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"sNscybf65aWse9Ll0dDMrO02Joo="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"REJnxnvmyiLjE/Se/uToirTgg/Y=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"sNscybf65aWse9Ll0dDMrO02Joo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"t8I5p1q3bAyKfM5d24oHGbrntvg="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"sNscybf65aWse9Ll0dDMrO02Joo=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"t8I5p1q3bAyKfM5d24oHGbrntvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"DNwCPRIswxwXpL8hkbQjTcuojPQ="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"t8I5p1q3bAyKfM5d24oHGbrntvg=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"DNwCPRIswxwXpL8hkbQjTcuojPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"uz47MM+lkJcVKuex/JAF42/ixn8="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"DNwCPRIswxwXpL8hkbQjTcuojPQ=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"uz47MM+lkJcVKuex/JAF42/ixn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"MmnBIlprGvGrm7OwLZ2dAMUMS78="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"uz47MM+lkJcVKuex/JAF42/ixn8=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"MmnBIlprGvGrm7OwLZ2dAMUMS78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"GI+oQHiE5kVrFEm+TC9p/KwUuHM="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"MmnBIlprGvGrm7OwLZ2dAMUMS78=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"GI+oQHiE5kVrFEm+TC9p/KwUuHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"a35+SOGhllhd+wjcpt2+mfL3u/E="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"GI+oQHiE5kVrFEm+TC9p/KwUuHM=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"a35+SOGhllhd+wjcpt2+mfL3u/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"vl09SeVYSqBV4HzxQzjypp+25yE="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"a35+SOGhllhd+wjcpt2+mfL3u/E=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"vl09SeVYSqBV4HzxQzjypp+25yE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="},{"type":"next-occurrence","id":"4pC8BhkCwLOz2RuheWM2t900URg="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"vl09SeVYSqBV4HzxQzjypp+25yE=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"4pC8BhkCwLOz2RuheWM2t900URg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHRISTOPHER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fbs6mGvAi93doAjk/QHb6D+6S/g="}],"description":"Construction on CHRISTOPHER AVE northbound between RIVERDALE AVE (New York) and LIVONIA AVE (New York) for boom/pump operations., Tuesday March 31st, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 4th, 2026 thru Saturday June 20th, 2026, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-31T19:04:17Z"},"road_event_id":"4pC8BhkCwLOz2RuheWM2t900URg=","beginning_cross_street":"RIVERDALE AVE","ending_cross_street":"LIVONIA AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903838,40.661792]]}},{"id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MZHOpK1/DyBbEcegxTpxFEeJ3AU="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"MZHOpK1/DyBbEcegxTpxFEeJ3AU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"su00nYTaQCZCXlShl7Di+qVZcLo="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"MZHOpK1/DyBbEcegxTpxFEeJ3AU=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"su00nYTaQCZCXlShl7Di+qVZcLo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"iy/2YeaPB+68gBp58UhdsTRw+1o="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"su00nYTaQCZCXlShl7Di+qVZcLo=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"iy/2YeaPB+68gBp58UhdsTRw+1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"Ne0CQXA4pNmMVMuLBqb0Ts09hoo="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"iy/2YeaPB+68gBp58UhdsTRw+1o=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"Ne0CQXA4pNmMVMuLBqb0Ts09hoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"R4BTLn6Mofd4U9zTWgZcDU/5A+k="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"Ne0CQXA4pNmMVMuLBqb0Ts09hoo=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"R4BTLn6Mofd4U9zTWgZcDU/5A+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"rAX+TJwjRoyVz04S5OzYRkakiXk="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"R4BTLn6Mofd4U9zTWgZcDU/5A+k=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"rAX+TJwjRoyVz04S5OzYRkakiXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"syOvuPjHyTbNwJnchaHhHBnaNIU="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"rAX+TJwjRoyVz04S5OzYRkakiXk=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"syOvuPjHyTbNwJnchaHhHBnaNIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"xRkXV2UkVpUQa0+tLgD/WzrmtTc="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"syOvuPjHyTbNwJnchaHhHBnaNIU=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"xRkXV2UkVpUQa0+tLgD/WzrmtTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"pgWQs/68y6jYvXtAmdRgXddTJaI="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"xRkXV2UkVpUQa0+tLgD/WzrmtTc=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"pgWQs/68y6jYvXtAmdRgXddTJaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"eYdmPljnFxPoHYbbmaK/UFobkTM="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"pgWQs/68y6jYvXtAmdRgXddTJaI=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"eYdmPljnFxPoHYbbmaK/UFobkTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"eKBw0vlnUwL6hKEfpG2aWxLansU="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"eYdmPljnFxPoHYbbmaK/UFobkTM=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"eKBw0vlnUwL6hKEfpG2aWxLansU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="},{"type":"next-occurrence","id":"Pca4lMngaJgH0q6LEbjHIFOIS1o="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"eKBw0vlnUwL6hKEfpG2aWxLansU=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"Pca4lMngaJgH0q6LEbjHIFOIS1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-395"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5GBECx8tI8Vsg/PDdeSjOzHpT8E="}],"description":"Line striping on I-395 both directions between Exit 47 - US 44 (Putnam) and Exit 49 - CT 12 (Thompson/West Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday May 28th, 2026, 08:00 PM thru 06:00 AM All lanes open, Thursday May 28th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:05:43Z"},"road_event_id":"Pca4lMngaJgH0q6LEbjHIFOIS1o=","beginning_cross_street":"Exit 47 - US 44","ending_cross_street":"Exit 49 - CT 12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.883962,41.924838]]}},{"id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kWJEeEaJQIArpeHzNBu6g9f03lU="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"kWJEeEaJQIArpeHzNBu6g9f03lU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="},{"type":"next-occurrence","id":"z8E3ovkk5FsiD8d2TN+md+Pg8l4="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"kWJEeEaJQIArpeHzNBu6g9f03lU=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"z8E3ovkk5FsiD8d2TN+md+Pg8l4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="},{"type":"next-occurrence","id":"bQsobijyRHpUrT9DfVonNwXHafM="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"z8E3ovkk5FsiD8d2TN+md+Pg8l4=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"bQsobijyRHpUrT9DfVonNwXHafM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="},{"type":"next-occurrence","id":"1QaYt0AjcsrbLLW5U+X0E9yUx5s="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"bQsobijyRHpUrT9DfVonNwXHafM=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"1QaYt0AjcsrbLLW5U+X0E9yUx5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="},{"type":"next-occurrence","id":"bQckNVKUuYy/FtQkbAams5x7y2I="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"1QaYt0AjcsrbLLW5U+X0E9yUx5s=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"bQckNVKUuYy/FtQkbAams5x7y2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="},{"type":"next-occurrence","id":"5DZ5euYaGXgRpNcVaifZWRFXjwo="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"bQckNVKUuYy/FtQkbAams5x7y2I=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"5DZ5euYaGXgRpNcVaifZWRFXjwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="},{"type":"next-occurrence","id":"gjMdCt4JR/c9lpa8BLzg9dVamaA="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"5DZ5euYaGXgRpNcVaifZWRFXjwo=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"gjMdCt4JR/c9lpa8BLzg9dVamaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="},{"type":"next-occurrence","id":"hTe3fMIUBzNoz3juQ0PINZ6cH2w="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"gjMdCt4JR/c9lpa8BLzg9dVamaA=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"hTe3fMIUBzNoz3juQ0PINZ6cH2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["24TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"o0Zf+PeO2OuyFTOwDDdDMXC/NVQ="}],"description":"Construction on 24TH AVE both directions between 217TH ST (New York) for Con ed vault installation-crane., Friday April 3rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-31T19:11:17Z"},"road_event_id":"hTe3fMIUBzNoz3juQ0PINZ6cH2w=","beginning_cross_street":"217TH ST","ending_cross_street":"217TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.773939,40.780249]]}},{"id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S4WFb79Dyi1tGr0e7oYjEi5mCY8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"S4WFb79Dyi1tGr0e7oYjEi5mCY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"GAXcVb8zAbvgLUnj/bJZFK6yVZ8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"S4WFb79Dyi1tGr0e7oYjEi5mCY8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"GAXcVb8zAbvgLUnj/bJZFK6yVZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"06SLf2cxV838ITmzm4MD5RRJxm4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"GAXcVb8zAbvgLUnj/bJZFK6yVZ8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"06SLf2cxV838ITmzm4MD5RRJxm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"D+zfGYcpMQjk/vSBORjWGEwEvJs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"06SLf2cxV838ITmzm4MD5RRJxm4=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"D+zfGYcpMQjk/vSBORjWGEwEvJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"hSSFNxO+VeDWP1SyN5D8lGlsD6I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"D+zfGYcpMQjk/vSBORjWGEwEvJs=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"hSSFNxO+VeDWP1SyN5D8lGlsD6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"Pi4FkLfQUKs/sW13erT15HvwuDc="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"hSSFNxO+VeDWP1SyN5D8lGlsD6I=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"Pi4FkLfQUKs/sW13erT15HvwuDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"Dlei+xGhFCGaOXTDkqWu/4jpnhA="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"Pi4FkLfQUKs/sW13erT15HvwuDc=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"Dlei+xGhFCGaOXTDkqWu/4jpnhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"iTvmvjRzq9O3qSW/hGg7hcve1b8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"Dlei+xGhFCGaOXTDkqWu/4jpnhA=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"iTvmvjRzq9O3qSW/hGg7hcve1b8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"8QCd7ltmAbrxSp8p/7tWcJYHMso="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"iTvmvjRzq9O3qSW/hGg7hcve1b8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"8QCd7ltmAbrxSp8p/7tWcJYHMso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="},{"type":"next-occurrence","id":"J6ffMuXpY4/znZPIMdHrCvqr1u8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"8QCd7ltmAbrxSp8p/7tWcJYHMso=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"J6ffMuXpY4/znZPIMdHrCvqr1u8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/nOyYtH7NN1TBdOI+p9jlfe+qG8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:13:37Z"},"road_event_id":"J6ffMuXpY4/znZPIMdHrCvqr1u8=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805216,40.590475]]}},{"id":"gskRb/dTSoVwY1euUZq31lldxIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4KFCnwMrU4qaPKoEWfsv9YeN5FI="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"gskRb/dTSoVwY1euUZq31lldxIA=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"4KFCnwMrU4qaPKoEWfsv9YeN5FI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"O8yvc2TCgSbRLe/4ybAGsvdntDQ="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"4KFCnwMrU4qaPKoEWfsv9YeN5FI=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"O8yvc2TCgSbRLe/4ybAGsvdntDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"n+qFeGScP+SVRBBkEnokG8zAxyc="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"O8yvc2TCgSbRLe/4ybAGsvdntDQ=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"n+qFeGScP+SVRBBkEnokG8zAxyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"CLT4vPdLPUWHpeLhJpI2HUbZAsw="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"n+qFeGScP+SVRBBkEnokG8zAxyc=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"CLT4vPdLPUWHpeLhJpI2HUbZAsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"L5fvnRK5/b+vX9lGoy5ICtjz4s0="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"CLT4vPdLPUWHpeLhJpI2HUbZAsw=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"L5fvnRK5/b+vX9lGoy5ICtjz4s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"7eT7IENvDpmwykKCqlYWaqXjNKw="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"L5fvnRK5/b+vX9lGoy5ICtjz4s0=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"7eT7IENvDpmwykKCqlYWaqXjNKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"go0FY7ETTcSp505Zu7xcu+4fvJc="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"7eT7IENvDpmwykKCqlYWaqXjNKw=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"go0FY7ETTcSp505Zu7xcu+4fvJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"F2BHGjWqiC8SyBsiwjw2xKSdXHw="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"go0FY7ETTcSp505Zu7xcu+4fvJc=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"F2BHGjWqiC8SyBsiwjw2xKSdXHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"Xw2wApUKgZa/UR9gDfuXA3/wMws="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"F2BHGjWqiC8SyBsiwjw2xKSdXHw=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"Xw2wApUKgZa/UR9gDfuXA3/wMws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"HVO64TK1vNc6OaDuA0lE5IhBQvk="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"Xw2wApUKgZa/UR9gDfuXA3/wMws=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"HVO64TK1vNc6OaDuA0lE5IhBQvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"Oj56q35u63CRNiuf61B0/pfz/c4="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"HVO64TK1vNc6OaDuA0lE5IhBQvk=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"Oj56q35u63CRNiuf61B0/pfz/c4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="},{"type":"next-occurrence","id":"2kJlgcsXRac0gq4KC1ehb5t3o34="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"Oj56q35u63CRNiuf61B0/pfz/c4=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"2kJlgcsXRac0gq4KC1ehb5t3o34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gskRb/dTSoVwY1euUZq31lldxIA="}],"description":"Line striping on CT-21 northbound between CT-12 (Killingly) and CT-193 (Thompson) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:17:27Z"},"road_event_id":"2kJlgcsXRac0gq4KC1ehb5t3o34=","beginning_cross_street":"CT-12","ending_cross_street":"CT-193","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.874994,41.876875]]}},{"id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9e6RQ+NFdPZQI4SMRsqMLSePQcI="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"9e6RQ+NFdPZQI4SMRsqMLSePQcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"geafno3bGLpqtaYtJh8eo4rAyEQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"9e6RQ+NFdPZQI4SMRsqMLSePQcI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"geafno3bGLpqtaYtJh8eo4rAyEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"IqZaEDSGS0noW2bGbRQzFGEwv1M="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"geafno3bGLpqtaYtJh8eo4rAyEQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"IqZaEDSGS0noW2bGbRQzFGEwv1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"jDr0szSNqO2guZVNXai2m57FqRQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"IqZaEDSGS0noW2bGbRQzFGEwv1M=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"jDr0szSNqO2guZVNXai2m57FqRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"aOr+wSBGZ1rEY19e4ipmbPkbrrQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"jDr0szSNqO2guZVNXai2m57FqRQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"aOr+wSBGZ1rEY19e4ipmbPkbrrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"HQlrZiBsfbEUUQJDr+y5y5tz2OY="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"aOr+wSBGZ1rEY19e4ipmbPkbrrQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"HQlrZiBsfbEUUQJDr+y5y5tz2OY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"ORyV7p8szu2t7MTfnHCjs8wuI1I="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"HQlrZiBsfbEUUQJDr+y5y5tz2OY=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"ORyV7p8szu2t7MTfnHCjs8wuI1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"pza5uCsOPHu3peUmNTsaZnwMsXo="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"ORyV7p8szu2t7MTfnHCjs8wuI1I=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"pza5uCsOPHu3peUmNTsaZnwMsXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"sV2uS/5KDizRdGrxhQ9upXV2WHI="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"pza5uCsOPHu3peUmNTsaZnwMsXo=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"sV2uS/5KDizRdGrxhQ9upXV2WHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="},{"type":"next-occurrence","id":"rHPweAft1+HtxjbaLTUi8bMako0="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"sV2uS/5KDizRdGrxhQ9upXV2WHI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"rHPweAft1+HtxjbaLTUi8bMako0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VAkR4PICW4sMN/Vw/wsDnHSkrAI="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 79TH ST (New York) and Beach Channel Dr at Beach 69th St (Queens) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:16:50Z"},"road_event_id":"rHPweAft1+HtxjbaLTUi8bMako0=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"Beach 69th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805265,40.590489]]}},{"id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BxAvAE2u22OsVsgqBkxXofp4oxQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"BxAvAE2u22OsVsgqBkxXofp4oxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"Kfweqbba0q8FvzLFktEA1wnv/1w="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"BxAvAE2u22OsVsgqBkxXofp4oxQ=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"Kfweqbba0q8FvzLFktEA1wnv/1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"tmDAg0hqy3ttTk1LS64Xv/zsJfI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"Kfweqbba0q8FvzLFktEA1wnv/1w=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"tmDAg0hqy3ttTk1LS64Xv/zsJfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"n68eXEUu6PfLhDdmWL+zFPguWTM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"tmDAg0hqy3ttTk1LS64Xv/zsJfI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"n68eXEUu6PfLhDdmWL+zFPguWTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"5gxpSeuuNlbZHZVdeKstKwVq38c="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"n68eXEUu6PfLhDdmWL+zFPguWTM=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"5gxpSeuuNlbZHZVdeKstKwVq38c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"Oug2rr9dOe26xugcPUhUGkFOw/U="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"5gxpSeuuNlbZHZVdeKstKwVq38c=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"Oug2rr9dOe26xugcPUhUGkFOw/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"50h8kyscIspCTuZs3e4yu0dxpaM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"Oug2rr9dOe26xugcPUhUGkFOw/U=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"50h8kyscIspCTuZs3e4yu0dxpaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"L74fC1go79MdvUCnyzeUfMRTNVI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"50h8kyscIspCTuZs3e4yu0dxpaM=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"L74fC1go79MdvUCnyzeUfMRTNVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"U4NCpF2YyrSG40IclVkWW184Fto="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"L74fC1go79MdvUCnyzeUfMRTNVI=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"U4NCpF2YyrSG40IclVkWW184Fto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="},{"type":"next-occurrence","id":"tbXeqQoU8lQe3/aLKxEGbACJD2Q="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"U4NCpF2YyrSG40IclVkWW184Fto=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"tbXeqQoU8lQe3/aLKxEGbACJD2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FKQDOf3vQ6OQWrfmqyQg1s9TALU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:18:56Z"},"road_event_id":"tbXeqQoU8lQe3/aLKxEGbACJD2Q=","beginning_cross_street":"BEACH 79TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805425,40.590533]]}},{"id":"luUdIkqdGtQ/EOGq9IivO0yrBN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"os2S+FLQBGpKnTrmjOedzowNCKg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"luUdIkqdGtQ/EOGq9IivO0yrBN4=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"os2S+FLQBGpKnTrmjOedzowNCKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"MQm8Fo/Y4PduWrsBLZ4TVjchOqo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"os2S+FLQBGpKnTrmjOedzowNCKg=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"MQm8Fo/Y4PduWrsBLZ4TVjchOqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"cj+mT6IgP0xO3YRlLsVfsMfU6fQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"MQm8Fo/Y4PduWrsBLZ4TVjchOqo=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"cj+mT6IgP0xO3YRlLsVfsMfU6fQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"SUf3FkVYzAQQzF/GDt/zZh8RTqo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"cj+mT6IgP0xO3YRlLsVfsMfU6fQ=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"SUf3FkVYzAQQzF/GDt/zZh8RTqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"5QEaCrEfK2SbwAeqzWJ4fT7Td7s="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"SUf3FkVYzAQQzF/GDt/zZh8RTqo=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"5QEaCrEfK2SbwAeqzWJ4fT7Td7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"LQ22PRVmsMtbIqTNlvbWL4SPn5I="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"5QEaCrEfK2SbwAeqzWJ4fT7Td7s=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"LQ22PRVmsMtbIqTNlvbWL4SPn5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"uWRWcTgu62FxO2fANtTgYG1gTCo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"LQ22PRVmsMtbIqTNlvbWL4SPn5I=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"uWRWcTgu62FxO2fANtTgYG1gTCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"45izTITazKivOqYYIwgVRFvg1ec="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"uWRWcTgu62FxO2fANtTgYG1gTCo=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"45izTITazKivOqYYIwgVRFvg1ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"DJN6DMyiiV6VePP2ABRjc/PzZxI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"45izTITazKivOqYYIwgVRFvg1ec=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"DJN6DMyiiV6VePP2ABRjc/PzZxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="},{"type":"next-occurrence","id":"ecyz/D1I0/Al4dckHRrJKbaMuG8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"DJN6DMyiiV6VePP2ABRjc/PzZxI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"ecyz/D1I0/Al4dckHRrJKbaMuG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"luUdIkqdGtQ/EOGq9IivO0yrBN4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:20:49Z"},"road_event_id":"ecyz/D1I0/Al4dckHRrJKbaMuG8=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806686,40.590821]]}},{"id":"30Z/QprAdD9rZq3ak4MRBVXRVYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dQkhRSLCkVKWjk8rsGZea3P9ifg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"30Z/QprAdD9rZq3ak4MRBVXRVYk=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"dQkhRSLCkVKWjk8rsGZea3P9ifg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"SA/aTBriC/VcCzfDCGYiatgSNlI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"dQkhRSLCkVKWjk8rsGZea3P9ifg=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"SA/aTBriC/VcCzfDCGYiatgSNlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"jm6z434Mw0asT0yY4epIx1stNiM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"SA/aTBriC/VcCzfDCGYiatgSNlI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"jm6z434Mw0asT0yY4epIx1stNiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"G0tb3ailrehhqqkYr206ZFjWvow="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"jm6z434Mw0asT0yY4epIx1stNiM=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"G0tb3ailrehhqqkYr206ZFjWvow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"rS8FLVkQwKXigcsstBpbpiT3CCI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"G0tb3ailrehhqqkYr206ZFjWvow=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"rS8FLVkQwKXigcsstBpbpiT3CCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"qkZfRnssC1GWUSsQtySSCU05tmI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"rS8FLVkQwKXigcsstBpbpiT3CCI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"qkZfRnssC1GWUSsQtySSCU05tmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"avz/CwWAl9qGXMdBD0ERgeIr71s="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"qkZfRnssC1GWUSsQtySSCU05tmI=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"avz/CwWAl9qGXMdBD0ERgeIr71s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"GqGkmQV3nRwXY5VPhOZUnc0Tkp0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"avz/CwWAl9qGXMdBD0ERgeIr71s=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"GqGkmQV3nRwXY5VPhOZUnc0Tkp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"OchylwEj5ZPAHZgOwYPIHYEjkr0="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"GqGkmQV3nRwXY5VPhOZUnc0Tkp0=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"OchylwEj5ZPAHZgOwYPIHYEjkr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="},{"type":"next-occurrence","id":"frYpf5KLiVltOUViuegr83vEBrg="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"OchylwEj5ZPAHZgOwYPIHYEjkr0=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"frYpf5KLiVltOUViuegr83vEBrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"30Z/QprAdD9rZq3ak4MRBVXRVYk="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 80TH ST (New York) and BEACH 79TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:22:39Z"},"road_event_id":"frYpf5KLiVltOUViuegr83vEBrg=","beginning_cross_street":"BEACH 80TH ST","ending_cross_street":"BEACH 79TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.806589,40.590802]]}},{"id":"ut1nmesl4bgGoYRqcegopvKwoeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J33GNH4M5YpXAA/IJ4ztgJ32BoY="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"ut1nmesl4bgGoYRqcegopvKwoeE=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"J33GNH4M5YpXAA/IJ4ztgJ32BoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"9HK++L/YccFQJzycI5xSB+hCGfw="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"J33GNH4M5YpXAA/IJ4ztgJ32BoY=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"9HK++L/YccFQJzycI5xSB+hCGfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"GpLFvUeAhmthlbxpEF6Lu9laAuc="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"9HK++L/YccFQJzycI5xSB+hCGfw=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"GpLFvUeAhmthlbxpEF6Lu9laAuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"IL5a7aqdSAO1FPxcgiCf+M3bgDQ="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"GpLFvUeAhmthlbxpEF6Lu9laAuc=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"IL5a7aqdSAO1FPxcgiCf+M3bgDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"8F9YWUwvIiwQtRV1Bb/UF2GjPcA="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"IL5a7aqdSAO1FPxcgiCf+M3bgDQ=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"8F9YWUwvIiwQtRV1Bb/UF2GjPcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"T/st9weih9K4ZJPadeKedizZayk="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"8F9YWUwvIiwQtRV1Bb/UF2GjPcA=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"T/st9weih9K4ZJPadeKedizZayk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"LYSc35GsymWVUlhiTiT7VDUtRHc="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"T/st9weih9K4ZJPadeKedizZayk=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"LYSc35GsymWVUlhiTiT7VDUtRHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"fPLGI/KPqJj36L+zd3BYFFjzfDw="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"LYSc35GsymWVUlhiTiT7VDUtRHc=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"fPLGI/KPqJj36L+zd3BYFFjzfDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"R3+2VeJmdbdgiCtWluRhpR++kZg="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"fPLGI/KPqJj36L+zd3BYFFjzfDw=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"R3+2VeJmdbdgiCtWluRhpR++kZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="},{"type":"next-occurrence","id":"ezPPPgJK+gr5vJRLqW9D1mmxJAk="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"R3+2VeJmdbdgiCtWluRhpR++kZg=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"ezPPPgJK+gr5vJRLqW9D1mmxJAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ut1nmesl4bgGoYRqcegopvKwoeE="}],"description":"Construction on ROCKAWAY FWY both directions between BEACH 84TH ST (New York) and BEACH 80TH ST (New York) for concrete restoration on the track of the Rockaway viaduct line., Tuesday March 31st, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-31T19:24:42Z"},"road_event_id":"ezPPPgJK+gr5vJRLqW9D1mmxJAk=","beginning_cross_street":"BEACH 84TH ST","ending_cross_street":"BEACH 80TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810039,40.590483]]}},{"id":"cJw1+WrOKqyEJC9+jghTwkpzNys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IaijmOWjwqVPi55wGwtZQmNH/GQ="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"cJw1+WrOKqyEJC9+jghTwkpzNys=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"IaijmOWjwqVPi55wGwtZQmNH/GQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"SkCA7citjopTAt3O3c0F2iDAqw0="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"IaijmOWjwqVPi55wGwtZQmNH/GQ=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"SkCA7citjopTAt3O3c0F2iDAqw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"GvyGihizYBAVgnjf/EKKO6V2xs8="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"SkCA7citjopTAt3O3c0F2iDAqw0=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"GvyGihizYBAVgnjf/EKKO6V2xs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"hez6zplVCxhcI9kuLSk/z5BAXds="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"GvyGihizYBAVgnjf/EKKO6V2xs8=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"hez6zplVCxhcI9kuLSk/z5BAXds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"MVjNb5D0dLqze3yHILEZC8AZf6I="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"hez6zplVCxhcI9kuLSk/z5BAXds=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"MVjNb5D0dLqze3yHILEZC8AZf6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"P3TVplfkjICCkorapHRYqNfxieE="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"MVjNb5D0dLqze3yHILEZC8AZf6I=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"P3TVplfkjICCkorapHRYqNfxieE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"SrQPuYYnc0Vu3aaDRzpKHbOgkfA="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"P3TVplfkjICCkorapHRYqNfxieE=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"SrQPuYYnc0Vu3aaDRzpKHbOgkfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"oCERzffLJanJv+DXn6DIJf7YeOE="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"SrQPuYYnc0Vu3aaDRzpKHbOgkfA=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"oCERzffLJanJv+DXn6DIJf7YeOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"+6JL6+5r7BIHyf6SeY2YZIyDrAE="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"oCERzffLJanJv+DXn6DIJf7YeOE=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"+6JL6+5r7BIHyf6SeY2YZIyDrAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"nBWkuRwf6Tfh6IEqqEbLEoWsKsg="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"+6JL6+5r7BIHyf6SeY2YZIyDrAE=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"nBWkuRwf6Tfh6IEqqEbLEoWsKsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"YLJ7mUyeq2qu+YCeYAvCcgvxLFI="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"nBWkuRwf6Tfh6IEqqEbLEoWsKsg=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"YLJ7mUyeq2qu+YCeYAvCcgvxLFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="},{"type":"next-occurrence","id":"oT/NbaH8O+w9XYqtg9qR3KfRa78="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"YLJ7mUyeq2qu+YCeYAvCcgvxLFI=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"oT/NbaH8O+w9XYqtg9qR3KfRa78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cJw1+WrOKqyEJC9+jghTwkpzNys="}],"description":"Line striping on CT-21 southbound between CT-193 (Thompson) and CT-12 (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 PM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:29:14Z"},"road_event_id":"oT/NbaH8O+w9XYqtg9qR3KfRa78=","beginning_cross_street":"CT-193","ending_cross_street":"CT-12","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.865955,41.953488]]}},{"id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Uge2UR0w37SN6IkySJZy8GM0zKs="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"Uge2UR0w37SN6IkySJZy8GM0zKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"0A9z5orNEDiLOEKGLlN7vMJSRk4="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"Uge2UR0w37SN6IkySJZy8GM0zKs=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"0A9z5orNEDiLOEKGLlN7vMJSRk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"L/8RMN0z66qXM4y1eyTMS0y1caI="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"0A9z5orNEDiLOEKGLlN7vMJSRk4=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"L/8RMN0z66qXM4y1eyTMS0y1caI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"Pb2ow8H+UIr2yC8O0+6ETWXWOjY="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"L/8RMN0z66qXM4y1eyTMS0y1caI=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"Pb2ow8H+UIr2yC8O0+6ETWXWOjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"w2UBqWnob0ldxKeAUJklSg91sfI="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"Pb2ow8H+UIr2yC8O0+6ETWXWOjY=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"w2UBqWnob0ldxKeAUJklSg91sfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"3T3PUPakCAC7WfI59LPz/WZtJaQ="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"w2UBqWnob0ldxKeAUJklSg91sfI=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"3T3PUPakCAC7WfI59LPz/WZtJaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"de56om6dxEt42r28gvC7rkqwOQk="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"3T3PUPakCAC7WfI59LPz/WZtJaQ=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"de56om6dxEt42r28gvC7rkqwOQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"vkgtsD8kRwZ4R1g7vKWmpmW2uGo="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"de56om6dxEt42r28gvC7rkqwOQk=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"vkgtsD8kRwZ4R1g7vKWmpmW2uGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"xbFhKMVxW7mlfpg7E97Py47AfX8="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"vkgtsD8kRwZ4R1g7vKWmpmW2uGo=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"xbFhKMVxW7mlfpg7E97Py47AfX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"JA7+xt0JpJnLlMsTPcrAhyiPn3U="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"xbFhKMVxW7mlfpg7E97Py47AfX8=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"JA7+xt0JpJnLlMsTPcrAhyiPn3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"Rz02jLMxhVjpaoYg0DjHl17z3eE="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"JA7+xt0JpJnLlMsTPcrAhyiPn3U=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"Rz02jLMxhVjpaoYg0DjHl17z3eE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="},{"type":"next-occurrence","id":"QSisMEuTl0mBz0DSrer6wpvIYVM="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"Rz02jLMxhVjpaoYg0DjHl17z3eE=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"QSisMEuTl0mBz0DSrer6wpvIYVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jkx5nAm9xrUBMnUv4yEd3rCZh5A="}],"description":"Line striping on CT-101 both directions between CT-101 (Pomfret) and PINE KNOLLS DR (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:42:04Z"},"road_event_id":"QSisMEuTl0mBz0DSrer6wpvIYVM=","beginning_cross_street":"CT-101 ","ending_cross_street":"PINE KNOLLS DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.959003,41.857828]]}},{"id":"uXGWhI2qNZAT38aEpXJefudj8T4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vfUoARfhXhiegeEvhwqAbKhvSiM="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"uXGWhI2qNZAT38aEpXJefudj8T4=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"vfUoARfhXhiegeEvhwqAbKhvSiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"Ea/sFrb1W4jJySxoJbCeTC+WG0w="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"vfUoARfhXhiegeEvhwqAbKhvSiM=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"Ea/sFrb1W4jJySxoJbCeTC+WG0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"y70yNErVmgROYH/I9EqVGnXGMiw="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"Ea/sFrb1W4jJySxoJbCeTC+WG0w=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"y70yNErVmgROYH/I9EqVGnXGMiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"flhlf6zao5GBQ+lSVHZgDB4gg1Q="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"y70yNErVmgROYH/I9EqVGnXGMiw=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"flhlf6zao5GBQ+lSVHZgDB4gg1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"8cDSKWs9+rNkjbqS+vtcK21Szv8="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"flhlf6zao5GBQ+lSVHZgDB4gg1Q=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"8cDSKWs9+rNkjbqS+vtcK21Szv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"nUZY8+RAtD2fUh+aIt/3zrbNYVg="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"8cDSKWs9+rNkjbqS+vtcK21Szv8=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"nUZY8+RAtD2fUh+aIt/3zrbNYVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"SIYGNN6sLoLOLy6RoIBn1Uxze5Y="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"nUZY8+RAtD2fUh+aIt/3zrbNYVg=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"SIYGNN6sLoLOLy6RoIBn1Uxze5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"NghxqB1p2j9zYuVtLUMH8+ocy0k="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"SIYGNN6sLoLOLy6RoIBn1Uxze5Y=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"NghxqB1p2j9zYuVtLUMH8+ocy0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"trDTaFMnoF58SKOZ304ozuWcTi0="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"NghxqB1p2j9zYuVtLUMH8+ocy0k=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"trDTaFMnoF58SKOZ304ozuWcTi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"RZvViuJV6QcIV5iG7ggiYzOKBbM="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"trDTaFMnoF58SKOZ304ozuWcTi0=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"RZvViuJV6QcIV5iG7ggiYzOKBbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"f+7xdX7kTSbHdE+680uiTfjyB2Y="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"RZvViuJV6QcIV5iG7ggiYzOKBbM=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"f+7xdX7kTSbHdE+680uiTfjyB2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="},{"type":"next-occurrence","id":"lLaVFjbL80EJJvZFJAx9LPLasGo="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"f+7xdX7kTSbHdE+680uiTfjyB2Y=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"lLaVFjbL80EJJvZFJAx9LPLasGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uXGWhI2qNZAT38aEpXJefudj8T4="}],"description":"Line striping on US-6 both directions between CT-12 (Killingly) and GOVERNOR JOHN DAVIS LODGE TPKE (Killingly) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:52:25Z"},"road_event_id":"lLaVFjbL80EJJvZFJAx9LPLasGo=","beginning_cross_street":"CT-12","ending_cross_street":"GOVERNOR JOHN DAVIS LODGE TPKE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.886773,41.801739]]}},{"id":"wXkxhV9B40toJSfkydDQioRRMBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lcC4H9e7wCfGO5kf+OQSUVBSE90="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"wXkxhV9B40toJSfkydDQioRRMBA=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"lcC4H9e7wCfGO5kf+OQSUVBSE90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"3njJklVz6g5IFNMcC5QHuUzb3o0="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"lcC4H9e7wCfGO5kf+OQSUVBSE90=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"3njJklVz6g5IFNMcC5QHuUzb3o0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"9xfiyNEx+xk9OkLj0ARsjeAXX9g="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"3njJklVz6g5IFNMcC5QHuUzb3o0=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"9xfiyNEx+xk9OkLj0ARsjeAXX9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"PzpoPMjL7/RlC7x6f3GLtM/UF7Q="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"9xfiyNEx+xk9OkLj0ARsjeAXX9g=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"PzpoPMjL7/RlC7x6f3GLtM/UF7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"42Mig+d80yCjnC1RqYSxmjb4K+E="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"PzpoPMjL7/RlC7x6f3GLtM/UF7Q=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"42Mig+d80yCjnC1RqYSxmjb4K+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"pNN0gokofJqNv0UB+6fW0rYMIfc="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"42Mig+d80yCjnC1RqYSxmjb4K+E=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"pNN0gokofJqNv0UB+6fW0rYMIfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"Fp+qPJTMrXHARuSCHdMHrLu7tik="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"pNN0gokofJqNv0UB+6fW0rYMIfc=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"Fp+qPJTMrXHARuSCHdMHrLu7tik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"iaCnHznf+aGhP2k4GTKSeHfP6cA="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"Fp+qPJTMrXHARuSCHdMHrLu7tik=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"iaCnHznf+aGhP2k4GTKSeHfP6cA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"3Al8FUsPFwkM2sUk+hifX+WjDCI="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"iaCnHznf+aGhP2k4GTKSeHfP6cA=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"3Al8FUsPFwkM2sUk+hifX+WjDCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"/MdYtorFCrVDdpIH/mx6LC+Kc2Y="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"3Al8FUsPFwkM2sUk+hifX+WjDCI=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"/MdYtorFCrVDdpIH/mx6LC+Kc2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"Nj2+JrAJiuHrC5opQyfElSmI0n4="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"/MdYtorFCrVDdpIH/mx6LC+Kc2Y=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"Nj2+JrAJiuHrC5opQyfElSmI0n4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="},{"type":"next-occurrence","id":"BPyr93GF+tA+BiGUVxfmB05+ibo="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"Nj2+JrAJiuHrC5opQyfElSmI0n4=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"BPyr93GF+tA+BiGUVxfmB05+ibo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wXkxhV9B40toJSfkydDQioRRMBA="}],"description":"Line striping on US-6 both directions between CT-66 (Columbia) and E OLD ROUTE 6 (Hampton) This moving operation will use the proper crash attenuator vehicles. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone as needed. , Sunday April 19th, 2026 thru Thursday May 21st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday May 26th, 2026 thru Wednesday May 27th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday May 27th, 2026 thru Thursday July 2nd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Monday July 6th, 2026 thru Tuesday July 7th, 2026, 08:00 PM thru 06:00 AM All lanes open, Tuesday July 7th, 2026 thru Thursday September 3rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open, Tuesday September 8th, 2026 thru Wednesday September 9th, 2026, 08:00 PM thru 06:00 AM All lanes open, Wednesday September 9th, 2026 thru Friday October 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-31T19:59:28Z"},"road_event_id":"BPyr93GF+tA+BiGUVxfmB05+ibo=","beginning_cross_street":"CT-66","ending_cross_street":"E OLD ROUTE 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.27729,41.720277]]}},{"id":"kGcb2ImCP++WFiKP0kGu9uQVu08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-84 HOV Lane eastbound Exit 60 - US 44/Middle Turnpike West (Manchester), Continuous Monday April 6th, 2026 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes closed","update_date":"2026-03-31T20:03:23Z"},"road_event_id":"kGcb2ImCP++WFiKP0kGu9uQVu08=","beginning_cross_street":"Exit 60 - US 44/Middle Turnpike West","ending_cross_street":"Exit 60 - US 44/Middle Turnpike West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.589968,41.773015]]}},{"id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"567qafoU3qDsc6yjggIBOpWxD9o="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"567qafoU3qDsc6yjggIBOpWxD9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"eMLD6o2D6RwSX4k44ceP0FjW/pY="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"567qafoU3qDsc6yjggIBOpWxD9o=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"eMLD6o2D6RwSX4k44ceP0FjW/pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"jn4J7sHmGg0Fqz0ykkTTkL9TEjE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"eMLD6o2D6RwSX4k44ceP0FjW/pY=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"jn4J7sHmGg0Fqz0ykkTTkL9TEjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"8It96ztmmfokxmEeOE+MHl6xAjI="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"jn4J7sHmGg0Fqz0ykkTTkL9TEjE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"8It96ztmmfokxmEeOE+MHl6xAjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"wCNqtUXkWVtRpphL9lMbPlC2PIo="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"8It96ztmmfokxmEeOE+MHl6xAjI=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"wCNqtUXkWVtRpphL9lMbPlC2PIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"7BuDKRDizr8qNliJ/9Zgbm6KuvQ="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"wCNqtUXkWVtRpphL9lMbPlC2PIo=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"7BuDKRDizr8qNliJ/9Zgbm6KuvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"7E0p674OgvJTh53Q/VkwwOy3KAE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"7BuDKRDizr8qNliJ/9Zgbm6KuvQ=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"7E0p674OgvJTh53Q/VkwwOy3KAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"Fwzl1TlrX5PIBg4tGKJvP6s7F/g="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"7E0p674OgvJTh53Q/VkwwOy3KAE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"Fwzl1TlrX5PIBg4tGKJvP6s7F/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"5W4a5mR5z3K1egrXgD6vlDjXo4A="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"Fwzl1TlrX5PIBg4tGKJvP6s7F/g=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"5W4a5mR5z3K1egrXgD6vlDjXo4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"8aJNO6WOmRrRGgizt/TS0qHdYJo="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"5W4a5mR5z3K1egrXgD6vlDjXo4A=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"8aJNO6WOmRrRGgizt/TS0qHdYJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"99SEtXY2o5CDA9R0ydE7DS2Chyk="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"8aJNO6WOmRrRGgizt/TS0qHdYJo=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"99SEtXY2o5CDA9R0ydE7DS2Chyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"w6XvrxHGNlBb/UVhNbqodeICxLc="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"99SEtXY2o5CDA9R0ydE7DS2Chyk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"w6XvrxHGNlBb/UVhNbqodeICxLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"tyQbLZihrFeRQaWGPjC8i612fiw="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"w6XvrxHGNlBb/UVhNbqodeICxLc=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"tyQbLZihrFeRQaWGPjC8i612fiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"8L96KxukRWexwEGcwhp+Qs2M/Ug="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"tyQbLZihrFeRQaWGPjC8i612fiw=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"8L96KxukRWexwEGcwhp+Qs2M/Ug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"vJjLwmvFt1w4HP8oix80WHapiTc="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"8L96KxukRWexwEGcwhp+Qs2M/Ug=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"vJjLwmvFt1w4HP8oix80WHapiTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"0fthWNoajLLmAUSlmYCLZrPCbXM="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"vJjLwmvFt1w4HP8oix80WHapiTc=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"0fthWNoajLLmAUSlmYCLZrPCbXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"2OBYYd7JXaH6qkeCj/z2C+DC38Q="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"0fthWNoajLLmAUSlmYCLZrPCbXM=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"2OBYYd7JXaH6qkeCj/z2C+DC38Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"ThUeU2ZVstHnNoxFu1cW2K0IwEU="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"2OBYYd7JXaH6qkeCj/z2C+DC38Q=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T22:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"ThUeU2ZVstHnNoxFu1cW2K0IwEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"oJjSt3JLVw9/zKW/AG1CAIh8k38="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"ThUeU2ZVstHnNoxFu1cW2K0IwEU=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"oJjSt3JLVw9/zKW/AG1CAIh8k38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"SAbMIYDUHoT45c3clJVnsgdJ1+I="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"oJjSt3JLVw9/zKW/AG1CAIh8k38=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"SAbMIYDUHoT45c3clJVnsgdJ1+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"UEOrX1EfEBYPsAwRiWq791pSxuE="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"SAbMIYDUHoT45c3clJVnsgdJ1+I=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"UEOrX1EfEBYPsAwRiWq791pSxuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"ayY4UluuGi2Brm735tpL//3rzeA="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"UEOrX1EfEBYPsAwRiWq791pSxuE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"ayY4UluuGi2Brm735tpL//3rzeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="},{"type":"next-occurrence","id":"4tACTIZPB82Gjtp4kJYF2lefvo4="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"ayY4UluuGi2Brm735tpL//3rzeA=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"4tACTIZPB82Gjtp4kJYF2lefvo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SMZLUY/DjFcB72lFhJmHnr9Cfl0="}],"description":"Bridge rehabilitation on I-384 eastbound between Exit 1 - West Center Street/Silver Line (Manchester) Lane closures can be expected , Monday April 6th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday April 6th, 2026 thru Monday November 30th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 06:00 PM thru 06:00 AM All lanes open, Saturday April 11th, 2026 thru Monday November 30th, 2026, 08:00 PM thru 08:00 AM All lanes open","update_date":"2026-03-31T20:07:04Z"},"road_event_id":"4tACTIZPB82Gjtp4kJYF2lefvo4=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 1 - West Center Street/Silver Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.583989,41.772645]]}},{"id":"pooSpcSYDc84+aRlOss52EiJSrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aHD+6BFOAIgShC3E3QuyKVv1B/4="}],"description":"Bridge work on CT 8 both directions between Exit 11 - Huntington Road (NB) (Trumbull) and Exit 12 - Old Stratford Road (Shelton) There will be various lane closures , Monday April 6th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-31T20:09:39Z"},"road_event_id":"pooSpcSYDc84+aRlOss52EiJSrQ=","beginning_cross_street":"Exit 11 - Huntington Road (NB)","ending_cross_street":"Exit 12 - Old Stratford Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.147355,41.253112]]}},{"id":"aHD+6BFOAIgShC3E3QuyKVv1B/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pooSpcSYDc84+aRlOss52EiJSrQ="},{"type":"next-occurrence","id":"qtYqxCKalmfAg6jIc9MejuQ1ouE="}],"description":"Bridge work on CT 8 both directions between Exit 11 - Huntington Road (NB) (Trumbull) and Exit 12 - Old Stratford Road (Shelton) There will be various lane closures , Monday April 6th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-31T20:09:39Z"},"road_event_id":"aHD+6BFOAIgShC3E3QuyKVv1B/4=","beginning_cross_street":"Exit 11 - Huntington Road (NB)","ending_cross_street":"Exit 12 - Old Stratford Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.147355,41.253112]]}},{"id":"qtYqxCKalmfAg6jIc9MejuQ1ouE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pooSpcSYDc84+aRlOss52EiJSrQ="}],"description":"Bridge work on CT 8 both directions between Exit 11 - Huntington Road (NB) (Trumbull) and Exit 12 - Old Stratford Road (Shelton) There will be various lane closures , Monday April 6th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-31T20:09:39Z"},"road_event_id":"qtYqxCKalmfAg6jIc9MejuQ1ouE=","beginning_cross_street":"Exit 11 - Huntington Road (NB)","ending_cross_street":"Exit 12 - Old Stratford Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.147355,41.253112]]}},{"id":"twstJkEiFMeCo3jAzmb0Gn/MfKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yGTMUxmltFuOHfz3C6n3lPwzQ8Y="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"twstJkEiFMeCo3jAzmb0Gn/MfKc=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"yGTMUxmltFuOHfz3C6n3lPwzQ8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"HnMyasFitLHOvR8vu06Xm+XyhdQ="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"yGTMUxmltFuOHfz3C6n3lPwzQ8Y=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"HnMyasFitLHOvR8vu06Xm+XyhdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"FD/SyOWUzgPpuX3nH245saT7IBY="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"HnMyasFitLHOvR8vu06Xm+XyhdQ=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"FD/SyOWUzgPpuX3nH245saT7IBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"qtMMX1pJMYmHL1D/SJDCDnjf/Rw="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"FD/SyOWUzgPpuX3nH245saT7IBY=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"qtMMX1pJMYmHL1D/SJDCDnjf/Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"tyLF30weCDkW2MZpi+MrLA/aASo="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"qtMMX1pJMYmHL1D/SJDCDnjf/Rw=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"tyLF30weCDkW2MZpi+MrLA/aASo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"LZTwsba+Xj4dC3i0D36hwRAqnUY="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"tyLF30weCDkW2MZpi+MrLA/aASo=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"LZTwsba+Xj4dC3i0D36hwRAqnUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"n1+dDEVPRY3IAJ0g9SjsxtcsPEo="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"LZTwsba+Xj4dC3i0D36hwRAqnUY=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"n1+dDEVPRY3IAJ0g9SjsxtcsPEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"cNFEHjdCpJSyZMAfaqleQdfV5qk="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"n1+dDEVPRY3IAJ0g9SjsxtcsPEo=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"cNFEHjdCpJSyZMAfaqleQdfV5qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"f9tMwZRT8TCvy8wWlrusQSMNWQ4="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"cNFEHjdCpJSyZMAfaqleQdfV5qk=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"f9tMwZRT8TCvy8wWlrusQSMNWQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"cH9hQcHQEZEa/0rEekGF/69GGEY="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"f9tMwZRT8TCvy8wWlrusQSMNWQ4=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"cH9hQcHQEZEa/0rEekGF/69GGEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"5C6hozJ46PyiJW7WumKd3GVmAJw="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"cH9hQcHQEZEa/0rEekGF/69GGEY=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"5C6hozJ46PyiJW7WumKd3GVmAJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"nrqcJsBZWCRN2s6liRSlACcgWj4="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"5C6hozJ46PyiJW7WumKd3GVmAJw=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"nrqcJsBZWCRN2s6liRSlACcgWj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"uH+/FiDNUdPchvHEFkzsrF7GNsw="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"nrqcJsBZWCRN2s6liRSlACcgWj4=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"uH+/FiDNUdPchvHEFkzsrF7GNsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="},{"type":"next-occurrence","id":"jtDtpv57n7qOFnEm+kAqGeUpY+w="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"uH+/FiDNUdPchvHEFkzsrF7GNsw=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"jtDtpv57n7qOFnEm+kAqGeUpY+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"twstJkEiFMeCo3jAzmb0Gn/MfKc="}],"description":"Construction on I-84 both directions between Exit 8 - US 6/Newtown Road (Bethel) and Exit 13 - River Road (Eastbound Only) (Southbury) There will be intermittent nightly lane closures, Monday April 6th, 2026 thru Sunday October 31st, 2027, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-03-31T20:13:18Z"},"road_event_id":"jtDtpv57n7qOFnEm+kAqGeUpY+w=","beginning_cross_street":"Exit 8 - US 6/Newtown Road","ending_cross_street":"Exit 13 - River Road (Eastbound Only)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.405011,41.415917]]}},{"id":"3fR1Or3PZS6nbkbJc3/rqhMiN58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fAExaY4eqxxOuM+PPl/slLEkYjI="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"3fR1Or3PZS6nbkbJc3/rqhMiN58=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"fAExaY4eqxxOuM+PPl/slLEkYjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"xyjnuaYdQAp91M165nhO2wCStw8="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"fAExaY4eqxxOuM+PPl/slLEkYjI=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"xyjnuaYdQAp91M165nhO2wCStw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"fYEPBt4hcIzx0WYRMCnAbnjywsI="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"xyjnuaYdQAp91M165nhO2wCStw8=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"fYEPBt4hcIzx0WYRMCnAbnjywsI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"r7wc/ECSxAyUoQp9ElI20gssrVU="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"fYEPBt4hcIzx0WYRMCnAbnjywsI=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"r7wc/ECSxAyUoQp9ElI20gssrVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"JdePdUxTapfx5VmR8NHFo8iOJ4Y="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"r7wc/ECSxAyUoQp9ElI20gssrVU=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"JdePdUxTapfx5VmR8NHFo8iOJ4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"SOAwZfwpOTdc+Z8o9C3I1Hfoi2g="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"JdePdUxTapfx5VmR8NHFo8iOJ4Y=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"SOAwZfwpOTdc+Z8o9C3I1Hfoi2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"WtZYd8dw5bsMFS8sDIt+C/BHruw="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"SOAwZfwpOTdc+Z8o9C3I1Hfoi2g=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"WtZYd8dw5bsMFS8sDIt+C/BHruw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"zhFrMk5xNnSmuoC3w+STUzXhvI0="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"WtZYd8dw5bsMFS8sDIt+C/BHruw=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"zhFrMk5xNnSmuoC3w+STUzXhvI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"vNClz2W+tSlN1UKsX1MJZLFphus="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"zhFrMk5xNnSmuoC3w+STUzXhvI0=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"vNClz2W+tSlN1UKsX1MJZLFphus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="},{"type":"next-occurrence","id":"QQK6CZPAjS4YliRNh8NsNzt2oQA="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"vNClz2W+tSlN1UKsX1MJZLFphus=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"QQK6CZPAjS4YliRNh8NsNzt2oQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3fR1Or3PZS6nbkbJc3/rqhMiN58="}],"description":"Noise wall construction on I-95 northbound between Exit 32 - CT 113 (Stratford) and Exit 33 - CT 110/US 1 (Stratford) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Sunday April 4th, 2027, Monday thru Friday, 09:00 AM thru 03:30 PM All lanes open","update_date":"2026-03-31T20:16:39Z"},"road_event_id":"QQK6CZPAjS4YliRNh8NsNzt2oQA=","beginning_cross_street":"Exit 32 - CT 113","ending_cross_street":"Exit 33 - CT 110/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.13216,41.192861]]}},{"id":"7shzN/Fx5J2T6YC4jXjDa5zsKgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAHAM VILLAGE RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on GRAHAM VILLAGE RD both directions between NORTHSIDE DR (Torrington) and TERRACE DR (Torrington) Motorist can expect a lane closure with switching traffic from two lanes to one lane alternating traffic, Continuous Wednesday April 8th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM All lanes open","update_date":"2026-03-31T20:19:26Z"},"road_event_id":"7shzN/Fx5J2T6YC4jXjDa5zsKgQ=","beginning_cross_street":"NORTHSIDE DR","ending_cross_street":"TERRACE DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.112597,41.821571]]}},{"id":"Uzf71buAfrcmAtOPchTvbreWSbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 90"],"direction":"unknown","related_road_events":[],"description":"Emergency repairs on NY 90 both directions between Gully Rd (Ledyard) and Levanna Rd (Ledyard) ; Alternating one-way traffic with temporary signals, Continuous Tuesday March 31st, 2026 04:30 PM thru Thursday April 30th, 2026 03:30 PM All lanes open northbound; All lanes closed southbound","update_date":"2026-03-31T22:15:39Z"},"road_event_id":"Uzf71buAfrcmAtOPchTvbreWSbc=","beginning_cross_street":"Gully Rd","ending_cross_street":"Levanna Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.710301,42.772245]]}},{"id":"W44YoPU3PxFTkbBcn8QOnyqg+zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4bh86ZBol7A9HGkK8qMohM05OlU="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"W44YoPU3PxFTkbBcn8QOnyqg+zw=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"4bh86ZBol7A9HGkK8qMohM05OlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"cSHIF9t+i2ch+7hFN8v3Ac7s55g="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"4bh86ZBol7A9HGkK8qMohM05OlU=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"cSHIF9t+i2ch+7hFN8v3Ac7s55g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"LiP7Wye+yh319Cnx/QoZVnGeTZQ="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"cSHIF9t+i2ch+7hFN8v3Ac7s55g=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"LiP7Wye+yh319Cnx/QoZVnGeTZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"qsKix0mGMSd9T0npcBYQ4rBWHqI="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"LiP7Wye+yh319Cnx/QoZVnGeTZQ=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"qsKix0mGMSd9T0npcBYQ4rBWHqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"Mr/lw6xvz3mCDB9YMcs7U6Kmz8o="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"qsKix0mGMSd9T0npcBYQ4rBWHqI=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"Mr/lw6xvz3mCDB9YMcs7U6Kmz8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"M/EiSrpe3RYfepaH+e+jzwBGJN0="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"Mr/lw6xvz3mCDB9YMcs7U6Kmz8o=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"M/EiSrpe3RYfepaH+e+jzwBGJN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"Roo2Uo9w1G2VX3KMbhsGno4HvHY="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"M/EiSrpe3RYfepaH+e+jzwBGJN0=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"Roo2Uo9w1G2VX3KMbhsGno4HvHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"lToMiilPSFPRwBVkJ7TpIJsixXA="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"Roo2Uo9w1G2VX3KMbhsGno4HvHY=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"lToMiilPSFPRwBVkJ7TpIJsixXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"ckm73tzd926lg2ehrxn3okDBVJ4="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"lToMiilPSFPRwBVkJ7TpIJsixXA=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"ckm73tzd926lg2ehrxn3okDBVJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"KHh4QjYSd9v3OluuAwzOLLNX48A="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"ckm73tzd926lg2ehrxn3okDBVJ4=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"KHh4QjYSd9v3OluuAwzOLLNX48A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"lmkOlHJU1YW99FfplRGkTEaRDL0="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"KHh4QjYSd9v3OluuAwzOLLNX48A=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"lmkOlHJU1YW99FfplRGkTEaRDL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="},{"type":"next-occurrence","id":"fPpdWBAwdR/n8BIuvHeaWMH+f2o="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"lmkOlHJU1YW99FfplRGkTEaRDL0=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"fPpdWBAwdR/n8BIuvHeaWMH+f2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W44YoPU3PxFTkbBcn8QOnyqg+zw="}],"description":"Utility work on NY 100 both directions between Sand Street (New Castle) and Crow Hill Road (New Castle) 2025083286978/32720309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday April 25th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 2nd, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 9th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 16th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 04:00 PM, alternating traffic, Wednesday May 27th, 2026 thru Friday May 29th, 2026 Wednesday/ Thursday/ Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday May 30th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 1st, 2026 thru Friday June 5th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 6th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 8th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 13th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 15th, 2026 thru Friday June 19th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic, Saturday June 20th, 2026, 09:00 AM thru 02:00 PM, alternating traffic, Monday June 22nd, 2026 thru Friday June 26th, 2026, Monday thru Friday, 09:00 AM thru 04:00 P","update_date":"2026-04-18T18:00:54Z"},"road_event_id":"fPpdWBAwdR/n8BIuvHeaWMH+f2o=","beginning_cross_street":"Sand Street","ending_cross_street":"Crow Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79441,41.195739]]}},{"id":"bYFHnJEVyzNOQs8+24ULs9ohVhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 481 northbound between Exit 2 (Old Exit 11) - Maple Road; Caughdenoy Road (Clay) and Henry Clay Boulevard; CR 121 (Clay), Continuous Wednesday April 1st, 2026 07:00 AM thru Friday April 24th, 2026 03:30 PM right shoulder closed","update_date":"2026-04-01T13:22:26Z"},"road_event_id":"bYFHnJEVyzNOQs8+24ULs9ohVhE=","beginning_cross_street":"Exit 2 (Old Exit 11) - Maple Road; Caughdenoy Road","ending_cross_street":"Henry Clay Boulevard; CR 121","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.157357,43.158518]]}},{"id":"SgeV8qMB53gU3rOSyf2rSRMDcuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 481 southbound between Henry Clay Boulevard; CR 121 (Clay) and Exit 1C (Old Exit 10) Southbound - US 11 (Cicero), Continuous Wednesday April 1st, 2026 07:00 AM thru Friday April 24th, 2026 03:30 PM right shoulder closed","update_date":"2026-04-01T13:27:04Z"},"road_event_id":"SgeV8qMB53gU3rOSyf2rSRMDcuo=","beginning_cross_street":"Henry Clay Boulevard; CR 121","ending_cross_street":"Exit 1C (Old Exit 10) Southbound - US 11   ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.197717,43.17125]]}},{"id":"WmbQMN9PeH6vrXAvQviWy7Q0XlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MC+EsXrizyF1mOGFfeBWscx2Gno="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without noticed., Monday April 6th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:47:47Z"},"road_event_id":"WmbQMN9PeH6vrXAvQviWy7Q0XlA=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789191,40.668266]]}},{"id":"MC+EsXrizyF1mOGFfeBWscx2Gno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WmbQMN9PeH6vrXAvQviWy7Q0XlA="},{"type":"next-occurrence","id":"rt53GSvcnxxDZURnx789MK0Bowc="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without noticed., Monday April 6th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:47:47Z"},"road_event_id":"MC+EsXrizyF1mOGFfeBWscx2Gno=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789191,40.668266]]}},{"id":"rt53GSvcnxxDZURnx789MK0Bowc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["150TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WmbQMN9PeH6vrXAvQviWy7Q0XlA="}],"description":"Construction on 150TH ST southbound from 133RD AVE (New York) to 148TH ST at 150TH AVE (New York) Subject to change without noticed., Monday April 6th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:47:47Z"},"road_event_id":"rt53GSvcnxxDZURnx789MK0Bowc=","beginning_cross_street":"133RD AVE","ending_cross_street":"150TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789191,40.668266]]}},{"id":"scS0XCb5/0V2NseQuO23mQYd8TY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Bridge work on I-95 southbound between Exit 85 - CT 184/US 1N (Groton) and Exit 84 - CT 32 (New London), Continuous Monday April 6th, 2026 08:00 PM thru Thursday October 31st, 2030 06:00 AM 2 Left lanes of 6 lanes closed","update_date":"2026-04-01T17:31:56Z"},"road_event_id":"scS0XCb5/0V2NseQuO23mQYd8TY=","beginning_cross_street":"Exit 85 - CT 184/US 1N","ending_cross_street":"Exit 84 - CT 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.080515,41.364692]]}},{"id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JMz6rVewpe4Ht78RPUsx0NV5cbU="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"JMz6rVewpe4Ht78RPUsx0NV5cbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"2pEIbfb0rQW5QicvgwuHeqUngIU="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"JMz6rVewpe4Ht78RPUsx0NV5cbU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"2pEIbfb0rQW5QicvgwuHeqUngIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"zcyK7d9Up3I7jNMCxkkS/vMo5gk="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"2pEIbfb0rQW5QicvgwuHeqUngIU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"zcyK7d9Up3I7jNMCxkkS/vMo5gk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"hSfRwbGdIii0syeOdBPkgvP1beE="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"zcyK7d9Up3I7jNMCxkkS/vMo5gk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"hSfRwbGdIii0syeOdBPkgvP1beE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"9N/t57la5q0aiQMpfCmDH+mNXfE="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"hSfRwbGdIii0syeOdBPkgvP1beE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"9N/t57la5q0aiQMpfCmDH+mNXfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"eVh/oC15QDF1eh6cipN0OCO4A+Q="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"9N/t57la5q0aiQMpfCmDH+mNXfE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"eVh/oC15QDF1eh6cipN0OCO4A+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"Tor4+S+Ks3t4QIi1yh6QuynVrNg="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"eVh/oC15QDF1eh6cipN0OCO4A+Q=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"Tor4+S+Ks3t4QIi1yh6QuynVrNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"rt/ToQ1sl6Fl/sI+v3YGHD7X92Q="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"Tor4+S+Ks3t4QIi1yh6QuynVrNg=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T14:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"rt/ToQ1sl6Fl/sI+v3YGHD7X92Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"xvu8ANdlZ3AiuNIXX6vGd0SbNs0="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"rt/ToQ1sl6Fl/sI+v3YGHD7X92Q=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"xvu8ANdlZ3AiuNIXX6vGd0SbNs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"HyfW+MHXPb13Kg+GTwHscXiLV+0="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"xvu8ANdlZ3AiuNIXX6vGd0SbNs0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"HyfW+MHXPb13Kg+GTwHscXiLV+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"bNXENSw27ZVdfGc/qRYgoeTt1Ww="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"HyfW+MHXPb13Kg+GTwHscXiLV+0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"bNXENSw27ZVdfGc/qRYgoeTt1Ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"xZtraI/mJFM1ifyB5dxOrIlytPE="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"bNXENSw27ZVdfGc/qRYgoeTt1Ww=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"xZtraI/mJFM1ifyB5dxOrIlytPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"V2aYymrsjndFxNDQxBhxY8x+k/k="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"xZtraI/mJFM1ifyB5dxOrIlytPE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"V2aYymrsjndFxNDQxBhxY8x+k/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"tquDfEXk2Irwjw8AEQGYJBeFhm4="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"V2aYymrsjndFxNDQxBhxY8x+k/k=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"tquDfEXk2Irwjw8AEQGYJBeFhm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"hoz1AXtD8MMaRo21AmaEbgm2P0o="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"tquDfEXk2Irwjw8AEQGYJBeFhm4=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"hoz1AXtD8MMaRo21AmaEbgm2P0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"gT4yiIEh92rokqNfSmx/A0bsdmY="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"hoz1AXtD8MMaRo21AmaEbgm2P0o=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"gT4yiIEh92rokqNfSmx/A0bsdmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"JvYly8HdZo/h8C6i4J6RqY7GXtk="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"gT4yiIEh92rokqNfSmx/A0bsdmY=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"JvYly8HdZo/h8C6i4J6RqY7GXtk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"PpfGJR0/up0QbSe1m0Del6WUiWI="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"JvYly8HdZo/h8C6i4J6RqY7GXtk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"PpfGJR0/up0QbSe1m0Del6WUiWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"2YTAswqvMm/fwco6P9twsTboMPM="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"PpfGJR0/up0QbSe1m0Del6WUiWI=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T14:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"2YTAswqvMm/fwco6P9twsTboMPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"0Nl0GtGpMhWvN7SFL22TOGAhmB4="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"2YTAswqvMm/fwco6P9twsTboMPM=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T14:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"0Nl0GtGpMhWvN7SFL22TOGAhmB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"OCuOH21TxwO1gadEzq9WmNhElMc="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"0Nl0GtGpMhWvN7SFL22TOGAhmB4=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"OCuOH21TxwO1gadEzq9WmNhElMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"2zC02OUWeU60tANp5j0Hqbeutig="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"OCuOH21TxwO1gadEzq9WmNhElMc=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"2zC02OUWeU60tANp5j0Hqbeutig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"d/UcKgo/I8T18SI/fARg/xoFQ5g="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"2zC02OUWeU60tANp5j0Hqbeutig=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"d/UcKgo/I8T18SI/fARg/xoFQ5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"d8SYvaotZrsZYAk2FRtD373HDFI="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"d/UcKgo/I8T18SI/fARg/xoFQ5g=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"d8SYvaotZrsZYAk2FRtD373HDFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="},{"type":"next-occurrence","id":"cOycM2vM0fFYXLY/KKyhIm/HzhU="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"d8SYvaotZrsZYAk2FRtD373HDFI=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"cOycM2vM0fFYXLY/KKyhIm/HzhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n2/3LXDWqgCZqf5VpTkrq2kAz9Y="}],"description":"Bridge replacement on I-84 eastbound Exit ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T17:57:40Z"},"road_event_id":"cOycM2vM0fFYXLY/KKyhIm/HzhU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.214261,41.474694]]}},{"id":"dSRKaCpRranEKMVrtWt3VPYv1U8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"riEKKjclJx7PFvLtXd0u9p5At+Q="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"dSRKaCpRranEKMVrtWt3VPYv1U8=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"riEKKjclJx7PFvLtXd0u9p5At+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"nJq5fqqvoesKBjIW4rRIfiAVw1s="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"riEKKjclJx7PFvLtXd0u9p5At+Q=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"nJq5fqqvoesKBjIW4rRIfiAVw1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"yQ7+EDWDomVgWBrWFQ9FpNg2lXs="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"nJq5fqqvoesKBjIW4rRIfiAVw1s=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"yQ7+EDWDomVgWBrWFQ9FpNg2lXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"arK3vEQ/pOvsqxYzOa72hosQQ2U="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"yQ7+EDWDomVgWBrWFQ9FpNg2lXs=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"arK3vEQ/pOvsqxYzOa72hosQQ2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"9AVZWtASrwcgCSGGLsiOPNBiTAM="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"arK3vEQ/pOvsqxYzOa72hosQQ2U=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"9AVZWtASrwcgCSGGLsiOPNBiTAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"EvaKv7OVLBoeG3IwqT2UPafNiPk="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"9AVZWtASrwcgCSGGLsiOPNBiTAM=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"EvaKv7OVLBoeG3IwqT2UPafNiPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"1VhYKscAni3c2PRZtx0h8ETYetE="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"EvaKv7OVLBoeG3IwqT2UPafNiPk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"1VhYKscAni3c2PRZtx0h8ETYetE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"RYz7iehq1wzPC/AG3mMRo410C/E="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"1VhYKscAni3c2PRZtx0h8ETYetE=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T14:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"RYz7iehq1wzPC/AG3mMRo410C/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"XCKxkgqdMl6qJScMzuoME38BuNA="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"RYz7iehq1wzPC/AG3mMRo410C/E=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"XCKxkgqdMl6qJScMzuoME38BuNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"Od3Hwgf6cXuiL4svfhN0Tpu65jU="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"XCKxkgqdMl6qJScMzuoME38BuNA=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"Od3Hwgf6cXuiL4svfhN0Tpu65jU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"XeaNfv/XR6XpX0avfi7j/NPuUpM="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"Od3Hwgf6cXuiL4svfhN0Tpu65jU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"XeaNfv/XR6XpX0avfi7j/NPuUpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"i55PCZhxE8b9LYyAeldPrmkpBy0="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"XeaNfv/XR6XpX0avfi7j/NPuUpM=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"i55PCZhxE8b9LYyAeldPrmkpBy0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"UrU4r81zX7PtT29jJioBS3LXLf0="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"i55PCZhxE8b9LYyAeldPrmkpBy0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"UrU4r81zX7PtT29jJioBS3LXLf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"UVlkzV5QA/0iJQN1WzaKMAXojDw="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"UrU4r81zX7PtT29jJioBS3LXLf0=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"UVlkzV5QA/0iJQN1WzaKMAXojDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"zaOOScRIm7+zU/YwUoKZdoH+ZVQ="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"UVlkzV5QA/0iJQN1WzaKMAXojDw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"zaOOScRIm7+zU/YwUoKZdoH+ZVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"beuI37Hw849eABf/zWj32H1JrZs="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"zaOOScRIm7+zU/YwUoKZdoH+ZVQ=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"beuI37Hw849eABf/zWj32H1JrZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"24PsT1Dbvgm1fCquxS6eP9oXo38="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"beuI37Hw849eABf/zWj32H1JrZs=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"24PsT1Dbvgm1fCquxS6eP9oXo38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"g6pNsEsktRl1r3p0cfqhHD8TbMo="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"24PsT1Dbvgm1fCquxS6eP9oXo38=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"g6pNsEsktRl1r3p0cfqhHD8TbMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"DaPSEK9FXWEYytBHLLMwuQR78fU="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"g6pNsEsktRl1r3p0cfqhHD8TbMo=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T14:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"DaPSEK9FXWEYytBHLLMwuQR78fU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"adJGKuBTEkta6xn8olnttyW3Qdc="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"DaPSEK9FXWEYytBHLLMwuQR78fU=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T14:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"adJGKuBTEkta6xn8olnttyW3Qdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"pyTvYg8k5dGh8+cU/hQ5S0w/STk="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"adJGKuBTEkta6xn8olnttyW3Qdc=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"pyTvYg8k5dGh8+cU/hQ5S0w/STk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"CxE8psiia04l3vdSDc9UZbeekT4="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"pyTvYg8k5dGh8+cU/hQ5S0w/STk=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"CxE8psiia04l3vdSDc9UZbeekT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"a/0itVRRG8zSyYUJoPcdzB9/+Qw="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"CxE8psiia04l3vdSDc9UZbeekT4=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"a/0itVRRG8zSyYUJoPcdzB9/+Qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"m64KfHuXihqEkFAwQXc04+KN/YY="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"a/0itVRRG8zSyYUJoPcdzB9/+Qw=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"m64KfHuXihqEkFAwQXc04+KN/YY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="},{"type":"next-occurrence","id":"ZUGR7OJl8HGmwMH+tQF+1H+2/g8="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"m64KfHuXihqEkFAwQXc04+KN/YY=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"ZUGR7OJl8HGmwMH+tQF+1H+2/g8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dSRKaCpRranEKMVrtWt3VPYv1U8="}],"description":"Bridge replacement on I-84 eastbound Entrance ramp Exit 15 - US 6/CT 67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:34:33Z"},"road_event_id":"ZUGR7OJl8HGmwMH+tQF+1H+2/g8=","beginning_cross_street":"Exit 15 - US 6/CT 67","ending_cross_street":"Exit 15 - US 6/CT 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.210387,41.476487]]}},{"id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dl10a0TWOyKV2zApAiNuVzsnydc="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"dl10a0TWOyKV2zApAiNuVzsnydc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"nC9OQrqaycxbACdcmy337KjOALQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"dl10a0TWOyKV2zApAiNuVzsnydc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"nC9OQrqaycxbACdcmy337KjOALQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"qlTzjzCB4+BBviuKLy022VuEWo8="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"nC9OQrqaycxbACdcmy337KjOALQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"qlTzjzCB4+BBviuKLy022VuEWo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"/uWfGS2x1cZPjogVw7ANBYm2D9o="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"qlTzjzCB4+BBviuKLy022VuEWo8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"/uWfGS2x1cZPjogVw7ANBYm2D9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"r3JYuRibNbjxJLgLEDPFo20ThK8="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"/uWfGS2x1cZPjogVw7ANBYm2D9o=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"r3JYuRibNbjxJLgLEDPFo20ThK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"62McDULP6x5R7pKBNcjAl/R97f4="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"r3JYuRibNbjxJLgLEDPFo20ThK8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"62McDULP6x5R7pKBNcjAl/R97f4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"q2sW7Dln69mgMYy9O1ylrDgiqJw="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"62McDULP6x5R7pKBNcjAl/R97f4=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"q2sW7Dln69mgMYy9O1ylrDgiqJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"gimqlBAWjtwlqymO2se41AtB7UA="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"q2sW7Dln69mgMYy9O1ylrDgiqJw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T14:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"gimqlBAWjtwlqymO2se41AtB7UA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"wnehzW0RYtdZVfRE05Nlj33whDg="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"gimqlBAWjtwlqymO2se41AtB7UA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"wnehzW0RYtdZVfRE05Nlj33whDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"K4ad4We1a7P6yuB1wHoUboydpUQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"wnehzW0RYtdZVfRE05Nlj33whDg=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"K4ad4We1a7P6yuB1wHoUboydpUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"7wYikt5+MaNKGc86J+0GAGdCCqU="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"K4ad4We1a7P6yuB1wHoUboydpUQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"7wYikt5+MaNKGc86J+0GAGdCCqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"C33fDyXtZYg4YIhgjjc3aIN4qjA="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"7wYikt5+MaNKGc86J+0GAGdCCqU=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"C33fDyXtZYg4YIhgjjc3aIN4qjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"iZOGjaNBkzrVG5JRw6pAOYbAfEs="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"C33fDyXtZYg4YIhgjjc3aIN4qjA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"iZOGjaNBkzrVG5JRw6pAOYbAfEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"IUqecmhliT3i/eqtf3GvgZFHXN0="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"iZOGjaNBkzrVG5JRw6pAOYbAfEs=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"IUqecmhliT3i/eqtf3GvgZFHXN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"ypqENbESH/EeHxcn4r0DSJyjAuc="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"IUqecmhliT3i/eqtf3GvgZFHXN0=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"ypqENbESH/EeHxcn4r0DSJyjAuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"nOyARGWgY1twoBpPAdaqK8IimGw="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"ypqENbESH/EeHxcn4r0DSJyjAuc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"nOyARGWgY1twoBpPAdaqK8IimGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"lHs+lEFyVKLtu09Bw8ZgHSXv2Nk="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"nOyARGWgY1twoBpPAdaqK8IimGw=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"lHs+lEFyVKLtu09Bw8ZgHSXv2Nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"E+DFf5fEBwadsoOQyBCcBHJFNvA="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"lHs+lEFyVKLtu09Bw8ZgHSXv2Nk=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"E+DFf5fEBwadsoOQyBCcBHJFNvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"AGoucRfg1VoZhHHxMLF2q6h4Gxg="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"E+DFf5fEBwadsoOQyBCcBHJFNvA=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T14:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"AGoucRfg1VoZhHHxMLF2q6h4Gxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"qN2kusIUddJaTJbleXnCpflwEwQ="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"AGoucRfg1VoZhHHxMLF2q6h4Gxg=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T14:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"qN2kusIUddJaTJbleXnCpflwEwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"b8TX513+ydygfIjCFlTvw2RuZlE="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"qN2kusIUddJaTJbleXnCpflwEwQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"b8TX513+ydygfIjCFlTvw2RuZlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"n7hSLdfCi4ihAWt4rcjintO3qqc="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"b8TX513+ydygfIjCFlTvw2RuZlE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"n7hSLdfCi4ihAWt4rcjintO3qqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"REZ3Q2+5yEApMuGIznC9LMlQO8g="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"n7hSLdfCi4ihAWt4rcjintO3qqc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"REZ3Q2+5yEApMuGIznC9LMlQO8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"jdv8tvEWBL8Q0UosRpSL4lnyO7Q="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"REZ3Q2+5yEApMuGIznC9LMlQO8g=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"jdv8tvEWBL8Q0UosRpSL4lnyO7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="},{"type":"next-occurrence","id":"heaguAvPgu6VmvS2BKl/E/qZY7w="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"jdv8tvEWBL8Q0UosRpSL4lnyO7Q=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"heaguAvPgu6VmvS2BKl/E/qZY7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["KETTLETOWN RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fgy34Nju8N/EkaaeuoL6f5u1CWk="}],"description":"Bridge replacement on KETTLETOWN RD both directions between COMMUNITY HOUSE RD (Southbury) and COMMUNITY HOUSE RD at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:37:41Z"},"road_event_id":"heaguAvPgu6VmvS2BKl/E/qZY7w=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20937,41.475363]]}},{"id":"yzjqMOJv+vKnEp1brdIhz0OlhjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tR4Yo9WSuWqP+eM7tBq5XbJVnN4="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"yzjqMOJv+vKnEp1brdIhz0OlhjE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"tR4Yo9WSuWqP+eM7tBq5XbJVnN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"FQ71QjHFyhghKyiypPIFkL+TF8A="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"tR4Yo9WSuWqP+eM7tBq5XbJVnN4=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"FQ71QjHFyhghKyiypPIFkL+TF8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"YKQmZjhJ8A3kd+x1o3Cb/9lnrC8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"FQ71QjHFyhghKyiypPIFkL+TF8A=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"YKQmZjhJ8A3kd+x1o3Cb/9lnrC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"Tz1FEbgGkd2tLYaE+wUug5Xdf7s="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"YKQmZjhJ8A3kd+x1o3Cb/9lnrC8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"Tz1FEbgGkd2tLYaE+wUug5Xdf7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"ZyeBOR+fhD+267llLRuqEa3MHhE="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"Tz1FEbgGkd2tLYaE+wUug5Xdf7s=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"ZyeBOR+fhD+267llLRuqEa3MHhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"w3zCRQo/BZ3zCyCk8/kpGhiXsZ8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"ZyeBOR+fhD+267llLRuqEa3MHhE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"w3zCRQo/BZ3zCyCk8/kpGhiXsZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"l7S64Xm2EQcBFquA+9QzqkUG6ns="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"w3zCRQo/BZ3zCyCk8/kpGhiXsZ8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"l7S64Xm2EQcBFquA+9QzqkUG6ns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"YbsY7m+tE+6UeAbn4SVSUdVtb/U="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"l7S64Xm2EQcBFquA+9QzqkUG6ns=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T14:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"YbsY7m+tE+6UeAbn4SVSUdVtb/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"pKsVk44VcXtfsTJPl/JI9+gpQfE="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"YbsY7m+tE+6UeAbn4SVSUdVtb/U=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"pKsVk44VcXtfsTJPl/JI9+gpQfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"TPIyF+eziMcZjGHkigoLNgOJhH8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"pKsVk44VcXtfsTJPl/JI9+gpQfE=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"TPIyF+eziMcZjGHkigoLNgOJhH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"l6ikjCJD088hhXcJVVfh34RULMY="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"TPIyF+eziMcZjGHkigoLNgOJhH8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"l6ikjCJD088hhXcJVVfh34RULMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"DUuWHvuh0fc8lTzpo2tXrkWZJxQ="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"l6ikjCJD088hhXcJVVfh34RULMY=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"DUuWHvuh0fc8lTzpo2tXrkWZJxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"Fd9h3cJnVOhjayfPMmDvnxgxDaI="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"DUuWHvuh0fc8lTzpo2tXrkWZJxQ=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"Fd9h3cJnVOhjayfPMmDvnxgxDaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"unftfGaz1uCdHn9hnT0CjSt3opI="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"Fd9h3cJnVOhjayfPMmDvnxgxDaI=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"unftfGaz1uCdHn9hnT0CjSt3opI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"d0M67HSTFGjBUu6BvwoGfgzrK/8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"unftfGaz1uCdHn9hnT0CjSt3opI=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"d0M67HSTFGjBUu6BvwoGfgzrK/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"3tnwldgc2JIxF3JJzpbD3HXVYkc="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"d0M67HSTFGjBUu6BvwoGfgzrK/8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"3tnwldgc2JIxF3JJzpbD3HXVYkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"yREcildgmHcUaKpudDbg//5SB2Y="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"3tnwldgc2JIxF3JJzpbD3HXVYkc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"yREcildgmHcUaKpudDbg//5SB2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"Or7ZirjmygsrElLNVdaIBy/Thck="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"yREcildgmHcUaKpudDbg//5SB2Y=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"Or7ZirjmygsrElLNVdaIBy/Thck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"UjBXBuDaMDLq3nsdruvEAutD9cI="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"Or7ZirjmygsrElLNVdaIBy/Thck=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T14:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"UjBXBuDaMDLq3nsdruvEAutD9cI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"8bxsmXhRl5PfvPuO9v+x7rJ+w9I="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"UjBXBuDaMDLq3nsdruvEAutD9cI=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T14:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"8bxsmXhRl5PfvPuO9v+x7rJ+w9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"sijJHcdJznqHp4PMqSY6v2ZSL44="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"8bxsmXhRl5PfvPuO9v+x7rJ+w9I=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"sijJHcdJznqHp4PMqSY6v2ZSL44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"+H4wtmdDbldxH4xt7u7Ndt4Crw8="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"sijJHcdJznqHp4PMqSY6v2ZSL44=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"+H4wtmdDbldxH4xt7u7Ndt4Crw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"S5IOcLvnnP2QkbdogKmUObZPU9I="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"+H4wtmdDbldxH4xt7u7Ndt4Crw8=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"S5IOcLvnnP2QkbdogKmUObZPU9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"lPEEUpZkUwgqlemc0/78F7kT/Hc="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"S5IOcLvnnP2QkbdogKmUObZPU9I=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"lPEEUpZkUwgqlemc0/78F7kT/Hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="},{"type":"next-occurrence","id":"ph1OhCisYmR5S1AIrRpKWzhfZXs="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"lPEEUpZkUwgqlemc0/78F7kT/Hc=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"ph1OhCisYmR5S1AIrRpKWzhfZXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yzjqMOJv+vKnEp1brdIhz0OlhjE="}],"description":"Bridge replacement on CT-67 both directions between COMMUNITY HOUSE RD (Southbury) and US-6 at CT-67 (Southbury), Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Wednesday April 8th, 2026 thru Wednesday September 30th, 2026, Saturday/ Sunday, 10:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-01T18:40:48Z"},"road_event_id":"ph1OhCisYmR5S1AIrRpKWzhfZXs=","beginning_cross_street":"COMMUNITY HOUSE RD","ending_cross_street":"CT-67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20841,41.475915]]}},{"id":"R5Aol0YA66hJcEykC0h6y41MVG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"u77JLfmCPy3CB6vcMyC5gBNamfw="}],"description":"Construction on I-278 westbound between Kane Street (New York) and Sackett Street (New York) Subject to change without notice., Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:50:17Z"},"road_event_id":"R5Aol0YA66hJcEykC0h6y41MVG8=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999989,40.687215]]}},{"id":"u77JLfmCPy3CB6vcMyC5gBNamfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R5Aol0YA66hJcEykC0h6y41MVG8="},{"type":"next-occurrence","id":"ysJsJSoX4qei1Buf7xdxvW8T+e0="}],"description":"Construction on I-278 westbound between Kane Street (New York) and Sackett Street (New York) Subject to change without notice., Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:50:17Z"},"road_event_id":"u77JLfmCPy3CB6vcMyC5gBNamfw=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999989,40.687215]]}},{"id":"ysJsJSoX4qei1Buf7xdxvW8T+e0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R5Aol0YA66hJcEykC0h6y41MVG8="}],"description":"Construction on I-278 westbound between Kane Street (New York) and Sackett Street (New York) Subject to change without notice., Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:50:17Z"},"road_event_id":"ysJsJSoX4qei1Buf7xdxvW8T+e0=","beginning_cross_street":"Kane Street","ending_cross_street":"Sackett Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999989,40.687215]]}},{"id":"ezkynRIcyHNzjz/CVqXoi+wwPWU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Mv4mol8qHN2Ozk0I2UUPfTG7l7Y="}],"description":"Due to Station Rehabilitation both directions, Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line at New York Penn Station (New York) the women�s restroom will be closed nightly from 10:00 PM to 6:00 AM for renovations., Monday April 20th, 2026 thru Monday April 27th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM","update_date":"2026-04-01T20:33:14Z"},"road_event_id":"ezkynRIcyHNzjz/CVqXoi+wwPWU=","beginning_cross_street":"New York Penn Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"Mv4mol8qHN2Ozk0I2UUPfTG7l7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ezkynRIcyHNzjz/CVqXoi+wwPWU="},{"type":"next-occurrence","id":"6z8cc7HZAdFsd3mja6HCBUSj15U="}],"description":"Due to Station Rehabilitation both directions, Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line at New York Penn Station (New York) the women�s restroom will be closed nightly from 10:00 PM to 6:00 AM for renovations., Monday April 20th, 2026 thru Monday April 27th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM","update_date":"2026-04-01T20:33:14Z"},"road_event_id":"Mv4mol8qHN2Ozk0I2UUPfTG7l7Y=","beginning_cross_street":"New York Penn Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"6z8cc7HZAdFsd3mja6HCBUSj15U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ezkynRIcyHNzjz/CVqXoi+wwPWU="},{"type":"next-occurrence","id":"L7W/t9zGN0y+hgkADhnXzDzKhCQ="}],"description":"Due to Station Rehabilitation both directions, Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line at New York Penn Station (New York) the women�s restroom will be closed nightly from 10:00 PM to 6:00 AM for renovations., Monday April 20th, 2026 thru Monday April 27th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM","update_date":"2026-04-01T20:33:14Z"},"road_event_id":"6z8cc7HZAdFsd3mja6HCBUSj15U=","beginning_cross_street":"New York Penn Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"L7W/t9zGN0y+hgkADhnXzDzKhCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ezkynRIcyHNzjz/CVqXoi+wwPWU="},{"type":"next-occurrence","id":"5fO3c78w0r1sfjpP4nLJfENF45I="}],"description":"Due to Station Rehabilitation both directions, Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line at New York Penn Station (New York) the women�s restroom will be closed nightly from 10:00 PM to 6:00 AM for renovations., Monday April 20th, 2026 thru Monday April 27th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM","update_date":"2026-04-01T20:33:14Z"},"road_event_id":"L7W/t9zGN0y+hgkADhnXzDzKhCQ=","beginning_cross_street":"New York Penn Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"5fO3c78w0r1sfjpP4nLJfENF45I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ezkynRIcyHNzjz/CVqXoi+wwPWU="},{"type":"next-occurrence","id":"bc/xQjCj+ISfl19ZMvfDY5xuG4Y="}],"description":"Due to Station Rehabilitation both directions, Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line at New York Penn Station (New York) the women�s restroom will be closed nightly from 10:00 PM to 6:00 AM for renovations., Monday April 20th, 2026 thru Monday April 27th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM","update_date":"2026-04-01T20:33:14Z"},"road_event_id":"5fO3c78w0r1sfjpP4nLJfENF45I=","beginning_cross_street":"New York Penn Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T02:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"bc/xQjCj+ISfl19ZMvfDY5xuG4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ezkynRIcyHNzjz/CVqXoi+wwPWU="}],"description":"Due to Station Rehabilitation both directions, Montclair-Boonton Line, Morris & Essex Line, North Jersey Coast Line and Northeast Corridor Line at New York Penn Station (New York) the women�s restroom will be closed nightly from 10:00 PM to 6:00 AM for renovations., Monday April 20th, 2026 thru Monday April 27th, 2026, Sunday thru Saturday, 10:00 PM thru 06:00 AM","update_date":"2026-04-01T20:33:14Z"},"road_event_id":"bc/xQjCj+ISfl19ZMvfDY5xuG4Y=","beginning_cross_street":"New York Penn Station","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992358,40.750046]]}},{"id":"3UhOlFatVxhW0jZJU7K83mpMdXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Tuesday April 7, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-02T12:49:28Z"},"road_event_id":"3UhOlFatVxhW0jZJU7K83mpMdXc=","beginning_cross_street":"West of Exit 53 - NJ 23/US 46","ending_cross_street":"East of Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263801,40.894535]]}},{"id":"zmsJIpa/eJxJD9w5g+zmAAAMgRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 53 - NJ 23/US 46 (Wayne Twp), Continuous Monday April 6, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-02T12:49:41Z"},"road_event_id":"zmsJIpa/eJxJD9w5g+zmAAAMgRM=","beginning_cross_street":"East of Exit 53 - NJ 23/US 46","ending_cross_street":"West of Exit 54 - Minnisink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.243606,40.898761]]}},{"id":"JJS/nTP5a6zM5ebcvzOpVj73K54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1+7u410LuwwN8uPu4AjxQcfgAqA="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"JJS/nTP5a6zM5ebcvzOpVj73K54=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"1+7u410LuwwN8uPu4AjxQcfgAqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JJS/nTP5a6zM5ebcvzOpVj73K54="},{"type":"next-occurrence","id":"PEPbm7vxvdSAJhu+6iVuMI1Xhmo="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"1+7u410LuwwN8uPu4AjxQcfgAqA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"PEPbm7vxvdSAJhu+6iVuMI1Xhmo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JJS/nTP5a6zM5ebcvzOpVj73K54="},{"type":"next-occurrence","id":"Sha3YI3tV1Wbm3jWyiFmqmIJ05Y="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"PEPbm7vxvdSAJhu+6iVuMI1Xhmo=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"Sha3YI3tV1Wbm3jWyiFmqmIJ05Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JJS/nTP5a6zM5ebcvzOpVj73K54="},{"type":"next-occurrence","id":"1H6y9xTA6jS2kYcaK6SsemYyLRs="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"Sha3YI3tV1Wbm3jWyiFmqmIJ05Y=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T20:00:00Z","end_date":"2026-04-28T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"1H6y9xTA6jS2kYcaK6SsemYyLRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JJS/nTP5a6zM5ebcvzOpVj73K54="},{"type":"next-occurrence","id":"DCdx95px9ZBHhyi5b+sCWCRH3zM="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"1H6y9xTA6jS2kYcaK6SsemYyLRs=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"DCdx95px9ZBHhyi5b+sCWCRH3zM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JJS/nTP5a6zM5ebcvzOpVj73K54="},{"type":"next-occurrence","id":"y2RKEg9gTaK3JHb9bA9mk0h/gdc="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"DCdx95px9ZBHhyi5b+sCWCRH3zM=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"y2RKEg9gTaK3JHb9bA9mk0h/gdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JJS/nTP5a6zM5ebcvzOpVj73K54="},{"type":"next-occurrence","id":"7PyyV5myuR5Uxe+NzSVaI9VxM2g="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"y2RKEg9gTaK3JHb9bA9mk0h/gdc=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"7PyyV5myuR5Uxe+NzSVaI9VxM2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JJS/nTP5a6zM5ebcvzOpVj73K54="}],"description":"Road rehabilitation on NY 17 [Orange] westbound between Exit 122A - Fletcher Street (Goshen) and Exit 121E - I 84 (Wallkill) D265297/32479709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, left lane closure","update_date":"2026-04-20T16:33:18Z"},"road_event_id":"7PyyV5myuR5Uxe+NzSVaI9VxM2g=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.343458,41.406023]]}},{"id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E8mzZGs3ae23BHpwxzFKXg9Qc5M="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"E8mzZGs3ae23BHpwxzFKXg9Qc5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0="},{"type":"next-occurrence","id":"PWI+kBcN/5axjoHuynBv3dFY1Ok="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"E8mzZGs3ae23BHpwxzFKXg9Qc5M=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"PWI+kBcN/5axjoHuynBv3dFY1Ok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0="},{"type":"next-occurrence","id":"TMjPv2utoU2KS9qijDkKY1J62k8="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"PWI+kBcN/5axjoHuynBv3dFY1Ok=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"TMjPv2utoU2KS9qijDkKY1J62k8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0="},{"type":"next-occurrence","id":"dAWTSwc4xrO5bPX0ue4M0a2cR6w="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"TMjPv2utoU2KS9qijDkKY1J62k8=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T20:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"dAWTSwc4xrO5bPX0ue4M0a2cR6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0="},{"type":"next-occurrence","id":"XruWeTpj+sp/QDS632lrKtiCyaI="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"dAWTSwc4xrO5bPX0ue4M0a2cR6w=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"XruWeTpj+sp/QDS632lrKtiCyaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0="},{"type":"next-occurrence","id":"0SDv96NredFs4fiP9mK/Q3NJako="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"XruWeTpj+sp/QDS632lrKtiCyaI=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"0SDv96NredFs4fiP9mK/Q3NJako=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0="},{"type":"next-occurrence","id":"IxcFWcQhXFKksnfVf3iIm0xPZUU="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"0SDv96NredFs4fiP9mK/Q3NJako=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"IxcFWcQhXFKksnfVf3iIm0xPZUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ae72V5B/MTfdtqhhcTsy/0Ax9O0="}],"description":"Bridge inspection on Sprain Brook State Pkwy southbound between NY 100 (Yonkers) and Bronx River Parkway (Eastchester) D265367/B5501520/32345709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-22T13:49:57Z"},"road_event_id":"IxcFWcQhXFKksnfVf3iIm0xPZUU=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837628,40.937483]]}},{"id":"/q+S7ksA1UzJqF1irnBGZTU3EfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uL/p8qRpVQuUibQnQJGlY3qsBRU="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-16T20:57:37Z"},"road_event_id":"/q+S7ksA1UzJqF1irnBGZTU3EfE=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"uL/p8qRpVQuUibQnQJGlY3qsBRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/q+S7ksA1UzJqF1irnBGZTU3EfE="},{"type":"next-occurrence","id":"ctJKupS/tRjvZmLFJOcp3f4PY8c="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-16T20:57:37Z"},"road_event_id":"uL/p8qRpVQuUibQnQJGlY3qsBRU=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"ctJKupS/tRjvZmLFJOcp3f4PY8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/q+S7ksA1UzJqF1irnBGZTU3EfE="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D264324/DAY/B5501670/32494609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-16T20:57:37Z"},"road_event_id":"ctJKupS/tRjvZmLFJOcp3f4PY8c=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831593,40.999401]]}},{"id":"lKoG95FvwnQ2zBvMaJsRPBwHptM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KKroopN65g9kABKE5xUUh/gl8DM="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T10:16:43Z"},"road_event_id":"lKoG95FvwnQ2zBvMaJsRPBwHptM=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"KKroopN65g9kABKE5xUUh/gl8DM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKoG95FvwnQ2zBvMaJsRPBwHptM="},{"type":"next-occurrence","id":"13KKJMteEA4tq9O9N70UONVCFjY="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T10:16:43Z"},"road_event_id":"KKroopN65g9kABKE5xUUh/gl8DM=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"13KKJMteEA4tq9O9N70UONVCFjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lKoG95FvwnQ2zBvMaJsRPBwHptM="}],"description":"Bridge maintenance operations on Sprain Brook State Pkwy southbound between Dobbs Ferry Road - NY 100B (Greenburgh) and Jackson Avenue (Greenburgh) D264324/DAY/B5501670/32483909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T10:16:43Z"},"road_event_id":"13KKJMteEA4tq9O9N70UONVCFjY=","beginning_cross_street":"Dobbs Ferry Road - NY 100B","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831735,40.999721]]}},{"id":"ksCYGMNEiM6ohklAx7jG3BiFlgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rPM4EDs1HSbqKfIsEXqdc5JKLU8="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:38:24Z"},"road_event_id":"ksCYGMNEiM6ohklAx7jG3BiFlgY=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813705,40.69715]]}},{"id":"rPM4EDs1HSbqKfIsEXqdc5JKLU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ksCYGMNEiM6ohklAx7jG3BiFlgY="},{"type":"next-occurrence","id":"enSoBMULV7k0cAsUTzO8ugLMyKw="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:38:24Z"},"road_event_id":"rPM4EDs1HSbqKfIsEXqdc5JKLU8=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813705,40.69715]]}},{"id":"enSoBMULV7k0cAsUTzO8ugLMyKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ksCYGMNEiM6ohklAx7jG3BiFlgY="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to 133rd Avenue (New York) Subject to change without notice., Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:38:24Z"},"road_event_id":"enSoBMULV7k0cAsUTzO8ugLMyKw=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"133rd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813705,40.69715]]}},{"id":"CD8bRz38F+CjJsnQXsdSvUPPi08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v7hMuIHsewqmHH+IsZNueA7XoTM="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:36:48Z"},"road_event_id":"CD8bRz38F+CjJsnQXsdSvUPPi08=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822653,40.663815]]}},{"id":"v7hMuIHsewqmHH+IsZNueA7XoTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CD8bRz38F+CjJsnQXsdSvUPPi08="},{"type":"next-occurrence","id":"zJnlAVBn6HdYsgLlyYIz3327c+c="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:36:48Z"},"road_event_id":"v7hMuIHsewqmHH+IsZNueA7XoTM=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822653,40.663815]]}},{"id":"zJnlAVBn6HdYsgLlyYIz3327c+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CD8bRz38F+CjJsnQXsdSvUPPi08="}],"description":"Construction on NY 878 eastbound from Lefferts Boulevard (New York) to Exit 2S - 150th Street (New York) Subject to change without notice., Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:36:48Z"},"road_event_id":"zJnlAVBn6HdYsgLlyYIz3327c+c=","beginning_cross_street":"Lefferts Boulevard","ending_cross_street":"Exit 2S - 150th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.822653,40.663815]]}},{"id":"mzAS2aO9z76D/+102GQXn+/FBNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"++cMMIXc+fumLZccDFZHo0/TYis="}],"description":"Utility work on NY 39 both directions between North St. (Geneseo) and Town of Avon and Town of Geneseo Line (Geneseo) Alternating lane closures with flaggers as needed, Wednesday April 8th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-02T16:33:03Z"},"road_event_id":"mzAS2aO9z76D/+102GQXn+/FBNY=","beginning_cross_street":"North St.","ending_cross_street":"Town of Avon and Town of Geneseo Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.815701,42.800145]]}},{"id":"++cMMIXc+fumLZccDFZHo0/TYis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mzAS2aO9z76D/+102GQXn+/FBNY="},{"type":"next-occurrence","id":"AjUsUmHDQAdAA06T3hiycI/Fj40="}],"description":"Utility work on NY 39 both directions between North St. (Geneseo) and Town of Avon and Town of Geneseo Line (Geneseo) Alternating lane closures with flaggers as needed, Wednesday April 8th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-02T16:33:03Z"},"road_event_id":"++cMMIXc+fumLZccDFZHo0/TYis=","beginning_cross_street":"North St.","ending_cross_street":"Town of Avon and Town of Geneseo Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.815701,42.800145]]}},{"id":"AjUsUmHDQAdAA06T3hiycI/Fj40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mzAS2aO9z76D/+102GQXn+/FBNY="},{"type":"next-occurrence","id":"GbNXsO+dCjtNfM0/ZCgEGyrTB6A="}],"description":"Utility work on NY 39 both directions between North St. (Geneseo) and Town of Avon and Town of Geneseo Line (Geneseo) Alternating lane closures with flaggers as needed, Wednesday April 8th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-02T16:33:03Z"},"road_event_id":"AjUsUmHDQAdAA06T3hiycI/Fj40=","beginning_cross_street":"North St.","ending_cross_street":"Town of Avon and Town of Geneseo Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.815701,42.800145]]}},{"id":"GbNXsO+dCjtNfM0/ZCgEGyrTB6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mzAS2aO9z76D/+102GQXn+/FBNY="}],"description":"Utility work on NY 39 both directions between North St. (Geneseo) and Town of Avon and Town of Geneseo Line (Geneseo) Alternating lane closures with flaggers as needed, Wednesday April 8th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-02T16:33:03Z"},"road_event_id":"GbNXsO+dCjtNfM0/ZCgEGyrTB6A=","beginning_cross_street":"North St.","ending_cross_street":"Town of Avon and Town of Geneseo Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.815701,42.800145]]}},{"id":"RKb7nm7bQRQwoATm3AtjEA1kYMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4lye1qntQ5h9zsO7Tyvlz1soMls="}],"description":"Utility work on US 20 both directions between Genesee St. (Lima) and Clay St. (Lima) Alternating lane closures with flaggers as needed, Wednesday April 8th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T17:59:40Z"},"road_event_id":"RKb7nm7bQRQwoATm3AtjEA1kYMU=","beginning_cross_street":"Genesee St.","ending_cross_street":"Clay St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.613615,42.904591]]}},{"id":"4lye1qntQ5h9zsO7Tyvlz1soMls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RKb7nm7bQRQwoATm3AtjEA1kYMU="},{"type":"next-occurrence","id":"ecAUvNVwOg5xwFoan2+rNZ7O5DY="}],"description":"Utility work on US 20 both directions between Genesee St. (Lima) and Clay St. (Lima) Alternating lane closures with flaggers as needed, Wednesday April 8th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T17:59:40Z"},"road_event_id":"4lye1qntQ5h9zsO7Tyvlz1soMls=","beginning_cross_street":"Genesee St.","ending_cross_street":"Clay St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.613615,42.904591]]}},{"id":"ecAUvNVwOg5xwFoan2+rNZ7O5DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RKb7nm7bQRQwoATm3AtjEA1kYMU="}],"description":"Utility work on US 20 both directions between Genesee St. (Lima) and Clay St. (Lima) Alternating lane closures with flaggers as needed, Wednesday April 8th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T17:59:40Z"},"road_event_id":"ecAUvNVwOg5xwFoan2+rNZ7O5DY=","beginning_cross_street":"Genesee St.","ending_cross_street":"Clay St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.613615,42.904591]]}},{"id":"7602oPTe6yDiaLmARX8zsG2uIpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["West Perimeter"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on West Perimeter both directions at Sawmill Rd (South Valley), Continuous Monday April 13th, 2026 12:00 AM thru Sunday May 31st, 2026 11:59 PM All lanes closed","update_date":"2026-04-02T17:31:50Z"},"road_event_id":"7602oPTe6yDiaLmARX8zsG2uIpI=","beginning_cross_street":"Sawmill Rd","ending_cross_street":"Pennsylvania Sate Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.973634,42.028929]]}},{"id":"fu5m3+pBFJO5Fk8BtWoJsnyAovs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XV7MwGn9KZceaLEbNaHZu5hYoVY="}],"description":"Utility work on NY 104 both directions between Town of Parma and Town of Clarkson Line (Clarkson) and Sweden Walker Road; NY 260 (Clarkson) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:06:48Z"},"road_event_id":"fu5m3+pBFJO5Fk8BtWoJsnyAovs=","beginning_cross_street":"Town of Parma and Town of Clarkson Line","ending_cross_street":"Sweden Walker Road; NY 260","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.863191,43.223055]]}},{"id":"XV7MwGn9KZceaLEbNaHZu5hYoVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fu5m3+pBFJO5Fk8BtWoJsnyAovs="},{"type":"next-occurrence","id":"FEnygy6nkuQvVHYUqe46C3kHD7Y="}],"description":"Utility work on NY 104 both directions between Town of Parma and Town of Clarkson Line (Clarkson) and Sweden Walker Road; NY 260 (Clarkson) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:06:48Z"},"road_event_id":"XV7MwGn9KZceaLEbNaHZu5hYoVY=","beginning_cross_street":"Town of Parma and Town of Clarkson Line","ending_cross_street":"Sweden Walker Road; NY 260","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.863191,43.223055]]}},{"id":"FEnygy6nkuQvVHYUqe46C3kHD7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fu5m3+pBFJO5Fk8BtWoJsnyAovs="}],"description":"Utility work on NY 104 both directions between Town of Parma and Town of Clarkson Line (Clarkson) and Sweden Walker Road; NY 260 (Clarkson) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:06:48Z"},"road_event_id":"FEnygy6nkuQvVHYUqe46C3kHD7Y=","beginning_cross_street":"Town of Parma and Town of Clarkson Line","ending_cross_street":"Sweden Walker Road; NY 260","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.863191,43.223055]]}},{"id":"ORC32401209","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982C - Putnam Avenue"],"direction":"unknown","description":"Curb work on NY 982C - Putnam Avenue both directions between Locust Avenue (Port Chester) and Madison Avenue (Port Chester) 202508114226/32401209 - This work is weather permitting. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-04-21T19:31:08Z"},"road_event_id":"ORC32401209","beginning_cross_street":"Locust Avenue","ending_cross_street":"Madison Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-09T13:06:12Z","end_date":"2026-04-22T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.658303,41.012863]]}},{"id":"V21s8AZqdY9LMPMzUucvlvYBkH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 45 - CR 637/Beverwyck Rd (Parsippany-Troy Hills Twp), Continuous Thursday April 9, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed local lane","update_date":"2026-04-03T11:14:08Z"},"road_event_id":"V21s8AZqdY9LMPMzUucvlvYBkH8=","beginning_cross_street":"West of Exit 45 - CR 637/Beverwyck Rd","ending_cross_street":"East of Exit 43 - I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.39772,40.860549]]}},{"id":"myicQVfhk7r597AXGhZ0urxdzZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Continuous Wednesday April 8, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-03T11:14:03Z"},"road_event_id":"myicQVfhk7r597AXGhZ0urxdzZA=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.330825,40.868228]]}},{"id":"Fsq6aeQT9xCoDtEKfDa4kJJNeyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iEyFDkrgLO4NwMmV5ansjA7CBrY="}],"description":"Utility work on NY 5 both directions between Failing Ave (St Johnsville) and Church Street (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:54:54Z"},"road_event_id":"Fsq6aeQT9xCoDtEKfDa4kJJNeyM=","beginning_cross_street":"Failing Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.68338,42.998862]]}},{"id":"iEyFDkrgLO4NwMmV5ansjA7CBrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fsq6aeQT9xCoDtEKfDa4kJJNeyM="},{"type":"next-occurrence","id":"fRvpLMaU7lvY9ggMT1CNzkkuRhU="}],"description":"Utility work on NY 5 both directions between Failing Ave (St Johnsville) and Church Street (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:54:54Z"},"road_event_id":"iEyFDkrgLO4NwMmV5ansjA7CBrY=","beginning_cross_street":"Failing Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.68338,42.998862]]}},{"id":"fRvpLMaU7lvY9ggMT1CNzkkuRhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Fsq6aeQT9xCoDtEKfDa4kJJNeyM="}],"description":"Utility work on NY 5 both directions between Failing Ave (St Johnsville) and Church Street (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:54:54Z"},"road_event_id":"fRvpLMaU7lvY9ggMT1CNzkkuRhU=","beginning_cross_street":"Failing Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.68338,42.998862]]}},{"id":"/3RrqYy2khyomYwnCqMPMhlneMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9rQXdKRrL5+E2bAIPsyC/+B38rU="}],"description":"Construction on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-10T12:12:14Z"},"road_event_id":"/3RrqYy2khyomYwnCqMPMhlneMw=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"9rQXdKRrL5+E2bAIPsyC/+B38rU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/3RrqYy2khyomYwnCqMPMhlneMw="},{"type":"next-occurrence","id":"GtXE+8GQRQi3mGGXP9ySJll1g/g="}],"description":"Construction on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-10T12:12:14Z"},"road_event_id":"9rQXdKRrL5+E2bAIPsyC/+B38rU=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"GtXE+8GQRQi3mGGXP9ySJll1g/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/3RrqYy2khyomYwnCqMPMhlneMw="}],"description":"Construction on NY 208 southbound between Houston Place (Montgomery) and Aristotle Drive (Montgomery) 2026002249/32721609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-10T12:12:14Z"},"road_event_id":"GtXE+8GQRQi3mGGXP9ySJll1g/g=","beginning_cross_street":"Houston Place","ending_cross_street":"Aristotle Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206722,41.507254]]}},{"id":"/ImLzWYTTxJkM/B3f+oCKwwxCQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 67"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pnuCC4qKrQCLTN/e8U4geDXl88M="}],"description":"Utility work on NY 67 both directions between Klock Road (St Johnsville) and Suits Road (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:54:29Z"},"road_event_id":"/ImLzWYTTxJkM/B3f+oCKwwxCQs=","beginning_cross_street":"Klock Road","ending_cross_street":"Suits Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.629836,42.987481]]}},{"id":"pnuCC4qKrQCLTN/e8U4geDXl88M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ImLzWYTTxJkM/B3f+oCKwwxCQs="},{"type":"next-occurrence","id":"iyn/ep77NZz5MNAQdHyihVV2eVY="}],"description":"Utility work on NY 67 both directions between Klock Road (St Johnsville) and Suits Road (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:54:29Z"},"road_event_id":"pnuCC4qKrQCLTN/e8U4geDXl88M=","beginning_cross_street":"Klock Road","ending_cross_street":"Suits Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.629836,42.987481]]}},{"id":"iyn/ep77NZz5MNAQdHyihVV2eVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ImLzWYTTxJkM/B3f+oCKwwxCQs="}],"description":"Utility work on NY 67 both directions between Klock Road (St Johnsville) and Suits Road (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:54:29Z"},"road_event_id":"iyn/ep77NZz5MNAQdHyihVV2eVY=","beginning_cross_street":"Klock Road","ending_cross_street":"Suits Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.629836,42.987481]]}},{"id":"ddWZkpOo5kjuJ+lA047pAvHq4us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V65hjXLc0sKpTgPDczL9fGjXEyY="}],"description":"Construction on NY 167 both directions between West State Street; NY 29; END ROUTE; East State Street (Manheim) and Slawson Street Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-17T10:32:03Z"},"road_event_id":"ddWZkpOo5kjuJ+lA047pAvHq4us=","beginning_cross_street":"West State Street; NY 29; END ROUTE; East State Street","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.770416,43.102312]]}},{"id":"V65hjXLc0sKpTgPDczL9fGjXEyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ddWZkpOo5kjuJ+lA047pAvHq4us="},{"type":"next-occurrence","id":"5/IxWBOUh7o5ueCKlJ8m7ENsRZ8="}],"description":"Construction on NY 167 both directions between West State Street; NY 29; END ROUTE; East State Street (Manheim) and Slawson Street Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-17T10:32:03Z"},"road_event_id":"V65hjXLc0sKpTgPDczL9fGjXEyY=","beginning_cross_street":"West State Street; NY 29; END ROUTE; East State Street","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.770416,43.102312]]}},{"id":"5/IxWBOUh7o5ueCKlJ8m7ENsRZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 167"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ddWZkpOo5kjuJ+lA047pAvHq4us="}],"description":"Construction on NY 167 both directions between West State Street; NY 29; END ROUTE; East State Street (Manheim) and Slawson Street Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-17T10:32:03Z"},"road_event_id":"5/IxWBOUh7o5ueCKlJ8m7ENsRZ8=","beginning_cross_street":"West State Street; NY 29; END ROUTE; East State Street","ending_cross_street":"Slawson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.770416,43.102312]]}},{"id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lNZhyug/23Pzy+etkmu5TtMpjgQ="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"lNZhyug/23Pzy+etkmu5TtMpjgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"h/JLZLCjWHDObQWSSbX7+P4MA50="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"lNZhyug/23Pzy+etkmu5TtMpjgQ=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"h/JLZLCjWHDObQWSSbX7+P4MA50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"A3lIHBxZfa5rYJ3dsiQF5xISeVs="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"h/JLZLCjWHDObQWSSbX7+P4MA50=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"A3lIHBxZfa5rYJ3dsiQF5xISeVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"9MNRsTqYVD0q+mNL5AJcUb8d6Nk="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"A3lIHBxZfa5rYJ3dsiQF5xISeVs=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"9MNRsTqYVD0q+mNL5AJcUb8d6Nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"a/BAnhVEDC/PvVHz83y5Xg9yhfE="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"9MNRsTqYVD0q+mNL5AJcUb8d6Nk=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"a/BAnhVEDC/PvVHz83y5Xg9yhfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"PINtbWbl5vcMU08CPFFb/A1YkJs="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"a/BAnhVEDC/PvVHz83y5Xg9yhfE=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"PINtbWbl5vcMU08CPFFb/A1YkJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"XXGl65ftbsu4jtMuQnUELShiglk="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"PINtbWbl5vcMU08CPFFb/A1YkJs=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"XXGl65ftbsu4jtMuQnUELShiglk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"oYrYCNqNMF4Z6eWCXOQoQDnKiA0="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"XXGl65ftbsu4jtMuQnUELShiglk=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"oYrYCNqNMF4Z6eWCXOQoQDnKiA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"21aAU5tpCZdKhYbjlnSMOx4PjQw="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"oYrYCNqNMF4Z6eWCXOQoQDnKiA0=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"21aAU5tpCZdKhYbjlnSMOx4PjQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="},{"type":"next-occurrence","id":"RapU98bxqUCNpS7oMsiPyPp+Sdg="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"21aAU5tpCZdKhYbjlnSMOx4PjQw=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"RapU98bxqUCNpS7oMsiPyPp+Sdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MqBkwxz+vSnixZ6+0U9nQH3WNFY="}],"description":"Utility work on NY 5A westbound between Village of New York Mills; Town of Whitestown Line (Whitestown) and Start NY 69 Overlap (New York Mills) Motorists will encounter a west bound shoulder closure, Thursday April 2nd, 2026 thru Thursday October 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:35:43Z"},"road_event_id":"RapU98bxqUCNpS7oMsiPyPp+Sdg=","beginning_cross_street":"Village of New York Mills; Town of Whitestown Line","ending_cross_street":"Start NY 69 Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.284511,43.115002]]}},{"id":"pkdgLtBAK/o2hCgog5LX1fDIJow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W6/mwaUNr721r4PI0BfqFQuez6g="}],"description":"Utility work on NY 5 both directions between Old Route 5 (St Johnsville) and Vedder Road (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:55:16Z"},"road_event_id":"pkdgLtBAK/o2hCgog5LX1fDIJow=","beginning_cross_street":"Old Route 5","ending_cross_street":"Vedder Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.65981,42.994594]]}},{"id":"W6/mwaUNr721r4PI0BfqFQuez6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pkdgLtBAK/o2hCgog5LX1fDIJow="},{"type":"next-occurrence","id":"5AHMhep9DH4TDUtgqrY19OVI7jM="}],"description":"Utility work on NY 5 both directions between Old Route 5 (St Johnsville) and Vedder Road (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:55:16Z"},"road_event_id":"W6/mwaUNr721r4PI0BfqFQuez6g=","beginning_cross_street":"Old Route 5","ending_cross_street":"Vedder Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.65981,42.994594]]}},{"id":"5AHMhep9DH4TDUtgqrY19OVI7jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pkdgLtBAK/o2hCgog5LX1fDIJow="}],"description":"Utility work on NY 5 both directions between Old Route 5 (St Johnsville) and Vedder Road (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T14:55:16Z"},"road_event_id":"5AHMhep9DH4TDUtgqrY19OVI7jM=","beginning_cross_street":"Old Route 5","ending_cross_street":"Vedder Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.65981,42.994594]]}},{"id":"312mosIxW5ko40RXI7ixfUtpiT0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD RT-17"],"direction":"unknown","related_road_events":[],"description":"Bridge demolition on OLD RT-17 both directions RT-394 (Coldspring), Monday April 6th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes closed","update_date":"2026-04-03T14:11:55Z"},"road_event_id":"312mosIxW5ko40RXI7ixfUtpiT0=","beginning_cross_street":"RT-394","ending_cross_street":"RT-394","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.879125,42.106334]]}},{"id":"ahZA3gwff4dDQ1mNKghj6Xaq1B8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Tree trimming on NY 28 both directions between ONeil Flowage (Indian Lake) and Durant Road (Indian Lake) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Wednesday April 8th, 2026 7:00 AM thru Friday April 24th, 2026 5:00 PM","update_date":"2026-04-17T12:13:38Z"},"road_event_id":"ahZA3gwff4dDQ1mNKghj6Xaq1B8=","beginning_cross_street":"ONeil Flowage","ending_cross_street":"Durant Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.346154,43.820343]]}},{"id":"ORC300526495","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9N"],"direction":"unknown","description":"Roadwork on NY 9N both directions CR 36 (Greenfield) to Saratoga; Warren County Line (Lake Luzerne) Various Short Term Closures Not currently Scheduled","update_date":"2026-04-10T21:30:01Z"},"road_event_id":"ORC300526495","beginning_cross_street":"CR 36","ending_cross_street":"Saratoga; Warren County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-03T16:31:23Z","end_date":"2026-04-11T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.846611,43.128423]]}},{"id":"b4m0ufxRT1egA9ourt9R/hBCosE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 3"],"direction":"unknown","related_road_events":[],"description":"Bridge work on CT 3 both directions between I-91 (Wetherfield) a 20-ton weight restriction for Bridge No. 00417 (Putnam Memorial Bridge) over the Connecticut River, located in the towns of Wethersfield and Glastonbury, effective April 6, 2026. This restriction will remain in place until specific work under the associated project is completed,, Continuous Monday April 6th, 2026 12:00 AM thru Friday November 3rd, 2028 11:59 PM All lanes open","update_date":"2026-04-03T19:30:45Z"},"road_event_id":"b4m0ufxRT1egA9ourt9R/hBCosE=","beginning_cross_street":"I-91","ending_cross_street":"I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.641876,41.712963]]}},{"id":"EJrvQf4NmmhAGACaBbakuNnzC7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OA1Th6pzsWmBGbULDxCsfFxsXf4="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"EJrvQf4NmmhAGACaBbakuNnzC7s=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"OA1Th6pzsWmBGbULDxCsfFxsXf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"lXvNPp4ml7Q4pwgojNlQwaj4Yso="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"OA1Th6pzsWmBGbULDxCsfFxsXf4=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"lXvNPp4ml7Q4pwgojNlQwaj4Yso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"MzYbM+Nr04fVRbL7VBa8jn/0kJU="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"lXvNPp4ml7Q4pwgojNlQwaj4Yso=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"MzYbM+Nr04fVRbL7VBa8jn/0kJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"AcTFfGfOi1Q4sERmTslUjZqyCoA="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"MzYbM+Nr04fVRbL7VBa8jn/0kJU=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"AcTFfGfOi1Q4sERmTslUjZqyCoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"+jvJCf2yM3c8/3ZPJOmvO8Z1pSA="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"AcTFfGfOi1Q4sERmTslUjZqyCoA=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"+jvJCf2yM3c8/3ZPJOmvO8Z1pSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"ukCF/zfLDwF4dnv7jbIpJMX1wJw="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"+jvJCf2yM3c8/3ZPJOmvO8Z1pSA=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"ukCF/zfLDwF4dnv7jbIpJMX1wJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"8ngMQ0qJQCuRTi5LgwRGiVvPC7M="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"ukCF/zfLDwF4dnv7jbIpJMX1wJw=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"8ngMQ0qJQCuRTi5LgwRGiVvPC7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"nSS9P+9rSPNsPa+LnJvdjTZxV3c="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"8ngMQ0qJQCuRTi5LgwRGiVvPC7M=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"nSS9P+9rSPNsPa+LnJvdjTZxV3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"6P8Q19egU957pfvIiogEB1RSXm0="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"nSS9P+9rSPNsPa+LnJvdjTZxV3c=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"6P8Q19egU957pfvIiogEB1RSXm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"G6kBLwCEDNVGpYOwas2cuqasp2Y="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"6P8Q19egU957pfvIiogEB1RSXm0=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"G6kBLwCEDNVGpYOwas2cuqasp2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"3qJqUMoN++xPsucewgaotcLE4ww="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"G6kBLwCEDNVGpYOwas2cuqasp2Y=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"3qJqUMoN++xPsucewgaotcLE4ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"YEsBJfnRTMnRm+hWhHmEP/WnusM="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"3qJqUMoN++xPsucewgaotcLE4ww=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"YEsBJfnRTMnRm+hWhHmEP/WnusM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"lLxHAXSEFxnB73yJ4vgmkw3NREk="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"YEsBJfnRTMnRm+hWhHmEP/WnusM=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"lLxHAXSEFxnB73yJ4vgmkw3NREk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="},{"type":"next-occurrence","id":"tbQmDu1pjYSZh2GIQqGm6ZzVF7s="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"lLxHAXSEFxnB73yJ4vgmkw3NREk=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"tbQmDu1pjYSZh2GIQqGm6ZzVF7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-41"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EJrvQf4NmmhAGACaBbakuNnzC7s="}],"description":"Safety improvements on CT-41 both directions between CT-343 (Sharon) and US-44 at US-44 (Salisbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:50:49Z"},"road_event_id":"tbQmDu1pjYSZh2GIQqGm6ZzVF7s=","beginning_cross_street":"CT-343","ending_cross_street":"US-44","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.477079,41.876399]]}},{"id":"pJB+F/UdnHhUpxVziaprHuiMzLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/27Z8gO77vTI+S/x1DICbcR8uio="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"pJB+F/UdnHhUpxVziaprHuiMzLU=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"/27Z8gO77vTI+S/x1DICbcR8uio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"roRjKNr/ze9VWr+QFUD8JIoXbjI="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"/27Z8gO77vTI+S/x1DICbcR8uio=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"roRjKNr/ze9VWr+QFUD8JIoXbjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"MQvfrQxhsfduf14zZCY/7SKjQZU="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"roRjKNr/ze9VWr+QFUD8JIoXbjI=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"MQvfrQxhsfduf14zZCY/7SKjQZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"2aSE6/E36XUfQiMxryB4rpUHByw="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"MQvfrQxhsfduf14zZCY/7SKjQZU=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"2aSE6/E36XUfQiMxryB4rpUHByw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"CnDNC9ABD+qw1Nk1nkaGZe7PxfU="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"2aSE6/E36XUfQiMxryB4rpUHByw=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"CnDNC9ABD+qw1Nk1nkaGZe7PxfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"YKCLzus34nnUf6YvNfPFeRpZovE="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"CnDNC9ABD+qw1Nk1nkaGZe7PxfU=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"YKCLzus34nnUf6YvNfPFeRpZovE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"MRgGGp9VYUfBkl8SOueJblCAkN4="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"YKCLzus34nnUf6YvNfPFeRpZovE=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"MRgGGp9VYUfBkl8SOueJblCAkN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"PSzwpKX8fAv+yjEt8s0uf1CbUOc="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"MRgGGp9VYUfBkl8SOueJblCAkN4=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"PSzwpKX8fAv+yjEt8s0uf1CbUOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"fCeC3cgdveR5jli585GVb9xkZC4="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"PSzwpKX8fAv+yjEt8s0uf1CbUOc=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"fCeC3cgdveR5jli585GVb9xkZC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"icWioABOFdU3n3uKO7+NtiX3c9E="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"fCeC3cgdveR5jli585GVb9xkZC4=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"icWioABOFdU3n3uKO7+NtiX3c9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"UI4dQW3mPu38FV1Eim8zLGBh2JA="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"icWioABOFdU3n3uKO7+NtiX3c9E=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"UI4dQW3mPu38FV1Eim8zLGBh2JA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"svgj48s+Exks/3xalZAT5KH1nOA="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"UI4dQW3mPu38FV1Eim8zLGBh2JA=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"svgj48s+Exks/3xalZAT5KH1nOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"G/qTtYrZUe0RJW0vheapyFPGTjo="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"svgj48s+Exks/3xalZAT5KH1nOA=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"G/qTtYrZUe0RJW0vheapyFPGTjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="},{"type":"next-occurrence","id":"QIP/KvEkSt6Oz/mhcN3Lz2fzjtQ="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"G/qTtYrZUe0RJW0vheapyFPGTjo=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"QIP/KvEkSt6Oz/mhcN3Lz2fzjtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-63"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pJB+F/UdnHhUpxVziaprHuiMzLU="}],"description":"Safety improvements on CT-63 both directions between CONN JUNIOR REPUBLIC (Litchfield) and WESTSIDE RD (Goshen) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T19:53:12Z"},"road_event_id":"QIP/KvEkSt6Oz/mhcN3Lz2fzjtQ=","beginning_cross_street":"CONN JUNIOR REPUBLIC","ending_cross_street":"WESTSIDE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.20889,41.785527]]}},{"id":"vmG6iDc+YkYv5vhB9uH4XbGETAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WaALxlZWlbd7VnHZPJJj2u6Ly68="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"vmG6iDc+YkYv5vhB9uH4XbGETAk=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"WaALxlZWlbd7VnHZPJJj2u6Ly68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"q/EghvYKEzUH6w/O5k7VPgmQFcY="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"WaALxlZWlbd7VnHZPJJj2u6Ly68=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"q/EghvYKEzUH6w/O5k7VPgmQFcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"Tz/HbJ9VN2ME85BgLVUo3a5T1OQ="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"q/EghvYKEzUH6w/O5k7VPgmQFcY=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"Tz/HbJ9VN2ME85BgLVUo3a5T1OQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"N1+ouIL2heZtGHte/KTiD6pqmWA="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"Tz/HbJ9VN2ME85BgLVUo3a5T1OQ=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"N1+ouIL2heZtGHte/KTiD6pqmWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"kVeFcFrPONN38TVh2K1+lXMuL5g="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"N1+ouIL2heZtGHte/KTiD6pqmWA=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"kVeFcFrPONN38TVh2K1+lXMuL5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"uqsSSymUKAV2TalgZycJCf85sDg="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"kVeFcFrPONN38TVh2K1+lXMuL5g=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"uqsSSymUKAV2TalgZycJCf85sDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"s8Neh5R36v15V23Wq2ESTOHVlrQ="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"uqsSSymUKAV2TalgZycJCf85sDg=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"s8Neh5R36v15V23Wq2ESTOHVlrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"P10Vt6rFrOqEAlnTtkFyyCPwURc="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"s8Neh5R36v15V23Wq2ESTOHVlrQ=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"P10Vt6rFrOqEAlnTtkFyyCPwURc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"k8z3SH+OyHGfo8Cfu3ED9D1q7wg="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"P10Vt6rFrOqEAlnTtkFyyCPwURc=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"k8z3SH+OyHGfo8Cfu3ED9D1q7wg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"47ZnT5Zf5Dla09Gu+2+wnh28hyM="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"k8z3SH+OyHGfo8Cfu3ED9D1q7wg=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"47ZnT5Zf5Dla09Gu+2+wnh28hyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"i5NUbnNqMqYWE1pebBDbB5Jgnio="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"47ZnT5Zf5Dla09Gu+2+wnh28hyM=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"i5NUbnNqMqYWE1pebBDbB5Jgnio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"NXZUg5DfqzkBSreL599Paflk4Ls="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"i5NUbnNqMqYWE1pebBDbB5Jgnio=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"NXZUg5DfqzkBSreL599Paflk4Ls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"pvU8ZDBBHVMB8Us/9eRfmRNj1eE="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"NXZUg5DfqzkBSreL599Paflk4Ls=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"pvU8ZDBBHVMB8Us/9eRfmRNj1eE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="},{"type":"next-occurrence","id":"qQ0nKTxQ5xbdkFlsqxnoA3K/5L0="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"pvU8ZDBBHVMB8Us/9eRfmRNj1eE=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"qQ0nKTxQ5xbdkFlsqxnoA3K/5L0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WEST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vmG6iDc+YkYv5vhB9uH4XbGETAk="}],"description":"Safety improvements on WEST ST both directions between CT-209 (Morris) and CT-109 at CT-63 (Morris) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:02:27Z"},"road_event_id":"qQ0nKTxQ5xbdkFlsqxnoA3K/5L0=","beginning_cross_street":"CT-209","ending_cross_street":"CT-63","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.229166,41.68332]]}},{"id":"M85sNe+f36UMnUFt02qeSzeYoxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8GU3RZyr3xAtz9h3AXzZ+vX7pRc="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"M85sNe+f36UMnUFt02qeSzeYoxQ=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"8GU3RZyr3xAtz9h3AXzZ+vX7pRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"EDzuyh9EQ5+d1Q10t3CXdJmUSWY="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"8GU3RZyr3xAtz9h3AXzZ+vX7pRc=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"EDzuyh9EQ5+d1Q10t3CXdJmUSWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"6ZRZkAEWHpfjGNfQ4tuNB/U4Mlw="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"EDzuyh9EQ5+d1Q10t3CXdJmUSWY=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"6ZRZkAEWHpfjGNfQ4tuNB/U4Mlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"AmMNJEQ6Xs7U9WQXuehklL/Tu8k="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"6ZRZkAEWHpfjGNfQ4tuNB/U4Mlw=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"AmMNJEQ6Xs7U9WQXuehklL/Tu8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"yP2ams/TYA5R9Ts5bcrq+t1oEE0="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"AmMNJEQ6Xs7U9WQXuehklL/Tu8k=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"yP2ams/TYA5R9Ts5bcrq+t1oEE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"kfa0Ap814cx/4glRQIi6fSRRR7E="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"yP2ams/TYA5R9Ts5bcrq+t1oEE0=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"kfa0Ap814cx/4glRQIi6fSRRR7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"7mZnCTW2ITGs2ETDJOScTIrwDi4="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"kfa0Ap814cx/4glRQIi6fSRRR7E=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"7mZnCTW2ITGs2ETDJOScTIrwDi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"Vm6IPErYoot9miOjzWP2k4VAigg="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"7mZnCTW2ITGs2ETDJOScTIrwDi4=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"Vm6IPErYoot9miOjzWP2k4VAigg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"078srZP/NvC4xal7UR0ka5uvEME="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"Vm6IPErYoot9miOjzWP2k4VAigg=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"078srZP/NvC4xal7UR0ka5uvEME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"9ZXAl8uY49AzLQxNKiFlbIxme6E="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"078srZP/NvC4xal7UR0ka5uvEME=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"9ZXAl8uY49AzLQxNKiFlbIxme6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"qYHIZNIpHOy+cs5hGuyBTBt9Ao8="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"9ZXAl8uY49AzLQxNKiFlbIxme6E=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"qYHIZNIpHOy+cs5hGuyBTBt9Ao8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"oiRa4lRZL8DgzXgFsVolP7CZoWo="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"qYHIZNIpHOy+cs5hGuyBTBt9Ao8=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"oiRa4lRZL8DgzXgFsVolP7CZoWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"JYzivz4UCJHd+2XOENpGN1ydtEI="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"oiRa4lRZL8DgzXgFsVolP7CZoWo=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"JYzivz4UCJHd+2XOENpGN1ydtEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="},{"type":"next-occurrence","id":"O+jUx8bavw0bPlIuHvT5CG3zcyQ="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"JYzivz4UCJHd+2XOENpGN1ydtEI=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"O+jUx8bavw0bPlIuHvT5CG3zcyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-168"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"M85sNe+f36UMnUFt02qeSzeYoxQ="}],"description":"Safety improvements on CT-168 both directions between N STONE ST (Suffield) and CT-75 (Suffield) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:04:49Z"},"road_event_id":"O+jUx8bavw0bPlIuHvT5CG3zcyQ=","beginning_cross_street":"N STONE ST","ending_cross_street":"CT-75","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.714934,41.993012]]}},{"id":"ssigxgufIfrwIRCjaApiWl/hAfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v5uumSEED3Nx5f1mxJK+bPu27hM="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"ssigxgufIfrwIRCjaApiWl/hAfE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"v5uumSEED3Nx5f1mxJK+bPu27hM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"JOFx3DZ60dGejy3Hwgc61SqyUk8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"v5uumSEED3Nx5f1mxJK+bPu27hM=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"JOFx3DZ60dGejy3Hwgc61SqyUk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"g4CKp6J1Sq+dYhM4vKOTfdjP720="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"JOFx3DZ60dGejy3Hwgc61SqyUk8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"g4CKp6J1Sq+dYhM4vKOTfdjP720=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"ONQ/3BjlPtqVoWHotbTlC7tihXg="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"g4CKp6J1Sq+dYhM4vKOTfdjP720=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"ONQ/3BjlPtqVoWHotbTlC7tihXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"Y3CrZFRBFUUuijue0Ra9PjHT1Gk="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"ONQ/3BjlPtqVoWHotbTlC7tihXg=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"Y3CrZFRBFUUuijue0Ra9PjHT1Gk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"yUmmG7DC2vk3N3Pvu/2AQAk24wQ="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"Y3CrZFRBFUUuijue0Ra9PjHT1Gk=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"yUmmG7DC2vk3N3Pvu/2AQAk24wQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"H2pf3bOlxH7rAIOC+u5z4n5e3Ww="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"yUmmG7DC2vk3N3Pvu/2AQAk24wQ=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"H2pf3bOlxH7rAIOC+u5z4n5e3Ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"S2pxU9b93nDS+JdxmD3UG+hwBdE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"H2pf3bOlxH7rAIOC+u5z4n5e3Ww=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"S2pxU9b93nDS+JdxmD3UG+hwBdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"zerlP1wvOtTJzL5zbU5rjr+C4fQ="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"S2pxU9b93nDS+JdxmD3UG+hwBdE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"zerlP1wvOtTJzL5zbU5rjr+C4fQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"gwNrkY3uBOiHQExnvCG4GlCflmE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"zerlP1wvOtTJzL5zbU5rjr+C4fQ=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"gwNrkY3uBOiHQExnvCG4GlCflmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"znDiD93uNDQbZphwzOkRwHEpd5g="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"gwNrkY3uBOiHQExnvCG4GlCflmE=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"znDiD93uNDQbZphwzOkRwHEpd5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"4QT5NyFLxUMYCx1/TymIXnlIcF8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"znDiD93uNDQbZphwzOkRwHEpd5g=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"4QT5NyFLxUMYCx1/TymIXnlIcF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"9E4RvZLKzyNzAZbWYkvtzJlB508="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"4QT5NyFLxUMYCx1/TymIXnlIcF8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"9E4RvZLKzyNzAZbWYkvtzJlB508=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="},{"type":"next-occurrence","id":"oa/Kgq+W8iCXzzCfNS5QrUK9px8="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"9E4RvZLKzyNzAZbWYkvtzJlB508=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"oa/Kgq+W8iCXzzCfNS5QrUK9px8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-181"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ssigxgufIfrwIRCjaApiWl/hAfE="}],"description":"Safety improvements on CT-181 both directions between OLD COUNTY RD (Barkhamsted) and CT-318 (Barkhamsted) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:07:46Z"},"road_event_id":"oa/Kgq+W8iCXzzCfNS5QrUK9px8=","beginning_cross_street":"OLD COUNTY RD","ending_cross_street":"CT-318","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.990375,41.897742]]}},{"id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gI50EEjIsAw33lUWD/f7o9iNpD8="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"gI50EEjIsAw33lUWD/f7o9iNpD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"TKFbE2xudZA2YSXVGq931maNSIs="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"gI50EEjIsAw33lUWD/f7o9iNpD8=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"TKFbE2xudZA2YSXVGq931maNSIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"/QKrQOj1ptK/RiKbL++u5DbPpfk="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"TKFbE2xudZA2YSXVGq931maNSIs=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"/QKrQOj1ptK/RiKbL++u5DbPpfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"hv6AwheEpO+NtQTCrk0maHp2dVY="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"/QKrQOj1ptK/RiKbL++u5DbPpfk=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"hv6AwheEpO+NtQTCrk0maHp2dVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"gRW6SlTBpNiaqWhBAb3fUJd9y3g="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"hv6AwheEpO+NtQTCrk0maHp2dVY=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"gRW6SlTBpNiaqWhBAb3fUJd9y3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"7DEjD346DU6xNQLgOcQ2c94lljw="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"gRW6SlTBpNiaqWhBAb3fUJd9y3g=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"7DEjD346DU6xNQLgOcQ2c94lljw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"akNh83tfyT0W+FLkxrYwZL9QLok="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"7DEjD346DU6xNQLgOcQ2c94lljw=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"akNh83tfyT0W+FLkxrYwZL9QLok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"S2yUW01hQmbTFFpnFXXt7TLR/Tw="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"akNh83tfyT0W+FLkxrYwZL9QLok=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"S2yUW01hQmbTFFpnFXXt7TLR/Tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"swFaOKdcLe6ZdezDQziYdziIO4w="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"S2yUW01hQmbTFFpnFXXt7TLR/Tw=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"swFaOKdcLe6ZdezDQziYdziIO4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"j7YH+lKvMJVuI31J3bGQT84Dq+4="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"swFaOKdcLe6ZdezDQziYdziIO4w=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"j7YH+lKvMJVuI31J3bGQT84Dq+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"PQNxxsYcX7BecgRsM5elZyMlJ98="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"j7YH+lKvMJVuI31J3bGQT84Dq+4=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"PQNxxsYcX7BecgRsM5elZyMlJ98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"axorNzBddIF2lGYVenb+GBf6VwE="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"PQNxxsYcX7BecgRsM5elZyMlJ98=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"axorNzBddIF2lGYVenb+GBf6VwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"xLN0ta1GxsVheqKFksHL8g7Op8Y="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"axorNzBddIF2lGYVenb+GBf6VwE=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"xLN0ta1GxsVheqKFksHL8g7Op8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="},{"type":"next-occurrence","id":"aKmwh1eXAB1Rl0ZmKQdekGCzEro="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"xLN0ta1GxsVheqKFksHL8g7Op8Y=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"aKmwh1eXAB1Rl0ZmKQdekGCzEro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FpUrWmjaXg3dUWEkU+r6ZZHdeTg="}],"description":"Safety improvements on US-202 both directions between FERN DR (Torrington) and HARRISON RD (Torrington) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:09:46Z"},"road_event_id":"aKmwh1eXAB1Rl0ZmKQdekGCzEro=","beginning_cross_street":"FERN DR","ending_cross_street":"HARRISON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.107495,41.809117]]}},{"id":"dLCgeXB6eHVzWD41jVtWjetQEKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9WQtX8B24M8T4ZTpOFsuarEeWM4="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"dLCgeXB6eHVzWD41jVtWjetQEKU=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"9WQtX8B24M8T4ZTpOFsuarEeWM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"zS/AVoy7lUfUB3YozmLj6Wb68po="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"9WQtX8B24M8T4ZTpOFsuarEeWM4=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"zS/AVoy7lUfUB3YozmLj6Wb68po=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"UL/7ema/Ft0qk+mcArAvRKT5yMM="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"zS/AVoy7lUfUB3YozmLj6Wb68po=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"UL/7ema/Ft0qk+mcArAvRKT5yMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"7iQxveTe63Hu15hHP1thiNtgtsE="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"UL/7ema/Ft0qk+mcArAvRKT5yMM=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"7iQxveTe63Hu15hHP1thiNtgtsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"mKpyaDhvYiw3+5C6fUTl1QYsS7s="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"7iQxveTe63Hu15hHP1thiNtgtsE=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"mKpyaDhvYiw3+5C6fUTl1QYsS7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"xuYOkaWrh3Tztd8Nfu40Sf8KHlY="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"mKpyaDhvYiw3+5C6fUTl1QYsS7s=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"xuYOkaWrh3Tztd8Nfu40Sf8KHlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"nZHWbrat7hIh4bjyrP7qQiIGQ/0="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"xuYOkaWrh3Tztd8Nfu40Sf8KHlY=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"nZHWbrat7hIh4bjyrP7qQiIGQ/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"nnp9+6een4gRr5KQQKhdcs8HddQ="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"nZHWbrat7hIh4bjyrP7qQiIGQ/0=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"nnp9+6een4gRr5KQQKhdcs8HddQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"iMUjXJ/xGLgWdzZu6fNVDvujhYA="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"nnp9+6een4gRr5KQQKhdcs8HddQ=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"iMUjXJ/xGLgWdzZu6fNVDvujhYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"ty4Lpuz7/7XJKZsoLFz2hOdQlEY="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"iMUjXJ/xGLgWdzZu6fNVDvujhYA=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"ty4Lpuz7/7XJKZsoLFz2hOdQlEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"XVBiI+KDoRijXLe64N1Xamd/pFA="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"ty4Lpuz7/7XJKZsoLFz2hOdQlEY=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"XVBiI+KDoRijXLe64N1Xamd/pFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"fS2ytAK+fKVioiq27kCS5+u0fB4="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"XVBiI+KDoRijXLe64N1Xamd/pFA=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"fS2ytAK+fKVioiq27kCS5+u0fB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"JFswvd7YEifyOYmLho0+VEYjkPc="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"fS2ytAK+fKVioiq27kCS5+u0fB4=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"JFswvd7YEifyOYmLho0+VEYjkPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="},{"type":"next-occurrence","id":"0hQsmuR5Xuy9Fctz5z0ppCoWEKY="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"JFswvd7YEifyOYmLho0+VEYjkPc=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"0hQsmuR5Xuy9Fctz5z0ppCoWEKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-4"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dLCgeXB6eHVzWD41jVtWjetQEKU="}],"description":"Safety improvements on CT-4 both directions between CT-4 (Harwinton) and COUNTY LINE RD (Harwinton) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:12:36Z"},"road_event_id":"0hQsmuR5Xuy9Fctz5z0ppCoWEKY=","beginning_cross_street":"CT-4","ending_cross_street":"COUNTY LINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.067796,41.770195]]}},{"id":"hJKDONYnJpXzZlgPidSjsPBV4yQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TARJkC0vpjn/zl20mCJHqDCXQlY="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"hJKDONYnJpXzZlgPidSjsPBV4yQ=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"TARJkC0vpjn/zl20mCJHqDCXQlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"FeQhZmhb230IjT1IwNUK+KFbaDk="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"TARJkC0vpjn/zl20mCJHqDCXQlY=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"FeQhZmhb230IjT1IwNUK+KFbaDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"5bpLCpk+QveIRk6ZB72vjIs/kEk="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"FeQhZmhb230IjT1IwNUK+KFbaDk=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"5bpLCpk+QveIRk6ZB72vjIs/kEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"2okDeJQQSx+59ZPVipfDYwLYTo8="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"5bpLCpk+QveIRk6ZB72vjIs/kEk=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"2okDeJQQSx+59ZPVipfDYwLYTo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"hM9a2RYRwIlB0NwUMPaG55kg92Q="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"2okDeJQQSx+59ZPVipfDYwLYTo8=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"hM9a2RYRwIlB0NwUMPaG55kg92Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"G1IELQUuCC2pRIg2tbDtpq/WuRw="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"hM9a2RYRwIlB0NwUMPaG55kg92Q=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"G1IELQUuCC2pRIg2tbDtpq/WuRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"cDG1V1zH16ZPTNxQW+SvKttg/sQ="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"G1IELQUuCC2pRIg2tbDtpq/WuRw=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"cDG1V1zH16ZPTNxQW+SvKttg/sQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"C4j8oatPXp/aqG5l2VMaEgoNJwU="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"cDG1V1zH16ZPTNxQW+SvKttg/sQ=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"C4j8oatPXp/aqG5l2VMaEgoNJwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"M9BQX9mB/pG4H0B/Bv8s2g0Xmv4="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"C4j8oatPXp/aqG5l2VMaEgoNJwU=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"M9BQX9mB/pG4H0B/Bv8s2g0Xmv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"aRchabkUf8xOPowXn4U9QlxWdbo="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"M9BQX9mB/pG4H0B/Bv8s2g0Xmv4=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"aRchabkUf8xOPowXn4U9QlxWdbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"aZ7X2TKSWhnd37Pon+jiwAkxcCU="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"aRchabkUf8xOPowXn4U9QlxWdbo=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"aZ7X2TKSWhnd37Pon+jiwAkxcCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"kmBMPUSLFQUkBlgvbWvlwvSXNTw="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"aZ7X2TKSWhnd37Pon+jiwAkxcCU=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"kmBMPUSLFQUkBlgvbWvlwvSXNTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"D9zX3rBikSJKebvO104LsTDg4E0="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"kmBMPUSLFQUkBlgvbWvlwvSXNTw=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"D9zX3rBikSJKebvO104LsTDg4E0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="},{"type":"next-occurrence","id":"Z46c79+n3WcuxJ1l7hLNTP0mRXQ="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"D9zX3rBikSJKebvO104LsTDg4E0=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"Z46c79+n3WcuxJ1l7hLNTP0mRXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hJKDONYnJpXzZlgPidSjsPBV4yQ="}],"description":"Safety improvements on US-202 both directions between SAW MILL RD (Danbury) and US-6 at DRIFTWAY RD (Danbury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:15:07Z"},"road_event_id":"Z46c79+n3WcuxJ1l7hLNTP0mRXQ=","beginning_cross_street":"SAW MILL RD","ending_cross_street":"DRIFTWAY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.541129,41.390616]]}},{"id":"uUfDLDhRp2wn+dt+UZRbBAsxBMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[],"description":"Survey work and guard rail repairs and construction and line striping on New Jersey Turnpike/I-95 Local Lanes northbound between Exit 70B - Teaneck (Teaneck Twp) and North of Exit 71 (NB) - NJ 4/Broad Ave (Englewood), Thursday April 23rd,2026 thru Friday April 24th,2026, Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed northbound,","update_date":"2026-04-21T09:00:07Z"},"road_event_id":"uUfDLDhRp2wn+dt+UZRbBAsxBMk=","beginning_cross_street":"Exit 70B - Teaneck","ending_cross_street":"North of Exit 71 (NB) - NJ 4/Broad Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008486,40.865103]]}},{"id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cA/3ai4+nnSaj/sx/t9zDXpj8Ls="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"cA/3ai4+nnSaj/sx/t9zDXpj8Ls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"kGbw4NW6X8U66fkfmRyD9Nm0P1I="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"cA/3ai4+nnSaj/sx/t9zDXpj8Ls=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"kGbw4NW6X8U66fkfmRyD9Nm0P1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"6rsY7CdXFyCD4FHHKFFVmoAGZ4w="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"kGbw4NW6X8U66fkfmRyD9Nm0P1I=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"6rsY7CdXFyCD4FHHKFFVmoAGZ4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"G529Ps26yjI/9pKUzpmN5r3mvDg="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"6rsY7CdXFyCD4FHHKFFVmoAGZ4w=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"G529Ps26yjI/9pKUzpmN5r3mvDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"7bGbjg3boSgnRt1uIj4dIBG4YTs="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"G529Ps26yjI/9pKUzpmN5r3mvDg=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"7bGbjg3boSgnRt1uIj4dIBG4YTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"5G4tXAFcBdlmRvpKGKZvdXZqWT8="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"7bGbjg3boSgnRt1uIj4dIBG4YTs=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"5G4tXAFcBdlmRvpKGKZvdXZqWT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"7wjIOh3WMAJeglchDxqY6QheXOY="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"5G4tXAFcBdlmRvpKGKZvdXZqWT8=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"7wjIOh3WMAJeglchDxqY6QheXOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"Il4hLpBAuLCmabRS1kAxZA5hgsw="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"7wjIOh3WMAJeglchDxqY6QheXOY=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"Il4hLpBAuLCmabRS1kAxZA5hgsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"CXRQ45JfpPV7zxgRhpTNkXvaAXo="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"Il4hLpBAuLCmabRS1kAxZA5hgsw=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"CXRQ45JfpPV7zxgRhpTNkXvaAXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"+1htm1BrcUCs+qI76XyfKFju1R0="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"CXRQ45JfpPV7zxgRhpTNkXvaAXo=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"+1htm1BrcUCs+qI76XyfKFju1R0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"Gk7L6v4J6DmU4vEBxQ9cmGOOgAI="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"+1htm1BrcUCs+qI76XyfKFju1R0=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"Gk7L6v4J6DmU4vEBxQ9cmGOOgAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"8mPB4kDQp4//toyXQ6hs/xKMLjQ="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"Gk7L6v4J6DmU4vEBxQ9cmGOOgAI=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"8mPB4kDQp4//toyXQ6hs/xKMLjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"VTMRQWX+BDMcPBDXb3Y2wpm2K3U="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"8mPB4kDQp4//toyXQ6hs/xKMLjQ=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"VTMRQWX+BDMcPBDXb3Y2wpm2K3U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="},{"type":"next-occurrence","id":"jq+JoPn+ihtn6dCeevJQeHWG8is="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"VTMRQWX+BDMcPBDXb3Y2wpm2K3U=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"jq+JoPn+ihtn6dCeevJQeHWG8is=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-188"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JifGM7S1GZAfEQ7+AnxmLMMPv/8="}],"description":"Safety improvements on CT-188 northbound between CT-188 (Southbury) and CT-188 (Middlebury) There will be lane closures, Wednesday April 1st, 2026 thru Tuesday September 15th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-03T20:17:35Z"},"road_event_id":"jq+JoPn+ihtn6dCeevJQeHWG8is=","beginning_cross_street":"CT-188 ","ending_cross_street":"CT-188 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.162242,41.464895]]}},{"id":"DP0V1KO1+aqx1PRFk/9dRj4wa0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and deck work and milling and paving operations on New Jersey Turnpike - Western Spur northbound between Southern Mixing Bowl (Newark) and South of Northern Mixing Bowl (Ridgefield), Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 09:00 PM thru 06:00 AM All lanes closed northbound,","update_date":"2026-04-22T08:00:00Z"},"road_event_id":"DP0V1KO1+aqx1PRFk/9dRj4wa0s=","beginning_cross_street":"Southern Mixing Bowl","ending_cross_street":"South of Northern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.140531,40.713624]]}},{"id":"ihCGOm/WdMjm+1YnJIGlMSogdbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1/Rxf2oXEKgFXrx3ibXjYSAHrXw="}],"description":"Drainage improvements on NY 17 eastbound (Elmira) Lanes shift, Friday April 3rd, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-06T14:43:57Z"},"road_event_id":"ihCGOm/WdMjm+1YnJIGlMSogdbA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.771878,42.075108]]}},{"id":"1/Rxf2oXEKgFXrx3ibXjYSAHrXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCGOm/WdMjm+1YnJIGlMSogdbA="},{"type":"next-occurrence","id":"mFqGobvKMpr4/iEIA08+51hMnK0="}],"description":"Drainage improvements on NY 17 eastbound (Elmira) Lanes shift, Friday April 3rd, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-06T14:43:57Z"},"road_event_id":"1/Rxf2oXEKgFXrx3ibXjYSAHrXw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.771878,42.075108]]}},{"id":"mFqGobvKMpr4/iEIA08+51hMnK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ihCGOm/WdMjm+1YnJIGlMSogdbA="}],"description":"Drainage improvements on NY 17 eastbound (Elmira) Lanes shift, Friday April 3rd, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-06T14:43:57Z"},"road_event_id":"mFqGobvKMpr4/iEIA08+51hMnK0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.771878,42.075108]]}},{"id":"JpQfCcIldTAvcEE7/hdLTQ558bU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zEEWOU3AkLsvhXvTHVXhWN0O5o0="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"JpQfCcIldTAvcEE7/hdLTQ558bU=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"zEEWOU3AkLsvhXvTHVXhWN0O5o0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"MCdpux6EUEmiXlZLUKXgiSgt8y4="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"zEEWOU3AkLsvhXvTHVXhWN0O5o0=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"MCdpux6EUEmiXlZLUKXgiSgt8y4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"/ljPyFI5kFfyEx+4KP5K8z0wH/0="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"MCdpux6EUEmiXlZLUKXgiSgt8y4=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"/ljPyFI5kFfyEx+4KP5K8z0wH/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"zDejnqSKIk6BOpGcwq5P2h1LtYg="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"/ljPyFI5kFfyEx+4KP5K8z0wH/0=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"zDejnqSKIk6BOpGcwq5P2h1LtYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"zfRBS0Z+HWWgAtfzdXuFlwt8CjM="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"zDejnqSKIk6BOpGcwq5P2h1LtYg=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"zfRBS0Z+HWWgAtfzdXuFlwt8CjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"W5bMnj9XaGculpqkP9I+G11B2jA="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"zfRBS0Z+HWWgAtfzdXuFlwt8CjM=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"W5bMnj9XaGculpqkP9I+G11B2jA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"rK0XBflniv8ZZhTjHKe+5/kwO4c="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"W5bMnj9XaGculpqkP9I+G11B2jA=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"rK0XBflniv8ZZhTjHKe+5/kwO4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"q6uh3Zv2YcSVjPD/C1K6VVIVUpo="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"rK0XBflniv8ZZhTjHKe+5/kwO4c=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"q6uh3Zv2YcSVjPD/C1K6VVIVUpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"0lnGajDmVLflJlS0/1CIf+bNZqc="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"q6uh3Zv2YcSVjPD/C1K6VVIVUpo=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T18:00:00Z","end_date":"2026-05-05T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"0lnGajDmVLflJlS0/1CIf+bNZqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="},{"type":"next-occurrence","id":"lw1890t9247uMK/SJPi/15uPz/A="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"0lnGajDmVLflJlS0/1CIf+bNZqc=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"lw1890t9247uMK/SJPi/15uPz/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JpQfCcIldTAvcEE7/hdLTQ558bU="}],"description":"Track repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Greenport (Greenport) buses replace trains., Monday April 20th,2026 thru Friday April 24th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday April 27th,2026 thru Friday May 1st,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 4th,2026 thru Friday May 8th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM, Monday May 11th,2026 thru Friday May 15th,2026, Monday thru Friday, 07:00 AM thru 06:30 PM","update_date":"2026-04-17T22:30:20Z"},"road_event_id":"lw1890t9247uMK/SJPi/15uPz/A=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Greenport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T18:00:00Z","end_date":"2026-05-07T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"OpZi+T3EhV31JSu51HYEiXKhhms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 38 - US 46 (Denville Twp), Continuous Friday April 10, 2026 08:00 PM thru Thursday December 31, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-05T08:13:49Z"},"road_event_id":"OpZi+T3EhV31JSu51HYEiXKhhms=","beginning_cross_street":"West of Exit 38 - US 46","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.496742,40.90538]]}},{"id":"ycy9/WRcFT/Hz/4ba15+nH04vso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound near West of Exit 11 - CR 524 (Upper Freehold Twp), Friday April 24, 2026 09:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-06T11:16:41Z"},"road_event_id":"ycy9/WRcFT/Hz/4ba15+nH04vso=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.536781,40.176818]]}},{"id":"qhOlwRnPygsYYHj7xMUtfqQWfzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound near West of Exit 11 - CR 524 (Upper Freehold Twp), Friday April 24, 2026 09:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-06T11:16:43Z"},"road_event_id":"qhOlwRnPygsYYHj7xMUtfqQWfzU=","beginning_cross_street":"West of Exit 11 - CR 524","ending_cross_street":"West of Exit 11 - CR 524","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546142,40.177719]]}},{"id":"rbwoLuMfyQuBm84xlJj10qYszjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qY/jI4DHlhyyR2fq3ZopmV5Ltrs="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"rbwoLuMfyQuBm84xlJj10qYszjM=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"qY/jI4DHlhyyR2fq3ZopmV5Ltrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbwoLuMfyQuBm84xlJj10qYszjM="},{"type":"next-occurrence","id":"yyAIpmWki52rIIhMRRUguMue6QI="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"qY/jI4DHlhyyR2fq3ZopmV5Ltrs=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"yyAIpmWki52rIIhMRRUguMue6QI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbwoLuMfyQuBm84xlJj10qYszjM="},{"type":"next-occurrence","id":"6jTyOjKOLURDzGRydX+XyVp7NZc="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"yyAIpmWki52rIIhMRRUguMue6QI=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"6jTyOjKOLURDzGRydX+XyVp7NZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbwoLuMfyQuBm84xlJj10qYszjM="},{"type":"next-occurrence","id":"baqtHU30wnDFmHUx8QnSttduSv8="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"6jTyOjKOLURDzGRydX+XyVp7NZc=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"baqtHU30wnDFmHUx8QnSttduSv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbwoLuMfyQuBm84xlJj10qYszjM="},{"type":"next-occurrence","id":"sxxDRQjcUy8DYVF69mtHbMvhZP8="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"baqtHU30wnDFmHUx8QnSttduSv8=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"sxxDRQjcUy8DYVF69mtHbMvhZP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbwoLuMfyQuBm84xlJj10qYszjM="},{"type":"next-occurrence","id":"H7Y/8LNUM03/akB/j59GYeabj3s="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"sxxDRQjcUy8DYVF69mtHbMvhZP8=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"H7Y/8LNUM03/akB/j59GYeabj3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbwoLuMfyQuBm84xlJj10qYszjM="},{"type":"next-occurrence","id":"fKKs7elWU7bJcPVc1RM0XuG09DE="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"H7Y/8LNUM03/akB/j59GYeabj3s=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"fKKs7elWU7bJcPVc1RM0XuG09DE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S CROUSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rbwoLuMfyQuBm84xlJj10qYszjM="}],"description":"Roadwork on S CROUSE AVE northbound between E ADAMS ST (Syracuse) and E Genesee St; RT-92 (Syracuse), Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-06T11:29:52Z"},"road_event_id":"fKKs7elWU7bJcPVc1RM0XuG09DE=","beginning_cross_street":"E ADAMS ST","ending_cross_street":"E Genesee St; RT-92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.136619,43.042799]]}},{"id":"LOa0f+0uQ8sLgb7q4ImJsFxzJ3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S+O/FGzXtD+o1RPib/QOGcEcig8="}],"description":"Street sweeping on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 19A/B - NY 120A (Rye) Res 8-9 RW/NIGHT/32716809 - This is a moving operation. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Saturday April 25th, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile left lane closure, Thursday April 30th, 2026 thru Saturday May 2nd, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile right lane","update_date":"2026-04-18T09:00:50Z"},"road_event_id":"LOa0f+0uQ8sLgb7q4ImJsFxzJ3g=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 19A/B - NY 120A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798037,40.949934]]}},{"id":"S+O/FGzXtD+o1RPib/QOGcEcig8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LOa0f+0uQ8sLgb7q4ImJsFxzJ3g="},{"type":"next-occurrence","id":"ltYLT5LUpxCsGquo1fbxmVvXht4="}],"description":"Street sweeping on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 19A/B - NY 120A (Rye) Res 8-9 RW/NIGHT/32716809 - This is a moving operation. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Saturday April 25th, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile left lane closure, Thursday April 30th, 2026 thru Saturday May 2nd, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile right lane","update_date":"2026-04-18T09:00:50Z"},"road_event_id":"S+O/FGzXtD+o1RPib/QOGcEcig8=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 19A/B - NY 120A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798037,40.949934]]}},{"id":"ltYLT5LUpxCsGquo1fbxmVvXht4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LOa0f+0uQ8sLgb7q4ImJsFxzJ3g="},{"type":"next-occurrence","id":"7MV/YjheARO2eKBiSuTVZTy5CVQ="}],"description":"Street sweeping on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 19A/B - NY 120A (Rye) Res 8-9 RW/NIGHT/32716809 - This is a moving operation. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Saturday April 25th, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile left lane closure, Thursday April 30th, 2026 thru Saturday May 2nd, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile right lane","update_date":"2026-04-18T09:00:50Z"},"road_event_id":"ltYLT5LUpxCsGquo1fbxmVvXht4=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 19A/B - NY 120A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798037,40.949934]]}},{"id":"7MV/YjheARO2eKBiSuTVZTy5CVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LOa0f+0uQ8sLgb7q4ImJsFxzJ3g="}],"description":"Street sweeping on Hutchinson River Parkway [Westchester] both directions between Exit 4A/B - Boston Post Road - US 1 (Pelham) and Exit 19A/B - NY 120A (Rye) Res 8-9 RW/NIGHT/32716809 - This is a moving operation. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Saturday April 25th, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile left lane closure, Thursday April 30th, 2026 thru Saturday May 2nd, 2026 Thursday/ Friday, 11:00 PM thru 05:00 AM, mobile right lane","update_date":"2026-04-18T09:00:50Z"},"road_event_id":"7MV/YjheARO2eKBiSuTVZTy5CVQ=","beginning_cross_street":"Exit 4A/B - Boston Post Road - US 1","ending_cross_street":"Exit 19A/B - NY 120A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T02:00:00Z","end_date":"2026-05-03T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.798037,40.949934]]}},{"id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MgmSOy2m0vgmhXKnonmv8oeedgY="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"MgmSOy2m0vgmhXKnonmv8oeedgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"8eXD6lG8aY/Q4t3C694Dh4i/XW8="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"MgmSOy2m0vgmhXKnonmv8oeedgY=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"8eXD6lG8aY/Q4t3C694Dh4i/XW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"BbPF8VzlrScjXG8CUpeR9btG8fU="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"8eXD6lG8aY/Q4t3C694Dh4i/XW8=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"BbPF8VzlrScjXG8CUpeR9btG8fU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"47CapicYy7TKuNM8wqjzRwi3S7c="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"BbPF8VzlrScjXG8CUpeR9btG8fU=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"47CapicYy7TKuNM8wqjzRwi3S7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"Uy61pGgPYlxhdeBHvNeGShCDbvM="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"47CapicYy7TKuNM8wqjzRwi3S7c=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"Uy61pGgPYlxhdeBHvNeGShCDbvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"mDBan+Ghhd+ehlsuRXvJAIBOiz4="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"Uy61pGgPYlxhdeBHvNeGShCDbvM=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"mDBan+Ghhd+ehlsuRXvJAIBOiz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"sgMCJ/MQKR/UM1LKfWj8NqNcJVM="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"mDBan+Ghhd+ehlsuRXvJAIBOiz4=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"sgMCJ/MQKR/UM1LKfWj8NqNcJVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"oZdIbRRbLxRgEd/yORWEofoL6Fg="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"sgMCJ/MQKR/UM1LKfWj8NqNcJVM=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"oZdIbRRbLxRgEd/yORWEofoL6Fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"xz1iiG6YFVxGVwKqvAHsbH/bgVI="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"oZdIbRRbLxRgEd/yORWEofoL6Fg=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"xz1iiG6YFVxGVwKqvAHsbH/bgVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="},{"type":"next-occurrence","id":"LmWi6TrRq22nvheM8sdXxRNLMmc="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"xz1iiG6YFVxGVwKqvAHsbH/bgVI=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"LmWi6TrRq22nvheM8sdXxRNLMmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/ELwrhkuI4m/Y/c/Dv5lxQVOWME="}],"description":"Roadwork on NY 13 northbound between West State Street; NY 13 (Ithaca) and West Seneca Street; NY 79 (Ithaca), Monday April 6th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-06T13:42:26Z"},"road_event_id":"LmWi6TrRq22nvheM8sdXxRNLMmc=","beginning_cross_street":"West State Street; NY 13","ending_cross_street":"West Seneca Street; NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508354,42.439359]]}},{"id":"XkMMv8ze1RYqwhHXuBoo8Mq44rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 33 both directions between CR 161; Bromley Rd (Riga) and Percy Rd. (Riga), Continuous Monday April 6th, 2026 12:00 AM thru Saturday May 23rd, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-06T15:24:29Z"},"road_event_id":"XkMMv8ze1RYqwhHXuBoo8Mq44rA=","beginning_cross_street":"CR 161; Bromley Rd","ending_cross_street":"Percy Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.864952,43.110284]]}},{"id":"7fARuSYFLqnpJlzpsXe12xV4QQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"g3r/berKipqYsMai4FhWp66nQQA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"7fARuSYFLqnpJlzpsXe12xV4QQc=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"g3r/berKipqYsMai4FhWp66nQQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"/1dkg9RmXYpbvVB1hGu1XQ24aC0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"g3r/berKipqYsMai4FhWp66nQQA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"/1dkg9RmXYpbvVB1hGu1XQ24aC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"nXfR/NKBT+Z2zlxxMmZY00wnHDk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"/1dkg9RmXYpbvVB1hGu1XQ24aC0=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"nXfR/NKBT+Z2zlxxMmZY00wnHDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"YZu6LLw5ulURzt0FR7d92ZN81HU="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"nXfR/NKBT+Z2zlxxMmZY00wnHDk=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"YZu6LLw5ulURzt0FR7d92ZN81HU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"70UMp9K0JeUmWSCQnpwT4SyRsOw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"YZu6LLw5ulURzt0FR7d92ZN81HU=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"70UMp9K0JeUmWSCQnpwT4SyRsOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"kNLGU08j1ZDMJ2BHEQNv6R4hTxc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"70UMp9K0JeUmWSCQnpwT4SyRsOw=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"kNLGU08j1ZDMJ2BHEQNv6R4hTxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"UsjRb91hfDljOGiwQuyRqW483lE="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"kNLGU08j1ZDMJ2BHEQNv6R4hTxc=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"UsjRb91hfDljOGiwQuyRqW483lE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"Wyze3MUavjLHsMGIR+5Ja3O6P9c="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"UsjRb91hfDljOGiwQuyRqW483lE=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"Wyze3MUavjLHsMGIR+5Ja3O6P9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"tBoDaDLSaup1bpORspLWPR0XzDA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"Wyze3MUavjLHsMGIR+5Ja3O6P9c=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"tBoDaDLSaup1bpORspLWPR0XzDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="},{"type":"next-occurrence","id":"U/jqoO8vPTcxbZuLP7xUf4/6+Mg="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"tBoDaDLSaup1bpORspLWPR0XzDA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"U/jqoO8vPTcxbZuLP7xUf4/6+Mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7fARuSYFLqnpJlzpsXe12xV4QQc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures , Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:42:12Z"},"road_event_id":"U/jqoO8vPTcxbZuLP7xUf4/6+Mg=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.077921,43.135263]]}},{"id":"9utKRRfULR7A006eNq45hxKSSqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nTyoRHSOeWHvedL7RMrUeRLAXk0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"9utKRRfULR7A006eNq45hxKSSqA=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"nTyoRHSOeWHvedL7RMrUeRLAXk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"TxMyI+YK3gbpQqtzC9ziAFvSZyE="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"nTyoRHSOeWHvedL7RMrUeRLAXk0=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"TxMyI+YK3gbpQqtzC9ziAFvSZyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"pCRd89KW5vSsZw+r3LwGs8GFAi0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"TxMyI+YK3gbpQqtzC9ziAFvSZyE=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"pCRd89KW5vSsZw+r3LwGs8GFAi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"RsXqIpaYALCHAK01Y6nys9f/mac="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"pCRd89KW5vSsZw+r3LwGs8GFAi0=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"RsXqIpaYALCHAK01Y6nys9f/mac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"St3CxjAuShiv1c2zA4SyoYtg7KA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"RsXqIpaYALCHAK01Y6nys9f/mac=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"St3CxjAuShiv1c2zA4SyoYtg7KA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"m8uE9vAQVgGank5tArgAX5Cv2zM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"St3CxjAuShiv1c2zA4SyoYtg7KA=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"m8uE9vAQVgGank5tArgAX5Cv2zM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"LrTgoy/EYLuFm/VZU3hW1Lh5bjk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"m8uE9vAQVgGank5tArgAX5Cv2zM=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"LrTgoy/EYLuFm/VZU3hW1Lh5bjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"zLPv2DfmESYQBxwOrHxNSbN1TL8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"LrTgoy/EYLuFm/VZU3hW1Lh5bjk=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"zLPv2DfmESYQBxwOrHxNSbN1TL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"hwWAzz1S+pJYoYPSYYckdOj7PHw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"zLPv2DfmESYQBxwOrHxNSbN1TL8=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"hwWAzz1S+pJYoYPSYYckdOj7PHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="},{"type":"next-occurrence","id":"jtLV66rxtXnPhR/tXgqkDXnMP70="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"hwWAzz1S+pJYoYPSYYckdOj7PHw=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"jtLV66rxtXnPhR/tXgqkDXnMP70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9utKRRfULR7A006eNq45hxKSSqA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 89B and Exit 89A - Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:07:28Z"},"road_event_id":"jtLV66rxtXnPhR/tXgqkDXnMP70=","beginning_cross_street":"Exit 89B and Exit 89A - Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053687,43.078895]]}},{"id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Hn4n2R1LCXSOXeItRGNkQvXEr/c="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"Hn4n2R1LCXSOXeItRGNkQvXEr/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"4fcDwWEz2yyo2I1W5h2ZN5cVGQc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"Hn4n2R1LCXSOXeItRGNkQvXEr/c=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"4fcDwWEz2yyo2I1W5h2ZN5cVGQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"RnAYLX33KffeUre0zsEjv0X26qw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"4fcDwWEz2yyo2I1W5h2ZN5cVGQc=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"RnAYLX33KffeUre0zsEjv0X26qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"g6j2bku180aEFyYUFaT/w1tjolY="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"RnAYLX33KffeUre0zsEjv0X26qw=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"g6j2bku180aEFyYUFaT/w1tjolY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"pJ12CbmoLeScaJNg09B/Q1OWL+E="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"g6j2bku180aEFyYUFaT/w1tjolY=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"pJ12CbmoLeScaJNg09B/Q1OWL+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"AnH72Z5vB8qnO6abwWWibO9Cfw4="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"pJ12CbmoLeScaJNg09B/Q1OWL+E=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"AnH72Z5vB8qnO6abwWWibO9Cfw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"LvM9/rTan1RPXwkkRO2q8Tw0K1E="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"AnH72Z5vB8qnO6abwWWibO9Cfw4=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"LvM9/rTan1RPXwkkRO2q8Tw0K1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"IAiweUn8Fp0pe/U4Cup4PlNebRQ="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"LvM9/rTan1RPXwkkRO2q8Tw0K1E=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"IAiweUn8Fp0pe/U4Cup4PlNebRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"+1V708uYJQp3pfVkctph9+L6p3o="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"IAiweUn8Fp0pe/U4Cup4PlNebRQ=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"+1V708uYJQp3pfVkctph9+L6p3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="},{"type":"next-occurrence","id":"FXRBGB4Dfh8EXFCK/9NYpPdDaqo="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"+1V708uYJQp3pfVkctph9+L6p3o=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"FXRBGB4Dfh8EXFCK/9NYpPdDaqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0EDNnrlQR+Zqc0WLtcZhItH8GVA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramp to/from Exit 95 (Old Exit 8) - Northern Boulevard (Cicero) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:05:17Z"},"road_event_id":"FXRBGB4Dfh8EXFCK/9NYpPdDaqo=","beginning_cross_street":"Exit 95 (Old Exit 8) - Northern Boulevard  ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.087735,43.137539]]}},{"id":"oHv6TFxBjvB1mFj86ABm1YPy0B0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pYK9k+Y/IxNiGgmFjKwPlz4pG8I="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"oHv6TFxBjvB1mFj86ABm1YPy0B0=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"pYK9k+Y/IxNiGgmFjKwPlz4pG8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"A9gO3ZaR16UPVzx5dxNtjIkLrtM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"pYK9k+Y/IxNiGgmFjKwPlz4pG8I=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"A9gO3ZaR16UPVzx5dxNtjIkLrtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"RubbXHZNSjWZKg/7VEyk01c6Oi8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"A9gO3ZaR16UPVzx5dxNtjIkLrtM=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"RubbXHZNSjWZKg/7VEyk01c6Oi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"OTCWMsBlCfUXjYsXGRNhJhpeR/U="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"RubbXHZNSjWZKg/7VEyk01c6Oi8=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"OTCWMsBlCfUXjYsXGRNhJhpeR/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"JjfqW1MvKodAkzGbbxtaq8hwlN8="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"OTCWMsBlCfUXjYsXGRNhJhpeR/U=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"JjfqW1MvKodAkzGbbxtaq8hwlN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"yTlAa9lPKK7VTDmKZfRoNDlG6XM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"JjfqW1MvKodAkzGbbxtaq8hwlN8=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"yTlAa9lPKK7VTDmKZfRoNDlG6XM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"KWI0f99JaAGAT7Eu2eJiJOyHaCw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"yTlAa9lPKK7VTDmKZfRoNDlG6XM=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"KWI0f99JaAGAT7Eu2eJiJOyHaCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"fT24EgVUVTIy1UAI4D6Fh2WYD2Y="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"KWI0f99JaAGAT7Eu2eJiJOyHaCw=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"fT24EgVUVTIy1UAI4D6Fh2WYD2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"nwPjNSyTjm/0Tz8KIKSpRsVx+oY="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"fT24EgVUVTIy1UAI4D6Fh2WYD2Y=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"nwPjNSyTjm/0Tz8KIKSpRsVx+oY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="},{"type":"next-occurrence","id":"aefvue3WceZx6daAKMKQA6Ye3TA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"nwPjNSyTjm/0Tz8KIKSpRsVx+oY=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"aefvue3WceZx6daAKMKQA6Ye3TA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oHv6TFxBjvB1mFj86ABm1YPy0B0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramp to/from Exit 91 (Old Exit 7) - NY 298 (De Witt) ; Alternating left and right shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-06T16:43:57Z"},"road_event_id":"aefvue3WceZx6daAKMKQA6Ye3TA=","beginning_cross_street":"Exit 91 (Old Exit 7) - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052424,43.107066]]}},{"id":"E/CjfUtNXxYRzMj4rksKMBn/8VY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9RMrttrEdsJDT19fpisDgVeNRsg="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"E/CjfUtNXxYRzMj4rksKMBn/8VY=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"9RMrttrEdsJDT19fpisDgVeNRsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"QuwNn/45XDd29dcTfLDUP+SOz/o="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"9RMrttrEdsJDT19fpisDgVeNRsg=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"QuwNn/45XDd29dcTfLDUP+SOz/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"wZWSn+EbFzZypLNEkeo57L+AG1g="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"QuwNn/45XDd29dcTfLDUP+SOz/o=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"wZWSn+EbFzZypLNEkeo57L+AG1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"gk1Y1uYpywMGy0Y4Uh7fm9Merfs="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"wZWSn+EbFzZypLNEkeo57L+AG1g=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"gk1Y1uYpywMGy0Y4Uh7fm9Merfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"B+auxqc8BklklM1zPjg4kvo0Bpk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"gk1Y1uYpywMGy0Y4Uh7fm9Merfs=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"B+auxqc8BklklM1zPjg4kvo0Bpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"N3yj5/PJS+5UGwQ30pYGaMdX1dE="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"B+auxqc8BklklM1zPjg4kvo0Bpk=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"N3yj5/PJS+5UGwQ30pYGaMdX1dE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"eB3SaPx2Skw0J5fR3koyw2v6iQs="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"N3yj5/PJS+5UGwQ30pYGaMdX1dE=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"eB3SaPx2Skw0J5fR3koyw2v6iQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"Met50fLYhnIp9usiI+/SuWncRec="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"eB3SaPx2Skw0J5fR3koyw2v6iQs=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"Met50fLYhnIp9usiI+/SuWncRec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"7wNZDnqEMkbCXj1G7zJMleuyyqs="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"Met50fLYhnIp9usiI+/SuWncRec=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"7wNZDnqEMkbCXj1G7zJMleuyyqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="},{"type":"next-occurrence","id":"NvyXYtE2GLQWIbKfNxRFZVRRwNA="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"7wNZDnqEMkbCXj1G7zJMleuyyqs=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"NvyXYtE2GLQWIbKfNxRFZVRRwNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E/CjfUtNXxYRzMj4rksKMBn/8VY="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 89A and Exit 89B- Kirkville Road; CR 53 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:14:18Z"},"road_event_id":"NvyXYtE2GLQWIbKfNxRFZVRRwNA=","beginning_cross_street":"Exit 89A and Exit 89B- Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053378,43.078899]]}},{"id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wgxmfpQ6alOwDYHAqJtHxR8waCY="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"wgxmfpQ6alOwDYHAqJtHxR8waCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"LUuVGEfd1sWd6iuJPOcz/P8b0/Y="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"wgxmfpQ6alOwDYHAqJtHxR8waCY=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"LUuVGEfd1sWd6iuJPOcz/P8b0/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"CCYAvQ/g0lolfmfFtiqFIhLFwqE="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"LUuVGEfd1sWd6iuJPOcz/P8b0/Y=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"CCYAvQ/g0lolfmfFtiqFIhLFwqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"0qhW2zArmsQSyCWxMLDvVBiONLM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"CCYAvQ/g0lolfmfFtiqFIhLFwqE=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"0qhW2zArmsQSyCWxMLDvVBiONLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"Gw7+L9aJoX/NjCfcMzDo01w0T14="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"0qhW2zArmsQSyCWxMLDvVBiONLM=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"Gw7+L9aJoX/NjCfcMzDo01w0T14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"zd4EbJEwL78CsfEsWLlNXqU/fKw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"Gw7+L9aJoX/NjCfcMzDo01w0T14=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"zd4EbJEwL78CsfEsWLlNXqU/fKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"8wi2mY+noIpjf6ihaL62kFW9afQ="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"zd4EbJEwL78CsfEsWLlNXqU/fKw=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"8wi2mY+noIpjf6ihaL62kFW9afQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"h/DX9JHJWxyiwqdmzYb57+FGQZw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"8wi2mY+noIpjf6ihaL62kFW9afQ=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"h/DX9JHJWxyiwqdmzYb57+FGQZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"5az9PZZbBYQ5RI40/kDC8nJp7eo="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"h/DX9JHJWxyiwqdmzYb57+FGQZw=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"5az9PZZbBYQ5RI40/kDC8nJp7eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="},{"type":"next-occurrence","id":"x10wxKmhTOXAF7XKhfRDADE5Q/0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"5az9PZZbBYQ5RI40/kDC8nJp7eo=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"x10wxKmhTOXAF7XKhfRDADE5Q/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7Kt8MCz5zjAjEYiLg1L3aRkatx0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 southbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 31st, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:53:43Z"},"road_event_id":"x10wxKmhTOXAF7XKhfRDADE5Q/0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"U6tLEzuX69yr2HeVzpzTPEVeXsk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HWHv46gNPgll77TY3ERTlzAbxQ0="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"U6tLEzuX69yr2HeVzpzTPEVeXsk=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"HWHv46gNPgll77TY3ERTlzAbxQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"V5U3Fu/cd2eORc2WvRUphLSe0SU="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"HWHv46gNPgll77TY3ERTlzAbxQ0=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"V5U3Fu/cd2eORc2WvRUphLSe0SU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"IEhXvwxarw8x6givjfNJ1vHAmjU="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"V5U3Fu/cd2eORc2WvRUphLSe0SU=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"IEhXvwxarw8x6givjfNJ1vHAmjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"SzPFZDX+He6BdMSZDABxyE+Ht/4="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"IEhXvwxarw8x6givjfNJ1vHAmjU=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"SzPFZDX+He6BdMSZDABxyE+Ht/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"8pGJV0XkmLKZY+dhNI0e6OISokk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"SzPFZDX+He6BdMSZDABxyE+Ht/4=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"8pGJV0XkmLKZY+dhNI0e6OISokk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"l9fZsvLfR5SQwbv1M1DdIjlV2Vs="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"8pGJV0XkmLKZY+dhNI0e6OISokk=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"l9fZsvLfR5SQwbv1M1DdIjlV2Vs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"6dzeXpUFHBSYyESRzmFUpTCPGYg="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"l9fZsvLfR5SQwbv1M1DdIjlV2Vs=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"6dzeXpUFHBSYyESRzmFUpTCPGYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"DdovOpufp7PKGMwiyw5fFd1UGLM="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"6dzeXpUFHBSYyESRzmFUpTCPGYg=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"DdovOpufp7PKGMwiyw5fFd1UGLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"yRazttd0M6asWjqtBKpe2EK0KWw="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"DdovOpufp7PKGMwiyw5fFd1UGLM=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"yRazttd0M6asWjqtBKpe2EK0KWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="},{"type":"next-occurrence","id":"dkdjhbKYNZ9VN0cIfD/qXF74Blc="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"yRazttd0M6asWjqtBKpe2EK0KWw=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"dkdjhbKYNZ9VN0cIfD/qXF74Blc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U6tLEzuX69yr2HeVzpzTPEVeXsk="}],"description":"Guard rail repairs and installation of sign structure and line striping on I-481 northbound ramps to/from Exit 90 - I-90 (De Witt), Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM both shoulder closed","update_date":"2026-04-06T16:54:53Z"},"road_event_id":"dkdjhbKYNZ9VN0cIfD/qXF74Blc=","beginning_cross_street":"Exit 90 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05346,43.095798]]}},{"id":"TwNCY14uI8t7e7Lk+Ks8OxRsAXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Raritan Valley Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ywReTg6u/uAfKkHrX4Ws4GNcEzg="}],"description":"Due to Track repairs westbound, Raritan Valley Line between Dunellen (Dunellen) and High Bridge (High Bridge) westbound trains operating between Dunellen and Raritan or High Bridge Stations may be delayed up to 15 minutes due to track maintenance. NOTE: During this time, trains will stop on Track 2 in both directions at Raritan, Somerville, Bridgewater, and Bound Brook Stations. Customers are encouraged to check information boards and listen for announcements to ensure they are on the proper platform before the train arrives. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-04-06T16:47:46Z"},"road_event_id":"TwNCY14uI8t7e7Lk+Ks8OxRsAXk=","beginning_cross_street":"Dunellen","ending_cross_street":"High Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.463043,40.590869]]}},{"id":"ywReTg6u/uAfKkHrX4Ws4GNcEzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Raritan Valley Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwNCY14uI8t7e7Lk+Ks8OxRsAXk="},{"type":"next-occurrence","id":"uiPaNKvGw1T2FJTBUBYhBikhQSs="}],"description":"Due to Track repairs westbound, Raritan Valley Line between Dunellen (Dunellen) and High Bridge (High Bridge) westbound trains operating between Dunellen and Raritan or High Bridge Stations may be delayed up to 15 minutes due to track maintenance. NOTE: During this time, trains will stop on Track 2 in both directions at Raritan, Somerville, Bridgewater, and Bound Brook Stations. Customers are encouraged to check information boards and listen for announcements to ensure they are on the proper platform before the train arrives. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-04-06T16:47:46Z"},"road_event_id":"ywReTg6u/uAfKkHrX4Ws4GNcEzg=","beginning_cross_street":"Dunellen","ending_cross_street":"High Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.463043,40.590869]]}},{"id":"uiPaNKvGw1T2FJTBUBYhBikhQSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Raritan Valley Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TwNCY14uI8t7e7Lk+Ks8OxRsAXk="}],"description":"Due to Track repairs westbound, Raritan Valley Line between Dunellen (Dunellen) and High Bridge (High Bridge) westbound trains operating between Dunellen and Raritan or High Bridge Stations may be delayed up to 15 minutes due to track maintenance. NOTE: During this time, trains will stop on Track 2 in both directions at Raritan, Somerville, Bridgewater, and Bound Brook Stations. Customers are encouraged to check information boards and listen for announcements to ensure they are on the proper platform before the train arrives. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM","update_date":"2026-04-06T16:47:46Z"},"road_event_id":"uiPaNKvGw1T2FJTBUBYhBikhQSs=","beginning_cross_street":"Dunellen","ending_cross_street":"High Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.463043,40.590869]]}},{"id":"pidLqgIcpZD2rbMBHgaFKoptKSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 3"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 3 both directions NY 178 (Henderson) NYS Rte. 3 closed in both directions at the bridge over Stoney Creek. Traffic is directed to follow the signed detour, Continuous Monday April 6th, 2026 12:00 AM thru Sunday November 15th, 2026 11:59 PM All lanes closed","update_date":"2026-04-07T18:21:51Z"},"road_event_id":"pidLqgIcpZD2rbMBHgaFKoptKSU=","beginning_cross_street":"NY 178","ending_cross_street":"NY 178","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.199127,43.841085]]}},{"id":"DOoi1cxkaT9oES0XD8qGY1EOBTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on I-87 Northway both directions E. Schroon River Rd just north of Exit 23 (Bolton) 11' lane width restriction, Continuous Wednesday April 8th, 2026 12:00 AM thru Wednesday September 30th, 2026 11:59 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-10T18:40:16Z"},"road_event_id":"DOoi1cxkaT9oES0XD8qGY1EOBTk=","beginning_cross_street":"E. Schroon River Rd just north of Exit 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.746835,43.499729]]}},{"id":"RUSmJjSHth4uBjxfrZ7hgp0qd9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["28TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aEnis+geDRWfdwIf72hJBihQ7Ks="}],"description":"Construction on 28TH AVE westbound between 21ST ST (New York) and 14TH ST (New York) for building inspection from boom truck., Sunday April 12th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 12:00 PM All lanes closed","update_date":"2026-04-07T20:36:51Z"},"road_event_id":"RUSmJjSHth4uBjxfrZ7hgp0qd9I=","beginning_cross_street":"21ST ST","ending_cross_street":"14TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926929,40.771177]]}},{"id":"aEnis+geDRWfdwIf72hJBihQ7Ks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["28TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RUSmJjSHth4uBjxfrZ7hgp0qd9I="},{"type":"next-occurrence","id":"d+SHppjms6NmbSv3QXgi3SUNZnA="}],"description":"Construction on 28TH AVE westbound between 21ST ST (New York) and 14TH ST (New York) for building inspection from boom truck., Sunday April 12th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 12:00 PM All lanes closed","update_date":"2026-04-07T20:36:51Z"},"road_event_id":"aEnis+geDRWfdwIf72hJBihQ7Ks=","beginning_cross_street":"21ST ST","ending_cross_street":"14TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926929,40.771177]]}},{"id":"d+SHppjms6NmbSv3QXgi3SUNZnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["28TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RUSmJjSHth4uBjxfrZ7hgp0qd9I="},{"type":"next-occurrence","id":"u4Cnzl9icLOMykLj/nuTxTadtec="}],"description":"Construction on 28TH AVE westbound between 21ST ST (New York) and 14TH ST (New York) for building inspection from boom truck., Sunday April 12th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 12:00 PM All lanes closed","update_date":"2026-04-07T20:36:51Z"},"road_event_id":"d+SHppjms6NmbSv3QXgi3SUNZnA=","beginning_cross_street":"21ST ST","ending_cross_street":"14TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926929,40.771177]]}},{"id":"u4Cnzl9icLOMykLj/nuTxTadtec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["28TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RUSmJjSHth4uBjxfrZ7hgp0qd9I="},{"type":"next-occurrence","id":"/i2Wh3H/m7P3oFj2ARuI5LJ/NEo="}],"description":"Construction on 28TH AVE westbound between 21ST ST (New York) and 14TH ST (New York) for building inspection from boom truck., Sunday April 12th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 12:00 PM All lanes closed","update_date":"2026-04-07T20:36:51Z"},"road_event_id":"u4Cnzl9icLOMykLj/nuTxTadtec=","beginning_cross_street":"21ST ST","ending_cross_street":"14TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926929,40.771177]]}},{"id":"/i2Wh3H/m7P3oFj2ARuI5LJ/NEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["28TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RUSmJjSHth4uBjxfrZ7hgp0qd9I="}],"description":"Construction on 28TH AVE westbound between 21ST ST (New York) and 14TH ST (New York) for building inspection from boom truck., Sunday April 12th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 12:00 PM All lanes closed","update_date":"2026-04-07T20:36:51Z"},"road_event_id":"/i2Wh3H/m7P3oFj2ARuI5LJ/NEo=","beginning_cross_street":"21ST ST","ending_cross_street":"14TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926929,40.771177]]}},{"id":"BGxWmjs47pz7VamJnuueayHADYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gmL7Bo9QeoK+SEHt8j5N0DR2OQ4="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"BGxWmjs47pz7VamJnuueayHADYs=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"gmL7Bo9QeoK+SEHt8j5N0DR2OQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"yhYYdGnOZBmGXI8Eqd59DQbHAaM="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"gmL7Bo9QeoK+SEHt8j5N0DR2OQ4=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"yhYYdGnOZBmGXI8Eqd59DQbHAaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"9cvqMjl6U90Q4xunwHlFM7ArIio="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"yhYYdGnOZBmGXI8Eqd59DQbHAaM=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"9cvqMjl6U90Q4xunwHlFM7ArIio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"D75RTEm0kGZ0eOj4n+HhU9t7wzE="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"9cvqMjl6U90Q4xunwHlFM7ArIio=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"D75RTEm0kGZ0eOj4n+HhU9t7wzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"PWRv4nx6EdkqUrsr8GZnZASwOQs="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"D75RTEm0kGZ0eOj4n+HhU9t7wzE=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"PWRv4nx6EdkqUrsr8GZnZASwOQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"CneUQ47gO+STYE9mtuVMBS0pXb4="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"PWRv4nx6EdkqUrsr8GZnZASwOQs=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"CneUQ47gO+STYE9mtuVMBS0pXb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"cYbDXILE33ptXTLZ/u1GS5FA/Gs="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"CneUQ47gO+STYE9mtuVMBS0pXb4=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"cYbDXILE33ptXTLZ/u1GS5FA/Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"8WtJHEICdhpt4MGkJdxnO58DAQM="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"cYbDXILE33ptXTLZ/u1GS5FA/Gs=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"8WtJHEICdhpt4MGkJdxnO58DAQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"PRv83PPx9ltEACo0sof/Kd9eRNM="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"8WtJHEICdhpt4MGkJdxnO58DAQM=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"PRv83PPx9ltEACo0sof/Kd9eRNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="},{"type":"next-occurrence","id":"wRKahV9vnilir0uUCmmZLGB9ToM="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"PRv83PPx9ltEACo0sof/Kd9eRNM=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"wRKahV9vnilir0uUCmmZLGB9ToM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BGxWmjs47pz7VamJnuueayHADYs="}],"description":"Construction on 40TH AVE westbound between 30TH ST (New York) and 29TH ST (New York) for concrete operations., Friday April 10th, 2026 thru Saturday June 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:38:49Z"},"road_event_id":"wRKahV9vnilir0uUCmmZLGB9ToM=","beginning_cross_street":"30TH ST","ending_cross_street":"29TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.934803,40.751977]]}},{"id":"NZwllCOMcKyrOhihQTPqaDqnF9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XplB5rqThuZMrrg4FBRndnoXagg="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"NZwllCOMcKyrOhihQTPqaDqnF9I=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"XplB5rqThuZMrrg4FBRndnoXagg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"57DdWE5ksyijx16tzTCX6RRe0vQ="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"XplB5rqThuZMrrg4FBRndnoXagg=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"57DdWE5ksyijx16tzTCX6RRe0vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"OfewWJxtM5hyHELRhPf9SlYUCVA="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"57DdWE5ksyijx16tzTCX6RRe0vQ=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"OfewWJxtM5hyHELRhPf9SlYUCVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"H8qwvBEK9IJU4M5bafHcp9kiFYU="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"OfewWJxtM5hyHELRhPf9SlYUCVA=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"H8qwvBEK9IJU4M5bafHcp9kiFYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"BV0E0JPDXcaU+NnAfR4Dkgl4Xd8="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"H8qwvBEK9IJU4M5bafHcp9kiFYU=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"BV0E0JPDXcaU+NnAfR4Dkgl4Xd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"0VC0btRnxaGtriyR4jfic2RP1R4="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"BV0E0JPDXcaU+NnAfR4Dkgl4Xd8=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"0VC0btRnxaGtriyR4jfic2RP1R4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"deJOXiLGBVxJJKsTBMPqoSpBTZA="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"0VC0btRnxaGtriyR4jfic2RP1R4=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"deJOXiLGBVxJJKsTBMPqoSpBTZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"k0DTKTETJvtMjy4I7yt56mq16oo="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"deJOXiLGBVxJJKsTBMPqoSpBTZA=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"k0DTKTETJvtMjy4I7yt56mq16oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"Q+lPOp8KSg4i4l0UYv53/0mVbW0="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"k0DTKTETJvtMjy4I7yt56mq16oo=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"Q+lPOp8KSg4i4l0UYv53/0mVbW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="},{"type":"next-occurrence","id":"MkXkA7faQbmiw/y3RQ4FP2EsDMQ="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"Q+lPOp8KSg4i4l0UYv53/0mVbW0=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"MkXkA7faQbmiw/y3RQ4FP2EsDMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NZwllCOMcKyrOhihQTPqaDqnF9I="}],"description":"Construction on 40TH AVE westbound between 31ST ST (New York) and 30TH ST (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:40:42Z"},"road_event_id":"MkXkA7faQbmiw/y3RQ4FP2EsDMQ=","beginning_cross_street":"31ST ST","ending_cross_street":"30TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.933899,40.751667]]}},{"id":"HG5Q4uv+HBU51YXUE69IVDtk6OA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"thv/YGNxrEfkbGzqM/VSlo3p0XI="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"HG5Q4uv+HBU51YXUE69IVDtk6OA=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"thv/YGNxrEfkbGzqM/VSlo3p0XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"DsBfHqTQQN16I6LWFEa10iKaTzk="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"thv/YGNxrEfkbGzqM/VSlo3p0XI=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"DsBfHqTQQN16I6LWFEa10iKaTzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"ivuKAkoUEOL5Hl/peHShWIeJMk4="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"DsBfHqTQQN16I6LWFEa10iKaTzk=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"ivuKAkoUEOL5Hl/peHShWIeJMk4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"Eer2zubma2ZiMELLwiiTGotJD1w="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"ivuKAkoUEOL5Hl/peHShWIeJMk4=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"Eer2zubma2ZiMELLwiiTGotJD1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"0af3TD0Lap25sIONmvgJZkMnbOk="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"Eer2zubma2ZiMELLwiiTGotJD1w=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"0af3TD0Lap25sIONmvgJZkMnbOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"k3GneYs9CE+CF4zHZST93t8nInE="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"0af3TD0Lap25sIONmvgJZkMnbOk=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"k3GneYs9CE+CF4zHZST93t8nInE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"GCnwFNFxBjkad/AIhXOvrBrX/hA="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"k3GneYs9CE+CF4zHZST93t8nInE=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"GCnwFNFxBjkad/AIhXOvrBrX/hA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"7LQiMO5AJQyZMqsyYbCZx9hsdcs="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"GCnwFNFxBjkad/AIhXOvrBrX/hA=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"7LQiMO5AJQyZMqsyYbCZx9hsdcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"g3V6qVLbVAMC3uvaKCmsme+iI0s="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"7LQiMO5AJQyZMqsyYbCZx9hsdcs=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"g3V6qVLbVAMC3uvaKCmsme+iI0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="},{"type":"next-occurrence","id":"5+Cw3hbDjvGR0BidSiYiV7ZpjYI="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"g3V6qVLbVAMC3uvaKCmsme+iI0s=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"5+Cw3hbDjvGR0BidSiYiV7ZpjYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["40TH RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HG5Q4uv+HBU51YXUE69IVDtk6OA="}],"description":"Construction on 40TH RD eastbound between 29TH ST (New York) and RT-25A (New York) for concrete operations., Tuesday April 7th, 2026 thru Monday July 6th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:43:19Z"},"road_event_id":"5+Cw3hbDjvGR0BidSiYiV7ZpjYI=","beginning_cross_street":"29TH ST","ending_cross_street":"RT-25A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936078,40.751701]]}},{"id":"mwfpDT/bfjCjlkXsTDNXZx2cMw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Construction on US 11 both directions between Brewster Street (Malone) and Pearl Street (Malone) 2 way traffic maintained on narrow travel lanes - one travel lane per direction for Building Demolition Work, Continuous Tuesday April 7th, 2026 07:55 PM thru Friday May 29th, 2026 05:00 PM 1 Left lane of 2 lanes closed northbound; 1 Right lane of 2 lanes closed southbound","update_date":"2026-04-08T00:03:56Z"},"road_event_id":"mwfpDT/bfjCjlkXsTDNXZx2cMw8=","beginning_cross_street":"Brewster Street","ending_cross_street":"Pearl Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.295645,44.8488]]}},{"id":"RYU3DhoYCDUyAExJOfA9wDaQxjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E4tt6HovHKzf006k2BqPDXay//4="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"RYU3DhoYCDUyAExJOfA9wDaQxjM=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"E4tt6HovHKzf006k2BqPDXay//4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"pMJ8mhndSjI63V5A2E0obnrrduA="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"E4tt6HovHKzf006k2BqPDXay//4=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"pMJ8mhndSjI63V5A2E0obnrrduA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"HGODQsZl16AAx0lJqjopL/KvEyE="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"pMJ8mhndSjI63V5A2E0obnrrduA=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"HGODQsZl16AAx0lJqjopL/KvEyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"oMOlyFBG0073ZhTaLK+WR3CssrU="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"HGODQsZl16AAx0lJqjopL/KvEyE=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"oMOlyFBG0073ZhTaLK+WR3CssrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"GLMIQzzhzzb9gI+lEL/aStMg8Pw="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"oMOlyFBG0073ZhTaLK+WR3CssrU=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"GLMIQzzhzzb9gI+lEL/aStMg8Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"TppShFo1axYfETXqBME4P42z5fc="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"GLMIQzzhzzb9gI+lEL/aStMg8Pw=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"TppShFo1axYfETXqBME4P42z5fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"ymcxwysebfSGWq2sp1mUKGZTDAk="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"TppShFo1axYfETXqBME4P42z5fc=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"ymcxwysebfSGWq2sp1mUKGZTDAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"Zz94wOFtUMqAc/nRBuOQrtAd1PA="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"ymcxwysebfSGWq2sp1mUKGZTDAk=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"Zz94wOFtUMqAc/nRBuOQrtAd1PA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"rCnLitYH3TcTm+dp13hRLkLn6yQ="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"Zz94wOFtUMqAc/nRBuOQrtAd1PA=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"rCnLitYH3TcTm+dp13hRLkLn6yQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="},{"type":"next-occurrence","id":"FPSQ4g02cmhzsl2jq82684uikEM="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"rCnLitYH3TcTm+dp13hRLkLn6yQ=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"FPSQ4g02cmhzsl2jq82684uikEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYU3DhoYCDUyAExJOfA9wDaQxjM="}],"description":"Installation of sign structure on I-690 eastbound between Exit 19C - Bridge Street (De Witt) and I-481 (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:48:49Z"},"road_event_id":"FPSQ4g02cmhzsl2jq82684uikEM=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.066997,43.057165]]}},{"id":"by107XO+XekLqlmls8lb5Gdj+gE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVERVIEW RD"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on RIVERVIEW RD both directions over I-87 (Halfmoon) alternating lanes closed, Continuous Wednesday April 8th, 2026 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes","update_date":"2026-04-08T12:51:07Z"},"road_event_id":"by107XO+XekLqlmls8lb5Gdj+gE=","beginning_cross_street":"over I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764915,42.800434]]}},{"id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jOC8P28W++gjJTNKpbIcYFjmgvY="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"jOC8P28W++gjJTNKpbIcYFjmgvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"dkVWwg3zq67kMF3VY00JNJpA+gw="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"jOC8P28W++gjJTNKpbIcYFjmgvY=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"dkVWwg3zq67kMF3VY00JNJpA+gw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"mA9EX7XVW/zAYW52prsIP9G9aa0="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"dkVWwg3zq67kMF3VY00JNJpA+gw=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"mA9EX7XVW/zAYW52prsIP9G9aa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"/PdYNTMvnHGOmAdEai1dx4R/x/4="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"mA9EX7XVW/zAYW52prsIP9G9aa0=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"/PdYNTMvnHGOmAdEai1dx4R/x/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"i/rHuVGZQehIiAeAneJhzIHWRG8="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"/PdYNTMvnHGOmAdEai1dx4R/x/4=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"i/rHuVGZQehIiAeAneJhzIHWRG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"dR9vaOgabCO2wjX05tDVsmIkBw4="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"i/rHuVGZQehIiAeAneJhzIHWRG8=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"dR9vaOgabCO2wjX05tDVsmIkBw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"UI5PpoYp6CC0HGY5eq8Z43ZPjc8="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"dR9vaOgabCO2wjX05tDVsmIkBw4=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"UI5PpoYp6CC0HGY5eq8Z43ZPjc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"/PcprypLFzcpW4VGTXmKEbRDA88="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"UI5PpoYp6CC0HGY5eq8Z43ZPjc8=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"/PcprypLFzcpW4VGTXmKEbRDA88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"Y4kIF5XmgSiJLt4cjT/jsWzO89s="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"/PcprypLFzcpW4VGTXmKEbRDA88=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"Y4kIF5XmgSiJLt4cjT/jsWzO89s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="},{"type":"next-occurrence","id":"TizOj/+DhwK4flmKmmEChrJiiyw="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"Y4kIF5XmgSiJLt4cjT/jsWzO89s=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"TizOj/+DhwK4flmKmmEChrJiiyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DV6soIlVyvspXNOWj4EkZ2Ks7Gs="}],"description":"Installation of sign structure on I-690 westbound between I-481 (De Witt) and Exit 19C - Bridge Street (De Witt) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:52:33Z"},"road_event_id":"TizOj/+DhwK4flmKmmEChrJiiyw=","beginning_cross_street":"I-481","ending_cross_street":"Exit 19C - Bridge Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.061876,43.057001]]}},{"id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fZj8vOUgwyJRqdbuFM2tV/L3x6E="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"fZj8vOUgwyJRqdbuFM2tV/L3x6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"0VMqBa57jZXFGcWgUVEQlA9ttOU="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"fZj8vOUgwyJRqdbuFM2tV/L3x6E=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"0VMqBa57jZXFGcWgUVEQlA9ttOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"duOJa+1ZSaUxBavcPWBIH4jnZDc="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"0VMqBa57jZXFGcWgUVEQlA9ttOU=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"duOJa+1ZSaUxBavcPWBIH4jnZDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"UcA+2yGd6vWob8CLdWUXJGfw0Go="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"duOJa+1ZSaUxBavcPWBIH4jnZDc=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"UcA+2yGd6vWob8CLdWUXJGfw0Go=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"HJiG3lSsSmwXHGR2Vvr3RIEd7MI="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"UcA+2yGd6vWob8CLdWUXJGfw0Go=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"HJiG3lSsSmwXHGR2Vvr3RIEd7MI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"S3dG7fKjnUYhky1zzqPiGUqyxwI="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"HJiG3lSsSmwXHGR2Vvr3RIEd7MI=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"S3dG7fKjnUYhky1zzqPiGUqyxwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"Ma5ot24AbvaGaHaF9EJLS+Uc4pY="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"S3dG7fKjnUYhky1zzqPiGUqyxwI=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"Ma5ot24AbvaGaHaF9EJLS+Uc4pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"xZxo/w+iieeagY4GrWOKk86a1EI="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"Ma5ot24AbvaGaHaF9EJLS+Uc4pY=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"xZxo/w+iieeagY4GrWOKk86a1EI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"+pt8mXon7GwhWm7ZyV77T7XTyTc="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"xZxo/w+iieeagY4GrWOKk86a1EI=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"+pt8mXon7GwhWm7ZyV77T7XTyTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="},{"type":"next-occurrence","id":"qJ7pep8+AGsJU707HeNSKSutj8o="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"+pt8mXon7GwhWm7ZyV77T7XTyTc=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"qJ7pep8+AGsJU707HeNSKSutj8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BYgFlFIzLMrgQX5zO82wvRJH/XQ="}],"description":"Installation of sign structure on I-481 southbound between Exit 89B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) and Exit 86 (Old Exit 3) - NY 5; NY 92 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:54:16Z"},"road_event_id":"qJ7pep8+AGsJU707HeNSKSutj8o=","beginning_cross_street":"Exit 89B (Old Exit 5W) - Kirkville Road; CR 53","ending_cross_street":"Exit 86 (Old Exit 3) - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053715,43.083505]]}},{"id":"qqFn8rseYKJmbL7avcVbLLNIOu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"La08bittQ2hQgm/kwJajyD/6uZA="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"qqFn8rseYKJmbL7avcVbLLNIOu0=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"La08bittQ2hQgm/kwJajyD/6uZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"IpHjZDoNSQmnH+UM5PlHGBFbxfQ="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"La08bittQ2hQgm/kwJajyD/6uZA=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"IpHjZDoNSQmnH+UM5PlHGBFbxfQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"yQDiTQVcLBjtR/x5i7UbGME+Tf0="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"IpHjZDoNSQmnH+UM5PlHGBFbxfQ=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"yQDiTQVcLBjtR/x5i7UbGME+Tf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"Di+kmc68+06eCG3lwuoMPV6mGmE="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"yQDiTQVcLBjtR/x5i7UbGME+Tf0=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"Di+kmc68+06eCG3lwuoMPV6mGmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"GLHh/2hwEYK2TSQ4fCir+Sf6StU="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"Di+kmc68+06eCG3lwuoMPV6mGmE=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"GLHh/2hwEYK2TSQ4fCir+Sf6StU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"CX39ILMSIp+MNIfjOi3tBncYZzE="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"GLHh/2hwEYK2TSQ4fCir+Sf6StU=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"CX39ILMSIp+MNIfjOi3tBncYZzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"MHxbxPAYZg5YMtrfHGqys6nZiyE="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"CX39ILMSIp+MNIfjOi3tBncYZzE=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"MHxbxPAYZg5YMtrfHGqys6nZiyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"8AuPS7enj6TcfhYbNqtFa5ABN6E="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"MHxbxPAYZg5YMtrfHGqys6nZiyE=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"8AuPS7enj6TcfhYbNqtFa5ABN6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"glXcExBVD667BE5gaHDR8MHD5jw="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"8AuPS7enj6TcfhYbNqtFa5ABN6E=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"glXcExBVD667BE5gaHDR8MHD5jw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="},{"type":"next-occurrence","id":"a3jGI7XRtejaOq1zqnogociF9tU="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"glXcExBVD667BE5gaHDR8MHD5jw=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"a3jGI7XRtejaOq1zqnogociF9tU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qqFn8rseYKJmbL7avcVbLLNIOu0="}],"description":"Installation of sign structure on I-481 northbound between Exit 86A (Old Exit 3E) - NY 92; NY 5 (De Witt) and Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53 (De Witt) ; Alternating left and right lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T12:56:44Z"},"road_event_id":"a3jGI7XRtejaOq1zqnogociF9tU=","beginning_cross_street":"Exit 86A (Old Exit 3E) -  NY 92; NY 5","ending_cross_street":"Exit 89 B (Old Exit 5W) - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062005,43.029509]]}},{"id":"WHr5xzZNp4KoS7uCo3jcz01GnK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1zeJEf+90/4qKCzXxHJ8iOgJZMg="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"WHr5xzZNp4KoS7uCo3jcz01GnK4=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"1zeJEf+90/4qKCzXxHJ8iOgJZMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"nEZjeiczPnfXuIk7Tc1FbNF3NWk="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"1zeJEf+90/4qKCzXxHJ8iOgJZMg=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"nEZjeiczPnfXuIk7Tc1FbNF3NWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"u0KSmO3Cr8UK7bO7UK99dUtA46o="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"nEZjeiczPnfXuIk7Tc1FbNF3NWk=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"u0KSmO3Cr8UK7bO7UK99dUtA46o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"508LKudd1OkegmVCFaLVnVdqDSc="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"u0KSmO3Cr8UK7bO7UK99dUtA46o=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"508LKudd1OkegmVCFaLVnVdqDSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"3CMgUZO1vGoy67IPLZQEBZzSai8="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"508LKudd1OkegmVCFaLVnVdqDSc=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"3CMgUZO1vGoy67IPLZQEBZzSai8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"GYVjHWoi47feZIF0MVPk0PuvnI0="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"3CMgUZO1vGoy67IPLZQEBZzSai8=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"GYVjHWoi47feZIF0MVPk0PuvnI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"W3/f9Hfwaq/Ofi8fyu6IfkYHhSU="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"GYVjHWoi47feZIF0MVPk0PuvnI0=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"W3/f9Hfwaq/Ofi8fyu6IfkYHhSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"bS8fipKLOR3/qqwOW+IoDrjN5KU="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"W3/f9Hfwaq/Ofi8fyu6IfkYHhSU=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"bS8fipKLOR3/qqwOW+IoDrjN5KU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"Oj8xxYVsI1d82ef7Fs4G8ZEh88Q="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"bS8fipKLOR3/qqwOW+IoDrjN5KU=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"Oj8xxYVsI1d82ef7Fs4G8ZEh88Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="},{"type":"next-occurrence","id":"w0kIEBudy0BIXcSyi0EwTi4j/4k="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"Oj8xxYVsI1d82ef7Fs4G8ZEh88Q=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"w0kIEBudy0BIXcSyi0EwTi4j/4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WHr5xzZNp4KoS7uCo3jcz01GnK4="}],"description":"Installation of sign structure on I-81 southbound between Exit 1C - South Salina Street; Brighton Avenue; State Street (Syracuse) and Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:03:41Z"},"road_event_id":"w0kIEBudy0BIXcSyi0EwTi4j/4k=","beginning_cross_street":"Exit 1C - South Salina Street; Brighton Avenue; State Street","ending_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.140542,43.019965]]}},{"id":"OHsZq0f6DV1TTihSUt8BBzPwTQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SN0QPvMUNVLx5FDPpI0tq3DL9bo="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"OHsZq0f6DV1TTihSUt8BBzPwTQc=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"SN0QPvMUNVLx5FDPpI0tq3DL9bo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"XIAzlV6oswVpCq8PCs2kxPCNq5g="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"SN0QPvMUNVLx5FDPpI0tq3DL9bo=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"XIAzlV6oswVpCq8PCs2kxPCNq5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"lQyEMX5pam9yALEr+3lBKyEU768="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"XIAzlV6oswVpCq8PCs2kxPCNq5g=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"lQyEMX5pam9yALEr+3lBKyEU768=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"Vm0m2joCXx+U/SfMQAgS3FOrLk8="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"lQyEMX5pam9yALEr+3lBKyEU768=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"Vm0m2joCXx+U/SfMQAgS3FOrLk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"YHtpEgvDS+CwmZUIGajf4EVJ2Xk="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"Vm0m2joCXx+U/SfMQAgS3FOrLk8=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"YHtpEgvDS+CwmZUIGajf4EVJ2Xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"KJayoWcLhY3J6MnbRmhhRcHZ4dc="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"YHtpEgvDS+CwmZUIGajf4EVJ2Xk=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"KJayoWcLhY3J6MnbRmhhRcHZ4dc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"vRIcpxDbvxdrQW0zubITFRR5CLs="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"KJayoWcLhY3J6MnbRmhhRcHZ4dc=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"vRIcpxDbvxdrQW0zubITFRR5CLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"FGp9PHOYWkUTdpumz3VgyCICduc="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"vRIcpxDbvxdrQW0zubITFRR5CLs=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"FGp9PHOYWkUTdpumz3VgyCICduc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"f1GiJpQE6XaXjywDxiyG+fFVHvs="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"FGp9PHOYWkUTdpumz3VgyCICduc=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"f1GiJpQE6XaXjywDxiyG+fFVHvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="},{"type":"next-occurrence","id":"2cXwob7DCRR8JJeZWq4PBJ//Hbs="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"f1GiJpQE6XaXjywDxiyG+fFVHvs=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"2cXwob7DCRR8JJeZWq4PBJ//Hbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OHsZq0f6DV1TTihSUt8BBzPwTQc="}],"description":"Installation of sign structure on I-81 northbound between Exit 78 - US 11; Nedrow; Onondaga Nation (Onondaga) and Exit 1B - South Salina Street; Brighton Avenue; State Street (Syracuse) ; Alternating lane closures, Wednesday April 8th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-08T13:06:19Z"},"road_event_id":"2cXwob7DCRR8JJeZWq4PBJ//Hbs=","beginning_cross_street":"Exit 78 - US 11; Nedrow; Onondaga Nation","ending_cross_street":"Exit 1B - South Salina Street; Brighton Avenue; State Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.138333,42.952509]]}},{"id":"gwJ7ga75uC5d2W9AaGNZMe4e1Xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between North of NJ 27 (New Brunswick) and John Lynch Bridge (New Brunswick), Monday April 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-08T15:01:49Z"},"road_event_id":"gwJ7ga75uC5d2W9AaGNZMe4e1Xw=","beginning_cross_street":"North of NJ 27","ending_cross_street":"John Lynch Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.442871,40.501018]]}},{"id":"36IBTyZEVuQDD/9soFojfCuu1Cg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between North of NJ 27 (New Brunswick) and South of John Lynch Bridge (New Brunswick), Tuesday April 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-08T15:02:17Z"},"road_event_id":"36IBTyZEVuQDD/9soFojfCuu1Cg=","beginning_cross_street":"North of NJ 27","ending_cross_street":"South of John Lynch Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.44149,40.500026]]}},{"id":"aM+cX8atxzEGDeNECnPn/19asTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 54A"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on NY 54A northbound Town of Pulteney; Town of Urbana Line (Pulteney) 2 lanes reduced to 1, Continuous Wednesday April 8th, 2026 12:00 AM thru Friday May 29th, 2026 11:59 PM All lanes closed","update_date":"2026-04-08T17:54:54Z"},"road_event_id":"aM+cX8atxzEGDeNECnPn/19asTE=","beginning_cross_street":"Town of Pulteney; Town of Urbana Line","ending_cross_street":"Town of Pulteney; Town of Urbana Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.172096,42.475378]]}},{"id":"4nBU3tdyJMrzBQoMcesGMdmRvvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["North Avenue Bridge"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on North Avenue Bridge eastbound east of Earhart Drive (Elizabeth), Continuous Friday April 10th, 2026 08:00 PM thru Saturday June 6th, 2026 08:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-12T12:21:30Z"},"road_event_id":"4nBU3tdyJMrzBQoMcesGMdmRvvU=","beginning_cross_street":"Earhart Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.178241,40.669786]]}},{"id":"HOgDEfjbgWCwk3mYbqd5RDcTYGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[],"description":"Survey work on NY 17 [Orange] eastbound between Exit 130 - NY 208 (Monroe) and Exit 131 - NY 17 (Woodbury) 2025082373184/32705209 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 24th, 2026, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-22T18:30:00Z"},"road_event_id":"HOgDEfjbgWCwk3mYbqd5RDcTYGc=","beginning_cross_street":"","ending_cross_street":"Exit 131 - NY 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.18411,41.342661]]}},{"id":"LLLUPqBZyPyLDpjYspsgVDUTDho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3oLfY1n33ngicMhk0Lw4sjf9L74="}],"description":"Survey work on NY 17 [Orange] westbound between Exit 131 - NY 17 (Woodbury) and Exit 130 - NY 208 (Monroe) 2025082373184/32705309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Thursday April 23rd, 2026 Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-09T10:34:23Z"},"road_event_id":"LLLUPqBZyPyLDpjYspsgVDUTDho=","beginning_cross_street":"Exit 131 - NY 17","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131051,41.315346]]}},{"id":"3oLfY1n33ngicMhk0Lw4sjf9L74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LLLUPqBZyPyLDpjYspsgVDUTDho="}],"description":"Survey work on NY 17 [Orange] westbound between Exit 131 - NY 17 (Woodbury) and Exit 130 - NY 208 (Monroe) 2025082373184/32705309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Thursday April 23rd, 2026 Tuesday/ Wednesday/ Thursday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-09T10:34:23Z"},"road_event_id":"3oLfY1n33ngicMhk0Lw4sjf9L74=","beginning_cross_street":"Exit 131 - NY 17","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.131051,41.315346]]}},{"id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ro2vuhjwEFKUvRIDFa8xkEQ/SmU="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"Ro2vuhjwEFKUvRIDFa8xkEQ/SmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"ZSk/zuFKoIa349GCP3PuhdN97kQ="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"Ro2vuhjwEFKUvRIDFa8xkEQ/SmU=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"ZSk/zuFKoIa349GCP3PuhdN97kQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"mvEZV9Sq+8vjT6jYo77y8/boAsE="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"ZSk/zuFKoIa349GCP3PuhdN97kQ=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"mvEZV9Sq+8vjT6jYo77y8/boAsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"siupGsVj1z1OczE4CSCoihhgCmU="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"mvEZV9Sq+8vjT6jYo77y8/boAsE=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:30:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"siupGsVj1z1OczE4CSCoihhgCmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"J0GosGsPrYGwU0cgDGEqOpa1HCo="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"siupGsVj1z1OczE4CSCoihhgCmU=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:30:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"J0GosGsPrYGwU0cgDGEqOpa1HCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"RtfY1+iLTz46uRIxg6hj30mtvbU="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"J0GosGsPrYGwU0cgDGEqOpa1HCo=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:30:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"RtfY1+iLTz46uRIxg6hj30mtvbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"Yo1qzNSAmVEtuRuh6uQwTndXHE8="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"RtfY1+iLTz46uRIxg6hj30mtvbU=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:30:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"Yo1qzNSAmVEtuRuh6uQwTndXHE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"wv8cSPA4x8sRQc08/IZe464FYOA="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"Yo1qzNSAmVEtuRuh6uQwTndXHE8=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:30:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"wv8cSPA4x8sRQc08/IZe464FYOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"7gj35AWrmPBd7TW7wxMmOZzRD9M="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"wv8cSPA4x8sRQc08/IZe464FYOA=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:30:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"7gj35AWrmPBd7TW7wxMmOZzRD9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="},{"type":"next-occurrence","id":"cxu9FMoswzaeM5Owb/Pq3bcWUL0="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"7gj35AWrmPBd7TW7wxMmOZzRD9M=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:30:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"cxu9FMoswzaeM5Owb/Pq3bcWUL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gMOaQ5/kLr0TSvLkkutnfgNjDuQ="}],"description":"Safety improvements on US 9 northbound between Pulcher Avenue (Hudson) and Joslen Blvd (Hudson) 202508114400/32642009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-09T11:54:21Z"},"road_event_id":"cxu9FMoswzaeM5Owb/Pq3bcWUL0=","beginning_cross_street":"Pulcher Avenue","ending_cross_street":"Joslen Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:30:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.758114,42.277099]]}},{"id":"P24ZINWYAM9k3Cg0bPdG0tYEaqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on I-95 northbound Exit ramp Exit 55 - US 1/East Main Street (Branford), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-09T12:56:17Z"},"road_event_id":"P24ZINWYAM9k3Cg0bPdG0tYEaqc=","beginning_cross_street":"Exit 55 - US 1/East Main Street","ending_cross_street":"Exit 55 - US 1/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.782078,41.293717]]}},{"id":"PEwjV1iJzp8zQG31YNTj/Qc3N1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on I-95 southbound Exit ramp Exit 55 - US 1/East Main Street (Branford), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-09T13:04:52Z"},"road_event_id":"PEwjV1iJzp8zQG31YNTj/Qc3N1U=","beginning_cross_street":"Exit 55 - US 1/East Main Street","ending_cross_street":"Exit 55 - US 1/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.784868,41.294486]]}},{"id":"7/97X5S945z4/x7OCl22ijKgzKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jCp+q76EfW7+RBgTYs3Jm+EyZ18="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"7/97X5S945z4/x7OCl22ijKgzKU=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"jCp+q76EfW7+RBgTYs3Jm+EyZ18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/97X5S945z4/x7OCl22ijKgzKU="},{"type":"next-occurrence","id":"47yIMGbIutIbEz0JiDcPjEvOlVc="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"jCp+q76EfW7+RBgTYs3Jm+EyZ18=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"47yIMGbIutIbEz0JiDcPjEvOlVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/97X5S945z4/x7OCl22ijKgzKU="},{"type":"next-occurrence","id":"sw0hnHrzbKOplYky4S++sIZWde8="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"47yIMGbIutIbEz0JiDcPjEvOlVc=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"sw0hnHrzbKOplYky4S++sIZWde8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/97X5S945z4/x7OCl22ijKgzKU="},{"type":"next-occurrence","id":"TPOYKm6VnPKTSIetgqgBimw1Xn0="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"sw0hnHrzbKOplYky4S++sIZWde8=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"TPOYKm6VnPKTSIetgqgBimw1Xn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/97X5S945z4/x7OCl22ijKgzKU="},{"type":"next-occurrence","id":"tm+VhUHPm401xumy8yLnJF/Fk3Y="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"TPOYKm6VnPKTSIetgqgBimw1Xn0=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"tm+VhUHPm401xumy8yLnJF/Fk3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/97X5S945z4/x7OCl22ijKgzKU="},{"type":"next-occurrence","id":"yfbnKa0bhWUFbSqGpdLwLt50tTM="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"tm+VhUHPm401xumy8yLnJF/Fk3Y=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"yfbnKa0bhWUFbSqGpdLwLt50tTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/97X5S945z4/x7OCl22ijKgzKU="},{"type":"next-occurrence","id":"rlYmWUMtiJV4y7Dwd8ya27Sunso="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"yfbnKa0bhWUFbSqGpdLwLt50tTM=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"rlYmWUMtiJV4y7Dwd8ya27Sunso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7/97X5S945z4/x7OCl22ijKgzKU="}],"description":"Utility work on NY 15A southbound between Castle Road (Henrietta) and Calkins Road; CR 39 (Henrietta), Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-09T13:27:44Z"},"road_event_id":"rlYmWUMtiJV4y7Dwd8ya27Sunso=","beginning_cross_street":"Castle Road","ending_cross_street":"Calkins Road; CR 39","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607374,43.082606]]}},{"id":"W+8G4ePwTyJAa0+MMbCMDgof8Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1bA/KinJI/r8mN96ieuhfkACQo4="}],"description":"Installation of traffic management systems on NY 125 southbound between Laurel Avenue (Mamaroneck) and Harmon Drive (Mamaroneck) D265523/32723909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane","update_date":"2026-04-17T19:01:22Z"},"road_event_id":"W+8G4ePwTyJAa0+MMbCMDgof8Xg=","beginning_cross_street":"Laurel Avenue","ending_cross_street":"Harmon Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753581,40.939953]]}},{"id":"1bA/KinJI/r8mN96ieuhfkACQo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W+8G4ePwTyJAa0+MMbCMDgof8Xg="},{"type":"next-occurrence","id":"X18Rzz0AcRrYacvzvNQW1DFXsbI="}],"description":"Installation of traffic management systems on NY 125 southbound between Laurel Avenue (Mamaroneck) and Harmon Drive (Mamaroneck) D265523/32723909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane","update_date":"2026-04-17T19:01:22Z"},"road_event_id":"1bA/KinJI/r8mN96ieuhfkACQo4=","beginning_cross_street":"Laurel Avenue","ending_cross_street":"Harmon Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753581,40.939953]]}},{"id":"X18Rzz0AcRrYacvzvNQW1DFXsbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W+8G4ePwTyJAa0+MMbCMDgof8Xg="}],"description":"Installation of traffic management systems on NY 125 southbound between Laurel Avenue (Mamaroneck) and Harmon Drive (Mamaroneck) D265523/32723909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane","update_date":"2026-04-17T19:01:22Z"},"road_event_id":"X18Rzz0AcRrYacvzvNQW1DFXsbI=","beginning_cross_street":"Laurel Avenue","ending_cross_street":"Harmon Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.753581,40.939953]]}},{"id":"CE1xc3WKkZjbCR3pNY+8zXW74MU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MObgBD6s8qNkG++VDWr33xjHe1Y="}],"description":"Utility work on US 9W both directions between Main Street (Esopus) and Barry Drive (Esopus) 2025082183781/32712809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Thursday April 23rd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-09T14:07:59Z"},"road_event_id":"CE1xc3WKkZjbCR3pNY+8zXW74MU=","beginning_cross_street":"Main Street","ending_cross_street":"Barry Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959346,41.806218]]}},{"id":"MObgBD6s8qNkG++VDWr33xjHe1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CE1xc3WKkZjbCR3pNY+8zXW74MU="}],"description":"Utility work on US 9W both directions between Main Street (Esopus) and Barry Drive (Esopus) 2025082183781/32712809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Thursday April 23rd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-09T14:07:59Z"},"road_event_id":"MObgBD6s8qNkG++VDWr33xjHe1Y=","beginning_cross_street":"Main Street","ending_cross_street":"Barry Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.959346,41.806218]]}},{"id":"T295iTrRXlBOHMeu7JP46saGW40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue N/B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6ncCQrOSL+dXDXkKIWraSVFZgPg="}],"description":"Safety improvements on NY 983B - Nepperhan Avenue N/B between Walsh Road (Yonkers) and Ashburton Avenue (Yonkers) 2025083410106/29652709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-09T13:52:42Z"},"road_event_id":"T295iTrRXlBOHMeu7JP46saGW40=","beginning_cross_street":"Walsh Road","ending_cross_street":"Ashburton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886102,40.938534]]}},{"id":"6ncCQrOSL+dXDXkKIWraSVFZgPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue N/B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T295iTrRXlBOHMeu7JP46saGW40="},{"type":"next-occurrence","id":"fhy3lZjES78KCLUKjIEnpvXEnNw="}],"description":"Safety improvements on NY 983B - Nepperhan Avenue N/B between Walsh Road (Yonkers) and Ashburton Avenue (Yonkers) 2025083410106/29652709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-09T13:52:42Z"},"road_event_id":"6ncCQrOSL+dXDXkKIWraSVFZgPg=","beginning_cross_street":"Walsh Road","ending_cross_street":"Ashburton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886102,40.938534]]}},{"id":"fhy3lZjES78KCLUKjIEnpvXEnNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 983B - Nepperhan Avenue N/B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"T295iTrRXlBOHMeu7JP46saGW40="}],"description":"Safety improvements on NY 983B - Nepperhan Avenue N/B between Walsh Road (Yonkers) and Ashburton Avenue (Yonkers) 2025083410106/29652709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, right lane closure","update_date":"2026-04-09T13:52:42Z"},"road_event_id":"fhy3lZjES78KCLUKjIEnpvXEnNw=","beginning_cross_street":"Walsh Road","ending_cross_street":"Ashburton Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886102,40.938534]]}},{"id":"UfMpLlS4ObRqprv85x/KweeF2UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on I-95 southbound Exit ramp Exit 42 - CT 162/Saw Mill Road (West Haven), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-09T13:56:33Z"},"road_event_id":"UfMpLlS4ObRqprv85x/KweeF2UU=","beginning_cross_street":"Exit 42 - CT 162/Saw Mill Road","ending_cross_street":"Exit 42 - CT 162/Saw Mill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.971526,41.271589]]}},{"id":"z50c0l16aEu9Eb48kNfm0mtY7GM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on I-95 southbound Exit ramp Exit 41 - CT 114 (Orange), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-09T14:00:43Z"},"road_event_id":"z50c0l16aEu9Eb48kNfm0mtY7GM=","beginning_cross_street":"Exit 41 - CT 114","ending_cross_street":"Exit 41 - CT 114","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.996079,41.256091]]}},{"id":"ikPxboEX0E1ObyczBhXUfMKfmwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on Merritt Parkway/CT 15 southbound Exit ramp Exit 40 - Main Avenue (Norwalk), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-09T14:03:49Z"},"road_event_id":"ikPxboEX0E1ObyczBhXUfMKfmwc=","beginning_cross_street":"Exit 40 - Main Avenue","ending_cross_street":"Exit 40 - Main Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.423629,41.143153]]}},{"id":"99sRKaykYJ3nemraVCF1i8ydl3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Merritt Parkway/CT 15"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on Merritt Parkway/CT 15 southbound Exit ramp Exit 38 - CT 123/Norwalk Road (Norwalk), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-09T14:06:58Z"},"road_event_id":"99sRKaykYJ3nemraVCF1i8ydl3w=","beginning_cross_street":"Exit 38 - CT 123/Norwalk Road","ending_cross_street":"Exit 38 - CT 123/Norwalk Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.457562,41.13339]]}},{"id":"8RYIh7P69Ui1wZd4g1gZnmJCcts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Safety improvements on I-95 northbound Exit ramp Exit 5 - CT 104/US 1 (Greenwich), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 07:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-09T14:11:18Z"},"road_event_id":"8RYIh7P69Ui1wZd4g1gZnmJCcts=","beginning_cross_street":"Exit 5 - CT 104/US 1","ending_cross_street":"Exit 5 - CT 104/US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.57801,41.040897]]}},{"id":"xmAmLDkDoHtQ9DQQglWvvyoDDzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NtK4tJfBDs1GFY0dOjuG37zqGc4="}],"description":"Milling and paving operations on CT 104 both directions between RIVERBANK RD (Stamford) and New York State Line (Stamford) Motorists can expect lane closures , Sunday April 12th, 2026 thru Thursday April 23rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-09T14:16:43Z"},"road_event_id":"xmAmLDkDoHtQ9DQQglWvvyoDDzE=","beginning_cross_street":"RIVERBANK RD","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.590883,41.140408]]}},{"id":"NtK4tJfBDs1GFY0dOjuG37zqGc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmAmLDkDoHtQ9DQQglWvvyoDDzE="}],"description":"Milling and paving operations on CT 104 both directions between RIVERBANK RD (Stamford) and New York State Line (Stamford) Motorists can expect lane closures , Sunday April 12th, 2026 thru Thursday April 23rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-09T14:16:43Z"},"road_event_id":"NtK4tJfBDs1GFY0dOjuG37zqGc4=","beginning_cross_street":"RIVERBANK RD","ending_cross_street":"New York State Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.590883,41.140408]]}},{"id":"dtuHdAJBh+BvmKngnRtXsVyQHcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Jz3lsWxV+DRRIsIWOFGuqEzq54M="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"dtuHdAJBh+BvmKngnRtXsVyQHcA=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"Jz3lsWxV+DRRIsIWOFGuqEzq54M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"i1UCOLhpoBue6jA+mW3LkMdAIh0="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"Jz3lsWxV+DRRIsIWOFGuqEzq54M=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"i1UCOLhpoBue6jA+mW3LkMdAIh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"QhHkFGfC5UmHZAbCqAuxEKccw9I="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"i1UCOLhpoBue6jA+mW3LkMdAIh0=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"QhHkFGfC5UmHZAbCqAuxEKccw9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"07mXCHnTpCAs0gnRHMA6pL27MWM="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"QhHkFGfC5UmHZAbCqAuxEKccw9I=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"07mXCHnTpCAs0gnRHMA6pL27MWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"emlkGH/YWQ9kS9B3bvJQm+X8cxk="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"07mXCHnTpCAs0gnRHMA6pL27MWM=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"emlkGH/YWQ9kS9B3bvJQm+X8cxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"IbloUGE55VgnyoPTnqUOoSBASm8="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"emlkGH/YWQ9kS9B3bvJQm+X8cxk=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"IbloUGE55VgnyoPTnqUOoSBASm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"yJqsk1tlz35CbegzQ9Q/uXRB00c="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"IbloUGE55VgnyoPTnqUOoSBASm8=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"yJqsk1tlz35CbegzQ9Q/uXRB00c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"8h+FnjUtPzZhgO1hwD7Vsv/eWdQ="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"yJqsk1tlz35CbegzQ9Q/uXRB00c=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"8h+FnjUtPzZhgO1hwD7Vsv/eWdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"rzOD2GpZXG5QmIbaTNwXaJ/oWcc="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"8h+FnjUtPzZhgO1hwD7Vsv/eWdQ=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"rzOD2GpZXG5QmIbaTNwXaJ/oWcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="},{"type":"next-occurrence","id":"mOztRuZCag09cDBQH7eWGB7RBcg="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"rzOD2GpZXG5QmIbaTNwXaJ/oWcc=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"mOztRuZCag09cDBQH7eWGB7RBcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 79"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtuHdAJBh+BvmKngnRtXsVyQHcA="}],"description":"Roadwork on NY 79 westbound at South Meadow Street; NY 13 (Ithaca) ; Alternating one-way traffic with flaggers, Monday April 13th, 2026 thru Friday December 31st, 2027, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-09T15:31:52Z"},"road_event_id":"mOztRuZCag09cDBQH7eWGB7RBcg=","beginning_cross_street":"South Meadow Street; NY 13","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508388,42.44008]]}},{"id":"D0q1VSRFSSSUOzGjJirGwRSo8es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 46 both directions between Center Street (Durhamville) and Lafayette Street (Oneida) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 12:00 AM thru 11:59 PM,","update_date":"2026-04-17T11:12:39Z"},"road_event_id":"D0q1VSRFSSSUOzGjJirGwRSo8es=","beginning_cross_street":"Center Street","ending_cross_street":"Lafayette Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.670701,43.119885]]}},{"id":"Ona/m/PZ7kx7bxKPeR3C0IcWTbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+jwdvHNq8LVJTSxt+lutyGq9dFM="}],"description":"Construction on NY 365 both directions between Seneca Avenue; Oneida Castle; NY 5; START ROUTE NY 365 (Vernon) and Prospect Street; NY 365A Junction (Vernon) Motorists will encounter possible shoulder closures, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-17T11:09:03Z"},"road_event_id":"Ona/m/PZ7kx7bxKPeR3C0IcWTbk=","beginning_cross_street":"Seneca Avenue; Oneida Castle; NY 5; START ROUTE NY 365","ending_cross_street":"Prospect Street; NY 365A Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.634902,43.078098]]}},{"id":"+jwdvHNq8LVJTSxt+lutyGq9dFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ona/m/PZ7kx7bxKPeR3C0IcWTbk="},{"type":"next-occurrence","id":"Pl8sn54SritL0X79QTfz7aAZfa8="}],"description":"Construction on NY 365 both directions between Seneca Avenue; Oneida Castle; NY 5; START ROUTE NY 365 (Vernon) and Prospect Street; NY 365A Junction (Vernon) Motorists will encounter possible shoulder closures, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-17T11:09:03Z"},"road_event_id":"+jwdvHNq8LVJTSxt+lutyGq9dFM=","beginning_cross_street":"Seneca Avenue; Oneida Castle; NY 5; START ROUTE NY 365","ending_cross_street":"Prospect Street; NY 365A Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.634902,43.078098]]}},{"id":"Pl8sn54SritL0X79QTfz7aAZfa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ona/m/PZ7kx7bxKPeR3C0IcWTbk="}],"description":"Construction on NY 365 both directions between Seneca Avenue; Oneida Castle; NY 5; START ROUTE NY 365 (Vernon) and Prospect Street; NY 365A Junction (Vernon) Motorists will encounter possible shoulder closures, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-17T11:09:03Z"},"road_event_id":"Pl8sn54SritL0X79QTfz7aAZfa8=","beginning_cross_street":"Seneca Avenue; Oneida Castle; NY 5; START ROUTE NY 365","ending_cross_street":"Prospect Street; NY 365A Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.634902,43.078098]]}},{"id":"c0zE7c7mjEw76M22SCbO5DtEF74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 46 both directions between Hillside Road (Boonville) and Holmes Road (Boonville) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Thursday April 3rd, 2025 6:00 AM thru Friday April 24th, 2026 5:30 PM","update_date":"2026-04-17T10:22:37Z"},"road_event_id":"c0zE7c7mjEw76M22SCbO5DtEF74=","beginning_cross_street":"Hillside Road","ending_cross_street":"Holmes Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.341465,43.41094]]}},{"id":"wWj5Xon+PCp/f5RDp1KyiSbAysM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 28 both directions between Exit - Mohawk Street; I-90; Steele Street (Herkimer) and Marginal Road (Herkimer) Motorists may encounter flagging operations under the I-90 bridge, Continuous Monday April 13th, 2026 6:00 AM thru Monday November 30th, 2026 6:00 PM","update_date":"2026-04-09T17:19:56Z"},"road_event_id":"wWj5Xon+PCp/f5RDp1KyiSbAysM=","beginning_cross_street":"Exit   - Mohawk Street; I-90; Steele Street","ending_cross_street":"Marginal Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.993552,43.017647]]}},{"id":"8qifw4obc+ckm1WyAC+L+4cR6Zk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 30 both directions between Salmon Pond Road (Indian Lake) and Salmon River Road (Indian Lake) motorists will encounter lane closures in both direcitons with temporary signals in place, Continuous Monday April 13th, 2026 7:00 AM thru Friday April 24th, 2026 5:00 PM","update_date":"2026-04-17T09:59:02Z"},"road_event_id":"8qifw4obc+ckm1WyAC+L+4cR6Zk=","beginning_cross_street":"Salmon Pond Road","ending_cross_street":"Salmon River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.433521,43.898152]]}},{"id":"K3A0A75OmQSSixOCx8kT144R48E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9ftIEmXvQ25g2KhUsf6muGixPMk="}],"description":"Utility work on NY 15A both directions between Jefferson Road (Henrietta) and Town of Brighton and Town of Henrietta Line (Henrietta) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:16:20Z"},"road_event_id":"K3A0A75OmQSSixOCx8kT144R48E=","beginning_cross_street":"Jefferson Road","ending_cross_street":"Town of Brighton and Town of Henrietta Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.60918,43.087117]]}},{"id":"9ftIEmXvQ25g2KhUsf6muGixPMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K3A0A75OmQSSixOCx8kT144R48E="},{"type":"next-occurrence","id":"Q8DHA+dVdKLsLiOZZ2uKqJzKpTA="}],"description":"Utility work on NY 15A both directions between Jefferson Road (Henrietta) and Town of Brighton and Town of Henrietta Line (Henrietta) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:16:20Z"},"road_event_id":"9ftIEmXvQ25g2KhUsf6muGixPMk=","beginning_cross_street":"Jefferson Road","ending_cross_street":"Town of Brighton and Town of Henrietta Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.60918,43.087117]]}},{"id":"Q8DHA+dVdKLsLiOZZ2uKqJzKpTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"K3A0A75OmQSSixOCx8kT144R48E="}],"description":"Utility work on NY 15A both directions between Jefferson Road (Henrietta) and Town of Brighton and Town of Henrietta Line (Henrietta) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:16:20Z"},"road_event_id":"Q8DHA+dVdKLsLiOZZ2uKqJzKpTA=","beginning_cross_street":"Jefferson Road","ending_cross_street":"Town of Brighton and Town of Henrietta Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.60918,43.087117]]}},{"id":"nw9VdrnqJSYodLIdOeMpgXyeTOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 42 - US 202/Littleton Rd (Parsippany-Troy Hills Twp), Continuous Friday April 10, 2026 09:00 PM thru Saturday September 26, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-09T19:22:43Z"},"road_event_id":"nw9VdrnqJSYodLIdOeMpgXyeTOA=","beginning_cross_street":"West of Exit 42 - US 202/Littleton Rd","ending_cross_street":"West of Exit 42 - US 202/Littleton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452018,40.8679]]}},{"id":"x5Y5bEG3yrkkMXsqxcZSNh+scEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i4Uq5nBKZB5iBu138D0AliWlMbQ="}],"description":"Utility work on NY 96 both directions area of PELHAM RD (Brighton) alternating lane/shoulder closures w/flaggers when needed, Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T20:49:57Z"},"road_event_id":"x5Y5bEG3yrkkMXsqxcZSNh+scEU=","beginning_cross_street":"PELHAM RD","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.544667,43.140768]]}},{"id":"i4Uq5nBKZB5iBu138D0AliWlMbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x5Y5bEG3yrkkMXsqxcZSNh+scEU="},{"type":"next-occurrence","id":"hzWC15taCC4kaEvEl354pth2rbs="}],"description":"Utility work on NY 96 both directions area of PELHAM RD (Brighton) alternating lane/shoulder closures w/flaggers when needed, Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T20:49:57Z"},"road_event_id":"i4Uq5nBKZB5iBu138D0AliWlMbQ=","beginning_cross_street":"PELHAM RD","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.544667,43.140768]]}},{"id":"hzWC15taCC4kaEvEl354pth2rbs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x5Y5bEG3yrkkMXsqxcZSNh+scEU="}],"description":"Utility work on NY 96 both directions area of PELHAM RD (Brighton) alternating lane/shoulder closures w/flaggers when needed, Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T20:49:57Z"},"road_event_id":"hzWC15taCC4kaEvEl354pth2rbs=","beginning_cross_street":"PELHAM RD","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.544667,43.140768]]}},{"id":"FCtGRg40kfpzcQA/zrTsaZiWxr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PR1jf1h3RIDbrSGJsJg/3MIO8aU="}],"description":"Construction on NY 14 both directions area of MONTEZUMA ST (Lyons) This location with consist of a lane closure on the North and South bound lanes and a shoulder closing throughout the duration of work but never at the same time., Monday April 13th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T21:07:26Z"},"road_event_id":"FCtGRg40kfpzcQA/zrTsaZiWxr0=","beginning_cross_street":"MONTEZUMA ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.990681,43.063224]]}},{"id":"PR1jf1h3RIDbrSGJsJg/3MIO8aU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FCtGRg40kfpzcQA/zrTsaZiWxr0="},{"type":"next-occurrence","id":"RFzqZA5CChE5nuwYLb/sLAQ8WGQ="}],"description":"Construction on NY 14 both directions area of MONTEZUMA ST (Lyons) This location with consist of a lane closure on the North and South bound lanes and a shoulder closing throughout the duration of work but never at the same time., Monday April 13th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T21:07:26Z"},"road_event_id":"PR1jf1h3RIDbrSGJsJg/3MIO8aU=","beginning_cross_street":"MONTEZUMA ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.990681,43.063224]]}},{"id":"RFzqZA5CChE5nuwYLb/sLAQ8WGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FCtGRg40kfpzcQA/zrTsaZiWxr0="},{"type":"next-occurrence","id":"+1K5mrzJMoPEWDox7+734MkTryU="}],"description":"Construction on NY 14 both directions area of MONTEZUMA ST (Lyons) This location with consist of a lane closure on the North and South bound lanes and a shoulder closing throughout the duration of work but never at the same time., Monday April 13th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T21:07:26Z"},"road_event_id":"RFzqZA5CChE5nuwYLb/sLAQ8WGQ=","beginning_cross_street":"MONTEZUMA ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.990681,43.063224]]}},{"id":"+1K5mrzJMoPEWDox7+734MkTryU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FCtGRg40kfpzcQA/zrTsaZiWxr0="},{"type":"next-occurrence","id":"FvX4kwmfZFcaA8gygQEvfrMun2o="}],"description":"Construction on NY 14 both directions area of MONTEZUMA ST (Lyons) This location with consist of a lane closure on the North and South bound lanes and a shoulder closing throughout the duration of work but never at the same time., Monday April 13th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T21:07:26Z"},"road_event_id":"+1K5mrzJMoPEWDox7+734MkTryU=","beginning_cross_street":"MONTEZUMA ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.990681,43.063224]]}},{"id":"FvX4kwmfZFcaA8gygQEvfrMun2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FCtGRg40kfpzcQA/zrTsaZiWxr0="},{"type":"next-occurrence","id":"fdFiMICGFdahYYgIO50LBtQ5S9o="}],"description":"Construction on NY 14 both directions area of MONTEZUMA ST (Lyons) This location with consist of a lane closure on the North and South bound lanes and a shoulder closing throughout the duration of work but never at the same time., Monday April 13th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T21:07:26Z"},"road_event_id":"FvX4kwmfZFcaA8gygQEvfrMun2o=","beginning_cross_street":"MONTEZUMA ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.990681,43.063224]]}},{"id":"fdFiMICGFdahYYgIO50LBtQ5S9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FCtGRg40kfpzcQA/zrTsaZiWxr0="},{"type":"next-occurrence","id":"rxmyVKQgXjPpw6y5UiZ98fNpTmw="}],"description":"Construction on NY 14 both directions area of MONTEZUMA ST (Lyons) This location with consist of a lane closure on the North and South bound lanes and a shoulder closing throughout the duration of work but never at the same time., Monday April 13th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T21:07:26Z"},"road_event_id":"fdFiMICGFdahYYgIO50LBtQ5S9o=","beginning_cross_street":"MONTEZUMA ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.990681,43.063224]]}},{"id":"rxmyVKQgXjPpw6y5UiZ98fNpTmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FCtGRg40kfpzcQA/zrTsaZiWxr0="}],"description":"Construction on NY 14 both directions area of MONTEZUMA ST (Lyons) This location with consist of a lane closure on the North and South bound lanes and a shoulder closing throughout the duration of work but never at the same time., Monday April 13th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-09T21:07:26Z"},"road_event_id":"rxmyVKQgXjPpw6y5UiZ98fNpTmw=","beginning_cross_street":"MONTEZUMA ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.990681,43.063224]]}},{"id":"pgXU/oO15K8ZtJQCxmlKPqg+lMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c1mXD0B3H5zjJzTcEEf94qmsjpY="}],"description":"Construction on NY 5 both directions between Forbes Street (Amsterdam) and Kline Street (Amsterdam) Motorists will encounter shoulder closures in both directions, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:48:38Z"},"road_event_id":"pgXU/oO15K8ZtJQCxmlKPqg+lMk=","beginning_cross_street":"Forbes Street","ending_cross_street":"Kline Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183982,42.933167]]}},{"id":"c1mXD0B3H5zjJzTcEEf94qmsjpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pgXU/oO15K8ZtJQCxmlKPqg+lMk="},{"type":"next-occurrence","id":"1KTkuEo43CEGd13v47cUAKUCZFc="}],"description":"Construction on NY 5 both directions between Forbes Street (Amsterdam) and Kline Street (Amsterdam) Motorists will encounter shoulder closures in both directions, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:48:38Z"},"road_event_id":"c1mXD0B3H5zjJzTcEEf94qmsjpY=","beginning_cross_street":"Forbes Street","ending_cross_street":"Kline Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183982,42.933167]]}},{"id":"1KTkuEo43CEGd13v47cUAKUCZFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pgXU/oO15K8ZtJQCxmlKPqg+lMk="}],"description":"Construction on NY 5 both directions between Forbes Street (Amsterdam) and Kline Street (Amsterdam) Motorists will encounter shoulder closures in both directions, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:48:38Z"},"road_event_id":"1KTkuEo43CEGd13v47cUAKUCZFc=","beginning_cross_street":"Forbes Street","ending_cross_street":"Kline Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183982,42.933167]]}},{"id":"nlUervs6yPJTNXTPRSiVuDXc0M4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iNpIuS0VqbXB7LBn9TT1SBjZh30="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-17T10:21:23Z"},"road_event_id":"nlUervs6yPJTNXTPRSiVuDXc0M4=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"iNpIuS0VqbXB7LBn9TT1SBjZh30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nlUervs6yPJTNXTPRSiVuDXc0M4="},{"type":"next-occurrence","id":"BXFvQ5kyXXzfWOS/+0DhHhN6T4A="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-17T10:21:23Z"},"road_event_id":"iNpIuS0VqbXB7LBn9TT1SBjZh30=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"BXFvQ5kyXXzfWOS/+0DhHhN6T4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 80"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nlUervs6yPJTNXTPRSiVuDXc0M4="}],"description":"Construction on NY 80 both directions between Muller Hill Road (Georgetown) and Chapin Road (Georgetown) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-17T10:21:23Z"},"road_event_id":"BXFvQ5kyXXzfWOS/+0DhHhN6T4A=","beginning_cross_street":"Muller Hill Road","ending_cross_street":"Chapin Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.753676,42.784731]]}},{"id":"mspLEELxeC73HWSpKFHSzkkY7UY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sK2IRgbJXVbineU/ix6TtppTb5k="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"mspLEELxeC73HWSpKFHSzkkY7UY=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"sK2IRgbJXVbineU/ix6TtppTb5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="},{"type":"next-occurrence","id":"9+sb8juYm042wM3yZavtwftu6co="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"sK2IRgbJXVbineU/ix6TtppTb5k=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"9+sb8juYm042wM3yZavtwftu6co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="},{"type":"next-occurrence","id":"xm3W5q0fu9vHhUSua2N23CodxcE="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"9+sb8juYm042wM3yZavtwftu6co=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"xm3W5q0fu9vHhUSua2N23CodxcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="},{"type":"next-occurrence","id":"zvlFjcdNSVo9AiY+vwRYmmDnAUY="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"xm3W5q0fu9vHhUSua2N23CodxcE=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"zvlFjcdNSVo9AiY+vwRYmmDnAUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="},{"type":"next-occurrence","id":"bPhN9T2o/UBlmh/zavbDpsE4d9A="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"zvlFjcdNSVo9AiY+vwRYmmDnAUY=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"bPhN9T2o/UBlmh/zavbDpsE4d9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="},{"type":"next-occurrence","id":"341SZQ4e//dCFu9IDS+VL4qEpoI="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"bPhN9T2o/UBlmh/zavbDpsE4d9A=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"341SZQ4e//dCFu9IDS+VL4qEpoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="},{"type":"next-occurrence","id":"Mkh9ZAY2aBg752oxM7YYY/64YCc="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"341SZQ4e//dCFu9IDS+VL4qEpoI=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"Mkh9ZAY2aBg752oxM7YYY/64YCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="},{"type":"next-occurrence","id":"X8AxlsmIZZLEOoLC29t3YjYg/6Q="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"Mkh9ZAY2aBg752oxM7YYY/64YCc=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"X8AxlsmIZZLEOoLC29t3YjYg/6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mspLEELxeC73HWSpKFHSzkkY7UY="}],"description":"Utility work on NY 332 both directions between Farmbrook Dr (Farmington) and END ROUTE (Farmington) Alternating lane closures with flaggers as needed, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 07:00 AM All lanes","update_date":"2026-04-20T17:57:34Z"},"road_event_id":"X8AxlsmIZZLEOoLC29t3YjYg/6Q=","beginning_cross_street":"Farmbrook Dr","ending_cross_street":"END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.341287,42.954896]]}},{"id":"BoEDOtQ1bLcul/qvcDy9y04T9u8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[],"description":"Road maintenance operations on NY 9A northbound between Worthington Road (Greenburgh) and Parkview Place (Greenburgh) Res 8-9 RW/32515009 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday April 25th, 2026, 06:00 AM thru 02:00 PM, alternating traffic","update_date":"2026-04-10T11:47:47Z"},"road_event_id":"BoEDOtQ1bLcul/qvcDy9y04T9u8=","beginning_cross_street":"Worthington Road","ending_cross_street":"Parkview Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T16:00:00Z","end_date":"2026-04-26T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830709,41.044082]]}},{"id":"7jepo35VV6QdI6sRnQYlDi2VigE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oDILvQRcgqeHYya/pjzi4X5oRlg="}],"description":"Bridge maintenance operations on Sprain Brook State Parkway both directions between Underhill Road (Greenburgh) and Jackson Avenue (Greenburgh) D264324/B5501670/NIGHT/29333209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, various lanes closed","update_date":"2026-04-17T10:12:37Z"},"road_event_id":"7jepo35VV6QdI6sRnQYlDi2VigE=","beginning_cross_street":"Underhill Road","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82966,41.004654]]}},{"id":"oDILvQRcgqeHYya/pjzi4X5oRlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7jepo35VV6QdI6sRnQYlDi2VigE="},{"type":"next-occurrence","id":"i3JzY8Xkxb0jiHQjZe67cYUQ/rI="}],"description":"Bridge maintenance operations on Sprain Brook State Parkway both directions between Underhill Road (Greenburgh) and Jackson Avenue (Greenburgh) D264324/B5501670/NIGHT/29333209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, various lanes closed","update_date":"2026-04-17T10:12:37Z"},"road_event_id":"oDILvQRcgqeHYya/pjzi4X5oRlg=","beginning_cross_street":"Underhill Road","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82966,41.004654]]}},{"id":"i3JzY8Xkxb0jiHQjZe67cYUQ/rI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7jepo35VV6QdI6sRnQYlDi2VigE="}],"description":"Bridge maintenance operations on Sprain Brook State Parkway both directions between Underhill Road (Greenburgh) and Jackson Avenue (Greenburgh) D264324/B5501670/NIGHT/29333209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM, various lanes closed","update_date":"2026-04-17T10:12:37Z"},"road_event_id":"i3JzY8Xkxb0jiHQjZe67cYUQ/rI=","beginning_cross_street":"Underhill Road","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.82966,41.004654]]}},{"id":"+BYljd5EiWv9O3ImsNmtoB36U8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mn03X4qXpittcrJzTmkOtP9/8VI="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"+BYljd5EiWv9O3ImsNmtoB36U8w=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"mn03X4qXpittcrJzTmkOtP9/8VI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"/J2TOlUwB68O4cVE2UxGCFoenQk="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"mn03X4qXpittcrJzTmkOtP9/8VI=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"/J2TOlUwB68O4cVE2UxGCFoenQk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"ql0UOvw0En05HpVo6YM54u99yOI="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"/J2TOlUwB68O4cVE2UxGCFoenQk=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"ql0UOvw0En05HpVo6YM54u99yOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"DWXBtB+krhwFaglb9gfSXGiUJhc="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"ql0UOvw0En05HpVo6YM54u99yOI=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"DWXBtB+krhwFaglb9gfSXGiUJhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"2dfs/nshDzKxVNaCRlaOz638rtI="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"DWXBtB+krhwFaglb9gfSXGiUJhc=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"2dfs/nshDzKxVNaCRlaOz638rtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"OSlYLhRoL1pG9N/EaJRV32SxFbU="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"2dfs/nshDzKxVNaCRlaOz638rtI=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"OSlYLhRoL1pG9N/EaJRV32SxFbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"m4OABS/3vU3u//TJlrVsmV718Sc="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"OSlYLhRoL1pG9N/EaJRV32SxFbU=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"m4OABS/3vU3u//TJlrVsmV718Sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"3CBx2DEWVz+vOen6/EMobr9ZHv4="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"m4OABS/3vU3u//TJlrVsmV718Sc=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"3CBx2DEWVz+vOen6/EMobr9ZHv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="},{"type":"next-occurrence","id":"zkLN5WahAB+IGXfSo41Vz2GYRPU="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"3CBx2DEWVz+vOen6/EMobr9ZHv4=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"zkLN5WahAB+IGXfSo41Vz2GYRPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+BYljd5EiWv9O3ImsNmtoB36U8w="}],"description":"Culvert repairs on NY 22 both directions Dock Street (Essex) Alternating, Monday April 13th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-10T13:14:24Z"},"road_event_id":"zkLN5WahAB+IGXfSo41Vz2GYRPU=","beginning_cross_street":"Dock Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.356823,44.309476]]}},{"id":"90jmr6JZz8XcmySbtCMsHLeqo/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GfvxMno4zP8oww7osEJrFksJNeU="}],"description":"Bridge maintenance operations on NY 119 both directions between Undercliff Avenue (Elmsford) and Vreeland Avenue (Elmsford) D264324/DAY/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, various lanes closed","update_date":"2026-04-17T19:01:13Z"},"road_event_id":"90jmr6JZz8XcmySbtCMsHLeqo/w=","beginning_cross_street":"Undercliff Avenue","ending_cross_street":"Vreeland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821292,41.055576]]}},{"id":"GfvxMno4zP8oww7osEJrFksJNeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"90jmr6JZz8XcmySbtCMsHLeqo/w="},{"type":"next-occurrence","id":"3RrDpfxaBjFlITfpngKUv1K1tXE="}],"description":"Bridge maintenance operations on NY 119 both directions between Undercliff Avenue (Elmsford) and Vreeland Avenue (Elmsford) D264324/DAY/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, various lanes closed","update_date":"2026-04-17T19:01:13Z"},"road_event_id":"GfvxMno4zP8oww7osEJrFksJNeU=","beginning_cross_street":"Undercliff Avenue","ending_cross_street":"Vreeland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821292,41.055576]]}},{"id":"3RrDpfxaBjFlITfpngKUv1K1tXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"90jmr6JZz8XcmySbtCMsHLeqo/w="}],"description":"Bridge maintenance operations on NY 119 both directions between Undercliff Avenue (Elmsford) and Vreeland Avenue (Elmsford) D264324/DAY/B5500749/32337809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, various lanes closed","update_date":"2026-04-17T19:01:13Z"},"road_event_id":"3RrDpfxaBjFlITfpngKUv1K1tXE=","beginning_cross_street":"Undercliff Avenue","ending_cross_street":"Vreeland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821292,41.055576]]}},{"id":"MudyNzqd/U3Zeossu0sak4Ix5kM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uqmPcIcN44x2P49UTxRu6VXuoBA="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T18:01:11Z"},"road_event_id":"MudyNzqd/U3Zeossu0sak4Ix5kM=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"uqmPcIcN44x2P49UTxRu6VXuoBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MudyNzqd/U3Zeossu0sak4Ix5kM="},{"type":"next-occurrence","id":"Qyz+Wx9H217p/k4QZqE5eyKi/UU="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T18:01:11Z"},"road_event_id":"uqmPcIcN44x2P49UTxRu6VXuoBA=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"Qyz+Wx9H217p/k4QZqE5eyKi/UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MudyNzqd/U3Zeossu0sak4Ix5kM="}],"description":"Bridge maintenance operations on Saw Mill River Parkway northbound between Exit 20 - I-87 (Greenburgh) and Exit 23 - Old Saw Mill Road - CR 303 (Greenburgh) D264324/DAY/B5500749/32387409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T18:01:11Z"},"road_event_id":"Qyz+Wx9H217p/k4QZqE5eyKi/UU=","beginning_cross_street":"Exit 20 - I-87","ending_cross_street":"Exit 23 - Old Saw Mill Road - CR 303","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821132,41.055486]]}},{"id":"0SctFWbNReEZgp06qwr2GlvOKgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GqeilsRrUOZnOP01KIgKbiR6UdM="}],"description":"Roadwork on NY 385 both directions 2nd Street; CR 28 (Athens) Various , Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:20:39Z"},"road_event_id":"0SctFWbNReEZgp06qwr2GlvOKgc=","beginning_cross_street":"2nd Street; CR 28","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802511,42.274328]]}},{"id":"GqeilsRrUOZnOP01KIgKbiR6UdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SctFWbNReEZgp06qwr2GlvOKgc="},{"type":"next-occurrence","id":"/zbKvGKOTRGUnFL1bHpLcYjbq98="}],"description":"Roadwork on NY 385 both directions 2nd Street; CR 28 (Athens) Various , Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:20:39Z"},"road_event_id":"GqeilsRrUOZnOP01KIgKbiR6UdM=","beginning_cross_street":"2nd Street; CR 28","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802511,42.274328]]}},{"id":"/zbKvGKOTRGUnFL1bHpLcYjbq98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SctFWbNReEZgp06qwr2GlvOKgc="}],"description":"Roadwork on NY 385 both directions 2nd Street; CR 28 (Athens) Various , Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:20:39Z"},"road_event_id":"/zbKvGKOTRGUnFL1bHpLcYjbq98=","beginning_cross_street":"2nd Street; CR 28","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802511,42.274328]]}},{"id":"OwX+6ouApWF6D2sszI1TfQ1Xolw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 29A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/A/YzrAEYuAOunM+Cpk7jYbl7P0="}],"description":"Construction on NY 29A both directions at NY 30A (Gloversville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T10:36:16Z"},"road_event_id":"OwX+6ouApWF6D2sszI1TfQ1Xolw=","beginning_cross_street":"NY 30A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.32224,43.05103]]}},{"id":"/A/YzrAEYuAOunM+Cpk7jYbl7P0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 29A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OwX+6ouApWF6D2sszI1TfQ1Xolw="},{"type":"next-occurrence","id":"rYO2YGjTRsYN8uLUB93nuTy0NGI="}],"description":"Construction on NY 29A both directions at NY 30A (Gloversville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T10:36:16Z"},"road_event_id":"/A/YzrAEYuAOunM+Cpk7jYbl7P0=","beginning_cross_street":"NY 30A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.32224,43.05103]]}},{"id":"rYO2YGjTRsYN8uLUB93nuTy0NGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 29A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OwX+6ouApWF6D2sszI1TfQ1Xolw="}],"description":"Construction on NY 29A both directions at NY 30A (Gloversville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T10:36:16Z"},"road_event_id":"rYO2YGjTRsYN8uLUB93nuTy0NGI=","beginning_cross_street":"NY 30A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.32224,43.05103]]}},{"id":"UyW4jbBuw+tmAv634uUcPl823QE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Canaan"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TXVmt6vTBz7DQyppddZ2dfm5GF8="}],"description":"Due to Track repairs both directions, New Canaan between Stamford (Stamford) and New Canaan (New Canaan) Buses replace weekend trains between Stamford and New Canaan for the next two months, between April 11 and June 7, excluding Memorial Day Weekend, Saturday April 11th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 12:00 AM thru 11:59 PM bus service only, Saturday May 30th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 12:00 AM thru 11:59 PM bus service only","update_date":"2026-04-10T14:51:40Z"},"road_event_id":"UyW4jbBuw+tmAv634uUcPl823QE=","beginning_cross_street":"Stamford","ending_cross_street":"New Canaan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542846,41.046611]]}},{"id":"TXVmt6vTBz7DQyppddZ2dfm5GF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Canaan"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UyW4jbBuw+tmAv634uUcPl823QE="}],"description":"Due to Track repairs both directions, New Canaan between Stamford (Stamford) and New Canaan (New Canaan) Buses replace weekend trains between Stamford and New Canaan for the next two months, between April 11 and June 7, excluding Memorial Day Weekend, Saturday April 11th, 2026 thru Sunday May 17th, 2026, Saturday/ Sunday, 12:00 AM thru 11:59 PM bus service only, Saturday May 30th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 12:00 AM thru 11:59 PM bus service only","update_date":"2026-04-10T14:51:40Z"},"road_event_id":"TXVmt6vTBz7DQyppddZ2dfm5GF8=","beginning_cross_street":"Stamford","ending_cross_street":"New Canaan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T04:00:00Z","end_date":"2026-05-04T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542846,41.046611]]}},{"id":"zXWW3BNROtFNl+Hv5dewTs/Q4ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nyIIVUyiH83qGiSkQnBEU007Hco="}],"description":"Installation of traffic management systems and overnight roadwork on NY 33A both directions at Union Street; NY 259; CR 170 (Chili) Alternating lane closures with flaggers as needed, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-04-16T13:20:19Z"},"road_event_id":"zXWW3BNROtFNl+Hv5dewTs/Q4ow=","beginning_cross_street":"Union Street; NY 259; CR 170","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.798028,43.093039]]}},{"id":"nyIIVUyiH83qGiSkQnBEU007Hco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zXWW3BNROtFNl+Hv5dewTs/Q4ow="},{"type":"next-occurrence","id":"PzeapfzIKlWn7XUdJl13PMlIZR4="}],"description":"Installation of traffic management systems and overnight roadwork on NY 33A both directions at Union Street; NY 259; CR 170 (Chili) Alternating lane closures with flaggers as needed, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-04-16T13:20:19Z"},"road_event_id":"nyIIVUyiH83qGiSkQnBEU007Hco=","beginning_cross_street":"Union Street; NY 259; CR 170","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.798028,43.093039]]}},{"id":"PzeapfzIKlWn7XUdJl13PMlIZR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zXWW3BNROtFNl+Hv5dewTs/Q4ow="}],"description":"Installation of traffic management systems and overnight roadwork on NY 33A both directions at Union Street; NY 259; CR 170 (Chili) Alternating lane closures with flaggers as needed, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes","update_date":"2026-04-16T13:20:19Z"},"road_event_id":"PzeapfzIKlWn7XUdJl13PMlIZR4=","beginning_cross_street":"Union Street; NY 259; CR 170","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.798028,43.093039]]}},{"id":"wnwDcVCvLP0fzLF5lGONuSxO0Fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[],"description":"Road maintenance operations on Hutchinson River Parkway [Westchester] both directions ramps to/from Exit 4A/B - Boston Post Road; US 1 (Pelham) Res 8-9 RW/29945809 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday April 25th, 2026, 06:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-21T12:35:52Z"},"road_event_id":"wnwDcVCvLP0fzLF5lGONuSxO0Fk=","beginning_cross_street":"Exit 4A/B - Boston Post Road; US 1","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T16:00:00Z","end_date":"2026-04-26T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.727433,40.998268]]}},{"id":"QytxxktJp3jq+YqieJBoYPL93CY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement and longterm construction on I-590 both directions between Edgewood Ave (Brighton) and Elmwood Avenue; CR 87 (Brighton), Continuous Saturday March 28th, 2026 09:00 AM thru Wednesday September 30th, 2026 05:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-10T15:33:15Z"},"road_event_id":"QytxxktJp3jq+YqieJBoYPL93CY=","beginning_cross_street":"Edgewood Ave","ending_cross_street":"Elmwood Avenue; CR 87","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.560936,43.108454]]}},{"id":"D38hwA0d2FIA/p181v2NaqOYCx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LaSalle Expressway"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on LaSalle Expressway both directions Exit - 77th Street (Niagara Falls) to City of Niagara Falls; Town of Wheatfield Line (Wheatfield), Continuous Friday April 10th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-10T15:42:44Z"},"road_event_id":"D38hwA0d2FIA/p181v2NaqOYCx8=","beginning_cross_street":"Exit   - 77th Street","ending_cross_street":"City of Niagara Falls; Town of Wheatfield Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.981487,43.079962]]}},{"id":"G3mXfS7WaC04gbP8miZ0TgRtB7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cjIRENqxI71SA6tNm0XDqy14l1Q="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"G3mXfS7WaC04gbP8miZ0TgRtB7k=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"cjIRENqxI71SA6tNm0XDqy14l1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3mXfS7WaC04gbP8miZ0TgRtB7k="},{"type":"next-occurrence","id":"+Y2EiBST2/8DYMgBDbKiwoUw12Y="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"cjIRENqxI71SA6tNm0XDqy14l1Q=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"+Y2EiBST2/8DYMgBDbKiwoUw12Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3mXfS7WaC04gbP8miZ0TgRtB7k="},{"type":"next-occurrence","id":"prFXAtXaByDxY3QKU2RbJPd5nDg="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"+Y2EiBST2/8DYMgBDbKiwoUw12Y=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"prFXAtXaByDxY3QKU2RbJPd5nDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3mXfS7WaC04gbP8miZ0TgRtB7k="},{"type":"next-occurrence","id":"cQTcLgzARzJrw7zc9EANrqbG1wk="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"prFXAtXaByDxY3QKU2RbJPd5nDg=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"cQTcLgzARzJrw7zc9EANrqbG1wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3mXfS7WaC04gbP8miZ0TgRtB7k="},{"type":"next-occurrence","id":"5TrcdhzjDnC80FZaXlIvy96TgZw="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"cQTcLgzARzJrw7zc9EANrqbG1wk=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"5TrcdhzjDnC80FZaXlIvy96TgZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3mXfS7WaC04gbP8miZ0TgRtB7k="},{"type":"next-occurrence","id":"gjTcMNGNik1pZBLZdfomfijzdNA="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"5TrcdhzjDnC80FZaXlIvy96TgZw=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"gjTcMNGNik1pZBLZdfomfijzdNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3mXfS7WaC04gbP8miZ0TgRtB7k="},{"type":"next-occurrence","id":"yc4Ulx8mEjxkTrAl39lSqMgA8C8="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"gjTcMNGNik1pZBLZdfomfijzdNA=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"yc4Ulx8mEjxkTrAl39lSqMgA8C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RT-19-TRUCK"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G3mXfS7WaC04gbP8miZ0TgRtB7k="}],"description":"Utility work on RT-19-TRUCK both directions between HARTSHORN DR (Sweden) and NY 31 at Sherry Ln. (Sweden) Alternating lane closures with flaggers as needed, Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:33:03Z"},"road_event_id":"yc4Ulx8mEjxkTrAl39lSqMgA8C8=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"Sherry Ln.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954388,43.19835]]}},{"id":"mZMgXQY72XuPyCGN4kvTkRPWQyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Tyf7p/YfSVvvHTQ6HAxwApDw3iw="}],"description":"Signal repairs on E Line eastbound bypassing Briarwood (New York) For service to this station, take the E line to Jamaica-Van Wyck and transfer to a Manhattan-bound E line. For service from this station, take the e line or F line to Kew Gardens-Union Tpke and transfer to a Jamaica Center-bound E line., Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 11:45 PM thru 05:00 AM","update_date":"2026-04-20T09:00:20Z"},"road_event_id":"mZMgXQY72XuPyCGN4kvTkRPWQyo=","beginning_cross_street":"Briarwood","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:45:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820574,40.709179]]}},{"id":"Tyf7p/YfSVvvHTQ6HAxwApDw3iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mZMgXQY72XuPyCGN4kvTkRPWQyo="},{"type":"next-occurrence","id":"WcWvdaISwuWcnmuCH2QZh7dmQCI="}],"description":"Signal repairs on E Line eastbound bypassing Briarwood (New York) For service to this station, take the E line to Jamaica-Van Wyck and transfer to a Manhattan-bound E line. For service from this station, take the e line or F line to Kew Gardens-Union Tpke and transfer to a Jamaica Center-bound E line., Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 11:45 PM thru 05:00 AM","update_date":"2026-04-20T09:00:20Z"},"road_event_id":"Tyf7p/YfSVvvHTQ6HAxwApDw3iw=","beginning_cross_street":"Briarwood","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:45:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820574,40.709179]]}},{"id":"WcWvdaISwuWcnmuCH2QZh7dmQCI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mZMgXQY72XuPyCGN4kvTkRPWQyo="}],"description":"Signal repairs on E Line eastbound bypassing Briarwood (New York) For service to this station, take the E line to Jamaica-Van Wyck and transfer to a Manhattan-bound E line. For service from this station, take the e line or F line to Kew Gardens-Union Tpke and transfer to a Jamaica Center-bound E line., Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 11:45 PM thru 05:00 AM","update_date":"2026-04-20T09:00:20Z"},"road_event_id":"WcWvdaISwuWcnmuCH2QZh7dmQCI=","beginning_cross_street":"Briarwood","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:45:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820574,40.709179]]}},{"id":"oa03xPz4WLQ8PRn/b2qHf2gsIAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3COe4AkGEWSnPvv+zQE/bF8c68w="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:35:41Z"},"road_event_id":"oa03xPz4WLQ8PRn/b2qHf2gsIAA=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803165,40.677309]]}},{"id":"3COe4AkGEWSnPvv+zQE/bF8c68w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oa03xPz4WLQ8PRn/b2qHf2gsIAA="},{"type":"next-occurrence","id":"+RRXsQKSDWHGExING0owSZm7eNE="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:35:41Z"},"road_event_id":"3COe4AkGEWSnPvv+zQE/bF8c68w=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803165,40.677309]]}},{"id":"+RRXsQKSDWHGExING0owSZm7eNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oa03xPz4WLQ8PRn/b2qHf2gsIAA="}],"description":"Construction on I-678 southbound from Foch Boulevard; Ramp (New York) to Rockaway Boulevard (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:35:41Z"},"road_event_id":"+RRXsQKSDWHGExING0owSZm7eNE=","beginning_cross_street":"Foch Boulevard; Ramp","ending_cross_street":"Rockaway Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803165,40.677309]]}},{"id":"0P8vTSdCDVGooP4/qbVFEvJX12c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FqLxJvI94Ecr1YnMatiNL3ztTJc="}],"description":"Construction on I-678 southbound from I-678; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:49:04Z"},"road_event_id":"0P8vTSdCDVGooP4/qbVFEvJX12c=","beginning_cross_street":"I-678; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802334,40.664648]]}},{"id":"FqLxJvI94Ecr1YnMatiNL3ztTJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0P8vTSdCDVGooP4/qbVFEvJX12c="},{"type":"next-occurrence","id":"XaoURkW2JhBDdsAWIHX6xMKdpEY="}],"description":"Construction on I-678 southbound from I-678; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:49:04Z"},"road_event_id":"FqLxJvI94Ecr1YnMatiNL3ztTJc=","beginning_cross_street":"I-678; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802334,40.664648]]}},{"id":"XaoURkW2JhBDdsAWIHX6xMKdpEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0P8vTSdCDVGooP4/qbVFEvJX12c="}],"description":"Construction on I-678 southbound from I-678; Ramp (New York) to Belt System - Southern Parkway (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:49:04Z"},"road_event_id":"XaoURkW2JhBDdsAWIHX6xMKdpEY=","beginning_cross_street":"I-678; Ramp","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.802334,40.664648]]}},{"id":"TVKjzsC6cq9Q1uwg4x7gMjcPHm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of Exit 9A - CR 706/Coles Rd (Gloucester Twp), Continuous Monday April 13, 2026 08:00 PM thru Monday April 27, 2026 11:00 PM, left lane closed","update_date":"2026-04-22T16:51:21Z"},"road_event_id":"TVKjzsC6cq9Q1uwg4x7gMjcPHm0=","beginning_cross_street":"North of Exit 9A - CR 706/Coles Rd","ending_cross_street":"North of Exit 10A - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.06398,39.813583]]}},{"id":"M2wjH0NKJ+gCMSEHqw/LCv2j7DA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of Exit 9A - CR 706/Coles Rd (Gloucester Twp), Continuous Monday April 13, 2026 08:00 PM thru Monday April 27, 2026 12:00 AM, left lane closed","update_date":"2026-04-22T16:51:21Z"},"road_event_id":"M2wjH0NKJ+gCMSEHqw/LCv2j7DA=","beginning_cross_street":"North of Exit 9A - CR 706/Coles Rd","ending_cross_street":"North of Exit 10A - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.06398,39.813583]]}},{"id":"hPpj7WtHs8qbG06wZFwojAQNEvk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bKpBEcTKDNb2JNOdKBixedTB47k="}],"description":"Construction on Bronx River Parkway both directions between Watson Avenue (New York) and I-278 - Bruckner Expressway (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed southbound, northbound","update_date":"2026-04-18T09:00:14Z"},"road_event_id":"hPpj7WtHs8qbG06wZFwojAQNEvk=","beginning_cross_street":"Watson Avenue","ending_cross_street":"I-278 - Bruckner Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872833,40.8266]]}},{"id":"bKpBEcTKDNb2JNOdKBixedTB47k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPpj7WtHs8qbG06wZFwojAQNEvk="},{"type":"next-occurrence","id":"KfyBoaaIUhEaeGvXWYx7JdokzUs="}],"description":"Construction on Bronx River Parkway both directions between Watson Avenue (New York) and I-278 - Bruckner Expressway (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed southbound, northbound","update_date":"2026-04-18T09:00:14Z"},"road_event_id":"bKpBEcTKDNb2JNOdKBixedTB47k=","beginning_cross_street":"Watson Avenue","ending_cross_street":"I-278 - Bruckner Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872833,40.8266]]}},{"id":"KfyBoaaIUhEaeGvXWYx7JdokzUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPpj7WtHs8qbG06wZFwojAQNEvk="}],"description":"Construction on Bronx River Parkway both directions between Watson Avenue (New York) and I-278 - Bruckner Expressway (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed southbound, northbound","update_date":"2026-04-18T09:00:14Z"},"road_event_id":"KfyBoaaIUhEaeGvXWYx7JdokzUs=","beginning_cross_street":"Watson Avenue","ending_cross_street":"I-278 - Bruckner Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872833,40.8266]]}},{"id":"hYaz+b9d/LlZN7j/Dt0nptypVVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JCluw8vouF0jKT2R2hV3io0bd60="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:01:57Z"},"road_event_id":"hYaz+b9d/LlZN7j/Dt0nptypVVQ=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901319,40.881006]]}},{"id":"JCluw8vouF0jKT2R2hV3io0bd60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hYaz+b9d/LlZN7j/Dt0nptypVVQ="},{"type":"next-occurrence","id":"REL36YUSSOn4D/mTiccXuoXKt1Q="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:01:57Z"},"road_event_id":"JCluw8vouF0jKT2R2hV3io0bd60=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901319,40.881006]]}},{"id":"REL36YUSSOn4D/mTiccXuoXKt1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hYaz+b9d/LlZN7j/Dt0nptypVVQ="},{"type":"next-occurrence","id":"l2jV64wHC2EnSkJiHu0ZLaN6YXg="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:01:57Z"},"road_event_id":"REL36YUSSOn4D/mTiccXuoXKt1Q=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901319,40.881006]]}},{"id":"l2jV64wHC2EnSkJiHu0ZLaN6YXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hYaz+b9d/LlZN7j/Dt0nptypVVQ="},{"type":"next-occurrence","id":"kLRQCga/EyENBxkvPoPFgDpM7Bc="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:01:57Z"},"road_event_id":"l2jV64wHC2EnSkJiHu0ZLaN6YXg=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901319,40.881006]]}},{"id":"kLRQCga/EyENBxkvPoPFgDpM7Bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hYaz+b9d/LlZN7j/Dt0nptypVVQ="},{"type":"next-occurrence","id":"fCYaV7/l+DfqttXeHOuDpxeo1z0="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:01:57Z"},"road_event_id":"kLRQCga/EyENBxkvPoPFgDpM7Bc=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901319,40.881006]]}},{"id":"fCYaV7/l+DfqttXeHOuDpxeo1z0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hYaz+b9d/LlZN7j/Dt0nptypVVQ="}],"description":"Construction on I-87 Major Deegan Expressway both directions between West 234th Street (New York) and West 238th Street (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:01:57Z"},"road_event_id":"fCYaV7/l+DfqttXeHOuDpxeo1z0=","beginning_cross_street":"West 234th Street","ending_cross_street":"West 238th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.901319,40.881006]]}},{"id":"Daoj+d77i71HFbttlo4o7E94GwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"U//GT4Oe/S5R6El/FeJWGHFJHrk="}],"description":"Track repairs on G Line both directions between Bedford - Nostrand Avs (New York) and Court Sq - 23 St (New York) G line runs between Church Av and Bedford-Nostrand Avs, the last stop. Free T403 shuttle buses make stops between Bedford-Nostrand Avs and Court Sq. Transfer between G line and at Bedford-Nostrand Avs., Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-04-16T09:00:20Z"},"road_event_id":"Daoj+d77i71HFbttlo4o7E94GwM=","beginning_cross_street":"Bedford - Nostrand Avs","ending_cross_street":"Court Sq - 23 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:45:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.953522,40.689627]]}},{"id":"U//GT4Oe/S5R6El/FeJWGHFJHrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Daoj+d77i71HFbttlo4o7E94GwM="},{"type":"next-occurrence","id":"ALL/6ZI3NXICNbBtG24ukLLFKvI="}],"description":"Track repairs on G Line both directions between Bedford - Nostrand Avs (New York) and Court Sq - 23 St (New York) G line runs between Church Av and Bedford-Nostrand Avs, the last stop. Free T403 shuttle buses make stops between Bedford-Nostrand Avs and Court Sq. Transfer between G line and at Bedford-Nostrand Avs., Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-04-16T09:00:20Z"},"road_event_id":"U//GT4Oe/S5R6El/FeJWGHFJHrk=","beginning_cross_street":"Bedford - Nostrand Avs","ending_cross_street":"Court Sq - 23 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:45:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.953522,40.689627]]}},{"id":"ALL/6ZI3NXICNbBtG24ukLLFKvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Daoj+d77i71HFbttlo4o7E94GwM="}],"description":"Track repairs on G Line both directions between Bedford - Nostrand Avs (New York) and Court Sq - 23 St (New York) G line runs between Church Av and Bedford-Nostrand Avs, the last stop. Free T403 shuttle buses make stops between Bedford-Nostrand Avs and Court Sq. Transfer between G line and at Bedford-Nostrand Avs., Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-04-16T09:00:20Z"},"road_event_id":"ALL/6ZI3NXICNbBtG24ukLLFKvI=","beginning_cross_street":"Bedford - Nostrand Avs","ending_cross_street":"Court Sq - 23 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:45:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.953522,40.689627]]}},{"id":"OV7moCbgxPLKWgg55KOtUXY4gkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on I-590 southbound Exit ramp Exit 2B to NY 31; Monroe Ave. (Brighton) RAMP CLOSED, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM All lanes closed and detoured ramp","update_date":"2026-04-10T17:42:08Z"},"road_event_id":"OV7moCbgxPLKWgg55KOtUXY4gkI=","beginning_cross_street":"Exit 2B to NY 31; Monroe Ave.","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552248,43.11434]]}},{"id":"EPruGB+grBpE2TWjGMArxj7QHfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement and longterm construction on NY 31 westbound Entrance ramp I-590 SB (Brighton) RAMP CLOSED, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM All lanes closed and detoured ramp","update_date":"2026-04-10T17:46:35Z"},"road_event_id":"EPruGB+grBpE2TWjGMArxj7QHfA=","beginning_cross_street":"I-590 SB","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.553968,43.117]]}},{"id":"HkN5nxwK55fF6nn3tKvhCwiu4B4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mSlsIJieLscpymo2O582k0gBt9w="}],"description":"Construction on I-278 both directions between Grand Central Parkway (New York) and Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound, westbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed eastbound, westbound","update_date":"2026-04-18T10:00:02Z"},"road_event_id":"HkN5nxwK55fF6nn3tKvhCwiu4B4=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:30:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90692,40.768581]]}},{"id":"mSlsIJieLscpymo2O582k0gBt9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HkN5nxwK55fF6nn3tKvhCwiu4B4="},{"type":"next-occurrence","id":"XvzBxAuQvpPpTfk7O96Kr5o5dYc="}],"description":"Construction on I-278 both directions between Grand Central Parkway (New York) and Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound, westbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed eastbound, westbound","update_date":"2026-04-18T10:00:02Z"},"road_event_id":"mSlsIJieLscpymo2O582k0gBt9w=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:30:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90692,40.768581]]}},{"id":"XvzBxAuQvpPpTfk7O96Kr5o5dYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HkN5nxwK55fF6nn3tKvhCwiu4B4="}],"description":"Construction on I-278 both directions between Grand Central Parkway (New York) and Grand Central Parkway at 49th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 05:00 AM 1 Right lane of 4 lanes closed eastbound, westbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed eastbound, westbound","update_date":"2026-04-18T10:00:02Z"},"road_event_id":"XvzBxAuQvpPpTfk7O96Kr5o5dYc=","beginning_cross_street":"Grand Central Parkway","ending_cross_street":"49th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.90692,40.768581]]}},{"id":"2ibiyGRxeIlKokyZh6R3FBdoqJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i7zIURwS6AMXkusy5Tx1vputVoM="}],"description":"Construction on I-278 westbound ramp from Astoria Boulevard South (New York) Subject to change without notice. 15 minute intermittent full closure., Monday April 20th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 05:00 AM All lanes closed , , Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 06:00 AM All lanes closed ,","update_date":"2026-04-18T10:00:03Z"},"road_event_id":"2ibiyGRxeIlKokyZh6R3FBdoqJI=","beginning_cross_street":"Astoria Boulevard South","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:30:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904724,40.767472]]}},{"id":"i7zIURwS6AMXkusy5Tx1vputVoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ibiyGRxeIlKokyZh6R3FBdoqJI="},{"type":"next-occurrence","id":"uUDdVLRY9muzbz1G25R+e0kf28A="}],"description":"Construction on I-278 westbound ramp from Astoria Boulevard South (New York) Subject to change without notice. 15 minute intermittent full closure., Monday April 20th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 05:00 AM All lanes closed , , Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 06:00 AM All lanes closed ,","update_date":"2026-04-18T10:00:03Z"},"road_event_id":"i7zIURwS6AMXkusy5Tx1vputVoM=","beginning_cross_street":"Astoria Boulevard South","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:30:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904724,40.767472]]}},{"id":"uUDdVLRY9muzbz1G25R+e0kf28A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2ibiyGRxeIlKokyZh6R3FBdoqJI="}],"description":"Construction on I-278 westbound ramp from Astoria Boulevard South (New York) Subject to change without notice. 15 minute intermittent full closure., Monday April 20th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:30 PM thru 05:00 AM All lanes closed , , Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 06:00 AM All lanes closed ,","update_date":"2026-04-18T10:00:03Z"},"road_event_id":"uUDdVLRY9muzbz1G25R+e0kf28A=","beginning_cross_street":"Astoria Boulevard South","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904724,40.767472]]}},{"id":"rybogiR2bBgXyfAbFY14L0J5aTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-590"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and longterm construction on I-590 southbound Elmwood Avenue; CR 87 (Brighton) to EXIT 2A to NY 31; Monroe Ave (Brighton) RIGHT LANE IS EXIT ONLY AT EXIT 2A, Continuous Saturday April 11th, 2026 05:00 AM thru Monday November 30th, 2026 12:00 PM 1 Right lane of 3 lanes diverted","update_date":"2026-04-10T17:54:37Z"},"road_event_id":"rybogiR2bBgXyfAbFY14L0J5aTA=","beginning_cross_street":"Elmwood Avenue; CR 87","ending_cross_street":"EXIT 2A to NY 31; Monroe Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.553512,43.126751]]}},{"id":"btmJCg7cC2QV7MG5DqtToWUBeiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4VHs+3VDq/f1OYrPzN6XthVimJY="}],"description":"Construction on I-278 both directions between NY 25; Queens Boulevard (New York) and 54th Avenue (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Left lane of 3 lanes closed westbound; 1 Right lane of 3 lanes closed eastbound","update_date":"2026-04-17T18:26:03Z"},"road_event_id":"btmJCg7cC2QV7MG5DqtToWUBeiQ=","beginning_cross_street":"NY 25; Queens Boulevard","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:30:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899288,40.740548]]}},{"id":"4VHs+3VDq/f1OYrPzN6XthVimJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"btmJCg7cC2QV7MG5DqtToWUBeiQ="},{"type":"next-occurrence","id":"MP0ZlgJDHCa79LqIN72CyWxzOtI="}],"description":"Construction on I-278 both directions between NY 25; Queens Boulevard (New York) and 54th Avenue (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Left lane of 3 lanes closed westbound; 1 Right lane of 3 lanes closed eastbound","update_date":"2026-04-17T18:26:03Z"},"road_event_id":"4VHs+3VDq/f1OYrPzN6XthVimJY=","beginning_cross_street":"NY 25; Queens Boulevard","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:30:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899288,40.740548]]}},{"id":"MP0ZlgJDHCa79LqIN72CyWxzOtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"btmJCg7cC2QV7MG5DqtToWUBeiQ="}],"description":"Construction on I-278 both directions between NY 25; Queens Boulevard (New York) and 54th Avenue (New York) Subject to change without notice., Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Left lane of 3 lanes closed westbound; 1 Right lane of 3 lanes closed eastbound","update_date":"2026-04-17T18:26:03Z"},"road_event_id":"MP0ZlgJDHCa79LqIN72CyWxzOtI=","beginning_cross_street":"NY 25; Queens Boulevard","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:30:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899288,40.740548]]}},{"id":"gxzVTTHPH/6K3mvf/TihSu55buE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 253"],"direction":"unknown","related_road_events":[],"description":"Structure repairs on NY 253 eastbound at I-390 (Henrietta), Continuous Monday April 13th, 2026 07:00 AM thru Monday August 31st, 2026 04:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-10T18:05:35Z"},"road_event_id":"gxzVTTHPH/6K3mvf/TihSu55buE=","beginning_cross_street":"I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.641599,43.058834]]}},{"id":"lo/HQ2yWCjqE0lDddhCgahChwHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"psCOvz5p3QJxsTpDmgXiUVgjGCE="}],"description":"Construction on I-278 both directions between Metropolitan Avenue; Williamsburg Bridge (New York) and 54th Avenue (New York), Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:34:25Z"},"road_event_id":"lo/HQ2yWCjqE0lDddhCgahChwHk=","beginning_cross_street":"Metropolitan Avenue; Williamsburg Bridge","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:30:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95282,40.714241]]}},{"id":"psCOvz5p3QJxsTpDmgXiUVgjGCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lo/HQ2yWCjqE0lDddhCgahChwHk="},{"type":"next-occurrence","id":"8V9hj4dhVNePgicy5Wxo49peMwk="}],"description":"Construction on I-278 both directions between Metropolitan Avenue; Williamsburg Bridge (New York) and 54th Avenue (New York), Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:34:25Z"},"road_event_id":"psCOvz5p3QJxsTpDmgXiUVgjGCE=","beginning_cross_street":"Metropolitan Avenue; Williamsburg Bridge","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:30:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95282,40.714241]]}},{"id":"8V9hj4dhVNePgicy5Wxo49peMwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lo/HQ2yWCjqE0lDddhCgahChwHk="}],"description":"Construction on I-278 both directions between Metropolitan Avenue; Williamsburg Bridge (New York) and 54th Avenue (New York), Monday April 13th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:30 PM thru 05:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:34:25Z"},"road_event_id":"8V9hj4dhVNePgicy5Wxo49peMwk=","beginning_cross_street":"Metropolitan Avenue; Williamsburg Bridge","ending_cross_street":"54th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:30:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95282,40.714241]]}},{"id":"1Cis6LJfDGFm+SPAq6bKWFP8c3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UdQ0rIqMjYrpdmt3lZzEQdimSGo="}],"description":"Construction on I-278 both directions between Exit 28B - Brooklyn Bridge (New York) and Metropolitan Avenue; Williamsburg Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:36:01Z"},"road_event_id":"1Cis6LJfDGFm+SPAq6bKWFP8c3c=","beginning_cross_street":"Exit 28B - Brooklyn Bridge","ending_cross_street":"Metropolitan Avenue; Williamsburg Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991568,40.70168]]}},{"id":"UdQ0rIqMjYrpdmt3lZzEQdimSGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1Cis6LJfDGFm+SPAq6bKWFP8c3c="},{"type":"next-occurrence","id":"nmqn/4ET8qLfRUlPmbQb9x29KDw="}],"description":"Construction on I-278 both directions between Exit 28B - Brooklyn Bridge (New York) and Metropolitan Avenue; Williamsburg Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:36:01Z"},"road_event_id":"UdQ0rIqMjYrpdmt3lZzEQdimSGo=","beginning_cross_street":"Exit 28B - Brooklyn Bridge","ending_cross_street":"Metropolitan Avenue; Williamsburg Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991568,40.70168]]}},{"id":"nmqn/4ET8qLfRUlPmbQb9x29KDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1Cis6LJfDGFm+SPAq6bKWFP8c3c="},{"type":"next-occurrence","id":"Ni5Jmf5KMDiPWdLCnAfFF+E2rik="}],"description":"Construction on I-278 both directions between Exit 28B - Brooklyn Bridge (New York) and Metropolitan Avenue; Williamsburg Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:36:01Z"},"road_event_id":"nmqn/4ET8qLfRUlPmbQb9x29KDw=","beginning_cross_street":"Exit 28B - Brooklyn Bridge","ending_cross_street":"Metropolitan Avenue; Williamsburg Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991568,40.70168]]}},{"id":"Ni5Jmf5KMDiPWdLCnAfFF+E2rik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1Cis6LJfDGFm+SPAq6bKWFP8c3c="}],"description":"Construction on I-278 both directions between Exit 28B - Brooklyn Bridge (New York) and Metropolitan Avenue; Williamsburg Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:36:01Z"},"road_event_id":"Ni5Jmf5KMDiPWdLCnAfFF+E2rik=","beginning_cross_street":"Exit 28B - Brooklyn Bridge","ending_cross_street":"Metropolitan Avenue; Williamsburg Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991568,40.70168]]}},{"id":"/mayjb2WJgQX++zmoseKGdGBu6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ntLeavNF1i/3qjjR0ElX/vrtaIE="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"/mayjb2WJgQX++zmoseKGdGBu6M=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"ntLeavNF1i/3qjjR0ElX/vrtaIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"NkjfxQ7658K4pyUL6aW3Gvk/CHg="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"ntLeavNF1i/3qjjR0ElX/vrtaIE=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"NkjfxQ7658K4pyUL6aW3Gvk/CHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"kej+KLkFM3mfOmjsbuWmTTO7C+k="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"NkjfxQ7658K4pyUL6aW3Gvk/CHg=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"kej+KLkFM3mfOmjsbuWmTTO7C+k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"j5jgkG3/zLojIZk5zuvCg76/9og="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"kej+KLkFM3mfOmjsbuWmTTO7C+k=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"j5jgkG3/zLojIZk5zuvCg76/9og=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"vTuWxmZ3hVqWRaVVrAnXfjGPOJE="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"j5jgkG3/zLojIZk5zuvCg76/9og=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"vTuWxmZ3hVqWRaVVrAnXfjGPOJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"INtY5O2C7YTcnnF7wgJaYUhellw="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"vTuWxmZ3hVqWRaVVrAnXfjGPOJE=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"INtY5O2C7YTcnnF7wgJaYUhellw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"FE/g9j1XqqMmWRzoRkfKBPVPNak="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"INtY5O2C7YTcnnF7wgJaYUhellw=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"FE/g9j1XqqMmWRzoRkfKBPVPNak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"1nROTZb3KzUTxL3hA/W+TLG1a/A="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"FE/g9j1XqqMmWRzoRkfKBPVPNak=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"1nROTZb3KzUTxL3hA/W+TLG1a/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"p6fGf5iKOMytlrkWBCxLubdgEQQ="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"1nROTZb3KzUTxL3hA/W+TLG1a/A=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"p6fGf5iKOMytlrkWBCxLubdgEQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="},{"type":"next-occurrence","id":"mGRbyHi95KjaSUcWuXesg7z0pFc="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"p6fGf5iKOMytlrkWBCxLubdgEQQ=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"mGRbyHi95KjaSUcWuXesg7z0pFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-218"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/mayjb2WJgQX++zmoseKGdGBu6M="}],"description":"Installation of traffic management systems and traffic signal repairs on CT-218 both directions between CT-189 (Bloomfield) and GRANBY ST (Bloomfield) There will be alternating lane closures, Friday April 10th, 2026 thru Monday November 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-10T18:27:00Z"},"road_event_id":"mGRbyHi95KjaSUcWuXesg7z0pFc=","beginning_cross_street":"CT-189","ending_cross_street":"GRANBY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.738572,41.816772]]}},{"id":"W/3y3aEX3qlCO2361HeQux3iSA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NZdzXWZWdtE/Ri4Xklu5pXQp5TM="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and Exit 28B - Brooklyn Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:39:00Z"},"road_event_id":"W/3y3aEX3qlCO2361HeQux3iSA8=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"Exit 28B - Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999248,40.691886]]}},{"id":"NZdzXWZWdtE/Ri4Xklu5pXQp5TM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W/3y3aEX3qlCO2361HeQux3iSA8="},{"type":"next-occurrence","id":"rielZ+DxuX8zzUaSF1QYW7ZRwBw="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and Exit 28B - Brooklyn Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:39:00Z"},"road_event_id":"NZdzXWZWdtE/Ri4Xklu5pXQp5TM=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"Exit 28B - Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T05:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999248,40.691886]]}},{"id":"rielZ+DxuX8zzUaSF1QYW7ZRwBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W/3y3aEX3qlCO2361HeQux3iSA8="},{"type":"next-occurrence","id":"/WOeBH1rtN98p/cAbTkCV2v13rY="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and Exit 28B - Brooklyn Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:39:00Z"},"road_event_id":"rielZ+DxuX8zzUaSF1QYW7ZRwBw=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"Exit 28B - Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T05:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999248,40.691886]]}},{"id":"/WOeBH1rtN98p/cAbTkCV2v13rY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W/3y3aEX3qlCO2361HeQux3iSA8="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and Exit 28B - Brooklyn Bridge (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 01:00 AM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:39:00Z"},"road_event_id":"/WOeBH1rtN98p/cAbTkCV2v13rY=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"Exit 28B - Brooklyn Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999248,40.691886]]}},{"id":"Y8V3mwYuOr56BfiaIkcae77Mmsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ct09SN+GmKPT09PG0OmlZCTsoF8="}],"description":"Milling and paving operations on I-84 both directions between Exit 19/20 - CT 8 (Waterbury) and Exit 22 - Union Street (Waterbury) Motorists can expect delays and one lane alternating Traffi, Wednesday April 15th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-10T18:31:51Z"},"road_event_id":"Y8V3mwYuOr56BfiaIkcae77Mmsg=","beginning_cross_street":"Exit 19/20 - CT 8","ending_cross_street":"Exit 22 - Union Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.052655,41.551554]]}},{"id":"ct09SN+GmKPT09PG0OmlZCTsoF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y8V3mwYuOr56BfiaIkcae77Mmsg="},{"type":"next-occurrence","id":"QKHQzb4Q3WNsgqhaJCYpajXLPNo="}],"description":"Milling and paving operations on I-84 both directions between Exit 19/20 - CT 8 (Waterbury) and Exit 22 - Union Street (Waterbury) Motorists can expect delays and one lane alternating Traffi, Wednesday April 15th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-10T18:31:51Z"},"road_event_id":"ct09SN+GmKPT09PG0OmlZCTsoF8=","beginning_cross_street":"Exit 19/20 - CT 8","ending_cross_street":"Exit 22 - Union Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.052655,41.551554]]}},{"id":"QKHQzb4Q3WNsgqhaJCYpajXLPNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y8V3mwYuOr56BfiaIkcae77Mmsg="},{"type":"next-occurrence","id":"V4FseB3/keOSXBdj0HHgs7Xq+Ik="}],"description":"Milling and paving operations on I-84 both directions between Exit 19/20 - CT 8 (Waterbury) and Exit 22 - Union Street (Waterbury) Motorists can expect delays and one lane alternating Traffi, Wednesday April 15th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-10T18:31:51Z"},"road_event_id":"QKHQzb4Q3WNsgqhaJCYpajXLPNo=","beginning_cross_street":"Exit 19/20 - CT 8","ending_cross_street":"Exit 22 - Union Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.052655,41.551554]]}},{"id":"V4FseB3/keOSXBdj0HHgs7Xq+Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y8V3mwYuOr56BfiaIkcae77Mmsg="}],"description":"Milling and paving operations on I-84 both directions between Exit 19/20 - CT 8 (Waterbury) and Exit 22 - Union Street (Waterbury) Motorists can expect delays and one lane alternating Traffi, Wednesday April 15th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-10T18:31:51Z"},"road_event_id":"V4FseB3/keOSXBdj0HHgs7Xq+Ik=","beginning_cross_street":"Exit 19/20 - CT 8","ending_cross_street":"Exit 22 - Union Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.052655,41.551554]]}},{"id":"Et9E52iwXi7ETy990fTZ811YWDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"n+eU/RvftR205Ei0NQw3Z5fbktY="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:26:07Z"},"road_event_id":"Et9E52iwXi7ETy990fTZ811YWDo=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"n+eU/RvftR205Ei0NQw3Z5fbktY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Et9E52iwXi7ETy990fTZ811YWDo="},{"type":"next-occurrence","id":"SPBe/u1YbqA2tSY3+yie0eAdxeE="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:26:07Z"},"road_event_id":"n+eU/RvftR205Ei0NQw3Z5fbktY=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"SPBe/u1YbqA2tSY3+yie0eAdxeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Et9E52iwXi7ETy990fTZ811YWDo="}],"description":"Construction on I-495 both directions between Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only (New York) and Exit 29 - Springfield Boulevard (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T17:26:07Z"},"road_event_id":"SPBe/u1YbqA2tSY3+yie0eAdxeE=","beginning_cross_street":"Exit 28 - Oceania Street / Francis Lewis Boulevard - WestBound Only","ending_cross_street":"Exit 29 - Springfield Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.771162,40.744269]]}},{"id":"YoYazr3FjHjiawcOU7JLIigzLnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gxwHJZMoeZuYZ+63K4Vl5QYKzuk="}],"description":"Construction on I-495 westbound between 80th Street; I-495 (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:57:10Z"},"road_event_id":"YoYazr3FjHjiawcOU7JLIigzLnY=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8802,40.728961]]}},{"id":"gxwHJZMoeZuYZ+63K4Vl5QYKzuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YoYazr3FjHjiawcOU7JLIigzLnY="},{"type":"next-occurrence","id":"fHN0141DLO/RMQ40vH172fYAi4U="}],"description":"Construction on I-495 westbound between 80th Street; I-495 (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:57:10Z"},"road_event_id":"gxwHJZMoeZuYZ+63K4Vl5QYKzuk=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8802,40.728961]]}},{"id":"fHN0141DLO/RMQ40vH172fYAi4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YoYazr3FjHjiawcOU7JLIigzLnY="}],"description":"Construction on I-495 westbound between 80th Street; I-495 (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:57:10Z"},"road_event_id":"fHN0141DLO/RMQ40vH172fYAi4U=","beginning_cross_street":"80th Street; I-495","ending_cross_street":"80th Street; I-495","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.8802,40.728961]]}},{"id":"OaLMUi40ZjgkpsxiQwqgmFyLHKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GUaXs8Ziuc8ftLO/KleBHrnoa4g="}],"description":"Construction on NY 878 both directions between Rockaway Boulevard (New York) and ROCKAWAY BLVD at FARMERS BLVD (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:58:31Z"},"road_event_id":"OaLMUi40ZjgkpsxiQwqgmFyLHKY=","beginning_cross_street":"Rockaway Boulevard","ending_cross_street":"FARMERS BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775588,40.660295]]}},{"id":"GUaXs8Ziuc8ftLO/KleBHrnoa4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OaLMUi40ZjgkpsxiQwqgmFyLHKY="},{"type":"next-occurrence","id":"2bCYvH30RRjLycUXh/lsMFmrQKA="}],"description":"Construction on NY 878 both directions between Rockaway Boulevard (New York) and ROCKAWAY BLVD at FARMERS BLVD (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:58:31Z"},"road_event_id":"GUaXs8Ziuc8ftLO/KleBHrnoa4g=","beginning_cross_street":"Rockaway Boulevard","ending_cross_street":"FARMERS BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775588,40.660295]]}},{"id":"2bCYvH30RRjLycUXh/lsMFmrQKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OaLMUi40ZjgkpsxiQwqgmFyLHKY="}],"description":"Construction on NY 878 both directions between Rockaway Boulevard (New York) and ROCKAWAY BLVD at FARMERS BLVD (New York) Subject to change without notice., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:58:31Z"},"road_event_id":"2bCYvH30RRjLycUXh/lsMFmrQKA=","beginning_cross_street":"Rockaway Boulevard","ending_cross_street":"FARMERS BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.775588,40.660295]]}},{"id":"kym2h8b+IwdDLn08zHwXCJaGu+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEEKER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lEygUenquejhWKmwO9IiZVmh8EY="}],"description":"Construction on MEEKER AVE westbound between MORGAN AVE (New York) and SUTTON ST (New York), Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-17T18:44:15Z"},"road_event_id":"kym2h8b+IwdDLn08zHwXCJaGu+w=","beginning_cross_street":"MORGAN AVE","ending_cross_street":"SUTTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939347,40.723325]]}},{"id":"lEygUenquejhWKmwO9IiZVmh8EY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEEKER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kym2h8b+IwdDLn08zHwXCJaGu+w="},{"type":"next-occurrence","id":"rPILRcAaaEcgqeJRNGM4UeaZ+dU="}],"description":"Construction on MEEKER AVE westbound between MORGAN AVE (New York) and SUTTON ST (New York), Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-17T18:44:15Z"},"road_event_id":"lEygUenquejhWKmwO9IiZVmh8EY=","beginning_cross_street":"MORGAN AVE","ending_cross_street":"SUTTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939347,40.723325]]}},{"id":"rPILRcAaaEcgqeJRNGM4UeaZ+dU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MEEKER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kym2h8b+IwdDLn08zHwXCJaGu+w="}],"description":"Construction on MEEKER AVE westbound between MORGAN AVE (New York) and SUTTON ST (New York), Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-17T18:44:15Z"},"road_event_id":"rPILRcAaaEcgqeJRNGM4UeaZ+dU=","beginning_cross_street":"MORGAN AVE","ending_cross_street":"SUTTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939347,40.723325]]}},{"id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rqM3y196PNpKF2hOmaB/pac+7fQ="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"rqM3y196PNpKF2hOmaB/pac+7fQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8="},{"type":"next-occurrence","id":"DUu4kDvFy1q6913uKA76Z0/Eh1Y="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"rqM3y196PNpKF2hOmaB/pac+7fQ=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"DUu4kDvFy1q6913uKA76Z0/Eh1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8="},{"type":"next-occurrence","id":"7ESseX4C3MTKLFVN6Y+hxd2OnFU="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"DUu4kDvFy1q6913uKA76Z0/Eh1Y=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"7ESseX4C3MTKLFVN6Y+hxd2OnFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8="},{"type":"next-occurrence","id":"83HPnPYN3AjR1dd4cnoTlJAhh+g="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"7ESseX4C3MTKLFVN6Y+hxd2OnFU=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"83HPnPYN3AjR1dd4cnoTlJAhh+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8="},{"type":"next-occurrence","id":"zs+X4gY3vYQ+POfkCo/vurrse48="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"83HPnPYN3AjR1dd4cnoTlJAhh+g=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"zs+X4gY3vYQ+POfkCo/vurrse48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8="},{"type":"next-occurrence","id":"x6avotUNpVYcUPZ4syMxEXksgrE="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"zs+X4gY3vYQ+POfkCo/vurrse48=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"x6avotUNpVYcUPZ4syMxEXksgrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8="},{"type":"next-occurrence","id":"N765NLRTa3EQGTKD7ZkkgzWUAYI="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"x6avotUNpVYcUPZ4syMxEXksgrE=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"N765NLRTa3EQGTKD7ZkkgzWUAYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 5/20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wcXCyiUyMuPRTJKMeEUQj+wiSv8="}],"description":"Utility work on US 5/20 both directions from Cannan Rd (West Bloomfield) to US 20A (East Bloomfield) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Monday April 13th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:07:06Z"},"road_event_id":"N765NLRTa3EQGTKD7ZkkgzWUAYI=","beginning_cross_street":"Cannan Rd","ending_cross_street":"US 20A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.467708,42.901995]]}},{"id":"quYgCSkp97faSRqtImwicrV5040=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YulbDsSYUffBok0NrqcjF37xa48="}],"description":"Bridge rehabilitation on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) There will be single lane closures, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-04-17T19:12:33Z"},"road_event_id":"quYgCSkp97faSRqtImwicrV5040=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"YulbDsSYUffBok0NrqcjF37xa48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quYgCSkp97faSRqtImwicrV5040="},{"type":"next-occurrence","id":"gBPT5lHTGFOKdnjJnVTGWh6RyOE="}],"description":"Bridge rehabilitation on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) There will be single lane closures, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-04-17T19:12:33Z"},"road_event_id":"YulbDsSYUffBok0NrqcjF37xa48=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"gBPT5lHTGFOKdnjJnVTGWh6RyOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"quYgCSkp97faSRqtImwicrV5040="}],"description":"Bridge rehabilitation on Bronx River Parkway southbound between Palmer Avenue (Yonkers) and Exit - Sprain Brook Parkway (Yonkers) There will be single lane closures, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM All lanes open","update_date":"2026-04-17T19:12:33Z"},"road_event_id":"gBPT5lHTGFOKdnjJnVTGWh6RyOE=","beginning_cross_street":"Palmer Avenue","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.83907,40.9413]]}},{"id":"Qu1Wusql1U70USfI81m2B83Mrac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nbw7m3HrDj3/ZJ6qrp7tYalVExs="}],"description":"Track replacement on 6 Line both directions between Pelham Bay Park (New York) and Brooklyn Bridge - City Hall (New York) runs every 8 minutes. 6 line runs on a modified schedule while 4 line, 5 line, and 6 line share a track in Manhattan., Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday/Sunday, 05:00 AM thru 07:00 PM","update_date":"2026-04-19T23:00:20Z"},"road_event_id":"Qu1Wusql1U70USfI81m2B83Mrac=","beginning_cross_street":"Pelham Bay Park","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828121,40.852462]]}},{"id":"Nbw7m3HrDj3/ZJ6qrp7tYalVExs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["6 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qu1Wusql1U70USfI81m2B83Mrac="}],"description":"Track replacement on 6 Line both directions between Pelham Bay Park (New York) and Brooklyn Bridge - City Hall (New York) runs every 8 minutes. 6 line runs on a modified schedule while 4 line, 5 line, and 6 line share a track in Manhattan., Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday/Sunday, 05:00 AM thru 07:00 PM","update_date":"2026-04-19T23:00:20Z"},"road_event_id":"Nbw7m3HrDj3/ZJ6qrp7tYalVExs=","beginning_cross_street":"Pelham Bay Park","ending_cross_street":"Brooklyn Bridge - City Hall","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T14:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828121,40.852462]]}},{"id":"yV29RDQjErjsVPg1OMSM1oJbb6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BURNET AVE"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and roadwork on BURNET AVE both directions between N CROUSE AVE (Syracuse) and HOWARD ST (Syracuse) ; follow detour, Continuous Monday April 13th, 2026 07:00 AM thru Friday May 1st, 2026 04:00 PM All lanes closed","update_date":"2026-04-22T13:15:54Z"},"road_event_id":"yV29RDQjErjsVPg1OMSM1oJbb6k=","beginning_cross_street":"N CROUSE AVE","ending_cross_street":"HOWARD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.13648,43.05219]]}},{"id":"u/8/8lp+uSrvVEke64cxOcTtb8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uhmZTasOLm/dbpzjrnzvBIsdUUQ="}],"description":"Utility work on NY 265 northbound Richmond Ave (Niagara Falls) to Factory Outlet Boulevard (Niagara), Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T22:50:15Z"},"road_event_id":"u/8/8lp+uSrvVEke64cxOcTtb8Q=","beginning_cross_street":"Richmond Ave","ending_cross_street":"Factory Outlet Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971055,43.093326]]}},{"id":"uhmZTasOLm/dbpzjrnzvBIsdUUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u/8/8lp+uSrvVEke64cxOcTtb8Q="},{"type":"next-occurrence","id":"1tvSCo4FkbDl/vOSJIuHrvAtNjA="}],"description":"Utility work on NY 265 northbound Richmond Ave (Niagara Falls) to Factory Outlet Boulevard (Niagara), Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T22:50:15Z"},"road_event_id":"uhmZTasOLm/dbpzjrnzvBIsdUUQ=","beginning_cross_street":"Richmond Ave","ending_cross_street":"Factory Outlet Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971055,43.093326]]}},{"id":"1tvSCo4FkbDl/vOSJIuHrvAtNjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 265"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u/8/8lp+uSrvVEke64cxOcTtb8Q="}],"description":"Utility work on NY 265 northbound Richmond Ave (Niagara Falls) to Factory Outlet Boulevard (Niagara), Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T22:50:15Z"},"road_event_id":"1tvSCo4FkbDl/vOSJIuHrvAtNjA=","beginning_cross_street":"Richmond Ave","ending_cross_street":"Factory Outlet Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.971055,43.093326]]}},{"id":"kndoY6dVjx2xPfR7c6PptRzkl6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5ARhr6rL1/GDgWcmdOOm6cORidY="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"kndoY6dVjx2xPfR7c6PptRzkl6I=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"5ARhr6rL1/GDgWcmdOOm6cORidY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kndoY6dVjx2xPfR7c6PptRzkl6I="},{"type":"next-occurrence","id":"GztReYqSoG+KtIxAN6/8HKRP/6M="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"5ARhr6rL1/GDgWcmdOOm6cORidY=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"GztReYqSoG+KtIxAN6/8HKRP/6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kndoY6dVjx2xPfR7c6PptRzkl6I="},{"type":"next-occurrence","id":"jo3EED/h7tovnEJuhlmYU7QKQk0="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"GztReYqSoG+KtIxAN6/8HKRP/6M=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"jo3EED/h7tovnEJuhlmYU7QKQk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kndoY6dVjx2xPfR7c6PptRzkl6I="},{"type":"next-occurrence","id":"tCtZDdU/tmZtCXDjrtVG30qYhMo="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"jo3EED/h7tovnEJuhlmYU7QKQk0=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"tCtZDdU/tmZtCXDjrtVG30qYhMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kndoY6dVjx2xPfR7c6PptRzkl6I="},{"type":"next-occurrence","id":"56aXX7ZGF+Cki8oidnRbrHingJo="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"tCtZDdU/tmZtCXDjrtVG30qYhMo=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"56aXX7ZGF+Cki8oidnRbrHingJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kndoY6dVjx2xPfR7c6PptRzkl6I="},{"type":"next-occurrence","id":"MwZBO6hMNcUJi42evAp+KbLx6lE="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"56aXX7ZGF+Cki8oidnRbrHingJo=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"MwZBO6hMNcUJi42evAp+KbLx6lE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kndoY6dVjx2xPfR7c6PptRzkl6I="},{"type":"next-occurrence","id":"afrS00T943HY/x4St6wVeGVB9Mg="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"MwZBO6hMNcUJi42evAp+KbLx6lE=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"afrS00T943HY/x4St6wVeGVB9Mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kndoY6dVjx2xPfR7c6PptRzkl6I="}],"description":"Repaving on I-481 southbound between Exit 88 - I-690 (De Witt) and Exit 86 - NY 5; NY 92 (De Witt) ; Alternating lane closures, Wednesday April 15th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-10T23:40:13Z"},"road_event_id":"afrS00T943HY/x4St6wVeGVB9Mg=","beginning_cross_street":"Exit 88 - I-690","ending_cross_street":"Exit  86 - NY 5; NY 92","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05204,43.060455]]}},{"id":"YGpFAloT9J5DaDc7Zp0gLur7IZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"47FXqNsEVwb5jg4sHQHPS2AxBRE="}],"description":"Deck work on I-481 southbound between Exit 81 - Brighton Avenue (Onondaga) and I-81 SB (Syracuse) ; Alternating left and right lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-11T00:22:26Z"},"road_event_id":"YGpFAloT9J5DaDc7Zp0gLur7IZY=","beginning_cross_street":"Exit 81 - Brighton Avenue","ending_cross_street":"I-81 SB","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.122434,43.007472]]}},{"id":"47FXqNsEVwb5jg4sHQHPS2AxBRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YGpFAloT9J5DaDc7Zp0gLur7IZY="},{"type":"next-occurrence","id":"UgukwHp0DlJMKzErhnZMZIxsf04="}],"description":"Deck work on I-481 southbound between Exit 81 - Brighton Avenue (Onondaga) and I-81 SB (Syracuse) ; Alternating left and right lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-11T00:22:26Z"},"road_event_id":"47FXqNsEVwb5jg4sHQHPS2AxBRE=","beginning_cross_street":"Exit 81 - Brighton Avenue","ending_cross_street":"I-81 SB","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.122434,43.007472]]}},{"id":"UgukwHp0DlJMKzErhnZMZIxsf04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YGpFAloT9J5DaDc7Zp0gLur7IZY="}],"description":"Deck work on I-481 southbound between Exit 81 - Brighton Avenue (Onondaga) and I-81 SB (Syracuse) ; Alternating left and right lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-11T00:22:26Z"},"road_event_id":"UgukwHp0DlJMKzErhnZMZIxsf04=","beginning_cross_street":"Exit 81 - Brighton Avenue","ending_cross_street":"I-81 SB","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.122434,43.007472]]}},{"id":"nrN63GNZneyUHAUuoHh0KKjN4/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South Bridge St (Somerville), Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-12T19:19:44Z"},"road_event_id":"nrN63GNZneyUHAUuoHh0KKjN4/8=","beginning_cross_street":"South Bridge St","ending_cross_street":"CR 608/Dukes Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.616836,40.557857]]}},{"id":"pk2OWLa9HNp74kiFoohz6/cDDuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South Bridge St (Somerville), Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-12T19:19:46Z"},"road_event_id":"pk2OWLa9HNp74kiFoohz6/cDDuc=","beginning_cross_street":"South Bridge St","ending_cross_street":"CR 608/Dukes Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.616836,40.557857]]}},{"id":"Jm+8hdakUqd5Of9OufbJ2DuI95E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound between NJ 4 (Paramus) and Summit Ave (Hackensack), Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 06:00 AM, left lane closed","update_date":"2026-04-12T19:20:00Z"},"road_event_id":"Jm+8hdakUqd5Of9OufbJ2DuI95E=","beginning_cross_street":"NJ 4","ending_cross_street":"Summit Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072364,40.92044]]}},{"id":"ZfleoGb/d55xIdJQ7J7Wyv/VWVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at north of Exit 69 - US 206 (Lawrence Twp) Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 03:00 AM, ramp","update_date":"2026-04-12T19:20:01Z"},"road_event_id":"ZfleoGb/d55xIdJQ7J7Wyv/VWVw=","beginning_cross_street":"north of Exit 69 - US 206","ending_cross_street":"north of Exit 69 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.733474,40.285766]]}},{"id":"BAZ8bCH/Q6YVmfyoc0wFHxMllLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at north of Exit 69 - US 206 (Lawrence Twp) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 03:00 AM, ramp","update_date":"2026-04-12T19:19:50Z"},"road_event_id":"BAZ8bCH/Q6YVmfyoc0wFHxMllLY=","beginning_cross_street":"north of Exit 69 - US 206","ending_cross_street":"north of Exit 69 - US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.733474,40.285766]]}},{"id":"PB1GdKJeQuVXUHRykEQp8fohSGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of NJ 70 (Toms River Twp), Tuesday April 28, 2026 08:30 AM thru 02:30 PM, right shoulder closed","update_date":"2026-04-12T19:19:49Z"},"road_event_id":"PB1GdKJeQuVXUHRykEQp8fohSGs=","beginning_cross_street":"South of NJ 70","ending_cross_street":"South of NJ 70","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T21:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.223022,40.040222]]}},{"id":"NYSSL9nzDDzmae/RYSEyliGXzEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near South of NJ 70 (Toms River Twp), Wednesday April 29, 2026 08:30 AM thru 02:30 PM, right shoulder closed","update_date":"2026-04-12T19:19:57Z"},"road_event_id":"NYSSL9nzDDzmae/RYSEyliGXzEI=","beginning_cross_street":"South of NJ 70","ending_cross_street":"South of NJ 70","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T21:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.223022,40.040222]]}},{"id":"Qri0LpA/UIarlAEEVOIH0gRfTQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Summit Ave (Hackensack) and NJ 4 (Paramus), Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 06:00 AM, left lane closed","update_date":"2026-04-12T19:19:56Z"},"road_event_id":"Qri0LpA/UIarlAEEVOIH0gRfTQw=","beginning_cross_street":"Summit Ave","ending_cross_street":"NJ 4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.06356,40.878772]]}},{"id":"oGaQphB43uJMdw1sbLl2KY4aKgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South Bridge St (Somerville), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-12T19:19:58Z"},"road_event_id":"oGaQphB43uJMdw1sbLl2KY4aKgU=","beginning_cross_street":"South Bridge St","ending_cross_street":"CR 608/Dukes Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.616836,40.557857]]}},{"id":"VFAHEYSUnpBBZ9eXHP9F3snKGEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LyztadeIOOcFtiedjoXKcIApW+w="}],"description":"Road rehabilitation on NY 286 both directions between NY 590 (Brighton) and Clark Road (Penfield), Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-15T13:06:05Z"},"road_event_id":"VFAHEYSUnpBBZ9eXHP9F3snKGEI=","beginning_cross_street":"NY 590","ending_cross_street":"Clark Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538849,43.157455]]}},{"id":"LyztadeIOOcFtiedjoXKcIApW+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VFAHEYSUnpBBZ9eXHP9F3snKGEI="},{"type":"next-occurrence","id":"BfvhzywGrLUYkbQ4Uu+YNf5uEUg="}],"description":"Road rehabilitation on NY 286 both directions between NY 590 (Brighton) and Clark Road (Penfield), Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-15T13:06:05Z"},"road_event_id":"LyztadeIOOcFtiedjoXKcIApW+w=","beginning_cross_street":"NY 590","ending_cross_street":"Clark Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538849,43.157455]]}},{"id":"BfvhzywGrLUYkbQ4Uu+YNf5uEUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VFAHEYSUnpBBZ9eXHP9F3snKGEI="}],"description":"Road rehabilitation on NY 286 both directions between NY 590 (Brighton) and Clark Road (Penfield), Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-15T13:06:05Z"},"road_event_id":"BfvhzywGrLUYkbQ4Uu+YNf5uEUg=","beginning_cross_street":"NY 590","ending_cross_street":"Clark Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538849,43.157455]]}},{"id":"KYQG82CPRm88XwwCp2FGOc/C7HY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Yp4/gn90Un8YVg0VJ1AEzrRRrxM="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 8 - Webster Avenue (Eastchester) and Exit 9 - North Avenue (New Rochelle) D264759/32693709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday February 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-13T12:18:22Z"},"road_event_id":"KYQG82CPRm88XwwCp2FGOc/C7HY=","beginning_cross_street":"Exit 8 - Webster Avenue","ending_cross_street":"Exit 9 - North Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800904,40.944156]]}},{"id":"Yp4/gn90Un8YVg0VJ1AEzrRRrxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYQG82CPRm88XwwCp2FGOc/C7HY="},{"type":"next-occurrence","id":"ha8wezEUq0A/9h9r8B1RuDrP3AA="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 8 - Webster Avenue (Eastchester) and Exit 9 - North Avenue (New Rochelle) D264759/32693709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday February 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-13T12:18:22Z"},"road_event_id":"Yp4/gn90Un8YVg0VJ1AEzrRRrxM=","beginning_cross_street":"Exit 8 - Webster Avenue","ending_cross_street":"Exit 9 - North Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800904,40.944156]]}},{"id":"ha8wezEUq0A/9h9r8B1RuDrP3AA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYQG82CPRm88XwwCp2FGOc/C7HY="},{"type":"next-occurrence","id":"RoJunrPVkpOIx776Fncg3AA8H9Q="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 8 - Webster Avenue (Eastchester) and Exit 9 - North Avenue (New Rochelle) D264759/32693709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday February 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-13T12:18:22Z"},"road_event_id":"ha8wezEUq0A/9h9r8B1RuDrP3AA=","beginning_cross_street":"Exit 8 - Webster Avenue","ending_cross_street":"Exit 9 - North Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800904,40.944156]]}},{"id":"RoJunrPVkpOIx776Fncg3AA8H9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYQG82CPRm88XwwCp2FGOc/C7HY="},{"type":"next-occurrence","id":"+bo2UZ1A74Doqv8XG25F56pQuX4="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 8 - Webster Avenue (Eastchester) and Exit 9 - North Avenue (New Rochelle) D264759/32693709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday February 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-13T12:18:22Z"},"road_event_id":"RoJunrPVkpOIx776Fncg3AA8H9Q=","beginning_cross_street":"Exit 8 - Webster Avenue","ending_cross_street":"Exit 9 - North Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800904,40.944156]]}},{"id":"+bo2UZ1A74Doqv8XG25F56pQuX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYQG82CPRm88XwwCp2FGOc/C7HY="},{"type":"next-occurrence","id":"yAUc8IfzuwaVQwfEBt+ygSfmJdQ="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 8 - Webster Avenue (Eastchester) and Exit 9 - North Avenue (New Rochelle) D264759/32693709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday February 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-13T12:18:22Z"},"road_event_id":"+bo2UZ1A74Doqv8XG25F56pQuX4=","beginning_cross_street":"Exit 8 - Webster Avenue","ending_cross_street":"Exit 9 - North Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800904,40.944156]]}},{"id":"yAUc8IfzuwaVQwfEBt+ygSfmJdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYQG82CPRm88XwwCp2FGOc/C7HY="},{"type":"next-occurrence","id":"j21+4DB8ZttOp03+lOIXVtwdIWk="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 8 - Webster Avenue (Eastchester) and Exit 9 - North Avenue (New Rochelle) D264759/32693709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday February 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-13T12:18:22Z"},"road_event_id":"yAUc8IfzuwaVQwfEBt+ygSfmJdQ=","beginning_cross_street":"Exit 8 - Webster Avenue","ending_cross_street":"Exit 9 - North Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800904,40.944156]]}},{"id":"j21+4DB8ZttOp03+lOIXVtwdIWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KYQG82CPRm88XwwCp2FGOc/C7HY="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] northbound between Exit 8 - Webster Avenue (Eastchester) and Exit 9 - North Avenue (New Rochelle) D264759/32693709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday February 16th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-13T12:18:22Z"},"road_event_id":"j21+4DB8ZttOp03+lOIXVtwdIWk=","beginning_cross_street":"Exit 8 - Webster Avenue","ending_cross_street":"Exit 9 - North Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800904,40.944156]]}},{"id":"hPjsHRZiYonlZS7J0j03Iq8dbWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ubWrbQeM9u2bdIQR/H+//Ucl7jw="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"hPjsHRZiYonlZS7J0j03Iq8dbWo=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"ubWrbQeM9u2bdIQR/H+//Ucl7jw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"wGXR7YFVGVDbWo1HkwGORn3Iwkg="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"ubWrbQeM9u2bdIQR/H+//Ucl7jw=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"wGXR7YFVGVDbWo1HkwGORn3Iwkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"zcFloswnfojBrn3o2ef2ofcgbv0="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"wGXR7YFVGVDbWo1HkwGORn3Iwkg=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"zcFloswnfojBrn3o2ef2ofcgbv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"G7Mt8ukGaxU42yoqYGLbXqK+5QQ="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"zcFloswnfojBrn3o2ef2ofcgbv0=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"G7Mt8ukGaxU42yoqYGLbXqK+5QQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"iJsnYAXZeZiMrWXlMWOSWMhkuxQ="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"G7Mt8ukGaxU42yoqYGLbXqK+5QQ=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"iJsnYAXZeZiMrWXlMWOSWMhkuxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"Dhu8UToImo6fli52Un+Ueckmp9E="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"iJsnYAXZeZiMrWXlMWOSWMhkuxQ=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"Dhu8UToImo6fli52Un+Ueckmp9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"UWxaJ5lkl6IcPmz5hoQesjS2LS4="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"Dhu8UToImo6fli52Un+Ueckmp9E=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"UWxaJ5lkl6IcPmz5hoQesjS2LS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"wtxIMlnAxRIs829uPYe0OzEoQdY="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"UWxaJ5lkl6IcPmz5hoQesjS2LS4=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"wtxIMlnAxRIs829uPYe0OzEoQdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"5E52NNJYlS/0ug73rW1QnoMJsAk="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"wtxIMlnAxRIs829uPYe0OzEoQdY=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"5E52NNJYlS/0ug73rW1QnoMJsAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="},{"type":"next-occurrence","id":"I3h4FqtHD5CZWci/6Bnh2eDAgwo="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"5E52NNJYlS/0ug73rW1QnoMJsAk=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"I3h4FqtHD5CZWci/6Bnh2eDAgwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hPjsHRZiYonlZS7J0j03Iq8dbWo="}],"description":"Roadwork on NY 31 both directions between Damon Rd (Cicero) and South Bay Road; CR 208 (Cicero) ; Alternating one-way traffic with flaggers, Tuesday April 14th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-13T13:51:24Z"},"road_event_id":"I3h4FqtHD5CZWci/6Bnh2eDAgwo=","beginning_cross_street":"Damon Rd","ending_cross_street":"South Bay Road; CR 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.095488,43.176543]]}},{"id":"IiWQvgUSesfS/dWk6wOP+rCeQ8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LMkIG1yrPXXu6vuPgpSTEHz5eAM="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 65 - NY 312 (Southeast) and Exit 68A/B - I-684 (Southeast) DOT BM/B1052822/32036209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday April 30th, 2026 Wednesday/ Thursday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-13T15:42:17Z"},"road_event_id":"IiWQvgUSesfS/dWk6wOP+rCeQ8M=","beginning_cross_street":"Exit 65 - NY 312","ending_cross_street":"Exit 68A/B - I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.616868,41.413]]}},{"id":"LMkIG1yrPXXu6vuPgpSTEHz5eAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IiWQvgUSesfS/dWk6wOP+rCeQ8M="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 65 - NY 312 (Southeast) and Exit 68A/B - I-684 (Southeast) DOT BM/B1052822/32036209 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday April 30th, 2026 Wednesday/ Thursday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-13T15:42:17Z"},"road_event_id":"LMkIG1yrPXXu6vuPgpSTEHz5eAM=","beginning_cross_street":"Exit 65 - NY 312","ending_cross_street":"Exit 68A/B - I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.616868,41.413]]}},{"id":"mULC6vNXx5tfSGHFwzShW6J1jK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 259"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tal9bTkMwq6oXAjnzCioQOnfUQs="}],"description":"Utility work on NY 259 both directions between King Road; CR 123 (Chili) and Buffalo Road; NY 33 (Chili) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:38:03Z"},"road_event_id":"mULC6vNXx5tfSGHFwzShW6J1jK0=","beginning_cross_street":"King Road; CR 123","ending_cross_street":"Buffalo Road; NY 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.803588,43.11297]]}},{"id":"tal9bTkMwq6oXAjnzCioQOnfUQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 259"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mULC6vNXx5tfSGHFwzShW6J1jK0="},{"type":"next-occurrence","id":"wMJbmpD5ExEUL5QxIlMxPHSj0TU="}],"description":"Utility work on NY 259 both directions between King Road; CR 123 (Chili) and Buffalo Road; NY 33 (Chili) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:38:03Z"},"road_event_id":"tal9bTkMwq6oXAjnzCioQOnfUQs=","beginning_cross_street":"King Road; CR 123","ending_cross_street":"Buffalo Road; NY 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.803588,43.11297]]}},{"id":"wMJbmpD5ExEUL5QxIlMxPHSj0TU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 259"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mULC6vNXx5tfSGHFwzShW6J1jK0="}],"description":"Utility work on NY 259 both directions between King Road; CR 123 (Chili) and Buffalo Road; NY 33 (Chili) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:38:03Z"},"road_event_id":"wMJbmpD5ExEUL5QxIlMxPHSj0TU=","beginning_cross_street":"King Road; CR 123","ending_cross_street":"Buffalo Road; NY 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.803588,43.11297]]}},{"id":"3rGh2xczS2LsCoyzjCNmH9OVGTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v/ctyQa13Q4HjaeilbDpA75gv0Q="}],"description":"Utility work on NY 33 both directions between Union Street; NY 259 (Chili) and Orchard St. (Chili) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:48:06Z"},"road_event_id":"3rGh2xczS2LsCoyzjCNmH9OVGTM=","beginning_cross_street":"Union Street; NY 259","ending_cross_street":"Orchard St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.805216,43.119884]]}},{"id":"v/ctyQa13Q4HjaeilbDpA75gv0Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3rGh2xczS2LsCoyzjCNmH9OVGTM="},{"type":"next-occurrence","id":"crN4W4pYax61v3l88k0KYzroKGo="}],"description":"Utility work on NY 33 both directions between Union Street; NY 259 (Chili) and Orchard St. (Chili) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:48:06Z"},"road_event_id":"v/ctyQa13Q4HjaeilbDpA75gv0Q=","beginning_cross_street":"Union Street; NY 259","ending_cross_street":"Orchard St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.805216,43.119884]]}},{"id":"crN4W4pYax61v3l88k0KYzroKGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3rGh2xczS2LsCoyzjCNmH9OVGTM="}],"description":"Utility work on NY 33 both directions between Union Street; NY 259 (Chili) and Orchard St. (Chili) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:48:06Z"},"road_event_id":"crN4W4pYax61v3l88k0KYzroKGo=","beginning_cross_street":"Union Street; NY 259","ending_cross_street":"Orchard St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.805216,43.119884]]}},{"id":"A9IwfM8M5I8u/K0V+S231nJCIWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cHYHHmmtv5LC+Thk93DVUaX6DSU="}],"description":"Utility work on NY 204 both directions between Chili Avenue; NY 33A (Gates) and Airport Road (Gates) Alternating lane closures with flaggers as needed, Wednesday April 15th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:55:23Z"},"road_event_id":"A9IwfM8M5I8u/K0V+S231nJCIWw=","beginning_cross_street":"Chili Avenue; NY 33A","ending_cross_street":"Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.687122,43.131574]]}},{"id":"cHYHHmmtv5LC+Thk93DVUaX6DSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A9IwfM8M5I8u/K0V+S231nJCIWw="},{"type":"next-occurrence","id":"FaUKsNqE+M63XLMKqbYtGxps6vQ="}],"description":"Utility work on NY 204 both directions between Chili Avenue; NY 33A (Gates) and Airport Road (Gates) Alternating lane closures with flaggers as needed, Wednesday April 15th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:55:23Z"},"road_event_id":"cHYHHmmtv5LC+Thk93DVUaX6DSU=","beginning_cross_street":"Chili Avenue; NY 33A","ending_cross_street":"Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.687122,43.131574]]}},{"id":"FaUKsNqE+M63XLMKqbYtGxps6vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A9IwfM8M5I8u/K0V+S231nJCIWw="}],"description":"Utility work on NY 204 both directions between Chili Avenue; NY 33A (Gates) and Airport Road (Gates) Alternating lane closures with flaggers as needed, Wednesday April 15th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T15:55:23Z"},"road_event_id":"FaUKsNqE+M63XLMKqbYtGxps6vQ=","beginning_cross_street":"Chili Avenue; NY 33A","ending_cross_street":"Airport Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.687122,43.131574]]}},{"id":"ZOwv/Ar7AB4okT0HJQQqE+Ve2lY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a/u/cvE4HB1hZTKOUp0NGLVfmms="}],"description":"Bridge work on I-87 Northway southbound at Exit 25; NY 8 (Chester), Wednesday April 15th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed, Continuous Thursday April 23rd, 2026 07:00 AM thru Wednesday May 6th, 2026 11:59 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-13T17:44:26Z"},"road_event_id":"ZOwv/Ar7AB4okT0HJQQqE+Ve2lY=","beginning_cross_street":"Exit 25; NY 8","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772584,43.664395]]}},{"id":"a/u/cvE4HB1hZTKOUp0NGLVfmms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZOwv/Ar7AB4okT0HJQQqE+Ve2lY="}],"description":"Bridge work on I-87 Northway southbound at Exit 25; NY 8 (Chester), Wednesday April 15th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 3 lanes closed, Continuous Thursday April 23rd, 2026 07:00 AM thru Wednesday May 6th, 2026 11:59 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-13T17:44:26Z"},"road_event_id":"a/u/cvE4HB1hZTKOUp0NGLVfmms=","beginning_cross_street":"Exit 25; NY 8","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.772584,43.664395]]}},{"id":"rYPwZdzeOVBrMQ0LB+at+/f9Wcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 8"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 8 both directions at I-87 Exit 25 (Chester) alternating lane closures controlled by traffic signal, Continuous Wednesday April 15th, 2026 07:00 AM thru Wednesday May 6th, 2026 11:59 PM All lanes open","update_date":"2026-04-13T17:48:32Z"},"road_event_id":"rYPwZdzeOVBrMQ0LB+at+/f9Wcc=","beginning_cross_street":"I-87 Exit 25","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.779433,43.668298]]}},{"id":"12rDFiWdWnfdNPOsQDbY0HtFi9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5gm4/5Avbx6qYf0k3PlkeOcoqmU="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"12rDFiWdWnfdNPOsQDbY0HtFi9g=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"5gm4/5Avbx6qYf0k3PlkeOcoqmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"12rDFiWdWnfdNPOsQDbY0HtFi9g="},{"type":"next-occurrence","id":"0Kf42ssLXQIoq6b+Ij6j2HRpTPQ="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"5gm4/5Avbx6qYf0k3PlkeOcoqmU=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"0Kf42ssLXQIoq6b+Ij6j2HRpTPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"12rDFiWdWnfdNPOsQDbY0HtFi9g="},{"type":"next-occurrence","id":"OMxF5KgC+3p0MfTCLKH3WZOy4Xo="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"0Kf42ssLXQIoq6b+Ij6j2HRpTPQ=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"OMxF5KgC+3p0MfTCLKH3WZOy4Xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"12rDFiWdWnfdNPOsQDbY0HtFi9g="},{"type":"next-occurrence","id":"X76l2O5TG+DiWgve0UqtD4SQN8w="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"OMxF5KgC+3p0MfTCLKH3WZOy4Xo=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"X76l2O5TG+DiWgve0UqtD4SQN8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"12rDFiWdWnfdNPOsQDbY0HtFi9g="},{"type":"next-occurrence","id":"oL18DahTx6BXafxUBA8jgpNeQP8="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"X76l2O5TG+DiWgve0UqtD4SQN8w=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"oL18DahTx6BXafxUBA8jgpNeQP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"12rDFiWdWnfdNPOsQDbY0HtFi9g="},{"type":"next-occurrence","id":"Ie33A0+9iBKAlmF8Ai03+7iba8A="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"oL18DahTx6BXafxUBA8jgpNeQP8=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"Ie33A0+9iBKAlmF8Ai03+7iba8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"12rDFiWdWnfdNPOsQDbY0HtFi9g="},{"type":"next-occurrence","id":"Kgf1r/cE7s2yVRtXUaj0oyLW5Mw="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"Ie33A0+9iBKAlmF8Ai03+7iba8A=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"Kgf1r/cE7s2yVRtXUaj0oyLW5Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"12rDFiWdWnfdNPOsQDbY0HtFi9g="}],"description":"Installation of traffic management systems on US 9W both directions between Castle Road (Orangetown) and Station Lane (Orangetown) D265291/32727009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T11:23:25Z"},"road_event_id":"Kgf1r/cE7s2yVRtXUaj0oyLW5Mw=","beginning_cross_street":"Castle Road","ending_cross_street":"Station Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.921926,41.039141]]}},{"id":"i2mh/+nh+NW0QVoUbITNcICJLws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HmVg569pwDPufESrt8pa2S2FDBY="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"i2mh/+nh+NW0QVoUbITNcICJLws=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"HmVg569pwDPufESrt8pa2S2FDBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i2mh/+nh+NW0QVoUbITNcICJLws="},{"type":"next-occurrence","id":"xVikQFEdwOFLxbF7f74aiGzOBLM="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"HmVg569pwDPufESrt8pa2S2FDBY=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"xVikQFEdwOFLxbF7f74aiGzOBLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i2mh/+nh+NW0QVoUbITNcICJLws="},{"type":"next-occurrence","id":"vBePGbMwkPGdJHnVIVY7Ei55XLY="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"xVikQFEdwOFLxbF7f74aiGzOBLM=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"vBePGbMwkPGdJHnVIVY7Ei55XLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i2mh/+nh+NW0QVoUbITNcICJLws="},{"type":"next-occurrence","id":"SdWOkMjbNvUzO28mmmumPtV5yXg="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"vBePGbMwkPGdJHnVIVY7Ei55XLY=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"SdWOkMjbNvUzO28mmmumPtV5yXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i2mh/+nh+NW0QVoUbITNcICJLws="},{"type":"next-occurrence","id":"89Wmv7W22f4wusyB80sQEXqXajM="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"SdWOkMjbNvUzO28mmmumPtV5yXg=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"89Wmv7W22f4wusyB80sQEXqXajM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i2mh/+nh+NW0QVoUbITNcICJLws="},{"type":"next-occurrence","id":"m+yzIhpave5WZGnXTJlRiUSR+zQ="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"89Wmv7W22f4wusyB80sQEXqXajM=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"m+yzIhpave5WZGnXTJlRiUSR+zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i2mh/+nh+NW0QVoUbITNcICJLws="},{"type":"next-occurrence","id":"JPAqbXtkMYvFRwVffiUkOjTudyw="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"m+yzIhpave5WZGnXTJlRiUSR+zQ=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"JPAqbXtkMYvFRwVffiUkOjTudyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i2mh/+nh+NW0QVoUbITNcICJLws="}],"description":"Installation of traffic management systems on NY 52 both directions between Munro Street (Crawford) and Albany Post Road (Crawford) D265291/32727109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:19:10Z"},"road_event_id":"JPAqbXtkMYvFRwVffiUkOjTudyw=","beginning_cross_street":"Munro Street","ending_cross_street":"Albany Post Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.263509,41.593213]]}},{"id":"TWGFVQG2icpKl658VglAmZENOTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-84 westbound between Exit 19 - NY 17 (Wallkill) and Exit 15 - US 6 - NY 17M (Wawayanda) DOT BM/B1052511/32136509 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 07:00 PM thru 03:00 AM, right lane closure","update_date":"2026-04-20T10:54:12Z"},"road_event_id":"TWGFVQG2icpKl658VglAmZENOTc=","beginning_cross_street":"Exit 19 - NY 17","ending_cross_street":"Exit 15 - US 6 - NY 17M","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40067,41.423339]]}},{"id":"6oED9ELiDtpcTF92rRTWtINGaVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Dk1RWg1CQ5aKu9rnH40BU9oShGY="}],"description":"Bridge rehabilitation on US 9 southbound between Kittredge Place (Poughkeepsie) and Laurel Street (Poughkeepsie) 2025083285514-3003041/NIGHT/32687209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday February 21st, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-14T16:44:46Z"},"road_event_id":"6oED9ELiDtpcTF92rRTWtINGaVo=","beginning_cross_street":"Kittredge Place","ending_cross_street":"Laurel Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935975,41.714569]]}},{"id":"Dk1RWg1CQ5aKu9rnH40BU9oShGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6oED9ELiDtpcTF92rRTWtINGaVo="},{"type":"next-occurrence","id":"ignQ+5ECG8GPVQWzzDSQT2cM8GQ="}],"description":"Bridge rehabilitation on US 9 southbound between Kittredge Place (Poughkeepsie) and Laurel Street (Poughkeepsie) 2025083285514-3003041/NIGHT/32687209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday February 21st, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-14T16:44:46Z"},"road_event_id":"Dk1RWg1CQ5aKu9rnH40BU9oShGY=","beginning_cross_street":"Kittredge Place","ending_cross_street":"Laurel Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935975,41.714569]]}},{"id":"ignQ+5ECG8GPVQWzzDSQT2cM8GQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6oED9ELiDtpcTF92rRTWtINGaVo="}],"description":"Bridge rehabilitation on US 9 southbound between Kittredge Place (Poughkeepsie) and Laurel Street (Poughkeepsie) 2025083285514-3003041/NIGHT/32687209 - This work is weather permitting. Plan travel accordingly; delays may exist, Saturday February 21st, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-04-14T16:44:46Z"},"road_event_id":"ignQ+5ECG8GPVQWzzDSQT2cM8GQ=","beginning_cross_street":"Kittredge Place","ending_cross_street":"Laurel Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.935975,41.714569]]}},{"id":"PmnGYDH8801XIoS1yohscMJzvXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark Light Rail"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WIz2oCBEF5lljXIu+hgc5Hw8lsc="}],"description":"Due to Track repairs both directions, Newark Light Rail between Grove Street Light Rail Station (Bloomfield Twp) and Penn Station Light Rail Arrival (Newark) buses will replace light rail service due to track improvements. Buses will depart every 20 minutes from Grove Street Station. Customers who need to travel between Newark Penn and Broad Street stations must use Bus Route Nos. 11, 28, 29, 72, or 76. Dedicated substitute buses will not run to these stations. Bus schedules can be found online here. Please check all destination signs before boarding and allow for extra travel time., Continuous Saturday April 25th, 2026 02:00 AM thru Monday April 27th, 2026 02:00 AM bus service only, Continuous Saturday May 2nd, 2026 02:00 AM thru Monday May 4th, 2026 02:00 AM bus service only","update_date":"2026-04-14T19:02:27Z"},"road_event_id":"PmnGYDH8801XIoS1yohscMJzvXU=","beginning_cross_street":"Grove Street Light Rail Station","ending_cross_street":"Penn Station Light Rail Arrival","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T06:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187931,40.780317]]}},{"id":"WIz2oCBEF5lljXIu+hgc5Hw8lsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark Light Rail"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PmnGYDH8801XIoS1yohscMJzvXU="}],"description":"Due to Track repairs both directions, Newark Light Rail between Grove Street Light Rail Station (Bloomfield Twp) and Penn Station Light Rail Arrival (Newark) buses will replace light rail service due to track improvements. Buses will depart every 20 minutes from Grove Street Station. Customers who need to travel between Newark Penn and Broad Street stations must use Bus Route Nos. 11, 28, 29, 72, or 76. Dedicated substitute buses will not run to these stations. Bus schedules can be found online here. Please check all destination signs before boarding and allow for extra travel time., Continuous Saturday April 25th, 2026 02:00 AM thru Monday April 27th, 2026 02:00 AM bus service only, Continuous Saturday May 2nd, 2026 02:00 AM thru Monday May 4th, 2026 02:00 AM bus service only","update_date":"2026-04-14T19:02:27Z"},"road_event_id":"WIz2oCBEF5lljXIu+hgc5Hw8lsc=","beginning_cross_street":"Grove Street Light Rail Station","ending_cross_street":"Penn Station Light Rail Arrival","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T06:00:00Z","end_date":"2026-05-04T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187931,40.780317]]}},{"id":"AMEFeVZa4F7NHNahaBDYFXfGEbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mukh08GkUhh/AHmBW3keXjqrF8g="}],"description":"Crane operations on WILLOUGHBY ST westbound between ASHLAND PL (New York) and FLEET PL (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:18:11Z"},"road_event_id":"AMEFeVZa4F7NHNahaBDYFXfGEbw=","beginning_cross_street":"ASHLAND PL","ending_cross_street":"FLEET PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-23T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979043,40.691913]]}},{"id":"mukh08GkUhh/AHmBW3keXjqrF8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AMEFeVZa4F7NHNahaBDYFXfGEbw="},{"type":"next-occurrence","id":"Z1gffZmNgKLc2b83VJhWAl3u+Do="}],"description":"Crane operations on WILLOUGHBY ST westbound between ASHLAND PL (New York) and FLEET PL (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:18:11Z"},"road_event_id":"mukh08GkUhh/AHmBW3keXjqrF8g=","beginning_cross_street":"ASHLAND PL","ending_cross_street":"FLEET PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-24T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979043,40.691913]]}},{"id":"Z1gffZmNgKLc2b83VJhWAl3u+Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AMEFeVZa4F7NHNahaBDYFXfGEbw="},{"type":"next-occurrence","id":"me2PL2We+FJX8CQmZIbxC5xiHhA="}],"description":"Crane operations on WILLOUGHBY ST westbound between ASHLAND PL (New York) and FLEET PL (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:18:11Z"},"road_event_id":"Z1gffZmNgKLc2b83VJhWAl3u+Do=","beginning_cross_street":"ASHLAND PL","ending_cross_street":"FLEET PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-25T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979043,40.691913]]}},{"id":"me2PL2We+FJX8CQmZIbxC5xiHhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AMEFeVZa4F7NHNahaBDYFXfGEbw="},{"type":"next-occurrence","id":"4a9agQAbL/hZvGZ+z83SlzSBPNk="}],"description":"Crane operations on WILLOUGHBY ST westbound between ASHLAND PL (New York) and FLEET PL (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:18:11Z"},"road_event_id":"me2PL2We+FJX8CQmZIbxC5xiHhA=","beginning_cross_street":"ASHLAND PL","ending_cross_street":"FLEET PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-26T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979043,40.691913]]}},{"id":"4a9agQAbL/hZvGZ+z83SlzSBPNk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AMEFeVZa4F7NHNahaBDYFXfGEbw="}],"description":"Crane operations on WILLOUGHBY ST westbound between ASHLAND PL (New York) and FLEET PL (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:18:11Z"},"road_event_id":"4a9agQAbL/hZvGZ+z83SlzSBPNk=","beginning_cross_street":"ASHLAND PL","ending_cross_street":"FLEET PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-27T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979043,40.691913]]}},{"id":"cogTNHYpotrvXI68hBLVEF4/kjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OA4Nd4FpNqdGWboGTUbxa7GPLJ8="}],"description":"Crane operations on WILLOUGHBY ST westbound between FLEET PL (New York) and FLATBUSH AVE EXT (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:20:13Z"},"road_event_id":"cogTNHYpotrvXI68hBLVEF4/kjc=","beginning_cross_street":"FLEET PL","ending_cross_street":"FLATBUSH AVE EXT","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-23T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981917,40.692014]]}},{"id":"OA4Nd4FpNqdGWboGTUbxa7GPLJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cogTNHYpotrvXI68hBLVEF4/kjc="},{"type":"next-occurrence","id":"tBUj5Xdwa0w+EbxBg1orYg/bT2A="}],"description":"Crane operations on WILLOUGHBY ST westbound between FLEET PL (New York) and FLATBUSH AVE EXT (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:20:13Z"},"road_event_id":"OA4Nd4FpNqdGWboGTUbxa7GPLJ8=","beginning_cross_street":"FLEET PL","ending_cross_street":"FLATBUSH AVE EXT","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-24T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981917,40.692014]]}},{"id":"tBUj5Xdwa0w+EbxBg1orYg/bT2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cogTNHYpotrvXI68hBLVEF4/kjc="},{"type":"next-occurrence","id":"l5voJcwpOWo1AUQxhSZKdnNRB2Q="}],"description":"Crane operations on WILLOUGHBY ST westbound between FLEET PL (New York) and FLATBUSH AVE EXT (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:20:13Z"},"road_event_id":"tBUj5Xdwa0w+EbxBg1orYg/bT2A=","beginning_cross_street":"FLEET PL","ending_cross_street":"FLATBUSH AVE EXT","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-25T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981917,40.692014]]}},{"id":"l5voJcwpOWo1AUQxhSZKdnNRB2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cogTNHYpotrvXI68hBLVEF4/kjc="},{"type":"next-occurrence","id":"ihTwgTkxR3j21aQM/6k+F5BKA9E="}],"description":"Crane operations on WILLOUGHBY ST westbound between FLEET PL (New York) and FLATBUSH AVE EXT (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:20:13Z"},"road_event_id":"l5voJcwpOWo1AUQxhSZKdnNRB2Q=","beginning_cross_street":"FLEET PL","ending_cross_street":"FLATBUSH AVE EXT","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-26T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981917,40.692014]]}},{"id":"ihTwgTkxR3j21aQM/6k+F5BKA9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLOUGHBY ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cogTNHYpotrvXI68hBLVEF4/kjc="}],"description":"Crane operations on WILLOUGHBY ST westbound between FLEET PL (New York) and FLATBUSH AVE EXT (New York), Sunday April 19th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 08:00 AM thru 08:00 PM All lanes closed","update_date":"2026-04-14T20:20:13Z"},"road_event_id":"ihTwgTkxR3j21aQM/6k+F5BKA9E=","beginning_cross_street":"FLEET PL","ending_cross_street":"FLATBUSH AVE EXT","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-27T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981917,40.692014]]}},{"id":"fTnMEOWHgqrU9vlUAFMmYZBRz88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MYeiw1QFXbXXnCMJK4TchBgpfNQ="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"fTnMEOWHgqrU9vlUAFMmYZBRz88=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"MYeiw1QFXbXXnCMJK4TchBgpfNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"t0TekjbkMegHTgM4yoQAGl8CFrs="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"MYeiw1QFXbXXnCMJK4TchBgpfNQ=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"t0TekjbkMegHTgM4yoQAGl8CFrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"bEfx9fiubS4+DT8xQPt6leDt+ak="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"t0TekjbkMegHTgM4yoQAGl8CFrs=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"bEfx9fiubS4+DT8xQPt6leDt+ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"6+si6+LVo+8urK3xzitM5wZlSGk="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"bEfx9fiubS4+DT8xQPt6leDt+ak=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"6+si6+LVo+8urK3xzitM5wZlSGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"87N1mdCGOQaaGceBiAgQRsfg7z0="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"6+si6+LVo+8urK3xzitM5wZlSGk=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"87N1mdCGOQaaGceBiAgQRsfg7z0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"Spz/GG8t+iKiEuWorXeDJhmkw7k="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"87N1mdCGOQaaGceBiAgQRsfg7z0=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"Spz/GG8t+iKiEuWorXeDJhmkw7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"ke+KkY1QXpT19hyOztHPl3hOGuE="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"Spz/GG8t+iKiEuWorXeDJhmkw7k=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"ke+KkY1QXpT19hyOztHPl3hOGuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"rK3gbzHC63ipO19qUGYnss+3ZxI="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"ke+KkY1QXpT19hyOztHPl3hOGuE=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"rK3gbzHC63ipO19qUGYnss+3ZxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="},{"type":"next-occurrence","id":"chI5ttO8X5znVYNvVIZMYnFDQ00="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"rK3gbzHC63ipO19qUGYnss+3ZxI=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"chI5ttO8X5znVYNvVIZMYnFDQ00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTnMEOWHgqrU9vlUAFMmYZBRz88="}],"description":"Crane operations on FLEET PL northbound between WILLOUGHBY ST (New York), Friday April 17th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:22:00Z"},"road_event_id":"chI5ttO8X5znVYNvVIZMYnFDQ00=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981777,40.692054]]}},{"id":"zmCcuNSxPMTp/EAlmFP2EtnpORo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Y4NRq8msAlEYCey8PnrOxf1MKCc="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"zmCcuNSxPMTp/EAlmFP2EtnpORo=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"Y4NRq8msAlEYCey8PnrOxf1MKCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"udpxBq7ouJfHhSQ0Lw7tBZXWz+U="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"Y4NRq8msAlEYCey8PnrOxf1MKCc=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"udpxBq7ouJfHhSQ0Lw7tBZXWz+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"Va7DUJeGGYIPjYu96dq5XzShVuE="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"udpxBq7ouJfHhSQ0Lw7tBZXWz+U=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"Va7DUJeGGYIPjYu96dq5XzShVuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"SUpqTF+C+/KXl/2ljhAV2bLYf0o="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"Va7DUJeGGYIPjYu96dq5XzShVuE=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"SUpqTF+C+/KXl/2ljhAV2bLYf0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"6jb+AK58eB4WtgOxVjtjHl3tepc="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"SUpqTF+C+/KXl/2ljhAV2bLYf0o=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"6jb+AK58eB4WtgOxVjtjHl3tepc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"WGq/IsMSGNZDS0w5kRJSp1H4kuo="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"6jb+AK58eB4WtgOxVjtjHl3tepc=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"WGq/IsMSGNZDS0w5kRJSp1H4kuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"Xl1C4HD+S915oU1tO8nxkSzxNl0="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"WGq/IsMSGNZDS0w5kRJSp1H4kuo=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"Xl1C4HD+S915oU1tO8nxkSzxNl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"3uWBiULtSqFYd8+T4QQN/YOFL0w="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"Xl1C4HD+S915oU1tO8nxkSzxNl0=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"3uWBiULtSqFYd8+T4QQN/YOFL0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"kKRZgMqVxd/p476pYD1BRWRp8/Y="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"3uWBiULtSqFYd8+T4QQN/YOFL0w=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"kKRZgMqVxd/p476pYD1BRWRp8/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"0YOI5jDLErgDNhNvgrzmqeumGyo="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"kKRZgMqVxd/p476pYD1BRWRp8/Y=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"0YOI5jDLErgDNhNvgrzmqeumGyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"/y57ysGIVlQi7CDdS12d6TO6Pv8="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"0YOI5jDLErgDNhNvgrzmqeumGyo=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"/y57ysGIVlQi7CDdS12d6TO6Pv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"gWz0e9jVHcG8PCUUED04kbJlVs4="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"/y57ysGIVlQi7CDdS12d6TO6Pv8=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"gWz0e9jVHcG8PCUUED04kbJlVs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"E+OmqgFDOHfVbrivfJ3gvoPUsT4="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"gWz0e9jVHcG8PCUUED04kbJlVs4=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"E+OmqgFDOHfVbrivfJ3gvoPUsT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="},{"type":"next-occurrence","id":"Roy02mWptGl0akEsUDsf/CDJLhY="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"E+OmqgFDOHfVbrivfJ3gvoPUsT4=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"Roy02mWptGl0akEsUDsf/CDJLhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmCcuNSxPMTp/EAlmFP2EtnpORo="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Friday April 17th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:23:50Z"},"road_event_id":"Roy02mWptGl0akEsUDsf/CDJLhY=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981776,40.69208]]}},{"id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dCneuh5uwVV1iwTv3b2AdlhHpUM="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"dCneuh5uwVV1iwTv3b2AdlhHpUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"3l3+guz0nn2R4giKuVzGvXKpnjs="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"dCneuh5uwVV1iwTv3b2AdlhHpUM=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"3l3+guz0nn2R4giKuVzGvXKpnjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"pcEoqLSkHySuQPpZkQQX3xnyLfY="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"3l3+guz0nn2R4giKuVzGvXKpnjs=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"pcEoqLSkHySuQPpZkQQX3xnyLfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"eLwuionWDLOo9n0DH2DSSL3kJow="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"pcEoqLSkHySuQPpZkQQX3xnyLfY=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"eLwuionWDLOo9n0DH2DSSL3kJow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"XlOHDiUHb4XJJlfmXYCIcHLsfPM="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"eLwuionWDLOo9n0DH2DSSL3kJow=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"XlOHDiUHb4XJJlfmXYCIcHLsfPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"lwV5bsfipX+651MOmgM4ivn5f60="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"XlOHDiUHb4XJJlfmXYCIcHLsfPM=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"lwV5bsfipX+651MOmgM4ivn5f60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"EIrk+qyEtvFAJfnUANlrDvZzLrM="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"lwV5bsfipX+651MOmgM4ivn5f60=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"EIrk+qyEtvFAJfnUANlrDvZzLrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"b2NXN2dglYeChRu9iP0CEPQ1P68="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"EIrk+qyEtvFAJfnUANlrDvZzLrM=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"b2NXN2dglYeChRu9iP0CEPQ1P68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"azsyjuSDefeSgSgFLNbPC+1uuEo="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"b2NXN2dglYeChRu9iP0CEPQ1P68=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"azsyjuSDefeSgSgFLNbPC+1uuEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"+8jb7+78rWDPSM019zjrr2SNqYY="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"azsyjuSDefeSgSgFLNbPC+1uuEo=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"+8jb7+78rWDPSM019zjrr2SNqYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"Ga2UjMQ6rLq8IZ7HgDhbvUz1DAs="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"+8jb7+78rWDPSM019zjrr2SNqYY=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"Ga2UjMQ6rLq8IZ7HgDhbvUz1DAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"5o4JjtN0F9rNYOb+KVfdngsW/Ak="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"Ga2UjMQ6rLq8IZ7HgDhbvUz1DAs=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"5o4JjtN0F9rNYOb+KVfdngsW/Ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"goZbLaGb1r3O1LNvsDgk12kUnH8="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"5o4JjtN0F9rNYOb+KVfdngsW/Ak=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"goZbLaGb1r3O1LNvsDgk12kUnH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="},{"type":"next-occurrence","id":"FyOseyJVzCCIJK5D+80cQ4Rg6MI="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"goZbLaGb1r3O1LNvsDgk12kUnH8=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"FyOseyJVzCCIJK5D+80cQ4Rg6MI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EMERSON PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TXfyHGWM+p5lpQtlUwIGhj/yZQ="}],"description":"Construction on EMERSON PL southbound between PARK AVE (New York) and MYRTLE AVE (New York) for boom, knuckle boom and concrete pump to work on new building., Friday April 17th, 2026 thru Sunday July 12th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:27:24Z"},"road_event_id":"FyOseyJVzCCIJK5D+80cQ4Rg6MI=","beginning_cross_street":"PARK AVE","ending_cross_street":"MYRTLE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962635,40.696008]]}},{"id":"txpSznx+jTppSIz/EItA/YWhQrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DUMONT AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bCjbKGG5+bFOnZcxAdhz8Pa+rrg="}],"description":"Construction on DUMONT AVE both directions between LINCOLN AVE (New York) and AUTUMN AVE (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:30:22Z"},"road_event_id":"txpSznx+jTppSIz/EItA/YWhQrc=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"AUTUMN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.866005,40.670448]]}},{"id":"bCjbKGG5+bFOnZcxAdhz8Pa+rrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DUMONT AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"txpSznx+jTppSIz/EItA/YWhQrc="}],"description":"Construction on DUMONT AVE both directions between LINCOLN AVE (New York) and AUTUMN AVE (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:30:22Z"},"road_event_id":"bCjbKGG5+bFOnZcxAdhz8Pa+rrg=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"AUTUMN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.866005,40.670448]]}},{"id":"ejuKAlrKMWm8VEL5scBtVcEoVic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORREST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ly8DPCCzj2c6K7Q+3XC/pbSP204="}],"description":"Crane operations on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York), Friday April 17th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:31:58Z"},"road_event_id":"ejuKAlrKMWm8VEL5scBtVcEoVic=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932762,40.702496]]}},{"id":"ly8DPCCzj2c6K7Q+3XC/pbSP204=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORREST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ejuKAlrKMWm8VEL5scBtVcEoVic="},{"type":"next-occurrence","id":"3edoplbHIUITB4GRE850LZ8ftps="}],"description":"Crane operations on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York), Friday April 17th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:31:58Z"},"road_event_id":"ly8DPCCzj2c6K7Q+3XC/pbSP204=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932762,40.702496]]}},{"id":"3edoplbHIUITB4GRE850LZ8ftps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORREST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ejuKAlrKMWm8VEL5scBtVcEoVic="},{"type":"next-occurrence","id":"+mgdR10BkFhBoVIK4+8r7YNNTC8="}],"description":"Crane operations on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York), Friday April 17th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:31:58Z"},"road_event_id":"3edoplbHIUITB4GRE850LZ8ftps=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932762,40.702496]]}},{"id":"+mgdR10BkFhBoVIK4+8r7YNNTC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORREST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ejuKAlrKMWm8VEL5scBtVcEoVic="},{"type":"next-occurrence","id":"6PQXLaZ6GMEzN6d7BSyLjtyBc/c="}],"description":"Crane operations on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York), Friday April 17th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:31:58Z"},"road_event_id":"+mgdR10BkFhBoVIK4+8r7YNNTC8=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932762,40.702496]]}},{"id":"6PQXLaZ6GMEzN6d7BSyLjtyBc/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORREST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ejuKAlrKMWm8VEL5scBtVcEoVic="},{"type":"next-occurrence","id":"1+useZS+OhN2rJyA/HNHhEfPDSM="}],"description":"Crane operations on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York), Friday April 17th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:31:58Z"},"road_event_id":"6PQXLaZ6GMEzN6d7BSyLjtyBc/c=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932762,40.702496]]}},{"id":"1+useZS+OhN2rJyA/HNHhEfPDSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORREST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ejuKAlrKMWm8VEL5scBtVcEoVic="},{"type":"next-occurrence","id":"BYGQC8rcrTiWB35CzmOrWwtHk4A="}],"description":"Crane operations on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York), Friday April 17th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:31:58Z"},"road_event_id":"1+useZS+OhN2rJyA/HNHhEfPDSM=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932762,40.702496]]}},{"id":"BYGQC8rcrTiWB35CzmOrWwtHk4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORREST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ejuKAlrKMWm8VEL5scBtVcEoVic="}],"description":"Crane operations on FORREST ST northbound between CENTRAL AVE (New York) and FLUSHING AVE (New York), Friday April 17th, 2026 thru Tuesday April 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:31:58Z"},"road_event_id":"BYGQC8rcrTiWB35CzmOrWwtHk4A=","beginning_cross_street":"CENTRAL AVE","ending_cross_street":"FLUSHING AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932762,40.702496]]}},{"id":"FNBpOzgZ0J5Wlqa59x5y88Z/pwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Tv/+6TUoBFvfENc7AQ77POVfkqw="}],"description":"Crane operations on HART ST westbound between BROADWAY (New York) and STUYVESANT AVE (New York), Friday April 17th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:34:13Z"},"road_event_id":"FNBpOzgZ0J5Wlqa59x5y88Z/pwk=","beginning_cross_street":"BROADWAY","ending_cross_street":"STUYVESANT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932087,40.69508]]}},{"id":"Tv/+6TUoBFvfENc7AQ77POVfkqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNBpOzgZ0J5Wlqa59x5y88Z/pwk="},{"type":"next-occurrence","id":"/snPzQoQ25fbsWb/2TkQLpjPv9o="}],"description":"Crane operations on HART ST westbound between BROADWAY (New York) and STUYVESANT AVE (New York), Friday April 17th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:34:13Z"},"road_event_id":"Tv/+6TUoBFvfENc7AQ77POVfkqw=","beginning_cross_street":"BROADWAY","ending_cross_street":"STUYVESANT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932087,40.69508]]}},{"id":"/snPzQoQ25fbsWb/2TkQLpjPv9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HART ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FNBpOzgZ0J5Wlqa59x5y88Z/pwk="}],"description":"Crane operations on HART ST westbound between BROADWAY (New York) and STUYVESANT AVE (New York), Friday April 17th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:34:13Z"},"road_event_id":"/snPzQoQ25fbsWb/2TkQLpjPv9o=","beginning_cross_street":"BROADWAY","ending_cross_street":"STUYVESANT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.932087,40.69508]]}},{"id":"3RPQUXrLlzcVWKHHDS1RrVAQyG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P5Chy9hsjhUqcR/khga0ewQFxd4="}],"description":"Construction on LINCOLN AVE both directions between BLAKE AVE (New York) and DUMONT AVE (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:37:36Z"},"road_event_id":"3RPQUXrLlzcVWKHHDS1RrVAQyG0=","beginning_cross_street":"BLAKE AVE","ending_cross_street":"DUMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.866212,40.671842]]}},{"id":"P5Chy9hsjhUqcR/khga0ewQFxd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3RPQUXrLlzcVWKHHDS1RrVAQyG0="}],"description":"Construction on LINCOLN AVE both directions between BLAKE AVE (New York) and DUMONT AVE (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:37:36Z"},"road_event_id":"P5Chy9hsjhUqcR/khga0ewQFxd4=","beginning_cross_street":"BLAKE AVE","ending_cross_street":"DUMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.866212,40.671842]]}},{"id":"IPnM0mQmhc/JNRF42+Yo8aX/thg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XIJbQCqaRul44iskOxsbnYrrIEA="}],"description":"Construction on LINCOLN AVE both directions between DUMONT AVE (New York) and LINDEN BLVD (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:40:17Z"},"road_event_id":"IPnM0mQmhc/JNRF42+Yo8aX/thg=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"LINDEN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865827,40.670336]]}},{"id":"XIJbQCqaRul44iskOxsbnYrrIEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINCOLN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IPnM0mQmhc/JNRF42+Yo8aX/thg="}],"description":"Construction on LINCOLN AVE both directions between DUMONT AVE (New York) and LINDEN BLVD (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:40:17Z"},"road_event_id":"XIJbQCqaRul44iskOxsbnYrrIEA=","beginning_cross_street":"DUMONT AVE","ending_cross_street":"LINDEN BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865827,40.670336]]}},{"id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"k2/aNreNv8spMF8G8yneVDaUwJQ="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"k2/aNreNv8spMF8G8yneVDaUwJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"SXEzz9QitHzykS/WPWhBdxRnGkA="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"k2/aNreNv8spMF8G8yneVDaUwJQ=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"SXEzz9QitHzykS/WPWhBdxRnGkA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"j1SwwedHP3FhCu8HeVFNMYdXqnI="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"SXEzz9QitHzykS/WPWhBdxRnGkA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"j1SwwedHP3FhCu8HeVFNMYdXqnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"0yyOqhDCSmO9wMzks38kUhsTnDw="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"j1SwwedHP3FhCu8HeVFNMYdXqnI=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"0yyOqhDCSmO9wMzks38kUhsTnDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"0q74hRo6axtnT5H2+8KFTNuCGR0="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"0yyOqhDCSmO9wMzks38kUhsTnDw=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"0q74hRo6axtnT5H2+8KFTNuCGR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"IFBoH/uutFp7CeqcYsrmZzM3qXg="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"0q74hRo6axtnT5H2+8KFTNuCGR0=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"IFBoH/uutFp7CeqcYsrmZzM3qXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"g8kxdX8XqlbJLkoX53Mq0Bj/Nxw="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"IFBoH/uutFp7CeqcYsrmZzM3qXg=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"g8kxdX8XqlbJLkoX53Mq0Bj/Nxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"CTeLSOe5bt7CMpmkTP1rJnwGJJ4="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"g8kxdX8XqlbJLkoX53Mq0Bj/Nxw=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"CTeLSOe5bt7CMpmkTP1rJnwGJJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"BYIDzk70NbmFwc3GosC0KbQNOfE="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"CTeLSOe5bt7CMpmkTP1rJnwGJJ4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"BYIDzk70NbmFwc3GosC0KbQNOfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"BLBZc8u6hxXkP1eDa2pvq2vGyVo="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"BYIDzk70NbmFwc3GosC0KbQNOfE=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"BLBZc8u6hxXkP1eDa2pvq2vGyVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"JBakTvkKhn0ZJH7VFZOkb+fedCo="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"BLBZc8u6hxXkP1eDa2pvq2vGyVo=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"JBakTvkKhn0ZJH7VFZOkb+fedCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"CMc6o+mxnZeyaAcFozTl+ocyId8="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"JBakTvkKhn0ZJH7VFZOkb+fedCo=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"CMc6o+mxnZeyaAcFozTl+ocyId8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"kOWZB41n3K7/22JE9J1MXLmkYaU="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"CMc6o+mxnZeyaAcFozTl+ocyId8=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"kOWZB41n3K7/22JE9J1MXLmkYaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="},{"type":"next-occurrence","id":"9y6GVXvcEYH94W3RwmM4NVTrFW8="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"kOWZB41n3K7/22JE9J1MXLmkYaU=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"9y6GVXvcEYH94W3RwmM4NVTrFW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRADFORD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uTfFzWM/D5Gy/fqFKhMazYSFvYQ="}],"description":"Construction on BRADFORD ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for installing feeder conduit to station., Friday April 17th, 2026 thru Saturday June 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:42:15Z"},"road_event_id":"9y6GVXvcEYH94W3RwmM4NVTrFW8=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.893111,40.676362]]}},{"id":"gcn+81wHc8S4MI0TlJCtN3IWrAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NOH3TXNQWXbS/sMqCNqbnJWuX5I="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"gcn+81wHc8S4MI0TlJCtN3IWrAw=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"NOH3TXNQWXbS/sMqCNqbnJWuX5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"eFqME71HjHW/b3SSXrknHdRr6Dw="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"NOH3TXNQWXbS/sMqCNqbnJWuX5I=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"eFqME71HjHW/b3SSXrknHdRr6Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"r5eYHhiW59Vovf5ne41/LAQ5nYs="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"eFqME71HjHW/b3SSXrknHdRr6Dw=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"r5eYHhiW59Vovf5ne41/LAQ5nYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"d/m42e/7iZ8Q6ilSXEU8oPtAQBg="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"r5eYHhiW59Vovf5ne41/LAQ5nYs=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"d/m42e/7iZ8Q6ilSXEU8oPtAQBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"XOiibL9l5u6HUlpUhsW3hcYZW98="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"d/m42e/7iZ8Q6ilSXEU8oPtAQBg=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"XOiibL9l5u6HUlpUhsW3hcYZW98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"eVSdzXJBi+O/2ylOLSs0IOYE8Ck="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"XOiibL9l5u6HUlpUhsW3hcYZW98=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"eVSdzXJBi+O/2ylOLSs0IOYE8Ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"wh1bMojpdoyg8yk4bsooFR70xzc="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"eVSdzXJBi+O/2ylOLSs0IOYE8Ck=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"wh1bMojpdoyg8yk4bsooFR70xzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"gI5me4WBwnpLhkfimvz4D9GxYw8="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"wh1bMojpdoyg8yk4bsooFR70xzc=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"gI5me4WBwnpLhkfimvz4D9GxYw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"GdiaaYEF3XedSpXV/BYdVVQUYIY="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"gI5me4WBwnpLhkfimvz4D9GxYw8=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"GdiaaYEF3XedSpXV/BYdVVQUYIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"6tzZzgZm48vDA4y+J+hVLgsN4f0="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"GdiaaYEF3XedSpXV/BYdVVQUYIY=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"6tzZzgZm48vDA4y+J+hVLgsN4f0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"QtfLlnftoul1U7Yw6fkobTBMpj8="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"6tzZzgZm48vDA4y+J+hVLgsN4f0=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"QtfLlnftoul1U7Yw6fkobTBMpj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"a/rmuilM04kktQr6FSGpM0FaR7I="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"QtfLlnftoul1U7Yw6fkobTBMpj8=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"a/rmuilM04kktQr6FSGpM0FaR7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"qukrEkVGvXzMcPeY69Dekv5yJdo="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"a/rmuilM04kktQr6FSGpM0FaR7I=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"qukrEkVGvXzMcPeY69Dekv5yJdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="},{"type":"next-occurrence","id":"SvRgOgdibWFrU9YVYhS7T1ialkA="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"qukrEkVGvXzMcPeY69Dekv5yJdo=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"SvRgOgdibWFrU9YVYhS7T1ialkA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DEGRAW ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gcn+81wHc8S4MI0TlJCtN3IWrAw="}],"description":"Construction on DEGRAW ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 17th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:44:15Z"},"road_event_id":"SvRgOgdibWFrU9YVYhS7T1ialkA=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988651,40.681181]]}},{"id":"ppQGfHp5OudGBgCOPdKh23/l3L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LIVONIA AVE"],"direction":"unknown","related_road_events":[],"description":"Construction on LIVONIA AVE both directions between JEROME ST (New York) and WARWICK ST (New York) for MTA contract A-37758 package 5 ADA upgrades/elevator replacement., Continuous Tuesday April 14th, 2026 12:00 AM thru Thursday April 30th, 2026 11:59 PM All lanes closed","update_date":"2026-04-14T20:46:48Z"},"road_event_id":"ppQGfHp5OudGBgCOPdKh23/l3L4=","beginning_cross_street":"JEROME ST","ending_cross_street":"WARWICK ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88486,40.666106]]}},{"id":"NY/oublwwRO7Oc0bUu/3JOSd1xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["28TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WeBPsnmdXi6ToelLcX6LC1LtWAM="}],"description":"Construction on 28TH ST southbound between 41ST AVE (New York) and QUEENS PLZ N (New York) for use of boom truck to hoist HVAC equipment., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:49:23Z"},"road_event_id":"NY/oublwwRO7Oc0bUu/3JOSd1xs=","beginning_cross_street":"41ST AVE","ending_cross_street":"QUEENS PLZ N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937617,40.751357]]}},{"id":"WeBPsnmdXi6ToelLcX6LC1LtWAM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["28TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NY/oublwwRO7Oc0bUu/3JOSd1xs="}],"description":"Construction on 28TH ST southbound between 41ST AVE (New York) and QUEENS PLZ N (New York) for use of boom truck to hoist HVAC equipment., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:49:23Z"},"road_event_id":"WeBPsnmdXi6ToelLcX6LC1LtWAM=","beginning_cross_street":"41ST AVE","ending_cross_street":"QUEENS PLZ N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937617,40.751357]]}},{"id":"J7RjVlOeajmnqZlw8A00bsb/43Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["45TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nCwlqvOE1wqsdokQkl1uQZExhD8="}],"description":"Construction on 45TH AVE westbound between 23RD ST (New York) and 21ST ST (New York) for new water and sewer installation., Friday April 17th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:54:10Z"},"road_event_id":"J7RjVlOeajmnqZlw8A00bsb/43Y=","beginning_cross_street":"23RD ST","ending_cross_street":"21ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945393,40.746934]]}},{"id":"nCwlqvOE1wqsdokQkl1uQZExhD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["45TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7RjVlOeajmnqZlw8A00bsb/43Y="},{"type":"next-occurrence","id":"jvpSx81O6OHhGrwdJIUckDalprw="}],"description":"Construction on 45TH AVE westbound between 23RD ST (New York) and 21ST ST (New York) for new water and sewer installation., Friday April 17th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:54:10Z"},"road_event_id":"nCwlqvOE1wqsdokQkl1uQZExhD8=","beginning_cross_street":"23RD ST","ending_cross_street":"21ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945393,40.746934]]}},{"id":"jvpSx81O6OHhGrwdJIUckDalprw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["45TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7RjVlOeajmnqZlw8A00bsb/43Y="},{"type":"next-occurrence","id":"6Gkt7WwktFRwycYmc79PQ3Ggc10="}],"description":"Construction on 45TH AVE westbound between 23RD ST (New York) and 21ST ST (New York) for new water and sewer installation., Friday April 17th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:54:10Z"},"road_event_id":"jvpSx81O6OHhGrwdJIUckDalprw=","beginning_cross_street":"23RD ST","ending_cross_street":"21ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945393,40.746934]]}},{"id":"6Gkt7WwktFRwycYmc79PQ3Ggc10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["45TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J7RjVlOeajmnqZlw8A00bsb/43Y="}],"description":"Construction on 45TH AVE westbound between 23RD ST (New York) and 21ST ST (New York) for new water and sewer installation., Friday April 17th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:54:10Z"},"road_event_id":"6Gkt7WwktFRwycYmc79PQ3Ggc10=","beginning_cross_street":"23RD ST","ending_cross_street":"21ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945393,40.746934]]}},{"id":"rCsSJQtxHrbab+nx41bepM7yd6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["69TH RD"],"direction":"unknown","related_road_events":[],"description":"Construction on 69TH RD southbound between QUEENS BLVD (New York) and GERARD PL (New York) for associated closure., Continuous Saturday April 25th,2026 05:00 AM thru Sunday April 26th,2026 08:00 PM All lanes closed southbound,","update_date":"2026-04-20T00:00:01Z"},"road_event_id":"rCsSJQtxHrbab+nx41bepM7yd6o=","beginning_cross_street":"QUEENS BLVD","ending_cross_street":"GERARD PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T09:00:00Z","end_date":"2026-04-27T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.847551,40.722188]]}},{"id":"6uTKCSeSSG7WQ2PsC7qa4tDJGYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6J1N/RUy6o+3bxpMfm8sjfPUN7k="}],"description":"Installation of traffic management systems on I-481 northbound Exit 95 - Northern Boulevard (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T20:57:50Z"},"road_event_id":"6uTKCSeSSG7WQ2PsC7qa4tDJGYg=","beginning_cross_street":"Exit 95 - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.099724,43.139931]]}},{"id":"6J1N/RUy6o+3bxpMfm8sjfPUN7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uTKCSeSSG7WQ2PsC7qa4tDJGYg="},{"type":"next-occurrence","id":"wBBYnJCRo8XrNDvAAoT3/m4rPrU="}],"description":"Installation of traffic management systems on I-481 northbound Exit 95 - Northern Boulevard (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T20:57:50Z"},"road_event_id":"6J1N/RUy6o+3bxpMfm8sjfPUN7k=","beginning_cross_street":"Exit 95 - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.099724,43.139931]]}},{"id":"wBBYnJCRo8XrNDvAAoT3/m4rPrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6uTKCSeSSG7WQ2PsC7qa4tDJGYg="}],"description":"Installation of traffic management systems on I-481 northbound Exit 95 - Northern Boulevard (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T20:57:50Z"},"road_event_id":"wBBYnJCRo8XrNDvAAoT3/m4rPrU=","beginning_cross_street":"Exit 95 - Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.099724,43.139931]]}},{"id":"OgkydxCkpvlEgq/UbcENs8zrAH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["AUSTIN ST"],"direction":"unknown","related_road_events":[],"description":"Crane operations on AUSTIN ST both directions between PEDESTRIAN WAY (New York) and 69TH RD (New York), Continuous Saturday April 25th,2026 12:00 AM thru Sunday April 26th,2026 08:00 PM All lanes closed eastbound, westbound","update_date":"2026-04-20T00:00:01Z"},"road_event_id":"OgkydxCkpvlEgq/UbcENs8zrAH0=","beginning_cross_street":"PEDESTRIAN WAY","ending_cross_street":"69TH RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-27T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.851279,40.722535]]}},{"id":"/J24GDT68XdLagb3ZMq4HDK32WM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v4sGuno4PzivWHH13z7PGg+z4SY="}],"description":"Installation of traffic management systems on I-81 southbound before Exit 98 - NY 31; Cicero; Bridgeport (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:02:22Z"},"road_event_id":"/J24GDT68XdLagb3ZMq4HDK32WM=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119099,43.183638]]}},{"id":"v4sGuno4PzivWHH13z7PGg+z4SY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/J24GDT68XdLagb3ZMq4HDK32WM="},{"type":"next-occurrence","id":"ne1DjpfPCNegYWfXu3gsTmSII2M="}],"description":"Installation of traffic management systems on I-81 southbound before Exit 98 - NY 31; Cicero; Bridgeport (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:02:22Z"},"road_event_id":"v4sGuno4PzivWHH13z7PGg+z4SY=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119099,43.183638]]}},{"id":"ne1DjpfPCNegYWfXu3gsTmSII2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/J24GDT68XdLagb3ZMq4HDK32WM="}],"description":"Installation of traffic management systems on I-81 southbound before Exit 98 - NY 31; Cicero; Bridgeport (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:02:22Z"},"road_event_id":"ne1DjpfPCNegYWfXu3gsTmSII2M=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119099,43.183638]]}},{"id":"JQz5DWPXH5NW+FqqnZqhy92LDTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+knbg+ivx1EwZu6G2Uh3digCbYw="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"JQz5DWPXH5NW+FqqnZqhy92LDTE=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"+knbg+ivx1EwZu6G2Uh3digCbYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"dc7T7J6jyLLfAFYbicy+AY9VLyE="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"+knbg+ivx1EwZu6G2Uh3digCbYw=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"dc7T7J6jyLLfAFYbicy+AY9VLyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"Ril2//rRnIzUYDWqww2cHiMTuy8="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"dc7T7J6jyLLfAFYbicy+AY9VLyE=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"Ril2//rRnIzUYDWqww2cHiMTuy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"fVL2TD1h6S4TvXaIS4la/VW8o0w="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"Ril2//rRnIzUYDWqww2cHiMTuy8=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"fVL2TD1h6S4TvXaIS4la/VW8o0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"JPhtdT9akWt2nuPHovsiKV4Evxw="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"fVL2TD1h6S4TvXaIS4la/VW8o0w=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"JPhtdT9akWt2nuPHovsiKV4Evxw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"SgMKhvm8EbGmEJoi3yTsJexlEFU="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"JPhtdT9akWt2nuPHovsiKV4Evxw=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"SgMKhvm8EbGmEJoi3yTsJexlEFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"+mYWhIj3WsHIbEQQK9+uCeBEC3o="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"SgMKhvm8EbGmEJoi3yTsJexlEFU=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"+mYWhIj3WsHIbEQQK9+uCeBEC3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"WYldrqpccwd1shkUqVcf7BG5akk="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"+mYWhIj3WsHIbEQQK9+uCeBEC3o=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"WYldrqpccwd1shkUqVcf7BG5akk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"47egt9OZkwS+IkK/b1qK3tyULpA="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"WYldrqpccwd1shkUqVcf7BG5akk=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"47egt9OZkwS+IkK/b1qK3tyULpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="},{"type":"next-occurrence","id":"oDAEyQzzEh/cj8WMZmlH0I/DEx8="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"47egt9OZkwS+IkK/b1qK3tyULpA=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"oDAEyQzzEh/cj8WMZmlH0I/DEx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VIRGINIA AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQz5DWPXH5NW+FqqnZqhy92LDTE="}],"description":"Construction on VIRGINIA AVE both directions between BAY ST (New York) and ANDERSON ST (New York) for pouring foundation and composite slabs when using concrete pump truck., Tuesday April 14th, 2026 thru Tuesday May 26th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T21:02:37Z"},"road_event_id":"oDAEyQzzEh/cj8WMZmlH0I/DEx8=","beginning_cross_street":"BAY ST","ending_cross_street":"ANDERSON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.067419,40.615585]]}},{"id":"NUNkZB/0p+tU7p+6yUuTKEi1FI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3Bl9Qb6apxl9MIE2motn8ctmDls="}],"description":"Installation of traffic management systems on I-81 northbound before Exit 11B - NY 481; North Syracuse; Oswego (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:04:12Z"},"road_event_id":"NUNkZB/0p+tU7p+6yUuTKEi1FI8=","beginning_cross_street":"Exit 11B - NY 481; North Syracuse; Oswego","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.11862,43.135616]]}},{"id":"3Bl9Qb6apxl9MIE2motn8ctmDls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUNkZB/0p+tU7p+6yUuTKEi1FI8="},{"type":"next-occurrence","id":"fHe/4TeIQHfMdA5b29uj/St/MXs="}],"description":"Installation of traffic management systems on I-81 northbound before Exit 11B - NY 481; North Syracuse; Oswego (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:04:12Z"},"road_event_id":"3Bl9Qb6apxl9MIE2motn8ctmDls=","beginning_cross_street":"Exit 11B - NY 481; North Syracuse; Oswego","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.11862,43.135616]]}},{"id":"fHe/4TeIQHfMdA5b29uj/St/MXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUNkZB/0p+tU7p+6yUuTKEi1FI8="}],"description":"Installation of traffic management systems on I-81 northbound before Exit 11B - NY 481; North Syracuse; Oswego (Cicero), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:04:12Z"},"road_event_id":"fHe/4TeIQHfMdA5b29uj/St/MXs=","beginning_cross_street":"Exit 11B - NY 481; North Syracuse; Oswego","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.11862,43.135616]]}},{"id":"Cqj5mzq6dDFPMoRfuTq06tWGTj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KjZ90CAnYMmifRcoVGo4dX5BKw0="}],"description":"Installation of traffic management systems on NY 481 northbound between Exit 2 - Maple Road; Caughdenoy Road (Clay) and Exit 7 - NY 31 (Clay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:05:57Z"},"road_event_id":"Cqj5mzq6dDFPMoRfuTq06tWGTj0=","beginning_cross_street":"Exit 2 - Maple Road; Caughdenoy Road","ending_cross_street":"Exit 7 - NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.152967,43.157662]]}},{"id":"KjZ90CAnYMmifRcoVGo4dX5BKw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cqj5mzq6dDFPMoRfuTq06tWGTj0="},{"type":"next-occurrence","id":"4INhzKZ77JKZT5JM9ct/ZuLCcrk="}],"description":"Installation of traffic management systems on NY 481 northbound between Exit 2 - Maple Road; Caughdenoy Road (Clay) and Exit 7 - NY 31 (Clay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:05:57Z"},"road_event_id":"KjZ90CAnYMmifRcoVGo4dX5BKw0=","beginning_cross_street":"Exit 2 - Maple Road; Caughdenoy Road","ending_cross_street":"Exit 7 - NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.152967,43.157662]]}},{"id":"4INhzKZ77JKZT5JM9ct/ZuLCcrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cqj5mzq6dDFPMoRfuTq06tWGTj0="}],"description":"Installation of traffic management systems on NY 481 northbound between Exit 2 - Maple Road; Caughdenoy Road (Clay) and Exit 7 - NY 31 (Clay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 07:00 PM right shoulder closed","update_date":"2026-04-14T21:05:57Z"},"road_event_id":"4INhzKZ77JKZT5JM9ct/ZuLCcrk=","beginning_cross_street":"Exit 2 - Maple Road; Caughdenoy Road","ending_cross_street":"Exit 7 - NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.152967,43.157662]]}},{"id":"oieBgQWj2GYSIVT0pHG7zK+NtZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/KmddQYCxl1T3aE0UU/bxtKl5s0="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"oieBgQWj2GYSIVT0pHG7zK+NtZo=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"/KmddQYCxl1T3aE0UU/bxtKl5s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"Xl4PN/+kuCleUcawawtCmMKItL8="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"/KmddQYCxl1T3aE0UU/bxtKl5s0=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"Xl4PN/+kuCleUcawawtCmMKItL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"sNjC0aqOP4RYolztbZuRESUl+ZY="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"Xl4PN/+kuCleUcawawtCmMKItL8=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"sNjC0aqOP4RYolztbZuRESUl+ZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"K7XJuGbha8/nImbNj069SG1AcgY="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"sNjC0aqOP4RYolztbZuRESUl+ZY=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"K7XJuGbha8/nImbNj069SG1AcgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"iKGCI+niDBAT6pEh/3Yb5SYyJv0="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"K7XJuGbha8/nImbNj069SG1AcgY=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"iKGCI+niDBAT6pEh/3Yb5SYyJv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"FdQ83yz9VSTPwqUoThNStRyU+zo="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"iKGCI+niDBAT6pEh/3Yb5SYyJv0=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"FdQ83yz9VSTPwqUoThNStRyU+zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"p9ZPbE6oHTZ/pheq3KKVrAFOh6c="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"FdQ83yz9VSTPwqUoThNStRyU+zo=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"p9ZPbE6oHTZ/pheq3KKVrAFOh6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"jBekJbmVQG2laK6gzfR+DwTAGuQ="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"p9ZPbE6oHTZ/pheq3KKVrAFOh6c=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"jBekJbmVQG2laK6gzfR+DwTAGuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"DsmQ+Zv2oqD3kj5pRT3kL4QKGkM="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"jBekJbmVQG2laK6gzfR+DwTAGuQ=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"DsmQ+Zv2oqD3kj5pRT3kL4QKGkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"mGOn/VqCLkyJKnNDSNHnV7W7KKY="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"DsmQ+Zv2oqD3kj5pRT3kL4QKGkM=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"mGOn/VqCLkyJKnNDSNHnV7W7KKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"z/bCUx5L/4VOcp3c+GqwNzRJW94="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"mGOn/VqCLkyJKnNDSNHnV7W7KKY=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"z/bCUx5L/4VOcp3c+GqwNzRJW94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"KSZOn8Sxe3m9afURZCrhIb+SZZE="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"z/bCUx5L/4VOcp3c+GqwNzRJW94=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T12:00:00Z","end_date":"2026-05-03T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"KSZOn8Sxe3m9afURZCrhIb+SZZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"0WdS3Lfnhzu3Vrjok/HA7Mmdp3I="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"KSZOn8Sxe3m9afURZCrhIb+SZZE=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"0WdS3Lfnhzu3Vrjok/HA7Mmdp3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="},{"type":"next-occurrence","id":"wPnhfbIk8GSAkoSA/Dri1UpzPhc="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"0WdS3Lfnhzu3Vrjok/HA7Mmdp3I=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"wPnhfbIk8GSAkoSA/Dri1UpzPhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"oieBgQWj2GYSIVT0pHG7zK+NtZo="}],"description":"Bridge work on NY 481 northbound between Exit 11 - CR 57A (Schroeppel) and Exit 13 - NY 264 (Schroeppel), Wednesday April 15th, 2026 thru Friday May 8th, 2026, Sunday thru Saturday, 08:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-14T21:18:50Z"},"road_event_id":"wPnhfbIk8GSAkoSA/Dri1UpzPhc=","beginning_cross_street":"Exit 11 - CR 57A","ending_cross_street":"Exit 13 - NY 264","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.272445,43.224167]]}},{"id":"tFRL/eIxHYtpeVp+SBeVR8jGe3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4TQrfniqOVzZsuzcrGpB2wdBx48="}],"description":"Overhead sign repair on I-690 eastbound between Exit 13 - Hiawatha Boulevard (Syracuse) and Exit 14 - NY 298; Bear Street (Syracuse) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-14T22:58:33Z"},"road_event_id":"tFRL/eIxHYtpeVp+SBeVR8jGe3Q=","beginning_cross_street":"Exit 13 - Hiawatha Boulevard","ending_cross_street":"Exit 14 - NY 298; Bear Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.185505,43.059387]]}},{"id":"4TQrfniqOVzZsuzcrGpB2wdBx48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tFRL/eIxHYtpeVp+SBeVR8jGe3Q="}],"description":"Overhead sign repair on I-690 eastbound between Exit 13 - Hiawatha Boulevard (Syracuse) and Exit 14 - NY 298; Bear Street (Syracuse) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-14T22:58:33Z"},"road_event_id":"4TQrfniqOVzZsuzcrGpB2wdBx48=","beginning_cross_street":"Exit 13 - Hiawatha Boulevard","ending_cross_street":"Exit 14 - NY 298; Bear Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.185505,43.059387]]}},{"id":"ECoq3D60kItj8bVDiqYdN+Nx6fM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on NY 370 eastbound between Onondaga Lake Parkway (Salina) and Park Street; Ramp (Syracuse) ; Alternating lane closures, Monday April 20th, 2026 thru Wednesday April 22nd, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:58:42Z"},"road_event_id":"ECoq3D60kItj8bVDiqYdN+Nx6fM=","beginning_cross_street":"Onondaga Lake Parkway","ending_cross_street":"Park Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.178935,43.079417]]}},{"id":"Mo9t5oQ7auai8TzbmpdPKs3x70k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 370"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on NY 370 westbound between Park Street; Ramp (Syracuse) and Old Liverpool Road (Syracuse) ; Alternating lane closures, Monday April 20th, 2026 thru Wednesday April 22nd, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:59:30Z"},"road_event_id":"Mo9t5oQ7auai8TzbmpdPKs3x70k=","beginning_cross_street":"Park Street; Ramp","ending_cross_street":"Old Liverpool Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.172936,43.076276]]}},{"id":"UU8A8NKqs3xOiW2gSSl8VDwgegw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yx05OU7+RmT42Pb1YD1oTo/mIBo="}],"description":"Overhead sign repair on NY 695 southbound between Gerelock Road (Camillus) and NY 5 (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-14T23:59:57Z"},"road_event_id":"UU8A8NKqs3xOiW2gSSl8VDwgegw=","beginning_cross_street":"Gerelock Road","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.234469,43.07058]]}},{"id":"yx05OU7+RmT42Pb1YD1oTo/mIBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UU8A8NKqs3xOiW2gSSl8VDwgegw="},{"type":"next-occurrence","id":"4KFeHsccpgdufBexiEuvkRd6a1g="}],"description":"Overhead sign repair on NY 695 southbound between Gerelock Road (Camillus) and NY 5 (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-14T23:59:57Z"},"road_event_id":"yx05OU7+RmT42Pb1YD1oTo/mIBo=","beginning_cross_street":"Gerelock Road","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.234469,43.07058]]}},{"id":"4KFeHsccpgdufBexiEuvkRd6a1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UU8A8NKqs3xOiW2gSSl8VDwgegw="}],"description":"Overhead sign repair on NY 695 southbound between Gerelock Road (Camillus) and NY 5 (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-14T23:59:57Z"},"road_event_id":"4KFeHsccpgdufBexiEuvkRd6a1g=","beginning_cross_street":"Gerelock Road","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.234469,43.07058]]}},{"id":"xmwQwORBCD5XV2KRIEmegKbZisM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aCbzYhFENgFUEreclUgYDBzmkQ4="}],"description":"Overhead sign repair on NY 5 eastbound between Hinsdale Road (Camillus) and West Genesee Street (Geddes) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T00:07:44Z"},"road_event_id":"xmwQwORBCD5XV2KRIEmegKbZisM=","beginning_cross_street":"Hinsdale Road","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.26434,43.054726]]}},{"id":"aCbzYhFENgFUEreclUgYDBzmkQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xmwQwORBCD5XV2KRIEmegKbZisM="}],"description":"Overhead sign repair on NY 5 eastbound between Hinsdale Road (Camillus) and West Genesee Street (Geddes) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T00:07:44Z"},"road_event_id":"aCbzYhFENgFUEreclUgYDBzmkQ4=","beginning_cross_street":"Hinsdale Road","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.26434,43.054726]]}},{"id":"7hoiMtAf3BXbs/6luaxjVahrrnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"K7/uP0S3UURlFP+4Y49oSDxlclI="}],"description":"Overhead sign repair on NY 5 westbound between West Genesee Street (Geddes) and Hinsdale Road (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T00:09:53Z"},"road_event_id":"7hoiMtAf3BXbs/6luaxjVahrrnU=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Hinsdale Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223832,43.050052]]}},{"id":"K7/uP0S3UURlFP+4Y49oSDxlclI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7hoiMtAf3BXbs/6luaxjVahrrnU="}],"description":"Overhead sign repair on NY 5 westbound between West Genesee Street (Geddes) and Hinsdale Road (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T00:09:53Z"},"road_event_id":"K7/uP0S3UURlFP+4Y49oSDxlclI=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Hinsdale Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223832,43.050052]]}},{"id":"n6v4+7HjptZn9sVvg1HOANi2acU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"I8K6NDNalzmIMNa5pNVgIHN2NpY="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-04-17T10:00:11Z"},"road_event_id":"n6v4+7HjptZn9sVvg1HOANi2acU=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"I8K6NDNalzmIMNa5pNVgIHN2NpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n6v4+7HjptZn9sVvg1HOANi2acU="}],"description":"Survey work on NY 100A both directions between Stuart Way (Greenburgh) and NY 100 (Greenburgh) D265312/32477509 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, shoulder closure","update_date":"2026-04-17T10:00:11Z"},"road_event_id":"I8K6NDNalzmIMNa5pNVgIHN2NpY=","beginning_cross_street":"Stuart Way","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807766,41.039251]]}},{"id":"/uMEnjjqLY+7X1yhY3s6Q2hHW24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1JTO3US5FH+8deI4uBOSbjwxqwA="}],"description":"Guard rail repairs on NY 9A northbound between Holly Place (Hastings-on-Hudson) and Farragut Avenue (Hastings-on-Hudson) D265183/NIGHT/32590409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, lane shift","update_date":"2026-04-15T12:19:57Z"},"road_event_id":"/uMEnjjqLY+7X1yhY3s6Q2hHW24=","beginning_cross_street":"Holly Place","ending_cross_street":"Farragut Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865285,40.981007]]}},{"id":"1JTO3US5FH+8deI4uBOSbjwxqwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/uMEnjjqLY+7X1yhY3s6Q2hHW24="},{"type":"next-occurrence","id":"f7I7uL33wzUynBE6UBKUlfqPx7Y="}],"description":"Guard rail repairs on NY 9A northbound between Holly Place (Hastings-on-Hudson) and Farragut Avenue (Hastings-on-Hudson) D265183/NIGHT/32590409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, lane shift","update_date":"2026-04-15T12:19:57Z"},"road_event_id":"1JTO3US5FH+8deI4uBOSbjwxqwA=","beginning_cross_street":"Holly Place","ending_cross_street":"Farragut Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865285,40.981007]]}},{"id":"f7I7uL33wzUynBE6UBKUlfqPx7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/uMEnjjqLY+7X1yhY3s6Q2hHW24="}],"description":"Guard rail repairs on NY 9A northbound between Holly Place (Hastings-on-Hudson) and Farragut Avenue (Hastings-on-Hudson) D265183/NIGHT/32590409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, lane shift","update_date":"2026-04-15T12:19:57Z"},"road_event_id":"f7I7uL33wzUynBE6UBKUlfqPx7Y=","beginning_cross_street":"Holly Place","ending_cross_street":"Farragut Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865285,40.981007]]}},{"id":"rRZHEPK7zNlDfwydkf++33MS764=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yKdbdxf1PaxGEfSoX9AVCgnmd7U="}],"description":"Repaving on I-90 both directions Exit 1N; I-87 Adirondack Northway (Albany) to Exit 4; NY 85 (Albany), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 08:00 PM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 08:00 PM thru 06:00 AM 2 Left lanes of 3 lanes closed westbound","update_date":"2026-04-15T12:27:08Z"},"road_event_id":"rRZHEPK7zNlDfwydkf++33MS764=","beginning_cross_street":"Exit 1N; I-87 Adirondack Northway","ending_cross_street":"Exit 4; NY 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842588,42.696764]]}},{"id":"yKdbdxf1PaxGEfSoX9AVCgnmd7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-90"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rRZHEPK7zNlDfwydkf++33MS764="}],"description":"Repaving on I-90 both directions Exit 1N; I-87 Adirondack Northway (Albany) to Exit 4; NY 85 (Albany), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 08:00 PM thru 06:00 AM 2 Left lanes of 3 lanes closed eastbound, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 08:00 PM thru 06:00 AM 2 Left lanes of 3 lanes closed westbound","update_date":"2026-04-15T12:27:08Z"},"road_event_id":"yKdbdxf1PaxGEfSoX9AVCgnmd7U=","beginning_cross_street":"Exit 1N; I-87 Adirondack Northway","ending_cross_street":"Exit 4; NY 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842588,42.696764]]}},{"id":"vB+SV74RFtHfhmtiFLWwqGK1/MA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 436 both directions between Town of Nunda and Town of Ossian Line (Nunda) and RILEY LN (Nunda) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Wednesday April 22nd, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T12:57:17Z"},"road_event_id":"vB+SV74RFtHfhmtiFLWwqGK1/MA=","beginning_cross_street":"Town of Nunda and Town of Ossian Line","ending_cross_street":"RILEY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.865427,42.56364]]}},{"id":"OkqlDrzjvJABUBhVZ3rn4JFHt3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mXjhpASePHtJLIx2cJG4PDgAnh4="}],"description":"Gas main repairs on NY 52 both directions between White Street (Fishkill) and Blodgett Road (Fishkill) 2026084636715/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Wednesday April 22nd, 2026 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic, Friday April 24th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:30:14Z"},"road_event_id":"OkqlDrzjvJABUBhVZ3rn4JFHt3k=","beginning_cross_street":"White Street","ending_cross_street":"Blodgett Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910606,41.529106]]}},{"id":"mXjhpASePHtJLIx2cJG4PDgAnh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkqlDrzjvJABUBhVZ3rn4JFHt3k="},{"type":"next-occurrence","id":"ZbbGbbJEja8TBXfhMRBq9Ow/OoY="}],"description":"Gas main repairs on NY 52 both directions between White Street (Fishkill) and Blodgett Road (Fishkill) 2026084636715/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Wednesday April 22nd, 2026 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic, Friday April 24th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:30:14Z"},"road_event_id":"mXjhpASePHtJLIx2cJG4PDgAnh4=","beginning_cross_street":"White Street","ending_cross_street":"Blodgett Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910606,41.529106]]}},{"id":"ZbbGbbJEja8TBXfhMRBq9Ow/OoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkqlDrzjvJABUBhVZ3rn4JFHt3k="}],"description":"Gas main repairs on NY 52 both directions between White Street (Fishkill) and Blodgett Road (Fishkill) 2026084636715/32727809 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Wednesday April 22nd, 2026 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, alternating traffic, Friday April 24th, 2026, 09:00 AM thru 04:00 PM, alternating traffic, Monday April 27th, 2026, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T10:30:14Z"},"road_event_id":"ZbbGbbJEja8TBXfhMRBq9Ow/OoY=","beginning_cross_street":"White Street","ending_cross_street":"Blodgett Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910606,41.529106]]}},{"id":"OfBVpN/XVfEdtXn8RfL6qAm6VNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound near CR 646/Warren St (Phillipsburg), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-15T14:57:31Z"},"road_event_id":"OfBVpN/XVfEdtXn8RfL6qAm6VNU=","beginning_cross_street":"CR 646/Warren St","ending_cross_street":"East of CR 646/Warren St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.187088,40.696144]]}},{"id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ae0acrf7dIuz45OeipBMPSkUf2g="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"ae0acrf7dIuz45OeipBMPSkUf2g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q="},{"type":"next-occurrence","id":"r8NlAciXR0azlPdbUFsAB3EXidM="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"ae0acrf7dIuz45OeipBMPSkUf2g=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"r8NlAciXR0azlPdbUFsAB3EXidM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q="},{"type":"next-occurrence","id":"+0JGz9mkTvVEIYyfzbjVwvPe2us="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"r8NlAciXR0azlPdbUFsAB3EXidM=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"+0JGz9mkTvVEIYyfzbjVwvPe2us=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q="},{"type":"next-occurrence","id":"laRrhsUfwcR8e0SPDzCP8s+Q1hg="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"+0JGz9mkTvVEIYyfzbjVwvPe2us=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"laRrhsUfwcR8e0SPDzCP8s+Q1hg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q="},{"type":"next-occurrence","id":"EXyYZrFuILRdlH55zCttqKffM0Y="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"laRrhsUfwcR8e0SPDzCP8s+Q1hg=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"EXyYZrFuILRdlH55zCttqKffM0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q="},{"type":"next-occurrence","id":"UmmclWeb3T9H7kFmUqn2B5WXm5A="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"EXyYZrFuILRdlH55zCttqKffM0Y=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"UmmclWeb3T9H7kFmUqn2B5WXm5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q="},{"type":"next-occurrence","id":"d5T9dXEVybyULSnkZ1FaYugPCRc="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"UmmclWeb3T9H7kFmUqn2B5WXm5A=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"d5T9dXEVybyULSnkZ1FaYugPCRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Xx1omUF5Uj4lc+XAk0IhVm7/Y1Q="}],"description":"Utility work on US 20 both directions between Wadsworth Avenue; NY 39 (Avon) and West Henrietta Road; NY 15; Lakeville Road (Avon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T12:09:19Z"},"road_event_id":"d5T9dXEVybyULSnkZ1FaYugPCRc=","beginning_cross_street":"Wadsworth Avenue; NY 39","ending_cross_street":"West Henrietta Road; NY 15; Lakeville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.747988,42.913122]]}},{"id":"dhYuz85jKSAV0mdzEVybU27MqfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ib4oQnDX662IV5NOyo+lk+/Qews="}],"description":"Roadwork on US 20 both directions between MOLASSES HILL RD (Alexander) and Alexander Road; NY 98; Main Street (Alexander) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T15:20:07Z"},"road_event_id":"dhYuz85jKSAV0mdzEVybU27MqfA=","beginning_cross_street":"MOLASSES HILL RD","ending_cross_street":"Alexander Road; NY 98; Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.192297,42.901543]]}},{"id":"ib4oQnDX662IV5NOyo+lk+/Qews=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dhYuz85jKSAV0mdzEVybU27MqfA="},{"type":"next-occurrence","id":"r1TQSN/GQd3Gdb80vzGEmK8jQnU="}],"description":"Roadwork on US 20 both directions between MOLASSES HILL RD (Alexander) and Alexander Road; NY 98; Main Street (Alexander) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T15:20:07Z"},"road_event_id":"ib4oQnDX662IV5NOyo+lk+/Qews=","beginning_cross_street":"MOLASSES HILL RD","ending_cross_street":"Alexander Road; NY 98; Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.192297,42.901543]]}},{"id":"r1TQSN/GQd3Gdb80vzGEmK8jQnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dhYuz85jKSAV0mdzEVybU27MqfA="}],"description":"Roadwork on US 20 both directions between MOLASSES HILL RD (Alexander) and Alexander Road; NY 98; Main Street (Alexander) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T15:20:07Z"},"road_event_id":"r1TQSN/GQd3Gdb80vzGEmK8jQnU=","beginning_cross_street":"MOLASSES HILL RD","ending_cross_street":"Alexander Road; NY 98; Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.192297,42.901543]]}},{"id":"7X5MhJ2+njnHAuWZTrEXhwaUxRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fCYCGZ1q84mGPL5QMv1LjvCtbRk="}],"description":"Utility work on NY 77 both directions area of Cohocton Rd (Pembroke) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T15:46:18Z"},"road_event_id":"7X5MhJ2+njnHAuWZTrEXhwaUxRY=","beginning_cross_street":"Cohocton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.978075]]}},{"id":"fCYCGZ1q84mGPL5QMv1LjvCtbRk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7X5MhJ2+njnHAuWZTrEXhwaUxRY="},{"type":"next-occurrence","id":"yyqS3ZyxYiig8T3gfs9Gu3edg3w="}],"description":"Utility work on NY 77 both directions area of Cohocton Rd (Pembroke) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T15:46:18Z"},"road_event_id":"fCYCGZ1q84mGPL5QMv1LjvCtbRk=","beginning_cross_street":"Cohocton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.978075]]}},{"id":"yyqS3ZyxYiig8T3gfs9Gu3edg3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7X5MhJ2+njnHAuWZTrEXhwaUxRY="}],"description":"Utility work on NY 77 both directions area of Cohocton Rd (Pembroke) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T15:46:18Z"},"road_event_id":"yyqS3ZyxYiig8T3gfs9Gu3edg3w=","beginning_cross_street":"Cohocton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.978075]]}},{"id":"hv2UZeINhFmC49Jy5JNZcCymuao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near South of Dowd Av (Elizabeth), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right shoulder closed local lane","update_date":"2026-04-15T15:48:21Z"},"road_event_id":"hv2UZeINhFmC49Jy5JNZcCymuao=","beginning_cross_street":"South of Dowd Av","ending_cross_street":"Dowd Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.195213,40.678928]]}},{"id":"ISCTBz6WS0ZnggVkPuZGIbioMnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound at CR 624/North Ave (Elizabeth) Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, ramp, right partial lane local lane","update_date":"2026-04-15T15:48:20Z"},"road_event_id":"ISCTBz6WS0ZnggVkPuZGIbioMnw=","beginning_cross_street":"CR 624/North Ave","ending_cross_street":"CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19783,40.676666]]}},{"id":"aCStflGf3heIO1paG370cCaaYvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near North of CR 624/North Ave (Elizabeth), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed express lane","update_date":"2026-04-15T15:48:18Z"},"road_event_id":"aCStflGf3heIO1paG370cCaaYvY=","beginning_cross_street":"North of CR 624/North Ave","ending_cross_street":"South of Dowd Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.196426,40.677951]]}},{"id":"dGkY8TTsYZCCXb/ymylj+4PpLpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Allendale Av (Saddle River) Thursday April 30, 2026 11:00 PM thru Friday May 1, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:54:19Z"},"road_event_id":"dGkY8TTsYZCCXb/ymylj+4PpLpo=","beginning_cross_street":"South of Allendale Av","ending_cross_street":"South of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111015,41.031002]]}},{"id":"kZMh9pWzpT1TWAxtEUEqFeuvthA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-15T15:54:23Z"},"road_event_id":"kZMh9pWzpT1TWAxtEUEqFeuvthA=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"rZ/6la3AnRPlffMHx0etvwaAJxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at Allendale Av (Saddle River) Thursday April 30, 2026 11:00 PM thru Friday May 1, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:54:22Z"},"road_event_id":"rZ/6la3AnRPlffMHx0etvwaAJxc=","beginning_cross_street":"Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"hGSu6cNoKgLocWUyKGe5MGt8+kA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Allendale Av (Saddle River) Monday April 27, 2026 11:00 PM thru Tuesday April 28, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:54:21Z"},"road_event_id":"hGSu6cNoKgLocWUyKGe5MGt8+kA=","beginning_cross_street":"South of Allendale Av","ending_cross_street":"South of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111015,41.031002]]}},{"id":"ynTif87EaWGUYmBfmb+YdBqW0bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Allendale Av (Saddle River) Tuesday April 28, 2026 11:00 PM thru Wednesday April 29, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:54:25Z"},"road_event_id":"ynTif87EaWGUYmBfmb+YdBqW0bs=","beginning_cross_street":"South of Allendale Av","ending_cross_street":"South of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111015,41.031002]]}},{"id":"kHdVDq2mb5M2f0TZskTNZYGxIn0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Allendale Av (Saddle River) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:54:27Z"},"road_event_id":"kHdVDq2mb5M2f0TZskTNZYGxIn0=","beginning_cross_street":"South of Allendale Av","ending_cross_street":"South of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111015,41.031002]]}},{"id":"JVj4gV2+HQNXwl1iZGAi2ZhjSnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-15T15:55:30Z"},"road_event_id":"JVj4gV2+HQNXwl1iZGAi2ZhjSnU=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"tibQ26lIo8/W842aWEE4DieFf5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at Allendale Av (Saddle River) Monday April 27, 2026 11:00 PM thru Tuesday April 28, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:55:27Z"},"road_event_id":"tibQ26lIo8/W842aWEE4DieFf5c=","beginning_cross_street":"Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"4qLgjF6EYUenAfN6fzJeNVKucIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-04-15T15:55:33Z"},"road_event_id":"4qLgjF6EYUenAfN6fzJeNVKucIw=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"415Ez2qtUWqZmm+x1Wprr5az5yU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at Allendale Av (Saddle River) Tuesday April 28, 2026 11:00 PM thru Wednesday April 29, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:55:31Z"},"road_event_id":"415Ez2qtUWqZmm+x1Wprr5az5yU=","beginning_cross_street":"Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"xGf/5xqvsRoo4OcppSCKl7Q1nJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at Allendale Av (Saddle River) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:55:36Z"},"road_event_id":"xGf/5xqvsRoo4OcppSCKl7Q1nJk=","beginning_cross_street":"Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"zNH7vX5K8B5f5GtrjPqnYg0qtDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at Allendale Av (Saddle River) Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:55:13Z"},"road_event_id":"zNH7vX5K8B5f5GtrjPqnYg0qtDE=","beginning_cross_street":"Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"LBkZyq+SrMSgjpPnaMPaTWHSlWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Friday April 24, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-15T15:55:14Z"},"road_event_id":"LBkZyq+SrMSgjpPnaMPaTWHSlWM=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070823,40.82209]]}},{"id":"ExVvACVMXfT1iXlwV+SZPk0+Q/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Allendale Av (Saddle River) Wednesday April 29, 2026 11:00 PM thru Thursday April 30, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:55:01Z"},"road_event_id":"ExVvACVMXfT1iXlwV+SZPk0+Q/k=","beginning_cross_street":"South of Allendale Av","ending_cross_street":"South of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111015,41.031002]]}},{"id":"iE3QGQXsIJD0pLI1Kk6CBENvsCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Allendale Av (Saddle River) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:54:56Z"},"road_event_id":"iE3QGQXsIJD0pLI1Kk6CBENvsCk=","beginning_cross_street":"South of Allendale Av","ending_cross_street":"South of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111015,41.031002]]}},{"id":"xeTVZM/1xOMUIf8xaiydvmLjIMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-04-15T15:54:55Z"},"road_event_id":"xeTVZM/1xOMUIf8xaiydvmLjIMg=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"dDvOBfbyxTG5aXjBe1eOiqy0fHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Thursday April 23, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-15T15:54:52Z"},"road_event_id":"dDvOBfbyxTG5aXjBe1eOiqy0fHM=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070823,40.82209]]}},{"id":"JNM/3JOKyfCTrDAmQU0+1GgPfEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Allendale Av (Saddle River) Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:55:16Z"},"road_event_id":"JNM/3JOKyfCTrDAmQU0+1GgPfEc=","beginning_cross_street":"South of Allendale Av","ending_cross_street":"South of Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111015,41.031002]]}},{"id":"ny7HYV4RF0EQyX3EXt9SR1f1gzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at Allendale Av (Saddle River) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:54:43Z"},"road_event_id":"ny7HYV4RF0EQyX3EXt9SR1f1gzQ=","beginning_cross_street":"Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"Lgbom7yzhXOyymGbr5f5gCyq+R0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-15T15:54:47Z"},"road_event_id":"Lgbom7yzhXOyymGbr5f5gCyq+R0=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"7UzgTHo/ADmndL2j78xgoerZsls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between North of CR 601/Avalon Blvd (Middle Twp) and North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Wednesday April 22, 2026 07:00 PM thru Thursday April 23, 2026 07:00 AM, right shoulder closed","update_date":"2026-04-15T15:54:39Z"},"road_event_id":"7UzgTHo/ADmndL2j78xgoerZsls=","beginning_cross_street":"North of CR 601/Avalon Blvd","ending_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774444,39.134864]]}},{"id":"JHFKtNiftQLtWTDV7/1NjgWNmEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 06:00 AM)","update_date":"2026-04-15T15:54:37Z"},"road_event_id":"JHFKtNiftQLtWTDV7/1NjgWNmEY=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"VfRthGAhSYEpcRepKhpM9YP9c3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-15T15:54:36Z"},"road_event_id":"VfRthGAhSYEpcRepKhpM9YP9c3Q=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"7O+T6ETrRTtI8xc6FYSMi2UtT98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-15T15:55:50Z"},"road_event_id":"7O+T6ETrRTtI8xc6FYSMi2UtT98=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"5xGpl4tQIRLXauAyl+ImjkE0GC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between North of CR 601/Avalon Blvd (Middle Twp) and North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Thursday April 23, 2026 07:00 PM thru Friday April 24, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-15T15:55:51Z"},"road_event_id":"5xGpl4tQIRLXauAyl+ImjkE0GC8=","beginning_cross_street":"North of CR 601/Avalon Blvd","ending_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.774444,39.134864]]}},{"id":"+ahQpZmU3ehauPe3GryFcm1eCr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at Allendale Av (Saddle River) Wednesday April 29, 2026 11:00 PM thru Thursday April 30, 2026 05:00 AM, ramp","update_date":"2026-04-15T15:55:55Z"},"road_event_id":"+ahQpZmU3ehauPe3GryFcm1eCr0=","beginning_cross_street":"Allendale Av","ending_cross_street":"Allendale Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.111289,41.03247]]}},{"id":"EK5lR00Tb+RJ7S/URCxCj+OJ9J4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h/eIJCoNMwjdskdykFMJ6/kP6Mk="}],"description":"Utility work on NY 385 southbound between Mansion St (Coxsackie) and Freleigh Pl (Coxsackie), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-15T15:59:47Z"},"road_event_id":"EK5lR00Tb+RJ7S/URCxCj+OJ9J4=","beginning_cross_street":"Mansion St","ending_cross_street":"Freleigh Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.804748,42.353516]]}},{"id":"h/eIJCoNMwjdskdykFMJ6/kP6Mk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EK5lR00Tb+RJ7S/URCxCj+OJ9J4="}],"description":"Utility work on NY 385 southbound between Mansion St (Coxsackie) and Freleigh Pl (Coxsackie), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-15T15:59:47Z"},"road_event_id":"h/eIJCoNMwjdskdykFMJ6/kP6Mk=","beginning_cross_street":"Mansion St","ending_cross_street":"Freleigh Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.804748,42.353516]]}},{"id":"fVpuV/kvTTrO58MYYrCS5aP2ONk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fT/Ti86BKpjJ6cKfqFxd6/Xt+yI="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"fVpuV/kvTTrO58MYYrCS5aP2ONk=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"fT/Ti86BKpjJ6cKfqFxd6/Xt+yI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fVpuV/kvTTrO58MYYrCS5aP2ONk="},{"type":"next-occurrence","id":"K09sPwjBCC8TfxdfswrvBanSq44="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"fT/Ti86BKpjJ6cKfqFxd6/Xt+yI=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"K09sPwjBCC8TfxdfswrvBanSq44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fVpuV/kvTTrO58MYYrCS5aP2ONk="},{"type":"next-occurrence","id":"Jnm/1wQGZNFV+Qs+L2Cjq1yNXVQ="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"K09sPwjBCC8TfxdfswrvBanSq44=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"Jnm/1wQGZNFV+Qs+L2Cjq1yNXVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fVpuV/kvTTrO58MYYrCS5aP2ONk="},{"type":"next-occurrence","id":"JVq8HYZKiBNjPRHMuPQ29w4vBa0="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"Jnm/1wQGZNFV+Qs+L2Cjq1yNXVQ=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"JVq8HYZKiBNjPRHMuPQ29w4vBa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fVpuV/kvTTrO58MYYrCS5aP2ONk="},{"type":"next-occurrence","id":"jVmcYBE8zWviyBJK0/hCpvg8K/U="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"JVq8HYZKiBNjPRHMuPQ29w4vBa0=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"jVmcYBE8zWviyBJK0/hCpvg8K/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fVpuV/kvTTrO58MYYrCS5aP2ONk="},{"type":"next-occurrence","id":"GtDkkVH1aQi4Ov42s8tUcyUxc2o="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"jVmcYBE8zWviyBJK0/hCpvg8K/U=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"GtDkkVH1aQi4Ov42s8tUcyUxc2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fVpuV/kvTTrO58MYYrCS5aP2ONk="},{"type":"next-occurrence","id":"noX5OpvFybTZFQk7SvACMjOEkaQ="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"GtDkkVH1aQi4Ov42s8tUcyUxc2o=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"noX5OpvFybTZFQk7SvACMjOEkaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fVpuV/kvTTrO58MYYrCS5aP2ONk="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:22:48Z"},"road_event_id":"noX5OpvFybTZFQk7SvACMjOEkaQ=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235836,43.060489]]}},{"id":"HwatlfQjVGN9QMXM8R60/H2WgWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NVahkeyZxSiQn3e0bgCdi7WjunM="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"HwatlfQjVGN9QMXM8R60/H2WgWM=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"NVahkeyZxSiQn3e0bgCdi7WjunM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HwatlfQjVGN9QMXM8R60/H2WgWM="},{"type":"next-occurrence","id":"apnLhhmN1x44N7M3Ey9Lro3C4dY="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"NVahkeyZxSiQn3e0bgCdi7WjunM=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"apnLhhmN1x44N7M3Ey9Lro3C4dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HwatlfQjVGN9QMXM8R60/H2WgWM="},{"type":"next-occurrence","id":"A+inhwoV8nBMfxP3jX0CBcY8dx4="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"apnLhhmN1x44N7M3Ey9Lro3C4dY=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"A+inhwoV8nBMfxP3jX0CBcY8dx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HwatlfQjVGN9QMXM8R60/H2WgWM="},{"type":"next-occurrence","id":"uu1B0ADuiQRNBwJl170xwlr7wF8="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"A+inhwoV8nBMfxP3jX0CBcY8dx4=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"uu1B0ADuiQRNBwJl170xwlr7wF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HwatlfQjVGN9QMXM8R60/H2WgWM="},{"type":"next-occurrence","id":"LSAcbI5ilVxy50VsbcsNAhwHoZ0="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"uu1B0ADuiQRNBwJl170xwlr7wF8=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"LSAcbI5ilVxy50VsbcsNAhwHoZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HwatlfQjVGN9QMXM8R60/H2WgWM="},{"type":"next-occurrence","id":"dVOpCXVthyGrObtzuKQ8RG38Rgs="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"LSAcbI5ilVxy50VsbcsNAhwHoZ0=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"dVOpCXVthyGrObtzuKQ8RG38Rgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HwatlfQjVGN9QMXM8R60/H2WgWM="},{"type":"next-occurrence","id":"6bc/WLpZ0CNPphdqUDE7MePqkvY="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"dVOpCXVthyGrObtzuKQ8RG38Rgs=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"6bc/WLpZ0CNPphdqUDE7MePqkvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HwatlfQjVGN9QMXM8R60/H2WgWM="}],"description":"Rock blasting on NY 695 southbound between I-690 (Geddes) and NY 5 (Camillus) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:25:26Z"},"road_event_id":"6bc/WLpZ0CNPphdqUDE7MePqkvY=","beginning_cross_street":"I-690 ","ending_cross_street":"NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.227877,43.077022]]}},{"id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ncRHWjQPp/1AK/rdjNbjrCiqfc0="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"ncRHWjQPp/1AK/rdjNbjrCiqfc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc="},{"type":"next-occurrence","id":"md6R7v93qj7dKKeikKp04A3I9pw="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"ncRHWjQPp/1AK/rdjNbjrCiqfc0=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"md6R7v93qj7dKKeikKp04A3I9pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc="},{"type":"next-occurrence","id":"tbyCnieMkJt/GLUoH/2ZodSf9Qg="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"md6R7v93qj7dKKeikKp04A3I9pw=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"tbyCnieMkJt/GLUoH/2ZodSf9Qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc="},{"type":"next-occurrence","id":"UvFl8BFDcqw2SUh0Jdv16MCzPOU="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"tbyCnieMkJt/GLUoH/2ZodSf9Qg=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"UvFl8BFDcqw2SUh0Jdv16MCzPOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc="},{"type":"next-occurrence","id":"s3M+NSK3s+HvFIoG/CPJ4O0f1/c="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"UvFl8BFDcqw2SUh0Jdv16MCzPOU=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"s3M+NSK3s+HvFIoG/CPJ4O0f1/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc="},{"type":"next-occurrence","id":"OsR2IX1HgFXUbTob/bZINOum6pI="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"s3M+NSK3s+HvFIoG/CPJ4O0f1/c=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"OsR2IX1HgFXUbTob/bZINOum6pI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc="},{"type":"next-occurrence","id":"eB+0kYiEXRF/pfHsg4oY/bZp7zY="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"OsR2IX1HgFXUbTob/bZINOum6pI=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"eB+0kYiEXRF/pfHsg4oY/bZp7zY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iRiFRDpGxUu8pDvL2l2mJ08E1Wc="}],"description":"Roadwork on NY 695 northbound between NY 5 (Camillus) and I-690 (Geddes) ; Alternating lane closures, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T16:39:50Z"},"road_event_id":"eB+0kYiEXRF/pfHsg4oY/bZp7zY=","beginning_cross_street":"NY 5","ending_cross_street":"I-690","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.235842,43.060452]]}},{"id":"GziMiLvpY7D0/lBYn54tQ/WAJb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SlSSVYuHZHcPjtLaE9WNTSXOoX4="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"GziMiLvpY7D0/lBYn54tQ/WAJb4=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"SlSSVYuHZHcPjtLaE9WNTSXOoX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"JbHr5L3dpw+qVS2DZQgOncxnwHA="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"SlSSVYuHZHcPjtLaE9WNTSXOoX4=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"JbHr5L3dpw+qVS2DZQgOncxnwHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"YneAAixCIscPiJWE1h8cPwlYoa0="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"JbHr5L3dpw+qVS2DZQgOncxnwHA=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"YneAAixCIscPiJWE1h8cPwlYoa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"kuNgPnF+4owfLv7VKdydUgz0EJk="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"YneAAixCIscPiJWE1h8cPwlYoa0=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"kuNgPnF+4owfLv7VKdydUgz0EJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"3uqmQpCEIyklan36yhdnoGp+eqs="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"kuNgPnF+4owfLv7VKdydUgz0EJk=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"3uqmQpCEIyklan36yhdnoGp+eqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"xUoxTIMyTqNZGiK4nrLPomHvf+4="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"3uqmQpCEIyklan36yhdnoGp+eqs=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"xUoxTIMyTqNZGiK4nrLPomHvf+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"rM9oBT2s9fETz/F/xsQLhii5cHU="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"xUoxTIMyTqNZGiK4nrLPomHvf+4=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"rM9oBT2s9fETz/F/xsQLhii5cHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"sp0rkiWjIO/GFwZymVzor3KCGVY="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"rM9oBT2s9fETz/F/xsQLhii5cHU=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"sp0rkiWjIO/GFwZymVzor3KCGVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"rpoPsrkSHHIjIrria2MZwXWya78="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"sp0rkiWjIO/GFwZymVzor3KCGVY=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"rpoPsrkSHHIjIrria2MZwXWya78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="},{"type":"next-occurrence","id":"4j4nQruXuxIO5tn43L3sCrPYOlU="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"rpoPsrkSHHIjIrria2MZwXWya78=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"4j4nQruXuxIO5tn43L3sCrPYOlU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GziMiLvpY7D0/lBYn54tQ/WAJb4="}],"description":"Roadwork on NY 104 both directions between Cayuga-Oswego County Line (Hannibal) and Blythe Road (Hannibal) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Wednesday May 20th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-15T16:45:12Z"},"road_event_id":"4j4nQruXuxIO5tn43L3sCrPYOlU=","beginning_cross_street":"Cayuga-Oswego County Line","ending_cross_street":"Blythe Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.607466,43.29693]]}},{"id":"ERE9DQlXRTaetebtMtK+IT0wP3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9G"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 9G both directions between E Dorsey Lane (Hyde Park) and Creek Road (Hyde Park) 2025082502725/32701709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Wednesday April 22nd, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-15T17:03:20Z"},"road_event_id":"ERE9DQlXRTaetebtMtK+IT0wP3s=","beginning_cross_street":"E Dorsey Lane","ending_cross_street":"Creek Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911618,41.745535]]}},{"id":"dtpES/ST2VSOrae2acZn+TyXmxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3pOVUM4tmmrOJkVruhNnLHUpjYE="}],"description":"Utility work on NY 94 both directions between North Main Street - NY 17A (Goshen) and Durland Road (Goshen) 2024081975849/32464109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Friday April 24th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-15T17:29:06Z"},"road_event_id":"dtpES/ST2VSOrae2acZn+TyXmxA=","beginning_cross_street":"North Main Street - NY 17A","ending_cross_street":"Durland Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.357715,41.338123]]}},{"id":"3pOVUM4tmmrOJkVruhNnLHUpjYE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtpES/ST2VSOrae2acZn+TyXmxA="},{"type":"next-occurrence","id":"ARAt8ZkOErBwSEWc91f3OZqcPvg="}],"description":"Utility work on NY 94 both directions between North Main Street - NY 17A (Goshen) and Durland Road (Goshen) 2024081975849/32464109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Friday April 24th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-15T17:29:06Z"},"road_event_id":"3pOVUM4tmmrOJkVruhNnLHUpjYE=","beginning_cross_street":"North Main Street - NY 17A","ending_cross_street":"Durland Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.357715,41.338123]]}},{"id":"ARAt8ZkOErBwSEWc91f3OZqcPvg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtpES/ST2VSOrae2acZn+TyXmxA="},{"type":"next-occurrence","id":"kkRNWTL6UFq4vqmBQJkF+fj/Yms="}],"description":"Utility work on NY 94 both directions between North Main Street - NY 17A (Goshen) and Durland Road (Goshen) 2024081975849/32464109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Friday April 24th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-15T17:29:06Z"},"road_event_id":"ARAt8ZkOErBwSEWc91f3OZqcPvg=","beginning_cross_street":"North Main Street - NY 17A","ending_cross_street":"Durland Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.357715,41.338123]]}},{"id":"kkRNWTL6UFq4vqmBQJkF+fj/Yms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtpES/ST2VSOrae2acZn+TyXmxA="},{"type":"next-occurrence","id":"XLtQzbPGp6W9m56z/+nqNTeJFgU="}],"description":"Utility work on NY 94 both directions between North Main Street - NY 17A (Goshen) and Durland Road (Goshen) 2024081975849/32464109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Friday April 24th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-15T17:29:06Z"},"road_event_id":"kkRNWTL6UFq4vqmBQJkF+fj/Yms=","beginning_cross_street":"North Main Street - NY 17A","ending_cross_street":"Durland Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.357715,41.338123]]}},{"id":"XLtQzbPGp6W9m56z/+nqNTeJFgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dtpES/ST2VSOrae2acZn+TyXmxA="}],"description":"Utility work on NY 94 both directions between North Main Street - NY 17A (Goshen) and Durland Road (Goshen) 2024081975849/32464109 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Friday April 24th, 2026 Wednesday/ Thursday/ Friday, 09:30 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-15T17:29:06Z"},"road_event_id":"XLtQzbPGp6W9m56z/+nqNTeJFgU=","beginning_cross_street":"North Main Street - NY 17A","ending_cross_street":"Durland Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.357715,41.338123]]}},{"id":"BxIJhlbBuHV3lLIQMriGCitJdB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fNpcTizB4x/Ww2nsGCC4RVtQISU="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"BxIJhlbBuHV3lLIQMriGCitJdB0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"fNpcTizB4x/Ww2nsGCC4RVtQISU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BxIJhlbBuHV3lLIQMriGCitJdB0="},{"type":"next-occurrence","id":"R6OKKuPR49R1k4Kp750BWwhLeEk="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"fNpcTizB4x/Ww2nsGCC4RVtQISU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"R6OKKuPR49R1k4Kp750BWwhLeEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BxIJhlbBuHV3lLIQMriGCitJdB0="},{"type":"next-occurrence","id":"OsQTy0D3PPNsWoFzoP4hNCF3Zuk="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"R6OKKuPR49R1k4Kp750BWwhLeEk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"OsQTy0D3PPNsWoFzoP4hNCF3Zuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BxIJhlbBuHV3lLIQMriGCitJdB0="},{"type":"next-occurrence","id":"JI1cwxqtgi0pA3FBKu2Egwx51yE="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"OsQTy0D3PPNsWoFzoP4hNCF3Zuk=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"JI1cwxqtgi0pA3FBKu2Egwx51yE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BxIJhlbBuHV3lLIQMriGCitJdB0="},{"type":"next-occurrence","id":"Aq6e900AxxbDnoxTCJMOLhtNQ8o="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"JI1cwxqtgi0pA3FBKu2Egwx51yE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"Aq6e900AxxbDnoxTCJMOLhtNQ8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BxIJhlbBuHV3lLIQMriGCitJdB0="},{"type":"next-occurrence","id":"kOxNTFsee0V0PS/pFJK9LfhodJ0="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"Aq6e900AxxbDnoxTCJMOLhtNQ8o=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"kOxNTFsee0V0PS/pFJK9LfhodJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BxIJhlbBuHV3lLIQMriGCitJdB0="},{"type":"next-occurrence","id":"FY2qTgorqoLTF5mCceZ4ZGPiGNU="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"kOxNTFsee0V0PS/pFJK9LfhodJ0=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"FY2qTgorqoLTF5mCceZ4ZGPiGNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BxIJhlbBuHV3lLIQMriGCitJdB0="}],"description":"Construction on NY 35/US 202 eastbound at Croton Avenue (Cortlandt) 2025083410106/32728009 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-15T17:38:30Z"},"road_event_id":"FY2qTgorqoLTF5mCceZ4ZGPiGNU=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.868295,41.292889]]}},{"id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1YJhofemvkqJkkLn1GyeYd7FKts="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"1YJhofemvkqJkkLn1GyeYd7FKts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"GDgKedRH0IPgWW8+9c7MNuTwkJ0="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"1YJhofemvkqJkkLn1GyeYd7FKts=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"GDgKedRH0IPgWW8+9c7MNuTwkJ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"zNTQtTedZTAB0enq5knZdR4vKnc="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"GDgKedRH0IPgWW8+9c7MNuTwkJ0=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"zNTQtTedZTAB0enq5knZdR4vKnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"5F/1lakK5v//+Jw/z7CLfo9/D5A="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"zNTQtTedZTAB0enq5knZdR4vKnc=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"5F/1lakK5v//+Jw/z7CLfo9/D5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"XA3rgChznbNTo4P5sLFxMEn3xOk="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"5F/1lakK5v//+Jw/z7CLfo9/D5A=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"XA3rgChznbNTo4P5sLFxMEn3xOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"2m3CfFQC5zWbhK3ZtswJK33FBGo="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"XA3rgChznbNTo4P5sLFxMEn3xOk=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"2m3CfFQC5zWbhK3ZtswJK33FBGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"fBN1fodGQj3OyyuSFctq4W0aBm0="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"2m3CfFQC5zWbhK3ZtswJK33FBGo=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"fBN1fodGQj3OyyuSFctq4W0aBm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"cD06aDN34Un9cmN2p2BYKdSphQs="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"fBN1fodGQj3OyyuSFctq4W0aBm0=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"cD06aDN34Un9cmN2p2BYKdSphQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"To80BAt1budBqbABcAgpRAc1MbM="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"cD06aDN34Un9cmN2p2BYKdSphQs=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"To80BAt1budBqbABcAgpRAc1MbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="},{"type":"next-occurrence","id":"drboQL7qCQqPVxGJQ9BEatPrCE8="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"To80BAt1budBqbABcAgpRAc1MbM=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"drboQL7qCQqPVxGJQ9BEatPrCE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WJS/Uyr2w9RQ8Fk6MsA2zaCnWs8="}],"description":"Utility work on NY 15 both directions between Erie Station Road; Thruway Park Drive; CR 71 (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:48:02Z"},"road_event_id":"drboQL7qCQqPVxGJQ9BEatPrCE8=","beginning_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","ending_cross_street":"Erie Station Road; Thruway Park Drive; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.662046,43.040233]]}},{"id":"alkeQu+C8I6Z47WYsZHLYfu/x2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yZntV0Y9Ts+YHTHUV6wVbiSrtyc="}],"description":"Utility work on NY 21 both directions between Walton Point Dr. (South Bristol) and Pine Bank Drive (South Bristol) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:53:10Z"},"road_event_id":"alkeQu+C8I6Z47WYsZHLYfu/x2E=","beginning_cross_street":"Walton Point Dr.","ending_cross_street":"Pine Bank Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365252,42.682987]]}},{"id":"yZntV0Y9Ts+YHTHUV6wVbiSrtyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alkeQu+C8I6Z47WYsZHLYfu/x2E="},{"type":"next-occurrence","id":"lXBP/VzCEEsoDFPbegO+ThMjTa0="}],"description":"Utility work on NY 21 both directions between Walton Point Dr. (South Bristol) and Pine Bank Drive (South Bristol) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:53:10Z"},"road_event_id":"yZntV0Y9Ts+YHTHUV6wVbiSrtyc=","beginning_cross_street":"Walton Point Dr.","ending_cross_street":"Pine Bank Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365252,42.682987]]}},{"id":"lXBP/VzCEEsoDFPbegO+ThMjTa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"alkeQu+C8I6Z47WYsZHLYfu/x2E="}],"description":"Utility work on NY 21 both directions between Walton Point Dr. (South Bristol) and Pine Bank Drive (South Bristol) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-15T17:53:10Z"},"road_event_id":"lXBP/VzCEEsoDFPbegO+ThMjTa0=","beginning_cross_street":"Walton Point Dr.","ending_cross_street":"Pine Bank Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365252,42.682987]]}},{"id":"1b12RXBCmc4YBD6u4PLWpawtR5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of CR 546/Franklin Corner Rd (Lawrence Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-15T18:15:29Z"},"road_event_id":"1b12RXBCmc4YBD6u4PLWpawtR5o=","beginning_cross_street":"North of CR 546/Franklin Corner Rd","ending_cross_street":"CR 546/Franklin Corner Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.731758,40.295234]]}},{"id":"ymyvJkrFHCRAzG4CEOHZe3RNuBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near North of CR 546/Franklin Corner Rd (Lawrence Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-15T18:15:31Z"},"road_event_id":"ymyvJkrFHCRAzG4CEOHZe3RNuBI=","beginning_cross_street":"North of CR 546/Franklin Corner Rd","ending_cross_street":"CR 546/Franklin Corner Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.731758,40.295234]]}},{"id":"hCbqtqMCDV61sIGQSFaNfBrSXQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between CR 534/Cooper St (Deptford Twp) and CR 646/Deptford Av (Deptford Twp) Friday April 24, 2026 09:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-15T19:21:35Z"},"road_event_id":"hCbqtqMCDV61sIGQSFaNfBrSXQI=","beginning_cross_street":"CR 534/Cooper St","ending_cross_street":"CR 646/Deptford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124794,39.827526]]}},{"id":"4LDyyLdZ2zz85Kx25Jdf5pKmUYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between CR 534/Cooper St (Deptford Twp) and CR 646/Deptford Av (Deptford Twp) Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-15T19:21:28Z"},"road_event_id":"4LDyyLdZ2zz85Kx25Jdf5pKmUYc=","beginning_cross_street":"CR 534/Cooper St","ending_cross_street":"CR 646/Deptford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124794,39.827526]]}},{"id":"/3cMYgo5Yj3SUEXEVklFmpxjVdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between CR 534/Cooper St (Deptford Twp) and CR 646/Deptford Av (Deptford Twp) Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-15T19:21:15Z"},"road_event_id":"/3cMYgo5Yj3SUEXEVklFmpxjVdo=","beginning_cross_street":"CR 534/Cooper St","ending_cross_street":"CR 646/Deptford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124794,39.827526]]}},{"id":"G5P0juLXoGKBAE3pm2Zjt9MVPTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Hempstead both directions between Hempstead (Hempstead) and Stewart Manor (Garden City) Buses will replace weekend trains at Hempstead, Garden City, Nassau Boulevard and Stewart Manor. Buses will operate to and from Mineola, Continuous Saturday April 25th,2026 01:15 AM thru Monday April 27th,2026 03:30 AM bus service only","update_date":"2026-04-20T07:30:21Z"},"road_event_id":"G5P0juLXoGKBAE3pm2Zjt9MVPTA=","beginning_cross_street":"Hempstead","ending_cross_street":"Stewart Manor","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:15:00Z","end_date":"2026-04-27T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.625032,40.713296]]}},{"id":"ECSUbwWQGeCP3k9ejjBBVsnZO7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Hempstead both directions at Country Life Press (Garden City) There will be no train or bus service at Country Life Press and Bellerose., Continuous Saturday April 25th,2026 01:15 AM thru Monday April 27th,2026 03:30 AM service suspended","update_date":"2026-04-20T07:30:20Z"},"road_event_id":"ECSUbwWQGeCP3k9ejjBBVsnZO7s=","beginning_cross_street":"Country Life Press","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:15:00Z","end_date":"2026-04-27T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.629673,40.721456]]}},{"id":"igooUtuXQ6goaSog25bW+WDmZdk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Hempstead both directions at Bellerose (Floral Park) There will be no train or bus service at Country Life Press and Bellerose., Continuous Saturday April 25th,2026 01:15 AM thru Monday April 27th,2026 03:30 AM service suspended","update_date":"2026-04-20T07:30:20Z"},"road_event_id":"igooUtuXQ6goaSog25bW+WDmZdk=","beginning_cross_street":"Bellerose","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:15:00Z","end_date":"2026-04-27T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.716652,40.722204]]}},{"id":"q0KOf/zwihpbSCtZY4sbSIC7jPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Hempstead both directions at Floral Park (Floral Park) There will be hourly train service at Floral Park in both directions., Continuous Saturday April 25th,2026 01:15 AM thru Monday April 27th,2026 03:30 AM","update_date":"2026-04-20T07:30:21Z"},"road_event_id":"q0KOf/zwihpbSCtZY4sbSIC7jPU=","beginning_cross_street":"Floral Park","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:15:00Z","end_date":"2026-04-27T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.706397,40.724637]]}},{"id":"HD/gWUtObY/Vr5/oz1ZGxgDdIV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Hempstead both directions between Elmont-UBS Arena (Hempstead) and Hollis (New York) There will be hourly westbound train service at Hollis, Queens Village, and Elmont-UBS Arena, but no eastbound train service to/from these stations., Continuous Saturday April 25th,2026 01:15 AM thru Monday April 27th,2026 03:30 AM","update_date":"2026-04-20T07:30:20Z"},"road_event_id":"HD/gWUtObY/Vr5/oz1ZGxgDdIV4=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:15:00Z","end_date":"2026-04-27T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"uYosm6U1x0acvmGns+sQnstlvy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Hempstead both directions between Jamaica (New York) and Queens Village (New York) Bus Alternatives from Jamaica to Hollis/Queens Village: LIRR tickets will be honored on MTA buses on the Q6, Q8, Q9 or Q41 routes from Jamaica to the Jamaica Bus Terminal, where customers can connect for continuing bus service on the Q2, Q3, Q36, Q82, and Q110 (at Jamaica Ave/168 St) routes for service to Hollis and Queens Village; Queens Village customers using bus routes Q2 and Q82, can transfer to the Q27 at Hempstead Ave/Springfield Blvd for service along Springfield Blvd between Hempstead Ave and Jamaica Ave., Continuous Saturday April 25th,2026 01:15 AM thru Monday April 27th,2026 03:30 AM","update_date":"2026-04-20T07:30:20Z"},"road_event_id":"uYosm6U1x0acvmGns+sQnstlvy8=","beginning_cross_street":"Jamaica","ending_cross_street":"Queens Village","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:15:00Z","end_date":"2026-04-27T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808529,40.699608]]}},{"id":"f2Ov/FkQGzLiDVZRb16sMRkmmLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Hempstead both directions between Country Life Press (Garden City) and Elmont-UBS Arena (Hempstead) Bus Alternatives at Country Life Press, Bellerose and Elmont-UBS Arena: LIRR tickets will be honored on nearby NICE Bus routes, N40/41 along Franklin Avenue for Country Life Press, N24 on Jericho Turnpike for Bellerose, and N6 on Hempstead Turnpike for Elmont-UBS Arena., Continuous Saturday April 25th,2026 01:15 AM thru Monday April 27th,2026 03:30 AM","update_date":"2026-04-20T07:30:20Z"},"road_event_id":"f2Ov/FkQGzLiDVZRb16sMRkmmLI=","beginning_cross_street":"Country Life Press","ending_cross_street":"Elmont-UBS Arena","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:15:00Z","end_date":"2026-04-27T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.629673,40.721456]]}},{"id":"zmeivC8FnDysmXOWBlSLyBaEIkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h9+HToYh377xrKI67rYcVc9dgbo="}],"description":"Utility work on NY 16 northbound Neamon Dr (Yorkshire) to Williams Dr (Yorkshire), Saturday April 18th, 2026 thru Thursday April 23rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Saturday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-04-15T22:55:59Z"},"road_event_id":"zmeivC8FnDysmXOWBlSLyBaEIkU=","beginning_cross_street":"Neamon Dr","ending_cross_street":"Williams Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.481126,42.469679]]}},{"id":"h9+HToYh377xrKI67rYcVc9dgbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zmeivC8FnDysmXOWBlSLyBaEIkU="}],"description":"Utility work on NY 16 northbound Neamon Dr (Yorkshire) to Williams Dr (Yorkshire), Saturday April 18th, 2026 thru Thursday April 23rd, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Saturday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-04-15T22:55:59Z"},"road_event_id":"h9+HToYh377xrKI67rYcVc9dgbo=","beginning_cross_street":"Neamon Dr","ending_cross_street":"Williams Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.481126,42.469679]]}},{"id":"scFFTC4sktSvPtEB19YWar4SHr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions At CR 674/Garden Rd (Vineland) Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-15T23:18:18Z"},"road_event_id":"scFFTC4sktSvPtEB19YWar4SHr0=","beginning_cross_street":"CR 674/Garden Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.041595,39.52161]]}},{"id":"9gRek1pqzAcwQHlxCYUuIrao4z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ALMOND ST"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on ALMOND ST northbound between ADAMS ST (Syracuse) and HARRISON ST (Syracuse) ; Alternating lane closures, Wednesday April 22nd, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T23:38:20Z"},"road_event_id":"9gRek1pqzAcwQHlxCYUuIrao4z8=","beginning_cross_street":"ADAMS ST","ending_cross_street":"HARRISON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142304,43.042918]]}},{"id":"aNKn8ueDS6e5rvkgo6f8dCTrRno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-81 northbound ramp to Exit 106 - NY 49; Central Square (Hastings) ; Alternating lane closures, Thursday April 23rd, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-15T23:52:40Z"},"road_event_id":"aNKn8ueDS6e5rvkgo6f8dCTrRno=","beginning_cross_street":"Exit 106 - NY 49; Central Square","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.124937,43.284361]]}},{"id":"bhacuPcauovmXuX/EG6FfvHbIfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 173"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on NY 173 westbound between Gates Road (De Witt) and CR 91 Jamesville (De Witt) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T00:01:09Z"},"road_event_id":"bhacuPcauovmXuX/EG6FfvHbIfs=","beginning_cross_street":"Gates Road","ending_cross_street":"CR 91 Jamesville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053267,42.991577]]}},{"id":"BzUfCdY/OTWtnL2dLRvG/M/aJug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on NY 52 both directions between Brookside Farms Road (Newburgh) and 5th Avenue (Newburgh) D265160/B1026780/32112309 - 24/7 RIGHT LANE CLOSURE - Plan travel accordingly; delays may exist, Continuous Monday December 16th, 2024 12:00 AM thru Friday May 22nd, 2026 12:00 AM right lane and shoulder closed to traffic","update_date":"2026-04-17T11:03:31Z"},"road_event_id":"BzUfCdY/OTWtnL2dLRvG/M/aJug=","beginning_cross_street":"Brookside Farms Road","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049278,41.513025]]}},{"id":"Do1c4wd1NTStjVDPBm9oET5xc28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sHnS08KVPtI5Orczbtuh6kZ4Lsg="}],"description":"Sign work on Hutchinson River Parkway [Westchester] northbound between Exit 5 - Wolfs Lane; East Sandford Boulevard; CR 61; Colonial Avenue (Pelham) and Exit 8 - Cross County Parkway (New Rochelle) D265509/32689509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-16T10:54:52Z"},"road_event_id":"Do1c4wd1NTStjVDPBm9oET5xc28=","beginning_cross_street":"Exit 5 - Wolfs Lane; East Sandford Boulevard; CR 61; Colonial Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813728,40.90501]]}},{"id":"sHnS08KVPtI5Orczbtuh6kZ4Lsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Do1c4wd1NTStjVDPBm9oET5xc28="},{"type":"next-occurrence","id":"y8dxf/svYS6FhwAhATPoFgxjqfk="}],"description":"Sign work on Hutchinson River Parkway [Westchester] northbound between Exit 5 - Wolfs Lane; East Sandford Boulevard; CR 61; Colonial Avenue (Pelham) and Exit 8 - Cross County Parkway (New Rochelle) D265509/32689509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-16T10:54:52Z"},"road_event_id":"sHnS08KVPtI5Orczbtuh6kZ4Lsg=","beginning_cross_street":"Exit 5 - Wolfs Lane; East Sandford Boulevard; CR 61; Colonial Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813728,40.90501]]}},{"id":"y8dxf/svYS6FhwAhATPoFgxjqfk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Do1c4wd1NTStjVDPBm9oET5xc28="}],"description":"Sign work on Hutchinson River Parkway [Westchester] northbound between Exit 5 - Wolfs Lane; East Sandford Boulevard; CR 61; Colonial Avenue (Pelham) and Exit 8 - Cross County Parkway (New Rochelle) D265509/32689509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-16T10:54:52Z"},"road_event_id":"y8dxf/svYS6FhwAhATPoFgxjqfk=","beginning_cross_street":"Exit 5 - Wolfs Lane; East Sandford Boulevard; CR 61; Colonial Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813728,40.90501]]}},{"id":"l1V0dhA55gLnj1KLiuGDNHLC8+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Xsicg7zc+pvqPk8TbJRxBMwp014="}],"description":"Sign work on Hutchinson River Parkway [Westchester] southbound between Exit 16/16B - NY 120 (Harrison) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265509/32684109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-16T10:48:08Z"},"road_event_id":"l1V0dhA55gLnj1KLiuGDNHLC8+M=","beginning_cross_street":"Exit 16/16B - NY 120","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.711668,41.021939]]}},{"id":"Xsicg7zc+pvqPk8TbJRxBMwp014=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l1V0dhA55gLnj1KLiuGDNHLC8+M="},{"type":"next-occurrence","id":"2Kfoirsg+acn8ygniEzqk1UKHNo="}],"description":"Sign work on Hutchinson River Parkway [Westchester] southbound between Exit 16/16B - NY 120 (Harrison) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265509/32684109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-16T10:48:08Z"},"road_event_id":"Xsicg7zc+pvqPk8TbJRxBMwp014=","beginning_cross_street":"Exit 16/16B - NY 120","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.711668,41.021939]]}},{"id":"2Kfoirsg+acn8ygniEzqk1UKHNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l1V0dhA55gLnj1KLiuGDNHLC8+M="}],"description":"Sign work on Hutchinson River Parkway [Westchester] southbound between Exit 16/16B - NY 120 (Harrison) and Exit 13A/B - Mamaroneck Avenue (White Plains) D265509/32684109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-16T10:48:08Z"},"road_event_id":"2Kfoirsg+acn8ygniEzqk1UKHNo=","beginning_cross_street":"Exit 16/16B - NY 120","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.711668,41.021939]]}},{"id":"4qMgbjzM70O7/+kWicxJ/ebA058=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 100 both directions between Roxbury Drive E (Yonkers) and Crisfield Street (Somers) 2025082502725/32620909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Wednesday April 22nd, 2026 Monday/ Tuesday/ Wednesday, 09:30 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-16T11:33:56Z"},"road_event_id":"4qMgbjzM70O7/+kWicxJ/ebA058=","beginning_cross_street":"Roxbury Drive E","ending_cross_street":"Crisfield Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833696,40.974139]]}},{"id":"RNERnR8n1UZxUvTCP7JgqRgFJow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-04-16T11:45:34Z"},"road_event_id":"RNERnR8n1UZxUvTCP7JgqRgFJow=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.828865,40.276138]]}},{"id":"8ZLGZNoLXTgKZtemd1SbJd5Wh4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of CR 10/Rector Pl (Red Bank), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-16T11:45:37Z"},"road_event_id":"8ZLGZNoLXTgKZtemd1SbJd5Wh4c=","beginning_cross_street":"South of CR 10/Rector Pl","ending_cross_street":"South of CR 10/Rector Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072624,40.352016]]}},{"id":"B1xQiGC3M8sVDdi6wue0vXYmKNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of CR 10/Rector Pl (Red Bank), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-16T11:45:45Z"},"road_event_id":"B1xQiGC3M8sVDdi6wue0vXYmKNU=","beginning_cross_street":"South of CR 10/Rector Pl","ending_cross_street":"South of CR 10/Rector Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072624,40.352016]]}},{"id":"EcjVPi5UMm1I3BHZQHUvwhgKOvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-16T11:45:44Z"},"road_event_id":"EcjVPi5UMm1I3BHZQHUvwhgKOvU=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.828865,40.276138]]}},{"id":"cjJNPQPWd+LzgswbW1XDwbmTlW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-16T11:45:43Z"},"road_event_id":"cjJNPQPWd+LzgswbW1XDwbmTlW8=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.835418,40.270778]]}},{"id":"F8c8k9L6ikUqgp1YV2ywY6Z/jHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between south of Exit 76 - NJ 29 (Ewing Twp) and north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 08:00 AM, acceleration lane closed","update_date":"2026-04-16T11:45:42Z"},"road_event_id":"F8c8k9L6ikUqgp1YV2ywY6Z/jHQ=","beginning_cross_street":"south of Exit 76 - NJ 29","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.84066,40.264667]]}},{"id":"rip2FHpoBnmIUCONsk8XkVQwqJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 08:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 07:00 AM)","update_date":"2026-04-16T11:45:24Z"},"road_event_id":"rip2FHpoBnmIUCONsk8XkVQwqJs=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.835418,40.270778]]}},{"id":"1gSqb54VmT3DzRGYrDxfim4xQeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-16T11:45:23Z"},"road_event_id":"1gSqb54VmT3DzRGYrDxfim4xQeI=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.835418,40.270778]]}},{"id":"YP9n51voXqpRyZrVdWbpbOqzrbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 08:00 AM, at least one lane closed","update_date":"2026-04-16T11:45:21Z"},"road_event_id":"YP9n51voXqpRyZrVdWbpbOqzrbU=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.835418,40.270778]]}},{"id":"xUGP+1ANZlv5F8F4mns71FS/hJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound near East of Exit 22 - CR 638 (Jackson Twp), Wednesday April 22, 2026 08:30 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-16T11:45:31Z"},"road_event_id":"xUGP+1ANZlv5F8F4mns71FS/hJ8=","beginning_cross_street":"East of Exit 22 - CR 638","ending_cross_street":"East of Exit 22 - CR 638","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.281829,40.156761]]}},{"id":"10d2Z/gYrlvEAkEK+voIKalLSPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 06:00 AM)","update_date":"2026-04-16T11:45:28Z"},"road_event_id":"10d2Z/gYrlvEAkEK+voIKalLSPI=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.828865,40.276138]]}},{"id":"KM1PbwOnlBLiDsuT2ie+IudUV9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound near East of Exit 22 - CR 638 (Jackson Twp), Thursday April 23, 2026 08:30 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-16T11:45:26Z"},"road_event_id":"KM1PbwOnlBLiDsuT2ie+IudUV9A=","beginning_cross_street":"East of Exit 22 - CR 638","ending_cross_street":"East of Exit 22 - CR 638","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T21:00:00Z","end_date":"2026-04-24T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.281829,40.156761]]}},{"id":"I5oXrYGEBhFKzUWTizxlYVL1AZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between north of Exit 73 - Scotch Rd (Hopewell Twp) and south of Exit 73 - Scotch Rd (Ewing Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-16T11:45:32Z"},"road_event_id":"I5oXrYGEBhFKzUWTizxlYVL1AZ0=","beginning_cross_street":"north of Exit 73 - Scotch Rd","ending_cross_street":"south of Exit 73 - Scotch Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.816741,40.287456]]}},{"id":"mon+RNVmGLNOwg66Pyl43GsJxvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near north of Exit 75 - CR 579/Bear Tavern Rd (Ewing Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-16T11:45:18Z"},"road_event_id":"mon+RNVmGLNOwg66Pyl43GsJxvA=","beginning_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","ending_cross_street":"north of Exit 75 - CR 579/Bear Tavern Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.828865,40.276138]]}},{"id":"KYFKA+zma0Nb7CLD52E/rF5BELs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on NY 14 northbound Town of Veteran; Town of Horseheads Line (Veteran) to Town of Veteran; Town of Montour Line; Schuyler - Chemung County Line (Veteran) 1lane2way flagger, Thursday April 16th, 2026 thru Wednesday April 22nd, 2026, Sunday thru Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T11:55:13Z"},"road_event_id":"KYFKA+zma0Nb7CLD52E/rF5BELs=","beginning_cross_street":"Town of Veteran; Town of Horseheads Line","ending_cross_street":"Town of Veteran; Town of Montour Line; Schuyler - Chemung County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.839286,42.19927]]}},{"id":"utP2xsKRH7fLowqeN1R40rjQPw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Taconic State Parkway northbound between Exit 20 - US 6 (Yorktown) and Exit 25 - Peekskill Hollow Rd. (Putnam Valley) D042080/32713309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 09:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-16T12:26:12Z"},"road_event_id":"utP2xsKRH7fLowqeN1R40rjQPw4=","beginning_cross_street":"Exit 20  - US 6","ending_cross_street":"Exit 25 - Peekskill Hollow Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.817483,41.331078]]}},{"id":"FFjlKYcgibWAm/Wi1g6L9lvDd6g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Taconic State Parkway southbound between Exit 25 - Peekskill Hollow Rd (Putnam Valley) and Exit 20 - US 6 (Yorktown) D042080/30117309 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-16T12:19:07Z"},"road_event_id":"FFjlKYcgibWAm/Wi1g6L9lvDd6g=","beginning_cross_street":"Exit 25 - Peekskill Hollow Rd","ending_cross_street":"Exit 20  - US 6","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786996,41.407573]]}},{"id":"E5t8WfAjUkZUeH2LwTF0rnH1NdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gTLdlg3ahA8+6b9oa8coZZupZDo="}],"description":"Utility work on NY 5 both directions between CR 25; Circular Hill Rd. (Le Roy) and Genesee-Livingston County Line (Le Roy) 2 way traffic on southbound roadway, Friday April 17th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T12:27:17Z"},"road_event_id":"E5t8WfAjUkZUeH2LwTF0rnH1NdQ=","beginning_cross_street":"CR 25; Circular Hill Rd.","ending_cross_street":"Genesee-Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954749,42.979892]]}},{"id":"gTLdlg3ahA8+6b9oa8coZZupZDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5t8WfAjUkZUeH2LwTF0rnH1NdQ="},{"type":"next-occurrence","id":"2J4jVf8ySPptSAgcLpFxTpYPt60="}],"description":"Utility work on NY 5 both directions between CR 25; Circular Hill Rd. (Le Roy) and Genesee-Livingston County Line (Le Roy) 2 way traffic on southbound roadway, Friday April 17th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T12:27:17Z"},"road_event_id":"gTLdlg3ahA8+6b9oa8coZZupZDo=","beginning_cross_street":"CR 25; Circular Hill Rd.","ending_cross_street":"Genesee-Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954749,42.979892]]}},{"id":"2J4jVf8ySPptSAgcLpFxTpYPt60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E5t8WfAjUkZUeH2LwTF0rnH1NdQ="}],"description":"Utility work on NY 5 both directions between CR 25; Circular Hill Rd. (Le Roy) and Genesee-Livingston County Line (Le Roy) 2 way traffic on southbound roadway, Friday April 17th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T12:27:17Z"},"road_event_id":"2J4jVf8ySPptSAgcLpFxTpYPt60=","beginning_cross_street":"CR 25; Circular Hill Rd.","ending_cross_street":"Genesee-Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.954749,42.979892]]}},{"id":"62HNAYn06tTMEK8PpKSPuDzqFZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on I-495 both directions from Exit 22A - Grand Central Parkwy (New York) to New York City and North Hempstead Line (North Hempstead) Subject to change without notice., Tuesday April 21st, 2026 thru Wednesday April 22nd, 2026, Tuesday/Wednesday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-04-16T12:34:47Z"},"road_event_id":"62HNAYn06tTMEK8PpKSPuDzqFZw=","beginning_cross_street":"Exit 22A - Grand Central Parkwy","ending_cross_street":"New York City and North Hempstead Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.845305,40.739986]]}},{"id":"V5v7ln03tHamkCPqiTRekjkP9vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on Grand Central Parkway both directions from Union Turnpike (New York) to Nassau-Queens County Line (North Hempstead) Subject to change without notice., Wednesday April 22nd, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-04-16T12:37:12Z"},"road_event_id":"V5v7ln03tHamkCPqiTRekjkP9vA=","beginning_cross_street":"Union Turnpike","ending_cross_street":"Nassau-Queens County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828275,40.716476]]}},{"id":"BFlmis8auQwTHOstu2YyDiI7qY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"U8TqtECK/e0ggJRqAgXNo+bg1jo="}],"description":"Street sweeping on I-695 both directions from I-95; Bruckner Expressway (New York) to Cross Bronx Extension (New York) Subject to change without notice., Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed southbound; 1 Left lane of 2 lanes closed northbound","update_date":"2026-04-16T12:39:22Z"},"road_event_id":"BFlmis8auQwTHOstu2YyDiI7qY0=","beginning_cross_street":"I-95; Bruckner Expressway","ending_cross_street":"Cross Bronx Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824746,40.836157]]}},{"id":"U8TqtECK/e0ggJRqAgXNo+bg1jo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BFlmis8auQwTHOstu2YyDiI7qY0="}],"description":"Street sweeping on I-695 both directions from I-95; Bruckner Expressway (New York) to Cross Bronx Extension (New York) Subject to change without notice., Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed southbound; 1 Left lane of 2 lanes closed northbound","update_date":"2026-04-16T12:39:22Z"},"road_event_id":"U8TqtECK/e0ggJRqAgXNo+bg1jo=","beginning_cross_street":"I-95; Bruckner Expressway","ending_cross_street":"Cross Bronx Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.824746,40.836157]]}},{"id":"i2mqSEXJMP281Ry6R46jorwI1as=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 64 - Summit Ave/NJ 17 (Hackensack), Wednesday April 22, 2026 01:00 PM thru 04:00 PM, right shoulder closed express lane","update_date":"2026-04-16T12:39:20Z"},"road_event_id":"i2mqSEXJMP281Ry6R46jorwI1as=","beginning_cross_street":"East of Exit 64 - Summit Ave/NJ 17","ending_cross_street":"East of Exit 64 - Summit Ave/NJ 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T17:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.063049,40.87664]]}},{"id":"blmQxlaCeo0SS2/c1IEpc1cV8ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hU0Uid3tkolm6dnFk2wQicvAPgk="}],"description":"Street sweeping on I-95 both directions from I-678- Hutchinson River Expressway (New York) to I-95 - New England Thruway at After Exit 10 (I-95) - Gun Hill Rd (New York) Subject to change without notice., Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-16T12:41:12Z"},"road_event_id":"blmQxlaCeo0SS2/c1IEpc1cV8ag=","beginning_cross_street":"I-678- Hutchinson River Expressway ","ending_cross_street":"After Exit 10 (I-95) - Gun Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836871,40.828845]]}},{"id":"hU0Uid3tkolm6dnFk2wQicvAPgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"blmQxlaCeo0SS2/c1IEpc1cV8ag="}],"description":"Street sweeping on I-95 both directions from I-678- Hutchinson River Expressway (New York) to I-95 - New England Thruway at After Exit 10 (I-95) - Gun Hill Rd (New York) Subject to change without notice., Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-16T12:41:12Z"},"road_event_id":"hU0Uid3tkolm6dnFk2wQicvAPgk=","beginning_cross_street":"I-678- Hutchinson River Expressway ","ending_cross_street":"After Exit 10 (I-95) - Gun Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.836871,40.828845]]}},{"id":"WD9BCzOQBlfPAZ4OeQGBcbmhO/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Street sweeping on I-278 both directions from East 138th Street; I-278-Bruckner Expressway (New York) to I-295-Cross Bronx Extension (New York) Subject to change without notice., Friday April 24th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T12:46:58Z"},"road_event_id":"WD9BCzOQBlfPAZ4OeQGBcbmhO/U=","beginning_cross_street":"East 138th Street; I-278-Bruckner Expressway","ending_cross_street":"I-295-Cross Bronx Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911948,40.804568]]}},{"id":"uEpmKfJyXrFNNIJA3GKMWD2rID8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 324"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 324 westbound Exit - Sheridan Drive; Ramp (Amherst) to Harlem Road; NY 240 (Amherst), Friday April 24th, 2026, 07:30 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T12:51:04Z"},"road_event_id":"uEpmKfJyXrFNNIJA3GKMWD2rID8=","beginning_cross_street":"Exit - Sheridan Drive; Ramp","ending_cross_street":"Harlem Road; NY 240","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T19:00:00Z","end_date":"2026-04-25T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.780926,42.978457]]}},{"id":"QpffjcJuhrdrAkIi/XRIlX67sDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cR2qkZg+Dbho/Bu0mJcum7pV0So="}],"description":"Utility work on NY 5 both directions between Church St (Le Roy) and Lathrop Ave (Le Roy) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T12:57:22Z"},"road_event_id":"QpffjcJuhrdrAkIi/XRIlX67sDk=","beginning_cross_street":"Church St","ending_cross_street":"Lathrop Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.987422,42.977706]]}},{"id":"cR2qkZg+Dbho/Bu0mJcum7pV0So=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QpffjcJuhrdrAkIi/XRIlX67sDk="},{"type":"next-occurrence","id":"5MeztPQvwNOdE4vDVnVOdTdcjxg="}],"description":"Utility work on NY 5 both directions between Church St (Le Roy) and Lathrop Ave (Le Roy) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T12:57:22Z"},"road_event_id":"cR2qkZg+Dbho/Bu0mJcum7pV0So=","beginning_cross_street":"Church St","ending_cross_street":"Lathrop Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.987422,42.977706]]}},{"id":"5MeztPQvwNOdE4vDVnVOdTdcjxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QpffjcJuhrdrAkIi/XRIlX67sDk="}],"description":"Utility work on NY 5 both directions between Church St (Le Roy) and Lathrop Ave (Le Roy) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T12:57:22Z"},"road_event_id":"5MeztPQvwNOdE4vDVnVOdTdcjxg=","beginning_cross_street":"Church St","ending_cross_street":"Lathrop Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.987422,42.977706]]}},{"id":"Al1JloAQoOA4r3CyG0gXlCsSUXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V8Xt/2iRd38dHo+dsuMzO20SnOs="}],"description":"Utility work on NY 31 both directions at Moseley Road; NY 250 (Perinton) Alternating lane closures with flaggers as needed, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T13:23:50Z"},"road_event_id":"Al1JloAQoOA4r3CyG0gXlCsSUXk=","beginning_cross_street":"Moseley Road; NY 250","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.442534,43.069314]]}},{"id":"V8Xt/2iRd38dHo+dsuMzO20SnOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Al1JloAQoOA4r3CyG0gXlCsSUXk="},{"type":"next-occurrence","id":"FyQVlr524FfyyFwvW/Nu5JDJ8aI="}],"description":"Utility work on NY 31 both directions at Moseley Road; NY 250 (Perinton) Alternating lane closures with flaggers as needed, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T13:23:50Z"},"road_event_id":"V8Xt/2iRd38dHo+dsuMzO20SnOs=","beginning_cross_street":"Moseley Road; NY 250","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.442534,43.069314]]}},{"id":"FyQVlr524FfyyFwvW/Nu5JDJ8aI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Al1JloAQoOA4r3CyG0gXlCsSUXk="}],"description":"Utility work on NY 31 both directions at Moseley Road; NY 250 (Perinton) Alternating lane closures with flaggers as needed, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T13:23:50Z"},"road_event_id":"FyQVlr524FfyyFwvW/Nu5JDJ8aI=","beginning_cross_street":"Moseley Road; NY 250","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.442534,43.069314]]}},{"id":"BuIjZ68m/KfItd3TxpdEU2nV2jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Sprain Brook State Pkwy both directions between Tuckahoe Road (Yonkers) and Jackson Avenue (Greenburgh) D042080/32728409 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-20T11:22:54Z"},"road_event_id":"BuIjZ68m/KfItd3TxpdEU2nV2jk=","beginning_cross_street":"Tuckahoe Road","ending_cross_street":"Jackson Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.850968,40.958011]]}},{"id":"8bsYEzsrF+clGwLTQo70T/TN9eM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PShcFcQfJQGOYOKEPq0ZF4JHThg="}],"description":"Bridge work on NY 16 northbound Exit - Old NY 16 from (NY 16/NY 400 to NY 16) Ramp (Aurora) to NY 400 at Harlem Road; NY 240 (West Seneca), Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:10:54Z"},"road_event_id":"8bsYEzsrF+clGwLTQo70T/TN9eM=","beginning_cross_street":"Exit   - Old NY 16 from (NY 16/NY 400 to NY 16) Ramp","ending_cross_street":"Harlem Road; NY 240","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.597421,42.732036]]}},{"id":"PShcFcQfJQGOYOKEPq0ZF4JHThg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 16"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8bsYEzsrF+clGwLTQo70T/TN9eM="}],"description":"Bridge work on NY 16 northbound Exit - Old NY 16 from (NY 16/NY 400 to NY 16) Ramp (Aurora) to NY 400 at Harlem Road; NY 240 (West Seneca), Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:10:54Z"},"road_event_id":"PShcFcQfJQGOYOKEPq0ZF4JHThg=","beginning_cross_street":"Exit   - Old NY 16 from (NY 16/NY 400 to NY 16) Ramp","ending_cross_street":"Harlem Road; NY 240","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.597421,42.732036]]}},{"id":"v+G5z5J5+Ix0fzrm+HEF5UvOUW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-990"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Px1nrtcCbSHcTA5s9SJZQEwdadY="}],"description":"Bridge work on I-990 southbound Millersport Highway; NY 263 (Amherst) to I-290 Youngman Expressway (Amherst), Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:13:50Z"},"road_event_id":"v+G5z5J5+Ix0fzrm+HEF5UvOUW0=","beginning_cross_street":"Millersport Highway; NY 263","ending_cross_street":"I-290 Youngman Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.743009,43.047454]]}},{"id":"Px1nrtcCbSHcTA5s9SJZQEwdadY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-990"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v+G5z5J5+Ix0fzrm+HEF5UvOUW0="}],"description":"Bridge work on I-990 southbound Millersport Highway; NY 263 (Amherst) to I-290 Youngman Expressway (Amherst), Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:13:50Z"},"road_event_id":"Px1nrtcCbSHcTA5s9SJZQEwdadY=","beginning_cross_street":"Millersport Highway; NY 263","ending_cross_street":"I-290 Youngman Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.743009,43.047454]]}},{"id":"xMo16T3UvRa3yTQb/3SQSz0NeS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1wDm6ngAZ3Rf7MTHJrYOeSnxfms="}],"description":"Bridge work on NY 33 westbound Genesee Street; Cayuga Road; Dick Road (Cheektowaga) to southbound N OAK ST at GENESEE ST (Buffalo), Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:17:27Z"},"road_event_id":"xMo16T3UvRa3yTQb/3SQSz0NeS4=","beginning_cross_street":"Genesee Street; Cayuga Road; Dick Road","ending_cross_street":"GENESEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.738983,42.930075]]}},{"id":"1wDm6ngAZ3Rf7MTHJrYOeSnxfms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xMo16T3UvRa3yTQb/3SQSz0NeS4="}],"description":"Bridge work on NY 33 westbound Genesee Street; Cayuga Road; Dick Road (Cheektowaga) to southbound N OAK ST at GENESEE ST (Buffalo), Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:17:27Z"},"road_event_id":"1wDm6ngAZ3Rf7MTHJrYOeSnxfms=","beginning_cross_street":"Genesee Street; Cayuga Road; Dick Road","ending_cross_street":"GENESEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.738983,42.930075]]}},{"id":"x9gn98BPaeACdpC/bnS0ANJj5Ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9W Both Directions between Charlotte Pl (Englewood Cliffs) and North of Bayview Av (Englewood Cliffs) Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, 1 right lane of 5 lanes, right shoulder closed southbound; 1 right lane of 5 lanes, right shoulder closed northbound","update_date":"2026-04-16T14:21:28Z"},"road_event_id":"x9gn98BPaeACdpC/bnS0ANJj5Ws=","beginning_cross_street":"Charlotte Pl","ending_cross_street":"North of Bayview Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95343,40.873149]]}},{"id":"wJbKKIXywwriRChTtKxO8JWlFkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9W Both Directions between Charlotte Pl (Englewood Cliffs) and North of Bayview Av (Englewood Cliffs) Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, 1 right lane of 5 lanes, right shoulder closed southbound; 1 right lane of 5 lanes, right shoulder closed northbound","update_date":"2026-04-16T14:21:04Z"},"road_event_id":"wJbKKIXywwriRChTtKxO8JWlFkw=","beginning_cross_street":"Charlotte Pl","ending_cross_street":"North of Bayview Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95343,40.873149]]}},{"id":"s87XP4GUQyQfUc1CastzCbkm6H4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9W Both Directions between Charlotte Pl (Englewood Cliffs) and North of Bayview Av (Englewood Cliffs) Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, 1 right lane of 5 lanes, right shoulder closed southbound; 1 right lane of 5 lanes, right shoulder closed northbound","update_date":"2026-04-16T14:21:47Z"},"road_event_id":"s87XP4GUQyQfUc1CastzCbkm6H4=","beginning_cross_street":"Charlotte Pl","ending_cross_street":"North of Bayview Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95343,40.873149]]}},{"id":"c1//l1QDWhI7OGMVzy8LZrN5dHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kum+rmbs1km2GdsSepqEL1SyAg8="}],"description":"Roadwork on NY 7 westbound past Mill Road (Colonie), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:32:06Z"},"road_event_id":"c1//l1QDWhI7OGMVzy8LZrN5dHI=","beginning_cross_street":"Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797907,42.76301]]}},{"id":"kum+rmbs1km2GdsSepqEL1SyAg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c1//l1QDWhI7OGMVzy8LZrN5dHI="},{"type":"next-occurrence","id":"DKo5HGSLrjy3QBLeQlipbA6K8tY="}],"description":"Roadwork on NY 7 westbound past Mill Road (Colonie), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:32:06Z"},"road_event_id":"kum+rmbs1km2GdsSepqEL1SyAg8=","beginning_cross_street":"Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797907,42.76301]]}},{"id":"DKo5HGSLrjy3QBLeQlipbA6K8tY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c1//l1QDWhI7OGMVzy8LZrN5dHI="}],"description":"Roadwork on NY 7 westbound past Mill Road (Colonie), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T14:32:06Z"},"road_event_id":"DKo5HGSLrjy3QBLeQlipbA6K8tY=","beginning_cross_street":"Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797907,42.76301]]}},{"id":"SVZ9HQ8qldK8vlZMe1EDEftqeko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of US 1&9 Truck Route/Communipaw Av (Jersey City) and South of Kennedy Boulevard (Bayonne), Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, left lane closed","update_date":"2026-04-16T14:33:21Z"},"road_event_id":"SVZ9HQ8qldK8vlZMe1EDEftqeko=","beginning_cross_street":"South of US 1&9 Truck Route/Communipaw Av","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092521,40.721855]]}},{"id":"+KJJZm1PegOoBWRbTA/QGybBMmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Northbound between South of Kennedy Boulevard (Bayonne) and South of US 1&9 Truck Route/Communipaw Av (Jersey City), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, left lane closed","update_date":"2026-04-16T14:33:29Z"},"road_event_id":"+KJJZm1PegOoBWRbTA/QGybBMmk=","beginning_cross_street":"South of Kennedy Boulevard","ending_cross_street":"South of US 1&9 Truck Route/Communipaw Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104354,40.691184]]}},{"id":"qJlHfRLBQvkXqkMuktwiJv7vgpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AMR4sCQS3ygCzYEm5VgPSl8B3Xs="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY-52 (East Fishkill) 2025083592928/32728809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-16T14:47:18Z"},"road_event_id":"qJlHfRLBQvkXqkMuktwiJv7vgpg=","beginning_cross_street":"Main Street","ending_cross_street":"NY-52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805339,41.570063]]}},{"id":"AMR4sCQS3ygCzYEm5VgPSl8B3Xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qJlHfRLBQvkXqkMuktwiJv7vgpg="},{"type":"next-occurrence","id":"h2gp5iV7CZP3baQ7aqkKPXMEljs="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY-52 (East Fishkill) 2025083592928/32728809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-16T14:47:18Z"},"road_event_id":"AMR4sCQS3ygCzYEm5VgPSl8B3Xs=","beginning_cross_street":"Main Street","ending_cross_street":"NY-52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805339,41.570063]]}},{"id":"h2gp5iV7CZP3baQ7aqkKPXMEljs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 376"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qJlHfRLBQvkXqkMuktwiJv7vgpg="}],"description":"Utility work on NY 376 both directions between Main Street (East Fishkill) and NY-52 (East Fishkill) 2025083592928/32728809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-16T14:47:18Z"},"road_event_id":"h2gp5iV7CZP3baQ7aqkKPXMEljs=","beginning_cross_street":"Main Street","ending_cross_street":"NY-52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805339,41.570063]]}},{"id":"29aXK+pXYG1vuLyEEvE+5dC2elk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Cf5TGk/p/FnOo22vmuRtBorw7Ao="}],"description":"Repaving on I-481 southbound between Ramp to I-690 Westbound (De Witt) and Ramp from I-690 Eastbound (De Witt) ; follow detour, Monday April 27th, 2026 thru Saturday May 9th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-16T14:45:52Z"},"road_event_id":"29aXK+pXYG1vuLyEEvE+5dC2elk=","beginning_cross_street":"Ramp to I-690 Westbound ","ending_cross_street":"Ramp from I-690 Eastbound ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051945,43.061423]]}},{"id":"Cf5TGk/p/FnOo22vmuRtBorw7Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"29aXK+pXYG1vuLyEEvE+5dC2elk="},{"type":"next-occurrence","id":"V8M4R0bqD1FCKwcKldDWUhmdJ84="}],"description":"Repaving on I-481 southbound between Ramp to I-690 Westbound (De Witt) and Ramp from I-690 Eastbound (De Witt) ; follow detour, Monday April 27th, 2026 thru Saturday May 9th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-16T14:45:52Z"},"road_event_id":"Cf5TGk/p/FnOo22vmuRtBorw7Ao=","beginning_cross_street":"Ramp to I-690 Westbound ","ending_cross_street":"Ramp from I-690 Eastbound ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051945,43.061423]]}},{"id":"V8M4R0bqD1FCKwcKldDWUhmdJ84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"29aXK+pXYG1vuLyEEvE+5dC2elk="},{"type":"next-occurrence","id":"fuQPEjq9isGOVW1c/olbe+iox7A="}],"description":"Repaving on I-481 southbound between Ramp to I-690 Westbound (De Witt) and Ramp from I-690 Eastbound (De Witt) ; follow detour, Monday April 27th, 2026 thru Saturday May 9th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-16T14:45:52Z"},"road_event_id":"V8M4R0bqD1FCKwcKldDWUhmdJ84=","beginning_cross_street":"Ramp to I-690 Westbound ","ending_cross_street":"Ramp from I-690 Eastbound ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051945,43.061423]]}},{"id":"fuQPEjq9isGOVW1c/olbe+iox7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"29aXK+pXYG1vuLyEEvE+5dC2elk="},{"type":"next-occurrence","id":"A0PhgLHUZpc3BGIgWXKv9dJSqUQ="}],"description":"Repaving on I-481 southbound between Ramp to I-690 Westbound (De Witt) and Ramp from I-690 Eastbound (De Witt) ; follow detour, Monday April 27th, 2026 thru Saturday May 9th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-16T14:45:52Z"},"road_event_id":"fuQPEjq9isGOVW1c/olbe+iox7A=","beginning_cross_street":"Ramp to I-690 Westbound ","ending_cross_street":"Ramp from I-690 Eastbound ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051945,43.061423]]}},{"id":"A0PhgLHUZpc3BGIgWXKv9dJSqUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"29aXK+pXYG1vuLyEEvE+5dC2elk="},{"type":"next-occurrence","id":"LEOJ6S5LKFVpbGpg2TVACW0T2NI="}],"description":"Repaving on I-481 southbound between Ramp to I-690 Westbound (De Witt) and Ramp from I-690 Eastbound (De Witt) ; follow detour, Monday April 27th, 2026 thru Saturday May 9th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-16T14:45:52Z"},"road_event_id":"A0PhgLHUZpc3BGIgWXKv9dJSqUQ=","beginning_cross_street":"Ramp to I-690 Westbound ","ending_cross_street":"Ramp from I-690 Eastbound ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051945,43.061423]]}},{"id":"LEOJ6S5LKFVpbGpg2TVACW0T2NI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"29aXK+pXYG1vuLyEEvE+5dC2elk="},{"type":"next-occurrence","id":"hNrZG931wptlGad45IOCvAXNgII="}],"description":"Repaving on I-481 southbound between Ramp to I-690 Westbound (De Witt) and Ramp from I-690 Eastbound (De Witt) ; follow detour, Monday April 27th, 2026 thru Saturday May 9th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-16T14:45:52Z"},"road_event_id":"LEOJ6S5LKFVpbGpg2TVACW0T2NI=","beginning_cross_street":"Ramp to I-690 Westbound ","ending_cross_street":"Ramp from I-690 Eastbound ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051945,43.061423]]}},{"id":"hNrZG931wptlGad45IOCvAXNgII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"29aXK+pXYG1vuLyEEvE+5dC2elk="}],"description":"Repaving on I-481 southbound between Ramp to I-690 Westbound (De Witt) and Ramp from I-690 Eastbound (De Witt) ; follow detour, Monday April 27th, 2026 thru Saturday May 9th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-16T14:45:52Z"},"road_event_id":"hNrZG931wptlGad45IOCvAXNgII=","beginning_cross_street":"Ramp to I-690 Westbound ","ending_cross_street":"Ramp from I-690 Eastbound ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T18:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051945,43.061423]]}},{"id":"QV4NtdUfiJZqXm1vT1sOM/ZFfWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-190"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-190 southbound US 62; Niagara Falls Boulevard (Niagara Falls) to Buffalo Avenue; NY 384 (Niagara Falls), Thursday April 16th, 2026 thru Wednesday March 31st, 2027, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T14:51:04Z"},"road_event_id":"QV4NtdUfiJZqXm1vT1sOM/ZFfWI=","beginning_cross_street":"US 62; Niagara Falls Boulevard","ending_cross_street":"Buffalo Avenue; NY 384","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.990228,43.090367]]}},{"id":"yQiHK5T8LyBzCl1BNltUt7S34UY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 62"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 62 southbound Builders Way (Niagara Falls) to I-190 Niagara Expressway (Niagara Falls), Monday April 20th, 2026 thru Friday October 30th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T14:54:13Z"},"road_event_id":"yQiHK5T8LyBzCl1BNltUt7S34UY=","beginning_cross_street":"Builders Way","ending_cross_street":"I-190 Niagara Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.991402,43.089752]]}},{"id":"F8GgPwv1tXA3dwADfabiHONQejQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r5V5BzNP/Hogu3PUCJZ98YegETU="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"F8GgPwv1tXA3dwADfabiHONQejQ=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"r5V5BzNP/Hogu3PUCJZ98YegETU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"TA0xBzuoAjAXjmLnnn3E8GG7Tkk="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"r5V5BzNP/Hogu3PUCJZ98YegETU=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"TA0xBzuoAjAXjmLnnn3E8GG7Tkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"AB4B036A4NuG3ywZPgGNa5EeR2E="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"TA0xBzuoAjAXjmLnnn3E8GG7Tkk=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"AB4B036A4NuG3ywZPgGNa5EeR2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"kaRAqte+PcGIpoA1rKj0cD1+MAQ="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"AB4B036A4NuG3ywZPgGNa5EeR2E=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"kaRAqte+PcGIpoA1rKj0cD1+MAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"c0dS/m/hOChqhpXh8KgRDo3O1rU="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"kaRAqte+PcGIpoA1rKj0cD1+MAQ=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"c0dS/m/hOChqhpXh8KgRDo3O1rU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"xKfKduLx9THN4TL8Ss+5YysSqVk="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"c0dS/m/hOChqhpXh8KgRDo3O1rU=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"xKfKduLx9THN4TL8Ss+5YysSqVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"JETH6YasCBc+PawoM1mx6g8lTew="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"xKfKduLx9THN4TL8Ss+5YysSqVk=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"JETH6YasCBc+PawoM1mx6g8lTew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"lF/XcHk1AvA3roX5eiquzN6bxKA="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"JETH6YasCBc+PawoM1mx6g8lTew=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"lF/XcHk1AvA3roX5eiquzN6bxKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"2ASw3vnvhZo+pTVOiY0iZmTO2H8="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"lF/XcHk1AvA3roX5eiquzN6bxKA=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"2ASw3vnvhZo+pTVOiY0iZmTO2H8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="},{"type":"next-occurrence","id":"7WlNzuvgxLzI9EI4I9fgFpjbE8w="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"2ASw3vnvhZo+pTVOiY0iZmTO2H8=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"7WlNzuvgxLzI9EI4I9fgFpjbE8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F8GgPwv1tXA3dwADfabiHONQejQ="}],"description":"Safety improvements on US 44/NY 55 eastbound between Market Street (Poughkeepsie) and Fairmont Avenue (Westchester) D265496/32728709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:35:55Z"},"road_event_id":"7WlNzuvgxLzI9EI4I9fgFpjbE8w=","beginning_cross_street":"Market Street","ending_cross_street":"Fairmont Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.929352,41.701741]]}},{"id":"l5pAhKf2J1CJn38I9IRldi/FTYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qm+VQlsiHLlc+9J1tStnUhFr5LA="}],"description":"Road maintenance operations on I-684 northbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 9 E/W - I-84 (Southeast) Res 8-3 RW/32729209 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-16T15:55:53Z"},"road_event_id":"l5pAhKf2J1CJn38I9IRldi/FTYo=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 9 E/W - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.650802,41.346595]]}},{"id":"qm+VQlsiHLlc+9J1tStnUhFr5LA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5pAhKf2J1CJn38I9IRldi/FTYo="}],"description":"Road maintenance operations on I-684 northbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 9 E/W - I-84 (Southeast) Res 8-3 RW/32729209 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-16T15:55:53Z"},"road_event_id":"qm+VQlsiHLlc+9J1tStnUhFr5LA=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 9 E/W - I-84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.650802,41.346595]]}},{"id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"d62kZ2uudjolcOl8cCKMlvH3pdw="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"d62kZ2uudjolcOl8cCKMlvH3pdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0="},{"type":"next-occurrence","id":"vzIPPDLdvAbe2DJouVqUWmnqT60="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"d62kZ2uudjolcOl8cCKMlvH3pdw=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"vzIPPDLdvAbe2DJouVqUWmnqT60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0="},{"type":"next-occurrence","id":"kHm/lBt9lafPqovY6hB8bWmEDSQ="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"vzIPPDLdvAbe2DJouVqUWmnqT60=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"kHm/lBt9lafPqovY6hB8bWmEDSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0="},{"type":"next-occurrence","id":"WzWsj0DLeOfKRhdlfcSYm4jdpGQ="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"kHm/lBt9lafPqovY6hB8bWmEDSQ=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"WzWsj0DLeOfKRhdlfcSYm4jdpGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0="},{"type":"next-occurrence","id":"W/Qj7ARwWR/ISVsl1q4PQEWdibk="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"WzWsj0DLeOfKRhdlfcSYm4jdpGQ=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"W/Qj7ARwWR/ISVsl1q4PQEWdibk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0="},{"type":"next-occurrence","id":"myemnJ9ShTTlCnkAbouipZ90v9Q="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"W/Qj7ARwWR/ISVsl1q4PQEWdibk=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"myemnJ9ShTTlCnkAbouipZ90v9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0="},{"type":"next-occurrence","id":"CZ4O46pCLKwu8CzmBvP+95i+uUY="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"myemnJ9ShTTlCnkAbouipZ90v9Q=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"CZ4O46pCLKwu8CzmBvP+95i+uUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rqrBEQ/1WLJM7CnBO40LJ7KgNj0="}],"description":"Construction on NY 32 both directions between Frank Koenig Boulevard (Kingston) and Frank Sottile Boulevard (Kingston) 2025084619463/29145509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T16:27:44Z"},"road_event_id":"CZ4O46pCLKwu8CzmBvP+95i+uUY=","beginning_cross_street":"Frank Koenig Boulevard","ending_cross_street":"Frank Sottile Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.980176,41.947689]]}},{"id":"cMZ9PyE5c0ffgU+q0x9KpWw22SY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 20 westbound between Pine Ridge Rd (Sennett) and Walker Rd (Sennett), Continuous Monday April 20th, 2026 07:00 AM thru Tuesday July 21st, 2026 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T16:21:27Z"},"road_event_id":"cMZ9PyE5c0ffgU+q0x9KpWw22SY=","beginning_cross_street":"Pine Ridge Rd ","ending_cross_street":"Walker Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.506805,42.938441]]}},{"id":"zoqqjUF5o3Xgpe3u3t5i3zEvAI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xV+hV19J3Ty/6tsPYY2HX9HnZd0="}],"description":"Roadwork on NY 22 southbound between Carman Road (Scarsdale) and Ferncliff Road (Scarsdale) D265565/32729309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-16T16:43:57Z"},"road_event_id":"zoqqjUF5o3Xgpe3u3t5i3zEvAI0=","beginning_cross_street":"Carman Road","ending_cross_street":"Ferncliff Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799401,40.982352]]}},{"id":"xV+hV19J3Ty/6tsPYY2HX9HnZd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zoqqjUF5o3Xgpe3u3t5i3zEvAI0="},{"type":"next-occurrence","id":"Gbgs66qgkuAujpARP/PBFL+/RKE="}],"description":"Roadwork on NY 22 southbound between Carman Road (Scarsdale) and Ferncliff Road (Scarsdale) D265565/32729309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-16T16:43:57Z"},"road_event_id":"xV+hV19J3Ty/6tsPYY2HX9HnZd0=","beginning_cross_street":"Carman Road","ending_cross_street":"Ferncliff Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799401,40.982352]]}},{"id":"Gbgs66qgkuAujpARP/PBFL+/RKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zoqqjUF5o3Xgpe3u3t5i3zEvAI0="}],"description":"Roadwork on NY 22 southbound between Carman Road (Scarsdale) and Ferncliff Road (Scarsdale) D265565/32729309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-16T16:43:57Z"},"road_event_id":"Gbgs66qgkuAujpARP/PBFL+/RKE=","beginning_cross_street":"Carman Road","ending_cross_street":"Ferncliff Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799401,40.982352]]}},{"id":"7iFnxcOySDgL2KzHv/HrE6ezu+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of CR 669/Canfield Av (Mine Hill Twp) and West of I-80 (Denville Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, , moving operation","update_date":"2026-04-16T17:00:21Z"},"road_event_id":"7iFnxcOySDgL2KzHv/HrE6ezu+0=","beginning_cross_street":"East of CR 669/Canfield Av","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.600013,40.879898]]}},{"id":"k9WlPV/SeRTh98RaZaZLNobxZG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-80 (Denville Twp) and East of CR 669/Canfield Av (Mine Hill Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, , moving operation","update_date":"2026-04-16T17:00:20Z"},"road_event_id":"k9WlPV/SeRTh98RaZaZLNobxZG8=","beginning_cross_street":"West of I-80","ending_cross_street":"East of CR 669/Canfield Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.490287,40.897205]]}},{"id":"Z3f1BiieT3sycRCKEWmFJylOHFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E6PmyvcGRZNN7RCzEW9ECBvzlB0="}],"description":"Guard rail repairs on NY 9A southbound between Holly Place (Hastings-on-Hudson) and Heath Place (Hastings-on-Hudson) D265183/32514309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, right lane closure","update_date":"2026-04-16T17:26:37Z"},"road_event_id":"Z3f1BiieT3sycRCKEWmFJylOHFc=","beginning_cross_street":"Holly Place","ending_cross_street":"Heath Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865356,40.98122]]}},{"id":"E6PmyvcGRZNN7RCzEW9ECBvzlB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z3f1BiieT3sycRCKEWmFJylOHFc="},{"type":"next-occurrence","id":"UKwlx0V7iIHTfxJ0aXkvolT1+5o="}],"description":"Guard rail repairs on NY 9A southbound between Holly Place (Hastings-on-Hudson) and Heath Place (Hastings-on-Hudson) D265183/32514309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, right lane closure","update_date":"2026-04-16T17:26:37Z"},"road_event_id":"E6PmyvcGRZNN7RCzEW9ECBvzlB0=","beginning_cross_street":"Holly Place","ending_cross_street":"Heath Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865356,40.98122]]}},{"id":"UKwlx0V7iIHTfxJ0aXkvolT1+5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z3f1BiieT3sycRCKEWmFJylOHFc="}],"description":"Guard rail repairs on NY 9A southbound between Holly Place (Hastings-on-Hudson) and Heath Place (Hastings-on-Hudson) D265183/32514309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, right lane closure","update_date":"2026-04-16T17:26:37Z"},"road_event_id":"UKwlx0V7iIHTfxJ0aXkvolT1+5o=","beginning_cross_street":"Holly Place","ending_cross_street":"Heath Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865356,40.98122]]}},{"id":"/z1QhIQpC9vUZcHlSZU8dx0yYEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gSRmpKHm+ZsLd956xWxKoYq/pI0="}],"description":"Utility work on NY 286 westbound at Creek Street; Blossom Road; CR 22 (Penfield) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T17:30:55Z"},"road_event_id":"/z1QhIQpC9vUZcHlSZU8dx0yYEY=","beginning_cross_street":"Creek Street; Blossom Road; CR 22","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.506152,43.153662]]}},{"id":"gSRmpKHm+ZsLd956xWxKoYq/pI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/z1QhIQpC9vUZcHlSZU8dx0yYEY="},{"type":"next-occurrence","id":"sksIP89sKRSoxVSZUAZZQGDcOII="}],"description":"Utility work on NY 286 westbound at Creek Street; Blossom Road; CR 22 (Penfield) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T17:30:55Z"},"road_event_id":"gSRmpKHm+ZsLd956xWxKoYq/pI0=","beginning_cross_street":"Creek Street; Blossom Road; CR 22","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.506152,43.153662]]}},{"id":"sksIP89sKRSoxVSZUAZZQGDcOII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/z1QhIQpC9vUZcHlSZU8dx0yYEY="}],"description":"Utility work on NY 286 westbound at Creek Street; Blossom Road; CR 22 (Penfield) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T17:30:55Z"},"road_event_id":"sksIP89sKRSoxVSZUAZZQGDcOII=","beginning_cross_street":"Creek Street; Blossom Road; CR 22","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.506152,43.153662]]}},{"id":"zFx1RPKoadWS7S1Nx7goEHyeFtk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YiXNzmQ5g2XvISAnb6sG7mLIRcY="}],"description":"Utility work on NY 436 both directions at South State Street; NY 408; North State Street (Nunda), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-16T17:35:29Z"},"road_event_id":"zFx1RPKoadWS7S1Nx7goEHyeFtk=","beginning_cross_street":"South State Street; NY 408; North State Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.94262,42.579505]]}},{"id":"YiXNzmQ5g2XvISAnb6sG7mLIRcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zFx1RPKoadWS7S1Nx7goEHyeFtk="},{"type":"next-occurrence","id":"WckM0NygOjxF9x3vNEr7xvvbrJo="}],"description":"Utility work on NY 436 both directions at South State Street; NY 408; North State Street (Nunda), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-16T17:35:29Z"},"road_event_id":"YiXNzmQ5g2XvISAnb6sG7mLIRcY=","beginning_cross_street":"South State Street; NY 408; North State Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.94262,42.579505]]}},{"id":"WckM0NygOjxF9x3vNEr7xvvbrJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zFx1RPKoadWS7S1Nx7goEHyeFtk="}],"description":"Utility work on NY 436 both directions at South State Street; NY 408; North State Street (Nunda), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-16T17:35:29Z"},"road_event_id":"WckM0NygOjxF9x3vNEr7xvvbrJo=","beginning_cross_street":"South State Street; NY 408; North State Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.94262,42.579505]]}},{"id":"pChW5vVhhEHoHr6BW3RQ7jujxCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 89"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IV0fo2YhTj1gQDJqcM9uO7PDfp0="}],"description":"Utility work on NY 89 both directions between Cotton Rd (Butler) and South Butler Rd. (Butler) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-04-16T17:39:58Z"},"road_event_id":"pChW5vVhhEHoHr6BW3RQ7jujxCY=","beginning_cross_street":"Cotton Rd","ending_cross_street":"South Butler Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.75806,43.116278]]}},{"id":"IV0fo2YhTj1gQDJqcM9uO7PDfp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 89"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pChW5vVhhEHoHr6BW3RQ7jujxCY="}],"description":"Utility work on NY 89 both directions between Cotton Rd (Butler) and South Butler Rd. (Butler) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-04-16T17:39:58Z"},"road_event_id":"IV0fo2YhTj1gQDJqcM9uO7PDfp0=","beginning_cross_street":"Cotton Rd","ending_cross_street":"South Butler Rd. ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.75806,43.116278]]}},{"id":"UsdohKQAPNhbQOMCZOhwxQVti7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 both directions at Roosevelt Avenue (New York), Wednesday April 22nd,2026 thru Thursday April 23rd,2026, Wednesday, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-21T07:00:01Z"},"road_event_id":"UsdohKQAPNhbQOMCZOhwxQVti7s=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838631,40.757261]]}},{"id":"pVr/TeuCZoob0a/Bx7exZO+jphI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lAGiu1LenpVm7t7co3hnkGknr6Y="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"pVr/TeuCZoob0a/Bx7exZO+jphI=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"lAGiu1LenpVm7t7co3hnkGknr6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pVr/TeuCZoob0a/Bx7exZO+jphI="},{"type":"next-occurrence","id":"JoMT7aLJhXJlP0lYIPZHv7zMiRo="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"lAGiu1LenpVm7t7co3hnkGknr6Y=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"JoMT7aLJhXJlP0lYIPZHv7zMiRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pVr/TeuCZoob0a/Bx7exZO+jphI="},{"type":"next-occurrence","id":"ez5S3L77/ZM5H6lO3BsLK2G9MEA="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"JoMT7aLJhXJlP0lYIPZHv7zMiRo=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"ez5S3L77/ZM5H6lO3BsLK2G9MEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pVr/TeuCZoob0a/Bx7exZO+jphI="},{"type":"next-occurrence","id":"VWnmZWxQID/bVgNVLJUUhgXKotg="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"ez5S3L77/ZM5H6lO3BsLK2G9MEA=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"VWnmZWxQID/bVgNVLJUUhgXKotg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pVr/TeuCZoob0a/Bx7exZO+jphI="},{"type":"next-occurrence","id":"hoJ2SZXMxF8M6QH2u09ig7bvvNs="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"VWnmZWxQID/bVgNVLJUUhgXKotg=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"hoJ2SZXMxF8M6QH2u09ig7bvvNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pVr/TeuCZoob0a/Bx7exZO+jphI="},{"type":"next-occurrence","id":"1wYU4YNcQtQ8iXYAWyIlxFtUODU="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"hoJ2SZXMxF8M6QH2u09ig7bvvNs=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"1wYU4YNcQtQ8iXYAWyIlxFtUODU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pVr/TeuCZoob0a/Bx7exZO+jphI="},{"type":"next-occurrence","id":"G6tpbjZ5f7OrVVplQirk4Qdb7zM="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"1wYU4YNcQtQ8iXYAWyIlxFtUODU=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"G6tpbjZ5f7OrVVplQirk4Qdb7zM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 65"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pVr/TeuCZoob0a/Bx7exZO+jphI="}],"description":"Utility work on NY 65 both directions between House St (West Bloomfield) and NY 5 and 20; US 20; START ROUTE NY 65 (West Bloomfield) Alternating lane closures with flaggers as needed, Monday March 23rd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:49:29Z"},"road_event_id":"G6tpbjZ5f7OrVVplQirk4Qdb7zM=","beginning_cross_street":"House St","ending_cross_street":"NY 5 and 20; US 20; START ROUTE NY 65","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.552124,42.927724]]}},{"id":"wvc8gzC3Hly29+MKkKH2LOrf4xE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Ronkonkoma"],"direction":"unknown","related_road_events":[],"description":"Signal repairs on Ronkonkoma both directions between Ronkonkoma (Islip) and Penn Station (New York) Ronkonkoma Branch trains will run hourly, Continuous Saturday April 25th,2026 12:00 AM thru Monday April 27th,2026 04:00 AM","update_date":"2026-04-20T08:00:20Z"},"road_event_id":"wvc8gzC3Hly29+MKkKH2LOrf4xE=","beginning_cross_street":"Ronkonkoma","ending_cross_street":"Penn Station","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-27T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.10594,40.808086]]}},{"id":"wt7D4dAfj41F1auLO/ZMJHPvLHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hlX3aqTV3ENwmQbqjB8yE3bfwjI="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"wt7D4dAfj41F1auLO/ZMJHPvLHk=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"hlX3aqTV3ENwmQbqjB8yE3bfwjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"OIyAV09gl/K3A5VTkbEkmHz8GyQ="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"hlX3aqTV3ENwmQbqjB8yE3bfwjI=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"OIyAV09gl/K3A5VTkbEkmHz8GyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"0vyGQ7ub+9jl3jUgDYEt/jBfGX4="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"OIyAV09gl/K3A5VTkbEkmHz8GyQ=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"0vyGQ7ub+9jl3jUgDYEt/jBfGX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"lyjmc7+biKgHl+FlrGB2lLn72Xw="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"0vyGQ7ub+9jl3jUgDYEt/jBfGX4=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"lyjmc7+biKgHl+FlrGB2lLn72Xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"tdvPOInosSbpGPxROjc7owSLV4o="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"lyjmc7+biKgHl+FlrGB2lLn72Xw=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"tdvPOInosSbpGPxROjc7owSLV4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"9gQi0Fwo5/2RLDoWztU2XylNXQo="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"tdvPOInosSbpGPxROjc7owSLV4o=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"9gQi0Fwo5/2RLDoWztU2XylNXQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"5zAbzBctZRbZj+W/X5irS0CarbY="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"9gQi0Fwo5/2RLDoWztU2XylNXQo=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"5zAbzBctZRbZj+W/X5irS0CarbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"vI5p4qWpof6mTZcD3ysprs4NWQ0="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"5zAbzBctZRbZj+W/X5irS0CarbY=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"vI5p4qWpof6mTZcD3ysprs4NWQ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="},{"type":"next-occurrence","id":"h2UVqKJ9kqXor5h/yihV0cP+BBs="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"vI5p4qWpof6mTZcD3ysprs4NWQ0=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"h2UVqKJ9kqXor5h/yihV0cP+BBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wt7D4dAfj41F1auLO/ZMJHPvLHk="}],"description":"Utility work on NY 64 both directions between Parrish Rd (West Bloomfield) and Taylor Rd. (Mendon) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:58:16Z"},"road_event_id":"h2UVqKJ9kqXor5h/yihV0cP+BBs=","beginning_cross_street":"Parrish Rd","ending_cross_street":"Taylor Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.494477,42.953967]]}},{"id":"TAh7DtzJW+P3y4JWp+wP0Sp10y8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WJlAPjtt86L0TcOpqlBdEmXSoqA="}],"description":"Installation of fiber optics on NY 21 both directions Cohocton Street; NY 371 (Cohocton) 1 Lane, 2 Way, Flagger Control, Thursday April 2nd, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T18:03:13Z"},"road_event_id":"TAh7DtzJW+P3y4JWp+wP0Sp10y8=","beginning_cross_street":"Cohocton Street; NY 371","ending_cross_street":"Cohocton Street; NY 371","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.465546,42.56136]]}},{"id":"WJlAPjtt86L0TcOpqlBdEmXSoqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TAh7DtzJW+P3y4JWp+wP0Sp10y8="},{"type":"next-occurrence","id":"zJAmOtl+L4vsp5I1lEg1PUFgjqE="}],"description":"Installation of fiber optics on NY 21 both directions Cohocton Street; NY 371 (Cohocton) 1 Lane, 2 Way, Flagger Control, Thursday April 2nd, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T18:03:13Z"},"road_event_id":"WJlAPjtt86L0TcOpqlBdEmXSoqA=","beginning_cross_street":"Cohocton Street; NY 371","ending_cross_street":"Cohocton Street; NY 371","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.465546,42.56136]]}},{"id":"zJAmOtl+L4vsp5I1lEg1PUFgjqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TAh7DtzJW+P3y4JWp+wP0Sp10y8="}],"description":"Installation of fiber optics on NY 21 both directions Cohocton Street; NY 371 (Cohocton) 1 Lane, 2 Way, Flagger Control, Thursday April 2nd, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T18:03:13Z"},"road_event_id":"zJAmOtl+L4vsp5I1lEg1PUFgjqE=","beginning_cross_street":"Cohocton Street; NY 371","ending_cross_street":"Cohocton Street; NY 371","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.465546,42.56136]]}},{"id":"NjYPCVQ0rqySVd8kOTBG0HPcHU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21 to CR 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UwKAQxFUzxz8zhvsQ62l5LcBK5A="}],"description":"Utility work on NY 21 to CR 32 both directions between NOTT RD (Canandaigua) and Bristol Road; NY 21 South; END ROUTE (Canandaigua) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-04-16T18:12:11Z"},"road_event_id":"NjYPCVQ0rqySVd8kOTBG0HPcHU4=","beginning_cross_street":"NOTT RD","ending_cross_street":"Bristol Road; NY 21   South; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.314903,42.84282]]}},{"id":"UwKAQxFUzxz8zhvsQ62l5LcBK5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21 to CR 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NjYPCVQ0rqySVd8kOTBG0HPcHU4="}],"description":"Utility work on NY 21 to CR 32 both directions between NOTT RD (Canandaigua) and Bristol Road; NY 21 South; END ROUTE (Canandaigua) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes","update_date":"2026-04-16T18:12:11Z"},"road_event_id":"UwKAQxFUzxz8zhvsQ62l5LcBK5A=","beginning_cross_street":"NOTT RD","ending_cross_street":"Bristol Road; NY 21   South; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.314903,42.84282]]}},{"id":"avx9juHRfQCWRNDrS2pFbLEFB0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 both directions at Exit 23 - Main Street (New York), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-16T18:13:27Z"},"road_event_id":"avx9juHRfQCWRNDrS2pFbLEFB0w=","beginning_cross_street":"Exit 23 - Main Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825947,40.742318]]}},{"id":"NiW9Bj+4y5tmZ04QCixRUF1KvbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+ON+u1t5bqVxOXrD22KDVcByaEU="}],"description":"Watermain break repairs on NY 15A both directions area of Goodburlet Rd (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:16:23Z"},"road_event_id":"NiW9Bj+4y5tmZ04QCixRUF1KvbA=","beginning_cross_street":"Goodburlet Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.617213,43.05042]]}},{"id":"+ON+u1t5bqVxOXrD22KDVcByaEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiW9Bj+4y5tmZ04QCixRUF1KvbA="},{"type":"next-occurrence","id":"8xe+doNYMOXKim++M/pM+QukUW0="}],"description":"Watermain break repairs on NY 15A both directions area of Goodburlet Rd (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:16:23Z"},"road_event_id":"+ON+u1t5bqVxOXrD22KDVcByaEU=","beginning_cross_street":"Goodburlet Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.617213,43.05042]]}},{"id":"8xe+doNYMOXKim++M/pM+QukUW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NiW9Bj+4y5tmZ04QCixRUF1KvbA="}],"description":"Watermain break repairs on NY 15A both directions area of Goodburlet Rd (Henrietta) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T18:16:23Z"},"road_event_id":"8xe+doNYMOXKim++M/pM+QukUW0=","beginning_cross_street":"Goodburlet Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.617213,43.05042]]}},{"id":"WyQey0KjdqVXhIzOrqFvlSkCOdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"g4QVQPc+MK1vl05uEAIrgkcoedM="}],"description":"Bridge work on I-390 both directions between Exit 18B - NY 204; Ramp (Gates) and NY 390 at Exit 27A 27B - Lake Ontario State Parkway (Greece) Mobile Operation with short duration stops at bridges., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:22:02Z"},"road_event_id":"WyQey0KjdqVXhIzOrqFvlSkCOdc=","beginning_cross_street":"Exit 18B - NY 204; Ramp","ending_cross_street":"Exit 27A 27B - Lake Ontario State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.660916,43.131076]]}},{"id":"g4QVQPc+MK1vl05uEAIrgkcoedM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WyQey0KjdqVXhIzOrqFvlSkCOdc="},{"type":"next-occurrence","id":"GZLN28cXv4GRLI6Kn59hymYFW6U="}],"description":"Bridge work on I-390 both directions between Exit 18B - NY 204; Ramp (Gates) and NY 390 at Exit 27A 27B - Lake Ontario State Parkway (Greece) Mobile Operation with short duration stops at bridges., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:22:02Z"},"road_event_id":"g4QVQPc+MK1vl05uEAIrgkcoedM=","beginning_cross_street":"Exit 18B - NY 204; Ramp","ending_cross_street":"Exit 27A 27B - Lake Ontario State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.660916,43.131076]]}},{"id":"GZLN28cXv4GRLI6Kn59hymYFW6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WyQey0KjdqVXhIzOrqFvlSkCOdc="}],"description":"Bridge work on I-390 both directions between Exit 18B - NY 204; Ramp (Gates) and NY 390 at Exit 27A 27B - Lake Ontario State Parkway (Greece) Mobile Operation with short duration stops at bridges., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:22:02Z"},"road_event_id":"GZLN28cXv4GRLI6Kn59hymYFW6U=","beginning_cross_street":"Exit 18B - NY 204; Ramp","ending_cross_street":"Exit 27A 27B - Lake Ontario State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.660916,43.131076]]}},{"id":"Y0PWcLDbHCDaIQMa4oYl8fCSxZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 northbound ramp to Northern Boulevard; NY 25A (New York), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T18:22:55Z"},"road_event_id":"Y0PWcLDbHCDaIQMa4oYl8fCSxZg=","beginning_cross_street":"Northern Boulevard; NY 25A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837645,40.762331]]}},{"id":"0g06ctDPrMHtkn9GXGhTe5F7mO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Grand Central Parkway eastbound at Exit 9E - Whitestone Expressway (New York), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-16T18:35:17Z"},"road_event_id":"0g06ctDPrMHtkn9GXGhTe5F7mO0=","beginning_cross_street":"Exit 9E - Whitestone Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.856592,40.759957]]}},{"id":"0O2uh+kAu2MY6OQWPhpP/GCZr6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["17TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3C5lEkMd/tb2nK/cYi7ipurwSUM="}],"description":"Construction on 17TH ST eastbound between HAMILTON AVE (New York) and 3RD AVE (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T18:36:08Z"},"road_event_id":"0O2uh+kAu2MY6OQWPhpP/GCZr6Y=","beginning_cross_street":"HAMILTON AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996106,40.666527]]}},{"id":"3C5lEkMd/tb2nK/cYi7ipurwSUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["17TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0O2uh+kAu2MY6OQWPhpP/GCZr6Y="}],"description":"Construction on 17TH ST eastbound between HAMILTON AVE (New York) and 3RD AVE (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T18:36:08Z"},"road_event_id":"3C5lEkMd/tb2nK/cYi7ipurwSUM=","beginning_cross_street":"HAMILTON AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.996106,40.666527]]}},{"id":"YoLxQbhOB+c9Ldt7SzGn6cU1OKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions at 54th Road (New York), Friday April 24th, 2026 thru Saturday April 25th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T18:38:28Z"},"road_event_id":"YoLxQbhOB+c9Ldt7SzGn6cU1OKg=","beginning_cross_street":"54th Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925522,40.731681]]}},{"id":"7UqWvRtTcGMux/TD5c9/72bjuX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LAUREL HILL BLVD"],"direction":"unknown","related_road_events":[],"description":"Construction on LAUREL HILL BLVD both directions at 58TH ST (New York), Friday April 24th, 2026 thru Saturday April 25th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-16T18:41:06Z"},"road_event_id":"7UqWvRtTcGMux/TD5c9/72bjuX0=","beginning_cross_street":"58TH ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.909792,40.736325]]}},{"id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8lHsm3lpOp3anqdAzmH7CAMJgoA="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed eastbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed westbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed westbound","update_date":"2026-04-16T18:43:19Z"},"road_event_id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:01:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"8lHsm3lpOp3anqdAzmH7CAMJgoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A="},{"type":"next-occurrence","id":"GDVPzeUDbeKlPhyev1+pkJiDorc="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed eastbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed westbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed westbound","update_date":"2026-04-16T18:43:19Z"},"road_event_id":"8lHsm3lpOp3anqdAzmH7CAMJgoA=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"GDVPzeUDbeKlPhyev1+pkJiDorc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A="},{"type":"next-occurrence","id":"0KA0Es99Dry48E43V6//7JnVpoc="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed eastbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed westbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed westbound","update_date":"2026-04-16T18:43:19Z"},"road_event_id":"GDVPzeUDbeKlPhyev1+pkJiDorc=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"0KA0Es99Dry48E43V6//7JnVpoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A="},{"type":"next-occurrence","id":"v7GNjuvLhormiySickQPw/JXZFA="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed eastbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed westbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed westbound","update_date":"2026-04-16T18:43:19Z"},"road_event_id":"0KA0Es99Dry48E43V6//7JnVpoc=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"v7GNjuvLhormiySickQPw/JXZFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A="},{"type":"next-occurrence","id":"8MtH05fQgI/+rw4uSFnH2NYBlU8="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed eastbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed westbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed westbound","update_date":"2026-04-16T18:43:19Z"},"road_event_id":"v7GNjuvLhormiySickQPw/JXZFA=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"8MtH05fQgI/+rw4uSFnH2NYBlU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A="},{"type":"next-occurrence","id":"186hdTEN3hqEWsg3hIO/yJMkAUI="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed eastbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed westbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed westbound","update_date":"2026-04-16T18:43:19Z"},"road_event_id":"8MtH05fQgI/+rw4uSFnH2NYBlU8=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"186hdTEN3hqEWsg3hIO/yJMkAUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1b9RkqmOsCfbo6iwBA+o3vBfq/A="}],"description":"Construction on Grand Central Parkway both directions from Roosevelt Avenue (New York) to 69th Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed eastbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed eastbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed westbound, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 12:01 AM 1 Right lane of 4 lanes closed westbound, Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:01 AM thru 05:00 AM 2 Right lanes of 4 lanes closed westbound","update_date":"2026-04-16T18:43:19Z"},"road_event_id":"186hdTEN3hqEWsg3hIO/yJMkAUI=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"69th Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852194,40.752603]]}},{"id":"6k0f9XfbfNE3hjMKtp0iI+T7kxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 both directions at 48th Street; Ramp (New York), Friday April 24th, 2026 thru Saturday April 25th, 2026, 09:00 PM thru 03:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-16T18:43:39Z"},"road_event_id":"6k0f9XfbfNE3hjMKtp0iI+T7kxA=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907106,40.727487]]}},{"id":"J2FNHkIvYwXyB0D++i/IY5r2KLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sglxFER5fft84y9yfQIof1MFlp4="}],"description":"Construction on NY 9A both directions between Joseph P Ward Street; START ROUTE NY 9A; West Street; Ramp (New York) and West 57th Street; 12th Avenue (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-16T18:45:34Z"},"road_event_id":"J2FNHkIvYwXyB0D++i/IY5r2KLM=","beginning_cross_street":"Joseph P Ward Street; START ROUTE NY 9A; West Street; Ramp","ending_cross_street":"West 57th Street; 12th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016427,40.705177]]}},{"id":"sglxFER5fft84y9yfQIof1MFlp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J2FNHkIvYwXyB0D++i/IY5r2KLM="},{"type":"next-occurrence","id":"tun1xDUJJsiIHhqjXOSgfGpzSpM="}],"description":"Construction on NY 9A both directions between Joseph P Ward Street; START ROUTE NY 9A; West Street; Ramp (New York) and West 57th Street; 12th Avenue (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-16T18:45:34Z"},"road_event_id":"sglxFER5fft84y9yfQIof1MFlp4=","beginning_cross_street":"Joseph P Ward Street; START ROUTE NY 9A; West Street; Ramp","ending_cross_street":"West 57th Street; 12th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016427,40.705177]]}},{"id":"tun1xDUJJsiIHhqjXOSgfGpzSpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J2FNHkIvYwXyB0D++i/IY5r2KLM="}],"description":"Construction on NY 9A both directions between Joseph P Ward Street; START ROUTE NY 9A; West Street; Ramp (New York) and West 57th Street; 12th Avenue (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-16T18:45:34Z"},"road_event_id":"tun1xDUJJsiIHhqjXOSgfGpzSpM=","beginning_cross_street":"Joseph P Ward Street; START ROUTE NY 9A; West Street; Ramp","ending_cross_street":"West 57th Street; 12th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.016427,40.705177]]}},{"id":"EHEZ3QdKuQ2ESjXLGswsBraSCPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TVOX2FqD3qf2+kweaF5Fhmanto8="}],"description":"Construction on NY 27 westbound from 7th Avenue (New York) to 4th Avenue (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-04-16T18:52:44Z"},"road_event_id":"EHEZ3QdKuQ2ESjXLGswsBraSCPQ=","beginning_cross_street":"7th Avenue","ending_cross_street":"4th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987321,40.660594]]}},{"id":"TVOX2FqD3qf2+kweaF5Fhmanto8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EHEZ3QdKuQ2ESjXLGswsBraSCPQ="},{"type":"next-occurrence","id":"xQrJG9wd53JT38BdvH6jUV/7Gqw="}],"description":"Construction on NY 27 westbound from 7th Avenue (New York) to 4th Avenue (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-04-16T18:52:44Z"},"road_event_id":"TVOX2FqD3qf2+kweaF5Fhmanto8=","beginning_cross_street":"7th Avenue","ending_cross_street":"4th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987321,40.660594]]}},{"id":"xQrJG9wd53JT38BdvH6jUV/7Gqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EHEZ3QdKuQ2ESjXLGswsBraSCPQ="}],"description":"Construction on NY 27 westbound from 7th Avenue (New York) to 4th Avenue (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed","update_date":"2026-04-16T18:52:44Z"},"road_event_id":"xQrJG9wd53JT38BdvH6jUV/7Gqw=","beginning_cross_street":"7th Avenue","ending_cross_street":"4th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987321,40.660594]]}},{"id":"eaYUn+7SN5uXB5Or7ksOg2qv8/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NrD3jLbfLZ81S8Pf6hyuI4x/3SM="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:55:00Z"},"road_event_id":"eaYUn+7SN5uXB5Or7ksOg2qv8/w=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97801,40.653853]]}},{"id":"NrD3jLbfLZ81S8Pf6hyuI4x/3SM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eaYUn+7SN5uXB5Or7ksOg2qv8/w="},{"type":"next-occurrence","id":"zczzTQvbixSt7hXmfVriwQaufMo="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:55:00Z"},"road_event_id":"NrD3jLbfLZ81S8Pf6hyuI4x/3SM=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97801,40.653853]]}},{"id":"zczzTQvbixSt7hXmfVriwQaufMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eaYUn+7SN5uXB5Or7ksOg2qv8/w="}],"description":"Construction on NY 27 eastbound from Seeley Street (New York) to Exit 5 - East 5th Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:55:00Z"},"road_event_id":"zczzTQvbixSt7hXmfVriwQaufMo=","beginning_cross_street":"Seeley Street","ending_cross_street":"Exit 5 - East 5th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97801,40.653853]]}},{"id":"TiaMVO6mcKoLPru75f7YPS1i7iw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NARROWS RD N"],"direction":"unknown","related_road_events":[],"description":"Construction on NARROWS RD N westbound from RICHMOND RD (New York) to CLOVE RD (New York) Subject to change without notice., Saturday April 25th, 2026, 09:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed service road","update_date":"2026-04-16T18:59:53Z"},"road_event_id":"TiaMVO6mcKoLPru75f7YPS1i7iw=","beginning_cross_street":"RICHMOND RD","ending_cross_street":"CLOVE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.090302,40.609493]]}},{"id":"5rrUUN/mMrJRLqMyG4urRPZN+DI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLOVE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Or0d7rgK/TyKIkZdFFvRAQVCTLE="}],"description":"Construction on CLOVE RD eastbound from EMERSON DR (New York) to NARROWS RD S (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed service road","update_date":"2026-04-16T19:04:08Z"},"road_event_id":"5rrUUN/mMrJRLqMyG4urRPZN+DI=","beginning_cross_street":"EMERSON DR","ending_cross_street":"NARROWS RD S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097261,40.610273]]}},{"id":"Or0d7rgK/TyKIkZdFFvRAQVCTLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLOVE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5rrUUN/mMrJRLqMyG4urRPZN+DI="},{"type":"next-occurrence","id":"L3uRyn8RUC7oPGFagg/R0bElg1k="}],"description":"Construction on CLOVE RD eastbound from EMERSON DR (New York) to NARROWS RD S (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed service road","update_date":"2026-04-16T19:04:08Z"},"road_event_id":"Or0d7rgK/TyKIkZdFFvRAQVCTLE=","beginning_cross_street":"EMERSON DR","ending_cross_street":"NARROWS RD S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097261,40.610273]]}},{"id":"L3uRyn8RUC7oPGFagg/R0bElg1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLOVE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5rrUUN/mMrJRLqMyG4urRPZN+DI="},{"type":"next-occurrence","id":"tE8LmreSatsTrxP57jqjmDWjGdc="}],"description":"Construction on CLOVE RD eastbound from EMERSON DR (New York) to NARROWS RD S (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed service road","update_date":"2026-04-16T19:04:08Z"},"road_event_id":"L3uRyn8RUC7oPGFagg/R0bElg1k=","beginning_cross_street":"EMERSON DR","ending_cross_street":"NARROWS RD S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097261,40.610273]]}},{"id":"tE8LmreSatsTrxP57jqjmDWjGdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLOVE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5rrUUN/mMrJRLqMyG4urRPZN+DI="}],"description":"Construction on CLOVE RD eastbound from EMERSON DR (New York) to NARROWS RD S (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed service road","update_date":"2026-04-16T19:04:08Z"},"road_event_id":"tE8LmreSatsTrxP57jqjmDWjGdc=","beginning_cross_street":"EMERSON DR","ending_cross_street":"NARROWS RD S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097261,40.610273]]}},{"id":"ZMQmy6Yhoa1imUfDvhe0qwPqiUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on Staten Island Expressway/I-278 HOV Lane both directions at Fingerboard Road; Verrazano Narrows Bridge (Staten Island), Wednesday April 22nd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T19:14:41Z"},"road_event_id":"ZMQmy6Yhoa1imUfDvhe0qwPqiUk=","beginning_cross_street":"Fingerboard Road; Verrazano Narrows Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.06902,40.604017]]}},{"id":"LiM8ZweYS5k33Anh07tciRHy91Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"333jdLv+qg84a2crU4sSJnkpgCE="}],"description":"Utility work on US 20 eastbound from ASBURY RD (Pavilion) to Town of Pavilion and Town of York Line (York) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder. , Thursday April 16th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:43:05Z"},"road_event_id":"LiM8ZweYS5k33Anh07tciRHy91Q=","beginning_cross_street":"ASBURY RD","ending_cross_street":"Town of Pavilion and Town of York Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.965804,42.91181]]}},{"id":"333jdLv+qg84a2crU4sSJnkpgCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LiM8ZweYS5k33Anh07tciRHy91Q="},{"type":"next-occurrence","id":"3fMNlmNHGxNQ2NMs7Vu8BJHJQYo="}],"description":"Utility work on US 20 eastbound from ASBURY RD (Pavilion) to Town of Pavilion and Town of York Line (York) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder. , Thursday April 16th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:43:05Z"},"road_event_id":"333jdLv+qg84a2crU4sSJnkpgCE=","beginning_cross_street":"ASBURY RD","ending_cross_street":"Town of Pavilion and Town of York Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.965804,42.91181]]}},{"id":"3fMNlmNHGxNQ2NMs7Vu8BJHJQYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LiM8ZweYS5k33Anh07tciRHy91Q="}],"description":"Utility work on US 20 eastbound from ASBURY RD (Pavilion) to Town of Pavilion and Town of York Line (York) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder. , Thursday April 16th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:43:05Z"},"road_event_id":"3fMNlmNHGxNQ2NMs7Vu8BJHJQYo=","beginning_cross_street":"ASBURY RD","ending_cross_street":"Town of Pavilion and Town of York Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.965804,42.91181]]}},{"id":"UfT12hpDZVNmgKnPr5L0NUtRi3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions at Drive Martin Luther King Expressway (Staten Island), Thursday April 23rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-16T19:17:40Z"},"road_event_id":"UfT12hpDZVNmgKnPr5L0NUtRi3g=","beginning_cross_street":"Drive Martin Luther King Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153587,40.612268]]}},{"id":"Wy8YS7O7jNAk93SojtPyiOwfo38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 both directions at Exit 8 - Willowbrook Expressway (Staten Island), Friday April 24th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-16T19:21:11Z"},"road_event_id":"Wy8YS7O7jNAk93SojtPyiOwfo38=","beginning_cross_street":"Exit 8 - Willowbrook Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.156222,40.614296]]}},{"id":"qtw/ZcQgT0osmzS4vgB8+srenSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Korean Veterans Memorial Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Korean Veterans Memorial Parkway both directions at Arden Avenue (Staten Island), Friday April 24th, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T19:23:45Z"},"road_event_id":"qtw/ZcQgT0osmzS4vgB8+srenSk=","beginning_cross_street":"Arden Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.180818,40.546557]]}},{"id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9LQ7tMhSxG6JnL65aTQlf3pjgUY="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"9LQ7tMhSxG6JnL65aTQlf3pjgUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"4GenUjM9yUShWbOSrsncOnBqSt0="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"9LQ7tMhSxG6JnL65aTQlf3pjgUY=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"4GenUjM9yUShWbOSrsncOnBqSt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"FX4CJoLiHpEWJ5t/92834JLppLE="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"4GenUjM9yUShWbOSrsncOnBqSt0=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"FX4CJoLiHpEWJ5t/92834JLppLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"4PR12gw4HXHy9fabch6SZwvyAFU="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"FX4CJoLiHpEWJ5t/92834JLppLE=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"4PR12gw4HXHy9fabch6SZwvyAFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"y+C6AkKZY3OZip6yMgXsFVRcnOc="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"4PR12gw4HXHy9fabch6SZwvyAFU=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"y+C6AkKZY3OZip6yMgXsFVRcnOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"uHPYvcwnLqy6yCMx6x/VjT9JsTk="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"y+C6AkKZY3OZip6yMgXsFVRcnOc=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"uHPYvcwnLqy6yCMx6x/VjT9JsTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"xG/dRAVuYF2PiWZsthoWId1MM5k="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"uHPYvcwnLqy6yCMx6x/VjT9JsTk=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"xG/dRAVuYF2PiWZsthoWId1MM5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"pn1HYoSsiQWfCdC+4AXgMHqOFO0="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"xG/dRAVuYF2PiWZsthoWId1MM5k=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"pn1HYoSsiQWfCdC+4AXgMHqOFO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="},{"type":"next-occurrence","id":"vyEXX7o2L4DLfLFEiF8P8gzWpFc="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"pn1HYoSsiQWfCdC+4AXgMHqOFO0=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"vyEXX7o2L4DLfLFEiF8P8gzWpFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dfp3Qz7/7g+hlGUpJyqxUJDqZsc="}],"description":"Utility work on NY 31 eastbound from HARTSHORN DR (Sweden) to SHERRY LN (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossings. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T21:37:29Z"},"road_event_id":"vyEXX7o2L4DLfLFEiF8P8gzWpFc=","beginning_cross_street":"HARTSHORN DR","ending_cross_street":"SHERRY LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.95472,43.19835]]}},{"id":"+q3GPDv6Wiwdn90l6VqdyxyMR4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GRvUgNscwAoNhVyF4pL77BP6Ulk="}],"description":"Construction on I-87 Major Deegan Expressway northbound from West Tremont Avenue (New York) to West Fordham Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T19:29:32Z"},"road_event_id":"+q3GPDv6Wiwdn90l6VqdyxyMR4I=","beginning_cross_street":"West Tremont Avenue","ending_cross_street":"West Fordham Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919676,40.853455]]}},{"id":"GRvUgNscwAoNhVyF4pL77BP6Ulk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+q3GPDv6Wiwdn90l6VqdyxyMR4I="},{"type":"next-occurrence","id":"VYSa45WTfbHpllUaTjM6Yp7HZBs="}],"description":"Construction on I-87 Major Deegan Expressway northbound from West Tremont Avenue (New York) to West Fordham Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T19:29:32Z"},"road_event_id":"GRvUgNscwAoNhVyF4pL77BP6Ulk=","beginning_cross_street":"West Tremont Avenue","ending_cross_street":"West Fordham Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919676,40.853455]]}},{"id":"VYSa45WTfbHpllUaTjM6Yp7HZBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+q3GPDv6Wiwdn90l6VqdyxyMR4I="}],"description":"Construction on I-87 Major Deegan Expressway northbound from West Tremont Avenue (New York) to West Fordham Road (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T19:29:32Z"},"road_event_id":"VYSa45WTfbHpllUaTjM6Yp7HZBs=","beginning_cross_street":"West Tremont Avenue","ending_cross_street":"West Fordham Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.919676,40.853455]]}},{"id":"UI+vnzbgOBCZXkY97TjseXRTMEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KryGV9EzGt+rvjH2/8vDN/epPTs="}],"description":"Construction on Grand Central Parkway eastbound from 168th Street (New York) to Homelawn Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T19:31:11Z"},"road_event_id":"UI+vnzbgOBCZXkY97TjseXRTMEs=","beginning_cross_street":"168th Street","ending_cross_street":"Homelawn Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797358,40.717486]]}},{"id":"KryGV9EzGt+rvjH2/8vDN/epPTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UI+vnzbgOBCZXkY97TjseXRTMEs="},{"type":"next-occurrence","id":"Rjr0/Q1YUYR4smh/p4qkEhUllok="}],"description":"Construction on Grand Central Parkway eastbound from 168th Street (New York) to Homelawn Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T19:31:11Z"},"road_event_id":"KryGV9EzGt+rvjH2/8vDN/epPTs=","beginning_cross_street":"168th Street","ending_cross_street":"Homelawn Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797358,40.717486]]}},{"id":"Rjr0/Q1YUYR4smh/p4qkEhUllok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UI+vnzbgOBCZXkY97TjseXRTMEs="}],"description":"Construction on Grand Central Parkway eastbound from 168th Street (New York) to Homelawn Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T19:31:11Z"},"road_event_id":"Rjr0/Q1YUYR4smh/p4qkEhUllok=","beginning_cross_street":"168th Street","ending_cross_street":"Homelawn Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.797358,40.717486]]}},{"id":"82sOtQgiKm7TFy2l4gDSs+dtWvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Zv3+s0EITrvieXBgEtrwRDoarCo="}],"description":"Construction on I-278 eastbound from Richmond Road; Targee Street (Staten Island) to Hylan Boulevard Exit; Ramp (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 5 lanes closed","update_date":"2026-04-16T19:33:10Z"},"road_event_id":"82sOtQgiKm7TFy2l4gDSs+dtWvE=","beginning_cross_street":"Richmond Road; Targee Street","ending_cross_street":"Hylan Boulevard Exit; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.088801,40.608277]]}},{"id":"Zv3+s0EITrvieXBgEtrwRDoarCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82sOtQgiKm7TFy2l4gDSs+dtWvE="},{"type":"next-occurrence","id":"tzbw5cSAsEiWxETTa3IeXmhn+OM="}],"description":"Construction on I-278 eastbound from Richmond Road; Targee Street (Staten Island) to Hylan Boulevard Exit; Ramp (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 5 lanes closed","update_date":"2026-04-16T19:33:10Z"},"road_event_id":"Zv3+s0EITrvieXBgEtrwRDoarCo=","beginning_cross_street":"Richmond Road; Targee Street","ending_cross_street":"Hylan Boulevard Exit; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.088801,40.608277]]}},{"id":"tzbw5cSAsEiWxETTa3IeXmhn+OM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"82sOtQgiKm7TFy2l4gDSs+dtWvE="}],"description":"Construction on I-278 eastbound from Richmond Road; Targee Street (Staten Island) to Hylan Boulevard Exit; Ramp (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 5 lanes closed","update_date":"2026-04-16T19:33:10Z"},"road_event_id":"tzbw5cSAsEiWxETTa3IeXmhn+OM=","beginning_cross_street":"Richmond Road; Targee Street","ending_cross_street":"Hylan Boulevard Exit; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.088801,40.608277]]}},{"id":"EDWKlfbuJ6afnUQYn78TRnvMJiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FRzcaICTcfN7iw3p/RW1eOcSjII="}],"description":"Construction on I-278 westbound from Hylan Boulevard Exit; Ramp (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 5 lanes closed","update_date":"2026-04-16T19:34:48Z"},"road_event_id":"EDWKlfbuJ6afnUQYn78TRnvMJiU=","beginning_cross_street":"Hylan Boulevard Exit; Ramp","ending_cross_street":"Hylan Boulevard Exit; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.076698,40.606232]]}},{"id":"FRzcaICTcfN7iw3p/RW1eOcSjII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDWKlfbuJ6afnUQYn78TRnvMJiU="},{"type":"next-occurrence","id":"lje76k+y50J0oy1+rDcX6tSQfHo="}],"description":"Construction on I-278 westbound from Hylan Boulevard Exit; Ramp (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 5 lanes closed","update_date":"2026-04-16T19:34:48Z"},"road_event_id":"FRzcaICTcfN7iw3p/RW1eOcSjII=","beginning_cross_street":"Hylan Boulevard Exit; Ramp","ending_cross_street":"Hylan Boulevard Exit; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.076698,40.606232]]}},{"id":"lje76k+y50J0oy1+rDcX6tSQfHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EDWKlfbuJ6afnUQYn78TRnvMJiU="}],"description":"Construction on I-278 westbound from Hylan Boulevard Exit; Ramp (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 5 lanes closed","update_date":"2026-04-16T19:34:48Z"},"road_event_id":"lje76k+y50J0oy1+rDcX6tSQfHo=","beginning_cross_street":"Hylan Boulevard Exit; Ramp","ending_cross_street":"Hylan Boulevard Exit; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.076698,40.606232]]}},{"id":"FeFGtBO/6D/xQSMCX3ibvr0jPMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PK9HfO1Y1NehgIdHKVYlKhyBg1A="}],"description":"Construction on I-495 westbound from NY 25 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-16T19:36:42Z"},"road_event_id":"FeFGtBO/6D/xQSMCX3ibvr0jPMA=","beginning_cross_street":"NY 25","ending_cross_street":"NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.871572,40.731802]]}},{"id":"PK9HfO1Y1NehgIdHKVYlKhyBg1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeFGtBO/6D/xQSMCX3ibvr0jPMA="},{"type":"next-occurrence","id":"24cwG9ufAwDO7Q/VPsFIri6T+PQ="}],"description":"Construction on I-495 westbound from NY 25 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-16T19:36:42Z"},"road_event_id":"PK9HfO1Y1NehgIdHKVYlKhyBg1A=","beginning_cross_street":"NY 25","ending_cross_street":"NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.871572,40.731802]]}},{"id":"24cwG9ufAwDO7Q/VPsFIri6T+PQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FeFGtBO/6D/xQSMCX3ibvr0jPMA="}],"description":"Construction on I-495 westbound from NY 25 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-16T19:36:42Z"},"road_event_id":"24cwG9ufAwDO7Q/VPsFIri6T+PQ=","beginning_cross_street":"NY 25","ending_cross_street":"NY 25","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.871572,40.731802]]}},{"id":"FnUgvVMmxnXSur7TqZbEbksNYcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OG2sSfyPj7GH5d9tm36GD1rPyS4="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"FnUgvVMmxnXSur7TqZbEbksNYcw=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"OG2sSfyPj7GH5d9tm36GD1rPyS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"FWq45/4iR50X5A+jTLfpIJF4YvI="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"OG2sSfyPj7GH5d9tm36GD1rPyS4=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"FWq45/4iR50X5A+jTLfpIJF4YvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"z64Ec61LLuV4R7udnjpGGWDCW4o="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"FWq45/4iR50X5A+jTLfpIJF4YvI=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"z64Ec61LLuV4R7udnjpGGWDCW4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"bficW8RTUujbv7qWpjluGTwgzC0="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"z64Ec61LLuV4R7udnjpGGWDCW4o=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"bficW8RTUujbv7qWpjluGTwgzC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"yURGMtEqbOP+ynXIuv5qA/tnfEg="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"bficW8RTUujbv7qWpjluGTwgzC0=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"yURGMtEqbOP+ynXIuv5qA/tnfEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"fAhq/mMuZEhgp/A2neLOz7ovsc8="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"yURGMtEqbOP+ynXIuv5qA/tnfEg=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"fAhq/mMuZEhgp/A2neLOz7ovsc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"dLUM6aKdEWHweReFhuCozHSOtjE="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"fAhq/mMuZEhgp/A2neLOz7ovsc8=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"dLUM6aKdEWHweReFhuCozHSOtjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"5q2ZPbZDdulfkAtm2qK9Ngg4CyU="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"dLUM6aKdEWHweReFhuCozHSOtjE=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"5q2ZPbZDdulfkAtm2qK9Ngg4CyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="},{"type":"next-occurrence","id":"GpSvl/dRNwQLHmjkS0WYB57qcWA="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"5q2ZPbZDdulfkAtm2qK9Ngg4CyU=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"GpSvl/dRNwQLHmjkS0WYB57qcWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FnUgvVMmxnXSur7TqZbEbksNYcw="}],"description":"Utility work on NY 19 both directions between Brockport Spencerport Road; NY 31; 4th Section Road (Sweden) and Park Avenue (Sweden) We will be placing/splicing aerial fiber. Right/left lane/shoulder closure needed. Temporary road closure needed for aerial crossing. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:38:21Z"},"road_event_id":"GpSvl/dRNwQLHmjkS0WYB57qcWA=","beginning_cross_street":"Brockport Spencerport Road; NY 31; 4th Section Road","ending_cross_street":"Park Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.944373,43.187349]]}},{"id":"fye/fLdDRfx7+k6Pfcw3Imm2THA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4JvMOFQ8DgM3FEdTv3/J4xIl2VY="}],"description":"Construction on I-278 eastbound ramp to Northern Boulevard (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T19:41:36Z"},"road_event_id":"fye/fLdDRfx7+k6Pfcw3Imm2THA=","beginning_cross_street":"Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.897392,40.752028]]}},{"id":"4JvMOFQ8DgM3FEdTv3/J4xIl2VY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fye/fLdDRfx7+k6Pfcw3Imm2THA="},{"type":"next-occurrence","id":"FS9D+fcwT+OPGFNPdcmlQQd3Ef0="}],"description":"Construction on I-278 eastbound ramp to Northern Boulevard (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T19:41:36Z"},"road_event_id":"4JvMOFQ8DgM3FEdTv3/J4xIl2VY=","beginning_cross_street":"Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.897392,40.752028]]}},{"id":"FS9D+fcwT+OPGFNPdcmlQQd3Ef0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fye/fLdDRfx7+k6Pfcw3Imm2THA="}],"description":"Construction on I-278 eastbound ramp to Northern Boulevard (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-16T19:41:36Z"},"road_event_id":"FS9D+fcwT+OPGFNPdcmlQQd3Ef0=","beginning_cross_street":"Northern Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.897392,40.752028]]}},{"id":"eNDs7LPEFKF1Es7yxvhZJLnhubM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LhVQcbRfRSmE3SttqBRCsaED3cE="}],"description":"Construction on NY 9A southbound from West 45th Street (New York) to Chambers Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-16T19:43:47Z"},"road_event_id":"eNDs7LPEFKF1Es7yxvhZJLnhubM=","beginning_cross_street":"West 45th Street","ending_cross_street":"Chambers Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999133,40.76379]]}},{"id":"LhVQcbRfRSmE3SttqBRCsaED3cE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eNDs7LPEFKF1Es7yxvhZJLnhubM="}],"description":"Construction on NY 9A southbound from West 45th Street (New York) to Chambers Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-16T19:43:47Z"},"road_event_id":"LhVQcbRfRSmE3SttqBRCsaED3cE=","beginning_cross_street":"West 45th Street","ending_cross_street":"Chambers Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999133,40.76379]]}},{"id":"1SgBVkQFot7HYO0l+SPaSGmlAIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6QyRTJqEaMCIcHjfVUUBKdjI3E0="}],"description":"Utility work on NY 260 northbound between Gordon Rd (Sweden) and Gilmore Rd (Clarkson), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:56:49Z"},"road_event_id":"1SgBVkQFot7HYO0l+SPaSGmlAIo=","beginning_cross_street":"Gordon Rd","ending_cross_street":"Gilmore Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.894789,43.211856]]}},{"id":"6QyRTJqEaMCIcHjfVUUBKdjI3E0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1SgBVkQFot7HYO0l+SPaSGmlAIo="},{"type":"next-occurrence","id":"vy4uDLhqSmmiZaeRGSllmjIXcIY="}],"description":"Utility work on NY 260 northbound between Gordon Rd (Sweden) and Gilmore Rd (Clarkson), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:56:49Z"},"road_event_id":"6QyRTJqEaMCIcHjfVUUBKdjI3E0=","beginning_cross_street":"Gordon Rd","ending_cross_street":"Gilmore Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.894789,43.211856]]}},{"id":"vy4uDLhqSmmiZaeRGSllmjIXcIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 260"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1SgBVkQFot7HYO0l+SPaSGmlAIo="}],"description":"Utility work on NY 260 northbound between Gordon Rd (Sweden) and Gilmore Rd (Clarkson), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T19:56:49Z"},"road_event_id":"vy4uDLhqSmmiZaeRGSllmjIXcIY=","beginning_cross_street":"Gordon Rd","ending_cross_street":"Gilmore Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.894789,43.211856]]}},{"id":"ej+G8YFCcFGfU3+KhMYOi26Uljw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"N5/hbGqxBaS6bMBIju/xe5He630="}],"description":"Utility work on NY 19 northbound between Munson St (Le Roy) and Myrtle St (Le Roy) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:10:34Z"},"road_event_id":"ej+G8YFCcFGfU3+KhMYOi26Uljw=","beginning_cross_street":"Munson St","ending_cross_street":"Myrtle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993556,42.970524]]}},{"id":"N5/hbGqxBaS6bMBIju/xe5He630=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ej+G8YFCcFGfU3+KhMYOi26Uljw="},{"type":"next-occurrence","id":"Uc4WXtWxhw9Bk3m4lik/AWM4Y60="}],"description":"Utility work on NY 19 northbound between Munson St (Le Roy) and Myrtle St (Le Roy) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:10:34Z"},"road_event_id":"N5/hbGqxBaS6bMBIju/xe5He630=","beginning_cross_street":"Munson St","ending_cross_street":"Myrtle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993556,42.970524]]}},{"id":"Uc4WXtWxhw9Bk3m4lik/AWM4Y60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ej+G8YFCcFGfU3+KhMYOi26Uljw="}],"description":"Utility work on NY 19 northbound between Munson St (Le Roy) and Myrtle St (Le Roy) Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:10:34Z"},"road_event_id":"Uc4WXtWxhw9Bk3m4lik/AWM4Y60=","beginning_cross_street":"Munson St","ending_cross_street":"Myrtle St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.993556,42.970524]]}},{"id":"YqEzM3WVhBxvLt3DnazIsT5d5sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vOaOV8o2YTdVctQhCu0YLX21uNQ="}],"description":"Utility work on NY 36 northbound between EULER RD (Ogden) and WHITTIER RD (Ogden) We will be transferring cables off old poles and removing the old poles. Right/left lane/shoulder closures needed. Work beyond shoulder., Thursday April 16th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:07:33Z"},"road_event_id":"YqEzM3WVhBxvLt3DnazIsT5d5sc=","beginning_cross_street":"EULER RD","ending_cross_street":"WHITTIER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.856669,43.142275]]}},{"id":"vOaOV8o2YTdVctQhCu0YLX21uNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YqEzM3WVhBxvLt3DnazIsT5d5sc="},{"type":"next-occurrence","id":"0IxSh7HY4dZ96PIeGSVuZJBjdDM="}],"description":"Utility work on NY 36 northbound between EULER RD (Ogden) and WHITTIER RD (Ogden) We will be transferring cables off old poles and removing the old poles. Right/left lane/shoulder closures needed. Work beyond shoulder., Thursday April 16th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:07:33Z"},"road_event_id":"vOaOV8o2YTdVctQhCu0YLX21uNQ=","beginning_cross_street":"EULER RD","ending_cross_street":"WHITTIER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.856669,43.142275]]}},{"id":"0IxSh7HY4dZ96PIeGSVuZJBjdDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YqEzM3WVhBxvLt3DnazIsT5d5sc="}],"description":"Utility work on NY 36 northbound between EULER RD (Ogden) and WHITTIER RD (Ogden) We will be transferring cables off old poles and removing the old poles. Right/left lane/shoulder closures needed. Work beyond shoulder., Thursday April 16th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:07:33Z"},"road_event_id":"0IxSh7HY4dZ96PIeGSVuZJBjdDM=","beginning_cross_street":"EULER RD","ending_cross_street":"WHITTIER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.856669,43.142275]]}},{"id":"FzeCgDh2hURHg3POSuIf1Rb4rpg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6Okuah7A2sfNly/jtq9/HtRfiuQ="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"FzeCgDh2hURHg3POSuIf1Rb4rpg=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"6Okuah7A2sfNly/jtq9/HtRfiuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"esDQxVRPZD3JUc8Yg28qVEKS59M="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"6Okuah7A2sfNly/jtq9/HtRfiuQ=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"esDQxVRPZD3JUc8Yg28qVEKS59M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"PvslKz1VLjPN9Sg2WuxcgL1l2N4="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"esDQxVRPZD3JUc8Yg28qVEKS59M=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"PvslKz1VLjPN9Sg2WuxcgL1l2N4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"aq3LX7PFOn2BqBpYsCBYEFgOOjA="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"PvslKz1VLjPN9Sg2WuxcgL1l2N4=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"aq3LX7PFOn2BqBpYsCBYEFgOOjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"op0XmZ7xXG05FlOao0AOKEPmrn8="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"aq3LX7PFOn2BqBpYsCBYEFgOOjA=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"op0XmZ7xXG05FlOao0AOKEPmrn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"rItGNOuAUD9qyHJqLBCTGWxHGmc="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"op0XmZ7xXG05FlOao0AOKEPmrn8=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"rItGNOuAUD9qyHJqLBCTGWxHGmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"CrvGPuQCJYjaSrg3/fJjf+rVxkM="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"rItGNOuAUD9qyHJqLBCTGWxHGmc=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"CrvGPuQCJYjaSrg3/fJjf+rVxkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"xe9yHrNksQ017LNLRzABmNDnZfA="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"CrvGPuQCJYjaSrg3/fJjf+rVxkM=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"xe9yHrNksQ017LNLRzABmNDnZfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="},{"type":"next-occurrence","id":"Mx6LHO0ZNEdEXb0pGDOQaD/egk0="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"xe9yHrNksQ017LNLRzABmNDnZfA=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"Mx6LHO0ZNEdEXb0pGDOQaD/egk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FzeCgDh2hURHg3POSuIf1Rb4rpg="}],"description":"Utility work on NY 332 northbound between Howell St (Canandaigua) and Buffalo Rd (Canandaigua) We will be removing/placing/splicing aerial/underground fiber/copper. Work will be beyond shoulder. , Thursday April 16th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:12:02Z"},"road_event_id":"Mx6LHO0ZNEdEXb0pGDOQaD/egk0=","beginning_cross_street":"Howell St","ending_cross_street":"Buffalo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.284888,42.892666]]}},{"id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KaKRuhMmKFnG9JVqmHZ+lu/dqVU="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"KaKRuhMmKFnG9JVqmHZ+lu/dqVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"DOWvbxpS5A9JAe/unw/sdNPQFX4="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"KaKRuhMmKFnG9JVqmHZ+lu/dqVU=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"DOWvbxpS5A9JAe/unw/sdNPQFX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"jA4gMYCp3NCOTNsL0+1odSGQFWs="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"DOWvbxpS5A9JAe/unw/sdNPQFX4=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"jA4gMYCp3NCOTNsL0+1odSGQFWs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"mROp9LF6tlM4FpRJ8LGFWEfFavE="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"jA4gMYCp3NCOTNsL0+1odSGQFWs=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"mROp9LF6tlM4FpRJ8LGFWEfFavE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"4jtjo6uZlG14CrcL1wqoFe5ZCMs="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"mROp9LF6tlM4FpRJ8LGFWEfFavE=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"4jtjo6uZlG14CrcL1wqoFe5ZCMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"oRCzLoL1NQPmUv7xdpDQ3H79yeQ="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"4jtjo6uZlG14CrcL1wqoFe5ZCMs=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"oRCzLoL1NQPmUv7xdpDQ3H79yeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"aYPnhRzKzvxXza1/M2MFLXBDX40="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"oRCzLoL1NQPmUv7xdpDQ3H79yeQ=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"aYPnhRzKzvxXza1/M2MFLXBDX40=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"OCOoJs4AYrUcCW8afJPZj49Te0w="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"aYPnhRzKzvxXza1/M2MFLXBDX40=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"OCOoJs4AYrUcCW8afJPZj49Te0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="},{"type":"next-occurrence","id":"OYe5T9YPjU83ADaitLJOPQbD2dA="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"OCOoJs4AYrUcCW8afJPZj49Te0w=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"OYe5T9YPjU83ADaitLJOPQbD2dA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 77"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WzgAkQTgRdyhEvWeR9xtuDMjbK8="}],"description":"Utility work on NY 77 northbound at 8993 Alleghany Rd (Pembroke) We are doing underground work for a DOT road move. Right/left lane/shoulder closure needed. , Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:15:42Z"},"road_event_id":"OYe5T9YPjU83ADaitLJOPQbD2dA=","beginning_cross_street":"8993 Alleghany Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.40603,42.97803]]}},{"id":"uC0g5PpYXfVD/u9yZZkKXSSepdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zEV7H3MUpnypxdVviDaY6jZ0O7M="}],"description":"Pothole repair on NY 404 both directions between Five Mile Line Road (Webster) and NY 250 (Webster) EMERGENCY POT HOLE REPAIRS WITH FLAGGING OPERATION , Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:40:16Z"},"road_event_id":"uC0g5PpYXfVD/u9yZZkKXSSepdI=","beginning_cross_street":"Five Mile Line Road","ending_cross_street":"NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.474886,43.205029]]}},{"id":"zEV7H3MUpnypxdVviDaY6jZ0O7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uC0g5PpYXfVD/u9yZZkKXSSepdI="}],"description":"Pothole repair on NY 404 both directions between Five Mile Line Road (Webster) and NY 250 (Webster) EMERGENCY POT HOLE REPAIRS WITH FLAGGING OPERATION , Thursday April 16th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T20:40:16Z"},"road_event_id":"zEV7H3MUpnypxdVviDaY6jZ0O7M=","beginning_cross_street":"Five Mile Line Road","ending_cross_street":"NY 250","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.474886,43.205029]]}},{"id":"3wGY+sp+YI24SFlj3W/ZpMKA6BY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 181"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 181 Northbound North of Espanong Rd (Jefferson Twp) Friday April 24, 2026 09:00 AM thru 03:00 PM, All lanes open","update_date":"2026-04-16T20:48:39Z"},"road_event_id":"3wGY+sp+YI24SFlj3W/ZpMKA6BY=","beginning_cross_street":"North of Espanong Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.604537,40.978179]]}},{"id":"sT79ISB9NzdIs1b3kHoo4sWDpBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 181"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 181 Northbound North of Espanong Rd (Jefferson Twp) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, All lanes open","update_date":"2026-04-16T20:48:19Z"},"road_event_id":"sT79ISB9NzdIs1b3kHoo4sWDpBQ=","beginning_cross_street":"North of Espanong Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.604537,40.978179]]}},{"id":"mRGH8YPuyVK+0Xo1Ef6uBaEXACE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 284"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 284 Both Directions between North of NJ 23 (Sussex) and South of Old Rt 84 (Wantage Twp) Wednesday April 22, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-16T20:58:05Z"},"road_event_id":"mRGH8YPuyVK+0Xo1Ef6uBaEXACE=","beginning_cross_street":"North of NJ 23","ending_cross_street":"South of Old Rt 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601837,41.213638]]}},{"id":"iGoYHm4/7BCnjuZZY1XRuj06ooo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 284"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 284 Both Directions between North of NJ 23 (Sussex) and South of Old Rt 84 (Wantage Twp) Friday April 24, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-16T20:58:15Z"},"road_event_id":"iGoYHm4/7BCnjuZZY1XRuj06ooo=","beginning_cross_street":"North of NJ 23","ending_cross_street":"South of Old Rt 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601837,41.213638]]}},{"id":"drrseQNDz4H2XY4f8oq06tSfYeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 284"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 284 Both Directions between North of NJ 23 (Sussex) and South of Old Rt 84 (Wantage Twp) Thursday April 23, 2026 09:00 AM thru 03:30 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-16T20:58:10Z"},"road_event_id":"drrseQNDz4H2XY4f8oq06tSfYeA=","beginning_cross_street":"North of NJ 23","ending_cross_street":"South of Old Rt 84","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601837,41.213638]]}},{"id":"QyPlDUzL+5CGu+lcd8m2axa2e3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY 298; Bear Street (Syracuse), Continuous Monday May 4th, 2026 07:00 AM thru Friday May 8th, 2026 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T22:30:27Z"},"road_event_id":"QyPlDUzL+5CGu+lcd8m2axa2e3g=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY 298; Bear Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167759,43.055941]]}},{"id":"6p7GAudTq4A7vW6KrDer2ojkxKo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 290"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5Bs57x7rO1sQgW7s8tUIRKhPSJ8="}],"description":"Tree trimming on NY 290 both directions between Clemons Road (Manlius) and Minoa Rd (Manlius) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T23:27:39Z"},"road_event_id":"6p7GAudTq4A7vW6KrDer2ojkxKo=","beginning_cross_street":"Clemons Road","ending_cross_street":"Minoa Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.010722,43.059474]]}},{"id":"5Bs57x7rO1sQgW7s8tUIRKhPSJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 290"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6p7GAudTq4A7vW6KrDer2ojkxKo="},{"type":"next-occurrence","id":"Kb36smxsO9Cc/9Qfp++kR3+QtTw="}],"description":"Tree trimming on NY 290 both directions between Clemons Road (Manlius) and Minoa Rd (Manlius) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T23:27:39Z"},"road_event_id":"5Bs57x7rO1sQgW7s8tUIRKhPSJ8=","beginning_cross_street":"Clemons Road","ending_cross_street":"Minoa Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.010722,43.059474]]}},{"id":"Kb36smxsO9Cc/9Qfp++kR3+QtTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 290"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6p7GAudTq4A7vW6KrDer2ojkxKo="},{"type":"next-occurrence","id":"jM3DCLBmlVh4BM61YRezD5R17oo="}],"description":"Tree trimming on NY 290 both directions between Clemons Road (Manlius) and Minoa Rd (Manlius) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T23:27:39Z"},"road_event_id":"Kb36smxsO9Cc/9Qfp++kR3+QtTw=","beginning_cross_street":"Clemons Road","ending_cross_street":"Minoa Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.010722,43.059474]]}},{"id":"jM3DCLBmlVh4BM61YRezD5R17oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 290"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6p7GAudTq4A7vW6KrDer2ojkxKo="}],"description":"Tree trimming on NY 290 both directions between Clemons Road (Manlius) and Minoa Rd (Manlius) ; Alternating one-way traffic with flaggers, Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-16T23:27:39Z"},"road_event_id":"jM3DCLBmlVh4BM61YRezD5R17oo=","beginning_cross_street":"Clemons Road","ending_cross_street":"Minoa Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.010722,43.059474]]}},{"id":"VmCTzlhuZwSfnqaFo60QqRrFSNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9Jp4a+pzJGZ2OU694KIylpHrOYs="}],"description":"Roadwork on NY 5 eastbound Town of Dunkirk; Town of Sheridan (Dunkirk) to Town of Dunkirk; Town of Sheridan (Sheridan), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-16T23:29:24Z"},"road_event_id":"VmCTzlhuZwSfnqaFo60QqRrFSNg=","beginning_cross_street":"Town of Dunkirk; Town of Sheridan","ending_cross_street":"Town of Dunkirk; Town of Sheridan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.302478,42.500957]]}},{"id":"9Jp4a+pzJGZ2OU694KIylpHrOYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VmCTzlhuZwSfnqaFo60QqRrFSNg="},{"type":"next-occurrence","id":"g3gNqcCzsJWHiiIETzGzlsVt/XI="}],"description":"Roadwork on NY 5 eastbound Town of Dunkirk; Town of Sheridan (Dunkirk) to Town of Dunkirk; Town of Sheridan (Sheridan), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-16T23:29:24Z"},"road_event_id":"9Jp4a+pzJGZ2OU694KIylpHrOYs=","beginning_cross_street":"Town of Dunkirk; Town of Sheridan","ending_cross_street":"Town of Dunkirk; Town of Sheridan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.302478,42.500957]]}},{"id":"g3gNqcCzsJWHiiIETzGzlsVt/XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VmCTzlhuZwSfnqaFo60QqRrFSNg="}],"description":"Roadwork on NY 5 eastbound Town of Dunkirk; Town of Sheridan (Dunkirk) to Town of Dunkirk; Town of Sheridan (Sheridan), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-16T23:29:24Z"},"road_event_id":"g3gNqcCzsJWHiiIETzGzlsVt/XI=","beginning_cross_street":"Town of Dunkirk; Town of Sheridan","ending_cross_street":"Town of Dunkirk; Town of Sheridan","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-79.302478,42.500957]]}},{"id":"PRswPJhWH3kCbrvn6Foz6vUj528=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY-930J - BEAR RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"58y85XY6DLHoy0iyxwMSxDizTAU="}],"description":"Tree trimming on NY-930J - BEAR RD both directions between US-11 (North Syracuse) and South Bay Rd (North Syracuse), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T23:44:48Z"},"road_event_id":"PRswPJhWH3kCbrvn6Foz6vUj528=","beginning_cross_street":" US-11","ending_cross_street":"South Bay Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126803,43.144983]]}},{"id":"58y85XY6DLHoy0iyxwMSxDizTAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY-930J - BEAR RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PRswPJhWH3kCbrvn6Foz6vUj528="},{"type":"next-occurrence","id":"W1n1UgATQemThqtKiZ/wHTZXDIQ="}],"description":"Tree trimming on NY-930J - BEAR RD both directions between US-11 (North Syracuse) and South Bay Rd (North Syracuse), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T23:44:48Z"},"road_event_id":"58y85XY6DLHoy0iyxwMSxDizTAU=","beginning_cross_street":" US-11","ending_cross_street":"South Bay Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126803,43.144983]]}},{"id":"W1n1UgATQemThqtKiZ/wHTZXDIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY-930J - BEAR RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PRswPJhWH3kCbrvn6Foz6vUj528="},{"type":"next-occurrence","id":"zw3WA9JzwgDDEheRFjsw+vrwwpY="}],"description":"Tree trimming on NY-930J - BEAR RD both directions between US-11 (North Syracuse) and South Bay Rd (North Syracuse), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T23:44:48Z"},"road_event_id":"W1n1UgATQemThqtKiZ/wHTZXDIQ=","beginning_cross_street":" US-11","ending_cross_street":"South Bay Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126803,43.144983]]}},{"id":"zw3WA9JzwgDDEheRFjsw+vrwwpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY-930J - BEAR RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PRswPJhWH3kCbrvn6Foz6vUj528="}],"description":"Tree trimming on NY-930J - BEAR RD both directions between US-11 (North Syracuse) and South Bay Rd (North Syracuse), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T23:44:48Z"},"road_event_id":"zw3WA9JzwgDDEheRFjsw+vrwwpY=","beginning_cross_street":" US-11","ending_cross_street":"South Bay Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126803,43.144983]]}},{"id":"Oc+xCJ3O2dpJpLIfJncfPTJDcvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"D+xIe7IFo5SIGvulolZQSMcFFNs="}],"description":"Roadwork on NY 18 both directions area of Town of Newfane; Town of Wilson Line (Newfane), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T23:47:17Z"},"road_event_id":"Oc+xCJ3O2dpJpLIfJncfPTJDcvo=","beginning_cross_street":"Town of Newfane; Town of Wilson Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756694,43.32667]]}},{"id":"D+xIe7IFo5SIGvulolZQSMcFFNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oc+xCJ3O2dpJpLIfJncfPTJDcvo="}],"description":"Roadwork on NY 18 both directions area of Town of Newfane; Town of Wilson Line (Newfane), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-16T23:47:17Z"},"road_event_id":"D+xIe7IFo5SIGvulolZQSMcFFNs=","beginning_cross_street":"Town of Newfane; Town of Wilson Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.756694,43.32667]]}},{"id":"Z2epw46l3hh6Fe33GClSxzUDzhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w4hjl9IgdriiZpghoLJihoaNw8Y="}],"description":"Repaving on I-86 eastbound between NY 417 (Salamanca) and Exit 23 - US 219 (Carrollton), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T00:32:31Z"},"road_event_id":"Z2epw46l3hh6Fe33GClSxzUDzhQ=","beginning_cross_street":"NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.750779,42.153817]]}},{"id":"w4hjl9IgdriiZpghoLJihoaNw8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2epw46l3hh6Fe33GClSxzUDzhQ="},{"type":"next-occurrence","id":"Qxw1alhyrhM5+n/bCXc3n/BnodI="}],"description":"Repaving on I-86 eastbound between NY 417 (Salamanca) and Exit 23 - US 219 (Carrollton), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T00:32:31Z"},"road_event_id":"w4hjl9IgdriiZpghoLJihoaNw8Y=","beginning_cross_street":"NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.750779,42.153817]]}},{"id":"Qxw1alhyrhM5+n/bCXc3n/BnodI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2epw46l3hh6Fe33GClSxzUDzhQ="},{"type":"next-occurrence","id":"q3MWZpDjv0WdYPP4KATbXMxQX3w="}],"description":"Repaving on I-86 eastbound between NY 417 (Salamanca) and Exit 23 - US 219 (Carrollton), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T00:32:31Z"},"road_event_id":"Qxw1alhyrhM5+n/bCXc3n/BnodI=","beginning_cross_street":"NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.750779,42.153817]]}},{"id":"q3MWZpDjv0WdYPP4KATbXMxQX3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2epw46l3hh6Fe33GClSxzUDzhQ="}],"description":"Repaving on I-86 eastbound between NY 417 (Salamanca) and Exit 23 - US 219 (Carrollton), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T00:32:31Z"},"road_event_id":"q3MWZpDjv0WdYPP4KATbXMxQX3w=","beginning_cross_street":"NY 417","ending_cross_street":"Exit 23 - US 219","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.750779,42.153817]]}},{"id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5oOIBEI1sfMVenWsllRoG+bVO8M="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"5oOIBEI1sfMVenWsllRoG+bVO8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"MaOTSFq2v1Twuyy/WahrfTOnRVQ="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"5oOIBEI1sfMVenWsllRoG+bVO8M=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"MaOTSFq2v1Twuyy/WahrfTOnRVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"U+tckTCGmAKax5fT3n+YmhzrD48="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"MaOTSFq2v1Twuyy/WahrfTOnRVQ=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"U+tckTCGmAKax5fT3n+YmhzrD48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"dDPWhR8vXMDmywJJM2dtCtV7xKM="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"U+tckTCGmAKax5fT3n+YmhzrD48=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"dDPWhR8vXMDmywJJM2dtCtV7xKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"GYGugvYCYkk2TtM9IaX4MANhMF4="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"dDPWhR8vXMDmywJJM2dtCtV7xKM=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"GYGugvYCYkk2TtM9IaX4MANhMF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"24N0mkSEZSpms4GCVDrqqfN8PK4="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"GYGugvYCYkk2TtM9IaX4MANhMF4=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"24N0mkSEZSpms4GCVDrqqfN8PK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"qLZ+KjTs4xG80NBoVmqznzxaDdA="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"24N0mkSEZSpms4GCVDrqqfN8PK4=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"qLZ+KjTs4xG80NBoVmqznzxaDdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"7FTIF3KN5ZZqQtY/kWuLkweC8Ts="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"qLZ+KjTs4xG80NBoVmqznzxaDdA=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"7FTIF3KN5ZZqQtY/kWuLkweC8Ts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"ijHHBrgSZ1zoTp0Z3NJdRhgvaRc="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"7FTIF3KN5ZZqQtY/kWuLkweC8Ts=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"ijHHBrgSZ1zoTp0Z3NJdRhgvaRc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="},{"type":"next-occurrence","id":"H3mMRpKSjW1VWbnoe0Wl/H2y1Po="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"ijHHBrgSZ1zoTp0Z3NJdRhgvaRc=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"H3mMRpKSjW1VWbnoe0Wl/H2y1Po=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rwqer1D3DcKONu1E1Hu+qvOJ+Mw="}],"description":"Roadwork on I-81 northbound between Exit 102 - US 11; Bartell Road; Brewerton (Cicero) and Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T09:59:42Z"},"road_event_id":"H3mMRpKSjW1VWbnoe0Wl/H2y1Po=","beginning_cross_street":"Exit 102 - US 11; Bartell Road; Brewerton","ending_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.128863,43.231892]]}},{"id":"FLG2uEVXA4QB9HrN0H+iEtd40yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7aYnYi4J+AG/HVGKM2sjAJFEJHA="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"FLG2uEVXA4QB9HrN0H+iEtd40yc=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"7aYnYi4J+AG/HVGKM2sjAJFEJHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"RVilhVXDW44OLQdHFpSiiZ8ukXI="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"7aYnYi4J+AG/HVGKM2sjAJFEJHA=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"RVilhVXDW44OLQdHFpSiiZ8ukXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"2hWw2PZ6+bzqZkdecCavHfondLM="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"RVilhVXDW44OLQdHFpSiiZ8ukXI=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"2hWw2PZ6+bzqZkdecCavHfondLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"oWuz4Soaf5TJjbcl2rRs0vhMZnY="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"2hWw2PZ6+bzqZkdecCavHfondLM=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"oWuz4Soaf5TJjbcl2rRs0vhMZnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"rb6IqqsEbiazmPWYO4DIFc/hvwc="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"oWuz4Soaf5TJjbcl2rRs0vhMZnY=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"rb6IqqsEbiazmPWYO4DIFc/hvwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"UJZBRMc0FwWs2WV7RoWVoBcLKoE="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"rb6IqqsEbiazmPWYO4DIFc/hvwc=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"UJZBRMc0FwWs2WV7RoWVoBcLKoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"5/zl/sLLSIywQn4PpTdNoPFaf08="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"UJZBRMc0FwWs2WV7RoWVoBcLKoE=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"5/zl/sLLSIywQn4PpTdNoPFaf08=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"CdUCom1PMCQ8R0CxINv+zfT9efA="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"5/zl/sLLSIywQn4PpTdNoPFaf08=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"CdUCom1PMCQ8R0CxINv+zfT9efA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"hhBEsUJOUQ17tBUwUfhGK3Mj1cQ="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"CdUCom1PMCQ8R0CxINv+zfT9efA=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"hhBEsUJOUQ17tBUwUfhGK3Mj1cQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="},{"type":"next-occurrence","id":"Xl3Fv0l7rP6SeoYaTXF29OvrPdo="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"hhBEsUJOUQ17tBUwUfhGK3Mj1cQ=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"Xl3Fv0l7rP6SeoYaTXF29OvrPdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FLG2uEVXA4QB9HrN0H+iEtd40yc="}],"description":"Roadwork on I-81 southbound between Exit 131 - CR 15; Sandy Creek; Lacona (Sandy Creek) and Exit 102, US-11 Bartell Road; Brewerton (West Monroe) ; Mobile lane closure, Friday April 17th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T10:05:09Z"},"road_event_id":"Xl3Fv0l7rP6SeoYaTXF29OvrPdo=","beginning_cross_street":"Exit 131 - CR 15; Sandy Creek; Lacona","ending_cross_street":"Exit 102, US-11 Bartell Road; Brewerton","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079749,43.649263]]}},{"id":"kDT99/38XjPl9cYmfKwcaXH9pHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rpF6jBj3CIb9nZNoeXl+yzkWY4M="}],"description":"Construction on NY 365 both directions at Taylor Road (Trenton) motorists will encounter lane closures with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T10:47:22Z"},"road_event_id":"kDT99/38XjPl9cYmfKwcaXH9pHc=","beginning_cross_street":"Taylor Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.173471,43.289425]]}},{"id":"rpF6jBj3CIb9nZNoeXl+yzkWY4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kDT99/38XjPl9cYmfKwcaXH9pHc="},{"type":"next-occurrence","id":"bxVSgPMJrD+q0gIB66COeOZLing="}],"description":"Construction on NY 365 both directions at Taylor Road (Trenton) motorists will encounter lane closures with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T10:47:22Z"},"road_event_id":"rpF6jBj3CIb9nZNoeXl+yzkWY4M=","beginning_cross_street":"Taylor Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.173471,43.289425]]}},{"id":"bxVSgPMJrD+q0gIB66COeOZLing=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 365"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kDT99/38XjPl9cYmfKwcaXH9pHc="}],"description":"Construction on NY 365 both directions at Taylor Road (Trenton) motorists will encounter lane closures with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T10:47:22Z"},"road_event_id":"bxVSgPMJrD+q0gIB66COeOZLing=","beginning_cross_street":"Taylor Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.173471,43.289425]]}},{"id":"of1/SU5rbXhSRGYqtmxoRdyfM/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound between East of Exit 16E - Essex St (Kearny) and East of Stickel Drawbridge (Harrison), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 04:00 AM, right lane closed","update_date":"2026-04-17T11:15:51Z"},"road_event_id":"of1/SU5rbXhSRGYqtmxoRdyfM/c=","beginning_cross_street":"East of Exit 16E - Essex St","ending_cross_street":"East of Stickel Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.140846,40.743904]]}},{"id":"bdb9gA1QSbjRwd41fK9AEgTC/ks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 20 - CR 639 (Clinton Twp), Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, left lane closed","update_date":"2026-04-17T11:15:50Z"},"road_event_id":"bdb9gA1QSbjRwd41fK9AEgTC/ks=","beginning_cross_street":"West of Exit 20 - CR 639","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.849151,40.646621]]}},{"id":"orIA+cneldRCilbyfNBj9xmNHSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 52 - CR 613/Passaic Ave (Fairfield Twp) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-17T11:15:49Z"},"road_event_id":"orIA+cneldRCilbyfNBj9xmNHSU=","beginning_cross_street":"Exit 52 - CR 613/Passaic Ave","ending_cross_street":"Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.275398,40.893867]]}},{"id":"kliXxcY3n5uIxOQrnFCjD3RO8+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 20 - CR 639 (Clinton Twp), Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-04-17T11:15:41Z"},"road_event_id":"kliXxcY3n5uIxOQrnFCjD3RO8+E=","beginning_cross_street":"West of Exit 20 - CR 639","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.849151,40.646621]]}},{"id":"iABj0yoNo1iIa5hIRSUzLxjoFvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Montville Twp), Thursday April 23, 2026 07:00 PM thru Friday April 24, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-17T11:15:38Z"},"road_event_id":"iABj0yoNo1iIa5hIRSUzLxjoFvs=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.331489,40.86687]]}},{"id":"VqOuQa0gikYl+tpGWL3f3+R9gO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T11:15:43Z"},"road_event_id":"VqOuQa0gikYl+tpGWL3f3+R9gO0=","beginning_cross_street":"In the vicinity of Mount Pleasant Tpke","ending_cross_street":"In the vicinity of Mount Pleasant Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.520988,40.871875]]}},{"id":"4gh5IKeJSdh2/fwNpplXXDDwr9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T11:15:42Z"},"road_event_id":"4gh5IKeJSdh2/fwNpplXXDDwr9c=","beginning_cross_street":"In the vicinity of Mount Pleasant Tpke","ending_cross_street":"In the vicinity of Mount Pleasant Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.520988,40.871875]]}},{"id":"RNPegX5n2EOPFOrLSCkoCCB7z2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Montville Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T11:15:47Z"},"road_event_id":"RNPegX5n2EOPFOrLSCkoCCB7z2Y=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.331489,40.86687]]}},{"id":"WGRn3Zm+cPg6FidU/leY62vyc20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 54 - Minnisink Rd (Totowa) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-17T11:15:46Z"},"road_event_id":"WGRn3Zm+cPg6FidU/leY62vyc20=","beginning_cross_street":"Exit 54 - Minnisink Rd","ending_cross_street":"Exit 54 - Minnisink Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.233886,40.899597]]}},{"id":"kbpysk3e/hXb901m6glaGX0OUOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound at South of Lake St (Ramsey) Continuous Thursday April 23, 2026 08:00 AM thru Thursday April 23, 2026 04:00 PM, ramp, left partial lane","update_date":"2026-04-17T11:15:24Z"},"road_event_id":"kbpysk3e/hXb901m6glaGX0OUOQ=","beginning_cross_street":"South of Lake St","ending_cross_street":"South of Lake St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.121513,41.057937]]}},{"id":"darb1cnNGDFwQJ5m22Ji5w4isN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 20 - CR 639 (Clinton Twp), Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, at least one lane closed","update_date":"2026-04-17T11:15:22Z"},"road_event_id":"darb1cnNGDFwQJ5m22Ji5w4isN4=","beginning_cross_street":"West of Exit 20 - CR 639","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.849151,40.646621]]}},{"id":"MtMlVRAZ3zzs/ROUonXrSHPkWjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 52 - CR 613/Passaic Ave (Fairfield Twp) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, ramp","update_date":"2026-04-17T11:15:21Z"},"road_event_id":"MtMlVRAZ3zzs/ROUonXrSHPkWjY=","beginning_cross_street":"Exit 52 - CR 613/Passaic Ave","ending_cross_street":"Exit 52 - CR 613/Passaic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.275398,40.893867]]}},{"id":"iJn0wiFgCfxS7ITsD/I74/8wmrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Morris Tpke (Randolph Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T11:15:26Z"},"road_event_id":"iJn0wiFgCfxS7ITsD/I74/8wmrM=","beginning_cross_street":"In the vicinity of Morris Tpke","ending_cross_street":"In the vicinity of Irish Spring Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614379,40.855094]]}},{"id":"TBi4KeXZKVipUFxt61d2LJHMXbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, left lane closed","update_date":"2026-04-17T11:15:37Z"},"road_event_id":"TBi4KeXZKVipUFxt61d2LJHMXbk=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.329277,40.872406]]}},{"id":"P7EtPwOlbbPtdc4MKLkRRU5HBZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Morris Tpke (Randolph Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T11:15:18Z"},"road_event_id":"P7EtPwOlbbPtdc4MKLkRRU5HBZc=","beginning_cross_street":"In the vicinity of Morris Tpke","ending_cross_street":"In the vicinity of Irish Spring Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614379,40.855094]]}},{"id":"hzy+W332aeGTW0/6Z4Rtu0hWvQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of US 22 (Newark) and Exit 14 - US 46 (Clifton), Thursday April 23, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-17T11:18:22Z"},"road_event_id":"hzy+W332aeGTW0/6Z4Rtu0hWvQU=","beginning_cross_street":"North of US 22","ending_cross_street":"Exit 14 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181159,40.707855]]}},{"id":"6qDLdqSIVzk/Y4dCWzctE1PYC7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of US 22 (Newark) and Exit 14 - US 46 (Clifton), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM,","update_date":"2026-04-17T11:18:21Z"},"road_event_id":"6qDLdqSIVzk/Y4dCWzctE1PYC7o=","beginning_cross_street":"North of US 22","ending_cross_street":"Exit 14 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181159,40.707855]]}},{"id":"ll92MnLJWSdxJp4Wf4zZCljXb9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 35 westbound between Van Resselaer Road (Somers) and Cobbling Rock Drive (Somers) 2025082502725/32701309 - Plan travel accordingly; delays may exist, Friday April 24th, 2026, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-17T11:45:38Z"},"road_event_id":"ll92MnLJWSdxJp4Wf4zZCljXb9Q=","beginning_cross_street":"Van Resselaer Road","ending_cross_street":"Cobbling Rock Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.72494,41.282698]]}},{"id":"Pi635+BVPJI+f8/xbhLE5G91zr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 132"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 132 northbound between Holly Drive (Yorktown) and Barberry Road (Yorktown) 2025082502725/32687009 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 24th, 2026, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-17T11:49:58Z"},"road_event_id":"Pi635+BVPJI+f8/xbhLE5G91zr8=","beginning_cross_street":"Holly Drive","ending_cross_street":"Barberry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808926,41.301827]]}},{"id":"kn1zvYsv6RimLJL3Am0aTELVGMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wrd7csseu8pB6eVRcnxQjSg4wZQ="}],"description":"Utility work on NY 17M eastbound between Main Street (Chester) and Lake Road (Monroe) 2025084500874/32699909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Thursday April 23rd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-17T12:23:51Z"},"road_event_id":"kn1zvYsv6RimLJL3Am0aTELVGMw=","beginning_cross_street":"Main Street","ending_cross_street":"Lake Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.27419,41.351877]]}},{"id":"wrd7csseu8pB6eVRcnxQjSg4wZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kn1zvYsv6RimLJL3Am0aTELVGMw="}],"description":"Utility work on NY 17M eastbound between Main Street (Chester) and Lake Road (Monroe) 2025084500874/32699909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Thursday April 23rd, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-17T12:23:51Z"},"road_event_id":"wrd7csseu8pB6eVRcnxQjSg4wZQ=","beginning_cross_street":"Main Street","ending_cross_street":"Lake Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.27419,41.351877]]}},{"id":"GXJFDbH5HcbpECCf8eoxF2jCdGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wbE4LhQibowi9y7Aga0e3/tD2oA="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:39:24Z"},"road_event_id":"GXJFDbH5HcbpECCf8eoxF2jCdGg=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"wbE4LhQibowi9y7Aga0e3/tD2oA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXJFDbH5HcbpECCf8eoxF2jCdGg="},{"type":"next-occurrence","id":"ETyJpnU1feTdDTwNDuTTwPL7zME="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:39:24Z"},"road_event_id":"wbE4LhQibowi9y7Aga0e3/tD2oA=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"ETyJpnU1feTdDTwNDuTTwPL7zME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXJFDbH5HcbpECCf8eoxF2jCdGg="},{"type":"next-occurrence","id":"gXYQxF0J2rK86EGDLOHiFqIAhyg="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:39:24Z"},"road_event_id":"ETyJpnU1feTdDTwNDuTTwPL7zME=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"gXYQxF0J2rK86EGDLOHiFqIAhyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXJFDbH5HcbpECCf8eoxF2jCdGg="},{"type":"next-occurrence","id":"p5YDfXiTrr1JXtC8awwXrK1lXIc="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:39:24Z"},"road_event_id":"gXYQxF0J2rK86EGDLOHiFqIAhyg=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"p5YDfXiTrr1JXtC8awwXrK1lXIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXJFDbH5HcbpECCf8eoxF2jCdGg="},{"type":"next-occurrence","id":"7MNKfFqs6lyWs4//XSi+xqdRjjM="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:39:24Z"},"road_event_id":"p5YDfXiTrr1JXtC8awwXrK1lXIc=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"7MNKfFqs6lyWs4//XSi+xqdRjjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXJFDbH5HcbpECCf8eoxF2jCdGg="},{"type":"next-occurrence","id":"ppmmH1nJAetk1Ej8phFdxnV6/fw="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:39:24Z"},"road_event_id":"7MNKfFqs6lyWs4//XSi+xqdRjjM=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"ppmmH1nJAetk1Ej8phFdxnV6/fw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GXJFDbH5HcbpECCf8eoxF2jCdGg="}],"description":"Roadwork on NY 100B both directions between Saw Mill River Road - NY 9A (Greenburgh) and Sprain Brook State Parkway (Greenburgh) D265679/32730209 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:39:24Z"},"road_event_id":"ppmmH1nJAetk1Ej8phFdxnV6/fw=","beginning_cross_street":"Saw Mill River Road - NY 9A","ending_cross_street":"Sprain Brook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.841621,41.027706]]}},{"id":"zZcedel1aL5suUiRE+MCNprQMZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OA1oiLZqp+KSCaqB+qgNRQouK90="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:50:22Z"},"road_event_id":"zZcedel1aL5suUiRE+MCNprQMZ4=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"OA1oiLZqp+KSCaqB+qgNRQouK90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZcedel1aL5suUiRE+MCNprQMZ4="},{"type":"next-occurrence","id":"LJtT+Qq9tJK/5bSqvgnzfL9Vqlk="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:50:22Z"},"road_event_id":"OA1oiLZqp+KSCaqB+qgNRQouK90=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"LJtT+Qq9tJK/5bSqvgnzfL9Vqlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZcedel1aL5suUiRE+MCNprQMZ4="},{"type":"next-occurrence","id":"XhWWlijn3qT0pxuGY9irO9BHOb8="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:50:22Z"},"road_event_id":"LJtT+Qq9tJK/5bSqvgnzfL9Vqlk=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"XhWWlijn3qT0pxuGY9irO9BHOb8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZcedel1aL5suUiRE+MCNprQMZ4="},{"type":"next-occurrence","id":"gpOkCa+2JJAYLveX71cF9s6M+JY="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:50:22Z"},"road_event_id":"XhWWlijn3qT0pxuGY9irO9BHOb8=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"gpOkCa+2JJAYLveX71cF9s6M+JY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZcedel1aL5suUiRE+MCNprQMZ4="},{"type":"next-occurrence","id":"RRiTKQnwQ1jUxIPG/ZO264vVrhw="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:50:22Z"},"road_event_id":"gpOkCa+2JJAYLveX71cF9s6M+JY=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"RRiTKQnwQ1jUxIPG/ZO264vVrhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZcedel1aL5suUiRE+MCNprQMZ4="},{"type":"next-occurrence","id":"gxk2A5rdCK6hyFW+Ur/zdDpFRZc="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:50:22Z"},"road_event_id":"RRiTKQnwQ1jUxIPG/ZO264vVrhw=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"gxk2A5rdCK6hyFW+Ur/zdDpFRZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 133"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zZcedel1aL5suUiRE+MCNprQMZ4="}],"description":"Roadwork on NY 133 both directions between Pleasantville Road (Ossining) and Saw Mill River Road - NY 100 (New Castle) D265679/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 19th, 2026 thru Friday April 24th, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-17T12:50:22Z"},"road_event_id":"gxk2A5rdCK6hyFW+Ur/zdDpFRZc=","beginning_cross_street":"Pleasantville Road","ending_cross_street":"Saw Mill River Road - NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.848827,41.166945]]}},{"id":"7v3lpwFOgCnnbeLHD97NnbvTOpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IwD86zGRYWs6k7on564g+pKTV3Y="}],"description":"Overhead sign inspection on NY 9A northbound between NY 141 (Mount Pleasant) and Bedford Road - NY 117 (Mount Pleasant) D041200/32730409 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 10:00 AM thru 02:30 PM, right lane closure","update_date":"2026-04-17T13:13:20Z"},"road_event_id":"7v3lpwFOgCnnbeLHD97NnbvTOpk=","beginning_cross_street":"NY 141","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807492,41.105444]]}},{"id":"IwD86zGRYWs6k7on564g+pKTV3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7v3lpwFOgCnnbeLHD97NnbvTOpk="}],"description":"Overhead sign inspection on NY 9A northbound between NY 141 (Mount Pleasant) and Bedford Road - NY 117 (Mount Pleasant) D041200/32730409 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 10:00 AM thru 02:30 PM, right lane closure","update_date":"2026-04-17T13:13:20Z"},"road_event_id":"IwD86zGRYWs6k7on564g+pKTV3Y=","beginning_cross_street":"NY 141","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.807492,41.105444]]}},{"id":"zzwgVqdy/HuIzJVqBRJ7yl4YdCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pDwRIWW9rjh4Mgr5SqndtzhPF8s="}],"description":"Overhead sign inspection on NY 119 westbound between Old Kensico Road (Greenburgh) and I-287 (Greenburgh) D041200/32730609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 10:00 AM thru 02:30 PM, right lane closure","update_date":"2026-04-17T13:37:08Z"},"road_event_id":"zzwgVqdy/HuIzJVqBRJ7yl4YdCs=","beginning_cross_street":"Old Kensico Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782356,41.038682]]}},{"id":"pDwRIWW9rjh4Mgr5SqndtzhPF8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 119"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zzwgVqdy/HuIzJVqBRJ7yl4YdCs="}],"description":"Overhead sign inspection on NY 119 westbound between Old Kensico Road (Greenburgh) and I-287 (Greenburgh) D041200/32730609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 10:00 AM thru 02:30 PM, right lane closure","update_date":"2026-04-17T13:37:08Z"},"road_event_id":"pDwRIWW9rjh4Mgr5SqndtzhPF8s=","beginning_cross_street":"Old Kensico Road","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.782356,41.038682]]}},{"id":"uKW65FsvDIf2q33/EhEGP94RfiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM1 Bus, Bxm2 Bus, and BxM18 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, BxM1 Bus, Bxm2 Bus, and BxM18 Bus between 3 Av/E 33 St (New York) and Riverdale Av/W 263 St (New York) stops on Henry Hudson Pkwy West at W 246th St and W 239th St will be closed. Buses operate via w 246th St, Arlington Ave, W 246th St, Independence Ave and W 237th St., Continuous Saturday April 18th, 2026 06:00 AM thru Saturday May 30th, 2026 11:59 PM","update_date":"2026-04-17T14:19:27Z"},"road_event_id":"uKW65FsvDIf2q33/EhEGP94RfiE=","beginning_cross_street":"3 Av/E 33 St","ending_cross_street":"Riverdale Av/W 263 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978601,40.744963]]}},{"id":"83S/dKUGtXRhapd6uIdTeP4f/UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM10 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, BxM10 Bus at Madison Av/E 24 St (New York) stop will be closed. Use the BxM9 Bus stop on Madison Ave at E 25th St., Continuous Friday April 17th, 2026 10:30 AM thru Thursday April 30th, 2026 11:59 PM","update_date":"2026-04-17T14:24:11Z"},"road_event_id":"83S/dKUGtXRhapd6uIdTeP4f/UU=","beginning_cross_street":"Madison Av/E 24 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987516,40.741405]]}},{"id":"OSc+70f27ihPhwghJgGx584utds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M/AiIE9OmioYZWD5QiCi1tNCiio="}],"description":"Installation of traffic management systems on NY 100 northbound between E Fort Hill Road (Greenburgh) and Clifton Road (Greenburgh) D265523/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:32:12Z"},"road_event_id":"OSc+70f27ihPhwghJgGx584utds=","beginning_cross_street":"E Fort Hill Road","ending_cross_street":"Clifton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829886,40.980414]]}},{"id":"M/AiIE9OmioYZWD5QiCi1tNCiio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSc+70f27ihPhwghJgGx584utds="},{"type":"next-occurrence","id":"Ty40aSusOq9uy6ob/Or1qvqOVyg="}],"description":"Installation of traffic management systems on NY 100 northbound between E Fort Hill Road (Greenburgh) and Clifton Road (Greenburgh) D265523/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:32:12Z"},"road_event_id":"M/AiIE9OmioYZWD5QiCi1tNCiio=","beginning_cross_street":"E Fort Hill Road","ending_cross_street":"Clifton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829886,40.980414]]}},{"id":"Ty40aSusOq9uy6ob/Or1qvqOVyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OSc+70f27ihPhwghJgGx584utds="}],"description":"Installation of traffic management systems on NY 100 northbound between E Fort Hill Road (Greenburgh) and Clifton Road (Greenburgh) D265523/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:32:12Z"},"road_event_id":"Ty40aSusOq9uy6ob/Or1qvqOVyg=","beginning_cross_street":"E Fort Hill Road","ending_cross_street":"Clifton Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829886,40.980414]]}},{"id":"NzgAkGKTtZDBEHAeW4lZcBg7vQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M20 Bus and M7 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, M20 Bus and M7 Bus bypassing 7 Av/W 28 St (New York) Use the stop on 7th Ave at W 25th St due to Water Main Replacement., Continuous Saturday April 18th, 2026 12:00 AM thru Friday July 10th, 2026 11:59 PM","update_date":"2026-04-17T16:59:33Z"},"road_event_id":"NzgAkGKTtZDBEHAeW4lZcBg7vQc=","beginning_cross_street":"7 Av/W 28 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.993637,40.747035]]}},{"id":"BAKPvePQME8LuDsgP/K5DSCXyuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on I-684 northbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 6 - NY 35 (Bedford) Res 8-8 RW/32705409 - Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 10:00 AM thru 02:30 PM, right lane closure","update_date":"2026-04-17T16:44:04Z"},"road_event_id":"BAKPvePQME8LuDsgP/K5DSCXyuE=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 6 - NY 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.653753,41.3444]]}},{"id":"FifA6xAXDnZ5CJgiup/0ov+DphU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M15 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M15 Bus bypassing South St/Whitehall St (New York) The first and last stops will be made on Water St at Whitehall St. , Continuous Saturday April 18th, 2026 12:00 AM thru Friday July 31st, 2026 11:59 PM","update_date":"2026-04-17T16:57:57Z"},"road_event_id":"FifA6xAXDnZ5CJgiup/0ov+DphU=","beginning_cross_street":"South St/Whitehall St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.012226,40.701609]]}},{"id":"7sFGZOPcNu+Hn4o6UNFGtcTQU8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yiI3aVBLGAvJ3bdayDhZKIM7x1Q="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-17T17:04:20Z"},"road_event_id":"7sFGZOPcNu+Hn4o6UNFGtcTQU8g=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"yiI3aVBLGAvJ3bdayDhZKIM7x1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7sFGZOPcNu+Hn4o6UNFGtcTQU8g="},{"type":"next-occurrence","id":"ueTI6Zaiw0R9hIx6sFiOKEhpjNw="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-17T17:04:20Z"},"road_event_id":"yiI3aVBLGAvJ3bdayDhZKIM7x1Q=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"ueTI6Zaiw0R9hIx6sFiOKEhpjNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7sFGZOPcNu+Hn4o6UNFGtcTQU8g="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy southbound between Bradhurst Avenue - NY 100 (Mount Pleasant) and Grasslands Road - NY 100C (Greenburgh) D264324/DAY/B1070500/32429709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-17T17:04:20Z"},"road_event_id":"ueTI6Zaiw0R9hIx6sFiOKEhpjNw=","beginning_cross_street":"Bradhurst Avenue - NY 100","ending_cross_street":"Grasslands Road - NY 100C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80348,41.090234]]}},{"id":"k7k2CsyE7OH1ld3kEDdYdK9k4Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qwwgjXoUeEKUKcYiLjd//JfOZoE="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-17T17:03:23Z"},"road_event_id":"k7k2CsyE7OH1ld3kEDdYdK9k4Gs=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"qwwgjXoUeEKUKcYiLjd//JfOZoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k7k2CsyE7OH1ld3kEDdYdK9k4Gs="},{"type":"next-occurrence","id":"IyKUB0B9lOuD542UM9JKyXwHOR0="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-17T17:03:23Z"},"road_event_id":"qwwgjXoUeEKUKcYiLjd//JfOZoE=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"IyKUB0B9lOuD542UM9JKyXwHOR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k7k2CsyE7OH1ld3kEDdYdK9k4Gs="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy northbound between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/DAY/B1070500/32429809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-17T17:03:23Z"},"road_event_id":"IyKUB0B9lOuD542UM9JKyXwHOR0=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803218,41.09032]]}},{"id":"xoJ4hp+J6O1JFtkoI1G3Lukrfvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"v0bDi/O5b9uz3NZiWninap1CilY="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/NIGHT/B1070500/32289909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-17T17:01:15Z"},"road_event_id":"xoJ4hp+J6O1JFtkoI1G3Lukrfvc=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803204,41.090313]]}},{"id":"v0bDi/O5b9uz3NZiWninap1CilY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xoJ4hp+J6O1JFtkoI1G3Lukrfvc="},{"type":"next-occurrence","id":"RtTgLh0R06JynojeB/1oQuNG8b0="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/NIGHT/B1070500/32289909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-17T17:01:15Z"},"road_event_id":"v0bDi/O5b9uz3NZiWninap1CilY=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803204,41.090313]]}},{"id":"RtTgLh0R06JynojeB/1oQuNG8b0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xoJ4hp+J6O1JFtkoI1G3Lukrfvc="}],"description":"Bridge rehabilitation on Sprain Brook State Pkwy both directions between Grasslands Road - NY 100C (Greenburgh) and Taconic State Parkway (Mount Pleasant) D264324/NIGHT/B1070500/32289909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 09:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-17T17:01:15Z"},"road_event_id":"RtTgLh0R06JynojeB/1oQuNG8b0=","beginning_cross_street":"Grasslands Road - NY 100C","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803204,41.090313]]}},{"id":"eaz3DYB38mPvj1GIlG9KPfaxmZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M42 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, M42 Bus on W 42 St/9 Av (New York) Buses may experience delays., Continuous Saturday April 18th, 2026 12:00 AM thru Sunday May 10th, 2026 11:59 PM","update_date":"2026-04-17T17:08:23Z"},"road_event_id":"eaz3DYB38mPvj1GIlG9KPfaxmZ4=","beginning_cross_street":"W 42 St/9 Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992979,40.75867]]}},{"id":"AOYrR/tq5g+CLGESzNuQIPf9vJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["107 Bus and 37 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, 107 Bus and 37 Bus at Frelinghuysen Ave At Noble St (Newark) relinghuysen Avenue, northbound, at Noble Street, Far Side (MyBus #18611), Continuous Monday April 27th, 2026 12:00 AM thru Tuesday June 16th, 2026 11:59 PM","update_date":"2026-04-17T18:16:22Z"},"road_event_id":"AOYrR/tq5g+CLGESzNuQIPf9vJc=","beginning_cross_street":"Frelinghuysen Ave At Noble St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.193813,40.704979]]}},{"id":"L/RsDCLst0tJNP9zlMkzMDa69js=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near West of CR 509/Broad St (Clifton), Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:21:35Z"},"road_event_id":"L/RsDCLst0tJNP9zlMkzMDa69js=","beginning_cross_street":"West of CR 509/Broad St","ending_cross_street":"West of CR 509/Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.180366,40.859294]]}},{"id":"SrBwLCKpInG0gaqmdgKk8GjZpcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near West of CR 509/Broad St (Clifton), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:21:33Z"},"road_event_id":"SrBwLCKpInG0gaqmdgKk8GjZpcI=","beginning_cross_street":"West of CR 509/Broad St","ending_cross_street":"West of CR 509/Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.180366,40.859294]]}},{"id":"IodJY0hpw6zDLD/hh5CQoOpv1nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m+CKhHWbjkP2hj6eKbg8c9R15xw="}],"description":"Construction on I-295 both directions between Bruckner Boulevard (New York) and Tierney Place (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:23:14Z"},"road_event_id":"IodJY0hpw6zDLD/hh5CQoOpv1nw=","beginning_cross_street":"Bruckner Boulevard","ending_cross_street":"Tierney Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835674,40.828278]]}},{"id":"m+CKhHWbjkP2hj6eKbg8c9R15xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IodJY0hpw6zDLD/hh5CQoOpv1nw="},{"type":"next-occurrence","id":"p7/Ha9VgCJMJZUKOCtNXpPWQxRI="}],"description":"Construction on I-295 both directions between Bruckner Boulevard (New York) and Tierney Place (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:23:14Z"},"road_event_id":"m+CKhHWbjkP2hj6eKbg8c9R15xw=","beginning_cross_street":"Bruckner Boulevard","ending_cross_street":"Tierney Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835674,40.828278]]}},{"id":"p7/Ha9VgCJMJZUKOCtNXpPWQxRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IodJY0hpw6zDLD/hh5CQoOpv1nw="},{"type":"next-occurrence","id":"Ro7lJsdkOlFUb7Kv8hnz8g8uiks="}],"description":"Construction on I-295 both directions between Bruckner Boulevard (New York) and Tierney Place (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:23:14Z"},"road_event_id":"p7/Ha9VgCJMJZUKOCtNXpPWQxRI=","beginning_cross_street":"Bruckner Boulevard","ending_cross_street":"Tierney Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835674,40.828278]]}},{"id":"Ro7lJsdkOlFUb7Kv8hnz8g8uiks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IodJY0hpw6zDLD/hh5CQoOpv1nw="},{"type":"next-occurrence","id":"H3QlA6k/pmtZppgmi7O1b1vQ+Pc="}],"description":"Construction on I-295 both directions between Bruckner Boulevard (New York) and Tierney Place (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:23:14Z"},"road_event_id":"Ro7lJsdkOlFUb7Kv8hnz8g8uiks=","beginning_cross_street":"Bruckner Boulevard","ending_cross_street":"Tierney Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835674,40.828278]]}},{"id":"H3QlA6k/pmtZppgmi7O1b1vQ+Pc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IodJY0hpw6zDLD/hh5CQoOpv1nw="},{"type":"next-occurrence","id":"LNW+JqabUQ3ZSF1MKWujVHeUyTs="}],"description":"Construction on I-295 both directions between Bruckner Boulevard (New York) and Tierney Place (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:23:14Z"},"road_event_id":"H3QlA6k/pmtZppgmi7O1b1vQ+Pc=","beginning_cross_street":"Bruckner Boulevard","ending_cross_street":"Tierney Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835674,40.828278]]}},{"id":"LNW+JqabUQ3ZSF1MKWujVHeUyTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IodJY0hpw6zDLD/hh5CQoOpv1nw="}],"description":"Construction on I-295 both directions between Bruckner Boulevard (New York) and Tierney Place (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:23:14Z"},"road_event_id":"LNW+JqabUQ3ZSF1MKWujVHeUyTs=","beginning_cross_street":"Bruckner Boulevard","ending_cross_street":"Tierney Place","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835674,40.828278]]}},{"id":"lt69ZjSJXUq/D23/Ee9zkwN5mvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack River Drawbridge (Kearny/Jersey City), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, at least one lane closed","update_date":"2026-04-17T18:24:30Z"},"road_event_id":"lt69ZjSJXUq/D23/Ee9zkwN5mvQ=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"J27NoTKLiCbuvynwvoIgmY+D2m0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near South of Bayway Circle (Linden), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-04-17T18:24:28Z"},"road_event_id":"J27NoTKLiCbuvynwvoIgmY+D2m0=","beginning_cross_street":"South of Bayway Circle","ending_cross_street":"North of Bayway Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.225105,40.647159]]}},{"id":"7+GYVMPkN+2JB9MEZNpKjNC3zS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near North of I-278/Goethals Bridge (Linden), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-04-17T18:24:25Z"},"road_event_id":"7+GYVMPkN+2JB9MEZNpKjNC3zS0=","beginning_cross_street":"North of I-278/Goethals Bridge","ending_cross_street":"South of Bayway Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.22718,40.644737]]}},{"id":"Q+1r/AEF1pDT03dVeYK9xFK4D3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack River Drawbridge (Kearny/Jersey City), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-17T18:24:20Z"},"road_event_id":"Q+1r/AEF1pDT03dVeYK9xFK4D3M=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"XUfuEk1lKXGqxwPYs/ncwycKC0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound near Willow Glade Rd (Linden), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-04-17T18:24:33Z"},"road_event_id":"XUfuEk1lKXGqxwPYs/ncwycKC0E=","beginning_cross_street":"Willow Glade Rd","ending_cross_street":"Exxon Plant","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.235466,40.635005]]}},{"id":"l4Tfy8u7W1AxBWgkHEuZ48VOziI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Montclair-Boonton Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, Montclair-Boonton Line between Bay Street (Montclair Twp) and Newark Broad St (Newark) NJ TRANSIT buses will replace Montclair-Boonton Line trains at Bay Street, Glen Ridge, Bloomfield Avenue, and Watsessing Avenue stations due to track work at the Roseville Avenue Interlocking. Rail service will resume Sunday evening with the 8:08 PM departure from Hoboken (to Bay Street) and the 9:00 PM departure from Bay Street (to HobokenTrains numbered in the 500-series � which normally operate between Hoboken and Bay Street � will continue to operate between Hoboken and Newark Broad Street.Montclair Line customers will transfer between trains and buses at Newark Broad Street. Buses traveling from Bay Street to Newark Broad Street will depart stations 20 to 25 minutes earlier than the scheduled train time. EXCEPTION: The last bus of the night will depart Bay Street at 12:01 AM � the same time the train normally would � and will make station stops later than scheduled train times. Both the Hoboken and New York-bound trains will wait for this bus at Newark Broad Street Station. Buses traveling from Newark Broad Street to Bay Street will arrive at stations up to 30 minutes later than trains normally would. Montclair Line customers can also use NJ TRANSIT Bus Nos. 11, 28, and 29 to travel to/from Newark Broad Street. These buses operate along Bloomfield Avenue and make stops near Montclair Line stations. , Continuous Saturday May 2nd, 2026 06:00 AM thru Sunday May 3rd, 2026 07:30 PM","update_date":"2026-04-17T18:23:57Z"},"road_event_id":"l4Tfy8u7W1AxBWgkHEuZ48VOziI=","beginning_cross_street":"Bay Street","ending_cross_street":"Newark Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T10:00:00Z","end_date":"2026-05-03T23:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.208681,40.808178]]}},{"id":"HFGr/PFQeNyMqkMDgsgnkHwx+qc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8L8PPChYTFsyI1QCzBddKf9O+sc="}],"description":"Construction on I-95 northbound between I-87 Major Deegan Expressway (New York) and I-678- Hutchinson River Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T18:30:43Z"},"road_event_id":"HFGr/PFQeNyMqkMDgsgnkHwx+qc=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"I-678- Hutchinson River Expressway ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926586,40.844976]]}},{"id":"8L8PPChYTFsyI1QCzBddKf9O+sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFGr/PFQeNyMqkMDgsgnkHwx+qc="},{"type":"next-occurrence","id":"QWib/pVtnHttUXrtID2MUUvKm3o="}],"description":"Construction on I-95 northbound between I-87 Major Deegan Expressway (New York) and I-678- Hutchinson River Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T18:30:43Z"},"road_event_id":"8L8PPChYTFsyI1QCzBddKf9O+sc=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"I-678- Hutchinson River Expressway ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926586,40.844976]]}},{"id":"QWib/pVtnHttUXrtID2MUUvKm3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HFGr/PFQeNyMqkMDgsgnkHwx+qc="}],"description":"Construction on I-95 northbound between I-87 Major Deegan Expressway (New York) and I-678- Hutchinson River Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T18:30:43Z"},"road_event_id":"QWib/pVtnHttUXrtID2MUUvKm3o=","beginning_cross_street":"I-87 Major Deegan Expressway","ending_cross_street":"I-678- Hutchinson River Expressway ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926586,40.844976]]}},{"id":"SA2C2E0xqPSjOr240Cr/srqvM/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a2GvXqg3gxX8V+3/qxyis1NYSYg="}],"description":"Construction on I-95 southbound between Bruckner Interchange (New York) and I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:33:23Z"},"road_event_id":"SA2C2E0xqPSjOr240Cr/srqvM/k=","beginning_cross_street":"Bruckner Interchange","ending_cross_street":"I-87 Major Deegan Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838361,40.829742]]}},{"id":"a2GvXqg3gxX8V+3/qxyis1NYSYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SA2C2E0xqPSjOr240Cr/srqvM/k="},{"type":"next-occurrence","id":"g86W+1nqgLQrI1I6eARnI1yGr7g="}],"description":"Construction on I-95 southbound between Bruckner Interchange (New York) and I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:33:23Z"},"road_event_id":"a2GvXqg3gxX8V+3/qxyis1NYSYg=","beginning_cross_street":"Bruckner Interchange","ending_cross_street":"I-87 Major Deegan Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838361,40.829742]]}},{"id":"g86W+1nqgLQrI1I6eARnI1yGr7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SA2C2E0xqPSjOr240Cr/srqvM/k="}],"description":"Construction on I-95 southbound between Bruckner Interchange (New York) and I-87 Major Deegan Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:33:23Z"},"road_event_id":"g86W+1nqgLQrI1I6eARnI1yGr7g=","beginning_cross_street":"Bruckner Interchange","ending_cross_street":"I-87 Major Deegan Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838361,40.829742]]}},{"id":"CXvtYLLlQlIu/4FxZ/7jVJ4T000=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"19JGaSfMKr3rxnHZ0h7e8KPsVh8="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and West 9th Street; I-278 (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:41:54Z"},"road_event_id":"CXvtYLLlQlIu/4FxZ/7jVJ4T000=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"West 9th Street; I-278","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999214,40.691463]]}},{"id":"19JGaSfMKr3rxnHZ0h7e8KPsVh8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CXvtYLLlQlIu/4FxZ/7jVJ4T000="},{"type":"next-occurrence","id":"hvI6WtAf+AbysDh/Qey9PhRhhlA="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and West 9th Street; I-278 (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:41:54Z"},"road_event_id":"19JGaSfMKr3rxnHZ0h7e8KPsVh8=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"West 9th Street; I-278","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999214,40.691463]]}},{"id":"hvI6WtAf+AbysDh/Qey9PhRhhlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CXvtYLLlQlIu/4FxZ/7jVJ4T000="},{"type":"next-occurrence","id":"O5RH213TH6ifRjAcV2nC9MhutUE="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and West 9th Street; I-278 (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:41:54Z"},"road_event_id":"hvI6WtAf+AbysDh/Qey9PhRhhlA=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"West 9th Street; I-278","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999214,40.691463]]}},{"id":"O5RH213TH6ifRjAcV2nC9MhutUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CXvtYLLlQlIu/4FxZ/7jVJ4T000="}],"description":"Construction on I-278 both directions between Atlantic Avenue (New York) and West 9th Street; I-278 (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 05:00 AM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:41:54Z"},"road_event_id":"O5RH213TH6ifRjAcV2nC9MhutUE=","beginning_cross_street":"Atlantic Avenue","ending_cross_street":"West 9th Street; I-278","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999214,40.691463]]}},{"id":"SjT9gxUsgYVY9cb6WQfTfiwVZTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31F"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xTKnuAr/KfKQKXzM5CkfkCkEEHU="}],"description":"Traffic signal repairs on NY 31F at Sunset Trail (Perinton) alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM All lanes","update_date":"2026-04-17T18:44:29Z"},"road_event_id":"SjT9gxUsgYVY9cb6WQfTfiwVZTU=","beginning_cross_street":"Sunset Trail","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468485,43.10224]]}},{"id":"xTKnuAr/KfKQKXzM5CkfkCkEEHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SjT9gxUsgYVY9cb6WQfTfiwVZTU="},{"type":"next-occurrence","id":"U+99TDOpqZAo0a0CWL2HgS6fhaI="}],"description":"Traffic signal repairs on NY 31F at Sunset Trail (Perinton) alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM All lanes","update_date":"2026-04-17T18:44:29Z"},"road_event_id":"xTKnuAr/KfKQKXzM5CkfkCkEEHU=","beginning_cross_street":"Sunset Trail","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468485,43.10224]]}},{"id":"U+99TDOpqZAo0a0CWL2HgS6fhaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31F"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SjT9gxUsgYVY9cb6WQfTfiwVZTU="}],"description":"Traffic signal repairs on NY 31F at Sunset Trail (Perinton) alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM All lanes","update_date":"2026-04-17T18:44:29Z"},"road_event_id":"U+99TDOpqZAo0a0CWL2HgS6fhaI=","beginning_cross_street":"Sunset Trail","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468485,43.10224]]}},{"id":"9+Dv8KoxZuDbyBjsFGwa6i3dLrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5emZcWlOUtA6gknMz/yrvTQA/3I="}],"description":"Construction on I-678 northbound between Exit 1A - NY 878 (New York) and Belt System - Southern Parkway (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:47:35Z"},"road_event_id":"9+Dv8KoxZuDbyBjsFGwa6i3dLrY=","beginning_cross_street":"Exit 1A - NY 878","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803609,40.661817]]}},{"id":"5emZcWlOUtA6gknMz/yrvTQA/3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9+Dv8KoxZuDbyBjsFGwa6i3dLrY="},{"type":"next-occurrence","id":"99TCt7oTKFIR8mPMwZ6Yuanz8KE="}],"description":"Construction on I-678 northbound between Exit 1A - NY 878 (New York) and Belt System - Southern Parkway (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:47:35Z"},"road_event_id":"5emZcWlOUtA6gknMz/yrvTQA/3I=","beginning_cross_street":"Exit 1A - NY 878","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803609,40.661817]]}},{"id":"99TCt7oTKFIR8mPMwZ6Yuanz8KE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9+Dv8KoxZuDbyBjsFGwa6i3dLrY="}],"description":"Construction on I-678 northbound between Exit 1A - NY 878 (New York) and Belt System - Southern Parkway (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:47:35Z"},"road_event_id":"99TCt7oTKFIR8mPMwZ6Yuanz8KE=","beginning_cross_street":"Exit 1A - NY 878","ending_cross_street":"Belt System - Southern Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803609,40.661817]]}},{"id":"Ng/AhA+Lf/wjcOaM1SczyKJxNP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-695"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RBtWOQ0KFcOzQVREBtyI8xcQHf4="}],"description":"Construction on I-695 both directions from Randall Avenue (New York) to I-95; Bruckner Expressway (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T18:51:20Z"},"road_event_id":"Ng/AhA+Lf/wjcOaM1SczyKJxNP4=","beginning_cross_street":"Randall Avenue","ending_cross_street":"I-95; Bruckner Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819263,40.829934]]}},{"id":"RBtWOQ0KFcOzQVREBtyI8xcQHf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-695"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ng/AhA+Lf/wjcOaM1SczyKJxNP4="}],"description":"Construction on I-695 both directions from Randall Avenue (New York) to I-95; Bruckner Expressway (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T18:51:20Z"},"road_event_id":"RBtWOQ0KFcOzQVREBtyI8xcQHf4=","beginning_cross_street":"Randall Avenue","ending_cross_street":"I-95; Bruckner Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.819263,40.829934]]}},{"id":"oOVryh8rhJP4Ls6Ik5VWYN/ZgDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Both Directions between CR 549 Spur/Herbertsville Rd (Point Pleasant) and East of CR 54/Coolidge Dr (Brick Twp) Friday April 24, 2026 08:00 AM thru 05:00 PM, 2 center lanes of 4 lanes closed eastbound; 2 center lanes of 4 lanes closed westbound","update_date":"2026-04-17T18:52:26Z"},"road_event_id":"oOVryh8rhJP4Ls6Ik5VWYN/ZgDI=","beginning_cross_street":"CR 549 Spur/Herbertsville Rd","ending_cross_street":"East of CR 54/Coolidge Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.06958,40.082641]]}},{"id":"LxyKTIYO3/eS5QJhhwxmUN8tKIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Both Directions between CR 549 Spur/Herbertsville Rd (Point Pleasant) and East of CR 54/Coolidge Dr (Brick Twp) Thursday April 23, 2026 08:00 AM thru 05:00 PM, 2 center lanes of 4 lanes closed eastbound; 2 center lanes of 4 lanes closed westbound","update_date":"2026-04-17T18:52:20Z"},"road_event_id":"LxyKTIYO3/eS5QJhhwxmUN8tKIs=","beginning_cross_street":"CR 549 Spur/Herbertsville Rd","ending_cross_street":"East of CR 54/Coolidge Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.06958,40.082641]]}},{"id":"rarX7lyDRz/sLNzTGXhws0OcN0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Both Directions between CR 549 Spur/Herbertsville Rd (Point Pleasant) and East of CR 54/Coolidge Dr (Brick Twp) Wednesday April 22, 2026 08:00 AM thru 05:00 PM, 2 center lanes of 4 lanes closed eastbound; 2 center lanes of 4 lanes closed westbound","update_date":"2026-04-17T18:52:13Z"},"road_event_id":"rarX7lyDRz/sLNzTGXhws0OcN0s=","beginning_cross_street":"CR 549 Spur/Herbertsville Rd","ending_cross_street":"East of CR 54/Coolidge Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.06958,40.082641]]}},{"id":"lOUxcPTucxePpx3ChyqTDx+1VxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E1hiOchgfFfu7cPIzmTRA20+TJM="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"lOUxcPTucxePpx3ChyqTDx+1VxQ=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"E1hiOchgfFfu7cPIzmTRA20+TJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"ChRiZUtUWE3fd5viRn4Y1ZvFK9g="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"E1hiOchgfFfu7cPIzmTRA20+TJM=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"ChRiZUtUWE3fd5viRn4Y1ZvFK9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"YYb6xLBm1fObBvWG6405ZiSMh8w="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"ChRiZUtUWE3fd5viRn4Y1ZvFK9g=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"YYb6xLBm1fObBvWG6405ZiSMh8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"xCLCzxi3WK6vPTmQsIB5/ZZyWSM="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"YYb6xLBm1fObBvWG6405ZiSMh8w=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-26T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"xCLCzxi3WK6vPTmQsIB5/ZZyWSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"A7+fliUcFseYDejMWCqVg+QL+nA="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"xCLCzxi3WK6vPTmQsIB5/ZZyWSM=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"A7+fliUcFseYDejMWCqVg+QL+nA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"40nomxUcf1mBI5DrvYnZsbkNqIs="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"A7+fliUcFseYDejMWCqVg+QL+nA=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"40nomxUcf1mBI5DrvYnZsbkNqIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"05SFLUOJZ1IFaWw+eYunSi0DpNQ="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"40nomxUcf1mBI5DrvYnZsbkNqIs=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"05SFLUOJZ1IFaWw+eYunSi0DpNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"YvL/FF5I0qXBzkls+T2nD2NkJ1s="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"05SFLUOJZ1IFaWw+eYunSi0DpNQ=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"YvL/FF5I0qXBzkls+T2nD2NkJ1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"QseF1GiEIJ9I28T3ZpdgBG5IuE4="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"YvL/FF5I0qXBzkls+T2nD2NkJ1s=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"QseF1GiEIJ9I28T3ZpdgBG5IuE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"AFlOrYgTDpi0zybqSs9Rhf2i2LI="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"QseF1GiEIJ9I28T3ZpdgBG5IuE4=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"AFlOrYgTDpi0zybqSs9Rhf2i2LI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="},{"type":"next-occurrence","id":"y+lRXddAfgtfNaDU2qVR0HIbhhI="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"AFlOrYgTDpi0zybqSs9Rhf2i2LI=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"y+lRXddAfgtfNaDU2qVR0HIbhhI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q59 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lOUxcPTucxePpx3ChyqTDx+1VxQ="}],"description":"Construction on Q59 Bus both directions between GRAND ST/METROPOLITAN AV BR (New York) and GRAND AV/56 ST (New York) are detoured from Grand St/Grand Ave between 55th St and the Metropolitan Ave Bridge. For eastbound service, use the stops on Grand St at Metropolitan Ave Bridge or Grand Ave at Rust St. For westbound service, use the stops on Grand Ave at 56th St or Grand St at Metropolitan Ave Bridge. Buses also make requested stops along Metropolitan Ave in both directions., Saturday April 25th, 07:00 AM thru 02:00 PM , Saturday May 2nd, 07:00 AM thru 02:00 PM , Saturday April 18th,2026 thru Friday May 1st,2026, Sunday thru Saturday, 11:00 PM thru 05:00 AM","update_date":"2026-04-18T18:00:20Z"},"road_event_id":"y+lRXddAfgtfNaDU2qVR0HIbhhI=","beginning_cross_street":"GRAND ST/METROPOLITAN AV BR","ending_cross_street":"GRAND AV/56 ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931836,40.714171]]}},{"id":"BDqRe3q7tSFa8HgNozK8e8mfbtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hVRNJ4tojJpyD/Qte5tT/k+Ncps="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"BDqRe3q7tSFa8HgNozK8e8mfbtI=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"hVRNJ4tojJpyD/Qte5tT/k+Ncps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"63igKp8DSFaq7mrZeoZrgJo0q/s="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"hVRNJ4tojJpyD/Qte5tT/k+Ncps=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"63igKp8DSFaq7mrZeoZrgJo0q/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"1Ez+JzO+hAFKRa86f1j1HrkKevk="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"63igKp8DSFaq7mrZeoZrgJo0q/s=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"1Ez+JzO+hAFKRa86f1j1HrkKevk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"3zpCrCDckF1itmKkHTjEO3In49M="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"1Ez+JzO+hAFKRa86f1j1HrkKevk=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"3zpCrCDckF1itmKkHTjEO3In49M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"0Oj8vwFA86eoUoZQGGlQ8TG8uf4="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"3zpCrCDckF1itmKkHTjEO3In49M=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"0Oj8vwFA86eoUoZQGGlQ8TG8uf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"TeOJhiE3u4pXUCLnvigmVGb37jQ="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"0Oj8vwFA86eoUoZQGGlQ8TG8uf4=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"TeOJhiE3u4pXUCLnvigmVGb37jQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"p5SgmIqhih+ZHlgY9OHjlMODh0U="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"TeOJhiE3u4pXUCLnvigmVGb37jQ=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"p5SgmIqhih+ZHlgY9OHjlMODh0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"q/PmKMg+yQc5ZdJbqKAqJh9cG64="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"p5SgmIqhih+ZHlgY9OHjlMODh0U=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"q/PmKMg+yQc5ZdJbqKAqJh9cG64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"rYdzLlK66MbGoOkbXIBcpuTh0N8="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"q/PmKMg+yQc5ZdJbqKAqJh9cG64=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"rYdzLlK66MbGoOkbXIBcpuTh0N8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="},{"type":"next-occurrence","id":"K5wv+DlJxnf5sMafSAhmT1W+c6I="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"rYdzLlK66MbGoOkbXIBcpuTh0N8=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"K5wv+DlJxnf5sMafSAhmT1W+c6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 219"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BDqRe3q7tSFa8HgNozK8e8mfbtI="}],"description":"Roadwork on US 219 both directions Irvine Mill Road (Carrollton) to Cattaraugus County Line (Carrollton), Friday April 17th, 2026 thru Friday August 28th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:55:55Z"},"road_event_id":"K5wv+DlJxnf5sMafSAhmT1W+c6I=","beginning_cross_street":"Irvine Mill Road","ending_cross_street":"Cattaraugus County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.636585,42.067505]]}},{"id":"D+MuZe/bew29rxZSNEEHsox8eSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 534/Cooper St (Deptford Twp) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:55:45Z"},"road_event_id":"D+MuZe/bew29rxZSNEEHsox8eSA=","beginning_cross_street":"CR 534/Cooper St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124794,39.827526]]}},{"id":"4cbwAhuTpan9HTZ7X3uzbYMga0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 534/Cooper St (Deptford Twp) Saturday April 25, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:56:05Z"},"road_event_id":"4cbwAhuTpan9HTZ7X3uzbYMga0E=","beginning_cross_street":"CR 534/Cooper St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124794,39.827526]]}},{"id":"LuLzIXGfRL2PxPQHNfGS1ta1haY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 534/Cooper St (Deptford Twp) Friday April 24, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:55:59Z"},"road_event_id":"LuLzIXGfRL2PxPQHNfGS1ta1haY=","beginning_cross_street":"CR 534/Cooper St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124794,39.827526]]}},{"id":"ANEmLMwGn5bZuVfKQh0g51LdgF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 534/Cooper St (Deptford Twp) Sunday April 26, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:56:11Z"},"road_event_id":"ANEmLMwGn5bZuVfKQh0g51LdgF4=","beginning_cross_street":"CR 534/Cooper St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.124794,39.827526]]}},{"id":"q5fuW1l83yi4iY4aelSNnb/szNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LPtn8YArw3zMGbun28dj1O2UU+Y="}],"description":"Construction on I-295 both directions between Northern Boulevard; NY 25A (New York) and 32nd Avenue (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T18:56:56Z"},"road_event_id":"q5fuW1l83yi4iY4aelSNnb/szNY=","beginning_cross_street":"Northern Boulevard; NY 25A","ending_cross_street":"32nd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.776959,40.757492]]}},{"id":"LPtn8YArw3zMGbun28dj1O2UU+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5fuW1l83yi4iY4aelSNnb/szNY="}],"description":"Construction on I-295 both directions between Northern Boulevard; NY 25A (New York) and 32nd Avenue (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed service road","update_date":"2026-04-17T18:56:56Z"},"road_event_id":"LPtn8YArw3zMGbun28dj1O2UU+Y=","beginning_cross_street":"Northern Boulevard; NY 25A","ending_cross_street":"32nd Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.776959,40.757492]]}},{"id":"sZbkFWzB8O1UIs5RrVK+7QnBjoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 634/Fish Pond Rd (Glassboro) Friday April 24, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:58:36Z"},"road_event_id":"sZbkFWzB8O1UIs5RrVK+7QnBjoE=","beginning_cross_street":"CR 634/Fish Pond Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10955,39.708831]]}},{"id":"HewmNeelW19u4ygZchyQsKHTxbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 634/Fish Pond Rd (Glassboro) Thursday April 23, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:58:24Z"},"road_event_id":"HewmNeelW19u4ygZchyQsKHTxbQ=","beginning_cross_street":"CR 634/Fish Pond Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10955,39.708831]]}},{"id":"bg8UYvKvkm5CDoErIrHdF1Jv22E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 634/Fish Pond Rd (Glassboro) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:58:12Z"},"road_event_id":"bg8UYvKvkm5CDoErIrHdF1Jv22E=","beginning_cross_street":"CR 634/Fish Pond Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10955,39.708831]]}},{"id":"xoyQIUH7ntgfY3ARKxsWLmOSGvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SFlma93/5j2WlykihvaCZAZUkBE="}],"description":"Construction on I-495 westbound at 48th Street; Ramp (New York) Subject to change without notice., Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-17T19:00:50Z"},"road_event_id":"xoyQIUH7ntgfY3ARKxsWLmOSGvU=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906954,40.727398]]}},{"id":"SFlma93/5j2WlykihvaCZAZUkBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xoyQIUH7ntgfY3ARKxsWLmOSGvU="}],"description":"Construction on I-495 westbound at 48th Street; Ramp (New York) Subject to change without notice., Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-17T19:00:50Z"},"road_event_id":"SFlma93/5j2WlykihvaCZAZUkBE=","beginning_cross_street":"48th Street; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906954,40.727398]]}},{"id":"nOnx3/4kv8mGgmewAfjjgV9+z2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 634/Fish Pond Rd (Glassboro) Saturday April 25, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:58:47Z"},"road_event_id":"nOnx3/4kv8mGgmewAfjjgV9+z2o=","beginning_cross_street":"CR 634/Fish Pond Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10955,39.708831]]}},{"id":"MRB6ONlUeLvbOgVtKOvq1pUboM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound At CR 634/Fish Pond Rd (Glassboro) Sunday April 26, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T18:58:59Z"},"road_event_id":"MRB6ONlUeLvbOgVtKOvq1pUboM0=","beginning_cross_street":"CR 634/Fish Pond Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10955,39.708831]]}},{"id":"CzZqmNgQaMm5VQVzNhAr/3qOkXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound South of CR 553/Woodbury Av (Glassboro) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T19:02:21Z"},"road_event_id":"CzZqmNgQaMm5VQVzNhAr/3qOkXQ=","beginning_cross_street":"South of CR 553/Woodbury Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114349,39.719783]]}},{"id":"QYS+/+4YEDxJnJN4DtFGCFuseVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound South of CR 553/Woodbury Av (Glassboro) Thursday April 23, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T19:02:32Z"},"road_event_id":"QYS+/+4YEDxJnJN4DtFGCFuseVY=","beginning_cross_street":"South of CR 553/Woodbury Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114349,39.719783]]}},{"id":"HUypaXwStEA+TZWWktbGSOO24Fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound South of CR 553/Woodbury Av (Glassboro) Saturday April 25, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T19:02:52Z"},"road_event_id":"HUypaXwStEA+TZWWktbGSOO24Fk=","beginning_cross_street":"South of CR 553/Woodbury Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114349,39.719783]]}},{"id":"AWf4dtGQ3nR4gZDfk9JUhJHIF1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound South of CR 553/Woodbury Av (Glassboro) Friday April 24, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T19:02:42Z"},"road_event_id":"AWf4dtGQ3nR4gZDfk9JUhJHIF1s=","beginning_cross_street":"South of CR 553/Woodbury Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114349,39.719783]]}},{"id":"ZphTwrbZbaX96JSxHvZQsxGHhOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w1pIaoOe6V2jPMa00Em0khMs8FA="}],"description":"Due to Construction westbound, Hempstead between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis MTA buses will accept LIRR tickets for travel from Queens Village and Hollis to Jamaica Elmont-UBS Arena riders should use Bellerose station instead, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Friday, 10:00 AM thru 03:00 PM","update_date":"2026-04-17T19:28:39Z"},"road_event_id":"ZphTwrbZbaX96JSxHvZQsxGHhOg=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"w1pIaoOe6V2jPMa00Em0khMs8FA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hempstead"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZphTwrbZbaX96JSxHvZQsxGHhOg="}],"description":"Due to Construction westbound, Hempstead between Elmont-UBS Arena (Hempstead) and Hollis (New York) Westbound trains skip Elmont-UBS Arena, Queens Village, and Hollis MTA buses will accept LIRR tickets for travel from Queens Village and Hollis to Jamaica Elmont-UBS Arena riders should use Bellerose station instead, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Friday, 10:00 AM thru 03:00 PM","update_date":"2026-04-17T19:28:39Z"},"road_event_id":"w1pIaoOe6V2jPMa00Em0khMs8FA=","beginning_cross_street":"Elmont-UBS Arena","ending_cross_street":"Hollis","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.725549,40.720074]]}},{"id":"ammSJrd9s8LpgIAoInzcrENqAfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 9A both directions between Kappock Street (New York) and West 246th Street (New York) Subject to change without notice., Friday April 24th, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound, Friday April 24th, 2026, 10:00 AM thru 03:30 PM 1 Right lane of 2 lanes closed southbound","update_date":"2026-04-17T19:32:27Z"},"road_event_id":"ammSJrd9s8LpgIAoInzcrENqAfE=","beginning_cross_street":"Kappock Street","ending_cross_street":"West 246th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T05:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.918182,40.880482]]}},{"id":"FoPImy7Ld6wsD7Q1ZYnEVy4xIks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IiPXU5ardcsTucJoxSC9G+k3d3c="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 3 - Grand Concourse-Third Avenue Bridge (New York) and Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed southbound; 1 Left lane of 3 lanes closed northbound","update_date":"2026-04-17T19:34:25Z"},"road_event_id":"FoPImy7Ld6wsD7Q1ZYnEVy4xIks=","beginning_cross_street":"Exit 3 - Grand Concourse-Third Avenue Bridge","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931332,40.811081]]}},{"id":"IiPXU5ardcsTucJoxSC9G+k3d3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Major Deegan Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FoPImy7Ld6wsD7Q1ZYnEVy4xIks="}],"description":"Construction on I-87 Major Deegan Expressway both directions between Exit 3 - Grand Concourse-Third Avenue Bridge (New York) and Exit 2 - East 135th Street; Ramp (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed southbound; 1 Left lane of 3 lanes closed northbound","update_date":"2026-04-17T19:34:25Z"},"road_event_id":"IiPXU5ardcsTucJoxSC9G+k3d3c=","beginning_cross_street":"Exit 3 - Grand Concourse-Third Avenue Bridge","ending_cross_street":"Exit 2 - East 135th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.931332,40.811081]]}},{"id":"qc0K+pCQLYI8GUVUMuJex5eKTrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 77"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 77 Southbound South of CR 581/Commissioners Rd (Harrison Twp) Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T19:36:00Z"},"road_event_id":"qc0K+pCQLYI8GUVUMuJex5eKTrs=","beginning_cross_street":"South of CR 581/Commissioners Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.217002,39.721271]]}},{"id":"6+paPAMD5izZYs/54kjwDf8A4as=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 77"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 77 Southbound South of CR 581/Commissioners Rd (Harrison Twp) Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T19:35:51Z"},"road_event_id":"6+paPAMD5izZYs/54kjwDf8A4as=","beginning_cross_street":"South of CR 581/Commissioners Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.217002,39.721271]]}},{"id":"8z3kSbjZRfvn5cSXG3aRSfSKBko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 77"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 77 Southbound South of CR 581/Commissioners Rd (Harrison Twp) Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T19:36:08Z"},"road_event_id":"8z3kSbjZRfvn5cSXG3aRSfSKBko=","beginning_cross_street":"South of CR 581/Commissioners Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.217002,39.721271]]}},{"id":"TVQNH4JyTx+iE4o7U/5fYLlrjI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EXTERIOR ST"],"direction":"unknown","related_road_events":[],"description":"Construction on EXTERIOR ST both directions between E 144TH ST (New York) and 4 (New York) Subject to change without notice. One direction at a time., Friday April 24th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed northbound; 1 Left lane of 2 lanes closed southbound","update_date":"2026-04-17T19:38:03Z"},"road_event_id":"TVQNH4JyTx+iE4o7U/5fYLlrjI4=","beginning_cross_street":"E 144TH ST","ending_cross_street":"4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930992,40.816346]]}},{"id":"eBh/beOgpPQWP30nxetHNmMKFy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Bm0cdxF/Ppswnvz5DJaaSRGZtS4="}],"description":"Drainage improvements on I-390 both directions at Chili Ave to Scottsville Rd (Gates) Shoulder closures for drainage work. On mainline, shoulder closure will only be a right shoulder closure either NB or SB but not both at same time. On ramps, shoulder closure may be left or right but not both at same time. Crews will only close area they are working in but will be a mobile operation in said area., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM right shoulder","update_date":"2026-04-17T19:38:45Z"},"road_event_id":"eBh/beOgpPQWP30nxetHNmMKFy4=","beginning_cross_street":"Chili Ave to Scottsville Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668144,43.139588]]}},{"id":"Bm0cdxF/Ppswnvz5DJaaSRGZtS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBh/beOgpPQWP30nxetHNmMKFy4="},{"type":"next-occurrence","id":"LQ2PvdKfwcu8KCS7QjoroO1VJxs="}],"description":"Drainage improvements on I-390 both directions at Chili Ave to Scottsville Rd (Gates) Shoulder closures for drainage work. On mainline, shoulder closure will only be a right shoulder closure either NB or SB but not both at same time. On ramps, shoulder closure may be left or right but not both at same time. Crews will only close area they are working in but will be a mobile operation in said area., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM right shoulder","update_date":"2026-04-17T19:38:45Z"},"road_event_id":"Bm0cdxF/Ppswnvz5DJaaSRGZtS4=","beginning_cross_street":"Chili Ave to Scottsville Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668144,43.139588]]}},{"id":"LQ2PvdKfwcu8KCS7QjoroO1VJxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBh/beOgpPQWP30nxetHNmMKFy4="}],"description":"Drainage improvements on I-390 both directions at Chili Ave to Scottsville Rd (Gates) Shoulder closures for drainage work. On mainline, shoulder closure will only be a right shoulder closure either NB or SB but not both at same time. On ramps, shoulder closure may be left or right but not both at same time. Crews will only close area they are working in but will be a mobile operation in said area., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM right shoulder","update_date":"2026-04-17T19:38:45Z"},"road_event_id":"LQ2PvdKfwcu8KCS7QjoroO1VJxs=","beginning_cross_street":"Chili Ave to Scottsville Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.668144,43.139588]]}},{"id":"bSJpDsec8J4k1blA+D2RrupqUrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Construction on Washington Bridge both directions between Manhattan Side (Manhattan) and Bronx Side (New York) Subject to change without notice., Monday April 20th, 2026 thru Wednesday April 22nd, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T19:40:47Z"},"road_event_id":"bSJpDsec8J4k1blA+D2RrupqUrU=","beginning_cross_street":"Manhattan Side","ending_cross_street":"Bronx Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.930844,40.848103]]}},{"id":"JLIPn+PGzm8pjlnpIKLgNvI+3oU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"g6ssfKUxic9ydAOlEwjIVqke7Nc="}],"description":"Roadwork on NY 240 southbound Jewett Holmwood Road (Orchard Park) to NY 277 at Powers Road (Orchard Park), Thursday April 23rd, 2026 thru Saturday April 25th, 2026, Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T19:39:41Z"},"road_event_id":"JLIPn+PGzm8pjlnpIKLgNvI+3oU=","beginning_cross_street":"Jewett Holmwood Road","ending_cross_street":"Powers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.747886,42.751082]]}},{"id":"g6ssfKUxic9ydAOlEwjIVqke7Nc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JLIPn+PGzm8pjlnpIKLgNvI+3oU="},{"type":"next-occurrence","id":"BPaJoCWI88QuZQGTFxgwWzmET/g="}],"description":"Roadwork on NY 240 southbound Jewett Holmwood Road (Orchard Park) to NY 277 at Powers Road (Orchard Park), Thursday April 23rd, 2026 thru Saturday April 25th, 2026, Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T19:39:41Z"},"road_event_id":"g6ssfKUxic9ydAOlEwjIVqke7Nc=","beginning_cross_street":"Jewett Holmwood Road","ending_cross_street":"Powers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.747886,42.751082]]}},{"id":"BPaJoCWI88QuZQGTFxgwWzmET/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 240"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JLIPn+PGzm8pjlnpIKLgNvI+3oU="}],"description":"Roadwork on NY 240 southbound Jewett Holmwood Road (Orchard Park) to NY 277 at Powers Road (Orchard Park), Thursday April 23rd, 2026 thru Saturday April 25th, 2026, Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T19:39:41Z"},"road_event_id":"BPaJoCWI88QuZQGTFxgwWzmET/g=","beginning_cross_street":"Jewett Holmwood Road","ending_cross_street":"Powers Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.747886,42.751082]]}},{"id":"FC94oeK47DywxgP/nv74gKl3eXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8rOue4RRvpEbzRbyKoc8LCiIiu4="}],"description":"Construction on NY 9A northbound from West 45th Street (New York) to West 46th Street (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T19:45:09Z"},"road_event_id":"FC94oeK47DywxgP/nv74gKl3eXo=","beginning_cross_street":"West 45th Street","ending_cross_street":"West 46th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998938,40.763671]]}},{"id":"8rOue4RRvpEbzRbyKoc8LCiIiu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FC94oeK47DywxgP/nv74gKl3eXo="}],"description":"Construction on NY 9A northbound from West 45th Street (New York) to West 46th Street (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T19:45:09Z"},"road_event_id":"8rOue4RRvpEbzRbyKoc8LCiIiu4=","beginning_cross_street":"West 45th Street","ending_cross_street":"West 46th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998938,40.763671]]}},{"id":"j2t/W7J6ZQ9q2W0znb2icS7TEQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GTpE6MFonwinpyAmbvt9wwO+yrU="}],"description":"Construction on I-678 both directions from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T19:50:20Z"},"road_event_id":"j2t/W7J6ZQ9q2W0znb2icS7TEQc=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828777,40.724202]]}},{"id":"GTpE6MFonwinpyAmbvt9wwO+yrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2t/W7J6ZQ9q2W0znb2icS7TEQc="},{"type":"next-occurrence","id":"lmuQ4pHocb0zX1MolUSbuMS1MaQ="}],"description":"Construction on I-678 both directions from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T19:50:20Z"},"road_event_id":"GTpE6MFonwinpyAmbvt9wwO+yrU=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828777,40.724202]]}},{"id":"lmuQ4pHocb0zX1MolUSbuMS1MaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j2t/W7J6ZQ9q2W0znb2icS7TEQc="}],"description":"Construction on I-678 both directions from Exit 11 - 135th Street (New York) to 69th Road; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T19:50:20Z"},"road_event_id":"lmuQ4pHocb0zX1MolUSbuMS1MaQ=","beginning_cross_street":"Exit 11 - 135th Street","ending_cross_street":"69th Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.828777,40.724202]]}},{"id":"yoVTooycEEqBE76/58YJK53D+eM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Grand Central Parkway westbound at Belt System - Cross Island Parkway (New York) Subject to change without notice., Thursday April 23rd, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T20:02:16Z"},"road_event_id":"yoVTooycEEqBE76/58YJK53D+eM=","beginning_cross_street":"Belt System - Cross Island Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.732223,40.743949]]}},{"id":"WUFLJgkPzU657J0EKjY2DnkCRkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Grand Central Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Grand Central Parkway eastbound at Roosevelt Avenue (New York) Subject to change without notice., Thursday April 23rd, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T20:04:01Z"},"road_event_id":"WUFLJgkPzU657J0EKjY2DnkCRkU=","beginning_cross_street":"Roosevelt Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.850946,40.750238]]}},{"id":"Z1KbH82odFgSCJEGmabUL5+bO9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 westbound at Greenpoint Avenue (New York) Subject to change without notice., Thursday April 23rd, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T20:07:23Z"},"road_event_id":"Z1KbH82odFgSCJEGmabUL5+bO9k=","beginning_cross_street":"Greenpoint Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.924905999999993,40.735754]]}},{"id":"TskQ2nErgeyuSNOooeo3mDOo/ys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V35gdO0FNONpFKII62kSassoZbo="}],"description":"Utility work on Garden State Parkway northbound between Union Toll Plaza (Hillside Twp) and South of Exit 143C - NJ 124 (Irvington Twp), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 05:00 AM 1 Right lane of 5 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Center lane of 5 lanes closed","update_date":"2026-04-17T20:18:19Z"},"road_event_id":"TskQ2nErgeyuSNOooeo3mDOo/ys=","beginning_cross_street":"Union Toll Plaza","ending_cross_street":"South of Exit 143C - NJ 124","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.246047,40.704105]]}},{"id":"V35gdO0FNONpFKII62kSassoZbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TskQ2nErgeyuSNOooeo3mDOo/ys="}],"description":"Utility work on Garden State Parkway northbound between Union Toll Plaza (Hillside Twp) and South of Exit 143C - NJ 124 (Irvington Twp), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 05:00 AM 1 Right lane of 5 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Center lane of 5 lanes closed","update_date":"2026-04-17T20:18:19Z"},"road_event_id":"V35gdO0FNONpFKII62kSassoZbo=","beginning_cross_street":"Union Toll Plaza","ending_cross_street":"South of Exit 143C - NJ 124","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.246047,40.704105]]}},{"id":"i0y2TSFsLiCDKoV9VIQrY1ihst8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Expansion joint repairs and survey work on Garden State Parkway Express Lanes northbound between South of Garden State Parkway - Jon Bon Jovi Service Area (Old Bridge Twp) and South of Exit 124 - Main St (Sayreville), Thursday April 23rd,2026 thru Friday April 24th,2026, Thursday, 07:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound,","update_date":"2026-04-22T10:00:02Z"},"road_event_id":"i0y2TSFsLiCDKoV9VIQrY1ihst8=","beginning_cross_street":"South of Garden State Parkway - Jon Bon Jovi Service Area","ending_cross_street":"South of Exit 124 - Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.269152,40.448462]]}},{"id":"0SMcLAYmYhreEcZwfk30+Byuyac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RrZCufWcCdR/pRzgtDGMRo8DoIs="}],"description":"Utility work on Garden State Parkway southbound between Exit 145 - I-280 (East Orange) and Exit 143B - Maplewood (Irvington Twp), Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday, 08:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed southbound, , Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed southbound,","update_date":"2026-04-21T09:00:04Z"},"road_event_id":"0SMcLAYmYhreEcZwfk30+Byuyac=","beginning_cross_street":"Exit 145 - I-280","ending_cross_street":"Exit 143B - Maplewood","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.209947,40.756408]]}},{"id":"RrZCufWcCdR/pRzgtDGMRo8DoIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0SMcLAYmYhreEcZwfk30+Byuyac="}],"description":"Utility work on Garden State Parkway southbound between Exit 145 - I-280 (East Orange) and Exit 143B - Maplewood (Irvington Twp), Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday, 08:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed southbound, , Tuesday April 21st,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed southbound,","update_date":"2026-04-21T09:00:04Z"},"road_event_id":"RrZCufWcCdR/pRzgtDGMRo8DoIs=","beginning_cross_street":"Exit 145 - I-280","ending_cross_street":"Exit 143B - Maplewood","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.209947,40.756408]]}},{"id":"WUkRA2trYIBL6wuh5MJTqvkRUXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6Jlejx7YlhphU3IKKCTx0JHyzYk="}],"description":"Construction on I-678 both directions from 20th Avenue (New York) to Belt System - Cross Island Parkway; Exit 16 - Cross Island Parkway (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed service road","update_date":"2026-04-17T20:19:20Z"},"road_event_id":"WUkRA2trYIBL6wuh5MJTqvkRUXY=","beginning_cross_street":"20th Avenue","ending_cross_street":"Belt System - Cross Island Parkway; Exit 16 - Cross Island Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825391,40.780806]]}},{"id":"6Jlejx7YlhphU3IKKCTx0JHyzYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUkRA2trYIBL6wuh5MJTqvkRUXY="}],"description":"Construction on I-678 both directions from 20th Avenue (New York) to Belt System - Cross Island Parkway; Exit 16 - Cross Island Parkway (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed service road","update_date":"2026-04-17T20:19:20Z"},"road_event_id":"6Jlejx7YlhphU3IKKCTx0JHyzYk=","beginning_cross_street":"20th Avenue","ending_cross_street":"Belt System - Cross Island Parkway; Exit 16 - Cross Island Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825391,40.780806]]}},{"id":"5CaoR+mmK92foJgrcETDj4p22gM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping and safety improvements on Garden State Parkway southbound Exit ramp Exit 116 - PNC Arts Center (Holmdel Twp) to Exit 116 - PNC Arts Center (Holmdel Twp), Thursday April 23rd,2026 thru Friday April 24th,2026, Thursday, 10:00 PM thru 05:00 AM All lanes closed southbound,","update_date":"2026-04-22T09:00:04Z"},"road_event_id":"5CaoR+mmK92foJgrcETDj4p22gM=","beginning_cross_street":"Exit 116 - PNC Arts Center","ending_cross_street":"Exit 116 - PNC Arts Center","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.183094,40.393449]]}},{"id":"6BtagtyNJi+a3aIgF+kEr+NZrnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway southbound Exit ramp Exit 37 - CR 608/US 322/US 40 (Egg Harbor Twp), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T20:25:28Z"},"road_event_id":"6BtagtyNJi+a3aIgF+kEr+NZrnY=","beginning_cross_street":"Exit 37 - CR 608/US 322/US 40","ending_cross_street":"Exit 37 - CR 608/US 322/US 40","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.555242,39.410554]]}},{"id":"XHKFZ3bEOVVi9ZyWKiQKORhfcoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Expansion joint repairs on Garden State Parkway northbound between North of Exit 156 - US 46 (Elmwood Park) and South of Exit 159 - I-80 (Elmwood Park), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 08:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 11:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-04-17T20:28:42Z"},"road_event_id":"XHKFZ3bEOVVi9ZyWKiQKORhfcoo=","beginning_cross_street":"North of Exit 156 - US 46","ending_cross_street":"South of Exit 159 - I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.128414,40.889809]]}},{"id":"Cx1RmbQoEYrSzw8VkMiWjJ+zExI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Shore Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h7EDxx5JWqVyxHeRrieg9/VnPDE="}],"description":"Construction on Belt System - Shore Parkway both directions between Coney Island Avenue (New York) and East 12th Street (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-04-17T20:27:37Z"},"road_event_id":"Cx1RmbQoEYrSzw8VkMiWjJ+zExI=","beginning_cross_street":"Coney Island Avenue","ending_cross_street":"East 12th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960005,40.584633]]}},{"id":"h7EDxx5JWqVyxHeRrieg9/VnPDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Shore Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Cx1RmbQoEYrSzw8VkMiWjJ+zExI="}],"description":"Construction on Belt System - Shore Parkway both directions between Coney Island Avenue (New York) and East 12th Street (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-04-17T20:27:37Z"},"road_event_id":"h7EDxx5JWqVyxHeRrieg9/VnPDE=","beginning_cross_street":"Coney Island Avenue","ending_cross_street":"East 12th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960005,40.584633]]}},{"id":"xhZ0yCfp+0o3ys4KIXvlzKXTPAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on Garden State Parkway southbound Exit ramp Exit 157 - US 46 (Elmwood Park), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 10:30 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T20:32:16Z"},"road_event_id":"xhZ0yCfp+0o3ys4KIXvlzKXTPAw=","beginning_cross_street":"Exit 157 - US 46","ending_cross_street":"Exit 157 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T07:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.118444,40.895116]]}},{"id":"8CShILwtjyoVjEN8Hk9cTfv+bN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LBwxDbvLucW2e7li1QMUASngEOA="}],"description":"Construction on I-278 both directions between South 5th Street (New York) and Exit 32 - Rodney Street; Ramp (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T20:32:14Z"},"road_event_id":"8CShILwtjyoVjEN8Hk9cTfv+bN8=","beginning_cross_street":"South 5th Street","ending_cross_street":"Exit 32 - Rodney Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956809,40.708898]]}},{"id":"LBwxDbvLucW2e7li1QMUASngEOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8CShILwtjyoVjEN8Hk9cTfv+bN8="}],"description":"Construction on I-278 both directions between South 5th Street (New York) and Exit 32 - Rodney Street; Ramp (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T20:32:14Z"},"road_event_id":"LBwxDbvLucW2e7li1QMUASngEOA=","beginning_cross_street":"South 5th Street","ending_cross_street":"Exit 32 - Rodney Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956809,40.708898]]}},{"id":"S6CDsy+BNHUusl9NKMD2MzY5f/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Expansion joint repairs on Garden State Parkway northbound between Larry Doby Service Area (Bloomfield) and South of Exit 153A - NJ 3 (Clifton), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 08:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 10:00 PM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-04-17T20:35:02Z"},"road_event_id":"S6CDsy+BNHUusl9NKMD2MzY5f/A=","beginning_cross_street":"Larry Doby Service Area","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.179412,40.837026]]}},{"id":"MHABXT2Q1hbjfQqso5Ibd6Bk1yk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Expansion joint repairs and survey work on Garden State Parkway Local Lanes northbound between North of Exit 116 - PNC Arts Center (Holmdel Twp) and North of Exit 117 - NJ 36 (Aberdeen Twp), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 07:00 PM thru 06:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-04-17T20:37:03Z"},"road_event_id":"MHABXT2Q1hbjfQqso5Ibd6Bk1yk=","beginning_cross_street":"North of Exit 116 - PNC Arts Center","ending_cross_street":"North of Exit 117 - NJ 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192121,40.402951]]}},{"id":"CqxJeGr+el8Vf+AIgJa9ITmr1xU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Crack sealing on Garden State Parkway southbound between North of Exit 63B - NJ 72 West (Stafford Twp) and Exit 58 - CR 539 (Little Egg Harbor Twp), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 11:00 PM thru 05:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-04-17T20:41:48Z"},"road_event_id":"CqxJeGr+el8Vf+AIgJa9ITmr1xU=","beginning_cross_street":"North of Exit 63B - NJ 72 West","ending_cross_street":"Exit 58 - CR 539","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.276896,39.71611]]}},{"id":"G8drooC1+5KdTSdhAkwQoG57QOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kML0isxtFXEL3Ob0SG3NjaU6/xo="}],"description":"Construction on NY 27 both directions between 4th Avenue (New York) and Prospect Park West (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-04-17T20:41:53Z"},"road_event_id":"G8drooC1+5KdTSdhAkwQoG57QOM=","beginning_cross_street":"4th Avenue","ending_cross_street":"Prospect Park  West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992794,40.665169]]}},{"id":"kML0isxtFXEL3Ob0SG3NjaU6/xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8drooC1+5KdTSdhAkwQoG57QOM="}],"description":"Construction on NY 27 both directions between 4th Avenue (New York) and Prospect Park West (New York) Subject to change without notice., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-04-17T20:41:53Z"},"road_event_id":"kML0isxtFXEL3Ob0SG3NjaU6/xo=","beginning_cross_street":"4th Avenue","ending_cross_street":"Prospect Park  West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.992794,40.665169]]}},{"id":"rPAiBarllvafiAOBt14GmxVx1r0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on Garden State Parkway southbound between North of Colonia Service Area (Woodbridge Twp) and South of Exit 130B-A - US 1 (Woodbridge Twp), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 10:30 PM thru 05:00 AM 2 Left lanes of 5 lanes closed, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:00 PM thru 05:00 AM 1 Center lane of 5 lanes closed","update_date":"2026-04-17T20:43:02Z"},"road_event_id":"rPAiBarllvafiAOBt14GmxVx1r0=","beginning_cross_street":"North of Colonia Service Area","ending_cross_street":"South of Exit 130B-A - US 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.324327,40.59159]]}},{"id":"34ugyyQzUxVe5Lm+yzEW7fM/uso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Sqn7QPh/GT65JzxUAERtA/hGmVs="}],"description":"Construction on Garden State Parkway Express Lanes northbound Entrance ramp Exit 117 - NJ 36 (Hazlet Twp), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 AM thru 06:00 AM All lanes closed, Friday April 24th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-17T20:52:44Z"},"road_event_id":"34ugyyQzUxVe5Lm+yzEW7fM/uso=","beginning_cross_street":"Exit 117 - NJ 36","ending_cross_street":"Exit 117 - NJ 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206266,40.42084]]}},{"id":"Sqn7QPh/GT65JzxUAERtA/hGmVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"34ugyyQzUxVe5Lm+yzEW7fM/uso="}],"description":"Construction on Garden State Parkway Express Lanes northbound Entrance ramp Exit 117 - NJ 36 (Hazlet Twp), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 AM thru 06:00 AM All lanes closed, Friday April 24th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-17T20:52:44Z"},"road_event_id":"Sqn7QPh/GT65JzxUAERtA/hGmVs=","beginning_cross_street":"Exit 117 - NJ 36","ending_cross_street":"Exit 117 - NJ 36","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.206266,40.42084]]}},{"id":"mqlZkufp0yKLoB2MYEy+/Ieb9xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on Garden State Parkway northbound Entrance ramp Exit 153 - NJ 3 (Clifton), Saturday April 25th, 2026 thru Saturday April 25th, 2026, 12:00 AM thru 04:00 AM All lanes closed","update_date":"2026-04-17T20:49:12Z"},"road_event_id":"mqlZkufp0yKLoB2MYEy+/Ieb9xk=","beginning_cross_street":"Exit 153 - NJ 3","ending_cross_street":"Exit 153 - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.173243,40.850321]]}},{"id":"TsTzUrvqiYJZ2ctIZJ/qtNCWXnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[],"description":"Construction on Belt System - Southern Parkway both directions near Springfield Boulevard (New York) Subject to change without notice. One direction at a time., Thursday April 23rd, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-04-17T20:50:09Z"},"road_event_id":"TsTzUrvqiYJZ2ctIZJ/qtNCWXnk=","beginning_cross_street":"Springfield Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.75822,40.665937]]}},{"id":"/n54H1rtjHFwl13skBF41qq8xOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ePceIo//CJp1tBkSiF7800Op6j4="}],"description":"Expansion joint repairs and survey work on Garden State Parkway southbound between South of Exit 154 - US 46 (Clifton) and South of Exit 153A - NJ 3 (Bloomfield), Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Saturday April 25th, 2026, 01:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-04-17T20:51:41Z"},"road_event_id":"/n54H1rtjHFwl13skBF41qq8xOA=","beginning_cross_street":"South of Exit 154 - US 46","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T06:00:00Z","end_date":"2026-04-25T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.170718,40.865969]]}},{"id":"ePceIo//CJp1tBkSiF7800Op6j4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Garden State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/n54H1rtjHFwl13skBF41qq8xOA="}],"description":"Expansion joint repairs and survey work on Garden State Parkway southbound between South of Exit 154 - US 46 (Clifton) and South of Exit 153A - NJ 3 (Bloomfield), Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed, Saturday April 25th, 2026, 01:00 AM thru 06:00 AM 1 Center lane of 3 lanes closed","update_date":"2026-04-17T20:51:41Z"},"road_event_id":"ePceIo//CJp1tBkSiF7800Op6j4=","beginning_cross_street":"South of Exit 154 - US 46","ending_cross_street":"South of Exit 153A - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.170718,40.865969]]}},{"id":"i4KaY8A1dt/D3c9111z0U6tSg0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAND CENTRAL PKWY"],"direction":"unknown","related_road_events":[],"description":"Construction on GRAND CENTRAL PKWY at 47th Street (New York) Subject to change without notice. , Friday April 24th, 2026, 10:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-04-17T20:52:53Z"},"road_event_id":"i4KaY8A1dt/D3c9111z0U6tSg0k=","beginning_cross_street":"47th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904485,40.767644]]}},{"id":"hmXtk9uZHidJToDv8YwM+YWhvas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 eastbound at Exit 41 - Astoria Boulevard West (New York) Subject to change without notice. , Friday April 24th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T20:54:30Z"},"road_event_id":"hmXtk9uZHidJToDv8YwM+YWhvas=","beginning_cross_street":"Exit 41 - Astoria Boulevard West","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.904217,40.767504]]}},{"id":"8V8pbFZZpqWm2Emu5K9ukjI6HkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Gd8yuZXW/oMokUjptXzuzCyCYbY="}],"description":"Deck work on New Jersey Turnpike - Hudson County Extension eastbound between East of Grand St (Jersey City) and West of Jersey Ave/Holland Tunnel (Jersey City), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed, Saturday April 25th, 2026, 06:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-19T22:42:00Z"},"road_event_id":"8V8pbFZZpqWm2Emu5K9ukjI6HkE=","beginning_cross_street":"East of Grand St","ending_cross_street":"West of Jersey Ave/Holland Tunnel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.055563,40.719562]]}},{"id":"Gd8yuZXW/oMokUjptXzuzCyCYbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8V8pbFZZpqWm2Emu5K9ukjI6HkE="},{"type":"next-occurrence","id":"Msfjnd78n4N9p4DW3gTQ8BTlAu8="}],"description":"Deck work on New Jersey Turnpike - Hudson County Extension eastbound between East of Grand St (Jersey City) and West of Jersey Ave/Holland Tunnel (Jersey City), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed, Saturday April 25th, 2026, 06:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-19T22:42:00Z"},"road_event_id":"Gd8yuZXW/oMokUjptXzuzCyCYbY=","beginning_cross_street":"East of Grand St","ending_cross_street":"West of Jersey Ave/Holland Tunnel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.055563,40.719562]]}},{"id":"Msfjnd78n4N9p4DW3gTQ8BTlAu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8V8pbFZZpqWm2Emu5K9ukjI6HkE="}],"description":"Deck work on New Jersey Turnpike - Hudson County Extension eastbound between East of Grand St (Jersey City) and West of Jersey Ave/Holland Tunnel (Jersey City), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed, Saturday April 25th, 2026, 06:00 AM thru 05:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-19T22:42:00Z"},"road_event_id":"Msfjnd78n4N9p4DW3gTQ8BTlAu8=","beginning_cross_street":"East of Grand St","ending_cross_street":"West of Jersey Ave/Holland Tunnel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T16:00:00Z","end_date":"2026-04-26T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.055563,40.719562]]}},{"id":"fm41+H1tmOiPrcUzxZ7ut0+WVy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike - Western Spur northbound Entrance ramp Interchange 15W - I-280 (Kearny) to Interchange 15W - I-280 (Kearny), Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 09:00 PM thru 06:00 AM All lanes closed northbound,","update_date":"2026-04-22T08:00:01Z"},"road_event_id":"fm41+H1tmOiPrcUzxZ7ut0+WVy4=","beginning_cross_street":"Interchange 15W - I-280","ending_cross_street":"Interchange 15W - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.117721,40.75514]]}},{"id":"v8Itp88HWI0MrNx6tNXnog1qf8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Zp0XxXWR7JGcwQZv3mMcIvTzgcg="}],"description":"Construction on Jackie Robinson Parkway both directions near Woodhaven Boulevard (New York) Subject to change without notice. One direction at a time., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-04-17T20:59:04Z"},"road_event_id":"v8Itp88HWI0MrNx6tNXnog1qf8U=","beginning_cross_street":"Woodhaven Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.858157,40.702882]]}},{"id":"Zp0XxXWR7JGcwQZv3mMcIvTzgcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jackie Robinson Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"v8Itp88HWI0MrNx6tNXnog1qf8U="}],"description":"Construction on Jackie Robinson Parkway both directions near Woodhaven Boulevard (New York) Subject to change without notice. One direction at a time., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound; 1 Left lane of 2 lanes closed westbound","update_date":"2026-04-17T20:59:04Z"},"road_event_id":"Zp0XxXWR7JGcwQZv3mMcIvTzgcg=","beginning_cross_street":"Woodhaven Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.858157,40.702882]]}},{"id":"vLz2Hy+70SIvYdn5xNbUJIDwfwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[],"description":"Construction on I-495 both directions Exit 23 - Main Street (New York) Subject to change without notice. One direction at a time., Thursday April 23rd, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound; 1 Left lane of 3 lanes closed westbound","update_date":"2026-04-17T21:03:59Z"},"road_event_id":"vLz2Hy+70SIvYdn5xNbUJIDwfwk=","beginning_cross_street":"Exit 23 - Main Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837464,40.743259]]}},{"id":"QxaUhKM8KDRWfSIgZ7XflVHSfdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[],"description":"Construction on I-678 both directions near I-495 Long Island Expressway (New York) Subject to change without notice. One direction at a time., Friday April 24th,2026 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed northbound, 1 Left lane of 3 lanes closed southbound","update_date":"2026-04-22T18:00:07Z"},"road_event_id":"QxaUhKM8KDRWfSIgZ7XflVHSfdg=","beginning_cross_street":"I-495 Long Island Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837586,40.743304]]}},{"id":"/rVdCmsr0qG+ymAnOiceVfUj60k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Inner Roadway northbound ramp from Woodrow Wilson Service Area (Hamilton Twp), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T21:31:40Z"},"road_event_id":"/rVdCmsr0qG+ymAnOiceVfUj60k=","beginning_cross_street":"Woodrow Wilson Service Area","ending_cross_street":"Woodrow Wilson Service Area","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.625549,40.178948]]}},{"id":"EADvmRFXs3V5BA2cC7Ig/reit+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 7A - I-195 (Robbinsville Twp), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T21:32:50Z"},"road_event_id":"EADvmRFXs3V5BA2cC7Ig/reit+c=","beginning_cross_street":"Interchange 7A - I-195","ending_cross_street":"Interchange 7A - I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.59573,40.19583]]}},{"id":"l+bJsaMN1cc0rnGuatHwYGPpiEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on New Jersey Turnpike Inner Roadway northbound Exit ramp Interchange 8 - NJ 33 (East Windsor Twp), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:33:58Z"},"road_event_id":"l+bJsaMN1cc0rnGuatHwYGPpiEs=","beginning_cross_street":"Interchange 8 - NJ 33","ending_cross_street":"Interchange 8 - NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.513055,40.258999]]}},{"id":"PUmhYhTBMnBUFRKo9/icOSact3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike - Hudson County Extension eastbound between West of Newark Bay Bridge (Newark) and East of Interchange 14A - NJ 440/Bayonne Bridge (Jersey City), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 08:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T21:34:59Z"},"road_event_id":"PUmhYhTBMnBUFRKo9/icOSact3A=","beginning_cross_street":"West of Newark Bay Bridge","ending_cross_street":"East of Interchange 14A - NJ 440/Bayonne Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.125342,40.697396]]}},{"id":"s6ST91JbAcwskdasfvEOv9rTqtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vmlNDGJgkLj7KSQSC/nrtNjbI4A="}],"description":"Sign work on New Jersey Turnpike - Eastern Spur southbound Entrance ramp From County Avenue to Interchange 16E (Secaucus), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday, 08:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:40:01Z"},"road_event_id":"s6ST91JbAcwskdasfvEOv9rTqtw=","beginning_cross_street":"From County Avenue to Interchange 16E","ending_cross_street":"From County Avenue to Interchange 16E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059047,40.778733]]}},{"id":"vmlNDGJgkLj7KSQSC/nrtNjbI4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s6ST91JbAcwskdasfvEOv9rTqtw="}],"description":"Sign work on New Jersey Turnpike - Eastern Spur southbound Entrance ramp From County Avenue to Interchange 16E (Secaucus), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday, 08:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:40:01Z"},"road_event_id":"vmlNDGJgkLj7KSQSC/nrtNjbI4A=","beginning_cross_street":"From County Avenue to Interchange 16E","ending_cross_street":"From County Avenue to Interchange 16E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.059047,40.778733]]}},{"id":"WklVpAJiY545+kLhyalKOL3EeCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iNCfugyH6yQxZOTMXvk0UUDKgMU="}],"description":"Sign work on New Jersey Turnpike - Eastern Spur eastbound Entrance ramp From NJ 3 to Interchange 16E (Secaucus), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday, 08:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:41:47Z"},"road_event_id":"WklVpAJiY545+kLhyalKOL3EeCs=","beginning_cross_street":"From NJ 3 to Interchange 16E","ending_cross_street":"From NJ 3 to Interchange 16E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051417,40.786933]]}},{"id":"iNCfugyH6yQxZOTMXvk0UUDKgMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WklVpAJiY545+kLhyalKOL3EeCs="}],"description":"Sign work on New Jersey Turnpike - Eastern Spur eastbound Entrance ramp From NJ 3 to Interchange 16E (Secaucus), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday, 08:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:41:47Z"},"road_event_id":"iNCfugyH6yQxZOTMXvk0UUDKgMU=","beginning_cross_street":"From NJ 3 to Interchange 16E","ending_cross_street":"From NJ 3 to Interchange 16E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.051417,40.786933]]}},{"id":"Ve4X0i0ZN3+Mdnqeygt8XIkaY9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ExIddPYa5pDV1rXA3OtHQqorAdw="}],"description":"Drainage improvements on New Jersey Turnpike/I-95 Express Lanes southbound between Exit 70B - Teaneck (Teaneck Twp) and New Jersey Turnpike/I-95 at South of Exit 68 - Challenger Rd (Ridgefield Park), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 10:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 10:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:54:07Z"},"road_event_id":"Ve4X0i0ZN3+Mdnqeygt8XIkaY9A=","beginning_cross_street":"Exit 70B - Teaneck","ending_cross_street":"South of Exit 68 - Challenger Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008737,40.865818]]}},{"id":"ExIddPYa5pDV1rXA3OtHQqorAdw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike/I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ve4X0i0ZN3+Mdnqeygt8XIkaY9A="}],"description":"Drainage improvements on New Jersey Turnpike/I-95 Express Lanes southbound between Exit 70B - Teaneck (Teaneck Twp) and New Jersey Turnpike/I-95 at South of Exit 68 - Challenger Rd (Ridgefield Park), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 10:00 PM thru 05:00 AM 1 Center lane of 3 lanes closed, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 10:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:54:07Z"},"road_event_id":"ExIddPYa5pDV1rXA3OtHQqorAdw=","beginning_cross_street":"Exit 70B - Teaneck","ending_cross_street":"South of Exit 68 - Challenger Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.008737,40.865818]]}},{"id":"q0fSCufngFDWhuETIUfVsvvoeYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Steel repairs on New Jersey Turnpike Inner Roadway northbound Exit ramp Interchange 14 - I-78/US 1&9 (Newark), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-17T21:48:29Z"},"road_event_id":"q0fSCufngFDWhuETIUfVsvvoeYQ=","beginning_cross_street":"Interchange 14 - I-78/US 1&9","ending_cross_street":"Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.152516,40.703714]]}},{"id":"EXlp8y8L1FkWwRxTGCN/M0XSlkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Sign work on New Jersey Turnpike - Western Spur southbound Exit ramp From Eastern Spur to Interchange 15W (Kearny), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 08:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-17T21:49:37Z"},"road_event_id":"EXlp8y8L1FkWwRxTGCN/M0XSlkc=","beginning_cross_street":"From Eastern Spur to Interchange 15W","ending_cross_street":"From Eastern Spur to Interchange 15W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.11105,40.753447]]}},{"id":"mVPj9PvlnuFqAGDGwCokqkaVmow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[],"description":"Milling and paving operations on New Jersey Turnpike - Western Spur northbound between South of Interchange 15E - US 1&9 (Newark) and South of Interchange 16W - NJ 3 (Rutherford), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 07:00 PM thru 06:00 AM 1 Right lane of 5 lanes closed, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 PM thru 05:45 AM 1 Center lane of 5 lanes closed","update_date":"2026-04-17T21:52:24Z"},"road_event_id":"mVPj9PvlnuFqAGDGwCokqkaVmow=","beginning_cross_street":"South of Interchange 15E - US 1&9","ending_cross_street":"South of Interchange 16W - NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.133165,40.724557]]}},{"id":"zRujvHq6pEZdcqH6aGczfYlkSNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"273QTrLlgpmWyRPcE9gAafGCo/w="}],"description":"Roadwork on NY 48 southbound between COUNTY ROUTE 24 (Minetto) and COUNTY ROUTE 8 (Minetto), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T23:25:27Z"},"road_event_id":"zRujvHq6pEZdcqH6aGczfYlkSNI=","beginning_cross_street":"COUNTY ROUTE 24","ending_cross_street":"COUNTY ROUTE 8 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.473171,43.398275]]}},{"id":"273QTrLlgpmWyRPcE9gAafGCo/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRujvHq6pEZdcqH6aGczfYlkSNI="},{"type":"next-occurrence","id":"yIGP902gB0MNafKqVsoFhhaQlFg="}],"description":"Roadwork on NY 48 southbound between COUNTY ROUTE 24 (Minetto) and COUNTY ROUTE 8 (Minetto), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T23:25:27Z"},"road_event_id":"273QTrLlgpmWyRPcE9gAafGCo/w=","beginning_cross_street":"COUNTY ROUTE 24","ending_cross_street":"COUNTY ROUTE 8 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.473171,43.398275]]}},{"id":"yIGP902gB0MNafKqVsoFhhaQlFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zRujvHq6pEZdcqH6aGczfYlkSNI="}],"description":"Roadwork on NY 48 southbound between COUNTY ROUTE 24 (Minetto) and COUNTY ROUTE 8 (Minetto), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T23:25:27Z"},"road_event_id":"yIGP902gB0MNafKqVsoFhhaQlFg=","beginning_cross_street":"COUNTY ROUTE 24","ending_cross_street":"COUNTY ROUTE 8 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.473171,43.398275]]}},{"id":"IR9JnexPmQqjuXXztecPtgCOgjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Pine Av (Sayreville), Wednesday April 22, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-04-18T04:15:22Z"},"road_event_id":"IR9JnexPmQqjuXXztecPtgCOgjQ=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Pine Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"SkrsLJne7VNQ83xwqp5dh6BHxw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Friday April 24, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-04-18T04:15:21Z"},"road_event_id":"SkrsLJne7VNQ83xwqp5dh6BHxw8=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"BhhLJ2npzcayDHOabyyd8OwMMVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Wednesday April 22, 2026 10:00 PM thru Thursday April 23, 2026 06:00 AM, left lane closed","update_date":"2026-04-18T04:15:18Z"},"road_event_id":"BhhLJ2npzcayDHOabyyd8OwMMVs=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"1IW80zQE1wlJo/Yj06bQJERfg3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Pine Av (Sayreville), Thursday April 23, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-04-18T04:15:26Z"},"road_event_id":"1IW80zQE1wlJo/Yj06bQJERfg3g=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Pine Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"21Slxvd/pB6t8qwi63/sm9rP/+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of US 1&9 Truck Route/Communipaw Av (Jersey City) and South of Kennedy Boulevard (Bayonne), Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, left lane closed","update_date":"2026-04-18T04:15:24Z"},"road_event_id":"21Slxvd/pB6t8qwi63/sm9rP/+M=","beginning_cross_street":"South of US 1&9 Truck Route/Communipaw Av","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092521,40.721855]]}},{"id":"w3e+VJIL6xqYH8BPhtKs0ACr3OM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Mount Pleasant Tpke (Denville Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 05:00 AM, right lane closed","update_date":"2026-04-18T04:15:28Z"},"road_event_id":"w3e+VJIL6xqYH8BPhtKs0ACr3OM=","beginning_cross_street":"In the vicinity of Mount Pleasant Tpke","ending_cross_street":"In the vicinity of Mount Pleasant Tpke","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.520988,40.871875]]}},{"id":"tA+/cSoVFnfX+c4ESjiH7dPLBJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Montville Twp), Friday April 24, 2026 07:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-18T04:15:27Z"},"road_event_id":"tA+/cSoVFnfX+c4ESjiH7dPLBJs=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.331489,40.86687]]}},{"id":"XoXi3n+Qxy2HS6P8AkCyNxbYVJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Wantage School Rd (Wantage Twp) and North of Sawmill Rd (Montague Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 11:00 AM, right shoulder closed, moving operation","update_date":"2026-04-18T04:15:23Z"},"road_event_id":"XoXi3n+Qxy2HS6P8AkCyNxbYVJA=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"North of Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618453,41.234889]]}},{"id":"GbstrhynMh9Yx5jRmvKIv8Z5/o4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound near South of Maple Ave (Fair Lawn), Friday April 24, 2026 10:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-18T04:15:29Z"},"road_event_id":"GbstrhynMh9Yx5jRmvKIv8Z5/o4=","beginning_cross_street":"South of Maple Ave","ending_cross_street":"North of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.135963,40.948986]]}},{"id":"czlx43MMVTEsv9ah5JCka3e777I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound at Ernston Rd (Sayreville) Wednesday April 22, 2026 08:00 AM thru 03:30 PM, ramp","update_date":"2026-04-18T04:16:12Z"},"road_event_id":"czlx43MMVTEsv9ah5JCka3e777I=","beginning_cross_street":"Ernston Rd","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.272956,40.464385]]}},{"id":"YsIrlwAJjvyjRbZJ4im0zMfo3Uk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Friday April 24, 2026 10:00 PM thru Saturday April 25, 2026 08:00 AM, right lane closed","update_date":"2026-04-18T04:16:16Z"},"road_event_id":"YsIrlwAJjvyjRbZJ4im0zMfo3Uk=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"ZEve3vWm9qn42NC8Tjs7KU0pock=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 5 - CR 529/Stelton Rd (South Plainfield), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-18T04:16:11Z"},"road_event_id":"ZEve3vWm9qn42NC8Tjs7KU0pock=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"Exit 5 - CR 529/Stelton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.434799,40.556858]]}},{"id":"8PZWK8LZ/q5qHDVuZMRHzGS1uJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Friday April 24, 2026 08:00 AM thru 03:30 PM, ramp","update_date":"2026-04-18T04:15:38Z"},"road_event_id":"8PZWK8LZ/q5qHDVuZMRHzGS1uJs=","beginning_cross_street":"South of Ernston Rd","ending_cross_street":"South of Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.27108,40.46437]]}},{"id":"D0SxGa4dEGO+EGs88V30MSmAFMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Wednesday April 22, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-04-18T04:15:41Z"},"road_event_id":"D0SxGa4dEGO+EGs88V30MSmAFMg=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"eDBk1Pp8DH2mFHdBdazYDFEU9bQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 7 - South Randolphville Rd (Piscataway Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-18T04:15:36Z"},"road_event_id":"eDBk1Pp8DH2mFHdBdazYDFEU9bQ=","beginning_cross_street":"North of Exit 7 - South Randolphville Rd","ending_cross_street":"North of Exit 7 - South Randolphville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.470611,40.556777]]}},{"id":"iqn1uCJwTmN9H8YSDfbVkUIqsbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of US 46 (Clifton) and US 1&9 (North Bergen Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM,","update_date":"2026-04-18T04:15:43Z"},"road_event_id":"iqn1uCJwTmN9H8YSDfbVkUIqsbc=","beginning_cross_street":"East of US 46","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.186302,40.8693]]}},{"id":"MgAmQ4M5ebkLODE4YgLd1BRRy2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound at Ernston Rd (Sayreville) Thursday April 23, 2026 08:00 AM thru 03:30 PM, ramp","update_date":"2026-04-18T04:15:42Z"},"road_event_id":"MgAmQ4M5ebkLODE4YgLd1BRRy2A=","beginning_cross_street":"Ernston Rd","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.272956,40.464385]]}},{"id":"FBB18WHyyc6ywZolzbUtuT/nK8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 5 - CR 529/Stelton Rd (South Plainfield), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-18T04:15:46Z"},"road_event_id":"FBB18WHyyc6ywZolzbUtuT/nK8Q=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"Exit 5 - CR 529/Stelton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.434799,40.556858]]}},{"id":"CfY3mw2baSLixSrYJXw68zBZ4r0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Friday April 24, 2026 10:00 PM thru Saturday April 25, 2026 08:00 AM, left lane closed","update_date":"2026-04-18T04:15:44Z"},"road_event_id":"CfY3mw2baSLixSrYJXw68zBZ4r0=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"81LnZpbIcqYbpaN/hFHJcr6g2O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 47A - I-280 (Montville Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-18T04:15:34Z"},"road_event_id":"81LnZpbIcqYbpaN/hFHJcr6g2O0=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.331489,40.86687]]}},{"id":"rpwD4025Svhtl0dA7GyN0juishs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Thursday April 23, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-04-18T04:15:33Z"},"road_event_id":"rpwD4025Svhtl0dA7GyN0juishs=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"S4Xq+mBLKc7atwCEKmcPvRVUMcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound near North of Maple Ave (Glen Rock), Friday April 24, 2026 09:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-18T04:15:32Z"},"road_event_id":"S4Xq+mBLKc7atwCEKmcPvRVUMcw=","beginning_cross_street":"North of Maple Ave","ending_cross_street":"South of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.138366,40.951374]]}},{"id":"r8F155FOEmssklxX1KcyIZWp+pU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound at Exit 48 - Hook Mountain Rd (Montville Twp) Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, ramp","update_date":"2026-04-18T04:16:03Z"},"road_event_id":"r8F155FOEmssklxX1KcyIZWp+pU=","beginning_cross_street":"Exit 48 - Hook Mountain Rd","ending_cross_street":"Exit 48 - Hook Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.34201,40.861568]]}},{"id":"yi2LtT9woN0idoLGgP/uDpTrmRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near East of Exit 47A - I-280 (Fairfield Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, left lane closed","update_date":"2026-04-18T04:16:06Z"},"road_event_id":"yi2LtT9woN0idoLGgP/uDpTrmRI=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.329277,40.872406]]}},{"id":"ULD+Vo83U+QZBhIVdt1Snjf7JQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 3 - New Durham Rd (Edison Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-18T04:16:05Z"},"road_event_id":"ULD+Vo83U+QZBhIVdt1Snjf7JQg=","beginning_cross_street":"South of Exit 3 - New Durham Rd","ending_cross_street":"Exit 3 - New Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.388107,40.54058]]}},{"id":"gvnd+wUHWVVzGqQHf32hi+A1Vqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Pine Av (Sayreville), Friday April 24, 2026 08:00 AM thru 03:30 PM, right lane closed","update_date":"2026-04-18T04:15:58Z"},"road_event_id":"gvnd+wUHWVVzGqQHf32hi+A1Vqc=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Pine Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"Kn8cXgFRod2AV0lSRnjJ9vna8Dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of US 22 (Newark) and Exit 14 - US 46 (Clifton), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM,","update_date":"2026-04-18T04:16:01Z"},"road_event_id":"Kn8cXgFRod2AV0lSRnjJ9vna8Dg=","beginning_cross_street":"North of US 22","ending_cross_street":"Exit 14 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181159,40.707855]]}},{"id":"2sJlDspXYMRg4AGXzfhMvvLVJVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Northbound between South of Kennedy Boulevard (Bayonne) and South of US 1&9 Truck Route/Communipaw Av (Jersey City), Friday April 24, 2026 09:00 PM thru Saturday April 25, 2026 05:00 AM, left lane closed","update_date":"2026-04-18T04:16:10Z"},"road_event_id":"2sJlDspXYMRg4AGXzfhMvvLVJVI=","beginning_cross_street":"South of Kennedy Boulevard","ending_cross_street":"South of US 1&9 Truck Route/Communipaw Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104354,40.691184]]}},{"id":"xQarXpJr+RXQ0qJLbDmUTOA7eIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near Exit 6 - CR 665/Washington Ave (Piscataway Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-18T04:16:09Z"},"road_event_id":"xQarXpJr+RXQ0qJLbDmUTOA7eIU=","beginning_cross_street":"Exit 6 - CR 665/Washington Ave","ending_cross_street":"North of Exit 6 - CR 665/Washington Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.446006,40.555458]]}},{"id":"ohw0nJgwtca4XgFX6QRUJBw+MYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near Exit 6 - CR 665/Washington Ave (Piscataway Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-18T04:15:50Z"},"road_event_id":"ohw0nJgwtca4XgFX6QRUJBw+MYI=","beginning_cross_street":"Exit 6 - CR 665/Washington Ave","ending_cross_street":"North of Exit 6 - CR 665/Washington Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.446006,40.555458]]}},{"id":"qSg87SRC/5MNBd7EpKC6i0gzBSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound at Ernston Rd (Sayreville) Friday April 24, 2026 08:00 AM thru 03:30 PM, ramp","update_date":"2026-04-18T04:15:53Z"},"road_event_id":"qSg87SRC/5MNBd7EpKC6i0gzBSQ=","beginning_cross_street":"Ernston Rd","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.272956,40.464385]]}},{"id":"6xEF8+Ij97B4lbENK9DEFt8jYok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Wednesday April 22, 2026 08:00 AM thru 03:30 PM, ramp","update_date":"2026-04-18T04:15:48Z"},"road_event_id":"6xEF8+Ij97B4lbENK9DEFt8jYok=","beginning_cross_street":"South of Ernston Rd","ending_cross_street":"South of Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.27108,40.46437]]}},{"id":"PMBix0zMW+IZMa0BgjymBPrSN0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near West of Exit 20 - CR 639 (Clinton Twp), Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, left lane closed","update_date":"2026-04-18T04:15:56Z"},"road_event_id":"PMBix0zMW+IZMa0BgjymBPrSN0M=","beginning_cross_street":"West of Exit 20 - CR 639","ending_cross_street":"West of Exit 20 - CR 639","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.849151,40.646621]]}},{"id":"0YBc2fprnuFNVnM0YK7ULE4gaLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Thursday April 23, 2026 08:00 AM thru 03:30 PM, ramp","update_date":"2026-04-18T04:15:55Z"},"road_event_id":"0YBc2fprnuFNVnM0YK7ULE4gaLY=","beginning_cross_street":"South of Ernston Rd","ending_cross_street":"South of Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.27108,40.46437]]}},{"id":"4pGVDPL2dp4WN7WSAMkgMFCyDzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near In the vicinity of Morris Tpke (Randolph Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 05:00 AM, right lane closed","update_date":"2026-04-18T04:15:57Z"},"road_event_id":"4pGVDPL2dp4WN7WSAMkgMFCyDzs=","beginning_cross_street":"In the vicinity of Morris Tpke","ending_cross_street":"In the vicinity of Irish Spring Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614379,40.855094]]}},{"id":"C4iP9Ahf7umfWkUI3mHVBUVGNZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of CR 669/Canfield Av (Mine Hill Twp) and West of I-80 (Denville Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, , moving operation","update_date":"2026-04-18T04:18:22Z"},"road_event_id":"C4iP9Ahf7umfWkUI3mHVBUVGNZg=","beginning_cross_street":"East of CR 669/Canfield Av","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.600013,40.879898]]}},{"id":"+nbABNuUeQbvFf5RyK17pETs1Kw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack River Drawbridge (Kearny/Jersey City), Friday April 24, 2026 09:00 PM thru Saturday April 25, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 06:00 AM)","update_date":"2026-04-18T04:18:17Z"},"road_event_id":"+nbABNuUeQbvFf5RyK17pETs1Kw=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"South of NJ 440","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"pxnBElJXymlhYasUCPP9oSLZE34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between East of CR 613/Passaic Ave (Fairfield Twp) and West of NJ 159/CR 627/Plymouth Rd (Fairfield Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 08:00 AM, left lane closed","update_date":"2026-04-18T04:18:20Z"},"road_event_id":"pxnBElJXymlhYasUCPP9oSLZE34=","beginning_cross_street":"East of CR 613/Passaic Ave","ending_cross_street":"West of NJ 159/CR 627/Plymouth Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.271972,40.890518]]}},{"id":"e8aBf9uhCUxke+/q2JTYWZXJ5cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-80 (Denville Twp) and East of CR 669/Canfield Av (Mine Hill Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, , moving operation","update_date":"2026-04-18T04:18:18Z"},"road_event_id":"e8aBf9uhCUxke+/q2JTYWZXJ5cs=","beginning_cross_street":"West of I-80","ending_cross_street":"East of CR 669/Canfield Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.490287,40.897205]]}},{"id":"kvBqSmfRD5DvMQdPg9ljYw3kBP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound between Hackensack River Drawbridge (Kearny/Jersey City) and NJ 440 (Jersey City), Friday April 24, 2026 09:00 PM thru Saturday April 25, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-18T04:18:21Z"},"road_event_id":"kvBqSmfRD5DvMQdPg9ljYw3kBP0=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"NJ 440","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"tJpNGKHvtNwfFahDN/RmVTnbQwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HJ0goPQfLkoDeI+OstyQ21QyXd4="}],"description":"Gas main repairs on NY 7 westbound South Lake Avenue; North Lake Avenue (Troy) to Burdett Avenue (Troy), Sunday April 19th, 2026 thru Friday April 24th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-18T16:17:39Z"},"road_event_id":"tJpNGKHvtNwfFahDN/RmVTnbQwQ=","beginning_cross_street":"South Lake Avenue; North Lake Avenue","ending_cross_street":"Burdett Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.661126,42.738397]]}},{"id":"HJ0goPQfLkoDeI+OstyQ21QyXd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tJpNGKHvtNwfFahDN/RmVTnbQwQ="}],"description":"Gas main repairs on NY 7 westbound South Lake Avenue; North Lake Avenue (Troy) to Burdett Avenue (Troy), Sunday April 19th, 2026 thru Friday April 24th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-18T16:17:39Z"},"road_event_id":"HJ0goPQfLkoDeI+OstyQ21QyXd4=","beginning_cross_street":"South Lake Avenue; North Lake Avenue","ending_cross_street":"Burdett Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.661126,42.738397]]}},{"id":"gPBih2YUhJwq/zOv5KVb0E1w8Lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rBtSa5ZzH8ByvRghljObtZrPXGM="}],"description":"Watermain break repairs on NY 443 westbound Bedell Avenue (Bethlehem) Alternating, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-18T17:32:30Z"},"road_event_id":"gPBih2YUhJwq/zOv5KVb0E1w8Lw=","beginning_cross_street":"Bedell Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.816789,42.628043]]}},{"id":"rBtSa5ZzH8ByvRghljObtZrPXGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gPBih2YUhJwq/zOv5KVb0E1w8Lw="},{"type":"next-occurrence","id":"Hl+lv7fHOBflCBoC5pIo+g8uNyo="}],"description":"Watermain break repairs on NY 443 westbound Bedell Avenue (Bethlehem) Alternating, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-18T17:32:30Z"},"road_event_id":"rBtSa5ZzH8ByvRghljObtZrPXGM=","beginning_cross_street":"Bedell Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.816789,42.628043]]}},{"id":"Hl+lv7fHOBflCBoC5pIo+g8uNyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gPBih2YUhJwq/zOv5KVb0E1w8Lw="}],"description":"Watermain break repairs on NY 443 westbound Bedell Avenue (Bethlehem) Alternating, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-18T17:32:30Z"},"road_event_id":"Hl+lv7fHOBflCBoC5pIo+g8uNyo=","beginning_cross_street":"Bedell Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.816789,42.628043]]}},{"id":"EZfxDt1fhciu3sYjeWOvRGYgLfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WGw6+ic2BSnHkthZaa0/95HSZuE="}],"description":"Watermain break repairs on NY 443 westbound City of Albany; Town of Bethlehem Line (Bethlehem) Alternating, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-18T17:51:10Z"},"road_event_id":"EZfxDt1fhciu3sYjeWOvRGYgLfo=","beginning_cross_street":"City of Albany; Town of Bethlehem Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799273,42.633705]]}},{"id":"WGw6+ic2BSnHkthZaa0/95HSZuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EZfxDt1fhciu3sYjeWOvRGYgLfo="},{"type":"next-occurrence","id":"3na7tK4BhjMwlB+Oq65br0IdsM0="}],"description":"Watermain break repairs on NY 443 westbound City of Albany; Town of Bethlehem Line (Bethlehem) Alternating, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-18T17:51:10Z"},"road_event_id":"WGw6+ic2BSnHkthZaa0/95HSZuE=","beginning_cross_street":"City of Albany; Town of Bethlehem Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799273,42.633705]]}},{"id":"3na7tK4BhjMwlB+Oq65br0IdsM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 443"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EZfxDt1fhciu3sYjeWOvRGYgLfo="}],"description":"Watermain break repairs on NY 443 westbound City of Albany; Town of Bethlehem Line (Bethlehem) Alternating, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-18T17:51:10Z"},"road_event_id":"3na7tK4BhjMwlB+Oq65br0IdsM0=","beginning_cross_street":"City of Albany; Town of Bethlehem Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799273,42.633705]]}},{"id":"lFFeQncwbPZmYEreUdLdiFACkq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound at North of I-78/US 22 (Clinton Twp) Friday April 24, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-18T20:57:19Z"},"road_event_id":"lFFeQncwbPZmYEreUdLdiFACkq8=","beginning_cross_street":"North of I-78/US 22","ending_cross_street":"North of I-78/US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.890983,40.638687]]}},{"id":"fpqg+FqijJ2M5BSbipvj5a56nBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound at North of I-78/US 22 (Clinton Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-18T20:57:21Z"},"road_event_id":"fpqg+FqijJ2M5BSbipvj5a56nBE=","beginning_cross_street":"North of I-78/US 22","ending_cross_street":"North of I-78/US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.890983,40.638687]]}},{"id":"257Jo5+Ri2NuOfzXPS04kqupyPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound at North of I-78/US 22 (Clinton Twp) Thursday April 23, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-18T20:57:22Z"},"road_event_id":"257Jo5+Ri2NuOfzXPS04kqupyPc=","beginning_cross_street":"North of I-78/US 22","ending_cross_street":"North of I-78/US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.890983,40.638687]]}},{"id":"PjYGzXuPUlIHANEPGvOVtvla6Q0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-18T21:00:18Z"},"road_event_id":"PjYGzXuPUlIHANEPGvOVtvla6Q0=","beginning_cross_street":"CR 518/Washington St","ending_cross_street":"South of CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.649543,40.403152]]}},{"id":"VngoYx0I3asIbEyvoX62if8etRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 173"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 173 Southbound At CR 513/Pittstown Rd (Franklin Twp) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes, right shoulder closed","update_date":"2026-04-18T23:16:41Z"},"road_event_id":"VngoYx0I3asIbEyvoX62if8etRo=","beginning_cross_street":"CR 513/Pittstown Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.919548,40.63055]]}},{"id":"d2v8HrFZ2u3b/xTGOjxlZWeQbaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near East of Berrys Creek Bridge (East Rutherford), Wednesday April 29, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-19T11:21:28Z"},"road_event_id":"d2v8HrFZ2u3b/xTGOjxlZWeQbaM=","beginning_cross_street":"East of Berrys Creek Bridge","ending_cross_street":"West of Berrys Creek Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.090339,40.811038]]}},{"id":"I/DtoNqvrvBwFkgv8bnxeW6iv4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near East of Garden State Parkway (Clifton), Wednesday April 29, 2026 09:30 AM thru 03:00 PM, acceleration lane closed","update_date":"2026-04-19T11:21:27Z"},"road_event_id":"I/DtoNqvrvBwFkgv8bnxeW6iv4g=","beginning_cross_street":"East of Garden State Parkway","ending_cross_street":"East of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.17488,40.851764]]}},{"id":"GtOmQdxp2KOjj8ig4vv9wLN7Vhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Thursday April 30, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-19T11:21:24Z"},"road_event_id":"GtOmQdxp2KOjj8ig4vv9wLN7Vhw=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"wtmcwmvMPQkzzmiHADeTZbiip34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near West of Berrys Creek Bridge (Rutherford), Tuesday April 28, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-19T11:21:22Z"},"road_event_id":"wtmcwmvMPQkzzmiHADeTZbiip34=","beginning_cross_street":"West of Berrys Creek Bridge","ending_cross_street":"East of Berrys Creek Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.094131,40.810634]]}},{"id":"aGxAao9ySPHWZXQ0NB3KULAy4M4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound at South of Ernston Rd (Sayreville) Saturday April 25, 2026 08:00 PM thru Sunday April 26, 2026 06:00 AM, ramp","update_date":"2026-04-19T11:21:26Z"},"road_event_id":"aGxAao9ySPHWZXQ0NB3KULAy4M4=","beginning_cross_street":"South of Ernston Rd","ending_cross_street":"South of Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.27108,40.46437]]}},{"id":"TJshFM5WrhmmKHTkdu6VfmcVd7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near NJ 21 (Clifton), Monday April 27, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-19T11:21:25Z"},"road_event_id":"TJshFM5WrhmmKHTkdu6VfmcVd7A=","beginning_cross_street":"NJ 21","ending_cross_street":"West of NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.125213,40.823642]]}},{"id":"5a3gobil+hnG2UY24lSevjNJQTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Wednesday April 29, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-19T11:21:20Z"},"road_event_id":"5a3gobil+hnG2UY24lSevjNJQTo=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"mynl+LuRCcPniERK3AD3wMtGixg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound at Ernston Rd (Sayreville) Saturday April 25, 2026 08:00 PM thru Sunday April 26, 2026 06:00 AM, ramp","update_date":"2026-04-19T11:21:19Z"},"road_event_id":"mynl+LuRCcPniERK3AD3wMtGixg=","beginning_cross_street":"Ernston Rd","ending_cross_street":"Ernston Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.272956,40.464385]]}},{"id":"jyNoQELZ6Dr+dhkXA2V8y48W5tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Monday April 27, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-19T11:21:21Z"},"road_event_id":"jyNoQELZ6Dr+dhkXA2V8y48W5tw=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"x0X+7sBdlwbkulFiwxX9UbA0z44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Morgan Drawbridge (Old Bridge Twp) and Pine Av (Sayreville), Saturday April 25, 2026 08:00 PM thru Sunday April 26, 2026 06:00 AM, right lane closed","update_date":"2026-04-19T11:21:18Z"},"road_event_id":"x0X+7sBdlwbkulFiwxX9UbA0z44=","beginning_cross_street":"South of Morgan Drawbridge","ending_cross_street":"Pine Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.25373,40.460311]]}},{"id":"g11Z9UynIhVnICFgN+bMVkos0+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between Summit Ave (Hackensack) and NJ 4 (Paramus), Friday May 1, 2026 11:00 PM thru Saturday May 2, 2026 12:00 AM, left lane closed","update_date":"2026-04-19T11:21:16Z"},"road_event_id":"g11Z9UynIhVnICFgN+bMVkos0+Y=","beginning_cross_street":"Summit Ave","ending_cross_street":"NJ 4","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T02:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.06356,40.878772]]}},{"id":"DU97PMT2BDkt84FvInuDEyJOqE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Tuesday April 28, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-19T11:21:33Z"},"road_event_id":"DU97PMT2BDkt84FvInuDEyJOqE8=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"/pL0qI86JaeQu+wIu1IhA7j3USU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 34 - NJ 15 (Wharton), Monday April 27, 2026 10:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T11:21:32Z"},"road_event_id":"/pL0qI86JaeQu+wIu1IhA7j3USU=","beginning_cross_street":"West of Exit 34 - NJ 15","ending_cross_street":"Exit 34 - NJ 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.583786,40.908]]}},{"id":"Z/Ag1eE30lzxQnPx/TRT9KDj3ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Friday May 1, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-19T11:21:31Z"},"road_event_id":"Z/Ag1eE30lzxQnPx/TRT9KDj3ik=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"fLtoYuCMDPX6MfDD+hC/65mueCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound between NJ 4 (Paramus) and Summit Ave (Hackensack), Thursday April 30, 2026 11:00 PM thru Friday May 1, 2026 05:00 AM, left lane closed","update_date":"2026-04-19T11:21:29Z"},"road_event_id":"fLtoYuCMDPX6MfDD+hC/65mueCU=","beginning_cross_street":"NJ 4","ending_cross_street":"Summit Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.072364,40.92044]]}},{"id":"oByv5+Zn3Wx1+KEK9w62N6qcVpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near East of Garden State Parkway (Clifton), Wednesday April 29, 2026 09:30 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T11:21:35Z"},"road_event_id":"oByv5+Zn3Wx1+KEK9w62N6qcVpo=","beginning_cross_street":"East of Garden State Parkway","ending_cross_street":"East of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.171592,40.848197]]}},{"id":"ioKxnCty4xwP8BW66Ulje/gQJec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound near North of NJ 27 (New Brunswick), Tuesday April 28, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T11:21:34Z"},"road_event_id":"ioKxnCty4xwP8BW66Ulje/gQJec=","beginning_cross_street":"North of NJ 27","ending_cross_street":"South of Bishop Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.442871,40.501018]]}},{"id":"WyF2k+vnb03sWy2VTiiUBaXGQJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound between North of Ernston Rd (Sayreville) and North of Birchwood Dr (Old Bridge Twp), Saturday April 25, 2026 08:00 PM thru Sunday April 26, 2026 06:00 AM, right lane closed","update_date":"2026-04-19T11:21:36Z"},"road_event_id":"WyF2k+vnb03sWy2VTiiUBaXGQJM=","beginning_cross_street":"North of Ernston Rd","ending_cross_street":"North of Birchwood Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.278411,40.465423]]}},{"id":"qSFZbdOGgypAHOqvNWSwc3Aa9XU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and Exit 12 - CR 635/Perryville Rd (Union Twp), Thursday April 23, 2026 10:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:00:24Z"},"road_event_id":"qSFZbdOGgypAHOqvNWSwc3Aa9XU=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"0vzNzyh7TdHZNTOFksFZr+foTxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of I-295 (Bordentown Twp), Friday April 24, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:00:26Z"},"road_event_id":"0vzNzyh7TdHZNTOFksFZr+foTxk=","beginning_cross_street":"North of I-295","ending_cross_street":"North of US 206","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.710403,40.137733]]}},{"id":"N7oiuiMccYO1UUmqSbglDGKBuMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near Exit 12 - CR 635/Perryville Rd (Union Twp), Thursday April 23, 2026 11:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:00:25Z"},"road_event_id":"N7oiuiMccYO1UUmqSbglDGKBuMQ=","beginning_cross_street":"Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.969566,40.635074]]}},{"id":"/AWiIGLT+rDSe04yFU34DhaVxjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and North of I-295 (Mount Laurel Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, left lane closed","update_date":"2026-04-19T12:00:28Z"},"road_event_id":"/AWiIGLT+rDSe04yFU34DhaVxjs=","beginning_cross_street":"North of NJ 70","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.928695,39.895069]]}},{"id":"tffAr7Oq3dWsLhqNYH4ixvG7wtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 34"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 34 Southbound between Collingswood Circle (Wall Twp) and CR 524 Spur/Atlantic Ave (Wall Twp), Thursday April 23, 2026 12:00 PM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-04-19T12:00:27Z"},"road_event_id":"tffAr7Oq3dWsLhqNYH4ixvG7wtY=","beginning_cross_street":"Collingswood Circle","ending_cross_street":"CR 524 Spur/Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.128852,40.219444]]}},{"id":"IdbFmtNFWBp9ymoMJuRr9+9CWFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and North of Exit 57 - US 130 (Hamilton Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:00:29Z"},"road_event_id":"IdbFmtNFWBp9ymoMJuRr9+9CWFs=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"/fjK7afEVwTbiWKeDgAFjkiZxYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-04-19T12:00:20Z"},"road_event_id":"/fjK7afEVwTbiWKeDgAFjkiZxYo=","beginning_cross_street":"I-295","ending_cross_street":"South of NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"t2/Si6JKheQLoBhWpotqM5Gc/Uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and North of Exit 57 - US 130 (Hamilton Twp), left shoulder","update_date":"2026-04-19T12:00:19Z"},"road_event_id":"t2/Si6JKheQLoBhWpotqM5Gc/Uc=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"ggljSL3ep5JsQoYoFFAMX7MlTIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 57 - US 130 (Hamilton Twp) and Exit 76 - NJ 29 (Ewing Twp), left shoulder","update_date":"2026-04-19T12:00:23Z"},"road_event_id":"ggljSL3ep5JsQoYoFFAMX7MlTIU=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718093,40.153728]]}},{"id":"RefQzufYmnp0ZwMBIPe7Y+sUNTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Friday April 24, 2026 07:00 AM thru 02:59 PM, right shoulder closed","update_date":"2026-04-19T12:00:21Z"},"road_event_id":"RefQzufYmnp0ZwMBIPe7Y+sUNTk=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T01:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"VpH9PxOwZrtgt1fc1djOYR9+TEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 57 - US 130 (Hamilton Twp) and Exit 76 - NJ 29 (Ewing Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:00:16Z"},"road_event_id":"VpH9PxOwZrtgt1fc1djOYR9+TEo=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718093,40.153728]]}},{"id":"K2pqaxNmAuAUHNNmW50dYkOZikk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), left shoulder","update_date":"2026-04-19T12:00:18Z"},"road_event_id":"K2pqaxNmAuAUHNNmW50dYkOZikk=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"2uY3lsEiVClnbsXfelVM6K5bFVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and NJ 38 (Maple Shade Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, left lane closed","update_date":"2026-04-19T12:00:17Z"},"road_event_id":"2uY3lsEiVClnbsXfelVM6K5bFVg=","beginning_cross_street":"I-295","ending_cross_street":"NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"epy+o5Bsn8b596xQoViRyW5uDr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 64 - CR 535/East State Street Extension (Hamilton Twp) and North of Exit 62 - Olden Ave (Hamilton Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:00:32Z"},"road_event_id":"epy+o5Bsn8b596xQoViRyW5uDr4=","beginning_cross_street":"Exit 64 - CR 535/East State Street Extension","ending_cross_street":"North of Exit 62 - Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.700538,40.244544]]}},{"id":"yYvKPx0JpBL/WDeJII14QJ8oQWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and NJ 38 (Maple Shade Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-19T12:00:31Z"},"road_event_id":"yYvKPx0JpBL/WDeJII14QJ8oQWM=","beginning_cross_street":"I-295","ending_cross_street":"NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"B8xcDwIPq+jtjbvjW9/F6+qffxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near West of Exit 34 - NJ 15 (Roxbury Twp), Monday April 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:00:34Z"},"road_event_id":"B8xcDwIPq+jtjbvjW9/F6+qffxY=","beginning_cross_street":"West of Exit 34 - NJ 15","ending_cross_street":"West of Exit 34 - NJ 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.602386,40.907115]]}},{"id":"1Ha+Git6cOc5nQ1/R6zGZC+xAFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of NJ 33 Business (Freehold Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-19T12:00:30Z"},"road_event_id":"1Ha+Git6cOc5nQ1/R6zGZC+xAFc=","beginning_cross_street":"North of NJ 33 Business","ending_cross_street":"South of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.292274,40.261535]]}},{"id":"1eWCsUkKFsIpHcQi/Xl3CJ7kOBU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near Exit 30 - North Maple Ave (Bernards Twp), Thursday April 23, 2026 10:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:00:35Z"},"road_event_id":"1eWCsUkKFsIpHcQi/Xl3CJ7kOBU=","beginning_cross_street":"Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.539649,40.728511]]}},{"id":"ly95R8mvEg90xzozRzRv6YenY8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 12 - CR 635/Perryville Rd (Union Twp) and East of Exit 7 - NJ 173 (Bethlehem Twp), Friday April 24, 2026 07:00 AM thru 02:59 PM, right shoulder closed","update_date":"2026-04-19T12:00:33Z"},"road_event_id":"ly95R8mvEg90xzozRzRv6YenY8M=","beginning_cross_street":"East of Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 7 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T01:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958419,40.636024]]}},{"id":"7qvkPbaNb7yAthbiEZz2tItOyeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 4 - Durham Rd (Edison Twp) and New Jersey Turnpike (Edison Twp), left shoulder","update_date":"2026-04-19T12:03:28Z"},"road_event_id":"7qvkPbaNb7yAthbiEZz2tItOyeY=","beginning_cross_street":"South of Exit 4 - Durham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.403892,40.548637]]}},{"id":"Udhq0xgqGQI/41V4CvQ2gdP5QiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 4 - Durham Rd (Edison Twp), left shoulder","update_date":"2026-04-19T12:03:27Z"},"road_event_id":"Udhq0xgqGQI/41V4CvQ2gdP5QiY=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 4 - Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"cvErDtX93/DJ0PzFzZYPDsKPhFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between Exit 12 - CR 635/Perryville Rd (Union Twp) and East of Exit 7 - NJ 173 (Bethlehem Twp), Friday April 24, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-19T12:03:25Z"},"road_event_id":"cvErDtX93/DJ0PzFzZYPDsKPhFc=","beginning_cross_street":"Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 7 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.969566,40.635074]]}},{"id":"mpcZoaqLKxgWG4VSBkU6gY9WW9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and East of Exit 12 - CR 635/Perryville Rd (Union Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:18Z"},"road_event_id":"mpcZoaqLKxgWG4VSBkU6gY9WW9s=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"hU1UMFbS6frLXxpNqW/DV0P3IpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:17Z"},"road_event_id":"hU1UMFbS6frLXxpNqW/DV0P3IpQ=","beginning_cross_street":"West of CR 614/Cologne Av","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.673698,39.44857]]}},{"id":"OznqGfnGvashHNB667Z+oe4xDw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near East of Exit 15 - NJ 173 East (Clinton Twp), Wednesday April 22, 2026 09:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:24Z"},"road_event_id":"OznqGfnGvashHNB667Z+oe4xDw8=","beginning_cross_street":"East of Exit 15 - NJ 173 East","ending_cross_street":"East of Exit 15 - NJ 173 East","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.913421,40.631885]]}},{"id":"WcaZoj9fQ0+QYCbF2BjhjR1zQGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound near North of CR 601/Avalon Blvd (Middle Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:24Z"},"road_event_id":"WcaZoj9fQ0+QYCbF2BjhjR1zQGE=","beginning_cross_street":"North of CR 601/Avalon Blvd","ending_cross_street":"North of CR 601/Avalon Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.775489,39.133666]]}},{"id":"IVr7QDLajqI1WF0NwOOpmqUvDfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:03:20Z"},"road_event_id":"IVr7QDLajqI1WF0NwOOpmqUvDfA=","beginning_cross_street":"US 322","ending_cross_street":"West of CR 614/Cologne Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"b/q0DPWkQdAgtggKrT41Xz2/Sus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and NJ 38 (Maple Shade Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-19T12:06:34Z"},"road_event_id":"b/q0DPWkQdAgtggKrT41Xz2/Sus=","beginning_cross_street":"I-295","ending_cross_street":"NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"6gLmAys3HJWa5r+QYKWTVkYbGNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 4 - Durham Rd (Edison Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:23Z"},"road_event_id":"6gLmAys3HJWa5r+QYKWTVkYbGNA=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 4 - Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"brn4AhwYlxXTX7qzVId4W4tlx58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 34"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 34 Southbound between CR 537/Colts Neck Rd (Colts Neck Twp) and South of Earle Naval Base (Howell Twp), Wednesday April 22, 2026 12:00 PM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-04-19T12:03:21Z"},"road_event_id":"brn4AhwYlxXTX7qzVId4W4tlx58=","beginning_cross_street":"CR 537/Colts Neck Rd","ending_cross_street":"South of Earle Naval Base","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T16:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.173088,40.286666]]}},{"id":"chd/Zk8Q4O0SnV0g2j2+SuVA5PM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney Bridge-Westbound (Dover Twp) and West of Mathis Bridge-Eastbound (Toms River Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:03:29Z"},"road_event_id":"chd/Zk8Q4O0SnV0g2j2+SuVA5PM=","beginning_cross_street":"East of Tunney Bridge-Westbound","ending_cross_street":"West of Mathis Bridge-Eastbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.089477,39.942928]]}},{"id":"bEOSvsOom7WhNUn6be90BtyTKmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and East of Exit 12 - CR 635/Perryville Rd (Union Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:35Z"},"road_event_id":"bEOSvsOom7WhNUn6be90BtyTKmg=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"HPOEQEbvH3YUgqLuk+JwUbEynmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:03:32Z"},"road_event_id":"HPOEQEbvH3YUgqLuk+JwUbEynmE=","beginning_cross_street":"US 322","ending_cross_street":"East of CR 651/Fire Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"TZ7wQSz65dxpdl4SCSYOlncStXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-19T12:03:31Z"},"road_event_id":"TZ7wQSz65dxpdl4SCSYOlncStXw=","beginning_cross_street":"South of NJ 31","ending_cross_street":"South of NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.878974,40.417716]]}},{"id":"GSW9Kk+JSSlUprzP2s5Pqvcg+bQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and East of Exit 12 - CR 635/Perryville Rd (Union Twp), left shoulder","update_date":"2026-04-19T12:03:34Z"},"road_event_id":"GSW9Kk+JSSlUprzP2s5Pqvcg+bQ=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"h50yaz777phcCeg9GjrcaVagN50=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney Bridge-Westbound (Dover Twp) and West of Mathis Bridge-Eastbound (Toms River Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:03:33Z"},"road_event_id":"h50yaz777phcCeg9GjrcaVagN50=","beginning_cross_street":"East of Tunney Bridge-Westbound","ending_cross_street":"West of Mathis Bridge-Eastbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.089477,39.942928]]}},{"id":"B3WgJVOqChhNU7NHZgASDolDeww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Friday April 24, 2026 09:00 AM thru 09:15 AM, right lane closed","update_date":"2026-04-19T12:03:50Z"},"road_event_id":"B3WgJVOqChhNU7NHZgASDolDeww=","beginning_cross_street":"CR 585/Main St","ending_cross_street":"East of CR 629/West End Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-24T22:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.523635,39.389816]]}},{"id":"EFZDWeg8iVvRAJzMq8peoXZTeS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 12 - CR 635/Perryville Rd (Union Twp) and East of Exit 7 - NJ 173 (Bethlehem Twp), left shoulder","update_date":"2026-04-19T12:03:49Z"},"road_event_id":"EFZDWeg8iVvRAJzMq8peoXZTeS4=","beginning_cross_street":"East of Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 7 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958419,40.636024]]}},{"id":"b90g9VU7oWkaPzySkudp6bWwm/Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-19T12:03:51Z"},"road_event_id":"b90g9VU7oWkaPzySkudp6bWwm/Y=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"XJnnj4nQy9xtbunB4HO3W13EeUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:03:46Z"},"road_event_id":"XJnnj4nQy9xtbunB4HO3W13EeUs=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"Gb+ZOtfxzTOq+WcInFlupQ35uPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), left shoulder","update_date":"2026-04-19T12:03:48Z"},"road_event_id":"Gb+ZOtfxzTOq+WcInFlupQ35uPY=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"wQzyMzD0amO6sel8dibQIyZI5YA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Ocean Av (Point Pleasant Beach) and South of CR 635/Broadway (Point Pleasant Beach), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-04-19T12:03:47Z"},"road_event_id":"wQzyMzD0amO6sel8dibQIyZI5YA=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"South of CR 635/Broadway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"Ald59RKp8Sd24waOcjH9FzMxdHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and Exit 12 - CR 635/Perryville Rd (Union Twp), Friday April 24, 2026 10:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:03:54Z"},"road_event_id":"Ald59RKp8Sd24waOcjH9FzMxdHE=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"Ks8uT9dzy5cP5lk9Ler2hOHYWcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Friday April 24, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-19T12:03:53Z"},"road_event_id":"Ks8uT9dzy5cP5lk9Ler2hOHYWcA=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"bMnJiiaQdzr3RMTaV52oprRalRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between North of NJ 70 (Evesham Twp) and North of I-295 (Mount Laurel Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, left lane closed","update_date":"2026-04-19T12:03:55Z"},"road_event_id":"bMnJiiaQdzr3RMTaV52oprRalRo=","beginning_cross_street":"North of NJ 70","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.928695,39.895069]]}},{"id":"DGfp0rpZeKG3adfQBYlTo4FSRKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:03:39Z"},"road_event_id":"DGfp0rpZeKG3adfQBYlTo4FSRKk=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"F73K8Y9GsynpJIehCx9waYch5B8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:03:38Z"},"road_event_id":"F73K8Y9GsynpJIehCx9waYch5B8=","beginning_cross_street":"East of CR 651/Fire Rd","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549751,39.397087]]}},{"id":"an9AZpd1JCsgPB0MSDnzIZ5FwNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 681/North Main St (Southampton Twp) and North of CR 630/Woodlane Rd (Pemberton Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:41Z"},"road_event_id":"an9AZpd1JCsgPB0MSDnzIZ5FwNY=","beginning_cross_street":"North of CR 681/North Main St","ending_cross_street":"North of CR 630/Woodlane Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.739784,39.960857]]}},{"id":"l/DyvWwCiVf+Jq+10OJ8Oc8PW5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:03:40Z"},"road_event_id":"l/DyvWwCiVf+Jq+10OJ8Oc8PW5g=","beginning_cross_street":"US 322","ending_cross_street":"East of CR 651/Fire Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"4dPlOoimuQ6nZd6yTDfBCM8Z8LE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near CR 665/New York Ave (Somers Point), Friday April 24, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:37Z"},"road_event_id":"4dPlOoimuQ6nZd6yTDfBCM8Z8LE=","beginning_cross_street":"CR 665/New York Ave","ending_cross_street":"Chapman Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.603988,39.318782]]}},{"id":"wHiaOTWxxyJGNzk8cKt1pnODopM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and Exit 12 - CR 635/Perryville Rd (Union Twp), Wednesday April 22, 2026 10:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:03:43Z"},"road_event_id":"wHiaOTWxxyJGNzk8cKt1pnODopM=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"ThYl84nzpDUxeTSvZPPa+FcZJtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and East of Exit 12 - CR 635/Perryville Rd (Union Twp), left shoulder","update_date":"2026-04-19T12:03:42Z"},"road_event_id":"ThYl84nzpDUxeTSvZPPa+FcZJtM=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"PlVhyI1hOWOzzvIFo6WbmF20Dnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:03:45Z"},"road_event_id":"PlVhyI1hOWOzzvIFo6WbmF20Dnw=","beginning_cross_street":"US 322","ending_cross_street":"West of CR 614/Cologne Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"X9ZbUvpFizb6IQBPteBiSgsYKPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near East of Exit 12 - CR 635/Perryville Rd (Union Twp), Friday April 24, 2026 09:00 AM thru 01:00 PM, left lane closed","update_date":"2026-04-19T12:03:44Z"},"road_event_id":"X9ZbUvpFizb6IQBPteBiSgsYKPU=","beginning_cross_street":"East of Exit 12 - CR 635/Perryville Rd","ending_cross_street":"Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958419,40.636024]]}},{"id":"sTnJyzf8B4SJCSbnkYAaBiuX228=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-19T12:04:09Z"},"road_event_id":"sTnJyzf8B4SJCSbnkYAaBiuX228=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"92A0l+RUIK8x6EERSoAYhqnHSKw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:04:08Z"},"road_event_id":"92A0l+RUIK8x6EERSoAYhqnHSKw=","beginning_cross_street":"East of CR 651/Fire Rd","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549751,39.397087]]}},{"id":"hjxgfiACEWR29JIN2PMFViaC2kY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Ocean Av (Point Pleasant Beach) and South of CR 635/Broadway (Point Pleasant Beach), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-04-19T12:04:11Z"},"road_event_id":"hjxgfiACEWR29JIN2PMFViaC2kY=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"South of CR 635/Broadway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"1IXWznVKnv5JgZNE+cNJlFSws+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 681/North Main St (Southampton Twp) and North of CR 630/Woodlane Rd (Pemberton Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:04:10Z"},"road_event_id":"1IXWznVKnv5JgZNE+cNJlFSws+w=","beginning_cross_street":"North of CR 681/North Main St","ending_cross_street":"North of CR 630/Woodlane Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.739784,39.960857]]}},{"id":"OL89MAlOFDR9U2sLwmwFBUtMM3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near Exit 12 - CR 635/Perryville Rd (Union Twp), Wednesday April 22, 2026 11:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:04:07Z"},"road_event_id":"OL89MAlOFDR9U2sLwmwFBUtMM3o=","beginning_cross_street":"Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T15:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.969566,40.635074]]}},{"id":"xkN9xOWPcXpLBU/2zwwnJiBH3mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 4 - Durham Rd (Edison Twp) and New Jersey Turnpike (Edison Twp), Friday April 24, 2026 09:00 AM thru 02:59 PM, right shoulder closed","update_date":"2026-04-19T12:04:04Z"},"road_event_id":"xkN9xOWPcXpLBU/2zwwnJiBH3mw=","beginning_cross_street":"South of Exit 4 - Durham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.403892,40.548637]]}},{"id":"Of3SYvXfALC/sldgAy6uYYhxoZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-19T12:04:03Z"},"road_event_id":"Of3SYvXfALC/sldgAy6uYYhxoZE=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"N0DssQtj2GIo9bgSpIbwsM9itUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Friday April 24, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-19T12:03:57Z"},"road_event_id":"N0DssQtj2GIo9bgSpIbwsM9itUk=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"WUST52y7kD2XCjEf+ALELvM5AO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near Exit 12 - CR 635/Perryville Rd (Union Twp), Friday April 24, 2026 11:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:03:56Z"},"road_event_id":"WUST52y7kD2XCjEf+ALELvM5AO0=","beginning_cross_street":"Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.969566,40.635074]]}},{"id":"rI3b5Lla3AvhyLDOi2vJ2+3G/TA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:03:59Z"},"road_event_id":"rI3b5Lla3AvhyLDOi2vJ2+3G/TA=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"d4y1BiX3qYCBvNqMimzdv3xASBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and NJ 38 (Maple Shade Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, left lane closed","update_date":"2026-04-19T12:04:06Z"},"road_event_id":"d4y1BiX3qYCBvNqMimzdv3xASBI=","beginning_cross_street":"I-295","ending_cross_street":"NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"oahFme84jNlHE/TeBKRMxJsENLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 57 - US 130 (Hamilton Twp) and Exit 76 - NJ 29 (Ewing Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:44Z"},"road_event_id":"oahFme84jNlHE/TeBKRMxJsENLA=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718093,40.153728]]}},{"id":"fePXpRv0b6IER4tX36Cp6CsCuRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound between South of Ocean Av (Point Pleasant Beach) and South of CR 635/Broadway (Point Pleasant Beach), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed, moving operation","update_date":"2026-04-19T12:06:46Z"},"road_event_id":"fePXpRv0b6IER4tX36Cp6CsCuRQ=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"South of CR 635/Broadway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"XfY4CFiZ3DB0sMapOZtf4aoTqHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 34"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 34 Northbound between CR 524 Spur/Atlantic Ave (Wall Twp) and Collingswood Circle (Wall Twp), Thursday April 23, 2026 08:00 AM thru 12:00 PM, right shoulder closed, moving operation","update_date":"2026-04-19T12:06:45Z"},"road_event_id":"XfY4CFiZ3DB0sMapOZtf4aoTqHI=","beginning_cross_street":"CR 524 Spur/Atlantic Ave","ending_cross_street":"Collingswood Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092224,40.140865]]}},{"id":"u+i2h+cMFYdY1ZzPWWSCeERSmro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 12 - CR 635/Perryville Rd (Union Twp) and East of Exit 7 - NJ 173 (Bethlehem Twp), left shoulder","update_date":"2026-04-19T12:06:48Z"},"road_event_id":"u+i2h+cMFYdY1ZzPWWSCeERSmro=","beginning_cross_street":"East of Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 7 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958419,40.636024]]}},{"id":"M9AwXaJtgunVO3l5UOQzf9ITI5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:42Z"},"road_event_id":"M9AwXaJtgunVO3l5UOQzf9ITI5A=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"+DIQTVQXha7r5Da/qyvihN3f0E0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between East of CR 651/Fire Rd (Egg Harbor Twp) and US 322 (Hamilton Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:06:41Z"},"road_event_id":"+DIQTVQXha7r5Da/qyvihN3f0E0=","beginning_cross_street":"East of CR 651/Fire Rd","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.549751,39.397087]]}},{"id":"Vqv1dCbJ8pa3R3gci7euZ7gxV/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 4 - Durham Rd (Edison Twp), left shoulder","update_date":"2026-04-19T12:06:43Z"},"road_event_id":"Vqv1dCbJ8pa3R3gci7euZ7gxV/s=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 4 - Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"4wboH8gnVqL0F/GFjdEVHCsDh1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 30 - North Maple Ave (Bernards Twp), Thursday April 23, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-19T12:06:38Z"},"road_event_id":"4wboH8gnVqL0F/GFjdEVHCsDh1M=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.538871,40.729694]]}},{"id":"PiGR8AJ6VEGrcLuZ/hDF1Fp+3OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:06:36Z"},"road_event_id":"PiGR8AJ6VEGrcLuZ/hDF1Fp+3OU=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"5FaxebYTZd84+3+A2Vi05pjlO30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and North of Exit 57 - US 130 (Hamilton Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:33Z"},"road_event_id":"5FaxebYTZd84+3+A2Vi05pjlO30=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"tceyNyYBhfltBEg4VKjVcuZF+Gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Thursday April 23, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:35Z"},"road_event_id":"tceyNyYBhfltBEg4VKjVcuZF+Gs=","beginning_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","ending_cross_street":"North of CR 550/Woodbine Ocean View Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.729576,39.179553]]}},{"id":"QcsnEv/EQt6/X4HeLbsi3qRyyW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound near East of Exit 12 - CR 635/Perryville Rd (Union Twp), Thursday April 23, 2026 09:00 AM thru 01:00 PM, left lane closed","update_date":"2026-04-19T12:06:30Z"},"road_event_id":"QcsnEv/EQt6/X4HeLbsi3qRyyW8=","beginning_cross_street":"East of Exit 12 - CR 635/Perryville Rd","ending_cross_street":"Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958419,40.636024]]}},{"id":"sbprQIG4vT/W0wGU7ozml9yJZvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Thursday April 23, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-19T12:06:29Z"},"road_event_id":"sbprQIG4vT/W0wGU7ozml9yJZvU=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"zOhWAXReTfEiRqUityHxLdtbSMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 03:00 AM, right lane closed","update_date":"2026-04-19T12:06:31Z"},"road_event_id":"zOhWAXReTfEiRqUityHxLdtbSMM=","beginning_cross_street":"CR 585/Main St","ending_cross_street":"East of CR 629/West End Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.523635,39.389816]]}},{"id":"uvt5f6mNJ+UZoSi8xeW9e5gdeac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 64 - CR 535/East State Street Extension (Hamilton Twp) and North of Exit 62 - Olden Ave (Hamilton Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:26Z"},"road_event_id":"uvt5f6mNJ+UZoSi8xeW9e5gdeac=","beginning_cross_street":"Exit 64 - CR 535/East State Street Extension","ending_cross_street":"North of Exit 62 - Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.700538,40.244544]]}},{"id":"Y7qImvXLm7YTdD+OMpIEv06t8cQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 12 - CR 635/Perryville Rd (Union Twp) and East of Exit 7 - NJ 173 (Bethlehem Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:25Z"},"road_event_id":"Y7qImvXLm7YTdD+OMpIEv06t8cQ=","beginning_cross_street":"East of Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 7 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958419,40.636024]]}},{"id":"aj6ixdqzpuHWHwCR5T/HNZsjF2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 30 - North Maple Ave (Bernards Twp), Thursday April 23, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:28Z"},"road_event_id":"aj6ixdqzpuHWHwCR5T/HNZsjF2k=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.547073,40.721817]]}},{"id":"4NdtwC9gVXBZC1pwRv5Gs+uDteg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:06:18Z"},"road_event_id":"4NdtwC9gVXBZC1pwRv5Gs+uDteg=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"m1rERom0XgGf4AqilIWHqB5Ymss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), left shoulder","update_date":"2026-04-19T12:06:17Z"},"road_event_id":"m1rERom0XgGf4AqilIWHqB5Ymss=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"NB47PeMZMGK5zP3RH2FdhOf48O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 4 - Durham Rd (Edison Twp) and New Jersey Turnpike (Edison Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:20Z"},"road_event_id":"NB47PeMZMGK5zP3RH2FdhOf48O4=","beginning_cross_street":"South of Exit 4 - Durham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.403892,40.548637]]}},{"id":"dR/bsn2DyDB9FEnfobALnc55kO0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near CR 665/New York Ave (Somers Point), Thursday April 23, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:19Z"},"road_event_id":"dR/bsn2DyDB9FEnfobALnc55kO0=","beginning_cross_street":"CR 665/New York Ave","ending_cross_street":"Chapman Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.603988,39.318782]]}},{"id":"XgDMcDlMXH5UnT4CHXldk1M1mu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Northbound between I-295 (Mount Laurel Twp) and South of NJ 38 (Maple Shade Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 11:00 PM to 05:00 AM)","update_date":"2026-04-19T12:06:21Z"},"road_event_id":"XgDMcDlMXH5UnT4CHXldk1M1mu0=","beginning_cross_street":"I-295","ending_cross_street":"South of NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.965492,39.934547]]}},{"id":"MDr6aATWAPxeAPauttYLuuF2T9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 57 - US 130 (Hamilton Twp) and Exit 76 - NJ 29 (Ewing Twp), left shoulder","update_date":"2026-04-19T12:07:06Z"},"road_event_id":"MDr6aATWAPxeAPauttYLuuF2T9k=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718093,40.153728]]}},{"id":"ttlb+yMjRI/wgWcQO/Y4r7NygIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and East of Exit 12 - CR 635/Perryville Rd (Union Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:07:08Z"},"road_event_id":"ttlb+yMjRI/wgWcQO/Y4r7NygIg=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"IhCcJ1mdxqBIN8jK429i2LW1z3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Thursday April 23, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-19T12:07:07Z"},"road_event_id":"IhCcJ1mdxqBIN8jK429i2LW1z3I=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"mKv51yorpjAJEYxZGIln7smYZ38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound near North of CR 601/Avalon Blvd (Middle Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:07:15Z"},"road_event_id":"mKv51yorpjAJEYxZGIln7smYZ38=","beginning_cross_street":"North of CR 601/Avalon Blvd","ending_cross_street":"North of CR 601/Avalon Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.775489,39.133666]]}},{"id":"5ro0C27CTMIBpu17lkjOA6GPAbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 4 - Durham Rd (Edison Twp) and New Jersey Turnpike (Edison Twp), left shoulder","update_date":"2026-04-19T12:07:14Z"},"road_event_id":"5ro0C27CTMIBpu17lkjOA6GPAbM=","beginning_cross_street":"South of Exit 4 - Durham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.403892,40.548637]]}},{"id":"J72pnKNexowLUVChs7zxRfFWsQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 7 - NJ 173 (Bethlehem Twp) and East of Exit 12 - CR 635/Perryville Rd (Union Twp), left shoulder","update_date":"2026-04-19T12:07:11Z"},"road_event_id":"J72pnKNexowLUVChs7zxRfFWsQo=","beginning_cross_street":"East of Exit 7 - NJ 173","ending_cross_street":"East of Exit 12 - CR 635/Perryville Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.042984,40.660156]]}},{"id":"LsUr+gwo+8YJAWPqZ1i5qjf6y3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:07:09Z"},"road_event_id":"LsUr+gwo+8YJAWPqZ1i5qjf6y3o=","beginning_cross_street":"West of CR 614/Cologne Av","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.673698,39.44857]]}},{"id":"K6RIT4IhVX4RveghEcsvif2yE+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 30 - North Maple Ave (Bernards Twp), Thursday April 23, 2026 09:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:07:13Z"},"road_event_id":"K6RIT4IhVX4RveghEcsvif2yE+4=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.548446,40.720809]]}},{"id":"zAaPY48racmNA3hiABRXZy5sQqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney Bridge-Westbound (Dover Twp) and West of Mathis Bridge-Eastbound (Toms River Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:07:12Z"},"road_event_id":"zAaPY48racmNA3hiABRXZy5sQqU=","beginning_cross_street":"East of Tunney Bridge-Westbound","ending_cross_street":"West of Mathis Bridge-Eastbound","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.089477,39.942928]]}},{"id":"sLv74vZASGTs3MQJpTbyte8vasU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:56Z"},"road_event_id":"sLv74vZASGTs3MQJpTbyte8vasU=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"q9d8K6JnrsuJLztn/SaPKXRXxl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between Exit 12 - CR 635/Perryville Rd (Union Twp) and East of Exit 7 - NJ 173 (Bethlehem Twp), Thursday April 23, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-19T12:06:54Z"},"road_event_id":"q9d8K6JnrsuJLztn/SaPKXRXxl4=","beginning_cross_street":"Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 7 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.969566,40.635074]]}},{"id":"OSeyMuARpphJrGr1O55AncukQFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 681/North Main St (Southampton Twp) and North of CR 630/Woodlane Rd (Pemberton Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:07:02Z"},"road_event_id":"OSeyMuARpphJrGr1O55AncukQFQ=","beginning_cross_street":"North of CR 681/North Main St","ending_cross_street":"North of CR 630/Woodlane Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.739784,39.960857]]}},{"id":"5GQqo5Zd4WkgG/FjNYDSdfwolw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 30 - North Maple Ave (Bernards Twp), Thursday April 23, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-19T12:07:05Z"},"road_event_id":"5GQqo5Zd4WkgG/FjNYDSdfwolw8=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.538871,40.729694]]}},{"id":"48tshLL+s7B8axBMyvPCD2PsR0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and North of Exit 57 - US 130 (Hamilton Twp), left shoulder","update_date":"2026-04-19T12:07:04Z"},"road_event_id":"48tshLL+s7B8axBMyvPCD2PsR0w=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"iFGu7tMbon+XP31cxm1ZxNTO4qQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between CR 585/Main St (Pleasantville) and East of CR 629/West End Av (Atlantic City), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:06:58Z"},"road_event_id":"iFGu7tMbon+XP31cxm1ZxNTO4qQ=","beginning_cross_street":"CR 585/Main St","ending_cross_street":"East of CR 629/West End Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.523635,39.389816]]}},{"id":"XW7a+rTESBcIRyjxv0SEANmVFsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), left shoulder","update_date":"2026-04-19T12:06:57Z"},"road_event_id":"XW7a+rTESBcIRyjxv0SEANmVFsA=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"7vCff5EJ9FWoptaO6vrhbmDbRFk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between US 322 (Hamilton Twp) and East of CR 651/Fire Rd (Egg Harbor Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:07:00Z"},"road_event_id":"7vCff5EJ9FWoptaO6vrhbmDbRFk=","beginning_cross_street":"US 322","ending_cross_street":"East of CR 651/Fire Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"++/3I99aTdIqr2dyyPB6L0+tV7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of NJ 33 Business (Freehold Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-19T12:06:59Z"},"road_event_id":"++/3I99aTdIqr2dyyPB6L0+tV7U=","beginning_cross_street":"North of NJ 33 Business","ending_cross_street":"South of CR 522/Throckmorton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.292274,40.261535]]}},{"id":"r20PDuavdZ8bMDoSM50GxO4PbqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near Exit 30 - North Maple Ave (Bernards Twp), Thursday April 23, 2026 10:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:06:53Z"},"road_event_id":"r20PDuavdZ8bMDoSM50GxO4PbqI=","beginning_cross_street":"Exit 30 - North Maple Ave","ending_cross_street":"North of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.539649,40.728511]]}},{"id":"v4ryAjQNLsb/3F3X/3d+9TqId2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between US 322 (Hamilton Twp) and West of CR 614/Cologne Av (Hamilton Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:06:50Z"},"road_event_id":"v4ryAjQNLsb/3F3X/3d+9TqId2Q=","beginning_cross_street":"US 322","ending_cross_street":"West of CR 614/Cologne Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.642486,39.4505]]}},{"id":"Q3eTOy0xVE+ad9mPW7szSn9MLAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-19T12:06:52Z"},"road_event_id":"Q3eTOy0xVE+ad9mPW7szSn9MLAY=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"South of CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573295,40.384716]]}},{"id":"i3+i8DYoXRUqRgUdklkaVp/mLaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 4 - Durham Rd (Edison Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:06:51Z"},"road_event_id":"i3+i8DYoXRUqRgUdklkaVp/mLaY=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 4 - Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"ssjFsbLVAwrHoiapNSIHQaWNniY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:15:21Z"},"road_event_id":"ssjFsbLVAwrHoiapNSIHQaWNniY=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"1+2lb4XdN86I9PcRSb1yGsbzGGw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp) and North of Exit 14 - US 22 (Bridgewater Twp), left shoulder","update_date":"2026-04-19T12:15:36Z"},"road_event_id":"1+2lb4XdN86I9PcRSb1yGsbzGGw=","beginning_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.601997,40.678226]]}},{"id":"MNl/Gk4QzTFva4bYKDcpgkofe6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 57 - US 130 (Hamilton Twp) and Exit 76 - NJ 29 (Ewing Twp), left shoulder","update_date":"2026-04-19T12:15:33Z"},"road_event_id":"MNl/Gk4QzTFva4bYKDcpgkofe6Y=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718093,40.153728]]}},{"id":"ExNK6wPlOuWAGM6Q3s/NIvrVzgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 4 - Durham Rd (Edison Twp) and New Jersey Turnpike (Edison Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:21:39Z"},"road_event_id":"ExNK6wPlOuWAGM6Q3s/NIvrVzgg=","beginning_cross_street":"South of Exit 4 - Durham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.403892,40.548637]]}},{"id":"wOKkKN5+Ved0KfP/83NB8/pzFjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:21:41Z"},"road_event_id":"wOKkKN5+Ved0KfP/83NB8/pzFjQ=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"DXe8SCcn/3as4X2IJNHA1Mkkb/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 4 - Durham Rd (Edison Twp) and New Jersey Turnpike (Edison Twp), left shoulder","update_date":"2026-04-19T12:21:36Z"},"road_event_id":"DXe8SCcn/3as4X2IJNHA1Mkkb/o=","beginning_cross_street":"South of Exit 4 - Durham Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.403892,40.548637]]}},{"id":"KcQbujz1vhpALGCA6tBbud1hPcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-19T12:21:35Z"},"road_event_id":"KcQbujz1vhpALGCA6tBbud1hPcE=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"dxJtlfc496ozya/vHxT99ZLlJtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 66"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 66 Westbound near West of Jumping Brook Rd (Neptune Twp), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-19T12:21:37Z"},"road_event_id":"dxJtlfc496ozya/vHxT99ZLlJtU=","beginning_cross_street":"West of Jumping Brook Rd","ending_cross_street":"West of Jumping Brook Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.087348,40.222415]]}},{"id":"2e87gDxDzemepyHNdJV2dqhWcnA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between West of CR 614/Cologne Av (Hamilton Twp) and US 322 (Hamilton Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:13Z"},"road_event_id":"2e87gDxDzemepyHNdJV2dqhWcnA=","beginning_cross_street":"West of CR 614/Cologne Av","ending_cross_street":"US 322","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.673698,39.44857]]}},{"id":"eL0yV+Sgpp7OQxuF9kB3I6DOwSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), left shoulder","update_date":"2026-04-19T12:22:08Z"},"road_event_id":"eL0yV+Sgpp7OQxuF9kB3I6DOwSo=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"1Eotr6+2fpHxkZczKz3GPfWZaiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 4 - Durham Rd (Edison Twp), left shoulder","update_date":"2026-04-19T12:22:00Z"},"road_event_id":"1Eotr6+2fpHxkZczKz3GPfWZaiQ=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 4 - Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"l+vuqSZT9vJ50JPC+T4A6EkisHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and North of Exit 57 - US 130 (Hamilton Twp), left shoulder","update_date":"2026-04-19T12:21:59Z"},"road_event_id":"l+vuqSZT9vJ50JPC+T4A6EkisHI=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"dzB6SmikjirHApenjqA2g/QuzOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 4 - Durham Rd (Edison Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:27Z"},"road_event_id":"dzB6SmikjirHApenjqA2g/QuzOI=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 4 - Durham Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"OVz0PewXX/KXZTHS+FtjvZbVYrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Wednesday April 22, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:29Z"},"road_event_id":"OVz0PewXX/KXZTHS+FtjvZbVYrI=","beginning_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","ending_cross_street":"North of CR 550/Woodbine Ocean View Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.729576,39.179553]]}},{"id":"E4W+g+myfc8IBl1zyMRLMiaOgTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 76 - NJ 29 (Ewing Twp) and North of Exit 57 - US 130 (Hamilton Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:28Z"},"road_event_id":"E4W+g+myfc8IBl1zyMRLMiaOgTI=","beginning_cross_street":"Exit 76 - NJ 29","ending_cross_street":"North of Exit 57 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844207,40.260536]]}},{"id":"7xWp96nNIe17u+mK0YjiCd6w3RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between North of Exit 14 - US 22 (Bridgewater Twp) and South of Exit 26 - CR 525/Mount Airy Rd (Bernards Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-19T12:22:39Z"},"road_event_id":"7xWp96nNIe17u+mK0YjiCd6w3RY=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"South of Exit 26 - CR 525/Mount Airy Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.579765,40.580242]]}},{"id":"e8DsENnvcdxfwc+6c2BclUKdF0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 57 - US 130 (Hamilton Twp) and Exit 76 - NJ 29 (Ewing Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:42Z"},"road_event_id":"e8DsENnvcdxfwc+6c2BclUKdF0g=","beginning_cross_street":"North of Exit 57 - US 130","ending_cross_street":"Exit 76 - NJ 29","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.718093,40.153728]]}},{"id":"XpjfNV2re8/zsc9U82tXgNkEqRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 12 - CR 635/Perryville Rd (Union Twp) and East of Exit 7 - NJ 173 (Bethlehem Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:36Z"},"road_event_id":"XpjfNV2re8/zsc9U82tXgNkEqRg=","beginning_cross_street":"East of Exit 12 - CR 635/Perryville Rd","ending_cross_street":"East of Exit 7 - NJ 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.958419,40.636024]]}},{"id":"0CkJx8SkTi8xX/isFQYNG/dOwto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between Exit 64 - CR 535/East State Street Extension (Hamilton Twp) and North of Exit 62 - Olden Ave (Hamilton Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:37Z"},"road_event_id":"0CkJx8SkTi8xX/isFQYNG/dOwto=","beginning_cross_street":"Exit 64 - CR 535/East State Street Extension","ending_cross_street":"North of Exit 62 - Olden Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.700538,40.244544]]}},{"id":"r3QvjMiUCvh4RZfcaSjUWkO3w8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near CR 665/New York Ave (Somers Point), Wednesday April 22, 2026 07:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-19T12:22:33Z"},"road_event_id":"r3QvjMiUCvh4RZfcaSjUWkO3w8o=","beginning_cross_street":"CR 665/New York Ave","ending_cross_street":"Chapman Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.603988,39.318782]]}},{"id":"yYjxPfUJA0PAA/QXRr8WPAgvYW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BoM/aAFpPebXQ7R7CQ5+LM3NyaI="}],"description":"Bridge inspection on NY 36 both directions under I-390 (North Dansville) alternating lane closures, Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes northbound; All lanes open southbound","update_date":"2026-04-19T17:30:33Z"},"road_event_id":"yYjxPfUJA0PAA/QXRr8WPAgvYW4=","beginning_cross_street":"I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697668,42.546782]]}},{"id":"BoM/aAFpPebXQ7R7CQ5+LM3NyaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yYjxPfUJA0PAA/QXRr8WPAgvYW4="}],"description":"Bridge inspection on NY 36 both directions under I-390 (North Dansville) alternating lane closures, Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes northbound; All lanes open southbound","update_date":"2026-04-19T17:30:33Z"},"road_event_id":"BoM/aAFpPebXQ7R7CQ5+LM3NyaI=","beginning_cross_street":"I-390","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697668,42.546782]]}},{"id":"X/V6m9EZSzif/iV1gEXfdH5plHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound near I-295 (Bellmawr), Tuesday May 5, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T17:51:25Z"},"road_event_id":"X/V6m9EZSzif/iV1gEXfdH5plHY=","beginning_cross_street":"I-295","ending_cross_street":"South of Exit 14 - CR 753/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.101387,39.867847]]}},{"id":"jcZxqzp0FMs6ed6X36+KpWeLieI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-76"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-76 Eastbound between Exit 1A - NJ 42/I-295 (Bellmawr) and West of Exit 1C - CR 634/Market St (Gloucester City), Tuesday May 5, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T17:51:20Z"},"road_event_id":"jcZxqzp0FMs6ed6X36+KpWeLieI=","beginning_cross_street":"Exit 1A - NJ 42/I-295","ending_cross_street":"West of Exit 1C - CR 634/Market St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10221,39.87395]]}},{"id":"GyKgJ9YuZrGLNpzA0qdCU0/2qdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-76"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-76 Eastbound between Exit 1A - NJ 42/I-295 (Bellmawr) and West of Exit 1C - CR 634/Market St (Gloucester City), Wednesday May 6, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T17:51:27Z"},"road_event_id":"GyKgJ9YuZrGLNpzA0qdCU0/2qdA=","beginning_cross_street":"Exit 1A - NJ 42/I-295","ending_cross_street":"West of Exit 1C - CR 634/Market St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10221,39.87395]]}},{"id":"UCACOKBnDD3szCZH8Gml8iXdm1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound near I-295 (Bellmawr), Monday May 4, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T17:51:18Z"},"road_event_id":"UCACOKBnDD3szCZH8Gml8iXdm1I=","beginning_cross_street":"I-295","ending_cross_street":"South of Exit 14 - CR 753/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.101387,39.867847]]}},{"id":"IUDANehNHivKnDNUdnIkTqxrY9Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-76"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-76 Eastbound between Exit 1A - NJ 42/I-295 (Bellmawr) and West of Exit 1C - CR 634/Market St (Gloucester City), Monday May 4, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T17:51:30Z"},"road_event_id":"IUDANehNHivKnDNUdnIkTqxrY9Q=","beginning_cross_street":"Exit 1A - NJ 42/I-295","ending_cross_street":"West of Exit 1C - CR 634/Market St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.10221,39.87395]]}},{"id":"/APciOrG9SgaDkTu/EOqxTfx2tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near South of Exit 14 - CR 753/Creek Rd (Bellmawr), Wednesday May 6, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-19T17:51:33Z"},"road_event_id":"/APciOrG9SgaDkTu/EOqxTfx2tI=","beginning_cross_street":"South of Exit 14 - CR 753/Creek Rd","ending_cross_street":"I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.09938,39.85934]]}},{"id":"nRwDx2Vm1faGqjXhWxDnTCUYmeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Springfield Twp) and West of Exit 45 - CR 527/Glenside Ave (Summit), Friday April 24, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-04-19T19:54:22Z"},"road_event_id":"nRwDx2Vm1faGqjXhWxDnTCUYmeY=","beginning_cross_street":"East of Exit 45 - CR 527/Glenside Ave","ending_cross_street":"West of Exit 45 - CR 527/Glenside Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.344032,40.703895]]}},{"id":"VYS7m7UAMswFxis5hFBon0MN+4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Westbound between East of Exit 45 - CR 527/Glenside Ave (Springfield Twp) and West of Exit 45 - CR 527/Glenside Ave (Summit), Thursday April 23, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-04-19T19:54:21Z"},"road_event_id":"VYS7m7UAMswFxis5hFBon0MN+4E=","beginning_cross_street":"East of Exit 45 - CR 527/Glenside Ave","ending_cross_street":"West of Exit 45 - CR 527/Glenside Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.344032,40.703895]]}},{"id":"dzKFjL78CiksrMY4TWn+vNAhL0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Hudson County Extension"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike - Hudson County Extension eastbound between East of Interchange 14A - NJ 440/Bayonne Bridge (Jersey City) and West of Interchange 14C - Toll Plaza (Jersey City), Friday April 24th, 2026 thru Saturday April 25th, 2026, 08:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-19T21:52:38Z"},"road_event_id":"dzKFjL78CiksrMY4TWn+vNAhL0k=","beginning_cross_street":"East of Interchange 14A - NJ 440/Bayonne Bridge","ending_cross_street":"West of Interchange 14C - Toll Plaza","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.085831,40.689973]]}},{"id":"aj6E3LSyCHWdVv29j4xi1Ici0HU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Steel repairs on New Jersey Turnpike Outer Roadway northbound Exit ramp Interchange 14 - I-78/US 1&9 (Newark), Saturday April 25th, 2026 thru Sunday April 26th, 2026, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-19T22:46:00Z"},"road_event_id":"aj6E3LSyCHWdVv29j4xi1Ici0HU=","beginning_cross_street":"Interchange 14 - I-78/US 1&9","ending_cross_street":"Interchange 14 - I-78/US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.153375,40.702154]]}},{"id":"w6A1lxw+obTuIYp5NrKtbZK5MGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2AlvGx1zDLMWlIFD1pDlRrKIBss="}],"description":"Barrier repairs and line striping and milling and paving operations on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and Southern Mixing Bowl (Newark), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 05:00 AM All lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-19T23:28:08Z"},"road_event_id":"w6A1lxw+obTuIYp5NrKtbZK5MGM=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749715,40.078704]]}},{"id":"2AlvGx1zDLMWlIFD1pDlRrKIBss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w6A1lxw+obTuIYp5NrKtbZK5MGM="},{"type":"next-occurrence","id":"+uSP402NJt2L+qi9Tt9kJpHopSQ="}],"description":"Barrier repairs and line striping and milling and paving operations on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and Southern Mixing Bowl (Newark), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 05:00 AM All lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-19T23:28:08Z"},"road_event_id":"2AlvGx1zDLMWlIFD1pDlRrKIBss=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749715,40.078704]]}},{"id":"+uSP402NJt2L+qi9Tt9kJpHopSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"w6A1lxw+obTuIYp5NrKtbZK5MGM="}],"description":"Barrier repairs and line striping and milling and paving operations on New Jersey Turnpike Inner Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and Southern Mixing Bowl (Newark), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 PM thru 05:00 AM All lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 08:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-19T23:28:08Z"},"road_event_id":"+uSP402NJt2L+qi9Tt9kJpHopSQ=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749715,40.078704]]}},{"id":"SpYRyjhjx6x1Oq5LMmA3RtmTcIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aUapZTE9PjLdTRHvERSKXiJCUD0="}],"description":"Milling and barrier repairs and paving operations and curb work on New Jersey Turnpike - Western Spur southbound between South of Northern Mixing Bowl (Ridgefield) and North of Southern Mixing Bowl (Newark), Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 09:00 PM thru 06:00 AM All lanes closed southbound, , Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 06:00 AM All lanes closed southbound, , Sunday April 26th,2026 thru Monday April 27th,2026, Sunday, 10:00 PM thru 04:00 AM All lanes closed southbound,","update_date":"2026-04-22T08:00:01Z"},"road_event_id":"SpYRyjhjx6x1Oq5LMmA3RtmTcIg=","beginning_cross_street":"South of Northern Mixing Bowl","ending_cross_street":"North of Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.027355,40.828845]]}},{"id":"aUapZTE9PjLdTRHvERSKXiJCUD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SpYRyjhjx6x1Oq5LMmA3RtmTcIg="},{"type":"next-occurrence","id":"rQZ9/gJdJtV7ClOycPFDJPXL1AQ="}],"description":"Milling and barrier repairs and paving operations and curb work on New Jersey Turnpike - Western Spur southbound between South of Northern Mixing Bowl (Ridgefield) and North of Southern Mixing Bowl (Newark), Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 09:00 PM thru 06:00 AM All lanes closed southbound, , Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 06:00 AM All lanes closed southbound, , Sunday April 26th,2026 thru Monday April 27th,2026, Sunday, 10:00 PM thru 04:00 AM All lanes closed southbound,","update_date":"2026-04-22T08:00:01Z"},"road_event_id":"aUapZTE9PjLdTRHvERSKXiJCUD0=","beginning_cross_street":"South of Northern Mixing Bowl","ending_cross_street":"North of Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.027355,40.828845]]}},{"id":"rQZ9/gJdJtV7ClOycPFDJPXL1AQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Western Spur"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SpYRyjhjx6x1Oq5LMmA3RtmTcIg="}],"description":"Milling and barrier repairs and paving operations and curb work on New Jersey Turnpike - Western Spur southbound between South of Northern Mixing Bowl (Ridgefield) and North of Southern Mixing Bowl (Newark), Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 09:00 PM thru 06:00 AM All lanes closed southbound, , Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 06:00 AM All lanes closed southbound, , Sunday April 26th,2026 thru Monday April 27th,2026, Sunday, 10:00 PM thru 04:00 AM All lanes closed southbound,","update_date":"2026-04-22T08:00:01Z"},"road_event_id":"rQZ9/gJdJtV7ClOycPFDJPXL1AQ=","beginning_cross_street":"South of Northern Mixing Bowl","ending_cross_street":"North of Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.027355,40.828845]]}},{"id":"7FYAgPy8RCQTW4MNuVumBQcxi9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and guard rail repairs and line striping and safety improvements on New Jersey Turnpike - Eastern Spur northbound between North of Southern Mixing Bowl (Newark) and Northern Mixing Bowl (Ridgefield), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-19T23:12:32Z"},"road_event_id":"7FYAgPy8RCQTW4MNuVumBQcxi9g=","beginning_cross_street":"North of Southern Mixing Bowl","ending_cross_street":"Northern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.137857,40.715353]]}},{"id":"JnIdnl0W7FCzkYeyUv6Jt1sxD4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike - Eastern Spur"],"direction":"unknown","related_road_events":[],"description":"Barrier repairs and drainage improvements and guard rail repairs and line striping on New Jersey Turnpike - Eastern Spur southbound between Northern Mixing Bowl (Ridgefield) and North of Southern Mixing Bowl (Newark), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 PM thru 04:00 AM All lanes closed","update_date":"2026-04-19T23:26:05Z"},"road_event_id":"JnIdnl0W7FCzkYeyUv6Jt1sxD4Y=","beginning_cross_street":"Northern Mixing Bowl","ending_cross_street":"North of Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022705,40.831627]]}},{"id":"QqUSPossl0ijt/F/C38hWtvbFSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction and line striping on New Jersey Turnpike Outer Roadway northbound between Inner and Outer Roadway Split (Mansfield Twp) and Southern Mixing Bowl (Newark), Saturday April 25th, 2026 thru Sunday April 26th, 2026, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-19T23:40:57Z"},"road_event_id":"QqUSPossl0ijt/F/C38hWtvbFSo=","beginning_cross_street":"Inner and Outer Roadway Split","ending_cross_street":"Southern Mixing Bowl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.749725,40.078692]]}},{"id":"1IvI0jwio8l37Gwsylg+Vk9Wzzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Construction on New Jersey Turnpike Inner Roadway northbound Entrance ramp Interchange 8A - NJ 32 (Monroe Twp) to Interchange 8A - NJ 32 (Monroe Twp), Monday April 20th,2026 thru Thursday April 23rd,2026, Monday/Tuesday/Wednesday, 08:00 PM thru 05:00 AM All lanes closed northbound,","update_date":"2026-04-21T20:00:02Z"},"road_event_id":"1IvI0jwio8l37Gwsylg+Vk9Wzzk=","beginning_cross_street":"Interchange 8A - NJ 32","ending_cross_street":"Interchange 8A - NJ 32","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.471581,40.349241]]}},{"id":"8bgMLk4QcpC1NhU3XY++PrSbjz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q55 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs westbound, Q55 Bus at MYRTLE AV/PALMETTO AV (New York) stop is closed. The last stop before detour will be made on Myrtle Ave at Cypress Ave., Continuous Tuesday April 21st, 2026 05:00 AM thru Sunday May 31st, 2026 11:00 PM","update_date":"2026-04-20T01:33:21Z"},"road_event_id":"8bgMLk4QcpC1NhU3XY++PrSbjz0=","beginning_cross_street":"MYRTLE AV/PALMETTO AV","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911851,40.699516]]}},{"id":"Mj15OgOJrrr4P7FWjEVP1sbLRQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NtQRUKl+gc39FGyw73+hoHHWYbc="}],"description":"Guard rail repairs and installation of sign structure and roadwork on Loop Parkway both directions between Meadowbrook State Parkway (Hempstead) and START ROUTE Loop Parkway at Lido Boulevard (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T01:33:38Z"},"road_event_id":"Mj15OgOJrrr4P7FWjEVP1sbLRQQ=","beginning_cross_street":"Meadowbrook State Parkway","ending_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.549038,40.610625]]}},{"id":"NtQRUKl+gc39FGyw73+hoHHWYbc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mj15OgOJrrr4P7FWjEVP1sbLRQQ="},{"type":"next-occurrence","id":"oP6ArbzTnvcF7QY23mrUgrL9w7A="}],"description":"Guard rail repairs and installation of sign structure and roadwork on Loop Parkway both directions between Meadowbrook State Parkway (Hempstead) and START ROUTE Loop Parkway at Lido Boulevard (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T01:33:38Z"},"road_event_id":"NtQRUKl+gc39FGyw73+hoHHWYbc=","beginning_cross_street":"Meadowbrook State Parkway","ending_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.549038,40.610625]]}},{"id":"oP6ArbzTnvcF7QY23mrUgrL9w7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Loop Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Mj15OgOJrrr4P7FWjEVP1sbLRQQ="}],"description":"Guard rail repairs and installation of sign structure and roadwork on Loop Parkway both directions between Meadowbrook State Parkway (Hempstead) and START ROUTE Loop Parkway at Lido Boulevard (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T01:33:38Z"},"road_event_id":"oP6ArbzTnvcF7QY23mrUgrL9w7A=","beginning_cross_street":"Meadowbrook State Parkway","ending_cross_street":"START ROUTE Loop Parkway at Lido Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.549038,40.610625]]}},{"id":"y3pnh+JcdTze+moLiUOlRf0O7rA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q58 Bus and Q98 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs westbound, Q58 Bus and Q98 Bus between PUTNAM AV/MYRTLE AV (New York) and PALMETTO ST/MYRTLE AV (New York) stops will be closed. The last stop before detour will be made on Myrtle Ave at Cypress Ave., Continuous Tuesday April 21st, 2026 06:00 AM thru Wednesday May 20th, 2026 06:00 AM","update_date":"2026-04-20T01:40:58Z"},"road_event_id":"y3pnh+JcdTze+moLiUOlRf0O7rA=","beginning_cross_street":"PUTNAM AV/MYRTLE AV","ending_cross_street":"PALMETTO ST/MYRTLE AV","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907354,40.699716]]}},{"id":"cDfRAGFrAfVLdaQs69L5rADdWtU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7paPphFKrO4UwVSpK6mL+peMy18="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"cDfRAGFrAfVLdaQs69L5rADdWtU=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T19:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"7paPphFKrO4UwVSpK6mL+peMy18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"Lc/o0ayCzEnVPXt/dj+/90d9Obs="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"7paPphFKrO4UwVSpK6mL+peMy18=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T19:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"Lc/o0ayCzEnVPXt/dj+/90d9Obs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"rg9cykEjVgPl7qRs7heMKd6G46U="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"Lc/o0ayCzEnVPXt/dj+/90d9Obs=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T19:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"rg9cykEjVgPl7qRs7heMKd6G46U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"vK85AtkuREmhjXUi5TqPXbqs6sY="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"rg9cykEjVgPl7qRs7heMKd6G46U=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"vK85AtkuREmhjXUi5TqPXbqs6sY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"T7Vo3MlDURvk7aK6cch0i1T/uXg="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"vK85AtkuREmhjXUi5TqPXbqs6sY=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"T7Vo3MlDURvk7aK6cch0i1T/uXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"xQHKzRFWlg/5jc0ihLPulITpr2A="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"T7Vo3MlDURvk7aK6cch0i1T/uXg=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"xQHKzRFWlg/5jc0ihLPulITpr2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"CAxzhnFQwbXD0icrCJTg27Jvmgg="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"xQHKzRFWlg/5jc0ihLPulITpr2A=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"CAxzhnFQwbXD0icrCJTg27Jvmgg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"/gLrOBT1Uxy8xXPPU7N0lXyCwY8="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"CAxzhnFQwbXD0icrCJTg27Jvmgg=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T10:00:00Z","end_date":"2026-05-02T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"/gLrOBT1Uxy8xXPPU7N0lXyCwY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="},{"type":"next-occurrence","id":"xfx8Zjy2ZPDsLP7KqhPlX4JPIPo="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"/gLrOBT1Uxy8xXPPU7N0lXyCwY8=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"xfx8Zjy2ZPDsLP7KqhPlX4JPIPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SIM15 Bus, SIM35 Bus and SIM5 Bus"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cDfRAGFrAfVLdaQs69L5rADdWtU="}],"description":"Due to Construction southbound, SIM15 Bus, SIM35 Bus and SIM5 Bus at Water St/Hanover Sq (New York) until further notice stop is closed and buses make a temporary stop on Water St at Broad St instead., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 18th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM, Monday May 25th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 03:00 PM thru 07:00 PM","update_date":"2026-04-20T01:48:06Z"},"road_event_id":"xfx8Zjy2ZPDsLP7KqhPlX4JPIPo=","beginning_cross_street":"Water St/Hanover Sq","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.009427,40.703882]]}},{"id":"ilXWEMNydWHD0p28GR/BkdcIySI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F line"],"direction":"unknown","related_road_events":[],"description":"Due to Escalator Work both directions, E Line and F line at 5 Av/53 St (New York) Enter at 5 Av only. Madison Av entrance will be exit only., Continuous Monday April 20th, 2026 12:00 AM thru Tuesday June 30th, 2026 11:59 PM","update_date":"2026-04-20T01:55:24Z"},"road_event_id":"ilXWEMNydWHD0p28GR/BkdcIySI=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"PCu6UeTYnrsYRWC2AHt5Ze9n//g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLEN COVE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VnsjzemTYRF0fBNrHOPboCDYvMA="}],"description":"Guard rail repairs and installation of sign structure and roadwork on GLEN COVE RD both directions between CEDAR SWAMP RD (Old Brookville) and Town Path (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T01:57:40Z"},"road_event_id":"PCu6UeTYnrsYRWC2AHt5Ze9n//g=","beginning_cross_street":"CEDAR SWAMP RD","ending_cross_street":"Town Path","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.615118,40.839048]]}},{"id":"VnsjzemTYRF0fBNrHOPboCDYvMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLEN COVE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu6UeTYnrsYRWC2AHt5Ze9n//g="},{"type":"next-occurrence","id":"h8MuPF6XFcYH2baVsYy7eJmR4Cs="}],"description":"Guard rail repairs and installation of sign structure and roadwork on GLEN COVE RD both directions between CEDAR SWAMP RD (Old Brookville) and Town Path (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T01:57:40Z"},"road_event_id":"VnsjzemTYRF0fBNrHOPboCDYvMA=","beginning_cross_street":"CEDAR SWAMP RD","ending_cross_street":"Town Path","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.615118,40.839048]]}},{"id":"h8MuPF6XFcYH2baVsYy7eJmR4Cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GLEN COVE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PCu6UeTYnrsYRWC2AHt5Ze9n//g="}],"description":"Guard rail repairs and installation of sign structure and roadwork on GLEN COVE RD both directions between CEDAR SWAMP RD (Old Brookville) and Town Path (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T01:57:40Z"},"road_event_id":"h8MuPF6XFcYH2baVsYy7eJmR4Cs=","beginning_cross_street":"CEDAR SWAMP RD","ending_cross_street":"Town Path","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.615118,40.839048]]}},{"id":"ihXGkfrq5jt8M6peSxXt2c4d0Nc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of NJ 53 (Denville Twp), Wednesday April 22, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:48Z"},"road_event_id":"ihXGkfrq5jt8M6peSxXt2c4d0Nc=","beginning_cross_street":"East of NJ 53","ending_cross_street":"West of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.470611,40.889331]]}},{"id":"D/OT/s+pq1JaaUAyDsMHC4YwiNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-20T02:00:45Z"},"road_event_id":"D/OT/s+pq1JaaUAyDsMHC4YwiNg=","beginning_cross_street":"West of I-287","ending_cross_street":"CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.419418,40.870544]]}},{"id":"1yR9x982Vl5O1oYaUkYB1UN1/sY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs and installation of sign structure and roadwork on Meadowbrook State Parkway both directions between Washington Ave (Hempstead) and Exit M8E - Sunrise Highway; NY 27 (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:00:47Z"},"road_event_id":"1yR9x982Vl5O1oYaUkYB1UN1/sY=","beginning_cross_street":"Washington Ave","ending_cross_street":"Exit M8E - Sunrise Highway; NY 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.57222,40.679642]]}},{"id":"rxbGckiuTSdgbGioPIbYHdnpYRY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-287 (Parsippany-Troy Hills Twp) and CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-20T02:00:46Z"},"road_event_id":"rxbGckiuTSdgbGioPIbYHdnpYRY=","beginning_cross_street":"West of I-287","ending_cross_street":"CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.419418,40.870544]]}},{"id":"7uK9ingm4QkoXB1NllcvX5lrLe0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Thursday April 23, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:43Z"},"road_event_id":"7uK9ingm4QkoXB1NllcvX5lrLe0=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 644/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"xQrdmszG8/WRWogmetBOKP5PiOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of CR 618/Mountain Lakes Blvd (Mountain Lakes) and East of CR 654/Cherry Hill Rd (Parsippany-Troy Hills Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-20T02:00:37Z"},"road_event_id":"xQrdmszG8/WRWogmetBOKP5PiOY=","beginning_cross_street":"East of CR 618/Mountain Lakes Blvd","ending_cross_street":"East of CR 654/Cherry Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.452751,40.88132]]}},{"id":"9IYg35VvmlZclg3L8wkyUSDoU18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Wednesday April 22, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:35Z"},"road_event_id":"9IYg35VvmlZclg3L8wkyUSDoU18=","beginning_cross_street":"West of CR 644/Main St","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.512825,40.890899]]}},{"id":"KctqPPkJTc839MzF8IUaUxeHl1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Friday April 24, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:29Z"},"road_event_id":"KctqPPkJTc839MzF8IUaUxeHl1o=","beginning_cross_street":"West of CR 618/Mountain Lakes Blvd","ending_cross_street":"East of NJ 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462821,40.885417]]}},{"id":"ZBrkpHqDCGNiRMlFWaJU0xDbJ3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Thursday April 23, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:28Z"},"road_event_id":"ZBrkpHqDCGNiRMlFWaJU0xDbJ3g=","beginning_cross_street":"West of CR 644/Main St","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.512825,40.890899]]}},{"id":"UelxFmiGcrYgNHM14Bug9fA5t18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Friday April 24, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:31Z"},"road_event_id":"UelxFmiGcrYgNHM14Bug9fA5t18=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 644/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"GVeVtph6lQ4zIu6trk1PDENr2uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Wednesday April 22, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:24Z"},"road_event_id":"GVeVtph6lQ4zIu6trk1PDENr2uw=","beginning_cross_street":"West of CR 618/Mountain Lakes Blvd","ending_cross_street":"East of NJ 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462821,40.885417]]}},{"id":"glEcPZofYvgvs4G30SIG8+lDKaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of NJ 53 (Denville Twp), Friday April 24, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:27Z"},"road_event_id":"glEcPZofYvgvs4G30SIG8+lDKaE=","beginning_cross_street":"East of NJ 53","ending_cross_street":"West of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.470611,40.889331]]}},{"id":"jvjfO8CbeQxwMXzmeApBA/kUY+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp) and West of CR 644/Main St (Rockaway Twp), Wednesday April 22, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:26Z"},"road_event_id":"jvjfO8CbeQxwMXzmeApBA/kUY+0=","beginning_cross_street":"US 202/CR 511/Parsippany Blvd","ending_cross_street":"West of CR 644/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421287,40.870948]]}},{"id":"iIBjrJZLBvg7kF61zzecZp48s9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of CR 618/Mountain Lakes Blvd (Mountain Lakes), Thursday April 23, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:32Z"},"road_event_id":"iIBjrJZLBvg7kF61zzecZp48s9c=","beginning_cross_street":"West of CR 618/Mountain Lakes Blvd","ending_cross_street":"East of NJ 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462821,40.885417]]}},{"id":"M4mmW4FgtBPlJvXHGUYgaUSGVeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound near East of NJ 53 (Denville Twp), Thursday April 23, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:19Z"},"road_event_id":"M4mmW4FgtBPlJvXHGUYgaUSGVeY=","beginning_cross_street":"East of NJ 53","ending_cross_street":"West of CR 618/Mountain Lakes Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.470611,40.889331]]}},{"id":"C2bhPJDwNkTtjiIEDLX2KRVdvhc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of CR 669/Canfield Av (Mine Hill Twp) and West of I-80 (Denville Twp), Wednesday April 22, 2026 06:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-20T02:00:18Z"},"road_event_id":"C2bhPJDwNkTtjiIEDLX2KRVdvhc=","beginning_cross_street":"East of CR 669/Canfield Av","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T16:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.600013,40.879898]]}},{"id":"AIGbu9ege93zpp3/atrenWXqFDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 644/Main St (Rockaway Twp) and US 202/CR 511/Parsippany Blvd (Parsippany-Troy Hills Twp), Friday April 24, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T02:00:21Z"},"road_event_id":"AIGbu9ege93zpp3/atrenWXqFDA=","beginning_cross_street":"West of CR 644/Main St","ending_cross_street":"US 202/CR 511/Parsippany Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.512825,40.890899]]}},{"id":"j6kLYdYDvKVMxh5kS55p+AzuZr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KCGzSTN8iKU3HIb9UUWqKUHmhZg="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"j6kLYdYDvKVMxh5kS55p+AzuZr4=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"KCGzSTN8iKU3HIb9UUWqKUHmhZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"wyHNkZNzr5JKcX05sgvORfbteYQ="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"KCGzSTN8iKU3HIb9UUWqKUHmhZg=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"wyHNkZNzr5JKcX05sgvORfbteYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"m2EbXXK75bkWGL7hWYkTSe81F+s="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"wyHNkZNzr5JKcX05sgvORfbteYQ=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"m2EbXXK75bkWGL7hWYkTSe81F+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"QGQM2vDlx5gup0rts3wZk4FsDus="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"m2EbXXK75bkWGL7hWYkTSe81F+s=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T17:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"QGQM2vDlx5gup0rts3wZk4FsDus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"SeqVQRqtBHOvmLwyjhsFHIkRTjY="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"QGQM2vDlx5gup0rts3wZk4FsDus=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T17:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"SeqVQRqtBHOvmLwyjhsFHIkRTjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"vNexIKp21d5Qm+ZbZYyukHhHEGQ="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"SeqVQRqtBHOvmLwyjhsFHIkRTjY=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T17:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"vNexIKp21d5Qm+ZbZYyukHhHEGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"jaq0u1YS96VB7evaGFwWUhJCa5U="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"vNexIKp21d5Qm+ZbZYyukHhHEGQ=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T17:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"jaq0u1YS96VB7evaGFwWUhJCa5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"qwf4yIT6IbXgtR8j7pfiA9n9AZY="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"jaq0u1YS96VB7evaGFwWUhJCa5U=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T17:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"qwf4yIT6IbXgtR8j7pfiA9n9AZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"S2ylIrAkfcmgJNpSbqHIVl9Tzc8="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"qwf4yIT6IbXgtR8j7pfiA9n9AZY=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T17:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"S2ylIrAkfcmgJNpSbqHIVl9Tzc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="},{"type":"next-occurrence","id":"YadcBj/TMIIOv5//KtBcndCZbL0="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"S2ylIrAkfcmgJNpSbqHIVl9Tzc8=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T17:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"YadcBj/TMIIOv5//KtBcndCZbL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line and F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"j6kLYdYDvKVMxh5kS55p+AzuZr4="}],"description":"Due to Escalator Work both directions, E Line and F Line at 5 Av/53 St (New York) is exit only during the weekday AM rush hours. Use nearby Lexington Av/53 St E line or F line. All other times, enter/exit station via 5 Av side only�the Madison Av side will remain closed at all times. , Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 10:30 AM","update_date":"2026-04-20T02:01:14Z"},"road_event_id":"YadcBj/TMIIOv5//KtBcndCZbL0=","beginning_cross_street":"5 Av/53 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T17:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975224,40.760167]]}},{"id":"1sTbFpUomYToCpsCO2zT4UO41SE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 106"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hEZhqbqd5PkjzjdV8ummKuEDNok="}],"description":"Guard rail repairs and installation of sign structure and roadwork on NY 106 both directions between Newbridge Road; Jerusalem Avenue; START ROUTE NY 106; NY 105 (Hempstead) and Waltoffer Avenue (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T02:08:36Z"},"road_event_id":"1sTbFpUomYToCpsCO2zT4UO41SE=","beginning_cross_street":"Newbridge Road; Jerusalem Avenue; START ROUTE NY 106; NY 105","ending_cross_street":"Waltoffer Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542595,40.691275]]}},{"id":"hEZhqbqd5PkjzjdV8ummKuEDNok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 106"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sTbFpUomYToCpsCO2zT4UO41SE="},{"type":"next-occurrence","id":"2VnKuhBYPPaKrIi/MaSMjYqwDWg="}],"description":"Guard rail repairs and installation of sign structure and roadwork on NY 106 both directions between Newbridge Road; Jerusalem Avenue; START ROUTE NY 106; NY 105 (Hempstead) and Waltoffer Avenue (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T02:08:36Z"},"road_event_id":"hEZhqbqd5PkjzjdV8ummKuEDNok=","beginning_cross_street":"Newbridge Road; Jerusalem Avenue; START ROUTE NY 106; NY 105","ending_cross_street":"Waltoffer Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542595,40.691275]]}},{"id":"2VnKuhBYPPaKrIi/MaSMjYqwDWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 106"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1sTbFpUomYToCpsCO2zT4UO41SE="}],"description":"Guard rail repairs and installation of sign structure and roadwork on NY 106 both directions between Newbridge Road; Jerusalem Avenue; START ROUTE NY 106; NY 105 (Hempstead) and Waltoffer Avenue (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T02:08:36Z"},"road_event_id":"2VnKuhBYPPaKrIi/MaSMjYqwDWg=","beginning_cross_street":"Newbridge Road; Jerusalem Avenue; START ROUTE NY 106; NY 105","ending_cross_street":"Waltoffer Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542595,40.691275]]}},{"id":"nX6AVv6rSYSEyS8NYC2zo+rOme8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27A"],"direction":"unknown","related_road_events":[],"description":"Roadwork and traffic signal repairs on NY 27A both directions between Riverside Avenue (Amityville) and Grand Central Avenue (Amityville), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes closed","update_date":"2026-04-20T02:13:05Z"},"road_event_id":"nX6AVv6rSYSEyS8NYC2zo+rOme8=","beginning_cross_street":"Riverside Avenue","ending_cross_street":"Grand Central Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.412815,40.669945]]}},{"id":"5zB7GeFXfkORCn6ZweRUi2PuVnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5sq352KRwSzK1Kx2vc8CYhJbHOc="}],"description":"Overnight roadwork and steel repairs on NY 27 westbound between Exit 41 - Robert Moses Causeway (Islip) and Town of Islip; Town of Babylon Line; NY 231 (Babylon), Sunday April 19th, 2026 thru Friday April 24th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-20T02:16:32Z"},"road_event_id":"5zB7GeFXfkORCn6ZweRUi2PuVnY=","beginning_cross_street":"Exit 41 - Robert Moses Causeway","ending_cross_street":"Town of Islip; Town of Babylon Line; NY 231","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.286314,40.726494]]}},{"id":"5sq352KRwSzK1Kx2vc8CYhJbHOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5zB7GeFXfkORCn6ZweRUi2PuVnY="}],"description":"Overnight roadwork and steel repairs on NY 27 westbound between Exit 41 - Robert Moses Causeway (Islip) and Town of Islip; Town of Babylon Line; NY 231 (Babylon), Sunday April 19th, 2026 thru Friday April 24th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-20T02:16:32Z"},"road_event_id":"5sq352KRwSzK1Kx2vc8CYhJbHOc=","beginning_cross_street":"Exit 41 - Robert Moses Causeway","ending_cross_street":"Town of Islip; Town of Babylon Line; NY 231","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.286314,40.726494]]}},{"id":"hcSxin4OzK+grzgqyVNeePIx0to=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3xO+JWGNdWsYDev6mcs2oQXD9eQ="}],"description":"Bridge painting and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and Bay Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:22:37Z"},"road_event_id":"hcSxin4OzK+grzgqyVNeePIx0to=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"Bay Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.511923,40.664095]]}},{"id":"3xO+JWGNdWsYDev6mcs2oQXD9eQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hcSxin4OzK+grzgqyVNeePIx0to="},{"type":"next-occurrence","id":"jT0MQ8vVItXNQSWKQjx7d1BaX9g="}],"description":"Bridge painting and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and Bay Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:22:37Z"},"road_event_id":"3xO+JWGNdWsYDev6mcs2oQXD9eQ=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"Bay Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.511923,40.664095]]}},{"id":"jT0MQ8vVItXNQSWKQjx7d1BaX9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hcSxin4OzK+grzgqyVNeePIx0to="}],"description":"Bridge painting and roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and Bay Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:22:37Z"},"road_event_id":"jT0MQ8vVItXNQSWKQjx7d1BaX9g=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"Bay Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.511923,40.664095]]}},{"id":"u25IEQHogf0vpjyzyr8q3oeZE00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge painting and roadwork on Wantagh State Parkway northbound at Sloop Channel Bridge (Hempstead), Sunday April 19th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM right shoulder closed","update_date":"2026-04-20T02:24:48Z"},"road_event_id":"u25IEQHogf0vpjyzyr8q3oeZE00=","beginning_cross_street":"Sloop Channel Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.500638,40.614194]]}},{"id":"BrLf2BbA2u6AcPrbGWnj5p9BlP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BklBGOVP/KJw4Z1Cwa/mvwFhqeU="}],"description":"Bridge painting and roadwork on Meadowbrook State Parkway northbound between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:26:31Z"},"road_event_id":"BrLf2BbA2u6AcPrbGWnj5p9BlP0=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.535223,40.593661]]}},{"id":"BklBGOVP/KJw4Z1Cwa/mvwFhqeU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrLf2BbA2u6AcPrbGWnj5p9BlP0="},{"type":"next-occurrence","id":"I27vOuFfvSYXoKgHBaoM2jrsWao="}],"description":"Bridge painting and roadwork on Meadowbrook State Parkway northbound between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:26:31Z"},"road_event_id":"BklBGOVP/KJw4Z1Cwa/mvwFhqeU=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.535223,40.593661]]}},{"id":"I27vOuFfvSYXoKgHBaoM2jrsWao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BrLf2BbA2u6AcPrbGWnj5p9BlP0="}],"description":"Bridge painting and roadwork on Meadowbrook State Parkway northbound between START ROUTE Meadowbrook State Parkway at Ocean Parkway (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:26:31Z"},"road_event_id":"I27vOuFfvSYXoKgHBaoM2jrsWao=","beginning_cross_street":"START ROUTE Meadowbrook State Parkway at Ocean Parkway","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.535223,40.593661]]}},{"id":"fpBty00JTmxZfMls7nUD7oM+fCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge painting and roadwork on Meadowbrook State Parkway southbound at Jones Bay Bridge (Hempstead), Sunday April 19th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 12:00 AM thru 11:59 PM right shoulder closed","update_date":"2026-04-20T02:27:54Z"},"road_event_id":"fpBty00JTmxZfMls7nUD7oM+fCY=","beginning_cross_street":"Jones Bay Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.543283,40.599464]]}},{"id":"nSVAUFO21G3FGuDJy72leAi2JWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xwPnhI2yb5XPNyL3HhmmQAs55Xk="}],"description":"Bridge painting and overnight roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and Bay Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T02:36:24Z"},"road_event_id":"nSVAUFO21G3FGuDJy72leAi2JWc=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"Bay Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.512256,40.664305]]}},{"id":"xwPnhI2yb5XPNyL3HhmmQAs55Xk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nSVAUFO21G3FGuDJy72leAi2JWc="}],"description":"Bridge painting and overnight roadwork on Wantagh State Parkway both directions between Exit W6 - Merrick Road (Hempstead) and Bay Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T02:36:24Z"},"road_event_id":"xwPnhI2yb5XPNyL3HhmmQAs55Xk=","beginning_cross_street":"Exit W6 - Merrick Road","ending_cross_street":"Bay Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.512256,40.664305]]}},{"id":"BIUNUQw0hkSQGrCvdxx+r8LJ0hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wOdFrBVm8iZNyxKMGCKD9DH20Ek="}],"description":"Bridge painting and overnight roadwork on Meadowbrook State Parkway both directions between Bay Drive; Ocean Parkway - Toll (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:38:01Z"},"road_event_id":"BIUNUQw0hkSQGrCvdxx+r8LJ0hs=","beginning_cross_street":"Bay Drive; Ocean Parkway - Toll","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542041,40.595817]]}},{"id":"wOdFrBVm8iZNyxKMGCKD9DH20Ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BIUNUQw0hkSQGrCvdxx+r8LJ0hs="}],"description":"Bridge painting and overnight roadwork on Meadowbrook State Parkway both directions between Bay Drive; Ocean Parkway - Toll (Hempstead) and Exit M10 - Loop Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T02:38:01Z"},"road_event_id":"wOdFrBVm8iZNyxKMGCKD9DH20Ek=","beginning_cross_street":"Bay Drive; Ocean Parkway - Toll","ending_cross_street":"Exit M10 - Loop Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542041,40.595817]]}},{"id":"ktdPn13tvvmWdMDeqoK1SvXCfM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GOL2fNsbjflbwRM3KUl6kK8wqUQ="}],"description":"Roadwork on NY 27 eastbound between Exit 65 - Hamptons Bay Road; NY 24 (Southampton) and Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T02:39:48Z"},"road_event_id":"ktdPn13tvvmWdMDeqoK1SvXCfM4=","beginning_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","ending_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.525686,40.884779]]}},{"id":"GOL2fNsbjflbwRM3KUl6kK8wqUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ktdPn13tvvmWdMDeqoK1SvXCfM4="},{"type":"next-occurrence","id":"WFkPzDB6LPOzeh5kxLaJMmsTrro="}],"description":"Roadwork on NY 27 eastbound between Exit 65 - Hamptons Bay Road; NY 24 (Southampton) and Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T02:39:48Z"},"road_event_id":"GOL2fNsbjflbwRM3KUl6kK8wqUQ=","beginning_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","ending_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.525686,40.884779]]}},{"id":"WFkPzDB6LPOzeh5kxLaJMmsTrro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ktdPn13tvvmWdMDeqoK1SvXCfM4="}],"description":"Roadwork on NY 27 eastbound between Exit 65 - Hamptons Bay Road; NY 24 (Southampton) and Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T02:39:48Z"},"road_event_id":"WFkPzDB6LPOzeh5kxLaJMmsTrro=","beginning_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","ending_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.525686,40.884779]]}},{"id":"AcR5qCLzk8UwM+lZfQRTB71/j7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"exgxbv8JVhgtm1ABnL/l2AAwuIw="}],"description":"Roadwork on NY 27 westbound between Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton) and Exit 65 - Hamptons Bay Road; NY 24 (Southampton), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T02:42:04Z"},"road_event_id":"AcR5qCLzk8UwM+lZfQRTB71/j7k=","beginning_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","ending_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.494124,40.890822]]}},{"id":"exgxbv8JVhgtm1ABnL/l2AAwuIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AcR5qCLzk8UwM+lZfQRTB71/j7k="}],"description":"Roadwork on NY 27 westbound between Exit 66 - North Shore Highway; CR 39; North Shore Road (Southampton) and Exit 65 - Hamptons Bay Road; NY 24 (Southampton), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 08:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T02:42:04Z"},"road_event_id":"exgxbv8JVhgtm1ABnL/l2AAwuIw=","beginning_cross_street":"Exit 66 - North Shore Highway; CR 39; North Shore Road","ending_cross_street":"Exit 65 - Hamptons Bay Road; NY 24","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.494124,40.890822]]}},{"id":"LWrzyl0mhHnHkUiDz/plWGfwef0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 111"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qPNnVWTBD1yntRjIzuPPFrQDjCc="}],"description":"Drainage improvements and overnight roadwork on NY 111 both directions between Moffitt Boulevard (Islip) and Long Island Rail Road (Islip), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T02:45:39Z"},"road_event_id":"LWrzyl0mhHnHkUiDz/plWGfwef0=","beginning_cross_street":"Moffitt Boulevard","ending_cross_street":"Long Island Rail Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.207749,40.737442]]}},{"id":"qPNnVWTBD1yntRjIzuPPFrQDjCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 111"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LWrzyl0mhHnHkUiDz/plWGfwef0="}],"description":"Drainage improvements and overnight roadwork on NY 111 both directions between Moffitt Boulevard (Islip) and Long Island Rail Road (Islip), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T02:45:39Z"},"road_event_id":"qPNnVWTBD1yntRjIzuPPFrQDjCc=","beginning_cross_street":"Moffitt Boulevard","ending_cross_street":"Long Island Rail Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.207749,40.737442]]}},{"id":"9O++aPKTSZAnK+pd3/QfinmuxTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vPO/Rfo9ZJFPqGv6eUTbKwzec+Y="}],"description":"Roadwork and tree trimming on I-495 both directions between Exit 49N - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-20T02:54:26Z"},"road_event_id":"9O++aPKTSZAnK+pd3/QfinmuxTQ=","beginning_cross_street":"Exit 49N - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419687,40.78074]]}},{"id":"vPO/Rfo9ZJFPqGv6eUTbKwzec+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9O++aPKTSZAnK+pd3/QfinmuxTQ="},{"type":"next-occurrence","id":"vnf9+DxnEaPa8yH6ZVk+e6R0gIs="}],"description":"Roadwork and tree trimming on I-495 both directions between Exit 49N - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-20T02:54:26Z"},"road_event_id":"vPO/Rfo9ZJFPqGv6eUTbKwzec+Y=","beginning_cross_street":"Exit 49N - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419687,40.78074]]}},{"id":"vnf9+DxnEaPa8yH6ZVk+e6R0gIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-495"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"9O++aPKTSZAnK+pd3/QfinmuxTQ="}],"description":"Roadwork and tree trimming on I-495 both directions between Exit 49N - NY 110 (Huntington) and Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7 (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-20T02:54:26Z"},"road_event_id":"vnf9+DxnEaPa8yH6ZVk+e6R0gIs=","beginning_cross_street":"Exit 49N - NY 110","ending_cross_street":"Exit 53 - Sagtikos State Parkway; Wicks Road; CR 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.419687,40.78074]]}},{"id":"VGzBtIRvdlAUq7nKrq9lKNngrxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S SERVICE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OsC+q6s2Ef7XHKUL4P2hAHpJY+A="}],"description":"Roadwork and tree trimming on S SERVICE RD both directions between RT-110 (Huntington) and EXPRESS DR S at Sagtikos State Parkway (Smithtown), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T02:56:12Z"},"road_event_id":"VGzBtIRvdlAUq7nKrq9lKNngrxU=","beginning_cross_street":" RT-110","ending_cross_street":"Sagtikos State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.42025,40.779226]]}},{"id":"OsC+q6s2Ef7XHKUL4P2hAHpJY+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S SERVICE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VGzBtIRvdlAUq7nKrq9lKNngrxU="},{"type":"next-occurrence","id":"1K204DjrhSET8r8neocooyIDaA0="}],"description":"Roadwork and tree trimming on S SERVICE RD both directions between RT-110 (Huntington) and EXPRESS DR S at Sagtikos State Parkway (Smithtown), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T02:56:12Z"},"road_event_id":"OsC+q6s2Ef7XHKUL4P2hAHpJY+A=","beginning_cross_street":" RT-110","ending_cross_street":"Sagtikos State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.42025,40.779226]]}},{"id":"1K204DjrhSET8r8neocooyIDaA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["S SERVICE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VGzBtIRvdlAUq7nKrq9lKNngrxU="}],"description":"Roadwork and tree trimming on S SERVICE RD both directions between RT-110 (Huntington) and EXPRESS DR S at Sagtikos State Parkway (Smithtown), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T02:56:12Z"},"road_event_id":"1K204DjrhSET8r8neocooyIDaA0=","beginning_cross_street":" RT-110","ending_cross_street":"Sagtikos State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.42025,40.779226]]}},{"id":"PM26aYaCFeX/8wvW9yBmsu4NGbw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/U5dL3aIQJD5B++SV6c6d6Cm7ko="}],"description":"Drainage improvements and repaving and traffic signal repairs and utility work on NY 347 both directions between Nicolls Road; CR 97 (Brookhaven) and Hallock Road (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T04:05:18Z"},"road_event_id":"PM26aYaCFeX/8wvW9yBmsu4NGbw=","beginning_cross_street":"Nicolls Road; CR 97","ending_cross_street":"Hallock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.106912,40.88304]]}},{"id":"/U5dL3aIQJD5B++SV6c6d6Cm7ko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM26aYaCFeX/8wvW9yBmsu4NGbw="},{"type":"next-occurrence","id":"WUzPfANTx98LwRz1g2wmrPgPJJs="}],"description":"Drainage improvements and repaving and traffic signal repairs and utility work on NY 347 both directions between Nicolls Road; CR 97 (Brookhaven) and Hallock Road (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T04:05:18Z"},"road_event_id":"/U5dL3aIQJD5B++SV6c6d6Cm7ko=","beginning_cross_street":"Nicolls Road; CR 97","ending_cross_street":"Hallock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.106912,40.88304]]}},{"id":"WUzPfANTx98LwRz1g2wmrPgPJJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM26aYaCFeX/8wvW9yBmsu4NGbw="}],"description":"Drainage improvements and repaving and traffic signal repairs and utility work on NY 347 both directions between Nicolls Road; CR 97 (Brookhaven) and Hallock Road (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T04:05:18Z"},"road_event_id":"WUzPfANTx98LwRz1g2wmrPgPJJs=","beginning_cross_street":"Nicolls Road; CR 97","ending_cross_street":"Hallock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.106912,40.88304]]}},{"id":"DJJ0OZNG2S3qymL98PJCOjoIZFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5HixPaXc/2wlXt3nUTe6dLkv+0c="}],"description":"Installation of sign structure and repaving and roadwork on SUNRISE HWY westbound between North Ocean Ave (Brookhaven) and GATEWAY BLVD (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:22:54Z"},"road_event_id":"DJJ0OZNG2S3qymL98PJCOjoIZFY=","beginning_cross_street":"North Ocean Ave","ending_cross_street":"GATEWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.015566,40.779846]]}},{"id":"5HixPaXc/2wlXt3nUTe6dLkv+0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJJ0OZNG2S3qymL98PJCOjoIZFY="},{"type":"next-occurrence","id":"2Ju2WIlvCzrjUp11Mwxn8JRKNKM="}],"description":"Installation of sign structure and repaving and roadwork on SUNRISE HWY westbound between North Ocean Ave (Brookhaven) and GATEWAY BLVD (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:22:54Z"},"road_event_id":"5HixPaXc/2wlXt3nUTe6dLkv+0c=","beginning_cross_street":"North Ocean Ave","ending_cross_street":"GATEWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.015566,40.779846]]}},{"id":"2Ju2WIlvCzrjUp11Mwxn8JRKNKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DJJ0OZNG2S3qymL98PJCOjoIZFY="}],"description":"Installation of sign structure and repaving and roadwork on SUNRISE HWY westbound between North Ocean Ave (Brookhaven) and GATEWAY BLVD (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:22:54Z"},"road_event_id":"2Ju2WIlvCzrjUp11Mwxn8JRKNKM=","beginning_cross_street":"North Ocean Ave","ending_cross_street":"GATEWAY BLVD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.015566,40.779846]]}},{"id":"FkBgPv+b3h6iMtMBlqb0bjz5+TI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S+9AVNU4mzH5VJyfObW4fTkiYY0="}],"description":"Installation of sign structure and repaving and roadwork on SUNRISE HWY eastbound between Halley Drive (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:25:41Z"},"road_event_id":"FkBgPv+b3h6iMtMBlqb0bjz5+TI=","beginning_cross_street":"Halley Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.039593,40.774478]]}},{"id":"S+9AVNU4mzH5VJyfObW4fTkiYY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FkBgPv+b3h6iMtMBlqb0bjz5+TI="},{"type":"next-occurrence","id":"lwk7JWwf3IMLmEqRYs6a2YU4dRM="}],"description":"Installation of sign structure and repaving and roadwork on SUNRISE HWY eastbound between Halley Drive (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:25:41Z"},"road_event_id":"S+9AVNU4mzH5VJyfObW4fTkiYY0=","beginning_cross_street":"Halley Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.039593,40.774478]]}},{"id":"lwk7JWwf3IMLmEqRYs6a2YU4dRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FkBgPv+b3h6iMtMBlqb0bjz5+TI="}],"description":"Installation of sign structure and repaving and roadwork on SUNRISE HWY eastbound between Halley Drive (Brookhaven), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:25:41Z"},"road_event_id":"lwk7JWwf3IMLmEqRYs6a2YU4dRM=","beginning_cross_street":"Halley Drive","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.039593,40.774478]]}},{"id":"R4go7nkwXSY8V/GfEeC8kE2eA/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0vnHdu89VW0qg8RxQWELL/v2rOo="}],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Wednesday/Friday, 08:30 AM thru 02:30 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T04:41:57Z"},"road_event_id":"R4go7nkwXSY8V/GfEeC8kE2eA/g=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:30:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944852,40.850246]]}},{"id":"0vnHdu89VW0qg8RxQWELL/v2rOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R4go7nkwXSY8V/GfEeC8kE2eA/g="}],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Wednesday/Friday, 08:30 AM thru 02:30 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T04:41:57Z"},"road_event_id":"0vnHdu89VW0qg8RxQWELL/v2rOo=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:30:00Z","end_date":"2026-04-24T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944852,40.850246]]}},{"id":"rHRJbbFAucoqtlXe+70ZlrhmFqs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Thursday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T04:43:03Z"},"road_event_id":"rHRJbbFAucoqtlXe+70ZlrhmFqs=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:30:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944851,40.850246]]}},{"id":"cWWeliMGV6vja6Pf/BPJvr/PQ44=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XkJAEK6FHkMvA/aekyVRMTIbkc8="}],"description":"Construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T04:44:26Z"},"road_event_id":"cWWeliMGV6vja6Pf/BPJvr/PQ44=","beginning_cross_street":"Lower Trans Manhattan Expressway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:30:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939593,40.849279]]}},{"id":"XkJAEK6FHkMvA/aekyVRMTIbkc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cWWeliMGV6vja6Pf/BPJvr/PQ44="},{"type":"next-occurrence","id":"0SfCVHD+fvuaZjPazbhAAXRA0CI="}],"description":"Construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T04:44:26Z"},"road_event_id":"XkJAEK6FHkMvA/aekyVRMTIbkc8=","beginning_cross_street":"Lower Trans Manhattan Expressway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:30:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939593,40.849279]]}},{"id":"0SfCVHD+fvuaZjPazbhAAXRA0CI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cWWeliMGV6vja6Pf/BPJvr/PQ44="}],"description":"Construction on George Washington Bridge Lower Level westbound Lower Trans Manhattan Expressway (Manhattan) to Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 02:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T04:44:26Z"},"road_event_id":"0SfCVHD+fvuaZjPazbhAAXRA0CI=","beginning_cross_street":"Lower Trans Manhattan Expressway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:30:00Z","end_date":"2026-04-24T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939593,40.849279]]}},{"id":"gJ08dDdongzv1Km52RYnEm3v8fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/wejc2PAzqmxTP9HucbV9KtkjS4="}],"description":"Construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-20T16:51:57Z"},"road_event_id":"gJ08dDdongzv1Km52RYnEm3v8fo=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960777,40.853202]]}},{"id":"/wejc2PAzqmxTP9HucbV9KtkjS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gJ08dDdongzv1Km52RYnEm3v8fo="},{"type":"next-occurrence","id":"ptMMuhjgJxArUpH/QWQo7QAjY7o="}],"description":"Construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-20T16:51:57Z"},"road_event_id":"/wejc2PAzqmxTP9HucbV9KtkjS4=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960777,40.853202]]}},{"id":"ptMMuhjgJxArUpH/QWQo7QAjY7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gJ08dDdongzv1Km52RYnEm3v8fo="},{"type":"next-occurrence","id":"BlQEgLaqFwKsWlZujOsOZOu3s30="}],"description":"Construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-20T16:51:57Z"},"road_event_id":"ptMMuhjgJxArUpH/QWQo7QAjY7o=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960777,40.853202]]}},{"id":"BlQEgLaqFwKsWlZujOsOZOu3s30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gJ08dDdongzv1Km52RYnEm3v8fo="}],"description":"Construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 04:30 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-20T16:51:57Z"},"road_event_id":"BlQEgLaqFwKsWlZujOsOZOu3s30=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-25T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960777,40.853202]]}},{"id":"L4wfaPAMKnwdCtYr7Jeu7RunVhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JHod58HIKpMV2y4Sbhxj0ny80fg="}],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T04:46:28Z"},"road_event_id":"L4wfaPAMKnwdCtYr7Jeu7RunVhw=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960934,40.853187]]}},{"id":"JHod58HIKpMV2y4Sbhxj0ny80fg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L4wfaPAMKnwdCtYr7Jeu7RunVhw="},{"type":"next-occurrence","id":"cGANNxPRDmW8DvkuKXHq5jzhVjI="}],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T04:46:28Z"},"road_event_id":"JHod58HIKpMV2y4Sbhxj0ny80fg=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960934,40.853187]]}},{"id":"cGANNxPRDmW8DvkuKXHq5jzhVjI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L4wfaPAMKnwdCtYr7Jeu7RunVhw="}],"description":"Bridge construction on George Washington Bridge Lower Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:30 AM thru 03:30 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T04:46:28Z"},"road_event_id":"cGANNxPRDmW8DvkuKXHq5jzhVjI=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960934,40.853187]]}},{"id":"iH4WpYwVDlVW1nx7M/OmHFwF6jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"G4tu4pgTIG2lP1ZEVkU0Lr1IjaA="}],"description":"Roadwork on NY 110 southbound between Old Country Road (Huntington) and I-495 South Service Road (Huntington), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T04:45:43Z"},"road_event_id":"iH4WpYwVDlVW1nx7M/OmHFwF6jE=","beginning_cross_street":"Old Country Road","ending_cross_street":"I-495 South Service Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.4156,40.792977]]}},{"id":"G4tu4pgTIG2lP1ZEVkU0Lr1IjaA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iH4WpYwVDlVW1nx7M/OmHFwF6jE="}],"description":"Roadwork on NY 110 southbound between Old Country Road (Huntington) and I-495 South Service Road (Huntington), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T04:45:43Z"},"road_event_id":"G4tu4pgTIG2lP1ZEVkU0Lr1IjaA=","beginning_cross_street":"Old Country Road","ending_cross_street":"I-495 South Service Road ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.4156,40.792977]]}},{"id":"Oihw085KkiEwmRciZS5pwkSsnKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"32X1WV4gcdqlI/IDnpOwoAzvpXE="}],"description":"Construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:47:48Z"},"road_event_id":"Oihw085KkiEwmRciZS5pwkSsnKs=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:30:00Z","end_date":"2026-04-22T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943385,40.849682]]}},{"id":"32X1WV4gcdqlI/IDnpOwoAzvpXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oihw085KkiEwmRciZS5pwkSsnKs="},{"type":"next-occurrence","id":"XPvL7fsrWeSPWzhYIbQNu3NP/ow="}],"description":"Construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:47:48Z"},"road_event_id":"32X1WV4gcdqlI/IDnpOwoAzvpXE=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:30:00Z","end_date":"2026-04-23T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943385,40.849682]]}},{"id":"XPvL7fsrWeSPWzhYIbQNu3NP/ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oihw085KkiEwmRciZS5pwkSsnKs="}],"description":"Construction on George Washington Bridge Upper Level eastbound ramp to Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:30 AM thru 04:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:47:48Z"},"road_event_id":"XPvL7fsrWeSPWzhYIbQNu3NP/ow=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:30:00Z","end_date":"2026-04-24T20:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.943385,40.849682]]}},{"id":"6H1fsFLTcEFG2JXyQotDvm4nIGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GLA761+JfIB0nSjy+VfyRXTxt1c="}],"description":"Construction on George Washington Bridge Lower Level eastbound ramp from Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:50:14Z"},"road_event_id":"6H1fsFLTcEFG2JXyQotDvm4nIGA=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.942945,40.847344]]}},{"id":"GLA761+JfIB0nSjy+VfyRXTxt1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6H1fsFLTcEFG2JXyQotDvm4nIGA="},{"type":"next-occurrence","id":"aDS3WK+JbvbETy/NBRTI9nd5iZw="}],"description":"Construction on George Washington Bridge Lower Level eastbound ramp from Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:50:14Z"},"road_event_id":"GLA761+JfIB0nSjy+VfyRXTxt1c=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.942945,40.847344]]}},{"id":"aDS3WK+JbvbETy/NBRTI9nd5iZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6H1fsFLTcEFG2JXyQotDvm4nIGA="}],"description":"Construction on George Washington Bridge Lower Level eastbound ramp from Exit 1A - Henry Hudson Parkway (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T04:50:14Z"},"road_event_id":"aDS3WK+JbvbETy/NBRTI9nd5iZw=","beginning_cross_street":"Exit 1A - Henry Hudson Parkway","ending_cross_street":"Exit 1A - Henry Hudson Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.942945,40.847344]]}},{"id":"D+90laaNsJFneBb3bha9xEjwokQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oKKLfjXK+vYzw+66EW/hFRiM+EI="}],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:00 AM thru 08:00 AM All lanes closed and detoured","update_date":"2026-04-20T04:51:56Z"},"road_event_id":"D+90laaNsJFneBb3bha9xEjwokQ=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944938,40.850266]]}},{"id":"oKKLfjXK+vYzw+66EW/hFRiM+EI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+90laaNsJFneBb3bha9xEjwokQ="},{"type":"next-occurrence","id":"QL3h48AocJy8/uJSTYqK77jIHUg="}],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:00 AM thru 08:00 AM All lanes closed and detoured","update_date":"2026-04-20T04:51:56Z"},"road_event_id":"oKKLfjXK+vYzw+66EW/hFRiM+EI=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944938,40.850266]]}},{"id":"QL3h48AocJy8/uJSTYqK77jIHUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"D+90laaNsJFneBb3bha9xEjwokQ="}],"description":"Bridge construction on George Washington Bridge Lower Level westbound New York Side (New York) to New Jersey Side (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:00 AM thru 08:00 AM All lanes closed and detoured","update_date":"2026-04-20T04:51:56Z"},"road_event_id":"QL3h48AocJy8/uJSTYqK77jIHUg=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944938,40.850266]]}},{"id":"lIXtcGtVVfdpBiXBqe1CyP2uZR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gLniXDm+lAbEBHkC/K6GMCt5mEI="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:30 PM thru 04:30 AM 3 Right lanes of 4 lanes closed, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 11:00 PM thru 08:00 AM 3 Right lanes of 4 lanes closed","update_date":"2026-04-20T04:54:33Z"},"road_event_id":"lIXtcGtVVfdpBiXBqe1CyP2uZR8=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:30:00Z","end_date":"2026-04-23T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960303,40.8531]]}},{"id":"gLniXDm+lAbEBHkC/K6GMCt5mEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lIXtcGtVVfdpBiXBqe1CyP2uZR8="},{"type":"next-occurrence","id":"scSwn16lq29tVgNjjeB9ikJefLU="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:30 PM thru 04:30 AM 3 Right lanes of 4 lanes closed, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 11:00 PM thru 08:00 AM 3 Right lanes of 4 lanes closed","update_date":"2026-04-20T04:54:33Z"},"road_event_id":"gLniXDm+lAbEBHkC/K6GMCt5mEI=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:30:00Z","end_date":"2026-04-24T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960303,40.8531]]}},{"id":"scSwn16lq29tVgNjjeB9ikJefLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lIXtcGtVVfdpBiXBqe1CyP2uZR8="},{"type":"next-occurrence","id":"2SobifIqasgb1juPVnY2LrVeGJ4="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:30 PM thru 04:30 AM 3 Right lanes of 4 lanes closed, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 11:00 PM thru 08:00 AM 3 Right lanes of 4 lanes closed","update_date":"2026-04-20T04:54:33Z"},"road_event_id":"scSwn16lq29tVgNjjeB9ikJefLU=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960303,40.8531]]}},{"id":"2SobifIqasgb1juPVnY2LrVeGJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lIXtcGtVVfdpBiXBqe1CyP2uZR8="}],"description":"Bridge construction on George Washington Bridge Upper Level eastbound New Jersey Side (Fort Lee) to New York Side (New York), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:30 PM thru 04:30 AM 3 Right lanes of 4 lanes closed, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 11:00 PM thru 08:00 AM 3 Right lanes of 4 lanes closed","update_date":"2026-04-20T04:54:33Z"},"road_event_id":"2SobifIqasgb1juPVnY2LrVeGJ4=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T02:00:00Z","end_date":"2026-04-27T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960303,40.8531]]}},{"id":"g8otSWe1X2h2Tp1uwAMWVtyc6+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hJTWuDO7MaRIB/xnP5xZc+m9VPY="}],"description":"Construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 04:30 AM All lanes closed and detoured, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 10:30 PM thru 08:00 AM All lanes closed and detoured","update_date":"2026-04-20T04:56:22Z"},"road_event_id":"g8otSWe1X2h2Tp1uwAMWVtyc6+E=","beginning_cross_street":"Palisades Interstate Parkway","ending_cross_street":"Palisades Interstate Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962902,40.854746]]}},{"id":"hJTWuDO7MaRIB/xnP5xZc+m9VPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g8otSWe1X2h2Tp1uwAMWVtyc6+E="},{"type":"next-occurrence","id":"SsBt+VCyzonK5mAH+1gG8k56JrU="}],"description":"Construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 04:30 AM All lanes closed and detoured, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 10:30 PM thru 08:00 AM All lanes closed and detoured","update_date":"2026-04-20T04:56:22Z"},"road_event_id":"hJTWuDO7MaRIB/xnP5xZc+m9VPY=","beginning_cross_street":"Palisades Interstate Parkway","ending_cross_street":"Palisades Interstate Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962902,40.854746]]}},{"id":"SsBt+VCyzonK5mAH+1gG8k56JrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g8otSWe1X2h2Tp1uwAMWVtyc6+E="},{"type":"next-occurrence","id":"Sfvm2gK22KMYt0bfZS2zzQh4Zf0="}],"description":"Construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 04:30 AM All lanes closed and detoured, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 10:30 PM thru 08:00 AM All lanes closed and detoured","update_date":"2026-04-20T04:56:22Z"},"road_event_id":"SsBt+VCyzonK5mAH+1gG8k56JrU=","beginning_cross_street":"Palisades Interstate Parkway","ending_cross_street":"Palisades Interstate Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962902,40.854746]]}},{"id":"Sfvm2gK22KMYt0bfZS2zzQh4Zf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g8otSWe1X2h2Tp1uwAMWVtyc6+E="}],"description":"Construction on George Washington Bridge Upper Level southbound ramp from Palisades Interstate Parkway (Fort Lee), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 04:30 AM All lanes closed and detoured, Friday April 24th, 2026 thru Sunday April 26th, 2026, Friday/Saturday, 10:30 PM thru 08:00 AM All lanes closed and detoured","update_date":"2026-04-20T04:56:22Z"},"road_event_id":"Sfvm2gK22KMYt0bfZS2zzQh4Zf0=","beginning_cross_street":"Palisades Interstate Parkway","ending_cross_street":"Palisades Interstate Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962902,40.854746]]}},{"id":"X2As8u5rJVS7b/dIyjkV5JIGywU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Lincoln Tunnel"],"direction":"unknown","related_road_events":[],"description":"Construction on Lincoln Tunnel South Tube eastbound New Jersey Side (Weehawken Twp) to New York Side (Manhattan), Thursday April 23rd,2026 thru Friday April 24th,2026, Thursday, 11:00 PM thru 05:00 AM All lanes closed and detoured eastbound,","update_date":"2026-04-20T09:00:00Z"},"road_event_id":"X2As8u5rJVS7b/dIyjkV5JIGywU=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019635,40.766666]]}},{"id":"WqB9s3WrClb9B/i1XYDt3mb2TFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Lincoln Tunnel"],"direction":"unknown","related_road_events":[],"description":"Construction on Lincoln Tunnel Center Tube both directions New York Side (New York) to New Jersey Side (Weehawken Twp), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday, 11:00 PM thru 05:00 AM All lanes closed and detoured","update_date":"2026-04-22T02:29:48Z"},"road_event_id":"WqB9s3WrClb9B/i1XYDt3mb2TFE=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002299,40.759829]]}},{"id":"i80w8myZ03XNOz9ej1KIyBL+0S8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LWd1noXC3/irsS7Kt9yYvEINcYM="}],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:03:22Z"},"road_event_id":"i80w8myZ03XNOz9ej1KIyBL+0S8=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239689,40.525238]]}},{"id":"LWd1noXC3/irsS7Kt9yYvEINcYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i80w8myZ03XNOz9ej1KIyBL+0S8="},{"type":"next-occurrence","id":"6a9nzRq4nPYpHG2qnL20/nSYWV4="}],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:03:22Z"},"road_event_id":"LWd1noXC3/irsS7Kt9yYvEINcYM=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239689,40.525238]]}},{"id":"6a9nzRq4nPYpHG2qnL20/nSYWV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i80w8myZ03XNOz9ej1KIyBL+0S8="}],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 08:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:03:22Z"},"road_event_id":"6a9nzRq4nPYpHG2qnL20/nSYWV4=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:58:00Z","end_date":"2026-04-26T11:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239689,40.525238]]}},{"id":"oB/9R/Xn6LI0nLP/nrTYpIN8t5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on Goethals Bridge eastbound New Jersey Side (Elizabeth) to New York Side (New York), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:07:02Z"},"road_event_id":"oB/9R/Xn6LI0nLP/nrTYpIN8t5A=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.201776,40.637704]]}},{"id":"8J1szenxW/UdD2Jam1QTjzEwIdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on Goethals Bridge westbound New York Side (New York) to New Jersey Side (Elizabeth), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:08:13Z"},"road_event_id":"8J1szenxW/UdD2Jam1QTjzEwIdA=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189769,40.631639]]}},{"id":"uGnJGj/qNByz/HoHD3HWX5GJGbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on Goethals Bridge eastbound New Jersey Side (Elizabeth) to New York Side (New York), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 10:00 PM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T05:10:43Z"},"road_event_id":"uGnJGj/qNByz/HoHD3HWX5GJGbU=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.201525,40.637545]]}},{"id":"AJekb7JyK3DlEGDOjZnG1KjRUnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xT1t/A58OW1m9fn3ito4+xnDvnU="}],"description":"Bridge construction on Goethals Bridge westbound New York Side (New York) to New Jersey Side (Elizabeth), Friday April 24th, 2026 thru Saturday April 25th, 2026, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed, Saturday April 25th, 2026 thru Sunday April 26th, 2026, 10:00 PM thru 05:00 AM 2 Right lanes and shoulder of 3 lanes closed","update_date":"2026-04-20T05:12:22Z"},"road_event_id":"AJekb7JyK3DlEGDOjZnG1KjRUnE=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189667,40.631588]]}},{"id":"xT1t/A58OW1m9fn3ito4+xnDvnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AJekb7JyK3DlEGDOjZnG1KjRUnE="}],"description":"Bridge construction on Goethals Bridge westbound New York Side (New York) to New Jersey Side (Elizabeth), Friday April 24th, 2026 thru Saturday April 25th, 2026, 10:00 PM thru 05:00 AM 1 Right lane and shoulder of 3 lanes closed, Saturday April 25th, 2026 thru Sunday April 26th, 2026, 10:00 PM thru 05:00 AM 2 Right lanes and shoulder of 3 lanes closed","update_date":"2026-04-20T05:12:22Z"},"road_event_id":"xT1t/A58OW1m9fn3ito4+xnDvnU=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189667,40.631588]]}},{"id":"i71eygtd9K7m4lbHACkPERNhCG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nAgWpsXgiNPakH0Sc+/3kSxKYRI="}],"description":"Construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:30 PM thru 05:30 AM 1 Left lane of 2 lanes closed","update_date":"2026-04-22T03:23:45Z"},"road_event_id":"i71eygtd9K7m4lbHACkPERNhCG8=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:30:00Z","end_date":"2026-04-23T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011,40.726198]]}},{"id":"nAgWpsXgiNPakH0Sc+/3kSxKYRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i71eygtd9K7m4lbHACkPERNhCG8="}],"description":"Construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:30 PM thru 05:30 AM 1 Left lane of 2 lanes closed","update_date":"2026-04-22T03:23:45Z"},"road_event_id":"nAgWpsXgiNPakH0Sc+/3kSxKYRI=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:30:00Z","end_date":"2026-04-24T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011,40.726198]]}},{"id":"sPIfH5UGfErcDeSYaMdE8lJ9pYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[],"description":"Construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Thursday, 11:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:17:08Z"},"road_event_id":"sPIfH5UGfErcDeSYaMdE8lJ9pYc=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.031671,40.72873]]}},{"id":"5s5g8ZXur3P31SsAchV4IgDZhuY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[],"description":"Construction on Holland Tunnel North Tube westbound New York Side (New York) to New Jersey Side (Jersey City), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 11:30 PM thru 05:30 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:15:35Z"},"road_event_id":"5s5g8ZXur3P31SsAchV4IgDZhuY=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.011035,40.726203]]}},{"id":"swo6R+8ZI7cBJRcBpiRbFPL/ht0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Holland Tunnel"],"direction":"unknown","related_road_events":[],"description":"Construction on Holland Tunnel South Tube eastbound New Jersey Side (Jersey City) to New York Side (Manhattan), Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T05:18:19Z"},"road_event_id":"swo6R+8ZI7cBJRcBpiRbFPL/ht0=","beginning_cross_street":"New Jersey Side","ending_cross_street":"New York Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.031604,40.728723]]}},{"id":"Yh4AVrWBfz1xuDOKxPkvPV6Mkpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hXThRsnlWOwkpla7TEmJAHvgpK8="}],"description":"Roadwork on NY 347 eastbound between Townline Road; Ramp (Smithtown) and Mount Pleasant Road (Smithtown), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:24:03Z"},"road_event_id":"Yh4AVrWBfz1xuDOKxPkvPV6Mkpk=","beginning_cross_street":"Townline Road; Ramp","ending_cross_street":"Mount Pleasant Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.209002,40.825335]]}},{"id":"hXThRsnlWOwkpla7TEmJAHvgpK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yh4AVrWBfz1xuDOKxPkvPV6Mkpk="},{"type":"next-occurrence","id":"QsJMlHH5O6EDEfVhi9oB3hlx8NY="}],"description":"Roadwork on NY 347 eastbound between Townline Road; Ramp (Smithtown) and Mount Pleasant Road (Smithtown), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:24:03Z"},"road_event_id":"hXThRsnlWOwkpla7TEmJAHvgpK8=","beginning_cross_street":"Townline Road; Ramp","ending_cross_street":"Mount Pleasant Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.209002,40.825335]]}},{"id":"QsJMlHH5O6EDEfVhi9oB3hlx8NY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 347"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Yh4AVrWBfz1xuDOKxPkvPV6Mkpk="}],"description":"Roadwork on NY 347 eastbound between Townline Road; Ramp (Smithtown) and Mount Pleasant Road (Smithtown), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:24:03Z"},"road_event_id":"QsJMlHH5O6EDEfVhi9oB3hlx8NY=","beginning_cross_street":"Townline Road; Ramp","ending_cross_street":"Mount Pleasant Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.209002,40.825335]]}},{"id":"RvvWsDNequP7AzZ3AvxirCCDd60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UqztR0JqH4sLA6xjKvEJUqjouns="}],"description":"Milling and repaving and roadwork and traffic signal repairs on NY 24 both directions between Munson Ave (Hempstead) and North Franklin Street (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:27:11Z"},"road_event_id":"RvvWsDNequP7AzZ3AvxirCCDd60=","beginning_cross_street":"Munson Ave","ending_cross_street":"North Franklin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.659223,40.705967]]}},{"id":"UqztR0JqH4sLA6xjKvEJUqjouns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RvvWsDNequP7AzZ3AvxirCCDd60="},{"type":"next-occurrence","id":"wKJZNrMCLRGLOKNLmPw77GWUYpE="}],"description":"Milling and repaving and roadwork and traffic signal repairs on NY 24 both directions between Munson Ave (Hempstead) and North Franklin Street (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:27:11Z"},"road_event_id":"UqztR0JqH4sLA6xjKvEJUqjouns=","beginning_cross_street":"Munson Ave","ending_cross_street":"North Franklin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.659223,40.705967]]}},{"id":"wKJZNrMCLRGLOKNLmPw77GWUYpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RvvWsDNequP7AzZ3AvxirCCDd60="}],"description":"Milling and repaving and roadwork and traffic signal repairs on NY 24 both directions between Munson Ave (Hempstead) and North Franklin Street (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:27:11Z"},"road_event_id":"wKJZNrMCLRGLOKNLmPw77GWUYpE=","beginning_cross_street":"Munson Ave","ending_cross_street":"North Franklin Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.659223,40.705967]]}},{"id":"IgmJTIr2RPVUZ6NuXdiPK+2OAcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a1zANtRmta2hc57UVksf/+A15VI="}],"description":"Milling and overnight roadwork and repaving and traffic signal repairs on NY 24 eastbound between Hendrickson Avenue (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:35:21Z"},"road_event_id":"IgmJTIr2RPVUZ6NuXdiPK+2OAcc=","beginning_cross_street":"Hendrickson Avenue","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.610717,40.711551]]}},{"id":"a1zANtRmta2hc57UVksf/+A15VI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IgmJTIr2RPVUZ6NuXdiPK+2OAcc="}],"description":"Milling and overnight roadwork and repaving and traffic signal repairs on NY 24 eastbound between Hendrickson Avenue (Hempstead) and Meadowbrook State Parkway (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:35:21Z"},"road_event_id":"a1zANtRmta2hc57UVksf/+A15VI=","beginning_cross_street":"Hendrickson Avenue","ending_cross_street":"Meadowbrook State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.610717,40.711551]]}},{"id":"VQMih4wUAzZyVkfB1DrYCwJiRgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sfSvKnbp2/3Oub5eD6j9p/fiaBc="}],"description":"Drainage improvements and roadwork on Wantagh State Parkway southbound between Exit W1 - Brush Hollow Road SB (North Hempstead) and Exit W2W - Old Country Road - Town of Hempstead Line (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 01:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:39:24Z"},"road_event_id":"VQMih4wUAzZyVkfB1DrYCwJiRgA=","beginning_cross_street":"Exit W1 - Brush Hollow Road SB","ending_cross_street":"Exit W2W - Old Country Road - Town of Hempstead Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.564568,40.770218]]}},{"id":"sfSvKnbp2/3Oub5eD6j9p/fiaBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQMih4wUAzZyVkfB1DrYCwJiRgA="},{"type":"next-occurrence","id":"QPi98A6rUC2I4ds7/xUGbQMSPX8="}],"description":"Drainage improvements and roadwork on Wantagh State Parkway southbound between Exit W1 - Brush Hollow Road SB (North Hempstead) and Exit W2W - Old Country Road - Town of Hempstead Line (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 01:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:39:24Z"},"road_event_id":"sfSvKnbp2/3Oub5eD6j9p/fiaBc=","beginning_cross_street":"Exit W1 - Brush Hollow Road SB","ending_cross_street":"Exit W2W - Old Country Road - Town of Hempstead Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.564568,40.770218]]}},{"id":"QPi98A6rUC2I4ds7/xUGbQMSPX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wantagh State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VQMih4wUAzZyVkfB1DrYCwJiRgA="}],"description":"Drainage improvements and roadwork on Wantagh State Parkway southbound between Exit W1 - Brush Hollow Road SB (North Hempstead) and Exit W2W - Old Country Road - Town of Hempstead Line (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 01:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T05:39:24Z"},"road_event_id":"QPi98A6rUC2I4ds7/xUGbQMSPX8=","beginning_cross_street":"Exit W1 - Brush Hollow Road SB","ending_cross_street":"Exit W2W - Old Country Road - Town of Hempstead Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.564568,40.770218]]}},{"id":"yuG1+zUsEevzZnLQWO4LPpAQ7b8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DP3hT6aj6yFWHKhIL6lZF+iTFSc="}],"description":"Milling and repaving and traffic signal repairs on SUNRISE HWY both directions between Nicolls Road (Islip) and Montauk Highway (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:57:47Z"},"road_event_id":"yuG1+zUsEevzZnLQWO4LPpAQ7b8=","beginning_cross_street":"Nicolls Road","ending_cross_street":"Montauk Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047958,40.771997]]}},{"id":"DP3hT6aj6yFWHKhIL6lZF+iTFSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yuG1+zUsEevzZnLQWO4LPpAQ7b8="},{"type":"next-occurrence","id":"Gt8LaTivZnwzuA0TCFEny0lhUUk="}],"description":"Milling and repaving and traffic signal repairs on SUNRISE HWY both directions between Nicolls Road (Islip) and Montauk Highway (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:57:47Z"},"road_event_id":"DP3hT6aj6yFWHKhIL6lZF+iTFSc=","beginning_cross_street":"Nicolls Road","ending_cross_street":"Montauk Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047958,40.771997]]}},{"id":"Gt8LaTivZnwzuA0TCFEny0lhUUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yuG1+zUsEevzZnLQWO4LPpAQ7b8="}],"description":"Milling and repaving and traffic signal repairs on SUNRISE HWY both directions between Nicolls Road (Islip) and Montauk Highway (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T05:57:47Z"},"road_event_id":"Gt8LaTivZnwzuA0TCFEny0lhUUk=","beginning_cross_street":"Nicolls Road","ending_cross_street":"Montauk Highway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.047958,40.771997]]}},{"id":"pPCO+We2ar/RSSTjjxl+x1OkKlk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"00+hFZ0AoCmr36+hORrgR0e0EU8="}],"description":"Milling and repaving and traffic signal repairs on NY 25 both directions between Parker Road (Riverhead) and Splish Splash Drive (Riverhead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:06:32Z"},"road_event_id":"pPCO+We2ar/RSSTjjxl+x1OkKlk=","beginning_cross_street":"Parker Road","ending_cross_street":"Splish Splash Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.791117,40.927667]]}},{"id":"00+hFZ0AoCmr36+hORrgR0e0EU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPCO+We2ar/RSSTjjxl+x1OkKlk="},{"type":"next-occurrence","id":"Zo1VlvVNlhIye80s7IkJONBwqO4="}],"description":"Milling and repaving and traffic signal repairs on NY 25 both directions between Parker Road (Riverhead) and Splish Splash Drive (Riverhead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:06:32Z"},"road_event_id":"00+hFZ0AoCmr36+hORrgR0e0EU8=","beginning_cross_street":"Parker Road","ending_cross_street":"Splish Splash Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.791117,40.927667]]}},{"id":"Zo1VlvVNlhIye80s7IkJONBwqO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pPCO+We2ar/RSSTjjxl+x1OkKlk="}],"description":"Milling and repaving and traffic signal repairs on NY 25 both directions between Parker Road (Riverhead) and Splish Splash Drive (Riverhead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:06:32Z"},"road_event_id":"Zo1VlvVNlhIye80s7IkJONBwqO4=","beginning_cross_street":"Parker Road","ending_cross_street":"Splish Splash Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.791117,40.927667]]}},{"id":"k2um8MEYYF0A3CyEwNzL+ETGspw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LYE2GGSkYBc+uE7yNO18K74bvIk="}],"description":"Milling and overnight roadwork and repaving and traffic signal repairs on NY 25 both directions between Parker Road (Riverhead) and Edwards Avenue (Riverhead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T06:09:53Z"},"road_event_id":"k2um8MEYYF0A3CyEwNzL+ETGspw=","beginning_cross_street":"Parker Road","ending_cross_street":"Edwards Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.791163,40.927662]]}},{"id":"LYE2GGSkYBc+uE7yNO18K74bvIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k2um8MEYYF0A3CyEwNzL+ETGspw="}],"description":"Milling and overnight roadwork and repaving and traffic signal repairs on NY 25 both directions between Parker Road (Riverhead) and Edwards Avenue (Riverhead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T06:09:53Z"},"road_event_id":"LYE2GGSkYBc+uE7yNO18K74bvIk=","beginning_cross_street":"Parker Road","ending_cross_street":"Edwards Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.791163,40.927662]]}},{"id":"mlS3xJSe6yuJEqFfupmdPO7Fab8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CoOvhG7/rZK8ouhKN5PCst5jOaE="}],"description":"Milling and overnight roadwork and repaving and traffic signal repairs on SUNRISE HWY eastbound between Montauk Highway (Islip) and OAKDALE BOHEMIA RD (Islip), Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T06:11:34Z"},"road_event_id":"mlS3xJSe6yuJEqFfupmdPO7Fab8=","beginning_cross_street":"Montauk Highway","ending_cross_street":"OAKDALE BOHEMIA RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.143411,40.748171]]}},{"id":"CoOvhG7/rZK8ouhKN5PCst5jOaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["SUNRISE HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mlS3xJSe6yuJEqFfupmdPO7Fab8="}],"description":"Milling and overnight roadwork and repaving and traffic signal repairs on SUNRISE HWY eastbound between Montauk Highway (Islip) and OAKDALE BOHEMIA RD (Islip), Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T06:11:34Z"},"road_event_id":"CoOvhG7/rZK8ouhKN5PCst5jOaE=","beginning_cross_street":"Montauk Highway","ending_cross_street":"OAKDALE BOHEMIA RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.143411,40.748171]]}},{"id":"NldCGnrMaLXE88dOHvzOs+3Ylx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xAfX/WbbAJIiifNK1Vm9JnSQNYw="}],"description":"Drainage improvements and milling and overnight roadwork and utility work on Northern State Parkway eastbound between Exit 36A - NY 135 (Oyster Bay) and Exit 37A - Long Island Expressway (Oyster Bay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-20T06:14:02Z"},"road_event_id":"NldCGnrMaLXE88dOHvzOs+3Ylx8=","beginning_cross_street":"Exit 36A - NY 135","ending_cross_street":"Exit 37A - Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.48824,40.795047]]}},{"id":"xAfX/WbbAJIiifNK1Vm9JnSQNYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NldCGnrMaLXE88dOHvzOs+3Ylx8="}],"description":"Drainage improvements and milling and overnight roadwork and utility work on Northern State Parkway eastbound between Exit 36A - NY 135 (Oyster Bay) and Exit 37A - Long Island Expressway (Oyster Bay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-20T06:14:02Z"},"road_event_id":"xAfX/WbbAJIiifNK1Vm9JnSQNYw=","beginning_cross_street":"Exit 36A - NY 135","ending_cross_street":"Exit 37A - Long Island Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.48824,40.795047]]}},{"id":"vOIvd58Z5kG5nJEQNdsdiCqlkAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 112"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zjLnvniDu1T7DHdVNzUp+ki5TD8="}],"description":"Overnight roadwork on NY 112 both directions between NY 27 North Service Road (Brookhaven) and Middle Country Road; Ramp (Brookhaven), Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:19:14Z"},"road_event_id":"vOIvd58Z5kG5nJEQNdsdiCqlkAw=","beginning_cross_street":"NY 27 North Service Road","ending_cross_street":"Middle Country Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.008277,40.780099]]}},{"id":"zjLnvniDu1T7DHdVNzUp+ki5TD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 112"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vOIvd58Z5kG5nJEQNdsdiCqlkAw="}],"description":"Overnight roadwork on NY 112 both directions between NY 27 North Service Road (Brookhaven) and Middle Country Road; Ramp (Brookhaven), Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:19:14Z"},"road_event_id":"zjLnvniDu1T7DHdVNzUp+ki5TD8=","beginning_cross_street":"NY 27 North Service Road","ending_cross_street":"Middle Country Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.008277,40.780099]]}},{"id":"Ji2LOyoscsO0/DJUAQPSBDrGIbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ihspa813+E3fPC1UcmyV9KfeWuk="}],"description":"Roadwork and traffic signal repairs on NY 25A westbound at Beach Street; Brook Road (Port Jefferson), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:21:03Z"},"road_event_id":"Ji2LOyoscsO0/DJUAQPSBDrGIbQ=","beginning_cross_street":"Beach Street; Brook Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.073592,40.944717]]}},{"id":"Ihspa813+E3fPC1UcmyV9KfeWuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ji2LOyoscsO0/DJUAQPSBDrGIbQ="},{"type":"next-occurrence","id":"qJ8sOTFOAEi78TfS31I3z5zSwjs="}],"description":"Roadwork and traffic signal repairs on NY 25A westbound at Beach Street; Brook Road (Port Jefferson), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:21:03Z"},"road_event_id":"Ihspa813+E3fPC1UcmyV9KfeWuk=","beginning_cross_street":"Beach Street; Brook Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.073592,40.944717]]}},{"id":"qJ8sOTFOAEi78TfS31I3z5zSwjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ji2LOyoscsO0/DJUAQPSBDrGIbQ="}],"description":"Roadwork and traffic signal repairs on NY 25A westbound at Beach Street; Brook Road (Port Jefferson), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:21:03Z"},"road_event_id":"qJ8sOTFOAEi78TfS31I3z5zSwjs=","beginning_cross_street":"Beach Street; Brook Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.073592,40.944717]]}},{"id":"UPsk/lddu8mxIWgBTYlOddQth5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"y1o3aUffZ+FqbYcKt/wb/9cE2UM="}],"description":"Roadwork and traffic signal repairs on NY 25A westbound at Mankamah Road (Huntington), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-20T06:22:30Z"},"road_event_id":"UPsk/lddu8mxIWgBTYlOddQth5Y=","beginning_cross_street":"Mankamah Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.313584,40.909242]]}},{"id":"y1o3aUffZ+FqbYcKt/wb/9cE2UM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UPsk/lddu8mxIWgBTYlOddQth5Y="},{"type":"next-occurrence","id":"izIg7rXqvpsAbpN9rzC5Wh03Vwc="}],"description":"Roadwork and traffic signal repairs on NY 25A westbound at Mankamah Road (Huntington), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-20T06:22:30Z"},"road_event_id":"y1o3aUffZ+FqbYcKt/wb/9cE2UM=","beginning_cross_street":"Mankamah Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.313584,40.909242]]}},{"id":"izIg7rXqvpsAbpN9rzC5Wh03Vwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UPsk/lddu8mxIWgBTYlOddQth5Y="}],"description":"Roadwork and traffic signal repairs on NY 25A westbound at Mankamah Road (Huntington), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-20T06:22:30Z"},"road_event_id":"izIg7rXqvpsAbpN9rzC5Wh03Vwc=","beginning_cross_street":"Mankamah Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.313584,40.909242]]}},{"id":"xAykyp9qLjndJjX5b6xpUEflBfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 101"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"89pfAY89XCGyw9ijsO87HGGAVK0="}],"description":"Roadwork and traffic signal repairs on NY 101 southbound at Willowdale Avenue (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:23:19Z"},"road_event_id":"xAykyp9qLjndJjX5b6xpUEflBfA=","beginning_cross_street":"Willowdale Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682796,40.825585]]}},{"id":"89pfAY89XCGyw9ijsO87HGGAVK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAykyp9qLjndJjX5b6xpUEflBfA="},{"type":"next-occurrence","id":"dwPXY1SX7NtlKZM/NmNzy3F0k4c="}],"description":"Roadwork and traffic signal repairs on NY 101 southbound at Willowdale Avenue (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:23:19Z"},"road_event_id":"89pfAY89XCGyw9ijsO87HGGAVK0=","beginning_cross_street":"Willowdale Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682796,40.825585]]}},{"id":"dwPXY1SX7NtlKZM/NmNzy3F0k4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xAykyp9qLjndJjX5b6xpUEflBfA="}],"description":"Roadwork and traffic signal repairs on NY 101 southbound at Willowdale Avenue (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:23:19Z"},"road_event_id":"dwPXY1SX7NtlKZM/NmNzy3F0k4c=","beginning_cross_street":"Willowdale Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682796,40.825585]]}},{"id":"azBn86XXwLzg/YyE6859kheMh58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"koGmbg2t72w20PKv8ZlEqfPk940="}],"description":"Roadwork and traffic signal repairs on NY 24 eastbound at Front Street (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T06:27:27Z"},"road_event_id":"azBn86XXwLzg/YyE6859kheMh58=","beginning_cross_street":"Front Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.559277,40.72475]]}},{"id":"koGmbg2t72w20PKv8ZlEqfPk940=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"azBn86XXwLzg/YyE6859kheMh58="},{"type":"next-occurrence","id":"TM9rLLg9ArorUw5IsEtx3k+eyEI="}],"description":"Roadwork and traffic signal repairs on NY 24 eastbound at Front Street (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T06:27:27Z"},"road_event_id":"koGmbg2t72w20PKv8ZlEqfPk940=","beginning_cross_street":"Front Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.559277,40.72475]]}},{"id":"TM9rLLg9ArorUw5IsEtx3k+eyEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 24"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"azBn86XXwLzg/YyE6859kheMh58="}],"description":"Roadwork and traffic signal repairs on NY 24 eastbound at Front Street (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T06:27:27Z"},"road_event_id":"TM9rLLg9ArorUw5IsEtx3k+eyEI=","beginning_cross_street":"Front Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.559277,40.72475]]}},{"id":"Za9oCJAd6UVVfDGMu2dtFBQf7m4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 101"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rx++h8zG5sF8E0kGAP46QL0DtIg="}],"description":"Roadwork and traffic signal repairs on NY 101 southbound at Fairview Avenue (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:30:17Z"},"road_event_id":"Za9oCJAd6UVVfDGMu2dtFBQf7m4=","beginning_cross_street":"Fairview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682539,40.824661]]}},{"id":"rx++h8zG5sF8E0kGAP46QL0DtIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Za9oCJAd6UVVfDGMu2dtFBQf7m4="},{"type":"next-occurrence","id":"j6KfgvpKJ9E8Xd+Ebb7a/ZyTqPk="}],"description":"Roadwork and traffic signal repairs on NY 101 southbound at Fairview Avenue (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:30:17Z"},"road_event_id":"rx++h8zG5sF8E0kGAP46QL0DtIg=","beginning_cross_street":"Fairview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682539,40.824661]]}},{"id":"j6KfgvpKJ9E8Xd+Ebb7a/ZyTqPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 101"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Za9oCJAd6UVVfDGMu2dtFBQf7m4="}],"description":"Roadwork and traffic signal repairs on NY 101 southbound at Fairview Avenue (North Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:30:17Z"},"road_event_id":"j6KfgvpKJ9E8Xd+Ebb7a/ZyTqPk=","beginning_cross_street":"Fairview Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682539,40.824661]]}},{"id":"Tv6WMCEesapqc8hu+/muYQifaHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8IcB1jHIh09Q/5QXBdTkgIc+6Co="}],"description":"Overnight roadwork on NY 25 both directions between NY 112 (Brookhaven) and END ROUTE 25; Orient Point (Southold), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:32:54Z"},"road_event_id":"Tv6WMCEesapqc8hu+/muYQifaHI=","beginning_cross_street":"NY 112","ending_cross_street":"END ROUTE 25; Orient Point","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.001331,40.868715]]}},{"id":"8IcB1jHIh09Q/5QXBdTkgIc+6Co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tv6WMCEesapqc8hu+/muYQifaHI="}],"description":"Overnight roadwork on NY 25 both directions between NY 112 (Brookhaven) and END ROUTE 25; Orient Point (Southold), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 05:30 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:32:54Z"},"road_event_id":"8IcB1jHIh09Q/5QXBdTkgIc+6Co=","beginning_cross_street":"NY 112","ending_cross_street":"END ROUTE 25; Orient Point","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.001331,40.868715]]}},{"id":"3dWPiTEqkhxxqOkEi4rNCjwdfao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Meadowbrook State Parkway southbound between Exit M2 - Zeckendorf Boulevard (Hempstead) and Merchants Concourse (Hempstead), Wednesday April 22nd, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T06:36:34Z"},"road_event_id":"3dWPiTEqkhxxqOkEi4rNCjwdfao=","beginning_cross_street":"Exit M2 - Zeckendorf Boulevard","ending_cross_street":"Merchants Concourse ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.60809,40.737655]]}},{"id":"J/rNwE6zKCJkOBFophxA0S/dNxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 878 both directions between Rock Hall Road (Hempstead) and Exit - Seagirt Boulevard (Lawrence), Thursday April 23rd, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:40:53Z"},"road_event_id":"J/rNwE6zKCJkOBFophxA0S/dNxg=","beginning_cross_street":"Rock Hall Road","ending_cross_street":"Exit   - Seagirt Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.739525,40.605786]]}},{"id":"B7xYvua2KlNoXTgIfYrxDaioOkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Meadowbrook State Parkway both directions between Jerusalem Ave (Hempstead) and Exit M9W -Merrick Road (Hempstead), Friday April 24th, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T06:41:57Z"},"road_event_id":"B7xYvua2KlNoXTgIfYrxDaioOkM=","beginning_cross_street":"Jerusalem Ave","ending_cross_street":"Exit M9W -Merrick Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.576123,40.694573]]}},{"id":"InKaI/eV44Wp75EbOkPCUjlTTkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i8HWkB2NfgqdLwrH2C3sI5gVqqU="}],"description":"Installation of sign structure and roadwork on NY 27A westbound between Mowbray Place (Islip) and Gibson Street (Islip), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:43:51Z"},"road_event_id":"InKaI/eV44Wp75EbOkPCUjlTTkE=","beginning_cross_street":"Mowbray Place","ending_cross_street":"Gibson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.240737,40.724892]]}},{"id":"i8HWkB2NfgqdLwrH2C3sI5gVqqU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"InKaI/eV44Wp75EbOkPCUjlTTkE="},{"type":"next-occurrence","id":"yvnQmlmvwnsOZuM2v/Auuyjuork="}],"description":"Installation of sign structure and roadwork on NY 27A westbound between Mowbray Place (Islip) and Gibson Street (Islip), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:43:51Z"},"road_event_id":"i8HWkB2NfgqdLwrH2C3sI5gVqqU=","beginning_cross_street":"Mowbray Place","ending_cross_street":"Gibson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.240737,40.724892]]}},{"id":"yvnQmlmvwnsOZuM2v/Auuyjuork=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"InKaI/eV44Wp75EbOkPCUjlTTkE="}],"description":"Installation of sign structure and roadwork on NY 27A westbound between Mowbray Place (Islip) and Gibson Street (Islip), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:43:51Z"},"road_event_id":"yvnQmlmvwnsOZuM2v/Auuyjuork=","beginning_cross_street":"Mowbray Place","ending_cross_street":"Gibson Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.240737,40.724892]]}},{"id":"KU5VKJYO+o7A61SP0wa+1AaNReg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"U4bcVQWBiW3EL2e330VgDMrWnUM="}],"description":"Overnight roadwork and utility work on NY 110 both directions between RailRoad Street; Broadway (Huntington) and 23rd Street; New York Avenue (Huntington), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:50:15Z"},"road_event_id":"KU5VKJYO+o7A61SP0wa+1AaNReg=","beginning_cross_street":"RailRoad Street; Broadway","ending_cross_street":"23rd Street; New York Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411733,40.853464]]}},{"id":"U4bcVQWBiW3EL2e330VgDMrWnUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KU5VKJYO+o7A61SP0wa+1AaNReg="}],"description":"Overnight roadwork and utility work on NY 110 both directions between RailRoad Street; Broadway (Huntington) and 23rd Street; New York Avenue (Huntington), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:50:15Z"},"road_event_id":"U4bcVQWBiW3EL2e330VgDMrWnUM=","beginning_cross_street":"RailRoad Street; Broadway","ending_cross_street":"23rd Street; New York Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.411733,40.853464]]}},{"id":"yMJP/RwcKGEfzTwhUbbRGICDQPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD POWERHOUSE RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5OzOFj1a5j6NFC/8JJ4kVNZ4qtE="}],"description":"Roadwork and utility work on OLD POWERHOUSE RD westbound between JEFFERSON AVE (North Hempstead) and N SERVICE RD at Bates Road (Lake Success), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:52:23Z"},"road_event_id":"yMJP/RwcKGEfzTwhUbbRGICDQPQ=","beginning_cross_street":"JEFFERSON AVE","ending_cross_street":"Bates Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.646473,40.785295]]}},{"id":"5OzOFj1a5j6NFC/8JJ4kVNZ4qtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD POWERHOUSE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMJP/RwcKGEfzTwhUbbRGICDQPQ="},{"type":"next-occurrence","id":"VDKmzTot3A/wSSP/vnYoMjgo/uM="}],"description":"Roadwork and utility work on OLD POWERHOUSE RD westbound between JEFFERSON AVE (North Hempstead) and N SERVICE RD at Bates Road (Lake Success), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:52:23Z"},"road_event_id":"5OzOFj1a5j6NFC/8JJ4kVNZ4qtE=","beginning_cross_street":"JEFFERSON AVE","ending_cross_street":"Bates Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.646473,40.785295]]}},{"id":"VDKmzTot3A/wSSP/vnYoMjgo/uM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLD POWERHOUSE RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yMJP/RwcKGEfzTwhUbbRGICDQPQ="}],"description":"Roadwork and utility work on OLD POWERHOUSE RD westbound between JEFFERSON AVE (North Hempstead) and N SERVICE RD at Bates Road (Lake Success), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:52:23Z"},"road_event_id":"VDKmzTot3A/wSSP/vnYoMjgo/uM=","beginning_cross_street":"JEFFERSON AVE","ending_cross_street":"Bates Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.646473,40.785295]]}},{"id":"HgnbGsk866Z+seXSbXipQHifKks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 25A"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork and utility work on NY 25A eastbound between Hillside Ave (Huntington) and Prime Avenue; Spring Road (Huntington), Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday, 10:00 PM thru 06:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:55:15Z"},"road_event_id":"HgnbGsk866Z+seXSbXipQHifKks=","beginning_cross_street":"Hillside Ave","ending_cross_street":"Prime Avenue; Spring Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.433852,40.869512]]}},{"id":"C4TU3nssmT+UyGw9oS28uq+sHTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 107"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oYJKW5cqHo/FIGE7qjJWSRdyz8s="}],"description":"Roadwork and utility work on NY 107 northbound between Willoughby Avenue (Oyster Bay) and NY 106 at Bethpage Road; Dawson Lane (Oyster Bay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:58:51Z"},"road_event_id":"C4TU3nssmT+UyGw9oS28uq+sHTE=","beginning_cross_street":"Willoughby Avenue","ending_cross_street":"Bethpage Road; Dawson Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.52687,40.771425]]}},{"id":"oYJKW5cqHo/FIGE7qjJWSRdyz8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 107"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C4TU3nssmT+UyGw9oS28uq+sHTE="},{"type":"next-occurrence","id":"Xlv2SsoDa228wJ/Qtt6IbR9gsTw="}],"description":"Roadwork and utility work on NY 107 northbound between Willoughby Avenue (Oyster Bay) and NY 106 at Bethpage Road; Dawson Lane (Oyster Bay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:58:51Z"},"road_event_id":"oYJKW5cqHo/FIGE7qjJWSRdyz8s=","beginning_cross_street":"Willoughby Avenue","ending_cross_street":"Bethpage Road; Dawson Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.52687,40.771425]]}},{"id":"Xlv2SsoDa228wJ/Qtt6IbR9gsTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 107"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"C4TU3nssmT+UyGw9oS28uq+sHTE="}],"description":"Roadwork and utility work on NY 107 northbound between Willoughby Avenue (Oyster Bay) and NY 106 at Bethpage Road; Dawson Lane (Oyster Bay), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T06:58:51Z"},"road_event_id":"Xlv2SsoDa228wJ/Qtt6IbR9gsTw=","beginning_cross_street":"Willoughby Avenue","ending_cross_street":"Bethpage Road; Dawson Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.52687,40.771425]]}},{"id":"z97H2OCbHY1fXJ5aqoGxzicPogM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAUK HWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"F1LdVjyA7l+12tj89kpGKNiAIxc="}],"description":"Overnight roadwork and utility work on MONTAUK HWY both directions between SCOTCH MIST LN (Southampton) and DELLARIA DR (Southampton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T07:00:36Z"},"road_event_id":"z97H2OCbHY1fXJ5aqoGxzicPogM=","beginning_cross_street":"SCOTCH MIST LN","ending_cross_street":"DELLARIA DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.448195,40.885517]]}},{"id":"F1LdVjyA7l+12tj89kpGKNiAIxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MONTAUK HWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z97H2OCbHY1fXJ5aqoGxzicPogM="}],"description":"Overnight roadwork and utility work on MONTAUK HWY both directions between SCOTCH MIST LN (Southampton) and DELLARIA DR (Southampton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T07:00:36Z"},"road_event_id":"F1LdVjyA7l+12tj89kpGKNiAIxc=","beginning_cross_street":"SCOTCH MIST LN","ending_cross_street":"DELLARIA DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.448195,40.885517]]}},{"id":"IyOqZC90Ch/PKRy49Zvx9wrMm8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m5XqjW1K+HJH1UewLigMsmTrUWw="}],"description":"Bridge work and installation of sign structure and repaving on Meadowbrook State Parkway northbound between Exit M5 - NY 24 East; Hempstead Turnpike (Hempstead) and Charles Lindbergh Blvd (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T07:02:43Z"},"road_event_id":"IyOqZC90Ch/PKRy49Zvx9wrMm8Q=","beginning_cross_street":"Exit M5 - NY 24 East; Hempstead Turnpike","ending_cross_street":"Charles Lindbergh Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.58035,40.722464]]}},{"id":"m5XqjW1K+HJH1UewLigMsmTrUWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyOqZC90Ch/PKRy49Zvx9wrMm8Q="},{"type":"next-occurrence","id":"cciCgcBggdL88VCLRSDWPnU9UVY="}],"description":"Bridge work and installation of sign structure and repaving on Meadowbrook State Parkway northbound between Exit M5 - NY 24 East; Hempstead Turnpike (Hempstead) and Charles Lindbergh Blvd (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T07:02:43Z"},"road_event_id":"m5XqjW1K+HJH1UewLigMsmTrUWw=","beginning_cross_street":"Exit M5 - NY 24 East; Hempstead Turnpike","ending_cross_street":"Charles Lindbergh Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.58035,40.722464]]}},{"id":"cciCgcBggdL88VCLRSDWPnU9UVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IyOqZC90Ch/PKRy49Zvx9wrMm8Q="}],"description":"Bridge work and installation of sign structure and repaving on Meadowbrook State Parkway northbound between Exit M5 - NY 24 East; Hempstead Turnpike (Hempstead) and Charles Lindbergh Blvd (Hempstead), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-20T07:02:43Z"},"road_event_id":"cciCgcBggdL88VCLRSDWPnU9UVY=","beginning_cross_street":"Exit M5 - NY 24 East; Hempstead Turnpike","ending_cross_street":"Charles Lindbergh Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.58035,40.722464]]}},{"id":"JC0MFbUJ5nwO+c9soNXouGH4s9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Meadowbrook State Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge work and installation of sign structure and repaving on Meadowbrook State Parkway northbound at Charles Lindbergh Blvd (Hempstead), Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 12:00 AM thru 11:59 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T07:03:54Z"},"road_event_id":"JC0MFbUJ5nwO+c9soNXouGH4s9c=","beginning_cross_street":"Charles Lindbergh Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.580972,40.729518]]}},{"id":"3N7y5Bq+qeab4kUQmvFiZEaQmGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 454"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i5JSzUe+iYBHb1S5c3weXxx/Ci8="}],"description":"Overnight roadwork on NY 454 both directions between Johnson Avenue; CR 112 (Islip) and Broadway Avenue (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-04-20T07:05:30Z"},"road_event_id":"3N7y5Bq+qeab4kUQmvFiZEaQmGs=","beginning_cross_street":"Johnson Avenue; CR 112","ending_cross_street":"Broadway Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.097954,40.782403]]}},{"id":"i5JSzUe+iYBHb1S5c3weXxx/Ci8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 454"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3N7y5Bq+qeab4kUQmvFiZEaQmGs="}],"description":"Overnight roadwork on NY 454 both directions between Johnson Avenue; CR 112 (Islip) and Broadway Avenue (Islip), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 PM thru 05:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-04-20T07:05:30Z"},"road_event_id":"i5JSzUe+iYBHb1S5c3weXxx/Ci8=","beginning_cross_street":"Johnson Avenue; CR 112","ending_cross_street":"Broadway Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.097954,40.782403]]}},{"id":"n1mvY2yViw9CKBZDX/+hHNZaK0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 27 westbound between Exit 39 - Hubbards Lane (Babylon) and Exit 38 - Little East Neck Road (Babylon), Wednesday April 22nd, 2026, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T07:09:43Z"},"road_event_id":"n1mvY2yViw9CKBZDX/+hHNZaK0E=","beginning_cross_street":"Exit 39 - Hubbards Lane","ending_cross_street":"Exit 38 - Little East Neck Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.338908,40.71391]]}},{"id":"sxZ+1kA5+5sE4Kl5Nhru9kDupnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Northern State Parkway"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on Northern State Parkway eastbound at Exit 30 - I U Willets Road (North Hempstead), Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:00 PM thru 04:00 AM 2 Right lanes of 4 lanes closed","update_date":"2026-04-20T07:11:03Z"},"road_event_id":"sxZ+1kA5+5sE4Kl5Nhru9kDupnE=","beginning_cross_street":"Exit 30 - I U Willets Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.625756,40.772046]]}},{"id":"DbLWcYfXWl+rt5NUUyR33WA3T5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Southern State Parkway"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on Southern State Parkway eastbound between Exit 27S - Wantagh State Parkway (Hempstead) and Exit 28N - Wantagh Avenue (Hempstead), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 11:00 PM thru 03:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T07:16:42Z"},"road_event_id":"DbLWcYfXWl+rt5NUUyR33WA3T5s=","beginning_cross_street":"Exit 27S - Wantagh State Parkway","ending_cross_street":"Exit 28N - Wantagh Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.520648,40.698517]]}},{"id":"4qU/J8FlbX5kWw48XGmAZ7rM/Yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 110"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on NY 110 northbound between Excecutive Boulevard; Del Drive (Babylon) and Route 109; Ramp (Babylon), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 10:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed","update_date":"2026-04-20T07:18:51Z"},"road_event_id":"4qU/J8FlbX5kWw48XGmAZ7rM/Yc=","beginning_cross_street":"Excecutive Boulevard; Del Drive","ending_cross_street":"Route 109; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.426038,40.718473]]}},{"id":"Gl+ICW0Y9TdeqQR0j5UNZZbx5Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 27 westbound between Third Ave (Islip) and Howells Road (Brightwaters), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 01:00 AM 2 Left lanes of 3 lanes closed","update_date":"2026-04-20T07:24:44Z"},"road_event_id":"Gl+ICW0Y9TdeqQR0j5UNZZbx5Dw=","beginning_cross_street":"Third Ave","ending_cross_street":"Howells Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.256397,40.734046]]}},{"id":"+kKxaBrLgMtjXtLnwpq/uR0Pr2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on NY 27 eastbound between Exit 42 - Manor Lane (Islip) and Howells Road (Brightwaters), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 PM thru 01:30 AM 2 Left lanes of 3 lanes closed","update_date":"2026-04-20T07:27:16Z"},"road_event_id":"+kKxaBrLgMtjXtLnwpq/uR0Pr2o=","beginning_cross_street":"Exit 42 - Manor Lane","ending_cross_street":"Howells Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.280044,40.729062]]}},{"id":"UdZL9waGOdd1L4suwF4Tvy6X/5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements and utility work on Cross County Parkway both directions between Exit 8 - NY 22 (Mount Vernon) and Exit 9 - Hutchinson River Parkway (Mount Vernon) 202608346630/32731109 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 09:30 AM thru 11:00 AM, shoulder closure","update_date":"2026-04-20T10:10:20Z"},"road_event_id":"UdZL9waGOdd1L4suwF4Tvy6X/5U=","beginning_cross_street":"Exit 8 - NY 22","ending_cross_street":"Exit 9 - Hutchinson River Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T00:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825722,40.924155]]}},{"id":"J1C7LoiwL6CROt2f0b0O+SPuRPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on US 6 westbound between Hill Blvd (Yorktown) and Taconic State Parkway (Yorktown) Res 8-8 RW/29399309 - This is a moving operation. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 08:00 PM thru 11:30 PM, right lane closure","update_date":"2026-04-20T10:42:19Z"},"road_event_id":"J1C7LoiwL6CROt2f0b0O+SPuRPA=","beginning_cross_street":"Hill Blvd","ending_cross_street":"Taconic State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-24T23:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.769571,41.337784]]}},{"id":"DBCueqlckP3CjxCjYtOMA6aXazw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on Sprain Brook State Pkwy both directions between I-287 (Greenburgh) and NY 100 (Mount Pleasant) D042080/32728409 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 23rd, 2026, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-20T11:25:09Z"},"road_event_id":"DBCueqlckP3CjxCjYtOMA6aXazw=","beginning_cross_street":"I-287","ending_cross_street":"NY 100","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809157,41.057966]]}},{"id":"RwIaU37x2YUtthm6J1w+t+lulXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 980P - South Street"],"direction":"unknown","related_road_events":[],"description":"Road rehabilitation on NY 980P - South Street both directions between Johnston Street (Newburgh) and Lander Street (Newburgh) 2025082446198/32720009 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 27th, 2026, 09:00 AM thru 03:00 PM, all lanes closed and detoured","update_date":"2026-04-20T13:04:41Z"},"road_event_id":"RwIaU37x2YUtthm6J1w+t+lulXU=","beginning_cross_street":"Johnston Street","ending_cross_street":"Lander Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013023,41.506968]]}},{"id":"3+dcWl3oIF+VjZGZTKxti0rfsdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QqVQeHNoW8itCNl50iLoESzkfOI="}],"description":"Water main work on I-684 both directions between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Exit 3 S/N - NY 22 (North Castle) 202408111677-112132/32585009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Saturday April 25th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-20T13:39:14Z"},"road_event_id":"3+dcWl3oIF+VjZGZTKxti0rfsdg=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Exit 3 S/N - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718169,41.078213]]}},{"id":"QqVQeHNoW8itCNl50iLoESzkfOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3+dcWl3oIF+VjZGZTKxti0rfsdg="},{"type":"next-occurrence","id":"9cOzv1USq4LZkzlkUqGU+lFXrGc="}],"description":"Water main work on I-684 both directions between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Exit 3 S/N - NY 22 (North Castle) 202408111677-112132/32585009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Saturday April 25th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-20T13:39:14Z"},"road_event_id":"QqVQeHNoW8itCNl50iLoESzkfOI=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Exit 3 S/N - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718169,41.078213]]}},{"id":"9cOzv1USq4LZkzlkUqGU+lFXrGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3+dcWl3oIF+VjZGZTKxti0rfsdg="}],"description":"Water main work on I-684 both directions between Exit 2 - NY 120 - Westchester County Airport (North Castle) and Exit 3 S/N - NY 22 (North Castle) 202408111677-112132/32585009 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday April 21st, 2026 thru Saturday April 25th, 2026 Tuesday/ Wednesday/ Thursday/ Friday, 10:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-20T13:39:14Z"},"road_event_id":"9cOzv1USq4LZkzlkUqGU+lFXrGc=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"Exit 3 S/N - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.718169,41.078213]]}},{"id":"Rp0T74aHC7kAKz5MSBlvexyPd90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Howard Beach Route"],"direction":"unknown","related_road_events":[],"description":"Due to Repairs both directions, Howard Beach Route between Howard Beach-Station A (New York) and Terminal 1 (New York) service will be suspended and free shuttle bus service will be provided from Howard Beach, Lefferts Boulevard and Federal Circle Ground Levels to all Airline Terminals, Tuesday April 28th, 2026 thru Wednesday April 29th, 2026, 11:00 PM thru 06:00 AM","update_date":"2026-04-20T15:22:03Z"},"road_event_id":"Rp0T74aHC7kAKz5MSBlvexyPd90=","beginning_cross_street":"Howard Beach-Station A","ending_cross_street":"Terminal 1","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.829638,40.661051]]}},{"id":"Vo2xstZXtgl/unx1u47P3AOKBuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rrRzH/2dbD2tYrQeP8Dp5ALx438="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"Vo2xstZXtgl/unx1u47P3AOKBuQ=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"rrRzH/2dbD2tYrQeP8Dp5ALx438=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vo2xstZXtgl/unx1u47P3AOKBuQ="},{"type":"next-occurrence","id":"2kaMK7nUeix71KoKSIDBGJI8bFI="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"rrRzH/2dbD2tYrQeP8Dp5ALx438=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"2kaMK7nUeix71KoKSIDBGJI8bFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vo2xstZXtgl/unx1u47P3AOKBuQ="},{"type":"next-occurrence","id":"C0gf89TmbNOozrTCEDOXKlxnxYI="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"2kaMK7nUeix71KoKSIDBGJI8bFI=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"C0gf89TmbNOozrTCEDOXKlxnxYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vo2xstZXtgl/unx1u47P3AOKBuQ="},{"type":"next-occurrence","id":"pFHkHv2fdHHFh7tCth1TEN1B3vg="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"C0gf89TmbNOozrTCEDOXKlxnxYI=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"pFHkHv2fdHHFh7tCth1TEN1B3vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vo2xstZXtgl/unx1u47P3AOKBuQ="},{"type":"next-occurrence","id":"XplXKpeWhed5T8rHNS48UJB1+xI="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"pFHkHv2fdHHFh7tCth1TEN1B3vg=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"XplXKpeWhed5T8rHNS48UJB1+xI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vo2xstZXtgl/unx1u47P3AOKBuQ="},{"type":"next-occurrence","id":"LTO/R7ey6sfe7R2hlymYMuDvKDg="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"XplXKpeWhed5T8rHNS48UJB1+xI=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"LTO/R7ey6sfe7R2hlymYMuDvKDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vo2xstZXtgl/unx1u47P3AOKBuQ="},{"type":"next-occurrence","id":"nL6ZnZS3aURBXNhV1wZdHSpLTUA="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"LTO/R7ey6sfe7R2hlymYMuDvKDg=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"nL6ZnZS3aURBXNhV1wZdHSpLTUA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Vo2xstZXtgl/unx1u47P3AOKBuQ="}],"description":"Bridge maintenance operations on I-684 southbound between Exit 8 - Hardscrabble Road (North Salem) and Exit 7 - NY-116 (North Salem) D265281/B1016629/32703709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-21T11:26:18Z"},"road_event_id":"nL6ZnZS3aURBXNhV1wZdHSpLTUA=","beginning_cross_street":"Exit 8 - Hardscrabble Road","ending_cross_street":"Exit 7 - NY-116","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.658064,41.326303]]}},{"id":"w9D6mb466OhXTkVg4aiP1PsVwwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Jamaica Station Route"],"direction":"unknown","related_road_events":[],"description":"Due to Repairs both directions, Jamaica Station Route between Jamaica Station-Station D (New York) and Federal Circle-Station C (New York) service will be suspended and free shuttle bus service will be provided to and from Federal Circle and Jamaica Stations. , Wednesday April 29th, 2026 thru Thursday April 30th, 2026, 11:00 PM thru 06:00 AM","update_date":"2026-04-20T15:21:46Z"},"road_event_id":"w9D6mb466OhXTkVg4aiP1PsVwwk=","beginning_cross_street":"Jamaica Station-Station D","ending_cross_street":"Federal Circle-Station C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.808416,40.698942]]}},{"id":"+lzYIO93444MZTKbXQlN9Qpi0O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Newark AirTrain"],"direction":"unknown","related_road_events":[],"description":"Due to Repairs both directions, Newark AirTrain between Newark Liberty Airport Station (Newark) and Terminal A (Newark) service will be suspended for required maintenance and free shuttle bus service will be provided as an alternative., Saturday April 25th, 2026 thru Sunday April 26th, 2026, 08:00 PM thru 07:00 AM","update_date":"2026-04-20T15:33:26Z"},"road_event_id":"+lzYIO93444MZTKbXQlN9Qpi0O4=","beginning_cross_street":"Newark Liberty Airport Station","ending_cross_street":"Terminal A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.187822,40.702009]]}},{"id":"kLsLaw0JzDoNDiqSeTgIDWktyFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ykwPu17OSiqUyn6zM2oco+HA1cU="}],"description":"Construction on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:42:43Z"},"road_event_id":"kLsLaw0JzDoNDiqSeTgIDWktyFI=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"ykwPu17OSiqUyn6zM2oco+HA1cU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLsLaw0JzDoNDiqSeTgIDWktyFI="},{"type":"next-occurrence","id":"Jj6G+g2f3EGHLp1jkpcxNKotFFQ="}],"description":"Construction on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:42:43Z"},"road_event_id":"ykwPu17OSiqUyn6zM2oco+HA1cU=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"Jj6G+g2f3EGHLp1jkpcxNKotFFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 49"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kLsLaw0JzDoNDiqSeTgIDWktyFI="}],"description":"Construction on NY 49 both directions between Lauther Road (Verona) and Drummond Drive (Verona) motorists will encounter lane closures with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:42:43Z"},"road_event_id":"Jj6G+g2f3EGHLp1jkpcxNKotFFQ=","beginning_cross_street":"Lauther Road","ending_cross_street":"Drummond Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.593619,43.22319]]}},{"id":"pIlwa4CxzgIPmd6/5xbn4j3Apxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ezCmwhkjSIYaNmCJBhmNed6/CAI="}],"description":"Construction on NY 46 both directions between Dopp Hill Road (Western) and Main Street (Western) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:44:36Z"},"road_event_id":"pIlwa4CxzgIPmd6/5xbn4j3Apxo=","beginning_cross_street":"Dopp Hill Road","ending_cross_street":"Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.387798,43.300661]]}},{"id":"ezCmwhkjSIYaNmCJBhmNed6/CAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pIlwa4CxzgIPmd6/5xbn4j3Apxo="},{"type":"next-occurrence","id":"VIcDiQe1kaU+JpFbmMn2vHUCv24="}],"description":"Construction on NY 46 both directions between Dopp Hill Road (Western) and Main Street (Western) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:44:36Z"},"road_event_id":"ezCmwhkjSIYaNmCJBhmNed6/CAI=","beginning_cross_street":"Dopp Hill Road","ending_cross_street":"Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.387798,43.300661]]}},{"id":"VIcDiQe1kaU+JpFbmMn2vHUCv24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 46"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"pIlwa4CxzgIPmd6/5xbn4j3Apxo="}],"description":"Construction on NY 46 both directions between Dopp Hill Road (Western) and Main Street (Western) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:44:36Z"},"road_event_id":"VIcDiQe1kaU+JpFbmMn2vHUCv24=","beginning_cross_street":"Dopp Hill Road","ending_cross_street":"Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.387798,43.300661]]}},{"id":"eXzcxubgm06mSMRdkOgH61279EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ssknbgh9z3kavIXdguxcohKqxXM="}],"description":"Road maintenance operations on NY 9A northbound between NY 117 (Ossining) and Pleasantville Road (Cortlandt) Res 8-8 RW/32443809 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 09:30 AM thru 02:00 PM, right lane closure","update_date":"2026-04-20T16:42:50Z"},"road_event_id":"eXzcxubgm06mSMRdkOgH61279EQ=","beginning_cross_street":"","ending_cross_street":"Pleasantville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809989,41.123512]]}},{"id":"ssknbgh9z3kavIXdguxcohKqxXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eXzcxubgm06mSMRdkOgH61279EQ="}],"description":"Road maintenance operations on NY 9A northbound between NY 117 (Ossining) and Pleasantville Road (Cortlandt) Res 8-8 RW/32443809 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026 Thursday/ Friday, 09:30 AM thru 02:00 PM, right lane closure","update_date":"2026-04-20T16:42:50Z"},"road_event_id":"ssknbgh9z3kavIXdguxcohKqxXM=","beginning_cross_street":"","ending_cross_street":"Pleasantville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.809989,41.123512]]}},{"id":"v2sh3uJi3w1wUvR6dOJT+lu5QBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-684 southbound between Exit 6 - NY 35 (Bedford) and Exit 4 - NY 172 (Bedford) DOT BM/NIGHT/B1053169/32307609 - This work is weather permitting, Plan travel accordingly; delays may exist, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 08:00 PM thru 05:00 AM, right and left lanes closed to traffic","update_date":"2026-04-20T17:07:50Z"},"road_event_id":"v2sh3uJi3w1wUvR6dOJT+lu5QBI=","beginning_cross_street":"Exit 6 - NY 35","ending_cross_street":"Exit 4 - NY 172","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682389,41.261809]]}},{"id":"bk/Vgx0yGUgYdcDT7egtrSdywyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Southbound at Exit 2 - Walt Whitman Bridge (Camden) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, ramp","update_date":"2026-04-20T21:25:15Z"},"road_event_id":"bk/Vgx0yGUgYdcDT7egtrSdywyU=","beginning_cross_street":"Exit 2 - Walt Whitman Bridge","ending_cross_street":"Exit 2 - Walt Whitman Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.113021,39.903541]]}},{"id":"zGB5n/nuqxaxhqVnmYRHgrcfUmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Southbound at Exit 1 - Collings Ave (Camden) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-20T21:25:13Z"},"road_event_id":"zGB5n/nuqxaxhqVnmYRHgrcfUmI=","beginning_cross_street":"Exit 1 - Collings Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112632,39.90213]]}},{"id":"+rwl1O4vIDgl2hoYKhO8gDOtC3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near South of US 1&9 Truck Route/Pulaski Skyway (Newark), Thursday April 23, 2026 10:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed local lane","update_date":"2026-04-20T21:25:14Z"},"road_event_id":"+rwl1O4vIDgl2hoYKhO8gDOtC3M=","beginning_cross_street":"South of US 1&9 Truck Route/Pulaski Skyway","ending_cross_street":"North of Wilson Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.133476,40.73014]]}},{"id":"4M21O9uLOjZA4MBboBxr2gEGUF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney/Mathis Bridge (Toms River Twp) and West of NJ 35/CR 629 (Seaside Heights), Thursday April 23, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-20T21:25:11Z"},"road_event_id":"4M21O9uLOjZA4MBboBxr2gEGUF4=","beginning_cross_street":"East of Tunney/Mathis Bridge","ending_cross_street":"West of NJ 35/CR 629","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097618,39.944992]]}},{"id":"AC9uubGGVdt/EIJTY5YC6cNDAX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Southbound near South of Exit 3 - Morgan Blvd (Camden), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 06:00 AM)","update_date":"2026-04-20T21:25:17Z"},"road_event_id":"AC9uubGGVdt/EIJTY5YC6cNDAX4=","beginning_cross_street":"South of Exit 3 - Morgan Blvd","ending_cross_street":"I-76 Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.115425,39.910522]]}},{"id":"XUHvbRynuoiyfKUGFu6slh4AgeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near Ridge Rd (South Brunswick Twp), Thursday April 23, 2026 10:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-20T21:25:01Z"},"road_event_id":"XUHvbRynuoiyfKUGFu6slh4AgeE=","beginning_cross_street":"Ridge Rd","ending_cross_street":"North of Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.595428,40.366565]]}},{"id":"sRzD07uHd/Sm9q24FvKLtGZQQio=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 near NJ 35/CR 629 (Berkeley Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T21:24:56Z"},"road_event_id":"sRzD07uHd/Sm9q24FvKLtGZQQio=","beginning_cross_street":"NJ 35/CR 629","ending_cross_street":"West of NJ 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081817,39.940639]]}},{"id":"PX1mm2GRnSwJfLNdY/MznQpEXgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Southbound at Exit 1 - Collings Ave (Camden) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, ramp","update_date":"2026-04-20T21:25:07Z"},"road_event_id":"PX1mm2GRnSwJfLNdY/MznQpEXgo=","beginning_cross_street":"Exit 1 - Collings Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112632,39.90213]]}},{"id":"YMr+W4j2kDqQ3XDSZ219h4YRE3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound between CR 623/Elmwood Rd (Mullica Twp) and East of CR 575/Pomona Rd (Galloway Twp), Thursday April 23, 2026 07:00 AM thru Friday April 24, 2026 03:30 AM, right shoulder closed, moving operation","update_date":"2026-04-20T21:25:05Z"},"road_event_id":"YMr+W4j2kDqQ3XDSZ219h4YRE3Y=","beginning_cross_street":"CR 623/Elmwood Rd","ending_cross_street":"East of CR 575/Pomona Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T14:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.715927,39.576293]]}},{"id":"plqV7nKYscMW9a7/+Zb41tn6f9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between North of Howard Blvd (Mount Laurel Twp) and South of CR 674/Greentree Rd (Evesham Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 07:00 AM, right lane closed","update_date":"2026-04-20T21:25:06Z"},"road_event_id":"plqV7nKYscMW9a7/+Zb41tn6f9U=","beginning_cross_street":"North of Howard Blvd","ending_cross_street":"South of CR 674/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.953933,39.926879]]}},{"id":"on4igLiwrIzkzIA19qQp660eBUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gSpkjetUl69duitpL7aQzz1zvJk="}],"description":"Bridge work and deck work on NY 5 eastbound before Milton Avenue (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-20T23:00:02Z"},"road_event_id":"on4igLiwrIzkzIA19qQp660eBUg=","beginning_cross_street":"Milton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.307361,43.04785]]}},{"id":"gSpkjetUl69duitpL7aQzz1zvJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"on4igLiwrIzkzIA19qQp660eBUg="}],"description":"Bridge work and deck work on NY 5 eastbound before Milton Avenue (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-20T23:00:02Z"},"road_event_id":"gSpkjetUl69duitpL7aQzz1zvJk=","beginning_cross_street":"Milton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.307361,43.04785]]}},{"id":"z1f9thn82kSGkcBosxZszlCK5mc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CkOFwU6TyZwGlQ2t6u7eO6qCvdM="}],"description":"Bridge work and deck work on NY 5 westbound just past Newport Road (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-20T22:25:36Z"},"road_event_id":"z1f9thn82kSGkcBosxZszlCK5mc=","beginning_cross_street":"Newport Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.301856,43.049804]]}},{"id":"CkOFwU6TyZwGlQ2t6u7eO6qCvdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z1f9thn82kSGkcBosxZszlCK5mc="}],"description":"Bridge work and deck work on NY 5 westbound just past Newport Road (Camillus) ; Alternating lane closures, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-20T22:25:36Z"},"road_event_id":"CkOFwU6TyZwGlQ2t6u7eO6qCvdM=","beginning_cross_street":"Newport Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.301856,43.049804]]}},{"id":"qRsZ9hGneyglfj7frBuf+PPG9tI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3dJn1Wt+uPxbc1WLYArDpXjEdfI="}],"description":"Roadwork on I-81 northbound at Exit 16A - I-481 (Syracuse) ; follow detour, Wednesday April 29th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T22:31:38Z"},"road_event_id":"qRsZ9hGneyglfj7frBuf+PPG9tI=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.133478,43.004381]]}},{"id":"3dJn1Wt+uPxbc1WLYArDpXjEdfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qRsZ9hGneyglfj7frBuf+PPG9tI="},{"type":"next-occurrence","id":"XJoHAz4EP7swHkUvn31H4lyZcNM="}],"description":"Roadwork on I-81 northbound at Exit 16A - I-481 (Syracuse) ; follow detour, Wednesday April 29th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T22:31:38Z"},"road_event_id":"3dJn1Wt+uPxbc1WLYArDpXjEdfI=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.133478,43.004381]]}},{"id":"XJoHAz4EP7swHkUvn31H4lyZcNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qRsZ9hGneyglfj7frBuf+PPG9tI="},{"type":"next-occurrence","id":"uScvromUbAvXY8WUJHOLqDQWwAA="}],"description":"Roadwork on I-81 northbound at Exit 16A - I-481 (Syracuse) ; follow detour, Wednesday April 29th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T22:31:38Z"},"road_event_id":"XJoHAz4EP7swHkUvn31H4lyZcNM=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.133478,43.004381]]}},{"id":"uScvromUbAvXY8WUJHOLqDQWwAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qRsZ9hGneyglfj7frBuf+PPG9tI="},{"type":"next-occurrence","id":"mYaouTAwAmtX3trzibPnjjpueFE="}],"description":"Roadwork on I-81 northbound at Exit 16A - I-481 (Syracuse) ; follow detour, Wednesday April 29th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T22:31:38Z"},"road_event_id":"uScvromUbAvXY8WUJHOLqDQWwAA=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.133478,43.004381]]}},{"id":"mYaouTAwAmtX3trzibPnjjpueFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qRsZ9hGneyglfj7frBuf+PPG9tI="}],"description":"Roadwork on I-81 northbound at Exit 16A - I-481 (Syracuse) ; follow detour, Wednesday April 29th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes closed","update_date":"2026-04-20T22:31:38Z"},"road_event_id":"mYaouTAwAmtX3trzibPnjjpueFE=","beginning_cross_street":"Exit 16A - I-481","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T18:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.133478,43.004381]]}},{"id":"MaEXkMfE9oPeuB8oC8Y3ZhgQvD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 92"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0B6pre0nmlXAD4FG2YXT/faNtok="}],"description":"Tree trimming on NY 92 both directions between East Seneca Street; NY 173 (Manlius) and Enders Road (Pompey) ; Alternating one-way traffic with flaggers, Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T23:09:20Z"},"road_event_id":"MaEXkMfE9oPeuB8oC8Y3ZhgQvD4=","beginning_cross_street":"East Seneca Street; NY 173","ending_cross_street":"Enders Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.975431,43.001583]]}},{"id":"0B6pre0nmlXAD4FG2YXT/faNtok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 92"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MaEXkMfE9oPeuB8oC8Y3ZhgQvD4="}],"description":"Tree trimming on NY 92 both directions between East Seneca Street; NY 173 (Manlius) and Enders Road (Pompey) ; Alternating one-way traffic with flaggers, Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T23:09:20Z"},"road_event_id":"0B6pre0nmlXAD4FG2YXT/faNtok=","beginning_cross_street":"East Seneca Street; NY 173","ending_cross_street":"Enders Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.975431,43.001583]]}},{"id":"OUSsLx76m1aSoeXjsHoN+1A1wd0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Thursday April 23, 2026 10:00 PM thru Friday April 24, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-04-20T23:33:24Z"},"road_event_id":"OUSsLx76m1aSoeXjsHoN+1A1wd0=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167945,39.870201]]}},{"id":"2DIRutLHian2v27/JjKuZS54gY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Friday April 24, 2026 10:00 PM thru Saturday April 25, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-04-20T23:33:22Z"},"road_event_id":"2DIRutLHian2v27/JjKuZS54gY0=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167945,39.870201]]}},{"id":"AuBFT8RCLvijLLDUsfARoz2P66c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Wednesday April 22, 2026 10:00 PM thru Thursday April 23, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-04-20T23:33:23Z"},"road_event_id":"AuBFT8RCLvijLLDUsfARoz2P66c=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167945,39.870201]]}},{"id":"QfWmB+xQlL8SKnzaMg8kzPzo18g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Saturday April 25, 2026 10:00 PM thru Sunday April 26, 2026 05:00 AM, right shoulder closed, moving operation","update_date":"2026-04-20T23:33:20Z"},"road_event_id":"QfWmB+xQlL8SKnzaMg8kzPzo18g=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.167945,39.870201]]}},{"id":"ORC300541030","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","description":"Overhead sign repair on I-490 eastbound between Exit 6 - NY 204 (Gates) and Buffalo Road; Ramp (Gates) Ramp at Exit 7A will be narrowed, but will remain open. Installation of OSS End section right side - Location 2 - SIN 44080 Not currently Scheduled","update_date":"2026-04-21T09:00:06Z"},"road_event_id":"ORC300541030","beginning_cross_street":"Exit 6 - NY 204","ending_cross_street":"Buffalo Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-21T01:49:43Z","end_date":"2026-04-22T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-77.722681,43.13083]]}},{"id":"Ooa28hH5LTvlDIlurtoKQZAilyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on I-490 eastbound Rt-204 to east of exit 7A (Gates) Additional left lane develops mid closure. Assembly of OSS Span and signs in Median - Location 2 - SIN 44080, Tuesday April 21st, 2026 thru Wednesday April 22nd, 2026, Tuesday/Wednesday, 06:00 PM thru 06:00 PM 2 Left lanes of 4 lanes","update_date":"2026-04-21T02:15:53Z"},"road_event_id":"Ooa28hH5LTvlDIlurtoKQZAilyM=","beginning_cross_street":"Rt-204 to east of exit 7A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.717966,43.144175]]}},{"id":"lgvnmwHTd4Hz3amfhtM68LNvSZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near Briggs Rd (Mount Laurel Twp), Tuesday April 28, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-21T02:18:20Z"},"road_event_id":"lgvnmwHTd4Hz3amfhtM68LNvSZ4=","beginning_cross_street":"Briggs Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.898689,39.968528]]}},{"id":"+8qN4mhF9TSSKmjI2PZ0UaGlg2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 59 - NJ 208 (Franklin Lakes), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T02:36:20Z"},"road_event_id":"+8qN4mhF9TSSKmjI2PZ0UaGlg2k=","beginning_cross_street":"North of Exit 59 - NJ 208","ending_cross_street":"North of Exit 59 - NJ 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192436,41.039291]]}},{"id":"uVv2dg22dMTJjLEwLoDZu55dIyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 59 - NJ 208 (Franklin Lakes), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T02:36:21Z"},"road_event_id":"uVv2dg22dMTJjLEwLoDZu55dIyE=","beginning_cross_street":"North of Exit 59 - NJ 208","ending_cross_street":"North of Exit 59 - NJ 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.192436,41.039291]]}},{"id":"9VluIdVdy/9yrAv8KPNWahiKBkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Construction and installation of sign structure on I-490 eastbound between Exit 6 - NY 204 (Gates) and Exit 7B - NY 531 (Gates), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-21T03:17:11Z"},"road_event_id":"9VluIdVdy/9yrAv8KPNWahiKBkE=","beginning_cross_street":"Exit 6 - NY 204","ending_cross_street":"Exit 7B - NY 531","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.722137,43.131283]]}},{"id":"LicrQMqjlHfo3J/47tdt3jt0m+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 204"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on NY 204 westbound Entrance ramp Start NY 204 at I-490 (Gates), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-21T03:21:24Z"},"road_event_id":"LicrQMqjlHfo3J/47tdt3jt0m+E=","beginning_cross_street":"Start NY 204 at I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.717943,43.13403]]}},{"id":"SwEfExqO0YLQRAZxLt+BdhkhIWY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-490 westbound between Howard Road; 940L; Howard Road (Gates) and Wegman Road; Ramp (Gates), Thursday April 23rd, 2026, 06:00 PM thru 10:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-21T03:30:50Z"},"road_event_id":"SwEfExqO0YLQRAZxLt+BdhkhIWY=","beginning_cross_street":"Howard Road; 940L; Howard Road","ending_cross_street":"Wegman Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T16:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.690982,43.157436]]}},{"id":"Fll0uqCxq+6mMzB+1tu6I2kUGOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 531"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on NY 531 eastbound between Elmgrove Road; NY 386 (Gates) and Exit - I-490; END ROUTE (Gates), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 PM thru 04:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-21T03:34:21Z"},"road_event_id":"Fll0uqCxq+6mMzB+1tu6I2kUGOI=","beginning_cross_street":"Elmgrove Road; NY 386","ending_cross_street":"Exit   - I-490; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.732664,43.158481]]}},{"id":"nHRbMOaMFdiouVygOJccLO95znA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-490 westbound between Howard Road; 940L; Howard Road (Gates) and Wegman Road; Ramp (Gates), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:00 PM thru 06:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-21T03:37:17Z"},"road_event_id":"nHRbMOaMFdiouVygOJccLO95znA=","beginning_cross_street":"Howard Road; 940L; Howard Road","ending_cross_street":"Wegman Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.690986,43.157435]]}},{"id":"oMMx7CoHEZNGJN2F63/Q6LK84R4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Construction on I-490 eastbound between Exit 7B - NY 531 (Gates) and Wegman Road; Ramp (Gates), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 06:00 PM thru 06:00 AM 1 Right lane of 4 lanes closed","update_date":"2026-04-21T03:43:32Z"},"road_event_id":"oMMx7CoHEZNGJN2F63/Q6LK84R4=","beginning_cross_street":"Exit 7B - NY 531","ending_cross_street":"Wegman Road; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T16:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.717247,43.146747]]}},{"id":"5jgLNEuJw+wJhQKdhISOnL9nlbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-490 westbound between City of Rochester; Town of Gates Line; Ramp (Rochester) and Exit 7B - NY 531 (Gates), Thursday April 30th, 2026 thru Friday May 1st, 2026, 10:00 PM thru 05:00 PM All lanes closed","update_date":"2026-04-21T04:04:38Z"},"road_event_id":"5jgLNEuJw+wJhQKdhISOnL9nlbM=","beginning_cross_street":"City of Rochester; Town of Gates Line; Ramp","ending_cross_street":"Exit 7B - NY 531","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.674635,43.157773]]}},{"id":"48hYY781ID7dPLAEbpeZ6hSWaMs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 390"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on NY 390 southbound at I-490 (Gates), Thursday April 30th, 2026 thru Friday May 1st, 2026, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-21T04:08:40Z"},"road_event_id":"48hYY781ID7dPLAEbpeZ6hSWaMs=","beginning_cross_street":"I-490","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.682856,43.160117]]}},{"id":"lasJYZE7WZLqVktGP1Vyfpj4U3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-390 northbound at I-490; Ramp (Gates), Thursday April 30th, 2026 thru Friday May 1st, 2026, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-21T04:13:02Z"},"road_event_id":"lasJYZE7WZLqVktGP1Vyfpj4U3A=","beginning_cross_street":"I-490; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.679082,43.156897]]}},{"id":"HMX8COewNE7c4Kw834uN+sZhepw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-84 both directions between Exit 61 - NY 311 (Patterson) and Exit 65 - NY 312 - Carmel (Southeast) DOT BM/B1052781/32462009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T11:07:11Z"},"road_event_id":"HMX8COewNE7c4Kw834uN+sZhepw=","beginning_cross_street":"Exit 61 - NY 311","ending_cross_street":"Exit 65 - NY 312 - Carmel","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.644597,41.465371]]}},{"id":"aDPamyAM3+JdjjsutQmOqaqvzAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Northbound Ramp US 46 (Knowlton Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, All lanes open","update_date":"2026-04-21T12:02:41Z"},"road_event_id":"aDPamyAM3+JdjjsutQmOqaqvzAY=","beginning_cross_street":"US 46","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.090614,40.922359]]}},{"id":"eu+FPYh8h5Ac2jg2fDfgT89iCak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Southbound South of CR 521/Stillwater Rd (Blairstown Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, All lanes open","update_date":"2026-04-21T12:09:15Z"},"road_event_id":"eu+FPYh8h5Ac2jg2fDfgT89iCak=","beginning_cross_street":"South of CR 521/Stillwater Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.954803,40.980506]]}},{"id":"3RBjCXR/Cj7TFq0zU9vLshXSFUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Southbound South of CR 659/Spring Valley Rd (Frelinghuysen Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, All lanes open","update_date":"2026-04-21T12:15:21Z"},"road_event_id":"3RBjCXR/Cj7TFq0zU9vLshXSFUo=","beginning_cross_street":"South of CR 659/Spring Valley Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.918472,40.981964]]}},{"id":"/BC/76IxLrQFyRESSqOZaOmmSi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Northbound South of CR 610/Stillwater Rd (Fredon Twp) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, All lanes open","update_date":"2026-04-21T12:20:04Z"},"road_event_id":"/BC/76IxLrQFyRESSqOZaOmmSi4=","beginning_cross_street":"South of CR 610/Stillwater Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.829582,41.022239]]}},{"id":"Kg8ykeJolxcx4CfKs2zeKbndmFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 9D southbound between Fair Street (Cold Spring) and Paulding Ave (Cold Spring) 2025082502725/32712609 - This work is weather permitting. Plan travel accordingly; delays may exist, Thursday April 30th, 2026, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T13:33:08Z"},"road_event_id":"Kg8ykeJolxcx4CfKs2zeKbndmFg=","beginning_cross_street":"Fair Street","ending_cross_street":"Paulding Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.960718,41.423859]]}},{"id":"40/3eFns5YYRiHF1Iye97g47jgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-290"],"direction":"unknown","related_road_events":[],"description":"Deck work on I-290 westbound Main Street; NY 5 (Amherst) to Millersport Highway; NY 263 (Amherst), Saturday May 2nd, 2026, 07:30 AM thru 05:00 PM 2 Left lanes of 4 lanes closed","update_date":"2026-04-21T13:46:51Z"},"road_event_id":"40/3eFns5YYRiHF1Iye97g47jgE=","beginning_cross_street":"Main Street; NY 5","ending_cross_street":"Millersport Highway; NY 263","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T19:00:00Z","end_date":"2026-05-03T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.766412,42.959232]]}},{"id":"MEWYX7VKZ4FRD+0mDw4qz6dceGg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E4PRcRTcQKFeteK+v1fjiwAhz7o="}],"description":"Reconstruction on NY 33 westbound Holtz Drive (Cheektowaga) to GENESEE ST at CR-245 (Cheektowaga), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-21T14:11:15Z"},"road_event_id":"MEWYX7VKZ4FRD+0mDw4qz6dceGg=","beginning_cross_street":"Holtz Drive","ending_cross_street":"CR-245","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717262,42.934389]]}},{"id":"E4PRcRTcQKFeteK+v1fjiwAhz7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MEWYX7VKZ4FRD+0mDw4qz6dceGg="},{"type":"next-occurrence","id":"onf5L4DW/pPPL0ANHcWqPL4KruA="}],"description":"Reconstruction on NY 33 westbound Holtz Drive (Cheektowaga) to GENESEE ST at CR-245 (Cheektowaga), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-21T14:11:15Z"},"road_event_id":"E4PRcRTcQKFeteK+v1fjiwAhz7o=","beginning_cross_street":"Holtz Drive","ending_cross_street":"CR-245","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717262,42.934389]]}},{"id":"onf5L4DW/pPPL0ANHcWqPL4KruA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MEWYX7VKZ4FRD+0mDw4qz6dceGg="},{"type":"next-occurrence","id":"HRD0c2BlPJXGAduxxSaGXa7trIE="}],"description":"Reconstruction on NY 33 westbound Holtz Drive (Cheektowaga) to GENESEE ST at CR-245 (Cheektowaga), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-21T14:11:15Z"},"road_event_id":"onf5L4DW/pPPL0ANHcWqPL4KruA=","beginning_cross_street":"Holtz Drive","ending_cross_street":"CR-245","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717262,42.934389]]}},{"id":"HRD0c2BlPJXGAduxxSaGXa7trIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MEWYX7VKZ4FRD+0mDw4qz6dceGg="},{"type":"next-occurrence","id":"Q1o2mmVhmZ1S2Ict1GOyMv6pUS4="}],"description":"Reconstruction on NY 33 westbound Holtz Drive (Cheektowaga) to GENESEE ST at CR-245 (Cheektowaga), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-21T14:11:15Z"},"road_event_id":"HRD0c2BlPJXGAduxxSaGXa7trIE=","beginning_cross_street":"Holtz Drive","ending_cross_street":"CR-245","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717262,42.934389]]}},{"id":"Q1o2mmVhmZ1S2Ict1GOyMv6pUS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 33"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MEWYX7VKZ4FRD+0mDw4qz6dceGg="}],"description":"Reconstruction on NY 33 westbound Holtz Drive (Cheektowaga) to GENESEE ST at CR-245 (Cheektowaga), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 05:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-21T14:11:15Z"},"road_event_id":"Q1o2mmVhmZ1S2Ict1GOyMv6pUS4=","beginning_cross_street":"Holtz Drive","ending_cross_street":"CR-245","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.717262,42.934389]]}},{"id":"0RIYGLiClGRkA0QmMoyfNR6mh0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions between CR 672/Mill St (Belleville Twp) and Greylock Pkwy (Belleville Twp) Wednesday April 22, 2026 06:00 AM thru 03:00 PM, right shoulder closed southbound; right shoulder closed northbound","update_date":"2026-04-21T14:12:02Z"},"road_event_id":"0RIYGLiClGRkA0QmMoyfNR6mh0M=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"Greylock Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782741]]}},{"id":"Kv3MPODbWOLEmG8aLlvCvNP74qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions between CR 672/Mill St (Belleville Twp) and Greylock Pkwy (Belleville Twp) Thursday April 23, 2026 06:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-21T14:14:01Z"},"road_event_id":"Kv3MPODbWOLEmG8aLlvCvNP74qg=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"Greylock Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782741]]}},{"id":"MmulPrj6LbcU3QA0bV2khQRMiZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 7"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 7 Both Directions between CR 672/Mill St (Belleville Twp) and Greylock Pkwy (Belleville Twp) Friday April 24, 2026 06:00 AM thru 03:00 PM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-21T14:15:52Z"},"road_event_id":"MmulPrj6LbcU3QA0bV2khQRMiZQ=","beginning_cross_street":"CR 672/Mill St","ending_cross_street":"Greylock Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.154037,40.782741]]}},{"id":"m71xA+La+msvb/jXh+CTGHtfpC0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mPCbjniMMxU/1w7cSa+KWGZeT04="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:32:34Z"},"road_event_id":"m71xA+La+msvb/jXh+CTGHtfpC0=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"mPCbjniMMxU/1w7cSa+KWGZeT04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m71xA+La+msvb/jXh+CTGHtfpC0="},{"type":"next-occurrence","id":"dkhCS+nbpvDj+4NH6J7vdDQWlmI="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:32:34Z"},"road_event_id":"mPCbjniMMxU/1w7cSa+KWGZeT04=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"dkhCS+nbpvDj+4NH6J7vdDQWlmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m71xA+La+msvb/jXh+CTGHtfpC0="},{"type":"next-occurrence","id":"Z3J9AXGgz5jxVn4rfg5babaH3xE="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:32:34Z"},"road_event_id":"dkhCS+nbpvDj+4NH6J7vdDQWlmI=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"Z3J9AXGgz5jxVn4rfg5babaH3xE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 208"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"m71xA+La+msvb/jXh+CTGHtfpC0="}],"description":"Utility work on NY 208 both directions between William Street (Montgomery) and Grove Street (Montgomery) 2025MO3381214/32731509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:32:34Z"},"road_event_id":"Z3J9AXGgz5jxVn4rfg5babaH3xE=","beginning_cross_street":"William Street","ending_cross_street":"Grove Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188216,41.561357]]}},{"id":"ORC30540009","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","description":"Street sweeping on Saw Mill River Parkway northbound between Exit 37 - Kisco Avenue (Mount Kisco) and I-684 (Bedford) Res 8-9 RW/30540009 - This is a moving operation. Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-04-21T18:30:38Z"},"road_event_id":"ORC30540009","beginning_cross_street":"Exit 37 - Kisco Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2023-10-03T13:48:59Z","end_date":"2026-04-22T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.722876,41.222003]]}},{"id":"28R4JlTEXOrRSO012iKgc6GPK8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 57 - Skyline Drive (Wanaque), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-21T14:30:30Z"},"road_event_id":"28R4JlTEXOrRSO012iKgc6GPK8E=","beginning_cross_street":"South of Exit 57 - Skyline Drive","ending_cross_street":"South of Exit 57 - Skyline Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.277725,41.025787]]}},{"id":"ewZESFgP5bXEgnt/ziI3CR/l2LI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound near Commerce St (Newark), Monday April 27, 2026 08:00 PM thru Tuesday April 28, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T14:30:28Z"},"road_event_id":"ewZESFgP5bXEgnt/ziI3CR/l2LI=","beginning_cross_street":"Commerce St","ending_cross_street":"CR 508/Center St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166282,40.734775]]}},{"id":"hzYyLIH+js/8wxDjDHlhL+cM5cM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near Briggs Rd (Mount Laurel Twp), Thursday April 30, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-21T14:30:26Z"},"road_event_id":"hzYyLIH+js/8wxDjDHlhL+cM5cM=","beginning_cross_street":"Briggs Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.898689,39.968528]]}},{"id":"WsvQFH7hKnsabzKqDdpQTRITDQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 24"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 24 Westbound near East of Exit 2 - CR 510/Columbia Turnpike (Florham Park), Thursday April 23, 2026 04:00 PM thru Friday April 24, 2026 12:00 AM, right shoulder closed, moving operation","update_date":"2026-04-21T14:30:27Z"},"road_event_id":"WsvQFH7hKnsabzKqDdpQTRITDQ4=","beginning_cross_street":"East of Exit 2 - CR 510/Columbia Turnpike","ending_cross_street":"West of Exit 2 - CR 510/Columbia Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.421005,40.78696]]}},{"id":"N3CVQ4c2BV0FUgBG3dcuYTZTP8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of Johnson St (Bay Head), Thursday April 23, 2026 09:00 AM thru 01:00 PM, right shoulder closed","update_date":"2026-04-21T14:30:23Z"},"road_event_id":"N3CVQ4c2BV0FUgBG3dcuYTZTP8E=","beginning_cross_street":"South of Johnson St","ending_cross_street":"South of Bergen Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.046119,40.060455]]}},{"id":"BtWP77vJiwZPXDYrB2aPz5iD9mI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound near Commerce St (Newark), Friday May 1, 2026 08:00 PM thru Saturday May 2, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T14:30:24Z"},"road_event_id":"BtWP77vJiwZPXDYrB2aPz5iD9mI=","beginning_cross_street":"Commerce St","ending_cross_street":"CR 508/Center St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166282,40.734775]]}},{"id":"y1fF2WTA60oAhAhHKVVMjtxyeRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 between In the vicinity of River Rd (East Hanover Twp) and NJ 53 (Morris Plains), Thursday April 23, 2026 08:00 PM thru 11:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T14:30:38Z"},"road_event_id":"y1fF2WTA60oAhAhHKVVMjtxyeRs=","beginning_cross_street":"In the vicinity of River Rd","ending_cross_street":"NJ 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.359886,40.801185]]}},{"id":"7znDQXm0E8bjfTyFAPcBJpFhLvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound near Commerce St (Newark), Wednesday April 29, 2026 08:00 PM thru Thursday April 30, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T14:30:35Z"},"road_event_id":"7znDQXm0E8bjfTyFAPcBJpFhLvY=","beginning_cross_street":"Commerce St","ending_cross_street":"CR 508/Center St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166282,40.734775]]}},{"id":"Xubm18CHPzxF1bBCo4yNKohLu1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near Briggs Rd (Mount Laurel Twp), Friday May 1, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-21T14:30:37Z"},"road_event_id":"Xubm18CHPzxF1bBCo4yNKohLu1k=","beginning_cross_street":"Briggs Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.898689,39.968528]]}},{"id":"ePfR8qAc0vjQGrvm/5Y9yHzaJl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near Briggs Rd (Mount Laurel Twp), Wednesday April 29, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-21T14:30:31Z"},"road_event_id":"ePfR8qAc0vjQGrvm/5Y9yHzaJl8=","beginning_cross_street":"Briggs Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.898689,39.968528]]}},{"id":"sbunoJ45wY5/rUwvtLRrSou3g3Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound near Commerce St (Newark), Thursday April 30, 2026 08:00 PM thru Friday May 1, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T14:30:42Z"},"road_event_id":"sbunoJ45wY5/rUwvtLRrSou3g3Q=","beginning_cross_street":"Commerce St","ending_cross_street":"CR 508/Center St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166282,40.734775]]}},{"id":"Vc2uHV8NTZIF2ELtjUzujx8CVtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound near Commerce St (Newark), Tuesday April 28, 2026 08:00 PM thru Wednesday April 29, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T14:30:40Z"},"road_event_id":"Vc2uHV8NTZIF2ELtjUzujx8CVtc=","beginning_cross_street":"Commerce St","ending_cross_street":"CR 508/Center St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.166282,40.734775]]}},{"id":"Xyag7TICtNJsIstPi2rvzN7nlsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 between NJ 53 (Morris Plains) and In the vicinity of River Rd (East Hanover Twp), Thursday April 23, 2026 04:00 PM thru 08:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T14:30:41Z"},"road_event_id":"Xyag7TICtNJsIstPi2rvzN7nlsQ=","beginning_cross_street":"NJ 53","ending_cross_street":"In the vicinity of River Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.473724,40.851112]]}},{"id":"HJ3Bw6xdUv8qMM+P4IOFGCcxf8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TgwHW7ZHhymMAV8xXEdyK9Wu7Bk="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:40:05Z"},"road_event_id":"HJ3Bw6xdUv8qMM+P4IOFGCcxf8k=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"TgwHW7ZHhymMAV8xXEdyK9Wu7Bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HJ3Bw6xdUv8qMM+P4IOFGCcxf8k="},{"type":"next-occurrence","id":"f2y/bE+hvjyjuQl3k+hFuHTzHr8="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:40:05Z"},"road_event_id":"TgwHW7ZHhymMAV8xXEdyK9Wu7Bk=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"f2y/bE+hvjyjuQl3k+hFuHTzHr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HJ3Bw6xdUv8qMM+P4IOFGCcxf8k="},{"type":"next-occurrence","id":"nS1psA59yLM9MNAUUZI8eSLXgR0="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:40:05Z"},"road_event_id":"f2y/bE+hvjyjuQl3k+hFuHTzHr8=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"nS1psA59yLM9MNAUUZI8eSLXgR0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HJ3Bw6xdUv8qMM+P4IOFGCcxf8k="}],"description":"Utility work on NY 52 both directions between Pine Street (Montgomery) and Hepper Street (Montgomery) 2025MO3381214/32701409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:40:05Z"},"road_event_id":"nS1psA59yLM9MNAUUZI8eSLXgR0=","beginning_cross_street":"Pine Street","ending_cross_street":"Hepper Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189234,41.560867]]}},{"id":"T/MaBdgP4J+I5Ih4fUBai4adu8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["936B; I-81 SB Service Road Taft-Airport"],"direction":"unknown","related_road_events":[],"description":"Roadwork on 936B; I-81 SB Service Road Taft-Airport northbound between US-11/Brewerton Rd (Salina) and Taft Rd (Cicero), Friday April 24th, 2026, 09:00 AM thru 02:30 PM right shoulder closed","update_date":"2026-04-21T14:34:25Z"},"road_event_id":"T/MaBdgP4J+I5Ih4fUBai4adu8M=","beginning_cross_street":"US-11/Brewerton Rd ","ending_cross_street":"Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.145323,43.111674]]}},{"id":"p3HIk893sDueSvK2/9a75g9GDUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MALzk6kpaKGYlf6vzgV3u3R9XX8="}],"description":"Utility work on NY 22 southbound between Mill Street (Dover) and Brady Lane (Dover) 2025082502725/30451309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:44:04Z"},"road_event_id":"p3HIk893sDueSvK2/9a75g9GDUc=","beginning_cross_street":"Mill Street","ending_cross_street":"Brady Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.580991,41.740353]]}},{"id":"MALzk6kpaKGYlf6vzgV3u3R9XX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p3HIk893sDueSvK2/9a75g9GDUc="},{"type":"next-occurrence","id":"Ssz0GLR2OJhKJi6r5rbH08S+mrw="}],"description":"Utility work on NY 22 southbound between Mill Street (Dover) and Brady Lane (Dover) 2025082502725/30451309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:44:04Z"},"road_event_id":"MALzk6kpaKGYlf6vzgV3u3R9XX8=","beginning_cross_street":"Mill Street","ending_cross_street":"Brady Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.580991,41.740353]]}},{"id":"Ssz0GLR2OJhKJi6r5rbH08S+mrw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p3HIk893sDueSvK2/9a75g9GDUc="},{"type":"next-occurrence","id":"YslIQ5fEBugx7NvR4LL5ISu4roU="}],"description":"Utility work on NY 22 southbound between Mill Street (Dover) and Brady Lane (Dover) 2025082502725/30451309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:44:04Z"},"road_event_id":"Ssz0GLR2OJhKJi6r5rbH08S+mrw=","beginning_cross_street":"Mill Street","ending_cross_street":"Brady Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.580991,41.740353]]}},{"id":"YslIQ5fEBugx7NvR4LL5ISu4roU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p3HIk893sDueSvK2/9a75g9GDUc="}],"description":"Utility work on NY 22 southbound between Mill Street (Dover) and Brady Lane (Dover) 2025082502725/30451309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T14:44:04Z"},"road_event_id":"YslIQ5fEBugx7NvR4LL5ISu4roU=","beginning_cross_street":"Mill Street","ending_cross_street":"Brady Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.580991,41.740353]]}},{"id":"Sf1GoASIZKg+BYkxyHEjy1QX5NE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["936B; I-81 SB Service Road Taft-Airport"],"direction":"unknown","related_road_events":[],"description":"Roadwork on 936B; I-81 SB Service Road Taft-Airport southbound between Taft Rd (Cicero) and US-11/Brewerton Rd (Salina), Friday April 24th, 2026, 09:00 AM thru 02:30 PM right shoulder closed","update_date":"2026-04-21T14:40:55Z"},"road_event_id":"Sf1GoASIZKg+BYkxyHEjy1QX5NE=","beginning_cross_street":"Taft Rd ","ending_cross_street":"US-11/Brewerton Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126732,43.123176]]}},{"id":"yDSqFDetq8zhdIHAjp74mQuitSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 9D southbound between Slocum Road (Beacon) and Hartsook Lane (Beacon) 2025082502725/32683309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday April 28th, 2026, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T15:05:03Z"},"road_event_id":"yDSqFDetq8zhdIHAjp74mQuitSs=","beginning_cross_street":"Slocum Road","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974993,41.472562]]}},{"id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zJG+AEj22SpyRbmaFsVDwTWjW7E="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"zJG+AEj22SpyRbmaFsVDwTWjW7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg="},{"type":"next-occurrence","id":"2rjosjqB940V69nn4B8Ftsr7m6E="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"zJG+AEj22SpyRbmaFsVDwTWjW7E=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"2rjosjqB940V69nn4B8Ftsr7m6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg="},{"type":"next-occurrence","id":"ivmGzH0hNLnHAP5VREjtX44IE5g="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"2rjosjqB940V69nn4B8Ftsr7m6E=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"ivmGzH0hNLnHAP5VREjtX44IE5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg="},{"type":"next-occurrence","id":"WBuavI/TT9cDp5Z3PTdACXfs+Zk="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"ivmGzH0hNLnHAP5VREjtX44IE5g=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"WBuavI/TT9cDp5Z3PTdACXfs+Zk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg="},{"type":"next-occurrence","id":"BupG6XQT+ZhlHDKBE3i4S4Tqv6c="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"WBuavI/TT9cDp5Z3PTdACXfs+Zk=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"BupG6XQT+ZhlHDKBE3i4S4Tqv6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg="},{"type":"next-occurrence","id":"dGDct2GDq1hrORobKPFUwrTVABo="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"BupG6XQT+ZhlHDKBE3i4S4Tqv6c=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"dGDct2GDq1hrORobKPFUwrTVABo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg="},{"type":"next-occurrence","id":"P0R/Rzp+LP6Cm7dRhiAEGghcSvM="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"dGDct2GDq1hrORobKPFUwrTVABo=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"P0R/Rzp+LP6Cm7dRhiAEGghcSvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7BX4eGTSlvgeWo4mo0UxlW2fKxg="}],"description":"Utility work on US 20A both directions between I-390 Exit 8 (Geneseo) and Pebble Beach Rd. (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:02:35Z"},"road_event_id":"P0R/Rzp+LP6Cm7dRhiAEGghcSvM=","beginning_cross_street":"I-390 Exit 8","ending_cross_street":"Pebble Beach Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.736422,42.826154]]}},{"id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OMRCEpBoBGK/+ux5QMHunrWaqZE="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"OMRCEpBoBGK/+ux5QMHunrWaqZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"6AZEIBOMipBBOQiJHbjV+AtMVks="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"OMRCEpBoBGK/+ux5QMHunrWaqZE=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"6AZEIBOMipBBOQiJHbjV+AtMVks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"d91IT2Gvdj8fFtB5E32J/YYFLbM="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"6AZEIBOMipBBOQiJHbjV+AtMVks=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"d91IT2Gvdj8fFtB5E32J/YYFLbM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"GFTjiiidFM14VAmwvXHbL/R61U0="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"d91IT2Gvdj8fFtB5E32J/YYFLbM=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"GFTjiiidFM14VAmwvXHbL/R61U0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"aPWx06T24rWGxvaICY2kQV2JOqA="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"GFTjiiidFM14VAmwvXHbL/R61U0=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"aPWx06T24rWGxvaICY2kQV2JOqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"HiVlQOEuMZVnL/glp8t4UEYCkrc="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"aPWx06T24rWGxvaICY2kQV2JOqA=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"HiVlQOEuMZVnL/glp8t4UEYCkrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"nUOHSRxUA+n3pI1eJxo2prclko0="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"HiVlQOEuMZVnL/glp8t4UEYCkrc=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"nUOHSRxUA+n3pI1eJxo2prclko0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"svW/Gz5mivLEHGCQqCFFylP6BD8="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"nUOHSRxUA+n3pI1eJxo2prclko0=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"svW/Gz5mivLEHGCQqCFFylP6BD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="},{"type":"next-occurrence","id":"QAWzYG2/do8NixDT07d2o0zHxPc="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"svW/Gz5mivLEHGCQqCFFylP6BD8=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"QAWzYG2/do8NixDT07d2o0zHxPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ID+4J1TXVQ2AiFE8hslWFjCCOkk="}],"description":"Utility work on NY 256 both directions between Pebble Beach Rd. (Geneseo) and Rochester Road; NY 15; END ROUTE NY 256 (Livonia) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T15:06:20Z"},"road_event_id":"QAWzYG2/do8NixDT07d2o0zHxPc=","beginning_cross_street":"Pebble Beach Rd.","ending_cross_street":"Rochester Road; NY 15; END ROUTE NY 256","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.715998,42.823477]]}},{"id":"BElanKxGOfEu33gWZ/4KIM8QdUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 14 both directions Oakwood Avenue (Horseheads) to Chemung Street (Horseheads) 2 lanes reduced to 1, Wednesday April 22nd, 2026, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-21T15:29:07Z"},"road_event_id":"BElanKxGOfEu33gWZ/4KIM8QdUM=","beginning_cross_street":"Oakwood Avenue","ending_cross_street":"Chemung Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.829299,42.141786]]}},{"id":"zcfiu9i2pZM1csKtpik6z6CK4gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound near North of CR 650/Church St (Raritan Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T16:00:21Z"},"road_event_id":"zcfiu9i2pZM1csKtpik6z6CK4gs=","beginning_cross_street":"North of CR 650/Church St","ending_cross_street":"North of CR 650/Church St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844604,40.506324]]}},{"id":"5NnP6MkaBcenhiZX9Ig3kwQ4J5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway between Tonnelle Circle (Jersey City) and South Kearny (South Kearny), Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM,","update_date":"2026-04-21T16:00:22Z"},"road_event_id":"5NnP6MkaBcenhiZX9Ig3kwQ4J5c=","beginning_cross_street":"Tonnelle Circle","ending_cross_street":"South Kearny","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.068,40.739089]]}},{"id":"RYmPt+/JpdndwtjZOJu09GBXSO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","related_road_events":[],"description":"Roadwork on Pulaski Skyway between South Kearny (South Kearny) and Tonnelle Circle (Jersey City), Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM,","update_date":"2026-04-21T16:00:19Z"},"road_event_id":"RYmPt+/JpdndwtjZOJu09GBXSO8=","beginning_cross_street":"South Kearny","ending_cross_street":"Tonnelle Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"wKwu84xclyBdjxhDouGLsMTopok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound between North of CR 612/Sand Hill Rd (Raritan Twp) and North of Woodschurch Rd (Readington Twp), Wednesday April 22, 2026 09:00 AM thru 08:00 PM, right lane closed","update_date":"2026-04-21T16:00:34Z"},"road_event_id":"wKwu84xclyBdjxhDouGLsMTopok=","beginning_cross_street":"North of CR 612/Sand Hill Rd","ending_cross_street":"North of Woodschurch Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-23T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.857116,40.544532]]}},{"id":"jzsHfpFZF2RyLFgUb/4Eyy/VeRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound near North of Woodschurch Rd (Readington Twp), Thursday April 23, 2026 09:00 AM thru 08:00 PM, left lane closed","update_date":"2026-04-21T16:00:35Z"},"road_event_id":"jzsHfpFZF2RyLFgUb/4Eyy/VeRU=","beginning_cross_street":"North of Woodschurch Rd","ending_cross_street":"South of Stanton Station Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.854309,40.55754]]}},{"id":"uiiRuPZoyotWE1JM51QBHFT7K9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Northbound between North of CR 612/Sand Hill Rd (Raritan Twp) and North of Woodschurch Rd (Readington Twp), Thursday April 23, 2026 09:00 AM thru 08:00 PM, right lane closed","update_date":"2026-04-21T16:00:30Z"},"road_event_id":"uiiRuPZoyotWE1JM51QBHFT7K9Y=","beginning_cross_street":"North of CR 612/Sand Hill Rd","ending_cross_street":"North of Woodschurch Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.857116,40.544532]]}},{"id":"lXVCJFzOByRpmmksSWUjSM7dOuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound near North of CR 650/Church St (Raritan Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 10:00 AM, right lane closed","update_date":"2026-04-21T16:00:26Z"},"road_event_id":"lXVCJFzOByRpmmksSWUjSM7dOuA=","beginning_cross_street":"North of CR 650/Church St","ending_cross_street":"North of CR 650/Church St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844604,40.506324]]}},{"id":"rWDvFhcp94M8i9lqBSd3OK3hB8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 52 - CR 613/Passaic Ave (Wayne Twp), Friday April 24, 2026 07:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-21T16:00:24Z"},"road_event_id":"rWDvFhcp94M8i9lqBSd3OK3hB8I=","beginning_cross_street":"East of Exit 52 - CR 613/Passaic Ave","ending_cross_street":"West of Exit 53 - NJ 23/US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.265693,40.894336]]}},{"id":"aKB6Gw0qKz62N9aDjJ80K3x6aII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 52 - CR 613/Passaic Ave (Wayne Twp), Wednesday April 22, 2026 07:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-21T16:00:25Z"},"road_event_id":"aKB6Gw0qKz62N9aDjJ80K3x6aII=","beginning_cross_street":"East of Exit 52 - CR 613/Passaic Ave","ending_cross_street":"West of Exit 53 - NJ 23/US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.265693,40.894336]]}},{"id":"qfLeOlQmqw84hsPw4BVMYG/ZpDo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound near North of CR 650/Church St (Raritan Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T16:00:23Z"},"road_event_id":"qfLeOlQmqw84hsPw4BVMYG/ZpDo=","beginning_cross_street":"North of CR 650/Church St","ending_cross_street":"North of CR 650/Church St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844604,40.506324]]}},{"id":"cW1+19FOMk+AcIOZNJXE+2at9fU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound near Garden State Parkway (Somers Point), Wednesday April 22, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-21T16:00:32Z"},"road_event_id":"cW1+19FOMk+AcIOZNJXE+2at9fU=","beginning_cross_street":"Garden State Parkway","ending_cross_street":"North of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618362,39.308502]]}},{"id":"nbOB/vtJ+fVYseuzbe4rxhcpU68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Installation of sign structure on I-690 westbound between Exit 19N-19A; NY 635;Thompson Rd. (De Witt) and NY 635; Thompson Rd. overpass (Syracuse), Continuous Tuesday April 21st, 2026 09:00 AM thru Tuesday May 12th, 2026 03:00 PM right shoulder closed","update_date":"2026-04-21T16:12:45Z"},"road_event_id":"nbOB/vtJ+fVYseuzbe4rxhcpU68=","beginning_cross_street":"Exit 19N-19A; NY 635;Thompson Rd. ","ending_cross_street":"NY 635; Thompson Rd. overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.073934,43.05783]]}},{"id":"u1Bz9uavW3MGtJ5rdsNvWnMFV3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between CR 657/Veterans Way (Franklin Twp) and NJ 347 (Maurice River Twp) Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed southbound; right shoulder closed northbound","update_date":"2026-04-21T17:03:05Z"},"road_event_id":"u1Bz9uavW3MGtJ5rdsNvWnMFV3c=","beginning_cross_street":"CR 657/Veterans Way","ending_cross_street":"NJ 347","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.079208,39.616561]]}},{"id":"YQs8xeYTFKbGQy7pO1X3pYBBwjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 44"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 44 Northbound At CR 656/Paradise Rd (West Deptford Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-21T17:05:42Z"},"road_event_id":"YQs8xeYTFKbGQy7pO1X3pYBBwjg=","beginning_cross_street":"CR 656/Paradise Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.223052,39.833969]]}},{"id":"Tyok/ZLZCJcMZ26Slc90q67KH0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Eastbound At NJ 70 (Brick Twp) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, 1 right lane of 3 lanes closed","update_date":"2026-04-21T17:09:29Z"},"road_event_id":"Tyok/ZLZCJcMZ26Slc90q67KH0c=","beginning_cross_street":"NJ 70","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.130432,40.068634]]}},{"id":"6xQ+Q5S64KfUJEmwz/phIzQZd7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nzd0G1rXywRJydxm/q98WL3hQ+M="}],"description":"Utility work on NY 256 both directions between Stagecoach Road; NY 255 (Sparta) and CR 1A; Springwater Rd. (Conesus) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T17:10:54Z"},"road_event_id":"6xQ+Q5S64KfUJEmwz/phIzQZd7s=","beginning_cross_street":"Stagecoach Road; NY 255","ending_cross_street":"CR 1A; Springwater Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697056,42.634855]]}},{"id":"Nzd0G1rXywRJydxm/q98WL3hQ+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6xQ+Q5S64KfUJEmwz/phIzQZd7s="},{"type":"next-occurrence","id":"FFCH3qFSeQfuaxbv9QGwfP3J04c="}],"description":"Utility work on NY 256 both directions between Stagecoach Road; NY 255 (Sparta) and CR 1A; Springwater Rd. (Conesus) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T17:10:54Z"},"road_event_id":"Nzd0G1rXywRJydxm/q98WL3hQ+M=","beginning_cross_street":"Stagecoach Road; NY 255","ending_cross_street":"CR 1A; Springwater Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697056,42.634855]]}},{"id":"FFCH3qFSeQfuaxbv9QGwfP3J04c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6xQ+Q5S64KfUJEmwz/phIzQZd7s="}],"description":"Utility work on NY 256 both directions between Stagecoach Road; NY 255 (Sparta) and CR 1A; Springwater Rd. (Conesus) Alternating lane closures with flaggers as needed, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T17:10:54Z"},"road_event_id":"FFCH3qFSeQfuaxbv9QGwfP3J04c=","beginning_cross_street":"Stagecoach Road; NY 255","ending_cross_street":"CR 1A; Springwater Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697056,42.634855]]}},{"id":"+CiigJu6rffJof9z+fhP0EAiNUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 66"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 66 Westbound At Jumping Brook Rd (Neptune Twp) Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-21T17:14:34Z"},"road_event_id":"+CiigJu6rffJof9z+fhP0EAiNUg=","beginning_cross_street":"Jumping Brook Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.085609,40.22293]]}},{"id":"/eQfIbfUDKpR6fOgohrvbQSnQvc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sy1GH6CgLR5VV6js4TArpq1xVds="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"/eQfIbfUDKpR6fOgohrvbQSnQvc=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"sy1GH6CgLR5VV6js4TArpq1xVds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"OozbH1unqXH09xH4vw1CtAsVsMU="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"sy1GH6CgLR5VV6js4TArpq1xVds=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"OozbH1unqXH09xH4vw1CtAsVsMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"hRSij0rGWM09o+hwQr1bRqLHDnM="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"OozbH1unqXH09xH4vw1CtAsVsMU=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"hRSij0rGWM09o+hwQr1bRqLHDnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"juuu4ksNx9cDOmEtx+An3H0fCFs="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"hRSij0rGWM09o+hwQr1bRqLHDnM=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:30:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"juuu4ksNx9cDOmEtx+An3H0fCFs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"o0tbs9lEnOAMv4Xg5HoY9X+WnPU="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"juuu4ksNx9cDOmEtx+An3H0fCFs=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:30:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"o0tbs9lEnOAMv4Xg5HoY9X+WnPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"k7AcvZz3JA7WAkBtuGgEIg2sdi0="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"o0tbs9lEnOAMv4Xg5HoY9X+WnPU=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"k7AcvZz3JA7WAkBtuGgEIg2sdi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"5Zb2BMikwp7tECVpljl1Q2OzdLc="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"k7AcvZz3JA7WAkBtuGgEIg2sdi0=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"5Zb2BMikwp7tECVpljl1Q2OzdLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"oBCIYaCqi+Be+oMFIEHzX9Gnm3g="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"5Zb2BMikwp7tECVpljl1Q2OzdLc=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"oBCIYaCqi+Be+oMFIEHzX9Gnm3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"0/e52bdjov7MQQHuCNy9kXDj4pY="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"oBCIYaCqi+Be+oMFIEHzX9Gnm3g=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"0/e52bdjov7MQQHuCNy9kXDj4pY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"1rwHOWThjweTY0XC5jKT7MGLXP4="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"0/e52bdjov7MQQHuCNy9kXDj4pY=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"1rwHOWThjweTY0XC5jKT7MGLXP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"cKcsQFIdlSYgPhS1Lo1i80dQv54="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"1rwHOWThjweTY0XC5jKT7MGLXP4=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:30:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"cKcsQFIdlSYgPhS1Lo1i80dQv54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"XIq82gd80ZbA3Iijr1lRgga5YY8="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"cKcsQFIdlSYgPhS1Lo1i80dQv54=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:30:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"XIq82gd80ZbA3Iijr1lRgga5YY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"fTdH6H2OatPFAxtGi+EbSJAqc/Q="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"XIq82gd80ZbA3Iijr1lRgga5YY8=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"fTdH6H2OatPFAxtGi+EbSJAqc/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="},{"type":"next-occurrence","id":"ix01TXxMaynyJXQ1hQ9gq7rSOM4="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"fTdH6H2OatPFAxtGi+EbSJAqc/Q=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"ix01TXxMaynyJXQ1hQ9gq7rSOM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/eQfIbfUDKpR6fOgohrvbQSnQvc="}],"description":"Utility work on NY 36 both directions between Town of Mount Morris and Town of Leicester Line (Leicester) and Main Street; NY 5 (Caledonia) Mobile operation, Wednesday April 22nd, 2026 thru Thursday May 7th, 2026, Sunday thru Saturday, 07:30 AM thru 04:00 PM right shoulder closed","update_date":"2026-04-21T17:22:38Z"},"road_event_id":"ix01TXxMaynyJXQ1hQ9gq7rSOM4=","beginning_cross_street":"Town of Mount Morris and Town of Leicester Line","ending_cross_street":"Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.882687,42.741471]]}},{"id":"mZZD47Zo1XnrVYTdx3t2UKOsEOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Astoria Boulevard"],"direction":"unknown","related_road_events":[],"description":"Construction on Astoria Boulevard eastbound ramp to E/B Northern Boulevard / N/B Whitestone Expressway (New York) Subject to change without notice., Thursday April 23rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-21T17:47:47Z"},"road_event_id":"mZZD47Zo1XnrVYTdx3t2UKOsEOg=","beginning_cross_street":"E/B Northern Boulevard / N/B Whitestone Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.852035,40.758089]]}},{"id":"KQ/+sy6cL5a7b6/nzB3argpbies=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UNj0mPMcXRbSy2SCrhStO/o5vy4="}],"description":"Installation of fiber optics on NY 36 both directions Steuben - Livingston County Line (Dansville) 1 Lane, 2 Way, Flagger Control- Replacing aerial/underground copper cable. , Thursday April 23rd, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:53:11Z"},"road_event_id":"KQ/+sy6cL5a7b6/nzB3argpbies=","beginning_cross_street":"Steuben - Livingston County Line","ending_cross_street":"Steuben - Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697366,42.525776]]}},{"id":"UNj0mPMcXRbSy2SCrhStO/o5vy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQ/+sy6cL5a7b6/nzB3argpbies="},{"type":"next-occurrence","id":"O1wbTojqKBfEmeP1CfzDvbwE7sc="}],"description":"Installation of fiber optics on NY 36 both directions Steuben - Livingston County Line (Dansville) 1 Lane, 2 Way, Flagger Control- Replacing aerial/underground copper cable. , Thursday April 23rd, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:53:11Z"},"road_event_id":"UNj0mPMcXRbSy2SCrhStO/o5vy4=","beginning_cross_street":"Steuben - Livingston County Line","ending_cross_street":"Steuben - Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697366,42.525776]]}},{"id":"O1wbTojqKBfEmeP1CfzDvbwE7sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQ/+sy6cL5a7b6/nzB3argpbies="},{"type":"next-occurrence","id":"9twt2obG45t4gia52ZSXLvcfZMc="}],"description":"Installation of fiber optics on NY 36 both directions Steuben - Livingston County Line (Dansville) 1 Lane, 2 Way, Flagger Control- Replacing aerial/underground copper cable. , Thursday April 23rd, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:53:11Z"},"road_event_id":"O1wbTojqKBfEmeP1CfzDvbwE7sc=","beginning_cross_street":"Steuben - Livingston County Line","ending_cross_street":"Steuben - Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697366,42.525776]]}},{"id":"9twt2obG45t4gia52ZSXLvcfZMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQ/+sy6cL5a7b6/nzB3argpbies="},{"type":"next-occurrence","id":"rIuOa1E5V6LZ5a8daz9LXX6l77M="}],"description":"Installation of fiber optics on NY 36 both directions Steuben - Livingston County Line (Dansville) 1 Lane, 2 Way, Flagger Control- Replacing aerial/underground copper cable. , Thursday April 23rd, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:53:11Z"},"road_event_id":"9twt2obG45t4gia52ZSXLvcfZMc=","beginning_cross_street":"Steuben - Livingston County Line","ending_cross_street":"Steuben - Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697366,42.525776]]}},{"id":"rIuOa1E5V6LZ5a8daz9LXX6l77M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQ/+sy6cL5a7b6/nzB3argpbies="},{"type":"next-occurrence","id":"J2j+Iu50yIj9IGPNDrIL/HexqCQ="}],"description":"Installation of fiber optics on NY 36 both directions Steuben - Livingston County Line (Dansville) 1 Lane, 2 Way, Flagger Control- Replacing aerial/underground copper cable. , Thursday April 23rd, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:53:11Z"},"road_event_id":"rIuOa1E5V6LZ5a8daz9LXX6l77M=","beginning_cross_street":"Steuben - Livingston County Line","ending_cross_street":"Steuben - Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697366,42.525776]]}},{"id":"J2j+Iu50yIj9IGPNDrIL/HexqCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KQ/+sy6cL5a7b6/nzB3argpbies="}],"description":"Installation of fiber optics on NY 36 both directions Steuben - Livingston County Line (Dansville) 1 Lane, 2 Way, Flagger Control- Replacing aerial/underground copper cable. , Thursday April 23rd, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Tuesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-21T17:53:11Z"},"road_event_id":"J2j+Iu50yIj9IGPNDrIL/HexqCQ=","beginning_cross_street":"Steuben - Livingston County Line","ending_cross_street":"Steuben - Livingston County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.697366,42.525776]]}},{"id":"n5jxgQPTJqC49/Pevj0+KbPSfOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4jPfxBYfdi6tut5iS9Gdkq/vNgQ="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Friday May 1st, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Thursday April 30th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound, Thursday April 30th, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound service road","update_date":"2026-04-21T18:07:44Z"},"road_event_id":"n5jxgQPTJqC49/Pevj0+KbPSfOw=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"4jPfxBYfdi6tut5iS9Gdkq/vNgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n5jxgQPTJqC49/Pevj0+KbPSfOw="},{"type":"next-occurrence","id":"PRPglefBfG4yzqGg6HF6NxkqZzU="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Friday May 1st, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Thursday April 30th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound, Thursday April 30th, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound service road","update_date":"2026-04-21T18:07:44Z"},"road_event_id":"4jPfxBYfdi6tut5iS9Gdkq/vNgQ=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"PRPglefBfG4yzqGg6HF6NxkqZzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n5jxgQPTJqC49/Pevj0+KbPSfOw="},{"type":"next-occurrence","id":"oT6HCCN0xywvVhQcR0BSCW2Y+4o="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Friday May 1st, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Thursday April 30th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound, Thursday April 30th, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound service road","update_date":"2026-04-21T18:07:44Z"},"road_event_id":"PRPglefBfG4yzqGg6HF6NxkqZzU=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"oT6HCCN0xywvVhQcR0BSCW2Y+4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n5jxgQPTJqC49/Pevj0+KbPSfOw="},{"type":"next-occurrence","id":"taLBtvw8ZRJzQWlcuK0UAdhj17A="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Friday May 1st, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Thursday April 30th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound, Thursday April 30th, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound service road","update_date":"2026-04-21T18:07:44Z"},"road_event_id":"oT6HCCN0xywvVhQcR0BSCW2Y+4o=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"taLBtvw8ZRJzQWlcuK0UAdhj17A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n5jxgQPTJqC49/Pevj0+KbPSfOw="}],"description":"Construction on I-278 both directions between Fort Hamilton Parkway Extension (New York) and 86th Street (New York) Subject to change without notice., Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Friday May 1st, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed westbound service road, Thursday April 30th, 2026, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed eastbound, Thursday April 30th, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed eastbound service road","update_date":"2026-04-21T18:07:44Z"},"road_event_id":"taLBtvw8ZRJzQWlcuK0UAdhj17A=","beginning_cross_street":"Fort Hamilton Parkway Extension","ending_cross_street":"86th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.019622,40.624241]]}},{"id":"nIiW6UJFlzTPzpbnWyAEv0wXuXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-80 (Denville Twp) and East of CR 669/Canfield Av (Mine Hill Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:30:24Z"},"road_event_id":"nIiW6UJFlzTPzpbnWyAEv0wXuXU=","beginning_cross_street":"West of I-80","ending_cross_street":"East of CR 669/Canfield Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.490287,40.897205]]}},{"id":"mJ/ENwEgL2BrL6hHYj81YmPS070=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of CR 669/Canfield Av (Mine Hill Twp) and West of I-80 (Denville Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:30:25Z"},"road_event_id":"mJ/ENwEgL2BrL6hHYj81YmPS070=","beginning_cross_street":"East of CR 669/Canfield Av","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.600013,40.879898]]}},{"id":"CNJRpnMHx/UZFn/1IuG/vMg23V0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 104 westbound On-ramp Hudson Avenue (Rochester), Wednesday April 22nd, 2026, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:31:41Z"},"road_event_id":"CNJRpnMHx/UZFn/1IuG/vMg23V0=","beginning_cross_street":"Hudson Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.606361,43.191833]]}},{"id":"XNSUd/E8iK5CLh9Tu10C7fHohSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near South of CR 522/Stouts Ln (South Brunswick Twp), Thursday April 23, 2026 03:00 AM thru 05:00 AM, , moving operation","update_date":"2026-04-21T18:33:31Z"},"road_event_id":"XNSUd/E8iK5CLh9Tu10C7fHohSU=","beginning_cross_street":"South of CR 522/Stouts Ln","ending_cross_street":"CR 522/Stouts Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.572013,40.385776]]}},{"id":"y4dMUS9a1bbWGJCiFRKuckvWlAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-80 (Denville Twp) and East of CR 669/Canfield Av (Mine Hill Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:33:32Z"},"road_event_id":"y4dMUS9a1bbWGJCiFRKuckvWlAo=","beginning_cross_street":"West of I-80","ending_cross_street":"East of CR 669/Canfield Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.490287,40.897205]]}},{"id":"RSUGo3PCb92L7VOyztOaG3M81qM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:33:29Z"},"road_event_id":"RSUGo3PCb92L7VOyztOaG3M81qM=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"t4eebE+Apxblfj2GUUNF8zTpe2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound near South of Arthur St (East Brunswick Twp), Wednesday April 22, 2026 07:00 AM thru 05:00 PM, right lane closed","update_date":"2026-04-21T18:33:30Z"},"road_event_id":"t4eebE+Apxblfj2GUUNF8zTpe2E=","beginning_cross_street":"South of Arthur St","ending_cross_street":"Arthur St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.387733,40.433139]]}},{"id":"gBmIWpnMl/rcP1cejlGvMLPEf4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between CR 606/Milltown Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Wednesday April 22, 2026 10:00 PM thru Thursday April 23, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 10:00 PM to 05:00 AM)","update_date":"2026-04-21T18:33:26Z"},"road_event_id":"gBmIWpnMl/rcP1cejlGvMLPEf4k=","beginning_cross_street":"CR 606/Milltown Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.394393,40.441699]]}},{"id":"sU30j5gM2KqiS5UfYtq+Lt0MElk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound at Exit 10 - NJ 66 (Neptune Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-21T18:33:27Z"},"road_event_id":"sU30j5gM2KqiS5UfYtq+Lt0MElk=","beginning_cross_street":"Exit 10 - NJ 66","ending_cross_street":"Exit 10 - NJ 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.05014,40.227825]]}},{"id":"i8+InJ1rZdp55Gd/znHxfmfuN90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound at North of Exit 10 - NJ 66 (Ocean Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-21T18:33:23Z"},"road_event_id":"i8+InJ1rZdp55Gd/znHxfmfuN90=","beginning_cross_street":"North of Exit 10 - NJ 66","ending_cross_street":"North of Exit 10 - NJ 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.05001,40.229236]]}},{"id":"EAlUfWlO3EMnDgo+Xo1KC4aK57M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound at North of Exit 10 - NJ 66 (Ocean Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-21T18:33:24Z"},"road_event_id":"EAlUfWlO3EMnDgo+Xo1KC4aK57M=","beginning_cross_street":"North of Exit 10 - NJ 66","ending_cross_street":"North of Exit 10 - NJ 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049964,40.230686]]}},{"id":"haTZzRZpkAdQ8M/Z21DOMd6y7To=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between CR 606/Milltown Rd (East Brunswick Twp) and West Prospect St (East Brunswick Twp), Wednesday April 22, 2026 10:00 PM thru Thursday April 23, 2026 05:00 AM, at least one lane closed","update_date":"2026-04-21T18:33:21Z"},"road_event_id":"haTZzRZpkAdQ8M/Z21DOMd6y7To=","beginning_cross_street":"CR 606/Milltown Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.394393,40.441699]]}},{"id":"2dbpxQnILcp2nFs2jI7PGtq+wU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of CR 669/Canfield Av (Mine Hill Twp) and West of I-80 (Denville Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:33:34Z"},"road_event_id":"2dbpxQnILcp2nFs2jI7PGtq+wU4=","beginning_cross_street":"East of CR 669/Canfield Av","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.600013,40.879898]]}},{"id":"nY4ZyVUcrKp7MYK3ir8DIiqMlp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 38 - US 46 (Denville Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T18:33:35Z"},"road_event_id":"nY4ZyVUcrKp7MYK3ir8DIiqMlp8=","beginning_cross_street":"West of Exit 38 - US 46","ending_cross_street":"East of Exit 37 - CR 513/Hibernia Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.495353,40.904388]]}},{"id":"8EiUAHLQTdrDmcxL0X9vwqBu8UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Southbound near South of CR 527/Old Bridge Tpke/Edgeboro Rd (East Brunswick Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, left lane closed","update_date":"2026-04-21T18:33:33Z"},"road_event_id":"8EiUAHLQTdrDmcxL0X9vwqBu8UU=","beginning_cross_street":"South of CR 527/Old Bridge Tpke/Edgeboro Rd","ending_cross_street":"West Prospect St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.403823,40.462303]]}},{"id":"xo7BHdusB82LFMStI0xZ3sJ1XNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Southbound between South of Arthur St (East Brunswick Twp) and South of CR 617/Rues Ln (East Brunswick Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-21T18:33:43Z"},"road_event_id":"xo7BHdusB82LFMStI0xZ3sJ1XNs=","beginning_cross_street":"South of Arthur St","ending_cross_street":"South of CR 617/Rues Ln","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.387733,40.433139]]}},{"id":"4OctnzrW8N6sAegMQe/aeYJ92k8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound at South of Exit 10 - NJ 66 (Neptune Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-21T18:33:41Z"},"road_event_id":"4OctnzrW8N6sAegMQe/aeYJ92k8=","beginning_cross_street":"South of Exit 10 - NJ 66","ending_cross_street":"South of Exit 10 - NJ 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050376,40.22636]]}},{"id":"89/r5kPkAjR5/mzMLJRX+arY7zU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Friday April 24, 2026 10:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:33:42Z"},"road_event_id":"89/r5kPkAjR5/mzMLJRX+arY7zU=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"Fj3xRRYnZMRSH+Cdo5fR92hnpf0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:33:40Z"},"road_event_id":"Fj3xRRYnZMRSH+Cdo5fR92hnpf0=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"56vAINVALj4gBve+cfprHRjIEfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound between North of Ridgefield Circle (Ridgefield) and North of 44th St (North Bergen Twp), Thursday April 23, 2026 10:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-21T18:33:36Z"},"road_event_id":"56vAINVALj4gBve+cfprHRjIEfE=","beginning_cross_street":"North of Ridgefield Circle","ending_cross_street":"North of 44th St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003181,40.840713]]}},{"id":"Oz20zLWuBMf7hLrr6aYzENcRbIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 15"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 15 Northbound at North of I-80 (Rockaway Twp) Thursday April 23, 2026 04:00 AM thru 02:00 PM, ramp","update_date":"2026-04-21T18:33:37Z"},"road_event_id":"Oz20zLWuBMf7hLrr6aYzENcRbIc=","beginning_cross_street":"North of I-80","ending_cross_street":"North of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.573585,40.910888]]}},{"id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/RdnvCfVe7zaxww2wXBUDNs2QGA="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"/RdnvCfVe7zaxww2wXBUDNs2QGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="},{"type":"next-occurrence","id":"AwlVzerKnwVEF3tt/DOrXSSY6oQ="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"/RdnvCfVe7zaxww2wXBUDNs2QGA=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"AwlVzerKnwVEF3tt/DOrXSSY6oQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="},{"type":"next-occurrence","id":"UG2JfarmSnXapHkHOI3aFivyQq4="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"AwlVzerKnwVEF3tt/DOrXSSY6oQ=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"UG2JfarmSnXapHkHOI3aFivyQq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="},{"type":"next-occurrence","id":"JwHx9xugBlXNqZIlMyJ2vF3j9Y4="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"UG2JfarmSnXapHkHOI3aFivyQq4=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"JwHx9xugBlXNqZIlMyJ2vF3j9Y4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="},{"type":"next-occurrence","id":"am3CyLs9scvZ0F99vWJIe29TLYQ="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"JwHx9xugBlXNqZIlMyJ2vF3j9Y4=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"am3CyLs9scvZ0F99vWJIe29TLYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="},{"type":"next-occurrence","id":"jc237/nONoOsaaGSoAgxEq0iTT4="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"am3CyLs9scvZ0F99vWJIe29TLYQ=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"jc237/nONoOsaaGSoAgxEq0iTT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="},{"type":"next-occurrence","id":"nG6N3Qsp+BH+Mw6jr8BbLPpArrc="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"jc237/nONoOsaaGSoAgxEq0iTT4=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"nG6N3Qsp+BH+Mw6jr8BbLPpArrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="},{"type":"next-occurrence","id":"N3/ENBuxBsZRN7p/r5irYCqBCCQ="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"nG6N3Qsp+BH+Mw6jr8BbLPpArrc=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"N3/ENBuxBsZRN7p/r5irYCqBCCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 18"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A7fTVNs5ehc8KPDrtGeqWmHlVbI="}],"description":"Utility work on NY 18 westbound at 1399 Roosevelt Highway (Clarkson) Installing a new pole on location. Right lane/shoulder closure needed. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:37:49Z"},"road_event_id":"N3/ENBuxBsZRN7p/r5irYCqBCCQ=","beginning_cross_street":"1399 Roosevelt Highway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.855284,43.284118]]}},{"id":"UwFr6GYsWVDtkbdlPCql2C5yg0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"09RqN57E3N+RtBWV66QkoUlxX1E="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"UwFr6GYsWVDtkbdlPCql2C5yg0k=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"09RqN57E3N+RtBWV66QkoUlxX1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="},{"type":"next-occurrence","id":"/nMV+y0QPy+KW8Z+yK+NVaUpUV0="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"09RqN57E3N+RtBWV66QkoUlxX1E=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"/nMV+y0QPy+KW8Z+yK+NVaUpUV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="},{"type":"next-occurrence","id":"IfZJFDTP8hRqD3PzzpOXXbxjoi8="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"/nMV+y0QPy+KW8Z+yK+NVaUpUV0=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"IfZJFDTP8hRqD3PzzpOXXbxjoi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="},{"type":"next-occurrence","id":"P757aZZXiycK5EyrwG5t3AOIQHQ="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"IfZJFDTP8hRqD3PzzpOXXbxjoi8=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"P757aZZXiycK5EyrwG5t3AOIQHQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="},{"type":"next-occurrence","id":"phGNjNSFbCOgtg9kgutFc9tVJUM="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"P757aZZXiycK5EyrwG5t3AOIQHQ=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"phGNjNSFbCOgtg9kgutFc9tVJUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="},{"type":"next-occurrence","id":"yYRwnHHSWYYfu5HtZuOzxze+PnE="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"phGNjNSFbCOgtg9kgutFc9tVJUM=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"yYRwnHHSWYYfu5HtZuOzxze+PnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="},{"type":"next-occurrence","id":"6088PtuLCpm6Uvparv6amS/hHi0="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"yYRwnHHSWYYfu5HtZuOzxze+PnE=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"6088PtuLCpm6Uvparv6amS/hHi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="},{"type":"next-occurrence","id":"r6gT4UnwHi7oXnIDlByWJY9DivA="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"6088PtuLCpm6Uvparv6amS/hHi0=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"r6gT4UnwHi7oXnIDlByWJY9DivA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 441"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UwFr6GYsWVDtkbdlPCql2C5yg0k="}],"description":"Utility work on NY 441 eastbound at 2620 NY-441 (Penfield) Replacing broken pole. Storm damage. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossings. Work beyond shoulder., Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T18:45:44Z"},"road_event_id":"r6gT4UnwHi7oXnIDlByWJY9DivA=","beginning_cross_street":"2620 NY-441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.410308,43.130227]]}},{"id":"KzZ501IsSMI7nFDxYf1aHNE4eTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-87 Northway northbound between Exit 2E (Colonie) and Exit 2W (Colonie), Saturday April 25th, 2026, 06:30 AM thru 10:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-21T19:07:49Z"},"road_event_id":"KzZ501IsSMI7nFDxYf1aHNE4eTM=","beginning_cross_street":"Exit 2E","ending_cross_street":"Exit 2W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T17:00:00Z","end_date":"2026-04-26T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830795,42.706394]]}},{"id":"Zn/Kv8nFFrquWAyfRWS+irt8BqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["New Jersey Turnpike"],"direction":"unknown","related_road_events":[],"description":"Substructure repairs on New Jersey Turnpike Outer Roadway southbound Entrance ramp Interchange 11 - Garden State Parkway (Woodbridge Twp), Wednesday April 22nd, 2026, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-21T19:12:00Z"},"road_event_id":"Zn/Kv8nFFrquWAyfRWS+irt8BqE=","beginning_cross_street":"Interchange 11 - Garden State Parkway","ending_cross_street":"Interchange 11 - Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.294368,40.541514]]}},{"id":"QSR9D0eevorWq0bl7iXQTd01iGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Overhead sign repair on I-87 Northway southbound area of Exit 1 E; Exit 1W (Albany), Sunday April 26th, 2026, 06:30 AM thru 11:00 AM 2 Right lanes of 5 lanes closed","update_date":"2026-04-21T19:14:09Z"},"road_event_id":"QSR9D0eevorWq0bl7iXQTd01iGY=","beginning_cross_street":"Exit 1 E; Exit 1W","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T17:00:00Z","end_date":"2026-04-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843086,42.697408]]}},{"id":"Ff/ZnZOZSWfCoxTDRkmTsuJ7sOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound between North of Island Rd (Mahwah Twp) and North of East Union Av (East Rutherford), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:30Z"},"road_event_id":"Ff/ZnZOZSWfCoxTDRkmTsuJ7sOU=","beginning_cross_street":"North of Island Rd","ending_cross_street":"North of East Union Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.150222,41.081027]]}},{"id":"vNLPXHn85EOpdqzfRHiwmVFIUYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between NJ 208 (Fair Lawn) and US 1&9 (Fort Lee), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:26Z"},"road_event_id":"vNLPXHn85EOpdqzfRHiwmVFIUYg=","beginning_cross_street":"NJ 208","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.096107,40.926692]]}},{"id":"hr6lcfp+G/d+ahkzyJ419oGJLjM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between North of East Union Av (East Rutherford) and North of Island Rd (Mahwah Twp), Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:24Z"},"road_event_id":"hr6lcfp+G/d+ahkzyJ419oGJLjM=","beginning_cross_street":"North of East Union Av","ending_cross_street":"North of Island Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.093055,40.828601]]}},{"id":"Ti1y7lfzI2EVbTOroo9VESGMGgQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and CR 79 (Fair Lawn), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:25Z"},"road_event_id":"Ti1y7lfzI2EVbTOroo9VESGMGgQ=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"CR 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"r+nfFt1C+T4X528DoQfpyVXRunk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound between South of Colonial Rd (Franklin Lakes) and South of Morlot Av (Fair Lawn), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:21Z"},"road_event_id":"r+nfFt1C+T4X528DoQfpyVXRunk=","beginning_cross_street":"South of Colonial Rd","ending_cross_street":"South of Morlot Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.218147,41.017967]]}},{"id":"DkDI7bIsndQWaBwjtV6kSQ+8KEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound between South of Colonial Rd (Franklin Lakes) and South of Morlot Av (Fair Lawn), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:23Z"},"road_event_id":"DkDI7bIsndQWaBwjtV6kSQ+8KEk=","beginning_cross_street":"South of Colonial Rd","ending_cross_street":"South of Morlot Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.218147,41.017967]]}},{"id":"ytSqSS+lpUR4zJD8s9SyK/jvb5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound between South of Colonial Rd (Franklin Lakes) and South of Morlot Av (Fair Lawn), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:20Z"},"road_event_id":"ytSqSS+lpUR4zJD8s9SyK/jvb5g=","beginning_cross_street":"South of Colonial Rd","ending_cross_street":"South of Morlot Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.218147,41.017967]]}},{"id":"M1M9zdD7mzSIqFBirwTVXFpZFdA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and CR 79 (Fair Lawn), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:39Z"},"road_event_id":"M1M9zdD7mzSIqFBirwTVXFpZFdA=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"CR 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"P5dPAnkqaeB2aMBcPNJETR+9iIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound between South of Morlot Av (Fair Lawn) and South of Colonial Rd (Franklin Lakes), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:36Z"},"road_event_id":"P5dPAnkqaeB2aMBcPNJETR+9iIA=","beginning_cross_street":"South of Morlot Av","ending_cross_street":"South of Colonial Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.106216,40.930297]]}},{"id":"9tuXwwKuVNbtWFBa+nGTY9eZrVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between NJ 208 (Fair Lawn) and US 1&9 (Fort Lee), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:38Z"},"road_event_id":"9tuXwwKuVNbtWFBa+nGTY9eZrVs=","beginning_cross_street":"NJ 208","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.096107,40.926692]]}},{"id":"SHhHruTkYumVBspXgYjZv6QLzPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between North of East Union Av (East Rutherford) and North of Island Rd (Mahwah Twp), Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:37Z"},"road_event_id":"SHhHruTkYumVBspXgYjZv6QLzPU=","beginning_cross_street":"North of East Union Av","ending_cross_street":"North of Island Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.093055,40.828601]]}},{"id":"frzp0djGWf3bXEvstu0AgHlhIUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound between South of Morlot Av (Fair Lawn) and South of Colonial Rd (Franklin Lakes), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:34Z"},"road_event_id":"frzp0djGWf3bXEvstu0AgHlhIUE=","beginning_cross_street":"South of Morlot Av","ending_cross_street":"South of Colonial Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.106216,40.930297]]}},{"id":"lAQQDVPPa83v8+F3bDkZTVPui3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound between North of Island Rd (Mahwah Twp) and North of East Union Av (East Rutherford), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:33Z"},"road_event_id":"lAQQDVPPa83v8+F3bDkZTVPui3E=","beginning_cross_street":"North of Island Rd","ending_cross_street":"North of East Union Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.150222,41.081027]]}},{"id":"KJVm+iBuyrekDhjfpXxXzAIIlPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound between North of Island Rd (Mahwah Twp) and North of East Union Av (East Rutherford), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:31Z"},"road_event_id":"KJVm+iBuyrekDhjfpXxXzAIIlPA=","beginning_cross_street":"North of Island Rd","ending_cross_street":"North of East Union Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.150222,41.081027]]}},{"id":"Xs67XYixvN0duzBLMJjiQkV/YMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between NJ 208 (Fair Lawn) and US 1&9 (Fort Lee), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:35Z"},"road_event_id":"Xs67XYixvN0duzBLMJjiQkV/YMU=","beginning_cross_street":"NJ 208","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.096107,40.926692]]}},{"id":"CkcJI55V1PzJo1n6+gyumSk38bc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and CR 79 (Fair Lawn), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:27Z"},"road_event_id":"CkcJI55V1PzJo1n6+gyumSk38bc=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"CR 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"cBL1XG6rO0jv8Tcm66dQPv3mw6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Northbound between North of East Union Av (East Rutherford) and North of Island Rd (Mahwah Twp), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:32Z"},"road_event_id":"cBL1XG6rO0jv8Tcm66dQPv3mw6Y=","beginning_cross_street":"North of East Union Av","ending_cross_street":"North of Island Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.093055,40.828601]]}},{"id":"amqkXX8QI/HDMRX/+lEHR0EbK+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound between South of Morlot Av (Fair Lawn) and South of Colonial Rd (Franklin Lakes), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-21T19:18:28Z"},"road_event_id":"amqkXX8QI/HDMRX/+lEHR0EbK+8=","beginning_cross_street":"South of Morlot Av","ending_cross_street":"South of Colonial Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.106216,40.930297]]}},{"id":"4CypD7vqKaf1WofM5CLP/IicILs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lfBUBuiu+160dRc4BbZ5mDXDYug="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"4CypD7vqKaf1WofM5CLP/IicILs=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T06:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"lfBUBuiu+160dRc4BbZ5mDXDYug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"83lT8jHH8v54ZHwN4Kc/ujix+vc="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"lfBUBuiu+160dRc4BbZ5mDXDYug=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"83lT8jHH8v54ZHwN4Kc/ujix+vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"oCVbfzbsAx3BcAXekhrWb9SecNo="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"83lT8jHH8v54ZHwN4Kc/ujix+vc=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T06:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"oCVbfzbsAx3BcAXekhrWb9SecNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"xoodEIcd/38RjPf2WtjT7KPUucM="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"oCVbfzbsAx3BcAXekhrWb9SecNo=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"xoodEIcd/38RjPf2WtjT7KPUucM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"Pai3XcUObPRpzkDI1g6U5tfkM8U="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"xoodEIcd/38RjPf2WtjT7KPUucM=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T06:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"Pai3XcUObPRpzkDI1g6U5tfkM8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"yhKMf7Hxhbp3DGR0ryQtgx8D2E8="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"Pai3XcUObPRpzkDI1g6U5tfkM8U=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"yhKMf7Hxhbp3DGR0ryQtgx8D2E8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"QoFKihhCMynHluDLYnWv64IQ6OU="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"yhKMf7Hxhbp3DGR0ryQtgx8D2E8=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T06:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"QoFKihhCMynHluDLYnWv64IQ6OU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"aDkIkki0o3+R3R/rpbEjU6U7d+A="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"QoFKihhCMynHluDLYnWv64IQ6OU=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"aDkIkki0o3+R3R/rpbEjU6U7d+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"1ttF/XYRX5CzT5HRst/EwWzc+x8="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"aDkIkki0o3+R3R/rpbEjU6U7d+A=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T06:00:00Z","end_date":"2026-05-02T11:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"1ttF/XYRX5CzT5HRst/EwWzc+x8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"U7Wl6nX++vN7MHAO0jI4IWVCid0="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"1ttF/XYRX5CzT5HRst/EwWzc+x8=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T17:00:00Z","end_date":"2026-05-03T01:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"U7Wl6nX++vN7MHAO0jI4IWVCid0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"nAOAtE7Uve2tgB97qyFT4iVxYLk="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"U7Wl6nX++vN7MHAO0jI4IWVCid0=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T02:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"nAOAtE7Uve2tgB97qyFT4iVxYLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="},{"type":"next-occurrence","id":"/OIAOhMxNCqXjfYAxZt6YYnjSv8="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"nAOAtE7Uve2tgB97qyFT4iVxYLk=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T08:00:00Z","end_date":"2026-05-03T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"/OIAOhMxNCqXjfYAxZt6YYnjSv8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4CypD7vqKaf1WofM5CLP/IicILs="}],"description":"Construction on I-95 northbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 11:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 11:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:27:13Z"},"road_event_id":"/OIAOhMxNCqXjfYAxZt6YYnjSv8=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T22:00:00Z","end_date":"2026-05-04T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825588,40.84279]]}},{"id":"LvdCqpds8exgWmlGfImdWg3pd/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping on Bronx River Parkway northbound between Exit - Sprain Brook Parkway (Yonkers) and Exit 4 - Scarsdale Road (Yonkers), Friday April 24th, 2026, 10:00 AM thru 01:00 PM All lanes closed","update_date":"2026-04-21T19:30:09Z"},"road_event_id":"LvdCqpds8exgWmlGfImdWg3pd/0=","beginning_cross_street":"Exit - Sprain Brook Parkway","ending_cross_street":"Exit 4 - Scarsdale Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.837695,40.937804]]}},{"id":"ua8mligZ1+jJnnARIynMg9YZIrs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ypgC6fpKXkkx6IwyIhXbgzBzOKE="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"ua8mligZ1+jJnnARIynMg9YZIrs=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T06:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"ypgC6fpKXkkx6IwyIhXbgzBzOKE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"AHW2rFPPFR3P0gPFi3aZyHQfRH0="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"ypgC6fpKXkkx6IwyIhXbgzBzOKE=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"AHW2rFPPFR3P0gPFi3aZyHQfRH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"6NZnJ3egf6r+nachJpVjluOoeCc="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"AHW2rFPPFR3P0gPFi3aZyHQfRH0=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T06:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"6NZnJ3egf6r+nachJpVjluOoeCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"QYrAQsZVuLgmo2MvE1mAsBTIUzc="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"6NZnJ3egf6r+nachJpVjluOoeCc=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"QYrAQsZVuLgmo2MvE1mAsBTIUzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"rk9EXoM0HZQu3KWkrauRVvpwhsU="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"QYrAQsZVuLgmo2MvE1mAsBTIUzc=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T06:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"rk9EXoM0HZQu3KWkrauRVvpwhsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"fLn4aKe8eqqhH6a0tzmDwpZo+ws="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"rk9EXoM0HZQu3KWkrauRVvpwhsU=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"fLn4aKe8eqqhH6a0tzmDwpZo+ws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"QkCERCZ4x5TmcyeuDHsxJBN6RnY="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"fLn4aKe8eqqhH6a0tzmDwpZo+ws=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T06:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"QkCERCZ4x5TmcyeuDHsxJBN6RnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"w2XLArYBSmBErnVPNoo262SkyvE="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"QkCERCZ4x5TmcyeuDHsxJBN6RnY=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"w2XLArYBSmBErnVPNoo262SkyvE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"w5Oc4raSPNyFBnkLnzxaSkOvjjU="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"w2XLArYBSmBErnVPNoo262SkyvE=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T06:00:00Z","end_date":"2026-05-02T11:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"w5Oc4raSPNyFBnkLnzxaSkOvjjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"rh3Fmt3WwjSNkKU4fGb02mycL1g="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"w5Oc4raSPNyFBnkLnzxaSkOvjjU=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T17:00:00Z","end_date":"2026-05-03T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"rh3Fmt3WwjSNkKU4fGb02mycL1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="},{"type":"next-occurrence","id":"W4qPgobOppeRXmFq5gW9UAVxRY4="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"rh3Fmt3WwjSNkKU4fGb02mycL1g=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T08:00:00Z","end_date":"2026-05-03T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"W4qPgobOppeRXmFq5gW9UAVxRY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ua8mligZ1+jJnnARIynMg9YZIrs="}],"description":"Bridge painting and construction on I-95 southbound at Country Club Road (New York) Subject to change without notice., Monday April 27th, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 01:00 AM 1 Right lane of 4 lanes closed, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 01:00 AM thru 05:00 AM 2 Right lanes of 4 lanes closed, Friday May 1st, 2026 thru Saturday May 2nd, 2026, 10:00 PM thru 01:00 AM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026, 01:00 AM thru 06:30 AM 2 Left lanes of 4 lanes closed, Saturday May 2nd, 2026, 06:30 AM thru 03:00 PM 1 Left lane of 4 lanes closed, Saturday May 2nd, 2026 thru Sunday May 3rd, 2026, 10:00 PM thru 02:00 AM 1 Left lane of 4 lanes closed, Sunday May 3rd, 2026, 02:00 AM thru 09:00 AM 2 Left lanes of 4 lanes closed, Sunday May 3rd, 2026, 09:00 AM thru 02:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-21T19:31:10Z"},"road_event_id":"W4qPgobOppeRXmFq5gW9UAVxRY4=","beginning_cross_street":"Country Club Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T22:00:00Z","end_date":"2026-05-04T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.825834,40.843013]]}},{"id":"fCjq5ZgMUlvvsLA9SzNOXf8nW/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[],"description":"Line striping on Bronx River Parkway southbound between Exit 4 - Scarsdale Road (Yonkers) and Exit - Sprain Brook Parkway (Yonkers), Thursday April 23rd, 2026, 10:00 AM thru 01:00 PM All lanes closed","update_date":"2026-04-21T19:36:57Z"},"road_event_id":"fCjq5ZgMUlvvsLA9SzNOXf8nW/E=","beginning_cross_street":"Exit 4 - Scarsdale Road","ending_cross_street":"Exit - Sprain Brook Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831429,40.955558]]}},{"id":"ORC300541188","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","description":"Drainage improvements on NY 22 southbound between Middle Rd (Willsboro) and Mountain View Dr (Essex) alternating lane closures Not currently Scheduled","update_date":"2026-04-22T18:30:01Z"},"road_event_id":"ORC300541188","beginning_cross_street":"Middle Rd","ending_cross_street":"Mountain View Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-21T19:52:58Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.392108,44.363736]]}},{"id":"+dpqSsan+mFzIrxEr0QQvqVrupU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 88"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 88 Eastbound East of CR 632/Bridge Av (Point Pleasant) Wednesday April 22, 2026 08:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-21T19:56:13Z"},"road_event_id":"+dpqSsan+mFzIrxEr0QQvqVrupU=","beginning_cross_street":"East of CR 632/Bridge Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.082427,40.080478]]}},{"id":"ORC300541190","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 73"],"direction":"unknown","description":"Street sweeping on NY 73 westbound between Nature Way (Keene) and NY 9N (Keene) alternating lane closures Not currently Scheduled","update_date":"2026-04-22T18:30:01Z"},"road_event_id":"ORC300541190","beginning_cross_street":"Nature Way","ending_cross_street":"NY 9N","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-21T19:57:12Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.784592,44.181971]]}},{"id":"oawoDtHr7zDnxtTY7QomBjwgLSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 48"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 48 Both Directions West of US 40 (Carneys Point Twp) Friday April 24, 2026 09:00 AM thru 03:00 PM, 1 left lane of 2 lanes closed eastbound; 1 left lane of 2 lanes closed westbound","update_date":"2026-04-21T20:00:56Z"},"road_event_id":"oawoDtHr7zDnxtTY7QomBjwgLSw=","beginning_cross_street":"West of US 40","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.412757,39.682659]]}},{"id":"uo/rhGmvRRNxYRVUpgIG5EO0A3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between North of Edison Bridge (Woodbridge Twp) and North of CR 616/New Brunswick Ave (Woodbridge Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-21T20:09:21Z"},"road_event_id":"uo/rhGmvRRNxYRVUpgIG5EO0A3c=","beginning_cross_street":"North of Edison Bridge","ending_cross_street":"North of CR 616/New Brunswick Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.300025,40.513652]]}},{"id":"7X4jX3z0RfHARcJDoYkQL91syMg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Utility work on US 9 southbound between Amazon Driveway (Schodack) and Champagne Dr (Schodack) Sewer Improvements , Thursday April 30th, 2026, 07:00 AM thru 04:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-04-21T20:23:34Z"},"road_event_id":"7X4jX3z0RfHARcJDoYkQL91syMg=","beginning_cross_street":"Amazon Driveway","ending_cross_street":"Champagne Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.675463,42.542684]]}},{"id":"3WaLT9W2gYN+sUARSgDTyHtzJXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Xdl4/EntKQ0rThzO6O7G/FrhRlc="}],"description":"Utility work on US 9 southbound between Champagne Dr (Schodack) and Birchen Bend (Schodack) Sewer improvements, Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 07:00 AM thru 04:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-04-21T20:35:29Z"},"road_event_id":"3WaLT9W2gYN+sUARSgDTyHtzJXo=","beginning_cross_street":"Champagne Dr","ending_cross_street":"Birchen Bend","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.679056,42.53518]]}},{"id":"Xdl4/EntKQ0rThzO6O7G/FrhRlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3WaLT9W2gYN+sUARSgDTyHtzJXo="},{"type":"next-occurrence","id":"uN9vJH+xbsZMed+BAlzxGgWNIMU="}],"description":"Utility work on US 9 southbound between Champagne Dr (Schodack) and Birchen Bend (Schodack) Sewer improvements, Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 07:00 AM thru 04:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-04-21T20:35:29Z"},"road_event_id":"Xdl4/EntKQ0rThzO6O7G/FrhRlc=","beginning_cross_street":"Champagne Dr","ending_cross_street":"Birchen Bend","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.679056,42.53518]]}},{"id":"uN9vJH+xbsZMed+BAlzxGgWNIMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3WaLT9W2gYN+sUARSgDTyHtzJXo="}],"description":"Utility work on US 9 southbound between Champagne Dr (Schodack) and Birchen Bend (Schodack) Sewer improvements, Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 07:00 AM thru 04:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-04-21T20:35:29Z"},"road_event_id":"uN9vJH+xbsZMed+BAlzxGgWNIMU=","beginning_cross_street":"Champagne Dr","ending_cross_street":"Birchen Bend","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.679056,42.53518]]}},{"id":"NFn/2xt3QjYuXSetYgF/GFz1ago=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on NY 7 westbound between Reservoir Lake Road (Pittstown) and County Route 129 (Pittstown) alternating lane closures, Wednesday April 22nd, 2026, 08:00 AM thru 10:00 PM All lanes open","update_date":"2026-04-21T20:40:14Z"},"road_event_id":"NFn/2xt3QjYuXSetYgF/GFz1ago=","beginning_cross_street":"Reservoir Lake Road","ending_cross_street":"County Route 129","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-23T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.515247,42.819817]]}},{"id":"673heVPLP7XUC/qm/9qgIeydEY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Outerbridge Crossing"],"direction":"unknown","related_road_events":[],"description":"Bridge construction on Outerbridge Crossing westbound New York Side (Staten Island) to New Jersey Side (Perth Amboy), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 09:00 PM thru 05:00 AM 1 Right lane of 2 lanes closed","update_date":"2026-04-21T20:53:13Z"},"road_event_id":"673heVPLP7XUC/qm/9qgIeydEY8=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.239519,40.525247]]}},{"id":"idBgF+GXo6rgKG/rAJejeyrGmsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PWshWxcShIE82yAex3xf4RUYWD0="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"idBgF+GXo6rgKG/rAJejeyrGmsA=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"PWshWxcShIE82yAex3xf4RUYWD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idBgF+GXo6rgKG/rAJejeyrGmsA="},{"type":"next-occurrence","id":"ecFVqcUOGiVc/fW2AmswVy3ZM9w="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"PWshWxcShIE82yAex3xf4RUYWD0=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"ecFVqcUOGiVc/fW2AmswVy3ZM9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idBgF+GXo6rgKG/rAJejeyrGmsA="},{"type":"next-occurrence","id":"JKbxTcpNAfFjwmOASLdd3hYkkL8="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"ecFVqcUOGiVc/fW2AmswVy3ZM9w=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"JKbxTcpNAfFjwmOASLdd3hYkkL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idBgF+GXo6rgKG/rAJejeyrGmsA="},{"type":"next-occurrence","id":"OJQc37o/1HvRSj+7LOMwrmMnqso="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"JKbxTcpNAfFjwmOASLdd3hYkkL8=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"OJQc37o/1HvRSj+7LOMwrmMnqso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idBgF+GXo6rgKG/rAJejeyrGmsA="},{"type":"next-occurrence","id":"3n6ppQFlSPSFSUf54CXmsjzcmkw="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"OJQc37o/1HvRSj+7LOMwrmMnqso=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"3n6ppQFlSPSFSUf54CXmsjzcmkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idBgF+GXo6rgKG/rAJejeyrGmsA="},{"type":"next-occurrence","id":"/yCNG+kUVficJM3i5YW+ROUC0Lk="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"3n6ppQFlSPSFSUf54CXmsjzcmkw=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T18:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"/yCNG+kUVficJM3i5YW+ROUC0Lk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idBgF+GXo6rgKG/rAJejeyrGmsA="},{"type":"next-occurrence","id":"Vr2W8bB6zj48/XfpTllm2sNypsc="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"/yCNG+kUVficJM3i5YW+ROUC0Lk=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"Vr2W8bB6zj48/XfpTllm2sNypsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 8"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"idBgF+GXo6rgKG/rAJejeyrGmsA="}],"description":"Milling and paving operations on CT 8 southbound between Exit 12 - Old Stratford Road (Shelton) and Exit 11 - Bridgeport Avenue (SB) (Trumbull) Motorists can expect lane closures, Sunday April 26th, 2026 thru Friday June 12th, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-04-21T20:57:57Z"},"road_event_id":"Vr2W8bB6zj48/XfpTllm2sNypsc=","beginning_cross_street":"Exit 12 - Old Stratford Road","ending_cross_street":"Exit 11 - Bridgeport Avenue (SB)","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T18:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.11724,41.274688]]}},{"id":"r3u6VFZCBDNSmh4exMxoxVEQ2cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 9TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eAmJtEgoCGU+WCNeGvnZ9Bs52q8="}],"description":"Construction on E 9TH ST westbound between 2ND AVE (New York) and STUYVESANT ST (New York) for building inspection from boom truck., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:26:35Z"},"road_event_id":"r3u6VFZCBDNSmh4exMxoxVEQ2cw=","beginning_cross_street":"2ND AVE","ending_cross_street":"STUYVESANT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987445,40.729279]]}},{"id":"eAmJtEgoCGU+WCNeGvnZ9Bs52q8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 9TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r3u6VFZCBDNSmh4exMxoxVEQ2cw="},{"type":"next-occurrence","id":"DfaDDH76ETL1pFz2mAvkphU+i/E="}],"description":"Construction on E 9TH ST westbound between 2ND AVE (New York) and STUYVESANT ST (New York) for building inspection from boom truck., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:26:35Z"},"road_event_id":"eAmJtEgoCGU+WCNeGvnZ9Bs52q8=","beginning_cross_street":"2ND AVE","ending_cross_street":"STUYVESANT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987445,40.729279]]}},{"id":"DfaDDH76ETL1pFz2mAvkphU+i/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 9TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r3u6VFZCBDNSmh4exMxoxVEQ2cw="},{"type":"next-occurrence","id":"TPwNCCVVSCZUfXuLD1aFgzwYmU4="}],"description":"Construction on E 9TH ST westbound between 2ND AVE (New York) and STUYVESANT ST (New York) for building inspection from boom truck., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:26:35Z"},"road_event_id":"DfaDDH76ETL1pFz2mAvkphU+i/E=","beginning_cross_street":"2ND AVE","ending_cross_street":"STUYVESANT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987445,40.729279]]}},{"id":"TPwNCCVVSCZUfXuLD1aFgzwYmU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 9TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"r3u6VFZCBDNSmh4exMxoxVEQ2cw="}],"description":"Construction on E 9TH ST westbound between 2ND AVE (New York) and STUYVESANT ST (New York) for building inspection from boom truck., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:26:35Z"},"road_event_id":"TPwNCCVVSCZUfXuLD1aFgzwYmU4=","beginning_cross_street":"2ND AVE","ending_cross_street":"STUYVESANT ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T22:00:00Z","end_date":"2026-05-04T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987445,40.729279]]}},{"id":"ZfY1fonZ2W36DJAy4K+a7GhiXVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 10TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YoIX498Y1q0qJjklKjuGRNPYQJs="}],"description":"Construction on E 10TH ST eastbound between 5TH AVE (New York) and UNIVERSITY PL (New York) for use of knuckle boom for lifting/hoisting materials., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:30:27Z"},"road_event_id":"ZfY1fonZ2W36DJAy4K+a7GhiXVg=","beginning_cross_street":"5TH AVE","ending_cross_street":"UNIVERSITY PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995399,40.733401]]}},{"id":"YoIX498Y1q0qJjklKjuGRNPYQJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZfY1fonZ2W36DJAy4K+a7GhiXVg="},{"type":"next-occurrence","id":"seVJshngDqxERTckvrmEnffioCo="}],"description":"Construction on E 10TH ST eastbound between 5TH AVE (New York) and UNIVERSITY PL (New York) for use of knuckle boom for lifting/hoisting materials., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:30:27Z"},"road_event_id":"YoIX498Y1q0qJjklKjuGRNPYQJs=","beginning_cross_street":"5TH AVE","ending_cross_street":"UNIVERSITY PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995399,40.733401]]}},{"id":"seVJshngDqxERTckvrmEnffioCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZfY1fonZ2W36DJAy4K+a7GhiXVg="},{"type":"next-occurrence","id":"IlymDxpzMIPE8UtEYcbWk9hxIEM="}],"description":"Construction on E 10TH ST eastbound between 5TH AVE (New York) and UNIVERSITY PL (New York) for use of knuckle boom for lifting/hoisting materials., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:30:27Z"},"road_event_id":"seVJshngDqxERTckvrmEnffioCo=","beginning_cross_street":"5TH AVE","ending_cross_street":"UNIVERSITY PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995399,40.733401]]}},{"id":"IlymDxpzMIPE8UtEYcbWk9hxIEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZfY1fonZ2W36DJAy4K+a7GhiXVg="}],"description":"Construction on E 10TH ST eastbound between 5TH AVE (New York) and UNIVERSITY PL (New York) for use of knuckle boom for lifting/hoisting materials., Saturday April 25th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 26th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-21T21:30:27Z"},"road_event_id":"IlymDxpzMIPE8UtEYcbWk9hxIEM=","beginning_cross_street":"5TH AVE","ending_cross_street":"UNIVERSITY PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T22:00:00Z","end_date":"2026-05-04T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995399,40.733401]]}},{"id":"LAVW1ehDamp86FdL29bPfg3Jywo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MhOv+9pFqujN+QhnrWONDXcuujg="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"LAVW1ehDamp86FdL29bPfg3Jywo=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"MhOv+9pFqujN+QhnrWONDXcuujg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAVW1ehDamp86FdL29bPfg3Jywo="},{"type":"next-occurrence","id":"rv92GXMaC9I9Gn7ay5NGQCzaud4="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"MhOv+9pFqujN+QhnrWONDXcuujg=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-26T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"rv92GXMaC9I9Gn7ay5NGQCzaud4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAVW1ehDamp86FdL29bPfg3Jywo="},{"type":"next-occurrence","id":"mGTC30YmENElsRg7XGYK7juzLNA="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"rv92GXMaC9I9Gn7ay5NGQCzaud4=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T18:00:00Z","end_date":"2026-04-27T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"mGTC30YmENElsRg7XGYK7juzLNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAVW1ehDamp86FdL29bPfg3Jywo="},{"type":"next-occurrence","id":"tSWbq8JUkkZoTXDcPNCipk1usPM="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"mGTC30YmENElsRg7XGYK7juzLNA=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"tSWbq8JUkkZoTXDcPNCipk1usPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAVW1ehDamp86FdL29bPfg3Jywo="},{"type":"next-occurrence","id":"q58p5jAfm7BAuoMpWr0VAt2gC9U="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"tSWbq8JUkkZoTXDcPNCipk1usPM=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"q58p5jAfm7BAuoMpWr0VAt2gC9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAVW1ehDamp86FdL29bPfg3Jywo="},{"type":"next-occurrence","id":"fAdShIk+Dvi8Y9H/IbfIj0y9GEQ="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"q58p5jAfm7BAuoMpWr0VAt2gC9U=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"fAdShIk+Dvi8Y9H/IbfIj0y9GEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAVW1ehDamp86FdL29bPfg3Jywo="},{"type":"next-occurrence","id":"a1i4riiJhiAx7mamW6sR3/XGlYI="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"fAdShIk+Dvi8Y9H/IbfIj0y9GEQ=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"a1i4riiJhiAx7mamW6sR3/XGlYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 20TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAVW1ehDamp86FdL29bPfg3Jywo="}],"description":"Crane operations on W 20TH ST westbound between 10TH AVE (New York) and 11TH AVE (New York), Friday April 24th, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:32:01Z"},"road_event_id":"a1i4riiJhiAx7mamW6sR3/XGlYI=","beginning_cross_street":"10TH AVE","ending_cross_street":"11TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005615,40.745856]]}},{"id":"f76AKkuPs+QZ3j3RdZxqzZj4N4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 26TH ST"],"direction":"unknown","related_road_events":[],"description":"Crane operations on W 26TH ST eastbound between 11TH AVE (New York) and 10TH AVE (New York), Friday April 24th, 2026, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:35:22Z"},"road_event_id":"f76AKkuPs+QZ3j3RdZxqzZj4N4g=","beginning_cross_street":"11TH AVE","ending_cross_street":"10TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.005529,40.750747]]}},{"id":"4T2QHGjtkcIbspFkjqlWSze9y3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c6cjMKkOCXTBZDsISuokNogb+oI="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"4T2QHGjtkcIbspFkjqlWSze9y3o=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:00:00Z","end_date":"2026-04-28T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"c6cjMKkOCXTBZDsISuokNogb+oI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"nHjzjp+UjyBiQzI9BzYSyKoCORc="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"c6cjMKkOCXTBZDsISuokNogb+oI=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:00:00Z","end_date":"2026-04-29T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"nHjzjp+UjyBiQzI9BzYSyKoCORc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"oSZ4iFoWWj8oREiHReNtTU0v5s4="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"nHjzjp+UjyBiQzI9BzYSyKoCORc=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:00:00Z","end_date":"2026-04-30T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"oSZ4iFoWWj8oREiHReNtTU0v5s4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"oLgZWTkN1/ricBM7ncRAubIyfoo="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"oSZ4iFoWWj8oREiHReNtTU0v5s4=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:00:00Z","end_date":"2026-05-01T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"oLgZWTkN1/ricBM7ncRAubIyfoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"jwIh1xrcMe6lXD7Dk4v3v8x64yE="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"oLgZWTkN1/ricBM7ncRAubIyfoo=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:00:00Z","end_date":"2026-05-02T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"jwIh1xrcMe6lXD7Dk4v3v8x64yE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"BBV5EfxYOjYSgF3jeIEM9G1l+VM="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"jwIh1xrcMe6lXD7Dk4v3v8x64yE=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:00:00Z","end_date":"2026-05-03T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"BBV5EfxYOjYSgF3jeIEM9G1l+VM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"98NVPBNfk7mNNQQ08d9rVTwJjJ4="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"BBV5EfxYOjYSgF3jeIEM9G1l+VM=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:00:00Z","end_date":"2026-05-04T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"98NVPBNfk7mNNQQ08d9rVTwJjJ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"en855GkffMgxqpBUvBcxG1eM6dU="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"98NVPBNfk7mNNQQ08d9rVTwJjJ4=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T03:00:00Z","end_date":"2026-05-05T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"en855GkffMgxqpBUvBcxG1eM6dU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="},{"type":"next-occurrence","id":"stFK/rinCtVOsART0bOZS9LGEys="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"en855GkffMgxqpBUvBcxG1eM6dU=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:00:00Z","end_date":"2026-05-06T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"stFK/rinCtVOsART0bOZS9LGEys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4T2QHGjtkcIbspFkjqlWSze9y3o="}],"description":"Crane operations on W 46TH ST eastbound between 8TH AVE (New York) and 7TH AVE (New York), Sunday April 26th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 11:30 PM thru 07:00 AM All lanes closed","update_date":"2026-04-21T21:37:06Z"},"road_event_id":"stFK/rinCtVOsART0bOZS9LGEys=","beginning_cross_street":"8TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T03:00:00Z","end_date":"2026-05-07T10:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987821,40.759747]]}},{"id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zurrpM6UQZInkVViZ+ibbFLWPS8="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:59:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"zurrpM6UQZInkVViZ+ibbFLWPS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"IZ9RoQ3vK79DlLu0mD9DxI5DkHM="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"zurrpM6UQZInkVViZ+ibbFLWPS8=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:59:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"IZ9RoQ3vK79DlLu0mD9DxI5DkHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"9YlGdeEIIOLrKIXY5l1QLk4r83Y="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"IZ9RoQ3vK79DlLu0mD9DxI5DkHM=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:59:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"9YlGdeEIIOLrKIXY5l1QLk4r83Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"9PXSkuFvkLC8WnQ4cmxl0g3HL4A="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"9YlGdeEIIOLrKIXY5l1QLk4r83Y=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:59:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"9PXSkuFvkLC8WnQ4cmxl0g3HL4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"6XMOjHCBjdXhPBkgIGJ+Ivs/law="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"9PXSkuFvkLC8WnQ4cmxl0g3HL4A=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:59:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"6XMOjHCBjdXhPBkgIGJ+Ivs/law=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"/lPhYTz7+n9n6hKH+0PfIOPlJYs="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"6XMOjHCBjdXhPBkgIGJ+Ivs/law=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:59:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"/lPhYTz7+n9n6hKH+0PfIOPlJYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"LiREsswxeIxrhnhsw9RMvYRqCYw="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"/lPhYTz7+n9n6hKH+0PfIOPlJYs=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:59:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"LiREsswxeIxrhnhsw9RMvYRqCYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"6vx57ejXW/fPLQg8g78JmncneyE="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"LiREsswxeIxrhnhsw9RMvYRqCYw=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:59:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"6vx57ejXW/fPLQg8g78JmncneyE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"n+zPBMMMXTof2f8hd3fSYCSfj6I="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"6vx57ejXW/fPLQg8g78JmncneyE=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:59:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"n+zPBMMMXTof2f8hd3fSYCSfj6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"eNZvQAriwi8emdhN1e3I7+WFuCs="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"n+zPBMMMXTof2f8hd3fSYCSfj6I=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:59:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"eNZvQAriwi8emdhN1e3I7+WFuCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"K90ixvRhFGw+kjIGWqrXfHK/z00="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"eNZvQAriwi8emdhN1e3I7+WFuCs=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:59:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"K90ixvRhFGw+kjIGWqrXfHK/z00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"Tn7UCCz8Yb2NdST/kEkvGR0luz8="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"K90ixvRhFGw+kjIGWqrXfHK/z00=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:59:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"Tn7UCCz8Yb2NdST/kEkvGR0luz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"qLMMO1Gwhc6ZsUwqCqbKg/0EQ5Q="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"Tn7UCCz8Yb2NdST/kEkvGR0luz8=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T03:59:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"qLMMO1Gwhc6ZsUwqCqbKg/0EQ5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="},{"type":"next-occurrence","id":"C0NAGGpF8OT6hYcwwI/sAQeC+qk="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"qLMMO1Gwhc6ZsUwqCqbKg/0EQ5Q=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:59:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"C0NAGGpF8OT6hYcwwI/sAQeC+qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 48TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0p6EJwQAPPFF79HA5Kd/Kwn9qc8="}],"description":"Crane operations on W 48TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York), Sunday April 19th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 11:59 PM thru 06:00 AM All lanes closed","update_date":"2026-04-21T21:42:20Z"},"road_event_id":"C0NAGGpF8OT6hYcwwI/sAQeC+qk=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T03:59:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.983986,40.759773]]}},{"id":"TGkMDqi7/ybcQFJuaL7Qf2nctXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound near West of Exit 11 - CR 614/Pattenburg Rd (Bethlehem Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-21T21:45:21Z"},"road_event_id":"TGkMDqi7/ybcQFJuaL7Qf2nctXE=","beginning_cross_street":"West of Exit 11 - CR 614/Pattenburg Rd","ending_cross_street":"West of Exit 11 - CR 614/Pattenburg Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.008155,40.647132]]}},{"id":"N3ax8gz9vs97G6RkzTBINcXibVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound near East of Ridge Rd (Readington Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-21T21:45:22Z"},"road_event_id":"N3ax8gz9vs97G6RkzTBINcXibVw=","beginning_cross_street":"East of Ridge Rd","ending_cross_street":"East of Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.726303,40.612377]]}},{"id":"U13DIjAvoI0rD5kzBkmqdx6G+As=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VY5QA26XNmr5zQp+DJl1k9GI+TU="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"U13DIjAvoI0rD5kzBkmqdx6G+As=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"VY5QA26XNmr5zQp+DJl1k9GI+TU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U13DIjAvoI0rD5kzBkmqdx6G+As="},{"type":"next-occurrence","id":"QMIp6ACKDzqfFcC5T7hkmL5yxXA="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"VY5QA26XNmr5zQp+DJl1k9GI+TU=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"QMIp6ACKDzqfFcC5T7hkmL5yxXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U13DIjAvoI0rD5kzBkmqdx6G+As="},{"type":"next-occurrence","id":"nna7tz4yb1QfMie2kojovTC5SNY="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"QMIp6ACKDzqfFcC5T7hkmL5yxXA=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"nna7tz4yb1QfMie2kojovTC5SNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U13DIjAvoI0rD5kzBkmqdx6G+As="},{"type":"next-occurrence","id":"mwCsKVLrOGiwzTTtOYoI/4FOx+M="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"nna7tz4yb1QfMie2kojovTC5SNY=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"mwCsKVLrOGiwzTTtOYoI/4FOx+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U13DIjAvoI0rD5kzBkmqdx6G+As="},{"type":"next-occurrence","id":"G9D47khwtc11ghOfhCwk9fT/K64="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"mwCsKVLrOGiwzTTtOYoI/4FOx+M=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"G9D47khwtc11ghOfhCwk9fT/K64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U13DIjAvoI0rD5kzBkmqdx6G+As="},{"type":"next-occurrence","id":"TxQcZXhukLQstOI8eCKL3WSzQgM="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"G9D47khwtc11ghOfhCwk9fT/K64=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"TxQcZXhukLQstOI8eCKL3WSzQgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U13DIjAvoI0rD5kzBkmqdx6G+As="},{"type":"next-occurrence","id":"HtmTv6ZH1fAWF5wh5jpWbIzvnOE="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"TxQcZXhukLQstOI8eCKL3WSzQgM=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"HtmTv6ZH1fAWF5wh5jpWbIzvnOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U13DIjAvoI0rD5kzBkmqdx6G+As="}],"description":"Roadwork on US 20 both directions between Rose Hill Rd (Skaneateles) and NY 174 (Marcellus) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 02:30 PM All lanes open","update_date":"2026-04-21T22:19:47Z"},"road_event_id":"HtmTv6ZH1fAWF5wh5jpWbIzvnOE=","beginning_cross_street":"Rose Hill Rd","ending_cross_street":"NY 174","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.349868,42.932443]]}},{"id":"ORC300541208","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","description":"Roadwork on NY 690 northbound between Exit 4 - CR 159; Van Buren Road (Van Buren) and Exit 2 - Downer Street Road; NY 31 (Van Buren) ; Alternating lane closures Not currently Scheduled","update_date":"2026-04-22T18:30:01Z"},"road_event_id":"ORC300541208","beginning_cross_street":"Exit 4 - CR 159; Van Buren Road","ending_cross_street":"Exit 2 - Downer Street Road; NY 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-21T23:06:29Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-76.316658,43.127846]]}},{"id":"TLa5Ji07r9cGG3YdyGKuxENMI/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Monday April 27, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T00:30:32Z"},"road_event_id":"TLa5Ji07r9cGG3YdyGKuxENMI/w=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T20:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.870895,39.994491]]}},{"id":"2f+s3djcwt3qacZmkxpqGaZCNa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Thursday April 23, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T00:30:31Z"},"road_event_id":"2f+s3djcwt3qacZmkxpqGaZCNa8=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.867752,39.996082]]}},{"id":"bF1U+9FTaWvwrRTq8FWyQ5mA7DY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound at south of Exit 72 - NJ 31 (Hopewell Twp) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 01:00 AM, ramp","update_date":"2026-04-22T00:30:25Z"},"road_event_id":"bF1U+9FTaWvwrRTq8FWyQ5mA7DY=","beginning_cross_street":"south of Exit 72 - NJ 31","ending_cross_street":"south of Exit 72 - NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.779342,40.291366]]}},{"id":"YIrHaHe2y9rYQnoQB+B5ujLA4Z8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Northbound near Parkside Av (Trenton), Wednesday April 22, 2026 08:00 PM thru 11:00 PM, , moving operation","update_date":"2026-04-22T00:30:26Z"},"road_event_id":"YIrHaHe2y9rYQnoQB+B5ujLA4Z8=","beginning_cross_street":"Parkside Av","ending_cross_street":"North of Parkside Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.792472,40.230407]]}},{"id":"YJzGMFa+f12jCQIqABHD9wYj2ZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Tuesday April 28, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T00:30:22Z"},"road_event_id":"YJzGMFa+f12jCQIqABHD9wYj2ZU=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.870895,39.994491]]}},{"id":"igCg/pQiYDzEmFmrFpQpwGfB9I0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Monday April 27, 2026 08:00 PM thru Tuesday April 28, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-04-22T00:30:24Z"},"road_event_id":"igCg/pQiYDzEmFmrFpQpwGfB9I0=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"34gPt4KTmZ/bGXwyIzS8cZUBFoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of CR 528/Crosswicks St (Bordentown Twp), Tuesday April 28, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-22T00:30:20Z"},"road_event_id":"34gPt4KTmZ/bGXwyIzS8cZUBFoU=","beginning_cross_street":"North of CR 528/Crosswicks St","ending_cross_street":"CR 528/Crosswicks St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.701034,40.147705]]}},{"id":"cn1JryMV669+sSJkT71P81T9lg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of US 130/Collingswood Circle (Collingswood), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T00:30:21Z"},"road_event_id":"cn1JryMV669+sSJkT71P81T9lg4=","beginning_cross_street":"East of I-676/Ben Franklin Bridge","ending_cross_street":"West of US 130/Collingswood Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.117393,39.947628]]}},{"id":"U1o1hoBRO/MI6Uc4KlquhSZ0BSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of CR 601/Avalon Blvd (Middle Twp) and North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Sunday April 26, 2026 07:00 PM thru Monday April 27, 2026 05:30 AM, right shoulder closed","update_date":"2026-04-22T00:30:29Z"},"road_event_id":"U1o1hoBRO/MI6Uc4KlquhSZ0BSE=","beginning_cross_street":"South of CR 601/Avalon Blvd","ending_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.781822,39.128372]]}},{"id":"8dIWr2xqnjQNy4uglAvsE//17pU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 29"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 29 Southbound near North of Parkside Av (Trenton), Wednesday April 22, 2026 08:00 PM thru 11:00 PM, , moving operation","update_date":"2026-04-22T00:30:29Z"},"road_event_id":"8dIWr2xqnjQNy4uglAvsE//17pU=","beginning_cross_street":"North of Parkside Av","ending_cross_street":"Parkside Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.793937,40.231285]]}},{"id":"oHUvrRtU0ATZD8X2yb9U8z/QwFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of CR 601/Avalon Blvd (Middle Twp) and North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Monday April 27, 2026 07:00 PM thru Tuesday April 28, 2026 05:30 AM, right shoulder closed","update_date":"2026-04-22T00:30:27Z"},"road_event_id":"oHUvrRtU0ATZD8X2yb9U8z/QwFU=","beginning_cross_street":"South of CR 601/Avalon Blvd","ending_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.781822,39.128372]]}},{"id":"ubT1s8csegtbZGVgUQS2GmLdoQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Monday April 27, 2026 10:00 PM thru Tuesday April 28, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-22T00:30:28Z"},"road_event_id":"ubT1s8csegtbZGVgUQS2GmLdoQ8=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"Pu9pYj63PLjGriZKfnvZzgJlLZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of CR 601/Avalon Blvd (Middle Twp) and North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Tuesday April 28, 2026 07:00 PM thru Wednesday April 29, 2026 05:30 AM, right shoulder closed","update_date":"2026-04-22T00:30:19Z"},"road_event_id":"Pu9pYj63PLjGriZKfnvZzgJlLZ8=","beginning_cross_street":"South of CR 601/Avalon Blvd","ending_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.781822,39.128372]]}},{"id":"mS65bze+R5zCgUzWpI2vRE5UL6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Southbound at Exit 10 - NJ 66 (Neptune Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-22T00:30:36Z"},"road_event_id":"mS65bze+R5zCgUzWpI2vRE5UL6Q=","beginning_cross_street":"Exit 10 - NJ 66","ending_cross_street":"Exit 10 - NJ 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.05014,40.227825]]}},{"id":"l+muSf8ZijBR/b13DHlZOuX5RDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound near North of CR 650/Church St (Raritan Twp), Wednesday April 22, 2026 10:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T00:30:38Z"},"road_event_id":"l+muSf8ZijBR/b13DHlZOuX5RDU=","beginning_cross_street":"North of CR 650/Church St","ending_cross_street":"North of CR 650/Church St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844604,40.506324]]}},{"id":"S72H+ZRo+2YDrEAU2EXwUuW3Zf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Wednesday April 29, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-22T00:30:34Z"},"road_event_id":"S72H+ZRo+2YDrEAU2EXwUuW3Zf8=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.870895,39.994491]]}},{"id":"7ve55g+DflGYTxgDj4/4CE5b3+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Southbound at North of Exit 10 - NJ 66 (Ocean Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-22T00:30:33Z"},"road_event_id":"7ve55g+DflGYTxgDj4/4CE5b3+s=","beginning_cross_street":"North of Exit 10 - NJ 66","ending_cross_street":"North of Exit 10 - NJ 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.05001,40.229236]]}},{"id":"K+E3sE6kVxgN0DZSNz3dBK7wpSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near East of CR 682/Maple Ave (Lumberton Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T00:30:41Z"},"road_event_id":"K+E3sE6kVxgN0DZSNz3dBK7wpSo=","beginning_cross_street":"East of CR 682/Maple Ave","ending_cross_street":"CR 691/Main St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.798309,39.982219]]}},{"id":"ySAxmldUe00zPyWELNrKDyAelxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound near South of Exit 7 (Oldmans Twp), Thursday April 23, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-22T00:30:38Z"},"road_event_id":"ySAxmldUe00zPyWELNrKDyAelxQ=","beginning_cross_street":"South of Exit 7","ending_cross_street":"South of Exit 7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.418853,39.724941]]}},{"id":"KABx49RF3Vg+sYV/7y0WWYXoeNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Tuesday April 28, 2026 10:00 PM thru Wednesday April 29, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-22T00:30:39Z"},"road_event_id":"KABx49RF3Vg+sYV/7y0WWYXoeNA=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"skBO801vWi0aBGeUhYX2qTnqSoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Southbound at North of Exit 10 - NJ 66 (Ocean Twp) Wednesday April 22, 2026 07:00 AM thru 03:00 PM, ramp","update_date":"2026-04-22T00:30:47Z"},"road_event_id":"skBO801vWi0aBGeUhYX2qTnqSoo=","beginning_cross_street":"North of Exit 10 - NJ 66","ending_cross_street":"North of Exit 10 - NJ 66","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049964,40.230686]]}},{"id":"iVk3Nbm90A1k80stCTsP4wHfkzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Tuesday April 28, 2026 08:00 PM thru Wednesday April 29, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-04-22T00:30:44Z"},"road_event_id":"iVk3Nbm90A1k80stCTsP4wHfkzY=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"mu84patMCYxFl4rDzDAmebBRuyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Wednesday April 22, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T00:30:42Z"},"road_event_id":"mu84patMCYxFl4rDzDAmebBRuyg=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.867752,39.996082]]}},{"id":"xtwSj07j/7OccmLEFGKUuJYmlbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound near North of Whitehead Rd (Lawrence Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T00:30:43Z"},"road_event_id":"xtwSj07j/7OccmLEFGKUuJYmlbU=","beginning_cross_street":"North of Whitehead Rd","ending_cross_street":"South of Whitehead Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.723793,40.251098]]}},{"id":"mng8Rllx0XIcNlP1aHh2CxCOFLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Nuv99VRwPA/6s1W8IudfQX60iEs="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"mng8Rllx0XIcNlP1aHh2CxCOFLs=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"Nuv99VRwPA/6s1W8IudfQX60iEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"UB+7UGa+WwUacnBIkl1eB1QuMDM="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"Nuv99VRwPA/6s1W8IudfQX60iEs=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"UB+7UGa+WwUacnBIkl1eB1QuMDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"eDiV48JiD8q81U4C8lj+59cNWmI="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"UB+7UGa+WwUacnBIkl1eB1QuMDM=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"eDiV48JiD8q81U4C8lj+59cNWmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"x9j1dVlcc2PettNx2CDhdVmlxyk="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"eDiV48JiD8q81U4C8lj+59cNWmI=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T18:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"x9j1dVlcc2PettNx2CDhdVmlxyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"Eb5QBbbSsrq+1wABbjlfSulNmtI="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"x9j1dVlcc2PettNx2CDhdVmlxyk=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"Eb5QBbbSsrq+1wABbjlfSulNmtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"XmASk5DbHNBzwQME2GNIpwm19DM="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"Eb5QBbbSsrq+1wABbjlfSulNmtI=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"XmASk5DbHNBzwQME2GNIpwm19DM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"9+Sylvj132UYAVvGodxiRXit+c8="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"XmASk5DbHNBzwQME2GNIpwm19DM=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"9+Sylvj132UYAVvGodxiRXit+c8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"4i/3yaotjpJv87UGfJg2uNgLJEI="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"9+Sylvj132UYAVvGodxiRXit+c8=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"4i/3yaotjpJv87UGfJg2uNgLJEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="},{"type":"next-occurrence","id":"GoLdDVQ/RY/sBftbQ/86j4YJBZI="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"4i/3yaotjpJv87UGfJg2uNgLJEI=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"GoLdDVQ/RY/sBftbQ/86j4YJBZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mng8Rllx0XIcNlP1aHh2CxCOFLs="}],"description":"Roadwork on US 9W southbound at NY 23A (Catskill), Thursday April 23rd, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T09:29:42Z"},"road_event_id":"GoLdDVQ/RY/sBftbQ/86j4YJBZI=","beginning_cross_street":"NY 23A","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.88822,42.213916]]}},{"id":"k7zxfFFQ/wW/Lpoa0lGX4sis5Y0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KqL+0TevSzMowo3ZGygdxmmLgjk="}],"description":"Roadwork on I-690 westbound at Exit 19C - Bridge Street (De Witt), Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 Left lanes of 4 lanes closed","update_date":"2026-04-22T10:02:32Z"},"road_event_id":"k7zxfFFQ/wW/Lpoa0lGX4sis5Y0=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.068233,43.057436]]}},{"id":"KqL+0TevSzMowo3ZGygdxmmLgjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k7zxfFFQ/wW/Lpoa0lGX4sis5Y0="},{"type":"next-occurrence","id":"Sfcc5vQLVV0BPTvWxvgM65iEjFM="}],"description":"Roadwork on I-690 westbound at Exit 19C - Bridge Street (De Witt), Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 Left lanes of 4 lanes closed","update_date":"2026-04-22T10:02:32Z"},"road_event_id":"KqL+0TevSzMowo3ZGygdxmmLgjk=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.068233,43.057436]]}},{"id":"Sfcc5vQLVV0BPTvWxvgM65iEjFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k7zxfFFQ/wW/Lpoa0lGX4sis5Y0="},{"type":"next-occurrence","id":"GYAE0lQXzywbMgbEMcEUgTNaVwo="}],"description":"Roadwork on I-690 westbound at Exit 19C - Bridge Street (De Witt), Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 Left lanes of 4 lanes closed","update_date":"2026-04-22T10:02:32Z"},"road_event_id":"Sfcc5vQLVV0BPTvWxvgM65iEjFM=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.068233,43.057436]]}},{"id":"GYAE0lQXzywbMgbEMcEUgTNaVwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"k7zxfFFQ/wW/Lpoa0lGX4sis5Y0="}],"description":"Roadwork on I-690 westbound at Exit 19C - Bridge Street (De Witt), Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 Left lanes of 4 lanes closed","update_date":"2026-04-22T10:02:32Z"},"road_event_id":"GYAE0lQXzywbMgbEMcEUgTNaVwo=","beginning_cross_street":"Exit 19C - Bridge Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.068233,43.057436]]}},{"id":"BtkhlnRI7nC7TjPP84JSyARjpvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qO7n/OjzczaGr555It78AdtHTyY="}],"description":"Bridge inspection on I-690 westbound before Exit 9 (Old Exit 5) - State Fair Boulevard; Van Vleck Road; CR 80 (Geddes), Wednesday April 29th, 2026 thru Thursday April 30th, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-04-22T10:05:46Z"},"road_event_id":"BtkhlnRI7nC7TjPP84JSyARjpvY=","beginning_cross_street":"Exit 9 (Old Exit 5) - State Fair Boulevard; Van Vleck Road; CR 80","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.247977,43.106263]]}},{"id":"qO7n/OjzczaGr555It78AdtHTyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BtkhlnRI7nC7TjPP84JSyARjpvY="}],"description":"Bridge inspection on I-690 westbound before Exit 9 (Old Exit 5) - State Fair Boulevard; Van Vleck Road; CR 80 (Geddes), Wednesday April 29th, 2026 thru Thursday April 30th, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 Right lanes of 3 lanes closed","update_date":"2026-04-22T10:05:46Z"},"road_event_id":"qO7n/OjzczaGr555It78AdtHTyY=","beginning_cross_street":"Exit 9 (Old Exit 5) - State Fair Boulevard; Van Vleck Road; CR 80","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.247977,43.106263]]}},{"id":"MCDAaLQYcMF3OYGtERNIuo9kwuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"otEKj0IKtIeREMTkGX4UbY63nkc="}],"description":"Roadwork on I-690 eastbound past Exit 19A-C (East Syracuse) ; Alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 3 lanes of 4 lanes closed","update_date":"2026-04-22T10:17:39Z"},"road_event_id":"MCDAaLQYcMF3OYGtERNIuo9kwuk=","beginning_cross_street":"Exit 19A-C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.075451,43.057717]]}},{"id":"otEKj0IKtIeREMTkGX4UbY63nkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MCDAaLQYcMF3OYGtERNIuo9kwuk="},{"type":"next-occurrence","id":"1SGr3hJROOwKqF4sNPOWDsrfjFA="}],"description":"Roadwork on I-690 eastbound past Exit 19A-C (East Syracuse) ; Alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 3 lanes of 4 lanes closed","update_date":"2026-04-22T10:17:39Z"},"road_event_id":"otEKj0IKtIeREMTkGX4UbY63nkc=","beginning_cross_street":"Exit 19A-C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.075451,43.057717]]}},{"id":"1SGr3hJROOwKqF4sNPOWDsrfjFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MCDAaLQYcMF3OYGtERNIuo9kwuk="},{"type":"next-occurrence","id":"wkxMnIDAAeautAlXvkuHbMrGX6w="}],"description":"Roadwork on I-690 eastbound past Exit 19A-C (East Syracuse) ; Alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 3 lanes of 4 lanes closed","update_date":"2026-04-22T10:17:39Z"},"road_event_id":"1SGr3hJROOwKqF4sNPOWDsrfjFA=","beginning_cross_street":"Exit 19A-C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.075451,43.057717]]}},{"id":"wkxMnIDAAeautAlXvkuHbMrGX6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MCDAaLQYcMF3OYGtERNIuo9kwuk="}],"description":"Roadwork on I-690 eastbound past Exit 19A-C (East Syracuse) ; Alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 03:00 PM 3 lanes of 4 lanes closed","update_date":"2026-04-22T10:17:39Z"},"road_event_id":"wkxMnIDAAeautAlXvkuHbMrGX6w=","beginning_cross_street":"Exit 19A-C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.075451,43.057717]]}},{"id":"vG8zFuNLjLH/b4gIa63Jhmr4vBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 100 both directions between Ardsley Road (Greenburgh) and Fulton Street (White Plains) 2025082284806/32731709 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T10:25:40Z"},"road_event_id":"vG8zFuNLjLH/b4gIa63Jhmr4vBI=","beginning_cross_street":"Ardsley Road","ending_cross_street":"Fulton Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.820165,40.993635]]}},{"id":"AtIW2/pynZuCilADO59lBpgunEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"781jD6d/nlNx+nNTKsFPcjI0SOE="}],"description":"Roadwork on I-690 eastbound between Exit 8 - Farrell Road, John Glenn Blvd (Van Buren) and Exit 9 - State Fair Boulevard; Van Vleck Road; CR 80 (Geddes), Wednesday April 29th, 2026 thru Thursday April 30th, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 lanes of 3 lanes closed","update_date":"2026-04-22T10:28:19Z"},"road_event_id":"AtIW2/pynZuCilADO59lBpgunEg=","beginning_cross_street":"Exit 8 - Farrell Road, John Glenn Blvd","ending_cross_street":"Exit 9 - State Fair Boulevard; Van Vleck Road; CR 80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.271436,43.112881]]}},{"id":"781jD6d/nlNx+nNTKsFPcjI0SOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AtIW2/pynZuCilADO59lBpgunEg="}],"description":"Roadwork on I-690 eastbound between Exit 8 - Farrell Road, John Glenn Blvd (Van Buren) and Exit 9 - State Fair Boulevard; Van Vleck Road; CR 80 (Geddes), Wednesday April 29th, 2026 thru Thursday April 30th, 2026, Wednesday/Thursday, 09:00 AM thru 03:00 PM 2 lanes of 3 lanes closed","update_date":"2026-04-22T10:28:19Z"},"road_event_id":"781jD6d/nlNx+nNTKsFPcjI0SOE=","beginning_cross_street":"Exit 8 - Farrell Road, John Glenn Blvd","ending_cross_street":"Exit 9 - State Fair Boulevard; Van Vleck Road; CR 80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.271436,43.112881]]}},{"id":"QKoBBpFa3EoA84fxRBMCT5HGkGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l7FD61+9Em6PfAaUCvwD5cTDTOc="}],"description":"Utility work on NY 52 both directions between Tompkins Avenue (Fishkill) and Brown Road (Fishkill) 2025082502725/32667809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T10:42:43Z"},"road_event_id":"QKoBBpFa3EoA84fxRBMCT5HGkGY=","beginning_cross_street":"Tompkins Avenue","ending_cross_street":"Brown Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93617,41.522362]]}},{"id":"l7FD61+9Em6PfAaUCvwD5cTDTOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QKoBBpFa3EoA84fxRBMCT5HGkGY="},{"type":"next-occurrence","id":"Cv8PbFgGRfeZZr4OCNULna3L55E="}],"description":"Utility work on NY 52 both directions between Tompkins Avenue (Fishkill) and Brown Road (Fishkill) 2025082502725/32667809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T10:42:43Z"},"road_event_id":"l7FD61+9Em6PfAaUCvwD5cTDTOc=","beginning_cross_street":"Tompkins Avenue","ending_cross_street":"Brown Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93617,41.522362]]}},{"id":"Cv8PbFgGRfeZZr4OCNULna3L55E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QKoBBpFa3EoA84fxRBMCT5HGkGY="},{"type":"next-occurrence","id":"PSvN116BJO/8OwxDA5CqDQzAWp0="}],"description":"Utility work on NY 52 both directions between Tompkins Avenue (Fishkill) and Brown Road (Fishkill) 2025082502725/32667809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T10:42:43Z"},"road_event_id":"Cv8PbFgGRfeZZr4OCNULna3L55E=","beginning_cross_street":"Tompkins Avenue","ending_cross_street":"Brown Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93617,41.522362]]}},{"id":"PSvN116BJO/8OwxDA5CqDQzAWp0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QKoBBpFa3EoA84fxRBMCT5HGkGY="},{"type":"next-occurrence","id":"nhAdt1MIyqoZtoOl7OQBk4VgDs8="}],"description":"Utility work on NY 52 both directions between Tompkins Avenue (Fishkill) and Brown Road (Fishkill) 2025082502725/32667809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T10:42:43Z"},"road_event_id":"PSvN116BJO/8OwxDA5CqDQzAWp0=","beginning_cross_street":"Tompkins Avenue","ending_cross_street":"Brown Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:30:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93617,41.522362]]}},{"id":"nhAdt1MIyqoZtoOl7OQBk4VgDs8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QKoBBpFa3EoA84fxRBMCT5HGkGY="},{"type":"next-occurrence","id":"XDEDr5YU8e9zIRhp3rE6Feu3nSs="}],"description":"Utility work on NY 52 both directions between Tompkins Avenue (Fishkill) and Brown Road (Fishkill) 2025082502725/32667809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T10:42:43Z"},"road_event_id":"nhAdt1MIyqoZtoOl7OQBk4VgDs8=","beginning_cross_street":"Tompkins Avenue","ending_cross_street":"Brown Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:30:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93617,41.522362]]}},{"id":"XDEDr5YU8e9zIRhp3rE6Feu3nSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QKoBBpFa3EoA84fxRBMCT5HGkGY="},{"type":"next-occurrence","id":"lXhShtqTFAEl0CNpiE8F0R+wVzQ="}],"description":"Utility work on NY 52 both directions between Tompkins Avenue (Fishkill) and Brown Road (Fishkill) 2025082502725/32667809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T10:42:43Z"},"road_event_id":"XDEDr5YU8e9zIRhp3rE6Feu3nSs=","beginning_cross_street":"Tompkins Avenue","ending_cross_street":"Brown Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:30:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93617,41.522362]]}},{"id":"lXhShtqTFAEl0CNpiE8F0R+wVzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 52"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QKoBBpFa3EoA84fxRBMCT5HGkGY="}],"description":"Utility work on NY 52 both directions between Tompkins Avenue (Fishkill) and Brown Road (Fishkill) 2025082502725/32667809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday March 27th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T10:42:43Z"},"road_event_id":"lXhShtqTFAEl0CNpiE8F0R+wVzQ=","beginning_cross_street":"Tompkins Avenue","ending_cross_street":"Brown Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:30:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93617,41.522362]]}},{"id":"7xJaCGW/Xc3MCAPC8AwBi6VAaI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 160"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9PFYiUnPfkuAS1mARjPs5JPDk8o="}],"description":"Roadwork on NY 160 both directions between Sulphur Springs Rd (Duanesburg) and Main Street; NY 5S (Rotterdam) alternating lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-04-22T11:04:57Z"},"road_event_id":"7xJaCGW/Xc3MCAPC8AwBi6VAaI0=","beginning_cross_street":"Sulphur Springs Rd","ending_cross_street":"Main Street; NY 5S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.141766,42.868692]]}},{"id":"9PFYiUnPfkuAS1mARjPs5JPDk8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 160"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xJaCGW/Xc3MCAPC8AwBi6VAaI0="},{"type":"next-occurrence","id":"sdUWuM77mbQrq2eRlewcp/BcRT4="}],"description":"Roadwork on NY 160 both directions between Sulphur Springs Rd (Duanesburg) and Main Street; NY 5S (Rotterdam) alternating lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-04-22T11:04:57Z"},"road_event_id":"9PFYiUnPfkuAS1mARjPs5JPDk8o=","beginning_cross_street":"Sulphur Springs Rd","ending_cross_street":"Main Street; NY 5S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.141766,42.868692]]}},{"id":"sdUWuM77mbQrq2eRlewcp/BcRT4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 160"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7xJaCGW/Xc3MCAPC8AwBi6VAaI0="}],"description":"Roadwork on NY 160 both directions between Sulphur Springs Rd (Duanesburg) and Main Street; NY 5S (Rotterdam) alternating lane closures, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 02:00 PM All lanes open","update_date":"2026-04-22T11:04:57Z"},"road_event_id":"sdUWuM77mbQrq2eRlewcp/BcRT4=","beginning_cross_street":"Sulphur Springs Rd","ending_cross_street":"Main Street; NY 5S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.141766,42.868692]]}},{"id":"AVK2fJkP1qMOoRpQQq+voUy+hd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mX9dFX/IlYilXU7x/A3u2MMhctc="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-22T11:13:21Z"},"road_event_id":"AVK2fJkP1qMOoRpQQq+voUy+hd8=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"mX9dFX/IlYilXU7x/A3u2MMhctc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AVK2fJkP1qMOoRpQQq+voUy+hd8="},{"type":"next-occurrence","id":"/tDJ3o0TxkjhnJg8rBD37cSaNBE="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-22T11:13:21Z"},"road_event_id":"mX9dFX/IlYilXU7x/A3u2MMhctc=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"/tDJ3o0TxkjhnJg8rBD37cSaNBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AVK2fJkP1qMOoRpQQq+voUy+hd8="},{"type":"next-occurrence","id":"iT9L1M6OoFY91E7VI6NZ8fOX6XU="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-22T11:13:21Z"},"road_event_id":"/tDJ3o0TxkjhnJg8rBD37cSaNBE=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"iT9L1M6OoFY91E7VI6NZ8fOX6XU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AVK2fJkP1qMOoRpQQq+voUy+hd8="},{"type":"next-occurrence","id":"JY/4ti3e7qvOHrmX7ld1FvSEqos="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-22T11:13:21Z"},"road_event_id":"iT9L1M6OoFY91E7VI6NZ8fOX6XU=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"JY/4ti3e7qvOHrmX7ld1FvSEqos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 303"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AVK2fJkP1qMOoRpQQq+voUy+hd8="}],"description":"Road rehabilitation on NY 303 southbound between Corporate Drive (Clarkstown) and US 9W (Clarkstown) D265648/NIGHT/32731809 - This work is weather permitting. Plan travel accordingly; delays may exist, Sunday April 26th, 2026 thru Friday May 1st, 2026 Sunday/ Monday/ Tuesday/ Wednesday/ Thursday, 09:00 PM thru 06:00 AM, alternating traffic","update_date":"2026-04-22T11:13:21Z"},"road_event_id":"JY/4ti3e7qvOHrmX7ld1FvSEqos=","beginning_cross_street":"Corporate Drive","ending_cross_street":"US 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949702,41.079544]]}},{"id":"gReuzsv+RoEYkY+b+ePCj+EQlHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near North of McClellan St (Newark), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, left lane closed express lane","update_date":"2026-04-22T11:15:20Z"},"road_event_id":"gReuzsv+RoEYkY+b+ePCj+EQlHw=","beginning_cross_street":"North of McClellan St","ending_cross_street":"South of McClellan St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.190795,40.691425]]}},{"id":"MAj24f5X6AUkKF4bHk4B743C01M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on I-81 northbound between Onondaga - Cortland County Line (Tully) and East Seneca Turnpike; NY 173 (Syracuse) ; Mobile lane closure, Wednesday April 22nd, 2026, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-22T13:21:49Z"},"road_event_id":"MAj24f5X6AUkKF4bHk4B743C01M=","beginning_cross_street":"Onondaga - Cortland County Line","ending_cross_street":"East Seneca Turnpike; NY 173","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.126419,42.778344]]}},{"id":"PUf+F1w8i739T0qbiu+qsyaM+ro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[],"description":"Pothole repair on I-81 southbound between East Seneca Turnpike; NY 173 (Syracuse) and Onondaga - Cortland County Line (Tully) ; Mobile lane closure, Wednesday April 22nd, 2026, 08:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-22T13:20:10Z"},"road_event_id":"PUf+F1w8i739T0qbiu+qsyaM+ro=","beginning_cross_street":"East Seneca Turnpike; NY 173","ending_cross_street":"Onondaga - Cortland County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.135017,43.0023]]}},{"id":"bwLsIx9o7o1Z3TEyvcv/g69OfLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4t8NN41jwOtyF68Db/r/d4siFqA="}],"description":"Guard rail repairs on NY 9D northbound between Old State Road (Wappinger) and Ketchamtown (Wappinger) 2025082906007/32731909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday April 30th, 2026 Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-22T11:31:45Z"},"road_event_id":"bwLsIx9o7o1Z3TEyvcv/g69OfLM=","beginning_cross_street":"Old State Road","ending_cross_street":"Ketchamtown","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941386,41.559572]]}},{"id":"4t8NN41jwOtyF68Db/r/d4siFqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bwLsIx9o7o1Z3TEyvcv/g69OfLM="},{"type":"next-occurrence","id":"qHCjEkul7HhTtprQXcBjx4srXnc="}],"description":"Guard rail repairs on NY 9D northbound between Old State Road (Wappinger) and Ketchamtown (Wappinger) 2025082906007/32731909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday April 30th, 2026 Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-22T11:31:45Z"},"road_event_id":"4t8NN41jwOtyF68Db/r/d4siFqA=","beginning_cross_street":"Old State Road","ending_cross_street":"Ketchamtown","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941386,41.559572]]}},{"id":"qHCjEkul7HhTtprQXcBjx4srXnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bwLsIx9o7o1Z3TEyvcv/g69OfLM="}],"description":"Guard rail repairs on NY 9D northbound between Old State Road (Wappinger) and Ketchamtown (Wappinger) 2025082906007/32731909 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Thursday April 30th, 2026 Tuesday/ Wednesday/ Thursday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-22T11:31:45Z"},"road_event_id":"qHCjEkul7HhTtprQXcBjx4srXnc=","beginning_cross_street":"Old State Road","ending_cross_street":"Ketchamtown","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941386,41.559572]]}},{"id":"DSVcqN8Wr4XNsp981T+7m2CJtVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZF6xdwdXQ/w9MqCUliF/0Gal4xs="}],"description":"Utility work on US 44/NY 55 both directions between Hull Avenue (Plattekill) and Larry Drive (Plattekill) 2025082502725/32304809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T11:53:24Z"},"road_event_id":"DSVcqN8Wr4XNsp981T+7m2CJtVE=","beginning_cross_street":"Hull Avenue","ending_cross_street":"Larry Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050828,41.694667]]}},{"id":"ZF6xdwdXQ/w9MqCUliF/0Gal4xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSVcqN8Wr4XNsp981T+7m2CJtVE="},{"type":"next-occurrence","id":"V5T/Bcd3OS4IvefeNk2IONkGGZM="}],"description":"Utility work on US 44/NY 55 both directions between Hull Avenue (Plattekill) and Larry Drive (Plattekill) 2025082502725/32304809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T11:53:24Z"},"road_event_id":"ZF6xdwdXQ/w9MqCUliF/0Gal4xs=","beginning_cross_street":"Hull Avenue","ending_cross_street":"Larry Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050828,41.694667]]}},{"id":"V5T/Bcd3OS4IvefeNk2IONkGGZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSVcqN8Wr4XNsp981T+7m2CJtVE="},{"type":"next-occurrence","id":"ch6K7vibQ++zmhBf6vvkv+TuvkI="}],"description":"Utility work on US 44/NY 55 both directions between Hull Avenue (Plattekill) and Larry Drive (Plattekill) 2025082502725/32304809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T11:53:24Z"},"road_event_id":"V5T/Bcd3OS4IvefeNk2IONkGGZM=","beginning_cross_street":"Hull Avenue","ending_cross_street":"Larry Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050828,41.694667]]}},{"id":"ch6K7vibQ++zmhBf6vvkv+TuvkI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSVcqN8Wr4XNsp981T+7m2CJtVE="}],"description":"Utility work on US 44/NY 55 both directions between Hull Avenue (Plattekill) and Larry Drive (Plattekill) 2025082502725/32304809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T11:53:24Z"},"road_event_id":"ch6K7vibQ++zmhBf6vvkv+TuvkI=","beginning_cross_street":"Hull Avenue","ending_cross_street":"Larry Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050828,41.694667]]}},{"id":"4QNc0mhL6vhxwOgxQiBBuKZaLpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[],"description":"Utility work on US 9W southbound between Station Lane (Orangetown) and S Tweed Blvd (Orangetown) 2025082502725/32672009 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 24th, 2026, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T12:36:54Z"},"road_event_id":"4QNc0mhL6vhxwOgxQiBBuKZaLpk=","beginning_cross_street":"Station Lane","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.920716,41.042076]]}},{"id":"1IvyxNAhLuRJ1mWzNdM2PW74n+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 59"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 59 westbound between Central Avenue (Clarkstown) and Ingalls Street (Clarkstown) 2025082502725/32633309 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 24th, 2026, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T12:43:51Z"},"road_event_id":"1IvyxNAhLuRJ1mWzNdM2PW74n+g=","beginning_cross_street":"Central Avenue","ending_cross_street":"Ingalls Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937954,41.094882]]}},{"id":"YL2TNf/HZs2NmQzktc4Aw5p4pQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"M42xkHqqV48GVJBZSGLKEIacYOw="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 1- US Hwy 6 (Deerpark) and Exit 4 - Mountain Rd (Greenville) DOT BM/B1003082-1032452/30406809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:19:48Z"},"road_event_id":"YL2TNf/HZs2NmQzktc4Aw5p4pQA=","beginning_cross_street":"Exit 1- US Hwy 6","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614049,41.373591]]}},{"id":"M42xkHqqV48GVJBZSGLKEIacYOw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YL2TNf/HZs2NmQzktc4Aw5p4pQA="},{"type":"next-occurrence","id":"w3rVDmhktOYV4F+h3htuJw/TN7Y="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 1- US Hwy 6 (Deerpark) and Exit 4 - Mountain Rd (Greenville) DOT BM/B1003082-1032452/30406809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:19:48Z"},"road_event_id":"M42xkHqqV48GVJBZSGLKEIacYOw=","beginning_cross_street":"Exit 1- US Hwy 6","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614049,41.373591]]}},{"id":"w3rVDmhktOYV4F+h3htuJw/TN7Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YL2TNf/HZs2NmQzktc4Aw5p4pQA="},{"type":"next-occurrence","id":"oYhBspLKT6k8ZfcPZJQlqiZDVOg="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 1- US Hwy 6 (Deerpark) and Exit 4 - Mountain Rd (Greenville) DOT BM/B1003082-1032452/30406809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:19:48Z"},"road_event_id":"w3rVDmhktOYV4F+h3htuJw/TN7Y=","beginning_cross_street":"Exit 1- US Hwy 6","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614049,41.373591]]}},{"id":"oYhBspLKT6k8ZfcPZJQlqiZDVOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YL2TNf/HZs2NmQzktc4Aw5p4pQA="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 1- US Hwy 6 (Deerpark) and Exit 4 - Mountain Rd (Greenville) DOT BM/B1003082-1032452/30406809 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:19:48Z"},"road_event_id":"oYhBspLKT6k8ZfcPZJQlqiZDVOg=","beginning_cross_street":"Exit 1- US Hwy 6","ending_cross_street":"Exit 4 - Mountain Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.614049,41.373591]]}},{"id":"wVl4JD5wGMkA+NWbE5UFzQOLVlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7DbndFSOVku4gBe3+peilHe+UPY="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 19 - NY17 (Wallkill) and Exit 28 - NY 208 (Montgomery) DOT BM/B1052642/32494909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 7th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:25:54Z"},"road_event_id":"wVl4JD5wGMkA+NWbE5UFzQOLVlg=","beginning_cross_street":"Exit 19 - NY17","ending_cross_street":"Exit 28 - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232338,41.501381]]}},{"id":"7DbndFSOVku4gBe3+peilHe+UPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wVl4JD5wGMkA+NWbE5UFzQOLVlg="},{"type":"next-occurrence","id":"RFPLVEy+CoANZQt9zT9jbjdS5Rs="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 19 - NY17 (Wallkill) and Exit 28 - NY 208 (Montgomery) DOT BM/B1052642/32494909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 7th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:25:54Z"},"road_event_id":"7DbndFSOVku4gBe3+peilHe+UPY=","beginning_cross_street":"Exit 19 - NY17","ending_cross_street":"Exit 28 - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232338,41.501381]]}},{"id":"RFPLVEy+CoANZQt9zT9jbjdS5Rs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wVl4JD5wGMkA+NWbE5UFzQOLVlg="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 19 - NY17 (Wallkill) and Exit 28 - NY 208 (Montgomery) DOT BM/B1052642/32494909 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday May 4th, 2026 thru Thursday May 7th, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:25:54Z"},"road_event_id":"RFPLVEy+CoANZQt9zT9jbjdS5Rs=","beginning_cross_street":"Exit 19 - NY17","ending_cross_street":"Exit 28 - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.232338,41.501381]]}},{"id":"MK+lQT2OI2RDGIn28HspJM3aTOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[],"description":"Due to Escalator Work southbound, A Line between W 4 St - Wash Sq (New York) and Jay St - MetroTech (New York) at Spring St, Canal St, Chambers St, Fulton St, and High St. Queens-bound A line runs via the F line from W 4 St-Wash Sq to Jay St-MetroTech. For Spring St, Canal St and Chambers St/World Trade Center, take the E line or an uptown A line via transfer at W 4 St-Wash Sq. For Fulton St, take the J line via transfer at Delancey St-Essex St F line. Or, use the nearby World Trade Center E line. For High St, use the nearby York St F line instead., Thursday April 23rd, 2026 thru Friday April 24th, 2026, 10:45 PM thru 05:00 AM service suspended","update_date":"2026-04-22T14:25:55Z"},"road_event_id":"MK+lQT2OI2RDGIn28HspJM3aTOQ=","beginning_cross_street":"W 4 St - Wash Sq","ending_cross_street":"Jay St - MetroTech","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:30:00Z","end_date":"2026-04-25T07:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000495,40.732338]]}},{"id":"ZFvVH8Q6pQH8JhKKCFMjsIL9ods=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CM7rlAPyJCXTyvdYYsfpYSsP7q0="}],"description":"Due to Track repairs both directions, B Line between Bedford Park Blvd (New York) and Brighton Beach (New York) ends early. Take the A line, C line, D line, and/or Q line. Transfer at 59 St-Columbus Circle A line, C line, or D line, 34 St-Herald Sq D line or Q line, and/or Atlantic Av-Barclays Ctr D line or Q line., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 08:15 PM thru 10:00 PM, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:15 PM thru 10:00 PM","update_date":"2026-04-22T14:33:23Z"},"road_event_id":"ZFvVH8Q6pQH8JhKKCFMjsIL9ods=","beginning_cross_street":"Bedford Park Blvd","ending_cross_street":"Brighton Beach","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:30:00Z","end_date":"2026-04-23T22:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.887138,40.873244]]}},{"id":"CM7rlAPyJCXTyvdYYsfpYSsP7q0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZFvVH8Q6pQH8JhKKCFMjsIL9ods="},{"type":"next-occurrence","id":"Jg+SW1dFiYzEG/48ngKhkaVS9rE="}],"description":"Due to Track repairs both directions, B Line between Bedford Park Blvd (New York) and Brighton Beach (New York) ends early. Take the A line, C line, D line, and/or Q line. Transfer at 59 St-Columbus Circle A line, C line, or D line, 34 St-Herald Sq D line or Q line, and/or Atlantic Av-Barclays Ctr D line or Q line., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 08:15 PM thru 10:00 PM, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:15 PM thru 10:00 PM","update_date":"2026-04-22T14:33:23Z"},"road_event_id":"CM7rlAPyJCXTyvdYYsfpYSsP7q0=","beginning_cross_street":"Bedford Park Blvd","ending_cross_street":"Brighton Beach","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:30:00Z","end_date":"2026-04-24T22:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.887138,40.873244]]}},{"id":"Jg+SW1dFiYzEG/48ngKhkaVS9rE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZFvVH8Q6pQH8JhKKCFMjsIL9ods="},{"type":"next-occurrence","id":"jPySdqi1KhqOHDQSO/UM537FM8g="}],"description":"Due to Track repairs both directions, B Line between Bedford Park Blvd (New York) and Brighton Beach (New York) ends early. Take the A line, C line, D line, and/or Q line. Transfer at 59 St-Columbus Circle A line, C line, or D line, 34 St-Herald Sq D line or Q line, and/or Atlantic Av-Barclays Ctr D line or Q line., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 08:15 PM thru 10:00 PM, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:15 PM thru 10:00 PM","update_date":"2026-04-22T14:33:23Z"},"road_event_id":"Jg+SW1dFiYzEG/48ngKhkaVS9rE=","beginning_cross_street":"Bedford Park Blvd","ending_cross_street":"Brighton Beach","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:30:00Z","end_date":"2026-04-28T22:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.887138,40.873244]]}},{"id":"jPySdqi1KhqOHDQSO/UM537FM8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZFvVH8Q6pQH8JhKKCFMjsIL9ods="},{"type":"next-occurrence","id":"jE6NERuwZRexkVhClWJ8ePHlTfg="}],"description":"Due to Track repairs both directions, B Line between Bedford Park Blvd (New York) and Brighton Beach (New York) ends early. Take the A line, C line, D line, and/or Q line. Transfer at 59 St-Columbus Circle A line, C line, or D line, 34 St-Herald Sq D line or Q line, and/or Atlantic Av-Barclays Ctr D line or Q line., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 08:15 PM thru 10:00 PM, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:15 PM thru 10:00 PM","update_date":"2026-04-22T14:33:23Z"},"road_event_id":"jPySdqi1KhqOHDQSO/UM537FM8g=","beginning_cross_street":"Bedford Park Blvd","ending_cross_street":"Brighton Beach","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:30:00Z","end_date":"2026-04-29T22:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.887138,40.873244]]}},{"id":"jE6NERuwZRexkVhClWJ8ePHlTfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZFvVH8Q6pQH8JhKKCFMjsIL9ods="},{"type":"next-occurrence","id":"8YLahq4WIk5m8rBP9NYsyqG7rBM="}],"description":"Due to Track repairs both directions, B Line between Bedford Park Blvd (New York) and Brighton Beach (New York) ends early. Take the A line, C line, D line, and/or Q line. Transfer at 59 St-Columbus Circle A line, C line, or D line, 34 St-Herald Sq D line or Q line, and/or Atlantic Av-Barclays Ctr D line or Q line., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 08:15 PM thru 10:00 PM, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:15 PM thru 10:00 PM","update_date":"2026-04-22T14:33:23Z"},"road_event_id":"jE6NERuwZRexkVhClWJ8ePHlTfg=","beginning_cross_street":"Bedford Park Blvd","ending_cross_street":"Brighton Beach","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:30:00Z","end_date":"2026-04-30T22:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.887138,40.873244]]}},{"id":"8YLahq4WIk5m8rBP9NYsyqG7rBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZFvVH8Q6pQH8JhKKCFMjsIL9ods="}],"description":"Due to Track repairs both directions, B Line between Bedford Park Blvd (New York) and Brighton Beach (New York) ends early. Take the A line, C line, D line, and/or Q line. Transfer at 59 St-Columbus Circle A line, C line, or D line, 34 St-Herald Sq D line or Q line, and/or Atlantic Av-Barclays Ctr D line or Q line., Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 08:15 PM thru 10:00 PM, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 08:15 PM thru 10:00 PM","update_date":"2026-04-22T14:33:23Z"},"road_event_id":"8YLahq4WIk5m8rBP9NYsyqG7rBM=","beginning_cross_street":"Bedford Park Blvd","ending_cross_street":"Brighton Beach","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:30:00Z","end_date":"2026-05-01T22:15:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.887138,40.873244]]}},{"id":"S4g9IQP3w1GBQVsd/RwpRhLDq7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zbQJk+vw3AEMAG6z73lGR1fjfhM="}],"description":"Overhead sign inspection on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D041200/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-04-22T15:00:47Z"},"road_event_id":"S4g9IQP3w1GBQVsd/RwpRhLDq7w=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717727,41.082606]]}},{"id":"zbQJk+vw3AEMAG6z73lGR1fjfhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S4g9IQP3w1GBQVsd/RwpRhLDq7w="},{"type":"next-occurrence","id":"ESvziR4kYbajyymkQgY0Exj8RRo="}],"description":"Overhead sign inspection on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D041200/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-04-22T15:00:47Z"},"road_event_id":"zbQJk+vw3AEMAG6z73lGR1fjfhM=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717727,41.082606]]}},{"id":"ESvziR4kYbajyymkQgY0Exj8RRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S4g9IQP3w1GBQVsd/RwpRhLDq7w="},{"type":"next-occurrence","id":"Kbu+iCioYcxqopEazVfPZDLaq+Q="}],"description":"Overhead sign inspection on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D041200/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-04-22T15:00:47Z"},"road_event_id":"ESvziR4kYbajyymkQgY0Exj8RRo=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717727,41.082606]]}},{"id":"Kbu+iCioYcxqopEazVfPZDLaq+Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S4g9IQP3w1GBQVsd/RwpRhLDq7w="},{"type":"next-occurrence","id":"pj4tsyhaIutNkUvxEN01kDDupGI="}],"description":"Overhead sign inspection on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D041200/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-04-22T15:00:47Z"},"road_event_id":"Kbu+iCioYcxqopEazVfPZDLaq+Q=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717727,41.082606]]}},{"id":"pj4tsyhaIutNkUvxEN01kDDupGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"S4g9IQP3w1GBQVsd/RwpRhLDq7w="}],"description":"Overhead sign inspection on I-684 southbound between Exit 2 - NY 120 - Westchester County Airport (North Castle) and I-287 (Harrison) D041200/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:30 PM, shoulder closure","update_date":"2026-04-22T15:00:47Z"},"road_event_id":"pj4tsyhaIutNkUvxEN01kDDupGI=","beginning_cross_street":"Exit 2 - NY 120 - Westchester County Airport","ending_cross_street":"I-287","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.717727,41.082606]]}},{"id":"xfzPA45gChvu7luGmYwyT4ZFBf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O3Yt+IfXS/GCoTTcI01LvP5lci8="}],"description":"Overhead sign inspection on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D041200/32089409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-22T14:51:49Z"},"road_event_id":"xfzPA45gChvu7luGmYwyT4ZFBf4=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838074,40.991563]]}},{"id":"O3Yt+IfXS/GCoTTcI01LvP5lci8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xfzPA45gChvu7luGmYwyT4ZFBf4="},{"type":"next-occurrence","id":"B/3eto+L0oQb5KyMvKy6ysDMxF8="}],"description":"Overhead sign inspection on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D041200/32089409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-22T14:51:49Z"},"road_event_id":"O3Yt+IfXS/GCoTTcI01LvP5lci8=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838074,40.991563]]}},{"id":"B/3eto+L0oQb5KyMvKy6ysDMxF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xfzPA45gChvu7luGmYwyT4ZFBf4="},{"type":"next-occurrence","id":"6xuLULkPBURefEaOVtdrwFzl6jU="}],"description":"Overhead sign inspection on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D041200/32089409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-22T14:51:49Z"},"road_event_id":"B/3eto+L0oQb5KyMvKy6ysDMxF8=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838074,40.991563]]}},{"id":"6xuLULkPBURefEaOVtdrwFzl6jU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xfzPA45gChvu7luGmYwyT4ZFBf4="},{"type":"next-occurrence","id":"xtrVG29PeyTY2BoaqUqUsFu8Of4="}],"description":"Overhead sign inspection on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D041200/32089409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-22T14:51:49Z"},"road_event_id":"6xuLULkPBURefEaOVtdrwFzl6jU=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838074,40.991563]]}},{"id":"xtrVG29PeyTY2BoaqUqUsFu8Of4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Sprain Brook State Pkwy"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xfzPA45gChvu7luGmYwyT4ZFBf4="}],"description":"Overhead sign inspection on Sprain Brook State Pkwy both directions between Jackson Avenue (Greenburgh) and Dobbs Ferry Road - NY 100B (Greenburgh) D041200/32089409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-22T14:51:49Z"},"road_event_id":"xtrVG29PeyTY2BoaqUqUsFu8Of4=","beginning_cross_street":"Jackson Avenue","ending_cross_street":"Dobbs Ferry Road - NY 100B","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838074,40.991563]]}},{"id":"5lC6R83YDTP2Ut/h8tQReNFyKrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rejaARSUHZtBg+6je9ZHHdDrSeI="}],"description":"Bridge maintenance operations on Hutchinson River Parkway [Westchester] southbound at Exit 13B - Mamaroneck Avenue - CR 8C (White Plains) DOT BM/B5523361/29970209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Wednesday April 29th, 2026 Monday/ Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:41:29Z"},"road_event_id":"5lC6R83YDTP2Ut/h8tQReNFyKrk=","beginning_cross_street":"Exit 13B - Mamaroneck Avenue - CR 8C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744178,40.983248]]}},{"id":"rejaARSUHZtBg+6je9ZHHdDrSeI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5lC6R83YDTP2Ut/h8tQReNFyKrk="},{"type":"next-occurrence","id":"OVQpxzu0avJZj36HJNdopkzvu+g="}],"description":"Bridge maintenance operations on Hutchinson River Parkway [Westchester] southbound at Exit 13B - Mamaroneck Avenue - CR 8C (White Plains) DOT BM/B5523361/29970209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Wednesday April 29th, 2026 Monday/ Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:41:29Z"},"road_event_id":"rejaARSUHZtBg+6je9ZHHdDrSeI=","beginning_cross_street":"Exit 13B - Mamaroneck Avenue - CR 8C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744178,40.983248]]}},{"id":"OVQpxzu0avJZj36HJNdopkzvu+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5lC6R83YDTP2Ut/h8tQReNFyKrk="}],"description":"Bridge maintenance operations on Hutchinson River Parkway [Westchester] southbound at Exit 13B - Mamaroneck Avenue - CR 8C (White Plains) DOT BM/B5523361/29970209 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Wednesday April 29th, 2026 Monday/ Tuesday/ Wednesday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-22T14:41:29Z"},"road_event_id":"OVQpxzu0avJZj36HJNdopkzvu+g=","beginning_cross_street":"Exit 13B - Mamaroneck Avenue - CR 8C","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.744178,40.983248]]}},{"id":"Tmx64HO9aJaUxCMzZL1eo0+lF+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on Cross County Parkway eastbound ramp to Exit 6 - Bronx River Parkway (Mount Vernon) 15-537/32732109 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026, 10:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-22T15:29:08Z"},"road_event_id":"Tmx64HO9aJaUxCMzZL1eo0+lF+o=","beginning_cross_street":"Exit 6 - Bronx River Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842154,40.928341]]}},{"id":"LAfoX+SSNAxP/QHGt414HOvx5jU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"otA3rCBbIceTRJZFqvqY/tkplE8="}],"description":"Due to Repairs northbound, E Line between Jamaica - Van Wyck (New York) and Forest Hills - 71 Av (New York) skips Briarwood and 75 Av. For service to these stations, take the E line to Kew Gardens-Union Tpke or Forest Hills-71 Av and transfer to a Jamaica Center-bound E line or Jamaica-bound F line. For service from Briarwood, take the E line to Jamaica-Van Wyck, and transfer to a Manhattan-bound E line. For service from 75 Av, take the E line or F line to Kew Gardens-Union Tpke and transfer to a Manhattan-bound E line., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T15:26:57Z"},"road_event_id":"LAfoX+SSNAxP/QHGt414HOvx5jU=","beginning_cross_street":"Jamaica - Van Wyck","ending_cross_street":"Forest Hills - 71 Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:45:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.816859,40.702566]]}},{"id":"otA3rCBbIceTRJZFqvqY/tkplE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LAfoX+SSNAxP/QHGt414HOvx5jU="}],"description":"Due to Repairs northbound, E Line between Jamaica - Van Wyck (New York) and Forest Hills - 71 Av (New York) skips Briarwood and 75 Av. For service to these stations, take the E line to Kew Gardens-Union Tpke or Forest Hills-71 Av and transfer to a Jamaica Center-bound E line or Jamaica-bound F line. For service from Briarwood, take the E line to Jamaica-Van Wyck, and transfer to a Manhattan-bound E line. For service from 75 Av, take the E line or F line to Kew Gardens-Union Tpke and transfer to a Manhattan-bound E line., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T15:26:57Z"},"road_event_id":"otA3rCBbIceTRJZFqvqY/tkplE8=","beginning_cross_street":"Jamaica - Van Wyck","ending_cross_street":"Forest Hills - 71 Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:45:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.816859,40.702566]]}},{"id":"F/lnC07QVd8ekVCPN1AG6Zc/Qe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1/NRCWT/BJ7Wx1VP54/ATN5Axfg="}],"description":"Due to Track repairs southbound, A Line from 168 St (New York) to 125 St (New York) Late night A line also stops at these stations., Saturday April 25th, 2026 thru Sunday April 26th, 2026, Saturday/ Sunday, 05:00 AM thru 07:00 PM local service only","update_date":"2026-04-22T15:30:11Z"},"road_event_id":"F/lnC07QVd8ekVCPN1AG6Zc/Qe8=","beginning_cross_street":"168 St","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939561,40.840719]]}},{"id":"1/NRCWT/BJ7Wx1VP54/ATN5Axfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"F/lnC07QVd8ekVCPN1AG6Zc/Qe8="}],"description":"Due to Track repairs southbound, A Line from 168 St (New York) to 125 St (New York) Late night A line also stops at these stations., Saturday April 25th, 2026 thru Sunday April 26th, 2026, Saturday/ Sunday, 05:00 AM thru 07:00 PM local service only","update_date":"2026-04-22T15:30:11Z"},"road_event_id":"1/NRCWT/BJ7Wx1VP54/ATN5Axfg=","beginning_cross_street":"168 St","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T14:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.939561,40.840719]]}},{"id":"p7XI+Ulxf0xNFL7O+oyi2vRgDaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"g5B6YSEFBGIDfETBDVe0eOqsZa8="}],"description":"Due to Track replacement southbound, B Line from Prospect Park (New York) to Kings Hwy (New York), Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM local service only","update_date":"2026-04-22T15:17:31Z"},"road_event_id":"p7XI+Ulxf0xNFL7O+oyi2vRgDaw=","beginning_cross_street":"Prospect Park","ending_cross_street":"Kings Hwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962246,40.661614]]}},{"id":"g5B6YSEFBGIDfETBDVe0eOqsZa8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p7XI+Ulxf0xNFL7O+oyi2vRgDaw="}],"description":"Due to Track replacement southbound, B Line from Prospect Park (New York) to Kings Hwy (New York), Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 10:00 AM thru 03:00 PM local service only","update_date":"2026-04-22T15:17:31Z"},"road_event_id":"g5B6YSEFBGIDfETBDVe0eOqsZa8=","beginning_cross_street":"Prospect Park","ending_cross_street":"Kings Hwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.962246,40.661614]]}},{"id":"aGAUMVwcfiMkJcwrqKlmDKht0Qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a5k54IFSOKWew9ouKJPW9PCKrdg="}],"description":"Due to Station Renovations eastbound, A Line between Hoyt - Schermerhorn Sts (New York) and Broadway Jct (New York) skips Lafayette Av, Clinton-Washington Avs, Franklin Av, Kingston-Throop Avs, Ralph Av and Rockaway Av. For service to these stations, take the A line to Nostrand Av, Utica Av , or Broadway Junction and transfer to a Manhattan-bound train. For service from these stations, take a Manhattan-bound train to Utica Av, Nostrand Av or Hoyt-Schermerhorn Sts and transfer to a Queens-bound A line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-04-22T15:22:02Z"},"road_event_id":"aGAUMVwcfiMkJcwrqKlmDKht0Qw=","beginning_cross_street":"Hoyt - Schermerhorn Sts","ending_cross_street":"Broadway Jct","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:30:00Z","end_date":"2026-04-26T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985001,40.688484]]}},{"id":"a5k54IFSOKWew9ouKJPW9PCKrdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGAUMVwcfiMkJcwrqKlmDKht0Qw="},{"type":"next-occurrence","id":"4sum0aunXXO9Fh4WAoYpjtl+/Dw="}],"description":"Due to Station Renovations eastbound, A Line between Hoyt - Schermerhorn Sts (New York) and Broadway Jct (New York) skips Lafayette Av, Clinton-Washington Avs, Franklin Av, Kingston-Throop Avs, Ralph Av and Rockaway Av. For service to these stations, take the A line to Nostrand Av, Utica Av , or Broadway Junction and transfer to a Manhattan-bound train. For service from these stations, take a Manhattan-bound train to Utica Av, Nostrand Av or Hoyt-Schermerhorn Sts and transfer to a Queens-bound A line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-04-22T15:22:02Z"},"road_event_id":"a5k54IFSOKWew9ouKJPW9PCKrdg=","beginning_cross_street":"Hoyt - Schermerhorn Sts","ending_cross_street":"Broadway Jct","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:30:00Z","end_date":"2026-04-27T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985001,40.688484]]}},{"id":"4sum0aunXXO9Fh4WAoYpjtl+/Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGAUMVwcfiMkJcwrqKlmDKht0Qw="},{"type":"next-occurrence","id":"3I74nOnvsHO39mGXPEwS81jOG84="}],"description":"Due to Station Renovations eastbound, A Line between Hoyt - Schermerhorn Sts (New York) and Broadway Jct (New York) skips Lafayette Av, Clinton-Washington Avs, Franklin Av, Kingston-Throop Avs, Ralph Av and Rockaway Av. For service to these stations, take the A line to Nostrand Av, Utica Av , or Broadway Junction and transfer to a Manhattan-bound train. For service from these stations, take a Manhattan-bound train to Utica Av, Nostrand Av or Hoyt-Schermerhorn Sts and transfer to a Queens-bound A line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-04-22T15:22:02Z"},"road_event_id":"4sum0aunXXO9Fh4WAoYpjtl+/Dw=","beginning_cross_street":"Hoyt - Schermerhorn Sts","ending_cross_street":"Broadway Jct","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:30:00Z","end_date":"2026-04-28T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985001,40.688484]]}},{"id":"3I74nOnvsHO39mGXPEwS81jOG84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aGAUMVwcfiMkJcwrqKlmDKht0Qw="}],"description":"Due to Station Renovations eastbound, A Line between Hoyt - Schermerhorn Sts (New York) and Broadway Jct (New York) skips Lafayette Av, Clinton-Washington Avs, Franklin Av, Kingston-Throop Avs, Ralph Av and Rockaway Av. For service to these stations, take the A line to Nostrand Av, Utica Av , or Broadway Junction and transfer to a Manhattan-bound train. For service from these stations, take a Manhattan-bound train to Utica Av, Nostrand Av or Hoyt-Schermerhorn Sts and transfer to a Queens-bound A line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only","update_date":"2026-04-22T15:22:02Z"},"road_event_id":"3I74nOnvsHO39mGXPEwS81jOG84=","beginning_cross_street":"Hoyt - Schermerhorn Sts","ending_cross_street":"Broadway Jct","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:30:00Z","end_date":"2026-04-29T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985001,40.688484]]}},{"id":"Pb7K+KUU/GPsvSHufCrdCa1K13A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["C Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations eastbound, C Line between Hoyt - Schermerhorn Sts (New York) and Broadway Jct (New York) skips Lafayette Av, Clinton-Washington Avs, Franklin Av, Kingston-Throop Avs, Ralph Av and Rockaway Av. For service to these stations, take the C line to Nostrand Av, Utica Av or Broadway Junction and transfer to a Manhattan-bound train. For service from these stations, take a Manhattan-bound train to Utica Av, Nostrand Av or Hoyt-Schermerhorn Sts and transfer to a Euclid Av-bound C line., Continuous Saturday April 25th, 2026 12:00 AM thru Sunday April 26th, 2026 11:59 PM","update_date":"2026-04-22T15:33:20Z"},"road_event_id":"Pb7K+KUU/GPsvSHufCrdCa1K13A=","beginning_cross_street":"Hoyt - Schermerhorn Sts","ending_cross_street":"Broadway Jct","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985001,40.688484]]}},{"id":"70EXkkGO8+EG+qbvpRYY0E5mCZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P4hazEgcB4QhiAPe5zPxlP8/2Bo="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"70EXkkGO8+EG+qbvpRYY0E5mCZw=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"P4hazEgcB4QhiAPe5zPxlP8/2Bo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70EXkkGO8+EG+qbvpRYY0E5mCZw="},{"type":"next-occurrence","id":"YkE0KpW34aHT65FcvqAIYX87nrk="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"P4hazEgcB4QhiAPe5zPxlP8/2Bo=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"YkE0KpW34aHT65FcvqAIYX87nrk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70EXkkGO8+EG+qbvpRYY0E5mCZw="},{"type":"next-occurrence","id":"vKNqBQ6DR3D2Pwkxe/ogBbeBndw="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"YkE0KpW34aHT65FcvqAIYX87nrk=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"vKNqBQ6DR3D2Pwkxe/ogBbeBndw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70EXkkGO8+EG+qbvpRYY0E5mCZw="},{"type":"next-occurrence","id":"n6+RxK72tiYqSgiAc1ITwm6Evkk="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"vKNqBQ6DR3D2Pwkxe/ogBbeBndw=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"n6+RxK72tiYqSgiAc1ITwm6Evkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70EXkkGO8+EG+qbvpRYY0E5mCZw="},{"type":"next-occurrence","id":"5jOsvnjaIMYQos6oT9R8aguIL88="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"n6+RxK72tiYqSgiAc1ITwm6Evkk=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"5jOsvnjaIMYQos6oT9R8aguIL88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70EXkkGO8+EG+qbvpRYY0E5mCZw="},{"type":"next-occurrence","id":"9KrQWGcYlPeVxi/i6EzjEG3Xl1Q="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"5jOsvnjaIMYQos6oT9R8aguIL88=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"9KrQWGcYlPeVxi/i6EzjEG3Xl1Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70EXkkGO8+EG+qbvpRYY0E5mCZw="},{"type":"next-occurrence","id":"ojF8mp6c8rGDn+DunKXsb5GGPRg="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"9KrQWGcYlPeVxi/i6EzjEG3Xl1Q=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"ojF8mp6c8rGDn+DunKXsb5GGPRg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"70EXkkGO8+EG+qbvpRYY0E5mCZw="}],"description":"Due to Track repairs both directions, D Line between 161 St - Yankee Stadium (New York) and Norwood - 205 St (New York) D line run between Coney Island-Stillwell Av and 161 St-Yankee Stadium, the last stop. Free T127 shuttle buses run between Mosholu Pkwy 4 line and Norwood-205 St. For service between 161 St-Yankee Stadium and Bedford Park Blvd, use nearby 4 line along Jerome Av instead. For Norwood-205 St, take a bus. Transfer between D line and 4 line at 161 St-Yankee Stadium. Transfer between 4 line and buses at Mosholu Pkwy., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:30 PM thru 05:00 AM service suspended, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:30 PM thru 05:00 AM service suspended","update_date":"2026-04-22T16:02:55Z"},"road_event_id":"ojF8mp6c8rGDn+DunKXsb5GGPRg=","beginning_cross_street":"161 St - Yankee Stadium","ending_cross_street":"Norwood - 205 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.925651,40.827905]]}},{"id":"5zcapLfE8L/MqKtVQLuyI3XWZZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/lO/NOuf05y6ESZErlKwn/Szcas="}],"description":"Due to Track repairs northbound, A Line between Jay St - MetroTech (New York) and W 4 St - Wash Sq (New York) at High St, Fulton St, Chambers St, Canal St and Spring St. Inwood-bound A line run via the F line from Jay St-MetroTech to W 4 St-Wash Sq. For High St, use the nearby York St F line instead. For Fulton St, take the J line via transfer at the Delancey St-Essex St F line. Or, use the nearby World Trade Center E line via transfer at W 4 St-Wash Sq. For Chambers St/World Trade Center, Canal St and Spring St, take the E line or downtown A line via transfer at W 4 St-Wash Sq., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM service suspended, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM service suspended","update_date":"2026-04-22T15:44:47Z"},"road_event_id":"5zcapLfE8L/MqKtVQLuyI3XWZZI=","beginning_cross_street":"Jay St - MetroTech","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:30:00Z","end_date":"2026-04-29T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987342,40.692338]]}},{"id":"/lO/NOuf05y6ESZErlKwn/Szcas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5zcapLfE8L/MqKtVQLuyI3XWZZI="},{"type":"next-occurrence","id":"NbbX5yZ0np4bP/X3uO+Uo3JyK18="}],"description":"Due to Track repairs northbound, A Line between Jay St - MetroTech (New York) and W 4 St - Wash Sq (New York) at High St, Fulton St, Chambers St, Canal St and Spring St. Inwood-bound A line run via the F line from Jay St-MetroTech to W 4 St-Wash Sq. For High St, use the nearby York St F line instead. For Fulton St, take the J line via transfer at the Delancey St-Essex St F line. Or, use the nearby World Trade Center E line via transfer at W 4 St-Wash Sq. For Chambers St/World Trade Center, Canal St and Spring St, take the E line or downtown A line via transfer at W 4 St-Wash Sq., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM service suspended, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM service suspended","update_date":"2026-04-22T15:44:47Z"},"road_event_id":"/lO/NOuf05y6ESZErlKwn/Szcas=","beginning_cross_street":"Jay St - MetroTech","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:30:00Z","end_date":"2026-04-30T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987342,40.692338]]}},{"id":"NbbX5yZ0np4bP/X3uO+Uo3JyK18=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5zcapLfE8L/MqKtVQLuyI3XWZZI="},{"type":"next-occurrence","id":"WdF/NLwkwn9/UJiFKh0pICcNazo="}],"description":"Due to Track repairs northbound, A Line between Jay St - MetroTech (New York) and W 4 St - Wash Sq (New York) at High St, Fulton St, Chambers St, Canal St and Spring St. Inwood-bound A line run via the F line from Jay St-MetroTech to W 4 St-Wash Sq. For High St, use the nearby York St F line instead. For Fulton St, take the J line via transfer at the Delancey St-Essex St F line. Or, use the nearby World Trade Center E line via transfer at W 4 St-Wash Sq. For Chambers St/World Trade Center, Canal St and Spring St, take the E line or downtown A line via transfer at W 4 St-Wash Sq., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM service suspended, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM service suspended","update_date":"2026-04-22T15:44:47Z"},"road_event_id":"NbbX5yZ0np4bP/X3uO+Uo3JyK18=","beginning_cross_street":"Jay St - MetroTech","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:30:00Z","end_date":"2026-05-01T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987342,40.692338]]}},{"id":"WdF/NLwkwn9/UJiFKh0pICcNazo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5zcapLfE8L/MqKtVQLuyI3XWZZI="},{"type":"next-occurrence","id":"xgx7vOuoUfOOh6cq+Yx/GCYn6kE="}],"description":"Due to Track repairs northbound, A Line between Jay St - MetroTech (New York) and W 4 St - Wash Sq (New York) at High St, Fulton St, Chambers St, Canal St and Spring St. Inwood-bound A line run via the F line from Jay St-MetroTech to W 4 St-Wash Sq. For High St, use the nearby York St F line instead. For Fulton St, take the J line via transfer at the Delancey St-Essex St F line. Or, use the nearby World Trade Center E line via transfer at W 4 St-Wash Sq. For Chambers St/World Trade Center, Canal St and Spring St, take the E line or downtown A line via transfer at W 4 St-Wash Sq., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM service suspended, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM service suspended","update_date":"2026-04-22T15:44:47Z"},"road_event_id":"WdF/NLwkwn9/UJiFKh0pICcNazo=","beginning_cross_street":"Jay St - MetroTech","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:30:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987342,40.692338]]}},{"id":"xgx7vOuoUfOOh6cq+Yx/GCYn6kE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5zcapLfE8L/MqKtVQLuyI3XWZZI="}],"description":"Due to Track repairs northbound, A Line between Jay St - MetroTech (New York) and W 4 St - Wash Sq (New York) at High St, Fulton St, Chambers St, Canal St and Spring St. Inwood-bound A line run via the F line from Jay St-MetroTech to W 4 St-Wash Sq. For High St, use the nearby York St F line instead. For Fulton St, take the J line via transfer at the Delancey St-Essex St F line. Or, use the nearby World Trade Center E line via transfer at W 4 St-Wash Sq. For Chambers St/World Trade Center, Canal St and Spring St, take the E line or downtown A line via transfer at W 4 St-Wash Sq., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM service suspended, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM service suspended","update_date":"2026-04-22T15:44:47Z"},"road_event_id":"xgx7vOuoUfOOh6cq+Yx/GCYn6kE=","beginning_cross_street":"Jay St - MetroTech","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:30:00Z","end_date":"2026-05-03T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987342,40.692338]]}},{"id":"Tb3Y97obdtINmsJUkZPOEi53H5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9ViZNgj4KkuHWyrLkPhgzdcmEh4="}],"description":"Due to Station Renovations eastbound, A Line between Broadway Jct (New York) and Euclid Av (New York) skips Liberty Av, Van Siclen Av, and Shepherd Av. For service to these stations, take the A line to Euclid Av and transfer to a Manhattan-bound A line local. For service from these stations, take the A line to Broadway Junction and transfer to a Queens-bound A line., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM","update_date":"2026-04-22T15:54:36Z"},"road_event_id":"Tb3Y97obdtINmsJUkZPOEi53H5w=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Euclid Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:30:00Z","end_date":"2026-05-03T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.905316,40.678334]]}},{"id":"9ViZNgj4KkuHWyrLkPhgzdcmEh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tb3Y97obdtINmsJUkZPOEi53H5w="},{"type":"next-occurrence","id":"jsfJbKqdbda/OA3fp9H/RHMsf2M="}],"description":"Due to Station Renovations eastbound, A Line between Broadway Jct (New York) and Euclid Av (New York) skips Liberty Av, Van Siclen Av, and Shepherd Av. For service to these stations, take the A line to Euclid Av and transfer to a Manhattan-bound A line local. For service from these stations, take the A line to Broadway Junction and transfer to a Queens-bound A line., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM","update_date":"2026-04-22T15:54:36Z"},"road_event_id":"9ViZNgj4KkuHWyrLkPhgzdcmEh4=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Euclid Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:30:00Z","end_date":"2026-05-04T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.905316,40.678334]]}},{"id":"jsfJbKqdbda/OA3fp9H/RHMsf2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tb3Y97obdtINmsJUkZPOEi53H5w="},{"type":"next-occurrence","id":"f1+f5ORSYJ9puXl8FbaKO6cvqD4="}],"description":"Due to Station Renovations eastbound, A Line between Broadway Jct (New York) and Euclid Av (New York) skips Liberty Av, Van Siclen Av, and Shepherd Av. For service to these stations, take the A line to Euclid Av and transfer to a Manhattan-bound A line local. For service from these stations, take the A line to Broadway Junction and transfer to a Queens-bound A line., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM","update_date":"2026-04-22T15:54:36Z"},"road_event_id":"jsfJbKqdbda/OA3fp9H/RHMsf2M=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Euclid Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T03:30:00Z","end_date":"2026-05-05T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.905316,40.678334]]}},{"id":"f1+f5ORSYJ9puXl8FbaKO6cvqD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["A Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Tb3Y97obdtINmsJUkZPOEi53H5w="}],"description":"Due to Station Renovations eastbound, A Line between Broadway Jct (New York) and Euclid Av (New York) skips Liberty Av, Van Siclen Av, and Shepherd Av. For service to these stations, take the A line to Euclid Av and transfer to a Manhattan-bound A line local. For service from these stations, take the A line to Broadway Junction and transfer to a Queens-bound A line., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM","update_date":"2026-04-22T15:54:36Z"},"road_event_id":"f1+f5ORSYJ9puXl8FbaKO6cvqD4=","beginning_cross_street":"Broadway Jct","ending_cross_street":"Euclid Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:30:00Z","end_date":"2026-05-06T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.905316,40.678334]]}},{"id":"zTA6PNvPQ7F0slY4w1BQFr1/OaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Pudef0uREWdeom86NnHanW09pUQ="}],"description":"Due to Escalator Work westbound, F Line between Jackson Hts - Roosevelt Av (New York) and 47-50 Sts - Rockefeller Ctr (New York) at 21 St-Queensbridge, Roosevelt Island, Lexington Av/63 St, and 57 St. Brooklyn-bound F line are rerouted via Court Sq E line from 36 St to 5 Av/53 St and resumes service at 47-50 Sts-Rockefeller Ctr. For service to these stations, take the F line to 47-50 Sts-Rockefeller Ctr and transfer to a Jamaica-bound F line. For service from 21 St-Queensbridge and Roosevelt Island, take the F line to Steinway St and transfer to a Brooklyn-bound F line. From Lexington Av/63 St, take the Q line to 34 St-Herald Sq and transfer to a Brooklyn-bound F line. From 57 St, use the nearby 57 St-7 Av N line or Q line for downtown service to 34 St-Herald Sq where Brooklyn-bound F line is available., Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:45 PM thru 05:00 AM service suspended, Tuesday April 28th, 2026 thru Wednesday April 29th, 2026, 09:45 PM thru 05:00 AM service suspended, Thursday April 30th, 2026 thru Friday May 1st, 2026, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-04-22T17:25:56Z"},"road_event_id":"zTA6PNvPQ7F0slY4w1BQFr1/OaY=","beginning_cross_street":"Jackson Hts - Roosevelt Av","ending_cross_street":"47-50 Sts - Rockefeller Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:30:00Z","end_date":"2026-04-25T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891338,40.746644]]}},{"id":"Pudef0uREWdeom86NnHanW09pUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTA6PNvPQ7F0slY4w1BQFr1/OaY="},{"type":"next-occurrence","id":"IxKvwP6VmEHX4fQ2fWr8LZSBk6w="}],"description":"Due to Escalator Work westbound, F Line between Jackson Hts - Roosevelt Av (New York) and 47-50 Sts - Rockefeller Ctr (New York) at 21 St-Queensbridge, Roosevelt Island, Lexington Av/63 St, and 57 St. Brooklyn-bound F line are rerouted via Court Sq E line from 36 St to 5 Av/53 St and resumes service at 47-50 Sts-Rockefeller Ctr. For service to these stations, take the F line to 47-50 Sts-Rockefeller Ctr and transfer to a Jamaica-bound F line. For service from 21 St-Queensbridge and Roosevelt Island, take the F line to Steinway St and transfer to a Brooklyn-bound F line. From Lexington Av/63 St, take the Q line to 34 St-Herald Sq and transfer to a Brooklyn-bound F line. From 57 St, use the nearby 57 St-7 Av N line or Q line for downtown service to 34 St-Herald Sq where Brooklyn-bound F line is available., Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:45 PM thru 05:00 AM service suspended, Tuesday April 28th, 2026 thru Wednesday April 29th, 2026, 09:45 PM thru 05:00 AM service suspended, Thursday April 30th, 2026 thru Friday May 1st, 2026, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-04-22T17:25:56Z"},"road_event_id":"Pudef0uREWdeom86NnHanW09pUQ=","beginning_cross_street":"Jackson Hts - Roosevelt Av","ending_cross_street":"47-50 Sts - Rockefeller Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:30:00Z","end_date":"2026-04-30T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891338,40.746644]]}},{"id":"IxKvwP6VmEHX4fQ2fWr8LZSBk6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTA6PNvPQ7F0slY4w1BQFr1/OaY="}],"description":"Due to Escalator Work westbound, F Line between Jackson Hts - Roosevelt Av (New York) and 47-50 Sts - Rockefeller Ctr (New York) at 21 St-Queensbridge, Roosevelt Island, Lexington Av/63 St, and 57 St. Brooklyn-bound F line are rerouted via Court Sq E line from 36 St to 5 Av/53 St and resumes service at 47-50 Sts-Rockefeller Ctr. For service to these stations, take the F line to 47-50 Sts-Rockefeller Ctr and transfer to a Jamaica-bound F line. For service from 21 St-Queensbridge and Roosevelt Island, take the F line to Steinway St and transfer to a Brooklyn-bound F line. From Lexington Av/63 St, take the Q line to 34 St-Herald Sq and transfer to a Brooklyn-bound F line. From 57 St, use the nearby 57 St-7 Av N line or Q line for downtown service to 34 St-Herald Sq where Brooklyn-bound F line is available., Thursday April 23rd, 2026 thru Friday April 24th, 2026, 09:45 PM thru 05:00 AM service suspended, Tuesday April 28th, 2026 thru Wednesday April 29th, 2026, 09:45 PM thru 05:00 AM service suspended, Thursday April 30th, 2026 thru Friday May 1st, 2026, 09:45 PM thru 05:00 AM service suspended","update_date":"2026-04-22T17:25:56Z"},"road_event_id":"IxKvwP6VmEHX4fQ2fWr8LZSBk6w=","beginning_cross_street":"Jackson Hts - Roosevelt Av","ending_cross_street":"47-50 Sts - Rockefeller Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:30:00Z","end_date":"2026-05-02T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.891338,40.746644]]}},{"id":"olo3bPmGqT1sU7UskF1JCzVFwj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GzcjjjobQFWza+hXdyE3Z64ngmc="}],"description":"Survey work on I-84 westbound between Exit 34 - NY 17K (Newburgh) and Exit 32 - Stewart International Airport (Newburgh) 2026082902907/32732309 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday April 30th, 2026 Wednesday/ Thursday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-22T17:21:33Z"},"road_event_id":"olo3bPmGqT1sU7UskF1JCzVFwj0=","beginning_cross_street":"Exit 34 - NY 17K","ending_cross_street":"Exit 32 - Stewart International Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110906,41.519991]]}},{"id":"GzcjjjobQFWza+hXdyE3Z64ngmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"olo3bPmGqT1sU7UskF1JCzVFwj0="}],"description":"Survey work on I-84 westbound between Exit 34 - NY 17K (Newburgh) and Exit 32 - Stewart International Airport (Newburgh) 2026082902907/32732309 - This work is weather permitting, Plan travel accordingly; delays may exist, Wednesday April 29th, 2026 thru Thursday April 30th, 2026 Wednesday/ Thursday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-22T17:21:33Z"},"road_event_id":"GzcjjjobQFWza+hXdyE3Z64ngmc=","beginning_cross_street":"Exit 34 - NY 17K","ending_cross_street":"Exit 32 - Stewart International Airport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110906,41.519991]]}},{"id":"JhX6GgbJDNd1zsHuvgI6M1nLF3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 747"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RdBhinYuEfW7+INHyMYpjbpp99s="}],"description":"Survey work on NY 747 both directions between James Kelly Drive (New Windsor) and Heritage Lane (Newburgh) 2026082902907/32732209 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Monday May 4th, 2026 Monday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 5th, 2026 thru Wednesday May 6th, 2026 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, shoulder closure, Thursday May 7th, 2026 thru Friday May 8th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-22T17:15:30Z"},"road_event_id":"JhX6GgbJDNd1zsHuvgI6M1nLF3k=","beginning_cross_street":"James Kelly Drive","ending_cross_street":"Heritage Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.132235,41.494915]]}},{"id":"RdBhinYuEfW7+INHyMYpjbpp99s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 747"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JhX6GgbJDNd1zsHuvgI6M1nLF3k="},{"type":"next-occurrence","id":"uhhI3YaptezCL5pSv2UhHpBnkVk="}],"description":"Survey work on NY 747 both directions between James Kelly Drive (New Windsor) and Heritage Lane (Newburgh) 2026082902907/32732209 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Monday May 4th, 2026 Monday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 5th, 2026 thru Wednesday May 6th, 2026 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, shoulder closure, Thursday May 7th, 2026 thru Friday May 8th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-22T17:15:30Z"},"road_event_id":"RdBhinYuEfW7+INHyMYpjbpp99s=","beginning_cross_street":"James Kelly Drive","ending_cross_street":"Heritage Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.132235,41.494915]]}},{"id":"uhhI3YaptezCL5pSv2UhHpBnkVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 747"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JhX6GgbJDNd1zsHuvgI6M1nLF3k="},{"type":"next-occurrence","id":"VGOnQfo9CfVdJG9m6OIREImgOh4="}],"description":"Survey work on NY 747 both directions between James Kelly Drive (New Windsor) and Heritage Lane (Newburgh) 2026082902907/32732209 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Monday May 4th, 2026 Monday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 5th, 2026 thru Wednesday May 6th, 2026 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, shoulder closure, Thursday May 7th, 2026 thru Friday May 8th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-22T17:15:30Z"},"road_event_id":"uhhI3YaptezCL5pSv2UhHpBnkVk=","beginning_cross_street":"James Kelly Drive","ending_cross_street":"Heritage Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.132235,41.494915]]}},{"id":"VGOnQfo9CfVdJG9m6OIREImgOh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 747"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JhX6GgbJDNd1zsHuvgI6M1nLF3k="}],"description":"Survey work on NY 747 both directions between James Kelly Drive (New Windsor) and Heritage Lane (Newburgh) 2026082902907/32732209 - This work is weather permitting, Plan travel accordingly; delays may exist, Friday May 1st, 2026 thru Monday May 4th, 2026 Monday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure, Tuesday May 5th, 2026 thru Wednesday May 6th, 2026 Tuesday/ Wednesday, 09:00 AM thru 04:00 PM, shoulder closure, Thursday May 7th, 2026 thru Friday May 8th, 2026 Thursday/ Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-04-22T17:15:30Z"},"road_event_id":"VGOnQfo9CfVdJG9m6OIREImgOh4=","beginning_cross_street":"James Kelly Drive","ending_cross_street":"Heritage Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.132235,41.494915]]}},{"id":"ltO3fCTevI/RGB2w7zh8RnQ3tyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bmLH8NRX5ZU/7/drV1J9KFFa6BE="}],"description":"Survey work on I-84 eastbound ramp to Exit 32 - Stewart International Airport (Newburgh) 2026082902907/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-22T17:26:18Z"},"road_event_id":"ltO3fCTevI/RGB2w7zh8RnQ3tyY=","beginning_cross_street":"Exit 32 - Stewart International Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.128793,41.512264]]}},{"id":"bmLH8NRX5ZU/7/drV1J9KFFa6BE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ltO3fCTevI/RGB2w7zh8RnQ3tyY="}],"description":"Survey work on I-84 eastbound ramp to Exit 32 - Stewart International Airport (Newburgh) 2026082902907/327 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-04-22T17:26:18Z"},"road_event_id":"bmLH8NRX5ZU/7/drV1J9KFFa6BE=","beginning_cross_street":"Exit 32 - Stewart International Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.128793,41.512264]]}},{"id":"A9dYvJ/Lme6lYV5qYHZTY5yJLU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line and G Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mFGDrRQyTvDNM04VTWz+Wtml78Q="}],"description":"Due to Track repairs southbound, F Line and G Line between Smith - 9 Sts (New York) and Church Av (New York) skip 4 Av-9 St, 15 St-Prospect Park, and Fort Hamilton Pkwy. For service to these stations, take the F line or G line to 7 Av or Church Av and transfer to a Manhattan-bound F line or Court Sq-bound G line. For service from these stations, take the F line or G line to 7 Av or Smith-9 Sts and transfer to a Coney Island-bound F line or Church Av-bound G line., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-04-22T17:23:13Z"},"road_event_id":"A9dYvJ/Lme6lYV5qYHZTY5yJLU0=","beginning_cross_street":"Smith - 9 Sts","ending_cross_street":"Church Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:30:00Z","end_date":"2026-04-29T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995959,40.67358]]}},{"id":"mFGDrRQyTvDNM04VTWz+Wtml78Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line and G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A9dYvJ/Lme6lYV5qYHZTY5yJLU0="},{"type":"next-occurrence","id":"qobDlOqftiGCezXBNNCvzKdKLTw="}],"description":"Due to Track repairs southbound, F Line and G Line between Smith - 9 Sts (New York) and Church Av (New York) skip 4 Av-9 St, 15 St-Prospect Park, and Fort Hamilton Pkwy. For service to these stations, take the F line or G line to 7 Av or Church Av and transfer to a Manhattan-bound F line or Court Sq-bound G line. For service from these stations, take the F line or G line to 7 Av or Smith-9 Sts and transfer to a Coney Island-bound F line or Church Av-bound G line., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-04-22T17:23:13Z"},"road_event_id":"mFGDrRQyTvDNM04VTWz+Wtml78Q=","beginning_cross_street":"Smith - 9 Sts","ending_cross_street":"Church Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:30:00Z","end_date":"2026-04-30T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995959,40.67358]]}},{"id":"qobDlOqftiGCezXBNNCvzKdKLTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line and G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A9dYvJ/Lme6lYV5qYHZTY5yJLU0="},{"type":"next-occurrence","id":"Kf7ONP/AnNaZXmn9OdXajfAxhMU="}],"description":"Due to Track repairs southbound, F Line and G Line between Smith - 9 Sts (New York) and Church Av (New York) skip 4 Av-9 St, 15 St-Prospect Park, and Fort Hamilton Pkwy. For service to these stations, take the F line or G line to 7 Av or Church Av and transfer to a Manhattan-bound F line or Court Sq-bound G line. For service from these stations, take the F line or G line to 7 Av or Smith-9 Sts and transfer to a Coney Island-bound F line or Church Av-bound G line., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-04-22T17:23:13Z"},"road_event_id":"qobDlOqftiGCezXBNNCvzKdKLTw=","beginning_cross_street":"Smith - 9 Sts","ending_cross_street":"Church Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:30:00Z","end_date":"2026-05-01T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995959,40.67358]]}},{"id":"Kf7ONP/AnNaZXmn9OdXajfAxhMU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line and G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A9dYvJ/Lme6lYV5qYHZTY5yJLU0="},{"type":"next-occurrence","id":"hDi3vmHw08me1OVxUHuA6fje3yU="}],"description":"Due to Track repairs southbound, F Line and G Line between Smith - 9 Sts (New York) and Church Av (New York) skip 4 Av-9 St, 15 St-Prospect Park, and Fort Hamilton Pkwy. For service to these stations, take the F line or G line to 7 Av or Church Av and transfer to a Manhattan-bound F line or Court Sq-bound G line. For service from these stations, take the F line or G line to 7 Av or Smith-9 Sts and transfer to a Coney Island-bound F line or Church Av-bound G line., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-04-22T17:23:13Z"},"road_event_id":"Kf7ONP/AnNaZXmn9OdXajfAxhMU=","beginning_cross_street":"Smith - 9 Sts","ending_cross_street":"Church Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:30:00Z","end_date":"2026-05-02T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995959,40.67358]]}},{"id":"hDi3vmHw08me1OVxUHuA6fje3yU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line and G Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"A9dYvJ/Lme6lYV5qYHZTY5yJLU0="}],"description":"Due to Track repairs southbound, F Line and G Line between Smith - 9 Sts (New York) and Church Av (New York) skip 4 Av-9 St, 15 St-Prospect Park, and Fort Hamilton Pkwy. For service to these stations, take the F line or G line to 7 Av or Church Av and transfer to a Manhattan-bound F line or Court Sq-bound G line. For service from these stations, take the F line or G line to 7 Av or Smith-9 Sts and transfer to a Coney Island-bound F line or Church Av-bound G line., Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM","update_date":"2026-04-22T17:23:13Z"},"road_event_id":"hDi3vmHw08me1OVxUHuA6fje3yU=","beginning_cross_street":"Smith - 9 Sts","ending_cross_street":"Church Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:30:00Z","end_date":"2026-05-03T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995959,40.67358]]}},{"id":"4gyvNASCfHi1S0W2FcGZTBHzmSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LWodHIYHxOAfR5ijq6UwIQMBItE="}],"description":"Due to Track repairs southbound, D Line between 145 St (New York) and 125 St (New York) stops at 135 St., Saturday April 25th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Saturday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-04-22T16:51:14Z"},"road_event_id":"4gyvNASCfHi1S0W2FcGZTBHzmSc=","beginning_cross_street":"145 St","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:02:00Z","end_date":"2026-04-25T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944216,40.824783]]}},{"id":"LWodHIYHxOAfR5ijq6UwIQMBItE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4gyvNASCfHi1S0W2FcGZTBHzmSc="},{"type":"next-occurrence","id":"jVAZrGJOC9wEkkA7xoL5/sranAw="}],"description":"Due to Track repairs southbound, D Line between 145 St (New York) and 125 St (New York) stops at 135 St., Saturday April 25th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Saturday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-04-22T16:51:14Z"},"road_event_id":"LWodHIYHxOAfR5ijq6UwIQMBItE=","beginning_cross_street":"145 St","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T04:02:00Z","end_date":"2026-04-26T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944216,40.824783]]}},{"id":"jVAZrGJOC9wEkkA7xoL5/sranAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4gyvNASCfHi1S0W2FcGZTBHzmSc="}],"description":"Due to Track repairs southbound, D Line between 145 St (New York) and 125 St (New York) stops at 135 St., Saturday April 25th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Saturday, 12:01 AM thru 05:00 AM local service only","update_date":"2026-04-22T16:51:14Z"},"road_event_id":"jVAZrGJOC9wEkkA7xoL5/sranAw=","beginning_cross_street":"145 St","ending_cross_street":"125 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:02:00Z","end_date":"2026-04-27T09:01:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944216,40.824783]]}},{"id":"/gNn1pplgFGHQiqaiRrbgHx0iiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations both directions, F Line between Church Av (New York) and Coney Island - Stillwell Av (New York) F line runs between Jamaica-179 St and Church Av, the last stop. Free shuttle buses provide alternate service between Church Av and Coney Island-Stillwell Av. For direct service between Manhattan/Downtown Brooklyn and Coney Island, take the D line, N line, or Q line instead. For W 8 St-NY Aquarium, take the Q line instead., Continuous Saturday April 25th, 2026 12:15 AM thru Monday April 27th, 2026 04:30 AM service suspended","update_date":"2026-04-22T16:53:30Z"},"road_event_id":"/gNn1pplgFGHQiqaiRrbgHx0iiI=","beginning_cross_street":"Church Av","ending_cross_street":"Coney Island - Stillwell Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:15:00Z","end_date":"2026-04-27T08:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.979678,40.644041]]}},{"id":"+VCav1oY35SU2Zyb6vSxmV8z514=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8MFWwEXl+eWgHdjfCVJkABVe2vE="}],"description":"Due to Repairs southbound, F Line between Kew Gardens - Union Tpke (New York) and Parsons Blvd (New York) skips Briarwood and Sutphin Blvd. For service to these stations, take the F line to Parsons Blvd and transfer to a Manhattan-bound F line. For service from Briarwood, take the E line or F line to Kew Gardens-Union Tpke and transfer to a Jamaica-bound F line. For service from Sutphin Blvd, take the F line to Kew Gardens-Union Tpke and transfer to a Jamaica-bound F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM","update_date":"2026-04-22T16:13:05Z"},"road_event_id":"+VCav1oY35SU2Zyb6vSxmV8z514=","beginning_cross_street":"Kew Gardens - Union Tpke","ending_cross_street":"Parsons Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:30:00Z","end_date":"2026-04-24T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831008,40.714441]]}},{"id":"8MFWwEXl+eWgHdjfCVJkABVe2vE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+VCav1oY35SU2Zyb6vSxmV8z514="},{"type":"next-occurrence","id":"wSWvfleD1n1+eCZsCoKtCyTKJZQ="}],"description":"Due to Repairs southbound, F Line between Kew Gardens - Union Tpke (New York) and Parsons Blvd (New York) skips Briarwood and Sutphin Blvd. For service to these stations, take the F line to Parsons Blvd and transfer to a Manhattan-bound F line. For service from Briarwood, take the E line or F line to Kew Gardens-Union Tpke and transfer to a Jamaica-bound F line. For service from Sutphin Blvd, take the F line to Kew Gardens-Union Tpke and transfer to a Jamaica-bound F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM","update_date":"2026-04-22T16:13:05Z"},"road_event_id":"8MFWwEXl+eWgHdjfCVJkABVe2vE=","beginning_cross_street":"Kew Gardens - Union Tpke","ending_cross_street":"Parsons Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:30:00Z","end_date":"2026-04-25T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831008,40.714441]]}},{"id":"wSWvfleD1n1+eCZsCoKtCyTKJZQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+VCav1oY35SU2Zyb6vSxmV8z514="}],"description":"Due to Repairs southbound, F Line between Kew Gardens - Union Tpke (New York) and Parsons Blvd (New York) skips Briarwood and Sutphin Blvd. For service to these stations, take the F line to Parsons Blvd and transfer to a Manhattan-bound F line. For service from Briarwood, take the E line or F line to Kew Gardens-Union Tpke and transfer to a Jamaica-bound F line. For service from Sutphin Blvd, take the F line to Kew Gardens-Union Tpke and transfer to a Jamaica-bound F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 11:45 PM thru 05:00 AM","update_date":"2026-04-22T16:13:05Z"},"road_event_id":"wSWvfleD1n1+eCZsCoKtCyTKJZQ=","beginning_cross_street":"Kew Gardens - Union Tpke","ending_cross_street":"Parsons Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:30:00Z","end_date":"2026-04-26T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.831008,40.714441]]}},{"id":"lnkrHg9LlJ5qyPo5VfI57ikIGxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jFCi0MYb3xaSmAEM8XIrBNJRUZU="}],"description":"Due to Track repairs southbound, F Line between 34 St - Herald Sq (New York) and W 4 St - Wash Sq (New York) skips 23 St and 14 St. For service to these stations, take the F line to W 4 St-Wash Sq and transfer to an uptown F line. For service from these stations, take the F line to 34 St-Herald Sq and transfer to a downtown F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM, Continuous Friday April 24th, 2026 09:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 09:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:43:46Z"},"road_event_id":"lnkrHg9LlJ5qyPo5VfI57ikIGxg=","beginning_cross_street":"34 St - Herald Sq","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:30:00Z","end_date":"2026-04-24T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987823,40.749719]]}},{"id":"jFCi0MYb3xaSmAEM8XIrBNJRUZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lnkrHg9LlJ5qyPo5VfI57ikIGxg="},{"type":"next-occurrence","id":"PtSDfe2eF3az2P0O84tSXcg1UcE="}],"description":"Due to Track repairs southbound, F Line between 34 St - Herald Sq (New York) and W 4 St - Wash Sq (New York) skips 23 St and 14 St. For service to these stations, take the F line to W 4 St-Wash Sq and transfer to an uptown F line. For service from these stations, take the F line to 34 St-Herald Sq and transfer to a downtown F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM, Continuous Friday April 24th, 2026 09:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 09:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:43:46Z"},"road_event_id":"jFCi0MYb3xaSmAEM8XIrBNJRUZU=","beginning_cross_street":"34 St - Herald Sq","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:30:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987823,40.749719]]}},{"id":"PtSDfe2eF3az2P0O84tSXcg1UcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lnkrHg9LlJ5qyPo5VfI57ikIGxg="},{"type":"next-occurrence","id":"/xADy7/1xwDpGjoEAsBHriP/LTc="}],"description":"Due to Track repairs southbound, F Line between 34 St - Herald Sq (New York) and W 4 St - Wash Sq (New York) skips 23 St and 14 St. For service to these stations, take the F line to W 4 St-Wash Sq and transfer to an uptown F line. For service from these stations, take the F line to 34 St-Herald Sq and transfer to a downtown F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM, Continuous Friday April 24th, 2026 09:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 09:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:43:46Z"},"road_event_id":"PtSDfe2eF3az2P0O84tSXcg1UcE=","beginning_cross_street":"34 St - Herald Sq","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:30:00Z","end_date":"2026-04-29T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987823,40.749719]]}},{"id":"/xADy7/1xwDpGjoEAsBHriP/LTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lnkrHg9LlJ5qyPo5VfI57ikIGxg="},{"type":"next-occurrence","id":"Vx1APZjfsd/g9pYiEucPytkVe9U="}],"description":"Due to Track repairs southbound, F Line between 34 St - Herald Sq (New York) and W 4 St - Wash Sq (New York) skips 23 St and 14 St. For service to these stations, take the F line to W 4 St-Wash Sq and transfer to an uptown F line. For service from these stations, take the F line to 34 St-Herald Sq and transfer to a downtown F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM, Continuous Friday April 24th, 2026 09:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 09:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:43:46Z"},"road_event_id":"/xADy7/1xwDpGjoEAsBHriP/LTc=","beginning_cross_street":"34 St - Herald Sq","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:30:00Z","end_date":"2026-04-30T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987823,40.749719]]}},{"id":"Vx1APZjfsd/g9pYiEucPytkVe9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lnkrHg9LlJ5qyPo5VfI57ikIGxg="},{"type":"next-occurrence","id":"M9cvDIgXVBOu8LAxekqltd8kVyo="}],"description":"Due to Track repairs southbound, F Line between 34 St - Herald Sq (New York) and W 4 St - Wash Sq (New York) skips 23 St and 14 St. For service to these stations, take the F line to W 4 St-Wash Sq and transfer to an uptown F line. For service from these stations, take the F line to 34 St-Herald Sq and transfer to a downtown F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM, Continuous Friday April 24th, 2026 09:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 09:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:43:46Z"},"road_event_id":"Vx1APZjfsd/g9pYiEucPytkVe9U=","beginning_cross_street":"34 St - Herald Sq","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:30:00Z","end_date":"2026-05-01T06:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987823,40.749719]]}},{"id":"M9cvDIgXVBOu8LAxekqltd8kVyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lnkrHg9LlJ5qyPo5VfI57ikIGxg="}],"description":"Due to Track repairs southbound, F Line between 34 St - Herald Sq (New York) and W 4 St - Wash Sq (New York) skips 23 St and 14 St. For service to these stations, take the F line to W 4 St-Wash Sq and transfer to an uptown F line. For service from these stations, take the F line to 34 St-Herald Sq and transfer to a downtown F line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 09:45 PM thru 05:00 AM, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 09:45 PM thru 05:00 AM, Continuous Friday April 24th, 2026 09:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 09:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:43:46Z"},"road_event_id":"M9cvDIgXVBOu8LAxekqltd8kVyo=","beginning_cross_street":"34 St - Herald Sq","ending_cross_street":"W 4 St - Wash Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:30:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987823,40.749719]]}},{"id":"DhXd7LVv3JtR2szvgwrHfApSe/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Q/wvQsZ5Wu6R97OOOruAmWja3oc="}],"description":"Due to Repairs northbound, F Line between Parsons Blvd (New York) and Forest Hills - 71 Av (New York) skips Sutphin Blvd, Briarwood and 75 Av. For service to these stations, take the F line to Kew Gardens-Union Tpke or Forest Hills-71 Av and transfer to a Jamaica-bound F line. For service from these stations, take the F line to Kew Gardens-Union Tpke or Parsons Blvd and transfer to a Manhattan-bound F line., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:48:33Z"},"road_event_id":"DhXd7LVv3JtR2szvgwrHfApSe/U=","beginning_cross_street":"Parsons Blvd","ending_cross_street":"Forest Hills - 71 Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:45:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803326,40.707564]]}},{"id":"Q/wvQsZ5Wu6R97OOOruAmWja3oc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DhXd7LVv3JtR2szvgwrHfApSe/U="}],"description":"Due to Repairs northbound, F Line between Parsons Blvd (New York) and Forest Hills - 71 Av (New York) skips Sutphin Blvd, Briarwood and 75 Av. For service to these stations, take the F line to Kew Gardens-Union Tpke or Forest Hills-71 Av and transfer to a Jamaica-bound F line. For service from these stations, take the F line to Kew Gardens-Union Tpke or Parsons Blvd and transfer to a Manhattan-bound F line., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM, Continuous Friday May 1st, 2026 11:45 PM thru Monday May 4th, 2026 05:00 AM","update_date":"2026-04-22T16:48:33Z"},"road_event_id":"Q/wvQsZ5Wu6R97OOOruAmWja3oc=","beginning_cross_street":"Parsons Blvd","ending_cross_street":"Forest Hills - 71 Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:45:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.803326,40.707564]]}},{"id":"0lVUzt/+My3+vBtGm69EQaHWUBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["160 Bus and 702 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, 160 Bus and 702 Bus between Locust Ave At Paterson Ave (Wallington) and Paterson Ave At Poplar St (East Rutherford) Paterson Avenue will be closed between Locust Avenue and Poplar Street due to milling work. NJ TRANSIT Bus Route Nos. 160 and 703 will operate on a detour as follows: Buses traveling toward PABT/East Rutherford will travel from Locust and Paterson Avenues, continue on Locust Lane, make a left on Carlton Avenue, left on West Erie Avenue, left on Maple Street, right on Central Avenue, left on Poplar Street, right on Paterson Avenue, and then continue the regular route. Buses traveling toward Elmwood Park/Haledon will travel from Paterson Avenue and Oak Street, make a left on Oak Street, left on Central Avenue, right on Maple Avenue, right on West Erie Avenue, right on Carlton Avenue, right on Locust Avenue, continue on Locust Avenue, and then continue the regular route. , Continuous Wednesday April 22nd, 2026 12:00 AM thru Friday April 24th, 2026 07:00 AM","update_date":"2026-04-22T16:25:59Z"},"road_event_id":"0lVUzt/+My3+vBtGm69EQaHWUBg=","beginning_cross_street":"Locust Ave At Paterson Ave","ending_cross_street":"Paterson Ave At Poplar St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.114113,40.849808]]}},{"id":"84ENgHKnKxzvqaB7GzSYrdXQog4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Hy1TfYbXcFTMwZnivXJdhZr0kC4="}],"description":"Due to Track repairs southbound, D Line between Grand St (New York) and 36 St (New York) skips DeKalb Av, Union St, 4 Av-9 St, Prospect Av and 25 St. Trains stop at Atlantic Av-Barclays Ctr. For DeKalb Av, take the Q line or a local Manhattan-bound D line or N line. Transfer at Atlantic Av-Barclays Ctr. For service to Union St, 4 Av-9 St, Prospect Av and 25 St, take the D line to 36 St and transfer to a local Manhattan-bound D line or N line. For service from these stations, take the D line or N line to Atlantic Av-Barclays Ctr and transfer to a Coney Island-bound D line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Monday April 27th, 2026 thru Tuesday April 28th, 2026, 11:15 PM thru 05:00 AM local service only","update_date":"2026-04-22T16:57:49Z"},"road_event_id":"84ENgHKnKxzvqaB7GzSYrdXQog4=","beginning_cross_street":"Grand St","ending_cross_street":"36 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:30:00Z","end_date":"2026-04-26T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.993753,40.718267]]}},{"id":"Hy1TfYbXcFTMwZnivXJdhZr0kC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"84ENgHKnKxzvqaB7GzSYrdXQog4="},{"type":"next-occurrence","id":"B5B074WsbqadBrdJBOfXO5VY1iY="}],"description":"Due to Track repairs southbound, D Line between Grand St (New York) and 36 St (New York) skips DeKalb Av, Union St, 4 Av-9 St, Prospect Av and 25 St. Trains stop at Atlantic Av-Barclays Ctr. For DeKalb Av, take the Q line or a local Manhattan-bound D line or N line. Transfer at Atlantic Av-Barclays Ctr. For service to Union St, 4 Av-9 St, Prospect Av and 25 St, take the D line to 36 St and transfer to a local Manhattan-bound D line or N line. For service from these stations, take the D line or N line to Atlantic Av-Barclays Ctr and transfer to a Coney Island-bound D line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Monday April 27th, 2026 thru Tuesday April 28th, 2026, 11:15 PM thru 05:00 AM local service only","update_date":"2026-04-22T16:57:49Z"},"road_event_id":"Hy1TfYbXcFTMwZnivXJdhZr0kC4=","beginning_cross_street":"Grand St","ending_cross_street":"36 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:30:00Z","end_date":"2026-04-27T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.993753,40.718267]]}},{"id":"B5B074WsbqadBrdJBOfXO5VY1iY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"84ENgHKnKxzvqaB7GzSYrdXQog4="},{"type":"next-occurrence","id":"qRxcyC1+pyQnCSXI2M8LlLZBrHI="}],"description":"Due to Track repairs southbound, D Line between Grand St (New York) and 36 St (New York) skips DeKalb Av, Union St, 4 Av-9 St, Prospect Av and 25 St. Trains stop at Atlantic Av-Barclays Ctr. For DeKalb Av, take the Q line or a local Manhattan-bound D line or N line. Transfer at Atlantic Av-Barclays Ctr. For service to Union St, 4 Av-9 St, Prospect Av and 25 St, take the D line to 36 St and transfer to a local Manhattan-bound D line or N line. For service from these stations, take the D line or N line to Atlantic Av-Barclays Ctr and transfer to a Coney Island-bound D line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Monday April 27th, 2026 thru Tuesday April 28th, 2026, 11:15 PM thru 05:00 AM local service only","update_date":"2026-04-22T16:57:49Z"},"road_event_id":"B5B074WsbqadBrdJBOfXO5VY1iY=","beginning_cross_street":"Grand St","ending_cross_street":"36 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:30:00Z","end_date":"2026-04-28T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.993753,40.718267]]}},{"id":"qRxcyC1+pyQnCSXI2M8LlLZBrHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"84ENgHKnKxzvqaB7GzSYrdXQog4="}],"description":"Due to Track repairs southbound, D Line between Grand St (New York) and 36 St (New York) skips DeKalb Av, Union St, 4 Av-9 St, Prospect Av and 25 St. Trains stop at Atlantic Av-Barclays Ctr. For DeKalb Av, take the Q line or a local Manhattan-bound D line or N line. Transfer at Atlantic Av-Barclays Ctr. For service to Union St, 4 Av-9 St, Prospect Av and 25 St, take the D line to 36 St and transfer to a local Manhattan-bound D line or N line. For service from these stations, take the D line or N line to Atlantic Av-Barclays Ctr and transfer to a Coney Island-bound D line., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM local service only, Monday April 27th, 2026 thru Tuesday April 28th, 2026, 11:15 PM thru 05:00 AM local service only","update_date":"2026-04-22T16:57:49Z"},"road_event_id":"qRxcyC1+pyQnCSXI2M8LlLZBrHI=","beginning_cross_street":"Grand St","ending_cross_street":"36 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:30:00Z","end_date":"2026-04-29T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.993753,40.718267]]}},{"id":"cYOF25cD1j0fl6kP9kwpDD1Fr8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 Both Directions South of CR 630/Woodlane Rd (Pemberton Twp) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-04-17T19:05:11Z"},"road_event_id":"cYOF25cD1j0fl6kP9kwpDD1Fr8E=","beginning_cross_street":"South of CR 630/Woodlane Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.73442,39.990489]]}},{"id":"wwzErzuCm3/F8TjJWvt+ozKhzI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-202"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on US-202 both directions between ANTOLINI RD (New Hartford) and CT-179 (Canton) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:39:41Z"},"road_event_id":"wwzErzuCm3/F8TjJWvt+ozKhzI4=","beginning_cross_street":"ANTOLINI RD","ending_cross_street":"CT-179","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.016571,41.830107]]}},{"id":"O3ao8k/bxbygQnHrrPP+BajS6Yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6V1HdvU7+7dTJwHuK4/v2Hc0avs="}],"description":"Landscaping and tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) There will be ramp and lane closuresTraffic will be detoured. Traffic control personnel signing patterns and trailer mounted attenuators will guide motorists through the work zone. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area. No work will be performed around any scheduled holidays, Monday February 23rd, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-02-09T20:03:07Z"},"road_event_id":"O3ao8k/bxbygQnHrrPP+BajS6Yc=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"6V1HdvU7+7dTJwHuK4/v2Hc0avs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3ao8k/bxbygQnHrrPP+BajS6Yc="},{"type":"next-occurrence","id":"YoBNhOy53pLeY+Cm6z9nbPOOVoo="}],"description":"Landscaping and tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) There will be ramp and lane closuresTraffic will be detoured. Traffic control personnel signing patterns and trailer mounted attenuators will guide motorists through the work zone. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area. No work will be performed around any scheduled holidays, Monday February 23rd, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-02-09T20:03:07Z"},"road_event_id":"6V1HdvU7+7dTJwHuK4/v2Hc0avs=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"YoBNhOy53pLeY+Cm6z9nbPOOVoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3ao8k/bxbygQnHrrPP+BajS6Yc="},{"type":"next-occurrence","id":"ekRAdMpnwZBCxzQiuK64bwEDml4="}],"description":"Landscaping and tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) There will be ramp and lane closuresTraffic will be detoured. Traffic control personnel signing patterns and trailer mounted attenuators will guide motorists through the work zone. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area. No work will be performed around any scheduled holidays, Monday February 23rd, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-02-09T20:03:07Z"},"road_event_id":"YoBNhOy53pLeY+Cm6z9nbPOOVoo=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"ekRAdMpnwZBCxzQiuK64bwEDml4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3ao8k/bxbygQnHrrPP+BajS6Yc="},{"type":"next-occurrence","id":"uo5QP6Si2aVHUO12X4GzOXJX9L8="}],"description":"Landscaping and tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) There will be ramp and lane closuresTraffic will be detoured. Traffic control personnel signing patterns and trailer mounted attenuators will guide motorists through the work zone. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area. No work will be performed around any scheduled holidays, Monday February 23rd, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-02-09T20:03:07Z"},"road_event_id":"ekRAdMpnwZBCxzQiuK64bwEDml4=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"uo5QP6Si2aVHUO12X4GzOXJX9L8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3ao8k/bxbygQnHrrPP+BajS6Yc="},{"type":"next-occurrence","id":"uVPRL/2vkrS+EypwD5pmW52821w="}],"description":"Landscaping and tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) There will be ramp and lane closuresTraffic will be detoured. Traffic control personnel signing patterns and trailer mounted attenuators will guide motorists through the work zone. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area. No work will be performed around any scheduled holidays, Monday February 23rd, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-02-09T20:03:07Z"},"road_event_id":"uo5QP6Si2aVHUO12X4GzOXJX9L8=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"uVPRL/2vkrS+EypwD5pmW52821w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"O3ao8k/bxbygQnHrrPP+BajS6Yc="}],"description":"Landscaping and tree trimming on I-84 eastbound between Exit 31 - CT 229/West Street (Southington) and CT 72 at Exit 2 - CT 372/New Britain Avenue (Plainville) There will be ramp and lane closuresTraffic will be detoured. Traffic control personnel signing patterns and trailer mounted attenuators will guide motorists through the work zone. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area. No work will be performed around any scheduled holidays, Monday February 23rd, 2026 thru Friday May 1st, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 PM thru 05:00 AM All lanes open","update_date":"2026-02-09T20:03:07Z"},"road_event_id":"uVPRL/2vkrS+EypwD5pmW52821w=","beginning_cross_street":"Exit 31 - CT 229/West Street","ending_cross_street":"Exit 2 - CT 372/New Britain Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.901764,41.603915]]}},{"id":"s52YRyZyxd/2BDNe2GWR7oKPXRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Northbound South of CR 553/Woodbury Av (Glassboro) Sunday April 26, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed","update_date":"2026-04-17T19:03:04Z"},"road_event_id":"s52YRyZyxd/2BDNe2GWR7oKPXRw=","beginning_cross_street":"South of CR 553/Woodbury Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.114349,39.719783]]}},{"id":"Ll0If48ba0h1LqZAWN/XwaTN4Xw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 Both Directions South of CR 630/Woodlane Rd (Pemberton Twp) Friday April 24, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-04-17T19:05:26Z"},"road_event_id":"Ll0If48ba0h1LqZAWN/XwaTN4Xw=","beginning_cross_street":"South of CR 630/Woodlane Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.73442,39.990489]]}},{"id":"RRNdJzGRRlVzGjxNAJKuNOdtRf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 Both Directions South of CR 630/Woodlane Rd (Pemberton Twp) Thursday April 23, 2026 09:00 AM thru 03:00 PM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-04-17T19:05:17Z"},"road_event_id":"RRNdJzGRRlVzGjxNAJKuNOdtRf4=","beginning_cross_street":"South of CR 630/Woodlane Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.73442,39.990489]]}},{"id":"fptr4+LQTvGRcICondxpMlDyu2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COGWHEEL LN"],"direction":"unknown","related_road_events":[],"description":"Paving operations and signal repair on COGWHEEL LN both directions CT-67 (Seymour) to SILVERMINE RD (Seymour) There will be intermittent lane closures with an alternating one-way traffic pattern throughout the project duration. Traffic control signing patterns, flaggers and municipal police will guide motorists through the work zone. , Continuous Monday April 21st, 2025 09:00 AM thru Tuesday August 4th, 2026 03:00 PM All lanes open","update_date":"2025-04-21T01:32:50Z"},"road_event_id":"fptr4+LQTvGRcICondxpMlDyu2M=","beginning_cross_street":"CT-67","ending_cross_street":"SILVERMINE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.04822,41.396269]]}},{"id":"WNTuXD9x9stUr50Rt1bvG770uiY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Construction on I-95 northbound ramp to I-678- Hutchinson River Expressway (New York) Subject to change without notice., Thursday April 23rd, 2026, 10:00 AM thru 03:00 PM left shoulder closed","update_date":"2026-04-17T19:11:51Z"},"road_event_id":"WNTuXD9x9stUr50Rt1bvG770uiY=","beginning_cross_street":"I-678- Hutchinson River Expressway ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.838909,40.828139]]}},{"id":"TwlLHSf5XRcwoME0hbw3wU3uZB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[],"description":"Construction on I-278 eastbound ramp to I-678-Hutchinson River Expressway (New York) Subject to change without notice., Friday April 24th, 2026, 09:00 AM thru 02:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T19:08:21Z"},"road_event_id":"TwlLHSf5XRcwoME0hbw3wU3uZB8=","beginning_cross_street":"I-678-Hutchinson River Expressway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.839276,40.828157]]}},{"id":"t7rhm8o6Uo7jUjBP/8A/kf/bFJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between East of CR 613/Passaic Ave (Fairfield Twp) and West of NJ 159/CR 627/Plymouth Rd (Fairfield Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, left lane closed","update_date":"2026-04-17T16:48:23Z"},"road_event_id":"t7rhm8o6Uo7jUjBP/8A/kf/bFJ8=","beginning_cross_street":"East of CR 613/Passaic Ave","ending_cross_street":"West of NJ 159/CR 627/Plymouth Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.271972,40.890518]]}},{"id":"lWeE+78zn8ESUAbWcEGOlH3xn+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[],"description":"Bridge maintenance operations on I-84 westbound between Exit 69 - US 6/202 - NY 121 (Southeast) and Exit 68 - I-684 (Southeast) DOT BM/B1032611/32403509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday May 6th, 2026, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-21T10:36:45Z"},"road_event_id":"lWeE+78zn8ESUAbWcEGOlH3xn+c=","beginning_cross_street":"Exit 69 - US 6/202 - NY 121","ending_cross_street":"Exit 68 - I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.582627,41.383913]]}},{"id":"P4q5i5W+3KLffpVNsZhi6tUVS1E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"utPLAU5EeW/GZKtqdDyGb/ZpsSM="}],"description":"Construction on I-278 both directions from Richmond Avenue Exit (Staten Island) to Victory Boulevard Exit; Bayonne Bridge Exit (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound; 2 Left lanes of 4 lanes closed westbound","update_date":"2026-04-17T16:46:39Z"},"road_event_id":"P4q5i5W+3KLffpVNsZhi6tUVS1E=","beginning_cross_street":"Richmond Avenue Exit","ending_cross_street":"Victory Boulevard Exit; Bayonne Bridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.157329,40.614842]]}},{"id":"utPLAU5EeW/GZKtqdDyGb/ZpsSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"P4q5i5W+3KLffpVNsZhi6tUVS1E="},{"type":"next-occurrence","id":"QpLTRWNmI1+nYjaV9FCYND0wfj8="}],"description":"Construction on I-278 both directions from Richmond Avenue Exit (Staten Island) to Victory Boulevard Exit; Bayonne Bridge Exit (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound; 2 Left lanes of 4 lanes closed westbound","update_date":"2026-04-17T16:46:39Z"},"road_event_id":"utPLAU5EeW/GZKtqdDyGb/ZpsSM=","beginning_cross_street":"Richmond Avenue Exit","ending_cross_street":"Victory Boulevard Exit; Bayonne Bridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.157329,40.614842]]}},{"id":"QpLTRWNmI1+nYjaV9FCYND0wfj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"P4q5i5W+3KLffpVNsZhi6tUVS1E="}],"description":"Construction on I-278 both directions from Richmond Avenue Exit (Staten Island) to Victory Boulevard Exit; Bayonne Bridge Exit (Staten Island) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 2 Right lanes of 4 lanes closed eastbound; 2 Left lanes of 4 lanes closed westbound","update_date":"2026-04-17T16:46:39Z"},"road_event_id":"QpLTRWNmI1+nYjaV9FCYND0wfj8=","beginning_cross_street":"Richmond Avenue Exit","ending_cross_street":"Victory Boulevard Exit; Bayonne Bridge Exit","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.157329,40.614842]]}},{"id":"TvIIRRz4cb76NOsrMCeVO2svvD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between East of CR 613/Passaic Ave (Fairfield Twp) and West of NJ 159/CR 627/Plymouth Rd (Fairfield Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T16:48:21Z"},"road_event_id":"TvIIRRz4cb76NOsrMCeVO2svvD8=","beginning_cross_street":"East of CR 613/Passaic Ave","ending_cross_street":"West of NJ 159/CR 627/Plymouth Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.271972,40.890518]]}},{"id":"RMYBgJukpERUKKdHzRE08ExGttg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T16:45:23Z"},"road_event_id":"RMYBgJukpERUKKdHzRE08ExGttg=","beginning_cross_street":"South of NJ 31","ending_cross_street":"South of NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.878974,40.417716]]}},{"id":"PSIQ2XbLLdboc0i4ihReflqHJC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T16:42:31Z"},"road_event_id":"PSIQ2XbLLdboc0i4ihReflqHJC4=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"NSOetNH5S1c7PeaU3f1omM0JA58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound near South of NJ 31 (East Amwell Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T16:45:19Z"},"road_event_id":"NSOetNH5S1c7PeaU3f1omM0JA58=","beginning_cross_street":"South of NJ 31","ending_cross_street":"South of NJ 31","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.878974,40.417716]]}},{"id":"atW/aYbggWUx5fH2aVPCwEDgPdY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hFjVsR9jtkXAPB7pYMpBIjKfpng="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 7 - Tuckahoe Road (Yonkers) D265183/NIGHT/32670809 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-16T17:49:16Z"},"road_event_id":"atW/aYbggWUx5fH2aVPCwEDgPdY=","beginning_cross_street":"Exit 7 - Rossiter Avenue; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830248,41.080386]]}},{"id":"hFjVsR9jtkXAPB7pYMpBIjKfpng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"atW/aYbggWUx5fH2aVPCwEDgPdY="},{"type":"next-occurrence","id":"YXHbDrBBjtv7W5IbMA9RSRF9+gE="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 7 - Tuckahoe Road (Yonkers) D265183/NIGHT/32670809 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-16T17:49:16Z"},"road_event_id":"hFjVsR9jtkXAPB7pYMpBIjKfpng=","beginning_cross_street":"Exit 7 - Rossiter Avenue; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830248,41.080386]]}},{"id":"YXHbDrBBjtv7W5IbMA9RSRF9+gE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"atW/aYbggWUx5fH2aVPCwEDgPdY="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 7 - Tuckahoe Road (Yonkers) D265183/NIGHT/32670809 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-16T17:49:16Z"},"road_event_id":"YXHbDrBBjtv7W5IbMA9RSRF9+gE=","beginning_cross_street":"Exit 7 - Rossiter Avenue; Ramp","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830248,41.080386]]}},{"id":"MjF/fsaVhO0bG2hyiWwmhAzarb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MlOYnIt6MV/BHYRYF6OG4JW3lH8="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"MjF/fsaVhO0bG2hyiWwmhAzarb4=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-23T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"MlOYnIt6MV/BHYRYF6OG4JW3lH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"L77HO73zxh2tNG0gatVKUptpdVE="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"MlOYnIt6MV/BHYRYF6OG4JW3lH8=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"L77HO73zxh2tNG0gatVKUptpdVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"DqFtpxbDRZxJQqOlKNE8iyWpIY4="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"L77HO73zxh2tNG0gatVKUptpdVE=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"DqFtpxbDRZxJQqOlKNE8iyWpIY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"hWG6dH3GEWHeBqpBZsL0EsTDFH8="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"DqFtpxbDRZxJQqOlKNE8iyWpIY4=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-28T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"hWG6dH3GEWHeBqpBZsL0EsTDFH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"JZ1ij4TrwgReHAozcB05DPiXLjE="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"hWG6dH3GEWHeBqpBZsL0EsTDFH8=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"JZ1ij4TrwgReHAozcB05DPiXLjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"1hjgQj0mWiGeW6V7dw8RgVyJtWo="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"JZ1ij4TrwgReHAozcB05DPiXLjE=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"1hjgQj0mWiGeW6V7dw8RgVyJtWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"kNvk68ByCcfeA+4qd9/2KZq7ccc="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"1hjgQj0mWiGeW6V7dw8RgVyJtWo=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"kNvk68ByCcfeA+4qd9/2KZq7ccc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"pxwLOB1KvaMnc5vkv1pq82CCbA4="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"kNvk68ByCcfeA+4qd9/2KZq7ccc=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-02T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"pxwLOB1KvaMnc5vkv1pq82CCbA4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"LooIGpFWohEIbTqtzxh1/atwTRU="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"pxwLOB1KvaMnc5vkv1pq82CCbA4=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-05T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"LooIGpFWohEIbTqtzxh1/atwTRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="},{"type":"next-occurrence","id":"RBK14X0Htac9Eac11QmxxmiApBM="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"LooIGpFWohEIbTqtzxh1/atwTRU=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-06T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"RBK14X0Htac9Eac11QmxxmiApBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-140"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MjF/fsaVhO0bG2hyiWwmhAzarb4="}],"description":"Road rehabilitation on CT-140 both directions between HOPKINS RD (Ellington) and PINNACLE RD (Ellington) Expect construction activities resulting in shoulder closures and alternating one way traffic, Monday March 17th, 2025 thru Tuesday November 30th, 2027, Monday thru Friday, 06:00 AM thru 10:00 PM both shoulder closed","update_date":"2025-03-10T15:13:34Z"},"road_event_id":"RBK14X0Htac9Eac11QmxxmiApBM=","beginning_cross_street":"HOPKINS RD","ending_cross_street":"PINNACLE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-07T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.428957,41.915445]]}},{"id":"4y4YicwQVfqBTD2wzE5psDIXLfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V7KZfijF2HdzQW/7hU36Wg9bsfI="}],"description":"Gas main work on US 9W northbound between Carlino Drive (Newburgh) and Highland Avenue (Orangetown) 2025083490771/32725609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-21T13:12:08Z"},"road_event_id":"4y4YicwQVfqBTD2wzE5psDIXLfg=","beginning_cross_street":"Carlino Drive","ending_cross_street":"Highland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989339,41.575996]]}},{"id":"V7KZfijF2HdzQW/7hU36Wg9bsfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4y4YicwQVfqBTD2wzE5psDIXLfg="},{"type":"next-occurrence","id":"BinzW4Bz5hWMevOHaNlSv0uxt1A="}],"description":"Gas main work on US 9W northbound between Carlino Drive (Newburgh) and Highland Avenue (Orangetown) 2025083490771/32725609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-21T13:12:08Z"},"road_event_id":"V7KZfijF2HdzQW/7hU36Wg9bsfI=","beginning_cross_street":"Carlino Drive","ending_cross_street":"Highland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989339,41.575996]]}},{"id":"BinzW4Bz5hWMevOHaNlSv0uxt1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4y4YicwQVfqBTD2wzE5psDIXLfg="}],"description":"Gas main work on US 9W northbound between Carlino Drive (Newburgh) and Highland Avenue (Orangetown) 2025083490771/32725609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 02:00 PM, shoulder closure","update_date":"2026-04-21T13:12:08Z"},"road_event_id":"BinzW4Bz5hWMevOHaNlSv0uxt1A=","beginning_cross_street":"Carlino Drive","ending_cross_street":"Highland Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.989339,41.575996]]}},{"id":"82UlqpbMx0kZeQakKi7Jdk9XCTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between Scudders Mill Rd (Plainsboro Twp) and North of I-295 (Lawrence Twp), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T16:42:28Z"},"road_event_id":"82UlqpbMx0kZeQakKi7Jdk9XCTE=","beginning_cross_street":"Scudders Mill Rd","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.622489,40.344341]]}},{"id":"uyriD/8JD4kHqCPA6ud7V/TsJsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T16:42:30Z"},"road_event_id":"uyriD/8JD4kHqCPA6ud7V/TsJsA=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"kO4kc3Kpi8BqrzQvMuVE1adgtmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T16:42:29Z"},"road_event_id":"kO4kc3Kpi8BqrzQvMuVE1adgtmw=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"3fnYbTbRYjRgaHfbSOhayK9KaY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound between Scudders Mill Rd (Plainsboro Twp) and North of I-295 (Lawrence Twp), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T16:42:25Z"},"road_event_id":"3fnYbTbRYjRgaHfbSOhayK9KaY0=","beginning_cross_street":"Scudders Mill Rd","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.622489,40.344341]]}},{"id":"Vd/hKroUDIs0KBlmtDb7igLnwNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 6N"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and drainage improvements on NY 6N both directions between Pine Tree Lane (Carmel) and Green Lane (Carmel) D265424/32701609 - ROAD CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Continuous Monday March 23rd, 2026 12:00 AM thru Saturday May 23rd, 2026 12:00 AM all lanes closed and detoured","update_date":"2026-03-03T11:17:21Z"},"road_event_id":"Vd/hKroUDIs0KBlmtDb7igLnwNw=","beginning_cross_street":"Pine Tree Lane","ending_cross_street":"Green Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.786249,41.343783]]}},{"id":"Fu5uf8IZ/yFTBp0CJxfKRM6eXyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 22"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 22 northbound between Grant Avenue (White Plains) and Westview Avenue (White Plains) 2025082502725/32516209 - Plan travel accordingly; delays may exist - Plan travel accordingly; delays may exist, Friday April 24th, 2026, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-22T15:38:52Z"},"road_event_id":"Fu5uf8IZ/yFTBp0CJxfKRM6eXyY=","beginning_cross_street":"","ending_cross_street":"Westview Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.768548,41.043094]]}},{"id":"zVqpunjChwgfWIP/NK6DzOFCVzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:36:32Z"},"road_event_id":"zVqpunjChwgfWIP/NK6DzOFCVzA=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"4hoN/LuUtNAsEEmWbZmvVDdt8zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["44TH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MEe6gPnvJ/TrgNiLoDHsBvdt37E="}],"description":"Crane operations on 44TH AVE both directions between 58TH ST (New York) and 59TH PL (New York), Friday March 13th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:58:52Z"},"road_event_id":"4hoN/LuUtNAsEEmWbZmvVDdt8zQ=","beginning_cross_street":"58TH ST","ending_cross_street":"59TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907276,40.742502]]}},{"id":"MEe6gPnvJ/TrgNiLoDHsBvdt37E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["44TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4hoN/LuUtNAsEEmWbZmvVDdt8zQ="},{"type":"next-occurrence","id":"f2yZ5B/vgKyX0Skqe2ftVfHaL/0="}],"description":"Crane operations on 44TH AVE both directions between 58TH ST (New York) and 59TH PL (New York), Friday March 13th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:58:52Z"},"road_event_id":"MEe6gPnvJ/TrgNiLoDHsBvdt37E=","beginning_cross_street":"58TH ST","ending_cross_street":"59TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907276,40.742502]]}},{"id":"f2yZ5B/vgKyX0Skqe2ftVfHaL/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["44TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4hoN/LuUtNAsEEmWbZmvVDdt8zQ="},{"type":"next-occurrence","id":"fFhCNtSA6J1TcPdOkb0w6uMqcDU="}],"description":"Crane operations on 44TH AVE both directions between 58TH ST (New York) and 59TH PL (New York), Friday March 13th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:58:52Z"},"road_event_id":"f2yZ5B/vgKyX0Skqe2ftVfHaL/0=","beginning_cross_street":"58TH ST","ending_cross_street":"59TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907276,40.742502]]}},{"id":"fFhCNtSA6J1TcPdOkb0w6uMqcDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["44TH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4hoN/LuUtNAsEEmWbZmvVDdt8zQ="}],"description":"Crane operations on 44TH AVE both directions between 58TH ST (New York) and 59TH PL (New York), Friday March 13th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:58:52Z"},"road_event_id":"fFhCNtSA6J1TcPdOkb0w6uMqcDU=","beginning_cross_street":"58TH ST","ending_cross_street":"59TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907276,40.742502]]}},{"id":"ck9ys++e8CpQPl10NGPeUfWHudY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["4 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, 4 Line bypassing Burnside Av (New York) through September 2026. Use nearby 176 St or 183 St stations, Continuous Wednesday March 4th, 2026 12:00 AM thru Friday September 4th, 2026 11:59 PM","update_date":"2026-03-04T15:00:05Z"},"road_event_id":"ck9ys++e8CpQPl10NGPeUfWHudY=","beginning_cross_street":"Burnside Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.907684,40.853453]]}},{"id":"TrOXSvGm6EFJi/T/H6er7tQ5Tac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Southbound between North of CR 650/Church St (Raritan Twp) and South of Reaville Av (Raritan Twp), Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, right lane closed","update_date":"2026-04-22T16:48:27Z"},"road_event_id":"TrOXSvGm6EFJi/T/H6er7tQ5Tac=","beginning_cross_street":"North of CR 650/Church St","ending_cross_street":"South of Reaville Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.844604,40.506324]]}},{"id":"eDMTwVEDxJg/uUvif4XZXS+srmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 39 eastbound NY 362 (Eagle), Monday April 27th, 2026, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-22T16:58:18Z"},"road_event_id":"eDMTwVEDxJg/uUvif4XZXS+srmM=","beginning_cross_street":"NY 362","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.254966,42.573935]]}},{"id":"/oiFQ4qKi3ZCsTsdL5QQ9NHXuzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:36:29Z"},"road_event_id":"/oiFQ4qKi3ZCsTsdL5QQ9NHXuzg=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"ZmlV3gWXEA40VAddh9qMCOd6z1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound near North Adamsville Rd (Bridgewater Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T16:48:25Z"},"road_event_id":"ZmlV3gWXEA40VAddh9qMCOd6z1k=","beginning_cross_street":"North Adamsville Rd","ending_cross_street":"East of North Gaston Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.582626,40.577915]]}},{"id":"DapUgzg+u1ZGyPHXA9StUe62zZA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T16:36:28Z"},"road_event_id":"DapUgzg+u1ZGyPHXA9StUe62zZA=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"3G6n2gNfrb4pfnSCTo6rgb+nwFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound near East of CR 577/Springfield Ave (Springfield Twp), Thursday April 23, 2026 10:00 PM thru 11:00 PM, left lane closed, moving operation","update_date":"2026-04-22T16:48:26Z"},"road_event_id":"3G6n2gNfrb4pfnSCTo6rgb+nwFE=","beginning_cross_street":"East of CR 577/Springfield Ave","ending_cross_street":"West of CR 635/Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.327026,40.684993]]}},{"id":"Q2zM5eyrvB3DoJx4jefZ1fu1nqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DhbVTcmpApyrTCUIrSv0FpN8KEg="}],"description":"Guard rail repairs on I-84 westbound between Exit 32 - Stewart International Airport (Newburgh) and Exit 28 - NY 208 (Montgomery) Res 8-4 RW/32694809 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026 Wednesday/ Thursday, 08:30 AM thru 02:30 PM, left lane closure","update_date":"2026-03-13T13:31:57Z"},"road_event_id":"Q2zM5eyrvB3DoJx4jefZ1fu1nqw=","beginning_cross_street":"Exit 32 - Stewart International Airport","ending_cross_street":"Exit 28 - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:30:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.140493,41.512259]]}},{"id":"DhbVTcmpApyrTCUIrSv0FpN8KEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Q2zM5eyrvB3DoJx4jefZ1fu1nqw="}],"description":"Guard rail repairs on I-84 westbound between Exit 32 - Stewart International Airport (Newburgh) and Exit 28 - NY 208 (Montgomery) Res 8-4 RW/32694809 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026 Wednesday/ Thursday, 08:30 AM thru 02:30 PM, left lane closure","update_date":"2026-03-13T13:31:57Z"},"road_event_id":"DhbVTcmpApyrTCUIrSv0FpN8KEg=","beginning_cross_street":"Exit 32 - Stewart International Airport","ending_cross_street":"Exit 28 - NY 208","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:30:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.140493,41.512259]]}},{"id":"yO9vTt5+N22qR8VOTy661JVbek0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:36:23Z"},"road_event_id":"yO9vTt5+N22qR8VOTy661JVbek0=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"mVZZjkjbn/uqFLO3xmrVHARybzU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound near East of CR 577/Springfield Ave (Springfield Twp), Thursday April 23, 2026 10:00 PM thru 10:30 PM, right lane closed, moving operation","update_date":"2026-04-22T16:48:23Z"},"road_event_id":"mVZZjkjbn/uqFLO3xmrVHARybzU=","beginning_cross_street":"East of CR 577/Springfield Ave","ending_cross_street":"West of CR 635/Mountain Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T00:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.327026,40.684993]]}},{"id":"3REFMB7pX9JoRt1uD2hdWWJf0xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 202"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 202 Northbound between South of Reaville Av (Raritan Twp) and North of CR 650/Church St (Raritan Twp), Friday April 24, 2026 11:00 PM thru Saturday April 25, 2026 05:00 AM, right lane closed","update_date":"2026-04-22T16:48:24Z"},"road_event_id":"3REFMB7pX9JoRt1uD2hdWWJf0xs=","beginning_cross_street":"South of Reaville Av","ending_cross_street":"North of CR 650/Church St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.857925,40.496791]]}},{"id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sXXDchjF3wNaEKpX334sgqYZOBE="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:46:48Z"},"road_event_id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"sXXDchjF3wNaEKpX334sgqYZOBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8="},{"type":"next-occurrence","id":"kr8dS5jUUe5P//Ru9wdJOL964yg="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:46:48Z"},"road_event_id":"sXXDchjF3wNaEKpX334sgqYZOBE=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"kr8dS5jUUe5P//Ru9wdJOL964yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8="},{"type":"next-occurrence","id":"nT1/NBZJstXAiI3ZBMpzZElujCw="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:46:48Z"},"road_event_id":"kr8dS5jUUe5P//Ru9wdJOL964yg=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"nT1/NBZJstXAiI3ZBMpzZElujCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8="},{"type":"next-occurrence","id":"ToPGCP7xH3aFBW4FVR3LiZ5g/Zo="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:46:48Z"},"road_event_id":"nT1/NBZJstXAiI3ZBMpzZElujCw=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"ToPGCP7xH3aFBW4FVR3LiZ5g/Zo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8="},{"type":"next-occurrence","id":"eynTiHsqdZY548Y0E0KlkVHziwY="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:46:48Z"},"road_event_id":"ToPGCP7xH3aFBW4FVR3LiZ5g/Zo=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"eynTiHsqdZY548Y0E0KlkVHziwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8="},{"type":"next-occurrence","id":"sIZsa+4pX950k+clXY5b58fep2A="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:46:48Z"},"road_event_id":"eynTiHsqdZY548Y0E0KlkVHziwY=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"sIZsa+4pX950k+clXY5b58fep2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8Za1s9i+qx9J2HRxA6zcTvmT/Y8="}],"description":"Sign work on I-684 southbound between I-287 (Harrison) and Hutchinson River Pkwy (Harrison) D265342/32384709 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 04:00 PM, right lane closure","update_date":"2026-03-31T14:46:48Z"},"road_event_id":"sIZsa+4pX950k+clXY5b58fep2A=","beginning_cross_street":"I-287","ending_cross_street":"Hutchinson River Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724429,41.029642]]}},{"id":"azwTDjdQxcz2/rwO9hsoM/FXKd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:36:25Z"},"road_event_id":"azwTDjdQxcz2/rwO9hsoM/FXKd4=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"MUySPt4r2OjYiI4pyz7WqLRorxY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound near West of CR 635/Mountain Ave (Mountainside), Thursday April 23, 2026 09:00 PM thru 10:00 PM, right lane closed","update_date":"2026-04-22T16:48:20Z"},"road_event_id":"MUySPt4r2OjYiI4pyz7WqLRorxY=","beginning_cross_street":"West of CR 635/Mountain Ave","ending_cross_street":"East of CR 577/Springfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.337997,40.683662]]}},{"id":"hp9AxRoGkC1VFBwbo5bcFJjfGVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 518/Washington St (Montgomery Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-17T16:36:24Z"},"road_event_id":"hp9AxRoGkC1VFBwbo5bcFJjfGVI=","beginning_cross_street":"South of CR 518/Washington St","ending_cross_street":"CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.651008,40.400485]]}},{"id":"zc1/QvY7ogFmzv/GVxw3HGBG7dY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound near West of CR 635/Mountain Ave (Mountainside), Thursday April 23, 2026 09:00 PM thru 10:00 PM, left lane closed, moving operation","update_date":"2026-04-22T16:48:22Z"},"road_event_id":"zc1/QvY7ogFmzv/GVxw3HGBG7dY=","beginning_cross_street":"West of CR 635/Mountain Ave","ending_cross_street":"East of CR 577/Springfield Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.337997,40.683662]]}},{"id":"BotyUAHZ1Rpo+bvTozNYD0Vs/tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound near North of Pennsylvania Av (Raritan Twp), Friday April 24, 2026 08:00 PM thru 10:00 PM, right shoulder closed, moving operation","update_date":"2026-04-22T16:48:19Z"},"road_event_id":"BotyUAHZ1Rpo+bvTozNYD0Vs/tQ=","beginning_cross_street":"North of Pennsylvania Av","ending_cross_street":"Pennsylvania Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.852348,40.514537]]}},{"id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KBvpB5RExZ5M+dpoADeSKA5+zbI="}],"description":"Utility work on NY 34 both directions between WISE RD (Ira) and DALTON RD (Ira) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T16:35:30Z"},"road_event_id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E=","beginning_cross_street":"WISE RD","ending_cross_street":"DALTON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.574749,43.182749]]}},{"id":"KBvpB5RExZ5M+dpoADeSKA5+zbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E="},{"type":"next-occurrence","id":"dNap95AhIWzEs6NEt+bxC2EX44E="}],"description":"Utility work on NY 34 both directions between WISE RD (Ira) and DALTON RD (Ira) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T16:35:30Z"},"road_event_id":"KBvpB5RExZ5M+dpoADeSKA5+zbI=","beginning_cross_street":"WISE RD","ending_cross_street":"DALTON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.574749,43.182749]]}},{"id":"dNap95AhIWzEs6NEt+bxC2EX44E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E="},{"type":"next-occurrence","id":"L8eNBS/1e2iDvaQLQk+EVyC/HPE="}],"description":"Utility work on NY 34 both directions between WISE RD (Ira) and DALTON RD (Ira) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T16:35:30Z"},"road_event_id":"dNap95AhIWzEs6NEt+bxC2EX44E=","beginning_cross_street":"WISE RD","ending_cross_street":"DALTON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.574749,43.182749]]}},{"id":"L8eNBS/1e2iDvaQLQk+EVyC/HPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E="},{"type":"next-occurrence","id":"kA1G3X/c2LpfhL/NncAP3zDMPSc="}],"description":"Utility work on NY 34 both directions between WISE RD (Ira) and DALTON RD (Ira) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T16:35:30Z"},"road_event_id":"L8eNBS/1e2iDvaQLQk+EVyC/HPE=","beginning_cross_street":"WISE RD","ending_cross_street":"DALTON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.574749,43.182749]]}},{"id":"kA1G3X/c2LpfhL/NncAP3zDMPSc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E="},{"type":"next-occurrence","id":"hjmqgNkqHkItq1ZSKgxzSHNRELs="}],"description":"Utility work on NY 34 both directions between WISE RD (Ira) and DALTON RD (Ira) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T16:35:30Z"},"road_event_id":"kA1G3X/c2LpfhL/NncAP3zDMPSc=","beginning_cross_street":"WISE RD","ending_cross_street":"DALTON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.574749,43.182749]]}},{"id":"hjmqgNkqHkItq1ZSKgxzSHNRELs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E="},{"type":"next-occurrence","id":"KQvb0kYVZIongJudNp32UYcJIZI="}],"description":"Utility work on NY 34 both directions between WISE RD (Ira) and DALTON RD (Ira) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T16:35:30Z"},"road_event_id":"hjmqgNkqHkItq1ZSKgxzSHNRELs=","beginning_cross_street":"WISE RD","ending_cross_street":"DALTON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.574749,43.182749]]}},{"id":"KQvb0kYVZIongJudNp32UYcJIZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EfG0i1SNXQ1/GZXsSU4zS85TK8E="}],"description":"Utility work on NY 34 both directions between WISE RD (Ira) and DALTON RD (Ira) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-22T16:35:30Z"},"road_event_id":"KQvb0kYVZIongJudNp32UYcJIZI=","beginning_cross_street":"WISE RD","ending_cross_street":"DALTON RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.574749,43.182749]]}},{"id":"BvcNUPm5GP93A5qoLJBli7kDeUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"24NCd11bdRz7qv5TlVjBAX3XNUU="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"BvcNUPm5GP93A5qoLJBli7kDeUY=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"24NCd11bdRz7qv5TlVjBAX3XNUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"PiCfOQZfjSgbOY3V+n+/3KFPmzg="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"24NCd11bdRz7qv5TlVjBAX3XNUU=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"PiCfOQZfjSgbOY3V+n+/3KFPmzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"0uux59ez8my1YmRSX8T452T5RL8="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"PiCfOQZfjSgbOY3V+n+/3KFPmzg=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"0uux59ez8my1YmRSX8T452T5RL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"8I5NtAiV/4A249akzI6gnresUeY="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"0uux59ez8my1YmRSX8T452T5RL8=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"8I5NtAiV/4A249akzI6gnresUeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"R+bYPoy7gFIIeQ6Leok+yUaXWdI="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"8I5NtAiV/4A249akzI6gnresUeY=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"R+bYPoy7gFIIeQ6Leok+yUaXWdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"E57LdRV22mpVGLRtnFMZUPfKt2U="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"R+bYPoy7gFIIeQ6Leok+yUaXWdI=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"E57LdRV22mpVGLRtnFMZUPfKt2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"fjMSxujopMhbF30ngcthdv0Ikl0="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"E57LdRV22mpVGLRtnFMZUPfKt2U=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T18:00:00Z","end_date":"2026-05-04T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"fjMSxujopMhbF30ngcthdv0Ikl0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"LWTGyD60faa8HesWDQmLhVLmvVE="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"fjMSxujopMhbF30ngcthdv0Ikl0=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T18:00:00Z","end_date":"2026-05-05T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"LWTGyD60faa8HesWDQmLhVLmvVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="},{"type":"next-occurrence","id":"dtEgFRnrKq1yzwhpm7MiXpuxVaM="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"LWTGyD60faa8HesWDQmLhVLmvVE=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"dtEgFRnrKq1yzwhpm7MiXpuxVaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 286"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BvcNUPm5GP93A5qoLJBli7kDeUY="}],"description":"Roadwork on NY 286 eastbound between NY 590 (Brighton) and Landing Road North (Brighton) alternating lane closures, Monday April 27th, 2026 thru Tuesday May 26th, 2026, Sunday thru Saturday, 07:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:40:03Z"},"road_event_id":"dtEgFRnrKq1yzwhpm7MiXpuxVaM=","beginning_cross_street":"NY 590","ending_cross_street":"Landing Road  North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T18:00:00Z","end_date":"2026-05-07T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.538201,43.157478]]}},{"id":"04l3MAt7bktSOC7UqQFNtHnXlbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T16:36:20Z"},"road_event_id":"04l3MAt7bktSOC7UqQFNtHnXlbQ=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"vhmcy5jHPge8qqaV2D+V1rqwcNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 436"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 436 eastbound between Town of Portage and Town of Nunda Line (Nunda) alternating lane closures, Friday April 24th, 2026, 09:00 AM thru 11:00 AM All lanes closed intermittently","update_date":"2026-04-22T16:28:10Z"},"road_event_id":"vhmcy5jHPge8qqaV2D+V1rqwcNc=","beginning_cross_street":"Town of Portage and Town of Nunda Line","ending_cross_street":"Town of Portage and Town of Nunda Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.969486,42.577992]]}},{"id":"heWV1v31oJUPdZhvXCvoqyVs648=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 65 - Green St (South Hackensack Twp) and East of Exit 63 - NJ 17 North (Lodi), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T16:33:52Z"},"road_event_id":"heWV1v31oJUPdZhvXCvoqyVs648=","beginning_cross_street":"East of Exit 65 - Green St","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.056602,40.869529]]}},{"id":"QbRoQiYHkhZEJ5uwbXh3qHtxJQQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 251"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ql0EE3JDG7O9sPIU6vZoWdoCJx4="}],"description":"Culvert repairs on NY 251 eastbound between Town of Rush-Town of Mendon Line (Rush) alternating lane closures, Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 07:00 AM thru 03:30 PM All lanes closed intermittently","update_date":"2026-04-22T16:32:53Z"},"road_event_id":"QbRoQiYHkhZEJ5uwbXh3qHtxJQQ=","beginning_cross_street":"Town of Rush-Town of Mendon Line","ending_cross_street":"Town of Rush-Town of Mendon Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607297,42.993121]]}},{"id":"ql0EE3JDG7O9sPIU6vZoWdoCJx4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 251"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QbRoQiYHkhZEJ5uwbXh3qHtxJQQ="},{"type":"next-occurrence","id":"XCNzkNH/qGpy/diNX6tDoA+xMvo="}],"description":"Culvert repairs on NY 251 eastbound between Town of Rush-Town of Mendon Line (Rush) alternating lane closures, Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 07:00 AM thru 03:30 PM All lanes closed intermittently","update_date":"2026-04-22T16:32:53Z"},"road_event_id":"ql0EE3JDG7O9sPIU6vZoWdoCJx4=","beginning_cross_street":"Town of Rush-Town of Mendon Line","ending_cross_street":"Town of Rush-Town of Mendon Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607297,42.993121]]}},{"id":"XCNzkNH/qGpy/diNX6tDoA+xMvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 251"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QbRoQiYHkhZEJ5uwbXh3qHtxJQQ="}],"description":"Culvert repairs on NY 251 eastbound between Town of Rush-Town of Mendon Line (Rush) alternating lane closures, Monday April 27th, 2026 thru Wednesday April 29th, 2026, Monday/Tuesday/Wednesday, 07:00 AM thru 03:30 PM All lanes closed intermittently","update_date":"2026-04-22T16:32:53Z"},"road_event_id":"XCNzkNH/qGpy/diNX6tDoA+xMvo=","beginning_cross_street":"Town of Rush-Town of Mendon Line","ending_cross_street":"Town of Rush-Town of Mendon Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.607297,42.993121]]}},{"id":"u1YaVnk9m+lNkaAMpxskXvrPJCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ja7ZueIOCZGjEccXW7sOWHc9PwE="}],"description":"Construction on I-81 southbound between Exit 9 A/B- Syracuse Airport/Taft Rd (Salina) and 4A N Clinton St (Syracuse), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:36:12Z"},"road_event_id":"u1YaVnk9m+lNkaAMpxskXvrPJCQ=","beginning_cross_street":"Exit 9 A/B- Syracuse Airport/Taft Rd","ending_cross_street":"4A N Clinton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142718,43.11339]]}},{"id":"Ja7ZueIOCZGjEccXW7sOWHc9PwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1YaVnk9m+lNkaAMpxskXvrPJCQ="},{"type":"next-occurrence","id":"tRD69dAWItDWL5JTjXDPNM9kjj4="}],"description":"Construction on I-81 southbound between Exit 9 A/B- Syracuse Airport/Taft Rd (Salina) and 4A N Clinton St (Syracuse), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:36:12Z"},"road_event_id":"Ja7ZueIOCZGjEccXW7sOWHc9PwE=","beginning_cross_street":"Exit 9 A/B- Syracuse Airport/Taft Rd","ending_cross_street":"4A N Clinton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142718,43.11339]]}},{"id":"tRD69dAWItDWL5JTjXDPNM9kjj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"u1YaVnk9m+lNkaAMpxskXvrPJCQ="}],"description":"Construction on I-81 southbound between Exit 9 A/B- Syracuse Airport/Taft Rd (Salina) and 4A N Clinton St (Syracuse), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:36:12Z"},"road_event_id":"tRD69dAWItDWL5JTjXDPNM9kjj4=","beginning_cross_street":"Exit 9 A/B- Syracuse Airport/Taft Rd","ending_cross_street":"4A N Clinton St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142718,43.11339]]}},{"id":"av/i5k5z6VFCqLCz6X8ZI58XKik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 19 northbound between West Main Street; NY 5 (Le Roy) alternating lane closures, Friday April 24th, 2026, 01:00 PM thru 03:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:13:02Z"},"road_event_id":"av/i5k5z6VFCqLCz6X8ZI58XKik=","beginning_cross_street":"West Main Street; NY 5","ending_cross_street":"West Main Street; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T06:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.992318,42.97506]]}},{"id":"BDYhACVPNqq8R6vVi9wZPkun8EA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 63"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 63 northbound between Town of Sparta and Town of North Dansville Line (Sparta) and CR-51 (Sparta) alternating lane closures, Friday April 24th, 2026, 11:00 AM thru 01:00 PM All lanes closed intermittently","update_date":"2026-04-22T16:20:42Z"},"road_event_id":"BDYhACVPNqq8R6vVi9wZPkun8EA=","beginning_cross_street":"Town of Sparta and Town of North Dansville Line","ending_cross_street":"CR-51","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.718784,42.594975]]}},{"id":"sRyvupn5/VnC0HYQC44OATpiCoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"F09mlCadfmNmGktUoRs2VHMGO5g="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"sRyvupn5/VnC0HYQC44OATpiCoI=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"F09mlCadfmNmGktUoRs2VHMGO5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"NqdSUDDDljLd0x8LSkVfAoUPiho="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"F09mlCadfmNmGktUoRs2VHMGO5g=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"NqdSUDDDljLd0x8LSkVfAoUPiho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"UfQU2pGIBIgYtZ8QnF47FGjQu0Y="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"NqdSUDDDljLd0x8LSkVfAoUPiho=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"UfQU2pGIBIgYtZ8QnF47FGjQu0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"9AXE4lxKG5Sv4+KgjDNCTpE5cMM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"UfQU2pGIBIgYtZ8QnF47FGjQu0Y=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"9AXE4lxKG5Sv4+KgjDNCTpE5cMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"esqVELyj66ovYylaB+SdgTKCV24="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"9AXE4lxKG5Sv4+KgjDNCTpE5cMM=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"esqVELyj66ovYylaB+SdgTKCV24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"/Njmf5UzMQcj63zi0kTddkB5z/w="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"esqVELyj66ovYylaB+SdgTKCV24=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"/Njmf5UzMQcj63zi0kTddkB5z/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"em+rCUHMW9xSzTqTrKsj9rFjjvU="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"/Njmf5UzMQcj63zi0kTddkB5z/w=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"em+rCUHMW9xSzTqTrKsj9rFjjvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"OD4KZeuLJAi5OKswv7k96q5lld8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"em+rCUHMW9xSzTqTrKsj9rFjjvU=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"OD4KZeuLJAi5OKswv7k96q5lld8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"3HANcHE4Zo8dVCl+jXuzUfdqy2c="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"OD4KZeuLJAi5OKswv7k96q5lld8=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"3HANcHE4Zo8dVCl+jXuzUfdqy2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="},{"type":"next-occurrence","id":"A5m5syo2wpKdnAU7m6S9/8yEkRs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"3HANcHE4Zo8dVCl+jXuzUfdqy2c=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"A5m5syo2wpKdnAU7m6S9/8yEkRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sRyvupn5/VnC0HYQC44OATpiCoI="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 54TH ST (New York) and BEACH 47TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Sunday June 7th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:03:56Z"},"road_event_id":"A5m5syo2wpKdnAU7m6S9/8yEkRs=","beginning_cross_street":"BEACH 54TH ST","ending_cross_street":"BEACH 47TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784006,40.592236]]}},{"id":"moshSsfcI/M5GHh9CUIP+EhRX1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"U0nEjm3peNZcrT/tfmHWAKO77E4="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"moshSsfcI/M5GHh9CUIP+EhRX1c=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"U0nEjm3peNZcrT/tfmHWAKO77E4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"7w9GKOGKC1NtKb5eHQAXS6PCgUQ="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"U0nEjm3peNZcrT/tfmHWAKO77E4=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"7w9GKOGKC1NtKb5eHQAXS6PCgUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"CMwgC/jqH9XRdOK2MWaU9d9NYX8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"7w9GKOGKC1NtKb5eHQAXS6PCgUQ=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"CMwgC/jqH9XRdOK2MWaU9d9NYX8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"jSldEJ6mFW2+LKYR2l2gJ3C/7MM="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"CMwgC/jqH9XRdOK2MWaU9d9NYX8=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"jSldEJ6mFW2+LKYR2l2gJ3C/7MM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"qQVGpxKLyFx5vZeOTL7gWNucDeY="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"jSldEJ6mFW2+LKYR2l2gJ3C/7MM=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"qQVGpxKLyFx5vZeOTL7gWNucDeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"YssCgpBDCons8+q61mU7BzLYm9A="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"qQVGpxKLyFx5vZeOTL7gWNucDeY=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"YssCgpBDCons8+q61mU7BzLYm9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"+vHY3he8rXrA3TnMBhWjSYFmQRs="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"YssCgpBDCons8+q61mU7BzLYm9A=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"+vHY3he8rXrA3TnMBhWjSYFmQRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"FmaQhy7JW9cmoFeMFWVnduNdZL8="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"+vHY3he8rXrA3TnMBhWjSYFmQRs=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"FmaQhy7JW9cmoFeMFWVnduNdZL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"bZJoO25WP1JmTK+3DwfUpquDAWw="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"FmaQhy7JW9cmoFeMFWVnduNdZL8=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"bZJoO25WP1JmTK+3DwfUpquDAWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="},{"type":"next-occurrence","id":"ThO1iOTGNdHgjyVt1wsexGZFjdo="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"bZJoO25WP1JmTK+3DwfUpquDAWw=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"ThO1iOTGNdHgjyVt1wsexGZFjdo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ROCKAWAY FWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"moshSsfcI/M5GHh9CUIP+EhRX1c="}],"description":"Construction on ROCKAWAY FWY eastbound between BEACH 56TH PL (New York) and BEACH 54TH ST (New York) for concrete restoration on the track of the Rockaway Viaduct line., Wednesday March 11th, 2026 thru Friday June 5th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-03-11T17:06:32Z"},"road_event_id":"ThO1iOTGNdHgjyVt1wsexGZFjdo=","beginning_cross_street":"BEACH 56TH PL","ending_cross_street":"BEACH 54TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.785746,40.592272]]}},{"id":"GgVucXaP3+Rh8VUXhHVvjD+ycKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/YKch8QK8poxg4tB5/qR8Kx+Q+Y="}],"description":"Utility work on NY 21 northbound between Coye Point Drive (South Bristol) alternating lane closures, Friday April 24th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T16:03:06Z"},"road_event_id":"GgVucXaP3+Rh8VUXhHVvjD+ycKA=","beginning_cross_street":"Coye Point Drive","ending_cross_street":"Coye Point Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365122,42.682706]]}},{"id":"/YKch8QK8poxg4tB5/qR8Kx+Q+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GgVucXaP3+Rh8VUXhHVvjD+ycKA="},{"type":"next-occurrence","id":"IqsaskkLCTxN+8wjFbCqKTDVPS4="}],"description":"Utility work on NY 21 northbound between Coye Point Drive (South Bristol) alternating lane closures, Friday April 24th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T16:03:06Z"},"road_event_id":"/YKch8QK8poxg4tB5/qR8Kx+Q+Y=","beginning_cross_street":"Coye Point Drive","ending_cross_street":"Coye Point Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365122,42.682706]]}},{"id":"IqsaskkLCTxN+8wjFbCqKTDVPS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GgVucXaP3+Rh8VUXhHVvjD+ycKA="},{"type":"next-occurrence","id":"MW3kGvbpRiqDDExw86ps02zUNSA="}],"description":"Utility work on NY 21 northbound between Coye Point Drive (South Bristol) alternating lane closures, Friday April 24th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T16:03:06Z"},"road_event_id":"IqsaskkLCTxN+8wjFbCqKTDVPS4=","beginning_cross_street":"Coye Point Drive","ending_cross_street":"Coye Point Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365122,42.682706]]}},{"id":"MW3kGvbpRiqDDExw86ps02zUNSA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GgVucXaP3+Rh8VUXhHVvjD+ycKA="}],"description":"Utility work on NY 21 northbound between Coye Point Drive (South Bristol) alternating lane closures, Friday April 24th, 2026 thru Monday April 27th, 2026, Sunday/Monday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T16:03:06Z"},"road_event_id":"MW3kGvbpRiqDDExw86ps02zUNSA=","beginning_cross_street":"Coye Point Drive","ending_cross_street":"Coye Point Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.365122,42.682706]]}},{"id":"ZdGTUe5e6x/7NThj68+HaxujqdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Wantage School Rd (Wantage Twp) and North of Sawmill Rd (Montague Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-04-17T16:33:48Z"},"road_event_id":"ZdGTUe5e6x/7NThj68+HaxujqdQ=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"North of Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618453,41.234889]]}},{"id":"EOzKOzBMEp31Nkp2BY/zJYBsfeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound between North of Meeker Av (Newark) and South of Poinier St (Newark) Friday May 1, 2026 08:00 PM thru Saturday May 2, 2026 06:00 AM, 1 right lane of 3 lanes, right shoulder closed","update_date":"2026-04-22T15:58:42Z"},"road_event_id":"EOzKOzBMEp31Nkp2BY/zJYBsfeE=","beginning_cross_street":"North of Meeker Av","ending_cross_street":"South of Poinier St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.194839,40.703369]]}},{"id":"B9x4JyFwmwYi5mjj65f1AwIC/rc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T16:42:19Z"},"road_event_id":"B9x4JyFwmwYi5mjj65f1AwIC/rc=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"qTPxAFECjLIlh2zK3hOwny/HpzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound between South of CR 614/Dey Rd (Cranbury Twp) and North of NJ 33 (East Windsor Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T16:42:18Z"},"road_event_id":"qTPxAFECjLIlh2zK3hOwny/HpzM=","beginning_cross_street":"South of CR 614/Dey Rd","ending_cross_street":"North of NJ 33","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.506538,40.327266]]}},{"id":"Ia5IffAvd4QRbJTSC97x2r6OP5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+0cx9sef41dhPZZW1iBWqiP7ig0="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"Ia5IffAvd4QRbJTSC97x2r6OP5Y=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"+0cx9sef41dhPZZW1iBWqiP7ig0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia5IffAvd4QRbJTSC97x2r6OP5Y="},{"type":"next-occurrence","id":"Y/tcBDNVA2oA8Dmd0MDd+D0bcCU="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"+0cx9sef41dhPZZW1iBWqiP7ig0=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"Y/tcBDNVA2oA8Dmd0MDd+D0bcCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia5IffAvd4QRbJTSC97x2r6OP5Y="},{"type":"next-occurrence","id":"TmvoCVQnklTHdLn7AhjXdo2fO4U="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"Y/tcBDNVA2oA8Dmd0MDd+D0bcCU=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"TmvoCVQnklTHdLn7AhjXdo2fO4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ia5IffAvd4QRbJTSC97x2r6OP5Y="}],"description":"Crane operations on MASPETH AVE both directions between GRANDPARENTS AVE (New York) and OLIVE ST (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:16:43Z"},"road_event_id":"TmvoCVQnklTHdLn7AhjXdo2fO4U=","beginning_cross_street":"GRANDPARENTS AVE","ending_cross_street":"OLIVE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.93997,40.715814]]}},{"id":"lgnqbgMujLIhA89EiquFfyQ1Keg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"a/JrLCgJVRwQIvZxkgOvYUt2XgE="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"lgnqbgMujLIhA89EiquFfyQ1Keg=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"a/JrLCgJVRwQIvZxkgOvYUt2XgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgnqbgMujLIhA89EiquFfyQ1Keg="},{"type":"next-occurrence","id":"IKo5/f3Z2x7/CVJ+rHJTiWUc7LI="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"a/JrLCgJVRwQIvZxkgOvYUt2XgE=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"IKo5/f3Z2x7/CVJ+rHJTiWUc7LI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgnqbgMujLIhA89EiquFfyQ1Keg="},{"type":"next-occurrence","id":"UKsICs1kgFnU7CPOv27AtZyzg9w="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"IKo5/f3Z2x7/CVJ+rHJTiWUc7LI=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"UKsICs1kgFnU7CPOv27AtZyzg9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["OLIVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lgnqbgMujLIhA89EiquFfyQ1Keg="}],"description":"Crane operations on OLIVE ST northbound between ORIENT AVE (New York) and MASPETH AVE (New York), Saturday March 14th, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:21:21Z"},"road_event_id":"UKsICs1kgFnU7CPOv27AtZyzg9w=","beginning_cross_street":"ORIENT AVE","ending_cross_street":"MASPETH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938727,40.715382]]}},{"id":"wmpfl0tMb4dvmuV0FzmdO6GEsqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oiVrpSwA58MqLkhf+gN6oiUx42g="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"wmpfl0tMb4dvmuV0FzmdO6GEsqg=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"oiVrpSwA58MqLkhf+gN6oiUx42g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wmpfl0tMb4dvmuV0FzmdO6GEsqg="},{"type":"next-occurrence","id":"9MSXMBWpNXkkobwa2R10mOZM/Vo="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"oiVrpSwA58MqLkhf+gN6oiUx42g=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"9MSXMBWpNXkkobwa2R10mOZM/Vo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wmpfl0tMb4dvmuV0FzmdO6GEsqg="},{"type":"next-occurrence","id":"Ri3kLTQ3/hl9W/BRaD/TWoW64Kc="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"9MSXMBWpNXkkobwa2R10mOZM/Vo=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"Ri3kLTQ3/hl9W/BRaD/TWoW64Kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MASPETH AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wmpfl0tMb4dvmuV0FzmdO6GEsqg="}],"description":"Crane operations on MASPETH AVE both directions between OLIVE ST (New York) and DEBEVOISE AVE (New York), Saturday March 21st, 2026 thru Saturday June 13th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 22nd, 2026 thru Sunday June 14th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-11T17:19:02Z"},"road_event_id":"Ri3kLTQ3/hl9W/BRaD/TWoW64Kc=","beginning_cross_street":"OLIVE ST","ending_cross_street":"DEBEVOISE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.938928,40.716071]]}},{"id":"n3WswtFwSRdNel50gHX2eEIek+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"73gn7Ix58XZq/PClc4oM0LD62LI="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"n3WswtFwSRdNel50gHX2eEIek+g=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"73gn7Ix58XZq/PClc4oM0LD62LI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"kRmV0HNCghOZpL0SLh1SsCimN5Q="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"73gn7Ix58XZq/PClc4oM0LD62LI=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"kRmV0HNCghOZpL0SLh1SsCimN5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"fNCpqqzO0hj8AuhTaEICzT3Z6/4="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"kRmV0HNCghOZpL0SLh1SsCimN5Q=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"fNCpqqzO0hj8AuhTaEICzT3Z6/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"ygyTR1X/HG1w2DJ4tHde15+IfeE="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"fNCpqqzO0hj8AuhTaEICzT3Z6/4=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"ygyTR1X/HG1w2DJ4tHde15+IfeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"WpPdz23F0odCriPhVh3EQWLc6mE="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"ygyTR1X/HG1w2DJ4tHde15+IfeE=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"WpPdz23F0odCriPhVh3EQWLc6mE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"VaEEaExj03PcfejL3df7vKr2FEI="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"WpPdz23F0odCriPhVh3EQWLc6mE=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"VaEEaExj03PcfejL3df7vKr2FEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"ICbBvYDuftsnnlTjt5IP0Ven6dw="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"VaEEaExj03PcfejL3df7vKr2FEI=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"ICbBvYDuftsnnlTjt5IP0Ven6dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"ghbzrJe0LGLeyu9qnv3TvBWrb/4="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"ICbBvYDuftsnnlTjt5IP0Ven6dw=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"ghbzrJe0LGLeyu9qnv3TvBWrb/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"S613xwf7+NMbnAq+Gs4GO7j6zRw="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"ghbzrJe0LGLeyu9qnv3TvBWrb/4=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"S613xwf7+NMbnAq+Gs4GO7j6zRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="},{"type":"next-occurrence","id":"pAvl0t+SPGuARtl12FJwyUXYG9c="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"S613xwf7+NMbnAq+Gs4GO7j6zRw=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"pAvl0t+SPGuARtl12FJwyUXYG9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WHITLOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n3WswtFwSRdNel50gHX2eEIek+g="}],"description":"Construction on WHITLOCK AVE southbound between E 165TH ST (New York) and ALDUS ST (New York) for new construction/concrete pump operations., Wednesday March 11th,2026 thru Friday May 8th,2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed southbound,","update_date":"2026-04-09T22:00:01Z"},"road_event_id":"pAvl0t+SPGuARtl12FJwyUXYG9c=","beginning_cross_street":"E 165TH ST","ending_cross_street":"ALDUS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886501,40.825273]]}},{"id":"iseEvf/Swe3Dl3edvnlx8Kvqbrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T16:36:46Z"},"road_event_id":"iseEvf/Swe3Dl3edvnlx8Kvqbrc=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"LbOVtZQiJ27eUic0tkp6zFYzC8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m6wV6VDaADZbNsP/oB3wSO0ibpY="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 9 - East 42nd Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed southbound; 2 Left lanes of 3 lanes closed northbound","update_date":"2026-04-17T16:39:39Z"},"road_event_id":"LbOVtZQiJ27eUic0tkp6zFYzC8k=","beginning_cross_street":"Exit 9 - East 42nd Street","ending_cross_street":"Exit 9 - East 42nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971282,40.744466]]}},{"id":"m6wV6VDaADZbNsP/oB3wSO0ibpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbOVtZQiJ27eUic0tkp6zFYzC8k="},{"type":"next-occurrence","id":"uztgF3oJEcL5WH06HuOgm7zZkAE="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 9 - East 42nd Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed southbound; 2 Left lanes of 3 lanes closed northbound","update_date":"2026-04-17T16:39:39Z"},"road_event_id":"m6wV6VDaADZbNsP/oB3wSO0ibpY=","beginning_cross_street":"Exit 9 - East 42nd Street","ending_cross_street":"Exit 9 - East 42nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971282,40.744466]]}},{"id":"uztgF3oJEcL5WH06HuOgm7zZkAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Franklin D. Roosevelt Drive"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbOVtZQiJ27eUic0tkp6zFYzC8k="}],"description":"Construction on Franklin D. Roosevelt Drive both directions from Exit 9 - East 42nd Street (New York) Subject to change without notice., Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 11:00 PM thru 05:00 AM 2 Right lanes of 3 lanes closed southbound; 2 Left lanes of 3 lanes closed northbound","update_date":"2026-04-17T16:39:39Z"},"road_event_id":"uztgF3oJEcL5WH06HuOgm7zZkAE=","beginning_cross_street":"Exit 9 - East 42nd Street","ending_cross_street":"Exit 9 - East 42nd Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.971282,40.744466]]}},{"id":"dffS4yAa6/E4c+K8RWqXtyVoZUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEVINS RD"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation and deck work on BEVINS RD both directions FRENCH CREEK RD (Clayton) Bevins Road Bridge over French Creek is closed to all traffic until further notice, Continuous Wednesday November 19th, 2025 04:48 PM thru Monday November 30th, 2026 05:00 PM All lanes closed","update_date":"2025-11-19T21:53:47Z"},"road_event_id":"dffS4yAa6/E4c+K8RWqXtyVoZUE=","beginning_cross_street":"FRENCH CREEK RD","ending_cross_street":"FRENCH CREEK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.134837,44.188614]]}},{"id":"HhRMftB7n5FpuyLhHPDdSZS264w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound at Exit 30 - Howard Blvd (Mount Arlington) Continuous Monday April 20, 2026 03:00 AM thru Friday May 1, 2026 06:00 PM, ramp","update_date":"2026-04-17T16:39:21Z"},"road_event_id":"HhRMftB7n5FpuyLhHPDdSZS264w=","beginning_cross_street":"Exit 30 - Howard Blvd","ending_cross_street":"Exit 30 - Howard Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.635299,40.897155]]}},{"id":"aQv8NDdFTpC6/T5+AZzoz1/u8Qg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T16:36:45Z"},"road_event_id":"aQv8NDdFTpC6/T5+AZzoz1/u8Qg=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"mBiYKiispzPY0MxmvLfs1BVCseI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between North of NJ 33 (East Windsor Twp) and South of CR 614/Dey Rd (Cranbury Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T16:36:39Z"},"road_event_id":"mBiYKiispzPY0MxmvLfs1BVCseI=","beginning_cross_street":"North of NJ 33","ending_cross_street":"South of CR 614/Dey Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.546669,40.263774]]}},{"id":"qh5UxWM1iWFforiTCQWX/6GQbU4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between South of Brooks Blvd (Hillsborough Twp) and North of CR 514/Amwell Rd (Hillsborough Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:36:38Z"},"road_event_id":"qh5UxWM1iWFforiTCQWX/6GQbU4=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"North of CR 514/Amwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.620437,40.533859]]}},{"id":"2GeBiCAoD2TNjyWN41B1S/LZN7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near CR 518/Washington St (Montgomery Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-17T16:36:42Z"},"road_event_id":"2GeBiCAoD2TNjyWN41B1S/LZN7I=","beginning_cross_street":"CR 518/Washington St","ending_cross_street":"South of CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.649543,40.403152]]}},{"id":"0HWKi/AoOoOZXVv+Dj9kKjxl4aA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of Brooks Blvd (Hillsborough Twp), Wednesday April 22, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-04-17T16:36:40Z"},"road_event_id":"0HWKi/AoOoOZXVv+Dj9kKjxl4aA=","beginning_cross_street":"South of Brooks Blvd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.622856,40.531631]]}},{"id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3ZDro8caCoQz4ocqpovXIWdwpNs="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"3ZDro8caCoQz4ocqpovXIWdwpNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"xZMS+UMDYSCvKKijfeldyZMcnCo="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"3ZDro8caCoQz4ocqpovXIWdwpNs=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"xZMS+UMDYSCvKKijfeldyZMcnCo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"5VgMG7EvnKme2RrKbhkK0JtFLnM="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"xZMS+UMDYSCvKKijfeldyZMcnCo=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"5VgMG7EvnKme2RrKbhkK0JtFLnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"2T8ShafWItOuilhRp5hvGQkjBVc="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"5VgMG7EvnKme2RrKbhkK0JtFLnM=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"2T8ShafWItOuilhRp5hvGQkjBVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"N6zkkk3Sb5c9hSy3ul6MKV352OM="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"2T8ShafWItOuilhRp5hvGQkjBVc=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"N6zkkk3Sb5c9hSy3ul6MKV352OM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"wXobfzjUcpW9fN3w2lDWj26NU74="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"N6zkkk3Sb5c9hSy3ul6MKV352OM=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"wXobfzjUcpW9fN3w2lDWj26NU74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"dz53HtpPJU/6Ev7h4wQgl6m/YJw="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"wXobfzjUcpW9fN3w2lDWj26NU74=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"dz53HtpPJU/6Ev7h4wQgl6m/YJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"qtvccSmb60w30cBmJ9ffzchCaNQ="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"dz53HtpPJU/6Ev7h4wQgl6m/YJw=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"qtvccSmb60w30cBmJ9ffzchCaNQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"1jxcnzjplItEvolSlGCIxxvzQPk="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"qtvccSmb60w30cBmJ9ffzchCaNQ=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"1jxcnzjplItEvolSlGCIxxvzQPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="},{"type":"next-occurrence","id":"3/NaGcieI7pfdaCTsfe807uhL/o="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"1jxcnzjplItEvolSlGCIxxvzQPk=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"3/NaGcieI7pfdaCTsfe807uhL/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AN+XYgrtkaWhz+WVgWmN/K+3XpI="}],"description":"Signal repair and survey work on NY 94 both directions between Durland Road (Goshen) and North Main Street - NY 17A (Warwick) D265402/32356609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 9th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-20T09:59:28Z"},"road_event_id":"3/NaGcieI7pfdaCTsfe807uhL/o=","beginning_cross_street":"Durland Road","ending_cross_street":"North Main Street - NY 17A","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.341576,41.347307]]}},{"id":"s/g8veH7l0KGtrZfRAzltawm1hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"bwghEoLS97tewPqgHzxbIFhRv/c="}],"description":"Longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/32310409 - ROAD CLOSED NIGHTLY - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, all lanes closed and detoured","update_date":"2026-04-03T12:01:44Z"},"road_event_id":"s/g8veH7l0KGtrZfRAzltawm1hw=","beginning_cross_street":"NY 304","ending_cross_street":"Short Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94427,41.174774]]}},{"id":"bwghEoLS97tewPqgHzxbIFhRv/c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s/g8veH7l0KGtrZfRAzltawm1hw="},{"type":"next-occurrence","id":"tiqzE1wuzdvXSsrJwmgaXoWoAME="}],"description":"Longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/32310409 - ROAD CLOSED NIGHTLY - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, all lanes closed and detoured","update_date":"2026-04-03T12:01:44Z"},"road_event_id":"bwghEoLS97tewPqgHzxbIFhRv/c=","beginning_cross_street":"NY 304","ending_cross_street":"Short Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94427,41.174774]]}},{"id":"tiqzE1wuzdvXSsrJwmgaXoWoAME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s/g8veH7l0KGtrZfRAzltawm1hw="},{"type":"next-occurrence","id":"UC3h+IDUuyH2aDke/wFgMMtho4k="}],"description":"Longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/32310409 - ROAD CLOSED NIGHTLY - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, all lanes closed and detoured","update_date":"2026-04-03T12:01:44Z"},"road_event_id":"tiqzE1wuzdvXSsrJwmgaXoWoAME=","beginning_cross_street":"NY 304","ending_cross_street":"Short Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94427,41.174774]]}},{"id":"UC3h+IDUuyH2aDke/wFgMMtho4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s/g8veH7l0KGtrZfRAzltawm1hw="},{"type":"next-occurrence","id":"MVz82piGsmw7nT74TIqpUObYgRQ="}],"description":"Longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/32310409 - ROAD CLOSED NIGHTLY - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, all lanes closed and detoured","update_date":"2026-04-03T12:01:44Z"},"road_event_id":"UC3h+IDUuyH2aDke/wFgMMtho4k=","beginning_cross_street":"NY 304","ending_cross_street":"Short Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94427,41.174774]]}},{"id":"MVz82piGsmw7nT74TIqpUObYgRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"s/g8veH7l0KGtrZfRAzltawm1hw="}],"description":"Longterm construction on US 9W both directions between NY 304 (Haverstraw) and Short Clove Road (Haverstraw) 202308107656/32310409 - ROAD CLOSED NIGHTLY - This work is weather permitting. Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, all lanes closed and detoured","update_date":"2026-04-03T12:01:44Z"},"road_event_id":"MVz82piGsmw7nT74TIqpUObYgRQ=","beginning_cross_street":"NY 304","ending_cross_street":"Short Clove Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.94427,41.174774]]}},{"id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Ojx9/nGRW4DGOFw+28+atIZag/I="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"Ojx9/nGRW4DGOFw+28+atIZag/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"+2ONgYq0DmhjjcTf0nvZ9nYV+jM="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"Ojx9/nGRW4DGOFw+28+atIZag/I=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"+2ONgYq0DmhjjcTf0nvZ9nYV+jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"TNA5CXElMsKBGzwjlbYh8UqAg28="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"+2ONgYq0DmhjjcTf0nvZ9nYV+jM=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"TNA5CXElMsKBGzwjlbYh8UqAg28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"PpJqY05IeL+2Kxum98x5tOhmCjE="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"TNA5CXElMsKBGzwjlbYh8UqAg28=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"PpJqY05IeL+2Kxum98x5tOhmCjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"E/XGc88LLgUFufYlpFnM8nii0zQ="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"PpJqY05IeL+2Kxum98x5tOhmCjE=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"E/XGc88LLgUFufYlpFnM8nii0zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"Pft6ECEYERk0PSZqTWzr97IubfA="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"E/XGc88LLgUFufYlpFnM8nii0zQ=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"Pft6ECEYERk0PSZqTWzr97IubfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"QGEim/IVZ5VlaCw6LVkVnwvLn70="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"Pft6ECEYERk0PSZqTWzr97IubfA=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"QGEim/IVZ5VlaCw6LVkVnwvLn70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"9Okm/haf3Dh7p1kkunZ0aRxpPTw="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"QGEim/IVZ5VlaCw6LVkVnwvLn70=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"9Okm/haf3Dh7p1kkunZ0aRxpPTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"wK7HTbjznabeL0AxXUGzCe9qDGY="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"9Okm/haf3Dh7p1kkunZ0aRxpPTw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"wK7HTbjznabeL0AxXUGzCe9qDGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"w2PwccJBkHkWVosNJmHnXRum1L4="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"wK7HTbjznabeL0AxXUGzCe9qDGY=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"w2PwccJBkHkWVosNJmHnXRum1L4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"rQGRjyLQ2h3jM8gvlXV4nm4Hwsw="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"w2PwccJBkHkWVosNJmHnXRum1L4=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"rQGRjyLQ2h3jM8gvlXV4nm4Hwsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="},{"type":"next-occurrence","id":"/aG4U2wGDTsAv/qVQOGAOTks9Cw="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"rQGRjyLQ2h3jM8gvlXV4nm4Hwsw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"/aG4U2wGDTsAv/qVQOGAOTks9Cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GA+CUjU1Xb4IMjmTEDsCd1EIxXc="}],"description":"Bridge rehabilitation on I-84 eastbound between Exit 36A - I-87 (Newburgh) and Exit 37 - NY 52 (Gardnertown) D265160/B1026780/DAY/32448409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday April 25th, 2026, 10:00 AM thru 03:00 PM, various lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 2nd, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 4th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 9th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 11th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures, Saturday May 16th, 2026, 10:00 AM thru 02:00 PM, various lane closures, Monday May 18th, 2026 thru Thursday May 21st, 2026 Monday/ Tuesday/ Wednesday/ Thursday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-04-18T18:00:47Z"},"road_event_id":"/aG4U2wGDTsAv/qVQOGAOTks9Cw=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"Exit 37 - NY 52","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.049463,41.513497]]}},{"id":"nh46xIRIVTdpWtRewRbjIqf0AYs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRATFORD AVE"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on STRATFORD AVE both directions between FAIRFIELD AVE (Bridgeport) and KOSSUTH ST (Bridgeport) There will be lane shifts , Continuous Tuesday April 1st, 2025 09:00 AM thru Wednesday November 11th, 2026 11:59 PM All lanes open","update_date":"2025-01-23T15:49:57Z"},"road_event_id":"nh46xIRIVTdpWtRewRbjIqf0AYs=","beginning_cross_street":"FAIRFIELD AVE","ending_cross_street":"KOSSUTH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.187204,41.179664]]}},{"id":"kKlM0z8/ecjvzZBar6pC9BvLlJE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 between North of CR 514/Amwell Rd (Hillsborough Twp) and South of Brooks Blvd (Hillsborough Twp), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:36:35Z"},"road_event_id":"kKlM0z8/ecjvzZBar6pC9BvLlJE=","beginning_cross_street":"North of CR 514/Amwell Rd","ending_cross_street":"South of Brooks Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.632385,40.51324]]}},{"id":"Ziu8lnjjB7yGzmL4ULC0YdX43yM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 518/Washington St (Montgomery Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:36:34Z"},"road_event_id":"Ziu8lnjjB7yGzmL4ULC0YdX43yM=","beginning_cross_street":"South of CR 518/Washington St","ending_cross_street":"CR 518/Washington St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.651008,40.400485]]}},{"id":"ymw9OE0sI39zCsG81pJJM1/Qtno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"t2dkf+A0aZRBECf7ELYSApEvUkA="}],"description":"Utility work on NY 15 northbound between Jefferson Road; NY 252 (Henrietta) alternating lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed intermittently","update_date":"2026-04-22T17:24:19Z"},"road_event_id":"ymw9OE0sI39zCsG81pJJM1/Qtno=","beginning_cross_street":"Jefferson Road; NY 252","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640212,43.080783]]}},{"id":"t2dkf+A0aZRBECf7ELYSApEvUkA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ymw9OE0sI39zCsG81pJJM1/Qtno="},{"type":"next-occurrence","id":"B2gNMen+0zt3ZpSasAfQkj8YHOg="}],"description":"Utility work on NY 15 northbound between Jefferson Road; NY 252 (Henrietta) alternating lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed intermittently","update_date":"2026-04-22T17:24:19Z"},"road_event_id":"t2dkf+A0aZRBECf7ELYSApEvUkA=","beginning_cross_street":"Jefferson Road; NY 252","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640212,43.080783]]}},{"id":"B2gNMen+0zt3ZpSasAfQkj8YHOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ymw9OE0sI39zCsG81pJJM1/Qtno="},{"type":"next-occurrence","id":"F2e2JYkl1aoDrkjkh+swd4yOZfg="}],"description":"Utility work on NY 15 northbound between Jefferson Road; NY 252 (Henrietta) alternating lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed intermittently","update_date":"2026-04-22T17:24:19Z"},"road_event_id":"B2gNMen+0zt3ZpSasAfQkj8YHOg=","beginning_cross_street":"Jefferson Road; NY 252","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640212,43.080783]]}},{"id":"F2e2JYkl1aoDrkjkh+swd4yOZfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ymw9OE0sI39zCsG81pJJM1/Qtno="},{"type":"next-occurrence","id":"JjeoV3WgUodMdm3efLdBu3c0z0M="}],"description":"Utility work on NY 15 northbound between Jefferson Road; NY 252 (Henrietta) alternating lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed intermittently","update_date":"2026-04-22T17:24:19Z"},"road_event_id":"F2e2JYkl1aoDrkjkh+swd4yOZfg=","beginning_cross_street":"Jefferson Road; NY 252","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640212,43.080783]]}},{"id":"JjeoV3WgUodMdm3efLdBu3c0z0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ymw9OE0sI39zCsG81pJJM1/Qtno="}],"description":"Utility work on NY 15 northbound between Jefferson Road; NY 252 (Henrietta) alternating lane closures, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed intermittently","update_date":"2026-04-22T17:24:19Z"},"road_event_id":"JjeoV3WgUodMdm3efLdBu3c0z0M=","beginning_cross_street":"Jefferson Road; NY 252","ending_cross_street":"Jefferson Road; NY 252","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.640212,43.080783]]}},{"id":"nTUhf5t0EaoyEGMXP0hgW53CvV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HCndCpulmg5rHlh7K1Mr/5JFMtA="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"nTUhf5t0EaoyEGMXP0hgW53CvV0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"HCndCpulmg5rHlh7K1Mr/5JFMtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"8p6Y0o+sw7mCYqFaSOTW0SqSyo4="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"HCndCpulmg5rHlh7K1Mr/5JFMtA=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"8p6Y0o+sw7mCYqFaSOTW0SqSyo4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"qQllug0qVLpoEiN1qeuVua6WeLg="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"8p6Y0o+sw7mCYqFaSOTW0SqSyo4=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"qQllug0qVLpoEiN1qeuVua6WeLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"IDhMt0OIsQN7JVgLICAPOWQrZ+g="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"qQllug0qVLpoEiN1qeuVua6WeLg=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"IDhMt0OIsQN7JVgLICAPOWQrZ+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"A710gd5tEWDs4XKs/o7VZnFpaZo="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"IDhMt0OIsQN7JVgLICAPOWQrZ+g=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"A710gd5tEWDs4XKs/o7VZnFpaZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"sxQWwAYfgobXLlcK00ev9kmjbBQ="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"A710gd5tEWDs4XKs/o7VZnFpaZo=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"sxQWwAYfgobXLlcK00ev9kmjbBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"afQp8x1zHFIzRhlCqONlnzrOsAU="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"sxQWwAYfgobXLlcK00ev9kmjbBQ=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"afQp8x1zHFIzRhlCqONlnzrOsAU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"kq0P8JNJuIvd1Mz2qAXG9CihFH4="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"afQp8x1zHFIzRhlCqONlnzrOsAU=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"kq0P8JNJuIvd1Mz2qAXG9CihFH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"XDwh5b/MA0gUIpoAw8XlnHUMTBA="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"kq0P8JNJuIvd1Mz2qAXG9CihFH4=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"XDwh5b/MA0gUIpoAw8XlnHUMTBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"CUhI9ZyjtFtmviiLPbZwHKQ0Pg0="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"XDwh5b/MA0gUIpoAw8XlnHUMTBA=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"CUhI9ZyjtFtmviiLPbZwHKQ0Pg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"/E8GLMpUDH8v9tBFgLMWoANfud8="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"CUhI9ZyjtFtmviiLPbZwHKQ0Pg0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"/E8GLMpUDH8v9tBFgLMWoANfud8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"m0PzKCa2Xp4g1RXIqOGft0ia4wY="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"/E8GLMpUDH8v9tBFgLMWoANfud8=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"m0PzKCa2Xp4g1RXIqOGft0ia4wY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"VXgGYOrM4SJM5mABQviSaLr3HEg="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"m0PzKCa2Xp4g1RXIqOGft0ia4wY=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"VXgGYOrM4SJM5mABQviSaLr3HEg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="},{"type":"next-occurrence","id":"chSP2Moy0QUwsXTg3q+NtzaGg24="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"VXgGYOrM4SJM5mABQviSaLr3HEg=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"chSP2Moy0QUwsXTg3q+NtzaGg24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"nTUhf5t0EaoyEGMXP0hgW53CvV0="}],"description":"Reconstruction on I-91 northbound Entrance ramp Exit 16 - CT 15/East Main Street (Meriden) East Main Street on-Ramp to I-91 Northbound,A detour will be posted directing traffic eastly on East Main Street to Preston Avenue and to the I-691 Westbound on-Ramp. Once motorists on I-691 Westbound and finally take Exit 1A for I-91 Northbound or Exit 10 for Route 15 Northbound., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:09:05Z"},"road_event_id":"chSP2Moy0QUwsXTg3q+NtzaGg24=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768576,41.526287]]}},{"id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qQoyrCOgnLZduQ3FTQV01QgpYUI="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"qQoyrCOgnLZduQ3FTQV01QgpYUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"OQSXFLZuSf5H1rHf3Q8FIdS9jxo="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"qQoyrCOgnLZduQ3FTQV01QgpYUI=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"OQSXFLZuSf5H1rHf3Q8FIdS9jxo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"j/fvRvbUjojy6JAEfPgLydfNNyg="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"OQSXFLZuSf5H1rHf3Q8FIdS9jxo=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"j/fvRvbUjojy6JAEfPgLydfNNyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"0yiTqIIAFyfQCU+V8Q244q5Y+Zg="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"j/fvRvbUjojy6JAEfPgLydfNNyg=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"0yiTqIIAFyfQCU+V8Q244q5Y+Zg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"pF4IJufhjPU71F5otm0ngqw9Z74="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"0yiTqIIAFyfQCU+V8Q244q5Y+Zg=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"pF4IJufhjPU71F5otm0ngqw9Z74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"1Q+1+KzbU1SdwtzlhF2R0aWV1Ik="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"pF4IJufhjPU71F5otm0ngqw9Z74=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"1Q+1+KzbU1SdwtzlhF2R0aWV1Ik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"5hwECpt9q9oARv1b5FYWFTU6e24="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"1Q+1+KzbU1SdwtzlhF2R0aWV1Ik=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"5hwECpt9q9oARv1b5FYWFTU6e24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"xXaWrF6iFFfFhcMfPVbiDo7AJz8="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"5hwECpt9q9oARv1b5FYWFTU6e24=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"xXaWrF6iFFfFhcMfPVbiDo7AJz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"kfap3P6lYJhlEhbVIpMQndODwH4="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"xXaWrF6iFFfFhcMfPVbiDo7AJz8=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"kfap3P6lYJhlEhbVIpMQndODwH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"6scMJXlLwyBkvQn7Wo89Or2CXlc="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"kfap3P6lYJhlEhbVIpMQndODwH4=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"6scMJXlLwyBkvQn7Wo89Or2CXlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"m35PMuMOhKEabtLjxWRbuvcEjOg="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"6scMJXlLwyBkvQn7Wo89Or2CXlc=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"m35PMuMOhKEabtLjxWRbuvcEjOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"diybczteTW+3X6yQSzgOiwDraIs="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"m35PMuMOhKEabtLjxWRbuvcEjOg=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"diybczteTW+3X6yQSzgOiwDraIs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"Ywtr6jjgf4QV3OMBLGpoANdo3FM="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"diybczteTW+3X6yQSzgOiwDraIs=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"Ywtr6jjgf4QV3OMBLGpoANdo3FM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"b021FlkvD//Vn++NOISCtSn5SmE="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"Ywtr6jjgf4QV3OMBLGpoANdo3FM=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"b021FlkvD//Vn++NOISCtSn5SmE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"K87ey0JVKjVgmy7DquXg+Pms8KY="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"b021FlkvD//Vn++NOISCtSn5SmE=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"K87ey0JVKjVgmy7DquXg+Pms8KY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"/sz4FXsfNF9YO5RYApf9W+lA/lw="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"K87ey0JVKjVgmy7DquXg+Pms8KY=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"/sz4FXsfNF9YO5RYApf9W+lA/lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"mZMLuA910CueX9SMib029xoPl5Y="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"/sz4FXsfNF9YO5RYApf9W+lA/lw=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"mZMLuA910CueX9SMib029xoPl5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"e3Rq59ZeZORERLmrqgmbrPVijuo="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"mZMLuA910CueX9SMib029xoPl5Y=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"e3Rq59ZeZORERLmrqgmbrPVijuo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"mGNkCF2BJkVsQ3wCItjD9Pwj8nY="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"e3Rq59ZeZORERLmrqgmbrPVijuo=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"mGNkCF2BJkVsQ3wCItjD9Pwj8nY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"BFcbPJ4rH0aBEDgWSZbC/4BMEDk="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"mGNkCF2BJkVsQ3wCItjD9Pwj8nY=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"BFcbPJ4rH0aBEDgWSZbC/4BMEDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="},{"type":"next-occurrence","id":"3nSk3n4R8koHHW7/JaAeIj0cx0k="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"BFcbPJ4rH0aBEDgWSZbC/4BMEDk=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"3nSk3n4R8koHHW7/JaAeIj0cx0k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MILLER AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jcgJ0uMqKh8PnKIKU0KjlatnA4Q="}],"description":"Reconstruction on MILLER AVE both directions between RICE RD (Meriden) and ELMWOOD DR (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:05:55Z"},"road_event_id":"3nSk3n4R8koHHW7/JaAeIj0cx0k=","beginning_cross_street":"RICE RD","ending_cross_street":"ELMWOOD DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.783199,41.512814]]}},{"id":"6P0nq7pIfmlauJOp6l44kJIydu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zOtisWmBomwz797rG/4dgEU0gVw="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"6P0nq7pIfmlauJOp6l44kJIydu8=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"zOtisWmBomwz797rG/4dgEU0gVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"42aNDXpOoQDwr+Kn7WniwVmwbp8="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"zOtisWmBomwz797rG/4dgEU0gVw=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"42aNDXpOoQDwr+Kn7WniwVmwbp8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"r9VtvUqWVtXOziVmdBYdpotvXzs="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"42aNDXpOoQDwr+Kn7WniwVmwbp8=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"r9VtvUqWVtXOziVmdBYdpotvXzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"3F9qGyondfJqE/hqUfS7+JfWhE8="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"r9VtvUqWVtXOziVmdBYdpotvXzs=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"3F9qGyondfJqE/hqUfS7+JfWhE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"6G1vghPE41CitGhMM8u7Y+MT1Do="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"3F9qGyondfJqE/hqUfS7+JfWhE8=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"6G1vghPE41CitGhMM8u7Y+MT1Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"tyPDliVouUP273pHIA5aSwu4tCg="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"6G1vghPE41CitGhMM8u7Y+MT1Do=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"tyPDliVouUP273pHIA5aSwu4tCg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"dq+f+H92/nuDgGqR71b1YNlp6vs="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"tyPDliVouUP273pHIA5aSwu4tCg=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"dq+f+H92/nuDgGqR71b1YNlp6vs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"RsFnn7BnMaq8OYVTYncu2Obu32U="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"dq+f+H92/nuDgGqR71b1YNlp6vs=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"RsFnn7BnMaq8OYVTYncu2Obu32U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"CGDjIbi6UMrtBukHAuDsc9+OBmw="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"RsFnn7BnMaq8OYVTYncu2Obu32U=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"CGDjIbi6UMrtBukHAuDsc9+OBmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"NZ8MHhHYw+di2uSBd/HPwEJZCHU="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"CGDjIbi6UMrtBukHAuDsc9+OBmw=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"NZ8MHhHYw+di2uSBd/HPwEJZCHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"GOioVBSFmPMIWHUE54J0c4Mg5gY="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"NZ8MHhHYw+di2uSBd/HPwEJZCHU=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"GOioVBSFmPMIWHUE54J0c4Mg5gY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"QJsDGieJnrwgAXC4kVeZp4ODh7E="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"GOioVBSFmPMIWHUE54J0c4Mg5gY=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"QJsDGieJnrwgAXC4kVeZp4ODh7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"jN/z5GcJ8YjUlz9mc9cvEDQDxOg="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"QJsDGieJnrwgAXC4kVeZp4ODh7E=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"jN/z5GcJ8YjUlz9mc9cvEDQDxOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"cqK/vDIhRExTpj2kF6kGz9zPLVE="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"jN/z5GcJ8YjUlz9mc9cvEDQDxOg=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"cqK/vDIhRExTpj2kF6kGz9zPLVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"5gUkFc82psvmV0eJEGVBP3HoJEE="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"cqK/vDIhRExTpj2kF6kGz9zPLVE=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"5gUkFc82psvmV0eJEGVBP3HoJEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"exTHL+Yfs80wjiOh3i/jeELT/aw="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"5gUkFc82psvmV0eJEGVBP3HoJEE=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"exTHL+Yfs80wjiOh3i/jeELT/aw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"/lZl751xw12lxKIO92YYilUchvA="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"exTHL+Yfs80wjiOh3i/jeELT/aw=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"/lZl751xw12lxKIO92YYilUchvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"E8sijVEUJl96EWIhhLns+72QN3s="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"/lZl751xw12lxKIO92YYilUchvA=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"E8sijVEUJl96EWIhhLns+72QN3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"BLJNKLPcUtEo5znykwaw/WDg8rU="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"E8sijVEUJl96EWIhhLns+72QN3s=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"BLJNKLPcUtEo5znykwaw/WDg8rU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"vyBDn3zzFWLMMqHrKgr3vFOeFpY="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"BLJNKLPcUtEo5znykwaw/WDg8rU=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"vyBDn3zzFWLMMqHrKgr3vFOeFpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="},{"type":"next-occurrence","id":"d+JYKeUhDkmZaWwzp6JmCg55jlo="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"vyBDn3zzFWLMMqHrKgr3vFOeFpY=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"d+JYKeUhDkmZaWwzp6JmCg55jlo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Broad Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6P0nq7pIfmlauJOp6l44kJIydu8="}],"description":"Reconstruction on Broad Street both directions between Yale Acres Road (Meriden) and Platt Street Extension (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T16:03:45Z"},"road_event_id":"d+JYKeUhDkmZaWwzp6JmCg55jlo=","beginning_cross_street":"Yale Acres Road","ending_cross_street":"Platt Street Extension","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.786411,41.541607]]}},{"id":"lkckA2QEagOOX688jcJYJPa5aPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"K03VgY4tyh90Cp9AWhdqVDg6NOY="}],"description":"Due to Track repairs both directions, L Line between Bedford Av (New York) and Union Sq - 14 St (New York) all trains at 1 Av and 3 Av board from the Brooklyn-bound platform., Wednesday March 11th, 2026 thru Friday May 1st, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-03-08T20:54:56Z"},"road_event_id":"lkckA2QEagOOX688jcJYJPa5aPo=","beginning_cross_street":"Bedford Av","ending_cross_street":"Union Sq - 14 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:30:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956872,40.717304]]}},{"id":"K03VgY4tyh90Cp9AWhdqVDg6NOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lkckA2QEagOOX688jcJYJPa5aPo="},{"type":"next-occurrence","id":"Q6CAlvEh96IP9kEJ9EPvSp3Mv5Y="}],"description":"Due to Track repairs both directions, L Line between Bedford Av (New York) and Union Sq - 14 St (New York) all trains at 1 Av and 3 Av board from the Brooklyn-bound platform., Wednesday March 11th, 2026 thru Friday May 1st, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-03-08T20:54:56Z"},"road_event_id":"K03VgY4tyh90Cp9AWhdqVDg6NOY=","beginning_cross_street":"Bedford Av","ending_cross_street":"Union Sq - 14 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T05:30:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956872,40.717304]]}},{"id":"Q6CAlvEh96IP9kEJ9EPvSp3Mv5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lkckA2QEagOOX688jcJYJPa5aPo="},{"type":"next-occurrence","id":"XL6RE2xqRONVaOBpqbnh2UhiH4M="}],"description":"Due to Track repairs both directions, L Line between Bedford Av (New York) and Union Sq - 14 St (New York) all trains at 1 Av and 3 Av board from the Brooklyn-bound platform., Wednesday March 11th, 2026 thru Friday May 1st, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-03-08T20:54:56Z"},"road_event_id":"Q6CAlvEh96IP9kEJ9EPvSp3Mv5Y=","beginning_cross_street":"Bedford Av","ending_cross_street":"Union Sq - 14 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T05:30:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956872,40.717304]]}},{"id":"XL6RE2xqRONVaOBpqbnh2UhiH4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lkckA2QEagOOX688jcJYJPa5aPo="}],"description":"Due to Track repairs both directions, L Line between Bedford Av (New York) and Union Sq - 14 St (New York) all trains at 1 Av and 3 Av board from the Brooklyn-bound platform., Wednesday March 11th, 2026 thru Friday May 1st, 2026, Wednesday/Friday, 01:30 AM thru 05:00 AM","update_date":"2026-03-08T20:54:56Z"},"road_event_id":"XL6RE2xqRONVaOBpqbnh2UhiH4M=","beginning_cross_street":"Bedford Av","ending_cross_street":"Union Sq - 14 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T05:30:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.956872,40.717304]]}},{"id":"REsEMzuQ/dktv0PNbjysi90ZnfE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Zvxx+tUzd0tREQ2mGetAL2LBhVM="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"REsEMzuQ/dktv0PNbjysi90ZnfE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"Zvxx+tUzd0tREQ2mGetAL2LBhVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"yt8TgTL0OiF1sBMXHp/H4jb5Re4="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"Zvxx+tUzd0tREQ2mGetAL2LBhVM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"yt8TgTL0OiF1sBMXHp/H4jb5Re4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"OSVkFsNEqK3XhqxS8cSnLRxsccM="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"yt8TgTL0OiF1sBMXHp/H4jb5Re4=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"OSVkFsNEqK3XhqxS8cSnLRxsccM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"TvnwqKm3RRZxCNs3X4oYnNym62s="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"OSVkFsNEqK3XhqxS8cSnLRxsccM=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"TvnwqKm3RRZxCNs3X4oYnNym62s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"wHlpjPIde17yv13uhsVzlrOI/wo="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"TvnwqKm3RRZxCNs3X4oYnNym62s=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"wHlpjPIde17yv13uhsVzlrOI/wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"h29EEi6OZVBq2OYKpDssKELpIuw="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"wHlpjPIde17yv13uhsVzlrOI/wo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"h29EEi6OZVBq2OYKpDssKELpIuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"1sAkmBLlRmjOmK5TNYsuraSV1wo="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"h29EEi6OZVBq2OYKpDssKELpIuw=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"1sAkmBLlRmjOmK5TNYsuraSV1wo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"5g9cS0yEhP+nj8bJJ1Q7yqQwioc="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"1sAkmBLlRmjOmK5TNYsuraSV1wo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"5g9cS0yEhP+nj8bJJ1Q7yqQwioc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"SzKlANm4WwPhLsMxPYgM+UBw87w="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"5g9cS0yEhP+nj8bJJ1Q7yqQwioc=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"SzKlANm4WwPhLsMxPYgM+UBw87w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"qMFKdJ6bDlXuG3TaVVmHP1zo+5Q="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"SzKlANm4WwPhLsMxPYgM+UBw87w=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"qMFKdJ6bDlXuG3TaVVmHP1zo+5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"/tpM9qguWtqDnZC8zC13rPf/bxA="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"qMFKdJ6bDlXuG3TaVVmHP1zo+5Q=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"/tpM9qguWtqDnZC8zC13rPf/bxA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"tus3utwtlhG1XC8OnSPW2qGHzMo="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"/tpM9qguWtqDnZC8zC13rPf/bxA=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"tus3utwtlhG1XC8OnSPW2qGHzMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"2sk8d8APn9qjWpzAHlj/phT4jlQ="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"tus3utwtlhG1XC8OnSPW2qGHzMo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"2sk8d8APn9qjWpzAHlj/phT4jlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"SVdg7oRA/IgCuFQ17P2u4tvB1vc="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"2sk8d8APn9qjWpzAHlj/phT4jlQ=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"SVdg7oRA/IgCuFQ17P2u4tvB1vc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"u6OXU0X+ECN70nTqY6OAyzGLoqE="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"SVdg7oRA/IgCuFQ17P2u4tvB1vc=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"u6OXU0X+ECN70nTqY6OAyzGLoqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"vpcgjeYtdg87FM2wMjHc+DZvFaE="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"u6OXU0X+ECN70nTqY6OAyzGLoqE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"vpcgjeYtdg87FM2wMjHc+DZvFaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"KHWdTQDTBDNUmkSh1JmzTWgKVEo="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"vpcgjeYtdg87FM2wMjHc+DZvFaE=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"KHWdTQDTBDNUmkSh1JmzTWgKVEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"E7upxQ1Swih4hzbJy/gbrMEN1K0="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"KHWdTQDTBDNUmkSh1JmzTWgKVEo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"E7upxQ1Swih4hzbJy/gbrMEN1K0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"jASVdJMVSGP9JQoOMiUIB+Bmm+E="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"E7upxQ1Swih4hzbJy/gbrMEN1K0=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"jASVdJMVSGP9JQoOMiUIB+Bmm+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"jUM5ANyw0VomGZQKfsMsX6yuD1M="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"jASVdJMVSGP9JQoOMiUIB+Bmm+E=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"jUM5ANyw0VomGZQKfsMsX6yuD1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="},{"type":"next-occurrence","id":"StCnXnu3LT4X9rWfoK1RCe7RXSo="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"jUM5ANyw0VomGZQKfsMsX6yuD1M=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"StCnXnu3LT4X9rWfoK1RCe7RXSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GRAVEL ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"REsEMzuQ/dktv0PNbjysi90ZnfE="}],"description":"Reconstruction on GRAVEL ST both directions between HORSESHOE DR (Meriden) and BALDWIN AVE (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:59:54Z"},"road_event_id":"StCnXnu3LT4X9rWfoK1RCe7RXSo=","beginning_cross_street":"HORSESHOE DR","ending_cross_street":"BALDWIN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.773928,41.539648]]}},{"id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HLkboRbZOO7Xkg1L4C5xHZIJ0uY="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"HLkboRbZOO7Xkg1L4C5xHZIJ0uY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"DjJ2Tj0ejpMT1FtdR6GLF1rzrU0="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"HLkboRbZOO7Xkg1L4C5xHZIJ0uY=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"DjJ2Tj0ejpMT1FtdR6GLF1rzrU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"WkXOXBMYlHHEIhY0QcxH6HQArqQ="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"DjJ2Tj0ejpMT1FtdR6GLF1rzrU0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"WkXOXBMYlHHEIhY0QcxH6HQArqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"LxJkPtxxCSE6TTu8pahWUZweFxQ="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"WkXOXBMYlHHEIhY0QcxH6HQArqQ=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"LxJkPtxxCSE6TTu8pahWUZweFxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"jBPP8xThydISHpaBcN2yOTzn7EQ="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"LxJkPtxxCSE6TTu8pahWUZweFxQ=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"jBPP8xThydISHpaBcN2yOTzn7EQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"DJFEUp17YaHKBZrpwtVJJxZ+Pj0="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"jBPP8xThydISHpaBcN2yOTzn7EQ=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"DJFEUp17YaHKBZrpwtVJJxZ+Pj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"f7z9PL8awY3XKZ4DiMLe7CEQSEQ="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"DJFEUp17YaHKBZrpwtVJJxZ+Pj0=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"f7z9PL8awY3XKZ4DiMLe7CEQSEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"QaCHQqZX0gj05zeRH44UeLfd654="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"f7z9PL8awY3XKZ4DiMLe7CEQSEQ=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"QaCHQqZX0gj05zeRH44UeLfd654=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"jDnF5cfdXRjmNb2S67naH0xukas="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"QaCHQqZX0gj05zeRH44UeLfd654=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"jDnF5cfdXRjmNb2S67naH0xukas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"opYPRwAkmlT7ccU3bv7QNDnqUkw="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"jDnF5cfdXRjmNb2S67naH0xukas=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"opYPRwAkmlT7ccU3bv7QNDnqUkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"nrPxha4xmRiPDkEJC5flv4pWGvs="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"opYPRwAkmlT7ccU3bv7QNDnqUkw=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"nrPxha4xmRiPDkEJC5flv4pWGvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"qxUxjBAX8xqSs7Z4ajMqvbruqSo="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"nrPxha4xmRiPDkEJC5flv4pWGvs=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"qxUxjBAX8xqSs7Z4ajMqvbruqSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"01Zay/HBFIntjKm8O4WP0VLcu9I="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"qxUxjBAX8xqSs7Z4ajMqvbruqSo=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"01Zay/HBFIntjKm8O4WP0VLcu9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="},{"type":"next-occurrence","id":"0t5mrK6HNpFFOssI05Xr38ZfAXo="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"01Zay/HBFIntjKm8O4WP0VLcu9I=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"0t5mrK6HNpFFOssI05Xr38ZfAXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QfuSadZrWGeNCq8i2MrnfI/h0Yg="}],"description":"Reconstruction on I-91 northbound Exit ramp Exit 16 - CT 15/East Main Street (Meriden) A detour will be posted to direct the traffic to take Exit 17 to Route 15 NB, then take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally take right onto East Main Street., Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:18:59Z"},"road_event_id":"0t5mrK6HNpFFOssI05Xr38ZfAXo=","beginning_cross_street":"Exit 16 - CT 15/East Main Street","ending_cross_street":"Exit 16 - CT 15/East Main Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770966,41.519385]]}},{"id":"SfpX5v1q9TCfT4mZsxSSawir5bA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Ocean Av (Point Pleasant Beach), Wednesday April 22, 2026 08:00 AM thru 04:00 PM, right lane closed","update_date":"2026-04-17T13:37:25Z"},"road_event_id":"SfpX5v1q9TCfT4mZsxSSawir5bA=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"NJ 88","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dSvsKgxVbCPVFKSmR+5qLiaKyAA="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"dSvsKgxVbCPVFKSmR+5qLiaKyAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"Q5XT+m3ge/TQ4V5mgebevPxXT10="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"dSvsKgxVbCPVFKSmR+5qLiaKyAA=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"Q5XT+m3ge/TQ4V5mgebevPxXT10=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"CbQpWq7oO6dRrI40MGK112tlCYA="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"Q5XT+m3ge/TQ4V5mgebevPxXT10=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"CbQpWq7oO6dRrI40MGK112tlCYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"OcSSHcz/pIeo3AILZ/aZW2vfJWE="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"CbQpWq7oO6dRrI40MGK112tlCYA=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"OcSSHcz/pIeo3AILZ/aZW2vfJWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"wqiGmIXiWl7KYvTSmFCVEUMZjfI="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"OcSSHcz/pIeo3AILZ/aZW2vfJWE=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"wqiGmIXiWl7KYvTSmFCVEUMZjfI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"iugE45pATCYJGAXtdG1odL/AWlQ="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"wqiGmIXiWl7KYvTSmFCVEUMZjfI=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"iugE45pATCYJGAXtdG1odL/AWlQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"jjEWCErq0SYjMH04SRxWoPkFlec="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"iugE45pATCYJGAXtdG1odL/AWlQ=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"jjEWCErq0SYjMH04SRxWoPkFlec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"rwcqxyeGMLDRrKv16+I0aWtr8o4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"jjEWCErq0SYjMH04SRxWoPkFlec=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"rwcqxyeGMLDRrKv16+I0aWtr8o4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"aphLmaMKTuVkCbfEZDVVMU+qdg4="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"rwcqxyeGMLDRrKv16+I0aWtr8o4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"aphLmaMKTuVkCbfEZDVVMU+qdg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"0A74XIpC+7K47FivhVetXoNTynE="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"aphLmaMKTuVkCbfEZDVVMU+qdg4=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"0A74XIpC+7K47FivhVetXoNTynE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"RDAtNI9kMmuBj4G+boTIE3yipOg="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"0A74XIpC+7K47FivhVetXoNTynE=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"RDAtNI9kMmuBj4G+boTIE3yipOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"rrTDSgLO4HdrfGxgjLuyxZkALJw="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"RDAtNI9kMmuBj4G+boTIE3yipOg=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"rrTDSgLO4HdrfGxgjLuyxZkALJw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"zSPypqSj8Swt1fzPnAJ2tklNs3k="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"rrTDSgLO4HdrfGxgjLuyxZkALJw=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"zSPypqSj8Swt1fzPnAJ2tklNs3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="},{"type":"next-occurrence","id":"1p/ZSiFoF5KDQjNDukgTafZIfAw="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"zSPypqSj8Swt1fzPnAJ2tklNs3k=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"1p/ZSiFoF5KDQjNDukgTafZIfAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Croos Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8lFMyJ7fHA+iH8HpSPvVp7IK6tg="}],"description":"Reconstruction on Wilbur Croos Parkway northbound Exit ramp Exit 67 (Meriden) to Wilbur Cross Parkway at Exit 67 (Meriden) A detour will be posted directing traffic to take Exit 68 N-E to I-91 Northbound, then take Exit 18 to Route 66 Eastbound, then take Exit 1 to Preston Avenue and finally onto East Main Street. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:16:48Z"},"road_event_id":"1p/ZSiFoF5KDQjNDukgTafZIfAw=","beginning_cross_street":"Exit 67","ending_cross_street":"Exit 67","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.770277,41.522618]]}},{"id":"TWckfW5ZA0nXwLLhDVnoY7p0eVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound at West Farm Rd (Howell Twp) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, ramp","update_date":"2026-04-17T13:37:24Z"},"road_event_id":"TWckfW5ZA0nXwLLhDVnoY7p0eVI=","beginning_cross_street":"West Farm Rd","ending_cross_street":"West Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.249809,40.186172]]}},{"id":"c5bdSQOfZsmx20FmkfPgRtlmw0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"huUk/uJCy72v1z7QWuWPxvioLqc="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"c5bdSQOfZsmx20FmkfPgRtlmw0M=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"huUk/uJCy72v1z7QWuWPxvioLqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"lt26HfKPmWtRefAuovT96QSvdrQ="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"huUk/uJCy72v1z7QWuWPxvioLqc=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"lt26HfKPmWtRefAuovT96QSvdrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"vqgLwipQQA8Sc6pg5Ge6cRRgQic="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"lt26HfKPmWtRefAuovT96QSvdrQ=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"vqgLwipQQA8Sc6pg5Ge6cRRgQic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"Avr+ZwqK2uc+d1knO1m6kHkATEU="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"vqgLwipQQA8Sc6pg5Ge6cRRgQic=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"Avr+ZwqK2uc+d1knO1m6kHkATEU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"88Ha2WpX02la/STM8cuzfsh0Na8="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"Avr+ZwqK2uc+d1knO1m6kHkATEU=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"88Ha2WpX02la/STM8cuzfsh0Na8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"2SvCUBM/TgYxuted4MtxU/Zlyj4="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"88Ha2WpX02la/STM8cuzfsh0Na8=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"2SvCUBM/TgYxuted4MtxU/Zlyj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"jagJ4mGmsSD54vJFCXLMBHzKeHE="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"2SvCUBM/TgYxuted4MtxU/Zlyj4=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"jagJ4mGmsSD54vJFCXLMBHzKeHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"HZFpiDzLq0gHBYTq6BtUoauYAWw="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"jagJ4mGmsSD54vJFCXLMBHzKeHE=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"HZFpiDzLq0gHBYTq6BtUoauYAWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"zO8xKwsIk01n68RcxbeVRu/Tl/w="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"HZFpiDzLq0gHBYTq6BtUoauYAWw=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"zO8xKwsIk01n68RcxbeVRu/Tl/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"KtxKAK2qfX03VuKTBWp10TmSPBA="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"zO8xKwsIk01n68RcxbeVRu/Tl/w=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"KtxKAK2qfX03VuKTBWp10TmSPBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"8RJvBRR7pnVWL8s0SHpz+Ey3rdQ="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"KtxKAK2qfX03VuKTBWp10TmSPBA=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"8RJvBRR7pnVWL8s0SHpz+Ey3rdQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"2AqiRMPhsefchuc+D8TjusOYGl8="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"8RJvBRR7pnVWL8s0SHpz+Ey3rdQ=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"2AqiRMPhsefchuc+D8TjusOYGl8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"tHWl2elrczlPl2n6UrNutPniy1c="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"2AqiRMPhsefchuc+D8TjusOYGl8=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"tHWl2elrczlPl2n6UrNutPniy1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="},{"type":"next-occurrence","id":"esmyHxpNxxMZlfG5tduTTm3bwuQ="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"tHWl2elrczlPl2n6UrNutPniy1c=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"esmyHxpNxxMZlfG5tduTTm3bwuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c5bdSQOfZsmx20FmkfPgRtlmw0M="}],"description":"Reconstruction on Wilbur Cross Parkway northbound Exit ramp Exit 68 N/E (Meriden) A detour will be posted directing traffic to take Exit 68 W onto I-691 Westbound, then take Exit 28 to Lake Street then onto I-691 Eastbound on-ramp and finally taking entering I-91 Northbound at Exit 1A. , Monday March 10th, 2025 thru Thursday November 30th, 2028, Sunday thru Saturday, 09:00 PM thru 06:00 AM All lanes closed","update_date":"2025-03-13T16:13:34Z"},"road_event_id":"esmyHxpNxxMZlfG5tduTTm3bwuQ=","beginning_cross_street":"Exit 68 N/E","ending_cross_street":"Exit 68 N/E","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.768662,41.530704]]}},{"id":"1r1mGZm2Dvn9hO5/jqhKf4z99EY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of Cindy St (Old Bridge Twp) and South of Woodbridge Av (Woodbridge Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, , moving operation","update_date":"2026-04-20T18:01:12Z"},"road_event_id":"1r1mGZm2Dvn9hO5/jqhKf4z99EY=","beginning_cross_street":"South of Cindy St","ending_cross_street":"South of Woodbridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.307998,40.388965]]}},{"id":"o+XMyHsW9IoKUAWMmRCYJ9tg+BQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of Cindy St (Old Bridge Twp) and South of Woodbridge Av (Woodbridge Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, , moving operation","update_date":"2026-04-20T18:01:11Z"},"road_event_id":"o+XMyHsW9IoKUAWMmRCYJ9tg+BQ=","beginning_cross_street":"South of Cindy St","ending_cross_street":"South of Woodbridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.307998,40.388965]]}},{"id":"ogONU70GyW+IPtvw6LPUYZb/fq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound between East of Exit 47A - I-280 (Montville Twp) and Exit 55 - NJ 62/Union Blvd (Totowa), Thursday April 23, 2026 09:00 AM thru 02:00 PM, left lane closed, moving operation","update_date":"2026-04-20T18:01:14Z"},"road_event_id":"ogONU70GyW+IPtvw6LPUYZb/fq8=","beginning_cross_street":"East of Exit 47A - I-280","ending_cross_street":"Exit 55 - NJ 62/Union Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.332397,40.865604]]}},{"id":"/AOHqqR1QyRtwFql6AB7KSPXLVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between South of US 46 (Wayne Twp) and US 202 (Wayne Twp), Thursday April 23, 2026 02:00 PM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-04-20T18:01:07Z"},"road_event_id":"/AOHqqR1QyRtwFql6AB7KSPXLVo=","beginning_cross_street":"South of US 46","ending_cross_street":"US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T08:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.252151,40.89318]]}},{"id":"cfSpoewzw1jgB8m+lW08umQlJzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 310"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs and reconstruction on NY 310 both directions Ellis Road (Canton) to Morley Potsdam Road (Canton) Rte. 310 over tributary to Nettle Creek is now open to alternating one-way traffic. Traffic is being controlled by a temporary signal. Additional work at the site will be completed once the weather is more favorable. , Continuous Monday November 10th, 2025 12:00 AM thru Friday May 29th, 2026 11:59 PM All lanes open","update_date":"2026-04-07T15:59:54Z"},"road_event_id":"cfSpoewzw1jgB8m+lW08umQlJzs=","beginning_cross_street":"Ellis Road","ending_cross_street":"Morley Potsdam Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.149518,44.659017]]}},{"id":"af3A+AKjImEoFxBlIXQA4nz2yZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound near South of Alexander Av (Pequannock Twp), Thursday April 23, 2026 02:00 PM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-04-20T18:01:00Z"},"road_event_id":"af3A+AKjImEoFxBlIXQA4nz2yZM=","beginning_cross_street":"South of Alexander Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T08:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.279876,40.953052]]}},{"id":"V9BFha8SsURDezeO1iWnbH6ZwIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 03:00 AM, at least one lane closed","update_date":"2026-04-17T13:37:31Z"},"road_event_id":"V9BFha8SsURDezeO1iWnbH6ZwIY=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112869,39.931434]]}},{"id":"2FN6JbRodhSIxdggdKJrZRsLT+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near South of Exit 10A - NJ 168/Black Horse Pike (Gloucester Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-17T13:37:34Z"},"road_event_id":"2FN6JbRodhSIxdggdKJrZRsLT+w=","beginning_cross_street":"South of Exit 10A - NJ 168/Black Horse Pike","ending_cross_street":"North of Exit 10A - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.065277,39.814636]]}},{"id":"gR1TW5Vr26Jf+DLfBDw4nbPX4XI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound near Watson Dr (Washington Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T13:37:33Z"},"road_event_id":"gR1TW5Vr26Jf+DLfBDw4nbPX4XI=","beginning_cross_street":"Watson Dr","ending_cross_street":"CR 555/Stagecoach Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.038536,39.735107]]}},{"id":"BhdzJ8MFUqa3dlrXmObFXMpLY9g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM)","update_date":"2026-04-17T13:37:32Z"},"road_event_id":"BhdzJ8MFUqa3dlrXmObFXMpLY9g=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112869,39.931434]]}},{"id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XCIIwW0r/EhvQJXOE1c3NNaUjY8="}],"description":"Tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238/32312209 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-23T17:23:25Z"},"road_event_id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.441285]]}},{"id":"XCIIwW0r/EhvQJXOE1c3NNaUjY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA="},{"type":"next-occurrence","id":"Px7UOuUjgTwQM6nCVWZPl+R3yfY="}],"description":"Tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238/32312209 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-23T17:23:25Z"},"road_event_id":"XCIIwW0r/EhvQJXOE1c3NNaUjY8=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.441285]]}},{"id":"Px7UOuUjgTwQM6nCVWZPl+R3yfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA="},{"type":"next-occurrence","id":"/6V1KfKIJ8umgSA6UNuetCfJnps="}],"description":"Tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238/32312209 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-23T17:23:25Z"},"road_event_id":"Px7UOuUjgTwQM6nCVWZPl+R3yfY=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:30:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.441285]]}},{"id":"/6V1KfKIJ8umgSA6UNuetCfJnps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA="},{"type":"next-occurrence","id":"dPCP6zhVEC711lAMqAQQq09UVWc="}],"description":"Tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238/32312209 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-23T17:23:25Z"},"road_event_id":"/6V1KfKIJ8umgSA6UNuetCfJnps=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:30:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.441285]]}},{"id":"dPCP6zhVEC711lAMqAQQq09UVWc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA="},{"type":"next-occurrence","id":"RnOfi8S7KwzdS26TzVFStt7soGQ="}],"description":"Tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238/32312209 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-23T17:23:25Z"},"road_event_id":"dPCP6zhVEC711lAMqAQQq09UVWc=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:30:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.441285]]}},{"id":"RnOfi8S7KwzdS26TzVFStt7soGQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA="},{"type":"next-occurrence","id":"4u45LSkB2EU8Vd9RBjIRZXY5qrg="}],"description":"Tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238/32312209 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-23T17:23:25Z"},"road_event_id":"RnOfi8S7KwzdS26TzVFStt7soGQ=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:30:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.441285]]}},{"id":"4u45LSkB2EU8Vd9RBjIRZXY5qrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9D"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Wxz3szpKNV9X1UTAwTOSzUfWLCA="}],"description":"Tunnel repairs on NY 9D northbound between Fair Street (Cold Spring) and Hartsook Lane (Cold Spring) D265238/32312209 - TEMPORARY SIGNAL IN PLACE - Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 08:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-03-23T17:23:25Z"},"road_event_id":"4u45LSkB2EU8Vd9RBjIRZXY5qrg=","beginning_cross_street":"Fair Street","ending_cross_street":"Hartsook Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:30:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975961,41.441285]]}},{"id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"d/oQqF33ViazI96R7cF5imbjaEw="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"d/oQqF33ViazI96R7cF5imbjaEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"onqfzJQ/joGjYG74Z0QL6OS2iwE="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"d/oQqF33ViazI96R7cF5imbjaEw=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"onqfzJQ/joGjYG74Z0QL6OS2iwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"kkPWov83e6BcStvFos8jW+FKOUk="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"onqfzJQ/joGjYG74Z0QL6OS2iwE=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"kkPWov83e6BcStvFos8jW+FKOUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"SFG/7lGd7HB3vRo5sg/rEaAM8JI="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"kkPWov83e6BcStvFos8jW+FKOUk=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"SFG/7lGd7HB3vRo5sg/rEaAM8JI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"evpiuBcBz9hkmGSw2sM2eTBKqOI="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"SFG/7lGd7HB3vRo5sg/rEaAM8JI=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"evpiuBcBz9hkmGSw2sM2eTBKqOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"V2xAzCmTHhl7GUDitpXzltRRGnk="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"evpiuBcBz9hkmGSw2sM2eTBKqOI=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"V2xAzCmTHhl7GUDitpXzltRRGnk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"G/NCeuFYCcNaqkppng+XtnLf1/A="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"V2xAzCmTHhl7GUDitpXzltRRGnk=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"G/NCeuFYCcNaqkppng+XtnLf1/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"jdwDZRIhrmIgcTPihMapKOemquw="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"G/NCeuFYCcNaqkppng+XtnLf1/A=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"jdwDZRIhrmIgcTPihMapKOemquw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"Unqtd8w61Ts9OmXinTrv9JKFWI0="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"jdwDZRIhrmIgcTPihMapKOemquw=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"Unqtd8w61Ts9OmXinTrv9JKFWI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"U/LoFePKEUBSxJtoVN8/31Pchpc="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"Unqtd8w61Ts9OmXinTrv9JKFWI0=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"U/LoFePKEUBSxJtoVN8/31Pchpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"xsEIbq6n96vV9QtzOBtGp3YbG/w="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"U/LoFePKEUBSxJtoVN8/31Pchpc=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"xsEIbq6n96vV9QtzOBtGp3YbG/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="},{"type":"next-occurrence","id":"U9J+RxTiPyhJFFwH6hKaF3DnxG0="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"xsEIbq6n96vV9QtzOBtGp3YbG/w=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"U9J+RxTiPyhJFFwH6hKaF3DnxG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Wilbur Cross Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GjC0M4VQ5CXm8EifwNa0cQOnk3w="}],"description":"Reconstruction on Wilbur Cross Parkway both directions between Exit 66 - CT 68 (Wallingford) and Exit 67 - I-91 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 08:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-13T15:52:58Z"},"road_event_id":"U9J+RxTiPyhJFFwH6hKaF3DnxG0=","beginning_cross_street":"Exit 66 - CT 68","ending_cross_street":"Exit 67 - I-91","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.81216,41.489486]]}},{"id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"seYB7dxgUV123PDcnGKF5u1zQoE="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"seYB7dxgUV123PDcnGKF5u1zQoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"CQ/aNMIkTfmlHVUrKYpg274Ug6c="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"seYB7dxgUV123PDcnGKF5u1zQoE=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"CQ/aNMIkTfmlHVUrKYpg274Ug6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"TB7rAZfo77zL5mDBlrVGcfyHGOs="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"CQ/aNMIkTfmlHVUrKYpg274Ug6c=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"TB7rAZfo77zL5mDBlrVGcfyHGOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"n8hgf2q3xv12xNO5VZIv6xSTgqE="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"TB7rAZfo77zL5mDBlrVGcfyHGOs=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"n8hgf2q3xv12xNO5VZIv6xSTgqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"IuQcPM40r+Q/b+yEKGKMh8gd3S4="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"n8hgf2q3xv12xNO5VZIv6xSTgqE=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"IuQcPM40r+Q/b+yEKGKMh8gd3S4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"zGA2ubmIxN3MqivnVlqtBy4agIQ="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"IuQcPM40r+Q/b+yEKGKMh8gd3S4=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"zGA2ubmIxN3MqivnVlqtBy4agIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"wAv6TWhIjHgQbwQS1CblDORcCRw="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"zGA2ubmIxN3MqivnVlqtBy4agIQ=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"wAv6TWhIjHgQbwQS1CblDORcCRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"mVCLxOFuqMMQFPMq9W9IhdObbzA="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"wAv6TWhIjHgQbwQS1CblDORcCRw=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"mVCLxOFuqMMQFPMq9W9IhdObbzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"Zl2IJ/DGzesLKZkGTdJi54c1yI8="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"mVCLxOFuqMMQFPMq9W9IhdObbzA=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"Zl2IJ/DGzesLKZkGTdJi54c1yI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"law/DsGqQfKtdLc6pbdI2AuvPHI="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"Zl2IJ/DGzesLKZkGTdJi54c1yI8=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"law/DsGqQfKtdLc6pbdI2AuvPHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"5+gvEs8sthi221ecU8bDMy3pLSw="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"law/DsGqQfKtdLc6pbdI2AuvPHI=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"5+gvEs8sthi221ecU8bDMy3pLSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"3MmubxWSUHkDz4LlssnAxhTEa2M="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"5+gvEs8sthi221ecU8bDMy3pLSw=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"3MmubxWSUHkDz4LlssnAxhTEa2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"YSvWlAkY0nO+Gdxk4oeOa5vs8+0="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"3MmubxWSUHkDz4LlssnAxhTEa2M=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"YSvWlAkY0nO+Gdxk4oeOa5vs8+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"zcZJRGzDsvBqyiCdI83LMhfnC5c="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"YSvWlAkY0nO+Gdxk4oeOa5vs8+0=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"zcZJRGzDsvBqyiCdI83LMhfnC5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"BmFJI2gtjjxAM4ArAEHseaAYh/w="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"zcZJRGzDsvBqyiCdI83LMhfnC5c=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"BmFJI2gtjjxAM4ArAEHseaAYh/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"F+ctMZYFmAVvf6cJFzE3OXWkt1Y="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"BmFJI2gtjjxAM4ArAEHseaAYh/w=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"F+ctMZYFmAVvf6cJFzE3OXWkt1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"FFsD9mSzk8dCpmWy+M1Xzdg1V9k="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"F+ctMZYFmAVvf6cJFzE3OXWkt1Y=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"FFsD9mSzk8dCpmWy+M1Xzdg1V9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"dFLpM76DP64DhwgpkgKoQFjyCQY="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"FFsD9mSzk8dCpmWy+M1Xzdg1V9k=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"dFLpM76DP64DhwgpkgKoQFjyCQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"p1sW7ticsu6s4F6/xxQthbflrKU="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"dFLpM76DP64DhwgpkgKoQFjyCQY=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"p1sW7ticsu6s4F6/xxQthbflrKU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"E+b4dBEnT0S8MsTStOHlEcYLC8s="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"p1sW7ticsu6s4F6/xxQthbflrKU=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"E+b4dBEnT0S8MsTStOHlEcYLC8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"5TMDjzPG0JaSGkxFDm/mev5V7H0="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"E+b4dBEnT0S8MsTStOHlEcYLC8s=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"5TMDjzPG0JaSGkxFDm/mev5V7H0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"FBM/zhZl+O6oDdNfdDYglnVXWXY="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"5TMDjzPG0JaSGkxFDm/mev5V7H0=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"FBM/zhZl+O6oDdNfdDYglnVXWXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="},{"type":"next-occurrence","id":"oDgCyQxCjqf6mzG/vI/PY41J74o="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"FBM/zhZl+O6oDdNfdDYglnVXWXY=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"oDgCyQxCjqf6mzG/vI/PY41J74o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-691"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dwHLW+wb1AcP54S4Sgu3+jKrJh0="}],"description":"Reconstruction on I-691 both directions between Exit 3 - CT 10 (Cheshire) There will be lane closures , Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 06:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:49:28Z"},"road_event_id":"oDgCyQxCjqf6mzG/vI/PY41J74o=","beginning_cross_street":"Exit 3 - CT 10","ending_cross_street":"Exit 3 - CT 10","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.8849,41.556579]]}},{"id":"GOmtiAQPmaR+K/HeyJmrtlbZoIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound at West Farm Rd (Howell Twp) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-17T13:37:11Z"},"road_event_id":"GOmtiAQPmaR+K/HeyJmrtlbZoIM=","beginning_cross_street":"West Farm Rd","ending_cross_street":"West Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.249809,40.186172]]}},{"id":"DSZhOZp0S8O4vl9CartsmLGdSC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mPTuw6/bVVM16zExKe7v3sOcHTM="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"DSZhOZp0S8O4vl9CartsmLGdSC4=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"mPTuw6/bVVM16zExKe7v3sOcHTM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"dinzxkwVUazCj6eNndhySj5AeYM="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"mPTuw6/bVVM16zExKe7v3sOcHTM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"dinzxkwVUazCj6eNndhySj5AeYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"KAgnDPAb7Je+GxWeqBWEWD5jNwg="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"dinzxkwVUazCj6eNndhySj5AeYM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"KAgnDPAb7Je+GxWeqBWEWD5jNwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"2wWwOcHH3/0hrO87lF0tSaRh/5k="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"KAgnDPAb7Je+GxWeqBWEWD5jNwg=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"2wWwOcHH3/0hrO87lF0tSaRh/5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"NyoPyaF5pwfWSAf+tkx7vBihOEs="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"2wWwOcHH3/0hrO87lF0tSaRh/5k=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"NyoPyaF5pwfWSAf+tkx7vBihOEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"/t5/dJh26V757h5V3YXYvSJ5WCw="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"NyoPyaF5pwfWSAf+tkx7vBihOEs=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"/t5/dJh26V757h5V3YXYvSJ5WCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"wPUqMMqqC2s50nf5MBpiZf/tlok="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"/t5/dJh26V757h5V3YXYvSJ5WCw=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"wPUqMMqqC2s50nf5MBpiZf/tlok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"VustXQqMbqlz51sdYUplQxkmK7I="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"wPUqMMqqC2s50nf5MBpiZf/tlok=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"VustXQqMbqlz51sdYUplQxkmK7I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"2hNmRAX5xDZDrhNzGugXRjfrS+w="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"VustXQqMbqlz51sdYUplQxkmK7I=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"2hNmRAX5xDZDrhNzGugXRjfrS+w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"/s+Dip2h2oSqYrh+f8XVtvlFz6c="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"2hNmRAX5xDZDrhNzGugXRjfrS+w=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"/s+Dip2h2oSqYrh+f8XVtvlFz6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"0hKFNGJ2wxL+e0W/MLvpnz/t95c="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"/s+Dip2h2oSqYrh+f8XVtvlFz6c=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"0hKFNGJ2wxL+e0W/MLvpnz/t95c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"5Ih4zV8Fbu/Wl9xPwqYqYbgESVA="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"0hKFNGJ2wxL+e0W/MLvpnz/t95c=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"5Ih4zV8Fbu/Wl9xPwqYqYbgESVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"pRROZttxQnHuKiVrzny/rrEQKZM="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"5Ih4zV8Fbu/Wl9xPwqYqYbgESVA=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"pRROZttxQnHuKiVrzny/rrEQKZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"3EzE48W61EKCQDg0+kUNo2gJeu0="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"pRROZttxQnHuKiVrzny/rrEQKZM=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"3EzE48W61EKCQDg0+kUNo2gJeu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"6qx1a1wxZNw+Dd69jmwfgVd4xQc="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"3EzE48W61EKCQDg0+kUNo2gJeu0=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"6qx1a1wxZNw+Dd69jmwfgVd4xQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"jAV7JPvpjaxBuGy5/1fKtBwIV8s="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"6qx1a1wxZNw+Dd69jmwfgVd4xQc=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"jAV7JPvpjaxBuGy5/1fKtBwIV8s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"/TZysZKQrQ79wBl7SMhPdqVm5wY="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"jAV7JPvpjaxBuGy5/1fKtBwIV8s=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"/TZysZKQrQ79wBl7SMhPdqVm5wY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"elu68MYgcQJTSVf7Cl/2TiVzSd8="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"/TZysZKQrQ79wBl7SMhPdqVm5wY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T13:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"elu68MYgcQJTSVf7Cl/2TiVzSd8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"Ja/2lNPCdF1WgZDECKziIADaUQY="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"elu68MYgcQJTSVf7Cl/2TiVzSd8=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"Ja/2lNPCdF1WgZDECKziIADaUQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"XQAUCdKSTlp/H8CLv4KFsT2C3No="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"Ja/2lNPCdF1WgZDECKziIADaUQY=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"XQAUCdKSTlp/H8CLv4KFsT2C3No=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"76tIQZv4cfkYUBlz9RWscjOlRTI="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"XQAUCdKSTlp/H8CLv4KFsT2C3No=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"76tIQZv4cfkYUBlz9RWscjOlRTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"xm5Vt+iwSrhRlyvYuu+go1rkZGk="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"76tIQZv4cfkYUBlz9RWscjOlRTI=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"xm5Vt+iwSrhRlyvYuu+go1rkZGk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="},{"type":"next-occurrence","id":"OL944JqcpCbwcBbRZ3n1UhhT/tQ="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"xm5Vt+iwSrhRlyvYuu+go1rkZGk=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"OL944JqcpCbwcBbRZ3n1UhhT/tQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DSZhOZp0S8O4vl9CartsmLGdSC4="}],"description":"Reconstruction on I-91 both directions between Exit 15 - CT 68 (Wallingford) and Exit 18 - I-691 (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 07:00 PM thru 06:00 AM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, 07:00 PM thru 09:00 AM All lanes open","update_date":"2025-03-13T15:45:39Z"},"road_event_id":"OL944JqcpCbwcBbRZ3n1UhhT/tQ=","beginning_cross_street":"Exit 15 - CT 68","ending_cross_street":"Exit 18 - I-691","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.769415,41.480566]]}},{"id":"y7SweeboJG7XFnO5piIGKVvcjLw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3xxi7BTppuItI3qS6gqogCNCH5k="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"y7SweeboJG7XFnO5piIGKVvcjLw=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"3xxi7BTppuItI3qS6gqogCNCH5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"1J86qN3doAvcDatJr3yVPOfDeo0="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"3xxi7BTppuItI3qS6gqogCNCH5k=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"1J86qN3doAvcDatJr3yVPOfDeo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"sBTCHxwCaoymMwVhbjo0gA+NAP0="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"1J86qN3doAvcDatJr3yVPOfDeo0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"sBTCHxwCaoymMwVhbjo0gA+NAP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"LtaeEg5GtlUA8dc8lMHRmPrB8mg="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"sBTCHxwCaoymMwVhbjo0gA+NAP0=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"LtaeEg5GtlUA8dc8lMHRmPrB8mg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"YQohn/nzoXvkNaCCDzzOd9ifGxE="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"LtaeEg5GtlUA8dc8lMHRmPrB8mg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"YQohn/nzoXvkNaCCDzzOd9ifGxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"jk1nnJi3sxaafE1tS5oOrdBmii4="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"YQohn/nzoXvkNaCCDzzOd9ifGxE=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"jk1nnJi3sxaafE1tS5oOrdBmii4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"kk2vI8TN4zQib26oAuP/IW61Umc="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"jk1nnJi3sxaafE1tS5oOrdBmii4=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"kk2vI8TN4zQib26oAuP/IW61Umc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"TDAb3cwYEznzt3Bvqaz5M+4zACg="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"kk2vI8TN4zQib26oAuP/IW61Umc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"TDAb3cwYEznzt3Bvqaz5M+4zACg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"ZDxhCbXSYbAfafySc4kDN+hhIyQ="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"TDAb3cwYEznzt3Bvqaz5M+4zACg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"ZDxhCbXSYbAfafySc4kDN+hhIyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"nGl1RqhNlf2Nrl6MXBYR6NX7n3A="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"ZDxhCbXSYbAfafySc4kDN+hhIyQ=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"nGl1RqhNlf2Nrl6MXBYR6NX7n3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"+Qgnvmt7S/nARvtvLjpYAxLI/WU="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"nGl1RqhNlf2Nrl6MXBYR6NX7n3A=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"+Qgnvmt7S/nARvtvLjpYAxLI/WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"/u4/r/806BYX0p+ZI/SUlVAw7xI="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"+Qgnvmt7S/nARvtvLjpYAxLI/WU=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"/u4/r/806BYX0p+ZI/SUlVAw7xI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"0IPQlw0gSBB315gW+tmXF8GyjV4="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"/u4/r/806BYX0p+ZI/SUlVAw7xI=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"0IPQlw0gSBB315gW+tmXF8GyjV4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"2q3Qbmx2lFEZM7nAhA3Ul2vI8vY="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"0IPQlw0gSBB315gW+tmXF8GyjV4=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"2q3Qbmx2lFEZM7nAhA3Ul2vI8vY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"e0IhVna+5ntnISwj84i0oll7hnE="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"2q3Qbmx2lFEZM7nAhA3Ul2vI8vY=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"e0IhVna+5ntnISwj84i0oll7hnE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"Grq2Sg1VFNoebAgoON967v8oKOk="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"e0IhVna+5ntnISwj84i0oll7hnE=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"Grq2Sg1VFNoebAgoON967v8oKOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"badiGPGazKR3TuNRb8m7DdOzMBg="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"Grq2Sg1VFNoebAgoON967v8oKOk=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"badiGPGazKR3TuNRb8m7DdOzMBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"E3lHj2gZUcxzTVQ4AOpWXwslZFc="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"badiGPGazKR3TuNRb8m7DdOzMBg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"E3lHj2gZUcxzTVQ4AOpWXwslZFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"giT43Emc2XNvenh7wAQr1ujjLYc="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"E3lHj2gZUcxzTVQ4AOpWXwslZFc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"giT43Emc2XNvenh7wAQr1ujjLYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"MS7az+wh1VKTmkdz2bsRtKJfXXI="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"giT43Emc2XNvenh7wAQr1ujjLYc=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"MS7az+wh1VKTmkdz2bsRtKJfXXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="},{"type":"next-occurrence","id":"pW9obW73SnzmplQ9F1scG2yXJyg="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"MS7az+wh1VKTmkdz2bsRtKJfXXI=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"pW9obW73SnzmplQ9F1scG2yXJyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E MAIN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"y7SweeboJG7XFnO5piIGKVvcjLw="}],"description":"Reconstruction on E MAIN ST both directions between PARKWAY PL (Meriden) and BEE ST (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:57:51Z"},"road_event_id":"pW9obW73SnzmplQ9F1scG2yXJyg=","beginning_cross_street":"PARKWAY PL","ending_cross_street":"BEE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.771784,41.526906]]}},{"id":"Z+rzqulXLef8zZ53CcsecG9MPfo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between NJ 70 (Pennsauken Twp) and South of NJ 73 (Pennsauken Twp), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, at least one lane closed","update_date":"2026-04-20T18:00:54Z"},"road_event_id":"Z+rzqulXLef8zZ53CcsecG9MPfo=","beginning_cross_street":"NJ 70","ending_cross_street":"South of NJ 73","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.082199,39.934108]]}},{"id":"n+4ujOMkcUMcOp7z2/DXn4MeowU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cxsD4LJni7xWG0DUGoLivIzBbTc="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"n+4ujOMkcUMcOp7z2/DXn4MeowU=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"cxsD4LJni7xWG0DUGoLivIzBbTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"OY+w5OkZ9pCOGJb7Y3iFQBCrxeo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"cxsD4LJni7xWG0DUGoLivIzBbTc=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T22:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"OY+w5OkZ9pCOGJb7Y3iFQBCrxeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"8e8otQo0IO6y0GOCfKJkh9n0AbU="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"OY+w5OkZ9pCOGJb7Y3iFQBCrxeo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"8e8otQo0IO6y0GOCfKJkh9n0AbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"Nct+wE1TOyW70kpXb4AnS5juCuA="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"8e8otQo0IO6y0GOCfKJkh9n0AbU=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Nct+wE1TOyW70kpXb4AnS5juCuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"MOfxJ5w1H8C5eGyjUTfNESVeGi4="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Nct+wE1TOyW70kpXb4AnS5juCuA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"MOfxJ5w1H8C5eGyjUTfNESVeGi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"LgRXYyCA2zPB9WfZ2kLp8gzY924="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"MOfxJ5w1H8C5eGyjUTfNESVeGi4=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"LgRXYyCA2zPB9WfZ2kLp8gzY924=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"F397oi6KNzFJS4//O8sI4GSLGQA="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"LgRXYyCA2zPB9WfZ2kLp8gzY924=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"F397oi6KNzFJS4//O8sI4GSLGQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"B3eBqGwtK7Qo1YU+q9xx9q2a0vo="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"F397oi6KNzFJS4//O8sI4GSLGQA=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"B3eBqGwtK7Qo1YU+q9xx9q2a0vo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"Hhj3swei8advzT4T/yQbDvLPt2Y="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"B3eBqGwtK7Qo1YU+q9xx9q2a0vo=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Hhj3swei8advzT4T/yQbDvLPt2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"1dk0g5ALvcGE8ZZYLpaX6g2T7tw="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Hhj3swei8advzT4T/yQbDvLPt2Y=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"1dk0g5ALvcGE8ZZYLpaX6g2T7tw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"XZFkPebj4tqiojoeTa1rFzj7838="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"1dk0g5ALvcGE8ZZYLpaX6g2T7tw=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"XZFkPebj4tqiojoeTa1rFzj7838=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"a1Qn/mWemWEFjy4iMozTBoAFY70="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"XZFkPebj4tqiojoeTa1rFzj7838=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"a1Qn/mWemWEFjy4iMozTBoAFY70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"O9AuBdrJDHJrDyaIoNh4MlJAIyY="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"a1Qn/mWemWEFjy4iMozTBoAFY70=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"O9AuBdrJDHJrDyaIoNh4MlJAIyY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"diozBMs/eY4o9PLlNoJ7u5L0ync="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"O9AuBdrJDHJrDyaIoNh4MlJAIyY=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"diozBMs/eY4o9PLlNoJ7u5L0ync=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"dKPYNmmHymH24jEvy1rUkBo2Rw8="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"diozBMs/eY4o9PLlNoJ7u5L0ync=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"dKPYNmmHymH24jEvy1rUkBo2Rw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"583W6KOugzFeEbN8YaCQUX7Dl4E="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"dKPYNmmHymH24jEvy1rUkBo2Rw8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"583W6KOugzFeEbN8YaCQUX7Dl4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"GleUUMcYhi2wTUNeyYIyO1CXa7Q="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"583W6KOugzFeEbN8YaCQUX7Dl4E=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"GleUUMcYhi2wTUNeyYIyO1CXa7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"BizEf/q79G+Gn1fEoG9yv9scrH8="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"GleUUMcYhi2wTUNeyYIyO1CXa7Q=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"BizEf/q79G+Gn1fEoG9yv9scrH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"b2jb1IfK90ZYlxriq3TC1DmiWLs="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"BizEf/q79G+Gn1fEoG9yv9scrH8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"b2jb1IfK90ZYlxriq3TC1DmiWLs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"P8Rzsiikj5tbSOSZlFwcOqCDZFM="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"b2jb1IfK90ZYlxriq3TC1DmiWLs=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"P8Rzsiikj5tbSOSZlFwcOqCDZFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="},{"type":"next-occurrence","id":"Fpc5u6KzGUOFBHcQ4BkxPMELck8="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"P8Rzsiikj5tbSOSZlFwcOqCDZFM=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"Fpc5u6KzGUOFBHcQ4BkxPMELck8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"n+4ujOMkcUMcOp7z2/DXn4MeowU="}],"description":"Reconstruction on PADDOCK AVE both directions between OVERLOOK RD (Meriden) There will be lane closures, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open, Monday March 10th, 2025 thru Thursday November 30th, 2028, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-13T15:55:40Z"},"road_event_id":"Fpc5u6KzGUOFBHcQ4BkxPMELck8=","beginning_cross_street":"OVERLOOK RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776116,41.516632]]}},{"id":"1ZTbxjHMIf0sNcxAHlFaMottJSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 621/Woodside Av (Newton), Wednesday April 22, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-20T18:00:59Z"},"road_event_id":"1ZTbxjHMIf0sNcxAHlFaMottJSs=","beginning_cross_street":"South of CR 621/Woodside Av","ending_cross_street":"South of CR 621/Woodside Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.763664,41.040073]]}},{"id":"bU4WKVpSazJbmAafcZ5MfiU0SEE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between West of Exit 55 - NJ 62/Union Blvd (Totowa) and East of Exit 47A - I-280 (Montville Twp), Thursday April 23, 2026 05:00 AM thru 06:00 AM, left lane closed, moving operation","update_date":"2026-04-20T18:00:50Z"},"road_event_id":"bU4WKVpSazJbmAafcZ5MfiU0SEE=","beginning_cross_street":"West of Exit 55 - NJ 62/Union Blvd","ending_cross_street":"East of Exit 47A - I-280","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T15:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.228744,40.898281]]}},{"id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kMKEQOp7KFgZMlnnJWyxHj2rEAk="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-03-31T15:07:48Z"},"road_event_id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"kMKEQOp7KFgZMlnnJWyxHj2rEAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk="},{"type":"next-occurrence","id":"SKAr1yAqLJHAwGPOLlq5npDFfCk="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-03-31T15:07:48Z"},"road_event_id":"kMKEQOp7KFgZMlnnJWyxHj2rEAk=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"SKAr1yAqLJHAwGPOLlq5npDFfCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk="},{"type":"next-occurrence","id":"uAtDA406WdfXbxLzlH2Iy798UA8="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-03-31T15:07:48Z"},"road_event_id":"SKAr1yAqLJHAwGPOLlq5npDFfCk=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"uAtDA406WdfXbxLzlH2Iy798UA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk="},{"type":"next-occurrence","id":"lJeaCSDGAmXRihIndyfqmM2+5dI="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-03-31T15:07:48Z"},"road_event_id":"uAtDA406WdfXbxLzlH2Iy798UA8=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"lJeaCSDGAmXRihIndyfqmM2+5dI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk="},{"type":"next-occurrence","id":"WgOh/WOrZgzIVfZqh7ZBtP7+bDk="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-03-31T15:07:48Z"},"road_event_id":"lJeaCSDGAmXRihIndyfqmM2+5dI=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"WgOh/WOrZgzIVfZqh7ZBtP7+bDk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk="},{"type":"next-occurrence","id":"jMJp7wMycedT06UGtETASRwxBUQ="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-03-31T15:07:48Z"},"road_event_id":"WgOh/WOrZgzIVfZqh7ZBtP7+bDk=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"jMJp7wMycedT06UGtETASRwxBUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-684"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"L9NoH4OD12pMzQ4cTpCw2+c84Bk="}],"description":"Sign work on I-684 northbound between Exit 6 - NY 35 - Katonah - Cross River (Bedford) and Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp (Lewisboro) D265342/32349509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-03-31T15:07:48Z"},"road_event_id":"jMJp7wMycedT06UGtETASRwxBUQ=","beginning_cross_street":"Exit 6 - NY 35 - Katonah - Cross River","ending_cross_street":"Exit 6A - NY 22 - NY 138 - Northbound Exit Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.682373,41.262104]]}},{"id":"vy3Lx2f9rOvsLPOZUaQOfvB8dz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 10"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 10 near West of Mount Pleasant Tpke (Denville Twp), Thursday April 23, 2026 04:00 PM thru Friday April 24, 2026 11:00 AM, right shoulder closed","update_date":"2026-04-20T18:00:49Z"},"road_event_id":"vy3Lx2f9rOvsLPOZUaQOfvB8dz4=","beginning_cross_street":"West of Mount Pleasant Tpke","ending_cross_street":"Cooper Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.509613,40.866683]]}},{"id":"CB3YOKljbYZI2qtWkGMp5RmHzyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 03:00 AM, at least one lane closed","update_date":"2026-04-17T13:37:16Z"},"road_event_id":"CB3YOKljbYZI2qtWkGMp5RmHzyw=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112869,39.931434]]}},{"id":"W7HRDdre0FGwkE61tp5TXXIR53E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NnRnGlJvsCGck2Mr7nVVL5VJGaY="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"W7HRDdre0FGwkE61tp5TXXIR53E=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T05:30:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"NnRnGlJvsCGck2Mr7nVVL5VJGaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W7HRDdre0FGwkE61tp5TXXIR53E="},{"type":"next-occurrence","id":"KGhwE9TcZ4XhEgIn3uRTivQSNOI="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"NnRnGlJvsCGck2Mr7nVVL5VJGaY=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T05:30:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"KGhwE9TcZ4XhEgIn3uRTivQSNOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W7HRDdre0FGwkE61tp5TXXIR53E="},{"type":"next-occurrence","id":"zpdktq4Zb3FGmv/ewWv7tgUmsK8="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"KGhwE9TcZ4XhEgIn3uRTivQSNOI=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T05:30:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"zpdktq4Zb3FGmv/ewWv7tgUmsK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"W7HRDdre0FGwkE61tp5TXXIR53E="}],"description":"Due to Track repairs both directions, L Line between Union Sq - 14 St (New York) and Bedford Av (New York) all trains at 3 Av and 1 Av board from the 8 Av-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the L line. , Tuesday March 10th, 2026 thru Thursday May 28th, 2026, Tuesday/Thursday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T18:28:19Z"},"road_event_id":"zpdktq4Zb3FGmv/ewWv7tgUmsK8=","beginning_cross_street":"Union Sq - 14 St","ending_cross_street":"Bedford Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T05:30:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.99073,40.734789]]}},{"id":"fIpqMB6BSbjO6ef5bAhNBLtn5xM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound near Watson Dr (Washington Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T13:37:15Z"},"road_event_id":"fIpqMB6BSbjO6ef5bAhNBLtn5xM=","beginning_cross_street":"Watson Dr","ending_cross_street":"CR 555/Stagecoach Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.038536,39.735107]]}},{"id":"U85EnFRZE3V0wnSZVLx07kYLGMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Ocean Av (Point Pleasant Beach), Friday April 24, 2026 08:00 AM thru 04:00 PM, right lane closed","update_date":"2026-04-17T13:37:22Z"},"road_event_id":"U85EnFRZE3V0wnSZVLx07kYLGMc=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"NJ 88","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"4nKbuMaFAIl824lTZggU8YBH2b0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near South of Exit 10A - NJ 168/Black Horse Pike (Gloucester Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 10:30 PM to 04:00 AM)","update_date":"2026-04-17T13:37:21Z"},"road_event_id":"4nKbuMaFAIl824lTZggU8YBH2b0=","beginning_cross_street":"South of Exit 10A - NJ 168/Black Horse Pike","ending_cross_street":"North of Exit 10A - NJ 168/Black Horse Pike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T06:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.065277,39.814636]]}},{"id":"o3nYQFh6FTNU9ejEIq3IPBM16pQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound between Watson Dr (Washington Twp) and North of CR 689/Cross Keys Berlin Rd (Washington Twp), Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T13:37:18Z"},"road_event_id":"o3nYQFh6FTNU9ejEIq3IPBM16pQ=","beginning_cross_street":"Watson Dr","ending_cross_street":"North of CR 689/Cross Keys Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.038536,39.735107]]}},{"id":"q3cJwBHWcAKYkJidZ8s0Oaf2yUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, M11 Bus at Amsterdam Av/W 62 St (New York) stop is being bypassed until 2028, use the stops on Amsterdam Ave at W 59th St or W 65th St, Continuous Thursday March 12th, 2026 07:43 AM thru Monday January 3rd, 2028 11:59 PM","update_date":"2026-03-12T11:43:37Z"},"road_event_id":"q3cJwBHWcAKYkJidZ8s0Oaf2yUQ=","beginning_cross_street":"Amsterdam Av/W 62 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985836,40.772642]]}},{"id":"sc99igOboeyVJ91U5ksUCbe8Uq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T14:33:20Z"},"road_event_id":"sc99igOboeyVJ91U5ksUCbe8Uq4=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"5BH0pDEkZnrQCR7nriwr+dQH9cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Both Directions between West of Exit 16 - CR 537/Great Adventure (Millstone Twp) and East of Exit 16 - CR 537/Great Adventure (Jackson Twp) Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-04-20T19:38:40Z"},"road_event_id":"5BH0pDEkZnrQCR7nriwr+dQH9cs=","beginning_cross_street":"West of Exit 16 - CR 537/Great Adventure","ending_cross_street":"East of Exit 16 - CR 537/Great Adventure","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.430389,40.1622]]}},{"id":"D/OSQyHfB3YQcwmnqbXPXCBB50Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FERRY ST"],"direction":"unknown","related_road_events":[],"description":"Repaving on FERRY ST both directions SCHUYLER ISLAND DR (Schuylerville) to NY 29 at NY 22 (Salem) Various, Tuesday April 21st, 2026 thru Wednesday April 22nd, 2026, Tuesday/Wednesday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-04-20T19:33:58Z"},"road_event_id":"D/OSQyHfB3YQcwmnqbXPXCBB50Q=","beginning_cross_street":"SCHUYLER ISLAND DR","ending_cross_street":"NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.573808,43.098196]]}},{"id":"gNIHzH/shWkqC6Ifb5u5I34rZ6c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 29"],"direction":"unknown","related_road_events":[],"description":"Repaving on NY 29 both directions Saratoga; Fulton County Line (Broadalbin) to FERRY ST at SCHUYLER ISLAND DR (Schuylerville) Various , Tuesday April 21st, 2026 thru Wednesday April 22nd, 2026, Tuesday/Wednesday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-20T19:34:55Z"},"road_event_id":"gNIHzH/shWkqC6Ifb5u5I34rZ6c=","beginning_cross_street":"Saratoga; Fulton County Line","ending_cross_street":"SCHUYLER ISLAND DR","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.110027,43.062349]]}},{"id":"zy/Smo4jn7znEo2XbaPU5pADjQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ypSr95hDjEStViDS5QyEnqt7qls="}],"description":"Utility work on NY 19 both directions between Mill St (Le Roy) and Randall Road; CR 8 (Le Roy) alternating lane closures, Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T00:49:18Z"},"road_event_id":"zy/Smo4jn7znEo2XbaPU5pADjQg=","beginning_cross_street":"Mill St","ending_cross_street":"Randall Road; CR 8","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.992249,42.982563]]}},{"id":"ypSr95hDjEStViDS5QyEnqt7qls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zy/Smo4jn7znEo2XbaPU5pADjQg="},{"type":"next-occurrence","id":"js55BB3EvGvWJWphtdW8X+0+WWw="}],"description":"Utility work on NY 19 both directions between Mill St (Le Roy) and Randall Road; CR 8 (Le Roy) alternating lane closures, Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T00:49:18Z"},"road_event_id":"ypSr95hDjEStViDS5QyEnqt7qls=","beginning_cross_street":"Mill St","ending_cross_street":"Randall Road; CR 8","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.992249,42.982563]]}},{"id":"js55BB3EvGvWJWphtdW8X+0+WWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zy/Smo4jn7znEo2XbaPU5pADjQg="},{"type":"next-occurrence","id":"ogh0BSylT/5AzRaHhMn1TdKSFzY="}],"description":"Utility work on NY 19 both directions between Mill St (Le Roy) and Randall Road; CR 8 (Le Roy) alternating lane closures, Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T00:49:18Z"},"road_event_id":"js55BB3EvGvWJWphtdW8X+0+WWw=","beginning_cross_street":"Mill St","ending_cross_street":"Randall Road; CR 8","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.992249,42.982563]]}},{"id":"ogh0BSylT/5AzRaHhMn1TdKSFzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zy/Smo4jn7znEo2XbaPU5pADjQg="}],"description":"Utility work on NY 19 both directions between Mill St (Le Roy) and Randall Road; CR 8 (Le Roy) alternating lane closures, Placing/splicing aerial/underground cable. Right/left lane/shoulder closure needed. Temp road closure needed for aerial crossing. Work beyond shoulder., Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-21T00:49:18Z"},"road_event_id":"ogh0BSylT/5AzRaHhMn1TdKSFzY=","beginning_cross_street":"Mill St","ending_cross_street":"Randall Road; CR 8","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.992249,42.982563]]}},{"id":"MPlyYVf8dX9dFxKi3329UakamgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T14:33:26Z"},"road_event_id":"MPlyYVf8dX9dFxKi3329UakamgY=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"z0WOhMKNvYxifxV6QVaqbgAW/sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GARDEN RD"],"direction":"unknown","related_road_events":[],"description":"Bridge work on GARDEN RD both directions RT-26 (Philadelphia) to Sophia Street (Philadelphia) Garden Rd over Indian River Bridge #P021Closed to Traffic until further notice, Continuous Thursday November 2nd, 2023 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed westbound; All lanes of 1 lanes closed eastbound, Continuous Thursday November 2nd, 2023 12:00 AM thru Thursday December 31st, 2026 11:59 PM All lanes closed","update_date":"2026-01-02T21:30:19Z"},"road_event_id":"z0WOhMKNvYxifxV6QVaqbgAW/sg=","beginning_cross_street":" RT-26","ending_cross_street":"Sophia Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.708586,44.158968]]}},{"id":"6Pclbq5HjlZNMM95pkfBGn1PUXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound near South of Maple Ave (Fair Lawn), Wednesday April 22, 2026 10:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T14:33:30Z"},"road_event_id":"6Pclbq5HjlZNMM95pkfBGn1PUXU=","beginning_cross_street":"South of Maple Ave","ending_cross_street":"North of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.135963,40.948986]]}},{"id":"7TMnht//tR87XcywUwWgWOug1Ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0+7K8D0Wigc9K3uNDXuUfzmvRw8="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"7TMnht//tR87XcywUwWgWOug1Ps=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"0+7K8D0Wigc9K3uNDXuUfzmvRw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"fgR08i98EBABu64u5W0klSIC8Uw="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"0+7K8D0Wigc9K3uNDXuUfzmvRw8=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"fgR08i98EBABu64u5W0klSIC8Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"Q0u8HxOL7SFxzfnHOmamxClJIwA="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"fgR08i98EBABu64u5W0klSIC8Uw=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"Q0u8HxOL7SFxzfnHOmamxClJIwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"sMBopNpHUB9hF9c7MClD/iKxb68="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"Q0u8HxOL7SFxzfnHOmamxClJIwA=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"sMBopNpHUB9hF9c7MClD/iKxb68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"KK6Rp5mwBqlTfL3L4n8Xl7T6jnM="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"sMBopNpHUB9hF9c7MClD/iKxb68=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T10:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"KK6Rp5mwBqlTfL3L4n8Xl7T6jnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"/Rq16A+/ZcYZZD5xmQajc1P2B5Y="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"KK6Rp5mwBqlTfL3L4n8Xl7T6jnM=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"/Rq16A+/ZcYZZD5xmQajc1P2B5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"eKHvq6dkKyZn9cOrB99Hzw7epNU="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"/Rq16A+/ZcYZZD5xmQajc1P2B5Y=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"eKHvq6dkKyZn9cOrB99Hzw7epNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"/1DAll1H6yWc84oX9APLG5ZNJCA="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"eKHvq6dkKyZn9cOrB99Hzw7epNU=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"/1DAll1H6yWc84oX9APLG5ZNJCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"Em7C3EP6Eyp9EVA4gYPXr0YXH8Y="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"/1DAll1H6yWc84oX9APLG5ZNJCA=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"Em7C3EP6Eyp9EVA4gYPXr0YXH8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"HPUcXHC5x1g66RUCqJnKP86lXxI="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"Em7C3EP6Eyp9EVA4gYPXr0YXH8Y=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"HPUcXHC5x1g66RUCqJnKP86lXxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"13EavSq9d55FfCiH2HtD82seHj8="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"HPUcXHC5x1g66RUCqJnKP86lXxI=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T10:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"13EavSq9d55FfCiH2HtD82seHj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"K25NDqCktxGtTc5xFVVQik9nQuE="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"13EavSq9d55FfCiH2HtD82seHj8=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T10:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"K25NDqCktxGtTc5xFVVQik9nQuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"R7kcGJc0zg2onax4dhAjfECWVDU="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"K25NDqCktxGtTc5xFVVQik9nQuE=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"R7kcGJc0zg2onax4dhAjfECWVDU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="},{"type":"next-occurrence","id":"pEH/sy0M56iwe1cmXWcFs7/bf+0="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"R7kcGJc0zg2onax4dhAjfECWVDU=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"pEH/sy0M56iwe1cmXWcFs7/bf+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7TMnht//tR87XcywUwWgWOug1Ps="}],"description":"Roadwork on I-481 southbound between Exit 10; I-81 N (Cicero) and Exit 5W - Kirkville Road; CR 53 (De Witt) ; Alternating lane closures, Thursday January 1st, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 06:00 PM All lanes open","update_date":"2026-03-12T10:55:01Z"},"road_event_id":"pEH/sy0M56iwe1cmXWcFs7/bf+0=","beginning_cross_street":"Exit 10; I-81 N","ending_cross_street":"Exit 5W - Kirkville Road; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.103447,43.140328]]}},{"id":"gGBSJ9ECUyevFZ4eFqtivwXYEcs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[],"description":"Due to Signal repairs both directions, 7 Line between Grand Central - 42 St (New York) and Court Sq (New York) all trains at Vernon Blvd-Jackson Av and Hunters Point Av board from the Manhattan-bound platform., Monday March 9th, 2026 thru Monday April 27th, 2026, 01:30 AM thru 05:00 AM","update_date":"2026-03-08T22:24:15Z"},"road_event_id":"gGBSJ9ECUyevFZ4eFqtivwXYEcs=","beginning_cross_street":"Grand Central - 42 St","ending_cross_street":"Court Sq","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T05:30:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976041,40.751431]]}},{"id":"rCC9T6/tS6NSPuOxrxx5/sre+e0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Uuhf8KJyxQszhS5rrjHhvVvjMuQ="}],"description":"Installation of traffic management systems on NY 250 both directions north of Penfield Road; NY 441 (Penfield), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T18:15:51Z"},"road_event_id":"rCC9T6/tS6NSPuOxrxx5/sre+e0=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44187,43.134777]]}},{"id":"Uuhf8KJyxQszhS5rrjHhvVvjMuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rCC9T6/tS6NSPuOxrxx5/sre+e0="},{"type":"next-occurrence","id":"iYkiJRnC1Q3kdn1S+opBBqGNFc0="}],"description":"Installation of traffic management systems on NY 250 both directions north of Penfield Road; NY 441 (Penfield), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T18:15:51Z"},"road_event_id":"Uuhf8KJyxQszhS5rrjHhvVvjMuQ=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44187,43.134777]]}},{"id":"iYkiJRnC1Q3kdn1S+opBBqGNFc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rCC9T6/tS6NSPuOxrxx5/sre+e0="},{"type":"next-occurrence","id":"k2UOwK+pssIfg1AYD/MW3X5ybpM="}],"description":"Installation of traffic management systems on NY 250 both directions north of Penfield Road; NY 441 (Penfield), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T18:15:51Z"},"road_event_id":"iYkiJRnC1Q3kdn1S+opBBqGNFc0=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44187,43.134777]]}},{"id":"k2UOwK+pssIfg1AYD/MW3X5ybpM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rCC9T6/tS6NSPuOxrxx5/sre+e0="},{"type":"next-occurrence","id":"XT5ToJkaLuOI7/CbIjYQhY3ZL5M="}],"description":"Installation of traffic management systems on NY 250 both directions north of Penfield Road; NY 441 (Penfield), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T18:15:51Z"},"road_event_id":"k2UOwK+pssIfg1AYD/MW3X5ybpM=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44187,43.134777]]}},{"id":"XT5ToJkaLuOI7/CbIjYQhY3ZL5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 250"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rCC9T6/tS6NSPuOxrxx5/sre+e0="}],"description":"Installation of traffic management systems on NY 250 both directions north of Penfield Road; NY 441 (Penfield), Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T18:15:51Z"},"road_event_id":"XT5ToJkaLuOI7/CbIjYQhY3ZL5M=","beginning_cross_street":"Penfield Road; NY 441","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.44187,43.134777]]}},{"id":"V8bUpbtB2CWf0G+FOKo/sfi4OPo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"T0TBUgNQwrE5QB0TjEy8JrREC2Q="}],"description":"Drainage improvements on I-490 both directions between Exit 24 - West Commercial Street (Pittsford) and Golf Ave (Pittsford), Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 04:00 PM 1 Left lane of 4 lanes","update_date":"2026-04-20T18:48:06Z"},"road_event_id":"V8bUpbtB2CWf0G+FOKo/sfi4OPo=","beginning_cross_street":"Exit 24 -  West Commercial Street","ending_cross_street":"Golf Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T08:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.50746,43.116912]]}},{"id":"T0TBUgNQwrE5QB0TjEy8JrREC2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V8bUpbtB2CWf0G+FOKo/sfi4OPo="},{"type":"next-occurrence","id":"W5gDjezESbBNoyrqjWEv/BDSVxs="}],"description":"Drainage improvements on I-490 both directions between Exit 24 - West Commercial Street (Pittsford) and Golf Ave (Pittsford), Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 04:00 PM 1 Left lane of 4 lanes","update_date":"2026-04-20T18:48:06Z"},"road_event_id":"T0TBUgNQwrE5QB0TjEy8JrREC2Q=","beginning_cross_street":"Exit 24 -  West Commercial Street","ending_cross_street":"Golf Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T08:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.50746,43.116912]]}},{"id":"W5gDjezESbBNoyrqjWEv/BDSVxs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"V8bUpbtB2CWf0G+FOKo/sfi4OPo="}],"description":"Drainage improvements on I-490 both directions between Exit 24 - West Commercial Street (Pittsford) and Golf Ave (Pittsford), Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 04:00 PM 1 Left lane of 4 lanes","update_date":"2026-04-20T18:48:06Z"},"road_event_id":"W5gDjezESbBNoyrqjWEv/BDSVxs=","beginning_cross_street":"Exit 24 -  West Commercial Street","ending_cross_street":"Golf Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T08:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.50746,43.116912]]}},{"id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z4t9FOrEWCEBwm6+Xw6MVmwleO4="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T16:00:00Z","end_date":"2026-04-28T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"z4t9FOrEWCEBwm6+Xw6MVmwleO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"poFsZzo/WhoPTEGvTdLywuToPlE="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"z4t9FOrEWCEBwm6+Xw6MVmwleO4=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T16:00:00Z","end_date":"2026-04-29T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"poFsZzo/WhoPTEGvTdLywuToPlE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"fviDjcyATPDktp1Bx1P5I7mSh9A="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"poFsZzo/WhoPTEGvTdLywuToPlE=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T16:00:00Z","end_date":"2026-04-30T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"fviDjcyATPDktp1Bx1P5I7mSh9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"HGYynX+RYQG4X7Wwsb6zClvkPuE="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"fviDjcyATPDktp1Bx1P5I7mSh9A=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T16:00:00Z","end_date":"2026-05-01T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"HGYynX+RYQG4X7Wwsb6zClvkPuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"PS1ApCSvXwlPZ9GFeGQgVhAnHJU="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"HGYynX+RYQG4X7Wwsb6zClvkPuE=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T16:00:00Z","end_date":"2026-05-02T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"PS1ApCSvXwlPZ9GFeGQgVhAnHJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"fBvtaMI1uUCez9V1tIrWQ3svEco="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"PS1ApCSvXwlPZ9GFeGQgVhAnHJU=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T16:00:00Z","end_date":"2026-05-03T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"fBvtaMI1uUCez9V1tIrWQ3svEco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"NKnJzaKvMqesXV9FUCtbn2vxjOc="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"fBvtaMI1uUCez9V1tIrWQ3svEco=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T16:00:00Z","end_date":"2026-05-04T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"NKnJzaKvMqesXV9FUCtbn2vxjOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"2DWvxh8eWPN615DkYSH2Aanhjzg="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"NKnJzaKvMqesXV9FUCtbn2vxjOc=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T16:00:00Z","end_date":"2026-05-05T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"2DWvxh8eWPN615DkYSH2Aanhjzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="},{"type":"next-occurrence","id":"yVW/AgxNM33xUllyFU9FKCOpYOI="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"2DWvxh8eWPN615DkYSH2Aanhjzg=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T16:00:00Z","end_date":"2026-05-06T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"yVW/AgxNM33xUllyFU9FKCOpYOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PIyuwl5gFgUIFnmmRD8gv4ZfG24="}],"description":"Street sweeping on I-86 both directions Exit 43 - NY 415; Ramp (Erwin) to Exit 48 - NY 352; Ramp (Corning) left lane closed merge right., Monday April 27th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 06:00 AM thru 04:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-20T18:18:58Z"},"road_event_id":"yVW/AgxNM33xUllyFU9FKCOpYOI=","beginning_cross_street":"Exit 43 - NY 415; Ramp","ending_cross_street":"Exit 48 - NY 352; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T16:00:00Z","end_date":"2026-05-07T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.108935,42.175758]]}},{"id":"lPRLoGvfXTfjx0b0N5p3LvbMRgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cGLAD0BpVHmGdNoDPchAHvlvXZY="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"lPRLoGvfXTfjx0b0N5p3LvbMRgk=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T16:00:00Z","end_date":"2026-05-05T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"cGLAD0BpVHmGdNoDPchAHvlvXZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lPRLoGvfXTfjx0b0N5p3LvbMRgk="},{"type":"next-occurrence","id":"yhkZH2MXrGxthM6uxrgkMBi/7/I="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"cGLAD0BpVHmGdNoDPchAHvlvXZY=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T16:00:00Z","end_date":"2026-05-06T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"yhkZH2MXrGxthM6uxrgkMBi/7/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 248"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lPRLoGvfXTfjx0b0N5p3LvbMRgk="}],"description":"Milling on NY 248 both directions Town of Independence; Town of West Union Line; Allegany-Steuben County Line (West Union) to CR 117; Rexville (West Union) 2 Lanes reduced to 1 Lane W/ Flaggers., Monday May 4th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 06:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T18:14:58Z"},"road_event_id":"yhkZH2MXrGxthM6uxrgkMBi/7/I=","beginning_cross_street":"Town of Independence; Town of West Union Line; Allegany-Steuben County Line","ending_cross_street":"CR 117; Rexville","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T16:00:00Z","end_date":"2026-05-07T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.75064,42.047831]]}},{"id":"tlvhqb7lPqFfi0QqFHlEr1GuRUk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rochester Inner Loop"],"direction":"unknown","related_road_events":[],"description":"Utility work on Rochester Inner Loop eastbound between State Street (Rochester) and Saint Paul Street (Rochester), Thursday April 23rd, 2026, 08:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T18:06:56Z"},"road_event_id":"tlvhqb7lPqFfi0QqFHlEr1GuRUk=","beginning_cross_street":"State Street","ending_cross_street":"Saint Paul Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.616159,43.15842]]}},{"id":"ZbVa7eTa6ZnAOKUkVqPe8UzH6ZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between CR 555/Stagecoach Rd (Washington Twp) and North of CR 655/Fries Mill Rd (Washington Twp), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T13:36:38Z"},"road_event_id":"ZbVa7eTa6ZnAOKUkVqPe8UzH6ZY=","beginning_cross_street":"CR 555/Stagecoach Rd","ending_cross_street":"North of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.032798,39.729408]]}},{"id":"UnkPaWxnwsT488af2PNh2+MmGWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between North of Ryan Rd/Symmes Rd (Manalapan Twp) and North of I-195 (Howell Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 05:59 AM, right lane closed","update_date":"2026-04-17T13:36:41Z"},"road_event_id":"UnkPaWxnwsT488af2PNh2+MmGWg=","beginning_cross_street":"North of Ryan Rd/Symmes Rd","ending_cross_street":"North of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T05:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.29895,40.293815]]}},{"id":"Vu4K6L6Y4Z8tzDrZ4/S+0gBEFJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Northbound near South of Ocean Av (Point Pleasant Beach), Thursday April 23, 2026 08:00 AM thru 04:00 PM, right lane closed","update_date":"2026-04-17T13:36:40Z"},"road_event_id":"Vu4K6L6Y4Z8tzDrZ4/S+0gBEFJM=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"NJ 88","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"+UfgCwb4yk2y7HT/D8Ys1cKK+Wc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9A"],"direction":"unknown","related_road_events":[],"description":"Road rehabilitation on NY 9A both directions between Browns Lane (Mount Pleasant) and Belmont Road (Mount Pleasant) 202508112781/32731409 - This work is weather permitting, Plan travel accordingly; delays may exist, Saturday May 2nd, 2026, 07:00 AM thru 02:00 PM, various lane closures","update_date":"2026-04-21T11:52:37Z"},"road_event_id":"+UfgCwb4yk2y7HT/D8Ys1cKK+Wc=","beginning_cross_street":"Browns Lane","ending_cross_street":"Belmont Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T01:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.813025,41.094298]]}},{"id":"kcl4uR/of7X6sE2X32HXXRrY7II=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mIuQs+9nLuWi8GLWw663U5Tg99A="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"kcl4uR/of7X6sE2X32HXXRrY7II=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"mIuQs+9nLuWi8GLWw663U5Tg99A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kcl4uR/of7X6sE2X32HXXRrY7II="},{"type":"next-occurrence","id":"Fs2TIDa5WgejPJvx02RQmxuzm0U="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"mIuQs+9nLuWi8GLWw663U5Tg99A=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"Fs2TIDa5WgejPJvx02RQmxuzm0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kcl4uR/of7X6sE2X32HXXRrY7II="},{"type":"next-occurrence","id":"t6qdELrFZLjC3K9oxSO2re10YtI="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"Fs2TIDa5WgejPJvx02RQmxuzm0U=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"t6qdELrFZLjC3K9oxSO2re10YtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kcl4uR/of7X6sE2X32HXXRrY7II="},{"type":"next-occurrence","id":"j29QE2tsKfMY/+wecYzVq2YeJ/U="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"t6qdELrFZLjC3K9oxSO2re10YtI=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"j29QE2tsKfMY/+wecYzVq2YeJ/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kcl4uR/of7X6sE2X32HXXRrY7II="},{"type":"next-occurrence","id":"wbcTcRUTYrV+8yzK94srkobSAiQ="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"j29QE2tsKfMY/+wecYzVq2YeJ/U=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"wbcTcRUTYrV+8yzK94srkobSAiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kcl4uR/of7X6sE2X32HXXRrY7II="},{"type":"next-occurrence","id":"TnTgkaP5r8e5zafEAJPQVamq6eg="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"wbcTcRUTYrV+8yzK94srkobSAiQ=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"TnTgkaP5r8e5zafEAJPQVamq6eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kcl4uR/of7X6sE2X32HXXRrY7II="},{"type":"next-occurrence","id":"YhJn7kIngeiSjpY3MnOPjjO0nmc="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"TnTgkaP5r8e5zafEAJPQVamq6eg=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"YhJn7kIngeiSjpY3MnOPjjO0nmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kcl4uR/of7X6sE2X32HXXRrY7II="}],"description":"Bridge maintenance operations and bridge painting on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue (Yorktown) D264582/DAY/B5502190/32231509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 11th, 2026 thru Thursday April 30th, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 06:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-12T13:12:44Z"},"road_event_id":"YhJn7kIngeiSjpY3MnOPjjO0nmc=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.812751,41.23741]]}},{"id":"ORC300522247","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 175TH ST"],"direction":"unknown","description":"Bridge inspection on E 175TH ST eastbound between WALTON AVE (New York) and GRAND CONCOURSE (New York) Not currently Scheduled","update_date":"2026-03-17T20:00:05Z"},"road_event_id":"ORC300522247","beginning_cross_street":"WALTON AVE","ending_cross_street":"GRAND CONCOURSE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-03-13T15:09:26Z","end_date":"2026-03-18T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.910592,40.846956]]}},{"id":"KnzX6Nu+T7EZAHcUxBhk+s1ikVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 near NJ 35/CR 629 (Berkeley Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T18:00:43Z"},"road_event_id":"KnzX6Nu+T7EZAHcUxBhk+s1ikVQ=","beginning_cross_street":"NJ 35/CR 629","ending_cross_street":"West of NJ 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.081817,39.940639]]}},{"id":"bE/7SGH9egbDDBi/SvysulPbM54=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 621/Woodside Av (Newton), Thursday April 23, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-20T18:00:40Z"},"road_event_id":"bE/7SGH9egbDDBi/SvysulPbM54=","beginning_cross_street":"South of CR 621/Woodside Av","ending_cross_street":"South of CR 621/Woodside Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.763664,41.040073]]}},{"id":"9bl2VGwBLRFsDKSfGjSDJ+akELI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 621/Woodside Av (Newton), Friday April 24, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-20T18:00:39Z"},"road_event_id":"9bl2VGwBLRFsDKSfGjSDJ+akELI=","beginning_cross_street":"South of CR 621/Woodside Av","ending_cross_street":"South of CR 621/Woodside Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.763664,41.040073]]}},{"id":"8V5/DA3WV/Hn1xKO2VHc6udRP8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound between NJ 38 (Pennsauken Twp) and South of NJ 73 (Pennsauken Twp), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-20T18:00:38Z"},"road_event_id":"8V5/DA3WV/Hn1xKO2VHc6udRP8I=","beginning_cross_street":"NJ 38","ending_cross_street":"South of NJ 73","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.081008,39.93478]]}},{"id":"jlK3JdoYXuDeg6/R671dQ2SfJGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound between New Jersey Turnpike (Edison Twp) and South of Exit 5 - CR 529/Stelton Rd (South Plainfield), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-20T18:00:33Z"},"road_event_id":"jlK3JdoYXuDeg6/R671dQ2SfJGc=","beginning_cross_street":"New Jersey Turnpike","ending_cross_street":"South of Exit 5 - CR 529/Stelton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.336959,40.528419]]}},{"id":"cPQvuKMBPgG9IQVtGT5r60NJz9c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound at West Farm Rd (Howell Twp) Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, ramp","update_date":"2026-04-17T13:37:02Z"},"road_event_id":"cPQvuKMBPgG9IQVtGT5r60NJz9c=","beginning_cross_street":"West Farm Rd","ending_cross_street":"West Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.249809,40.186172]]}},{"id":"+HCSThRU1HaAVhD7wNIoE7EsEE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between CR 555/Stagecoach Rd (Washington Twp) and North of CR 655/Fries Mill Rd (Washington Twp), Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T13:37:01Z"},"road_event_id":"+HCSThRU1HaAVhD7wNIoE7EsEE4=","beginning_cross_street":"CR 555/Stagecoach Rd","ending_cross_street":"North of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.032798,39.729408]]}},{"id":"ZzGcgGjvvrPmjYiW9CPZgivdUvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between North of Ryan Rd/Symmes Rd (Manalapan Twp) and North of I-195 (Howell Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, left lane closed","update_date":"2026-04-17T13:37:04Z"},"road_event_id":"ZzGcgGjvvrPmjYiW9CPZgivdUvs=","beginning_cross_street":"North of Ryan Rd/Symmes Rd","ending_cross_street":"North of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.29895,40.293815]]}},{"id":"U7wcwVPLGDL+uoALtwbYl6ltO7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WzEbDwUj2vP01CBqfcUZ09uO3T0="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"U7wcwVPLGDL+uoALtwbYl6ltO7o=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"WzEbDwUj2vP01CBqfcUZ09uO3T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"Flq2mZnFOhXiglyF3fOyBDAX/p0="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"WzEbDwUj2vP01CBqfcUZ09uO3T0=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"Flq2mZnFOhXiglyF3fOyBDAX/p0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"tHr8wUGX0oakjFBIbkPOmv7seYU="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"Flq2mZnFOhXiglyF3fOyBDAX/p0=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"tHr8wUGX0oakjFBIbkPOmv7seYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"pm26n+Ari89c4Gxsd4qloGukkEA="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"tHr8wUGX0oakjFBIbkPOmv7seYU=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:00:00Z","end_date":"2026-04-26T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"pm26n+Ari89c4Gxsd4qloGukkEA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"Q4GTDjYMU5lKZux13YIjyWMVNls="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"pm26n+Ari89c4Gxsd4qloGukkEA=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:00:00Z","end_date":"2026-04-27T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"Q4GTDjYMU5lKZux13YIjyWMVNls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"KFRVAaNSkINq2Py0jco0fICvdIg="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"Q4GTDjYMU5lKZux13YIjyWMVNls=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"KFRVAaNSkINq2Py0jco0fICvdIg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"jCogJRneHc/QBFjmfMPIC6z7M7M="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"KFRVAaNSkINq2Py0jco0fICvdIg=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"jCogJRneHc/QBFjmfMPIC6z7M7M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"V3Mi2gSkwVKWUcOUxWz8Mwxi3Xg="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"jCogJRneHc/QBFjmfMPIC6z7M7M=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"V3Mi2gSkwVKWUcOUxWz8Mwxi3Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"dFoSRyvXZ6JdxAXS+1CBwd3J1vQ="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"V3Mi2gSkwVKWUcOUxWz8Mwxi3Xg=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"dFoSRyvXZ6JdxAXS+1CBwd3J1vQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"Fkf8Ig38sDjwFdsAwCdGSt5XX68="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"dFoSRyvXZ6JdxAXS+1CBwd3J1vQ=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"Fkf8Ig38sDjwFdsAwCdGSt5XX68=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"F1VojW6ucgQVjj74Ja64EetZ/n8="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"Fkf8Ig38sDjwFdsAwCdGSt5XX68=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:00:00Z","end_date":"2026-05-03T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"F1VojW6ucgQVjj74Ja64EetZ/n8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"39vAPDkrIxbetXg+tdLq7181MmA="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"F1VojW6ucgQVjj74Ja64EetZ/n8=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:00:00Z","end_date":"2026-05-04T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"39vAPDkrIxbetXg+tdLq7181MmA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"cFdVeMvOErzrdLiTzZw/uQNhBHU="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"39vAPDkrIxbetXg+tdLq7181MmA=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"cFdVeMvOErzrdLiTzZw/uQNhBHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="},{"type":"next-occurrence","id":"vCBtP6C7NKYXaINHlgHpuzOm6O0="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"cFdVeMvOErzrdLiTzZw/uQNhBHU=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"vCBtP6C7NKYXaINHlgHpuzOm6O0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U7wcwVPLGDL+uoALtwbYl6ltO7o="}],"description":"Safety improvements on CT 2 westbound between Exit 9 - Neipsic Road (Glastonbury) and Exit 6 - Griswold Street (Glastonbury) There will be various lane closures on Route 2 westbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 10:00 PM thru 05:00 PM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 11:00 PM thru 08:00 AM All lanes open","update_date":"2025-03-10T16:05:36Z"},"road_event_id":"vCBtP6C7NKYXaINHlgHpuzOm6O0=","beginning_cross_street":"Exit 9 - Neipsic Road","ending_cross_street":"Exit 6 - Griswold Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.578774,41.707494]]}},{"id":"LYO0NNUD1eiDeDkhA9f0tj5DQo0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oHQa03xK4fcdvEGfqwE6uj173Mw="}],"description":"Utility work on NY 30A both directions between East State Street; NY 67 (Johnstown) and Fon Clair Street (Johnstown) Motorists will encounter lane and shoulder closures with flaggers in place, Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:05:48Z"},"road_event_id":"LYO0NNUD1eiDeDkhA9f0tj5DQo0=","beginning_cross_street":"East State Street; NY 67","ending_cross_street":"Fon Clair Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360442,42.998681]]}},{"id":"oHQa03xK4fcdvEGfqwE6uj173Mw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYO0NNUD1eiDeDkhA9f0tj5DQo0="},{"type":"next-occurrence","id":"yk0OP5/dC1hUY6kQ20ib47pxYaU="}],"description":"Utility work on NY 30A both directions between East State Street; NY 67 (Johnstown) and Fon Clair Street (Johnstown) Motorists will encounter lane and shoulder closures with flaggers in place, Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:05:48Z"},"road_event_id":"oHQa03xK4fcdvEGfqwE6uj173Mw=","beginning_cross_street":"East State Street; NY 67","ending_cross_street":"Fon Clair Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360442,42.998681]]}},{"id":"yk0OP5/dC1hUY6kQ20ib47pxYaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 30A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LYO0NNUD1eiDeDkhA9f0tj5DQo0="}],"description":"Utility work on NY 30A both directions between East State Street; NY 67 (Johnstown) and Fon Clair Street (Johnstown) Motorists will encounter lane and shoulder closures with flaggers in place, Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:05:48Z"},"road_event_id":"yk0OP5/dC1hUY6kQ20ib47pxYaU=","beginning_cross_street":"East State Street; NY 67","ending_cross_street":"Fon Clair Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.360442,42.998681]]}},{"id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eObQq3lHQ6Kb3vgf1dZH6QNpmHE="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"eObQq3lHQ6Kb3vgf1dZH6QNpmHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"pyGs/cZ2i5lKSRZ2XrW6fHEk1pI="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"eObQq3lHQ6Kb3vgf1dZH6QNpmHE=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"pyGs/cZ2i5lKSRZ2XrW6fHEk1pI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"quYi8f9wBIUG6rOYGZyPL5kIc1w="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"pyGs/cZ2i5lKSRZ2XrW6fHEk1pI=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"quYi8f9wBIUG6rOYGZyPL5kIc1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"RYHgUIkhj3XY4duoG/nn3snQPF8="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"quYi8f9wBIUG6rOYGZyPL5kIc1w=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T01:00:00Z","end_date":"2026-04-26T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"RYHgUIkhj3XY4duoG/nn3snQPF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"/6OCuEGF8fpvVC01s7BRz/CIvDI="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"RYHgUIkhj3XY4duoG/nn3snQPF8=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T01:00:00Z","end_date":"2026-04-27T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"/6OCuEGF8fpvVC01s7BRz/CIvDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"IM2U4x3U2cvoP/DSOwzzJ4yrc5E="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"/6OCuEGF8fpvVC01s7BRz/CIvDI=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T01:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"IM2U4x3U2cvoP/DSOwzzJ4yrc5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"8CPIEZf+APt4pf4vuwaTX+7xEsc="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"IM2U4x3U2cvoP/DSOwzzJ4yrc5E=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T01:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"8CPIEZf+APt4pf4vuwaTX+7xEsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"4iJoQTA1z5CH6i/2kjAZRSac/14="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"8CPIEZf+APt4pf4vuwaTX+7xEsc=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T01:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"4iJoQTA1z5CH6i/2kjAZRSac/14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"g8sx9E73eDUaeJWWqZkUoYRGypI="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"4iJoQTA1z5CH6i/2kjAZRSac/14=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T01:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"g8sx9E73eDUaeJWWqZkUoYRGypI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"VIJemb7FIUCpW2+5dF+EJSzR/p8="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"g8sx9E73eDUaeJWWqZkUoYRGypI=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"VIJemb7FIUCpW2+5dF+EJSzR/p8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"dXHPBKpFHs0QEuvYiLmpN0YvvjE="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"VIJemb7FIUCpW2+5dF+EJSzR/p8=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T01:00:00Z","end_date":"2026-05-03T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"dXHPBKpFHs0QEuvYiLmpN0YvvjE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"y14pn9/nY+PhRqbDDfwHDI/2nR8="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"dXHPBKpFHs0QEuvYiLmpN0YvvjE=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T01:00:00Z","end_date":"2026-05-04T11:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"y14pn9/nY+PhRqbDDfwHDI/2nR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"XCuzglqa4csnz3ruQ5q/cKfl1Ls="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"y14pn9/nY+PhRqbDDfwHDI/2nR8=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T01:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"XCuzglqa4csnz3ruQ5q/cKfl1Ls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="},{"type":"next-occurrence","id":"Pf6NphSGAtGw4R7NVS+P0epGYOY="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"XCuzglqa4csnz3ruQ5q/cKfl1Ls=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T01:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"Pf6NphSGAtGw4R7NVS+P0epGYOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT 2"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VgRFyvhBvZkHGUrdocGUR0PF+Sw="}],"description":"Safety improvements on CT 2 eastbound between Exit 6 - Griswold Street (Glastonbury) and Exit 7 - CT 17 (Glastonbury) There will be various lane closures on Route 2 eastbound, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Monday thru Friday, 09:00 PM thru 06:00 AM All lanes open, Tuesday April 1st, 2025 thru Friday November 13th, 2026, Saturday/ Sunday, 09:00 PM thru 07:00 AM All lanes open","update_date":"2025-03-10T15:59:42Z"},"road_event_id":"Pf6NphSGAtGw4R7NVS+P0epGYOY=","beginning_cross_street":"Exit 6 - Griswold Street","ending_cross_street":"Exit 7 - CT 17","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T01:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.61213,41.727237]]}},{"id":"30FlPOchBSXsD8iX3GBlV+8L208=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound between East of CR 575/Pomona Rd (Galloway Twp) and CR 623/Elmwood Rd (Mullica Twp), left shoulder, moving operation","update_date":"2026-04-20T18:00:32Z"},"road_event_id":"30FlPOchBSXsD8iX3GBlV+8L208=","beginning_cross_street":"East of CR 575/Pomona Rd","ending_cross_street":"CR 623/Elmwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.569549,39.474647]]}},{"id":"0bTdx6RqQYmai3l0ZnD5BuRIxB8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T13:36:58Z"},"road_event_id":"0bTdx6RqQYmai3l0ZnD5BuRIxB8=","beginning_cross_street":"North of NJ 38","ending_cross_street":"North of NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.077766,39.936237]]}},{"id":"swAdyMjKDfQd1P44tyB0wACOtIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T13:36:51Z"},"road_event_id":"swAdyMjKDfQd1P44tyB0wACOtIE=","beginning_cross_street":"North of CR 639/Ganttown Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.046707,39.75518]]}},{"id":"vJ3qlKFPl1zLphAz825a6wDYylU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T13:36:49Z"},"road_event_id":"vJ3qlKFPl1zLphAz825a6wDYylU=","beginning_cross_street":"North of CR 639/Ganttown Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.046707,39.75518]]}},{"id":"2rV3auT6mshcVRNnLYydtdbhcvY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lvBrI3yEMOeIu8DG2n0n8ABakXA="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"2rV3auT6mshcVRNnLYydtdbhcvY=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"lvBrI3yEMOeIu8DG2n0n8ABakXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"92ljhCSZTpXL1L+MgyyAr8IUYEc="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"lvBrI3yEMOeIu8DG2n0n8ABakXA=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"92ljhCSZTpXL1L+MgyyAr8IUYEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"iY/deH2dlw2h6Fazzc+OAVqjmWw="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"92ljhCSZTpXL1L+MgyyAr8IUYEc=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"iY/deH2dlw2h6Fazzc+OAVqjmWw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"Ke/PqlOf3HB4H8AMJZYEUerh4Mc="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"iY/deH2dlw2h6Fazzc+OAVqjmWw=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"Ke/PqlOf3HB4H8AMJZYEUerh4Mc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"ye7a/DSRe4wO7F5fgGbI6zPXjwk="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"Ke/PqlOf3HB4H8AMJZYEUerh4Mc=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"ye7a/DSRe4wO7F5fgGbI6zPXjwk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"jLLf6DE7i7cbBosmFKSh0dW6900="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"ye7a/DSRe4wO7F5fgGbI6zPXjwk=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"jLLf6DE7i7cbBosmFKSh0dW6900=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"KGDNgpy/AHqvFtyXgSYJvO39y5I="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"jLLf6DE7i7cbBosmFKSh0dW6900=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"KGDNgpy/AHqvFtyXgSYJvO39y5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"S5C7IRfewlUPJznoG1hp2uRukD4="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"KGDNgpy/AHqvFtyXgSYJvO39y5I=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"S5C7IRfewlUPJznoG1hp2uRukD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"iyBDHZYf5+Stimh379XL1VtdmY0="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"S5C7IRfewlUPJznoG1hp2uRukD4=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"iyBDHZYf5+Stimh379XL1VtdmY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="},{"type":"next-occurrence","id":"zym+dvkx1AejO9/ndzBwiKtsFwg="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"iyBDHZYf5+Stimh379XL1VtdmY0=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"zym+dvkx1AejO9/ndzBwiKtsFwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 178TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2rV3auT6mshcVRNnLYydtdbhcvY="}],"description":"Construction on E 178TH ST eastbound between ARTHUR AVE (New York) and HUGHES AVE (New York) for use of boom truck., Tuesday April 7th, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:28:41Z"},"road_event_id":"zym+dvkx1AejO9/ndzBwiKtsFwg=","beginning_cross_street":"ARTHUR AVE","ending_cross_street":"HUGHES AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892963,40.846943]]}},{"id":"wp3fog0UEZ6n9pBehIFMYxcNrN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xGINyTwHnv71tnePjjpr23alBvA="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"wp3fog0UEZ6n9pBehIFMYxcNrN4=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"xGINyTwHnv71tnePjjpr23alBvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"vyM0btdOFziv1LE3jAB+l4/EP1Y="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"xGINyTwHnv71tnePjjpr23alBvA=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"vyM0btdOFziv1LE3jAB+l4/EP1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"lUe+1+P0iNXDAN5mzkdD2CChrA8="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"vyM0btdOFziv1LE3jAB+l4/EP1Y=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"lUe+1+P0iNXDAN5mzkdD2CChrA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"aGeVpG8jH12BXpSPH2xVGxsXD14="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"lUe+1+P0iNXDAN5mzkdD2CChrA8=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"aGeVpG8jH12BXpSPH2xVGxsXD14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"qmomxhFzZIg44S8jiCWeRkAwFtw="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"aGeVpG8jH12BXpSPH2xVGxsXD14=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"qmomxhFzZIg44S8jiCWeRkAwFtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"uqWJU4choclLUD8hIO6Np0JpVS4="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"qmomxhFzZIg44S8jiCWeRkAwFtw=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"uqWJU4choclLUD8hIO6Np0JpVS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"udDN+0P45DTUf0iRB7SavXQqPPE="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"uqWJU4choclLUD8hIO6Np0JpVS4=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"udDN+0P45DTUf0iRB7SavXQqPPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"SgFCerCrHTWEc2yzdnTA/rKqGA0="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"udDN+0P45DTUf0iRB7SavXQqPPE=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"SgFCerCrHTWEc2yzdnTA/rKqGA0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"c3PatGTReAuqj22X03vxMycsiVA="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"SgFCerCrHTWEc2yzdnTA/rKqGA0=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"c3PatGTReAuqj22X03vxMycsiVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"cRaRpcorE/ziZyi5nMQGoTIxOtQ="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"c3PatGTReAuqj22X03vxMycsiVA=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"cRaRpcorE/ziZyi5nMQGoTIxOtQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"KUMqnHKnTcE+VV+xJZctreqomRI="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"cRaRpcorE/ziZyi5nMQGoTIxOtQ=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"KUMqnHKnTcE+VV+xJZctreqomRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="},{"type":"next-occurrence","id":"Km0qBJR/xgqERAe1/CWCoX+4708="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"KUMqnHKnTcE+VV+xJZctreqomRI=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"Km0qBJR/xgqERAe1/CWCoX+4708=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 165TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wp3fog0UEZ6n9pBehIFMYxcNrN4="}],"description":"Construction on E 165TH ST westbound between WHITLOCK AVE (New York) and LONGFELLOW AVE (New York) for new construction/concrete pump operations., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T18:27:00Z"},"road_event_id":"Km0qBJR/xgqERAe1/CWCoX+4708=","beginning_cross_street":"WHITLOCK AVE","ending_cross_street":"LONGFELLOW AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.886578,40.825276]]}},{"id":"VnYetqZfRla7usBo7pkvNPfcfsc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WASHINGTON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0s+NOZduS/UvHRRaHPFIgonGkNE="}],"description":"Crane operations on WASHINGTON AVE southbound between E 168TH ST (New York) and E 167TH ST (New York), Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Saturday May 9th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:29:40Z"},"road_event_id":"VnYetqZfRla7usBo7pkvNPfcfsc=","beginning_cross_street":"E 168TH ST","ending_cross_street":"E 167TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906869,40.831338]]}},{"id":"0s+NOZduS/UvHRRaHPFIgonGkNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WASHINGTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VnYetqZfRla7usBo7pkvNPfcfsc="},{"type":"next-occurrence","id":"hXrehlikBkMGv9IRJR1V1iln1x0="}],"description":"Crane operations on WASHINGTON AVE southbound between E 168TH ST (New York) and E 167TH ST (New York), Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Saturday May 9th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:29:40Z"},"road_event_id":"0s+NOZduS/UvHRRaHPFIgonGkNE=","beginning_cross_street":"E 168TH ST","ending_cross_street":"E 167TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906869,40.831338]]}},{"id":"hXrehlikBkMGv9IRJR1V1iln1x0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WASHINGTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VnYetqZfRla7usBo7pkvNPfcfsc="},{"type":"next-occurrence","id":"zIZn3VTX+xFxlcl1WWlywPRckPg="}],"description":"Crane operations on WASHINGTON AVE southbound between E 168TH ST (New York) and E 167TH ST (New York), Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Saturday May 9th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:29:40Z"},"road_event_id":"hXrehlikBkMGv9IRJR1V1iln1x0=","beginning_cross_street":"E 168TH ST","ending_cross_street":"E 167TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906869,40.831338]]}},{"id":"zIZn3VTX+xFxlcl1WWlywPRckPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WASHINGTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VnYetqZfRla7usBo7pkvNPfcfsc="}],"description":"Crane operations on WASHINGTON AVE southbound between E 168TH ST (New York) and E 167TH ST (New York), Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Saturday May 9th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:29:40Z"},"road_event_id":"zIZn3VTX+xFxlcl1WWlywPRckPg=","beginning_cross_street":"E 168TH ST","ending_cross_street":"E 167TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.906869,40.831338]]}},{"id":"MijICWOO5yDw4yMbhBfE8EqdIEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xaAIKgqtvtVJGu8ts27mVnSwVks="}],"description":"Pothole repair on US 6 both directions between Navajo Street (Yorktown) and Windsor Road (Yorktown) Res 8-8 RW/28912809 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Wednesday April 29th, 2026 Tuesday/ Wednesday, 09:30 AM thru 02:30 PM, alternating traffic","update_date":"2026-04-22T13:42:00Z"},"road_event_id":"MijICWOO5yDw4yMbhBfE8EqdIEY=","beginning_cross_street":"Navajo Street","ending_cross_street":"Windsor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783159,41.337103]]}},{"id":"xaAIKgqtvtVJGu8ts27mVnSwVks=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 6"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MijICWOO5yDw4yMbhBfE8EqdIEY="}],"description":"Pothole repair on US 6 both directions between Navajo Street (Yorktown) and Windsor Road (Yorktown) Res 8-8 RW/28912809 - This work is weather permitting, Plan travel accordingly; delays may exist, Tuesday April 28th, 2026 thru Wednesday April 29th, 2026 Tuesday/ Wednesday, 09:30 AM thru 02:30 PM, alternating traffic","update_date":"2026-04-22T13:42:00Z"},"road_event_id":"xaAIKgqtvtVJGu8ts27mVnSwVks=","beginning_cross_street":"Navajo Street","ending_cross_street":"Windsor Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783159,41.337103]]}},{"id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GzojcKFH5kPKpW8yK5kbMFZ5rIU="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"GzojcKFH5kPKpW8yK5kbMFZ5rIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"WBclMOVPSBVgzXAamoc7DSzwSyQ="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"GzojcKFH5kPKpW8yK5kbMFZ5rIU=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"WBclMOVPSBVgzXAamoc7DSzwSyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"+k5WKLMHPNLnU049ehGdvExoz1U="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"WBclMOVPSBVgzXAamoc7DSzwSyQ=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"+k5WKLMHPNLnU049ehGdvExoz1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"cn99I4ZkGdi1lsAX9/ZGEfl0RqI="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"+k5WKLMHPNLnU049ehGdvExoz1U=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"cn99I4ZkGdi1lsAX9/ZGEfl0RqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"hJpHwKkwJGSujV6n1EU2EGOHrGY="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"cn99I4ZkGdi1lsAX9/ZGEfl0RqI=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"hJpHwKkwJGSujV6n1EU2EGOHrGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"UTzLHh9SwulgcHM4DdRkIMukYQ8="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"hJpHwKkwJGSujV6n1EU2EGOHrGY=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"UTzLHh9SwulgcHM4DdRkIMukYQ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"KyOhY+p6a8gqIb1UcfUxTGO4zhM="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"UTzLHh9SwulgcHM4DdRkIMukYQ8=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"KyOhY+p6a8gqIb1UcfUxTGO4zhM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"RAnokZP7AF8JrGKcpqmv6EKQCPQ="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"KyOhY+p6a8gqIb1UcfUxTGO4zhM=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"RAnokZP7AF8JrGKcpqmv6EKQCPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="},{"type":"next-occurrence","id":"0oDA3cNypEcOtL+sHareb3bIDQs="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"RAnokZP7AF8JrGKcpqmv6EKQCPQ=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"0oDA3cNypEcOtL+sHareb3bIDQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 206TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KZdC8p3GqsnJ80Mwd9/JVxe8dtY="}],"description":"Construction on E 206TH ST both directions between E MOSHOLU PKWY S (New York) and ST GEORGES CRES (New York) for booming and pouring concrete., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T18:31:27Z"},"road_event_id":"0oDA3cNypEcOtL+sHareb3bIDQs=","beginning_cross_street":"E MOSHOLU PKWY S","ending_cross_street":"ST GEORGES CRES","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.883511,40.87576]]}},{"id":"Am1ymW3oH/v9cCjOue9cLqKORDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fOBFA6CGXEvEI1zIWRHQ12Zfe1Y="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"Am1ymW3oH/v9cCjOue9cLqKORDE=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"fOBFA6CGXEvEI1zIWRHQ12Zfe1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"fh8GEs7T63osEIZbUsaVlttm/hc="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"fOBFA6CGXEvEI1zIWRHQ12Zfe1Y=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"fh8GEs7T63osEIZbUsaVlttm/hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"37SRT5jIoyNgV07uE0uLtmRDUDw="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"fh8GEs7T63osEIZbUsaVlttm/hc=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"37SRT5jIoyNgV07uE0uLtmRDUDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"w855wWW41W6vPZ6oSli4R4QXkoA="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"37SRT5jIoyNgV07uE0uLtmRDUDw=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"w855wWW41W6vPZ6oSli4R4QXkoA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"AZUftp9gu4knIyDfv4KCtmspfhw="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"w855wWW41W6vPZ6oSli4R4QXkoA=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"AZUftp9gu4knIyDfv4KCtmspfhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"6g2BuTThGcgQ4dXQomX0rCWwmu8="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"AZUftp9gu4knIyDfv4KCtmspfhw=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"6g2BuTThGcgQ4dXQomX0rCWwmu8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"omhutjb2jQP0dHaUdYld3Bc0PPQ="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"6g2BuTThGcgQ4dXQomX0rCWwmu8=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"omhutjb2jQP0dHaUdYld3Bc0PPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"Fxcf3kmXbP2uciQ+dAJie+ZDxIM="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"omhutjb2jQP0dHaUdYld3Bc0PPQ=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"Fxcf3kmXbP2uciQ+dAJie+ZDxIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"koaMd7lFZqYleo1/YAIt2/M+mOs="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"Fxcf3kmXbP2uciQ+dAJie+ZDxIM=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"koaMd7lFZqYleo1/YAIt2/M+mOs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"ggSnzUGj+PZ0fy4s0IB8OQ2Jml8="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"koaMd7lFZqYleo1/YAIt2/M+mOs=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"ggSnzUGj+PZ0fy4s0IB8OQ2Jml8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"DdrGA0rS9W15GYlzV30pf38SvkM="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"ggSnzUGj+PZ0fy4s0IB8OQ2Jml8=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"DdrGA0rS9W15GYlzV30pf38SvkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"s+lre4T1oTTd1FG0k4HXpMHc+2o="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"DdrGA0rS9W15GYlzV30pf38SvkM=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"s+lre4T1oTTd1FG0k4HXpMHc+2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"/49GwWRKxeOdqIVfUfzHU5zEF9Y="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"s+lre4T1oTTd1FG0k4HXpMHc+2o=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"/49GwWRKxeOdqIVfUfzHU5zEF9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="},{"type":"next-occurrence","id":"/dCRUdnpLWgpuZaqr1WPDAnAtc0="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"/49GwWRKxeOdqIVfUfzHU5zEF9Y=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"/dCRUdnpLWgpuZaqr1WPDAnAtc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BRIDGE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Am1ymW3oH/v9cCjOue9cLqKORDE="}],"description":"Construction on BRIDGE ST eastbound between WHITEHALL ST (New York) and BROAD ST (New York) for use of knuckle boom and concrete pup for building alteration., Friday April 10th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:20:49Z"},"road_event_id":"/dCRUdnpLWgpuZaqr1WPDAnAtc0=","beginning_cross_street":"WHITEHALL ST","ending_cross_street":"BROAD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013065,40.703578]]}},{"id":"cSWriH8dTDUvsdJd3LQFXMNsAnQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 221"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on NY 221 both directions between Jennings Creek Rd (Lapeer) and Cooper Hill Rd (Lapeer) ; follow detour, Continuous Monday February 2nd, 2026 07:00 AM thru Monday September 21st, 2026 04:00 PM All lanes closed","update_date":"2026-03-12T11:08:21Z"},"road_event_id":"cSWriH8dTDUvsdJd3LQFXMNsAnQ=","beginning_cross_street":"Jennings Creek Rd","ending_cross_street":"Cooper Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.083494,42.425507]]}},{"id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"YxzcqUJBchoWZ+3Aj0jqq359T0w="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"YxzcqUJBchoWZ+3Aj0jqq359T0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="},{"type":"next-occurrence","id":"18DqNXM6fjdUa/6i/Z2zqR6n9Ig="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"YxzcqUJBchoWZ+3Aj0jqq359T0w=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"18DqNXM6fjdUa/6i/Z2zqR6n9Ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="},{"type":"next-occurrence","id":"yBP4AhyIg7VdKYHsK6xVMcl7sHA="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"18DqNXM6fjdUa/6i/Z2zqR6n9Ig=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"yBP4AhyIg7VdKYHsK6xVMcl7sHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="},{"type":"next-occurrence","id":"y14vlD86uE6BD492TIVVsjlXU1M="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"yBP4AhyIg7VdKYHsK6xVMcl7sHA=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"y14vlD86uE6BD492TIVVsjlXU1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="},{"type":"next-occurrence","id":"wx7ig+BsqYvXbKNX66EnchFgDHg="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"y14vlD86uE6BD492TIVVsjlXU1M=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"wx7ig+BsqYvXbKNX66EnchFgDHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="},{"type":"next-occurrence","id":"mGiu/pi6w0oWWJfPQSCQDdvedhw="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"wx7ig+BsqYvXbKNX66EnchFgDHg=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"mGiu/pi6w0oWWJfPQSCQDdvedhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="},{"type":"next-occurrence","id":"sexP6cpwjbMftnrM95Empg8srPg="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"mGiu/pi6w0oWWJfPQSCQDdvedhw=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"sexP6cpwjbMftnrM95Empg8srPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="},{"type":"next-occurrence","id":"qbba+zWsKU4OQ+fPZY5kvURWqqo="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"sexP6cpwjbMftnrM95Empg8srPg=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"qbba+zWsKU4OQ+fPZY5kvURWqqo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["COMMERCE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHkI5fv8VfYaOhYN6Z2M0XhKzoY="}],"description":"Construction on COMMERCE ST westbound between 7TH AVE S (New York) and BARROW ST (New York) for relay water and sewer services., Friday April 10th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T18:04:57Z"},"road_event_id":"qbba+zWsKU4OQ+fPZY5kvURWqqo=","beginning_cross_street":"7TH AVE S","ending_cross_street":"BARROW ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003879,40.731862]]}},{"id":"Aq/ucjZ5Fs+closOzkJHUasMBis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BARUCH DR"],"direction":"unknown","related_road_events":[],"description":"Construction on BARUCH DR southbound between DELANCEY ST (New York) and DELANCEY ST S (New York) for SANDRESPC-East Side Coastal Resiliency., Continuous Tuesday April 7th, 2026 12:00 AM thru Sunday May 10th, 2026 11:59 PM All lanes closed","update_date":"2026-04-07T17:56:03Z"},"road_event_id":"Aq/ucjZ5Fs+closOzkJHUasMBis=","beginning_cross_street":"DELANCEY ST","ending_cross_street":"DELANCEY ST S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.978053,40.715623]]}},{"id":"NuI+vWRLB4H9YIkFZTUrIdj+HI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ndcPpeQW4nGWJIwHkL78001vMmw="}],"description":"Overhead sign inspection on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D041200/32523409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:06:53Z"},"road_event_id":"NuI+vWRLB4H9YIkFZTUrIdj+HI4=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884502,40.911726]]}},{"id":"ndcPpeQW4nGWJIwHkL78001vMmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuI+vWRLB4H9YIkFZTUrIdj+HI4="},{"type":"next-occurrence","id":"V2T5t6DGfeQ2Slrty5+0cytrM4c="}],"description":"Overhead sign inspection on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D041200/32523409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:06:53Z"},"road_event_id":"ndcPpeQW4nGWJIwHkL78001vMmw=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884502,40.911726]]}},{"id":"V2T5t6DGfeQ2Slrty5+0cytrM4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuI+vWRLB4H9YIkFZTUrIdj+HI4="},{"type":"next-occurrence","id":"CPeEKM8iUZge4Yx3uXi+852Stlg="}],"description":"Overhead sign inspection on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D041200/32523409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:06:53Z"},"road_event_id":"V2T5t6DGfeQ2Slrty5+0cytrM4c=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884502,40.911726]]}},{"id":"CPeEKM8iUZge4Yx3uXi+852Stlg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuI+vWRLB4H9YIkFZTUrIdj+HI4="},{"type":"next-occurrence","id":"jIzIRpSJMkt+0UsVtIcX6dq7/HE="}],"description":"Overhead sign inspection on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D041200/32523409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:06:53Z"},"road_event_id":"CPeEKM8iUZge4Yx3uXi+852Stlg=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884502,40.911726]]}},{"id":"jIzIRpSJMkt+0UsVtIcX6dq7/HE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NuI+vWRLB4H9YIkFZTUrIdj+HI4="}],"description":"Overhead sign inspection on Saw Mill River Parkway northbound between Bronx-Westchester County Line (Yonkers) and Exit 4 - Cross County Parkway (Yonkers) D041200/32523409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:06:53Z"},"road_event_id":"jIzIRpSJMkt+0UsVtIcX6dq7/HE=","beginning_cross_street":"Bronx-Westchester County Line","ending_cross_street":"Exit 4 - Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.884502,40.911726]]}},{"id":"37KE5In8NVELk+r8b2ovTo2Bqek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0zVFD0DsoaWCw2Ygybe402T7jTU="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"37KE5In8NVELk+r8b2ovTo2Bqek=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"0zVFD0DsoaWCw2Ygybe402T7jTU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"Vq5uA+oauXE4LhKaG80bLYBjpyQ="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"0zVFD0DsoaWCw2Ygybe402T7jTU=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"Vq5uA+oauXE4LhKaG80bLYBjpyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"bEtEo3mL+kOQqJDh8IjqT01ksBs="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"Vq5uA+oauXE4LhKaG80bLYBjpyQ=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"bEtEo3mL+kOQqJDh8IjqT01ksBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"XKtngu55Sqi9tnms2bJWQUylqqc="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"bEtEo3mL+kOQqJDh8IjqT01ksBs=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"XKtngu55Sqi9tnms2bJWQUylqqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"FYk8X4Kf88YSu5COmELARKnjuv0="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"XKtngu55Sqi9tnms2bJWQUylqqc=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"FYk8X4Kf88YSu5COmELARKnjuv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"CeXmoqvrwvL7THEqljwZYE+iTzI="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"FYk8X4Kf88YSu5COmELARKnjuv0=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"CeXmoqvrwvL7THEqljwZYE+iTzI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"Gw4i5pzVYTL/atAYeEfVNR9Gcdg="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"CeXmoqvrwvL7THEqljwZYE+iTzI=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"Gw4i5pzVYTL/atAYeEfVNR9Gcdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"ev6qfh6hajliHgjJcHqt0L3Jr9E="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"Gw4i5pzVYTL/atAYeEfVNR9Gcdg=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"ev6qfh6hajliHgjJcHqt0L3Jr9E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"GnM88HP4j2K5Hp63AREgyNRUIzQ="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"ev6qfh6hajliHgjJcHqt0L3Jr9E=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:00:00Z","end_date":"2026-05-04T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"GnM88HP4j2K5Hp63AREgyNRUIzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="},{"type":"next-occurrence","id":"My20uwTAhthNs4dAMPCEOIi8Fnc="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"GnM88HP4j2K5Hp63AREgyNRUIzQ=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:00:00Z","end_date":"2026-05-05T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"My20uwTAhthNs4dAMPCEOIi8Fnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"37KE5In8NVELk+r8b2ovTo2Bqek="}],"description":"Construction on PINE ST westbound between WATER ST (New York) and PEARL ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 06:00 AM thru 10:00 AM All lanes closed","update_date":"2026-04-07T18:18:59Z"},"road_event_id":"My20uwTAhthNs4dAMPCEOIi8Fnc=","beginning_cross_street":"WATER ST","ending_cross_street":"PEARL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:00:00Z","end_date":"2026-05-06T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.0068,40.705666]]}},{"id":"lpHjSvujz8nwAmWLvBLoYEyiCfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eU0HGQnHRTY+BIi9fsWV7/iLjTY="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday April 10th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:19:28Z"},"road_event_id":"lpHjSvujz8nwAmWLvBLoYEyiCfw=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995629,40.687907]]}},{"id":"eU0HGQnHRTY+BIi9fsWV7/iLjTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERANDAH PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lpHjSvujz8nwAmWLvBLoYEyiCfw="}],"description":"Construction on VERANDAH PL westbound between CLINTON ST (New York) and HENRY ST (New York) for water service relay., Friday April 10th, 2026 thru Thursday April 23rd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:19:28Z"},"road_event_id":"eU0HGQnHRTY+BIi9fsWV7/iLjTY=","beginning_cross_street":"CLINTON ST","ending_cross_street":"HENRY ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995629,40.687907]]}},{"id":"Hte0xddf2+smgFdGkPu05kxkYXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SMsWKfkDuf6lj56KVoxYKM7t74U="}],"description":"Construction on LINDEN BLVD eastbound between E 98TH ST (New York) and THOMAS S BOYLAND ST (New York) for National Grid., Friday April 10th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:17:39Z"},"road_event_id":"Hte0xddf2+smgFdGkPu05kxkYXE=","beginning_cross_street":"E 98TH ST","ending_cross_street":"THOMAS S BOYLAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910599,40.654018]]}},{"id":"SMsWKfkDuf6lj56KVoxYKM7t74U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hte0xddf2+smgFdGkPu05kxkYXE="},{"type":"next-occurrence","id":"mZ4lTr4wH6SROClqYRzTMrlcX0c="}],"description":"Construction on LINDEN BLVD eastbound between E 98TH ST (New York) and THOMAS S BOYLAND ST (New York) for National Grid., Friday April 10th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:17:39Z"},"road_event_id":"SMsWKfkDuf6lj56KVoxYKM7t74U=","beginning_cross_street":"E 98TH ST","ending_cross_street":"THOMAS S BOYLAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910599,40.654018]]}},{"id":"mZ4lTr4wH6SROClqYRzTMrlcX0c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hte0xddf2+smgFdGkPu05kxkYXE="},{"type":"next-occurrence","id":"t+UpF641aL9XqwsCBsZ1VSSHBwo="}],"description":"Construction on LINDEN BLVD eastbound between E 98TH ST (New York) and THOMAS S BOYLAND ST (New York) for National Grid., Friday April 10th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:17:39Z"},"road_event_id":"mZ4lTr4wH6SROClqYRzTMrlcX0c=","beginning_cross_street":"E 98TH ST","ending_cross_street":"THOMAS S BOYLAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910599,40.654018]]}},{"id":"t+UpF641aL9XqwsCBsZ1VSSHBwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Hte0xddf2+smgFdGkPu05kxkYXE="}],"description":"Construction on LINDEN BLVD eastbound between E 98TH ST (New York) and THOMAS S BOYLAND ST (New York) for National Grid., Friday April 10th, 2026 thru Saturday April 25th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:17:39Z"},"road_event_id":"t+UpF641aL9XqwsCBsZ1VSSHBwo=","beginning_cross_street":"E 98TH ST","ending_cross_street":"THOMAS S BOYLAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910599,40.654018]]}},{"id":"qwzP3JL9HYEPDys6BNVZRNNtgDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yvv2tyn0uO9UhukckQHSsdF8648="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"qwzP3JL9HYEPDys6BNVZRNNtgDg=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"yvv2tyn0uO9UhukckQHSsdF8648=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"irwSUeteD0r7CsRDUS05GIQkDtA="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"yvv2tyn0uO9UhukckQHSsdF8648=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"irwSUeteD0r7CsRDUS05GIQkDtA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"FbbfjMU5kUC/FmTqT3Uu5lbUhwc="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"irwSUeteD0r7CsRDUS05GIQkDtA=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"FbbfjMU5kUC/FmTqT3Uu5lbUhwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"IlTa7Ql+wWetg86iHUdtYYtsCTY="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"FbbfjMU5kUC/FmTqT3Uu5lbUhwc=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"IlTa7Ql+wWetg86iHUdtYYtsCTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"ZfHBjhM0sTDFRtnH489uoFwSv+s="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"IlTa7Ql+wWetg86iHUdtYYtsCTY=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"ZfHBjhM0sTDFRtnH489uoFwSv+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"+UBGQrN1S/UVQ7WV+yJCTJdA3JQ="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"ZfHBjhM0sTDFRtnH489uoFwSv+s=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"+UBGQrN1S/UVQ7WV+yJCTJdA3JQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"MEJolFR+/DVTWaOyMclpT4JZv0s="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"+UBGQrN1S/UVQ7WV+yJCTJdA3JQ=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"MEJolFR+/DVTWaOyMclpT4JZv0s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"mE4MXKTneEvOLRYPdQ4nq+caP1w="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"MEJolFR+/DVTWaOyMclpT4JZv0s=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"mE4MXKTneEvOLRYPdQ4nq+caP1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="},{"type":"next-occurrence","id":"NQzSdj/5vnBfeY+Ww5cK66lwogk="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"mE4MXKTneEvOLRYPdQ4nq+caP1w=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"NQzSdj/5vnBfeY+Ww5cK66lwogk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qwzP3JL9HYEPDys6BNVZRNNtgDg="}],"description":"Construction on BASSETT RD northbound between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:06:03Z"},"road_event_id":"NQzSdj/5vnBfeY+Ww5cK66lwogk=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.842789,40.850817]]}},{"id":"AC6XBzeKv4lh7enRdGIAlmvrgQU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Z4AgoQKmZK3hbfl2xZg+MB1xoe8="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"AC6XBzeKv4lh7enRdGIAlmvrgQU=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"Z4AgoQKmZK3hbfl2xZg+MB1xoe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AC6XBzeKv4lh7enRdGIAlmvrgQU="},{"type":"next-occurrence","id":"EIfvvWddI/6EXzHf0Sc3OxBRAr4="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"Z4AgoQKmZK3hbfl2xZg+MB1xoe8=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"EIfvvWddI/6EXzHf0Sc3OxBRAr4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AC6XBzeKv4lh7enRdGIAlmvrgQU="},{"type":"next-occurrence","id":"lZvv1ETrXLx6c6KGgblMelU01BM="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"EIfvvWddI/6EXzHf0Sc3OxBRAr4=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"lZvv1ETrXLx6c6KGgblMelU01BM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AC6XBzeKv4lh7enRdGIAlmvrgQU="},{"type":"next-occurrence","id":"Q5LazVrAE7fHnkRHEuSiUe25fCQ="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"lZvv1ETrXLx6c6KGgblMelU01BM=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"Q5LazVrAE7fHnkRHEuSiUe25fCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AC6XBzeKv4lh7enRdGIAlmvrgQU="},{"type":"next-occurrence","id":"bdMgJtSz7ua0QJBV851wpt6TMiI="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"Q5LazVrAE7fHnkRHEuSiUe25fCQ=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"bdMgJtSz7ua0QJBV851wpt6TMiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AC6XBzeKv4lh7enRdGIAlmvrgQU="},{"type":"next-occurrence","id":"ayAKpYGAdq4MybFsIu21GKII3ag="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"bdMgJtSz7ua0QJBV851wpt6TMiI=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"ayAKpYGAdq4MybFsIu21GKII3ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AC6XBzeKv4lh7enRdGIAlmvrgQU="},{"type":"next-occurrence","id":"QNAM2WEojG9vxn4hVZXQKkYJ5qs="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"ayAKpYGAdq4MybFsIu21GKII3ag=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"QNAM2WEojG9vxn4hVZXQKkYJ5qs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 35/US 202"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AC6XBzeKv4lh7enRdGIAlmvrgQU="}],"description":"Curb work and drainage improvements on NY 35/US 202 both directions between Stony Street (Yorktown) and Old Crompond Road (Yorktown) 202408107712/32212309 - This work is weather permitting, Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-15T11:48:02Z"},"road_event_id":"QNAM2WEojG9vxn4hVZXQKkYJ5qs=","beginning_cross_street":"Stony Street","ending_cross_street":"Old Crompond Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.832429,41.291212]]}},{"id":"21MBCNyLmmSHqZBfE+/PW6ndIOo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZP+G2EpdJneizGhZM449SND3+LI="}],"description":"Construction on NY 27 westbound from East 7th Street (New York) to Fort Hamilton Parkway (New York) Subject to change without notice. One lane at a time., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-16T19:05:38Z"},"road_event_id":"21MBCNyLmmSHqZBfE+/PW6ndIOo=","beginning_cross_street":"East 7th Street","ending_cross_street":"Fort Hamilton Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974912,40.64791]]}},{"id":"ZP+G2EpdJneizGhZM449SND3+LI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"21MBCNyLmmSHqZBfE+/PW6ndIOo="},{"type":"next-occurrence","id":"7E0Ya2A3akx9pEePlFI8RcwzEzY="}],"description":"Construction on NY 27 westbound from East 7th Street (New York) to Fort Hamilton Parkway (New York) Subject to change without notice. One lane at a time., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-16T19:05:38Z"},"road_event_id":"ZP+G2EpdJneizGhZM449SND3+LI=","beginning_cross_street":"East 7th Street","ending_cross_street":"Fort Hamilton Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974912,40.64791]]}},{"id":"7E0Ya2A3akx9pEePlFI8RcwzEzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"21MBCNyLmmSHqZBfE+/PW6ndIOo="}],"description":"Construction on NY 27 westbound from East 7th Street (New York) to Fort Hamilton Parkway (New York) Subject to change without notice. One lane at a time., Monday April 13th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed, Monday April 13th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-16T19:05:38Z"},"road_event_id":"7E0Ya2A3akx9pEePlFI8RcwzEzY=","beginning_cross_street":"East 7th Street","ending_cross_street":"Fort Hamilton Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974912,40.64791]]}},{"id":"ABsQReMAY4rK/oFyaW53MdFix+o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FULTON ST"],"direction":"unknown","related_road_events":[],"description":"Construction on FULTON ST eastbound between HALE AVE (New York) and ARLINGTON AVE (New York) for utility work., Continuous Wednesday March 11th, 2026 12:00 AM thru Wednesday April 29th, 2026 11:59 PM All lanes closed","update_date":"2026-03-11T17:25:52Z"},"road_event_id":"ABsQReMAY4rK/oFyaW53MdFix+o=","beginning_cross_street":"HALE AVE","ending_cross_street":"ARLINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880157,40.681346]]}},{"id":"CmBBzB/qipqlKPhB85uscgazfF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Roadwork and toll plaza repairs on I-87 Northway northbound at END ROUTE I-87; US-Canadian Line (Champlain) Starting on 4/21/25, border crossing will be restricted to trailers over 16'4\" in height, 8'5\" in width and over 53' in length. , Monday April 21st, 2025 thru Sunday December 31st, 2028, Sunday thru Saturday, 12:00 AM thru 11:59 PM All lanes open","update_date":"2025-04-15T16:28:14Z"},"road_event_id":"CmBBzB/qipqlKPhB85uscgazfF0=","beginning_cross_street":"END ROUTE I-87; US-Canadian Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.452066,45.008807]]}},{"id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1fWVp8v5g96VwK7nmtKz82m0cp4="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"1fWVp8v5g96VwK7nmtKz82m0cp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"/SEk6QEwHC2mgh6+2IBzkm+HUJI="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"1fWVp8v5g96VwK7nmtKz82m0cp4=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"/SEk6QEwHC2mgh6+2IBzkm+HUJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"5BJB8554TNrc12R/59sp3+lg4YI="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"/SEk6QEwHC2mgh6+2IBzkm+HUJI=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"5BJB8554TNrc12R/59sp3+lg4YI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"3EgbrkFQKHtxcPsSc7iShA5zMMY="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"5BJB8554TNrc12R/59sp3+lg4YI=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"3EgbrkFQKHtxcPsSc7iShA5zMMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"SGjLNBuPhsoFq4RzRiQ1GlMgZkU="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"3EgbrkFQKHtxcPsSc7iShA5zMMY=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"SGjLNBuPhsoFq4RzRiQ1GlMgZkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"kW6vlCMIjW/JW/BP1kLFhHNDVPk="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"SGjLNBuPhsoFq4RzRiQ1GlMgZkU=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"kW6vlCMIjW/JW/BP1kLFhHNDVPk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"5sbOlknAMlmGdUARCLb1pvLOa+Y="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"kW6vlCMIjW/JW/BP1kLFhHNDVPk=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"5sbOlknAMlmGdUARCLb1pvLOa+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"LRt/6b4igLMYj+7zH7baFWTjKrg="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"5sbOlknAMlmGdUARCLb1pvLOa+Y=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"LRt/6b4igLMYj+7zH7baFWTjKrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"EfkpARwpMHPvUR5Uzet8wuZ3514="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"LRt/6b4igLMYj+7zH7baFWTjKrg=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"EfkpARwpMHPvUR5Uzet8wuZ3514=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"YRGotF253AkACcESZhReBLVaPCw="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"EfkpARwpMHPvUR5Uzet8wuZ3514=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"YRGotF253AkACcESZhReBLVaPCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"s02jc3A9UPpFMZd31W3qbufaMVU="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"YRGotF253AkACcESZhReBLVaPCw=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"s02jc3A9UPpFMZd31W3qbufaMVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"6/ufJTOWgPoDT7Vuf0MI+o9UGrU="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"s02jc3A9UPpFMZd31W3qbufaMVU=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"6/ufJTOWgPoDT7Vuf0MI+o9UGrU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"Vbo9+UplRRaHz75Xt0y3cMjnZas="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"6/ufJTOWgPoDT7Vuf0MI+o9UGrU=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"Vbo9+UplRRaHz75Xt0y3cMjnZas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="},{"type":"next-occurrence","id":"s3SVNx7TFCoOY+qdm8fXY0clmx0="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"Vbo9+UplRRaHz75Xt0y3cMjnZas=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"s3SVNx7TFCoOY+qdm8fXY0clmx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CEDAR AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zI2TOughcFPlM7nMJ9cfWl4n3Vg="}],"description":"Construction on CEDAR AVE both directions between 8 (New York) and W FORDHAM RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Friday April 10th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T19:58:02Z"},"road_event_id":"s3SVNx7TFCoOY+qdm8fXY0clmx0=","beginning_cross_street":"8","ending_cross_street":"W FORDHAM RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91721,40.856096]]}},{"id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mGbJl6g8CUljyFUYb7rqCVErgJQ="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"mGbJl6g8CUljyFUYb7rqCVErgJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"WuCixh1cxTxSfqITtHM7zvi//As="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"mGbJl6g8CUljyFUYb7rqCVErgJQ=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"WuCixh1cxTxSfqITtHM7zvi//As=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"eDFhxcYfOS9Zbh+7VzQic8QpWPI="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"WuCixh1cxTxSfqITtHM7zvi//As=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"eDFhxcYfOS9Zbh+7VzQic8QpWPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"u/gscHhJziM4q8mEljodMnBOnH4="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"eDFhxcYfOS9Zbh+7VzQic8QpWPI=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"u/gscHhJziM4q8mEljodMnBOnH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"/dC4xGePJh8OZAJHgCJpqr9tq2w="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"u/gscHhJziM4q8mEljodMnBOnH4=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"/dC4xGePJh8OZAJHgCJpqr9tq2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"LuVAz4B8GISgYeLkaJu2bFH3E3g="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"/dC4xGePJh8OZAJHgCJpqr9tq2w=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"LuVAz4B8GISgYeLkaJu2bFH3E3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"ibmLL6miPYyIlraOWl/XdNooI9Y="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"LuVAz4B8GISgYeLkaJu2bFH3E3g=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"ibmLL6miPYyIlraOWl/XdNooI9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"p8m7gFM7Vu7B7kBuLoG0oPx84Xg="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"ibmLL6miPYyIlraOWl/XdNooI9Y=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"p8m7gFM7Vu7B7kBuLoG0oPx84Xg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="},{"type":"next-occurrence","id":"BQLa4XihMOoa/lhqV09Oe8RbWSU="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"p8m7gFM7Vu7B7kBuLoG0oPx84Xg=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"BQLa4XihMOoa/lhqV09Oe8RbWSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BASSETT RD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ntN6zLfMbfQ76nxoEgvUbFMNmzg="}],"description":"Construction on BASSETT RD both directions between EASTCHESTER RD (New York) for sewer and water connections for contract# CBX001-Penn Station access., Tuesday April 7th, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-07T20:02:33Z"},"road_event_id":"BQLa4XihMOoa/lhqV09Oe8RbWSU=","beginning_cross_street":"EASTCHESTER RD","ending_cross_street":"EASTCHESTER RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.843312,40.85005]]}},{"id":"l5PhDz9MFEf0LTT65xKQPWoVgIY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"L5YEBYBZI3zgCudFRYJvn3nWZ7A="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"l5PhDz9MFEf0LTT65xKQPWoVgIY=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"L5YEBYBZI3zgCudFRYJvn3nWZ7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"NhJyrLccMZB83JdHmePlFvYwQDw="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"L5YEBYBZI3zgCudFRYJvn3nWZ7A=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"NhJyrLccMZB83JdHmePlFvYwQDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"FJLPdhUIOivEjl4QIHbfjMyGhZs="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"NhJyrLccMZB83JdHmePlFvYwQDw=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"FJLPdhUIOivEjl4QIHbfjMyGhZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"X8nWOYUsDwNhp9KxMy+xK9sryDQ="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"FJLPdhUIOivEjl4QIHbfjMyGhZs=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"X8nWOYUsDwNhp9KxMy+xK9sryDQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"ujWxVCZjGjEjKpreXphMAOfBPho="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"X8nWOYUsDwNhp9KxMy+xK9sryDQ=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"ujWxVCZjGjEjKpreXphMAOfBPho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"Rmr8rSeuSTBb8jOaGUNjXrdaL8w="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"ujWxVCZjGjEjKpreXphMAOfBPho=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"Rmr8rSeuSTBb8jOaGUNjXrdaL8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"p7l+wNcRfKomHC/Z5JugQTeerg4="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"Rmr8rSeuSTBb8jOaGUNjXrdaL8w=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"p7l+wNcRfKomHC/Z5JugQTeerg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"5RhcHh1PKiRrqMjDEZcT8xzOLHc="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"p7l+wNcRfKomHC/Z5JugQTeerg4=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"5RhcHh1PKiRrqMjDEZcT8xzOLHc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"Liu9xIRTQdeI7gIbDL2i2AAaXSE="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"5RhcHh1PKiRrqMjDEZcT8xzOLHc=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"Liu9xIRTQdeI7gIbDL2i2AAaXSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"OtMtYyDFBK6TCh+RRgKNO9Not5c="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"Liu9xIRTQdeI7gIbDL2i2AAaXSE=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"OtMtYyDFBK6TCh+RRgKNO9Not5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"+LsGHDxpc+FXdFtmqaHUGz0Fooo="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"OtMtYyDFBK6TCh+RRgKNO9Not5c=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"+LsGHDxpc+FXdFtmqaHUGz0Fooo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"25ch/apBl4ZDS9F54N0tmYkYlg8="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"+LsGHDxpc+FXdFtmqaHUGz0Fooo=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"25ch/apBl4ZDS9F54N0tmYkYlg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"lcoUMnTYfRwhJLgxHLbSg3MN4Ms="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"25ch/apBl4ZDS9F54N0tmYkYlg8=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"lcoUMnTYfRwhJLgxHLbSg3MN4Ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="},{"type":"next-occurrence","id":"TIKQEbMOSDUfnG+EsMo2GP7FyiM="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"lcoUMnTYfRwhJLgxHLbSg3MN4Ms=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"TIKQEbMOSDUfnG+EsMo2GP7FyiM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["EASTBURN AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"l5PhDz9MFEf0LTT65xKQPWoVgIY="}],"description":"Construction and crane operations on EASTBURN AVE southbound between E 174TH ST (New York) and E 173RD ST (New York) Monday to Friday , 9am to 4pm (when school is not in session), to place crane to erect new building., Tuesday April 7th, 2026 thru Monday May 11th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 12th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-07T19:52:29Z"},"road_event_id":"TIKQEbMOSDUfnG+EsMo2GP7FyiM=","beginning_cross_street":"E 174TH ST","ending_cross_street":"E 173RD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.908475,40.844724]]}},{"id":"GlNVoO76SONwoLFkrhYknKUa7v4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GNToztejmeKYiGHTrm6Klqpx9gw="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"GlNVoO76SONwoLFkrhYknKUa7v4=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"GNToztejmeKYiGHTrm6Klqpx9gw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"+f9sr/2TBgKixV3fsbRaAkd5yA8="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"GNToztejmeKYiGHTrm6Klqpx9gw=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"+f9sr/2TBgKixV3fsbRaAkd5yA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"src6RtTbagdBWNzAGGoxoDcgfI0="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"+f9sr/2TBgKixV3fsbRaAkd5yA8=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"src6RtTbagdBWNzAGGoxoDcgfI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"32Ou9mIXoJultAjCx1uNeNBQ5kk="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"src6RtTbagdBWNzAGGoxoDcgfI0=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"32Ou9mIXoJultAjCx1uNeNBQ5kk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"aoJ5T4tUk3wyyNevRUYm5Jrv6u8="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"32Ou9mIXoJultAjCx1uNeNBQ5kk=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"aoJ5T4tUk3wyyNevRUYm5Jrv6u8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"AcubhUNZAFOe3Cn/zI3MYrnFMwo="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"aoJ5T4tUk3wyyNevRUYm5Jrv6u8=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"AcubhUNZAFOe3Cn/zI3MYrnFMwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"/Db0P+EhrAtXzz9RjZGz8xhbfhg="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"AcubhUNZAFOe3Cn/zI3MYrnFMwo=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"/Db0P+EhrAtXzz9RjZGz8xhbfhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"HNYmCAMVX8TT/DVFSpbhopbAy74="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"/Db0P+EhrAtXzz9RjZGz8xhbfhg=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"HNYmCAMVX8TT/DVFSpbhopbAy74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"PTFFvqtRs6Q3qP2sjNZMH0J5Bx0="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"HNYmCAMVX8TT/DVFSpbhopbAy74=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"PTFFvqtRs6Q3qP2sjNZMH0J5Bx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="},{"type":"next-occurrence","id":"yewWXGMeo3BKPqCt/dvRt04oC1c="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"PTFFvqtRs6Q3qP2sjNZMH0J5Bx0=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"yewWXGMeo3BKPqCt/dvRt04oC1c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PARK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GlNVoO76SONwoLFkrhYknKUa7v4="}],"description":"Construction on PARK AVE southbound between E 178TH ST (New York) and E TREMONT AVE (New York) for electric major service/equipment; backhoe, dump truck., Tuesday April 7th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-21T21:08:07Z"},"road_event_id":"yewWXGMeo3BKPqCt/dvRt04oC1c=","beginning_cross_street":"E 178TH ST","ending_cross_street":"E TREMONT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898891,40.848772]]}},{"id":"OA2C7i1MpUx+uUNUEigt3gpCN9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rYgD9DVbtg7oX2lZtDCeU8hyJ6U="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:48:39Z"},"road_event_id":"OA2C7i1MpUx+uUNUEigt3gpCN9Y=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999046,40.689083]]}},{"id":"rYgD9DVbtg7oX2lZtDCeU8hyJ6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OA2C7i1MpUx+uUNUEigt3gpCN9Y="},{"type":"next-occurrence","id":"28FrO7TQ8k008R57v5eHnlEnQhw="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:48:39Z"},"road_event_id":"rYgD9DVbtg7oX2lZtDCeU8hyJ6U=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999046,40.689083]]}},{"id":"28FrO7TQ8k008R57v5eHnlEnQhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OA2C7i1MpUx+uUNUEigt3gpCN9Y="}],"description":"Construction on I-278 westbound from Congress Street (New York) to Kane Street (New York) Subject to change without notice., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 12:00 AM thru 05:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-16T18:48:39Z"},"road_event_id":"28FrO7TQ8k008R57v5eHnlEnQhw=","beginning_cross_street":"Congress Street","ending_cross_street":"Kane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999046,40.689083]]}},{"id":"Yxj55Z+lpcOOxlGehPV3mxVyPIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T14:33:46Z"},"road_event_id":"Yxj55Z+lpcOOxlGehPV3mxVyPIw=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"+v3pf5j9zNdaJl78SGKaJiFyuVM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Eastbound near West of NJ 33 Business (Manalapan Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-20T21:24:24Z"},"road_event_id":"+v3pf5j9zNdaJl78SGKaJiFyuVM=","beginning_cross_street":"West of NJ 33 Business","ending_cross_street":"NJ 33 Business","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.327316,40.25325]]}},{"id":"2SYSuAtbO8Ls8uh3nTvtpoSEkYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between South of CR 674/Greentree Rd (Evesham Twp) and North of NJ 70 (Evesham Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 07:00 AM, right lane closed","update_date":"2026-04-20T21:24:21Z"},"road_event_id":"2SYSuAtbO8Ls8uh3nTvtpoSEkYk=","beginning_cross_street":"South of CR 674/Greentree Rd","ending_cross_street":"North of NJ 70","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.938621,39.907348]]}},{"id":"KVGGPF354MnAMa5p1mJarcCOdns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near Ridge Rd (South Brunswick Twp), Friday April 24, 2026 10:00 PM thru Saturday April 25, 2026 05:00 AM, right lane closed","update_date":"2026-04-20T21:24:23Z"},"road_event_id":"KVGGPF354MnAMa5p1mJarcCOdns=","beginning_cross_street":"Ridge Rd","ending_cross_street":"North of Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.595428,40.366565]]}},{"id":"afS0GvcCYSz1VxFglFGm8YkdtDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T14:33:50Z"},"road_event_id":"afS0GvcCYSz1VxFglFGm8YkdtDc=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"HotzUOC9kuK+KiBayoWhN30idMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound near Ridge Rd (South Brunswick Twp), Wednesday April 22, 2026 10:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-20T21:24:32Z"},"road_event_id":"HotzUOC9kuK+KiBayoWhN30idMQ=","beginning_cross_street":"Ridge Rd","ending_cross_street":"North of Ridge Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.595428,40.366565]]}},{"id":"Ad9BOtepOun5vm09p1g1FsU553U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Southbound between South of Exit 3 - Morgan Blvd (Camden) and I-76 Connector (Camden), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-20T21:24:28Z"},"road_event_id":"Ad9BOtepOun5vm09p1g1FsU553U=","beginning_cross_street":"South of Exit 3 - Morgan Blvd","ending_cross_street":"I-76 Connector","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.115425,39.910522]]}},{"id":"ecoQVMUmbJKt2ID0zYDeZaf6Ing=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between North of Howard Blvd (Mount Laurel Twp) and South of CR 674/Greentree Rd (Evesham Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-20T21:24:26Z"},"road_event_id":"ecoQVMUmbJKt2ID0zYDeZaf6Ing=","beginning_cross_street":"North of Howard Blvd","ending_cross_street":"South of CR 674/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.953933,39.926879]]}},{"id":"zHwI7jxHeuoxZTanFF6S1Vl/e98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AWiwgKpaAcq0Z6ILdbrEp4jPXoo="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"zHwI7jxHeuoxZTanFF6S1Vl/e98=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"AWiwgKpaAcq0Z6ILdbrEp4jPXoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"GgjQQ0pqFBz9w/4aXMTQIJ5dR4s="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"AWiwgKpaAcq0Z6ILdbrEp4jPXoo=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"GgjQQ0pqFBz9w/4aXMTQIJ5dR4s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"3ZRrgFCaQGrNnsDY90jHCvZI6/M="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"GgjQQ0pqFBz9w/4aXMTQIJ5dR4s=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"3ZRrgFCaQGrNnsDY90jHCvZI6/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"+5G5GQOtXfQyjHOV2ZFfh4otHNU="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"3ZRrgFCaQGrNnsDY90jHCvZI6/M=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"+5G5GQOtXfQyjHOV2ZFfh4otHNU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"WAMr0jIxb8l5e9gdBZoy+ezApOE="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"+5G5GQOtXfQyjHOV2ZFfh4otHNU=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"WAMr0jIxb8l5e9gdBZoy+ezApOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"jFSe2RIcIbiZ7K5Jg9DgfvWgUt8="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"WAMr0jIxb8l5e9gdBZoy+ezApOE=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"jFSe2RIcIbiZ7K5Jg9DgfvWgUt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"QeHLBlr/EbjrCcKOQ1/r5vlYxD0="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"jFSe2RIcIbiZ7K5Jg9DgfvWgUt8=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"QeHLBlr/EbjrCcKOQ1/r5vlYxD0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"Hgrv8/bilLuXzIzKXyPacDbT0T0="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"QeHLBlr/EbjrCcKOQ1/r5vlYxD0=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"Hgrv8/bilLuXzIzKXyPacDbT0T0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"RLq/J+FJIcf1c9CSAkJO7FswLtI="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"Hgrv8/bilLuXzIzKXyPacDbT0T0=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T20:00:00Z","end_date":"2026-05-04T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"RLq/J+FJIcf1c9CSAkJO7FswLtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="},{"type":"next-occurrence","id":"rSW9zYjJ9hdHEaOFshiDVrjsxpY="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"RLq/J+FJIcf1c9CSAkJO7FswLtI=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T20:00:00Z","end_date":"2026-05-06T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"rSW9zYjJ9hdHEaOFshiDVrjsxpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zHwI7jxHeuoxZTanFF6S1Vl/e98="}],"description":"Bridge rehabilitation on I-84 eastbound ramp to Exit 36A - I-87 (Newburgh) D265160/B1026780/NIGHT/32075409 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Sunday April 26th, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, left lane closure, Monday April 27th, 2026 thru Friday May 22nd, 2026 Monday/ Tuesday/ Wednesday/ Thursday/ Friday/ Saturday, 08:00 PM thru 06:00 AM, left lane closure","update_date":"2026-04-17T10:25:15Z"},"road_event_id":"rSW9zYjJ9hdHEaOFshiDVrjsxpY=","beginning_cross_street":"Exit 36A - I-87","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T20:00:00Z","end_date":"2026-05-07T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.075181,41.514695]]}},{"id":"QxjeFQEHOHZiWn4nySbeAGbpODw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[],"description":"Water main work on NY 32 northbound between Washington Green (New Windsor) and Corporate Dr (New Windsor) 2026084537937/32727309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026, 09:00 AM thru 03:00 PM, right shoulder closure","update_date":"2026-04-14T16:38:34Z"},"road_event_id":"QxjeFQEHOHZiWn4nySbeAGbpODw=","beginning_cross_street":"Washington Green","ending_cross_street":"Corporate Dr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.050353,41.465326]]}},{"id":"OH4jacrfRDGQVHaRikjI2HHRtLU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Eastbound between In the vicinity of Garden State Parkway (Paramus) and East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T14:33:32Z"},"road_event_id":"OH4jacrfRDGQVHaRikjI2HHRtLU=","beginning_cross_street":"In the vicinity of Garden State Parkway","ending_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.078071,40.922229]]}},{"id":"pGETe5uUwwE2vfvV0VLmt+BzqgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 55 - CR 602/Lyons Ave (Newark) and East of Exit 57 - US 1&9/NJ 21 (Newark), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T14:33:31Z"},"road_event_id":"pGETe5uUwwE2vfvV0VLmt+BzqgA=","beginning_cross_street":"East of Exit 55 - CR 602/Lyons Ave","ending_cross_street":"East of Exit 57 - US 1&9/NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.219528,40.715835]]}},{"id":"oB+uZ71dqqw0loOP9z/UbfnzkJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 48"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 48 Both Directions At US 130 (Penns Grove) Tuesday April 21, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-04-20T19:55:56Z"},"road_event_id":"oB+uZ71dqqw0loOP9z/UbfnzkJI=","beginning_cross_street":"US 130","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.464187,39.725975]]}},{"id":"NTquNFJ685zq0yYDdTpbLFYeJdI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 14 - US 22 (Bridgewater Twp), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T14:33:36Z"},"road_event_id":"NTquNFJ685zq0yYDdTpbLFYeJdI=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.604171,40.582786]]}},{"id":"58YZxG54QCJolmv5ZYCczmX82kU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 55 - CR 602/Lyons Ave (Newark) and East of Exit 57 - US 1&9/NJ 21 (Newark), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T14:33:35Z"},"road_event_id":"58YZxG54QCJolmv5ZYCczmX82kU=","beginning_cross_street":"East of Exit 55 - CR 602/Lyons Ave","ending_cross_street":"East of Exit 57 - US 1&9/NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.219528,40.715835]]}},{"id":"Mg/98snyQIsBrgETUyS8dMN5mds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 31 Southbound between North of Rocky Run Rd (Lebanon Twp) and Cregar Rd (Lebanon Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T14:33:34Z"},"road_event_id":"Mg/98snyQIsBrgETUyS8dMN5mds=","beginning_cross_street":"North of Rocky Run Rd","ending_cross_street":"Cregar Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.923843,40.682151]]}},{"id":"U6r5OVHqv1gno/W8aEpXn3Y6fUQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Northbound near South of Maple Ave (Fair Lawn), Thursday April 23, 2026 10:00 PM thru Friday April 24, 2026 06:00 AM, left lane closed","update_date":"2026-04-17T14:33:33Z"},"road_event_id":"U6r5OVHqv1gno/W8aEpXn3Y6fUQ=","beginning_cross_street":"South of Maple Ave","ending_cross_street":"North of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.135963,40.948986]]}},{"id":"WUQpwCHtYGfzFnfnG6W/7La+pms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UlN86VKKnveCpc5bs491i5ib2kg="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"WUQpwCHtYGfzFnfnG6W/7La+pms=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"UlN86VKKnveCpc5bs491i5ib2kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"dKannfhYIyZRON7ZbbnwTJaZgKQ="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"UlN86VKKnveCpc5bs491i5ib2kg=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"dKannfhYIyZRON7ZbbnwTJaZgKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"bSyL5kyoBoBsg3sLxebAisHIyrE="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"dKannfhYIyZRON7ZbbnwTJaZgKQ=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"bSyL5kyoBoBsg3sLxebAisHIyrE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"Tj2FF7jDKA7EHQt6EpoozazWv+0="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"bSyL5kyoBoBsg3sLxebAisHIyrE=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"Tj2FF7jDKA7EHQt6EpoozazWv+0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"2/JwBARU8TcdTb22gjfPLnKj82k="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"Tj2FF7jDKA7EHQt6EpoozazWv+0=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"2/JwBARU8TcdTb22gjfPLnKj82k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"TN+Kno/nnd4ekp4HhI7DhlJN3vA="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"2/JwBARU8TcdTb22gjfPLnKj82k=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"TN+Kno/nnd4ekp4HhI7DhlJN3vA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"nQt8Su9ecEzVEaAyc9tnPIOoznY="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"TN+Kno/nnd4ekp4HhI7DhlJN3vA=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T18:00:00Z","end_date":"2026-05-04T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"nQt8Su9ecEzVEaAyc9tnPIOoznY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"h2H5YuIIEhcNAsV0EDFHS0KxDXA="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"nQt8Su9ecEzVEaAyc9tnPIOoznY=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T18:00:00Z","end_date":"2026-05-05T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"h2H5YuIIEhcNAsV0EDFHS0KxDXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="},{"type":"next-occurrence","id":"Xt9Klf20UsiKafQc76c8JmslY58="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"h2H5YuIIEhcNAsV0EDFHS0KxDXA=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"Xt9Klf20UsiKafQc76c8JmslY58=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WUQpwCHtYGfzFnfnG6W/7La+pms="}],"description":"Culvert repairs on NY 31A both directions 4th Section Road; NY 31; Redman Road (Sweden) Roadway CLOSURE on NY 31A - EB & WB Location: NYS Rte. 31A (Fourth Section Road) Town of Sweden, Monroe County ... area between County Line Road and West Sweden Road Operation: Culvert Replacement ..four (4) weeks allowed , Monday April 27th, 2026 thru Monday May 25th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Left lane of 2 lanes","update_date":"2026-04-20T21:16:03Z"},"road_event_id":"Xt9Klf20UsiKafQc76c8JmslY58=","beginning_cross_street":"4th Section Road; NY 31; Redman Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T18:00:00Z","end_date":"2026-05-07T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.967365,43.198325]]}},{"id":"vAvAt4uicHQO/CjWu769bwPQYFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VEaiIiZIdFG0keHD2spm+FgY4uc="}],"description":"Overhead sign repair on I-390 northbound Chili Avenue (Gates) alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-04-21T15:29:58Z"},"road_event_id":"vAvAt4uicHQO/CjWu769bwPQYFI=","beginning_cross_street":"Chili Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.667685,43.139177]]}},{"id":"VEaiIiZIdFG0keHD2spm+FgY4uc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAvAt4uicHQO/CjWu769bwPQYFI="},{"type":"next-occurrence","id":"Jk8NkqcoIf2a6whqSZy2pzYeQ30="}],"description":"Overhead sign repair on I-390 northbound Chili Avenue (Gates) alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-04-21T15:29:58Z"},"road_event_id":"VEaiIiZIdFG0keHD2spm+FgY4uc=","beginning_cross_street":"Chili Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.667685,43.139177]]}},{"id":"Jk8NkqcoIf2a6whqSZy2pzYeQ30=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAvAt4uicHQO/CjWu769bwPQYFI="},{"type":"next-occurrence","id":"1Pt7mL9er3YRNU85FDtbn5Lb4ek="}],"description":"Overhead sign repair on I-390 northbound Chili Avenue (Gates) alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-04-21T15:29:58Z"},"road_event_id":"Jk8NkqcoIf2a6whqSZy2pzYeQ30=","beginning_cross_street":"Chili Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.667685,43.139177]]}},{"id":"1Pt7mL9er3YRNU85FDtbn5Lb4ek=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAvAt4uicHQO/CjWu769bwPQYFI="}],"description":"Overhead sign repair on I-390 northbound Chili Avenue (Gates) alternating lane closures, Monday April 27th, 2026 thru Thursday April 30th, 2026, Monday/Tuesday/Wednesday/Thursday, 09:00 AM thru 02:00 PM All lanes","update_date":"2026-04-21T15:29:58Z"},"road_event_id":"1Pt7mL9er3YRNU85FDtbn5Lb4ek=","beginning_cross_street":"Chili Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.667685,43.139177]]}},{"id":"rYLFM/MN7cA/TsroVfd8ieKCCPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Eastbound between East of NJ 73 (Evesham Twp) and CR 607/Maple Ave (Evesham Twp) Monday April 20, 2026 09:00 AM thru Friday April 24, 2026 03:00 PM, 2 right lanes of 3 lanes closed","update_date":"2026-04-20T20:20:01Z"},"road_event_id":"rYLFM/MN7cA/TsroVfd8ieKCCPw=","beginning_cross_street":"East of NJ 73","ending_cross_street":"CR 607/Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.92604,39.89381]]}},{"id":"/1mfGb5cAtbkFlOjqFWMJssOi78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Both Directions between East of New Jersey Turnpike (Cherry Hill Twp) and West of Cropwell Rd (Evesham Twp) Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, 1 right lane of 2 lanes, right shoulder closed eastbound; 1 right lane of 2 lanes, right shoulder closed westbound","update_date":"2026-04-20T20:27:50Z"},"road_event_id":"/1mfGb5cAtbkFlOjqFWMJssOi78=","beginning_cross_street":"East of New Jersey Turnpike","ending_cross_street":"West of Cropwell Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.978881,39.907218]]}},{"id":"urYUVAXc5omq+7ympEovYyTlCQc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 70"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 70 Westbound between West of N. Elmwood Rd (Evesham Twp) and East of N. Elmwood Rd (Evesham Twp) Monday April 20, 2026 09:00 AM thru Friday April 24, 2026 03:00 PM, right shoulder closed","update_date":"2026-04-20T20:21:52Z"},"road_event_id":"urYUVAXc5omq+7ympEovYyTlCQc=","beginning_cross_street":"West of N. Elmwood Rd","ending_cross_street":"East of N. Elmwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.901611,39.894031]]}},{"id":"T6N/sU0XJIWhbKbip0FSZnwX+lI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 4"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 4 Westbound between East of New Jersey Turnpike/I-95/George Washington Bridge (Fort Lee) and In the vicinity of Garden State Parkway (Paramus), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T14:33:41Z"},"road_event_id":"T6N/sU0XJIWhbKbip0FSZnwX+lI=","beginning_cross_street":"East of New Jersey Turnpike/I-95/George Washington Bridge","ending_cross_street":"In the vicinity of Garden State Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.975257,40.862434]]}},{"id":"U6pR2datsZdBCsYqYhMYak29m/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near North of Exit 14 - US 22 (Bridgewater Twp), Thursday April 23, 2026 07:00 AM thru 03:30 PM, right shoulder closed","update_date":"2026-04-17T14:33:38Z"},"road_event_id":"U6pR2datsZdBCsYqYhMYak29m/8=","beginning_cross_street":"North of Exit 14 - US 22","ending_cross_street":"North of Exit 14 - US 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.598609,40.581844]]}},{"id":"SlLLJrOSFbL2odDL9epqdWhcMNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-78"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-78 Eastbound between East of Exit 55 - CR 602/Lyons Ave (Newark) and East of Exit 57 - US 1&9/NJ 21 (Newark), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T14:33:37Z"},"road_event_id":"SlLLJrOSFbL2odDL9epqdWhcMNc=","beginning_cross_street":"East of Exit 55 - CR 602/Lyons Ave","ending_cross_street":"East of Exit 57 - US 1&9/NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.219528,40.715835]]}},{"id":"q8esW17HLatABNGyxc3bxx6gI6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Westbound near East of Exit 5 - US 130 (Hamilton Twp), Tuesday April 28, 2026 09:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-07T14:38:27Z"},"road_event_id":"q8esW17HLatABNGyxc3bxx6gI6Q=","beginning_cross_street":"East of Exit 5 - US 130","ending_cross_street":"West of Exit 5 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.631347,40.201461]]}},{"id":"Ih8uMiWSs/9n9fN2CjWEWiEtCXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound between CR 623/Elmwood Rd (Mullica Twp) and East of CR 575/Pomona Rd (Galloway Twp), Friday April 24, 2026 07:00 AM thru 03:30 PM, right shoulder closed, moving operation","update_date":"2026-04-20T21:24:45Z"},"road_event_id":"Ih8uMiWSs/9n9fN2CjWEWiEtCXE=","beginning_cross_street":"CR 623/Elmwood Rd","ending_cross_street":"East of CR 575/Pomona Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.715927,39.576293]]}},{"id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J2jweJakDr+IA0gBHwG4dkpHLwg="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"J2jweJakDr+IA0gBHwG4dkpHLwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"uEGZelTE+YxIgs+K4ZvMt9vdwgY="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"J2jweJakDr+IA0gBHwG4dkpHLwg=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"uEGZelTE+YxIgs+K4ZvMt9vdwgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"F8tocvzO8KIRuxByoHyLhGumZq4="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"uEGZelTE+YxIgs+K4ZvMt9vdwgY=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"F8tocvzO8KIRuxByoHyLhGumZq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"Pvg+8KIQW5DNvkNw+hnTx883URE="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"F8tocvzO8KIRuxByoHyLhGumZq4=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T14:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"Pvg+8KIQW5DNvkNw+hnTx883URE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"o107PtEw3K+wslffsVhkTUVk5cM="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"Pvg+8KIQW5DNvkNw+hnTx883URE=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T14:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"o107PtEw3K+wslffsVhkTUVk5cM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"RrRwbYmXV3Kd5BBcoojOY37i1sI="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"o107PtEw3K+wslffsVhkTUVk5cM=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"RrRwbYmXV3Kd5BBcoojOY37i1sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"DxKyf1rxIUZLmog6+lYU4pmlaQw="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"RrRwbYmXV3Kd5BBcoojOY37i1sI=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"DxKyf1rxIUZLmog6+lYU4pmlaQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"3z0MAiCu5kevVVGuEPL5fGKFWs4="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"DxKyf1rxIUZLmog6+lYU4pmlaQw=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"3z0MAiCu5kevVVGuEPL5fGKFWs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"gO0NtTzxVQpPEQkJPovMC+DP4Wk="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"3z0MAiCu5kevVVGuEPL5fGKFWs4=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"gO0NtTzxVQpPEQkJPovMC+DP4Wk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"a9AkmOnTJkc3+MCf8j3mKF83+2c="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"gO0NtTzxVQpPEQkJPovMC+DP4Wk=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T14:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"a9AkmOnTJkc3+MCf8j3mKF83+2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"7ctNX/IysGwQGsu0vV7G4mUm1Wg="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"a9AkmOnTJkc3+MCf8j3mKF83+2c=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T14:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"7ctNX/IysGwQGsu0vV7G4mUm1Wg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"vLIOdlh8sxSKDi/VrH6FhBcIuXM="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"7ctNX/IysGwQGsu0vV7G4mUm1Wg=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T14:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"vLIOdlh8sxSKDi/VrH6FhBcIuXM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"6P/jCNGyLpXmzv9OUd+U1Prg8QA="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"vLIOdlh8sxSKDi/VrH6FhBcIuXM=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T14:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"6P/jCNGyLpXmzv9OUd+U1Prg8QA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="},{"type":"next-occurrence","id":"jtXe4YJTpf5GBdrYcGDuaEun8KQ="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"6P/jCNGyLpXmzv9OUd+U1Prg8QA=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T14:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"jtXe4YJTpf5GBdrYcGDuaEun8KQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 45TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJQ61LTiDTqgPRm3YSDFirHZ4HI="}],"description":"Crane operations on E 45TH ST westbound between LEXINGTON AVE (New York) and VANDERBILT AVE (New York), Tuesday April 7th, 2026 thru Sunday May 10th, 2026, Sunday thru Saturday, 10:00 AM thru 05:00 AM All lanes closed","update_date":"2026-04-07T17:34:45Z"},"road_event_id":"jtXe4YJTpf5GBdrYcGDuaEun8KQ=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T14:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974806,40.753434]]}},{"id":"JQdlGUPCrhvQCabn6S3CBkpPmDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 49TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"J/bO6NDHD8erDXAFcU7qj//zqfU="}],"description":"Construction on E 49TH ST westbound between 1ST AVE (New York) and 2ND AVE (New York) for facade restoration from boom truck., Saturday April 11th, 2026 thru Sunday April 26th, 2026, Saturday/ Sunday, 06:00 AM thru 11:59 AM All lanes closed","update_date":"2026-04-07T17:36:32Z"},"road_event_id":"JQdlGUPCrhvQCabn6S3CBkpPmDY=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:00:00Z","end_date":"2026-04-25T15:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.966773,40.753331]]}},{"id":"J/bO6NDHD8erDXAFcU7qj//zqfU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 49TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JQdlGUPCrhvQCabn6S3CBkpPmDY="}],"description":"Construction on E 49TH ST westbound between 1ST AVE (New York) and 2ND AVE (New York) for facade restoration from boom truck., Saturday April 11th, 2026 thru Sunday April 26th, 2026, Saturday/ Sunday, 06:00 AM thru 11:59 AM All lanes closed","update_date":"2026-04-07T17:36:32Z"},"road_event_id":"J/bO6NDHD8erDXAFcU7qj//zqfU=","beginning_cross_street":"1ST AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T10:00:00Z","end_date":"2026-04-26T15:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.966773,40.753331]]}},{"id":"Px6QHac7Q4qNkK7Lh7gQ6wmfJAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Westbound between CR 672/CR 557 (Buena) and East of CR 648 (Upper Pittsgrove Twp), left shoulder, moving operation","update_date":"2026-04-20T21:24:49Z"},"road_event_id":"Px6QHac7Q4qNkK7Lh7gQ6wmfJAw=","beginning_cross_street":"CR 672/CR 557","ending_cross_street":"East of CR 648","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.956092,39.539997]]}},{"id":"DqarL6PNiA5OhW72Ce9vNfxB/8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of CR 4/Holmdel Rd/Main St (Hazlet Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 02:00 AM, right shoulder closed","update_date":"2026-04-20T21:24:53Z"},"road_event_id":"DqarL6PNiA5OhW72Ce9vNfxB/8I=","beginning_cross_street":"South of CR 4/Holmdel Rd/Main St","ending_cross_street":"North of Bethany Rd/Pool Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.189521,40.422153]]}},{"id":"6EuPLtTqHbnrFTE7xuzZyd+2N6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/SGcVtLyuPJREDrY1Z+yW+qkQzg="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 65 - NY 312 - Carmel (Southeast) and Exit 68 - I-684 - Pawling - White Plains (Southeast) DOT BM/B1052842/32468809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-13T15:45:35Z"},"road_event_id":"6EuPLtTqHbnrFTE7xuzZyd+2N6I=","beginning_cross_street":"Exit 65 - NY 312 - Carmel","ending_cross_street":"Exit 68 - I-684 - Pawling - White Plains","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.601106,41.398096]]}},{"id":"/SGcVtLyuPJREDrY1Z+yW+qkQzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6EuPLtTqHbnrFTE7xuzZyd+2N6I="}],"description":"Bridge maintenance operations on I-84 eastbound between Exit 65 - NY 312 - Carmel (Southeast) and Exit 68 - I-684 - Pawling - White Plains (Southeast) DOT BM/B1052842/32468809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:00 AM thru 03:00 PM, left lane closure","update_date":"2026-04-13T15:45:35Z"},"road_event_id":"/SGcVtLyuPJREDrY1Z+yW+qkQzg=","beginning_cross_street":"Exit 65 - NY 312 - Carmel","ending_cross_street":"Exit 68 - I-684 - Pawling - White Plains","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.601106,41.398096]]}},{"id":"a1O5p8e0aDvHrAjgNftj96LPH8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EbfDmkg13q1OpLEoZGdCwhuoOOI="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"a1O5p8e0aDvHrAjgNftj96LPH8U=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"EbfDmkg13q1OpLEoZGdCwhuoOOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"cInzDq7PfiwGVyx7nseEnUJj6xU="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"EbfDmkg13q1OpLEoZGdCwhuoOOI=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"cInzDq7PfiwGVyx7nseEnUJj6xU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"OQVm0lYloUfaG09KFiDiTZ00N8M="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"cInzDq7PfiwGVyx7nseEnUJj6xU=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"OQVm0lYloUfaG09KFiDiTZ00N8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"EoJrLYyRo2W28FD7Ep7GP9BLeAA="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"OQVm0lYloUfaG09KFiDiTZ00N8M=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"EoJrLYyRo2W28FD7Ep7GP9BLeAA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"y2Z85jngrIvE+dBjWxzJdhOmA80="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"EoJrLYyRo2W28FD7Ep7GP9BLeAA=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"y2Z85jngrIvE+dBjWxzJdhOmA80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"8Bf/rLBvVG1YKdyT3KdNq3V+mJs="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"y2Z85jngrIvE+dBjWxzJdhOmA80=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"8Bf/rLBvVG1YKdyT3KdNq3V+mJs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"U8gNAbQYESA5ffgoUggK+H/n4/s="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"8Bf/rLBvVG1YKdyT3KdNq3V+mJs=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"U8gNAbQYESA5ffgoUggK+H/n4/s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"HlbFJjixVXKU3E3S+NyQ5Bqd3Sw="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"U8gNAbQYESA5ffgoUggK+H/n4/s=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"HlbFJjixVXKU3E3S+NyQ5Bqd3Sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"oCragtBB0PNvy6sDq8PLGAA9psU="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"HlbFJjixVXKU3E3S+NyQ5Bqd3Sw=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"oCragtBB0PNvy6sDq8PLGAA9psU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="},{"type":"next-occurrence","id":"0jUVTmMFqZm9JMcfO8rWpYn5TnY="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"oCragtBB0PNvy6sDq8PLGAA9psU=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"0jUVTmMFqZm9JMcfO8rWpYn5TnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 69TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a1O5p8e0aDvHrAjgNftj96LPH8U="}],"description":"Construction on E 69TH ST westbound between PARK AVE (New York) and MADISON AVE (New York) for building inspection from boom truck., Friday April 10th, 2026 thru Saturday May 2nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:43:39Z"},"road_event_id":"0jUVTmMFqZm9JMcfO8rWpYn5TnY=","beginning_cross_street":"PARK AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.965538,40.769296]]}},{"id":"DnBbeBBZZuFYWEs/WSM7VXqID4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound between East of CR 575/Pomona Rd (Galloway Twp) and CR 623/Elmwood Rd (Mullica Twp), left shoulder, moving operation","update_date":"2026-04-20T21:24:35Z"},"road_event_id":"DnBbeBBZZuFYWEs/WSM7VXqID4Y=","beginning_cross_street":"East of CR 575/Pomona Rd","ending_cross_street":"CR 623/Elmwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.569549,39.474647]]}},{"id":"SSrFLkxj2axt0Tco9MaayyMJozQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BEAR RD - NY-930J"],"direction":"unknown","related_road_events":[],"description":"Roadwork on BEAR RD - NY-930J westbound between South Bay Rd (North Syracuse) and I-481 (North Syracuse), Continuous Monday April 20th, 2026 07:00 AM thru Friday May 29th, 2026 04:00 PM right shoulder closed","update_date":"2026-04-17T15:05:49Z"},"road_event_id":"SSrFLkxj2axt0Tco9MaayyMJozQ=","beginning_cross_street":"South Bay Rd","ending_cross_street":"I-481 ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119734,43.141229]]}},{"id":"hYGB4+g0R4oCb2ndDn4jHZ02huE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound between South of CR 674/Greentree Rd (Evesham Twp) and North of NJ 70 (Evesham Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-20T21:24:33Z"},"road_event_id":"hYGB4+g0R4oCb2ndDn4jHZ02huE=","beginning_cross_street":"South of CR 674/Greentree Rd","ending_cross_street":"North of NJ 70","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.938621,39.907348]]}},{"id":"OTMWA6/g6yUavBex5IMjCQZElt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 40"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 40 Eastbound between East of CR 648 (Upper Pittsgrove Twp) and CR 672/CR 557 (Buena), Wednesday April 22, 2026 07:00 AM thru 03:30 PM, right shoulder closed, moving operation","update_date":"2026-04-20T21:24:34Z"},"road_event_id":"OTMWA6/g6yUavBex5IMjCQZElt0=","beginning_cross_street":"East of CR 648","ending_cross_street":"CR 672/CR 557","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.165084,39.597454]]}},{"id":"uu1PGiaJPSNAto9fUvcIsY59AXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 53"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 53 Both Directions between Park Rd (Parsippany-troy Hills Twp) and North of Park Rd (Parsippany-troy Hills Twp) Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-17T15:11:27Z"},"road_event_id":"uu1PGiaJPSNAto9fUvcIsY59AXg=","beginning_cross_street":"Park Rd","ending_cross_street":"North of Park Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.473297,40.86639]]}},{"id":"qGT2TT5k5+pwBH6R3JV6t12jfmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 22ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"MPvibIOweDmixjloFrJIFwPoVKI="}],"description":"Crane operations on E 22ND ST eastbound between LEXINGTON AVE (New York) and 3RD AVE (New York), Tuesday April 7th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:14:59Z"},"road_event_id":"qGT2TT5k5+pwBH6R3JV6t12jfmc=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985104,40.738787]]}},{"id":"MPvibIOweDmixjloFrJIFwPoVKI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 22ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qGT2TT5k5+pwBH6R3JV6t12jfmc="},{"type":"next-occurrence","id":"OCOKkUnn2k0IxDq0uy+geefOxeQ="}],"description":"Crane operations on E 22ND ST eastbound between LEXINGTON AVE (New York) and 3RD AVE (New York), Tuesday April 7th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:14:59Z"},"road_event_id":"MPvibIOweDmixjloFrJIFwPoVKI=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985104,40.738787]]}},{"id":"OCOKkUnn2k0IxDq0uy+geefOxeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 22ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qGT2TT5k5+pwBH6R3JV6t12jfmc="},{"type":"next-occurrence","id":"L4RJiphBarh1Eox9OLUJ5vJSmXw="}],"description":"Crane operations on E 22ND ST eastbound between LEXINGTON AVE (New York) and 3RD AVE (New York), Tuesday April 7th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:14:59Z"},"road_event_id":"OCOKkUnn2k0IxDq0uy+geefOxeQ=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985104,40.738787]]}},{"id":"L4RJiphBarh1Eox9OLUJ5vJSmXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 22ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qGT2TT5k5+pwBH6R3JV6t12jfmc="}],"description":"Crane operations on E 22ND ST eastbound between LEXINGTON AVE (New York) and 3RD AVE (New York), Tuesday April 7th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:14:59Z"},"road_event_id":"L4RJiphBarh1Eox9OLUJ5vJSmXw=","beginning_cross_street":"LEXINGTON AVE","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985104,40.738787]]}},{"id":"Pkoki9VJpSJsJ876gktmsIDC058=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 53"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 53 Both Directions between Park Rd (Parsippany-troy Hills Twp) and North of Park Rd (Parsippany-troy Hills Twp) Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-17T15:11:21Z"},"road_event_id":"Pkoki9VJpSJsJ876gktmsIDC058=","beginning_cross_street":"Park Rd","ending_cross_street":"North of Park Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.473297,40.86639]]}},{"id":"Va0vTDyRmBQCGcWCI9vpUATvHKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 53"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 53 Both Directions between Park Rd (Parsippany-troy Hills Twp) and North of Park Rd (Parsippany-troy Hills Twp) Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-17T15:11:16Z"},"road_event_id":"Va0vTDyRmBQCGcWCI9vpUATvHKg=","beginning_cross_street":"Park Rd","ending_cross_street":"North of Park Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.473297,40.86639]]}},{"id":"AS2OP25Y+gBo/D+KOCFf/PLC/Zw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Southbound at Exit 2 - Walt Whitman Bridge (Camden) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-20T21:24:30Z"},"road_event_id":"AS2OP25Y+gBo/D+KOCFf/PLC/Zw=","beginning_cross_street":"Exit 2 - Walt Whitman Bridge","ending_cross_street":"Exit 2 - Walt Whitman Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.113021,39.903541]]}},{"id":"egowwJhPB2+Fp/9yChesiTORhvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xtbUsw3atJXo4Ml3p170j9Ehwvs="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"egowwJhPB2+Fp/9yChesiTORhvQ=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"xtbUsw3atJXo4Ml3p170j9Ehwvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"xkZn/IhMclsjhOGYIh3hZ2A3zFY="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"xtbUsw3atJXo4Ml3p170j9Ehwvs=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"xkZn/IhMclsjhOGYIh3hZ2A3zFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"kJtqtj76DDcILCL4eOX8Qryghdc="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"xkZn/IhMclsjhOGYIh3hZ2A3zFY=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"kJtqtj76DDcILCL4eOX8Qryghdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"yrYdCkuEbH3ULFL6lK0sUYlTUXA="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"kJtqtj76DDcILCL4eOX8Qryghdc=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"yrYdCkuEbH3ULFL6lK0sUYlTUXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"Ri0SHYFejdzm/VakLJQuU5JkPBM="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"yrYdCkuEbH3ULFL6lK0sUYlTUXA=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"Ri0SHYFejdzm/VakLJQuU5JkPBM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"DJbG/Rl6SMXQItmKfAgC+5+Beuk="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"Ri0SHYFejdzm/VakLJQuU5JkPBM=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"DJbG/Rl6SMXQItmKfAgC+5+Beuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"Qpv1oY2WC4wLJzjkZAaUNrOymPE="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"DJbG/Rl6SMXQItmKfAgC+5+Beuk=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"Qpv1oY2WC4wLJzjkZAaUNrOymPE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"MJ1h9n5Wq+veZSXIPANw1CFh7Cw="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"Qpv1oY2WC4wLJzjkZAaUNrOymPE=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"MJ1h9n5Wq+veZSXIPANw1CFh7Cw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"3Btm6go27dy45K9KcjMYgt81LAc="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"MJ1h9n5Wq+veZSXIPANw1CFh7Cw=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"3Btm6go27dy45K9KcjMYgt81LAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"YqpJsBVIau4HBrMFJoBpEkfmOas="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"3Btm6go27dy45K9KcjMYgt81LAc=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"YqpJsBVIau4HBrMFJoBpEkfmOas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"oU7a83fy+pcI96mYcry+G15YvgY="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"YqpJsBVIau4HBrMFJoBpEkfmOas=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"oU7a83fy+pcI96mYcry+G15YvgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="},{"type":"next-occurrence","id":"NgdxvuKuQVV/tUeLW66zwmcisFU="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"oU7a83fy+pcI96mYcry+G15YvgY=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"NgdxvuKuQVV/tUeLW66zwmcisFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 16TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"egowwJhPB2+Fp/9yChesiTORhvQ="}],"description":"Construction on W 16TH ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for installation of conduit for system reinforcement., Tuesday April 7th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed, Saturday April 11th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T17:10:41Z"},"road_event_id":"NgdxvuKuQVV/tUeLW66zwmcisFU=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998599,40.739833]]}},{"id":"pBtsVvA3l9D7FZJUeZg7pIPuR6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near Briggs Rd (Mount Laurel Twp), Monday April 27, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-20T21:24:42Z"},"road_event_id":"pBtsVvA3l9D7FZJUeZg7pIPuR6A=","beginning_cross_street":"Briggs Rd","ending_cross_street":"East of New Jersey Turnpike","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.898689,39.968528]]}},{"id":"TkFdU87E15zlC8YpJXh5rxLsE3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near South of US 1&9 Truck Route/Pulaski Skyway (Newark), Friday April 24, 2026 10:00 PM thru Saturday April 25, 2026 05:00 AM, right lane closed local lane","update_date":"2026-04-20T21:24:39Z"},"road_event_id":"TkFdU87E15zlC8YpJXh5rxLsE3g=","beginning_cross_street":"South of US 1&9 Truck Route/Pulaski Skyway","ending_cross_street":"North of Wilson Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.133476,40.73014]]}},{"id":"Fs3OZS5tL1I1xVvE2AuYPL34cZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near South of US 1&9 Truck Route/Pulaski Skyway (Newark), Wednesday April 22, 2026 10:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed local lane","update_date":"2026-04-20T21:24:40Z"},"road_event_id":"Fs3OZS5tL1I1xVvE2AuYPL34cZM=","beginning_cross_street":"South of US 1&9 Truck Route/Pulaski Skyway","ending_cross_street":"North of Wilson Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.133476,40.73014]]}},{"id":"i1z7bpxW7YuMYPIuFoWorn9QE+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"8rFdPDjnrZb6kuiz7rEPa913Gm4="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"i1z7bpxW7YuMYPIuFoWorn9QE+s=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"8rFdPDjnrZb6kuiz7rEPa913Gm4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1z7bpxW7YuMYPIuFoWorn9QE+s="},{"type":"next-occurrence","id":"kB+5jp8KHka2zpgg7EBijORJPSg="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"8rFdPDjnrZb6kuiz7rEPa913Gm4=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"kB+5jp8KHka2zpgg7EBijORJPSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1z7bpxW7YuMYPIuFoWorn9QE+s="},{"type":"next-occurrence","id":"eDbrj4LZjnU1mCcYg5OSYR7fSuw="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"kB+5jp8KHka2zpgg7EBijORJPSg=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"eDbrj4LZjnU1mCcYg5OSYR7fSuw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 26TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"i1z7bpxW7YuMYPIuFoWorn9QE+s="}],"description":"Construction on E 26TH ST eastbound between 3RD AVE (New York) and 2ND AVE (New York) for system enhancement-gas., Saturday April 11th, 2026 thru Sunday June 7th, 2026, Saturday/ Sunday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-04-07T17:22:12Z"},"road_event_id":"eDbrj4LZjnU1mCcYg5OSYR7fSuw=","beginning_cross_street":"3RD AVE","ending_cross_street":"2ND AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981521,40.740629]]}},{"id":"ORC300367575","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","description":"Bridge replacement on NJ 47 both directions CR 551/Broadway Av (Westville) to US 130 (Westville) Not currently Scheduled","update_date":"2026-01-01T04:59:00Z"},"road_event_id":"ORC300367575","beginning_cross_street":"CR 551/Broadway Av","ending_cross_street":"US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2024-05-10T17:48:01Z","end_date":"2026-01-01T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-75.125527,39.870341]]}},{"id":"R3269abKYYtI/L2+J+YlqV1pLbE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 35TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CVOJBj8u0BwnK3tZILLKc4O7Dfw="}],"description":"Construction on W 35TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York) for building inspection from boom truck., Saturday April 11th, 2026 thru Sunday April 26th, 2026, Saturday/ Sunday, 06:00 AM thru 01:00 PM All lanes closed","update_date":"2026-04-07T17:23:49Z"},"road_event_id":"R3269abKYYtI/L2+J+YlqV1pLbE=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T10:00:00Z","end_date":"2026-04-25T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984249,40.749171]]}},{"id":"CVOJBj8u0BwnK3tZILLKc4O7Dfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 35TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"R3269abKYYtI/L2+J+YlqV1pLbE="}],"description":"Construction on W 35TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York) for building inspection from boom truck., Saturday April 11th, 2026 thru Sunday April 26th, 2026, Saturday/ Sunday, 06:00 AM thru 01:00 PM All lanes closed","update_date":"2026-04-07T17:23:49Z"},"road_event_id":"CVOJBj8u0BwnK3tZILLKc4O7Dfw=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T10:00:00Z","end_date":"2026-04-26T17:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.984249,40.749171]]}},{"id":"MsHOigyfiHZhKJeNbPXB7OcZvso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Northbound At Ridge Rd (South Brunswick Twp) Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, 1 right lane of 2 lanes, right shoulder closed","update_date":"2026-04-17T15:43:32Z"},"road_event_id":"MsHOigyfiHZhKJeNbPXB7OcZvso=","beginning_cross_street":"Ridge Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.595428,40.366569]]}},{"id":"GHWvwzc51mGa8wWrN1lwxH1sr3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINEHURST AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FZhaTXspYCt5AUhjBGglaqEuNhU="}],"description":"Crane operations on PINEHURST AVE southbound between W 187TH ST (New York) and W 185TH ST (New York), Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:28:38Z"},"road_event_id":"GHWvwzc51mGa8wWrN1lwxH1sr3k=","beginning_cross_street":"W 187TH ST","ending_cross_street":"W 185TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937826,40.855352]]}},{"id":"FZhaTXspYCt5AUhjBGglaqEuNhU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PINEHURST AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GHWvwzc51mGa8wWrN1lwxH1sr3k="}],"description":"Crane operations on PINEHURST AVE southbound between W 187TH ST (New York) and W 185TH ST (New York), Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:28:38Z"},"road_event_id":"FZhaTXspYCt5AUhjBGglaqEuNhU=","beginning_cross_street":"W 187TH ST","ending_cross_street":"W 185TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.937826,40.855352]]}},{"id":"6dcLuhQo5jw3S73t1dDXW2dZF4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound at US 46 (Hasbrouck Heights) Friday April 24, 2026 07:00 AM thru 04:00 PM, intersection","update_date":"2026-04-17T18:06:23Z"},"road_event_id":"6dcLuhQo5jw3S73t1dDXW2dZF4c=","beginning_cross_street":"US 46","ending_cross_street":"US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.064331,40.865673]]}},{"id":"H6SJbE1pghQiImU/F7hbVorGzys=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 143RD ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pAno6L7W//2Wolpxc4h1OJOq4Fk="}],"description":"Crane operations on W 143RD ST eastbound between LENOX AVE (New York) and 22 (New York), Tuesday April 14th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:26:10Z"},"road_event_id":"H6SJbE1pghQiImU/F7hbVorGzys=","beginning_cross_street":"LENOX AVE","ending_cross_street":"22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936961,40.819052]]}},{"id":"pAno6L7W//2Wolpxc4h1OJOq4Fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 143RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6SJbE1pghQiImU/F7hbVorGzys="},{"type":"next-occurrence","id":"gj1RwHzEUfL3Adyml9XHLLShH/I="}],"description":"Crane operations on W 143RD ST eastbound between LENOX AVE (New York) and 22 (New York), Tuesday April 14th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:26:10Z"},"road_event_id":"pAno6L7W//2Wolpxc4h1OJOq4Fk=","beginning_cross_street":"LENOX AVE","ending_cross_street":"22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936961,40.819052]]}},{"id":"gj1RwHzEUfL3Adyml9XHLLShH/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 143RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6SJbE1pghQiImU/F7hbVorGzys="},{"type":"next-occurrence","id":"16GjWmG26uNypl0H2Ly7e5z9wzs="}],"description":"Crane operations on W 143RD ST eastbound between LENOX AVE (New York) and 22 (New York), Tuesday April 14th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:26:10Z"},"road_event_id":"gj1RwHzEUfL3Adyml9XHLLShH/I=","beginning_cross_street":"LENOX AVE","ending_cross_street":"22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936961,40.819052]]}},{"id":"16GjWmG26uNypl0H2Ly7e5z9wzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 143RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6SJbE1pghQiImU/F7hbVorGzys="},{"type":"next-occurrence","id":"FT9A1pHekb+NsaeUku05z4Rg7jc="}],"description":"Crane operations on W 143RD ST eastbound between LENOX AVE (New York) and 22 (New York), Tuesday April 14th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:26:10Z"},"road_event_id":"16GjWmG26uNypl0H2Ly7e5z9wzs=","beginning_cross_street":"LENOX AVE","ending_cross_street":"22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936961,40.819052]]}},{"id":"FT9A1pHekb+NsaeUku05z4Rg7jc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 143RD ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H6SJbE1pghQiImU/F7hbVorGzys="}],"description":"Crane operations on W 143RD ST eastbound between LENOX AVE (New York) and 22 (New York), Tuesday April 14th, 2026 thru Sunday April 26th, 2026, Sunday thru Saturday, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:26:10Z"},"road_event_id":"FT9A1pHekb+NsaeUku05z4Rg7jc=","beginning_cross_street":"LENOX AVE","ending_cross_street":"22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.936961,40.819052]]}},{"id":"rODJVKSUPVIwkg2ugdp0uIhW43A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound at US 46 (Hasbrouck Heights) Wednesday April 22, 2026 07:00 AM thru 04:00 PM, intersection","update_date":"2026-04-17T18:06:26Z"},"road_event_id":"rODJVKSUPVIwkg2ugdp0uIhW43A=","beginning_cross_street":"US 46","ending_cross_street":"US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.064331,40.865673]]}},{"id":"0ShBS3Dm4DAah3ZLCrwDzK59KgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 122ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"z63NKBjSE1dsWaJcQASRoplFiuE="}],"description":"Construction on E 122ND ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:23:57Z"},"road_event_id":"0ShBS3Dm4DAah3ZLCrwDzK59KgE=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941909,40.803749]]}},{"id":"z63NKBjSE1dsWaJcQASRoplFiuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 122ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0ShBS3Dm4DAah3ZLCrwDzK59KgE="},{"type":"next-occurrence","id":"j9GY9KjaPOJcy8eElZeZ7+pmdjQ="}],"description":"Construction on E 122ND ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:23:57Z"},"road_event_id":"z63NKBjSE1dsWaJcQASRoplFiuE=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941909,40.803749]]}},{"id":"j9GY9KjaPOJcy8eElZeZ7+pmdjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 122ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0ShBS3Dm4DAah3ZLCrwDzK59KgE="}],"description":"Construction on E 122ND ST eastbound between MADISON AVE (New York) and PARK AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:23:57Z"},"road_event_id":"j9GY9KjaPOJcy8eElZeZ7+pmdjQ=","beginning_cross_street":"MADISON AVE","ending_cross_street":"PARK AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.941909,40.803749]]}},{"id":"esvfWarGh7MgoDukT5Y85fIYPcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Friday April 24, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-17T18:06:19Z"},"road_event_id":"esvfWarGh7MgoDukT5Y85fIYPcE=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Murray Hill Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.076232,40.825843]]}},{"id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TxI9Xr+xAa9dmxEOKkyN3JOJ76Q="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"TxI9Xr+xAa9dmxEOKkyN3JOJ76Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"GEbGIMB37poPY/s9pyDtwXlrv/g="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"TxI9Xr+xAa9dmxEOKkyN3JOJ76Q=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"GEbGIMB37poPY/s9pyDtwXlrv/g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"3VTvIj8M31ebMWnyn73gQ2gpA28="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"GEbGIMB37poPY/s9pyDtwXlrv/g=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"3VTvIj8M31ebMWnyn73gQ2gpA28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"NpyzWA47aAt7vXFUNx719VoLuIk="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"3VTvIj8M31ebMWnyn73gQ2gpA28=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"NpyzWA47aAt7vXFUNx719VoLuIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"YIVgXMf1kmpaV7wnvw9GmwvK9NQ="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"NpyzWA47aAt7vXFUNx719VoLuIk=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"YIVgXMf1kmpaV7wnvw9GmwvK9NQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"UP69S8rwBh/NiVZE6xCSgGqkd9I="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"YIVgXMf1kmpaV7wnvw9GmwvK9NQ=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"UP69S8rwBh/NiVZE6xCSgGqkd9I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"McaGl9TtjUGIt9IUKZ5LajRXEWA="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"UP69S8rwBh/NiVZE6xCSgGqkd9I=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"McaGl9TtjUGIt9IUKZ5LajRXEWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"QkRnNSUkkdFBOKCNOmxNkuGQrL4="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"McaGl9TtjUGIt9IUKZ5LajRXEWA=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"QkRnNSUkkdFBOKCNOmxNkuGQrL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"93JScS2ufUcLmcP9F1vBviJKnM4="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"QkRnNSUkkdFBOKCNOmxNkuGQrL4=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"93JScS2ufUcLmcP9F1vBviJKnM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="},{"type":"next-occurrence","id":"GY1aHrTZNAzlI8JrJrUIKIYXzeM="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"93JScS2ufUcLmcP9F1vBviJKnM4=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"GY1aHrTZNAzlI8JrJrUIKIYXzeM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["GROVE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sl/qgoEF/xpvvtMG21bDlMTyQ5g="}],"description":"Construction on GROVE ST eastbound between HUDSON ST (New York) and BEDFORD ST (New York) to lift and remove materials from roof., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T19:33:29Z"},"road_event_id":"GY1aHrTZNAzlI8JrJrUIKIYXzeM=","beginning_cross_street":"HUDSON ST","ending_cross_street":"BEDFORD ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006423,40.732412]]}},{"id":"wz3pnQZDB5D2XFZM6KpVTH3IW5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AELlIHyt2R3yprjm7C/XhjgPIII="}],"description":"Construction on NY 878 eastbound near I-678 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:00:13Z"},"road_event_id":"wz3pnQZDB5D2XFZM6KpVTH3IW5A=","beginning_cross_street":"I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801678,40.66527]]}},{"id":"AELlIHyt2R3yprjm7C/XhjgPIII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wz3pnQZDB5D2XFZM6KpVTH3IW5A="},{"type":"next-occurrence","id":"ejpVcd+VeUx435zsj04jtWKH1bI="}],"description":"Construction on NY 878 eastbound near I-678 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:00:13Z"},"road_event_id":"AELlIHyt2R3yprjm7C/XhjgPIII=","beginning_cross_street":"I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801678,40.66527]]}},{"id":"ejpVcd+VeUx435zsj04jtWKH1bI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 878"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"wz3pnQZDB5D2XFZM6KpVTH3IW5A="}],"description":"Construction on NY 878 eastbound near I-678 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 4 lanes closed","update_date":"2026-04-17T18:00:13Z"},"road_event_id":"ejpVcd+VeUx435zsj04jtWKH1bI=","beginning_cross_street":"I-678","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.801678,40.66527]]}},{"id":"lzY44vyVDtX4Wr7sgSQLME+8xf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 95TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GVjLImri1S6XLEnQ77d/fjNhs9k="}],"description":"Construction on E 95TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:22:22Z"},"road_event_id":"lzY44vyVDtX4Wr7sgSQLME+8xf8=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954744,40.786586]]}},{"id":"GVjLImri1S6XLEnQ77d/fjNhs9k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 95TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzY44vyVDtX4Wr7sgSQLME+8xf8="},{"type":"next-occurrence","id":"c9THfCFDAJoqg5R79XwM+0wpTMI="}],"description":"Construction on E 95TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:22:22Z"},"road_event_id":"GVjLImri1S6XLEnQ77d/fjNhs9k=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954744,40.786586]]}},{"id":"c9THfCFDAJoqg5R79XwM+0wpTMI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 95TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzY44vyVDtX4Wr7sgSQLME+8xf8="},{"type":"next-occurrence","id":"/syzf8EwZKKvSdMy91ZKR8G3IpI="}],"description":"Construction on E 95TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:22:22Z"},"road_event_id":"c9THfCFDAJoqg5R79XwM+0wpTMI=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954744,40.786586]]}},{"id":"/syzf8EwZKKvSdMy91ZKR8G3IpI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 95TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lzY44vyVDtX4Wr7sgSQLME+8xf8="}],"description":"Construction on E 95TH ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for building inspection from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:22:22Z"},"road_event_id":"/syzf8EwZKKvSdMy91ZKR8G3IpI=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.954744,40.786586]]}},{"id":"jJiX320/oTYwEMmTmillrhpQs78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"czXQKYXPB2curdyHVmbG6D8WRTg="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"jJiX320/oTYwEMmTmillrhpQs78=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"czXQKYXPB2curdyHVmbG6D8WRTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"4UZoSWzyZet3aZApWrDimVx5etI="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"czXQKYXPB2curdyHVmbG6D8WRTg=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"4UZoSWzyZet3aZApWrDimVx5etI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"rk2j5budsTyk2s8/o8noXQ1W76M="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"4UZoSWzyZet3aZApWrDimVx5etI=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"rk2j5budsTyk2s8/o8noXQ1W76M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"Oxxk7PWS2Kbmxu90o3asYrvfVHg="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"rk2j5budsTyk2s8/o8noXQ1W76M=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"Oxxk7PWS2Kbmxu90o3asYrvfVHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"17Ga4BxAVSGu04CC+uuUF3GiYmY="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"Oxxk7PWS2Kbmxu90o3asYrvfVHg=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"17Ga4BxAVSGu04CC+uuUF3GiYmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"galKGsQipyxHnPamTOqF7WSCwhg="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"17Ga4BxAVSGu04CC+uuUF3GiYmY=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"galKGsQipyxHnPamTOqF7WSCwhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"LMXBF0/feB2cB6LDrrI9si0tDF8="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"galKGsQipyxHnPamTOqF7WSCwhg=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"LMXBF0/feB2cB6LDrrI9si0tDF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"agrKMDMj8dvWeYMOKYWE8Azeovo="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"LMXBF0/feB2cB6LDrrI9si0tDF8=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"agrKMDMj8dvWeYMOKYWE8Azeovo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"QRAcAzKOGGugeUm4LXp+z83FNBs="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"agrKMDMj8dvWeYMOKYWE8Azeovo=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"QRAcAzKOGGugeUm4LXp+z83FNBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"0xyBUk+nu4+NKj/JCQRgR8spNXo="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"QRAcAzKOGGugeUm4LXp+z83FNBs=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"0xyBUk+nu4+NKj/JCQRgR8spNXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"WB4MDVYU4bbE1IuJ1JoDIxrct/E="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"0xyBUk+nu4+NKj/JCQRgR8spNXo=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"WB4MDVYU4bbE1IuJ1JoDIxrct/E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"b7QqwXFuiGA/mwB5jNwVQp7hl3c="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"WB4MDVYU4bbE1IuJ1JoDIxrct/E=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T12:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"b7QqwXFuiGA/mwB5jNwVQp7hl3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"xsUa43s0c+3CUQrVQn7ZttJxXMY="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"b7QqwXFuiGA/mwB5jNwVQp7hl3c=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"xsUa43s0c+3CUQrVQn7ZttJxXMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="},{"type":"next-occurrence","id":"FGVLGwInf2Iz4cWPfZ/69m92hK0="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"xsUa43s0c+3CUQrVQn7ZttJxXMY=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"FGVLGwInf2Iz4cWPfZ/69m92hK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 91ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jJiX320/oTYwEMmTmillrhpQs78="}],"description":"Construction on W 91ST ST westbound between CENTRAL PARK W (New York) and COLUMBUS AVE (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:19:38Z"},"road_event_id":"FGVLGwInf2Iz4cWPfZ/69m92hK0=","beginning_cross_street":"CENTRAL PARK W","ending_cross_street":"COLUMBUS AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967221,40.788568]]}},{"id":"Y/htOlqDFzGFrMRGLoWwhZn3wLA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 17"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 17 Southbound at US 46 (Hasbrouck Heights) Thursday April 23, 2026 07:00 AM thru 04:00 PM, intersection","update_date":"2026-04-17T18:06:27Z"},"road_event_id":"Y/htOlqDFzGFrMRGLoWwhZn3wLA=","beginning_cross_street":"US 46","ending_cross_street":"US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.064331,40.865673]]}},{"id":"PgEAISgFxP1/oGkqU2XmktKqfoo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5RbV7yst0P0U9NfBlfsrSC96A2E="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:50:51Z"},"road_event_id":"PgEAISgFxP1/oGkqU2XmktKqfoo=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"5RbV7yst0P0U9NfBlfsrSC96A2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PgEAISgFxP1/oGkqU2XmktKqfoo="},{"type":"next-occurrence","id":"ks9zmQpkIY1cpAfswPIuoz4vqRM="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:50:51Z"},"road_event_id":"5RbV7yst0P0U9NfBlfsrSC96A2E=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"ks9zmQpkIY1cpAfswPIuoz4vqRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PgEAISgFxP1/oGkqU2XmktKqfoo="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at Ashburton Avenue (Yonkers) D265523/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:50:51Z"},"road_event_id":"ks9zmQpkIY1cpAfswPIuoz4vqRM=","beginning_cross_street":"Ashburton Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880905,40.935061]]}},{"id":"epebQ+izxHJK9tPA2Q3tmQP4u6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 81ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EDw+WnSKb5ANc9QMJqjTIYurKXo="}],"description":"Construction on E 81ST ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage and equipment., Saturday April 18th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:12:35Z"},"road_event_id":"epebQ+izxHJK9tPA2Q3tmQP4u6w=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961304,40.777696]]}},{"id":"EDw+WnSKb5ANc9QMJqjTIYurKXo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 81ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epebQ+izxHJK9tPA2Q3tmQP4u6w="},{"type":"next-occurrence","id":"w80JqlOWrYQHr8W5C3ls6aAIU/w="}],"description":"Construction on E 81ST ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage and equipment., Saturday April 18th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:12:35Z"},"road_event_id":"EDw+WnSKb5ANc9QMJqjTIYurKXo=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961304,40.777696]]}},{"id":"w80JqlOWrYQHr8W5C3ls6aAIU/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 81ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epebQ+izxHJK9tPA2Q3tmQP4u6w="},{"type":"next-occurrence","id":"6KqcBlou9Wziz3hq1DF+RJt6UYk="}],"description":"Construction on E 81ST ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage and equipment., Saturday April 18th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:12:35Z"},"road_event_id":"w80JqlOWrYQHr8W5C3ls6aAIU/w=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961304,40.777696]]}},{"id":"6KqcBlou9Wziz3hq1DF+RJt6UYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 81ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"epebQ+izxHJK9tPA2Q3tmQP4u6w="}],"description":"Construction on E 81ST ST westbound between MADISON AVE (New York) and 5TH AVE (New York) for use of knuckle boom to hoist dunnage and equipment., Saturday April 18th, 2026 thru Saturday May 16th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 17th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:12:35Z"},"road_event_id":"6KqcBlou9Wziz3hq1DF+RJt6UYk=","beginning_cross_street":"MADISON AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.961304,40.777696]]}},{"id":"J4VG8PU4mvMFvMZyXa7nbYenxAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"l3pFla+eofeMrEVOtp/7EnZ8x6Y="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:43:43Z"},"road_event_id":"J4VG8PU4mvMFvMZyXa7nbYenxAE=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T08:00:00Z","end_date":"2026-04-22T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810639,40.691831]]}},{"id":"l3pFla+eofeMrEVOtp/7EnZ8x6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J4VG8PU4mvMFvMZyXa7nbYenxAE="},{"type":"next-occurrence","id":"fAEDOH7DqT8dhTk9PnbSZ50+AbU="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:43:43Z"},"road_event_id":"l3pFla+eofeMrEVOtp/7EnZ8x6Y=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810639,40.691831]]}},{"id":"fAEDOH7DqT8dhTk9PnbSZ50+AbU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J4VG8PU4mvMFvMZyXa7nbYenxAE="},{"type":"next-occurrence","id":"MXwQhR6Cr2c729T/lB6Ik20YNYw="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:43:43Z"},"road_event_id":"fAEDOH7DqT8dhTk9PnbSZ50+AbU=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810639,40.691831]]}},{"id":"MXwQhR6Cr2c729T/lB6Ik20YNYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J4VG8PU4mvMFvMZyXa7nbYenxAE="},{"type":"next-occurrence","id":"pofaIKcrD9qjIBMBeBLz3Io9qFQ="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:43:43Z"},"road_event_id":"MXwQhR6Cr2c729T/lB6Ik20YNYw=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810639,40.691831]]}},{"id":"pofaIKcrD9qjIBMBeBLz3Io9qFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J4VG8PU4mvMFvMZyXa7nbYenxAE="},{"type":"next-occurrence","id":"Xy/eIuS/CHa2sRpTE/qZ4CzWEEY="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:43:43Z"},"road_event_id":"pofaIKcrD9qjIBMBeBLz3Io9qFQ=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T02:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810639,40.691831]]}},{"id":"Xy/eIuS/CHa2sRpTE/qZ4CzWEEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"J4VG8PU4mvMFvMZyXa7nbYenxAE="}],"description":"Construction on I-678 southbound from Exit 5 - 101st Avenue (New York) to Nassau Expressway; NY 878 (New York) Subject to change without notice., Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 11:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 04:00 AM 2 Left lanes of 3 lanes closed, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 04:00 AM thru 06:00 AM 1 Left lane of 3 lanes closed, Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Left lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Left lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T17:43:43Z"},"road_event_id":"Xy/eIuS/CHa2sRpTE/qZ4CzWEEY=","beginning_cross_street":"Exit 5 - 101st Avenue","ending_cross_street":"Nassau Expressway; NY 878","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:58:00Z","end_date":"2026-04-26T10:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810639,40.691831]]}},{"id":"iN/HyucYRydpd48XL36WapW5TY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3jUGniMmcyBi86orHfGcBwS9R/M="}],"description":"Construction on W 52ND ST eastbound between 7TH AVE (New York) for use of knuckle boom for HVAC replacement., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:02:10Z"},"road_event_id":"iN/HyucYRydpd48XL36WapW5TY4=","beginning_cross_street":"7TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98223,40.762291]]}},{"id":"3jUGniMmcyBi86orHfGcBwS9R/M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iN/HyucYRydpd48XL36WapW5TY4="}],"description":"Construction on W 52ND ST eastbound between 7TH AVE (New York) for use of knuckle boom for HVAC replacement., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:02:10Z"},"road_event_id":"3jUGniMmcyBi86orHfGcBwS9R/M=","beginning_cross_street":"7TH AVE","ending_cross_street":"7TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98223,40.762291]]}},{"id":"B0m/M9mUenqgyRBVG/I6/2aIlE8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UPmbGq4LHZIIvXwQq6ag5yNmj6Q="}],"description":"Construction on W 52ND ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:00:16Z"},"road_event_id":"B0m/M9mUenqgyRBVG/I6/2aIlE8=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981006,40.761793]]}},{"id":"UPmbGq4LHZIIvXwQq6ag5yNmj6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 52ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B0m/M9mUenqgyRBVG/I6/2aIlE8="}],"description":"Construction on W 52ND ST eastbound between 7TH AVE (New York) and 6TH AVE (New York) for associated closure., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:00:16Z"},"road_event_id":"UPmbGq4LHZIIvXwQq6ag5yNmj6Q=","beginning_cross_street":"7TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981006,40.761793]]}},{"id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"awveFOqX982PaNysO029IcFGmKA="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"awveFOqX982PaNysO029IcFGmKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"4h3MQf23rQMLiVAGekPdf4yt3Uo="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"awveFOqX982PaNysO029IcFGmKA=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"4h3MQf23rQMLiVAGekPdf4yt3Uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"/HhtNIo+aWxbjmkCh+I6dfknnas="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"4h3MQf23rQMLiVAGekPdf4yt3Uo=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"/HhtNIo+aWxbjmkCh+I6dfknnas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"ZXLSe1dDiJQ8KJQdUxFVkhK6jkM="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"/HhtNIo+aWxbjmkCh+I6dfknnas=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"ZXLSe1dDiJQ8KJQdUxFVkhK6jkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"1j4x3AgQxRFoq64+QcU06tm8f6E="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"ZXLSe1dDiJQ8KJQdUxFVkhK6jkM=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"1j4x3AgQxRFoq64+QcU06tm8f6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"hoBPz4oAYrSxUltqkyeWKuNFS80="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"1j4x3AgQxRFoq64+QcU06tm8f6E=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"hoBPz4oAYrSxUltqkyeWKuNFS80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"b2lTY/KZZJyXLkLNIcxDzEH7fhw="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"hoBPz4oAYrSxUltqkyeWKuNFS80=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"b2lTY/KZZJyXLkLNIcxDzEH7fhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"DSamr2y9BhKyY5vldguZpIpWsUo="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"b2lTY/KZZJyXLkLNIcxDzEH7fhw=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"DSamr2y9BhKyY5vldguZpIpWsUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"wJANSSSKkU1J7UP+QfG4kfVsnZY="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"DSamr2y9BhKyY5vldguZpIpWsUo=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"wJANSSSKkU1J7UP+QfG4kfVsnZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"rabRAz0k0Ggezdh2/f8XOawf2oU="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"wJANSSSKkU1J7UP+QfG4kfVsnZY=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"rabRAz0k0Ggezdh2/f8XOawf2oU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"MOa/Mr2jzJa2nAzCYv6mcow5Rg4="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"rabRAz0k0Ggezdh2/f8XOawf2oU=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"MOa/Mr2jzJa2nAzCYv6mcow5Rg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"/RKAcRtetygdkykK3z99niozobY="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"MOa/Mr2jzJa2nAzCYv6mcow5Rg4=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T12:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"/RKAcRtetygdkykK3z99niozobY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"byjHPArI9mVuAXwr39tjrVufju4="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"/RKAcRtetygdkykK3z99niozobY=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"byjHPArI9mVuAXwr39tjrVufju4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="},{"type":"next-occurrence","id":"MeyzNf5ILpUbHsL7nmRAuOYkZHU="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"byjHPArI9mVuAXwr39tjrVufju4=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"MeyzNf5ILpUbHsL7nmRAuOYkZHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 90TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Z2kkE03hZMiC1GUaNuBwQcJdbRU="}],"description":"Construction on W 90TH ST eastbound between COLUMBUS AVE (New York) and CENTRAL PARK W (New York) for building inspection and facade repairs from boom truck., Saturday April 18th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:18:10Z"},"road_event_id":"MeyzNf5ILpUbHsL7nmRAuOYkZHU=","beginning_cross_street":"COLUMBUS AVE","ending_cross_street":"CENTRAL PARK W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.970183,40.788998]]}},{"id":"fGSHFsWItN92ZfzWUrGR+E66C9Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/JbbX4QDfKFra28RC5nvG1asS2w="}],"description":"Roadwork on NY 305 both directions Town of Clarksville; Town of Genesee Line (Clarksville) to HIGBY RD (Clarksville) 1 Lane, 2 Way, Flagger Control, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-17T17:42:29Z"},"road_event_id":"fGSHFsWItN92ZfzWUrGR+E66C9Y=","beginning_cross_street":"Town of Clarksville; Town of Genesee Line","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.251452,42.106415]]}},{"id":"/JbbX4QDfKFra28RC5nvG1asS2w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGSHFsWItN92ZfzWUrGR+E66C9Y="}],"description":"Roadwork on NY 305 both directions Town of Clarksville; Town of Genesee Line (Clarksville) to HIGBY RD (Clarksville) 1 Lane, 2 Way, Flagger Control, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-17T17:42:29Z"},"road_event_id":"/JbbX4QDfKFra28RC5nvG1asS2w=","beginning_cross_street":"Town of Clarksville; Town of Genesee Line","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.251452,42.106415]]}},{"id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ff3GrVmrrdYBhc69bXdR7COppi8="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"ff3GrVmrrdYBhc69bXdR7COppi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"CgqttdCFLMhpoESdw6WHc0oqGiA="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"ff3GrVmrrdYBhc69bXdR7COppi8=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"CgqttdCFLMhpoESdw6WHc0oqGiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"5zTQPH0fZtbKiPy5XMpVQyS0nAQ="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"CgqttdCFLMhpoESdw6WHc0oqGiA=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"5zTQPH0fZtbKiPy5XMpVQyS0nAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"rn0ze0WOwy+qc+gt/zemHSu1190="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"5zTQPH0fZtbKiPy5XMpVQyS0nAQ=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"rn0ze0WOwy+qc+gt/zemHSu1190=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"H11RIN65RcNk1x/NIs5DofhsvaM="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"rn0ze0WOwy+qc+gt/zemHSu1190=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"H11RIN65RcNk1x/NIs5DofhsvaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"cHZutf2qYyAMn/+e1Uwzn08QjEI="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"H11RIN65RcNk1x/NIs5DofhsvaM=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"cHZutf2qYyAMn/+e1Uwzn08QjEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"lXRVjW3J5c9GpztFonkzGpxakiI="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"cHZutf2qYyAMn/+e1Uwzn08QjEI=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"lXRVjW3J5c9GpztFonkzGpxakiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"YAZrDHp/nN1VeAmawqzl7gcs1Gc="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"lXRVjW3J5c9GpztFonkzGpxakiI=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"YAZrDHp/nN1VeAmawqzl7gcs1Gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"K44nosivg6UnArq7GynuNarc/PE="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"YAZrDHp/nN1VeAmawqzl7gcs1Gc=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"K44nosivg6UnArq7GynuNarc/PE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"Ix1hcKmTv3SLN/nO4yFhsSEVYZ4="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"K44nosivg6UnArq7GynuNarc/PE=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"Ix1hcKmTv3SLN/nO4yFhsSEVYZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"5z3/nP2c8o2rfRIpZoQd0rFHiFQ="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"Ix1hcKmTv3SLN/nO4yFhsSEVYZ4=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"5z3/nP2c8o2rfRIpZoQd0rFHiFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"jfYZWN8HuDdJJ9pXvAnpzGw2r0A="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"5z3/nP2c8o2rfRIpZoQd0rFHiFQ=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"jfYZWN8HuDdJJ9pXvAnpzGw2r0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"l9rDOFiMRuMHUb2pStSQ+9fqGFY="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"jfYZWN8HuDdJJ9pXvAnpzGw2r0A=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"l9rDOFiMRuMHUb2pStSQ+9fqGFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="},{"type":"next-occurrence","id":"k+1INfs1W7A9DzDCRtlk1HUefd4="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"l9rDOFiMRuMHUb2pStSQ+9fqGFY=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"k+1INfs1W7A9DzDCRtlk1HUefd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 47TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kvYsbuWWsGbhN3Rt30p7Rz47jgs="}],"description":"Construction on E 47TH ST westbound between VANDERBILT AVE (New York) and MADISON AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Sunday thru Saturday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:55:46Z"},"road_event_id":"k+1INfs1W7A9DzDCRtlk1HUefd4=","beginning_cross_street":"VANDERBILT AVE","ending_cross_street":"MADISON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976096,40.755615]]}},{"id":"YJUN7vZo07R/65qkL56nJsun4Nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VfvZcx0Mmeri9bFpA4xsdaFxQw0="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"YJUN7vZo07R/65qkL56nJsun4Nw=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"VfvZcx0Mmeri9bFpA4xsdaFxQw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"AtR3TBP0A7yI75XDu1fYi3DNVr8="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"VfvZcx0Mmeri9bFpA4xsdaFxQw0=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"AtR3TBP0A7yI75XDu1fYi3DNVr8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"/Z6g/bX1CWP6HY8fsxjAjb83CFc="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"AtR3TBP0A7yI75XDu1fYi3DNVr8=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"/Z6g/bX1CWP6HY8fsxjAjb83CFc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"otRq4hTwAxyh9FvcyN0/NEmQaK0="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"/Z6g/bX1CWP6HY8fsxjAjb83CFc=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"otRq4hTwAxyh9FvcyN0/NEmQaK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"k8bk4emobGfaEk63WUtrsejZJYI="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"otRq4hTwAxyh9FvcyN0/NEmQaK0=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"k8bk4emobGfaEk63WUtrsejZJYI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"lnm+XrkUIo2kHRs5usg5R9fmNP4="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"k8bk4emobGfaEk63WUtrsejZJYI=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"lnm+XrkUIo2kHRs5usg5R9fmNP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"WbvNcJ0USfm3wEer0jmn328a6sY="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"lnm+XrkUIo2kHRs5usg5R9fmNP4=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"WbvNcJ0USfm3wEer0jmn328a6sY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"oMm2zYVSqPTyMkJjFSs9ODpHCCM="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"WbvNcJ0USfm3wEer0jmn328a6sY=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"oMm2zYVSqPTyMkJjFSs9ODpHCCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"PvcybLsAN/WR9qCtJYuYlgzK22c="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"oMm2zYVSqPTyMkJjFSs9ODpHCCM=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"PvcybLsAN/WR9qCtJYuYlgzK22c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="},{"type":"next-occurrence","id":"2u26AnT6qA93c6cswLFuM4Neuj8="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"PvcybLsAN/WR9qCtJYuYlgzK22c=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"2u26AnT6qA93c6cswLFuM4Neuj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 46TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YJUN7vZo07R/65qkL56nJsun4Nw="}],"description":"Construction on E 46TH ST eastbound between MADISON AVE (New York) and VANDERBILT AVE (New York) for facade installation with mobile crane and man lifts., Tuesday April 14th, 2026 thru Tuesday June 30th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T18:53:57Z"},"road_event_id":"2u26AnT6qA93c6cswLFuM4Neuj8=","beginning_cross_street":"MADISON AVE","ending_cross_street":"VANDERBILT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977343,40.755318]]}},{"id":"09+nO4I2NMU62dV4t5CphLPItVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of I-287 (Parsippany-Troy Hills Twp) and West of I-80 (Parsippany-Troy Hills Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, left lane closed","update_date":"2026-04-17T17:45:24Z"},"road_event_id":"09+nO4I2NMU62dV4t5CphLPItVU=","beginning_cross_street":"East of I-287","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.40953,40.866123]]}},{"id":"QwXH5UBfXux2XuUIJeUAwPTGqjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fmCgUebxUzrvt/KBtZpq+8bPElo="}],"description":"Construction on I-678 northbound from 133rd Avenue (New York) to Foch Boulevard; Ramp (New York) Subject to change without notice., Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:52:25Z"},"road_event_id":"QwXH5UBfXux2XuUIJeUAwPTGqjo=","beginning_cross_street":"133rd Avenue","ending_cross_street":"Foch Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800913,40.669236]]}},{"id":"fmCgUebxUzrvt/KBtZpq+8bPElo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QwXH5UBfXux2XuUIJeUAwPTGqjo="},{"type":"next-occurrence","id":"sHhqX6BV5BHDFCCJuZqITNKT78E="}],"description":"Construction on I-678 northbound from 133rd Avenue (New York) to Foch Boulevard; Ramp (New York) Subject to change without notice., Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:52:25Z"},"road_event_id":"fmCgUebxUzrvt/KBtZpq+8bPElo=","beginning_cross_street":"133rd Avenue","ending_cross_street":"Foch Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T02:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800913,40.669236]]}},{"id":"sHhqX6BV5BHDFCCJuZqITNKT78E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QwXH5UBfXux2XuUIJeUAwPTGqjo="}],"description":"Construction on I-678 northbound from 133rd Avenue (New York) to Foch Boulevard; Ramp (New York) Subject to change without notice., Friday April 24th, 2026, 11:00 PM thru 11:59 PM 1 Right lane of 3 lanes closed, Friday April 24th, 2026 thru Saturday April 25th, 2026, 11:59 PM thru 07:00 AM 2 Right lanes of 3 lanes closed, Saturday April 25th, 2026, 07:00 AM thru 08:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:52:25Z"},"road_event_id":"sHhqX6BV5BHDFCCJuZqITNKT78E=","beginning_cross_street":"133rd Avenue","ending_cross_street":"Foch Boulevard; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:58:00Z","end_date":"2026-04-26T10:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.800913,40.669236]]}},{"id":"CuqqJ4Lp2UCb7S5Fy9dHp2nkN0Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORT HAMILTON PKWY"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ounyIV4x9pIHj4OTUpdKrP/sw5g="}],"description":"Construction on FORT HAMILTON PKWY eastbound between 83RD ST (New York) and 81ST ST (New York) for installation of gas main., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T20:14:03Z"},"road_event_id":"CuqqJ4Lp2UCb7S5Fy9dHp2nkN0Y=","beginning_cross_street":"83RD ST","ending_cross_street":"81ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022277,40.621914]]}},{"id":"ounyIV4x9pIHj4OTUpdKrP/sw5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORT HAMILTON PKWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CuqqJ4Lp2UCb7S5Fy9dHp2nkN0Y="},{"type":"next-occurrence","id":"Sr8vR9lPTUnPGU7sWo0hBPVsUk0="}],"description":"Construction on FORT HAMILTON PKWY eastbound between 83RD ST (New York) and 81ST ST (New York) for installation of gas main., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T20:14:03Z"},"road_event_id":"ounyIV4x9pIHj4OTUpdKrP/sw5g=","beginning_cross_street":"83RD ST","ending_cross_street":"81ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022277,40.621914]]}},{"id":"Sr8vR9lPTUnPGU7sWo0hBPVsUk0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FORT HAMILTON PKWY"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CuqqJ4Lp2UCb7S5Fy9dHp2nkN0Y="}],"description":"Construction on FORT HAMILTON PKWY eastbound between 83RD ST (New York) and 81ST ST (New York) for installation of gas main., Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-14T20:14:03Z"},"road_event_id":"Sr8vR9lPTUnPGU7sWo0hBPVsUk0=","beginning_cross_street":"83RD ST","ending_cross_street":"81ST ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.022277,40.621914]]}},{"id":"kzzjMeDyJ9oBCz+ovkSU7Vry/xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound near West of CR 509/Broad St (Clifton), Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:21:20Z"},"road_event_id":"kzzjMeDyJ9oBCz+ovkSU7Vry/xo=","beginning_cross_street":"West of CR 509/Broad St","ending_cross_street":"West of CR 509/Broad St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.180366,40.859294]]}},{"id":"x9BXlLPupRvLV30G4uXndSNSnQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLARKSON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PAFz7GyFltu8LIdDB1aJAoCLdZo="}],"description":"Crane operations on CLARKSON AVE both directions between E 55TH ST (New York) and E 56TH ST (New York), Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 3rd, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:11:04Z"},"road_event_id":"x9BXlLPupRvLV30G4uXndSNSnQI=","beginning_cross_street":"E 55TH ST","ending_cross_street":"E 56TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926045,40.656912]]}},{"id":"PAFz7GyFltu8LIdDB1aJAoCLdZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLARKSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x9BXlLPupRvLV30G4uXndSNSnQI="},{"type":"next-occurrence","id":"1oQ3t1/fFPqP6x5Lv7mfg8TGpvA="}],"description":"Crane operations on CLARKSON AVE both directions between E 55TH ST (New York) and E 56TH ST (New York), Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 3rd, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:11:04Z"},"road_event_id":"PAFz7GyFltu8LIdDB1aJAoCLdZo=","beginning_cross_street":"E 55TH ST","ending_cross_street":"E 56TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926045,40.656912]]}},{"id":"1oQ3t1/fFPqP6x5Lv7mfg8TGpvA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLARKSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x9BXlLPupRvLV30G4uXndSNSnQI="},{"type":"next-occurrence","id":"A5LOzjuu94MwtBjQ8jaCWm5Xs8Y="}],"description":"Crane operations on CLARKSON AVE both directions between E 55TH ST (New York) and E 56TH ST (New York), Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 3rd, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:11:04Z"},"road_event_id":"1oQ3t1/fFPqP6x5Lv7mfg8TGpvA=","beginning_cross_street":"E 55TH ST","ending_cross_street":"E 56TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926045,40.656912]]}},{"id":"A5LOzjuu94MwtBjQ8jaCWm5Xs8Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CLARKSON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x9BXlLPupRvLV30G4uXndSNSnQI="}],"description":"Crane operations on CLARKSON AVE both directions between E 55TH ST (New York) and E 56TH ST (New York), Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 3rd, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:11:04Z"},"road_event_id":"A5LOzjuu94MwtBjQ8jaCWm5Xs8Y=","beginning_cross_street":"E 55TH ST","ending_cross_street":"E 56TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926045,40.656912]]}},{"id":"61Tk4Z6gxL0xeoSwZtZz6s8fTWA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m9F398qfjpJYQcsGj9UY8/uXVCs="}],"description":"Construction on Hutchinson River Parkway [NYC] northbound from START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:19:58Z"},"road_event_id":"61Tk4Z6gxL0xeoSwZtZz6s8fTWA=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822425]]}},{"id":"m9F398qfjpJYQcsGj9UY8/uXVCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61Tk4Z6gxL0xeoSwZtZz6s8fTWA="},{"type":"next-occurrence","id":"SpsW3+r+a1S8nhXm6C8zMYFRxEk="}],"description":"Construction on Hutchinson River Parkway [NYC] northbound from START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:19:58Z"},"road_event_id":"m9F398qfjpJYQcsGj9UY8/uXVCs=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822425]]}},{"id":"SpsW3+r+a1S8nhXm6C8zMYFRxEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [NYC]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61Tk4Z6gxL0xeoSwZtZz6s8fTWA="}],"description":"Construction on Hutchinson River Parkway [NYC] northbound from START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 4 lanes closed","update_date":"2026-04-17T18:19:58Z"},"road_event_id":"SpsW3+r+a1S8nhXm6C8zMYFRxEk=","beginning_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","ending_cross_street":"START ROUTE Hutchinson River Parkway [NYC]; Exit - Bruckner Boulevard; I-678","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.835984,40.822425]]}},{"id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"w+crxkLaXapZYvJVsvJFujUP2eM="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"w+crxkLaXapZYvJVsvJFujUP2eM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"vlGcCqFoGuhM6uxCZl9Hm1AUbnM="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"w+crxkLaXapZYvJVsvJFujUP2eM=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"vlGcCqFoGuhM6uxCZl9Hm1AUbnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"+WSYI5qaBN/EViJ6D2oQ5pokO5g="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"vlGcCqFoGuhM6uxCZl9Hm1AUbnM=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"+WSYI5qaBN/EViJ6D2oQ5pokO5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"EB9Wh6qFW8WTEyL+bts2vj+yud4="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"+WSYI5qaBN/EViJ6D2oQ5pokO5g=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"EB9Wh6qFW8WTEyL+bts2vj+yud4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"bosMm7NoWnSgsJjbaWNmBeJU6RM="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"EB9Wh6qFW8WTEyL+bts2vj+yud4=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"bosMm7NoWnSgsJjbaWNmBeJU6RM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"3Gdwa/eNumTj09n42qirP5XqTrI="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"bosMm7NoWnSgsJjbaWNmBeJU6RM=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"3Gdwa/eNumTj09n42qirP5XqTrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"6CFMDKxKfPZ1gJBbndPmvoI4IJI="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"3Gdwa/eNumTj09n42qirP5XqTrI=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"6CFMDKxKfPZ1gJBbndPmvoI4IJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"MZosSXwDRlKjXOQ1qpGvlG4yOCY="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"6CFMDKxKfPZ1gJBbndPmvoI4IJI=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"MZosSXwDRlKjXOQ1qpGvlG4yOCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"rb9yt5LBFBCYkXZj5c1PFTdKr4Y="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"MZosSXwDRlKjXOQ1qpGvlG4yOCY=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"rb9yt5LBFBCYkXZj5c1PFTdKr4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="},{"type":"next-occurrence","id":"+g2dEgJr/eUGtYdrRv1cLSpmnJg="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"rb9yt5LBFBCYkXZj5c1PFTdKr4Y=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"+g2dEgJr/eUGtYdrRv1cLSpmnJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["18TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BJy6zqIIKvtsl0z7b+Psugk9Nd4="}],"description":"Construction on 18TH ST westbound between 6TH AVE (New York) and 5TH AVE (New York) 9am to 4pm when school is not in session for use of knuckle boom to unload materials., Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T20:06:25Z"},"road_event_id":"+g2dEgJr/eUGtYdrRv1cLSpmnJg=","beginning_cross_street":"6TH AVE","ending_cross_street":"5TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98955,40.661717]]}},{"id":"l25FGWX2D1t9YmaaNi2fQusUU+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 56 - Squirrelwood Rd (Paterson), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:18:29Z"},"road_event_id":"l25FGWX2D1t9YmaaNi2fQusUU+s=","beginning_cross_street":"East of Exit 56 - Squirrelwood Rd","ending_cross_street":"East of Exit 56 - Squirrelwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188056,40.906044]]}},{"id":"YY06JOXRgQM9tCMHV//9u7ftirM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 56 - Squirrelwood Rd (Paterson), Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:18:33Z"},"road_event_id":"YY06JOXRgQM9tCMHV//9u7ftirM=","beginning_cross_street":"East of Exit 56 - Squirrelwood Rd","ending_cross_street":"East of Exit 56 - Squirrelwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188056,40.906044]]}},{"id":"iVXFirh60y0Fnv65yze/d4+vf8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"H+evge9YqR2MqqU9mtJ29AajHDI="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"iVXFirh60y0Fnv65yze/d4+vf8w=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"H+evge9YqR2MqqU9mtJ29AajHDI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"X/ehZemj1hdSzeEcp5DoMQR5i28="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"H+evge9YqR2MqqU9mtJ29AajHDI=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"X/ehZemj1hdSzeEcp5DoMQR5i28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"qOsqRD4txGiRNgrCtGxlT8lRECc="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"X/ehZemj1hdSzeEcp5DoMQR5i28=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"qOsqRD4txGiRNgrCtGxlT8lRECc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"MnsOunmMPbrPjEUXljHr5arw1RA="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"qOsqRD4txGiRNgrCtGxlT8lRECc=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"MnsOunmMPbrPjEUXljHr5arw1RA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"7Ega0/LN/GD2fBIrmrrKffLz/xo="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"MnsOunmMPbrPjEUXljHr5arw1RA=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"7Ega0/LN/GD2fBIrmrrKffLz/xo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"TgWbEX9UiN7CE8qp7UkEtxhU6SI="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"7Ega0/LN/GD2fBIrmrrKffLz/xo=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"TgWbEX9UiN7CE8qp7UkEtxhU6SI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"5PmtjZk8wIKVj36uYzZ/qYDbqsU="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"TgWbEX9UiN7CE8qp7UkEtxhU6SI=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"5PmtjZk8wIKVj36uYzZ/qYDbqsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"w22vHSSNyeIwLoK4oXxQHAgfeF8="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"5PmtjZk8wIKVj36uYzZ/qYDbqsU=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"w22vHSSNyeIwLoK4oXxQHAgfeF8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"ixhFduAuTxiAS3nLKP7R+xfyBPY="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"w22vHSSNyeIwLoK4oXxQHAgfeF8=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"ixhFduAuTxiAS3nLKP7R+xfyBPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"CGwkzxFSNGd+zHDeXrlrLJeeV9A="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"ixhFduAuTxiAS3nLKP7R+xfyBPY=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"CGwkzxFSNGd+zHDeXrlrLJeeV9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"CNWD9v5+H2cnNZyvhLvGhb1Umjk="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"CGwkzxFSNGd+zHDeXrlrLJeeV9A=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"CNWD9v5+H2cnNZyvhLvGhb1Umjk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"gt1e+sPtKif3qjtCKlO/JewguC4="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"CNWD9v5+H2cnNZyvhLvGhb1Umjk=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"gt1e+sPtKif3qjtCKlO/JewguC4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"CNzx+A32uIX+FOSXW1zrTvFKXyM="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"gt1e+sPtKif3qjtCKlO/JewguC4=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"CNzx+A32uIX+FOSXW1zrTvFKXyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="},{"type":"next-occurrence","id":"QRH0Zp/ZeKdfuKuxapUqjAasluE="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"CNzx+A32uIX+FOSXW1zrTvFKXyM=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"QRH0Zp/ZeKdfuKuxapUqjAasluE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WARREN ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"iVXFirh60y0Fnv65yze/d4+vf8w="}],"description":"Construction on WARREN ST westbound between 5TH AVE (New York) and 4TH AVE (New York) for delivery/unloading of materials for building construction., Friday April 17th, 2026 thru Thursday July 16th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:16:05Z"},"road_event_id":"QRH0Zp/ZeKdfuKuxapUqjAasluE=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.977968,40.68023]]}},{"id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9X0tS4HAS5XwavXDTmuTWtRuy2c="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"9X0tS4HAS5XwavXDTmuTWtRuy2c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"kcxlcpGJisG70P1imXmRfPJdqVg="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"9X0tS4HAS5XwavXDTmuTWtRuy2c=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"kcxlcpGJisG70P1imXmRfPJdqVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"o+h1Dq4iiqN+WO3ELW2s8zpivUM="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"kcxlcpGJisG70P1imXmRfPJdqVg=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"o+h1Dq4iiqN+WO3ELW2s8zpivUM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"d1YZ4v7Lg3n0j2nOuVpdb++iHzA="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"o+h1Dq4iiqN+WO3ELW2s8zpivUM=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"d1YZ4v7Lg3n0j2nOuVpdb++iHzA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"znQlDrJPOz1FaNk7yHnN8OXDf3M="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"d1YZ4v7Lg3n0j2nOuVpdb++iHzA=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"znQlDrJPOz1FaNk7yHnN8OXDf3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"22lQMJB8aOuurKkBE6e3Kg5WYuA="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"znQlDrJPOz1FaNk7yHnN8OXDf3M=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"22lQMJB8aOuurKkBE6e3Kg5WYuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"HwdLWqQFdtj5SOQNyme7ApF0U2M="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"22lQMJB8aOuurKkBE6e3Kg5WYuA=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"HwdLWqQFdtj5SOQNyme7ApF0U2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"Xx/H1/1E/tyQ8Jg3qclUC1OuCmw="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"HwdLWqQFdtj5SOQNyme7ApF0U2M=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"Xx/H1/1E/tyQ8Jg3qclUC1OuCmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"OlKker3fEJJw/WlmuoLAhTJBNd4="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"Xx/H1/1E/tyQ8Jg3qclUC1OuCmw=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"OlKker3fEJJw/WlmuoLAhTJBNd4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"QkFHLZvx7jhIxoWu6Uu50oY7/F4="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"OlKker3fEJJw/WlmuoLAhTJBNd4=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"QkFHLZvx7jhIxoWu6Uu50oY7/F4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"H8sW9San2RisQ5Qx+3mhjuu+0ow="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"QkFHLZvx7jhIxoWu6Uu50oY7/F4=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"H8sW9San2RisQ5Qx+3mhjuu+0ow=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="},{"type":"next-occurrence","id":"rUDYAj02Oh8DMSSP2y3aPNWEjw8="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"H8sW9San2RisQ5Qx+3mhjuu+0ow=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"rUDYAj02Oh8DMSSP2y3aPNWEjw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CRESTON AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"G8pcNEg3XvxR4Q6qyRqN2/UiLHE="}],"description":"Construction on CRESTON AVE southbound between E 197TH ST (New York) and E 196TH ST (New York) to upgrade gas main., Friday April 17th, 2026 thru Monday May 4th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:55:26Z"},"road_event_id":"rUDYAj02Oh8DMSSP2y3aPNWEjw8=","beginning_cross_street":"E 197TH ST","ending_cross_street":"E 196TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.892659,40.870008]]}},{"id":"lMoLhoWdh9p/0+TqfCsKNPEMogM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["13TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3LA/fd+ODm0yFkIFb7m9EEitzrg="}],"description":"Crane operations on 13TH ST westbound between 5TH AVE (New York) and 4TH AVE (New York), Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:03:37Z"},"road_event_id":"lMoLhoWdh9p/0+TqfCsKNPEMogM=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988417,40.666812]]}},{"id":"3LA/fd+ODm0yFkIFb7m9EEitzrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["13TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lMoLhoWdh9p/0+TqfCsKNPEMogM="}],"description":"Crane operations on 13TH ST westbound between 5TH AVE (New York) and 4TH AVE (New York), Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T20:03:37Z"},"road_event_id":"3LA/fd+ODm0yFkIFb7m9EEitzrg=","beginning_cross_street":"5TH AVE","ending_cross_street":"4TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.988417,40.666812]]}},{"id":"BN5KKP5J9GqkM5XL26xG42ocU7E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CDJuo1TvhwXzzlbAdo/uQytvk8c="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"BN5KKP5J9GqkM5XL26xG42ocU7E=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"CDJuo1TvhwXzzlbAdo/uQytvk8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"8EygDvZHoAmD5aCHOxTTv7Yc5WU="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"CDJuo1TvhwXzzlbAdo/uQytvk8c=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"8EygDvZHoAmD5aCHOxTTv7Yc5WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"B8/Wgg4ga5JWypremNpjsBacuzs="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"8EygDvZHoAmD5aCHOxTTv7Yc5WU=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"B8/Wgg4ga5JWypremNpjsBacuzs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"l+znpKI0Vu2haww4O1srfRZ9PAE="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"B8/Wgg4ga5JWypremNpjsBacuzs=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"l+znpKI0Vu2haww4O1srfRZ9PAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"oj5KtmtAyb36vkwBoKO9D1WtCpY="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"l+znpKI0Vu2haww4O1srfRZ9PAE=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"oj5KtmtAyb36vkwBoKO9D1WtCpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"d1foVpt4btanBztYhFh8JjhTang="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"oj5KtmtAyb36vkwBoKO9D1WtCpY=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"d1foVpt4btanBztYhFh8JjhTang=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"MBhfB47DOXH8VqMprIFvpgUOgeo="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"d1foVpt4btanBztYhFh8JjhTang=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"MBhfB47DOXH8VqMprIFvpgUOgeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"dw7h43h91P6pJ6uBS+Pz9TpmsIM="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"MBhfB47DOXH8VqMprIFvpgUOgeo=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"dw7h43h91P6pJ6uBS+Pz9TpmsIM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"y7jbLqwA1eH1yaAzmdRaD2PW+t0="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"dw7h43h91P6pJ6uBS+Pz9TpmsIM=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"y7jbLqwA1eH1yaAzmdRaD2PW+t0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"HoefdDXBNnVe8rPe9zBzdDfsBXk="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"y7jbLqwA1eH1yaAzmdRaD2PW+t0=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"HoefdDXBNnVe8rPe9zBzdDfsBXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"yz98Uq+5K5m5kfpQOq2XKkw6mJY="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"HoefdDXBNnVe8rPe9zBzdDfsBXk=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"yz98Uq+5K5m5kfpQOq2XKkw6mJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"YxJd07QozsNBsmL1lck+ToQy8eQ="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"yz98Uq+5K5m5kfpQOq2XKkw6mJY=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"YxJd07QozsNBsmL1lck+ToQy8eQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"NfFbWkLWvze0Vaj82QX0kQQn3K0="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"YxJd07QozsNBsmL1lck+ToQy8eQ=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"NfFbWkLWvze0Vaj82QX0kQQn3K0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="},{"type":"next-occurrence","id":"mRh+Ats1ceYxAdQq2lTZ0FEW94g="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"NfFbWkLWvze0Vaj82QX0kQQn3K0=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"mRh+Ats1ceYxAdQq2lTZ0FEW94g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["2ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BN5KKP5J9GqkM5XL26xG42ocU7E="}],"description":"Crane operations on 2ND ST both directions between BOND ST (New York), Friday April 17th, 2026 thru Wednesday May 20th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T20:01:42Z"},"road_event_id":"mRh+Ats1ceYxAdQq2lTZ0FEW94g=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991295,40.677489]]}},{"id":"IQddBuaIRmH27GkCQ6T/1RKVSAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"S71t4m67A6+zoibv/wGdbqia1Pw="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"IQddBuaIRmH27GkCQ6T/1RKVSAE=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"S71t4m67A6+zoibv/wGdbqia1Pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"cagkKZwvIOOc3EpTyt1GKOxWRVk="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"S71t4m67A6+zoibv/wGdbqia1Pw=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"cagkKZwvIOOc3EpTyt1GKOxWRVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"gh9rvSLL1Q4gzGa4QwBNHvMIP8I="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"cagkKZwvIOOc3EpTyt1GKOxWRVk=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"gh9rvSLL1Q4gzGa4QwBNHvMIP8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"w/FmiEnyxnB5pyQudqmEEAMGLnY="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"gh9rvSLL1Q4gzGa4QwBNHvMIP8I=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"w/FmiEnyxnB5pyQudqmEEAMGLnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"eFH9l4JP5t63PIBIWA3PN732/+s="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"w/FmiEnyxnB5pyQudqmEEAMGLnY=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"eFH9l4JP5t63PIBIWA3PN732/+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"Aj4ERGpnJlPbe21c1clgGKWbASM="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"eFH9l4JP5t63PIBIWA3PN732/+s=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"Aj4ERGpnJlPbe21c1clgGKWbASM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"I9449p1xQelybxs7RUR7PfIAu9M="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"Aj4ERGpnJlPbe21c1clgGKWbASM=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"I9449p1xQelybxs7RUR7PfIAu9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"JiFMq8+yzLlTgLaOyQuSs1ONslY="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"I9449p1xQelybxs7RUR7PfIAu9M=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"JiFMq8+yzLlTgLaOyQuSs1ONslY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"8sHtO00PPcs5DFa+w79HMEE7R5Q="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"JiFMq8+yzLlTgLaOyQuSs1ONslY=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"8sHtO00PPcs5DFa+w79HMEE7R5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"l3wOzXOfHLea9RharwnGHswjxRw="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"8sHtO00PPcs5DFa+w79HMEE7R5Q=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"l3wOzXOfHLea9RharwnGHswjxRw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"MREk1CtN+k+hm025Rnr/t1slisg="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"l3wOzXOfHLea9RharwnGHswjxRw=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"MREk1CtN+k+hm025Rnr/t1slisg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"3FheVqQ7lp6f62TLYnymn8jEADM="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"MREk1CtN+k+hm025Rnr/t1slisg=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"3FheVqQ7lp6f62TLYnymn8jEADM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"MNEGQbibtP3+y2ABccl19ANQK4k="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"3FheVqQ7lp6f62TLYnymn8jEADM=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"MNEGQbibtP3+y2ABccl19ANQK4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="},{"type":"next-occurrence","id":"A3DNrSVHx9nbxarmWR7d3rEev4g="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"MNEGQbibtP3+y2ABccl19ANQK4k=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"A3DNrSVHx9nbxarmWR7d3rEev4g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VYSE AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IQddBuaIRmH27GkCQ6T/1RKVSAE="}],"description":"Construction on VYSE AVE northbound between FREEMAN ST (New York) and JENNINGS ST (New York) for use of boom and knuckle boom to work on major alteration., Tuesday April 14th, 2026 thru Thursday May 14th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday May 10th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:58:13Z"},"road_event_id":"A3DNrSVHx9nbxarmWR7d3rEev4g=","beginning_cross_street":"FREEMAN ST","ending_cross_street":"JENNINGS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.889881,40.830125]]}},{"id":"ORC300435275","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 20TH ST"],"direction":"unknown","description":"Construction on E 20TH ST eastbound between 20TH ST LOOP (New York) and AVENUE C (New York) for Sandrespc-East side coastal resiliency. Not currently Scheduled","update_date":"2025-05-30T20:00:02Z"},"road_event_id":"ORC300435275","beginning_cross_street":"20TH ST LOOP","ending_cross_street":"AVENUE C","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-04-01T20:13:26Z","end_date":"2025-05-31T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.977725,40.733945]]}},{"id":"yeNe2fOWQdDArd8Rsyy4stJAP/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound near East of Exit 1W - New Rd (East Hanover Twp), Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:18:28Z"},"road_event_id":"yeNe2fOWQdDArd8Rsyy4stJAP/I=","beginning_cross_street":"East of Exit 1W - New Rd","ending_cross_street":"East of Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.338531,40.839157]]}},{"id":"wocnJJTG8tLnhGM27Y3xUJMBqfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Eastbound near East of Exit 56 - Squirrelwood Rd (Paterson), Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:18:22Z"},"road_event_id":"wocnJJTG8tLnhGM27Y3xUJMBqfY=","beginning_cross_street":"East of Exit 56 - Squirrelwood Rd","ending_cross_street":"East of Exit 56 - Squirrelwood Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188056,40.906044]]}},{"id":"PhIcpkLfai1RrzAbUyzXWWL88L8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"THlTM5SMOZhyYl+3HAO2YnhBhAc="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"PhIcpkLfai1RrzAbUyzXWWL88L8=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"THlTM5SMOZhyYl+3HAO2YnhBhAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"ho2ZHMcuM+kt786bJupNlbrFyt0="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"THlTM5SMOZhyYl+3HAO2YnhBhAc=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"ho2ZHMcuM+kt786bJupNlbrFyt0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"31UX9XJtADtV6xOjYl+t+sNWr7g="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"ho2ZHMcuM+kt786bJupNlbrFyt0=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"31UX9XJtADtV6xOjYl+t+sNWr7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"C+0g3vcpYUJGpmTjpZZe7SRLNX4="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"31UX9XJtADtV6xOjYl+t+sNWr7g=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"C+0g3vcpYUJGpmTjpZZe7SRLNX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"7uxSz/wYXsev23E/ldwLJY1HRHo="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"C+0g3vcpYUJGpmTjpZZe7SRLNX4=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"7uxSz/wYXsev23E/ldwLJY1HRHo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"CCZt1xPR/uXnC4JwJ5poHBTCcpA="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"7uxSz/wYXsev23E/ldwLJY1HRHo=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"CCZt1xPR/uXnC4JwJ5poHBTCcpA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"psNmlZnFkLZosQvfAIzSHQUW3kc="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"CCZt1xPR/uXnC4JwJ5poHBTCcpA=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"psNmlZnFkLZosQvfAIzSHQUW3kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"gr3x4b9BBdvbJt2JgzfqkM6Nvkw="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"psNmlZnFkLZosQvfAIzSHQUW3kc=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"gr3x4b9BBdvbJt2JgzfqkM6Nvkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"48+EWwmMGLORTkJlvt4fbRreS+I="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"gr3x4b9BBdvbJt2JgzfqkM6Nvkw=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"48+EWwmMGLORTkJlvt4fbRreS+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"rerlLvvdyioByO2v0c1kL7ztdjQ="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"48+EWwmMGLORTkJlvt4fbRreS+I=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"rerlLvvdyioByO2v0c1kL7ztdjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"Fma308bRjzq+ajj9mn78tUd4Yt8="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"rerlLvvdyioByO2v0c1kL7ztdjQ=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"Fma308bRjzq+ajj9mn78tUd4Yt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"24okbqzLoZUf8EFwUIl5sK3586w="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"Fma308bRjzq+ajj9mn78tUd4Yt8=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"24okbqzLoZUf8EFwUIl5sK3586w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"cU/LLhYXlqODp5kj+zLh7iHHN5o="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"24okbqzLoZUf8EFwUIl5sK3586w=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"cU/LLhYXlqODp5kj+zLh7iHHN5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="},{"type":"next-occurrence","id":"LzGxCjDPWQyMbPDxZpHKieyoxMQ="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"cU/LLhYXlqODp5kj+zLh7iHHN5o=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"LzGxCjDPWQyMbPDxZpHKieyoxMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 176TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PhIcpkLfai1RrzAbUyzXWWL88L8="}],"description":"Construction on E 176TH ST eastbound between MARMION AVE (New York) and MOHEGAN AVE (New York) for concrete pump and booming operations., Friday April 17th, 2026 thru Wednesday May 13th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:48:03Z"},"road_event_id":"LzGxCjDPWQyMbPDxZpHKieyoxMQ=","beginning_cross_street":"MARMION AVE","ending_cross_street":"MOHEGAN AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.888473,40.841447]]}},{"id":"jFLEYAODlEsE2gm+AqL+/KjT67g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"fVvJiye8igc2FsZDpWg/4Nm6dvI="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"jFLEYAODlEsE2gm+AqL+/KjT67g=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"fVvJiye8igc2FsZDpWg/4Nm6dvI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"NdN6aTznWHcGrMBjYq4RGatmC5M="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"fVvJiye8igc2FsZDpWg/4Nm6dvI=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"NdN6aTznWHcGrMBjYq4RGatmC5M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"RgsUv3eiDhA+c7/BazBN9qYLS2U="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"NdN6aTznWHcGrMBjYq4RGatmC5M=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"RgsUv3eiDhA+c7/BazBN9qYLS2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"wKhF/3OIbvE922jJEKG8MK0WjfA="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"RgsUv3eiDhA+c7/BazBN9qYLS2U=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"wKhF/3OIbvE922jJEKG8MK0WjfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"ITobnG/CIGDNi7HLjofWhsPpsCQ="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"wKhF/3OIbvE922jJEKG8MK0WjfA=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"ITobnG/CIGDNi7HLjofWhsPpsCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"72+jX3jvbuiYE64D1FNLBSAa3MY="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"ITobnG/CIGDNi7HLjofWhsPpsCQ=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"72+jX3jvbuiYE64D1FNLBSAa3MY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"kQiN6UcV9057prsWegbPZsNLU1U="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"72+jX3jvbuiYE64D1FNLBSAa3MY=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"kQiN6UcV9057prsWegbPZsNLU1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"ySKz5Kf0Uuv8hPKm+HC8JPKeajQ="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"kQiN6UcV9057prsWegbPZsNLU1U=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"ySKz5Kf0Uuv8hPKm+HC8JPKeajQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"8FNXo/Kjop4dU8XOlMYODwxQQPA="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"ySKz5Kf0Uuv8hPKm+HC8JPKeajQ=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"8FNXo/Kjop4dU8XOlMYODwxQQPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"KZqn5a4LdZadDQ5c+e3ZNO6FuDc="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"8FNXo/Kjop4dU8XOlMYODwxQQPA=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"KZqn5a4LdZadDQ5c+e3ZNO6FuDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"F74XWYxVteifzTKyAXWKBd9e/Yw="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"KZqn5a4LdZadDQ5c+e3ZNO6FuDc=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"F74XWYxVteifzTKyAXWKBd9e/Yw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"p5z8MR2tctGaidEjFXIzDD+Jwis="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"F74XWYxVteifzTKyAXWKBd9e/Yw=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"p5z8MR2tctGaidEjFXIzDD+Jwis=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"8op6SqhA3Vew1fhncffVWO8e6kM="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"p5z8MR2tctGaidEjFXIzDD+Jwis=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"8op6SqhA3Vew1fhncffVWO8e6kM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="},{"type":"next-occurrence","id":"4KG2s7/T19iE0a/q8d2/evBUiKc="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"8op6SqhA3Vew1fhncffVWO8e6kM=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"4KG2s7/T19iE0a/q8d2/evBUiKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 159TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jFLEYAODlEsE2gm+AqL+/KjT67g="}],"description":"Construction on E 159TH ST westbound between MELROSE AVE (New York) and COURTLANDT AVE (New York) for NB-Lull roadway., Friday April 17th, 2026 thru Friday May 15th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:44:08Z"},"road_event_id":"4KG2s7/T19iE0a/q8d2/evBUiKc=","beginning_cross_street":"MELROSE AVE","ending_cross_street":"COURTLANDT AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.91462,40.822974]]}},{"id":"ssajtK9J/h39vMqH6IZk9ZoazkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound near East of Exit 1W - New Rd (East Hanover Twp), Friday April 24, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:18:23Z"},"road_event_id":"ssajtK9J/h39vMqH6IZk9ZoazkU=","beginning_cross_street":"East of Exit 1W - New Rd","ending_cross_street":"East of Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.338531,40.839157]]}},{"id":"VJniFDobywWaDtLQIPbghYjPKfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wukYlZ9UClJHHrVE1QjyKk1feqg="}],"description":"Construction on I-278 westbound between END ROUTE; I-95 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:13:19Z"},"road_event_id":"VJniFDobywWaDtLQIPbghYjPKfw=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833878,40.829876]]}},{"id":"wukYlZ9UClJHHrVE1QjyKk1feqg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJniFDobywWaDtLQIPbghYjPKfw="},{"type":"next-occurrence","id":"l3t7baiWPK8RrddNh/OGwy+Zeu0="}],"description":"Construction on I-278 westbound between END ROUTE; I-95 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:13:19Z"},"road_event_id":"wukYlZ9UClJHHrVE1QjyKk1feqg=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833878,40.829876]]}},{"id":"l3t7baiWPK8RrddNh/OGwy+Zeu0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-278"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"VJniFDobywWaDtLQIPbghYjPKfw="}],"description":"Construction on I-278 westbound between END ROUTE; I-95 (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T18:13:19Z"},"road_event_id":"l3t7baiWPK8RrddNh/OGwy+Zeu0=","beginning_cross_street":"END ROUTE; I-95","ending_cross_street":"END ROUTE; I-95","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.833878,40.829876]]}},{"id":"fjdCiC+6bK65deRSgZcNeQLkNI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DR MARTIN LUTHER KING JR BLVD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vzKj15O+Ov+Sm6mpycMf9Bu0N1Y="}],"description":"Crane operations on DR MARTIN LUTHER KING JR BLVD northbound between W 170TH ST (New York) and MERRIAM AVE (New York) for mobile crane installation to install Con Ed vaults., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:53:37Z"},"road_event_id":"fjdCiC+6bK65deRSgZcNeQLkNI8=","beginning_cross_street":"W 170TH ST","ending_cross_street":"MERRIAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926192,40.842142]]}},{"id":"vzKj15O+Ov+Sm6mpycMf9Bu0N1Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DR MARTIN LUTHER KING JR BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fjdCiC+6bK65deRSgZcNeQLkNI8="}],"description":"Crane operations on DR MARTIN LUTHER KING JR BLVD northbound between W 170TH ST (New York) and MERRIAM AVE (New York) for mobile crane installation to install Con Ed vaults., Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:53:37Z"},"road_event_id":"vzKj15O+Ov+Sm6mpycMf9Bu0N1Y=","beginning_cross_street":"W 170TH ST","ending_cross_street":"MERRIAM AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.926192,40.842142]]}},{"id":"X+TzGXkT4Dj242snga1wi4aQT6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound near East of Exit 1W - New Rd (East Hanover Twp), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T18:18:19Z"},"road_event_id":"X+TzGXkT4Dj242snga1wi4aQT6w=","beginning_cross_street":"East of Exit 1W - New Rd","ending_cross_street":"East of Exit 1W - New Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.338531,40.839157]]}},{"id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"e0VNXy+I17sid3kadc4JziPE92w="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"e0VNXy+I17sid3kadc4JziPE92w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"CJjX8uAlT5q3XvaSbj52i72MYSs="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"e0VNXy+I17sid3kadc4JziPE92w=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"CJjX8uAlT5q3XvaSbj52i72MYSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"DExAqDsawe0zpG4n4XUeJ9tQmgU="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"CJjX8uAlT5q3XvaSbj52i72MYSs=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"DExAqDsawe0zpG4n4XUeJ9tQmgU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"mLgxa/OsC9R9nslHLxFYS8D5Jms="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"DExAqDsawe0zpG4n4XUeJ9tQmgU=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"mLgxa/OsC9R9nslHLxFYS8D5Jms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"fh50bYCSrjtfKOhNfx3FRDSeEFE="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"mLgxa/OsC9R9nslHLxFYS8D5Jms=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"fh50bYCSrjtfKOhNfx3FRDSeEFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"qDTE+U7qa56xAmfGEpg5af9vXf8="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"fh50bYCSrjtfKOhNfx3FRDSeEFE=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"qDTE+U7qa56xAmfGEpg5af9vXf8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"2JyhqZ0kc2rpjcNJkFojiKE1xns="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"qDTE+U7qa56xAmfGEpg5af9vXf8=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"2JyhqZ0kc2rpjcNJkFojiKE1xns=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"i1ijHS63EVgXYVrpmn6JTmBayx8="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"2JyhqZ0kc2rpjcNJkFojiKE1xns=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"i1ijHS63EVgXYVrpmn6JTmBayx8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"yQNI4a3c+SzXr9wAjEh1LY1dmkM="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"i1ijHS63EVgXYVrpmn6JTmBayx8=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"yQNI4a3c+SzXr9wAjEh1LY1dmkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="},{"type":"next-occurrence","id":"EtC7I0b50thmAiYJv9THAe8+p9M="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"yQNI4a3c+SzXr9wAjEh1LY1dmkM=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"EtC7I0b50thmAiYJv9THAe8+p9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["REVIEW PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GLGQ4xlqsIbcPJ+3POGqgh9xhoU="}],"description":"Crane operations on REVIEW PL both directions between W 239TH ST (New York) and VAN CORTLANDT PARK S (New York), Tuesday April 14th, 2026 thru Friday July 10th, 2026, Monday thru Friday, 08:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:49:59Z"},"road_event_id":"EtC7I0b50thmAiYJv9THAe8+p9M=","beginning_cross_street":"W 239TH ST","ending_cross_street":"VAN CORTLANDT PARK S","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899282,40.885644]]}},{"id":"bhaVBGjHY76F92RaPaqBJdhIcGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R7gbJqe1YHuGDt28e8J9xyOaJVk="}],"description":"Construction on I-95 both directions from East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:16:03Z"},"road_event_id":"bhaVBGjHY76F92RaPaqBJdhIcGY=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830561,40.831659]]}},{"id":"R7gbJqe1YHuGDt28e8J9xyOaJVk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bhaVBGjHY76F92RaPaqBJdhIcGY="},{"type":"next-occurrence","id":"Qp6rHEPt4SvN9uXoLmJJMJqdm6A="}],"description":"Construction on I-95 both directions from East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:16:03Z"},"road_event_id":"R7gbJqe1YHuGDt28e8J9xyOaJVk=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830561,40.831659]]}},{"id":"Qp6rHEPt4SvN9uXoLmJJMJqdm6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bhaVBGjHY76F92RaPaqBJdhIcGY="},{"type":"next-occurrence","id":"YfRtq7xOsqs5TtgN6hawB9YnDT8="}],"description":"Construction on I-95 both directions from East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:16:03Z"},"road_event_id":"Qp6rHEPt4SvN9uXoLmJJMJqdm6A=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830561,40.831659]]}},{"id":"YfRtq7xOsqs5TtgN6hawB9YnDT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bhaVBGjHY76F92RaPaqBJdhIcGY="},{"type":"next-occurrence","id":"FVyVSeHEclNZ02bEuu4vDMYYEZ4="}],"description":"Construction on I-95 both directions from East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:16:03Z"},"road_event_id":"YfRtq7xOsqs5TtgN6hawB9YnDT8=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830561,40.831659]]}},{"id":"FVyVSeHEclNZ02bEuu4vDMYYEZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bhaVBGjHY76F92RaPaqBJdhIcGY="},{"type":"next-occurrence","id":"DRbHtsS501azKGlPes6wmDaOWFY="}],"description":"Construction on I-95 both directions from East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:16:03Z"},"road_event_id":"FVyVSeHEclNZ02bEuu4vDMYYEZ4=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830561,40.831659]]}},{"id":"DRbHtsS501azKGlPes6wmDaOWFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"bhaVBGjHY76F92RaPaqBJdhIcGY="}],"description":"Construction on I-95 both directions from East Tremont Avenue; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 10:00 PM thru 05:00 AM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T18:16:03Z"},"road_event_id":"DRbHtsS501azKGlPes6wmDaOWFY=","beginning_cross_street":"East Tremont Avenue; Ramp","ending_cross_street":"East Tremont Avenue; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830561,40.831659]]}},{"id":"YgMlvVwPUWdfhWT+G3HUkXYZO/8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MERCER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LfiEtpERAb949zwpUNEdbo6SDL0="}],"description":"Crane operations on MERCER ST southbound between BROOME ST (New York) and GRAND ST (New York), Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:38:19Z"},"road_event_id":"YgMlvVwPUWdfhWT+G3HUkXYZO/8=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000736,40.722071]]}},{"id":"LfiEtpERAb949zwpUNEdbo6SDL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["MERCER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YgMlvVwPUWdfhWT+G3HUkXYZO/8="}],"description":"Crane operations on MERCER ST southbound between BROOME ST (New York) and GRAND ST (New York), Saturday April 18th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday April 19th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T19:38:19Z"},"road_event_id":"LfiEtpERAb949zwpUNEdbo6SDL0=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.000736,40.722071]]}},{"id":"RYdS3HNe7wfSp0kMYow20q2E/Uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qqDw0TTtbJ3Gvvyd1TY/dxGF3Qk="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"RYdS3HNe7wfSp0kMYow20q2E/Uo=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"qqDw0TTtbJ3Gvvyd1TY/dxGF3Qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"ts8KC5I7jM3DIBwIOOx6auIrRz4="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"qqDw0TTtbJ3Gvvyd1TY/dxGF3Qk=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"ts8KC5I7jM3DIBwIOOx6auIrRz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"F4ELFBQ9G64yJwinVnpq3A64ozU="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"ts8KC5I7jM3DIBwIOOx6auIrRz4=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"F4ELFBQ9G64yJwinVnpq3A64ozU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"OEDYlr4cTNGsvdWUasyYETzDGOM="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"F4ELFBQ9G64yJwinVnpq3A64ozU=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"OEDYlr4cTNGsvdWUasyYETzDGOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"+bsX4r4+JIu3O1fW2cNHX4FdytA="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"OEDYlr4cTNGsvdWUasyYETzDGOM=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"+bsX4r4+JIu3O1fW2cNHX4FdytA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"IaLOosbME1v8vDlpwInYmN1Esto="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"+bsX4r4+JIu3O1fW2cNHX4FdytA=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"IaLOosbME1v8vDlpwInYmN1Esto=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"3KmDbtaEWdRMtrC7DkvLfAEUbVQ="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"IaLOosbME1v8vDlpwInYmN1Esto=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"3KmDbtaEWdRMtrC7DkvLfAEUbVQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"1AY82ITU22uAl5NSpJCzuUF6KL4="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"3KmDbtaEWdRMtrC7DkvLfAEUbVQ=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"1AY82ITU22uAl5NSpJCzuUF6KL4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"pOIV2ojQ8ZzGxouhP0RaZpykwuU="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"1AY82ITU22uAl5NSpJCzuUF6KL4=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"pOIV2ojQ8ZzGxouhP0RaZpykwuU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="},{"type":"next-occurrence","id":"N37KzfnGUSKgH3RV92liKboOdus="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"pOIV2ojQ8ZzGxouhP0RaZpykwuU=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"N37KzfnGUSKgH3RV92liKboOdus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WOOSTER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"RYdS3HNe7wfSp0kMYow20q2E/Uo="}],"description":"Construction on WOOSTER ST southbound between BROOME ST (New York) and GRAND ST (New York) for concrete pump, truck pump and boom., Tuesday April 14th, 2026 thru Sunday May 10th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T19:36:14Z"},"road_event_id":"N37KzfnGUSKgH3RV92liKboOdus=","beginning_cross_street":"BROOME ST","ending_cross_street":"GRAND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.002166,40.722849]]}},{"id":"y7DEq2ioOQr5fniYO8KAiWkAU4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 31 both directions between Brewerton Road; US 11 (Cicero) and Lakeshore Road (Cicero), Continuous Wednesday April 15th,2026 07:00 AM thru Thursday April 30th,2026 03:30 PM 1 Left lane of 2 lanes closed eastbound, westbound","update_date":"2026-04-20T17:00:01Z"},"road_event_id":"y7DEq2ioOQr5fniYO8KAiWkAU4Q=","beginning_cross_street":"Brewerton Road; US 11","ending_cross_street":"Lakeshore Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.119138,43.175476]]}},{"id":"jlEWrctBBnBpr6tjZ15fJiH5M/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yF4LqgMnFjVj/+s5nxtEvTqi3pw="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"jlEWrctBBnBpr6tjZ15fJiH5M/A=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"yF4LqgMnFjVj/+s5nxtEvTqi3pw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jlEWrctBBnBpr6tjZ15fJiH5M/A="},{"type":"next-occurrence","id":"8rPuCL/vwMYQnXU7f1f9pUbDD2k="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"yF4LqgMnFjVj/+s5nxtEvTqi3pw=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"8rPuCL/vwMYQnXU7f1f9pUbDD2k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jlEWrctBBnBpr6tjZ15fJiH5M/A="},{"type":"next-occurrence","id":"g1DWQL+O6ek/vWLdWsch8j42Zgs="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"8rPuCL/vwMYQnXU7f1f9pUbDD2k=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"g1DWQL+O6ek/vWLdWsch8j42Zgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jlEWrctBBnBpr6tjZ15fJiH5M/A="},{"type":"next-occurrence","id":"VAlMfjppDtmsF/SulaqLPal9slI="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"g1DWQL+O6ek/vWLdWsch8j42Zgs=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"VAlMfjppDtmsF/SulaqLPal9slI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jlEWrctBBnBpr6tjZ15fJiH5M/A="},{"type":"next-occurrence","id":"KIa1khfb2nkBPUysGK8qpe/r7/o="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"VAlMfjppDtmsF/SulaqLPal9slI=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"KIa1khfb2nkBPUysGK8qpe/r7/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jlEWrctBBnBpr6tjZ15fJiH5M/A="},{"type":"next-occurrence","id":"jlvv6gmGAHSKfm7St3ex9Zexf00="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"KIa1khfb2nkBPUysGK8qpe/r7/o=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"jlvv6gmGAHSKfm7St3ex9Zexf00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jlEWrctBBnBpr6tjZ15fJiH5M/A="},{"type":"next-occurrence","id":"zmlojYVtXBkx1267SL0iqrxwLVA="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"jlvv6gmGAHSKfm7St3ex9Zexf00=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"zmlojYVtXBkx1267SL0iqrxwLVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jlEWrctBBnBpr6tjZ15fJiH5M/A="}],"description":"Construction on US 9W northbound between Circle Drive (Highlands) and Mine Dock Road (Highlands) 2025082460769/32715309 - This work is weather permitting. Plan travel accordingly; delays may exist, Tuesday March 24th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, shoulder closure","update_date":"2026-03-24T14:08:24Z"},"road_event_id":"zmlojYVtXBkx1267SL0iqrxwLVA=","beginning_cross_street":"Circle Drive","ending_cross_street":"Mine Dock Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.991618,41.321354]]}},{"id":"sD1qxFUp7tgfyGPSdCHKnckMRq4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OidYkzJqa+WPtJa5qsWok8g21+U="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"sD1qxFUp7tgfyGPSdCHKnckMRq4=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"OidYkzJqa+WPtJa5qsWok8g21+U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"5sTIOQbmzoEXFxWXrEa62jaBCTA="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"OidYkzJqa+WPtJa5qsWok8g21+U=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"5sTIOQbmzoEXFxWXrEa62jaBCTA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"K6pva18EJOBZMvrpz0kFGUfs1Ng="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"5sTIOQbmzoEXFxWXrEa62jaBCTA=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"K6pva18EJOBZMvrpz0kFGUfs1Ng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"AJQE3riFn2NlaJMvoKM8UzdywJM="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"K6pva18EJOBZMvrpz0kFGUfs1Ng=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"AJQE3riFn2NlaJMvoKM8UzdywJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"5eLzRX3I1ai1a45OI8uZn850wNY="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"AJQE3riFn2NlaJMvoKM8UzdywJM=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"5eLzRX3I1ai1a45OI8uZn850wNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"BrufygwaFimGiQNlXQFzjA9rL5g="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"5eLzRX3I1ai1a45OI8uZn850wNY=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"BrufygwaFimGiQNlXQFzjA9rL5g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"96F8hgpSpJSfRHN55Oi5PheuNiQ="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"BrufygwaFimGiQNlXQFzjA9rL5g=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"96F8hgpSpJSfRHN55Oi5PheuNiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"K6+NRHho91CWyemX0ZAlwSOD9pU="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"96F8hgpSpJSfRHN55Oi5PheuNiQ=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"K6+NRHho91CWyemX0ZAlwSOD9pU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"FgqwQ10gamMmNrF4wv7z55yIOU8="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"K6+NRHho91CWyemX0ZAlwSOD9pU=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"FgqwQ10gamMmNrF4wv7z55yIOU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"SHD9kgIZkKpPQ/oUAKvJc0kjWdE="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"FgqwQ10gamMmNrF4wv7z55yIOU8=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"SHD9kgIZkKpPQ/oUAKvJc0kjWdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"rySJiL68u3/FhC1jIDUy5PRkE2s="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"SHD9kgIZkKpPQ/oUAKvJc0kjWdE=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"rySJiL68u3/FhC1jIDUy5PRkE2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"Chyf5tQLkO+t6AVqBNZQram2Lfw="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"rySJiL68u3/FhC1jIDUy5PRkE2s=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"Chyf5tQLkO+t6AVqBNZQram2Lfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"xccfVVZ8E2trYqMO39xPHPxW05w="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"Chyf5tQLkO+t6AVqBNZQram2Lfw=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"xccfVVZ8E2trYqMO39xPHPxW05w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="},{"type":"next-occurrence","id":"70WgpGfprIIYKzrWffbXTEYaVhg="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"xccfVVZ8E2trYqMO39xPHPxW05w=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"70WgpGfprIIYKzrWffbXTEYaVhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"sD1qxFUp7tgfyGPSdCHKnckMRq4="}],"description":"Construction on DOUGLASS ST eastbound between NEVINS ST (New York) and 3RD AVE (New York) for major service to 251 Douglass Street., Friday April 10th, 2026 thru Friday May 22nd, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:31:34Z"},"road_event_id":"70WgpGfprIIYKzrWffbXTEYaVhg=","beginning_cross_street":"NEVINS ST","ending_cross_street":"3RD AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.986012,40.680962]]}},{"id":"2BdiW3CP41pTtDyGHuhtLddzTgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ryuiXiG3sSslLOvr48dTJANNPSw="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"2BdiW3CP41pTtDyGHuhtLddzTgE=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"ryuiXiG3sSslLOvr48dTJANNPSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"ZFyXS+a7Btcx39TiJe1AfGzARkk="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"ryuiXiG3sSslLOvr48dTJANNPSw=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"ZFyXS+a7Btcx39TiJe1AfGzARkk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"7/OUH1hg8mbogE5VsoBISycgVxQ="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"ZFyXS+a7Btcx39TiJe1AfGzARkk=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"7/OUH1hg8mbogE5VsoBISycgVxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"uhUlUaSTKgZg36FfXlTuY+lvAuk="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"7/OUH1hg8mbogE5VsoBISycgVxQ=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"uhUlUaSTKgZg36FfXlTuY+lvAuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"ZuEJv3Ohpb5vad3FyMRhYb0CCz4="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"uhUlUaSTKgZg36FfXlTuY+lvAuk=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"ZuEJv3Ohpb5vad3FyMRhYb0CCz4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"h22QDnIZAx/dNXYtnNPMINSVz78="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"ZuEJv3Ohpb5vad3FyMRhYb0CCz4=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"h22QDnIZAx/dNXYtnNPMINSVz78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"qsB+zyibaHn33xnnGMFaKgKgmXs="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"h22QDnIZAx/dNXYtnNPMINSVz78=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"qsB+zyibaHn33xnnGMFaKgKgmXs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"N/3JZlWC1YJDJQsDADDWtGr0HOg="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"qsB+zyibaHn33xnnGMFaKgKgmXs=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"N/3JZlWC1YJDJQsDADDWtGr0HOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"nE0D2KbRn2gHz0ozIABroVgRdcA="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"N/3JZlWC1YJDJQsDADDWtGr0HOg=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"nE0D2KbRn2gHz0ozIABroVgRdcA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"1BdscSQ7RCovYLCpuzco8U4+N6E="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"nE0D2KbRn2gHz0ozIABroVgRdcA=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"1BdscSQ7RCovYLCpuzco8U4+N6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"6Q0p2SrDye/OMYTgO7hAaoeSNG8="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"1BdscSQ7RCovYLCpuzco8U4+N6E=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"6Q0p2SrDye/OMYTgO7hAaoeSNG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"VOlhMNCa8mbVPN/z3llOnG+O9oo="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"6Q0p2SrDye/OMYTgO7hAaoeSNG8=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"VOlhMNCa8mbVPN/z3llOnG+O9oo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"1rjyk9M2UcskHl7cll3ftqC7Yps="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"VOlhMNCa8mbVPN/z3llOnG+O9oo=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"1rjyk9M2UcskHl7cll3ftqC7Yps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="},{"type":"next-occurrence","id":"p+nVhz9/PgRUnnWqSRuUBXDASF0="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"1rjyk9M2UcskHl7cll3ftqC7Yps=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"p+nVhz9/PgRUnnWqSRuUBXDASF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["STRONG PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2BdiW3CP41pTtDyGHuhtLddzTgE="}],"description":"Construction on STRONG PL northbound between DEGRAW ST (New York) and KANE ST (New York) to accommodate truck deliveries., Friday April 10th, 2026 thru Wednesday July 1st, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:27:55Z"},"road_event_id":"p+nVhz9/PgRUnnWqSRuUBXDASF0=","beginning_cross_street":"DEGRAW ST","ending_cross_street":"KANE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.998118,40.684628]]}},{"id":"IVsB6pTt0svtMq86OXYNUqBeuuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"df4635aIBjCXrwhetofscXGafSE="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"IVsB6pTt0svtMq86OXYNUqBeuuA=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"df4635aIBjCXrwhetofscXGafSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"nzunijPf6A2szRLBZCHelSDyZng="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"df4635aIBjCXrwhetofscXGafSE=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"nzunijPf6A2szRLBZCHelSDyZng=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"gqaeP6ophrmLwwpbQbA4nFpEbCs="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"nzunijPf6A2szRLBZCHelSDyZng=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"gqaeP6ophrmLwwpbQbA4nFpEbCs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"HqTvs17uoqZIVdkFobyR5kxEWEo="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"gqaeP6ophrmLwwpbQbA4nFpEbCs=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"HqTvs17uoqZIVdkFobyR5kxEWEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"hcDth6yeGKkSB2uGwAGh+vhe9JY="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"HqTvs17uoqZIVdkFobyR5kxEWEo=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"hcDth6yeGKkSB2uGwAGh+vhe9JY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"1kz9Px6UHgY37VYzShn+A6Ire0A="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"hcDth6yeGKkSB2uGwAGh+vhe9JY=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"1kz9Px6UHgY37VYzShn+A6Ire0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"OPqFKoMwxC7t088akP7FqdzPbZw="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"1kz9Px6UHgY37VYzShn+A6Ire0A=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"OPqFKoMwxC7t088akP7FqdzPbZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"E7zkMbr/Pm2jFml0XndkcdFBLZM="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"OPqFKoMwxC7t088akP7FqdzPbZw=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"E7zkMbr/Pm2jFml0XndkcdFBLZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"AHI3EB5nYQQv482n9besMkdry9w="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"E7zkMbr/Pm2jFml0XndkcdFBLZM=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"AHI3EB5nYQQv482n9besMkdry9w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"wFxZwOsW013g/GMJZu6i06QVdEM="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"AHI3EB5nYQQv482n9besMkdry9w=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"wFxZwOsW013g/GMJZu6i06QVdEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"Z5RpYslCXmfNXsuln7lwqGUCbRU="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"wFxZwOsW013g/GMJZu6i06QVdEM=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"Z5RpYslCXmfNXsuln7lwqGUCbRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"+g8abe4rOoasdPBFcJUukL3y6Sc="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"Z5RpYslCXmfNXsuln7lwqGUCbRU=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"+g8abe4rOoasdPBFcJUukL3y6Sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"Qs4r5BIO+/AikeGGL2Il657mlY8="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"+g8abe4rOoasdPBFcJUukL3y6Sc=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"Qs4r5BIO+/AikeGGL2Il657mlY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="},{"type":"next-occurrence","id":"uVefr+GSKk6rys/fbDOUTaS3Fus="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"Qs4r5BIO+/AikeGGL2Il657mlY8=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"uVefr+GSKk6rys/fbDOUTaS3Fus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["DOUGLASS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IVsB6pTt0svtMq86OXYNUqBeuuA="}],"description":"Construction on DOUGLASS ST both directions between BOND ST (New York) for booming and pumping operations in conjunction with new building project., Friday April 10th, 2026 thru Sunday June 28th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:29:55Z"},"road_event_id":"uVefr+GSKk6rys/fbDOUTaS3Fus=","beginning_cross_street":"BOND ST","ending_cross_street":"BOND ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98819,40.681814]]}},{"id":"5LxJmvUe4M/O9DSPfJPlwOJny5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OkiBBhRoCYKe1gJEGP+sGPKNCKg="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"5LxJmvUe4M/O9DSPfJPlwOJny5E=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"OkiBBhRoCYKe1gJEGP+sGPKNCKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"8bor8qXp70KK2Eny3EvlZR14BoM="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"OkiBBhRoCYKe1gJEGP+sGPKNCKg=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"8bor8qXp70KK2Eny3EvlZR14BoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"OK+fkm3Km3LsKjtJlIhopFCCNYw="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"8bor8qXp70KK2Eny3EvlZR14BoM=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"OK+fkm3Km3LsKjtJlIhopFCCNYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"YntQBgx4Z07f9rw1aj8hH87LfUs="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"OK+fkm3Km3LsKjtJlIhopFCCNYw=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"YntQBgx4Z07f9rw1aj8hH87LfUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"RPx/tlJz1Bahk8KX2Pb8eSVoafU="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"YntQBgx4Z07f9rw1aj8hH87LfUs=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"RPx/tlJz1Bahk8KX2Pb8eSVoafU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"u9segSiLAF2H208nnem7o+8gCtE="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"RPx/tlJz1Bahk8KX2Pb8eSVoafU=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"u9segSiLAF2H208nnem7o+8gCtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"X9h68/IIohQIk4Q5lXQwRgOqTGI="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"u9segSiLAF2H208nnem7o+8gCtE=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"X9h68/IIohQIk4Q5lXQwRgOqTGI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"4vy35s3mxv7yNLZ2MEuKURb9H2M="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"X9h68/IIohQIk4Q5lXQwRgOqTGI=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"4vy35s3mxv7yNLZ2MEuKURb9H2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"fdI/UaLw0QW6Wl0F9Bez04PBjU8="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"4vy35s3mxv7yNLZ2MEuKURb9H2M=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"fdI/UaLw0QW6Wl0F9Bez04PBjU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"tff/Vs2TVWSBfagslRPwRLA1ai0="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"fdI/UaLw0QW6Wl0F9Bez04PBjU8=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"tff/Vs2TVWSBfagslRPwRLA1ai0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"irnMRLqUEAkErfsNT8tPXT8vC14="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"tff/Vs2TVWSBfagslRPwRLA1ai0=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"irnMRLqUEAkErfsNT8tPXT8vC14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"K8gqZgh/Cd1HDpjAKRQHocdMEkE="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"irnMRLqUEAkErfsNT8tPXT8vC14=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"K8gqZgh/Cd1HDpjAKRQHocdMEkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"b/xrSd8CvE7zkoWLIjSYf4RUTG4="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"K8gqZgh/Cd1HDpjAKRQHocdMEkE=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"b/xrSd8CvE7zkoWLIjSYf4RUTG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="},{"type":"next-occurrence","id":"bPhhWw26AHKq5pY0fTt2ueUUSRo="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"b/xrSd8CvE7zkoWLIjSYf4RUTG4=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"bPhhWw26AHKq5pY0fTt2ueUUSRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["10TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5LxJmvUe4M/O9DSPfJPlwOJny5E="}],"description":"Crane operations on 10TH ST eastbound between 40TH AVE (New York) and 38TH AVE (New York), Friday April 10th, 2026 thru Monday May 11th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:35:04Z"},"road_event_id":"bPhhWw26AHKq5pY0fTt2ueUUSRo=","beginning_cross_street":"40TH AVE","ending_cross_street":"38TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.944302,40.756913]]}},{"id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"i41H0ubCHap08/6Pj6RLGGqJ8UU="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"i41H0ubCHap08/6Pj6RLGGqJ8UU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"MTHSF0PDkaYn+IqgkSD6wy3vjVE="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"i41H0ubCHap08/6Pj6RLGGqJ8UU=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"MTHSF0PDkaYn+IqgkSD6wy3vjVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"YtoMJbRyzNQfNnPtztSsL9PrN5c="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"MTHSF0PDkaYn+IqgkSD6wy3vjVE=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"YtoMJbRyzNQfNnPtztSsL9PrN5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"v/4JmqqDeEcYYdpFSUOgF6/pwNo="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"YtoMJbRyzNQfNnPtztSsL9PrN5c=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"v/4JmqqDeEcYYdpFSUOgF6/pwNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"DxZ31m1a2UdUpYzo4h0EndbZtyk="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"v/4JmqqDeEcYYdpFSUOgF6/pwNo=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"DxZ31m1a2UdUpYzo4h0EndbZtyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"6hku7cTKuLjq/TV5EE90NFkaEFo="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"DxZ31m1a2UdUpYzo4h0EndbZtyk=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"6hku7cTKuLjq/TV5EE90NFkaEFo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"R/dFmUn2UaJ1mn6LC+mXRa/n4XE="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"6hku7cTKuLjq/TV5EE90NFkaEFo=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"R/dFmUn2UaJ1mn6LC+mXRa/n4XE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"D5NHScscWUGvsDmtAOkJ0rAL5h8="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"R/dFmUn2UaJ1mn6LC+mXRa/n4XE=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"D5NHScscWUGvsDmtAOkJ0rAL5h8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"OJ0dwcibSNNrQPzPhZ9zQn8MJhs="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"D5NHScscWUGvsDmtAOkJ0rAL5h8=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"OJ0dwcibSNNrQPzPhZ9zQn8MJhs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"oEPQf4fxNg9l/P39FtMjHBtyVhE="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"OJ0dwcibSNNrQPzPhZ9zQn8MJhs=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"oEPQf4fxNg9l/P39FtMjHBtyVhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"yJcOoYX0iF6JoI6gBNjyJ0MP5Pk="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"oEPQf4fxNg9l/P39FtMjHBtyVhE=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"yJcOoYX0iF6JoI6gBNjyJ0MP5Pk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"Bh3MZ2Qyo4URTutDRrIYfRICaI4="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"yJcOoYX0iF6JoI6gBNjyJ0MP5Pk=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"Bh3MZ2Qyo4URTutDRrIYfRICaI4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"0x2xJsFOnCe36zbIuHUnrt8gosM="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"Bh3MZ2Qyo4URTutDRrIYfRICaI4=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"0x2xJsFOnCe36zbIuHUnrt8gosM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="},{"type":"next-occurrence","id":"qCzE96YhWBDqrRqkCJ0a6+eW+UE="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"0x2xJsFOnCe36zbIuHUnrt8gosM=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"qCzE96YhWBDqrRqkCJ0a6+eW+UE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEW JERSEY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hEMh/o9gmqX3Wix/F3cKaUnpqhg="}],"description":"Construction on NEW JERSEY AVE southbound between FULTON ST (New York) and ATLANTIC AVE (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:26:12Z"},"road_event_id":"qCzE96YhWBDqrRqkCJ0a6+eW+UE=","beginning_cross_street":"FULTON ST","ending_cross_street":"ATLANTIC AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896207,40.677312]]}},{"id":"zR3LVeL0eE6IPXy5EXfNMLykuew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"evOlLf9JiJzMGinFx3HZkVXiEk8="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"zR3LVeL0eE6IPXy5EXfNMLykuew=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"evOlLf9JiJzMGinFx3HZkVXiEk8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"iiTzE7spIjfWusV3XHpq60eA2Qs="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"evOlLf9JiJzMGinFx3HZkVXiEk8=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"iiTzE7spIjfWusV3XHpq60eA2Qs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"jdf3rxDdOZX/YF/1m0OczSPevUE="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"iiTzE7spIjfWusV3XHpq60eA2Qs=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"jdf3rxDdOZX/YF/1m0OczSPevUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"0tpWY9aytpat0fn8IWYwUHjskYg="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"jdf3rxDdOZX/YF/1m0OczSPevUE=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"0tpWY9aytpat0fn8IWYwUHjskYg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"gt0nwX3xmngQyCJhEdpe4ywUNIk="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"0tpWY9aytpat0fn8IWYwUHjskYg=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"gt0nwX3xmngQyCJhEdpe4ywUNIk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"nnAMPixSgy0VUBcrc22PXdBGsVc="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"gt0nwX3xmngQyCJhEdpe4ywUNIk=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"nnAMPixSgy0VUBcrc22PXdBGsVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"wpRgRxh/RTH5j382dfQabKd9B24="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"nnAMPixSgy0VUBcrc22PXdBGsVc=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"wpRgRxh/RTH5j382dfQabKd9B24=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"HerAtbVrHhS47kkXaXyW7Mh6hFY="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"wpRgRxh/RTH5j382dfQabKd9B24=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"HerAtbVrHhS47kkXaXyW7Mh6hFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"qdHUnisz2RkgLNG9WGIM3NfHt8E="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"HerAtbVrHhS47kkXaXyW7Mh6hFY=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"qdHUnisz2RkgLNG9WGIM3NfHt8E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"U1X2fd7QAsvLozmjaCw+v1RdxXQ="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"qdHUnisz2RkgLNG9WGIM3NfHt8E=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"U1X2fd7QAsvLozmjaCw+v1RdxXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"QEfnBDRYm4B8v7TBF4dEsMfGIf4="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"U1X2fd7QAsvLozmjaCw+v1RdxXQ=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"QEfnBDRYm4B8v7TBF4dEsMfGIf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"BE2caBnVkY/zT1SwawrAgeGYdhA="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"QEfnBDRYm4B8v7TBF4dEsMfGIf4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"BE2caBnVkY/zT1SwawrAgeGYdhA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"m0OlUB92/zQCCya9wf7qzloEFn4="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"BE2caBnVkY/zT1SwawrAgeGYdhA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"m0OlUB92/zQCCya9wf7qzloEFn4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="},{"type":"next-occurrence","id":"DB64Li/sSA63z2egvXiempzAkbA="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"m0OlUB92/zQCCya9wf7qzloEFn4=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"DB64Li/sSA63z2egvXiempzAkbA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["VERMONT ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zR3LVeL0eE6IPXy5EXfNMLykuew="}],"description":"Construction on VERMONT ST northbound between ATLANTIC AVE (New York) and FULTON ST (New York) for concrete pump and booming operations., Friday April 10th, 2026 thru Tuesday June 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-07T20:24:21Z"},"road_event_id":"DB64Li/sSA63z2egvXiempzAkbA=","beginning_cross_street":"ATLANTIC AVE","ending_cross_street":"FULTON ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.894963,40.676102]]}},{"id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lHb6d4QvGtvizlU5aeJZroMh30w="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"lHb6d4QvGtvizlU5aeJZroMh30w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"j2vU+GT3JVhqwIZMwP6rUhFJfyc="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"lHb6d4QvGtvizlU5aeJZroMh30w=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"j2vU+GT3JVhqwIZMwP6rUhFJfyc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"0J5BvrjDU4x8Mt/jAeKbWessEGM="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"j2vU+GT3JVhqwIZMwP6rUhFJfyc=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"0J5BvrjDU4x8Mt/jAeKbWessEGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"lBEvsR4qvkqOON7kKxVyWwL7xeo="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"0J5BvrjDU4x8Mt/jAeKbWessEGM=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"lBEvsR4qvkqOON7kKxVyWwL7xeo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"M7dpKH0BlzG07D5KH+MaHQqSNdc="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"lBEvsR4qvkqOON7kKxVyWwL7xeo=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"M7dpKH0BlzG07D5KH+MaHQqSNdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"vxsF1TEbsm22TmDN4xa9SljkbeQ="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"M7dpKH0BlzG07D5KH+MaHQqSNdc=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"vxsF1TEbsm22TmDN4xa9SljkbeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"inRZtN9ouvtHG2IXefFM7gM10lU="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"vxsF1TEbsm22TmDN4xa9SljkbeQ=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"inRZtN9ouvtHG2IXefFM7gM10lU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"V6EEYUdXRL55Vlnf7UjidXNIZAs="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"inRZtN9ouvtHG2IXefFM7gM10lU=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"V6EEYUdXRL55Vlnf7UjidXNIZAs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"eY4No/dMoUIeILNJpb6+nnWn9zA="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"V6EEYUdXRL55Vlnf7UjidXNIZAs=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"eY4No/dMoUIeILNJpb6+nnWn9zA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="},{"type":"next-occurrence","id":"dTYwCQoOUvy5XT8R7+ukzvEGgkM="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"eY4No/dMoUIeILNJpb6+nnWn9zA=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"dTYwCQoOUvy5XT8R7+ukzvEGgkM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 120"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0XuBXbP4LsfqpQcwu+F9TMfO/qo="}],"description":"Substructure repairs on NY 120 northbound between Elm Street (New Castle) and Bedford Road - NY 117 (New Castle) 202408111178-80/32492509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 13th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-09T12:25:43Z"},"road_event_id":"dTYwCQoOUvy5XT8R7+ukzvEGgkM=","beginning_cross_street":"","ending_cross_street":"Bedford Road - NY 117","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.764278,41.158352]]}},{"id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6F8Q2dusLm6i3F1CKxR9m8cWe2o="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"6F8Q2dusLm6i3F1CKxR9m8cWe2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"HxN88/9Oz2yFG8U7I85xeqscynQ="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"6F8Q2dusLm6i3F1CKxR9m8cWe2o=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"HxN88/9Oz2yFG8U7I85xeqscynQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"ucdEW2qzese9jvJPkWMAkwiCV6U="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"HxN88/9Oz2yFG8U7I85xeqscynQ=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"ucdEW2qzese9jvJPkWMAkwiCV6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"PqwKQG4g7cjKtBcCrtqT+/O83RY="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"ucdEW2qzese9jvJPkWMAkwiCV6U=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"PqwKQG4g7cjKtBcCrtqT+/O83RY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"s55qYpGxm/99h+h5Qf3u528vjgA="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"PqwKQG4g7cjKtBcCrtqT+/O83RY=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"s55qYpGxm/99h+h5Qf3u528vjgA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"FJHcn1yYjODJtVjQM66FPf534d4="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"s55qYpGxm/99h+h5Qf3u528vjgA=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"FJHcn1yYjODJtVjQM66FPf534d4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"Cme43XVGDe4JJysePrEuMICvT8o="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"FJHcn1yYjODJtVjQM66FPf534d4=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"Cme43XVGDe4JJysePrEuMICvT8o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"cFLjjfZY6bgA1nb8EUPfwrZZppQ="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"Cme43XVGDe4JJysePrEuMICvT8o=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"cFLjjfZY6bgA1nb8EUPfwrZZppQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"YysTeAZcM8PlYZdaJKZaESyT2rI="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"cFLjjfZY6bgA1nb8EUPfwrZZppQ=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"YysTeAZcM8PlYZdaJKZaESyT2rI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="},{"type":"next-occurrence","id":"OypGnK8ldVJ9WbwNsKNyX3rYxLI="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"YysTeAZcM8PlYZdaJKZaESyT2rI=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"OypGnK8ldVJ9WbwNsKNyX3rYxLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JANE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vAxk1RKnRQ9uPaBhnSI+cAJyzYw="}],"description":"Construction on JANE ST westbound between WASHINGTON ST (New York) for booming and pumping operations for new building construction., Tuesday April 14th, 2026 thru Tuesday May 19th, 2026, Monday thru Friday, 07:00 AM thru 06:00 PM All lanes closed","update_date":"2026-04-14T18:22:52Z"},"road_event_id":"OypGnK8ldVJ9WbwNsKNyX3rYxLI=","beginning_cross_street":"WASHINGTON ST","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.00821,40.73814]]}},{"id":"Qd+9wuMMx2D35wbs31bvIO8e94Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"prb2nbRPtPpsG27gfsUV0qYHFzM="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:25:49Z"},"road_event_id":"Qd+9wuMMx2D35wbs31bvIO8e94Q=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"prb2nbRPtPpsG27gfsUV0qYHFzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd+9wuMMx2D35wbs31bvIO8e94Q="},{"type":"next-occurrence","id":"gCf0uZwqCiBunwAHnHC6YufYyjg="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:25:49Z"},"road_event_id":"prb2nbRPtPpsG27gfsUV0qYHFzM=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"gCf0uZwqCiBunwAHnHC6YufYyjg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd+9wuMMx2D35wbs31bvIO8e94Q="},{"type":"next-occurrence","id":"dF3KrfX5P0SQiTGMDbu1uCRNYmI="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:25:49Z"},"road_event_id":"gCf0uZwqCiBunwAHnHC6YufYyjg=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"dF3KrfX5P0SQiTGMDbu1uCRNYmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd+9wuMMx2D35wbs31bvIO8e94Q="},{"type":"next-occurrence","id":"D3+dhAwjCVynq0/QdgEeOPfBPGs="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:25:49Z"},"road_event_id":"dF3KrfX5P0SQiTGMDbu1uCRNYmI=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"D3+dhAwjCVynq0/QdgEeOPfBPGs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd+9wuMMx2D35wbs31bvIO8e94Q="},{"type":"next-occurrence","id":"cnnbD6qCNgJPE070QMrnXe/odZw="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:25:49Z"},"road_event_id":"D3+dhAwjCVynq0/QdgEeOPfBPGs=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"cnnbD6qCNgJPE070QMrnXe/odZw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd+9wuMMx2D35wbs31bvIO8e94Q="},{"type":"next-occurrence","id":"LtNXrH+1a+Rp75Q647KPxlVv0s0="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:25:49Z"},"road_event_id":"cnnbD6qCNgJPE070QMrnXe/odZw=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"LtNXrH+1a+Rp75Q647KPxlVv0s0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Dyer Avenue (Lincoln Tunnel Expressway)"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Qd+9wuMMx2D35wbs31bvIO8e94Q="}],"description":"Scheduled roadwork on Dyer Avenue (Lincoln Tunnel Expressway) both directions between Lincoln Tunnel (New York) and 30th Street (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:25:49Z"},"road_event_id":"LtNXrH+1a+Rp75Q647KPxlVv0s0=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"30th Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T03:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.999567,40.751886]]}},{"id":"tyQJd9FKQsqB4JWKKVRhZows+0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SuAPgLv338o04NWOQEv8N55tXVs="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"tyQJd9FKQsqB4JWKKVRhZows+0A=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"SuAPgLv338o04NWOQEv8N55tXVs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"yB/ScTIvhcwhfYLohZffRNkzyZ4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"SuAPgLv338o04NWOQEv8N55tXVs=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"yB/ScTIvhcwhfYLohZffRNkzyZ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"LTW2SOIUecrbP00mtCZ39d8WWD4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"yB/ScTIvhcwhfYLohZffRNkzyZ4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"LTW2SOIUecrbP00mtCZ39d8WWD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"zBpqAib0cknxiX5aXMbduke2BZE="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"LTW2SOIUecrbP00mtCZ39d8WWD4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"zBpqAib0cknxiX5aXMbduke2BZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"g+DcpSg/vFdNm3HVh5SNGAiUfx0="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"zBpqAib0cknxiX5aXMbduke2BZE=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"g+DcpSg/vFdNm3HVh5SNGAiUfx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"dPxVHZx9ENmFcfCde7mTXNHqIaQ="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"g+DcpSg/vFdNm3HVh5SNGAiUfx0=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"dPxVHZx9ENmFcfCde7mTXNHqIaQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"s0Fz40+Z8XUAu3Vu6W9Jdo69Tkw="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"dPxVHZx9ENmFcfCde7mTXNHqIaQ=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"s0Fz40+Z8XUAu3Vu6W9Jdo69Tkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"UFN9xdnOPkqsJK0WkEKT0KNL9JE="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"s0Fz40+Z8XUAu3Vu6W9Jdo69Tkw=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"UFN9xdnOPkqsJK0WkEKT0KNL9JE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"zRTTIDym2+PVooSWSpS5u0vPTb0="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"UFN9xdnOPkqsJK0WkEKT0KNL9JE=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"zRTTIDym2+PVooSWSpS5u0vPTb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"Iw+kDlD53Tf+3njjIBT2e5C99v4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"zRTTIDym2+PVooSWSpS5u0vPTb0=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"Iw+kDlD53Tf+3njjIBT2e5C99v4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"VTY1rz5Tvmr4+kJc9U2w6AqkDDA="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"Iw+kDlD53Tf+3njjIBT2e5C99v4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"VTY1rz5Tvmr4+kJc9U2w6AqkDDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"W9b7Q8xVn76mltVtnh4g12t5pc4="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"VTY1rz5Tvmr4+kJc9U2w6AqkDDA=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"W9b7Q8xVn76mltVtnh4g12t5pc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"U4/6YR11QZSo2uLb15ULFMt/7/Q="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"W9b7Q8xVn76mltVtnh4g12t5pc4=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"U4/6YR11QZSo2uLb15ULFMt/7/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="},{"type":"next-occurrence","id":"1a71vkbdeSg/lf53a3cChGlasOA="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"U4/6YR11QZSo2uLb15ULFMt/7/Q=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"1a71vkbdeSg/lf53a3cChGlasOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY I86"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tyQJd9FKQsqB4JWKKVRhZows+0A="}],"description":"Bridge rehabilitation and deck work on NY I86 westbound Exit 61 (Barton) to I-86 (Chemung) 2 lanes reduced to 1, Thursday April 16th, 2026 thru Friday November 20th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-10T19:41:35Z"},"road_event_id":"1a71vkbdeSg/lf53a3cChGlasOA=","beginning_cross_street":"Exit 61","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.514937,42.000374]]}},{"id":"ORC300540115","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 9L"],"direction":"unknown","description":"Installation of fiber optics on NY 9L both directions Quaker Road; NY 254 (Queensbury) to Meadowbrook Rd (Glens Falls) Alternating Not currently Scheduled","update_date":"2026-04-20T23:00:01Z"},"road_event_id":"ORC300540115","beginning_cross_street":"Quaker Road; NY 254","ending_cross_street":"Meadowbrook Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-17T17:21:27Z","end_date":"2026-04-21T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.636806,43.330989]]}},{"id":"NRfhFpU4BF+0C6Z8xE69Dz3/Plk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"++a3McpVhN/R6Ya9fJMI30az+e4="}],"description":"Bridge rehabilitation on WATER ST westbound between COLONIE ST (Albany) and ORANGE ST (Albany) various lane closures, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-17T11:26:00Z"},"road_event_id":"NRfhFpU4BF+0C6Z8xE69Dz3/Plk=","beginning_cross_street":"COLONIE ST","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.743969,42.65617]]}},{"id":"++a3McpVhN/R6Ya9fJMI30az+e4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NRfhFpU4BF+0C6Z8xE69Dz3/Plk="},{"type":"next-occurrence","id":"g5aMS+VK/xEDfbQQmYirQ9MrYJ8="}],"description":"Bridge rehabilitation on WATER ST westbound between COLONIE ST (Albany) and ORANGE ST (Albany) various lane closures, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-17T11:26:00Z"},"road_event_id":"++a3McpVhN/R6Ya9fJMI30az+e4=","beginning_cross_street":"COLONIE ST","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.743969,42.65617]]}},{"id":"g5aMS+VK/xEDfbQQmYirQ9MrYJ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WATER ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NRfhFpU4BF+0C6Z8xE69Dz3/Plk="}],"description":"Bridge rehabilitation on WATER ST westbound between COLONIE ST (Albany) and ORANGE ST (Albany) various lane closures, Friday April 17th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-17T11:26:00Z"},"road_event_id":"g5aMS+VK/xEDfbQQmYirQ9MrYJ8=","beginning_cross_street":"COLONIE ST","ending_cross_street":"ORANGE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.743969,42.65617]]}},{"id":"hk3HBNd72wrb7rJ3llHQsuP1R88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LYGYCUvjfNRcMRbdTPTayNbo7Bg="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:15:54Z"},"road_event_id":"hk3HBNd72wrb7rJ3llHQsuP1R88=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"LYGYCUvjfNRcMRbdTPTayNbo7Bg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hk3HBNd72wrb7rJ3llHQsuP1R88="},{"type":"next-occurrence","id":"OKyGIqUJwEN8hO0PM3JhpEC3HZg="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:15:54Z"},"road_event_id":"LYGYCUvjfNRcMRbdTPTayNbo7Bg=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"OKyGIqUJwEN8hO0PM3JhpEC3HZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hk3HBNd72wrb7rJ3llHQsuP1R88="},{"type":"next-occurrence","id":"EzNtYnR+TV/UszUQOtL9zr0TEiA="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:15:54Z"},"road_event_id":"OKyGIqUJwEN8hO0PM3JhpEC3HZg=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"EzNtYnR+TV/UszUQOtL9zr0TEiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hk3HBNd72wrb7rJ3llHQsuP1R88="},{"type":"next-occurrence","id":"M7Lo4XRkBjD23q0AEEfw7UbNIGE="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:15:54Z"},"road_event_id":"EzNtYnR+TV/UszUQOtL9zr0TEiA=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"M7Lo4XRkBjD23q0AEEfw7UbNIGE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hk3HBNd72wrb7rJ3llHQsuP1R88="},{"type":"next-occurrence","id":"LkrvLs0b+hq2y0/KqjG3RRfSctM="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:15:54Z"},"road_event_id":"M7Lo4XRkBjD23q0AEEfw7UbNIGE=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"LkrvLs0b+hq2y0/KqjG3RRfSctM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hk3HBNd72wrb7rJ3llHQsuP1R88="},{"type":"next-occurrence","id":"8HK1Ul6Gl8vC5D6OCkmYpJCJbH0="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:15:54Z"},"road_event_id":"LkrvLs0b+hq2y0/KqjG3RRfSctM=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"8HK1Ul6Gl8vC5D6OCkmYpJCJbH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["9th Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hk3HBNd72wrb7rJ3llHQsuP1R88="}],"description":"Scheduled roadwork on 9th Avenue southbound ramp to Lincoln Tunnel (New York), Tuesday April 21st, 2026 thru Thursday August 27th, 2026, Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T17:15:54Z"},"road_event_id":"8HK1Ul6Gl8vC5D6OCkmYpJCJbH0=","beginning_cross_street":"Lincoln Tunnel","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T03:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995268,40.754906]]}},{"id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wTMgxacXNJ5qEo+Dlwc22VHw1jM="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"wTMgxacXNJ5qEo+Dlwc22VHw1jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"WlylmmHusPv8nKprINpFGX0nMHI="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"wTMgxacXNJ5qEo+Dlwc22VHw1jM=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"WlylmmHusPv8nKprINpFGX0nMHI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"EyNLnn7Xatew57YJjvg1ok+fcyg="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"WlylmmHusPv8nKprINpFGX0nMHI=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"EyNLnn7Xatew57YJjvg1ok+fcyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"IDYDMDfhZTzco02Qca/C1i47k3o="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"EyNLnn7Xatew57YJjvg1ok+fcyg=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"IDYDMDfhZTzco02Qca/C1i47k3o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"46bIsdWY799yIiF5kL0ZupvlQbQ="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"IDYDMDfhZTzco02Qca/C1i47k3o=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"46bIsdWY799yIiF5kL0ZupvlQbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"c9FZH2fFIgiamXzHxB43Li9v82o="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"46bIsdWY799yIiF5kL0ZupvlQbQ=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"c9FZH2fFIgiamXzHxB43Li9v82o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"zV/Ewb07djoFIlY+jA6edpjxgN8="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"c9FZH2fFIgiamXzHxB43Li9v82o=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"zV/Ewb07djoFIlY+jA6edpjxgN8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"FgoWMDmmwFd1gUNJ3onDPJKt9hA="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"zV/Ewb07djoFIlY+jA6edpjxgN8=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"FgoWMDmmwFd1gUNJ3onDPJKt9hA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"zMOcj+jsIDu4STrdZxILORPLFIc="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"FgoWMDmmwFd1gUNJ3onDPJKt9hA=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"zMOcj+jsIDu4STrdZxILORPLFIc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="},{"type":"next-occurrence","id":"AyUD9K8NXSDLQim/83NhQu2Rdqw="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"zMOcj+jsIDu4STrdZxILORPLFIc=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"AyUD9K8NXSDLQim/83NhQu2Rdqw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 37TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"rMRcBQ8B7xZ/wUCw7WMOqf/1Kc8="}],"description":"Construction on W 37TH ST westbound between BROADWAY (New York) for conduit installation for new services/service upgrade and new structure installation., Tuesday April 14th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 08:00 PM thru 03:00 AM All lanes closed","update_date":"2026-04-14T18:45:39Z"},"road_event_id":"AyUD9K8NXSDLQim/83NhQu2Rdqw=","beginning_cross_street":"BROADWAY","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987575,40.752201]]}},{"id":"73psLtEOZBjg+IRGzuNb8wEUhH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 11TH ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"SDY+Dn/q7+yKRBiR4y2ctpzHRes="}],"description":"Construction on W 11TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T18:41:30Z"},"road_event_id":"73psLtEOZBjg+IRGzuNb8wEUhH8=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995184,40.734086]]}},{"id":"SDY+Dn/q7+yKRBiR4y2ctpzHRes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 11TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73psLtEOZBjg+IRGzuNb8wEUhH8="},{"type":"next-occurrence","id":"5aILYrrNUnWW55TDBUUm3q9ZdAI="}],"description":"Construction on W 11TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T18:41:30Z"},"road_event_id":"SDY+Dn/q7+yKRBiR4y2ctpzHRes=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995184,40.734086]]}},{"id":"5aILYrrNUnWW55TDBUUm3q9ZdAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 11TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73psLtEOZBjg+IRGzuNb8wEUhH8="},{"type":"next-occurrence","id":"zrLES8oEDFUfVT3xBD+7902RGtw="}],"description":"Construction on W 11TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T18:41:30Z"},"road_event_id":"5aILYrrNUnWW55TDBUUm3q9ZdAI=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995184,40.734086]]}},{"id":"zrLES8oEDFUfVT3xBD+7902RGtw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 11TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73psLtEOZBjg+IRGzuNb8wEUhH8="},{"type":"next-occurrence","id":"cT6CZeUGz7y71xxPehjyF0JmyEI="}],"description":"Construction on W 11TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T18:41:30Z"},"road_event_id":"zrLES8oEDFUfVT3xBD+7902RGtw=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995184,40.734086]]}},{"id":"cT6CZeUGz7y71xxPehjyF0JmyEI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 11TH ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"73psLtEOZBjg+IRGzuNb8wEUhH8="}],"description":"Construction on W 11TH ST westbound between 5TH AVE (New York) and 6TH AVE (New York) for building inspection from boom truck., Tuesday April 14th, 2026 thru Tuesday April 28th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes closed","update_date":"2026-04-14T18:41:30Z"},"road_event_id":"cT6CZeUGz7y71xxPehjyF0JmyEI=","beginning_cross_street":"5TH AVE","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995184,40.734086]]}},{"id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QxRidnG/F8EZQkYGrp0cVm5EDkE="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"QxRidnG/F8EZQkYGrp0cVm5EDkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"EiBBMULUGhdnbDcfILtP85ZjjPg="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"QxRidnG/F8EZQkYGrp0cVm5EDkE=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"EiBBMULUGhdnbDcfILtP85ZjjPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"V83etEpP+H/15Gg4nGgr+W+v0dk="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"EiBBMULUGhdnbDcfILtP85ZjjPg=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"V83etEpP+H/15Gg4nGgr+W+v0dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"R7oR1sd4UJ4oHuK2LTKhgUyRJUc="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"V83etEpP+H/15Gg4nGgr+W+v0dk=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"R7oR1sd4UJ4oHuK2LTKhgUyRJUc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"jUzK4uuSv3FXFe5VNN0VvvKr8zE="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"R7oR1sd4UJ4oHuK2LTKhgUyRJUc=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"jUzK4uuSv3FXFe5VNN0VvvKr8zE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"F6KJ6+82nt+n1b9TBJbJuZ7FT4E="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"jUzK4uuSv3FXFe5VNN0VvvKr8zE=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"F6KJ6+82nt+n1b9TBJbJuZ7FT4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"gvNeqsX72VG5pxRb5Kgmg4bRxDw="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"F6KJ6+82nt+n1b9TBJbJuZ7FT4E=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"gvNeqsX72VG5pxRb5Kgmg4bRxDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"luAjesSkrNjcHvdrq/4DObplLTY="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"gvNeqsX72VG5pxRb5Kgmg4bRxDw=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"luAjesSkrNjcHvdrq/4DObplLTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"hq3GpoB0gCpOSJ+ZUivPO/btScc="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"luAjesSkrNjcHvdrq/4DObplLTY=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"hq3GpoB0gCpOSJ+ZUivPO/btScc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"x0MRxWxJ1MZIwfg4NmMT7sR0cW8="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"hq3GpoB0gCpOSJ+ZUivPO/btScc=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"x0MRxWxJ1MZIwfg4NmMT7sR0cW8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"MVxeyOy0k6xrovS6YaJd+OE+cfA="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"x0MRxWxJ1MZIwfg4NmMT7sR0cW8=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"MVxeyOy0k6xrovS6YaJd+OE+cfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="},{"type":"next-occurrence","id":"qKh2W57w3fSE29QHIP3Z5LH6nfM="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"MVxeyOy0k6xrovS6YaJd+OE+cfA=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"qKh2W57w3fSE29QHIP3Z5LH6nfM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["RIVER TER"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"eBpkbTZ311dzaqQIRZqzS8c8Kv0="}],"description":"Construction on RIVER TER both directions between 6TH PL (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:29:35Z"},"road_event_id":"qKh2W57w3fSE29QHIP3Z5LH6nfM=","beginning_cross_street":"6TH PL","ending_cross_street":"6TH PL","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.015763,40.717709]]}},{"id":"WGPm0L9+24f7yL2w/m7c7knKFlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c6iY9TqXlGdYDq6wzGglaszcj74="}],"description":"Culvert repairs on NY 31A both directions between West Sweden Rd. (Clarendon) and County Line Rd. (Clarendon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-04-17T17:10:03Z"},"road_event_id":"WGPm0L9+24f7yL2w/m7c7knKFlA=","beginning_cross_street":"West Sweden Rd.","ending_cross_street":"County Line Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.987272,43.197958]]}},{"id":"c6iY9TqXlGdYDq6wzGglaszcj74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WGPm0L9+24f7yL2w/m7c7knKFlA="},{"type":"next-occurrence","id":"7N68HXzlh+ts+VjLFMoWQa1S7e4="}],"description":"Culvert repairs on NY 31A both directions between West Sweden Rd. (Clarendon) and County Line Rd. (Clarendon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-04-17T17:10:03Z"},"road_event_id":"c6iY9TqXlGdYDq6wzGglaszcj74=","beginning_cross_street":"West Sweden Rd.","ending_cross_street":"County Line Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.987272,43.197958]]}},{"id":"7N68HXzlh+ts+VjLFMoWQa1S7e4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 31A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WGPm0L9+24f7yL2w/m7c7knKFlA="}],"description":"Culvert repairs on NY 31A both directions between West Sweden Rd. (Clarendon) and County Line Rd. (Clarendon) Alternating lane closures with flaggers as needed, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes","update_date":"2026-04-17T17:10:03Z"},"road_event_id":"7N68HXzlh+ts+VjLFMoWQa1S7e4=","beginning_cross_street":"West Sweden Rd.","ending_cross_street":"County Line Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.987272,43.197958]]}},{"id":"5L95U6PAQQjul1hsX9+UOmW/8fk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7ZzKXt6oN9hTp+3TpplIpH1MGeE="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"5L95U6PAQQjul1hsX9+UOmW/8fk=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"7ZzKXt6oN9hTp+3TpplIpH1MGeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"EZpI92OL0uhsYsIrV/CUS731PX0="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"7ZzKXt6oN9hTp+3TpplIpH1MGeE=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"EZpI92OL0uhsYsIrV/CUS731PX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"8qCwO5gzoZVIhySlpqJWHD6sbNY="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"EZpI92OL0uhsYsIrV/CUS731PX0=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"8qCwO5gzoZVIhySlpqJWHD6sbNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"QSGv7mJZQoHx6k7OpR2cVESmzFY="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"8qCwO5gzoZVIhySlpqJWHD6sbNY=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"QSGv7mJZQoHx6k7OpR2cVESmzFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"F6O+VkpGOgPI29lVVbmqRm3ISWQ="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"QSGv7mJZQoHx6k7OpR2cVESmzFY=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"F6O+VkpGOgPI29lVVbmqRm3ISWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"kyKDN9IeZ6L/EdCebMOqGuC5DoQ="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"F6O+VkpGOgPI29lVVbmqRm3ISWQ=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"kyKDN9IeZ6L/EdCebMOqGuC5DoQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"cjnV/USHNBdg0J+VYd2y6tPHbuQ="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"kyKDN9IeZ6L/EdCebMOqGuC5DoQ=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"cjnV/USHNBdg0J+VYd2y6tPHbuQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"PdyRmSh7CqENpSnXuZ1ZipU3QWQ="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"cjnV/USHNBdg0J+VYd2y6tPHbuQ=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"PdyRmSh7CqENpSnXuZ1ZipU3QWQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"4Sg+1v+rQjVYV8qLAOHrFpslKhQ="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"PdyRmSh7CqENpSnXuZ1ZipU3QWQ=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"4Sg+1v+rQjVYV8qLAOHrFpslKhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"oiS8alEDgq+y2msf2LTnt5NDpOY="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"4Sg+1v+rQjVYV8qLAOHrFpslKhQ=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"oiS8alEDgq+y2msf2LTnt5NDpOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"/5h5/cRJvTr/zaNHQjLV9H8nO+4="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"oiS8alEDgq+y2msf2LTnt5NDpOY=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"/5h5/cRJvTr/zaNHQjLV9H8nO+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="},{"type":"next-occurrence","id":"UKF9Vj4EN5lp+GbuX/X1d3yjv7g="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"/5h5/cRJvTr/zaNHQjLV9H8nO+4=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"UKF9Vj4EN5lp+GbuX/X1d3yjv7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CHAMBERS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5L95U6PAQQjul1hsX9+UOmW/8fk="}],"description":"Construction on CHAMBERS ST both directions between N END AVE (New York) for water main work., Tuesday April 14th, 2026 thru Wednesday May 13th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM All lanes closed, Saturday April 18th, 2026 thru Saturday May 9th, 2026, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-04-14T18:26:08Z"},"road_event_id":"UKF9Vj4EN5lp+GbuX/X1d3yjv7g=","beginning_cross_street":"N END AVE","ending_cross_street":"N END AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.013845,40.717626]]}},{"id":"NX/qmSRqaEUbzA/Fy4Lrm7yjPmY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JKiCDsDw5AxoX9huHhgMxEnXBZg="}],"description":"Installation of traffic management systems on US 9 northbound at Nepperhan Avenue (Yonkers) D265523/32724209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:23Z"},"road_event_id":"NX/qmSRqaEUbzA/Fy4Lrm7yjPmY=","beginning_cross_street":"Nepperhan Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898801,40.931659]]}},{"id":"JKiCDsDw5AxoX9huHhgMxEnXBZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NX/qmSRqaEUbzA/Fy4Lrm7yjPmY="},{"type":"next-occurrence","id":"f+7iQNRYGzv2IRkkR1HhPdkdj6A="}],"description":"Installation of traffic management systems on US 9 northbound at Nepperhan Avenue (Yonkers) D265523/32724209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:23Z"},"road_event_id":"JKiCDsDw5AxoX9huHhgMxEnXBZg=","beginning_cross_street":"Nepperhan Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898801,40.931659]]}},{"id":"f+7iQNRYGzv2IRkkR1HhPdkdj6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NX/qmSRqaEUbzA/Fy4Lrm7yjPmY="}],"description":"Installation of traffic management systems on US 9 northbound at Nepperhan Avenue (Yonkers) D265523/32724209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:23Z"},"road_event_id":"f+7iQNRYGzv2IRkkR1HhPdkdj6A=","beginning_cross_street":"Nepperhan Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.898801,40.931659]]}},{"id":"+nM/WIv5IK44/19YnqJ/pxD8CCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Horace Harding Expressway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"g8f7HRceEfY02XC9IFNeWpBR48c="}],"description":"Construction on Horace Harding Expressway westbound between Springfield Blvd (New York) and Clearview Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-04-17T17:25:12Z"},"road_event_id":"+nM/WIv5IK44/19YnqJ/pxD8CCc=","beginning_cross_street":"Springfield Blvd","ending_cross_street":"Clearview Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.757146,40.749513]]}},{"id":"g8f7HRceEfY02XC9IFNeWpBR48c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Horace Harding Expressway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+nM/WIv5IK44/19YnqJ/pxD8CCc="}],"description":"Construction on Horace Harding Expressway westbound between Springfield Blvd (New York) and Clearview Expressway (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday/Tuesday/Wednesday/Thursday, 11:00 PM thru 05:00 AM 1 Left lane of 2 lanes closed","update_date":"2026-04-17T17:25:12Z"},"road_event_id":"g8f7HRceEfY02XC9IFNeWpBR48c=","beginning_cross_street":"Springfield Blvd","ending_cross_street":"Clearview Expressway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.757146,40.749513]]}},{"id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ac+6E1/rjFreCh5/rDREpdlmDfw="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"ac+6E1/rjFreCh5/rDREpdlmDfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw="},{"type":"next-occurrence","id":"uZCntkMldLN/S8Td8YACdjbPW88="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"ac+6E1/rjFreCh5/rDREpdlmDfw=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"uZCntkMldLN/S8Td8YACdjbPW88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw="},{"type":"next-occurrence","id":"p96b2O+U5SO4IGxH0Hj/zGAc80M="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"uZCntkMldLN/S8Td8YACdjbPW88=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"p96b2O+U5SO4IGxH0Hj/zGAc80M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw="},{"type":"next-occurrence","id":"azI9EGOSSbg4Qnh7bnbWqDADZX4="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"p96b2O+U5SO4IGxH0Hj/zGAc80M=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"azI9EGOSSbg4Qnh7bnbWqDADZX4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw="},{"type":"next-occurrence","id":"pabONj4AA1KqA760oZ5x52wktyw="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"azI9EGOSSbg4Qnh7bnbWqDADZX4=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"pabONj4AA1KqA760oZ5x52wktyw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw="},{"type":"next-occurrence","id":"Mt27OOid9btKaO+O0hUl8V1Q4cs="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"pabONj4AA1KqA760oZ5x52wktyw=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"Mt27OOid9btKaO+O0hUl8V1Q4cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw="},{"type":"next-occurrence","id":"7X4lcor21wFMZxxYQ24kalJ3N84="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"Mt27OOid9btKaO+O0hUl8V1Q4cs=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"7X4lcor21wFMZxxYQ24kalJ3N84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aY5g2fgQxu5AGx/cGOBZUeN+xAw="}],"description":"Guard rail repairs on I-84 both directions between Exit 46 - US 9 (Fishkill) and Exit 58 - Ludingtonville Road (Kent) D265499/NIGHT/32611609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 2nd, 2026 thru Friday May 1st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM, various lane closures","update_date":"2026-03-31T17:02:49Z"},"road_event_id":"7X4lcor21wFMZxxYQ24kalJ3N84=","beginning_cross_street":"Exit 46 - US 9","ending_cross_street":"Exit 58 - Ludingtonville Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.867929,41.52508]]}},{"id":"zEImjlVAfAjhJ2SW599+c0Lda6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 275"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4f45zPf8XslTn+9zN0cRzRkGZYM="}],"description":"Roadwork on NY 275 both directions Wellsville Street; NY 417; START ROUTE NY 275; Main Street; Bolivar (Bolivar) to Town of Wirt; Town of Bolivar Line (Bolivar) Right shoulder closure, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-17T17:39:05Z"},"road_event_id":"zEImjlVAfAjhJ2SW599+c0Lda6U=","beginning_cross_street":"Wellsville Street; NY 417; START ROUTE NY 275; Main Street; Bolivar","ending_cross_street":"Town of Wirt; Town of Bolivar Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.163863,42.075686]]}},{"id":"4f45zPf8XslTn+9zN0cRzRkGZYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 275"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zEImjlVAfAjhJ2SW599+c0Lda6U="}],"description":"Roadwork on NY 275 both directions Wellsville Street; NY 417; START ROUTE NY 275; Main Street; Bolivar (Bolivar) to Town of Wirt; Town of Bolivar Line (Bolivar) Right shoulder closure, Monday April 20th, 2026 thru Thursday April 23rd, 2026, Monday/Tuesday/Wednesday/Thursday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-17T17:39:05Z"},"road_event_id":"4f45zPf8XslTn+9zN0cRzRkGZYM=","beginning_cross_street":"Wellsville Street; NY 417; START ROUTE NY 275; Main Street; Bolivar","ending_cross_street":"Town of Wirt; Town of Bolivar Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.163863,42.075686]]}},{"id":"tlm2iW2oBVx/Gy7ZcFYM8gxRzUg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"oRDCMvBvdtIMbOn8qNjAgsmMSR8="}],"description":"Construction on Belt System - Southern Parkway westbound from 150th Street; Ramp (New York) to 130th Street; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:28:55Z"},"road_event_id":"tlm2iW2oBVx/Gy7ZcFYM8gxRzUg=","beginning_cross_street":"150th Street; Ramp","ending_cross_street":"130th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789689,40.666406]]}},{"id":"oRDCMvBvdtIMbOn8qNjAgsmMSR8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tlm2iW2oBVx/Gy7ZcFYM8gxRzUg="},{"type":"next-occurrence","id":"RJ3+PfjLI7UkrEt0mlGtjd8mMFA="}],"description":"Construction on Belt System - Southern Parkway westbound from 150th Street; Ramp (New York) to 130th Street; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:28:55Z"},"road_event_id":"oRDCMvBvdtIMbOn8qNjAgsmMSR8=","beginning_cross_street":"150th Street; Ramp","ending_cross_street":"130th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789689,40.666406]]}},{"id":"RJ3+PfjLI7UkrEt0mlGtjd8mMFA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Belt System - Southern Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tlm2iW2oBVx/Gy7ZcFYM8gxRzUg="}],"description":"Construction on Belt System - Southern Parkway westbound from 150th Street; Ramp (New York) to 130th Street; Ramp (New York) Subject to change without notice., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-17T17:28:55Z"},"road_event_id":"RJ3+PfjLI7UkrEt0mlGtjd8mMFA=","beginning_cross_street":"150th Street; Ramp","ending_cross_street":"130th Street; Ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.789689,40.666406]]}},{"id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7I2u9sIljEZANNiUQy+mYP8L8x4="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:30:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"7I2u9sIljEZANNiUQy+mYP8L8x4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"DX6VxXJuUtZjHTr/zM47kqqesdE="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"7I2u9sIljEZANNiUQy+mYP8L8x4=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:30:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"DX6VxXJuUtZjHTr/zM47kqqesdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"VqTlI79RdHI/xLCka5Lu9v9aVTs="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"DX6VxXJuUtZjHTr/zM47kqqesdE=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:30:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"VqTlI79RdHI/xLCka5Lu9v9aVTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"CNMKP7fqeXgcikRyQMdQ8DcUNNo="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"VqTlI79RdHI/xLCka5Lu9v9aVTs=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:30:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"CNMKP7fqeXgcikRyQMdQ8DcUNNo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"DN8GikimYA9XNfHZvMVpD0rRRlI="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"CNMKP7fqeXgcikRyQMdQ8DcUNNo=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:30:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"DN8GikimYA9XNfHZvMVpD0rRRlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"5hwbJ5XPyzoJq1Ht/gqwDTYDF2M="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"DN8GikimYA9XNfHZvMVpD0rRRlI=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:30:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"5hwbJ5XPyzoJq1Ht/gqwDTYDF2M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"FMW1FykxOGvvzOSzS6XUhbao9sI="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"5hwbJ5XPyzoJq1Ht/gqwDTYDF2M=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:30:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"FMW1FykxOGvvzOSzS6XUhbao9sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"9chiKujoFIhu5P3JLwh07Ob2p4U="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"FMW1FykxOGvvzOSzS6XUhbao9sI=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:30:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"9chiKujoFIhu5P3JLwh07Ob2p4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"O9V7SVS070nkAuxV1hF+n8K9ffs="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"9chiKujoFIhu5P3JLwh07Ob2p4U=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T03:30:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"O9V7SVS070nkAuxV1hF+n8K9ffs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="},{"type":"next-occurrence","id":"QKXu+JJbhQV85uOM03a3bfiG9ZE="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"O9V7SVS070nkAuxV1hF+n8K9ffs=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:30:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"QKXu+JJbhQV85uOM03a3bfiG9ZE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["W 41ST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Oh/SXoeOaeB6rg4lI5jeHHzcMLk="}],"description":"Construction on W 41ST ST westbound between 7TH AVE (New York) and 8TH AVE (New York) bucket truck for sign work., Tuesday April 14th, 2026 thru Friday June 12th, 2026, Monday thru Friday, 11:30 PM thru 06:00 AM All lanes closed","update_date":"2026-04-14T18:51:40Z"},"road_event_id":"QKXu+JJbhQV85uOM03a3bfiG9ZE=","beginning_cross_street":"7TH AVE","ending_cross_street":"8TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T03:30:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.987524,40.755415]]}},{"id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6LqJdjunHL5QPoTctsQOk3MBfZU="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T16:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"6LqJdjunHL5QPoTctsQOk3MBfZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"rub+uN4q9T9/3WO+HU3Cxbb7puM="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"6LqJdjunHL5QPoTctsQOk3MBfZU=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T16:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"rub+uN4q9T9/3WO+HU3Cxbb7puM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"pH5bVV5CBAQ8E2CT6msJgXHf2S0="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"rub+uN4q9T9/3WO+HU3Cxbb7puM=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T16:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"pH5bVV5CBAQ8E2CT6msJgXHf2S0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"lVSTEPJF2keH3rTpalLaBHqa8HM="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"pH5bVV5CBAQ8E2CT6msJgXHf2S0=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T16:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"lVSTEPJF2keH3rTpalLaBHqa8HM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"BkBAsUIRP8DjCcaxG5wyURZaHtM="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"lVSTEPJF2keH3rTpalLaBHqa8HM=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T16:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"BkBAsUIRP8DjCcaxG5wyURZaHtM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"wLjZZHe88cCbzFECkSRIBPZ99Nk="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"BkBAsUIRP8DjCcaxG5wyURZaHtM=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T16:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"wLjZZHe88cCbzFECkSRIBPZ99Nk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"syth7MQIVMp6tfV0cmQDnPqBWi0="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"wLjZZHe88cCbzFECkSRIBPZ99Nk=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T16:00:00Z","end_date":"2026-05-04T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"syth7MQIVMp6tfV0cmQDnPqBWi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"TL4cLvbybeXubPHPywI73r14S48="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"syth7MQIVMp6tfV0cmQDnPqBWi0=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T16:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"TL4cLvbybeXubPHPywI73r14S48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="},{"type":"next-occurrence","id":"/9Oo1uNOB/Uh7AJdmFb8zS0xNbo="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"TL4cLvbybeXubPHPywI73r14S48=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T16:00:00Z","end_date":"2026-05-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"/9Oo1uNOB/Uh7AJdmFb8zS0xNbo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BmiDnyaGw6ZZLkpouKhpPpKOqq0="}],"description":"Milling and repaving on I-81 southbound between Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) and Exit 4A - N Clinton St (Syracuse) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday thru Saturday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:51:53Z"},"road_event_id":"/9Oo1uNOB/Uh7AJdmFb8zS0xNbo=","beginning_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","ending_cross_street":"Exit 4A - N Clinton St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T16:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142708,43.113394]]}},{"id":"BjS32GlkbU+39TSdVgXg2duTcZo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 100"],"direction":"unknown","related_road_events":[],"description":"Road maintenance operations on NY 100 northbound between Old Army Road (Greenburgh) and Jane Street (Greenburgh) Res 8-9 RW/NIGHT/29612809 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 29th, 2026, 12:00 AM thru 05:00 AM, right lane closure","update_date":"2026-04-10T11:38:36Z"},"road_event_id":"BjS32GlkbU+39TSdVgXg2duTcZo=","beginning_cross_street":"Old Army Road","ending_cross_street":"Jane Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T04:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.814053,41.002108]]}},{"id":"waN+ICySig98bfLZhe9OpTOU1Kg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[],"description":"Culvert repairs on NY 21 both directions between Bristol Spring Rd; CR 12 (Naples) and NY 64 (South Bristol) Road closed , local traffic only, Follow posted detour, Continuous Monday April 27th, 2026 06:00 AM thru Thursday June 25th, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-14T13:12:58Z"},"road_event_id":"waN+ICySig98bfLZhe9OpTOU1Kg=","beginning_cross_street":"Bristol Spring Rd; CR 12","ending_cross_street":"NY 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.391818,42.63093]]}},{"id":"ORC300539117","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-86"],"direction":"unknown","description":"Guard rail repairs on I-86 eastbound east of Exit 14 - NY 62 Frewsburg Road (Poland) Not currently Scheduled","update_date":"2026-04-16T19:00:15Z"},"road_event_id":"ORC300539117","beginning_cross_street":"Exit 14 - NY 62 Frewsburg Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-14T14:20:10Z","end_date":"2026-04-17T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-79.068253,42.149227]]}},{"id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5rV59uVQ9Xv2AGploAiT5O1PHco="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T16:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"5rV59uVQ9Xv2AGploAiT5O1PHco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="},{"type":"next-occurrence","id":"AegC6IgaaOXul2PJD/bW0JABioI="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"5rV59uVQ9Xv2AGploAiT5O1PHco=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T16:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"AegC6IgaaOXul2PJD/bW0JABioI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="},{"type":"next-occurrence","id":"/U7wxqCyb1hiLL6ayd+Ku8Uch7k="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"AegC6IgaaOXul2PJD/bW0JABioI=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T16:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"/U7wxqCyb1hiLL6ayd+Ku8Uch7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="},{"type":"next-occurrence","id":"jCWrNqBdsDYVcQNNbTmIYmXNCjA="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"/U7wxqCyb1hiLL6ayd+Ku8Uch7k=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T16:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"jCWrNqBdsDYVcQNNbTmIYmXNCjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="},{"type":"next-occurrence","id":"YE2qCPRvb67xytQkXN8wiKKsTi0="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"jCWrNqBdsDYVcQNNbTmIYmXNCjA=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T16:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"YE2qCPRvb67xytQkXN8wiKKsTi0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="},{"type":"next-occurrence","id":"64pRqSB8G3XFxTZ2FqduHje4Dyk="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"YE2qCPRvb67xytQkXN8wiKKsTi0=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T16:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"64pRqSB8G3XFxTZ2FqduHje4Dyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="},{"type":"next-occurrence","id":"MxvyjhveuL5QWiWMdKEXn/T/FFg="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"64pRqSB8G3XFxTZ2FqduHje4Dyk=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T16:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"MxvyjhveuL5QWiWMdKEXn/T/FFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="},{"type":"next-occurrence","id":"lbV5ZsMg8ijsSWjOZKpfM3V1L0M="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"MxvyjhveuL5QWiWMdKEXn/T/FFg=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T16:00:00Z","end_date":"2026-05-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"lbV5ZsMg8ijsSWjOZKpfM3V1L0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LwiUdeCC8uhJTXKtJdQ+dKE8gLM="}],"description":"Milling and repaving on I-81 northbound between Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B - Syracuse Airport/Taft Rd (Salina) ; Alternating lane closures, Sunday April 26th, 2026 thru Friday July 31st, 2026, Sunday/Monday/Tuesday/Wednesday/Thursday/Friday, 06:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-17T16:53:49Z"},"road_event_id":"lbV5ZsMg8ijsSWjOZKpfM3V1L0M=","beginning_cross_street":"Exit 5A Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B - Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T16:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170132,43.073005]]}},{"id":"x+rxVokurQOVDpRqt2TCledxxfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h6ZR7UdWQ0T4IYXMBoXF9NO9ERo="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T11:01:48Z"},"road_event_id":"x+rxVokurQOVDpRqt2TCledxxfc=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"h6ZR7UdWQ0T4IYXMBoXF9NO9ERo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+rxVokurQOVDpRqt2TCledxxfc="},{"type":"next-occurrence","id":"mdYhF/D5GlLCTbUBI0YYUejF8EE="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T11:01:48Z"},"road_event_id":"h6ZR7UdWQ0T4IYXMBoXF9NO9ERo=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"mdYhF/D5GlLCTbUBI0YYUejF8EE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 412"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"x+rxVokurQOVDpRqt2TCledxxfc="}],"description":"Construction on NY 412 both directions between Bristol Road; NY 233; Harding Road; START ROUTE NY 412 (Kirkland) and Franklin Avenue; NY 12B; College Street; END ROUTE (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place., Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:30 AM thru 05:00 PM,","update_date":"2026-04-17T11:01:48Z"},"road_event_id":"mdYhF/D5GlLCTbUBI0YYUejF8EE=","beginning_cross_street":"Bristol Road; NY 233; Harding Road; START ROUTE NY 412","ending_cross_street":"Franklin Avenue; NY 12B; College Street; END ROUTE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.396003,43.0485]]}},{"id":"SDrNvJeUDlt9fzQiEV0fMxmBH84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-787"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kTznvd/uxBWgFK+q1vZx9trviEs="}],"description":"Bridge work on I-787 southbound Exit 1 southbound ramp to I-87 Thruway Interchange 23 (Albany), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 11:30 AM thru 06:00 PM right shoulder closed, Friday April 24th, 2026, 09:00 AM thru 06:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-22T15:42:41Z"},"road_event_id":"SDrNvJeUDlt9fzQiEV0fMxmBH84=","beginning_cross_street":"Exit 1 southbound ramp to I-87 Thruway Interchange 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T15:30:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777036,42.633028]]}},{"id":"kTznvd/uxBWgFK+q1vZx9trviEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-787"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SDrNvJeUDlt9fzQiEV0fMxmBH84="},{"type":"next-occurrence","id":"P1DHDka6kBxrEaNjFPDTY8nG1KU="}],"description":"Bridge work on I-787 southbound Exit 1 southbound ramp to I-87 Thruway Interchange 23 (Albany), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 11:30 AM thru 06:00 PM right shoulder closed, Friday April 24th, 2026, 09:00 AM thru 06:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-22T15:42:41Z"},"road_event_id":"kTznvd/uxBWgFK+q1vZx9trviEs=","beginning_cross_street":"Exit 1 southbound ramp to I-87 Thruway Interchange 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T15:30:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777036,42.633028]]}},{"id":"P1DHDka6kBxrEaNjFPDTY8nG1KU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-787"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SDrNvJeUDlt9fzQiEV0fMxmBH84="}],"description":"Bridge work on I-787 southbound Exit 1 southbound ramp to I-87 Thruway Interchange 23 (Albany), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 11:30 AM thru 06:00 PM right shoulder closed, Friday April 24th, 2026, 09:00 AM thru 06:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-22T15:42:41Z"},"road_event_id":"P1DHDka6kBxrEaNjFPDTY8nG1KU=","beginning_cross_street":"Exit 1 southbound ramp to I-87 Thruway Interchange 23","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.777036,42.633028]]}},{"id":"mokqP3XJ+9Ebimar/WjZ8i33xY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound South of CR 571/Washington St (Princeton Twp) Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-17T16:58:33Z"},"road_event_id":"mokqP3XJ+9Ebimar/WjZ8i33xY0=","beginning_cross_street":"South of CR 571/Washington St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T01:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.659156,40.349788]]}},{"id":"ORC300448529","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 71"],"direction":"unknown","description":"Roadwork on NJ 71 Southbound At South of Shark River Bridge (Belmar) Thursday June 12, 2025 09:30 PM thru Friday June 13, 2025 05:00 AM, 2 left lanes of 3 lanes closed","update_date":"2025-06-13T09:00:03Z"},"road_event_id":"ORC300448529","beginning_cross_street":"South of Shark River Bridge","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2025-06-10T14:52:30Z","end_date":"2025-06-13T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.023712,40.184688]]}},{"id":"zTEY3hwTST1omjvvxq/INzn4MXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"uuqgKj465KRMsQ1nETY4ufYc6f4="}],"description":"Roadwork on US 9W northbound between Sickles Avenue (Nyack) and 5th Avenue (Nyack) Res 8-6 RW/32716609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-03-25T13:29:18Z"},"road_event_id":"zTEY3hwTST1omjvvxq/INzn4MXY=","beginning_cross_street":"Sickles Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927254,41.095507]]}},{"id":"uuqgKj465KRMsQ1nETY4ufYc6f4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"zTEY3hwTST1omjvvxq/INzn4MXY="}],"description":"Roadwork on US 9W northbound between Sickles Avenue (Nyack) and 5th Avenue (Nyack) Res 8-6 RW/32716609 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Tuesday April 28th, 2026 Monday/ Tuesday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-03-25T13:29:18Z"},"road_event_id":"uuqgKj465KRMsQ1nETY4ufYc6f4=","beginning_cross_street":"Sickles Avenue","ending_cross_street":"5th Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.927254,41.095507]]}},{"id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FWWT7ZxebHQ2mTWMTseS7vkp7SQ="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"FWWT7ZxebHQ2mTWMTseS7vkp7SQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"Qp1o+F9OJBV7g2QH5OThJbFtoEc="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"FWWT7ZxebHQ2mTWMTseS7vkp7SQ=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"Qp1o+F9OJBV7g2QH5OThJbFtoEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"SP/irs8HxbcT0tLEhodcxQHyBg0="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"Qp1o+F9OJBV7g2QH5OThJbFtoEc=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"SP/irs8HxbcT0tLEhodcxQHyBg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"g/3JxmBrBL0PM1BJm9KQDyWhqfg="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"SP/irs8HxbcT0tLEhodcxQHyBg0=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"g/3JxmBrBL0PM1BJm9KQDyWhqfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"acRL/XIyH0nCY4SkgEpiuaTAgRU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"g/3JxmBrBL0PM1BJm9KQDyWhqfg=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"acRL/XIyH0nCY4SkgEpiuaTAgRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"HvVAxI32UAt8R4cQSglLZWzFxxE="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"acRL/XIyH0nCY4SkgEpiuaTAgRU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"HvVAxI32UAt8R4cQSglLZWzFxxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"G+PgYVEVDbHmogTQIENXmd8BCiE="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"HvVAxI32UAt8R4cQSglLZWzFxxE=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"G+PgYVEVDbHmogTQIENXmd8BCiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"4yTNCVJoJbIumvMh/1to+Umt+p0="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"G+PgYVEVDbHmogTQIENXmd8BCiE=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"4yTNCVJoJbIumvMh/1to+Umt+p0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"VjR+T3bP/MqabtHQ66ePGudgtWE="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"4yTNCVJoJbIumvMh/1to+Umt+p0=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"VjR+T3bP/MqabtHQ66ePGudgtWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"um/9QVzIOpqCNenDBPYL/986YUU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"VjR+T3bP/MqabtHQ66ePGudgtWE=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"um/9QVzIOpqCNenDBPYL/986YUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"I5Hx8hhPHLqR2qyzdGJBVlMxs9s="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"um/9QVzIOpqCNenDBPYL/986YUU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"I5Hx8hhPHLqR2qyzdGJBVlMxs9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"hzuRy2WsAUDDveJnOyWrvoUUNlc="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"I5Hx8hhPHLqR2qyzdGJBVlMxs9s=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"hzuRy2WsAUDDveJnOyWrvoUUNlc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"Yhm2bezXkSFlDEOaeCFUTj7zqQA="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"hzuRy2WsAUDDveJnOyWrvoUUNlc=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"Yhm2bezXkSFlDEOaeCFUTj7zqQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="},{"type":"next-occurrence","id":"iyAgHJ9kyImw2JBrt2uoubaG4uU="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"Yhm2bezXkSFlDEOaeCFUTj7zqQA=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"iyAgHJ9kyImw2JBrt2uoubaG4uU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hUJNmCBhZEQoZgC1BtC35ZRmntQ="}],"description":"Paving operations on I-84 both directions between Exit 13 - River Road (Eastbound Only) (Southbury) and Exit 16 - CT 188 (Southbury) There will be nighttime lane closures , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2025-03-11T13:42:47Z"},"road_event_id":"iyAgHJ9kyImw2JBrt2uoubaG4uU=","beginning_cross_street":"Exit 13 - River Road (Eastbound Only)","ending_cross_street":"Exit 16 - CT 188","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.249411,41.441691]]}},{"id":"AD/L39ZgicG8Sp/E2sY58bKROG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"AMx+naPFys9JvmPHoWTyd3huR14="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 23 - Old Saw Mill Road (Greenburgh) D265183/NIGHT/32657709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-22T10:59:08Z"},"road_event_id":"AD/L39ZgicG8Sp/E2sY58bKROG0=","beginning_cross_street":"Exit 23 - Old Saw Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830347,41.080371]]}},{"id":"AMx+naPFys9JvmPHoWTyd3huR14=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AD/L39ZgicG8Sp/E2sY58bKROG0="},{"type":"next-occurrence","id":"ja7tITm78wlzwINPF/5SolkTnA8="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 23 - Old Saw Mill Road (Greenburgh) D265183/NIGHT/32657709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-22T10:59:08Z"},"road_event_id":"AMx+naPFys9JvmPHoWTyd3huR14=","beginning_cross_street":"Exit 23 - Old Saw Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830347,41.080371]]}},{"id":"ja7tITm78wlzwINPF/5SolkTnA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AD/L39ZgicG8Sp/E2sY58bKROG0="},{"type":"next-occurrence","id":"RbjS3pvjnc5dT8v+sMgk1niNQJc="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 23 - Old Saw Mill Road (Greenburgh) D265183/NIGHT/32657709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-22T10:59:08Z"},"road_event_id":"ja7tITm78wlzwINPF/5SolkTnA8=","beginning_cross_street":"Exit 23 - Old Saw Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830347,41.080371]]}},{"id":"RbjS3pvjnc5dT8v+sMgk1niNQJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AD/L39ZgicG8Sp/E2sY58bKROG0="},{"type":"next-occurrence","id":"brhpjPNC0ZbZLvQuUhyWZ2Ke/Vg="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 23 - Old Saw Mill Road (Greenburgh) D265183/NIGHT/32657709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-22T10:59:08Z"},"road_event_id":"RbjS3pvjnc5dT8v+sMgk1niNQJc=","beginning_cross_street":"Exit 23 - Old Saw Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830347,41.080371]]}},{"id":"brhpjPNC0ZbZLvQuUhyWZ2Ke/Vg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"AD/L39ZgicG8Sp/E2sY58bKROG0="}],"description":"Guard rail repairs on Saw Mill River Parkway northbound ramp to Exit 23 - Old Saw Mill Road (Greenburgh) D265183/NIGHT/32657709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, ramp closed and detoured","update_date":"2026-04-22T10:59:08Z"},"road_event_id":"brhpjPNC0ZbZLvQuUhyWZ2Ke/Vg=","beginning_cross_street":"Exit 23 - Old Saw Mill Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.830347,41.080371]]}},{"id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QsMkUf5UMUKVdTR4tql4tKTJvSk="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-23T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"QsMkUf5UMUKVdTR4tql4tKTJvSk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"u9Oa3WBrbWE25+EY2XfgoeoXEHk="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"QsMkUf5UMUKVdTR4tql4tKTJvSk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-24T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"u9Oa3WBrbWE25+EY2XfgoeoXEHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"+kXAdWdpLg35s0reVVz7m51n7Rw="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"u9Oa3WBrbWE25+EY2XfgoeoXEHk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-25T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"+kXAdWdpLg35s0reVVz7m51n7Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"zwRjMko5uw7PRP+Ka4zjKpY464U="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"+kXAdWdpLg35s0reVVz7m51n7Rw=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-26T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"zwRjMko5uw7PRP+Ka4zjKpY464U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"wUe5VIBQidAnQMWQfy+Rm1Q0GrM="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"zwRjMko5uw7PRP+Ka4zjKpY464U=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-27T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"wUe5VIBQidAnQMWQfy+Rm1Q0GrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"fuU/x3qyGQCDT5Vigfp4WubxUhQ="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"wUe5VIBQidAnQMWQfy+Rm1Q0GrM=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-28T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"fuU/x3qyGQCDT5Vigfp4WubxUhQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"3tmdejxluLMtxF+JMLxR6y0lW1g="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"fuU/x3qyGQCDT5Vigfp4WubxUhQ=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-29T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"3tmdejxluLMtxF+JMLxR6y0lW1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"5ZsT49LR+Qkr4z8/mR3RauU95hs="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"3tmdejxluLMtxF+JMLxR6y0lW1g=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-30T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"5ZsT49LR+Qkr4z8/mR3RauU95hs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"4H4SwVbushqU7VJDph6d3zWGxpk="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"5ZsT49LR+Qkr4z8/mR3RauU95hs=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-05-01T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"4H4SwVbushqU7VJDph6d3zWGxpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"2qRZR4iK2/I9IWpCQoDvyG77bjs="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"4H4SwVbushqU7VJDph6d3zWGxpk=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-02T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"2qRZR4iK2/I9IWpCQoDvyG77bjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"9wA/k+1QCiq5Ku+l6oi/nuQHgaw="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"2qRZR4iK2/I9IWpCQoDvyG77bjs=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-03T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"9wA/k+1QCiq5Ku+l6oi/nuQHgaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"H8TqYfIJR1NiQ1+cPB8xesjfyeE="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"9wA/k+1QCiq5Ku+l6oi/nuQHgaw=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-04T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"H8TqYfIJR1NiQ1+cPB8xesjfyeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"8t5qNWI2qp7F0qVP0lOn5H66qTc="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"H8TqYfIJR1NiQ1+cPB8xesjfyeE=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-05T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"8t5qNWI2qp7F0qVP0lOn5H66qTc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="},{"type":"next-occurrence","id":"z4sNYQ77R68uAp4s2vQdiludhTw="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"8t5qNWI2qp7F0qVP0lOn5H66qTc=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-06T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"z4sNYQ77R68uAp4s2vQdiludhTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-384"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Y3gdWh82+wOYCrAGJl1i1FLxjRE="}],"description":"Bridge work and deck work on I-384 both directions Exit 1 - West Center Street/Silver Line (Manchester) to Exit 5 - CT 85 (Bolton) There will be lane closures on various state roads, town roads, and on I-384 , Tuesday April 1st, 2025 thru Monday November 30th, 2026, Sunday thru Saturday, 07:00 AM thru 08:00 PM All lanes open","update_date":"2025-03-11T13:50:12Z"},"road_event_id":"z4sNYQ77R68uAp4s2vQdiludhTw=","beginning_cross_street":"Exit 1 - West Center Street/Silver Line","ending_cross_street":"Exit 5 - CT 85","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-07T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.581517,41.771877]]}},{"id":"XfA44fR8/4xremhlkSWc11oCQy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ramf1Ee4ofavD8r6uf+u+yOiHiQ="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"XfA44fR8/4xremhlkSWc11oCQy8=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"ramf1Ee4ofavD8r6uf+u+yOiHiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"ETsLOY2GfOd5Qrf2g14XXCMXA/k="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"ramf1Ee4ofavD8r6uf+u+yOiHiQ=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"ETsLOY2GfOd5Qrf2g14XXCMXA/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"Fem76U45ds8A+eKwrQAEpSNU/JE="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"ETsLOY2GfOd5Qrf2g14XXCMXA/k=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"Fem76U45ds8A+eKwrQAEpSNU/JE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"2Hb9Mjze7dGy7NzjRh6k6W5XXWI="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"Fem76U45ds8A+eKwrQAEpSNU/JE=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"2Hb9Mjze7dGy7NzjRh6k6W5XXWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"UcA5E+AiXYxVMhmBzZxGxHdTUzg="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"2Hb9Mjze7dGy7NzjRh6k6W5XXWI=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T11:00:00Z","end_date":"2026-04-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"UcA5E+AiXYxVMhmBzZxGxHdTUzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"GfdgVL5lV+JGp+QZDcK1BG6N9e8="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"UcA5E+AiXYxVMhmBzZxGxHdTUzg=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"GfdgVL5lV+JGp+QZDcK1BG6N9e8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"7+MQIX0m1r9Kl9AJDPyXPnTzyqQ="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"GfdgVL5lV+JGp+QZDcK1BG6N9e8=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"7+MQIX0m1r9Kl9AJDPyXPnTzyqQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"tNghAo3yDcjkhny0bIn1dNefZ0w="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"7+MQIX0m1r9Kl9AJDPyXPnTzyqQ=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"tNghAo3yDcjkhny0bIn1dNefZ0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"bDWH2YaQFgJUupCdONZjuLbA0i8="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"tNghAo3yDcjkhny0bIn1dNefZ0w=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"bDWH2YaQFgJUupCdONZjuLbA0i8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"oHO4d/FDJ/MJc+LHt174p3K+/dU="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"bDWH2YaQFgJUupCdONZjuLbA0i8=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"oHO4d/FDJ/MJc+LHt174p3K+/dU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"XKcvWMqjSPlc8+vcBAPsSvrp2dg="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"oHO4d/FDJ/MJc+LHt174p3K+/dU=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"XKcvWMqjSPlc8+vcBAPsSvrp2dg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"LzZHqeb85K3mBXzgJE8IdD45VwU="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"XKcvWMqjSPlc8+vcBAPsSvrp2dg=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T11:00:00Z","end_date":"2026-05-03T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"LzZHqeb85K3mBXzgJE8IdD45VwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"VJjHAltXCk8KxBH9AGedxnOzvik="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"LzZHqeb85K3mBXzgJE8IdD45VwU=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"VJjHAltXCk8KxBH9AGedxnOzvik=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="},{"type":"next-occurrence","id":"NhZk1Itg0ncC5FxZ6FWK2LGUImE="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"VJjHAltXCk8KxBH9AGedxnOzvik=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"NhZk1Itg0ncC5FxZ6FWK2LGUImE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 14"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XfA44fR8/4xremhlkSWc11oCQy8="}],"description":"Bridge replacement on NY 14 both directions Chemung Street (Horseheads) to CR 64 (Horseheads) Lane Closure(Multilane HWY ), Monday March 16th, 2026 thru Tuesday December 15th, 2026, Sunday thru Saturday, 07:00 AM thru 05:30 PM All lanes open","update_date":"2026-03-18T17:01:57Z"},"road_event_id":"NhZk1Itg0ncC5FxZ6FWK2LGUImE=","beginning_cross_street":"Chemung Street","ending_cross_street":"CR 64","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.836093,42.15449]]}},{"id":"awvY1nkfISeJORFOycpX9vX5Rjc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound between South of Exit 40 - NJ 38 (Mount Laurel Twp) and North of Exit 30 - Warwick Rd (Lawnside), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 PM, right shoulder closed","update_date":"2026-04-22T12:51:20Z"},"road_event_id":"awvY1nkfISeJORFOycpX9vX5Rjc=","beginning_cross_street":"South of Exit 40 - NJ 38","ending_cross_street":"North of Exit 30 - Warwick Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.916992,39.961082]]}},{"id":"XeH+eK9spRuhRob3EqT8GX3sQzc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Northbound between North of Exit 30 - Warwick Rd (Lawnside) and South of Exit 40 - NJ 38 (Mount Laurel Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-22T12:51:21Z"},"road_event_id":"XeH+eK9spRuhRob3EqT8GX3sQzc=","beginning_cross_street":"North of Exit 30 - Warwick Rd","ending_cross_street":"South of Exit 40 - NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.030105,39.871261]]}},{"id":"8exViHM3heYHskauv8Acu6xiU6Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RWT9Nf+9MQQ5mPKRjQ1wfPFXGv4="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"8exViHM3heYHskauv8Acu6xiU6Q=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"RWT9Nf+9MQQ5mPKRjQ1wfPFXGv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"e9XlLG7e5DjQxCFTPHKzu9AdxTI="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"RWT9Nf+9MQQ5mPKRjQ1wfPFXGv4=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"e9XlLG7e5DjQxCFTPHKzu9AdxTI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"cuCEYOwOkS916kzN86XKcAvcuCU="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"e9XlLG7e5DjQxCFTPHKzu9AdxTI=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"cuCEYOwOkS916kzN86XKcAvcuCU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"6BT1IDiCk+LYYM5/vd5SknDhKIw="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"cuCEYOwOkS916kzN86XKcAvcuCU=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"6BT1IDiCk+LYYM5/vd5SknDhKIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"2w/C5atD/8ENa1qj+5fUSsBqaZ8="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"6BT1IDiCk+LYYM5/vd5SknDhKIw=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"2w/C5atD/8ENa1qj+5fUSsBqaZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"N5IQncZb0qPOmPD9lebjQQv8eJM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"2w/C5atD/8ENa1qj+5fUSsBqaZ8=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"N5IQncZb0qPOmPD9lebjQQv8eJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"lGpeICqD3TD5VW55THPJx3cgxmM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"N5IQncZb0qPOmPD9lebjQQv8eJM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"lGpeICqD3TD5VW55THPJx3cgxmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"3MQMknuwptuiYPDcpA+zcfMaKJM="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"lGpeICqD3TD5VW55THPJx3cgxmM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"3MQMknuwptuiYPDcpA+zcfMaKJM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"zGcxNi56ADnr/iQqK1Ia6ComJPQ="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"3MQMknuwptuiYPDcpA+zcfMaKJM=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"zGcxNi56ADnr/iQqK1Ia6ComJPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="},{"type":"next-occurrence","id":"wRglnDiacZpCbYbIwbiNGar1kM4="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"zGcxNi56ADnr/iQqK1Ia6ComJPQ=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"wRglnDiacZpCbYbIwbiNGar1kM4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Taconic State Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8exViHM3heYHskauv8Acu6xiU6Q="}],"description":"Bridge rehabilitation on Taconic State Parkway northbound between Exit 11 - NY 134 (Yorktown) and Exit 13 - Underhill Avenue - CR 131 (Yorktown) D265160/B5502170/NIGHT/32645709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday March 23rd, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures, Thursday November 27th, 2025 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 PM thru 05:00 AM, various lane closures","update_date":"2026-04-16T16:51:19Z"},"road_event_id":"wRglnDiacZpCbYbIwbiNGar1kM4=","beginning_cross_street":"Exit 11 - NY 134","ending_cross_street":"Exit 13 - Underhill Avenue - CR 131","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.80724,41.227648]]}},{"id":"vSjLKUrHs23GK9BbmLm9FBTfaQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"tbsm+GucLLj33R0HWCmHzYsG//E="}],"description":"Street sweeping on NY 19 both directions South Main Street; Start NY 417 Overlap (Wellsville) to Town of Wellsville; Town of Willing Line (Wellsville) Mobile Operation USE CAUTION, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T12:41:38Z"},"road_event_id":"vSjLKUrHs23GK9BbmLm9FBTfaQI=","beginning_cross_street":"South Main Street; Start NY 417 Overlap","ending_cross_street":"Town of Wellsville; Town of Willing Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.938914,42.115706]]}},{"id":"tbsm+GucLLj33R0HWCmHzYsG//E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vSjLKUrHs23GK9BbmLm9FBTfaQI="},{"type":"next-occurrence","id":"OyrjuQOOr5iqqrnYQ24RxN5Fbcg="}],"description":"Street sweeping on NY 19 both directions South Main Street; Start NY 417 Overlap (Wellsville) to Town of Wellsville; Town of Willing Line (Wellsville) Mobile Operation USE CAUTION, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T12:41:38Z"},"road_event_id":"tbsm+GucLLj33R0HWCmHzYsG//E=","beginning_cross_street":"South Main Street; Start NY 417 Overlap","ending_cross_street":"Town of Wellsville; Town of Willing Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.938914,42.115706]]}},{"id":"OyrjuQOOr5iqqrnYQ24RxN5Fbcg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 19"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vSjLKUrHs23GK9BbmLm9FBTfaQI="}],"description":"Street sweeping on NY 19 both directions South Main Street; Start NY 417 Overlap (Wellsville) to Town of Wellsville; Town of Willing Line (Wellsville) Mobile Operation USE CAUTION, Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T12:41:38Z"},"road_event_id":"OyrjuQOOr5iqqrnYQ24RxN5Fbcg=","beginning_cross_street":"South Main Street; Start NY 417 Overlap","ending_cross_street":"Town of Wellsville; Town of Willing Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.938914,42.115706]]}},{"id":"dy0LrESC94oUtoMC6Tdk9Sol7AU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZzOkZl0pV9+ReEfc/E2Gy0fiSMQ="}],"description":"Construction on I-678 northbound ramp from Exit 4 - Liberty Avenue (New York) Subject to change without notice., Monday April 20th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed , , Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed ,","update_date":"2026-04-18T12:00:04Z"},"road_event_id":"dy0LrESC94oUtoMC6Tdk9Sol7AU=","beginning_cross_street":"Exit 4 -  Liberty Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810731,40.692675]]}},{"id":"ZzOkZl0pV9+ReEfc/E2Gy0fiSMQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dy0LrESC94oUtoMC6Tdk9Sol7AU="},{"type":"next-occurrence","id":"IfHiLP+Rku03pMBqRFYmnGAiwII="}],"description":"Construction on I-678 northbound ramp from Exit 4 - Liberty Avenue (New York) Subject to change without notice., Monday April 20th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed , , Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed ,","update_date":"2026-04-18T12:00:04Z"},"road_event_id":"ZzOkZl0pV9+ReEfc/E2Gy0fiSMQ=","beginning_cross_street":"Exit 4 -  Liberty Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810731,40.692675]]}},{"id":"IfHiLP+Rku03pMBqRFYmnGAiwII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dy0LrESC94oUtoMC6Tdk9Sol7AU="}],"description":"Construction on I-678 northbound ramp from Exit 4 - Liberty Avenue (New York) Subject to change without notice., Monday April 20th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 06:00 AM All lanes closed , , Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:59 PM thru 08:00 AM All lanes closed ,","update_date":"2026-04-18T12:00:04Z"},"road_event_id":"IfHiLP+Rku03pMBqRFYmnGAiwII=","beginning_cross_street":"Exit 4 -  Liberty Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:58:00Z","end_date":"2026-04-26T11:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.810731,40.692675]]}},{"id":"zkmgfN+Qyf7YEj8I+b+BVOUf3Bs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on US-6 eastbound between MANSFIELD AVE (Mansfield) and CT-633 (Mansfield) Route 6 eastbound will be reduced from 2 lanes of travel to 1 lane , Continuous Wednesday September 10th, 2025 09:00 AM thru Thursday August 6th, 2026 11:59 PM All lanes open","update_date":"2025-08-28T20:45:01Z"},"road_event_id":"zkmgfN+Qyf7YEj8I+b+BVOUf3Bs=","beginning_cross_street":"MANSFIELD AVE","ending_cross_street":"CT-633","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.227656,41.729046]]}},{"id":"ORC300536734","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["JFK Expressway"],"direction":"unknown","description":"Scheduled roadwork on JFK Expressway southbound ramp to Terminal 8 Departures (New York) Not currently Scheduled","update_date":"2026-04-18T19:00:00Z"},"road_event_id":"ORC300536734","beginning_cross_street":"Terminal 8 Departures","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:18:19Z","end_date":"2026-04-19T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.786734,40.647794]]}},{"id":"H61jPOKqLjMOJJBSu3oW5xrtGnU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 982M - Rhinecliff Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 982M - Rhinecliff Road both directions between Garden Way (Rhinebeck) and US 9 (Rhinebeck) 2025082563457/32690309 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday March 25th, 2026 thru Wednesday April 22nd, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, right shoulder closure","update_date":"2026-03-31T12:30:52Z"},"road_event_id":"H61jPOKqLjMOJJBSu3oW5xrtGnU=","beginning_cross_street":"Garden Way","ending_cross_street":"US 9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.928424,41.928138]]}},{"id":"2JEmA5D2nkqWOlj5KbK6uPD4VQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Terminal 7 Arrivals"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"eX1isdfpYGalKFWzG2Z12Dq9ZFw="}],"description":"Scheduled roadwork on Terminal 7 Arrivals eastbound at (New York), Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 11:59 PM thru 05:00 AM All lanes closed eastbound,","update_date":"2026-04-18T09:00:10Z"},"road_event_id":"2JEmA5D2nkqWOlj5KbK6uPD4VQY=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T03:59:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783261,40.648078]]}},{"id":"eX1isdfpYGalKFWzG2Z12Dq9ZFw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Terminal 7 Arrivals"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2JEmA5D2nkqWOlj5KbK6uPD4VQY="},{"type":"next-occurrence","id":"VKZ4lwPGedNFKUv+XRsaXYXzXCA="}],"description":"Scheduled roadwork on Terminal 7 Arrivals eastbound at (New York), Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 11:59 PM thru 05:00 AM All lanes closed eastbound,","update_date":"2026-04-18T09:00:10Z"},"road_event_id":"eX1isdfpYGalKFWzG2Z12Dq9ZFw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:59:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783261,40.648078]]}},{"id":"VKZ4lwPGedNFKUv+XRsaXYXzXCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Terminal 7 Arrivals"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2JEmA5D2nkqWOlj5KbK6uPD4VQY="}],"description":"Scheduled roadwork on Terminal 7 Arrivals eastbound at (New York), Monday April 20th,2026 thru Saturday April 25th,2026, Monday thru Friday, 11:59 PM thru 05:00 AM All lanes closed eastbound,","update_date":"2026-04-18T09:00:10Z"},"road_event_id":"VKZ4lwPGedNFKUv+XRsaXYXzXCA=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:59:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.783261,40.648078]]}},{"id":"ORC300536736","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-678"],"direction":"unknown","description":"Scheduled roadwork on I-678 southbound Exit B - 130th Place (New York) to Exit A - South Service Road; North Service Road (New York) Not currently Scheduled","update_date":"2026-04-08T07:00:01Z"},"road_event_id":"ORC300536736","beginning_cross_street":"Exit B  - 130th Place","ending_cross_street":"Exit A - South Service Road; North Service Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-05T17:26:24Z","end_date":"2026-04-09T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.807534,40.655213]]}},{"id":"tGq0HYX5Pr9l1uyRAQuP8/eS5sA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"JEH5KhoJ2D2GwU5idOVHXtlsx5k="}],"description":"Utility work on NY 5 both directions between Cemetery Street (Fonda) and Switzer Hill Road (Fonda) Motorists will encounter lane and shoulder closures in both directions with flaggers in place, Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:06:11Z"},"road_event_id":"tGq0HYX5Pr9l1uyRAQuP8/eS5sA=","beginning_cross_street":"Cemetery Street","ending_cross_street":"Switzer Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.359996,42.954806]]}},{"id":"JEH5KhoJ2D2GwU5idOVHXtlsx5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tGq0HYX5Pr9l1uyRAQuP8/eS5sA="},{"type":"next-occurrence","id":"96ZAdkfW3EaV+K1IrTvnHG2iqH0="}],"description":"Utility work on NY 5 both directions between Cemetery Street (Fonda) and Switzer Hill Road (Fonda) Motorists will encounter lane and shoulder closures in both directions with flaggers in place, Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:06:11Z"},"road_event_id":"JEH5KhoJ2D2GwU5idOVHXtlsx5k=","beginning_cross_street":"Cemetery Street","ending_cross_street":"Switzer Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.359996,42.954806]]}},{"id":"96ZAdkfW3EaV+K1IrTvnHG2iqH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"tGq0HYX5Pr9l1uyRAQuP8/eS5sA="}],"description":"Utility work on NY 5 both directions between Cemetery Street (Fonda) and Switzer Hill Road (Fonda) Motorists will encounter lane and shoulder closures in both directions with flaggers in place, Monday March 30th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-03T12:06:11Z"},"road_event_id":"96ZAdkfW3EaV+K1IrTvnHG2iqH0=","beginning_cross_street":"Cemetery Street","ending_cross_street":"Switzer Hill Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.359996,42.954806]]}},{"id":"9QTkRcHxUNqa0jMq2td0kutfoi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 172"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 172 westbound between Long Ridge Road (Bedford) and Indian Hill Road (Bedford) 2025082502725/32551309 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026, 09:30 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-17T16:52:38Z"},"road_event_id":"9QTkRcHxUNqa0jMq2td0kutfoi4=","beginning_cross_street":"Long Ridge Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.628197,41.20276]]}},{"id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"y/zEZnaQsICt8p6a1AL95GmZ6Ww="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"y/zEZnaQsICt8p6a1AL95GmZ6Ww=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ="},{"type":"next-occurrence","id":"2mcPq/7iKsdQgUw6C/6poOjZojo="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"y/zEZnaQsICt8p6a1AL95GmZ6Ww=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"2mcPq/7iKsdQgUw6C/6poOjZojo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ="},{"type":"next-occurrence","id":"xhDGO1NNVBitnNXEDN7AK+PggBA="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"2mcPq/7iKsdQgUw6C/6poOjZojo=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"xhDGO1NNVBitnNXEDN7AK+PggBA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ="},{"type":"next-occurrence","id":"SrZnpFXKM5eEqqCygsHRJe6uuhY="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"xhDGO1NNVBitnNXEDN7AK+PggBA=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"SrZnpFXKM5eEqqCygsHRJe6uuhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ="},{"type":"next-occurrence","id":"GvBApXCd0h6OGPzcSCo1gxDgg8M="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"SrZnpFXKM5eEqqCygsHRJe6uuhY=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"GvBApXCd0h6OGPzcSCo1gxDgg8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ="},{"type":"next-occurrence","id":"XAYtLClYTtZQm7vLSyKvN9moAc0="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"GvBApXCd0h6OGPzcSCo1gxDgg8M=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"XAYtLClYTtZQm7vLSyKvN9moAc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ="},{"type":"next-occurrence","id":"TpdUITP1i4jvJkDKSbjohNece4o="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"XAYtLClYTtZQm7vLSyKvN9moAc0=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"TpdUITP1i4jvJkDKSbjohNece4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lvAbqtfoTWAvRssI7xs0Y04vRzQ="}],"description":"Guard rail repairs on Saw Mill River Parkway both directions between Exit 5A - CR 33II; Palmer Road (Yonkers) and Exit 32 - NY 120 (New Castle) D265183/NIGHT/32670709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM, various lane closure","update_date":"2026-04-22T11:06:03Z"},"road_event_id":"TpdUITP1i4jvJkDKSbjohNece4o=","beginning_cross_street":"Exit 5A - CR 33II; Palmer Road","ending_cross_street":"Exit 32 - Hunts Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T20:00:00Z","end_date":"2026-05-03T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.86772,40.979676]]}},{"id":"UXiz2xxgO9yWioASq2s5m0XrQYA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"/EBLndPQIW+KvjquuYaWfvUZaAc="}],"description":"Construction on NY 17 [Rockland] northbound ramp to Sterling Mine Road (Ramapo) RCHD RW/32725509 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Saturday April 25th, 2026 thru Monday April 27th, 2026, Saturday/Sunday, 07:00 PM thru 07:00 AM, ramp closed and detoured","update_date":"2026-04-10T10:56:39Z"},"road_event_id":"UXiz2xxgO9yWioASq2s5m0XrQYA=","beginning_cross_street":"Sterling Mine Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T18:00:00Z","end_date":"2026-04-27T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.190348,41.147747]]}},{"id":"/EBLndPQIW+KvjquuYaWfvUZaAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Rockland]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UXiz2xxgO9yWioASq2s5m0XrQYA="}],"description":"Construction on NY 17 [Rockland] northbound ramp to Sterling Mine Road (Ramapo) RCHD RW/32725509 - RAMP CLOSED - Motorists are advised to follow posted detour. Plan travel accordingly; delays may exist, Saturday April 25th, 2026 thru Monday April 27th, 2026, Saturday/Sunday, 07:00 PM thru 07:00 AM, ramp closed and detoured","update_date":"2026-04-10T10:56:39Z"},"road_event_id":"/EBLndPQIW+KvjquuYaWfvUZaAc=","beginning_cross_street":"Sterling Mine Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.190348,41.147747]]}},{"id":"061H2hkYuWUsm+ippONvijY3GJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"4rO8S8imGqcuogwoCHzLdY3szBE="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"061H2hkYuWUsm+ippONvijY3GJY=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"4rO8S8imGqcuogwoCHzLdY3szBE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"2RidPT2tv+q/jZLAV48nHWHYLsg="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"4rO8S8imGqcuogwoCHzLdY3szBE=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"2RidPT2tv+q/jZLAV48nHWHYLsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"Ixo4ZH6g9pXQc2YaQMir9ZewmtY="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"2RidPT2tv+q/jZLAV48nHWHYLsg=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"Ixo4ZH6g9pXQc2YaQMir9ZewmtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"y7IthxePGsEfCflfvIBJKidw1bk="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"Ixo4ZH6g9pXQc2YaQMir9ZewmtY=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"y7IthxePGsEfCflfvIBJKidw1bk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"SrQJrw5PdV6luQVKkYVpbUiOvgs="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"y7IthxePGsEfCflfvIBJKidw1bk=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"SrQJrw5PdV6luQVKkYVpbUiOvgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"8KiN2jNy1HslcVdxn3mT+1g6oz0="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"SrQJrw5PdV6luQVKkYVpbUiOvgs=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"8KiN2jNy1HslcVdxn3mT+1g6oz0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"X8hFHtSMyuor8QgXPxOk55dk29o="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"8KiN2jNy1HslcVdxn3mT+1g6oz0=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"X8hFHtSMyuor8QgXPxOk55dk29o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"tV0Vv/8jC03jlcXqoLYNDsdZ22w="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"X8hFHtSMyuor8QgXPxOk55dk29o=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"tV0Vv/8jC03jlcXqoLYNDsdZ22w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"JmQ+kxKW+BMciEjSkDCi3CNaM9M="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"tV0Vv/8jC03jlcXqoLYNDsdZ22w=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"JmQ+kxKW+BMciEjSkDCi3CNaM9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="},{"type":"next-occurrence","id":"aclQbrH1KPPuVFM7bIp3jq56VJI="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"JmQ+kxKW+BMciEjSkDCi3CNaM9M=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"aclQbrH1KPPuVFM7bIp3jq56VJI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"061H2hkYuWUsm+ippONvijY3GJY="}],"description":"Longterm construction on I-690 westbound between Exit 14 - Geddes Street (Syracuse) and NY-298; Bear Street; on-ramp (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-03-26T22:25:34Z"},"road_event_id":"aclQbrH1KPPuVFM7bIp3jq56VJI=","beginning_cross_street":"Exit 14 - Geddes Street","ending_cross_street":"NY-298; Bear Street; on-ramp","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167189,43.05591]]}},{"id":"iraKF4eUOaoiI56F4uKAXsnlpz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of US 202 (Bridgewater Twp), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-22T12:39:24Z"},"road_event_id":"iraKF4eUOaoiI56F4uKAXsnlpz8=","beginning_cross_street":"South of US 202","ending_cross_street":"South of US 202","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.612846,40.585632]]}},{"id":"pPC6Wnkl8j2fjjtBOASXnV1nIQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Tuesday April 28, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-22T12:39:20Z"},"road_event_id":"pPC6Wnkl8j2fjjtBOASXnV1nIQM=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070823,40.82209]]}},{"id":"rEtuOv1xlmn2kgJxKLmM5cPVqFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Thursday April 30, 2026 08:00 PM thru Friday May 1, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-04-22T12:39:23Z"},"road_event_id":"rEtuOv1xlmn2kgJxKLmM5cPVqFM=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"e1BTXPAhMhx6N7LfFiZCn6yZjcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 243"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"RuLC/ICYtinxBWyn/AvZKYk6v88="}],"description":"Drainage improvements on NY 243 westbound CR 23 (Rushford), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 07:00 AM thru 12:00 PM right shoulder closed","update_date":"2026-04-22T12:36:01Z"},"road_event_id":"e1BTXPAhMhx6N7LfFiZCn6yZjcc=","beginning_cross_street":"CR 23","ending_cross_street":"CR 23","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.252596,42.395713]]}},{"id":"RuLC/ICYtinxBWyn/AvZKYk6v88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 243"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"e1BTXPAhMhx6N7LfFiZCn6yZjcc="}],"description":"Drainage improvements on NY 243 westbound CR 23 (Rushford), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 07:00 AM thru 12:00 PM right shoulder closed","update_date":"2026-04-22T12:36:01Z"},"road_event_id":"RuLC/ICYtinxBWyn/AvZKYk6v88=","beginning_cross_street":"CR 23","ending_cross_street":"CR 23","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T16:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.252596,42.395713]]}},{"id":"dne0+D5ReG7YLdy0R0FxcX3b/2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 85"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BFfNzH82Y6r12hQJEc6K+uKWDic="}],"description":"Roadwork on NY 85 both directions between Campus Access Rd overpass (Albany) and Western Ave overpass (Albany), Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T12:38:04Z"},"road_event_id":"dne0+D5ReG7YLdy0R0FxcX3b/2Y=","beginning_cross_street":"Campus Access Rd overpass","ending_cross_street":"Western Ave overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805792,42.673683]]}},{"id":"BFfNzH82Y6r12hQJEc6K+uKWDic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 85"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dne0+D5ReG7YLdy0R0FxcX3b/2Y="},{"type":"next-occurrence","id":"7puvRg9nl5XLrXBm4JJZ2hZGVJU="}],"description":"Roadwork on NY 85 both directions between Campus Access Rd overpass (Albany) and Western Ave overpass (Albany), Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T12:38:04Z"},"road_event_id":"BFfNzH82Y6r12hQJEc6K+uKWDic=","beginning_cross_street":"Campus Access Rd overpass","ending_cross_street":"Western Ave overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805792,42.673683]]}},{"id":"7puvRg9nl5XLrXBm4JJZ2hZGVJU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 85"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dne0+D5ReG7YLdy0R0FxcX3b/2Y="},{"type":"next-occurrence","id":"sqhYilU2aI35TOCEM3uMoWXK1Rw="}],"description":"Roadwork on NY 85 both directions between Campus Access Rd overpass (Albany) and Western Ave overpass (Albany), Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T12:38:04Z"},"road_event_id":"7puvRg9nl5XLrXBm4JJZ2hZGVJU=","beginning_cross_street":"Campus Access Rd overpass","ending_cross_street":"Western Ave overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805792,42.673683]]}},{"id":"sqhYilU2aI35TOCEM3uMoWXK1Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 85"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dne0+D5ReG7YLdy0R0FxcX3b/2Y="},{"type":"next-occurrence","id":"u7Bx+H0yPBrPjBKoAGM4X7kB8kE="}],"description":"Roadwork on NY 85 both directions between Campus Access Rd overpass (Albany) and Western Ave overpass (Albany), Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T12:38:04Z"},"road_event_id":"sqhYilU2aI35TOCEM3uMoWXK1Rw=","beginning_cross_street":"Campus Access Rd overpass","ending_cross_street":"Western Ave overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805792,42.673683]]}},{"id":"u7Bx+H0yPBrPjBKoAGM4X7kB8kE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 85"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dne0+D5ReG7YLdy0R0FxcX3b/2Y="},{"type":"next-occurrence","id":"CwY8X7HD4zAS/5rvTCxaOfxtb94="}],"description":"Roadwork on NY 85 both directions between Campus Access Rd overpass (Albany) and Western Ave overpass (Albany), Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T12:38:04Z"},"road_event_id":"u7Bx+H0yPBrPjBKoAGM4X7kB8kE=","beginning_cross_street":"Campus Access Rd overpass","ending_cross_street":"Western Ave overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805792,42.673683]]}},{"id":"CwY8X7HD4zAS/5rvTCxaOfxtb94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 85"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"dne0+D5ReG7YLdy0R0FxcX3b/2Y="}],"description":"Roadwork on NY 85 both directions between Campus Access Rd overpass (Albany) and Western Ave overpass (Albany), Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T12:38:04Z"},"road_event_id":"CwY8X7HD4zAS/5rvTCxaOfxtb94=","beginning_cross_street":"Campus Access Rd overpass","ending_cross_street":"Western Ave overpass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.805792,42.673683]]}},{"id":"F+M80n64NBRAcAAjGDyGMVVkx34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["QM11 Bus, QM25 Bus, QM7 Bus and QM8 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction both directions, QM11 Bus, QM25 Bus, QM7 Bus and QM8 Bus at State St/Battery Pl (New York) stop is closed. Use the temporary stop on State St at Bridge St instead. Through November 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Sunday November 1st, 2026 11:59 PM","update_date":"2025-08-22T18:38:39Z"},"road_event_id":"F+M80n64NBRAcAAjGDyGMVVkx34=","beginning_cross_street":"State St/Battery Pl","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.014174,40.704386]]}},{"id":"WDb2Wc9EzisN1L1m099H88YXT6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 417"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 417 westbound Town of Greenwood; Town of Jasper Line (Jasper) 1 Lane, 2 Way, Flagger Control, Wednesday April 22nd, 2026, 07:30 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T12:32:59Z"},"road_event_id":"WDb2Wc9EzisN1L1m099H88YXT6A=","beginning_cross_street":"Town of Greenwood; Town of Jasper Line","ending_cross_street":"Town of Greenwood; Town of Jasper Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:30:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.60962,42.12232]]}},{"id":"wNPV/WI8GDM1FdWOPiVh0KhC2Ds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 94"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 94 Northbound South of CR 631/North Church Rd (Hardyston Twp) Thursday April 23, 2026 07:00 AM thru 03:00 PM, All lanes open","update_date":"2026-04-22T12:34:14Z"},"road_event_id":"wNPV/WI8GDM1FdWOPiVh0KhC2Ds=","beginning_cross_street":"South of CR 631/North Church Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.630973,41.119365]]}},{"id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"C4kd2O6rm4cgDqiI60CfJA0bptk="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"C4kd2O6rm4cgDqiI60CfJA0bptk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="},{"type":"next-occurrence","id":"yP4prGhwQjY2m1+eURMG+WXx3Ck="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"C4kd2O6rm4cgDqiI60CfJA0bptk=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"yP4prGhwQjY2m1+eURMG+WXx3Ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="},{"type":"next-occurrence","id":"BfvVlQ72aCWvQ2JyNqM9hp+CWhY="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"yP4prGhwQjY2m1+eURMG+WXx3Ck=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"BfvVlQ72aCWvQ2JyNqM9hp+CWhY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="},{"type":"next-occurrence","id":"YgpWorMlYacCNaYYgMPNiapKMNc="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"BfvVlQ72aCWvQ2JyNqM9hp+CWhY=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"YgpWorMlYacCNaYYgMPNiapKMNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="},{"type":"next-occurrence","id":"gAo25joz/S3KGfreH0VBlOWaKWM="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"YgpWorMlYacCNaYYgMPNiapKMNc=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"gAo25joz/S3KGfreH0VBlOWaKWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="},{"type":"next-occurrence","id":"E6IWOeZ1r8Jvr3SauBb2E2Wzxj4="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"gAo25joz/S3KGfreH0VBlOWaKWM=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"E6IWOeZ1r8Jvr3SauBb2E2Wzxj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="},{"type":"next-occurrence","id":"T4iJs/k2XaY+xU2GM84kW79JbJg="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"E6IWOeZ1r8Jvr3SauBb2E2Wzxj4=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"T4iJs/k2XaY+xU2GM84kW79JbJg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="},{"type":"next-occurrence","id":"z29DYhDSvPT46KqSverVeo34WnM="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"T4iJs/k2XaY+xU2GM84kW79JbJg=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"z29DYhDSvPT46KqSverVeo34WnM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"OkuJj/IHz5UjwRf+ZNnLrdQKe+8="}],"description":"Construction on E 92ND ST both directions between AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:28:46Z"},"road_event_id":"z29DYhDSvPT46KqSverVeo34WnM=","beginning_cross_street":"AVENUE D","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.912177,40.648105]]}},{"id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ShApmkwq/B4ktngIVVGvYMUfyIw="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"ShApmkwq/B4ktngIVVGvYMUfyIw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"lSFDqimaVj5x8MhrPebZjx80Iko="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"ShApmkwq/B4ktngIVVGvYMUfyIw=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"lSFDqimaVj5x8MhrPebZjx80Iko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"rd+b4WiCpTU96UmVdg8NZ4dPHNA="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"lSFDqimaVj5x8MhrPebZjx80Iko=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"rd+b4WiCpTU96UmVdg8NZ4dPHNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"LP+k9C0QHqvniqT0kd9Hot+FfE4="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"rd+b4WiCpTU96UmVdg8NZ4dPHNA=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"LP+k9C0QHqvniqT0kd9Hot+FfE4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"uggn9KuNANkTfYFCKLlbEF7pB4A="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"LP+k9C0QHqvniqT0kd9Hot+FfE4=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"uggn9KuNANkTfYFCKLlbEF7pB4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"jMAO4FYJ4V2WAHt7O4JUbBDomVU="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"uggn9KuNANkTfYFCKLlbEF7pB4A=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"jMAO4FYJ4V2WAHt7O4JUbBDomVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"UMMxawkPvnrm6qATYK2Bok+gkOk="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"jMAO4FYJ4V2WAHt7O4JUbBDomVU=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"UMMxawkPvnrm6qATYK2Bok+gkOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"bZMIewizzc6xgte+MKU/tUeUPGM="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"UMMxawkPvnrm6qATYK2Bok+gkOk=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"bZMIewizzc6xgte+MKU/tUeUPGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"lqjLO/os+iBOGIz/ZqvF/pRu6CY="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"bZMIewizzc6xgte+MKU/tUeUPGM=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"lqjLO/os+iBOGIz/ZqvF/pRu6CY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="},{"type":"next-occurrence","id":"qTP87YNYws4tJ2CkKZWdf0WPpDs="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"lqjLO/os+iBOGIz/ZqvF/pRu6CY=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"qTP87YNYws4tJ2CkKZWdf0WPpDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ugZVw/xX2J0VKJ4w0QupDNVjw3I="}],"description":"Roadwork on I-81 northbound ramp to/from Exit 9A - Exit 9B - Syracuse Airport (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:44:43Z"},"road_event_id":"qTP87YNYws4tJ2CkKZWdf0WPpDs=","beginning_cross_street":"Exit 9A - Exit 9B - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142521,43.113253]]}},{"id":"xpELxR4Vtqh8RJoqwverxyC45CE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"gBxAqcb1AkJ84dyh0klduxxO6m4="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"xpELxR4Vtqh8RJoqwverxyC45CE=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"gBxAqcb1AkJ84dyh0klduxxO6m4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="},{"type":"next-occurrence","id":"tNboXKcHW+meDOoEdg0bR6IdZQs="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"gBxAqcb1AkJ84dyh0klduxxO6m4=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"tNboXKcHW+meDOoEdg0bR6IdZQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="},{"type":"next-occurrence","id":"lxnd0IhwVePJtK1+wKZ2s9qapBc="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"tNboXKcHW+meDOoEdg0bR6IdZQs=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"lxnd0IhwVePJtK1+wKZ2s9qapBc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="},{"type":"next-occurrence","id":"JrBcxSF4UDGp6/4bB5WJXUr/JmQ="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"lxnd0IhwVePJtK1+wKZ2s9qapBc=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"JrBcxSF4UDGp6/4bB5WJXUr/JmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="},{"type":"next-occurrence","id":"1Ny9FTeCfEizWkbWI4r/YUotVC8="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"JrBcxSF4UDGp6/4bB5WJXUr/JmQ=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"1Ny9FTeCfEizWkbWI4r/YUotVC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="},{"type":"next-occurrence","id":"anE0PlZrMI81ukVJW6G2uKRCgqA="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"1Ny9FTeCfEizWkbWI4r/YUotVC8=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"anE0PlZrMI81ukVJW6G2uKRCgqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="},{"type":"next-occurrence","id":"6nT7sAVWwE4qLpJLgqitVePVE4o="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"anE0PlZrMI81ukVJW6G2uKRCgqA=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"6nT7sAVWwE4qLpJLgqitVePVE4o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="},{"type":"next-occurrence","id":"kzXYGE+uMsh2S/J77fnDePUFgkw="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"6nT7sAVWwE4qLpJLgqitVePVE4o=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"kzXYGE+uMsh2S/J77fnDePUFgkw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpELxR4Vtqh8RJoqwverxyC45CE="}],"description":"Construction on E 92ND ST both directions between DITMAS AVE (New York) and AVENUE D (New York) for installation of electrical manholes and conduit., Friday February 20th, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-19T15:26:42Z"},"road_event_id":"kzXYGE+uMsh2S/J77fnDePUFgkw=","beginning_cross_street":"DITMAS AVE","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.913192,40.649027]]}},{"id":"3E5KtSUHvgP04tJw089NwB2zZc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ANTHONY AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"F21v0OJQyKLuH5ZYfjTTGs0d0Pg="}],"description":"Construction and crane operations on ANTHONY AVE northbound between PROSPECT PL (New York) and E 175TH ST (New York) for foundation concrete pour, booming/pumping operations., Saturday March 14th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:15:41Z"},"road_event_id":"3E5KtSUHvgP04tJw089NwB2zZc8=","beginning_cross_street":"PROSPECT PL","ending_cross_street":"E 175TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903866,40.845863]]}},{"id":"F21v0OJQyKLuH5ZYfjTTGs0d0Pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ANTHONY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3E5KtSUHvgP04tJw089NwB2zZc8="},{"type":"next-occurrence","id":"9yyVhfYY8xPqvh4VfgE+Cp2HLrI="}],"description":"Construction and crane operations on ANTHONY AVE northbound between PROSPECT PL (New York) and E 175TH ST (New York) for foundation concrete pour, booming/pumping operations., Saturday March 14th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:15:41Z"},"road_event_id":"F21v0OJQyKLuH5ZYfjTTGs0d0Pg=","beginning_cross_street":"PROSPECT PL","ending_cross_street":"E 175TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903866,40.845863]]}},{"id":"9yyVhfYY8xPqvh4VfgE+Cp2HLrI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ANTHONY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3E5KtSUHvgP04tJw089NwB2zZc8="},{"type":"next-occurrence","id":"IigVgJF34jqAlLP8v8Si7MlnM6w="}],"description":"Construction and crane operations on ANTHONY AVE northbound between PROSPECT PL (New York) and E 175TH ST (New York) for foundation concrete pour, booming/pumping operations., Saturday March 14th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:15:41Z"},"road_event_id":"9yyVhfYY8xPqvh4VfgE+Cp2HLrI=","beginning_cross_street":"PROSPECT PL","ending_cross_street":"E 175TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903866,40.845863]]}},{"id":"IigVgJF34jqAlLP8v8Si7MlnM6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ANTHONY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3E5KtSUHvgP04tJw089NwB2zZc8="},{"type":"next-occurrence","id":"99E9Z6r4FCyRanuk1vtwKN3CGlA="}],"description":"Construction and crane operations on ANTHONY AVE northbound between PROSPECT PL (New York) and E 175TH ST (New York) for foundation concrete pour, booming/pumping operations., Saturday March 14th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:15:41Z"},"road_event_id":"IigVgJF34jqAlLP8v8Si7MlnM6w=","beginning_cross_street":"PROSPECT PL","ending_cross_street":"E 175TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903866,40.845863]]}},{"id":"99E9Z6r4FCyRanuk1vtwKN3CGlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["ANTHONY AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3E5KtSUHvgP04tJw089NwB2zZc8="}],"description":"Construction and crane operations on ANTHONY AVE northbound between PROSPECT PL (New York) and E 175TH ST (New York) for foundation concrete pour, booming/pumping operations., Saturday March 14th, 2026 thru Saturday April 25th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Sunday March 15th, 2026 thru Sunday April 26th, 2026, 09:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 05:00 PM All lanes closed","update_date":"2026-03-24T18:15:41Z"},"road_event_id":"99E9Z6r4FCyRanuk1vtwKN3CGlA=","beginning_cross_street":"PROSPECT PL","ending_cross_street":"E 175TH ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.903866,40.845863]]}},{"id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UKuuxWe/WUZ+f0+T+qYcckzfU+A="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"UKuuxWe/WUZ+f0+T+qYcckzfU+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"zazY5L0uHv92UQcB5MXDg0Z3HLg="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"UKuuxWe/WUZ+f0+T+qYcckzfU+A=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"zazY5L0uHv92UQcB5MXDg0Z3HLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"Rx/45ooqXZ5qmUcUqTjYdn++Ifs="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"zazY5L0uHv92UQcB5MXDg0Z3HLg=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"Rx/45ooqXZ5qmUcUqTjYdn++Ifs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"zrSySxoS5dqLQ8UzgK8V1TA/Wgs="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"Rx/45ooqXZ5qmUcUqTjYdn++Ifs=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"zrSySxoS5dqLQ8UzgK8V1TA/Wgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"E5t0ZKT3SXC3TRWX2F3Vk7QovqI="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"zrSySxoS5dqLQ8UzgK8V1TA/Wgs=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"E5t0ZKT3SXC3TRWX2F3Vk7QovqI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"q16szyNkHv7Il1KgNpyV1qNiWHM="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"E5t0ZKT3SXC3TRWX2F3Vk7QovqI=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"q16szyNkHv7Il1KgNpyV1qNiWHM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"IxztKuqg7GtReSEFOJL+Nc8aWBw="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"q16szyNkHv7Il1KgNpyV1qNiWHM=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"IxztKuqg7GtReSEFOJL+Nc8aWBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"1z8ZDlCKTk7T98neamx/gON51K0="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"IxztKuqg7GtReSEFOJL+Nc8aWBw=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"1z8ZDlCKTk7T98neamx/gON51K0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"9ekofnsxFdCeVOqtMh2zYqhT+sw="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"1z8ZDlCKTk7T98neamx/gON51K0=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"9ekofnsxFdCeVOqtMh2zYqhT+sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="},{"type":"next-occurrence","id":"yj2MzyoO0MWWlcTC2E13kuYz/G8="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"9ekofnsxFdCeVOqtMh2zYqhT+sw=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"yj2MzyoO0MWWlcTC2E13kuYz/G8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fKJFm9VzLAS1xSaQ0H0q7tl4oUo="}],"description":"Construction on NY 5 both directions at Village of Oneida Castle; Town of Vernon (Vernon) motorists will encounter lane closures with flaggers in place, Monday April 6th, 2026 thru Wednesday July 1st, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM,","update_date":"2026-04-09T17:00:37Z"},"road_event_id":"yj2MzyoO0MWWlcTC2E13kuYz/G8=","beginning_cross_street":"Village of Oneida Castle; Town of Vernon","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.633336,43.077729]]}},{"id":"Df9+v4XF+FIhxHCFu/fzEyQNjwc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NkrWhEZ0oKRAi+8zkvwcx5XIXpk="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"Df9+v4XF+FIhxHCFu/fzEyQNjwc=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"NkrWhEZ0oKRAi+8zkvwcx5XIXpk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df9+v4XF+FIhxHCFu/fzEyQNjwc="},{"type":"next-occurrence","id":"3otMEkADhSVps9p7zsMfnU2B4Uo="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"NkrWhEZ0oKRAi+8zkvwcx5XIXpk=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"3otMEkADhSVps9p7zsMfnU2B4Uo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df9+v4XF+FIhxHCFu/fzEyQNjwc="},{"type":"next-occurrence","id":"2oqR9YlsInK5sVnnr1YJtvQUuwU="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"3otMEkADhSVps9p7zsMfnU2B4Uo=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"2oqR9YlsInK5sVnnr1YJtvQUuwU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["LINDEN BLVD"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Df9+v4XF+FIhxHCFu/fzEyQNjwc="}],"description":"Construction on LINDEN BLVD eastbound between LINCOLN AVE (New York) and ELDERT LN (New York), Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Saturday June 6th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:35:39Z"},"road_event_id":"2oqR9YlsInK5sVnnr1YJtvQUuwU=","beginning_cross_street":"LINCOLN AVE","ending_cross_street":"ELDERT LN","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.865708,40.668891]]}},{"id":"ORC300541261","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-787"],"direction":"unknown","description":"Guard rail repairs on I-787 both directions between Exit 1 (Colonie) and Exit 9W () Not currently Scheduled","update_date":"2026-04-22T18:30:01Z"},"road_event_id":"ORC300541261","beginning_cross_street":"Exit 1","ending_cross_street":"Exit 9W","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:22:50Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.718971,42.685828]]}},{"id":"ORC300541259","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","description":"Roadwork on I-87 Northway northbound between Exit 12; NY 67 (Malta) and Exit 13S; US 9 south (Malta) Not currently Scheduled","update_date":"2026-04-22T18:30:02Z"},"road_event_id":"ORC300541259","beginning_cross_street":"Exit 12; NY 67","ending_cross_street":"Exit 13S; US 9 south","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:19:05Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.801428,42.967896]]}},{"id":"a+3Zn1Awga3WMwoNxRq8bPaPg7g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 230"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on NY 230 northbound Town of Wayne; Town of Tyrone Line; Steuben-Schuyler County Line (Tyrone) to Town of Tyrone; Town of Barrington Line (Tyrone) 2 Lanes Reduced to 1, Wednesday April 22nd, 2026, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T12:09:58Z"},"road_event_id":"a+3Zn1Awga3WMwoNxRq8bPaPg7g=","beginning_cross_street":"Town of Wayne; Town of Tyrone Line; Steuben-Schuyler County Line","ending_cross_street":"Town of Tyrone; Town of Barrington Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.0936,42.472476]]}},{"id":"ORC300541255","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 414"],"direction":"unknown","description":"Drainage improvements on NY 414 both directions NY 79 (Hector) to NY 79 (Hector) 1 Lane, 2 Way, Flagger Control Not currently Scheduled","update_date":"2026-04-22T18:30:02Z"},"road_event_id":"ORC300541255","beginning_cross_street":"NY 79","ending_cross_street":"NY 79","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:07:26Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-76.856857,42.394812]]}},{"id":"X2DMe5ESmZL9r8hG+5mJ4F/PZ1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zt+kww32m1BE6nVOpdPliu01Xo8="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Tuesday March 10th, 2026 thru Tuesday May 26th, 2026, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-10T18:50:44Z"},"road_event_id":"X2DMe5ESmZL9r8hG+5mJ4F/PZ1I=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981779,40.692021]]}},{"id":"zt+kww32m1BE6nVOpdPliu01Xo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FLEET PL"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"X2DMe5ESmZL9r8hG+5mJ4F/PZ1I="}],"description":"Construction on FLEET PL northbound between WILLOUGHBY ST (New York) and FAIR ST (New York), Tuesday March 10th, 2026 thru Tuesday May 26th, 2026, 09:00 AM thru 04:00 PM All lanes open","update_date":"2026-03-10T18:50:44Z"},"road_event_id":"zt+kww32m1BE6nVOpdPliu01Xo8=","beginning_cross_street":"WILLOUGHBY ST","ending_cross_street":"FAIR ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981779,40.692021]]}},{"id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"WbSUQbqrDsHZqmx41h+ICF/oEag="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"WbSUQbqrDsHZqmx41h+ICF/oEag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"S1CCYoJ3FjuUpFWJa+q7xR4s/0E="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"WbSUQbqrDsHZqmx41h+ICF/oEag=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"S1CCYoJ3FjuUpFWJa+q7xR4s/0E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"OkHoob0VAyg7L6TZ+gbfDRqoRXA="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"S1CCYoJ3FjuUpFWJa+q7xR4s/0E=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"OkHoob0VAyg7L6TZ+gbfDRqoRXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"hX2nGtHtQTSg5tzV05LHTKxK2g0="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"OkHoob0VAyg7L6TZ+gbfDRqoRXA=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"hX2nGtHtQTSg5tzV05LHTKxK2g0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"SdUxTkSAjTWhKK+8AezDxIXnlwM="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"hX2nGtHtQTSg5tzV05LHTKxK2g0=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"SdUxTkSAjTWhKK+8AezDxIXnlwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"SWtL/upWmEIGkX12qSc1PWymCu4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"SdUxTkSAjTWhKK+8AezDxIXnlwM=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"SWtL/upWmEIGkX12qSc1PWymCu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"5t4TphVux9/u8y8MyKZG4DNFVaE="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"SWtL/upWmEIGkX12qSc1PWymCu4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"5t4TphVux9/u8y8MyKZG4DNFVaE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"RsC1t38wGK4tDK4SMP9GKG3j2v4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"5t4TphVux9/u8y8MyKZG4DNFVaE=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"RsC1t38wGK4tDK4SMP9GKG3j2v4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"83BOgaDs23WgScTMW9F72cNbg/k="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"RsC1t38wGK4tDK4SMP9GKG3j2v4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"83BOgaDs23WgScTMW9F72cNbg/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="},{"type":"next-occurrence","id":"tA/4F/ZAeuYag6YCUWkxMO1i5N4="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"83BOgaDs23WgScTMW9F72cNbg/k=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"tA/4F/ZAeuYag6YCUWkxMO1i5N4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"HWDF6qEQc6RZFfNRqJ/MpRBkDKg="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 6 - 7th North Street; Liverpool (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-03T12:01:48Z"},"road_event_id":"tA/4F/ZAeuYag6YCUWkxMO1i5N4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.167568,43.089047]]}},{"id":"ogiJO3P4BxKBuwIij3/hmy6Vc8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HINSDALE ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"PwPq58PAAwChLPXuk3P0tkhmXrM="}],"description":"Construction on HINSDALE ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York), Tuesday March 10th, 2026 thru Monday May 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Monday May 4th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:48:39Z"},"road_event_id":"ogiJO3P4BxKBuwIij3/hmy6Vc8M=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899866,40.668664]]}},{"id":"PwPq58PAAwChLPXuk3P0tkhmXrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HINSDALE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ogiJO3P4BxKBuwIij3/hmy6Vc8M="},{"type":"next-occurrence","id":"4yBeBgz4YoV2OV+E30W/JoG4mw8="}],"description":"Construction on HINSDALE ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York), Tuesday March 10th, 2026 thru Monday May 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Monday May 4th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:48:39Z"},"road_event_id":"PwPq58PAAwChLPXuk3P0tkhmXrM=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899866,40.668664]]}},{"id":"4yBeBgz4YoV2OV+E30W/JoG4mw8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HINSDALE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ogiJO3P4BxKBuwIij3/hmy6Vc8M="},{"type":"next-occurrence","id":"OTt2d/2i9KU3XdHba6wrMgzVoas="}],"description":"Construction on HINSDALE ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York), Tuesday March 10th, 2026 thru Monday May 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Monday May 4th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:48:39Z"},"road_event_id":"4yBeBgz4YoV2OV+E30W/JoG4mw8=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899866,40.668664]]}},{"id":"OTt2d/2i9KU3XdHba6wrMgzVoas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HINSDALE ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ogiJO3P4BxKBuwIij3/hmy6Vc8M="}],"description":"Construction on HINSDALE ST southbound between SUTTER AVE (New York) and BLAKE AVE (New York), Tuesday March 10th, 2026 thru Monday May 4th, 2026, 08:00 AM thru 06:00 PM All lanes closed, Tuesday March 10th, 2026 thru Monday May 4th, 2026, 09:00 AM thru 06:00 PM All lanes closed","update_date":"2026-03-10T18:48:39Z"},"road_event_id":"OTt2d/2i9KU3XdHba6wrMgzVoas=","beginning_cross_street":"SUTTER AVE","ending_cross_street":"BLAKE AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.899866,40.668664]]}},{"id":"MAw6Ox7bVKddJ4viAUVz2sNahKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9GtkSgdE391qQl84jIKyPQ/EZ6A="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"MAw6Ox7bVKddJ4viAUVz2sNahKA=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"9GtkSgdE391qQl84jIKyPQ/EZ6A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"7OytlUCRKtVdmF+Sz8e/dYm4sO4="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"9GtkSgdE391qQl84jIKyPQ/EZ6A=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"7OytlUCRKtVdmF+Sz8e/dYm4sO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"9QBXg3JmYG3r29TOEb6Z2uN35LQ="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"7OytlUCRKtVdmF+Sz8e/dYm4sO4=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"9QBXg3JmYG3r29TOEb6Z2uN35LQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"FeARLAcumz375CjzJihUAS1XhfA="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"9QBXg3JmYG3r29TOEb6Z2uN35LQ=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T12:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"FeARLAcumz375CjzJihUAS1XhfA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"53/5N8w6jeckPK9SvduMFdmmB4k="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"FeARLAcumz375CjzJihUAS1XhfA=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T12:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"53/5N8w6jeckPK9SvduMFdmmB4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"hC29F3Txw81lJ+BC4LMvCQmYGic="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"53/5N8w6jeckPK9SvduMFdmmB4k=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"hC29F3Txw81lJ+BC4LMvCQmYGic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"iLfmK6mr4RmtFvDyZFM7vmV7S8Q="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"hC29F3Txw81lJ+BC4LMvCQmYGic=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"iLfmK6mr4RmtFvDyZFM7vmV7S8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"78ZEDa6Et/97NTDH2J3b07Edgc8="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"iLfmK6mr4RmtFvDyZFM7vmV7S8Q=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"78ZEDa6Et/97NTDH2J3b07Edgc8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"s0eeiehMqVpgKuiKwddiLdFs2NU="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"78ZEDa6Et/97NTDH2J3b07Edgc8=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"s0eeiehMqVpgKuiKwddiLdFs2NU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"R7VlmNpEgI4IyfIeZSL9DZYuZz8="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"s0eeiehMqVpgKuiKwddiLdFs2NU=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"R7VlmNpEgI4IyfIeZSL9DZYuZz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"GhurM4yji/VNSCBaWwxBotLrGVY="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"R7VlmNpEgI4IyfIeZSL9DZYuZz8=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T12:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"GhurM4yji/VNSCBaWwxBotLrGVY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"0uD2MtvVAY8J90I3WzrsmElqXGY="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"GhurM4yji/VNSCBaWwxBotLrGVY=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T12:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"0uD2MtvVAY8J90I3WzrsmElqXGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"0ZVpKRI5P8GZfLr4bAgl/jB6nL8="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"0uD2MtvVAY8J90I3WzrsmElqXGY=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"0ZVpKRI5P8GZfLr4bAgl/jB6nL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="},{"type":"next-occurrence","id":"87w2/o+oZylpmwQtWzgr0cyTihk="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"0ZVpKRI5P8GZfLr4bAgl/jB6nL8=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"87w2/o+oZylpmwQtWzgr0cyTihk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NEVINS ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MAw6Ox7bVKddJ4viAUVz2sNahKA="}],"description":"Construction on NEVINS ST southbound between BUTLER ST (New York) and DOUGLASS ST (New York) to build new conduit to provide service to 251 Douglass Street., Saturday February 21st, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 08:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:56:02Z"},"road_event_id":"87w2/o+oZylpmwQtWzgr0cyTihk=","beginning_cross_street":"BUTLER ST","ending_cross_street":"DOUGLASS ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.985716,40.681594]]}},{"id":"+i/zGKVybNTkeoETY6iaI/eE+Sw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"p55Q5Snap3xPhzWA0ReIuT39lFg="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"+i/zGKVybNTkeoETY6iaI/eE+Sw=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"p55Q5Snap3xPhzWA0ReIuT39lFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"fJ7uHrSsD9/HWB4d1WEYUWcy8IQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"p55Q5Snap3xPhzWA0ReIuT39lFg=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"fJ7uHrSsD9/HWB4d1WEYUWcy8IQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"7yaMhpobCfzbXt+FMyyoi8iREkg="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"fJ7uHrSsD9/HWB4d1WEYUWcy8IQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"7yaMhpobCfzbXt+FMyyoi8iREkg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"hTJHeonF01Rh2w3yEZEMgxxeykY="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"7yaMhpobCfzbXt+FMyyoi8iREkg=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"hTJHeonF01Rh2w3yEZEMgxxeykY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"jP+bnMj99mqissHqrI/0kmpeBWo="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"hTJHeonF01Rh2w3yEZEMgxxeykY=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"jP+bnMj99mqissHqrI/0kmpeBWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"vYsQ1brTTxz/9oSIzcYseSSaOlA="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"jP+bnMj99mqissHqrI/0kmpeBWo=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"vYsQ1brTTxz/9oSIzcYseSSaOlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"9hTTG/Lj22AxEeoOVcBGMTDIsQs="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"vYsQ1brTTxz/9oSIzcYseSSaOlA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"9hTTG/Lj22AxEeoOVcBGMTDIsQs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"pztV8GyGNQwC0wP4mhUHZYsINwo="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"9hTTG/Lj22AxEeoOVcBGMTDIsQs=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"pztV8GyGNQwC0wP4mhUHZYsINwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"zwJqFrYcdV5ha0SfWRG+SsqGmHw="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"pztV8GyGNQwC0wP4mhUHZYsINwo=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"zwJqFrYcdV5ha0SfWRG+SsqGmHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="},{"type":"next-occurrence","id":"jwC7F4ot8CfjIc53hY97LoIRDiQ="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"zwJqFrYcdV5ha0SfWRG+SsqGmHw=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"jwC7F4ot8CfjIc53hY97LoIRDiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+i/zGKVybNTkeoETY6iaI/eE+Sw="}],"description":"Roadwork on I-81 southbound ramp to/from Exit 7 - I-90 (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-04-08T13:24:29Z"},"road_event_id":"jwC7F4ot8CfjIc53hY97LoIRDiQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.163049,43.09404]]}},{"id":"kvbdO3Ktv+R6BoUWGn8DUNMbNlY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Eastbound between East of I-676/Ben Franklin Bridge (Camden) and West of CR 608/Baird Blvd (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right shoulder closed","update_date":"2026-04-22T16:51:20Z"},"road_event_id":"kvbdO3Ktv+R6BoUWGn8DUNMbNlY=","beginning_cross_street":"East of I-676/Ben Franklin Bridge","ending_cross_street":"West of CR 608/Baird Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.117393,39.947628]]}},{"id":"wTX+BTqYyBTPzJCmxoNe5dgaLMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 30"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 30 Westbound between West of CR 608/Baird Blvd (Camden) and East of I-676/Ben Franklin Bridge (Camden), Continuous Friday March 20, 2026 08:00 PM thru Sunday November 29, 2026 06:00 AM, right lane closed","update_date":"2026-04-22T16:51:22Z"},"road_event_id":"wTX+BTqYyBTPzJCmxoNe5dgaLMM=","beginning_cross_street":"West of CR 608/Baird Blvd","ending_cross_street":"East of I-676/Ben Franklin Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.099777,39.940704]]}},{"id":"g/C19rCrBVd9Il6Erv8mOihBZvM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ggNzpJsTO1YfaY4YwBeEAhypOYY="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"g/C19rCrBVd9Il6Erv8mOihBZvM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:30:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"ggNzpJsTO1YfaY4YwBeEAhypOYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"cuiUzIelCM9CtM4YfdcJQn7KG6k="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"ggNzpJsTO1YfaY4YwBeEAhypOYY=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:30:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"cuiUzIelCM9CtM4YfdcJQn7KG6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"iWRy8RMuZE/dMGZONblPrIxvEP4="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"cuiUzIelCM9CtM4YfdcJQn7KG6k=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:30:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"iWRy8RMuZE/dMGZONblPrIxvEP4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"W+38NSY7rDVniuiAqi8GFg7oZD4="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"iWRy8RMuZE/dMGZONblPrIxvEP4=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:30:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"W+38NSY7rDVniuiAqi8GFg7oZD4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"fKWnpwo8zZy5lpx47oc+2uxdy84="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"W+38NSY7rDVniuiAqi8GFg7oZD4=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:30:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"fKWnpwo8zZy5lpx47oc+2uxdy84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"EZ+MDj65zDALxCv3dGq/u0YYdrY="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"fKWnpwo8zZy5lpx47oc+2uxdy84=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:30:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"EZ+MDj65zDALxCv3dGq/u0YYdrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"PfCtfkNP6haVfInQsLqh8JvCV1s="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"EZ+MDj65zDALxCv3dGq/u0YYdrY=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:30:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"PfCtfkNP6haVfInQsLqh8JvCV1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"aEgs0Lj2RIy2JzoVVHWOgW47dWM="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"PfCtfkNP6haVfInQsLqh8JvCV1s=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:30:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"aEgs0Lj2RIy2JzoVVHWOgW47dWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"+V+dj1PAzyTgR3AUpgd29gMNtHs="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"aEgs0Lj2RIy2JzoVVHWOgW47dWM=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T10:30:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"+V+dj1PAzyTgR3AUpgd29gMNtHs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="},{"type":"next-occurrence","id":"WQfhqJV1osu9sP9EIhpCtVM7Kqc="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"+V+dj1PAzyTgR3AUpgd29gMNtHs=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T10:30:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"WQfhqJV1osu9sP9EIhpCtVM7Kqc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"g/C19rCrBVd9Il6Erv8mOihBZvM="}],"description":"Roadwork on I-81 southbound ramp from Exit 8 - US 11; Mattydale (Salina) ; Alternating shoulder closures, Tuesday March 17th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 06:30 AM thru 04:00 PM All lanes open","update_date":"2026-03-20T12:28:39Z"},"road_event_id":"WQfhqJV1osu9sP9EIhpCtVM7Kqc=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T10:30:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.151652,43.106076]]}},{"id":"IHWoL7xCs3wHdii+t+3bR9pbps4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[],"description":"Bridge inspection on NY 7 westbound at Miller Road Overpass (Colonie), Tuesday April 28th, 2026, 09:30 AM thru 10:30 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-22T11:30:51Z"},"road_event_id":"IHWoL7xCs3wHdii+t+3bR9pbps4=","beginning_cross_street":"Miller Road Overpass","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.736327,42.757208]]}},{"id":"lXG6uslOv5N8VE1+JOkBL8XTHyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"jqcsz/QQJ+5IxRkekYDMTqvz7pQ="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Wednesday March 18th, 2026 thru Saturday May 2nd, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T21:04:12Z"},"road_event_id":"lXG6uslOv5N8VE1+JOkBL8XTHyU=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T05:30:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"jqcsz/QQJ+5IxRkekYDMTqvz7pQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lXG6uslOv5N8VE1+JOkBL8XTHyU="},{"type":"next-occurrence","id":"2L8ZqhbaMIdN3t6MFVvTqKYUSko="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Wednesday March 18th, 2026 thru Saturday May 2nd, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T21:04:12Z"},"road_event_id":"jqcsz/QQJ+5IxRkekYDMTqvz7pQ=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T05:30:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"2L8ZqhbaMIdN3t6MFVvTqKYUSko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lXG6uslOv5N8VE1+JOkBL8XTHyU="},{"type":"next-occurrence","id":"F83J1hrIB7ydRl2WGayx0jtOuO4="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Wednesday March 18th, 2026 thru Saturday May 2nd, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T21:04:12Z"},"road_event_id":"2L8ZqhbaMIdN3t6MFVvTqKYUSko=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T05:30:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"F83J1hrIB7ydRl2WGayx0jtOuO4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lXG6uslOv5N8VE1+JOkBL8XTHyU="},{"type":"next-occurrence","id":"23TQklQ2udAFOEK1qCi8rM9ogSM="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Wednesday March 18th, 2026 thru Saturday May 2nd, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T21:04:12Z"},"road_event_id":"F83J1hrIB7ydRl2WGayx0jtOuO4=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T05:30:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"23TQklQ2udAFOEK1qCi8rM9ogSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lXG6uslOv5N8VE1+JOkBL8XTHyU="},{"type":"next-occurrence","id":"/swhSKo5W6vp0xFkjMKBuJPzRwQ="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Wednesday March 18th, 2026 thru Saturday May 2nd, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T21:04:12Z"},"road_event_id":"23TQklQ2udAFOEK1qCi8rM9ogSM=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T05:30:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"/swhSKo5W6vp0xFkjMKBuJPzRwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["7 Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lXG6uslOv5N8VE1+JOkBL8XTHyU="}],"description":"Due to Track repairs both directions, 7 Line between Court Sq (New York) and Grand Central - 42 St (New York) all trains at Hunters Point Av and Vernon blvd-Jackson Av board from the Flushing-bound platform. Some nights, this boarding change will be suspended or begin later because of other work along the 7 line., Wednesday March 18th, 2026 thru Saturday May 2nd, 2026, Wednesday/Friday/Saturday, 01:30 AM thru 05:00 AM","update_date":"2026-04-10T21:04:12Z"},"road_event_id":"/swhSKo5W6vp0xFkjMKBuJPzRwQ=","beginning_cross_street":"Court Sq","ending_cross_street":"Grand Central - 42 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T05:30:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.945264,40.747023]]}},{"id":"8nircmmZUvM4BdE+DdaBakBrQZU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["M66 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, M66 Bus bypassing W 65 St/Columbus Av (New York) Use the stop on W 65th at Broadway instead. Through 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Thursday December 31st, 2026 11:59 PM","update_date":"2026-04-17T17:48:21Z"},"road_event_id":"8nircmmZUvM4BdE+DdaBakBrQZU=","beginning_cross_street":"W 65 St/Columbus Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981874,40.772835]]}},{"id":"CD6uy3EFJ03fP5OpfEbAvgwY6DE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Q32 Bus and Q60 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction eastbound, Q32 Bus and Q60 Bus at Queens Bl/44 St (New York) Stop is closed; please use the stops on Queens Blvd at 41st St or 46th St instead. Until September 2026. , Continuous Saturday August 23rd, 2025 12:00 AM thru Tuesday September 1st, 2026 11:59 PM","update_date":"2025-08-22T18:24:55Z"},"road_event_id":"CD6uy3EFJ03fP5OpfEbAvgwY6DE=","beginning_cross_street":"Queens Bl/44 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.920408,40.743115]]}},{"id":"GjWa+0J0KVT4al9QHxX1ZS607RU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Thursday April 30, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-22T12:39:49Z"},"road_event_id":"GjWa+0J0KVT4al9QHxX1ZS607RU=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070823,40.82209]]}},{"id":"TDMmaLWv41p5O/ATBfwCt6OsRKQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near North of Riverton Rd (Cinnaminson Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T12:39:50Z"},"road_event_id":"TDMmaLWv41p5O/ATBfwCt6OsRKQ=","beginning_cross_street":"North of Riverton Rd","ending_cross_street":"South of Riverton Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.987709,39.999435]]}},{"id":"4wE9QDFJ6FWDZarmyk4xrO2D2PE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Thursday April 30, 2026 10:00 PM thru Friday May 1, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-22T12:39:48Z"},"road_event_id":"4wE9QDFJ6FWDZarmyk4xrO2D2PE=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"G7EmIf1TXuU7wdHUqG7p4C3g5b4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FULTON ST"],"direction":"unknown","related_road_events":[],"description":"Construction on FULTON ST eastbound between HALE AVE (New York) and ARLINGTON AVE (New York), Continuous Tuesday March 10th, 2026 12:00 AM thru Wednesday April 29th, 2026 11:59 PM All lanes closed","update_date":"2026-03-10T19:00:13Z"},"road_event_id":"G7EmIf1TXuU7wdHUqG7p4C3g5b4=","beginning_cross_street":"HALE AVE","ending_cross_street":"ARLINGTON AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-30T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.880159,40.681345]]}},{"id":"t11Z5JEbJuEtJGliBmCpbG/nP+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 73"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 73 Southbound near South of CR 693/Lafayette Av (Berlin), Wednesday April 29, 2026 08:00 PM thru Thursday April 30, 2026 06:00 AM, right lane closed, moving operation","update_date":"2026-04-22T12:39:45Z"},"road_event_id":"t11Z5JEbJuEtJGliBmCpbG/nP+E=","beginning_cross_street":"South of CR 693/Lafayette Av","ending_cross_street":"CR 692/Franklin Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.929039,39.820056]]}},{"id":"o22DGDRQGeTKLs22rGEklmT2tQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of CR 601/Avalon Blvd (Middle Twp) and North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Wednesday April 29, 2026 07:00 PM thru Thursday April 30, 2026 05:30 AM, right shoulder closed","update_date":"2026-04-22T12:39:46Z"},"road_event_id":"o22DGDRQGeTKLs22rGEklmT2tQA=","beginning_cross_street":"South of CR 601/Avalon Blvd","ending_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.781822,39.128372]]}},{"id":"1+KUiJMM/+Su6/7RyPGtTiwOx4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound at North of Exit 60 - I-195/NJ 129 (Hamilton Twp) Sunday May 3, 2026 11:00 PM thru Monday May 4, 2026 04:00 AM, ramp","update_date":"2026-04-22T12:39:43Z"},"road_event_id":"1+KUiJMM/+Su6/7RyPGtTiwOx4k=","beginning_cross_street":"North of Exit 60 - I-195/NJ 129","ending_cross_street":"North of Exit 60 - I-195/NJ 129","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.720474,40.188735]]}},{"id":"uTtW3HMNrmRH9vqO3Q71renAbE0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Monday April 27, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-22T12:39:44Z"},"road_event_id":"uTtW3HMNrmRH9vqO3Q71renAbE0=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070823,40.82209]]}},{"id":"eoto0WTtzzwHG+0/PzVNaDn/03Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Wednesday April 29, 2026 10:00 PM thru Thursday April 30, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-22T12:39:41Z"},"road_event_id":"eoto0WTtzzwHG+0/PzVNaDn/03Y=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"txIIscJJM/oz/0fIPmnDOrthZtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Friday May 1, 2026 10:00 PM thru Saturday May 2, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-22T12:39:40Z"},"road_event_id":"txIIscJJM/oz/0fIPmnDOrthZtI=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"PLX8C82R6aCR8/y1afL5BhMFFEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of Ocean Av (Point Pleasant Beach), Friday April 24, 2026 12:00 AM thru 05:00 AM, right shoulder closed","update_date":"2026-04-22T12:39:37Z"},"road_event_id":"PLX8C82R6aCR8/y1afL5BhMFFEs=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"Bridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"6Z5lKgkboEvcl1sK/dZE/mNzQxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"NWdf0FEOWBqiJOH0yBtUQRJfEXA="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between (Greenburgh) and Exit - Mountain Road (Greenburgh) D264324/DAY/B5500749/32234509 - This work is weather permitting, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T18:01:11Z"},"road_event_id":"6Z5lKgkboEvcl1sK/dZE/mNzQxI=","beginning_cross_street":"","ending_cross_street":"Exit - Mountain Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"NWdf0FEOWBqiJOH0yBtUQRJfEXA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Z5lKgkboEvcl1sK/dZE/mNzQxI="},{"type":"next-occurrence","id":"lx8wtZa8MLUgNDmthRxsujddm+Y="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between (Greenburgh) and Exit - Mountain Road (Greenburgh) D264324/DAY/B5500749/32234509 - This work is weather permitting, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T18:01:11Z"},"road_event_id":"NWdf0FEOWBqiJOH0yBtUQRJfEXA=","beginning_cross_street":"","ending_cross_street":"Exit - Mountain Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"lx8wtZa8MLUgNDmthRxsujddm+Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6Z5lKgkboEvcl1sK/dZE/mNzQxI="}],"description":"Bridge maintenance operations on Saw Mill River Parkway southbound between (Greenburgh) and Exit - Mountain Road (Greenburgh) D264324/DAY/B5500749/32234509 - This work is weather permitting, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, various lanes closed","update_date":"2026-04-17T18:01:11Z"},"road_event_id":"lx8wtZa8MLUgNDmthRxsujddm+Y=","beginning_cross_street":"","ending_cross_street":"Exit - Mountain Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.821302,41.055569]]}},{"id":"VANAC3t0e8tKl/6FmhRZmlt8SKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Southbound between South of CR 617/Harbor Inn Rd (Berkeley Twp) and South of Old Shore Rd/Beach Blvd (Lacey Twp), Saturday May 2, 2026 10:00 PM thru Sunday May 3, 2026 05:00 AM, right shoulder closed","update_date":"2026-04-22T12:39:38Z"},"road_event_id":"VANAC3t0e8tKl/6FmhRZmlt8SKs=","beginning_cross_street":"South of CR 617/Harbor Inn Rd","ending_cross_street":"South of Old Shore Rd/Beach Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.168357,39.868789]]}},{"id":"lhrIKxqolVghMW9v+KMM0s8MvqE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Friday May 1, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-22T12:39:33Z"},"road_event_id":"lhrIKxqolVghMW9v+KMM0s8MvqE=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070823,40.82209]]}},{"id":"gdaA9O9YIVkEa63CMJgLupaNaJY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near In the vicinity of Gotham Pkwy (East Rutherford), Wednesday April 29, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-22T12:39:35Z"},"road_event_id":"gdaA9O9YIVkEa63CMJgLupaNaJY=","beginning_cross_street":"In the vicinity of Gotham Pkwy","ending_cross_street":"In the vicinity of Gotham Pkwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.070823,40.82209]]}},{"id":"ipHyiaubj1jjK035Xc80j5USux8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FROST ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"FZmQtXG3xOWNxXETTj67rEVdl8w="}],"description":"Construction on FROST ST westbound between LORIMER ST (New York) and UNION AVE (New York), Tuesday March 10th, 2026 thru Saturday May 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T19:24:29Z"},"road_event_id":"ipHyiaubj1jjK035Xc80j5USux8=","beginning_cross_street":"LORIMER ST","ending_cross_street":"UNION AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949984,40.717567]]}},{"id":"FZmQtXG3xOWNxXETTj67rEVdl8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["FROST ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ipHyiaubj1jjK035Xc80j5USux8="}],"description":"Construction on FROST ST westbound between LORIMER ST (New York) and UNION AVE (New York), Tuesday March 10th, 2026 thru Saturday May 30th, 2026, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-10T19:24:29Z"},"road_event_id":"FZmQtXG3xOWNxXETTj67rEVdl8w=","beginning_cross_street":"LORIMER ST","ending_cross_street":"UNION AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.949984,40.717567]]}},{"id":"QeSj/WC8bBoDKTf8CKDZSUHbKPg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"UfRRpjqZUoUlyl/EyHC+iapZW3E="}],"description":"Overhead sign inspection on Cross County Parkway both directions between Exit 3 - Yonkers Avenue (Yonkers) and Exit 8 - NY 22 (Mount Vernon) D041200/32721109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:13:31Z"},"road_event_id":"QeSj/WC8bBoDKTf8CKDZSUHbKPg=","beginning_cross_street":"Yonkers Avenue","ending_cross_street":"Exit 8 - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872391,40.931968]]}},{"id":"UfRRpjqZUoUlyl/EyHC+iapZW3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QeSj/WC8bBoDKTf8CKDZSUHbKPg="},{"type":"next-occurrence","id":"s1a8oIeSfamXrS0gA57BW+N43Bo="}],"description":"Overhead sign inspection on Cross County Parkway both directions between Exit 3 - Yonkers Avenue (Yonkers) and Exit 8 - NY 22 (Mount Vernon) D041200/32721109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:13:31Z"},"road_event_id":"UfRRpjqZUoUlyl/EyHC+iapZW3E=","beginning_cross_street":"Yonkers Avenue","ending_cross_street":"Exit 8 - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872391,40.931968]]}},{"id":"s1a8oIeSfamXrS0gA57BW+N43Bo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QeSj/WC8bBoDKTf8CKDZSUHbKPg="},{"type":"next-occurrence","id":"liPf8impjxE6jx+k1faSldjeI9M="}],"description":"Overhead sign inspection on Cross County Parkway both directions between Exit 3 - Yonkers Avenue (Yonkers) and Exit 8 - NY 22 (Mount Vernon) D041200/32721109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:13:31Z"},"road_event_id":"s1a8oIeSfamXrS0gA57BW+N43Bo=","beginning_cross_street":"Yonkers Avenue","ending_cross_street":"Exit 8 - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872391,40.931968]]}},{"id":"liPf8impjxE6jx+k1faSldjeI9M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QeSj/WC8bBoDKTf8CKDZSUHbKPg="},{"type":"next-occurrence","id":"SUdXo6o8d9k1dYnPAj6Fl4+D47c="}],"description":"Overhead sign inspection on Cross County Parkway both directions between Exit 3 - Yonkers Avenue (Yonkers) and Exit 8 - NY 22 (Mount Vernon) D041200/32721109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:13:31Z"},"road_event_id":"liPf8impjxE6jx+k1faSldjeI9M=","beginning_cross_street":"Yonkers Avenue","ending_cross_street":"Exit 8 - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872391,40.931968]]}},{"id":"SUdXo6o8d9k1dYnPAj6Fl4+D47c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Cross County Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QeSj/WC8bBoDKTf8CKDZSUHbKPg="}],"description":"Overhead sign inspection on Cross County Parkway both directions between Exit 3 - Yonkers Avenue (Yonkers) and Exit 8 - NY 22 (Mount Vernon) D041200/32721109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-22T15:13:31Z"},"road_event_id":"SUdXo6o8d9k1dYnPAj6Fl4+D47c=","beginning_cross_street":"Yonkers Avenue","ending_cross_street":"Exit 8 - NY 22","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.872391,40.931968]]}},{"id":"0SA9f8Go03fHBa72DU/hFXC39mc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound near West of Exit 34 - NJ 15 (Jefferson Twp), Wednesday May 6, 2026 09:00 AM thru 01:00 PM,","update_date":"2026-04-22T12:39:30Z"},"road_event_id":"0SA9f8Go03fHBa72DU/hFXC39mc=","beginning_cross_street":"West of Exit 34 - NJ 15","ending_cross_street":"West of Exit 34 - NJ 15","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.596977,40.908531]]}},{"id":"EVVBHgTDjgHzaLB+ZjCtqRx/GL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound between Exit 16E - Essex St (Harrison) and East of Exit 6 - Laurel Ave (West Orange Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, left lane closed, moving operation","update_date":"2026-04-22T12:39:31Z"},"road_event_id":"EVVBHgTDjgHzaLB+ZjCtqRx/GL8=","beginning_cross_street":"Exit 16E - Essex St","ending_cross_street":"East of Exit 6 - Laurel Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.156005,40.742782]]}},{"id":"QGTO2DiAQb7ezcUDXsB0rAJ6aTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of CR 601/Avalon Blvd (Middle Twp) and North of CR 625/School House Rd/Sea Isle Blvd (Dennis Twp), Thursday April 30, 2026 07:00 PM thru Friday May 1, 2026 05:30 AM, right shoulder closed","update_date":"2026-04-22T12:39:28Z"},"road_event_id":"QGTO2DiAQb7ezcUDXsB0rAJ6aTE=","beginning_cross_street":"South of CR 601/Avalon Blvd","ending_cross_street":"North of CR 625/School House Rd/Sea Isle Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.781822,39.128372]]}},{"id":"VQeFr4Gq00ntFc91OtN2QzjMbQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Vosseller Av (Bridgewater Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T11:21:20Z"},"road_event_id":"VQeFr4Gq00ntFc91OtN2QzjMbQo=","beginning_cross_street":"East of CR 531/Somerset Av/Watchung Av","ending_cross_street":"West of Vosseller Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.433876,40.629402]]}},{"id":"rNUytTkc/iEsDCANliBOvsISFC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Vosseller Av (Bridgewater Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T11:21:19Z"},"road_event_id":"rNUytTkc/iEsDCANliBOvsISFC8=","beginning_cross_street":"East of CR 531/Somerset Av/Watchung Av","ending_cross_street":"West of Vosseller Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.433876,40.629402]]}},{"id":"+kd1VcZYmT/Msls2L6PxUagJJ2I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Friday April 24, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-20T11:09:31Z"},"road_event_id":"+kd1VcZYmT/Msls2L6PxUagJJ2I=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.867752,39.996082]]}},{"id":"EpnWNqbRCXI6iAzKVtSNdqlRFY4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of US 22 (Bridgewater Twp), Monday April 27, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-20T11:09:27Z"},"road_event_id":"EpnWNqbRCXI6iAzKVtSNdqlRFY4=","beginning_cross_street":"South of US 22","ending_cross_street":"South of US 202/NJ 28/Somerville Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T20:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.627426,40.576858]]}},{"id":"dUbYu2gSHGTbkXMfRXGQIvzQsi4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9/Tonnelle Avenue"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9/Tonnelle Avenue between North of 44th St (North Bergen Twp) and North of Ridgefield Circle (Ridgefield), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-20T11:09:26Z"},"road_event_id":"dUbYu2gSHGTbkXMfRXGQIvzQsi4=","beginning_cross_street":"North of 44th St","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.033393,40.784675]]}},{"id":"Aao5T16xhmcwkcFAFiHfNGQb1hc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kjMRwS4XSd4M+HLU3AI9m6ZgiGo="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"Aao5T16xhmcwkcFAFiHfNGQb1hc=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"kjMRwS4XSd4M+HLU3AI9m6ZgiGo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"t/SS+hqyrPJMSw8ikI8fQPQ3f78="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"kjMRwS4XSd4M+HLU3AI9m6ZgiGo=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"t/SS+hqyrPJMSw8ikI8fQPQ3f78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"ngmOZlc7b3/CCpEbcXCj+nwD/Os="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"t/SS+hqyrPJMSw8ikI8fQPQ3f78=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"ngmOZlc7b3/CCpEbcXCj+nwD/Os=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"Tvoycxoux7os5fukag0xFi5Pr1I="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"ngmOZlc7b3/CCpEbcXCj+nwD/Os=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T12:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"Tvoycxoux7os5fukag0xFi5Pr1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"vSjwKCmvpsHcm1gA3k2rBWAmi7w="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"Tvoycxoux7os5fukag0xFi5Pr1I=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T12:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"vSjwKCmvpsHcm1gA3k2rBWAmi7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"SVcj/qPxe714Tft1499zi6obhF4="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"vSjwKCmvpsHcm1gA3k2rBWAmi7w=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T12:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"SVcj/qPxe714Tft1499zi6obhF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"5N+CqoJX0LYDhK4X2vH0RbYNQoc="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"SVcj/qPxe714Tft1499zi6obhF4=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T12:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"5N+CqoJX0LYDhK4X2vH0RbYNQoc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"ig838a80KZFza0m1knlhG2TqiP0="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"5N+CqoJX0LYDhK4X2vH0RbYNQoc=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T12:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"ig838a80KZFza0m1knlhG2TqiP0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"HPX+ICO2IHLzID/LahzWtSzeRTw="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"ig838a80KZFza0m1knlhG2TqiP0=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T12:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"HPX+ICO2IHLzID/LahzWtSzeRTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="},{"type":"next-occurrence","id":"XM05flWjRDUh6D73jviiL/L8GiI="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"HPX+ICO2IHLzID/LahzWtSzeRTw=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T12:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"XM05flWjRDUh6D73jviiL/L8GiI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44 / NY 55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Aao5T16xhmcwkcFAFiHfNGQb1hc="}],"description":"Safety improvements on US 44 / NY 55 westbound between Taft Avenue (Poughkeepsie) and Mill Street (Poughkeepsie) D265496/32729009 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM, right lane closure","update_date":"2026-04-21T14:36:25Z"},"road_event_id":"XM05flWjRDUh6D73jviiL/L8GiI=","beginning_cross_street":"Taft Avenue","ending_cross_street":"Mill Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.896907,41.697089]]}},{"id":"Y/+BuJRxLwCSKV/iTzlJ43SGu+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 30 - North Maple Ave (Bernards Twp), Friday April 24, 2026 09:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-20T11:09:21Z"},"road_event_id":"Y/+BuJRxLwCSKV/iTzlJ43SGu+4=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.538871,40.729694]]}},{"id":"4SNeTnJNjGPh9MrM3xal+UeD0k0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound near North of Exit 43 - CR 838/Creek Rd (Mount Laurel Twp), Thursday April 23, 2026 09:00 AM thru 02:00 PM, right shoulder closed","update_date":"2026-04-20T11:09:20Z"},"road_event_id":"4SNeTnJNjGPh9MrM3xal+UeD0k0=","beginning_cross_street":"North of Exit 43 - CR 838/Creek Rd","ending_cross_street":"North of Exit 43 - CR 838/Creek Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.867752,39.996082]]}},{"id":"qZo0Z1WAE8ibNiVEmO7a7dqMbco=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-80 (Denville Twp) and East of CR 669/Canfield Av (Mine Hill Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, , moving operation","update_date":"2026-04-17T11:21:27Z"},"road_event_id":"qZo0Z1WAE8ibNiVEmO7a7dqMbco=","beginning_cross_street":"West of I-80","ending_cross_street":"East of CR 669/Canfield Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.490287,40.897205]]}},{"id":"9lo+nDBbSaR5VduPhS2+nTwkN88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["BxM11 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, BxM11 Bus at Madison Av/E 47 St (New York) stop is closed, please use the stop on Madison Ave at E 46th St instead., Continuous Saturday March 21st, 2026 12:00 AM thru Saturday December 30th, 2028 11:59 PM","update_date":"2026-03-20T18:57:26Z"},"road_event_id":"9lo+nDBbSaR5VduPhS2+nTwkN88=","beginning_cross_street":"Madison Av/E 47 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.976941,40.755877]]}},{"id":"PuUN1nYGdfD/o0hLRtwofIlCgwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between East of CR 531/Somerset Av/Watchung Av (North Plainfield) and West of Vosseller Av (Bridgewater Twp), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-17T11:21:21Z"},"road_event_id":"PuUN1nYGdfD/o0hLRtwofIlCgwE=","beginning_cross_street":"East of CR 531/Somerset Av/Watchung Av","ending_cross_street":"West of Vosseller Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.433876,40.629402]]}},{"id":"oHilGTE5OEUCbQetNa04yUUS1QE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between East of CR 669/Canfield Av (Mine Hill Twp) and West of I-80 (Denville Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, , moving operation","update_date":"2026-04-17T11:21:38Z"},"road_event_id":"oHilGTE5OEUCbQetNa04yUUS1QE=","beginning_cross_street":"East of CR 669/Canfield Av","ending_cross_street":"West of I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.600013,40.879898]]}},{"id":"af9Fl2eB67rZjfoUKFTIQbt/KyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of US 46 (Wayne Twp), Friday April 24, 2026 09:00 AM thru 11:00 AM, right shoulder closed","update_date":"2026-04-17T11:18:36Z"},"road_event_id":"af9Fl2eB67rZjfoUKFTIQbt/KyM=","beginning_cross_street":"North of US 46","ending_cross_street":"I-80","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T00:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.248291,40.895801]]}},{"id":"4HuSDaYROMVRnyz/pptJK/0bilQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P97bbJSjHweo/a5spfZ/XVIsEK8="}],"description":"Survey work on NY 28 westbound at Hurley Mountain Road (Ulster) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 8th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-03-25T15:24:59Z"},"road_event_id":"4HuSDaYROMVRnyz/pptJK/0bilQ=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.04785,41.952867]]}},{"id":"P97bbJSjHweo/a5spfZ/XVIsEK8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4HuSDaYROMVRnyz/pptJK/0bilQ="},{"type":"next-occurrence","id":"awmTJRwFi1yWMWG718qth4ly4nE="}],"description":"Survey work on NY 28 westbound at Hurley Mountain Road (Ulster) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 8th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-03-25T15:24:59Z"},"road_event_id":"P97bbJSjHweo/a5spfZ/XVIsEK8=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.04785,41.952867]]}},{"id":"awmTJRwFi1yWMWG718qth4ly4nE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 28"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4HuSDaYROMVRnyz/pptJK/0bilQ="}],"description":"Survey work on NY 28 westbound at Hurley Mountain Road (Ulster) D265617/32717009 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 8th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, shoulder closure","update_date":"2026-03-25T15:24:59Z"},"road_event_id":"awmTJRwFi1yWMWG718qth4ly4nE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.04785,41.952867]]}},{"id":"Q9qn1pEF51ogOv01uy6bO5VYX5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 27"],"direction":"unknown","related_road_events":[],"description":"Overnight roadwork on NY 27 westbound between Exit 47A - Oakdale Bohemia Road; EB Only (Islip) and Exit 47 - Pond Rd South; EB Only (Islip), Friday April 24th, 2026 thru Saturday April 25th, 2026, 09:00 PM thru 01:30 AM 2 Left lanes of 3 lanes closed","update_date":"2026-04-20T07:28:23Z"},"road_event_id":"Q9qn1pEF51ogOv01uy6bO5VYX5w=","beginning_cross_street":"Exit 47A - Oakdale Bohemia Road; EB Only","ending_cross_street":"Exit 47 - Pond Rd South; EB Only","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.124351,40.752377]]}},{"id":"Uab9Qc/k7RR6imYR+2lQVSbAnsA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Southbound between South of US 1&9 Truck Route/Communipaw Av (Jersey City) and South of Kennedy Boulevard (Bayonne), Thursday April 23, 2026 11:00 PM thru Friday April 24, 2026 05:00 AM, left lane closed","update_date":"2026-04-17T11:21:18Z"},"road_event_id":"Uab9Qc/k7RR6imYR+2lQVSbAnsA=","beginning_cross_street":"South of US 1&9 Truck Route/Communipaw Av","ending_cross_street":"South of Kennedy Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.092521,40.721855]]}},{"id":"bSxfPks2gV7J3L9pJWd+N6xToMY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of US 22 (Newark) and Exit 14 - US 46 (Clifton), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM,","update_date":"2026-04-17T11:18:41Z"},"road_event_id":"bSxfPks2gV7J3L9pJWd+N6xToMY=","beginning_cross_street":"North of US 22","ending_cross_street":"Exit 14 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181159,40.707855]]}},{"id":"q+QnnW5tjlI4Bw8/DTdtmE1kvMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of US 22 (Newark) and Exit 14 - US 46 (Clifton), Wednesday April 22, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-17T11:18:37Z"},"road_event_id":"q+QnnW5tjlI4Bw8/DTdtmE1kvMw=","beginning_cross_street":"North of US 22","ending_cross_street":"Exit 14 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181159,40.707855]]}},{"id":"Q9tfzTdYl2+w8w7vLxg3wizVaLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 21"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 21 Northbound between North of US 22 (Newark) and Exit 14 - US 46 (Clifton), Friday April 24, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-17T11:18:42Z"},"road_event_id":"Q9tfzTdYl2+w8w7vLxg3wizVaLI=","beginning_cross_street":"North of US 22","ending_cross_street":"Exit 14 - US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.181159,40.707855]]}},{"id":"4dYPrBAMXyinCYmaTBDqj5Drqg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B65 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction westbound, B65 Bus at Smith St/Atlantic Av (New York) is closed. Please use the stops on Smith St at Bergen St or Livingston St, Continuous Saturday March 8th, 2025 12:00 AM thru Sunday April 1st, 2029 11:59 PM","update_date":"2025-06-11T12:52:45Z"},"road_event_id":"4dYPrBAMXyinCYmaTBDqj5Drqg0=","beginning_cross_street":"Smith St/Atlantic Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98898,40.68878]]}},{"id":"l6REsyDDW2yDJjOPuszHSCy3kPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["B61 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction northbound, B61 Bus at Smith St/Atlantic Av (New York) is closed. Please use the stops on Atlantic Ave at Court St or Smith St at Livingston St. , Continuous Tuesday October 21st, 2025 09:10 AM thru Sunday April 1st, 2029 11:59 PM","update_date":"2025-10-21T13:11:55Z"},"road_event_id":"l6REsyDDW2yDJjOPuszHSCy3kPc=","beginning_cross_street":"Smith St/Atlantic Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.98898,40.68878]]}},{"id":"NPmnBbQeURuJ3TaLlLoe9/Pkzes=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 39"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NY 39 westbound at Liberty Street; NY 98 (Arcade), Wednesday April 22nd, 2026, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T11:40:46Z"},"road_event_id":"NPmnBbQeURuJ3TaLlLoe9/Pkzes=","beginning_cross_street":"Liberty Street; NY 98","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.422936,42.534181]]}},{"id":"94ms2tlCFR3wmQm94L1EHe0Aj1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T11:21:50Z"},"road_event_id":"94ms2tlCFR3wmQm94L1EHe0Aj1g=","beginning_cross_street":"West of Main St","ending_cross_street":"East of NJ 183/Netcong Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.669921,40.890205]]}},{"id":"K0E8DXUCDQCib6D5kA2PL1pMN8I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between East of North Dr (North Plainfield) and East of West End Av (North Plainfield), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-20T12:03:21Z"},"road_event_id":"K0E8DXUCDQCib6D5kA2PL1pMN8I=","beginning_cross_street":"East of North Dr","ending_cross_street":"East of West End Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.426773,40.634243]]}},{"id":"oqkSuTy+sMT92IH4AbxWF1oBBjs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between North of NJ 172/George St (New Brunswick) and South of Bishop Pl (New Brunswick), Thursday April 23, 2026 07:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-20T12:03:23Z"},"road_event_id":"oqkSuTy+sMT92IH4AbxWF1oBBjs=","beginning_cross_street":"North of NJ 172/George St","ending_cross_street":"South of Bishop Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.435569,40.488182]]}},{"id":"5k4DpPoW+9dyy7neP2C7X4MRUME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5Sj4etQtiEZvowS3EgvmsrPaHSQ="}],"description":"Roadwork on NY 13 southbound between 3rd St (Ithaca) and Cascadilla Street (Ithaca) ; Alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T11:38:51Z"},"road_event_id":"5k4DpPoW+9dyy7neP2C7X4MRUME=","beginning_cross_street":"3rd St ","ending_cross_street":"Cascadilla Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.506816,42.448293]]}},{"id":"5Sj4etQtiEZvowS3EgvmsrPaHSQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5k4DpPoW+9dyy7neP2C7X4MRUME="},{"type":"next-occurrence","id":"/5Rfi2zDxN7mQVLWeckgZZ7lvyI="}],"description":"Roadwork on NY 13 southbound between 3rd St (Ithaca) and Cascadilla Street (Ithaca) ; Alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T11:38:51Z"},"road_event_id":"5Sj4etQtiEZvowS3EgvmsrPaHSQ=","beginning_cross_street":"3rd St ","ending_cross_street":"Cascadilla Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.506816,42.448293]]}},{"id":"/5Rfi2zDxN7mQVLWeckgZZ7lvyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5k4DpPoW+9dyy7neP2C7X4MRUME="}],"description":"Roadwork on NY 13 southbound between 3rd St (Ithaca) and Cascadilla Street (Ithaca) ; Alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T11:38:51Z"},"road_event_id":"/5Rfi2zDxN7mQVLWeckgZZ7lvyI=","beginning_cross_street":"3rd St ","ending_cross_street":"Cascadilla Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.506816,42.448293]]}},{"id":"NOAo2d7EBwYs2icxSW+A4qebFiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between East of Wilson Av (North Plainfield) and East of Rock Av (North Plainfield), Thursday April 23, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-20T12:03:19Z"},"road_event_id":"NOAo2d7EBwYs2icxSW+A4qebFiU=","beginning_cross_street":"East of Wilson Av","ending_cross_street":"East of Rock Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.441383,40.624958]]}},{"id":"a49rl+xkcTVNapxClPPkmyYY8jE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"K8L8L7XYiRp+aBC9h0NWHErIWAQ="}],"description":"Roadwork on NY 13 northbound between Cascadilla Street (Ithaca) and 3rd St (Ithaca) ; Alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T11:40:12Z"},"road_event_id":"a49rl+xkcTVNapxClPPkmyYY8jE=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"3rd St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508622,42.444363]]}},{"id":"K8L8L7XYiRp+aBC9h0NWHErIWAQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a49rl+xkcTVNapxClPPkmyYY8jE="},{"type":"next-occurrence","id":"Akkzco+D2drdYNTRPq5fyG4jDb4="}],"description":"Roadwork on NY 13 northbound between Cascadilla Street (Ithaca) and 3rd St (Ithaca) ; Alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T11:40:12Z"},"road_event_id":"K8L8L7XYiRp+aBC9h0NWHErIWAQ=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"3rd St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508622,42.444363]]}},{"id":"Akkzco+D2drdYNTRPq5fyG4jDb4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 13"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"a49rl+xkcTVNapxClPPkmyYY8jE="}],"description":"Roadwork on NY 13 northbound between Cascadilla Street (Ithaca) and 3rd St (Ithaca) ; Alternating lane closures, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T11:40:12Z"},"road_event_id":"Akkzco+D2drdYNTRPq5fyG4jDb4=","beginning_cross_street":"Cascadilla Street","ending_cross_street":"3rd St ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.508622,42.444363]]}},{"id":"ORC32730009","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 94"],"direction":"unknown","description":"Bridge inspection on NY 94 both directions between Craigville Road (Blooming Grove) and Farmingdale Road (Blooming Grove) D042080/32730009 - This work is weather permitting, Plan travel accordingly; delays may exist Not currently scheduled","update_date":"2026-04-22T18:30:00Z"},"road_event_id":"ORC32730009","beginning_cross_street":"Craigville Road","ending_cross_street":"Farmingdale Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-17T11:09:12Z","end_date":"2026-04-23T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.231809,41.385089]]}},{"id":"p0se41OwsiWLDf2sCDrwhJ8aUxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY55"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"E6/i49qWxPa/5XJU9GC+34njcdM="}],"description":"Installation of traffic management systems on US 44/NY55 eastbound between Academy Street (Poughkeepsie) D265523/32650209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:18Z"},"road_event_id":"p0se41OwsiWLDf2sCDrwhJ8aUxU=","beginning_cross_street":"Academy Street","ending_cross_street":"NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917959,41.702333]]}},{"id":"E6/i49qWxPa/5XJU9GC+34njcdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0se41OwsiWLDf2sCDrwhJ8aUxU="},{"type":"next-occurrence","id":"gd9Moom/qboLujxEfDK1N+NwF8c="}],"description":"Installation of traffic management systems on US 44/NY55 eastbound between Academy Street (Poughkeepsie) D265523/32650209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:18Z"},"road_event_id":"E6/i49qWxPa/5XJU9GC+34njcdM=","beginning_cross_street":"Academy Street","ending_cross_street":"NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917959,41.702333]]}},{"id":"gd9Moom/qboLujxEfDK1N+NwF8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 44/NY55"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p0se41OwsiWLDf2sCDrwhJ8aUxU="}],"description":"Installation of traffic management systems on US 44/NY55 eastbound between Academy Street (Poughkeepsie) D265523/32650209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:18Z"},"road_event_id":"gd9Moom/qboLujxEfDK1N+NwF8c=","beginning_cross_street":"Academy Street","ending_cross_street":"NY 55","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.917959,41.702333]]}},{"id":"t9MctGuNyzfUUNuwre9jE6f0h94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"39WzQOIfZknDRz0iIcEsh3ToI6w="}],"description":"Roadwork on NY 5 eastbound between Route 695 (Camillus) and West Genesee Street (Geddes), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed ,","update_date":"2026-04-21T19:00:30Z"},"road_event_id":"t9MctGuNyzfUUNuwre9jE6f0h94=","beginning_cross_street":"Route 695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.236123,43.056676]]}},{"id":"39WzQOIfZknDRz0iIcEsh3ToI6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t9MctGuNyzfUUNuwre9jE6f0h94="},{"type":"next-occurrence","id":"2C1gxSPWJm4tsZbdaF5DQhs+oSs="}],"description":"Roadwork on NY 5 eastbound between Route 695 (Camillus) and West Genesee Street (Geddes), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed ,","update_date":"2026-04-21T19:00:30Z"},"road_event_id":"39WzQOIfZknDRz0iIcEsh3ToI6w=","beginning_cross_street":"Route 695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.236123,43.056676]]}},{"id":"2C1gxSPWJm4tsZbdaF5DQhs+oSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t9MctGuNyzfUUNuwre9jE6f0h94="},{"type":"next-occurrence","id":"iGi97CrFM8Q/TuxgDTspIlNhJts="}],"description":"Roadwork on NY 5 eastbound between Route 695 (Camillus) and West Genesee Street (Geddes), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed ,","update_date":"2026-04-21T19:00:30Z"},"road_event_id":"2C1gxSPWJm4tsZbdaF5DQhs+oSs=","beginning_cross_street":"Route 695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.236123,43.056676]]}},{"id":"iGi97CrFM8Q/TuxgDTspIlNhJts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t9MctGuNyzfUUNuwre9jE6f0h94="},{"type":"next-occurrence","id":"f2sFc36q/k7o7SYUjv3ECUcIGcw="}],"description":"Roadwork on NY 5 eastbound between Route 695 (Camillus) and West Genesee Street (Geddes), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed ,","update_date":"2026-04-21T19:00:30Z"},"road_event_id":"iGi97CrFM8Q/TuxgDTspIlNhJts=","beginning_cross_street":"Route 695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.236123,43.056676]]}},{"id":"f2sFc36q/k7o7SYUjv3ECUcIGcw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t9MctGuNyzfUUNuwre9jE6f0h94="},{"type":"next-occurrence","id":"2E+VHue0p5rq1YlQa1gVV/kEJTo="}],"description":"Roadwork on NY 5 eastbound between Route 695 (Camillus) and West Genesee Street (Geddes), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed ,","update_date":"2026-04-21T19:00:30Z"},"road_event_id":"f2sFc36q/k7o7SYUjv3ECUcIGcw=","beginning_cross_street":"Route 695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.236123,43.056676]]}},{"id":"2E+VHue0p5rq1YlQa1gVV/kEJTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t9MctGuNyzfUUNuwre9jE6f0h94="}],"description":"Roadwork on NY 5 eastbound between Route 695 (Camillus) and West Genesee Street (Geddes), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed ,","update_date":"2026-04-21T19:00:30Z"},"road_event_id":"2E+VHue0p5rq1YlQa1gVV/kEJTo=","beginning_cross_street":"Route 695","ending_cross_street":"West Genesee Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.236123,43.056676]]}},{"id":"GJVlmkwKvj7Ra5x8B0aTwV4DEno=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1C1GhalViPXJYw/DCPlapSIinkc="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-04-21T19:00:34Z"},"road_event_id":"GJVlmkwKvj7Ra5x8B0aTwV4DEno=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223748,43.049962]]}},{"id":"1C1GhalViPXJYw/DCPlapSIinkc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GJVlmkwKvj7Ra5x8B0aTwV4DEno="},{"type":"next-occurrence","id":"oAF0EdjPxU0zqWb1wwAvw+VR+/4="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-04-21T19:00:34Z"},"road_event_id":"1C1GhalViPXJYw/DCPlapSIinkc=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223748,43.049962]]}},{"id":"oAF0EdjPxU0zqWb1wwAvw+VR+/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GJVlmkwKvj7Ra5x8B0aTwV4DEno="},{"type":"next-occurrence","id":"P3xQALCw2aQ7Vs3ARKh2JtMe+Ps="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-04-21T19:00:34Z"},"road_event_id":"oAF0EdjPxU0zqWb1wwAvw+VR+/4=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223748,43.049962]]}},{"id":"P3xQALCw2aQ7Vs3ARKh2JtMe+Ps=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GJVlmkwKvj7Ra5x8B0aTwV4DEno="},{"type":"next-occurrence","id":"WWzQVfDgyi0RI60j3gYTr/NLg70="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-04-21T19:00:34Z"},"road_event_id":"P3xQALCw2aQ7Vs3ARKh2JtMe+Ps=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223748,43.049962]]}},{"id":"WWzQVfDgyi0RI60j3gYTr/NLg70=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GJVlmkwKvj7Ra5x8B0aTwV4DEno="},{"type":"next-occurrence","id":"0bRIWTutSOUtQjqxRwHGSQPxAV0="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-04-21T19:00:34Z"},"road_event_id":"WWzQVfDgyi0RI60j3gYTr/NLg70=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223748,43.049962]]}},{"id":"0bRIWTutSOUtQjqxRwHGSQPxAV0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GJVlmkwKvj7Ra5x8B0aTwV4DEno="}],"description":"Roadwork on NY 5 westbound between West Genesee Street (Geddes) and Route 695 (Camillus), Friday April 24th,2026 thru Friday May 1st,2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 2 lanes closed eastbound,","update_date":"2026-04-21T19:00:34Z"},"road_event_id":"0bRIWTutSOUtQjqxRwHGSQPxAV0=","beginning_cross_street":"West Genesee Street","ending_cross_street":"Route 695","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.223748,43.049962]]}},{"id":"/9JT1IprGKSpS1u6loUFtYXH9ak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 98"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IMXDhRl8NeyB5P6xTGpv9IjfffE="}],"description":"Roadwork on NY 98 both directions area of Haskell Ave (Arcade) Alternating lane closures with flaggers as needed, Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-17T11:44:16Z"},"road_event_id":"/9JT1IprGKSpS1u6loUFtYXH9ak=","beginning_cross_street":"Haskell Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.418621,42.530636]]}},{"id":"IMXDhRl8NeyB5P6xTGpv9IjfffE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 98"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"/9JT1IprGKSpS1u6loUFtYXH9ak="}],"description":"Roadwork on NY 98 both directions area of Haskell Ave (Arcade) Alternating lane closures with flaggers as needed, Thursday April 23rd, 2026 thru Friday April 24th, 2026, Thursday/Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-17T11:44:16Z"},"road_event_id":"IMXDhRl8NeyB5P6xTGpv9IjfffE=","beginning_cross_street":"Haskell Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.418621,42.530636]]}},{"id":"q66DtxyP3DuWoOPpF7kGzUYdq7Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound near North of Maple Ave (Glen Rock), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 06:00 AM, left lane closed","update_date":"2026-04-17T12:03:17Z"},"road_event_id":"q66DtxyP3DuWoOPpF7kGzUYdq7Q=","beginning_cross_street":"North of Maple Ave","ending_cross_street":"South of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.138366,40.951374]]}},{"id":"zpHI2wDRGVcBktyAzYlz8aotsl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on George Washington Bridge Upper Level westbound ramp to Center Avenue (Fort Lee) will be closed through July. Cars/Buses use Exit 73 for Local Streets. Trucks follow posted detours, Continuous Monday January 12th, 2026 10:00 PM thru Friday July 31st, 2026 11:59 PM All lanes closed","update_date":"2026-01-13T10:42:46Z"},"road_event_id":"zpHI2wDRGVcBktyAzYlz8aotsl4=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.969412,40.855231]]}},{"id":"wzo+y3xIZQpzS/18aUYPoFfwt/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound between Randolph Av (Woodbridge Twp) and North of Ridgefield Circle (Palisades Park), Wednesday April 22, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-17T11:21:42Z"},"road_event_id":"wzo+y3xIZQpzS/18aUYPoFfwt/w=","beginning_cross_street":"Randolph Av","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273193,40.594524]]}},{"id":"pdTuOcT25VVbefhNVoXkRyHwz90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound between Randolph Av (Woodbridge Twp) and North of Ridgefield Circle (Palisades Park), Thursday April 23, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-17T11:21:40Z"},"road_event_id":"pdTuOcT25VVbefhNVoXkRyHwz90=","beginning_cross_street":"Randolph Av","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273193,40.594524]]}},{"id":"IlnnVAx+jqYSX5AbgClDbMosJTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near North of Exit 30 - North Maple Ave (Bernards Twp), Friday April 24, 2026 09:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-20T11:09:41Z"},"road_event_id":"IlnnVAx+jqYSX5AbgClDbMosJTk=","beginning_cross_street":"North of Exit 30 - North Maple Ave","ending_cross_street":"Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.538871,40.729694]]}},{"id":"O4eT366/hBw8P8hLa/9pExxI3FM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound between West of I-80 (Denville Twp) and East of CR 669/Canfield Av (Mine Hill Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-20T11:09:40Z"},"road_event_id":"O4eT366/hBw8P8hLa/9pExxI3FM=","beginning_cross_street":"West of I-80","ending_cross_street":"East of CR 669/Canfield Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.490287,40.897205]]}},{"id":"t6plIg/29JcTDLdS+99qScrz/JQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"CsCAPidmoAOkiYX73VWdNUWSgQY="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-03-31T15:14:45Z"},"road_event_id":"t6plIg/29JcTDLdS+99qScrz/JQ=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"CsCAPidmoAOkiYX73VWdNUWSgQY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6plIg/29JcTDLdS+99qScrz/JQ="},{"type":"next-occurrence","id":"Z2WClY8wiGMT0cD7ik13y1ijMPI="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-03-31T15:14:45Z"},"road_event_id":"CsCAPidmoAOkiYX73VWdNUWSgQY=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"Z2WClY8wiGMT0cD7ik13y1ijMPI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6plIg/29JcTDLdS+99qScrz/JQ="},{"type":"next-occurrence","id":"ph4B8u+822rSMbJvORPJqWIQUJo="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-03-31T15:14:45Z"},"road_event_id":"Z2WClY8wiGMT0cD7ik13y1ijMPI=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"ph4B8u+822rSMbJvORPJqWIQUJo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6plIg/29JcTDLdS+99qScrz/JQ="},{"type":"next-occurrence","id":"Oei3Ozg8FWmpbOvvLbq1uQoPn5Q="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-03-31T15:14:45Z"},"road_event_id":"ph4B8u+822rSMbJvORPJqWIQUJo=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"Oei3Ozg8FWmpbOvvLbq1uQoPn5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6plIg/29JcTDLdS+99qScrz/JQ="},{"type":"next-occurrence","id":"OlSf7PWUDN9AUtO711jFoNHiG7c="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-03-31T15:14:45Z"},"road_event_id":"Oei3Ozg8FWmpbOvvLbq1uQoPn5Q=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"OlSf7PWUDN9AUtO711jFoNHiG7c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6plIg/29JcTDLdS+99qScrz/JQ="},{"type":"next-occurrence","id":"A5nHpssCciRJkY4qniGGwGbf79g="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-03-31T15:14:45Z"},"road_event_id":"OlSf7PWUDN9AUtO711jFoNHiG7c=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"A5nHpssCciRJkY4qniGGwGbf79g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Saw Mill River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"t6plIg/29JcTDLdS+99qScrz/JQ="}],"description":"Sign work on Saw Mill River Parkway northbound between Exit 42 - Railroad Avenue (Bedford) and I-684 (Bedford) D265342/32349609 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM, right lane closure","update_date":"2026-03-31T15:14:45Z"},"road_event_id":"A5nHpssCciRJkY4qniGGwGbf79g=","beginning_cross_street":"Exit 42 - Railroad Avenue","ending_cross_street":"I-684","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.685559,41.245432]]}},{"id":"AdpBZ2777jNj5Zu+z+nF2IedApo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound near South of Exit 30 - North Maple Ave (Bernards Twp), Friday April 24, 2026 08:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-20T11:09:34Z"},"road_event_id":"AdpBZ2777jNj5Zu+z+nF2IedApo=","beginning_cross_street":"South of Exit 30 - North Maple Ave","ending_cross_street":"South of Exit 30 - North Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.547073,40.721817]]}},{"id":"dNo+M1rBwTHm9a9IM2ESiGnSnI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound between Randolph Av (Woodbridge Twp) and North of Ridgefield Circle (Palisades Park), Friday April 24, 2026 09:00 AM thru 03:00 PM,","update_date":"2026-04-17T11:21:44Z"},"road_event_id":"dNo+M1rBwTHm9a9IM2ESiGnSnI0=","beginning_cross_street":"Randolph Av","ending_cross_street":"North of Ridgefield Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.273193,40.594524]]}},{"id":"r2uV3ElgdrMxQAyK8uJUgA3ciMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bruce Reynolds Blvd"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Bruce Reynolds Blvd westbound between Lemoine Avenue (Fort Lee) and Center Avenue (Fort Lee) will be closed through September., Continuous Monday January 12th, 2026 10:00 PM thru Wednesday September 30th, 2026 11:59 PM All lanes closed","update_date":"2026-01-13T10:43:29Z"},"road_event_id":"r2uV3ElgdrMxQAyK8uJUgA3ciMk=","beginning_cross_street":"Lemoine Avenue ","ending_cross_street":"Center Avenue ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.968544,40.853674]]}},{"id":"uZwINPjBwy4xxu3JdEUlNu56hlA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hhBXqw0VEhULqGLwd/DxJcdEYVo="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"uZwINPjBwy4xxu3JdEUlNu56hlA=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"hhBXqw0VEhULqGLwd/DxJcdEYVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"bj8O2/t7XDWA4JITy5emSVcinc0="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"hhBXqw0VEhULqGLwd/DxJcdEYVo=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"bj8O2/t7XDWA4JITy5emSVcinc0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"P0s3vC1V1YwUgNi+AzxSieYtRGM="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"bj8O2/t7XDWA4JITy5emSVcinc0=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T02:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"P0s3vC1V1YwUgNi+AzxSieYtRGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"h3BaQoU5hioVJiQVS4sY2Heb43s="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"P0s3vC1V1YwUgNi+AzxSieYtRGM=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T02:00:00Z","end_date":"2026-04-26T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"h3BaQoU5hioVJiQVS4sY2Heb43s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"SQYFkzaevHxgvtbLB9x7jpc7FCQ="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"h3BaQoU5hioVJiQVS4sY2Heb43s=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T02:00:00Z","end_date":"2026-04-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"SQYFkzaevHxgvtbLB9x7jpc7FCQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"9c84aBju3WZPo+4DHtAWTA3c35I="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"SQYFkzaevHxgvtbLB9x7jpc7FCQ=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T02:00:00Z","end_date":"2026-04-28T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"9c84aBju3WZPo+4DHtAWTA3c35I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"/n5lm+iJAR+3E/QN9zowUizvwIo="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"9c84aBju3WZPo+4DHtAWTA3c35I=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T02:00:00Z","end_date":"2026-04-29T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"/n5lm+iJAR+3E/QN9zowUizvwIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"DoRs4ofMi3oekH8PJM3hFqOwLic="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"/n5lm+iJAR+3E/QN9zowUizvwIo=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"DoRs4ofMi3oekH8PJM3hFqOwLic=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"DuHi82XnISRVmUMhWjmYQueAxmM="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"DoRs4ofMi3oekH8PJM3hFqOwLic=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T02:00:00Z","end_date":"2026-05-01T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"DuHi82XnISRVmUMhWjmYQueAxmM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"YRCNMCsfyU4HKPFZf3cinfWj7Es="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"DuHi82XnISRVmUMhWjmYQueAxmM=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T02:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"YRCNMCsfyU4HKPFZf3cinfWj7Es=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"UtFuRyBHI8ymzUmx03qJOGgKVu4="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"YRCNMCsfyU4HKPFZf3cinfWj7Es=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T02:00:00Z","end_date":"2026-05-03T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"UtFuRyBHI8ymzUmx03qJOGgKVu4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"g9wvKwPRxCHI0nCA9js+u9x5egA="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"UtFuRyBHI8ymzUmx03qJOGgKVu4=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T02:00:00Z","end_date":"2026-05-04T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"g9wvKwPRxCHI0nCA9js+u9x5egA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"NOWuP+Ry8WlMU0QE1MfqpWezLQw="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"g9wvKwPRxCHI0nCA9js+u9x5egA=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T02:00:00Z","end_date":"2026-05-05T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"NOWuP+Ry8WlMU0QE1MfqpWezLQw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="},{"type":"next-occurrence","id":"RnxKmon8YYuoaJVCORhTjaguPyg="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"NOWuP+Ry8WlMU0QE1MfqpWezLQw=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T02:00:00Z","end_date":"2026-05-06T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"RnxKmon8YYuoaJVCORhTjaguPyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["George Washington Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uZwINPjBwy4xxu3JdEUlNu56hlA="}],"description":"Scheduled roadwork on George Washington Bridge Lower Level eastbound ramp to Center Avenue (Fort Lee) will be closed through July., Monday January 12th, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 10:00 PM thru 11:59 PM All lanes closed","update_date":"2026-01-13T10:45:44Z"},"road_event_id":"RnxKmon8YYuoaJVCORhTjaguPyg=","beginning_cross_street":"Center Avenue ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T02:00:00Z","end_date":"2026-05-07T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.97118,40.855075]]}},{"id":"8wLReEzVtaD4/4aHW0UTg3ZzUjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 440"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 440 Northbound between South of Kennedy Boulevard (Bayonne) and South of US 1&9 Truck Route/Communipaw Av (Jersey City), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, left lane closed","update_date":"2026-04-17T11:21:47Z"},"road_event_id":"8wLReEzVtaD4/4aHW0UTg3ZzUjU=","beginning_cross_street":"South of Kennedy Boulevard","ending_cross_street":"South of US 1&9 Truck Route/Communipaw Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.104354,40.691184]]}},{"id":"h0hqikOeeMGz6sB2FQUWW8t0/io=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"m5m8hsqNas0/ebrn88cGjJhOslY="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"h0hqikOeeMGz6sB2FQUWW8t0/io=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"m5m8hsqNas0/ebrn88cGjJhOslY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"XDBY7diPcze7Uq2YDFwAS4BJvzQ="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"m5m8hsqNas0/ebrn88cGjJhOslY=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"XDBY7diPcze7Uq2YDFwAS4BJvzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"N5q49eHaHGwcArshS1PdK6RZwgE="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"XDBY7diPcze7Uq2YDFwAS4BJvzQ=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"N5q49eHaHGwcArshS1PdK6RZwgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"EVqeDm+9ks7zRyVZ74bc7ilL4/4="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"N5q49eHaHGwcArshS1PdK6RZwgE=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"EVqeDm+9ks7zRyVZ74bc7ilL4/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"JQ9A3B7nEsoesxfpNgov3z5HhMM="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"EVqeDm+9ks7zRyVZ74bc7ilL4/4=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"JQ9A3B7nEsoesxfpNgov3z5HhMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"pjp448UcpEeXZTGr9iA4wtFK6c0="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"JQ9A3B7nEsoesxfpNgov3z5HhMM=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"pjp448UcpEeXZTGr9iA4wtFK6c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"oenPGOknbzIvtkuz/LmMF3litT8="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"pjp448UcpEeXZTGr9iA4wtFK6c0=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"oenPGOknbzIvtkuz/LmMF3litT8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"srUA2LG8mhRfGp5p9ZGiNzTm0DE="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"oenPGOknbzIvtkuz/LmMF3litT8=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"srUA2LG8mhRfGp5p9ZGiNzTm0DE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"vLO+fiZhcgSBVWS+3ICwzAgXFFE="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"srUA2LG8mhRfGp5p9ZGiNzTm0DE=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"vLO+fiZhcgSBVWS+3ICwzAgXFFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="},{"type":"next-occurrence","id":"1SRicbbjM9RDmxAZEBE6q7gTCs4="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"vLO+fiZhcgSBVWS+3ICwzAgXFFE=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"1SRicbbjM9RDmxAZEBE6q7gTCs4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"h0hqikOeeMGz6sB2FQUWW8t0/io="}],"description":"Line striping and overnight roadwork on I-81 southbound between Exit 98 - NY 31; Cicero; Bridgeport (Cicero) and Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:00Z"},"road_event_id":"1SRicbbjM9RDmxAZEBE6q7gTCs4=","beginning_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","ending_cross_street":"Exit 5B and Exit 5A and Exit 4B; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.114816,43.172472]]}},{"id":"kSdDEXKpOT+le3juSU0YtgjlhrY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"vURCF79uPb2kYflRU3Q0sT6QZTs="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"kSdDEXKpOT+le3juSU0YtgjlhrY=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"vURCF79uPb2kYflRU3Q0sT6QZTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"JWcRvinXd5SxncsUb7/8yyjURPc="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"vURCF79uPb2kYflRU3Q0sT6QZTs=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"JWcRvinXd5SxncsUb7/8yyjURPc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"rCuSDBY95C4oz3flTLdNPx5AYac="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"JWcRvinXd5SxncsUb7/8yyjURPc=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"rCuSDBY95C4oz3flTLdNPx5AYac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"vxrA8pJMgyW0B90bAHWC3QUKSUU="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"rCuSDBY95C4oz3flTLdNPx5AYac=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"vxrA8pJMgyW0B90bAHWC3QUKSUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"YLAmslJm7C46gwn106xVQC0gdMM="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"vxrA8pJMgyW0B90bAHWC3QUKSUU=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"YLAmslJm7C46gwn106xVQC0gdMM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"DFEUxNIiaa4U570Wak3tzlr13UM="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"YLAmslJm7C46gwn106xVQC0gdMM=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"DFEUxNIiaa4U570Wak3tzlr13UM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"ZGpMmBCayOk/9qAHtOfa9AlgDTw="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"DFEUxNIiaa4U570Wak3tzlr13UM=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"ZGpMmBCayOk/9qAHtOfa9AlgDTw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"X3Zg9H2xldWDjOMmsqAzsRlkpeQ="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"ZGpMmBCayOk/9qAHtOfa9AlgDTw=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"X3Zg9H2xldWDjOMmsqAzsRlkpeQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"3fyeV0nO0vAF94NwjbAq34nb7AI="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"X3Zg9H2xldWDjOMmsqAzsRlkpeQ=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"3fyeV0nO0vAF94NwjbAq34nb7AI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="},{"type":"next-occurrence","id":"lWsTCq3MkeutqgG5XMB1cF2R5Qk="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"3fyeV0nO0vAF94NwjbAq34nb7AI=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"lWsTCq3MkeutqgG5XMB1cF2R5Qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kSdDEXKpOT+le3juSU0YtgjlhrY="}],"description":"Line striping and overnight roadwork on NY 481 southbound between Exit 1C - US 11; North Syracuse (Cicero) and I-481 at Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:37:11Z"},"road_event_id":"lWsTCq3MkeutqgG5XMB1cF2R5Qk=","beginning_cross_street":"Exit 1C - US 11; North Syracuse","ending_cross_street":"Exit 89B - Kirkville Road West; CR 53","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.125022,43.147404]]}},{"id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"QSpV/EK7NaGBHd7NHOQUFbs5s3g="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"QSpV/EK7NaGBHd7NHOQUFbs5s3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"6NUspifpZj2rj+9DL3U92XgD/74="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"QSpV/EK7NaGBHd7NHOQUFbs5s3g=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"6NUspifpZj2rj+9DL3U92XgD/74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"Gtl68JuFqp3zK/qeoEOHnbd1v7s="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"6NUspifpZj2rj+9DL3U92XgD/74=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"Gtl68JuFqp3zK/qeoEOHnbd1v7s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"IN8/2DjWErbNrR/+ywS+p3vhVY0="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"Gtl68JuFqp3zK/qeoEOHnbd1v7s=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"IN8/2DjWErbNrR/+ywS+p3vhVY0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"Tnv1wazZArBk03PVorTBhR3vxNw="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"IN8/2DjWErbNrR/+ywS+p3vhVY0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"Tnv1wazZArBk03PVorTBhR3vxNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"saO8nTMpeBqQCmeUg5Ez3tOh+pg="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"Tnv1wazZArBk03PVorTBhR3vxNw=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"saO8nTMpeBqQCmeUg5Ez3tOh+pg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"98efv0X4XQo29f9DbjzFZh1w7Cs="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"saO8nTMpeBqQCmeUg5Ez3tOh+pg=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"98efv0X4XQo29f9DbjzFZh1w7Cs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"I7AduqDokub/L5Sg+iK7sQgc5R0="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"98efv0X4XQo29f9DbjzFZh1w7Cs=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"I7AduqDokub/L5Sg+iK7sQgc5R0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"C1hECNdK+Otyeo1zPPRleAnBwMA="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"I7AduqDokub/L5Sg+iK7sQgc5R0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"C1hECNdK+Otyeo1zPPRleAnBwMA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="},{"type":"next-occurrence","id":"thqD8XRY8WYHmoLyxLSFJmQB2Dw="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"C1hECNdK+Otyeo1zPPRleAnBwMA=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"thqD8XRY8WYHmoLyxLSFJmQB2Dw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ckwtj2z5pMjSx2HUKjPM6YxsFZs="}],"description":"Line striping and overnight roadwork on I-481 northbound between Exit 89B - Kirkville Road West; CR 53 (De Witt) and NY 481 at Exit 1B - Circle Drive; US 11; North Syracuse (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:32:54Z"},"road_event_id":"thqD8XRY8WYHmoLyxLSFJmQB2Dw=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"Exit 1B - Circle Drive; US 11; North Syracuse","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05338,43.079054]]}},{"id":"5qmQ/KmLpUyheF9BHja+r4HrKNI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xnk717U1uBOL9YjaI1B+EPnz384="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"5qmQ/KmLpUyheF9BHja+r4HrKNI=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"xnk717U1uBOL9YjaI1B+EPnz384=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"WgA3XeM1XQxfWZCSNEhEaJBlnIo="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"xnk717U1uBOL9YjaI1B+EPnz384=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"WgA3XeM1XQxfWZCSNEhEaJBlnIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"qc0cSywiLFrR9IeWFhlxI9EPAJk="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"WgA3XeM1XQxfWZCSNEhEaJBlnIo=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"qc0cSywiLFrR9IeWFhlxI9EPAJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"Hjkt5UWyffbRZVx0ixvHrkldMfc="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"qc0cSywiLFrR9IeWFhlxI9EPAJk=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Hjkt5UWyffbRZVx0ixvHrkldMfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"Xez+CazxwPU/xBStnQrPrDd1FtE="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"Hjkt5UWyffbRZVx0ixvHrkldMfc=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"Xez+CazxwPU/xBStnQrPrDd1FtE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"91XRWUh0Y/YiKGvBmvBtGn67VN0="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"Xez+CazxwPU/xBStnQrPrDd1FtE=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"91XRWUh0Y/YiKGvBmvBtGn67VN0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"gx2+NYe6D8kja/ySa64TkHqdBos="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"91XRWUh0Y/YiKGvBmvBtGn67VN0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"gx2+NYe6D8kja/ySa64TkHqdBos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"msc/SEmEZzCxtayik3T7wM0Nmm8="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"gx2+NYe6D8kja/ySa64TkHqdBos=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"msc/SEmEZzCxtayik3T7wM0Nmm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"wd67iYno+BQcqmzZCpbLDmFvpK4="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"msc/SEmEZzCxtayik3T7wM0Nmm8=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"wd67iYno+BQcqmzZCpbLDmFvpK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="},{"type":"next-occurrence","id":"0Bh+rekfSz07gK5Thb9caUcuVmg="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"wd67iYno+BQcqmzZCpbLDmFvpK4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"0Bh+rekfSz07gK5Thb9caUcuVmg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"5qmQ/KmLpUyheF9BHja+r4HrKNI="}],"description":"Line striping and overnight roadwork on I-81 northbound between Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) and Exit 98 - NY 31; Cicero; Bridgeport (Cicero) ; Alternating mobile lane closures, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:23:43Z"},"road_event_id":"0Bh+rekfSz07gK5Thb9caUcuVmg=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"Exit 98 - NY 31; Cicero; Bridgeport","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166697,43.068303]]}},{"id":"p18P33zHswQ1s5CHFIVlyiOUhNc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qX5jmxXasFqiwzmYQXw21WnpJCA="}],"description":"Gas main work on NY 299 westbound between New Paltz Road (Lloyd) and Park Lane (Lloyd) 2025084725109/32708109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-16T10:17:04Z"},"road_event_id":"p18P33zHswQ1s5CHFIVlyiOUhNc=","beginning_cross_street":"New Paltz Road","ending_cross_street":"Park Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.017664,41.73803]]}},{"id":"qX5jmxXasFqiwzmYQXw21WnpJCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p18P33zHswQ1s5CHFIVlyiOUhNc="},{"type":"next-occurrence","id":"yGZimeTHQOxxvq0hc1vtQwaNGOg="}],"description":"Gas main work on NY 299 westbound between New Paltz Road (Lloyd) and Park Lane (Lloyd) 2025084725109/32708109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-16T10:17:04Z"},"road_event_id":"qX5jmxXasFqiwzmYQXw21WnpJCA=","beginning_cross_street":"New Paltz Road","ending_cross_street":"Park Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.017664,41.73803]]}},{"id":"yGZimeTHQOxxvq0hc1vtQwaNGOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 299"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"p18P33zHswQ1s5CHFIVlyiOUhNc="}],"description":"Gas main work on NY 299 westbound between New Paltz Road (Lloyd) and Park Lane (Lloyd) 2025084725109/32708109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, shoulder closure","update_date":"2026-04-16T10:17:04Z"},"road_event_id":"yGZimeTHQOxxvq0hc1vtQwaNGOg=","beginning_cross_street":"New Paltz Road","ending_cross_street":"Park Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.017664,41.73803]]}},{"id":"DMj/0TX3SQfhZy1VvueIzgcDTIE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XiWcgV0fPbKKpJIgOawZjafFoeY="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"DMj/0TX3SQfhZy1VvueIzgcDTIE=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"XiWcgV0fPbKKpJIgOawZjafFoeY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"qeKXUwkKUDgkACf3Rd2lpQZIYSY="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"XiWcgV0fPbKKpJIgOawZjafFoeY=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"qeKXUwkKUDgkACf3Rd2lpQZIYSY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"mqk1fsQgdc40qGyU7+cFfBfDJ0A="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"qeKXUwkKUDgkACf3Rd2lpQZIYSY=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"mqk1fsQgdc40qGyU7+cFfBfDJ0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"UpMgBuijqxm+37mHv7Mish51uII="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"mqk1fsQgdc40qGyU7+cFfBfDJ0A=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"UpMgBuijqxm+37mHv7Mish51uII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"raorsEsyWnBMHSoYi2Q75k9Gx5Q="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"UpMgBuijqxm+37mHv7Mish51uII=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"raorsEsyWnBMHSoYi2Q75k9Gx5Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"aKk3z4Qe/5d6a+i4ykR6FfQBOzM="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"raorsEsyWnBMHSoYi2Q75k9Gx5Q=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"aKk3z4Qe/5d6a+i4ykR6FfQBOzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"/eVp9SR78t1BgImABllfwqcszIU="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"aKk3z4Qe/5d6a+i4ykR6FfQBOzM=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"/eVp9SR78t1BgImABllfwqcszIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"ePISP61TWevfdTyK87csjClC7CY="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"/eVp9SR78t1BgImABllfwqcszIU=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"ePISP61TWevfdTyK87csjClC7CY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"ARAFubg/lVsETGY2Kn8nMnkxUeE="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"ePISP61TWevfdTyK87csjClC7CY=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"ARAFubg/lVsETGY2Kn8nMnkxUeE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="},{"type":"next-occurrence","id":"DQqgycojAsJxaK2YUOD78K0iuMk="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"ARAFubg/lVsETGY2Kn8nMnkxUeE=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"DQqgycojAsJxaK2YUOD78K0iuMk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMj/0TX3SQfhZy1VvueIzgcDTIE="}],"description":"Bridge replacement on I-81 northbound between Exit 22 - NY 298; Court Street (Syracuse) and Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse), Monday March 30th, 2026 thru Friday May 22nd, 2026, Monday thru Friday, 07:00 AM thru 03:00 PM right shoulder closed","update_date":"2026-03-27T00:10:08Z"},"road_event_id":"DQqgycojAsJxaK2YUOD78K0iuMk=","beginning_cross_street":"Exit 22 - NY 298; Court Street","ending_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.158226,43.062693]]}},{"id":"xc7qkY7BImV0yDe4ssCMswMIujM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6O+ccN4ub9SwfONkmA0VDgaWwyM="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"xc7qkY7BImV0yDe4ssCMswMIujM=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"6O+ccN4ub9SwfONkmA0VDgaWwyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"EwsHrBT2+trItYhy88Ra+0vL9L8="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"6O+ccN4ub9SwfONkmA0VDgaWwyM=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"EwsHrBT2+trItYhy88Ra+0vL9L8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"mtFJNg69Rqef3xxEzpXKKg7wqoI="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"EwsHrBT2+trItYhy88Ra+0vL9L8=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"mtFJNg69Rqef3xxEzpXKKg7wqoI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"25EE0cyRKwsRFmPRjgH25TPQ+SI="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"mtFJNg69Rqef3xxEzpXKKg7wqoI=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"25EE0cyRKwsRFmPRjgH25TPQ+SI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"bjjOjfTOst/q7IQlEsparWdjCDM="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"25EE0cyRKwsRFmPRjgH25TPQ+SI=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"bjjOjfTOst/q7IQlEsparWdjCDM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"2OCM2v/iOBLJjlyw2sG8tDxCMuk="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"bjjOjfTOst/q7IQlEsparWdjCDM=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"2OCM2v/iOBLJjlyw2sG8tDxCMuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"RdD8SWlNrSU1eBOUzEflykSzQKY="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"2OCM2v/iOBLJjlyw2sG8tDxCMuk=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"RdD8SWlNrSU1eBOUzEflykSzQKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"TpNnxD+BQzwCOotJYl4jBA5Bgj4="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"RdD8SWlNrSU1eBOUzEflykSzQKY=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"TpNnxD+BQzwCOotJYl4jBA5Bgj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"cJNM8pnZVjlLSMSe3WkqUKp6l+s="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"TpNnxD+BQzwCOotJYl4jBA5Bgj4=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"cJNM8pnZVjlLSMSe3WkqUKp6l+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="},{"type":"next-occurrence","id":"kmkotWh/Ay5EzBnQ9hKD6BkvzAE="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"cJNM8pnZVjlLSMSe3WkqUKp6l+s=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"kmkotWh/Ay5EzBnQ9hKD6BkvzAE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9W"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xc7qkY7BImV0yDe4ssCMswMIujM="}],"description":"Water main work on US 9W both directions between Miranda Court (Esopus) and Hiltebrant Lane (Esopus) 202508113265/32685809 - This work is weather permitting. Plan travel accordingly; delays may exist, Friday April 17th, 2026 thru Sunday May 17th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-09T18:46:16Z"},"road_event_id":"kmkotWh/Ay5EzBnQ9hKD6BkvzAE=","beginning_cross_street":"Miranda Court","ending_cross_street":"Hiltebrant Lane","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.974245,41.890722]]}},{"id":"6/+Zdn+DUsAX34y1qh78LEIqLoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1FY1D19kwJqArLX+qINHliG49+s="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"6/+Zdn+DUsAX34y1qh78LEIqLoU=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"1FY1D19kwJqArLX+qINHliG49+s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"6b/ZPGpsBsm3KZUyBgxeT94tYYM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"1FY1D19kwJqArLX+qINHliG49+s=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"6b/ZPGpsBsm3KZUyBgxeT94tYYM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"FhD19M9w3tG8Lgh7SNqUMjy52n4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"6b/ZPGpsBsm3KZUyBgxeT94tYYM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"FhD19M9w3tG8Lgh7SNqUMjy52n4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"CBklZCdQJH7wBqI+3kdAJ32/aRA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"FhD19M9w3tG8Lgh7SNqUMjy52n4=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"CBklZCdQJH7wBqI+3kdAJ32/aRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"52QOvT5bgj1WgVtgLRafJqjkOGA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"CBklZCdQJH7wBqI+3kdAJ32/aRA=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"52QOvT5bgj1WgVtgLRafJqjkOGA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"wRnCp4c0gFOs6gpIpp1nEs5hdDc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"52QOvT5bgj1WgVtgLRafJqjkOGA=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"wRnCp4c0gFOs6gpIpp1nEs5hdDc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"idLhbS+5G4I6v5Yv9JeDX550RzQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"wRnCp4c0gFOs6gpIpp1nEs5hdDc=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"idLhbS+5G4I6v5Yv9JeDX550RzQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"qWrHpRUs2mBBlQOpq29qnOyS28w="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"idLhbS+5G4I6v5Yv9JeDX550RzQ=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"qWrHpRUs2mBBlQOpq29qnOyS28w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"q9Xp3sAObvvi+/329r+g5W4zHZM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"qWrHpRUs2mBBlQOpq29qnOyS28w=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"q9Xp3sAObvvi+/329r+g5W4zHZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="},{"type":"next-occurrence","id":"n0jlHyiNGTdK349PWSc2oibhx7k="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"q9Xp3sAObvvi+/329r+g5W4zHZM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"n0jlHyiNGTdK349PWSc2oibhx7k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6/+Zdn+DUsAX34y1qh78LEIqLoU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:11:11Z"},"road_event_id":"n0jlHyiNGTdK349PWSc2oibhx7k=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053351,43.096933]]}},{"id":"ZkfkNoLmViqGBxlEv3dc+HlIicc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"V1tgzkT59l4U3V0AnKPwWiCKOIQ="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"ZkfkNoLmViqGBxlEv3dc+HlIicc=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"V1tgzkT59l4U3V0AnKPwWiCKOIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"9irXPcQFe8e1K4oaMffYBwB1z2o="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"V1tgzkT59l4U3V0AnKPwWiCKOIQ=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"9irXPcQFe8e1K4oaMffYBwB1z2o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"zL6bG7pxaSx0Bu+Y+2sYuC5x89A="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"9irXPcQFe8e1K4oaMffYBwB1z2o=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"zL6bG7pxaSx0Bu+Y+2sYuC5x89A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"2kAkXEsBcmUpFv1uhhum2U+SI0A="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"zL6bG7pxaSx0Bu+Y+2sYuC5x89A=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"2kAkXEsBcmUpFv1uhhum2U+SI0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"lyAs4dWrCb9x1rB2qbh90WH4TOU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"2kAkXEsBcmUpFv1uhhum2U+SI0A=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"lyAs4dWrCb9x1rB2qbh90WH4TOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"yNITul8iewFSZinDx4nW/Jgk5WM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"lyAs4dWrCb9x1rB2qbh90WH4TOU=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"yNITul8iewFSZinDx4nW/Jgk5WM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"PBnZsV8Jn7gcV3EhAiyyBbA+b3E="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"yNITul8iewFSZinDx4nW/Jgk5WM=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"PBnZsV8Jn7gcV3EhAiyyBbA+b3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"GAVf45To4weuLt6ExeQzOhavkVg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"PBnZsV8Jn7gcV3EhAiyyBbA+b3E=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"GAVf45To4weuLt6ExeQzOhavkVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"pKsmUK9VisNCx18t/Mf4/8TSgpY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"GAVf45To4weuLt6ExeQzOhavkVg=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"pKsmUK9VisNCx18t/Mf4/8TSgpY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="},{"type":"next-occurrence","id":"FOeg5L17VGsrVScmNmb8FIDkscY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"pKsmUK9VisNCx18t/Mf4/8TSgpY=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"FOeg5L17VGsrVScmNmb8FIDkscY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"ZkfkNoLmViqGBxlEv3dc+HlIicc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:07:08Z"},"road_event_id":"FOeg5L17VGsrVScmNmb8FIDkscY=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.055194,43.077648]]}},{"id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mGjeiTeM8IEklFNKGKeU/Lw0d4Y="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"mGjeiTeM8IEklFNKGKeU/Lw0d4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"LbQ33/su+f5yaYHYADdP7oxlPwY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"mGjeiTeM8IEklFNKGKeU/Lw0d4Y=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"LbQ33/su+f5yaYHYADdP7oxlPwY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"tZuwLX21NUdvrsBt27ptmKTehj4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"LbQ33/su+f5yaYHYADdP7oxlPwY=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"tZuwLX21NUdvrsBt27ptmKTehj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"F5UsbJluQVCQWgOnrAvBr5u/ig4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"tZuwLX21NUdvrsBt27ptmKTehj4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"F5UsbJluQVCQWgOnrAvBr5u/ig4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"ZUng1QwD2M/CevMe+nJEAK4OjZ8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"F5UsbJluQVCQWgOnrAvBr5u/ig4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"ZUng1QwD2M/CevMe+nJEAK4OjZ8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"0MAeU3Aw0HKpoOULNtamkMe0Bm0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"ZUng1QwD2M/CevMe+nJEAK4OjZ8=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"0MAeU3Aw0HKpoOULNtamkMe0Bm0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"EdtlvGnPnkxkvTdVRWy/cFJdWl4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"0MAeU3Aw0HKpoOULNtamkMe0Bm0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"EdtlvGnPnkxkvTdVRWy/cFJdWl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"8dJQMJV0AB7d9fo1BDm/Zabv3xs="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"EdtlvGnPnkxkvTdVRWy/cFJdWl4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"8dJQMJV0AB7d9fo1BDm/Zabv3xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"VH6eHWzq1hFFjTCwM1Oua4xX5/A="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"8dJQMJV0AB7d9fo1BDm/Zabv3xs=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"VH6eHWzq1hFFjTCwM1Oua4xX5/A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="},{"type":"next-occurrence","id":"y9U2DHvS8rBvHk2JqbPnaN3gtuk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"VH6eHWzq1hFFjTCwM1Oua4xX5/A=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"y9U2DHvS8rBvHk2JqbPnaN3gtuk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vhMzKXIRGBi/B9pLbMiYSm1HPm0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:04:35Z"},"road_event_id":"y9U2DHvS8rBvHk2JqbPnaN3gtuk=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053771,43.082208]]}},{"id":"dgV/zuEd9RS7bLMrdurXxPk6tpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-490"],"direction":"unknown","related_road_events":[],"description":"Drainage improvements on I-490 westbound Exit ramp Exit 27 - NY 96 (Perinton), Continuous Saturday March 21st, 2026 08:00 AM thru Friday April 24th, 2026 05:00 PM right shoulder closed","update_date":"2026-04-15T13:03:49Z"},"road_event_id":"dgV/zuEd9RS7bLMrdurXxPk6tpQ=","beginning_cross_street":"Exit 27 - NY 96","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.470494,43.054883]]}},{"id":"FZwFhcV+j+JFhngze6MY7oKxJgE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"p1E1E6CrutpedKUo5CTFhXdz7DU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"FZwFhcV+j+JFhngze6MY7oKxJgE=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"p1E1E6CrutpedKUo5CTFhXdz7DU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"2r2sZp0lGzFWRBrLnKQ5KnFAbg8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"p1E1E6CrutpedKUo5CTFhXdz7DU=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"2r2sZp0lGzFWRBrLnKQ5KnFAbg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"yR2xnSXh7kl9LPhTWnZWv+HK/NU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"2r2sZp0lGzFWRBrLnKQ5KnFAbg8=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"yR2xnSXh7kl9LPhTWnZWv+HK/NU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"20s81Dn5HiCnaR0h79n1wBkc85w="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"yR2xnSXh7kl9LPhTWnZWv+HK/NU=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"20s81Dn5HiCnaR0h79n1wBkc85w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"/b+La/xmBLrmnOSeQUnUfEnzqy8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"20s81Dn5HiCnaR0h79n1wBkc85w=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"/b+La/xmBLrmnOSeQUnUfEnzqy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"Pfh+2gKwNdNkolxjHhd2VRBypyg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"/b+La/xmBLrmnOSeQUnUfEnzqy8=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"Pfh+2gKwNdNkolxjHhd2VRBypyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"lU0QKx0HX9u8AeYV6zCSmhz+leA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"Pfh+2gKwNdNkolxjHhd2VRBypyg=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"lU0QKx0HX9u8AeYV6zCSmhz+leA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"WQaDHU1FEcE6iSc9tfPSWVPRZQ4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"lU0QKx0HX9u8AeYV6zCSmhz+leA=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"WQaDHU1FEcE6iSc9tfPSWVPRZQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"bCDUKd4wj4M0aqfpzWdzsxJPm7A="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"WQaDHU1FEcE6iSc9tfPSWVPRZQ4=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"bCDUKd4wj4M0aqfpzWdzsxJPm7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="},{"type":"next-occurrence","id":"O3Ud9SZpcUX9vR7nRcwK2wwizzM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"bCDUKd4wj4M0aqfpzWdzsxJPm7A=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"O3Ud9SZpcUX9vR7nRcwK2wwizzM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"FZwFhcV+j+JFhngze6MY7oKxJgE="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 90 - I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:16:34Z"},"road_event_id":"O3Ud9SZpcUX9vR7nRcwK2wwizzM=","beginning_cross_street":"Exit 90 - I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053876,43.098676]]}},{"id":"B42THujXEBawFzaL/9gYSSmp+Qk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"90KZFcEzJoCcw/a9UP5EqIWzDnI="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"B42THujXEBawFzaL/9gYSSmp+Qk=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"90KZFcEzJoCcw/a9UP5EqIWzDnI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"iZDekvnsFQrE3TWIiRMOyIYAPU8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"90KZFcEzJoCcw/a9UP5EqIWzDnI=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"iZDekvnsFQrE3TWIiRMOyIYAPU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"cGWN2Y/DmZ3vFdAuT/egMNgBcqA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"iZDekvnsFQrE3TWIiRMOyIYAPU8=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"cGWN2Y/DmZ3vFdAuT/egMNgBcqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"V93JcttfhRH1DfAaA3tXmXoY3rg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"cGWN2Y/DmZ3vFdAuT/egMNgBcqA=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"V93JcttfhRH1DfAaA3tXmXoY3rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"y+G7X7dJXt6hU1SoxQ6QaD+5w+A="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"V93JcttfhRH1DfAaA3tXmXoY3rg=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"y+G7X7dJXt6hU1SoxQ6QaD+5w+A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"Ql39EyjxRUfJ44o5tSCLkgUlnRA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"y+G7X7dJXt6hU1SoxQ6QaD+5w+A=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"Ql39EyjxRUfJ44o5tSCLkgUlnRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"rKtuNw75qU3/3gchlAp38TEDseU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"Ql39EyjxRUfJ44o5tSCLkgUlnRA=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"rKtuNw75qU3/3gchlAp38TEDseU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"osd2ktrTq3CHpTz/zWPDmlE6VsU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"rKtuNw75qU3/3gchlAp38TEDseU=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"osd2ktrTq3CHpTz/zWPDmlE6VsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"DuOMoccedJ0OWxAvGi1gzlm3DLE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"osd2ktrTq3CHpTz/zWPDmlE6VsU=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"DuOMoccedJ0OWxAvGi1gzlm3DLE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"LIWT50qZew4Cz7bQprCl07mDHZg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"DuOMoccedJ0OWxAvGi1gzlm3DLE=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"LIWT50qZew4Cz7bQprCl07mDHZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"/OkrJJ1pV0/QLUaYOPtOez3qxGY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"LIWT50qZew4Cz7bQprCl07mDHZg=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T00:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"/OkrJJ1pV0/QLUaYOPtOez3qxGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"D/bImfvjDHgadipfGuybueUMs78="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"/OkrJJ1pV0/QLUaYOPtOez3qxGY=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T00:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"D/bImfvjDHgadipfGuybueUMs78=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"xwmNhS09KFh1JVTlCZ+Jyzb91c0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"D/bImfvjDHgadipfGuybueUMs78=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"xwmNhS09KFh1JVTlCZ+Jyzb91c0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="},{"type":"next-occurrence","id":"XwqOoq+EOyCxLli0+Xly4zHmLMo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"xwmNhS09KFh1JVTlCZ+Jyzb91c0=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"XwqOoq+EOyCxLli0+Xly4zHmLMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B42THujXEBawFzaL/9gYSSmp+Qk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Sunday thru Saturday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:13:26Z"},"road_event_id":"XwqOoq+EOyCxLli0+Xly4zHmLMo=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.05269,43.098636]]}},{"id":"QJMVzHx0JDLH3DfK9pjLNMwPpss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EcfCmgQN4eyx5VIwOT9uQn5PtcU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"QJMVzHx0JDLH3DfK9pjLNMwPpss=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"EcfCmgQN4eyx5VIwOT9uQn5PtcU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"Xi5S01H1oCMqDG43wHv5JxX1IW4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"EcfCmgQN4eyx5VIwOT9uQn5PtcU=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"Xi5S01H1oCMqDG43wHv5JxX1IW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"N46nor7ZENmocnS8S3cOeFfBKBQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"Xi5S01H1oCMqDG43wHv5JxX1IW4=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"N46nor7ZENmocnS8S3cOeFfBKBQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"7VvjNXurT4hO8BaNPvhXsP88bSM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"N46nor7ZENmocnS8S3cOeFfBKBQ=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"7VvjNXurT4hO8BaNPvhXsP88bSM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"dwqaij/1mZgKiMTOnzuZOJL59Ec="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"7VvjNXurT4hO8BaNPvhXsP88bSM=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"dwqaij/1mZgKiMTOnzuZOJL59Ec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"uCBzKUnZrsLG0I2ScL0VAyNzgb0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"dwqaij/1mZgKiMTOnzuZOJL59Ec=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"uCBzKUnZrsLG0I2ScL0VAyNzgb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"zyXrgNmSH+DPIjrARoloDMJZJOk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"uCBzKUnZrsLG0I2ScL0VAyNzgb0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"zyXrgNmSH+DPIjrARoloDMJZJOk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"fc6kVX0c/S5flMPROLKsYJLAbI0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"zyXrgNmSH+DPIjrARoloDMJZJOk=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"fc6kVX0c/S5flMPROLKsYJLAbI0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"2CzJ4pt6wHmQbHI5Wcds270Nmuc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"fc6kVX0c/S5flMPROLKsYJLAbI0=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"2CzJ4pt6wHmQbHI5Wcds270Nmuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="},{"type":"next-occurrence","id":"Jut2SDd+CDqHgwVRb37sE27Gioo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"2CzJ4pt6wHmQbHI5Wcds270Nmuc=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"Jut2SDd+CDqHgwVRb37sE27Gioo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"QJMVzHx0JDLH3DfK9pjLNMwPpss="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 89B - Kirkville Road West; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:00:14Z"},"road_event_id":"Jut2SDd+CDqHgwVRb37sE27Gioo=","beginning_cross_street":"Exit 89B - Kirkville Road West; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.053129,43.07959]]}},{"id":"Us1MD5QVsvZA1UWOIuopycnWDVA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dv+eifnL6R2pw6zIlSxMuFMz8/w="}],"description":"Utility work on US 20A both directions between MORGAN VIEW RD (Geneseo) and POLE BRIDGE RD (Geneseo) alternating lane/shoulder closures w/flaggers when needed, Monday March 16th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:11:23Z"},"road_event_id":"Us1MD5QVsvZA1UWOIuopycnWDVA=","beginning_cross_street":"MORGAN VIEW RD","ending_cross_street":"POLE BRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.781295,42.801155]]}},{"id":"dv+eifnL6R2pw6zIlSxMuFMz8/w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Us1MD5QVsvZA1UWOIuopycnWDVA="},{"type":"next-occurrence","id":"DJS6mQyjckYxlCRiQgUOaPv4e6w="}],"description":"Utility work on US 20A both directions between MORGAN VIEW RD (Geneseo) and POLE BRIDGE RD (Geneseo) alternating lane/shoulder closures w/flaggers when needed, Monday March 16th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:11:23Z"},"road_event_id":"dv+eifnL6R2pw6zIlSxMuFMz8/w=","beginning_cross_street":"MORGAN VIEW RD","ending_cross_street":"POLE BRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.781295,42.801155]]}},{"id":"DJS6mQyjckYxlCRiQgUOaPv4e6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 20A"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Us1MD5QVsvZA1UWOIuopycnWDVA="}],"description":"Utility work on US 20A both directions between MORGAN VIEW RD (Geneseo) and POLE BRIDGE RD (Geneseo) alternating lane/shoulder closures w/flaggers when needed, Monday March 16th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-16T17:11:23Z"},"road_event_id":"DJS6mQyjckYxlCRiQgUOaPv4e6w=","beginning_cross_street":"MORGAN VIEW RD","ending_cross_street":"POLE BRIDGE RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.781295,42.801155]]}},{"id":"+SPAyeqs10FPcxHBzBBrXehsL8k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nrSXREohPQpV73Z6RU/xeQpelFE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"+SPAyeqs10FPcxHBzBBrXehsL8k=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"nrSXREohPQpV73Z6RU/xeQpelFE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"n6QN1OQHw0CHEwkHADfqAX/ybAk="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"nrSXREohPQpV73Z6RU/xeQpelFE=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"n6QN1OQHw0CHEwkHADfqAX/ybAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"+4PI/K4MPgFeofJ/0pmnhay1CdM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"n6QN1OQHw0CHEwkHADfqAX/ybAk=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"+4PI/K4MPgFeofJ/0pmnhay1CdM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"JJA1GC6bzEckRvpv3Ul0SX7d8Fo="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"+4PI/K4MPgFeofJ/0pmnhay1CdM=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"JJA1GC6bzEckRvpv3Ul0SX7d8Fo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"ZrBQlsD4XsUYO9Q79vuPgECzUVw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"JJA1GC6bzEckRvpv3Ul0SX7d8Fo=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"ZrBQlsD4XsUYO9Q79vuPgECzUVw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"rmhW3xUYWjIid4gHINkcl18FqBg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"ZrBQlsD4XsUYO9Q79vuPgECzUVw=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"rmhW3xUYWjIid4gHINkcl18FqBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"focnsNCeqjpM8kL045YE497EhC8="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"rmhW3xUYWjIid4gHINkcl18FqBg=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"focnsNCeqjpM8kL045YE497EhC8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"2Hs9MBulA/tvav4ie/bBLdljA4I="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"focnsNCeqjpM8kL045YE497EhC8=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"2Hs9MBulA/tvav4ie/bBLdljA4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"Q9NXjyhqn6jt5FlqzpR4SXMB0nw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"2Hs9MBulA/tvav4ie/bBLdljA4I=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"Q9NXjyhqn6jt5FlqzpR4SXMB0nw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="},{"type":"next-occurrence","id":"txTxtiXos8b4ShmgHV2W9k3EXOE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"Q9NXjyhqn6jt5FlqzpR4SXMB0nw=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"txTxtiXos8b4ShmgHV2W9k3EXOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+SPAyeqs10FPcxHBzBBrXehsL8k="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Kirkville Road; CR 53 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T00:54:07Z"},"road_event_id":"txTxtiXos8b4ShmgHV2W9k3EXOE=","beginning_cross_street":"Kirkville Road; CR 53","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051253,43.078427]]}},{"id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"q+GYlO8Gh6t/oGr3cbg81D32cn8="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"q+GYlO8Gh6t/oGr3cbg81D32cn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"ZNnnKpBDmXSpnV63xmlokh+PgpE="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"q+GYlO8Gh6t/oGr3cbg81D32cn8=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"ZNnnKpBDmXSpnV63xmlokh+PgpE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"hU4S50QqVU9w3psXUnf/8JH6b/o="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"ZNnnKpBDmXSpnV63xmlokh+PgpE=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"hU4S50QqVU9w3psXUnf/8JH6b/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"rRwYBHSSJHehblEOADdvCv5ow74="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"hU4S50QqVU9w3psXUnf/8JH6b/o=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"rRwYBHSSJHehblEOADdvCv5ow74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"DeLey7oPxfR8NBtpLICG5Dx+B74="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"rRwYBHSSJHehblEOADdvCv5ow74=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"DeLey7oPxfR8NBtpLICG5Dx+B74=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"TETYabXbmfYM2LXtpOimjRcreHg="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"DeLey7oPxfR8NBtpLICG5Dx+B74=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"TETYabXbmfYM2LXtpOimjRcreHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"krX/RoJMpTQCSIDLDn/mcGQdDcY="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"TETYabXbmfYM2LXtpOimjRcreHg=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"krX/RoJMpTQCSIDLDn/mcGQdDcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"K/8sYQUmXi3gT3enLpF+CWgoP6Y="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"krX/RoJMpTQCSIDLDn/mcGQdDcY=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"K/8sYQUmXi3gT3enLpF+CWgoP6Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"7EdsqZ4vpn2ppjqfc28P6wtxgpo="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"K/8sYQUmXi3gT3enLpF+CWgoP6Y=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"7EdsqZ4vpn2ppjqfc28P6wtxgpo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="},{"type":"next-occurrence","id":"mVQo2iPyIglbk6TFUrKhV+S52ag="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"7EdsqZ4vpn2ppjqfc28P6wtxgpo=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"mVQo2iPyIglbk6TFUrKhV+S52ag=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0Hi1zUJOW+uf0KsuM1vaDweMI7A="}],"description":"Line striping on I-81 northbound ramp to Exit 8 - US 11; Mattydale (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:30Z"},"road_event_id":"mVQo2iPyIglbk6TFUrKhV+S52ag=","beginning_cross_street":"Exit 8 - US 11; Mattydale","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.15059,43.106778]]}},{"id":"hzwHQesz4pXbLgILiPT19lTnt0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KPtA5tk2Qp+IkIeZ93rpQ5UcBHk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"hzwHQesz4pXbLgILiPT19lTnt0w=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"KPtA5tk2Qp+IkIeZ93rpQ5UcBHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"zCkxGKJcbojZRwAPgOlGhgjb+48="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"KPtA5tk2Qp+IkIeZ93rpQ5UcBHk=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"zCkxGKJcbojZRwAPgOlGhgjb+48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"uCTajb1zOyN0YBHlCanoCa5hr64="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"zCkxGKJcbojZRwAPgOlGhgjb+48=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"uCTajb1zOyN0YBHlCanoCa5hr64=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"Y5HaHmE7xHO9v6IqKVjoLxo8jg8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"uCTajb1zOyN0YBHlCanoCa5hr64=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"Y5HaHmE7xHO9v6IqKVjoLxo8jg8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"qDJIMnC+MH8rHPNZMMq9Tu5aTso="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"Y5HaHmE7xHO9v6IqKVjoLxo8jg8=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"qDJIMnC+MH8rHPNZMMq9Tu5aTso=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"froJABgQIrsZM975MXzVQXA2eeA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"qDJIMnC+MH8rHPNZMMq9Tu5aTso=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"froJABgQIrsZM975MXzVQXA2eeA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"L2oh9fCXKUowRXJDbwhp7VcVqoM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"froJABgQIrsZM975MXzVQXA2eeA=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"L2oh9fCXKUowRXJDbwhp7VcVqoM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"irXWLzJ4bLiuAVp1goIHh7B4K/0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"L2oh9fCXKUowRXJDbwhp7VcVqoM=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"irXWLzJ4bLiuAVp1goIHh7B4K/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"dusSooaK7300TuyeoVn6Y0dhS5c="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"irXWLzJ4bLiuAVp1goIHh7B4K/0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"dusSooaK7300TuyeoVn6Y0dhS5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="},{"type":"next-occurrence","id":"To1NcpcYbv5W9Z38ExRcRzOWves="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"dusSooaK7300TuyeoVn6Y0dhS5c=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"To1NcpcYbv5W9Z38ExRcRzOWves=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"hzwHQesz4pXbLgILiPT19lTnt0w="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Collamer Road; NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:30:22Z"},"road_event_id":"To1NcpcYbv5W9Z38ExRcRzOWves=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054118,43.10591]]}},{"id":"fGxrYw6ydPb0oSSImjnhkgH0KkE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"W3rBkRebe/RHXiusITJDCs8W3ho="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"fGxrYw6ydPb0oSSImjnhkgH0KkE=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"W3rBkRebe/RHXiusITJDCs8W3ho=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"6d0OoRlkzyg8Q5lN2RXG5Lommvw="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"W3rBkRebe/RHXiusITJDCs8W3ho=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"6d0OoRlkzyg8Q5lN2RXG5Lommvw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"BjBA0f6b/7pjuzr0M+7rkXTuark="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"6d0OoRlkzyg8Q5lN2RXG5Lommvw=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"BjBA0f6b/7pjuzr0M+7rkXTuark=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"c2tz+9HVB+WzOwxhGsgbQ2gukSE="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"BjBA0f6b/7pjuzr0M+7rkXTuark=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"c2tz+9HVB+WzOwxhGsgbQ2gukSE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"S9/AxXSLATxkSON2y4NCbOtNiCM="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"c2tz+9HVB+WzOwxhGsgbQ2gukSE=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"S9/AxXSLATxkSON2y4NCbOtNiCM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"LeLSSav7/ZFf5ALXkJM5/+sQ+7A="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"S9/AxXSLATxkSON2y4NCbOtNiCM=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"LeLSSav7/ZFf5ALXkJM5/+sQ+7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"y9eWfAry/nalb5m/rzxDnCgxD6I="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"LeLSSav7/ZFf5ALXkJM5/+sQ+7A=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"y9eWfAry/nalb5m/rzxDnCgxD6I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"STTaklUQVdDcub4wDiEa1Y3Z/yc="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"y9eWfAry/nalb5m/rzxDnCgxD6I=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"STTaklUQVdDcub4wDiEa1Y3Z/yc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"RAiZSUMZwRMSGev5CMr4vE9R6Gc="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"STTaklUQVdDcub4wDiEa1Y3Z/yc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"RAiZSUMZwRMSGev5CMr4vE9R6Gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="},{"type":"next-occurrence","id":"ksUw7ikYf4q7IrmzlVLgKZxNeqk="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"RAiZSUMZwRMSGev5CMr4vE9R6Gc=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"ksUw7ikYf4q7IrmzlVLgKZxNeqk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fGxrYw6ydPb0oSSImjnhkgH0KkE="}],"description":"Line striping on I-81 northbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:38:05Z"},"road_event_id":"ksUw7ikYf4q7IrmzlVLgKZxNeqk=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.162218,43.094595]]}},{"id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"j+Pja2bA6GU+Q7ymiZsuPB8Di5k="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"j+Pja2bA6GU+Q7ymiZsuPB8Di5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"uw1hdAM4AkVip0/g6ORJSGmtgvU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"j+Pja2bA6GU+Q7ymiZsuPB8Di5k=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"uw1hdAM4AkVip0/g6ORJSGmtgvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"0i4KUp/5b6mPRP5a39qToZ4Mx7w="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"uw1hdAM4AkVip0/g6ORJSGmtgvU=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"0i4KUp/5b6mPRP5a39qToZ4Mx7w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"3ECBsp8mjbWoEh1x+90H5Z6lefE="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"0i4KUp/5b6mPRP5a39qToZ4Mx7w=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"3ECBsp8mjbWoEh1x+90H5Z6lefE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"Y51SsABmF1ptXfcKN3ZhyV9ed+g="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"3ECBsp8mjbWoEh1x+90H5Z6lefE=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"Y51SsABmF1ptXfcKN3ZhyV9ed+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"CjlbjGnZinqf0YYrfD0TPoO4XIU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"Y51SsABmF1ptXfcKN3ZhyV9ed+g=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"CjlbjGnZinqf0YYrfD0TPoO4XIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"gsdHJeIzlDjFdsVpLiOiIiOCKm8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"CjlbjGnZinqf0YYrfD0TPoO4XIU=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"gsdHJeIzlDjFdsVpLiOiIiOCKm8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"q9xE+BFqnxWe3NhHtvcXKRQ8Z+I="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"gsdHJeIzlDjFdsVpLiOiIiOCKm8=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"q9xE+BFqnxWe3NhHtvcXKRQ8Z+I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"GP/QlZptBl0Wpis2nYOLCHAUGt8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"q9xE+BFqnxWe3NhHtvcXKRQ8Z+I=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"GP/QlZptBl0Wpis2nYOLCHAUGt8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="},{"type":"next-occurrence","id":"78YgpDiNdtK7wN4SgwxMo3VD22I="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"GP/QlZptBl0Wpis2nYOLCHAUGt8=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"78YgpDiNdtK7wN4SgwxMo3VD22I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"jxtcVeuj0rqzOeAjEFb30gDTJTQ="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:27:44Z"},"road_event_id":"78YgpDiNdtK7wN4SgwxMo3VD22I=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.052528,43.108987]]}},{"id":"MRjydT0UxJjvtqpgletPEMqFhNE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"r7fEsH3s57p5SjuMhpt46ttUdcY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"MRjydT0UxJjvtqpgletPEMqFhNE=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"r7fEsH3s57p5SjuMhpt46ttUdcY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"sTi368wXmqk3VKXqCWFe5dLbO/k="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"r7fEsH3s57p5SjuMhpt46ttUdcY=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"sTi368wXmqk3VKXqCWFe5dLbO/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"g3x8MIdb7afZG4AElF7n5uQQLwE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"sTi368wXmqk3VKXqCWFe5dLbO/k=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"g3x8MIdb7afZG4AElF7n5uQQLwE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"6y8+UvZ1lx9lLQAZou5wMYiqoG4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"g3x8MIdb7afZG4AElF7n5uQQLwE=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"6y8+UvZ1lx9lLQAZou5wMYiqoG4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"cPn6d9yHbiPM0Oox117F0Fulusg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"6y8+UvZ1lx9lLQAZou5wMYiqoG4=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"cPn6d9yHbiPM0Oox117F0Fulusg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"zh/yoI0OKQsVzAnqySSBTBVwLFM="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"cPn6d9yHbiPM0Oox117F0Fulusg=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"zh/yoI0OKQsVzAnqySSBTBVwLFM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"ylN5+vSSdkjdw4ZMYGeDWMoHsec="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"zh/yoI0OKQsVzAnqySSBTBVwLFM=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"ylN5+vSSdkjdw4ZMYGeDWMoHsec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"7Q8I7utrfQcSDvtc9QBrpqwF8KQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"ylN5+vSSdkjdw4ZMYGeDWMoHsec=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"7Q8I7utrfQcSDvtc9QBrpqwF8KQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"WbGLaQnHnHEGLzqcfJdPGnjdKME="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"7Q8I7utrfQcSDvtc9QBrpqwF8KQ=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"WbGLaQnHnHEGLzqcfJdPGnjdKME=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="},{"type":"next-occurrence","id":"eyThEZaoA5z/OwLvlIIr17gZ9O4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"WbGLaQnHnHEGLzqcfJdPGnjdKME=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"eyThEZaoA5z/OwLvlIIr17gZ9O4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MRjydT0UxJjvtqpgletPEMqFhNE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:33:05Z"},"road_event_id":"eyThEZaoA5z/OwLvlIIr17gZ9O4=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079285,43.135811]]}},{"id":"LOBLRMX7TAB6T97R5skVANbkLa0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 11"],"direction":"unknown","related_road_events":[],"description":"Construction on US 11 both directions in the vicinity of HALLAHAN RD (Lawrence) Narrow Bridge, Continuous Sunday December 15th, 2024 08:59 PM thru Friday December 31st, 2027 11:59 PM All lanes open","update_date":"2024-12-16T01:59:41Z"},"road_event_id":"LOBLRMX7TAB6T97R5skVANbkLa0=","beginning_cross_street":"HALLAHAN RD","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.713616,44.772081]]}},{"id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"O5B1hJd2LTFlH+kOx4BxIgR7M0U="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"O5B1hJd2LTFlH+kOx4BxIgR7M0U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"o6X+TVt1Uy4WUT6+XdiTlqtUbbI="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"O5B1hJd2LTFlH+kOx4BxIgR7M0U=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"o6X+TVt1Uy4WUT6+XdiTlqtUbbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"aN+KCpPB+rX+nimLIYloCkk952o="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"o6X+TVt1Uy4WUT6+XdiTlqtUbbI=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"aN+KCpPB+rX+nimLIYloCkk952o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"D1C34OPgkngs/pJR0s8RXIUj+6k="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"aN+KCpPB+rX+nimLIYloCkk952o=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"D1C34OPgkngs/pJR0s8RXIUj+6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"HXAlmGahczDRQEyOWQRw5A+dd/0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"D1C34OPgkngs/pJR0s8RXIUj+6k=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"HXAlmGahczDRQEyOWQRw5A+dd/0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"NfLdhkwoO3MO4uSe+NJhW7qBWRQ="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"HXAlmGahczDRQEyOWQRw5A+dd/0=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"NfLdhkwoO3MO4uSe+NJhW7qBWRQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"EGlxxLWifu/NPNaXjz5iP+dvGwM="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"NfLdhkwoO3MO4uSe+NJhW7qBWRQ=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"EGlxxLWifu/NPNaXjz5iP+dvGwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"S94YIYnMNWd6C52POT2ln6PyXrA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"EGlxxLWifu/NPNaXjz5iP+dvGwM=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"S94YIYnMNWd6C52POT2ln6PyXrA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"Q9P9AjwlMr1l5RE/vpdv6BeoJ/k="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"S94YIYnMNWd6C52POT2ln6PyXrA=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"Q9P9AjwlMr1l5RE/vpdv6BeoJ/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="},{"type":"next-occurrence","id":"fckLcSHhInUc4nBKrPvoR12AqVg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"Q9P9AjwlMr1l5RE/vpdv6BeoJ/k=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"fckLcSHhInUc4nBKrPvoR12AqVg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Zlv1p6wbZxq/nqeg3rqEGuwCKo8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from I-90; Thruway (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:19:01Z"},"road_event_id":"fckLcSHhInUc4nBKrPvoR12AqVg=","beginning_cross_street":"I-90; Thruway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.054354,43.096551]]}},{"id":"ic8vsd41U8PKvZAXCubhrbVX92M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Southbound near South of I-80 (Wayne Twp), Friday April 24, 2026 11:30 AM thru 01:00 PM, right shoulder closed","update_date":"2026-04-17T11:18:34Z"},"road_event_id":"ic8vsd41U8PKvZAXCubhrbVX92M=","beginning_cross_street":"South of I-80","ending_cross_street":"North of US 46","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:00:00Z","end_date":"2026-04-25T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.249404,40.896995]]}},{"id":"4Zql6tHfJXmBVw57J+bXgumyVpQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hJ9BsiNpfqofF0Jm+Lmt4mcBL80="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"4Zql6tHfJXmBVw57J+bXgumyVpQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"hJ9BsiNpfqofF0Jm+Lmt4mcBL80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"GJDZ8KVv1d9/0EHAz+CQgKFHL/o="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"hJ9BsiNpfqofF0Jm+Lmt4mcBL80=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"GJDZ8KVv1d9/0EHAz+CQgKFHL/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"odVA50BV9eEWPD0WTQMaOVenjrg="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"GJDZ8KVv1d9/0EHAz+CQgKFHL/o=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"odVA50BV9eEWPD0WTQMaOVenjrg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"SaHFqPEM/3on6kZ3lOzRR+tmOBw="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"odVA50BV9eEWPD0WTQMaOVenjrg=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"SaHFqPEM/3on6kZ3lOzRR+tmOBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"OcjAoW7hmUpWFWzTqo9VbQJDV4k="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"SaHFqPEM/3on6kZ3lOzRR+tmOBw=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"OcjAoW7hmUpWFWzTqo9VbQJDV4k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"AvmEIFcMg/vuGSCLTkNwCgoYRHg="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"OcjAoW7hmUpWFWzTqo9VbQJDV4k=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"AvmEIFcMg/vuGSCLTkNwCgoYRHg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"kyhIYTj7VSBbiZ3cykBKTm6z5Do="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"AvmEIFcMg/vuGSCLTkNwCgoYRHg=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"kyhIYTj7VSBbiZ3cykBKTm6z5Do=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"lMV9l1Mk8aKL2iqtXfgDsxm6YLg="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"kyhIYTj7VSBbiZ3cykBKTm6z5Do=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"lMV9l1Mk8aKL2iqtXfgDsxm6YLg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"z97ocUZXo09ymWQcu1OwIhTQw5I="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"lMV9l1Mk8aKL2iqtXfgDsxm6YLg=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"z97ocUZXo09ymWQcu1OwIhTQw5I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="},{"type":"next-occurrence","id":"WfjKOwHtaGKgEGgM0oumpFtZci4="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"z97ocUZXo09ymWQcu1OwIhTQw5I=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"WfjKOwHtaGKgEGgM0oumpFtZci4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"4Zql6tHfJXmBVw57J+bXgumyVpQ="}],"description":"Line striping on I-81 northbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"WfjKOwHtaGKgEGgM0oumpFtZci4=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.166863,43.089496]]}},{"id":"2I0AWrs/0YRuVb1UgZswYDJJZp4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"sKDayF90cgZVfb0Hrlp9LNbesOE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"2I0AWrs/0YRuVb1UgZswYDJJZp4=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"sKDayF90cgZVfb0Hrlp9LNbesOE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"PQYjETcrYcTqx/6przMN8oIdUko="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"sKDayF90cgZVfb0Hrlp9LNbesOE=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"PQYjETcrYcTqx/6przMN8oIdUko=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"nxDSv6YF96IPsoQ/ryJ7iLp12Rw="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"PQYjETcrYcTqx/6przMN8oIdUko=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"nxDSv6YF96IPsoQ/ryJ7iLp12Rw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"gbApPSXSErI52XMGQlkQtXoFUgc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"nxDSv6YF96IPsoQ/ryJ7iLp12Rw=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"gbApPSXSErI52XMGQlkQtXoFUgc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"rlkVGMCAiWkFZVa8iL3+P1ELLb0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"gbApPSXSErI52XMGQlkQtXoFUgc=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"rlkVGMCAiWkFZVa8iL3+P1ELLb0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"yOsTOlzIYZJq34mYG0lNV2OnJKs="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"rlkVGMCAiWkFZVa8iL3+P1ELLb0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"yOsTOlzIYZJq34mYG0lNV2OnJKs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"/+JyhpXxASBNzwutqBOpoBFiv3M="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"yOsTOlzIYZJq34mYG0lNV2OnJKs=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"/+JyhpXxASBNzwutqBOpoBFiv3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"SvIrnS5DFUiWWHSi+1nqREhO8oc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"/+JyhpXxASBNzwutqBOpoBFiv3M=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"SvIrnS5DFUiWWHSi+1nqREhO8oc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"SrhuS3l7JJfr6GVOl4x7tvm0Oeg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"SvIrnS5DFUiWWHSi+1nqREhO8oc=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"SrhuS3l7JJfr6GVOl4x7tvm0Oeg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="},{"type":"next-occurrence","id":"hTiTrzb039QmIBPl+3JTg6ZNrj0="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"SrhuS3l7JJfr6GVOl4x7tvm0Oeg=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"hTiTrzb039QmIBPl+3JTg6ZNrj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"2I0AWrs/0YRuVb1UgZswYDJJZp4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Collamer Road; NY 298 (De Witt), Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:25:30Z"},"road_event_id":"hTiTrzb039QmIBPl+3JTg6ZNrj0=","beginning_cross_street":"Collamer Road; NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.050695,43.106321]]}},{"id":"+gphBMeVeYSrerhxfIG6PZSa0a4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2UP/ZpRkQYPA46MTGizOyNfZe+g="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"+gphBMeVeYSrerhxfIG6PZSa0a4=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"2UP/ZpRkQYPA46MTGizOyNfZe+g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"CcMODcJ8JhLME9/plz9y/Bnxk5U="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"2UP/ZpRkQYPA46MTGizOyNfZe+g=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"CcMODcJ8JhLME9/plz9y/Bnxk5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"ZGgxCe1UsoJIdNqR/u3C+d3rndg="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"CcMODcJ8JhLME9/plz9y/Bnxk5U=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"ZGgxCe1UsoJIdNqR/u3C+d3rndg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"MIkuJk6kdx6Yo1ZsrFahiGxmSjY="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"ZGgxCe1UsoJIdNqR/u3C+d3rndg=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"MIkuJk6kdx6Yo1ZsrFahiGxmSjY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"oo6T+n+MOEQevK+IoUevmBlQy8A="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"MIkuJk6kdx6Yo1ZsrFahiGxmSjY=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"oo6T+n+MOEQevK+IoUevmBlQy8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"4cSg/6RTU5EpiXEewJszBSsG6f0="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"oo6T+n+MOEQevK+IoUevmBlQy8A=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"4cSg/6RTU5EpiXEewJszBSsG6f0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"8ip1piThtFZU4fucYmwuBHte34A="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"4cSg/6RTU5EpiXEewJszBSsG6f0=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"8ip1piThtFZU4fucYmwuBHte34A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"XRMu9L1hsoTvecnjwc8z6yaeeQI="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"8ip1piThtFZU4fucYmwuBHte34A=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"XRMu9L1hsoTvecnjwc8z6yaeeQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"uDk+EdZZp9h+7uz2EEsPvVEZMmI="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"XRMu9L1hsoTvecnjwc8z6yaeeQI=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"uDk+EdZZp9h+7uz2EEsPvVEZMmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="},{"type":"next-occurrence","id":"Rc+DpCYvl6TGh9oqfz8DBRjAFNw="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"uDk+EdZZp9h+7uz2EEsPvVEZMmI=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"Rc+DpCYvl6TGh9oqfz8DBRjAFNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+gphBMeVeYSrerhxfIG6PZSa0a4="}],"description":"Line striping on I-81 northbound ramp from Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard (Syracuse) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:05Z"},"road_event_id":"Rc+DpCYvl6TGh9oqfz8DBRjAFNw=","beginning_cross_street":"Exit 23 - NY 370 East; Park Street; Hiawatha Boulevard","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170414,43.07372]]}},{"id":"61P1tCTkAuP6Rex4VChURwO/nmQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c4Ht/ISJMnM3HC6pJoPbowQu8hY="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"61P1tCTkAuP6Rex4VChURwO/nmQ=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"c4Ht/ISJMnM3HC6pJoPbowQu8hY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"4HacYOz6ybLYSbCqfuFxQDZ97WU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"c4Ht/ISJMnM3HC6pJoPbowQu8hY=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"4HacYOz6ybLYSbCqfuFxQDZ97WU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"XAzg5tWbHwZu+xS1guXGMUVbKvU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"4HacYOz6ybLYSbCqfuFxQDZ97WU=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"XAzg5tWbHwZu+xS1guXGMUVbKvU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"f2ax7mxrNxuyb63CNvNBEExi2P4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"XAzg5tWbHwZu+xS1guXGMUVbKvU=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"f2ax7mxrNxuyb63CNvNBEExi2P4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"e3AaHVKbdwQk3b0llr3FuFEYAB4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"f2ax7mxrNxuyb63CNvNBEExi2P4=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"e3AaHVKbdwQk3b0llr3FuFEYAB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"qS45dqwhCgeuEG7zTLTsn/xuLyQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"e3AaHVKbdwQk3b0llr3FuFEYAB4=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"qS45dqwhCgeuEG7zTLTsn/xuLyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"Yrww6dph6YEx7FxMdaDuZSLUIcQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"qS45dqwhCgeuEG7zTLTsn/xuLyQ=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"Yrww6dph6YEx7FxMdaDuZSLUIcQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"VpVopmg+1/BbDj26AgaO4qcSS5U="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"Yrww6dph6YEx7FxMdaDuZSLUIcQ=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"VpVopmg+1/BbDj26AgaO4qcSS5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"IDoW8DkSeOXXUJW16doqZCdr/KU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"VpVopmg+1/BbDj26AgaO4qcSS5U=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"IDoW8DkSeOXXUJW16doqZCdr/KU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="},{"type":"next-occurrence","id":"vmFskUO+HMwHLcedY5ENSF3gWVE="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"IDoW8DkSeOXXUJW16doqZCdr/KU=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"vmFskUO+HMwHLcedY5ENSF3gWVE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"61P1tCTkAuP6Rex4VChURwO/nmQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp to Exit 91 - NY 298 (De Witt) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:23:01Z"},"road_event_id":"vmFskUO+HMwHLcedY5ENSF3gWVE=","beginning_cross_street":"Exit 91 - NY 298","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.051495,43.108876]]}},{"id":"An4BLdp3qeSBMu9Zc85MdW7yFJA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of US 46 (Clifton) and US 1&9 (North Bergen Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM,","update_date":"2026-04-17T11:18:26Z"},"road_event_id":"An4BLdp3qeSBMu9Zc85MdW7yFJA=","beginning_cross_street":"East of US 46","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.186302,40.8693]]}},{"id":"pBIm+8ZzEOwGoY6Qmy5Ws4fLDQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Eastbound between East of US 46 (Clifton) and US 1&9 (North Bergen Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM,","update_date":"2026-04-17T11:18:29Z"},"road_event_id":"pBIm+8ZzEOwGoY6Qmy5Ws4fLDQg=","beginning_cross_street":"East of US 46","ending_cross_street":"US 1&9","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.186302,40.8693]]}},{"id":"IxSmxyu6aYIuF4V5nyLnQqeGULw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9Pr7wBWF5Jx6r40yg1JvD76Y42Y="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"IxSmxyu6aYIuF4V5nyLnQqeGULw=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"9Pr7wBWF5Jx6r40yg1JvD76Y42Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"mXWOIinh6Az7vCSsjhIrQ4qFhPA="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"9Pr7wBWF5Jx6r40yg1JvD76Y42Y=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"mXWOIinh6Az7vCSsjhIrQ4qFhPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"HWCZL5Fne9+TLrHhxq5uX2ecHbQ="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"mXWOIinh6Az7vCSsjhIrQ4qFhPA=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"HWCZL5Fne9+TLrHhxq5uX2ecHbQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"5AoxKPw0H3IVrLTrlJRN2DdpQvo="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"HWCZL5Fne9+TLrHhxq5uX2ecHbQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"5AoxKPw0H3IVrLTrlJRN2DdpQvo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"pZZROpmzb7BxquB5INZMi8RpTXQ="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"5AoxKPw0H3IVrLTrlJRN2DdpQvo=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"pZZROpmzb7BxquB5INZMi8RpTXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"y6LB+sTPsVfpaDCOHincNEuMpzg="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"pZZROpmzb7BxquB5INZMi8RpTXQ=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"y6LB+sTPsVfpaDCOHincNEuMpzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"3J0sU9Qr3jW3QbOY4pANaYJwk6s="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"y6LB+sTPsVfpaDCOHincNEuMpzg=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"3J0sU9Qr3jW3QbOY4pANaYJwk6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"Zfl62tNmTG2d4HqdcMyAiA9U9N8="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"3J0sU9Qr3jW3QbOY4pANaYJwk6s=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"Zfl62tNmTG2d4HqdcMyAiA9U9N8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"YVKQELCdnEbbc/Dmnb4fucyiNhE="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"Zfl62tNmTG2d4HqdcMyAiA9U9N8=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"YVKQELCdnEbbc/Dmnb4fucyiNhE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="},{"type":"next-occurrence","id":"WOr6w3UDx399wCWFtUd7HyrKrO8="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"YVKQELCdnEbbc/Dmnb4fucyiNhE=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"WOr6w3UDx399wCWFtUd7HyrKrO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IxSmxyu6aYIuF4V5nyLnQqeGULw="}],"description":"Line striping on I-81 southbound ramp to Exit 6 - 7th North Street; Liverpool (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:44:49Z"},"road_event_id":"WOr6w3UDx399wCWFtUd7HyrKrO8=","beginning_cross_street":"Exit 6 - 7th North Street; Liverpool","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.164863,43.092187]]}},{"id":"7PnG9lk0xZjv6wNdxU6U7rShaw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mAmq7LznxhPEpQR44mjls9dcFOc="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"7PnG9lk0xZjv6wNdxU6U7rShaw4=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"mAmq7LznxhPEpQR44mjls9dcFOc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"SV7ex9jpxMWcDbvkdSOTGu4ojpU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"mAmq7LznxhPEpQR44mjls9dcFOc=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"SV7ex9jpxMWcDbvkdSOTGu4ojpU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"nkZsJ1dSVl1UqPxkyiRKGUFoHiA="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"SV7ex9jpxMWcDbvkdSOTGu4ojpU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"nkZsJ1dSVl1UqPxkyiRKGUFoHiA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"3npCF3HSaZgU8FMIvdc5mZO5VwQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"nkZsJ1dSVl1UqPxkyiRKGUFoHiA=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"3npCF3HSaZgU8FMIvdc5mZO5VwQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"8QzK6x1bKOd4nIPpSAEMUmLsFaI="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"3npCF3HSaZgU8FMIvdc5mZO5VwQ=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"8QzK6x1bKOd4nIPpSAEMUmLsFaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"9ffW7DvLzwPURrRDjMi70bwXrdg="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"8QzK6x1bKOd4nIPpSAEMUmLsFaI=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"9ffW7DvLzwPURrRDjMi70bwXrdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"u77nKF7Qcd4FS/x0onP2F9Ul0ok="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"9ffW7DvLzwPURrRDjMi70bwXrdg=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"u77nKF7Qcd4FS/x0onP2F9Ul0ok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"B2IO9oLeEAwiE8mDSbYqA4jhuFQ="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"u77nKF7Qcd4FS/x0onP2F9Ul0ok=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"B2IO9oLeEAwiE8mDSbYqA4jhuFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"uo7/raGI8Lv9O7R24mtFvVpZzyU="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"B2IO9oLeEAwiE8mDSbYqA4jhuFQ=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"uo7/raGI8Lv9O7R24mtFvVpZzyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="},{"type":"next-occurrence","id":"hEbB9KeV1L/QtRknMFAOEKIirj4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"uo7/raGI8Lv9O7R24mtFvVpZzyU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"hEbB9KeV1L/QtRknMFAOEKIirj4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"7PnG9lk0xZjv6wNdxU6U7rShaw4="}],"description":"Line striping and overnight roadwork on I-481 northbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:35:28Z"},"road_event_id":"hEbB9KeV1L/QtRknMFAOEKIirj4=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.084352,43.137472]]}},{"id":"1BbiaTAha0e81gG9ljHGEdxbpFQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 67"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"mPZmIhvC72XqhNKGAL/nlatmcyU="}],"description":"Landscaping on NY 67 both directions between NY 10 (Ephratah) and START ROUTE NY 67; NY 5 (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-20T15:48:12Z"},"road_event_id":"1BbiaTAha0e81gG9ljHGEdxbpFQ=","beginning_cross_street":"NY 10","ending_cross_street":"START ROUTE NY 67; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.5361,43.004]]}},{"id":"mPZmIhvC72XqhNKGAL/nlatmcyU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BbiaTAha0e81gG9ljHGEdxbpFQ="},{"type":"next-occurrence","id":"UsHly8eosJ3MqgLkpO+fAyUwXBI="}],"description":"Landscaping on NY 67 both directions between NY 10 (Ephratah) and START ROUTE NY 67; NY 5 (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-20T15:48:12Z"},"road_event_id":"mPZmIhvC72XqhNKGAL/nlatmcyU=","beginning_cross_street":"NY 10","ending_cross_street":"START ROUTE NY 67; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.5361,43.004]]}},{"id":"UsHly8eosJ3MqgLkpO+fAyUwXBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 67"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1BbiaTAha0e81gG9ljHGEdxbpFQ="}],"description":"Landscaping on NY 67 both directions between NY 10 (Ephratah) and START ROUTE NY 67; NY 5 (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-20T15:48:12Z"},"road_event_id":"UsHly8eosJ3MqgLkpO+fAyUwXBI=","beginning_cross_street":"NY 10","ending_cross_street":"START ROUTE NY 67; NY 5","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.5361,43.004]]}},{"id":"MzugJMVwDSuFrrObrNg0BvWKk1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wx2AgKPV74CQV71lN409vsG9j4Y="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"MzugJMVwDSuFrrObrNg0BvWKk1I=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"wx2AgKPV74CQV71lN409vsG9j4Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"flS/7QPSVRNOMJO1yKgKUygy3B8="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"wx2AgKPV74CQV71lN409vsG9j4Y=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"flS/7QPSVRNOMJO1yKgKUygy3B8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"Y31Mbta3IAbYTwpt1Tk+sFI3m5A="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"flS/7QPSVRNOMJO1yKgKUygy3B8=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"Y31Mbta3IAbYTwpt1Tk+sFI3m5A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"Z/PjGZ+JCuyn4mbS01RdPuewcck="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"Y31Mbta3IAbYTwpt1Tk+sFI3m5A=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"Z/PjGZ+JCuyn4mbS01RdPuewcck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"8TfbPi59yMskOyfOdumbLQo49Q0="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"Z/PjGZ+JCuyn4mbS01RdPuewcck=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"8TfbPi59yMskOyfOdumbLQo49Q0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"JJHwVmn2pcQQxu7oCG/PF0i4YVo="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"8TfbPi59yMskOyfOdumbLQo49Q0=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"JJHwVmn2pcQQxu7oCG/PF0i4YVo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"PQyg64Tn7wY4hWt1LLZ4SHiByEM="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"JJHwVmn2pcQQxu7oCG/PF0i4YVo=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"PQyg64Tn7wY4hWt1LLZ4SHiByEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"k4fk5/2A/rMM/5hXHMfanHnPxzE="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"PQyg64Tn7wY4hWt1LLZ4SHiByEM=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"k4fk5/2A/rMM/5hXHMfanHnPxzE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"gmpeteI5cSAHJoCnZx1qzDb7ua4="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"k4fk5/2A/rMM/5hXHMfanHnPxzE=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"gmpeteI5cSAHJoCnZx1qzDb7ua4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="},{"type":"next-occurrence","id":"02TbifVX/tHUX28eBgyNFCRl2R8="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"gmpeteI5cSAHJoCnZx1qzDb7ua4=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"02TbifVX/tHUX28eBgyNFCRl2R8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"MzugJMVwDSuFrrObrNg0BvWKk1I="}],"description":"Line striping on I-81 northbound ramp to Exit 9A - Syracuse Airport (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:03Z"},"road_event_id":"02TbifVX/tHUX28eBgyNFCRl2R8=","beginning_cross_street":"Exit 9A - Syracuse Airport","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.142243,43.113318]]}},{"id":"fOSNlYSPfbZjIqEhc6f8lDmq66o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"XY7cuhLxhefFmfqbSTIsLANH2ig="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"fOSNlYSPfbZjIqEhc6f8lDmq66o=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"XY7cuhLxhefFmfqbSTIsLANH2ig=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"zk4wfRCbEhAVcJBEXcDuBMqyAUI="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"XY7cuhLxhefFmfqbSTIsLANH2ig=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"zk4wfRCbEhAVcJBEXcDuBMqyAUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"EODPxCc0yG+FgxZx5AFCwCKNvOQ="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"zk4wfRCbEhAVcJBEXcDuBMqyAUI=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"EODPxCc0yG+FgxZx5AFCwCKNvOQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"I7tTYElqyPnkrydV2U+btsdPIWo="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"EODPxCc0yG+FgxZx5AFCwCKNvOQ=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"I7tTYElqyPnkrydV2U+btsdPIWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"iSFnzkf85NlVsuBp0fB/2dpmA+M="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"I7tTYElqyPnkrydV2U+btsdPIWo=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"iSFnzkf85NlVsuBp0fB/2dpmA+M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"uF11Diwn/0+UvZdz2qc5Q0j2M5o="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"iSFnzkf85NlVsuBp0fB/2dpmA+M=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"uF11Diwn/0+UvZdz2qc5Q0j2M5o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"HxHDBIZfrwvXXTnYcaOR79fnAHA="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"uF11Diwn/0+UvZdz2qc5Q0j2M5o=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"HxHDBIZfrwvXXTnYcaOR79fnAHA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"AIZujpI27zBg+ZGVEJY2w54ewWI="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"HxHDBIZfrwvXXTnYcaOR79fnAHA=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"AIZujpI27zBg+ZGVEJY2w54ewWI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"IXvodNB0vsN2RrEnwhBZ3MADPPM="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"AIZujpI27zBg+ZGVEJY2w54ewWI=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"IXvodNB0vsN2RrEnwhBZ3MADPPM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="},{"type":"next-occurrence","id":"oOczSNGcFk9cgMTjw3K+9eA+We4="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"IXvodNB0vsN2RrEnwhBZ3MADPPM=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"oOczSNGcFk9cgMTjw3K+9eA+We4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fOSNlYSPfbZjIqEhc6f8lDmq66o="}],"description":"Line striping on I-81 southbound ramp to Exit 7 - I-90 (Salina) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:45:20Z"},"road_event_id":"oOczSNGcFk9cgMTjw3K+9eA+We4=","beginning_cross_street":"Exit 7 - I-90","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.160296,43.096948]]}},{"id":"05INHwJmUYBlbXeGi5IpywjBjG8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wqAfGsWXVKV1EkzZNObRkLZ5YR4="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"05INHwJmUYBlbXeGi5IpywjBjG8=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"wqAfGsWXVKV1EkzZNObRkLZ5YR4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"SIeM5vhQWFEGEMRBFAWwW/q2orE="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"wqAfGsWXVKV1EkzZNObRkLZ5YR4=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"SIeM5vhQWFEGEMRBFAWwW/q2orE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"cAvjBgx2zd6BUWFA4ouMs+a0xsU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"SIeM5vhQWFEGEMRBFAWwW/q2orE=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"cAvjBgx2zd6BUWFA4ouMs+a0xsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"N5nnqHR383JJtC7C7q62yGgoPiU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"cAvjBgx2zd6BUWFA4ouMs+a0xsU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"N5nnqHR383JJtC7C7q62yGgoPiU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"41GIgq5vHT4EBkklSMY5ASn+NEo="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"N5nnqHR383JJtC7C7q62yGgoPiU=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"41GIgq5vHT4EBkklSMY5ASn+NEo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"CPPl1mTRQ7wst6ShXB7VspNNN00="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"41GIgq5vHT4EBkklSMY5ASn+NEo=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"CPPl1mTRQ7wst6ShXB7VspNNN00=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"Og/AdzIxrGOw/1m82OFi5EFKQ6s="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"CPPl1mTRQ7wst6ShXB7VspNNN00=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"Og/AdzIxrGOw/1m82OFi5EFKQ6s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"dvkollr6jv2diDCeHW3TK+JAPxk="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"Og/AdzIxrGOw/1m82OFi5EFKQ6s=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"dvkollr6jv2diDCeHW3TK+JAPxk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"qMRiE6rF6Xpcy2bKUam+6WIzSKY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"dvkollr6jv2diDCeHW3TK+JAPxk=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"qMRiE6rF6Xpcy2bKUam+6WIzSKY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="},{"type":"next-occurrence","id":"v/6awlrlAwMn3ZCs/ii5njjuKmw="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"qMRiE6rF6Xpcy2bKUam+6WIzSKY=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"v/6awlrlAwMn3ZCs/ii5njjuKmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"05INHwJmUYBlbXeGi5IpywjBjG8="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp from Northern Boulevard; CR 82 (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:39:31Z"},"road_event_id":"v/6awlrlAwMn3ZCs/ii5njjuKmw=","beginning_cross_street":"Northern Boulevard; CR 82","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.079544,43.135134]]}},{"id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hoD2S3pK79lO9AsKhaJbRfHGwus="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"hoD2S3pK79lO9AsKhaJbRfHGwus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"4ajgrTo1ebu/3vD5DVcFZu456Kc="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"hoD2S3pK79lO9AsKhaJbRfHGwus=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"4ajgrTo1ebu/3vD5DVcFZu456Kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"oMU82MPpvvPO/neQPuwRP8cnBxg="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"4ajgrTo1ebu/3vD5DVcFZu456Kc=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"oMU82MPpvvPO/neQPuwRP8cnBxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"5Yyceqqjy7tdxBncvKoUqWSpn1A="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"oMU82MPpvvPO/neQPuwRP8cnBxg=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"5Yyceqqjy7tdxBncvKoUqWSpn1A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"WkG0JGKm/92JY2UaByn1wfbTmFU="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"5Yyceqqjy7tdxBncvKoUqWSpn1A=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"WkG0JGKm/92JY2UaByn1wfbTmFU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"SZ7CAPNo/zpV7XoYwc4IDjdSyLY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"WkG0JGKm/92JY2UaByn1wfbTmFU=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"SZ7CAPNo/zpV7XoYwc4IDjdSyLY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"x97DhnrjBgMWrfACjF1/hLTrQfY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"SZ7CAPNo/zpV7XoYwc4IDjdSyLY=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"x97DhnrjBgMWrfACjF1/hLTrQfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"CaOCYPNcqRPyDFazeoAHL0TVGIA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"x97DhnrjBgMWrfACjF1/hLTrQfY=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"CaOCYPNcqRPyDFazeoAHL0TVGIA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"ccrCqDud+gA8OFsUU1S80oPtgPA="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"CaOCYPNcqRPyDFazeoAHL0TVGIA=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"ccrCqDud+gA8OFsUU1S80oPtgPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="},{"type":"next-occurrence","id":"6tWGsCZOL+zihdEOzXgkonjg+rY="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"ccrCqDud+gA8OFsUU1S80oPtgPA=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"6tWGsCZOL+zihdEOzXgkonjg+rY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-481"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WY/DDk6b1ahb9YZfBIg1hZ6JcU0="}],"description":"Line striping and overnight roadwork on I-481 southbound ramp to Exit 95 - Northern Blvd (Cicero) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:37:38Z"},"road_event_id":"6tWGsCZOL+zihdEOzXgkonjg+rY=","beginning_cross_street":"Exit 95 - Northern Blvd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.086491,43.137139]]}},{"id":"Rx59qlFaYztv3TSz2ERcNyOhbKc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"BF4kgsOtiiMPjWdr0o2eKtoQvB0="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"Rx59qlFaYztv3TSz2ERcNyOhbKc=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"BF4kgsOtiiMPjWdr0o2eKtoQvB0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"C6jqKFgRSKyj7Iy17klo81mU33M="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"BF4kgsOtiiMPjWdr0o2eKtoQvB0=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"C6jqKFgRSKyj7Iy17klo81mU33M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"gXi6szjijgPLR0jTqXWPxvnCKU8="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"C6jqKFgRSKyj7Iy17klo81mU33M=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"gXi6szjijgPLR0jTqXWPxvnCKU8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"bUGT13fYVyvpkp/peCp4a93Q7zQ="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"gXi6szjijgPLR0jTqXWPxvnCKU8=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"bUGT13fYVyvpkp/peCp4a93Q7zQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"Bv2FZz3OCIc9vFQm/ApLTeAMTGM="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"bUGT13fYVyvpkp/peCp4a93Q7zQ=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"Bv2FZz3OCIc9vFQm/ApLTeAMTGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"7LAHSsPv6Dib2kHGV9EHJK10zYY="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"Bv2FZz3OCIc9vFQm/ApLTeAMTGM=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"7LAHSsPv6Dib2kHGV9EHJK10zYY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"RbMR/VYrXycWPpFJg5cLIO9mlKA="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"7LAHSsPv6Dib2kHGV9EHJK10zYY=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"RbMR/VYrXycWPpFJg5cLIO9mlKA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"QILPv03tzGEciSy4PcE2+N1ZhDY="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"RbMR/VYrXycWPpFJg5cLIO9mlKA=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"QILPv03tzGEciSy4PcE2+N1ZhDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"eAToWrOpliEPq0aHTFyjwrAjEHw="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"QILPv03tzGEciSy4PcE2+N1ZhDY=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"eAToWrOpliEPq0aHTFyjwrAjEHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="},{"type":"next-occurrence","id":"s6jQjm45yEZWZf7n1Fqf3wRO8CQ="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"eAToWrOpliEPq0aHTFyjwrAjEHw=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"s6jQjm45yEZWZf7n1Fqf3wRO8CQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Rx59qlFaYztv3TSz2ERcNyOhbKc="}],"description":"Line striping on I-81 southbound ramp to Exit 9A, Exit 8 - Syracuse Airport; US-11 (Clay) ; Mobile lane closure, Monday April 6th, 2026 thru Sunday May 31st, 2026, Monday thru Friday, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-03-27T01:47:51Z"},"road_event_id":"s6jQjm45yEZWZf7n1Fqf3wRO8CQ=","beginning_cross_street":"Exit 9A, Exit 8 - Syracuse Airport; US-11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.129633,43.119242]]}},{"id":"qz0JIc+dSJcQLEg2cpxtXeoh4sI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Eastbound near West of NJ 33 Business (Manalapan Twp), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-20T18:00:22Z"},"road_event_id":"qz0JIc+dSJcQLEg2cpxtXeoh4sI=","beginning_cross_street":"West of NJ 33 Business","ending_cross_street":"NJ 33 Business","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.327316,40.25325]]}},{"id":"fqgb9eJqZlXOWooteSN5ejx++eY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound between West of Exit 7 - Pleasant Valley Way/CR 636 (West Orange Twp) and West of Exit 6 - Laurel Ave (Livingston Twp), Wednesday April 29, 2026 10:00 AM thru 02:00 PM, right lane closed","update_date":"2026-04-20T17:57:21Z"},"road_event_id":"fqgb9eJqZlXOWooteSN5ejx++eY=","beginning_cross_street":"West of Exit 7 - Pleasant Valley Way/CR 636","ending_cross_street":"West of Exit 6 - Laurel Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.274993,40.799976]]}},{"id":"IGYZIQniVcn1im5ZZPIS1rgNCak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"H/9Yj2KwzzTiyeaRtEnUEIJZxjA="}],"description":"Bridge construction on Goethals Bridge both directions New York Side (New York) to New Jersey Side (Elizabeth), Saturday April 25th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Sunday April 26th, 2026, 07:30 AM thru 10:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T17:59:45Z"},"road_event_id":"IGYZIQniVcn1im5ZZPIS1rgNCak=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-25T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188812,40.63117]]}},{"id":"H/9Yj2KwzzTiyeaRtEnUEIJZxjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Goethals Bridge"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IGYZIQniVcn1im5ZZPIS1rgNCak="}],"description":"Bridge construction on Goethals Bridge both directions New York Side (New York) to New Jersey Side (Elizabeth), Saturday April 25th, 2026, 07:00 AM thru 10:00 AM 1 Right lane of 3 lanes closed, Sunday April 26th, 2026, 07:30 AM thru 10:00 AM 1 Right lane of 3 lanes closed","update_date":"2026-04-20T17:59:45Z"},"road_event_id":"H/9Yj2KwzzTiyeaRtEnUEIJZxjA=","beginning_cross_street":"New York Side","ending_cross_street":"New Jersey Side","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T19:00:00Z","end_date":"2026-04-26T21:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.188812,40.63117]]}},{"id":"UCO/h8pbJIqNvnE7UbIIZBEEIfs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Southbound near North of Dowd Av (Elizabeth), left shoulder local lane","update_date":"2026-04-20T17:57:22Z"},"road_event_id":"UCO/h8pbJIqNvnE7UbIIZBEEIfs=","beginning_cross_street":"North of Dowd Av","ending_cross_street":"Dowd Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.194099,40.681812]]}},{"id":"FIrK+rSh/SnW39SVlinYEsnAiL0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 37"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 37 between East of Tunney/Mathis Bridge (Toms River Twp) and West of NJ 35/CR 629 (Seaside Heights), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-20T18:00:26Z"},"road_event_id":"FIrK+rSh/SnW39SVlinYEsnAiL0=","beginning_cross_street":"East of Tunney/Mathis Bridge","ending_cross_street":"West of NJ 35/CR 629","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.097618,39.944992]]}},{"id":"G9SApQO1j68HA5LiCyKfvM9fzS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound between South of Cindy St (Old Bridge Twp) and South of Woodbridge Av (Woodbridge Twp), Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, , moving operation","update_date":"2026-04-20T18:00:25Z"},"road_event_id":"G9SApQO1j68HA5LiCyKfvM9fzS4=","beginning_cross_street":"South of Cindy St","ending_cross_street":"South of Woodbridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.307998,40.388965]]}},{"id":"g88b5LhUV8t1IZPSSJTZcV84EPw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Southbound between South of Exit 5 - CR 529/Stelton Rd (South Plainfield) and New Jersey Turnpike (Edison Twp), Wednesday April 22, 2026 07:00 AM thru 03:00 PM, right shoulder closed, moving operation","update_date":"2026-04-20T18:00:27Z"},"road_event_id":"g88b5LhUV8t1IZPSSJTZcV84EPw=","beginning_cross_street":"South of Exit 5 - CR 529/Stelton Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.434799,40.556858]]}},{"id":"aIwgOOlWnPQa4EQNnmakmW0Lgyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"6j4Wy8yT6OtiCdyypizJ1Yxm2Uw="}],"description":"Installation of traffic management systems on NY 104 both directions at Jefferson St (Mexico) ; Alternating left and right lane closures, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:03:06Z"},"road_event_id":"aIwgOOlWnPQa4EQNnmakmW0Lgyo=","beginning_cross_street":"Jefferson St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.229612,43.45956]]}},{"id":"6j4Wy8yT6OtiCdyypizJ1Yxm2Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aIwgOOlWnPQa4EQNnmakmW0Lgyo="},{"type":"next-occurrence","id":"SZRhfS5uZxLNIoHza6LnFY3QR5s="}],"description":"Installation of traffic management systems on NY 104 both directions at Jefferson St (Mexico) ; Alternating left and right lane closures, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:03:06Z"},"road_event_id":"6j4Wy8yT6OtiCdyypizJ1Yxm2Uw=","beginning_cross_street":"Jefferson St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.229612,43.45956]]}},{"id":"SZRhfS5uZxLNIoHza6LnFY3QR5s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aIwgOOlWnPQa4EQNnmakmW0Lgyo="},{"type":"next-occurrence","id":"P1ZE8gE0h1e6dEy1V6Okazge3jM="}],"description":"Installation of traffic management systems on NY 104 both directions at Jefferson St (Mexico) ; Alternating left and right lane closures, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:03:06Z"},"road_event_id":"SZRhfS5uZxLNIoHza6LnFY3QR5s=","beginning_cross_street":"Jefferson St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.229612,43.45956]]}},{"id":"P1ZE8gE0h1e6dEy1V6Okazge3jM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aIwgOOlWnPQa4EQNnmakmW0Lgyo="},{"type":"next-occurrence","id":"InbA1PmIbk7hfBrTsI7D/IOHi2s="}],"description":"Installation of traffic management systems on NY 104 both directions at Jefferson St (Mexico) ; Alternating left and right lane closures, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:03:06Z"},"road_event_id":"P1ZE8gE0h1e6dEy1V6Okazge3jM=","beginning_cross_street":"Jefferson St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.229612,43.45956]]}},{"id":"InbA1PmIbk7hfBrTsI7D/IOHi2s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"aIwgOOlWnPQa4EQNnmakmW0Lgyo="}],"description":"Installation of traffic management systems on NY 104 both directions at Jefferson St (Mexico) ; Alternating left and right lane closures, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:03:06Z"},"road_event_id":"InbA1PmIbk7hfBrTsI7D/IOHi2s=","beginning_cross_street":"Jefferson St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.229612,43.45956]]}},{"id":"CQi3La+wscKSHSor94JPbymxkJc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ghOvidYFvgN34tlZUKB/rdMBCnc="}],"description":"Installation of traffic management systems on NY 48 both directions at Marble Rd (Van Buren) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 12:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T16:53:24Z"},"road_event_id":"CQi3La+wscKSHSor94JPbymxkJc=","beginning_cross_street":"Marble Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.331964,43.156063]]}},{"id":"ghOvidYFvgN34tlZUKB/rdMBCnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CQi3La+wscKSHSor94JPbymxkJc="},{"type":"next-occurrence","id":"1OHJbJFHEzfklR9KVG9o1NQb4gs="}],"description":"Installation of traffic management systems on NY 48 both directions at Marble Rd (Van Buren) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 12:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T16:53:24Z"},"road_event_id":"ghOvidYFvgN34tlZUKB/rdMBCnc=","beginning_cross_street":"Marble Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.331964,43.156063]]}},{"id":"1OHJbJFHEzfklR9KVG9o1NQb4gs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CQi3La+wscKSHSor94JPbymxkJc="},{"type":"next-occurrence","id":"pnI+o/o4NHQylB4RtPXF2cMorrM="}],"description":"Installation of traffic management systems on NY 48 both directions at Marble Rd (Van Buren) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 12:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T16:53:24Z"},"road_event_id":"1OHJbJFHEzfklR9KVG9o1NQb4gs=","beginning_cross_street":"Marble Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.331964,43.156063]]}},{"id":"pnI+o/o4NHQylB4RtPXF2cMorrM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CQi3La+wscKSHSor94JPbymxkJc="},{"type":"next-occurrence","id":"f+Ew9hAbqOQgh8KBJHocaHjVUmk="}],"description":"Installation of traffic management systems on NY 48 both directions at Marble Rd (Van Buren) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 12:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T16:53:24Z"},"road_event_id":"pnI+o/o4NHQylB4RtPXF2cMorrM=","beginning_cross_street":"Marble Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.331964,43.156063]]}},{"id":"f+Ew9hAbqOQgh8KBJHocaHjVUmk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CQi3La+wscKSHSor94JPbymxkJc="},{"type":"next-occurrence","id":"OidyBgxxjw1HxJTj353VLJHiHc4="}],"description":"Installation of traffic management systems on NY 48 both directions at Marble Rd (Van Buren) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 12:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T16:53:24Z"},"road_event_id":"f+Ew9hAbqOQgh8KBJHocaHjVUmk=","beginning_cross_street":"Marble Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T04:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.331964,43.156063]]}},{"id":"OidyBgxxjw1HxJTj353VLJHiHc4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 48"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"CQi3La+wscKSHSor94JPbymxkJc="}],"description":"Installation of traffic management systems on NY 48 both directions at Marble Rd (Van Buren) ; Alternating one-way traffic with flaggers, Wednesday April 22nd, 2026 thru Wednesday April 29th, 2026, Monday thru Friday, 12:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T16:53:24Z"},"road_event_id":"OidyBgxxjw1HxJTj353VLJHiHc4=","beginning_cross_street":"Marble Rd ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T04:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.331964,43.156063]]}},{"id":"fUtbFXyvRSBOWtED2Wj+QElRQuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound between Watson Dr (Washington Twp) and North of CR 689/Cross Keys Berlin Rd (Washington Twp), Wednesday April 22, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T13:36:27Z"},"road_event_id":"fUtbFXyvRSBOWtED2Wj+QElRQuE=","beginning_cross_street":"Watson Dr","ending_cross_street":"North of CR 689/Cross Keys Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.038536,39.735107]]}},{"id":"SGUu3QckZ3AIXk3gHaZeyMN+ODw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Southbound between Watson Dr (Washington Twp) and North of CR 689/Cross Keys Berlin Rd (Washington Twp), Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T13:36:35Z"},"road_event_id":"SGUu3QckZ3AIXk3gHaZeyMN+ODw=","beginning_cross_street":"Watson Dr","ending_cross_street":"North of CR 689/Cross Keys Berlin Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.038536,39.735107]]}},{"id":"qQ9xevDRqacHYQ7Z184oAPG+kII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near North of NJ 38 (Pennsauken Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T13:36:33Z"},"road_event_id":"qQ9xevDRqacHYQ7Z184oAPG+kII=","beginning_cross_street":"North of NJ 38","ending_cross_street":"North of NJ 38","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.077766,39.936237]]}},{"id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Yzik2y9yDLF7cZApJpJp+I4uuUY="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"Yzik2y9yDLF7cZApJpJp+I4uuUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"jxAOSLJ+E8LJOV/i/xhMu/ilxwg="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"Yzik2y9yDLF7cZApJpJp+I4uuUY=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"jxAOSLJ+E8LJOV/i/xhMu/ilxwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"6Mx+OI1Lwwy+5flnAbMAX3iAlXk="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"jxAOSLJ+E8LJOV/i/xhMu/ilxwg=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"6Mx+OI1Lwwy+5flnAbMAX3iAlXk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"+Z7Bvhaa4y9nZV5u8IGF2hGe7dk="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"6Mx+OI1Lwwy+5flnAbMAX3iAlXk=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"+Z7Bvhaa4y9nZV5u8IGF2hGe7dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"IKX9YI8irARQMhoQGJ86mJKt3qE="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"+Z7Bvhaa4y9nZV5u8IGF2hGe7dk=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"IKX9YI8irARQMhoQGJ86mJKt3qE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"r4LO7JEo0sP+UD29V6AjeDNze28="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"IKX9YI8irARQMhoQGJ86mJKt3qE=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"r4LO7JEo0sP+UD29V6AjeDNze28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"BPpIfA2L3rKrDnNDHR6023z2Kzw="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"r4LO7JEo0sP+UD29V6AjeDNze28=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"BPpIfA2L3rKrDnNDHR6023z2Kzw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"88fm5l+brv+Ix0sLwebg7aWwCak="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"BPpIfA2L3rKrDnNDHR6023z2Kzw=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"88fm5l+brv+Ix0sLwebg7aWwCak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"ubyLwla5U7Wtis8XBT1/E/ZEr/U="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"88fm5l+brv+Ix0sLwebg7aWwCak=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"ubyLwla5U7Wtis8XBT1/E/ZEr/U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="},{"type":"next-occurrence","id":"g2u56GVkT8eTo1z7lWI8o8pSJ8M="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"ubyLwla5U7Wtis8XBT1/E/ZEr/U=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"g2u56GVkT8eTo1z7lWI8o8pSJ8M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 125"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"PM70TE5ViXQ3OUtFgmndpGQWpyQ="}],"description":"Road maintenance operations on NY 125 both directions between Bonnie Way (Mamaroneck) and Murray Avenue (Mamaroneck) 8761/32570509 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Thursday May 21st, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic, Tuesday May 26th, 2026, 10:00 AM thru 03:30 PM, alternating traffic, Wednesday May 27th, 2026 thru Sunday June 28th, 2026, Monday thru Friday, 09:00 AM thru 03:30 PM, alternating traffic","update_date":"2026-04-01T12:59:19Z"},"road_event_id":"g2u56GVkT8eTo1z7lWI8o8pSJ8M=","beginning_cross_street":"Bonnie Way","ending_cross_street":"Murray Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767933,40.949565]]}},{"id":"U8Ls+YPX0R/8dTN21tQ3ny07xjo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"x0D08o6Ch7Q9ZJ2YKXy2BPPlFnw="}],"description":"Utility work on NY 96 southbound area of Town of Victor and Town of Perinton Line (Victor), Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T17:50:36Z"},"road_event_id":"U8Ls+YPX0R/8dTN21tQ3ny07xjo=","beginning_cross_street":"Town of Victor and Town of Perinton Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441473,43.031948]]}},{"id":"x0D08o6Ch7Q9ZJ2YKXy2BPPlFnw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U8Ls+YPX0R/8dTN21tQ3ny07xjo="},{"type":"next-occurrence","id":"F78uJwptpLUPFZDzdddswkIWGSs="}],"description":"Utility work on NY 96 southbound area of Town of Victor and Town of Perinton Line (Victor), Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T17:50:36Z"},"road_event_id":"x0D08o6Ch7Q9ZJ2YKXy2BPPlFnw=","beginning_cross_street":"Town of Victor and Town of Perinton Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441473,43.031948]]}},{"id":"F78uJwptpLUPFZDzdddswkIWGSs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U8Ls+YPX0R/8dTN21tQ3ny07xjo="},{"type":"next-occurrence","id":"0Q8F5kEQwLxZQad/h1xud6G3LCA="}],"description":"Utility work on NY 96 southbound area of Town of Victor and Town of Perinton Line (Victor), Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T17:50:36Z"},"road_event_id":"F78uJwptpLUPFZDzdddswkIWGSs=","beginning_cross_street":"Town of Victor and Town of Perinton Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441473,43.031948]]}},{"id":"0Q8F5kEQwLxZQad/h1xud6G3LCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 96"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"U8Ls+YPX0R/8dTN21tQ3ny07xjo="}],"description":"Utility work on NY 96 southbound area of Town of Victor and Town of Perinton Line (Victor), Tuesday April 21st, 2026 thru Saturday April 25th, 2026, Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-20T17:50:36Z"},"road_event_id":"0Q8F5kEQwLxZQad/h1xud6G3LCA=","beginning_cross_street":"Town of Victor and Town of Perinton Line","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.441473,43.031948]]}},{"id":"EqnxEyhuZxE6AGDfzx5PRyUcdEM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 257"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"5bEjErS5acPl3tzwd1Dy7IXniTY="}],"description":"Installation of traffic management systems on NY 257 both directions at Franklin St (Manlius) ; Alternating one-way traffic with flaggers, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:10:38Z"},"road_event_id":"EqnxEyhuZxE6AGDfzx5PRyUcdEM=","beginning_cross_street":"Franklin St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.000301,43.023865]]}},{"id":"5bEjErS5acPl3tzwd1Dy7IXniTY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 257"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EqnxEyhuZxE6AGDfzx5PRyUcdEM="},{"type":"next-occurrence","id":"y5x1xcwHQbGoO8AHk0fl9qP9ro0="}],"description":"Installation of traffic management systems on NY 257 both directions at Franklin St (Manlius) ; Alternating one-way traffic with flaggers, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:10:38Z"},"road_event_id":"5bEjErS5acPl3tzwd1Dy7IXniTY=","beginning_cross_street":"Franklin St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.000301,43.023865]]}},{"id":"y5x1xcwHQbGoO8AHk0fl9qP9ro0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 257"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EqnxEyhuZxE6AGDfzx5PRyUcdEM="},{"type":"next-occurrence","id":"2mKUV2msj3onV6k+64j5kQrmeUY="}],"description":"Installation of traffic management systems on NY 257 both directions at Franklin St (Manlius) ; Alternating one-way traffic with flaggers, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:10:38Z"},"road_event_id":"y5x1xcwHQbGoO8AHk0fl9qP9ro0=","beginning_cross_street":"Franklin St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.000301,43.023865]]}},{"id":"2mKUV2msj3onV6k+64j5kQrmeUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 257"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EqnxEyhuZxE6AGDfzx5PRyUcdEM="},{"type":"next-occurrence","id":"e+bl9PfauBNSsu3wVgGzNo7pUyk="}],"description":"Installation of traffic management systems on NY 257 both directions at Franklin St (Manlius) ; Alternating one-way traffic with flaggers, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:10:38Z"},"road_event_id":"2mKUV2msj3onV6k+64j5kQrmeUY=","beginning_cross_street":"Franklin St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.000301,43.023865]]}},{"id":"e+bl9PfauBNSsu3wVgGzNo7pUyk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 257"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"EqnxEyhuZxE6AGDfzx5PRyUcdEM="}],"description":"Installation of traffic management systems on NY 257 both directions at Franklin St (Manlius) ; Alternating one-way traffic with flaggers, Friday April 24th, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T17:10:38Z"},"road_event_id":"e+bl9PfauBNSsu3wVgGzNo7pUyk=","beginning_cross_street":"Franklin St ","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.000301,43.023865]]}},{"id":"9ydk7JyGgd4levxxqvQlJtD6P4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Northbound at CR 624/North Ave (Elizabeth) Tuesday April 28, 2026 11:00 PM thru Wednesday April 29, 2026 05:00 AM, ramp, right partial lane local lane","update_date":"2026-04-20T17:57:20Z"},"road_event_id":"9ydk7JyGgd4levxxqvQlJtD6P4Q=","beginning_cross_street":"CR 624/North Ave","ending_cross_street":"CR 624/North Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T02:00:00Z","end_date":"2026-04-30T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.19783,40.676666]]}},{"id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ivhWXpG8aOwjQNv1WJ76aGagtgI="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"ivhWXpG8aOwjQNv1WJ76aGagtgI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k="},{"type":"next-occurrence","id":"77Dy4Emg+g0Pi5MM8UgMQZUL9Ao="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"ivhWXpG8aOwjQNv1WJ76aGagtgI=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"77Dy4Emg+g0Pi5MM8UgMQZUL9Ao=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k="},{"type":"next-occurrence","id":"rfuwg9rXeevjWHYq7XMxezkrKrQ="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"77Dy4Emg+g0Pi5MM8UgMQZUL9Ao=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"rfuwg9rXeevjWHYq7XMxezkrKrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k="},{"type":"next-occurrence","id":"8cfkEAaCZljbFiohJAoxawl06CE="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"rfuwg9rXeevjWHYq7XMxezkrKrQ=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"8cfkEAaCZljbFiohJAoxawl06CE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k="},{"type":"next-occurrence","id":"X5OEJIirRwr+vuyM4UDcBL793WI="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"8cfkEAaCZljbFiohJAoxawl06CE=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"X5OEJIirRwr+vuyM4UDcBL793WI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k="},{"type":"next-occurrence","id":"me0gt/tbGaQxQcvTav0sjGapLxE="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"X5OEJIirRwr+vuyM4UDcBL793WI=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"me0gt/tbGaQxQcvTav0sjGapLxE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k="},{"type":"next-occurrence","id":"VHMbePbyLTnfFSsQ0y1UoY1RMEw="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"me0gt/tbGaQxQcvTav0sjGapLxE=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"VHMbePbyLTnfFSsQ0y1UoY1RMEw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 211"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Nuk5Lkcto51hgDRcFGKIhGl4B/k="}],"description":"Road rehabilitation on NY 211 both directions between Bert Crawford Road (Middletown) and Ebert Road (Middletown) 20240892898/32296709 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, various lane closures","update_date":"2026-04-02T14:38:27Z"},"road_event_id":"VHMbePbyLTnfFSsQ0y1UoY1RMEw=","beginning_cross_street":"Bert Crawford Road","ending_cross_street":"Ebert Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.377458,41.459646]]}},{"id":"bONxpCUfYynw+XZpqRSmGoYJdx0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5S"],"direction":"unknown","related_road_events":[],"description":"Bridge work on NY 5S both directions between CR 122; Auriesville Road (Glen) and CR 27; Main Street; Hamlet of Fort Hunter (Montgomery) Motorists will encounter lane closures in both directions with temporary signals in place, Continuous Monday March 16th, 2026 6:00 AM thru Saturday November 21st, 2026 6:00 PM","update_date":"2026-03-13T14:11:32Z"},"road_event_id":"bONxpCUfYynw+XZpqRSmGoYJdx0=","beginning_cross_street":"CR 122; Auriesville Road","ending_cross_street":"CR 27; Main Street; Hamlet of Fort Hunter","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.315,42.9299]]}},{"id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pyv29ZB2BrgvPdbaZl2iNAjWGVc="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound between Exit 14 - NY 127 (White Plains) and Exit 13A/B - Mamaroneck Avenue (White Plains) D264759/30298509 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 16th, 2023 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-13T12:13:54Z"},"road_event_id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724134,41.001419]]}},{"id":"pyv29ZB2BrgvPdbaZl2iNAjWGVc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ="},{"type":"next-occurrence","id":"86xr4Yhlz4CRthtakzZt3A3eaDg="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound between Exit 14 - NY 127 (White Plains) and Exit 13A/B - Mamaroneck Avenue (White Plains) D264759/30298509 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 16th, 2023 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-13T12:13:54Z"},"road_event_id":"pyv29ZB2BrgvPdbaZl2iNAjWGVc=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724134,41.001419]]}},{"id":"86xr4Yhlz4CRthtakzZt3A3eaDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ="},{"type":"next-occurrence","id":"APx7RENElLxsfpemQoZb7Cv1IGM="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound between Exit 14 - NY 127 (White Plains) and Exit 13A/B - Mamaroneck Avenue (White Plains) D264759/30298509 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 16th, 2023 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-13T12:13:54Z"},"road_event_id":"86xr4Yhlz4CRthtakzZt3A3eaDg=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724134,41.001419]]}},{"id":"APx7RENElLxsfpemQoZb7Cv1IGM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ="},{"type":"next-occurrence","id":"98m6VoEZir1Y2eikDFE7tej1BlI="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound between Exit 14 - NY 127 (White Plains) and Exit 13A/B - Mamaroneck Avenue (White Plains) D264759/30298509 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 16th, 2023 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-13T12:13:54Z"},"road_event_id":"APx7RENElLxsfpemQoZb7Cv1IGM=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724134,41.001419]]}},{"id":"98m6VoEZir1Y2eikDFE7tej1BlI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ="},{"type":"next-occurrence","id":"WKKgoi4M7Jp5o8xE2FTEHztAlaY="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound between Exit 14 - NY 127 (White Plains) and Exit 13A/B - Mamaroneck Avenue (White Plains) D264759/30298509 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 16th, 2023 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-13T12:13:54Z"},"road_event_id":"98m6VoEZir1Y2eikDFE7tej1BlI=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724134,41.001419]]}},{"id":"WKKgoi4M7Jp5o8xE2FTEHztAlaY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ="},{"type":"next-occurrence","id":"zu7niVzIetVdMXv1ztZ9O//9X98="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound between Exit 14 - NY 127 (White Plains) and Exit 13A/B - Mamaroneck Avenue (White Plains) D264759/30298509 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 16th, 2023 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-13T12:13:54Z"},"road_event_id":"WKKgoi4M7Jp5o8xE2FTEHztAlaY=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724134,41.001419]]}},{"id":"zu7niVzIetVdMXv1ztZ9O//9X98=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Hutchinson River Parkway [Westchester]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Ixey3aNpEP0+S/QhQn66sEt/5VQ="}],"description":"Guard rail repairs on Hutchinson River Parkway [Westchester] southbound between Exit 14 - NY 127 (White Plains) and Exit 13A/B - Mamaroneck Avenue (White Plains) D264759/30298509 - This work is weather permitting, Plan travel accordingly; delays may exist, Sunday April 16th, 2023 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 02:00 PM, right lane closure","update_date":"2026-04-13T12:13:54Z"},"road_event_id":"zu7niVzIetVdMXv1ztZ9O//9X98=","beginning_cross_street":"Exit 14 - NY 127","ending_cross_street":"Exit 13A/B - Mamaroneck Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T18:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.724134,41.001419]]}},{"id":"ORC300539861","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","description":"Roadwork on NY 7 eastbound Spicer Rd (Pittstown) to Tory Hill Rd (Pittstown) Alternating Not currently Scheduled","update_date":"2026-04-22T18:30:01Z"},"road_event_id":"ORC300539861","beginning_cross_street":"Spicer Rd","ending_cross_street":"Tory Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-17T12:16:19Z","end_date":"2026-04-23T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.408166,42.849129]]}},{"id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"ZajdL4sd39SDBwNf2yurcUsyxnc="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"ZajdL4sd39SDBwNf2yurcUsyxnc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8="},{"type":"next-occurrence","id":"49NsHq9MUSmGemk2U65LsVlCFXg="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"ZajdL4sd39SDBwNf2yurcUsyxnc=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"49NsHq9MUSmGemk2U65LsVlCFXg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8="},{"type":"next-occurrence","id":"AvtyViz4jA8GeTIx2X+pZOiHfcc="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"49NsHq9MUSmGemk2U65LsVlCFXg=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"AvtyViz4jA8GeTIx2X+pZOiHfcc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8="},{"type":"next-occurrence","id":"uDKrwPizQBHaZCJEDA2DuFW8tM0="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"AvtyViz4jA8GeTIx2X+pZOiHfcc=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"uDKrwPizQBHaZCJEDA2DuFW8tM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8="},{"type":"next-occurrence","id":"uN3azz4EpCDiRdQwQ9XQCNg5kMo="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"uDKrwPizQBHaZCJEDA2DuFW8tM0=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"uN3azz4EpCDiRdQwQ9XQCNg5kMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8="},{"type":"next-occurrence","id":"JJfYjdxcf8J62u1du+B0GgbOKHw="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"uN3azz4EpCDiRdQwQ9XQCNg5kMo=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"JJfYjdxcf8J62u1du+B0GgbOKHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8="},{"type":"next-occurrence","id":"eIQbuwmLk7q+NV1QtV40S4cFlzk="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"JJfYjdxcf8J62u1du+B0GgbOKHw=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"eIQbuwmLk7q+NV1QtV40S4cFlzk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17K"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uKu7rOAgs/CdT5vWU8Khp8vdXM8="}],"description":"Roadwork on NY 17K both directions between NY 17 (Wallkill) and Stone School House Road (Wallkill) D265594/32718309 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, alternating traffic","update_date":"2026-04-21T17:06:10Z"},"road_event_id":"eIQbuwmLk7q+NV1QtV40S4cFlzk=","beginning_cross_street":"NY 17","ending_cross_street":"Stone School House Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.424374,41.552407]]}},{"id":"5IzMK8QWjc1fzRYoCq4AjKUx+1M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Bridge work on US 9 eastbound Eastbound ramp to I-787 (Albany) Detour in place , Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, 10:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-17T12:27:47Z"},"road_event_id":"5IzMK8QWjc1fzRYoCq4AjKUx+1M=","beginning_cross_street":"Eastbound ramp to I-787","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.751289,42.644343]]}},{"id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"TWNubCI/YUHhquM0Vw8jx8lsYZY="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"TWNubCI/YUHhquM0Vw8jx8lsYZY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"/gHX9iIA6JORL7ZaFTbKJlcRvYk="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"TWNubCI/YUHhquM0Vw8jx8lsYZY=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"/gHX9iIA6JORL7ZaFTbKJlcRvYk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"4UYyKVJ+Spg7Hqzbi8fgoxXVPos="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"/gHX9iIA6JORL7ZaFTbKJlcRvYk=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"4UYyKVJ+Spg7Hqzbi8fgoxXVPos=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"8N2woO27NhFOMoxvnh+P1etNgW0="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"4UYyKVJ+Spg7Hqzbi8fgoxXVPos=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"8N2woO27NhFOMoxvnh+P1etNgW0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"wE3QSmthnADntqEwKmaJ05/0P+4="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"8N2woO27NhFOMoxvnh+P1etNgW0=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"wE3QSmthnADntqEwKmaJ05/0P+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"r8HI6+dRzunIqHeFIJvJ3DoUz1w="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"wE3QSmthnADntqEwKmaJ05/0P+4=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"r8HI6+dRzunIqHeFIJvJ3DoUz1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"nUmUJNaLbHlBNLcJ34mF6kzZ4d0="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"r8HI6+dRzunIqHeFIJvJ3DoUz1w=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"nUmUJNaLbHlBNLcJ34mF6kzZ4d0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"i8mU6MEUSQR/JbzaCKcbaxfOc90="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"nUmUJNaLbHlBNLcJ34mF6kzZ4d0=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"i8mU6MEUSQR/JbzaCKcbaxfOc90=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"8aI7FmeGtW2TRSLzAO9RP7buGlw="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"i8mU6MEUSQR/JbzaCKcbaxfOc90=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"8aI7FmeGtW2TRSLzAO9RP7buGlw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="},{"type":"next-occurrence","id":"NxCx3XaE4yOS6Uw6yIZxMdqFH1w="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"8aI7FmeGtW2TRSLzAO9RP7buGlw=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"NxCx3XaE4yOS6Uw6yIZxMdqFH1w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Rhinecliff Road NY-982M"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"fTS7QwJ1AHGKkATCfuYrPIKdJaw="}],"description":"Construction on Rhinecliff Road NY-982M both directions between US-9 (Rhinebeck) and Garden Way (Rhinebeck) 2025082563457/32728509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-16T14:06:17Z"},"road_event_id":"NxCx3XaE4yOS6Uw6yIZxMdqFH1w=","beginning_cross_street":"US-9","ending_cross_street":"Garden Way","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.922492,41.928077]]}},{"id":"cpaGmgxb/mpexF0qsjpT8iOMbwM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cmkhrmVpvZf5OPVaJG0VsziUYYQ="}],"description":"Roadwork on NY 385 both directions NY 23; Rip Van Winkle Bridge Approach (Catskill) to 2nd Street; CR 28 (Athens) Various, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:40:29Z"},"road_event_id":"cpaGmgxb/mpexF0qsjpT8iOMbwM=","beginning_cross_street":"NY 23; Rip Van Winkle Bridge Approach","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861937,42.226931]]}},{"id":"cmkhrmVpvZf5OPVaJG0VsziUYYQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cpaGmgxb/mpexF0qsjpT8iOMbwM="},{"type":"next-occurrence","id":"D4ZZDnjm2MdcHvSAs7FS0YVz7Jk="}],"description":"Roadwork on NY 385 both directions NY 23; Rip Van Winkle Bridge Approach (Catskill) to 2nd Street; CR 28 (Athens) Various, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:40:29Z"},"road_event_id":"cmkhrmVpvZf5OPVaJG0VsziUYYQ=","beginning_cross_street":"NY 23; Rip Van Winkle Bridge Approach","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861937,42.226931]]}},{"id":"D4ZZDnjm2MdcHvSAs7FS0YVz7Jk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cpaGmgxb/mpexF0qsjpT8iOMbwM="}],"description":"Roadwork on NY 385 both directions NY 23; Rip Van Winkle Bridge Approach (Catskill) to 2nd Street; CR 28 (Athens) Various, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:40:29Z"},"road_event_id":"D4ZZDnjm2MdcHvSAs7FS0YVz7Jk=","beginning_cross_street":"NY 23; Rip Van Winkle Bridge Approach","ending_cross_street":"2nd Street; CR 28","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.861937,42.226931]]}},{"id":"GWMA8gJmkLpaJsNmfpINqs5/dQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Westbound near West of Main St (Roxbury Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 05:00 AM, right lane closed","update_date":"2026-04-17T12:03:21Z"},"road_event_id":"GWMA8gJmkLpaJsNmfpINqs5/dQA=","beginning_cross_street":"West of Main St","ending_cross_street":"East of NJ 183/Netcong Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.669921,40.890205]]}},{"id":"gIx26iAzG1tgIfmEACmYOPqPDac=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Westbound between East of Rock Av (North Plainfield) and West of CR 529/Washington Ave (Green Brook Twp), Friday April 24, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-20T12:03:32Z"},"road_event_id":"gIx26iAzG1tgIfmEACmYOPqPDac=","beginning_cross_street":"East of Rock Av","ending_cross_street":"West of CR 529/Washington Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.462867,40.610748]]}},{"id":"ESp9FVVy2cwDgIy7//0PHWGu/xs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 18"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 18 Northbound between North of NJ 172/George St (New Brunswick) and South of Bishop Pl (New Brunswick), Friday April 24, 2026 07:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-20T12:03:35Z"},"road_event_id":"ESp9FVVy2cwDgIy7//0PHWGu/xs=","beginning_cross_street":"North of NJ 172/George St","ending_cross_street":"South of Bishop Pl","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.435569,40.488182]]}},{"id":"1YF6RgfA3V/+jgN7608QoEGt54o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"0HAVBckWZZvf8de9Gs0W2J4TT0M="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"1YF6RgfA3V/+jgN7608QoEGt54o=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:30:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"0HAVBckWZZvf8de9Gs0W2J4TT0M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YF6RgfA3V/+jgN7608QoEGt54o="},{"type":"next-occurrence","id":"e5Ipq+BCk2SB/qR6c0um3AMS6RE="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"0HAVBckWZZvf8de9Gs0W2J4TT0M=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:30:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"e5Ipq+BCk2SB/qR6c0um3AMS6RE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YF6RgfA3V/+jgN7608QoEGt54o="},{"type":"next-occurrence","id":"eofuDG/kl3UNb7rQNM5noF0xs5Y="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"e5Ipq+BCk2SB/qR6c0um3AMS6RE=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:30:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"eofuDG/kl3UNb7rQNM5noF0xs5Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YF6RgfA3V/+jgN7608QoEGt54o="},{"type":"next-occurrence","id":"d4EaCgxsbssXcpktAv4VK1B6L+c="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"eofuDG/kl3UNb7rQNM5noF0xs5Y=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"d4EaCgxsbssXcpktAv4VK1B6L+c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YF6RgfA3V/+jgN7608QoEGt54o="},{"type":"next-occurrence","id":"n/QHEpZ0AMVCRtvGV7sQ/Ho8Oz8="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"d4EaCgxsbssXcpktAv4VK1B6L+c=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"n/QHEpZ0AMVCRtvGV7sQ/Ho8Oz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YF6RgfA3V/+jgN7608QoEGt54o="},{"type":"next-occurrence","id":"MEbhUhKd8wjjGoUBTliA1IjB7C8="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"n/QHEpZ0AMVCRtvGV7sQ/Ho8Oz8=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"MEbhUhKd8wjjGoUBTliA1IjB7C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YF6RgfA3V/+jgN7608QoEGt54o="},{"type":"next-occurrence","id":"DJb3FtyRUL/PcOqnNo2aZCBR+aw="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"MEbhUhKd8wjjGoUBTliA1IjB7C8=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"DJb3FtyRUL/PcOqnNo2aZCBR+aw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"1YF6RgfA3V/+jgN7608QoEGt54o="}],"description":"Road rehabilitation on NY 17 [Orange] eastbound between Exit 121E - I 84 (Wallkill) and Exit 122A - Fletcher Street (Goshen) D265297/32463209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:30 AM thru 03:30 PM, left lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, left lane closure","update_date":"2026-04-20T16:34:34Z"},"road_event_id":"DJb3FtyRUL/PcOqnNo2aZCBR+aw=","beginning_cross_street":"","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.368544,41.446042]]}},{"id":"HPPaYHNXs2JkUtkGBka6ptc8Pyg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-676"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-676 Northbound near North of Exit 4 - Atlantic Ave (Camden), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 03:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 03:00 AM)","update_date":"2026-04-17T13:36:17Z"},"road_event_id":"HPPaYHNXs2JkUtkGBka6ptc8Pyg=","beginning_cross_street":"North of Exit 4 - Atlantic Ave","ending_cross_street":"North of Exit 4 - Atlantic Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.112869,39.931434]]}},{"id":"TzCSNLULAtl9Vx981ZjngwMPtas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"hMa1uVFfX5rZd8wjjBbTO4NagSo="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"TzCSNLULAtl9Vx981ZjngwMPtas=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T17:00:00Z","end_date":"2026-04-24T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"hMa1uVFfX5rZd8wjjBbTO4NagSo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TzCSNLULAtl9Vx981ZjngwMPtas="},{"type":"next-occurrence","id":"2f8wc0GCQUsHKAl0ayw5swRpH4A="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"hMa1uVFfX5rZd8wjjBbTO4NagSo=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T17:00:00Z","end_date":"2026-04-25T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"2f8wc0GCQUsHKAl0ayw5swRpH4A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TzCSNLULAtl9Vx981ZjngwMPtas="},{"type":"next-occurrence","id":"dPEI0A7Wd+FltOlZO0W8eDEMhCE="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"2f8wc0GCQUsHKAl0ayw5swRpH4A=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T17:00:00Z","end_date":"2026-04-26T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"dPEI0A7Wd+FltOlZO0W8eDEMhCE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TzCSNLULAtl9Vx981ZjngwMPtas="},{"type":"next-occurrence","id":"kMZ0Zt3SlxeYa9KzuazSdxTErw0="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"dPEI0A7Wd+FltOlZO0W8eDEMhCE=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T17:00:00Z","end_date":"2026-04-27T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"kMZ0Zt3SlxeYa9KzuazSdxTErw0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TzCSNLULAtl9Vx981ZjngwMPtas="},{"type":"next-occurrence","id":"tLobqEHgbtqfmHNKnmgiQnxObpc="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"kMZ0Zt3SlxeYa9KzuazSdxTErw0=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T17:00:00Z","end_date":"2026-04-28T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"tLobqEHgbtqfmHNKnmgiQnxObpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TzCSNLULAtl9Vx981ZjngwMPtas="},{"type":"next-occurrence","id":"VAk3/jc6UG3PlKh5ICPpGAqyE28="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"tLobqEHgbtqfmHNKnmgiQnxObpc=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T17:00:00Z","end_date":"2026-04-29T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"VAk3/jc6UG3PlKh5ICPpGAqyE28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TzCSNLULAtl9Vx981ZjngwMPtas="},{"type":"next-occurrence","id":"wMLBiGBTtT8K/nFPqSROjdQBly0="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"VAk3/jc6UG3PlKh5ICPpGAqyE28=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T17:00:00Z","end_date":"2026-04-30T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"wMLBiGBTtT8K/nFPqSROjdQBly0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"TzCSNLULAtl9Vx981ZjngwMPtas="}],"description":"Roadwork on US 9 northbound between Cherry Choke Rd (Malta) and Driscoll Rd (Malta) various lane closures, Thursday April 23rd, 2026 thru Thursday April 30th, 2026, Sunday thru Saturday, 06:30 AM thru 05:00 PM All lanes open","update_date":"2026-04-20T13:35:39Z"},"road_event_id":"wMLBiGBTtT8K/nFPqSROjdQBly0=","beginning_cross_street":"Cherry Choke Rd","ending_cross_street":"Driscoll Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T17:00:00Z","end_date":"2026-05-01T03:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.79249,43.026893]]}},{"id":"SGuifxYrPDxK1NcKBQsGXYMU5Vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[],"description":"Traffic shift on I-95 northbound between Exit 89 - Mystic Street/Allyn Street (Mystic) and Exit 90 - CT 27 (Stonington) Northbound Lane Shift Traffic will be guided to the right side while construction work is being performed along the left sides of Bridge Nos. 01788 over Cow Hill Road, 01791 over Route 27, and 01794 over Jerry Browne Road , Continuous Sunday April 28th, 2024 12:00 AM thru Friday May 1st, 2026 11:59 PM All lanes open","update_date":"2024-04-24T20:05:25Z"},"road_event_id":"SGuifxYrPDxK1NcKBQsGXYMU5Vw=","beginning_cross_street":"Exit 89 - Mystic Street/Allyn Street","ending_cross_street":"Exit 90 - CT 27","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-02T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-71.978415,41.371107]]}},{"id":"fDCpfX5r437uH53RuzagWfkzu4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 9 Northbound at West Farm Rd (Howell Twp) Wednesday April 22, 2026 11:00 PM thru Thursday April 23, 2026 05:00 AM, ramp","update_date":"2026-04-17T13:36:23Z"},"road_event_id":"fDCpfX5r437uH53RuzagWfkzu4U=","beginning_cross_street":"West Farm Rd","ending_cross_street":"West Farm Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.249809,40.186172]]}},{"id":"j0MN3ZIAOxaQ/kCf8GU/MS5OV6U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound between CR 555/Stagecoach Rd (Washington Twp) and North of CR 655/Fries Mill Rd (Washington Twp), Thursday April 23, 2026 07:00 AM thru 04:00 PM, right shoulder closed","update_date":"2026-04-17T13:36:22Z"},"road_event_id":"j0MN3ZIAOxaQ/kCf8GU/MS5OV6U=","beginning_cross_street":"CR 555/Stagecoach Rd","ending_cross_street":"North of CR 655/Fries Mill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.032798,39.729408]]}},{"id":"AgxVGOFye9P40obK4J/QfRU05oU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 42"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 42 Northbound near North of CR 639/Ganttown Rd (Washington Twp), Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right lane closed","update_date":"2026-04-17T13:36:19Z"},"road_event_id":"AgxVGOFye9P40obK4J/QfRU05oU=","beginning_cross_street":"North of CR 639/Ganttown Rd","ending_cross_street":"North of CR 651/Greentree Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T20:00:00Z","end_date":"2026-04-26T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.046707,39.75518]]}},{"id":"mh5svLmtWEQlo8HfGAD+W8sT7Co=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VQsEve+N/9MWm+PGhhIgYG45wpw="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"mh5svLmtWEQlo8HfGAD+W8sT7Co=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"VQsEve+N/9MWm+PGhhIgYG45wpw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"vQUhdcFb/HLZSiBTFsORGBRCUtI="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"VQsEve+N/9MWm+PGhhIgYG45wpw=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T04:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"vQUhdcFb/HLZSiBTFsORGBRCUtI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"w4Sf1Fl9tZk2Yf5Zgbz6FxkqGrQ="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"vQUhdcFb/HLZSiBTFsORGBRCUtI=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"w4Sf1Fl9tZk2Yf5Zgbz6FxkqGrQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"16e2G3L01A64QtVDAGhU+nOnzxM="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"w4Sf1Fl9tZk2Yf5Zgbz6FxkqGrQ=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T04:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"16e2G3L01A64QtVDAGhU+nOnzxM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"lkQaG15vlKWY0pPzBdCkfwjgHPY="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"16e2G3L01A64QtVDAGhU+nOnzxM=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T04:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"lkQaG15vlKWY0pPzBdCkfwjgHPY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"DUR44hBngE+1OX7fh/9l1h4Jsxg="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"lkQaG15vlKWY0pPzBdCkfwjgHPY=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T04:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"DUR44hBngE+1OX7fh/9l1h4Jsxg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"jVdmigcdBW7qepPeCTNJpzpdyNM="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"DUR44hBngE+1OX7fh/9l1h4Jsxg=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T04:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"jVdmigcdBW7qepPeCTNJpzpdyNM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"6B1B5VsTXubZesdxiNRjWcwvvjQ="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"jVdmigcdBW7qepPeCTNJpzpdyNM=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T04:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"6B1B5VsTXubZesdxiNRjWcwvvjQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"QlxalH9f9PHHWlnRxVuzE30nEHU="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"6B1B5VsTXubZesdxiNRjWcwvvjQ=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T04:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"QlxalH9f9PHHWlnRxVuzE30nEHU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="},{"type":"next-occurrence","id":"7yGRqdASIWmmhI4KQZEqeyA5J1g="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"QlxalH9f9PHHWlnRxVuzE30nEHU=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T04:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"7yGRqdASIWmmhI4KQZEqeyA5J1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 34"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mh5svLmtWEQlo8HfGAD+W8sT7Co="}],"description":"Culvert repairs on NY 34 both directions between Decker Rd (Newfield) and Elmira Road; NY 13 (Newfield) ; Alternating one-way traffic with temporary signals, Monday April 20th, 2026 thru Friday May 8th, 2026, Monday thru Friday, 12:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T15:30:49Z"},"road_event_id":"7yGRqdASIWmmhI4KQZEqeyA5J1g=","beginning_cross_street":"Decker Rd ","ending_cross_street":"Elmira Road; NY 13","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T04:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.553811,42.388026]]}},{"id":"8HI76IuYP1pkz78lq75t7CGTMDg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"R49XKs3pNtBQb6M5KS1eC+P2qgo="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"8HI76IuYP1pkz78lq75t7CGTMDg=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"R49XKs3pNtBQb6M5KS1eC+P2qgo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8HI76IuYP1pkz78lq75t7CGTMDg="},{"type":"next-occurrence","id":"u/FBEjd0axD3eccgtLEA3L240tY="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"R49XKs3pNtBQb6M5KS1eC+P2qgo=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"u/FBEjd0axD3eccgtLEA3L240tY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8HI76IuYP1pkz78lq75t7CGTMDg="},{"type":"next-occurrence","id":"7ySjSfXnqYRgnglPpNtNCELcoMw="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"u/FBEjd0axD3eccgtLEA3L240tY=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"7ySjSfXnqYRgnglPpNtNCELcoMw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8HI76IuYP1pkz78lq75t7CGTMDg="},{"type":"next-occurrence","id":"kGsBpXgw8uyJ3ZzFqeFFz+AC9C8="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"7ySjSfXnqYRgnglPpNtNCELcoMw=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"kGsBpXgw8uyJ3ZzFqeFFz+AC9C8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8HI76IuYP1pkz78lq75t7CGTMDg="},{"type":"next-occurrence","id":"SpsNyI9Qa9DzTTqi2X5ldKWH9PQ="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"kGsBpXgw8uyJ3ZzFqeFFz+AC9C8=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"SpsNyI9Qa9DzTTqi2X5ldKWH9PQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8HI76IuYP1pkz78lq75t7CGTMDg="},{"type":"next-occurrence","id":"4COV0XV6qGlZ4cKdR/4ha+7g9Lg="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"SpsNyI9Qa9DzTTqi2X5ldKWH9PQ=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"4COV0XV6qGlZ4cKdR/4ha+7g9Lg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8HI76IuYP1pkz78lq75t7CGTMDg="},{"type":"next-occurrence","id":"PrLgMQIBXuQOJcv7XrYLB7+mzNw="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"4COV0XV6qGlZ4cKdR/4ha+7g9Lg=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"PrLgMQIBXuQOJcv7XrYLB7+mzNw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 284"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8HI76IuYP1pkz78lq75t7CGTMDg="}],"description":"Installation of traffic management systems on NY 284 both directions between Langlitz Road (Wawayanda) and Welling Road (Wawayanda) D265291/327 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:00 AM thru 04:00 PM, alternating traffic","update_date":"2026-04-14T15:29:34Z"},"road_event_id":"PrLgMQIBXuQOJcv7XrYLB7+mzNw=","beginning_cross_street":"Langlitz Road","ending_cross_street":"Welling Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.552468,41.328626]]}},{"id":"gNUwvWGZCro01pX24OoHVBtxZok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US-6"],"direction":"unknown","related_road_events":[],"description":"Intersection improvements on US-6 both directions between AGNEY AVE (Plymouth) and N MAIN ST (Plymouth) Motorists can expect alternating one-way traffic will occur during off-peak hours on Route 6. Police Officers and traffic control signing patterns will guide motorists through the work zone during construction., Continuous Monday October 13th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM All lanes open","update_date":"2025-10-21T15:38:30Z"},"road_event_id":"gNUwvWGZCro01pX24OoHVBtxZok=","beginning_cross_street":"AGNEY AVE","ending_cross_street":"N MAIN ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.009439,41.678378]]}},{"id":"GCnprMoqARcvHxDW5SKfKjBgU3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DTWzxRGZMNJ1QYKrCUuIUFxYHDE="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"GCnprMoqARcvHxDW5SKfKjBgU3M=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"DTWzxRGZMNJ1QYKrCUuIUFxYHDE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"SOepFzqNMTcKQ6YVCTWyvhWmb8Q="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"DTWzxRGZMNJ1QYKrCUuIUFxYHDE=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"SOepFzqNMTcKQ6YVCTWyvhWmb8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"VNj1IFBqKSC/v6NjegUd2A9nRX0="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"SOepFzqNMTcKQ6YVCTWyvhWmb8Q=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"VNj1IFBqKSC/v6NjegUd2A9nRX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"b/N0oV5qdCyHakDOoEtZ2vNjVCY="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"VNj1IFBqKSC/v6NjegUd2A9nRX0=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"b/N0oV5qdCyHakDOoEtZ2vNjVCY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"AIEpS9iCCTxljDzyeeroCFNS/g0="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"b/N0oV5qdCyHakDOoEtZ2vNjVCY=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"AIEpS9iCCTxljDzyeeroCFNS/g0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"vqopygu/zfg2KeTbPKiIbZzlJPs="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"AIEpS9iCCTxljDzyeeroCFNS/g0=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"vqopygu/zfg2KeTbPKiIbZzlJPs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"z3FxGvTZb4IJFMkXn8cI9zwgfl4="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"vqopygu/zfg2KeTbPKiIbZzlJPs=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"z3FxGvTZb4IJFMkXn8cI9zwgfl4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"pEtnmbcdr1KE19yPxtZz+3cUj5w="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"z3FxGvTZb4IJFMkXn8cI9zwgfl4=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"pEtnmbcdr1KE19yPxtZz+3cUj5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"cPyhBj7od9RF69aFJIL8VvXIx9U="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"pEtnmbcdr1KE19yPxtZz+3cUj5w=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"cPyhBj7od9RF69aFJIL8VvXIx9U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"MRL1enX6i1miV8f0CA4LRh86Z+4="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"cPyhBj7od9RF69aFJIL8VvXIx9U=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"MRL1enX6i1miV8f0CA4LRh86Z+4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"YEtusiQRqzLbEBKVcYnPUQF0vRU="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"MRL1enX6i1miV8f0CA4LRh86Z+4=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"YEtusiQRqzLbEBKVcYnPUQF0vRU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"o7eiLGvj02l8aEZPuJ9tRVDe3HI="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"YEtusiQRqzLbEBKVcYnPUQF0vRU=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"o7eiLGvj02l8aEZPuJ9tRVDe3HI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="},{"type":"next-occurrence","id":"i3ZIk2r17KdOXKX5y1RaGLmeLsg="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"o7eiLGvj02l8aEZPuJ9tRVDe3HI=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"i3ZIk2r17KdOXKX5y1RaGLmeLsg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILLIAMSBURG ST E"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GCnprMoqARcvHxDW5SKfKjBgU3M="}],"description":"Construction on WILLIAMSBURG ST E northbound between BEDFORD AVE (New York) and KEAP ST (New York) for use of boom, knuckle boom and concrete pump to work on new building., Friday February 6th, 2026 thru Tuesday May 5th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-02-03T19:27:11Z"},"road_event_id":"i3ZIk2r17KdOXKX5y1RaGLmeLsg=","beginning_cross_street":"BEDFORD AVE","ending_cross_street":"KEAP ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.95983,40.703104]]}},{"id":"ORC300517613","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["HICKS ST"],"direction":"unknown","description":"Construction on HICKS ST northbound between REMSEN ST (New York) and MONTAGUE ST (New York) for use of knuckle boom to remove sidewalk shed and materials. Not currently Scheduled","update_date":"2026-02-28T21:00:02Z"},"road_event_id":"ORC300517613","beginning_cross_street":"REMSEN ST","ending_cross_street":"MONTAGUE ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-02-03T19:17:48Z","end_date":"2026-03-01T04:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-73.996163,40.694603]]}},{"id":"o+hiDq5vjgapx0kSFcEILex0QQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 7"],"direction":"unknown","related_road_events":[],"description":"Guard rail repairs on NY 7 westbound Vermont State Line (Hoosick) to eastbound BENNINGTON BYP at RT-7 (Hoosick) Alternating, Thursday April 23rd, 2026, 07:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-17T12:52:52Z"},"road_event_id":"o+hiDq5vjgapx0kSFcEILex0QQ4=","beginning_cross_street":"Vermont State Line","ending_cross_street":"RT-7","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.30095,42.878175]]}},{"id":"tutbZD3Dwa4vve8/SqBfFCrnWEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 at South of CR 604/Waterloo Rd (Stanhope) Thursday April 23, 2026 09:00 AM thru 03:00 PM, ramp, right partial lane","update_date":"2026-04-20T12:42:21Z"},"road_event_id":"tutbZD3Dwa4vve8/SqBfFCrnWEs=","beginning_cross_street":"South of CR 604/Waterloo Rd","ending_cross_street":"South of CR 604/Waterloo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71849,40.919456]]}},{"id":"CONRPEKp0vifhvQaT1W/T4DRKA8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 604/Waterloo Rd (Stanhope), Wednesday April 22, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-20T12:42:20Z"},"road_event_id":"CONRPEKp0vifhvQaT1W/T4DRKA8=","beginning_cross_street":"South of CR 604/Waterloo Rd","ending_cross_street":"South of CR 604/Waterloo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71849,40.919456]]}},{"id":"UQa6cJ1lXRw2RlmDtIn9ptDbGe8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cUiUptJ/20WU8xrxuSnwbFOkrUs="}],"description":"Guard rail repairs on NY 385 both directions CR 61 (Coxsackie) to US 9W; NY 81 (Coxsackie) Various, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:44:48Z"},"road_event_id":"UQa6cJ1lXRw2RlmDtIn9ptDbGe8=","beginning_cross_street":"CR 61","ending_cross_street":"US 9W; NY 81","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799399,42.347134]]}},{"id":"cUiUptJ/20WU8xrxuSnwbFOkrUs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQa6cJ1lXRw2RlmDtIn9ptDbGe8="},{"type":"next-occurrence","id":"bJTDmptgc/pEPkwCW+B9W4JwN7U="}],"description":"Guard rail repairs on NY 385 both directions CR 61 (Coxsackie) to US 9W; NY 81 (Coxsackie) Various, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:44:48Z"},"road_event_id":"cUiUptJ/20WU8xrxuSnwbFOkrUs=","beginning_cross_street":"CR 61","ending_cross_street":"US 9W; NY 81","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799399,42.347134]]}},{"id":"bJTDmptgc/pEPkwCW+B9W4JwN7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UQa6cJ1lXRw2RlmDtIn9ptDbGe8="}],"description":"Guard rail repairs on NY 385 both directions CR 61 (Coxsackie) to US 9W; NY 81 (Coxsackie) Various, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 07:00 PM All lanes open","update_date":"2026-04-17T12:44:48Z"},"road_event_id":"bJTDmptgc/pEPkwCW+B9W4JwN7U=","beginning_cross_street":"CR 61","ending_cross_street":"US 9W; NY 81","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.799399,42.347134]]}},{"id":"to8vghgojjUtBxSDFMvnp1uTO4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of Ocean Av (Point Pleasant Beach), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 12:00 AM, right shoulder closed","update_date":"2026-04-20T12:42:24Z"},"road_event_id":"to8vghgojjUtBxSDFMvnp1uTO4E=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"Bridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"WTuzphuA4pAh7A+gNv3CD0O1Svo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"P2SJtcLXG3wVL/z3thtURFav6/4="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"WTuzphuA4pAh7A+gNv3CD0O1Svo=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"P2SJtcLXG3wVL/z3thtURFav6/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WTuzphuA4pAh7A+gNv3CD0O1Svo="},{"type":"next-occurrence","id":"j+VZktSnm6PFWwQo8iHRL0HYUJk="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"P2SJtcLXG3wVL/z3thtURFav6/4=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"j+VZktSnm6PFWwQo8iHRL0HYUJk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WTuzphuA4pAh7A+gNv3CD0O1Svo="},{"type":"next-occurrence","id":"Z3B9SLbF7xAPAmZzyKsnRjIdo94="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"j+VZktSnm6PFWwQo8iHRL0HYUJk=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"Z3B9SLbF7xAPAmZzyKsnRjIdo94=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WTuzphuA4pAh7A+gNv3CD0O1Svo="},{"type":"next-occurrence","id":"jgQkyqZDdhh3FSmkq9Dhj2Q8G3w="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"Z3B9SLbF7xAPAmZzyKsnRjIdo94=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T10:00:00Z","end_date":"2026-04-27T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"jgQkyqZDdhh3FSmkq9Dhj2Q8G3w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WTuzphuA4pAh7A+gNv3CD0O1Svo="},{"type":"next-occurrence","id":"bW8tc/IquUhYJq4GuRa8nCEt3Qw="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"jgQkyqZDdhh3FSmkq9Dhj2Q8G3w=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T10:00:00Z","end_date":"2026-04-28T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"bW8tc/IquUhYJq4GuRa8nCEt3Qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WTuzphuA4pAh7A+gNv3CD0O1Svo="},{"type":"next-occurrence","id":"lfJxDmDOFn5+ZTFjUu+gcEWi1Sg="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"bW8tc/IquUhYJq4GuRa8nCEt3Qw=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T10:00:00Z","end_date":"2026-04-29T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"lfJxDmDOFn5+ZTFjUu+gcEWi1Sg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WTuzphuA4pAh7A+gNv3CD0O1Svo="},{"type":"next-occurrence","id":"cM9C6qFBGwaQ5v5FIaoh3O0C1so="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"lfJxDmDOFn5+ZTFjUu+gcEWi1Sg=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T10:00:00Z","end_date":"2026-04-30T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"cM9C6qFBGwaQ5v5FIaoh3O0C1so=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WTuzphuA4pAh7A+gNv3CD0O1Svo="}],"description":"Utility work on NY 5 both directions between Herkimer-Montgomery County Line - Center of Bridge (St Johnsville) and Amway Drive (St Johnsville) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 6th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T11:11:50Z"},"road_event_id":"cM9C6qFBGwaQ5v5FIaoh3O0C1so=","beginning_cross_street":"Herkimer-Montgomery County Line - Center of Bridge","ending_cross_street":"Amway Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T10:00:00Z","end_date":"2026-05-01T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.702035,43.001065]]}},{"id":"peUcxGBw4BMMFsHdyMcSOPl8zVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Southbound near South of Ocean Av (Point Pleasant Beach), Friday April 24, 2026 12:00 AM thru 06:00 AM, right shoulder closed","update_date":"2026-04-20T12:42:23Z"},"road_event_id":"peUcxGBw4BMMFsHdyMcSOPl8zVI=","beginning_cross_street":"South of Ocean Av","ending_cross_street":"Bridge Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.042282,40.076129]]}},{"id":"py4cyJKbYIj5b2ubvU3j6jSWgiE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"1uQvVToGxOuBMfqIM2t0xHSTIoU="}],"description":"Intersection improvements on NY 15 both directions at Doncaster Rd (Brighton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T13:11:28Z"},"road_event_id":"py4cyJKbYIj5b2ubvU3j6jSWgiE=","beginning_cross_street":"Doncaster Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.625375,43.108947]]}},{"id":"1uQvVToGxOuBMfqIM2t0xHSTIoU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"py4cyJKbYIj5b2ubvU3j6jSWgiE="},{"type":"next-occurrence","id":"BBo3HQRAyecM0Hv8Qp8co/iWd2U="}],"description":"Intersection improvements on NY 15 both directions at Doncaster Rd (Brighton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T13:11:28Z"},"road_event_id":"1uQvVToGxOuBMfqIM2t0xHSTIoU=","beginning_cross_street":"Doncaster Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.625375,43.108947]]}},{"id":"BBo3HQRAyecM0Hv8Qp8co/iWd2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 15"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"py4cyJKbYIj5b2ubvU3j6jSWgiE="}],"description":"Intersection improvements on NY 15 both directions at Doncaster Rd (Brighton), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T13:11:28Z"},"road_event_id":"BBo3HQRAyecM0Hv8Qp8co/iWd2U=","beginning_cross_street":"Doncaster Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.625375,43.108947]]}},{"id":"GW8ZQ42RLNx436OffwPxTQSgd2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 264"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"KTvMzvMb8O8B3lK+wiu76ZbyPus="}],"description":"Installation of traffic management systems on NY 264 both directions at Main Street; CR 57 (Schroeppel) ; Alternating one-way traffic with flaggers, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T12:55:43Z"},"road_event_id":"GW8ZQ42RLNx436OffwPxTQSgd2Q=","beginning_cross_street":"Main Street; CR 57","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.300115,43.231095]]}},{"id":"KTvMzvMb8O8B3lK+wiu76ZbyPus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 264"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW8ZQ42RLNx436OffwPxTQSgd2Q="},{"type":"next-occurrence","id":"oHpwJOFgBre3uSdMXZAX35CoVXI="}],"description":"Installation of traffic management systems on NY 264 both directions at Main Street; CR 57 (Schroeppel) ; Alternating one-way traffic with flaggers, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T12:55:43Z"},"road_event_id":"KTvMzvMb8O8B3lK+wiu76ZbyPus=","beginning_cross_street":"Main Street; CR 57","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.300115,43.231095]]}},{"id":"oHpwJOFgBre3uSdMXZAX35CoVXI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 264"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"GW8ZQ42RLNx436OffwPxTQSgd2Q="}],"description":"Installation of traffic management systems on NY 264 both directions at Main Street; CR 57 (Schroeppel) ; Alternating one-way traffic with flaggers, Tuesday April 21st, 2026 thru Friday April 24th, 2026, Tuesday/Wednesday/Thursday/Friday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-20T12:55:43Z"},"road_event_id":"oHpwJOFgBre3uSdMXZAX35CoVXI=","beginning_cross_street":"Main Street; CR 57","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.300115,43.231095]]}},{"id":"DRBRU0KnfwwmdsACTaqD3fVrm2U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 257"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"EvCI2lX/rKS8PcJ6N7HvjoKHBy8="}],"description":"Tree trimming on NY 257 both directions between East Genesee Street; NY 5 (Manlius) and Manlius Center Road (Manlius) ; Alternating one-way traffic with flaggers, Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T12:42:36Z"},"road_event_id":"DRBRU0KnfwwmdsACTaqD3fVrm2U=","beginning_cross_street":"East Genesee Street; NY 5","ending_cross_street":"Manlius Center Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.004562,43.030111]]}},{"id":"EvCI2lX/rKS8PcJ6N7HvjoKHBy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 257"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DRBRU0KnfwwmdsACTaqD3fVrm2U="}],"description":"Tree trimming on NY 257 both directions between East Genesee Street; NY 5 (Manlius) and Manlius Center Road (Manlius) ; Alternating one-way traffic with flaggers, Tuesday April 21st, 2026 thru Thursday April 23rd, 2026, Tuesday/Wednesday/Thursday, 08:00 AM thru 04:00 PM All lanes open","update_date":"2026-04-20T12:42:36Z"},"road_event_id":"EvCI2lX/rKS8PcJ6N7HvjoKHBy8=","beginning_cross_street":"East Genesee Street; NY 5","ending_cross_street":"Manlius Center Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.004562,43.030111]]}},{"id":"JMaw1P6EJhWIX2b3bq7wW1gssXY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"h0MvL71CUNo8mvQ0+GkET60PTDs="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"JMaw1P6EJhWIX2b3bq7wW1gssXY=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"h0MvL71CUNo8mvQ0+GkET60PTDs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"/7NMSy1aj7cQh7NUvaUDj34UiaU="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"h0MvL71CUNo8mvQ0+GkET60PTDs=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"/7NMSy1aj7cQh7NUvaUDj34UiaU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"4Amp8f9yDDPEkDs8N/9iMe9wnj8="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"/7NMSy1aj7cQh7NUvaUDj34UiaU=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"4Amp8f9yDDPEkDs8N/9iMe9wnj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"e2aznI62gPnAHrihM7xDZ5FA7dk="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"4Amp8f9yDDPEkDs8N/9iMe9wnj8=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"e2aznI62gPnAHrihM7xDZ5FA7dk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"9qHbS4pDgZWk1KBortBSc5MlTsw="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"e2aznI62gPnAHrihM7xDZ5FA7dk=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"9qHbS4pDgZWk1KBortBSc5MlTsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"se+JO2kxKWG97ibEWd4MsgaX588="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"9qHbS4pDgZWk1KBortBSc5MlTsw=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"se+JO2kxKWG97ibEWd4MsgaX588=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"xvfZ2pPaMBt9oRigEDvF2iqaYRI="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"se+JO2kxKWG97ibEWd4MsgaX588=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"xvfZ2pPaMBt9oRigEDvF2iqaYRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"8px4yJwTzOcXKsYyC/OOEvJBD60="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"xvfZ2pPaMBt9oRigEDvF2iqaYRI=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"8px4yJwTzOcXKsYyC/OOEvJBD60=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"t4IO40BmxjjK6zHswrTp9msNpVI="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"8px4yJwTzOcXKsYyC/OOEvJBD60=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"t4IO40BmxjjK6zHswrTp9msNpVI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"9EdMHnUHpm1zEmDhtqq20vdgHwg="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"t4IO40BmxjjK6zHswrTp9msNpVI=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T22:00:00Z","end_date":"2026-05-03T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"9EdMHnUHpm1zEmDhtqq20vdgHwg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"QjcF3WJY9nHV/3YY1zjLrgR3D0A="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"9EdMHnUHpm1zEmDhtqq20vdgHwg=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T22:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"QjcF3WJY9nHV/3YY1zjLrgR3D0A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="},{"type":"next-occurrence","id":"EvstrRXYAvALpzITDl6uW2O6qyM="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"QjcF3WJY9nHV/3YY1zjLrgR3D0A=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T22:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"EvstrRXYAvALpzITDl6uW2O6qyM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["PADDOCK AVE"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"JMaw1P6EJhWIX2b3bq7wW1gssXY="}],"description":"Bridge replacement on PADDOCK AVE both directions between BARR RD (Meriden) and OVERLOOK RD (Meriden) There will be alternating one-way traffic on Paddock Avenue over Route 15, Continuous Sunday September 8th, 2024 06:00 PM thru Monday January 4th, 2027 11:59 PM All lanes open, Sunday September 8th, 2024 thru Monday January 4th, 2027, Monday thru Friday, 06:00 PM thru 06:00 AM All lanes closed, Sunday September 8th, 2024 thru Monday January 4th, 2027, Friday/Saturday, 06:00 PM thru 10:00 AM All lanes closed","update_date":"2024-09-06T20:08:13Z"},"road_event_id":"EvstrRXYAvALpzITDl6uW2O6qyM=","beginning_cross_street":"BARR RD","ending_cross_street":"OVERLOOK RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T22:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.776203,41.515408]]}},{"id":"KnD0IVwBi/WxZGcg+bRnJ2KukcI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 near South of CR 604/Waterloo Rd (Stanhope), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-20T12:42:26Z"},"road_event_id":"KnD0IVwBi/WxZGcg+bRnJ2KukcI=","beginning_cross_street":"South of CR 604/Waterloo Rd","ending_cross_street":"South of CR 604/Waterloo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71849,40.919456]]}},{"id":"5Qmt6fo3PasVmDku+VBgR9x5PYo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 206"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 206 at South of CR 604/Waterloo Rd (Stanhope) Wednesday April 22, 2026 09:00 AM thru 03:00 PM, ramp, right partial lane","update_date":"2026-04-20T12:42:25Z"},"road_event_id":"5Qmt6fo3PasVmDku+VBgR9x5PYo=","beginning_cross_street":"South of CR 604/Waterloo Rd","ending_cross_street":"South of CR 604/Waterloo Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.71849,40.919456]]}},{"id":"HCLrXz8uTWJ4bwQOpdiJfYE6meo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 253"],"direction":"unknown","related_road_events":[],"description":"Intersection improvements on NY 253 both directions at Erie Station Road (Henrietta), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM right shoulder closed","update_date":"2026-04-17T16:26:40Z"},"road_event_id":"HCLrXz8uTWJ4bwQOpdiJfYE6meo=","beginning_cross_street":"Erie Station Road","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.696961,43.040018]]}},{"id":"6rHj9C3EpB7lHUOF9eaK/m5rL38=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Monday April 27, 2026 08:00 PM thru Tuesday April 28, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-22T15:39:30Z"},"road_event_id":"6rHj9C3EpB7lHUOF9eaK/m5rL38=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"l02FEp20eGxAXsk9JYzR+LZTHH0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Wednesday April 29, 2026 08:00 PM thru Thursday April 30, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-22T15:39:32Z"},"road_event_id":"l02FEp20eGxAXsk9JYzR+LZTHH0=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"gKFIW+OSiBw+rL0NtQctDP9HO8A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"zYQVIrWwhooR8HUC83QQVsgO+Uw="}],"description":"Construction on I-81 northbound between Exit 5A; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B- Syracuse Airport/Taft Rd (Salina), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:52:49Z"},"road_event_id":"gKFIW+OSiBw+rL0NtQctDP9HO8A=","beginning_cross_street":"Exit 5A; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B- Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170519,43.073889]]}},{"id":"zYQVIrWwhooR8HUC83QQVsgO+Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gKFIW+OSiBw+rL0NtQctDP9HO8A="},{"type":"next-occurrence","id":"oExauS7qXAL7wl1ETXNLcjATsr0="}],"description":"Construction on I-81 northbound between Exit 5A; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B- Syracuse Airport/Taft Rd (Salina), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:52:49Z"},"road_event_id":"zYQVIrWwhooR8HUC83QQVsgO+Uw=","beginning_cross_street":"Exit 5A; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B- Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170519,43.073889]]}},{"id":"oExauS7qXAL7wl1ETXNLcjATsr0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-81"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"gKFIW+OSiBw+rL0NtQctDP9HO8A="}],"description":"Construction on I-81 northbound between Exit 5A; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West (Syracuse) and Exit 9 A/B- Syracuse Airport/Taft Rd (Salina), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM 1 Left lane of 3 lanes closed","update_date":"2026-04-17T16:52:49Z"},"road_event_id":"oExauS7qXAL7wl1ETXNLcjATsr0=","beginning_cross_street":"Exit 5A; Hiawatha Boulevard; Carousel Center Drive; Bear Street; NY 298 to I-690 West","ending_cross_street":"Exit 9 A/B- Syracuse Airport/Taft Rd ","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.170519,43.073889]]}},{"id":"j7EkkFESpWveuwmjWp1Yr7Sa8WE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound near North of I-295 (Lawrence Twp), Tuesday April 28, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T15:39:28Z"},"road_event_id":"j7EkkFESpWveuwmjWp1Yr7Sa8WE=","beginning_cross_street":"North of I-295","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.68647,40.291362]]}},{"id":"9ulvTupL3byh57PcN5x1QcgdAGc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound between East of Exit 16E - Essex St (Harrison) and East of Exit 15 - NJ 21 (Newark), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right lane closed","update_date":"2026-04-22T15:39:29Z"},"road_event_id":"9ulvTupL3byh57PcN5x1QcgdAGc=","beginning_cross_street":"East of Exit 16E - Essex St","ending_cross_street":"East of Exit 15 - NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.152336,40.742294]]}},{"id":"6agwpXII6BnQmktQN62hGI7YUxI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Both Directions between North of Wantage School Rd (Wantage Twp) and North of Sawmill Rd (Montague Twp) Friday April 24, 2026 08:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-17T16:16:02Z"},"road_event_id":"6agwpXII6BnQmktQN62hGI7YUxI=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"North of Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618446,41.234889]]}},{"id":"thltWbyXkVmwZGMo2sck/7RvFQg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Tuesday April 28, 2026 08:00 PM thru Wednesday April 29, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-22T15:39:26Z"},"road_event_id":"thltWbyXkVmwZGMo2sck/7RvFQg=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"wYHdYAy51Cj6+QWd8SnsUMYp2fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near Hackensack River Drawbridge (Kearny/Jersey City), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-22T15:39:27Z"},"road_event_id":"wYHdYAy51Cj6+QWd8SnsUMYp2fc=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Jacobus Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"qpLCh12WaJfnLqOdo7AFWDLL7NQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Q3UIhghLJvwb2e4nsU50MRh8v9A="}],"description":"Intersection improvements on NY 104 both directions at Lake Ave (Rochester), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T16:23:37Z"},"road_event_id":"qpLCh12WaJfnLqOdo7AFWDLL7NQ=","beginning_cross_street":"Lake Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.628717,43.194676]]}},{"id":"Q3UIhghLJvwb2e4nsU50MRh8v9A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qpLCh12WaJfnLqOdo7AFWDLL7NQ="},{"type":"next-occurrence","id":"/QhtkhhB33FqnGQUrnRShnPBsTg="}],"description":"Intersection improvements on NY 104 both directions at Lake Ave (Rochester), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T16:23:37Z"},"road_event_id":"Q3UIhghLJvwb2e4nsU50MRh8v9A=","beginning_cross_street":"Lake Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T12:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.628717,43.194676]]}},{"id":"/QhtkhhB33FqnGQUrnRShnPBsTg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 104"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qpLCh12WaJfnLqOdo7AFWDLL7NQ="}],"description":"Intersection improvements on NY 104 both directions at Lake Ave (Rochester), Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 08:00 AM thru 03:30 PM right shoulder closed","update_date":"2026-04-17T16:23:37Z"},"road_event_id":"/QhtkhhB33FqnGQUrnRShnPBsTg=","beginning_cross_street":"Lake Ave","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T12:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.628717,43.194676]]}},{"id":"cMKFPOyptt8nwupG9UUDZWQuwRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 208"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 208 Southbound near North of Maple Ave (Glen Rock), Wednesday April 22, 2026 09:00 PM thru Thursday April 23, 2026 06:00 AM, left lane closed","update_date":"2026-04-22T15:39:24Z"},"road_event_id":"cMKFPOyptt8nwupG9UUDZWQuwRI=","beginning_cross_street":"North of Maple Ave","ending_cross_street":"South of Maple Ave","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T07:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.138366,40.951374]]}},{"id":"VdXhB+F+uH2qDDKnC2Bg2GClLIU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Tuesday April 28, 2026 08:00 PM thru Wednesday April 29, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-22T15:39:25Z"},"road_event_id":"VdXhB+F+uH2qDDKnC2Bg2GClLIU=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"Bd4/+sfnmUdZBVotJUHKnZw2RBI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"rchusGNceaWE76rRKXxvjxtoem8="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue between Midland Avenue (Yonkers) and Cross County Parkway (Yonkers) D265523/32724109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:22Z"},"road_event_id":"Bd4/+sfnmUdZBVotJUHKnZw2RBI=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87116,40.932775]]}},{"id":"rchusGNceaWE76rRKXxvjxtoem8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bd4/+sfnmUdZBVotJUHKnZw2RBI="},{"type":"next-occurrence","id":"W4jq9mu86kquP3bJTpOjEjr5HUI="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue between Midland Avenue (Yonkers) and Cross County Parkway (Yonkers) D265523/32724109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:22Z"},"road_event_id":"rchusGNceaWE76rRKXxvjxtoem8=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87116,40.932775]]}},{"id":"W4jq9mu86kquP3bJTpOjEjr5HUI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"Bd4/+sfnmUdZBVotJUHKnZw2RBI="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue between Midland Avenue (Yonkers) and Cross County Parkway (Yonkers) D265523/32724109 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T19:01:22Z"},"road_event_id":"W4jq9mu86kquP3bJTpOjEjr5HUI=","beginning_cross_street":"Midland Avenue","ending_cross_street":"Cross County Parkway","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87116,40.932775]]}},{"id":"mbuUH3OtSxujPSvVO/LG6w3tix0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"2h2y0TIHA2n4gjCa14swPQeFYyo="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"mbuUH3OtSxujPSvVO/LG6w3tix0=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:01:00Z","end_date":"2026-04-22T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"2h2y0TIHA2n4gjCa14swPQeFYyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="},{"type":"next-occurrence","id":"jb/M7I+SJjvWG4jxyZQv4Lmua5E="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"2h2y0TIHA2n4gjCa14swPQeFYyo=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T02:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"jb/M7I+SJjvWG4jxyZQv4Lmua5E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="},{"type":"next-occurrence","id":"pi4V+/6JF5UMpcdQQv03qR1UQTE="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"jb/M7I+SJjvWG4jxyZQv4Lmua5E=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"pi4V+/6JF5UMpcdQQv03qR1UQTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="},{"type":"next-occurrence","id":"wHxvnl7x1xoyq1QnFcXsme4gOAw="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"pi4V+/6JF5UMpcdQQv03qR1UQTE=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T06:00:00Z","end_date":"2026-04-25T12:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"wHxvnl7x1xoyq1QnFcXsme4gOAw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="},{"type":"next-occurrence","id":"oKnMOt5kjH1jGfd/dKPcvDbUzsQ="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"wHxvnl7x1xoyq1QnFcXsme4gOAw=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T17:00:00Z","end_date":"2026-04-26T01:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"oKnMOt5kjH1jGfd/dKPcvDbUzsQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="},{"type":"next-occurrence","id":"4ofHMzeNr14lGOGEMY58nQPM/rg="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"oKnMOt5kjH1jGfd/dKPcvDbUzsQ=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T00:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"4ofHMzeNr14lGOGEMY58nQPM/rg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="},{"type":"next-occurrence","id":"kB82G2SGOs7wSCiCxMr5rK5qOws="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"4ofHMzeNr14lGOGEMY58nQPM/rg=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T08:00:00Z","end_date":"2026-04-26T14:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"kB82G2SGOs7wSCiCxMr5rK5qOws=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="},{"type":"next-occurrence","id":"rqsEEBoGKtcaZdpw7hzHAWktV3g="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"kB82G2SGOs7wSCiCxMr5rK5qOws=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T20:00:00Z","end_date":"2026-04-27T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"rqsEEBoGKtcaZdpw7hzHAWktV3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bronx River Parkway"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mbuUH3OtSxujPSvVO/LG6w3tix0="}],"description":"Construction and bridge painting on Bronx River Parkway both directions at East 174th Street (New York) Subject to change without notice., Monday April 13th,2026 thru Friday April 24th,2026, Monday/Tuesday/Wednesday/Thursday, 10:00 PM thru 12:01 AM 1 Right lane of 3 lanes closed northbound, southbound, Tuesday April 14th,2026 thru Friday April 24th,2026, Tuesday/Wednesday/Thursday/Friday, 12:01 AM thru 05:00 AM 2 Right lanes of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 11:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 07:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 07:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 11:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 09:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Friday April 24th,2026 thru Saturday April 25th,2026, Friday, 10:00 PM thru 01:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 01:00 AM thru 06:30 AM 2 Left lanes of 3 lanes closed northbound, southbound, Saturday April 25th,2026 06:30 AM thru 03:00 PM 1 Left lane of 3 lanes closed northbound, southbound, Saturday April 25th,2026 thru Sunday April 26th,2026, Saturday, 10:00 PM thru 02:00 AM 1 Left lane of 3 lanes closed northbound, southbound, Sunday April 26th,2026 02:00 AM thru 08:00 AM 2 Left lanes of 3 lanes closed northbound, southbound, Sunday April 26th,2026 08:00 AM thru 02:00 PM 1 Left lane of 3 lanes closed northbound, southbound","update_date":"2026-04-19T18:00:02Z"},"road_event_id":"rqsEEBoGKtcaZdpw7hzHAWktV3g=","beginning_cross_street":"East 174th Street","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T00:00:00Z","end_date":"2026-04-27T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.87391,40.834214]]}},{"id":"pLs70csbZhUbNjjfLzIB/pc/l2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-287"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-287 Northbound near South of Exit 57 - Skyline Drive (Wanaque), Thursday April 23, 2026 11:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T15:39:33Z"},"road_event_id":"pLs70csbZhUbNjjfLzIB/pc/l2E=","beginning_cross_street":"South of Exit 57 - Skyline Drive","ending_cross_street":"South of Exit 57 - Skyline Drive","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.277725,41.025787]]}},{"id":"5Pg4mAyD4UrpxSpTyN2qIXzLVCc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 1 - Delaware Water Gap (Hardwick Twp), Wednesday April 22, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:33:21Z"},"road_event_id":"5Pg4mAyD4UrpxSpTyN2qIXzLVCc=","beginning_cross_street":"East of Exit 12 - CR 521/Hope-Blairstown Rd","ending_cross_street":"East of Exit 1 - Delaware Water Gap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T12:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.945503,40.924968]]}},{"id":"2UH1JNtOPV5WXJE10KzgVbeOFOg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near West of CR 616/CR 627/Coles Av (Cherry Hill Twp), Tuesday April 28, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T15:39:34Z"},"road_event_id":"2UH1JNtOPV5WXJE10KzgVbeOFOg=","beginning_cross_street":"West of CR 616/CR 627/Coles Av","ending_cross_street":"West of CR 616/CR 627/Coles Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.015129,39.939796]]}},{"id":"2Q5Y7ArZ6Rkb/rlRLr7cqoUNyZ0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 332"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 332 both directions between Howell St. (Canandaigua) and Buffalo St. (Canandaigua) Alternating lane closures with flaggers as needed, Wednesday April 15th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 12:00 AM thru 11:59 PM All lanes","update_date":"2026-04-13T19:55:42Z"},"road_event_id":"2Q5Y7ArZ6Rkb/rlRLr7cqoUNyZ0=","beginning_cross_street":"Howell St.","ending_cross_street":"Buffalo St.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-04-25T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.285055,42.892896]]}},{"id":"mkf2wO4HZ2jpof0E0LGedJxT0vw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IMPwuUifaZ68qmhJrqpzu3ATpTE="}],"description":"Roadwork on NY 21 both directions City of Hornell; Town of Hornellsville Line (Hornell) to NY 36 at CR 66; Webbs Crossing (Hornellsville) 2 lanes reduced to 1, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-17T15:51:20Z"},"road_event_id":"mkf2wO4HZ2jpof0E0LGedJxT0vw=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"CR 66; Webbs Crossing","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665273,42.334697]]}},{"id":"IMPwuUifaZ68qmhJrqpzu3ATpTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mkf2wO4HZ2jpof0E0LGedJxT0vw="},{"type":"next-occurrence","id":"8Q9eBmO4oSblD2aPgyeLZ/65AHw="}],"description":"Roadwork on NY 21 both directions City of Hornell; Town of Hornellsville Line (Hornell) to NY 36 at CR 66; Webbs Crossing (Hornellsville) 2 lanes reduced to 1, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-17T15:51:20Z"},"road_event_id":"IMPwuUifaZ68qmhJrqpzu3ATpTE=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"CR 66; Webbs Crossing","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665273,42.334697]]}},{"id":"8Q9eBmO4oSblD2aPgyeLZ/65AHw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mkf2wO4HZ2jpof0E0LGedJxT0vw="},{"type":"next-occurrence","id":"NA6jaC85X4iJB0GZK/FTOpP6BsE="}],"description":"Roadwork on NY 21 both directions City of Hornell; Town of Hornellsville Line (Hornell) to NY 36 at CR 66; Webbs Crossing (Hornellsville) 2 lanes reduced to 1, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-17T15:51:20Z"},"road_event_id":"8Q9eBmO4oSblD2aPgyeLZ/65AHw=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"CR 66; Webbs Crossing","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665273,42.334697]]}},{"id":"NA6jaC85X4iJB0GZK/FTOpP6BsE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 21"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"mkf2wO4HZ2jpof0E0LGedJxT0vw="}],"description":"Roadwork on NY 21 both directions City of Hornell; Town of Hornellsville Line (Hornell) to NY 36 at CR 66; Webbs Crossing (Hornellsville) 2 lanes reduced to 1, Monday April 20th, 2026 thru Saturday April 25th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 06:00 PM All lanes open","update_date":"2026-04-17T15:51:20Z"},"road_event_id":"NA6jaC85X4iJB0GZK/FTOpP6BsE=","beginning_cross_street":"City of Hornell; Town of Hornellsville Line","ending_cross_street":"CR 66; Webbs Crossing","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.665273,42.334697]]}},{"id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IZUCrOgGiD29aAw9AtXLlitqA+E="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"IZUCrOgGiD29aAw9AtXLlitqA+E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="},{"type":"next-occurrence","id":"LvChfrTHIcEPJN1mIORRyAwnJRA="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"IZUCrOgGiD29aAw9AtXLlitqA+E=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"LvChfrTHIcEPJN1mIORRyAwnJRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="},{"type":"next-occurrence","id":"em+FXUx7ft2VmmpYReCcTn2jm/o="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"LvChfrTHIcEPJN1mIORRyAwnJRA=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"em+FXUx7ft2VmmpYReCcTn2jm/o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="},{"type":"next-occurrence","id":"BxGox4LHc22wIrKuBqq2oyl5A34="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"em+FXUx7ft2VmmpYReCcTn2jm/o=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"BxGox4LHc22wIrKuBqq2oyl5A34=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="},{"type":"next-occurrence","id":"Y5v+XNa30LuzUid+mB9RRbQdCHk="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"BxGox4LHc22wIrKuBqq2oyl5A34=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"Y5v+XNa30LuzUid+mB9RRbQdCHk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="},{"type":"next-occurrence","id":"2SlAKljsVBQirrhW5WsVMZNA0hQ="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"Y5v+XNa30LuzUid+mB9RRbQdCHk=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"2SlAKljsVBQirrhW5WsVMZNA0hQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="},{"type":"next-occurrence","id":"yar1SspLLzsTDVobNpIbBwLKYgs="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"2SlAKljsVBQirrhW5WsVMZNA0hQ=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"yar1SspLLzsTDVobNpIbBwLKYgs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="},{"type":"next-occurrence","id":"hhMcwlgfo+codJ8NmvxGG2MA7qQ="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"yar1SspLLzsTDVobNpIbBwLKYgs=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"hhMcwlgfo+codJ8NmvxGG2MA7qQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"KV3QT5/j6Ar/ZUDQwxgpB01oPSw="}],"description":"Utility work on NY 404 both directions between Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed eastbound","update_date":"2026-04-22T15:37:01Z"},"road_event_id":"hhMcwlgfo+codJ8NmvxGG2MA7qQ=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"Plank Road; CR 11","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.508353,43.181537]]}},{"id":"NI1A3bYHlSufZNqWHwNrELV97/Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 256"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 256 northbound area of Stagecoach Road; NY 255 (Sparta) alternating lane closures, Thursday April 23rd, 2026, 11:00 AM thru 01:00 PM All lanes open","update_date":"2026-04-22T15:17:43Z"},"road_event_id":"NI1A3bYHlSufZNqWHwNrELV97/Q=","beginning_cross_street":"Stagecoach Road; NY 255","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T02:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.703527,42.647432]]}},{"id":"sl2KB4US0HAyYSfy8sMUalD3ZFY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 35"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 35 Westbound At Old Spye Rd (Sayreville) Wednesday May 6, 2026 08:30 AM thru 03:30 PM, 1 right lane of 3 lanes closed","update_date":"2026-04-17T16:07:32Z"},"road_event_id":"sl2KB4US0HAyYSfy8sMUalD3ZFY=","beginning_cross_street":"Old Spye Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T12:30:00Z","end_date":"2026-05-06T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.26741,40.46482]]}},{"id":"+Qt4unhjvL1KE/06ZqvcMNKn+Fc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qmglRdv0inmKTcKe3rMIdZaXaUU="}],"description":"Utility work on NY 64 both directions between Canan Rd (West Bloomfield) and Ontario and Monroe County Line (West Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T19:32:49Z"},"road_event_id":"+Qt4unhjvL1KE/06ZqvcMNKn+Fc=","beginning_cross_street":"Canan Rd","ending_cross_street":"Ontario and Monroe County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468452,42.922246]]}},{"id":"qmglRdv0inmKTcKe3rMIdZaXaUU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Qt4unhjvL1KE/06ZqvcMNKn+Fc="},{"type":"next-occurrence","id":"szzW5Lboz1cNvYsa726mJsayXmc="}],"description":"Utility work on NY 64 both directions between Canan Rd (West Bloomfield) and Ontario and Monroe County Line (West Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T19:32:49Z"},"road_event_id":"qmglRdv0inmKTcKe3rMIdZaXaUU=","beginning_cross_street":"Canan Rd","ending_cross_street":"Ontario and Monroe County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468452,42.922246]]}},{"id":"szzW5Lboz1cNvYsa726mJsayXmc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"+Qt4unhjvL1KE/06ZqvcMNKn+Fc="}],"description":"Utility work on NY 64 both directions between Canan Rd (West Bloomfield) and Ontario and Monroe County Line (West Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T19:32:49Z"},"road_event_id":"szzW5Lboz1cNvYsa726mJsayXmc=","beginning_cross_street":"Canan Rd","ending_cross_street":"Ontario and Monroe County Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.468452,42.922246]]}},{"id":"0c6NlJbnzU7pVfGiu6mgElf2ceE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"qfUHRx5GvdK68anP3qUGdVqTSOM="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"0c6NlJbnzU7pVfGiu6mgElf2ceE=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"qfUHRx5GvdK68anP3qUGdVqTSOM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="},{"type":"next-occurrence","id":"UwTbC8x6WPBM1jHK5fJUex5icz8="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"qfUHRx5GvdK68anP3qUGdVqTSOM=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"UwTbC8x6WPBM1jHK5fJUex5icz8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="},{"type":"next-occurrence","id":"qTstJWaeIdr8Bw6l19Hus1sPmf4="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"UwTbC8x6WPBM1jHK5fJUex5icz8=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"qTstJWaeIdr8Bw6l19Hus1sPmf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="},{"type":"next-occurrence","id":"HGnUyheFBdf6u+uLpzPE/1NY1c8="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"qTstJWaeIdr8Bw6l19Hus1sPmf4=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"HGnUyheFBdf6u+uLpzPE/1NY1c8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="},{"type":"next-occurrence","id":"6XCLZVzIxf03ph75lKzaRbrty4Q="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"HGnUyheFBdf6u+uLpzPE/1NY1c8=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"6XCLZVzIxf03ph75lKzaRbrty4Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="},{"type":"next-occurrence","id":"Q0Gt0RhT9Rtfm8iIiRGrfBN2u5U="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"6XCLZVzIxf03ph75lKzaRbrty4Q=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"Q0Gt0RhT9Rtfm8iIiRGrfBN2u5U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="},{"type":"next-occurrence","id":"PUFasBe6l3fL9sS6KNWpkNf1qW4="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"Q0Gt0RhT9Rtfm8iIiRGrfBN2u5U=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"PUFasBe6l3fL9sS6KNWpkNf1qW4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="},{"type":"next-occurrence","id":"x46utbgdIuHyzecB2NFJEcjuPSg="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"PUFasBe6l3fL9sS6KNWpkNf1qW4=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T18:00:00Z","end_date":"2026-05-05T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"x46utbgdIuHyzecB2NFJEcjuPSg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"0c6NlJbnzU7pVfGiu6mgElf2ceE="}],"description":"Guard rail repairs on NY 690 northbound between I-690 (Van Buren) and Hencle Boulevard; NY 48; Oswego Road (Lysander), Thursday April 23rd, 2026 thru Tuesday May 5th, 2026, Monday thru Friday, 07:00 AM thru 04:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-17T15:55:42Z"},"road_event_id":"x46utbgdIuHyzecB2NFJEcjuPSg=","beginning_cross_street":"I-690","ending_cross_street":"Hencle Boulevard; NY 48; Oswego Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.293868,43.115208]]}},{"id":"oPYrOLdDXEcKzkgIvPywwbZpWZk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 36"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 36 northbound between Town of York and Town of Leicester Line (Leicester) alternating lane closures, Thursday April 23rd, 2026, 01:00 PM thru 03:00 PM All lanes closed intermittently","update_date":"2026-04-22T15:23:43Z"},"road_event_id":"oPYrOLdDXEcKzkgIvPywwbZpWZk=","beginning_cross_street":"Town of York and Town of Leicester Line","ending_cross_street":"Town of York and Town of Leicester Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T06:00:00Z","end_date":"2026-04-24T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.896754,42.806925]]}},{"id":"bVWRP1V/q1jiqa1nnaWkKCG8aYc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[],"description":"Bridge rehabilitation on I-390 southbound between Exit 7 (Groveland) alternating lane closures, Thursday April 23rd, 2026, 08:00 AM thru 04:00 PM All lanes closed intermittently","update_date":"2026-04-22T15:04:14Z"},"road_event_id":"bVWRP1V/q1jiqa1nnaWkKCG8aYc=","beginning_cross_street":"Exit 7","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.83308,42.707172]]}},{"id":"tvslUzf3mpX7yzBJTuPdmSRrYIo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 9"],"direction":"unknown","related_road_events":[],"description":"Bridge work on US 9 both directions between Albany Marine Service Ln (Halfmoon) and Vischer Ferry Road (Halfmoon), Wednesday April 22nd, 2026, 11:15 AM thru 03:00 PM 1 Right lane of 2 lanes closed","update_date":"2026-04-22T15:07:55Z"},"road_event_id":"tvslUzf3mpX7yzBJTuPdmSRrYIo=","beginning_cross_street":"Albany Marine Service Ln","ending_cross_street":"Vischer Ferry Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T15:15:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.730855,42.819593]]}},{"id":"XkYMbwUOGu2vxfhs90lfIKJmt4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Both Directions At Ridge Rd (South Brunswick Twp) Friday April 24, 2026 09:00 PM thru Saturday April 25, 2026 05:00 AM, All lanes open northbound; 1 right lane of 2 lanes, right shoulder closed southbound","update_date":"2026-04-17T15:44:00Z"},"road_event_id":"XkYMbwUOGu2vxfhs90lfIKJmt4w=","beginning_cross_street":"Ridge Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.595428,40.366569]]}},{"id":"8LRRrM2xIu/TciFfDuFx9d/wOi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["WILER RD"],"direction":"unknown","related_road_events":[],"description":"Bridge replacement on WILER RD both directions between CR-203; Brick Schoolhouse Rd (Hamlin) and CR-207; Hamlin Center Rd. (Hamlin) Road closed, follow posted detour., Continuous Thursday April 30th, 2026 09:00 AM thru Sunday November 1st, 2026 05:00 PM All lanes closed and detoured","update_date":"2026-04-13T20:09:51Z"},"road_event_id":"8LRRrM2xIu/TciFfDuFx9d/wOi8=","beginning_cross_street":" CR-203; Brick Schoolhouse Rd","ending_cross_street":"CR-207; Hamlin Center Rd.","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.891045,43.312773]]}},{"id":"R5Bd2FrTz3VOBPigkln91wWCKaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Both Directions At Ridge Rd (South Brunswick Twp) Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, All lanes open northbound; 1 right lane of 2 lanes, right shoulder closed southbound","update_date":"2026-04-17T15:43:50Z"},"road_event_id":"R5Bd2FrTz3VOBPigkln91wWCKaM=","beginning_cross_street":"Ridge Rd","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.595428,40.366569]]}},{"id":"E12co3+AzVoTcDp2XqRDXFnajh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Walnut Street"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"nPqFv6Vh6qXJjAimt5rqANS/odI="}],"description":"Drainage improvements on Walnut Street both directions between Highland Place (Canajoharie) and Reed Street (Canajoharie) Motorists will encounter daily road closure with a signed detour in place. The closure will be only during working hours, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:56:48Z"},"road_event_id":"E12co3+AzVoTcDp2XqRDXFnajh4=","beginning_cross_street":"Highland Place","ending_cross_street":"Reed Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.578018,42.901937]]}},{"id":"nPqFv6Vh6qXJjAimt5rqANS/odI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Walnut Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E12co3+AzVoTcDp2XqRDXFnajh4="},{"type":"next-occurrence","id":"2zOvppfgMy8qAxjm8jAjDyYKYWk="}],"description":"Drainage improvements on Walnut Street both directions between Highland Place (Canajoharie) and Reed Street (Canajoharie) Motorists will encounter daily road closure with a signed detour in place. The closure will be only during working hours, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:56:48Z"},"road_event_id":"nPqFv6Vh6qXJjAimt5rqANS/odI=","beginning_cross_street":"Highland Place","ending_cross_street":"Reed Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.578018,42.901937]]}},{"id":"2zOvppfgMy8qAxjm8jAjDyYKYWk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Walnut Street"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"E12co3+AzVoTcDp2XqRDXFnajh4="}],"description":"Drainage improvements on Walnut Street both directions between Highland Place (Canajoharie) and Reed Street (Canajoharie) Motorists will encounter daily road closure with a signed detour in place. The closure will be only during working hours, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:56:48Z"},"road_event_id":"2zOvppfgMy8qAxjm8jAjDyYKYWk=","beginning_cross_street":"Highland Place","ending_cross_street":"Reed Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.578018,42.901937]]}},{"id":"BtNv0lq3jAE9V/QG84IwK0CaG4I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Thursday April 30, 2026 08:00 PM thru Friday May 1, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-22T15:39:21Z"},"road_event_id":"BtNv0lq3jAE9V/QG84IwK0CaG4I=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"6A0LR6VRyKUOfx3IvJe8uVmOmCA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Both Directions between North of Wantage School Rd (Wantage Twp) and North of Sawmill Rd (Montague Twp) Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-17T16:15:52Z"},"road_event_id":"6A0LR6VRyKUOfx3IvJe8uVmOmCA=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"North of Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618446,41.234889]]}},{"id":"R4BPP8RMgrs/pj7trf9e4QsLjY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Wednesday April 29, 2026 08:00 PM thru Thursday April 30, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-22T15:39:20Z"},"road_event_id":"R4BPP8RMgrs/pj7trf9e4QsLjY8=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"9YPrqhuCgOmE8MFzZYTdV+crZAk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Both Directions between North of Wantage School Rd (Wantage Twp) and North of Sawmill Rd (Montague Twp) Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed northbound; right shoulder closed southbound","update_date":"2026-04-17T16:15:48Z"},"road_event_id":"9YPrqhuCgOmE8MFzZYTdV+crZAk=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"North of Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618446,41.234889]]}},{"id":"VzRzsi5/mZ+UM8Z2QQwcPLScNRo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound between Hackensack River Drawbridge (Kearny/Jersey City) and North of Jacobus Avenue (Kearny), Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 05:00 AM, at least one lane closed","update_date":"2026-04-22T15:39:22Z"},"road_event_id":"VzRzsi5/mZ+UM8Z2QQwcPLScNRo=","beginning_cross_street":"Hackensack River Drawbridge","ending_cross_street":"North of Jacobus Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.100341,40.727783]]}},{"id":"pzOgbM4RBnQLzoB31R5wmmj+Bbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound between North of Meeker Av (Newark) and South of Poinier St (Newark) Wednesday April 29, 2026 08:00 PM thru Thursday April 30, 2026 06:00 AM, 1 right lane of 3 lanes, right shoulder closed","update_date":"2026-04-22T15:58:32Z"},"road_event_id":"pzOgbM4RBnQLzoB31R5wmmj+Bbk=","beginning_cross_street":"North of Meeker Av","ending_cross_street":"South of Poinier St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.194839,40.703369]]}},{"id":"ik1ENNDyNGpQHNwyifqYbXoo7/4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound between North of Wantage School Rd (Wantage Twp) and North of Sawmill Rd (Montague Twp), Wednesday April 22, 2026 08:00 PM thru Thursday April 23, 2026 06:00 AM, right shoulder closed, moving operation","update_date":"2026-04-17T16:33:41Z"},"road_event_id":"ik1ENNDyNGpQHNwyifqYbXoo7/4=","beginning_cross_street":"North of Wantage School Rd","ending_cross_street":"North of Sawmill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.618453,41.234889]]}},{"id":"mJBD2RFtiiMelvQSOTNTWko8k4w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound between North of Meeker Av (Newark) and South of Poinier St (Newark) Thursday April 30, 2026 08:00 PM thru Friday May 1, 2026 06:00 AM, 1 right lane of 3 lanes, right shoulder closed","update_date":"2026-04-22T15:58:37Z"},"road_event_id":"mJBD2RFtiiMelvQSOTNTWko8k4w=","beginning_cross_street":"North of Meeker Av","ending_cross_street":"South of Poinier St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.194839,40.703369]]}},{"id":"nPKzATpR5arpDZmR/nhzH3uQWhw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 65 - Green St (South Hackensack Twp) and East of Exit 63 - NJ 17 North (Lodi), Thursday April 23, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T16:33:46Z"},"road_event_id":"nPKzATpR5arpDZmR/nhzH3uQWhw=","beginning_cross_street":"East of Exit 65 - Green St","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.056602,40.869529]]}},{"id":"DIvxpdlUai0K0Im4poBdFV+Pqdg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound between North of Meeker Av (Newark) and South of Poinier St (Newark) Monday April 27, 2026 08:00 PM thru Tuesday April 28, 2026 06:00 AM, 1 right lane of 3 lanes, right shoulder closed","update_date":"2026-04-22T15:58:23Z"},"road_event_id":"DIvxpdlUai0K0Im4poBdFV+Pqdg=","beginning_cross_street":"North of Meeker Av","ending_cross_street":"South of Poinier St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.194839,40.703369]]}},{"id":"uKqDbkM3hh+gFyWK8JIeemCfBuA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 27"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 27 Northbound between North of Meeker Av (Newark) and South of Poinier St (Newark) Tuesday April 28, 2026 08:00 PM thru Wednesday April 29, 2026 06:00 AM, 1 right lane of 3 lanes, right shoulder closed","update_date":"2026-04-22T15:58:28Z"},"road_event_id":"uKqDbkM3hh+gFyWK8JIeemCfBuA=","beginning_cross_street":"North of Meeker Av","ending_cross_street":"South of Poinier St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.194839,40.703369]]}},{"id":"yQjpi1GWWPQNzHmP5zCygESkMiQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 24"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 24 Both Directions At Exit 7 - NJ 124/JFK Parkway (Millburn Twp) Friday April 24, 2026 09:00 PM thru Saturday April 25, 2026 06:00 AM, right shoulder closed eastbound; right shoulder closed westbound","update_date":"2026-04-22T15:53:07Z"},"road_event_id":"yQjpi1GWWPQNzHmP5zCygESkMiQ=","beginning_cross_street":"Exit 7 - NJ 124/JFK Parkway","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T01:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.369338,40.739631]]}},{"id":"EL7a/p4rIz2csgiflvkzxtOOHsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 65 - Green St (South Hackensack Twp) and East of Exit 63 - NJ 17 North (Lodi), Friday April 24, 2026 09:00 AM thru 03:00 PM, right shoulder closed local lane","update_date":"2026-04-17T16:33:36Z"},"road_event_id":"EL7a/p4rIz2csgiflvkzxtOOHsM=","beginning_cross_street":"East of Exit 65 - Green St","ending_cross_street":"East of Exit 63 - NJ 17 North","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.056602,40.869529]]}},{"id":"0Dv5tj3CXS97frWajQIn5Rsol3k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 124"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 124 Eastbound At CR 638/Fairmount Av (Chatham) Thursday April 23, 2026 09:00 PM thru Friday April 24, 2026 06:00 AM, All lanes open","update_date":"2026-04-22T15:54:28Z"},"road_event_id":"0Dv5tj3CXS97frWajQIn5Rsol3k=","beginning_cross_street":"CR 638/Fairmount Av","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T01:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.383422,40.740859]]}},{"id":"H7Yrr4QU2mS7XmbrCQ1tbPCy6C0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iSkkGyhwrJtlEFbgjk8LYZJV6Eo="}],"description":"Bridge painting on NY 32 southbound between Frontage Rd (Bethlehem) and Delmar Bypass (Bethlehem), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 07:00 AM thru 05:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-22T15:48:49Z"},"road_event_id":"H7Yrr4QU2mS7XmbrCQ1tbPCy6C0=","beginning_cross_street":"Frontage Rd","ending_cross_street":"Delmar Bypass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784258,42.618963]]}},{"id":"iSkkGyhwrJtlEFbgjk8LYZJV6Eo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"H7Yrr4QU2mS7XmbrCQ1tbPCy6C0="}],"description":"Bridge painting on NY 32 southbound between Frontage Rd (Bethlehem) and Delmar Bypass (Bethlehem), Wednesday April 22nd, 2026 thru Thursday April 23rd, 2026, Wednesday/Thursday, 07:00 AM thru 05:00 PM 1 Left lane of 2 lanes closed","update_date":"2026-04-22T15:48:49Z"},"road_event_id":"iSkkGyhwrJtlEFbgjk8LYZJV6Eo=","beginning_cross_street":"Frontage Rd","ending_cross_street":"Delmar Bypass","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.784258,42.618963]]}},{"id":"MtMmFgq8Z4ZxLbaXDxlg3XDrqZI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 1 - Delaware Water Gap (Hardwick Twp), Thursday April 23, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:33:40Z"},"road_event_id":"MtMmFgq8Z4ZxLbaXDxlg3XDrqZI=","beginning_cross_street":"East of Exit 12 - CR 521/Hope-Blairstown Rd","ending_cross_street":"East of Exit 1 - Delaware Water Gap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.945503,40.924968]]}},{"id":"WAOtWzhGeEV/PCf4qDWe9lRz9t0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"02PXQ+cha+La2dQG2X3B2k1E2xA="}],"description":"Bridge painting on NY 32 southbound between Port St (Bethlehem) and Corning Hill Rd (Bethlehem), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-04-22T15:50:21Z"},"road_event_id":"WAOtWzhGeEV/PCf4qDWe9lRz9t0=","beginning_cross_street":"Port St","ending_cross_street":"Corning Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767042,42.621077]]}},{"id":"02PXQ+cha+La2dQG2X3B2k1E2xA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WAOtWzhGeEV/PCf4qDWe9lRz9t0="},{"type":"next-occurrence","id":"7587OH+Ty4NGPI7wp4svOzvkJSw="}],"description":"Bridge painting on NY 32 southbound between Port St (Bethlehem) and Corning Hill Rd (Bethlehem), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-04-22T15:50:21Z"},"road_event_id":"02PXQ+cha+La2dQG2X3B2k1E2xA=","beginning_cross_street":"Port St","ending_cross_street":"Corning Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767042,42.621077]]}},{"id":"7587OH+Ty4NGPI7wp4svOzvkJSw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 32"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WAOtWzhGeEV/PCf4qDWe9lRz9t0="}],"description":"Bridge painting on NY 32 southbound between Port St (Bethlehem) and Corning Hill Rd (Bethlehem), Wednesday April 22nd, 2026 thru Friday April 24th, 2026, Wednesday/Thursday/Friday, 07:00 AM thru 05:00 PM right shoulder closed","update_date":"2026-04-22T15:50:21Z"},"road_event_id":"7587OH+Ty4NGPI7wp4svOzvkJSw=","beginning_cross_street":"Port St","ending_cross_street":"Corning Hill Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.767042,42.621077]]}},{"id":"YIirDJ4Ac09tktfauitAb5hocS4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMPSON ST"],"direction":"unknown","related_road_events":[],"description":"Construction on THOMPSON ST southbound between GRAND ST (New York) and 6TH AVE (New York), Continuous Wednesday March 11th, 2026 12:00 AM thru Monday June 1st, 2026 11:59 PM All lanes closed","update_date":"2026-03-11T16:23:13Z"},"road_event_id":"YIirDJ4Ac09tktfauitAb5hocS4=","beginning_cross_street":"GRAND ST","ending_cross_street":"6TH AVE","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.004441,40.722705]]}},{"id":"r+jdpZYi/gTBChzyYdBnS08UWss=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["THOMAS ST"],"direction":"unknown","related_road_events":[],"description":"Construction on THOMAS ST westbound between CHURCH ST (New York) and W BROADWAY (New York), Wednesday March 11th, 2026 thru Thursday April 30th, 2026, 07:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:17:11Z"},"road_event_id":"r+jdpZYi/gTBChzyYdBnS08UWss=","beginning_cross_street":"CHURCH ST","ending_cross_street":"W BROADWAY","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.006711,40.716534]]}},{"id":"XUfKbUF2+uFBQd6dcZZIwVaexNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Wednesday April 29, 2026 08:00 PM thru Thursday April 30, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-22T15:39:46Z"},"road_event_id":"XUfKbUF2+uFBQd6dcZZIwVaexNg=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"uDrvG5SM55pNTseGngQqWkpT6HU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Qzggx9ISJWg3gQLrRAG7D2AsiCk="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"uDrvG5SM55pNTseGngQqWkpT6HU=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"Qzggx9ISJWg3gQLrRAG7D2AsiCk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="},{"type":"next-occurrence","id":"ayofEdFaS1AZ2esN/EEXiLocit8="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"Qzggx9ISJWg3gQLrRAG7D2AsiCk=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"ayofEdFaS1AZ2esN/EEXiLocit8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="},{"type":"next-occurrence","id":"JKfZJrxYbaairfMyv4mYGXgU0eg="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"ayofEdFaS1AZ2esN/EEXiLocit8=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T22:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"JKfZJrxYbaairfMyv4mYGXgU0eg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="},{"type":"next-occurrence","id":"plbvUvoEYqXA45yhp2fC3r9gWV8="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"JKfZJrxYbaairfMyv4mYGXgU0eg=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T22:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"plbvUvoEYqXA45yhp2fC3r9gWV8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="},{"type":"next-occurrence","id":"oUmGjjXoGef4hV+SrpkCLIWMdXw="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"plbvUvoEYqXA45yhp2fC3r9gWV8=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"oUmGjjXoGef4hV+SrpkCLIWMdXw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="},{"type":"next-occurrence","id":"20H6gnhp2d/NHSopAcuDs64Ss6E="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"oUmGjjXoGef4hV+SrpkCLIWMdXw=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"20H6gnhp2d/NHSopAcuDs64Ss6E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="},{"type":"next-occurrence","id":"Ig1I0rAOsqpRZ7Ddq9/kC4eXkF0="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"20H6gnhp2d/NHSopAcuDs64Ss6E=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"Ig1I0rAOsqpRZ7Ddq9/kC4eXkF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="},{"type":"next-occurrence","id":"RDTxIQ69quiiNz9vjiEp0llCOAg="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"Ig1I0rAOsqpRZ7Ddq9/kC4eXkF0=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T22:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"RDTxIQ69quiiNz9vjiEp0llCOAg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 404"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"uDrvG5SM55pNTseGngQqWkpT6HU="}],"description":"Utility work on NY 404 eastbound area of Plank Road; CR 11 (Penfield) alternating lane closures, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 09:00 AM thru 03:00 PM 1 Right lane of 2 lanes closed intermittently","update_date":"2026-04-22T15:43:40Z"},"road_event_id":"RDTxIQ69quiiNz9vjiEp0llCOAg=","beginning_cross_street":"Plank Road; CR 11","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T22:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.507422,43.183269]]}},{"id":"XeJh6gTZPQaOeHg3DHgHwukyHBw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"lMheGc+WeEcQQr7liA+AVXeT5Kc="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at NY 100 (Yonkers) D265523/32730809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:43:19Z"},"road_event_id":"XeJh6gTZPQaOeHg3DHgHwukyHBw=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863027,40.921726]]}},{"id":"lMheGc+WeEcQQr7liA+AVXeT5Kc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeJh6gTZPQaOeHg3DHgHwukyHBw="},{"type":"next-occurrence","id":"iblV2o+1TWRDlsPcalGOSdxsq0I="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at NY 100 (Yonkers) D265523/32730809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:43:19Z"},"road_event_id":"lMheGc+WeEcQQr7liA+AVXeT5Kc=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863027,40.921726]]}},{"id":"iblV2o+1TWRDlsPcalGOSdxsq0I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 984E - Yonkers Avenue"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"XeJh6gTZPQaOeHg3DHgHwukyHBw="}],"description":"Installation of traffic management systems on NY 984E - Yonkers Avenue at NY 100 (Yonkers) D265523/32730809 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM, right lane closure","update_date":"2026-04-17T14:43:19Z"},"road_event_id":"iblV2o+1TWRDlsPcalGOSdxsq0I=","beginning_cross_street":"NY 100","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.863027,40.921726]]}},{"id":"ORC300540030","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Pulaski Skyway"],"direction":"unknown","description":"Roadwork on Pulaski Skyway between South Kearny (South Kearny) and Tonnelle Circle (Jersey City), Wednesday April 22, 2026 09:30 AM thru 02:30 PM, right lane closed","update_date":"2026-04-22T18:30:00Z"},"road_event_id":"ORC300540030","beginning_cross_street":"South Kearny","ending_cross_street":"Tonnelle Circle","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-17T16:33:35Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown"},"geometry":{"type":"MultiPoint","coordinates":[[-74.104087,40.734439]]}},{"id":"9iWgtnq1tr8AZNLUv1a/EP0lqiw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Southbound near South of Hackensack River Drawbridge (Kearny), Thursday April 30, 2026 08:00 PM thru Friday May 1, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-22T15:39:42Z"},"road_event_id":"9iWgtnq1tr8AZNLUv1a/EP0lqiw=","beginning_cross_street":"South of Hackensack River Drawbridge","ending_cross_street":"Hackensack Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.102226,40.728237]]}},{"id":"7RKTROpPb5iPBqp9I+GRoA9kFS0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 120/Paterson Plank Road"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 120/Paterson Plank Road Northbound near NJ 3 (East Rutherford), Thursday April 23, 2026 09:00 AM thru 03:00 PM, left lane closed","update_date":"2026-04-17T16:33:28Z"},"road_event_id":"7RKTROpPb5iPBqp9I+GRoA9kFS0=","beginning_cross_street":"NJ 3","ending_cross_street":"In the vicinity of NJ 3","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.073829,40.804927]]}},{"id":"G4Edo8RWsd3D/eiGJZYdHVkWVNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound at North of I-195 (Hamilton Twp) Friday April 24, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-04-22T15:39:43Z"},"road_event_id":"G4Edo8RWsd3D/eiGJZYdHVkWVNs=","beginning_cross_street":"North of I-195","ending_cross_street":"North of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T22:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.631469,40.206085]]}},{"id":"aP1mD9JAo1FeZgWE1Rtl4rt2OjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Wednesday April 29, 2026 08:00 PM thru Thursday April 30, 2026 06:00 AM, at least one lane closed","update_date":"2026-04-22T15:39:40Z"},"road_event_id":"aP1mD9JAo1FeZgWE1Rtl4rt2OjU=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"R9odNyJ640uFnplxsbcjQNmYgPA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 3"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 3 Westbound near East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur (East Rutherford), Thursday April 23, 2026 10:00 AM thru 02:00 PM, left lane closed","update_date":"2026-04-17T16:33:30Z"},"road_event_id":"R9odNyJ640uFnplxsbcjQNmYgPA=","beginning_cross_street":"East of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur","ending_cross_street":"West of NJ 120/Paterson Plank Road/New Jersey Turnpike - Western Spur","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.071411,40.802597]]}},{"id":"4YhiawOp+UE5tgYH1i/jU4JtlyI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 33"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 33 Westbound near East of NJ 35 (Neptune Twp), Thursday April 23, 2026 08:00 PM thru 11:00 PM, right shoulder closed, moving operation","update_date":"2026-04-22T15:39:41Z"},"road_event_id":"4YhiawOp+UE5tgYH1i/jU4JtlyI=","beginning_cross_street":"East of NJ 35","ending_cross_street":"NJ 35","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-24T23:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.025062,40.209629]]}},{"id":"R4HmX8CRvYYJfwrFgVB56sUiVaw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-80"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-80 Westbound between East of Exit 12 - CR 521/Hope-Blairstown Rd (Hope Twp) and East of Exit 1 - Delaware Water Gap (Hardwick Twp), Friday April 24, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-17T16:33:24Z"},"road_event_id":"R4HmX8CRvYYJfwrFgVB56sUiVaw=","beginning_cross_street":"East of Exit 12 - CR 521/Hope-Blairstown Rd","ending_cross_street":"East of Exit 1 - Delaware Water Gap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.945503,40.924968]]}},{"id":"pKN6BM3eX+418cZPSj+wwQdFf6M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound at North of I-195 (Hamilton Twp) Thursday April 23, 2026 09:00 AM thru 03:00 PM, ramp","update_date":"2026-04-22T15:39:38Z"},"road_event_id":"pKN6BM3eX+418cZPSj+wwQdFf6M=","beginning_cross_street":"North of I-195","ending_cross_street":"North of I-195","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.631469,40.206085]]}},{"id":"FgkJG5WIpLft96ucWuJJxQUcuLI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1&9 Truck Route"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1&9 Truck Route Northbound near Hackensack Avenue (Kearny), Monday April 27, 2026 08:00 PM thru Tuesday April 28, 2026 06:00 AM, at least one lane closed, (2nd lane closed from 09:00 PM to 05:00 AM)","update_date":"2026-04-22T15:39:39Z"},"road_event_id":"FgkJG5WIpLft96ucWuJJxQUcuLI=","beginning_cross_street":"Hackensack Avenue","ending_cross_street":"South of Hackensack River Drawbridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.105911,40.729213]]}},{"id":"JGe7G+Hyv4rNisXzvcFBF8E8Gj0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 38"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 38 near West of CR 616/CR 627/Coles Av (Cherry Hill Twp), Monday April 27, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T15:39:36Z"},"road_event_id":"JGe7G+Hyv4rNisXzvcFBF8E8Gj0=","beginning_cross_street":"West of CR 616/CR 627/Coles Av","ending_cross_street":"West of CR 616/CR 627/Coles Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.015129,39.939796]]}},{"id":"VwzZKXJl3kz0qjwOZUoGQyl1O88=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 22"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 22 Eastbound near West of Gray St (North Plainfield), Friday April 24, 2026 12:00 AM thru 02:00 AM, left lane closed, moving operation","update_date":"2026-04-22T15:39:37Z"},"road_event_id":"VwzZKXJl3kz0qjwOZUoGQyl1O88=","beginning_cross_street":"West of Gray St","ending_cross_street":"Gray St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T04:00:00Z","end_date":"2026-04-24T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.419845,40.639171]]}},{"id":"g0rAKkjNeD+xz6w2TxbC380a6Qw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 46"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 46 Eastbound between West of CR 620/Water St (White Twp) and CR 614/Water St (Independence Twp), Friday April 24, 2026 08:00 AM thru 04:00 PM, right shoulder closed, moving operation","update_date":"2026-04-22T15:39:44Z"},"road_event_id":"g0rAKkjNeD+xz6w2TxbC380a6Qw=","beginning_cross_street":"West of CR 620/Water St","ending_cross_street":"CR 614/Water St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.05339,40.843223]]}},{"id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"31q+0ZJN/5DM6FX9qPnDtu8HCgw="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"31q+0ZJN/5DM6FX9qPnDtu8HCgw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"v8d9hCUZGlE73lpLZVdoDgSVWBo="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"31q+0ZJN/5DM6FX9qPnDtu8HCgw=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"v8d9hCUZGlE73lpLZVdoDgSVWBo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"Fa6pPyJpx8d/gNwBmaMb0H+qvN4="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"v8d9hCUZGlE73lpLZVdoDgSVWBo=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"Fa6pPyJpx8d/gNwBmaMb0H+qvN4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"q9uTPS1Yn4Nywg0ofpSXT1KNtCw="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"Fa6pPyJpx8d/gNwBmaMb0H+qvN4=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"q9uTPS1Yn4Nywg0ofpSXT1KNtCw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"fsylaaDGkTAOK5USZa6JfI+9N6k="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"q9uTPS1Yn4Nywg0ofpSXT1KNtCw=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T13:00:00Z","end_date":"2026-04-26T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"fsylaaDGkTAOK5USZa6JfI+9N6k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"YEak5nsoZlwus4hYtLg20CT4FJQ="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"fsylaaDGkTAOK5USZa6JfI+9N6k=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"YEak5nsoZlwus4hYtLg20CT4FJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"8+M2Pjoir6Ka9XUHBNg8cc2p1D4="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"YEak5nsoZlwus4hYtLg20CT4FJQ=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"8+M2Pjoir6Ka9XUHBNg8cc2p1D4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"aLUkyPhfAk+NP1Ucz4MK9DJNSf4="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"8+M2Pjoir6Ka9XUHBNg8cc2p1D4=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"aLUkyPhfAk+NP1Ucz4MK9DJNSf4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"qWNa7Fu/dxBGxJ578ogxgTuUe2Q="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"aLUkyPhfAk+NP1Ucz4MK9DJNSf4=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"qWNa7Fu/dxBGxJ578ogxgTuUe2Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"3zKVv6GDHilgzao894njVVYoeus="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"qWNa7Fu/dxBGxJ578ogxgTuUe2Q=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"3zKVv6GDHilgzao894njVVYoeus=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"QrSx/zgJcGJ8V+FqQjp20MN+fgM="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"3zKVv6GDHilgzao894njVVYoeus=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"QrSx/zgJcGJ8V+FqQjp20MN+fgM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"KJe0rbzwRENAKGa3i9xYmvAtoRM="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"QrSx/zgJcGJ8V+FqQjp20MN+fgM=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T13:00:00Z","end_date":"2026-05-03T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"KJe0rbzwRENAKGa3i9xYmvAtoRM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"xXBQpzoZFlX14OeaGLuoCOvoZqA="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"KJe0rbzwRENAKGa3i9xYmvAtoRM=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"xXBQpzoZFlX14OeaGLuoCOvoZqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="},{"type":"next-occurrence","id":"zKjt6hspdhOdDo8aPpOdZVg7nSU="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"xXBQpzoZFlX14OeaGLuoCOvoZqA=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"zKjt6hspdhOdDo8aPpOdZVg7nSU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["E 92ND ST"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"NUXBwc3VUyCpY5UPJDNVeWTRdTs="}],"description":"Construction on E 92ND ST westbound between KRIER PL (New York) and AVENUE D (New York) for installing feeder conduit to station., Friday March 13th, 2026 thru Saturday May 9th, 2026, Sunday thru Saturday, 09:00 AM thru 04:00 PM All lanes closed","update_date":"2026-03-11T16:52:14Z"},"road_event_id":"zKjt6hspdhOdDo8aPpOdZVg7nSU=","beginning_cross_street":"KRIER PL","ending_cross_street":"AVENUE D","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.910585,40.646225]]}},{"id":"DaN7Jp50TA4ProF/Izsl5sdlFEk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 1 Southbound near North of I-295 (Lawrence Twp), Monday April 27, 2026 09:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T15:39:35Z"},"road_event_id":"DaN7Jp50TA4ProF/Izsl5sdlFEk=","beginning_cross_street":"North of I-295","ending_cross_street":"North of I-295","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T22:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.68647,40.291362]]}},{"id":"V8MmAxs+27YXU7NaDwXOMwp7HWo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[],"description":"Noise wall construction on I-690 eastbound Exit 18 - Midler Avenue (Syracuse) between the ramp to/ramp from , Continuous Thursday April 23rd, 2026 09:00 AM thru Friday May 22nd, 2026 03:00 PM 1 Right lane of 3 lanes closed","update_date":"2026-04-22T13:14:19Z"},"road_event_id":"V8MmAxs+27YXU7NaDwXOMwp7HWo=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.108585,43.056764]]}},{"id":"aAzC27MuqckDdNN1wWEuJEt0ads=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Atlantic City-Brigantine Connector"],"direction":"unknown","related_road_events":[],"description":"Scheduled roadwork on Atlantic City-Brigantine Connector southbound Exit D - Huron Ave (Atlantic City) to North of Bacharach Blvd/Convention Center (Atlantic City) MOVE OVER FOR HIGHWAY WORKERS, Wednesday April 22nd, 2026, 09:15 AM thru 04:00 PM 1 Right lane and shoulder of 2 lanes closed","update_date":"2026-04-22T13:23:54Z"},"road_event_id":"aAzC27MuqckDdNN1wWEuJEt0ads=","beginning_cross_street":"Exit D - Huron Ave","ending_cross_street":"North of Bacharach Blvd/Convention Center","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:15:00Z","end_date":"2026-04-22T20:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.442403,39.374779]]}},{"id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"kjfLsWJrrSGrcJEQW6KteBTGU5w="}],"description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-31T19:01:09Z"},"road_event_id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.73028,41.548337]]}},{"id":"kjfLsWJrrSGrcJEQW6KteBTGU5w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM="},{"type":"next-occurrence","id":"bR6jta85B+qy7hUiewS2kh9AaS8="}],"description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-31T19:01:09Z"},"road_event_id":"kjfLsWJrrSGrcJEQW6KteBTGU5w=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T14:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.73028,41.548337]]}},{"id":"bR6jta85B+qy7hUiewS2kh9AaS8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM="},{"type":"next-occurrence","id":"I//l41Uiku1l7k/SWlzTRQAhOOY="}],"description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-31T19:01:09Z"},"road_event_id":"bR6jta85B+qy7hUiewS2kh9AaS8=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T14:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.73028,41.548337]]}},{"id":"I//l41Uiku1l7k/SWlzTRQAhOOY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM="},{"type":"next-occurrence","id":"+dTkD3r2ROaJkg+L/0AsA8LCfqA="}],"description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-31T19:01:09Z"},"road_event_id":"I//l41Uiku1l7k/SWlzTRQAhOOY=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T14:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.73028,41.548337]]}},{"id":"+dTkD3r2ROaJkg+L/0AsA8LCfqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM="},{"type":"next-occurrence","id":"BMX1Awq3LkVghD+bOmiqpGEQTQ4="}],"description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-31T19:01:09Z"},"road_event_id":"+dTkD3r2ROaJkg+L/0AsA8LCfqA=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T14:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.73028,41.548337]]}},{"id":"BMX1Awq3LkVghD+bOmiqpGEQTQ4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM="},{"type":"next-occurrence","id":"J2D8bqbcuToUek/m/7xVwxpp3aY="}],"description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-31T19:01:09Z"},"road_event_id":"BMX1Awq3LkVghD+bOmiqpGEQTQ4=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T14:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.73028,41.548337]]}},{"id":"J2D8bqbcuToUek/m/7xVwxpp3aY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-84"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"BqxWI3tp0SQyMj+VrrD2Zf95XsM="}],"description":"Guard rail repairs on I-84 westbound between Exit 58 - Ludingtonville Road - CR 43 (Kent) and Exit 46 - US 9 - Poughkeepsie - Peekskill (Fishkill) D265499/DAY/32611509 - This work is weather permitting. Plan travel accordingly; delays may exist, Wednesday April 1st, 2026 thru Thursday April 30th, 2026, Monday thru Friday, 10:00 AM thru 03:00 PM, various lane closures","update_date":"2026-03-31T19:01:09Z"},"road_event_id":"J2D8bqbcuToUek/m/7xVwxpp3aY=","beginning_cross_street":"Exit 58 - Ludingtonville Road - CR 43","ending_cross_street":"Exit 46 - US 9 - Poughkeepsie - Peekskill","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T14:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.73028,41.548337]]}},{"id":"dw+caS/+7h6eJBQkssppkIuUaPQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of Reservoir Rd (West Milford Twp), Thursday April 23, 2026 09:00 AM thru 01:00 PM, right lane closed","update_date":"2026-04-22T12:51:23Z"},"road_event_id":"dw+caS/+7h6eJBQkssppkIuUaPQ=","beginning_cross_street":"North of Reservoir Rd","ending_cross_street":"Canistear Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T22:00:00Z","end_date":"2026-04-24T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.48793,41.07373]]}},{"id":"JhhXDLlFC1fu9I2aHzykhA9Fhas=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 385"],"direction":"unknown","related_road_events":[],"description":"Utility work on NY 385 both directions Water St (Catskill) to Franklin St (Catskill) alternating traffic with flaggers, Thursday April 23rd, 2026 thru Friday April 24th, 2026, 08:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:13:09Z"},"road_event_id":"JhhXDLlFC1fu9I2aHzykhA9Fhas=","beginning_cross_street":"Water St","ending_cross_street":"Franklin St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T20:00:00Z","end_date":"2026-04-25T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.866029,42.217382]]}},{"id":"XHlTqqvkhia2sj/qPS6mGT84fvQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[],"description":"Attenuator repairs on I-91 northbound at Exit 29/27(southbound) - US 6/CT 2/US 5 (Hartford), Thursday April 23rd, 2026 thru Friday April 24th, 2026, 07:00 PM thru 05:00 AM 2 lanes and both shoulder of 3 lanes closed","update_date":"2026-04-22T13:46:25Z"},"road_event_id":"XHlTqqvkhia2sj/qPS6mGT84fvQ=","beginning_cross_street":"Exit 29/27(southbound) - US 6/CT 2/US 5","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.658431,41.748566]]}},{"id":"tdxOYQ5MB9SexEv0pl0savbisXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Northbound near South of CR 612/Browning Rd (Camden), Tuesday April 28, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T13:48:21Z"},"road_event_id":"tdxOYQ5MB9SexEv0pl0savbisXU=","beginning_cross_street":"South of CR 612/Browning Rd","ending_cross_street":"South of CR 612/Browning Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.067169,39.948055]]}},{"id":"zVsTc+E5pIwz/Lrczlu+nHeWWmI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-81"],"direction":"unknown","related_road_events":[],"description":"Milling on CT-81 both directions between N HIGH ST (Clinton) and GLENWOOD RD (Clinton) There will be lane closures , Thursday April 30th, 2026, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T13:40:56Z"},"road_event_id":"zVsTc+E5pIwz/Lrczlu+nHeWWmI=","beginning_cross_street":"N HIGH ST","ending_cross_street":"GLENWOOD RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.528591,41.287777]]}},{"id":"vGWPxacyHNbY+I7kPguIT9y+5r0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"IqikPcoE1vWgJCoNLUGgTMFlHOA="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"vGWPxacyHNbY+I7kPguIT9y+5r0=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:30:00Z","end_date":"2026-04-22T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"IqikPcoE1vWgJCoNLUGgTMFlHOA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vGWPxacyHNbY+I7kPguIT9y+5r0="},{"type":"next-occurrence","id":"2O4Vi1DpkTcW8NevGE11fMJIsv0="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"IqikPcoE1vWgJCoNLUGgTMFlHOA=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:30:00Z","end_date":"2026-04-23T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"2O4Vi1DpkTcW8NevGE11fMJIsv0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vGWPxacyHNbY+I7kPguIT9y+5r0="},{"type":"next-occurrence","id":"3CPc+os4eN+LRJZ+dChNxPrFm1g="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"2O4Vi1DpkTcW8NevGE11fMJIsv0=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:30:00Z","end_date":"2026-04-24T18:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"3CPc+os4eN+LRJZ+dChNxPrFm1g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vGWPxacyHNbY+I7kPguIT9y+5r0="},{"type":"next-occurrence","id":"koQigL4g3e8sNwj+WeJluDlqOrc="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"3CPc+os4eN+LRJZ+dChNxPrFm1g=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"koQigL4g3e8sNwj+WeJluDlqOrc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vGWPxacyHNbY+I7kPguIT9y+5r0="},{"type":"next-occurrence","id":"ZLXgfbqn9cIx+7c8+6DF/dDZ4n0="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"koQigL4g3e8sNwj+WeJluDlqOrc=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"ZLXgfbqn9cIx+7c8+6DF/dDZ4n0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vGWPxacyHNbY+I7kPguIT9y+5r0="},{"type":"next-occurrence","id":"YOEReZ2/6bFb/nVt8R5/hGtOT1U="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"ZLXgfbqn9cIx+7c8+6DF/dDZ4n0=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"YOEReZ2/6bFb/nVt8R5/hGtOT1U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vGWPxacyHNbY+I7kPguIT9y+5r0="},{"type":"next-occurrence","id":"N2aK8i499hUOV8UKus54pAnUhMo="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"YOEReZ2/6bFb/nVt8R5/hGtOT1U=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"N2aK8i499hUOV8UKus54pAnUhMo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 17 [Orange]"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vGWPxacyHNbY+I7kPguIT9y+5r0="}],"description":"Roadwork on NY 17 [Orange] westbound between Exit 118 - Fair Oaks (Wallkill) and Exit 116 - NY 17K (Wallkill) D265594/32703209 - This work is weather permitting. Plan travel accordingly; delays may exist, Monday April 20th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure, Monday April 27th, 2026 thru Friday May 1st, 2026, Monday thru Friday, 09:30 AM thru 02:30 PM, right lane closure","update_date":"2026-04-21T17:09:12Z"},"road_event_id":"N2aK8i499hUOV8UKus54pAnUhMo=","beginning_cross_street":"Exit 118 - Fair Oaks","ending_cross_street":"Exit 116 - NY 17K","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.414302,41.519586]]}},{"id":"6xjQ3oIGoejeguHSvsN/3pBqsNY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-110"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"pK7kOfqhpk+vecM4k+YnSTGiO3g="}],"description":"Drainage improvements on CT-110 southbound between CT-714 (Shelton) and CORNELL ST (Shelton), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-04-22T13:44:27Z"},"road_event_id":"6xjQ3oIGoejeguHSvsN/3pBqsNY=","beginning_cross_street":"CT-714","ending_cross_street":"CORNELL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.092868,41.316776]]}},{"id":"pK7kOfqhpk+vecM4k+YnSTGiO3g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-110"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6xjQ3oIGoejeguHSvsN/3pBqsNY="},{"type":"next-occurrence","id":"PFPE9Bw7xb7hvG+pld+0dgkqgK4="}],"description":"Drainage improvements on CT-110 southbound between CT-714 (Shelton) and CORNELL ST (Shelton), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-04-22T13:44:27Z"},"road_event_id":"pK7kOfqhpk+vecM4k+YnSTGiO3g=","beginning_cross_street":"CT-714","ending_cross_street":"CORNELL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.092868,41.316776]]}},{"id":"PFPE9Bw7xb7hvG+pld+0dgkqgK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-110"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6xjQ3oIGoejeguHSvsN/3pBqsNY="},{"type":"next-occurrence","id":"xjrtdA1YEGlOf+3v1GA68whYYZc="}],"description":"Drainage improvements on CT-110 southbound between CT-714 (Shelton) and CORNELL ST (Shelton), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-04-22T13:44:27Z"},"road_event_id":"PFPE9Bw7xb7hvG+pld+0dgkqgK4=","beginning_cross_street":"CT-714","ending_cross_street":"CORNELL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.092868,41.316776]]}},{"id":"xjrtdA1YEGlOf+3v1GA68whYYZc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-110"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"6xjQ3oIGoejeguHSvsN/3pBqsNY="}],"description":"Drainage improvements on CT-110 southbound between CT-714 (Shelton) and CORNELL ST (Shelton), Monday April 20th, 2026 thru Monday April 27th, 2026, Monday thru Friday, 07:00 AM thru 03:30 PM All lanes closed","update_date":"2026-04-22T13:44:27Z"},"road_event_id":"xjrtdA1YEGlOf+3v1GA68whYYZc=","beginning_cross_street":"CT-714","ending_cross_street":"CORNELL ST","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.092868,41.316776]]}},{"id":"c3IsMZ0wE1g5lDkYCeFYFKcRCtY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-171"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"GEKgfYfktWHlW2ZST4m4NtnnZQo="}],"description":"Milling and paving operations on CT-171 both directions between HOLLAND RD (Union) and CT-171 (Union) Motorists can expect lane closures, Friday May 1st, 2026 thru Monday May 4th, 2026, Monday/Friday, 06:30 AM thru 05:30 PM All lanes open, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM All lanes open","update_date":"2026-04-22T13:32:45Z"},"road_event_id":"c3IsMZ0wE1g5lDkYCeFYFKcRCtY=","beginning_cross_street":"HOLLAND RD","ending_cross_street":"CT-171","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T17:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.141912,42.023865]]}},{"id":"GEKgfYfktWHlW2ZST4m4NtnnZQo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["CT-171"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"c3IsMZ0wE1g5lDkYCeFYFKcRCtY="}],"description":"Milling and paving operations on CT-171 both directions between HOLLAND RD (Union) and CT-171 (Union) Motorists can expect lane closures, Friday May 1st, 2026 thru Monday May 4th, 2026, Monday/Friday, 06:30 AM thru 05:30 PM All lanes open, Thursday May 7th, 2026 thru Friday May 15th, 2026, Monday thru Friday, 06:30 AM thru 05:30 PM All lanes open","update_date":"2026-04-22T13:32:45Z"},"road_event_id":"GEKgfYfktWHlW2ZST4m4NtnnZQo=","beginning_cross_street":"HOLLAND RD","ending_cross_street":"CT-171","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T17:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.141912,42.023865]]}},{"id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"iKVZ35uRlDqCubFukV7ZPR1weAI="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"iKVZ35uRlDqCubFukV7ZPR1weAI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"1vRkTASlR+LN/9WVDti7SzDh1mo="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"iKVZ35uRlDqCubFukV7ZPR1weAI=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"1vRkTASlR+LN/9WVDti7SzDh1mo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"4O0vHhrXC09ndAQbC6KOTWWplBs="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"1vRkTASlR+LN/9WVDti7SzDh1mo=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"4O0vHhrXC09ndAQbC6KOTWWplBs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"zsQu+7JmOkEIUyHNnSBDiZXMMAY="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"4O0vHhrXC09ndAQbC6KOTWWplBs=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"zsQu+7JmOkEIUyHNnSBDiZXMMAY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"z49Lo5q7Konhz3i4Ud2yZb0TJpc="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"zsQu+7JmOkEIUyHNnSBDiZXMMAY=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"z49Lo5q7Konhz3i4Ud2yZb0TJpc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"qlpY75rfCWGNnwk8cBAXYgdTehE="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"z49Lo5q7Konhz3i4Ud2yZb0TJpc=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"qlpY75rfCWGNnwk8cBAXYgdTehE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"gJlMfkO15hKfGWqfhbYJat7O0po="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"qlpY75rfCWGNnwk8cBAXYgdTehE=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"gJlMfkO15hKfGWqfhbYJat7O0po=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"kMk7+KlJfZPu0f4q9wgp4EH7U1k="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"gJlMfkO15hKfGWqfhbYJat7O0po=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"kMk7+KlJfZPu0f4q9wgp4EH7U1k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"sr76lftt8Dc1Mbd6InjJ/iRI+GY="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"kMk7+KlJfZPu0f4q9wgp4EH7U1k=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"sr76lftt8Dc1Mbd6InjJ/iRI+GY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="},{"type":"next-occurrence","id":"2Rnn82dP9MRWO/ZAZirrM9LSl84="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"sr76lftt8Dc1Mbd6InjJ/iRI+GY=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"2Rnn82dP9MRWO/ZAZirrM9LSl84=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 1"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"UbfPXCmy3Z/4Qrz3RLyQ0dccY0g="}],"description":"Bridge rehabilitation on US 1 both directions between Quinnipiac River Bridge (New Haven) Motorists can expect lane closures, Wednesday April 1st, 2026 thru Thursday November 30th, 2028, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:38:27Z"},"road_event_id":"2Rnn82dP9MRWO/ZAZirrM9LSl84=","beginning_cross_street":"Quinnipiac River Bridge","ending_cross_street":"Quinnipiac River Bridge","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.906038,41.298841]]}},{"id":"3H8SmtDy7MZEOoQtzitUhNTZtZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"OPpGGHp/7ygFPGKJ+Is7rLAMYtc="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday February 24th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:26:04Z"},"road_event_id":"3H8SmtDy7MZEOoQtzitUhNTZtZg=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T10:00:00Z","end_date":"2026-04-22T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.487149,43.38194]]}},{"id":"OPpGGHp/7ygFPGKJ+Is7rLAMYtc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3H8SmtDy7MZEOoQtzitUhNTZtZg="},{"type":"next-occurrence","id":"YaBRb+qc0IKB5sxlvIpdBmOkCwA="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday February 24th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:26:04Z"},"road_event_id":"OPpGGHp/7ygFPGKJ+Is7rLAMYtc=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T10:00:00Z","end_date":"2026-04-23T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.487149,43.38194]]}},{"id":"YaBRb+qc0IKB5sxlvIpdBmOkCwA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 26"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"3H8SmtDy7MZEOoQtzitUhNTZtZg="}],"description":"Construction on NY 26 both directions between Tuffy Road (Ava) and River Road (Ava) Motorists will encounter lane and shoulder closures with flaggers in place, Tuesday February 24th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 06:00 AM thru 06:00 PM,","update_date":"2026-04-17T10:26:04Z"},"road_event_id":"YaBRb+qc0IKB5sxlvIpdBmOkCwA=","beginning_cross_street":"Tuffy Road","ending_cross_street":"River Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T10:00:00Z","end_date":"2026-04-24T22:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.487149,43.38194]]}},{"id":"8ejl31NsWuArhR4GJacY7epqW1o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5B"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"itW2knLStnatFHTWPxAsP5PY0ms="}],"description":"Survey work on NY 5B both directions between NY 5; End NY 5B (New Hartford) and Utica Road;Start NY 12B Overlap (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:39:33Z"},"road_event_id":"8ejl31NsWuArhR4GJacY7epqW1o=","beginning_cross_street":"NY 5; End NY 5B","ending_cross_street":"Utica Road;Start NY 12B Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.3264,43.082801]]}},{"id":"itW2knLStnatFHTWPxAsP5PY0ms=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8ejl31NsWuArhR4GJacY7epqW1o="},{"type":"next-occurrence","id":"D9MmE5Fb4pxED86yMdKAqjji/1s="}],"description":"Survey work on NY 5B both directions between NY 5; End NY 5B (New Hartford) and Utica Road;Start NY 12B Overlap (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:39:33Z"},"road_event_id":"itW2knLStnatFHTWPxAsP5PY0ms=","beginning_cross_street":"NY 5; End NY 5B","ending_cross_street":"Utica Road;Start NY 12B Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.3264,43.082801]]}},{"id":"D9MmE5Fb4pxED86yMdKAqjji/1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5B"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"8ejl31NsWuArhR4GJacY7epqW1o="}],"description":"Survey work on NY 5B both directions between NY 5; End NY 5B (New Hartford) and Utica Road;Start NY 12B Overlap (Kirkland) Motorists will encounter lane closures in both directions with flaggers in place, Monday April 13th, 2026 thru Friday April 24th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM,","update_date":"2026-04-20T15:39:33Z"},"road_event_id":"D9MmE5Fb4pxED86yMdKAqjji/1s=","beginning_cross_street":"NY 5; End NY 5B","ending_cross_street":"Utica Road;Start NY 12B Overlap","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T21:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.3264,43.082801]]}},{"id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xUA0W5fAcV4KH+eRU7R4jaUZimg="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"xUA0W5fAcV4KH+eRU7R4jaUZimg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"MUD8evSPFJ794j89D48HtHlxTK4="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"xUA0W5fAcV4KH+eRU7R4jaUZimg=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"MUD8evSPFJ794j89D48HtHlxTK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"QJL7mk+S9YcecZqV5h0edBw+DgY="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"MUD8evSPFJ794j89D48HtHlxTK4=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"QJL7mk+S9YcecZqV5h0edBw+DgY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"gfrAyikqQLfaJZWEDU9eWc0XZn8="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"QJL7mk+S9YcecZqV5h0edBw+DgY=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"gfrAyikqQLfaJZWEDU9eWc0XZn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"vbT1pONf3S+OpltMkl26ATd6PP8="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"gfrAyikqQLfaJZWEDU9eWc0XZn8=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"vbT1pONf3S+OpltMkl26ATd6PP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"4NXWZbrO1Ma1GjMgTaYYdBSMB6w="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"vbT1pONf3S+OpltMkl26ATd6PP8=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"4NXWZbrO1Ma1GjMgTaYYdBSMB6w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"ihk+gYDF2QfPLsakK5w7VlCRzDw="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"4NXWZbrO1Ma1GjMgTaYYdBSMB6w=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"ihk+gYDF2QfPLsakK5w7VlCRzDw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"ltUJ1DGEhExzVgwQxpYOOu/gQ2E="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"ihk+gYDF2QfPLsakK5w7VlCRzDw=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"ltUJ1DGEhExzVgwQxpYOOu/gQ2E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"oPsRMB3Um+yy1mYavx11s305IUE="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"ltUJ1DGEhExzVgwQxpYOOu/gQ2E=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"oPsRMB3Um+yy1mYavx11s305IUE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="},{"type":"next-occurrence","id":"GxPeOJGMnlk0WD549iFcT7tB82c="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"oPsRMB3Um+yy1mYavx11s305IUE=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"GxPeOJGMnlk0WD549iFcT7tB82c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"SPuKcwOLNW4YZtzfTsaqgIG+DXE="}],"description":"Crack sealing and milling and paving operations on I-91 northbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:06:08Z"},"road_event_id":"GxPeOJGMnlk0WD549iFcT7tB82c=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.599834,41.953601]]}},{"id":"toZk+W9U6tpko6aY9Ww+Kl8vMew=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"aAAniiiBS6tFpsxS1lcYQ5gSYK4="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"toZk+W9U6tpko6aY9Ww+Kl8vMew=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"aAAniiiBS6tFpsxS1lcYQ5gSYK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"28xDknvEPu+4mt9h2pV1Jn2cVbI="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"aAAniiiBS6tFpsxS1lcYQ5gSYK4=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"28xDknvEPu+4mt9h2pV1Jn2cVbI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"OIrO4owlxCHpGccZx60jmkqH/bU="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"28xDknvEPu+4mt9h2pV1Jn2cVbI=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"OIrO4owlxCHpGccZx60jmkqH/bU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"IzTIKHb5A64V93LYj7HiOvt2Myc="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"OIrO4owlxCHpGccZx60jmkqH/bU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"IzTIKHb5A64V93LYj7HiOvt2Myc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"Ob9A3RvzRl5KGKEJG20litwgY04="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"IzTIKHb5A64V93LYj7HiOvt2Myc=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"Ob9A3RvzRl5KGKEJG20litwgY04=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"IPmnEbBvAttXIChb+iS+MPZp5gc="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"Ob9A3RvzRl5KGKEJG20litwgY04=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"IPmnEbBvAttXIChb+iS+MPZp5gc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"JAAMtOjxk0bwbPlbqbSvwcKNODg="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"IPmnEbBvAttXIChb+iS+MPZp5gc=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"JAAMtOjxk0bwbPlbqbSvwcKNODg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"TIJbK/lLSCO9NA93+gUC3YImBec="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"JAAMtOjxk0bwbPlbqbSvwcKNODg=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"TIJbK/lLSCO9NA93+gUC3YImBec=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"OTxl0gTNt4il6POC8gy+HWqEnVU="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"TIJbK/lLSCO9NA93+gUC3YImBec=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"OTxl0gTNt4il6POC8gy+HWqEnVU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="},{"type":"next-occurrence","id":"qTuY4opFtrZTcLhJLLPV9zfAG3M="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"OTxl0gTNt4il6POC8gy+HWqEnVU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"qTuY4opFtrZTcLhJLLPV9zfAG3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"toZk+W9U6tpko6aY9Ww+Kl8vMew="}],"description":"Crack sealing and line striping and milling on I-91 northbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:11:04Z"},"road_event_id":"qTuY4opFtrZTcLhJLLPV9zfAG3M=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.598131,41.952926]]}},{"id":"LbolNguvz8DdrAhVhPe19Q6/XNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"VjK53XkGb2WxGcRD9fzHTZB+YF0="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"LbolNguvz8DdrAhVhPe19Q6/XNg=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"VjK53XkGb2WxGcRD9fzHTZB+YF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"IVBdbVo4QfAPioqYP+CPNkeNeaM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"VjK53XkGb2WxGcRD9fzHTZB+YF0=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"IVBdbVo4QfAPioqYP+CPNkeNeaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"LROeGAWOmOrZO5xHsBFyMVOEorE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"IVBdbVo4QfAPioqYP+CPNkeNeaM=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"LROeGAWOmOrZO5xHsBFyMVOEorE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"oDbc9PJ6oPOZwZl+YZb7CSJXC3M="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"LROeGAWOmOrZO5xHsBFyMVOEorE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"oDbc9PJ6oPOZwZl+YZb7CSJXC3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"14bBTNLgDlgZeefyNfkyT5TDg9s="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"oDbc9PJ6oPOZwZl+YZb7CSJXC3M=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"14bBTNLgDlgZeefyNfkyT5TDg9s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"bmzq2SMNNfo8CSFLS8uW4vLiYi8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"14bBTNLgDlgZeefyNfkyT5TDg9s=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"bmzq2SMNNfo8CSFLS8uW4vLiYi8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"B411Wztu33i7+zJIYhfFLw9OZ3E="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"bmzq2SMNNfo8CSFLS8uW4vLiYi8=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"B411Wztu33i7+zJIYhfFLw9OZ3E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"w7r4qwQNrT8Iv3+9f7afwFM/QnY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"B411Wztu33i7+zJIYhfFLw9OZ3E=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"w7r4qwQNrT8Iv3+9f7afwFM/QnY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"TykJhv1jNJyOrmz7XZiw2PDpmRs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"w7r4qwQNrT8Iv3+9f7afwFM/QnY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"TykJhv1jNJyOrmz7XZiw2PDpmRs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="},{"type":"next-occurrence","id":"FORzhzwEzmzxEu0rFNgJqjOR/hw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"TykJhv1jNJyOrmz7XZiw2PDpmRs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"FORzhzwEzmzxEu0rFNgJqjOR/hw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"LbolNguvz8DdrAhVhPe19Q6/XNg="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:59:06Z"},"road_event_id":"FORzhzwEzmzxEu0rFNgJqjOR/hw=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.609521,41.930107]]}},{"id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Mh7csuohyOfs97/92hIjh1dWNro="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"Mh7csuohyOfs97/92hIjh1dWNro=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"GgTZFKYNgq8zf3XyCO6ZvO5BzMc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"Mh7csuohyOfs97/92hIjh1dWNro=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"GgTZFKYNgq8zf3XyCO6ZvO5BzMc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"84aOcQrMVW/63T1XFbmv35ltrRA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"GgTZFKYNgq8zf3XyCO6ZvO5BzMc=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"84aOcQrMVW/63T1XFbmv35ltrRA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"MYSOk58sfMAehtmwEeSPEORVFoE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"84aOcQrMVW/63T1XFbmv35ltrRA=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"MYSOk58sfMAehtmwEeSPEORVFoE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"uo/t1QJ+YnLEI0WkfYCwIIndTNs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"MYSOk58sfMAehtmwEeSPEORVFoE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"uo/t1QJ+YnLEI0WkfYCwIIndTNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"jXtXoiNtFAJR+jg+rD4DroP2/7A="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"uo/t1QJ+YnLEI0WkfYCwIIndTNs=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"jXtXoiNtFAJR+jg+rD4DroP2/7A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"MVK9RwLa6AVzXavHtbdaGH4PVyA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"jXtXoiNtFAJR+jg+rD4DroP2/7A=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"MVK9RwLa6AVzXavHtbdaGH4PVyA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"HbDr59JPVBt+nFkHIxlVTpTK4lw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"MVK9RwLa6AVzXavHtbdaGH4PVyA=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"HbDr59JPVBt+nFkHIxlVTpTK4lw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"oz8U/PQio4CJKIPviBVoqV3jBsw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"HbDr59JPVBt+nFkHIxlVTpTK4lw=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"oz8U/PQio4CJKIPviBVoqV3jBsw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="},{"type":"next-occurrence","id":"xLmqEDs9G809Gh24unA3/Q5Aagw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"oz8U/PQio4CJKIPviBVoqV3jBsw=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"xLmqEDs9G809Gh24unA3/Q5Aagw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"apGX1cT/Ao7sOifFzDD/Tg8Hxyo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:03:05Z"},"road_event_id":"xLmqEDs9G809Gh24unA3/Q5Aagw=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.608473,41.932229]]}},{"id":"yUvSOzCsqGtKExWRcnOYdGSmDwI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"efwey7WJDxV62AybLJTN22FwXh4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"yUvSOzCsqGtKExWRcnOYdGSmDwI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"efwey7WJDxV62AybLJTN22FwXh4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"6Va9aEINL5E2WGUKqL7A+LCdiJQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"efwey7WJDxV62AybLJTN22FwXh4=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"6Va9aEINL5E2WGUKqL7A+LCdiJQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"20ZLondB/9sIpIcVbgeZPyle/dU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"6Va9aEINL5E2WGUKqL7A+LCdiJQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"20ZLondB/9sIpIcVbgeZPyle/dU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"FS3S3acmtO2VLWyPiztG9B82nKk="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"20ZLondB/9sIpIcVbgeZPyle/dU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"FS3S3acmtO2VLWyPiztG9B82nKk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"syutuVnLaVjxOEVhqtiyoJrRy3A="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"FS3S3acmtO2VLWyPiztG9B82nKk=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"syutuVnLaVjxOEVhqtiyoJrRy3A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"cfsRlvgGbpKWDfBwiopBenywt8g="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"syutuVnLaVjxOEVhqtiyoJrRy3A=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"cfsRlvgGbpKWDfBwiopBenywt8g=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"e59bgk+9Gq5LRCL9+7CxvkB/r8c="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"cfsRlvgGbpKWDfBwiopBenywt8g=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"e59bgk+9Gq5LRCL9+7CxvkB/r8c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"/djIG/J5Zemc/FqgtavnCdzWlw4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"e59bgk+9Gq5LRCL9+7CxvkB/r8c=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"/djIG/J5Zemc/FqgtavnCdzWlw4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"Nn7DvEwQR+RN7PT4rgy20PdGPDY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"/djIG/J5Zemc/FqgtavnCdzWlw4=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"Nn7DvEwQR+RN7PT4rgy20PdGPDY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="},{"type":"next-occurrence","id":"6DxAHBbbSQWTPChMpSdt5ftlH1s="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"Nn7DvEwQR+RN7PT4rgy20PdGPDY=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"6DxAHBbbSQWTPChMpSdt5ftlH1s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"yUvSOzCsqGtKExWRcnOYdGSmDwI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Entrance ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:56:47Z"},"road_event_id":"6DxAHBbbSQWTPChMpSdt5ftlH1s=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.607827,41.93038]]}},{"id":"TKvgJOTL7CT7aysol0iVSkY8qEc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Eastbound between West of Exit 4 - Eisenhower Pkwy/CR 609 (East Hanover Twp) and East of Exit 4 - Eisenhower Pkwy/CR 609 (Roseland), Thursday April 23, 2026 10:00 PM thru Friday April 24, 2026 06:00 AM, right lane closed","update_date":"2026-04-22T13:57:20Z"},"road_event_id":"TKvgJOTL7CT7aysol0iVSkY8qEc=","beginning_cross_street":"West of Exit 4 - Eisenhower Pkwy/CR 609","ending_cross_street":"East of Exit 4 - Eisenhower Pkwy/CR 609","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T08:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.334503,40.834114]]}},{"id":"cMRqw3rwjLu80L7s6uJgl12omD8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"HifASLx5Oso2V1mcMST4rcxC9fE="}],"description":"Utility work on NY 64 both directions between Vincent Hill Rd. (Bristol) and NY 5 and 20; US 20 (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T18:48:46Z"},"road_event_id":"cMRqw3rwjLu80L7s6uJgl12omD8=","beginning_cross_street":"Vincent Hill Rd.","ending_cross_street":"NY 5 and 20; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.401136,42.835427]]}},{"id":"HifASLx5Oso2V1mcMST4rcxC9fE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cMRqw3rwjLu80L7s6uJgl12omD8="},{"type":"next-occurrence","id":"CJbXgSp9302lbQdMXiM9sqC87Wg="}],"description":"Utility work on NY 64 both directions between Vincent Hill Rd. (Bristol) and NY 5 and 20; US 20 (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T18:48:46Z"},"road_event_id":"HifASLx5Oso2V1mcMST4rcxC9fE=","beginning_cross_street":"Vincent Hill Rd.","ending_cross_street":"NY 5 and 20; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.401136,42.835427]]}},{"id":"CJbXgSp9302lbQdMXiM9sqC87Wg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 64"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"cMRqw3rwjLu80L7s6uJgl12omD8="}],"description":"Utility work on NY 64 both directions between Vincent Hill Rd. (Bristol) and NY 5 and 20; US 20 (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T18:48:46Z"},"road_event_id":"CJbXgSp9302lbQdMXiM9sqC87Wg=","beginning_cross_street":"Vincent Hill Rd.","ending_cross_street":"NY 5 and 20; US 20","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.401136,42.835427]]}},{"id":"DMOmBu7fBILKZVm33qpOCM9Pu/I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"3BrASvYRkQNrVPi5UiQTP6M+URw="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"DMOmBu7fBILKZVm33qpOCM9Pu/I=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"3BrASvYRkQNrVPi5UiQTP6M+URw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="},{"type":"next-occurrence","id":"GhJAVHLUx14nr9/sA77vUZeK6o4="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"3BrASvYRkQNrVPi5UiQTP6M+URw=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"GhJAVHLUx14nr9/sA77vUZeK6o4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="},{"type":"next-occurrence","id":"e5O3FSJ56TZ9A8hXAz0mnTtj5cA="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"GhJAVHLUx14nr9/sA77vUZeK6o4=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-26T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"e5O3FSJ56TZ9A8hXAz0mnTtj5cA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="},{"type":"next-occurrence","id":"8IcPA5IV7BmEuc5Bx9O/8Q3JaPU="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"e5O3FSJ56TZ9A8hXAz0mnTtj5cA=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T18:00:00Z","end_date":"2026-04-27T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"8IcPA5IV7BmEuc5Bx9O/8Q3JaPU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="},{"type":"next-occurrence","id":"o88fwcyvCUaZ8Yle26xvCubUSsU="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"8IcPA5IV7BmEuc5Bx9O/8Q3JaPU=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"o88fwcyvCUaZ8Yle26xvCubUSsU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="},{"type":"next-occurrence","id":"vMIZx6qtEOYtgdi7/GEzppgTAak="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"o88fwcyvCUaZ8Yle26xvCubUSsU=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"vMIZx6qtEOYtgdi7/GEzppgTAak=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="},{"type":"next-occurrence","id":"Sy5fAxnOqoUHSLS/paUrir7x3wg="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"vMIZx6qtEOYtgdi7/GEzppgTAak=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"Sy5fAxnOqoUHSLS/paUrir7x3wg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="},{"type":"next-occurrence","id":"YKqk1bTc+ARPcKLWZZxxZ2z/b6o="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"Sy5fAxnOqoUHSLS/paUrir7x3wg=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"YKqk1bTc+ARPcKLWZZxxZ2z/b6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 245"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"DMOmBu7fBILKZVm33qpOCM9Pu/I="}],"description":"Drainage improvements on NY 245 both directions W RIVER RD (Italy) to Town of Middlesex; Town of Italy Line (Italy) 1lane2way flagger, Thursday April 23rd, 2026 thru Friday May 1st, 2026, Sunday thru Saturday, 07:00 AM thru 03:30 PM All lanes open","update_date":"2026-04-22T14:22:08Z"},"road_event_id":"YKqk1bTc+ARPcKLWZZxxZ2z/b6o=","beginning_cross_street":"W RIVER RD","ending_cross_street":"Town of Middlesex; Town of Italy Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T02:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.329812,42.654327]]}},{"id":"snyt0PbbSk3CPSE/nu6sXIH0lYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"xnlA9Woa8jZB/Th1PQGODxSojY8="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"snyt0PbbSk3CPSE/nu6sXIH0lYU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"xnlA9Woa8jZB/Th1PQGODxSojY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"tYamSuXLhcEJu7sa8dBwZ6W9ceA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"xnlA9Woa8jZB/Th1PQGODxSojY8=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"tYamSuXLhcEJu7sa8dBwZ6W9ceA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"GX+f5hOGy5b33LdoVmHF2fUVYRE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"tYamSuXLhcEJu7sa8dBwZ6W9ceA=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"GX+f5hOGy5b33LdoVmHF2fUVYRE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"av7/J3THtum5MjvykePpbeoDWdE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"GX+f5hOGy5b33LdoVmHF2fUVYRE=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"av7/J3THtum5MjvykePpbeoDWdE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"xyY3lNCAt0J51ktoIeEn0LyIjvs="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"av7/J3THtum5MjvykePpbeoDWdE=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"xyY3lNCAt0J51ktoIeEn0LyIjvs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"qH7YI/klnraVWCo/PFwh1ohNNqA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"xyY3lNCAt0J51ktoIeEn0LyIjvs=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"qH7YI/klnraVWCo/PFwh1ohNNqA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"JmAzCPV2U4KcA0zk44p0wniuzxc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"qH7YI/klnraVWCo/PFwh1ohNNqA=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"JmAzCPV2U4KcA0zk44p0wniuzxc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"TpaHw26CNDmU6pSrI32xHYPET4c="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"JmAzCPV2U4KcA0zk44p0wniuzxc=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"TpaHw26CNDmU6pSrI32xHYPET4c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"kxGo65K8XmtSLuhyvCXhR5jON3s="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"TpaHw26CNDmU6pSrI32xHYPET4c=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"kxGo65K8XmtSLuhyvCXhR5jON3s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="},{"type":"next-occurrence","id":"iN0jofjW4X0mBpa9SYzMpEF9q8U="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"kxGo65K8XmtSLuhyvCXhR5jON3s=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"iN0jofjW4X0mBpa9SYzMpEF9q8U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"snyt0PbbSk3CPSE/nu6sXIH0lYU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Exit ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:14:35Z"},"road_event_id":"iN0jofjW4X0mBpa9SYzMpEF9q8U=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.597859,41.954962]]}},{"id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"c3M13WDkOnLiKooS4uugDBABmgw="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"c3M13WDkOnLiKooS4uugDBABmgw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"GBKMcYLSIRGarQF42+hIBtvFHwo="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"c3M13WDkOnLiKooS4uugDBABmgw=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"GBKMcYLSIRGarQF42+hIBtvFHwo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"QBlgRcawcEr3IgCaSH1+hw53NHY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"GBKMcYLSIRGarQF42+hIBtvFHwo=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"QBlgRcawcEr3IgCaSH1+hw53NHY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"vTwneO0LFQZgfWj/BC+rtG59zUY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"QBlgRcawcEr3IgCaSH1+hw53NHY=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"vTwneO0LFQZgfWj/BC+rtG59zUY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"K2tWohzD/epl+548+Y0bNE7f4nc="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"vTwneO0LFQZgfWj/BC+rtG59zUY=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"K2tWohzD/epl+548+Y0bNE7f4nc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"Qfb86vpT93wSQBRo/8u4kXEjBGY="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"K2tWohzD/epl+548+Y0bNE7f4nc=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"Qfb86vpT93wSQBRo/8u4kXEjBGY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"lAvHxunI5Vw6u65pNnR2igMLy48="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"Qfb86vpT93wSQBRo/8u4kXEjBGY=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"lAvHxunI5Vw6u65pNnR2igMLy48=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"MG8uj3N37JOgrgm6Voc+lcUC31s="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"lAvHxunI5Vw6u65pNnR2igMLy48=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"MG8uj3N37JOgrgm6Voc+lcUC31s=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"RNS4RYvE7gMPFrFqV5z+73yDmXU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"MG8uj3N37JOgrgm6Voc+lcUC31s=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"RNS4RYvE7gMPFrFqV5z+73yDmXU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="},{"type":"next-occurrence","id":"ivb07asM2V2KlN31NLVaGrc0jy4="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"RNS4RYvE7gMPFrFqV5z+73yDmXU=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"ivb07asM2V2KlN31NLVaGrc0jy4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vr/Ek9TZQywhDBwxBg9TSwSVJjA="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 southbound Entrance ramp Exit 46 - US 5/King Street (Enfield), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T14:17:42Z"},"road_event_id":"ivb07asM2V2KlN31NLVaGrc0jy4=","beginning_cross_street":"Exit 46 - US 5/King Street","ending_cross_street":"Exit 46 - US 5/King Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.601023,41.95389]]}},{"id":"67+IjO8HQVNuaDx4BFlFM0HGTG0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"wrZdPyrJxD1War/STfhLPN5tndk="}],"description":"Utility work on NY 5 both directions between Sand Rd (West Bloomfield) and Route 64 Junction (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T19:29:12Z"},"road_event_id":"67+IjO8HQVNuaDx4BFlFM0HGTG0=","beginning_cross_street":"Sand Rd","ending_cross_street":"Route 64 Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.484931,42.902457]]}},{"id":"wrZdPyrJxD1War/STfhLPN5tndk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"67+IjO8HQVNuaDx4BFlFM0HGTG0="},{"type":"next-occurrence","id":"5FdycKlLmEhcKRL5beb6eReiPls="}],"description":"Utility work on NY 5 both directions between Sand Rd (West Bloomfield) and Route 64 Junction (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T19:29:12Z"},"road_event_id":"wrZdPyrJxD1War/STfhLPN5tndk=","beginning_cross_street":"Sand Rd","ending_cross_street":"Route 64 Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.484931,42.902457]]}},{"id":"5FdycKlLmEhcKRL5beb6eReiPls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 5"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"67+IjO8HQVNuaDx4BFlFM0HGTG0="}],"description":"Utility work on NY 5 both directions between Sand Rd (West Bloomfield) and Route 64 Junction (East Bloomfield) Alternating lane closures with flaggers as needed, Tuesday April 14th, 2026 thru Friday April 24th, 2026, Monday thru Friday, 09:00 AM thru 03:00 PM All lanes","update_date":"2026-04-13T19:29:12Z"},"road_event_id":"5FdycKlLmEhcKRL5beb6eReiPls=","beginning_cross_street":"Sand Rd","ending_cross_street":"Route 64 Junction","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.484931,42.902457]]}},{"id":"IsFlAgU64hRSVgkx6/idHGhHmuc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["Bx39 Bus"],"direction":"unknown","related_road_events":[],"description":"Due to Construction southbound, Bx39 Bus on White Plains Rd/E 215 St (New York) is closed; please use the new stop on White Plains Rd at E 216th St instead., Continuous Friday January 17th, 2025 12:00 AM thru Monday November 30th, 2026 11:59 PM","update_date":"2026-03-09T12:28:03Z"},"road_event_id":"IsFlAgU64hRSVgkx6/idHGhHmuc=","beginning_cross_street":"White Plains Rd/E 215 St","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.864544,40.880382]]}},{"id":"lD94dG4rPIOAcOdKnyWvJ6H7n80=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-295"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-295 Southbound at North of Exit 60 - I-195/NJ 129 (Hamilton Twp) Tuesday April 28, 2026 10:00 AM thru 03:00 PM, ramp","update_date":"2026-04-07T14:38:01Z"},"road_event_id":"lD94dG4rPIOAcOdKnyWvJ6H7n80=","beginning_cross_street":"North of Exit 60 - I-195/NJ 129","ending_cross_street":"North of Exit 60 - I-195/NJ 129","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T05:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.720474,40.188735]]}},{"id":"XsA7diFAPBNcnnB6fYKyzobheEY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["US 130"],"direction":"unknown","related_road_events":[],"description":"Roadwork on US 130 Southbound near South of CR 612/Browning Rd (Pennsauken Twp), Wednesday April 29, 2026 09:00 AM thru 03:00 PM, right lane closed","update_date":"2026-04-22T13:48:25Z"},"road_event_id":"XsA7diFAPBNcnnB6fYKyzobheEY=","beginning_cross_street":"South of CR 612/Browning Rd","ending_cross_street":"South of CR 612/Browning Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T22:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-75.061408,39.953582]]}},{"id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"9HbBDKLDGnqF28cIo7zYdKWmlaM="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T23:00:00Z","end_date":"2026-04-23T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"9HbBDKLDGnqF28cIo7zYdKWmlaM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"TrZnNk74k5iiVRXIdYFW0gb+zBk="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"9HbBDKLDGnqF28cIo7zYdKWmlaM=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T23:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"TrZnNk74k5iiVRXIdYFW0gb+zBk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"/vTIiTVYZGAD4ISAOoCjcHOFp4E="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"TrZnNk74k5iiVRXIdYFW0gb+zBk=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T23:00:00Z","end_date":"2026-04-25T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"/vTIiTVYZGAD4ISAOoCjcHOFp4E=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"jhdYQO64mIw+l5qzD3kzPiWAlmw="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"/vTIiTVYZGAD4ISAOoCjcHOFp4E=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T23:00:00Z","end_date":"2026-04-26T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"jhdYQO64mIw+l5qzD3kzPiWAlmw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"pUV6azEjKACYyrbjtIuWZNiF8sA="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"jhdYQO64mIw+l5qzD3kzPiWAlmw=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T23:00:00Z","end_date":"2026-04-27T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"pUV6azEjKACYyrbjtIuWZNiF8sA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"UdRCHAXPp54kh7hLj1bNFqrVpxQ="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"pUV6azEjKACYyrbjtIuWZNiF8sA=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T23:00:00Z","end_date":"2026-04-28T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"UdRCHAXPp54kh7hLj1bNFqrVpxQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"DYdox0w+ikuCZSWNp6Y9CqPPbWg="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"UdRCHAXPp54kh7hLj1bNFqrVpxQ=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T23:00:00Z","end_date":"2026-04-29T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"DYdox0w+ikuCZSWNp6Y9CqPPbWg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"ys+o1FwAZHo44V+TLt2QtO4qOP8="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"DYdox0w+ikuCZSWNp6Y9CqPPbWg=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T23:00:00Z","end_date":"2026-04-30T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"ys+o1FwAZHo44V+TLt2QtO4qOP8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"ZGC/ycAzQhbDQPZPd+O6uIAVCxU="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"ys+o1FwAZHo44V+TLt2QtO4qOP8=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T23:00:00Z","end_date":"2026-05-01T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"ZGC/ycAzQhbDQPZPd+O6uIAVCxU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"D3Ahs13npu+LPvyJNlko4ZQlB0o="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"ZGC/ycAzQhbDQPZPd+O6uIAVCxU=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T23:00:00Z","end_date":"2026-05-02T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"D3Ahs13npu+LPvyJNlko4ZQlB0o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"Blxgem8usY/nI1KJVde9ybe0wY8="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"D3Ahs13npu+LPvyJNlko4ZQlB0o=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T23:00:00Z","end_date":"2026-05-03T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"Blxgem8usY/nI1KJVde9ybe0wY8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"3nnwICy68D57vKdUznRLurNwNDA="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"Blxgem8usY/nI1KJVde9ybe0wY8=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T23:00:00Z","end_date":"2026-05-04T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"3nnwICy68D57vKdUznRLurNwNDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"nfOT8Z9KWeSGyb/3Z/QdSJdxnL8="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"3nnwICy68D57vKdUznRLurNwNDA=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T23:00:00Z","end_date":"2026-05-05T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"nfOT8Z9KWeSGyb/3Z/QdSJdxnL8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="},{"type":"next-occurrence","id":"sMRMXQrJIGDu977uv88cqdXATfY="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"nfOT8Z9KWeSGyb/3Z/QdSJdxnL8=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T23:00:00Z","end_date":"2026-05-06T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"sMRMXQrJIGDu977uv88cqdXATfY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-95"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"z3hCZMprnYOj/RkzVTAWfu2d5Uw="}],"description":"Bridge work on I-95 both directions between Exit 7 - CT 137 (Stamford) and Exit 36 - Plains Road (Milford) There will be various alternating lane closures , Sunday April 19th, 2026 thru Friday July 3rd, 2026, Sunday thru Saturday, 07:00 PM thru 06:00 AM All lanes open","update_date":"2026-04-22T13:49:30Z"},"road_event_id":"sMRMXQrJIGDu977uv88cqdXATfY=","beginning_cross_street":"Exit 7 - CT 137","ending_cross_street":"Exit 36 - Plains Road","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T23:00:00Z","end_date":"2026-05-07T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.542686,41.04732]]}},{"id":"UiqY5z83kdoFkQeZOAlHs2KrGEQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of CR 680/Jackson Av (Pequannock Twp), Wednesday April 22, 2026 10:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T13:48:23Z"},"road_event_id":"UiqY5z83kdoFkQeZOAlHs2KrGEQ=","beginning_cross_street":"North of CR 680/Jackson Av","ending_cross_street":"North of CR 680/Jackson Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T14:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.287536,40.972656]]}},{"id":"ny1rWgk+GtiCBMkJUWr7pnufKF0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 23"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 23 Northbound near North of Reservoir Rd (West Milford Twp), Thursday April 23, 2026 08:00 AM thru 03:00 PM, right shoulder closed","update_date":"2026-04-22T13:48:24Z"},"road_event_id":"ny1rWgk+GtiCBMkJUWr7pnufKF0=","beginning_cross_street":"North of Reservoir Rd","ending_cross_street":"Canistear Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T20:00:00Z","end_date":"2026-04-24T03:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.48793,41.07373]]}},{"id":"C5QhtJj+z83xIQtGit0tSIpGY2Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-280"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-280 Westbound at Exit 15 - NJ 21 (Newark) Continuous Friday April 24, 2026 09:00 AM thru Friday April 24, 2026 03:00 PM, ramp, right partial lane","update_date":"2026-04-22T13:48:22Z"},"road_event_id":"C5QhtJj+z83xIQtGit0tSIpGY2Y=","beginning_cross_street":"Exit 15 - NJ 21","ending_cross_street":"Exit 15 - NJ 21","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.165061,40.747959]]}},{"id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"LWcC1sNzMPzEhbg4MKE34pPWwOU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T00:00:00Z","end_date":"2026-04-23T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"LWcC1sNzMPzEhbg4MKE34pPWwOU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"goD+69RvbcVQcUFsO7uIa41UuWM="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"LWcC1sNzMPzEhbg4MKE34pPWwOU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"goD+69RvbcVQcUFsO7uIa41UuWM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"m7HYfQUt555W9E3rlqqok/ejaII="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"goD+69RvbcVQcUFsO7uIa41UuWM=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T00:00:00Z","end_date":"2026-04-25T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"m7HYfQUt555W9E3rlqqok/ejaII=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"mgVlP2Y2iVZ163X5t3WMZVvWt4M="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"m7HYfQUt555W9E3rlqqok/ejaII=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T00:00:00Z","end_date":"2026-04-28T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"mgVlP2Y2iVZ163X5t3WMZVvWt4M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"5SCSDkktSBh7EB8wQ6Y8XlKT5wU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"mgVlP2Y2iVZ163X5t3WMZVvWt4M=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T00:00:00Z","end_date":"2026-04-29T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"5SCSDkktSBh7EB8wQ6Y8XlKT5wU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"fAIAxvi2ZJgi25LRSOwn1Pv+rRI="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"5SCSDkktSBh7EB8wQ6Y8XlKT5wU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T00:00:00Z","end_date":"2026-04-30T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"fAIAxvi2ZJgi25LRSOwn1Pv+rRI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"qpuy2mN6hBA07QMtnA3Cj0Lf56U="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"fAIAxvi2ZJgi25LRSOwn1Pv+rRI=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T00:00:00Z","end_date":"2026-05-01T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"qpuy2mN6hBA07QMtnA3Cj0Lf56U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"UlKhoB+lPTiMvuEEX+88ZRm7hmU="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"qpuy2mN6hBA07QMtnA3Cj0Lf56U=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T00:00:00Z","end_date":"2026-05-02T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"UlKhoB+lPTiMvuEEX+88ZRm7hmU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"dssGEy89/JPF5U1qhBrEmE9oFok="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"UlKhoB+lPTiMvuEEX+88ZRm7hmU=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T00:00:00Z","end_date":"2026-05-05T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"dssGEy89/JPF5U1qhBrEmE9oFok=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="},{"type":"next-occurrence","id":"5dMP7yAHm9U8AFYAykhIcaYpRIQ="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"dssGEy89/JPF5U1qhBrEmE9oFok=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T00:00:00Z","end_date":"2026-05-06T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"5dMP7yAHm9U8AFYAykhIcaYpRIQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-91"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"IZPEi9SK/lM4Pc+XoHTEc27hpuE="}],"description":"Crack sealing and line striping and milling and paving operations on I-91 northbound Exit ramp Exit 45 - CT 140 (East Windsor), Monday April 20th, 2026 thru Friday May 29th, 2026, Monday thru Friday, 08:00 PM thru 05:00 AM All lanes closed","update_date":"2026-04-22T13:54:26Z"},"road_event_id":"5dMP7yAHm9U8AFYAykhIcaYpRIQ=","beginning_cross_street":"Exit 45 - CT 140","ending_cross_street":"Exit 45 - CT 140","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-07T00:00:00Z","end_date":"2026-05-07T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-72.60891,41.928292]]}},{"id":"B4q0QW+niNG93RntCxCnr95KHts=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"7IkNbJibHC2DdVWkDl10vwYTVj8="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"B4q0QW+niNG93RntCxCnr95KHts=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T11:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"7IkNbJibHC2DdVWkDl10vwYTVj8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"Zq4vxUVJWCi1lOEWacdc35jopbk="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"7IkNbJibHC2DdVWkDl10vwYTVj8=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"Zq4vxUVJWCi1lOEWacdc35jopbk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"afQeGQ9O3DRB0m32v7II6I/WbQA="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"Zq4vxUVJWCi1lOEWacdc35jopbk=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"afQeGQ9O3DRB0m32v7II6I/WbQA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"1m92C4QeI/Ywq+TJLkofnMZwwdc="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"afQeGQ9O3DRB0m32v7II6I/WbQA=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T11:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"1m92C4QeI/Ywq+TJLkofnMZwwdc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"1bAYEHZ/juwbai7sMrCPaCmkhg0="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"1m92C4QeI/Ywq+TJLkofnMZwwdc=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T11:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"1bAYEHZ/juwbai7sMrCPaCmkhg0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"fPUw9TUIbV9Qbg5ZzEot3bYPerQ="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"1bAYEHZ/juwbai7sMrCPaCmkhg0=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T11:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"fPUw9TUIbV9Qbg5ZzEot3bYPerQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"3hn0oTCregKFAfynjnJ8epeaof0="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"fPUw9TUIbV9Qbg5ZzEot3bYPerQ=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T11:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"3hn0oTCregKFAfynjnJ8epeaof0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"fAyMOlPidi7BHbcbtHvEps/FH20="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"3hn0oTCregKFAfynjnJ8epeaof0=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T11:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"fAyMOlPidi7BHbcbtHvEps/FH20=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"35EZkS27JJrg3QHiWAvuJRRnZM0="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"fAyMOlPidi7BHbcbtHvEps/FH20=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T11:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"35EZkS27JJrg3QHiWAvuJRRnZM0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"K6pJefPukQ117+v6lL10MFUrHds="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"35EZkS27JJrg3QHiWAvuJRRnZM0=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T11:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"K6pJefPukQ117+v6lL10MFUrHds=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"20/kIbMLcFF2McE2yK1l7TUaz1I="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"K6pJefPukQ117+v6lL10MFUrHds=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T11:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"20/kIbMLcFF2McE2yK1l7TUaz1I=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="},{"type":"next-occurrence","id":"ZIkZ/wIdoWsAZSag/m9o+9cdWTo="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"20/kIbMLcFF2McE2yK1l7TUaz1I=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T11:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"ZIkZ/wIdoWsAZSag/m9o+9cdWTo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"B4q0QW+niNG93RntCxCnr95KHts="}],"description":"Mowing on I-690 westbound between Exit 15A - West Street (Syracuse) and Exit 7A - Jones Road; CR 118 (Van Buren) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 07:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:52:05Z"},"road_event_id":"ZIkZ/wIdoWsAZSag/m9o+9cdWTo=","beginning_cross_street":"Exit 15A - West Street","ending_cross_street":"Exit 7A - Jones Road; CR 118","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T11:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.153249,43.054109]]}},{"id":"HbdJr9a3UvnGBd59jbVSg7YqHTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-195"],"direction":"unknown","related_road_events":[],"description":"Roadwork on I-195 Eastbound near West of Exit 5 - US 130 (Hamilton Twp), Tuesday April 28, 2026 09:00 AM thru 05:00 PM, right shoulder closed","update_date":"2026-04-07T14:37:57Z"},"road_event_id":"HbdJr9a3UvnGBd59jbVSg7YqHTk=","beginning_cross_street":"West of Exit 5 - US 130","ending_cross_street":"East of Exit 5 - US 130","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T22:00:00Z","end_date":"2026-04-29T06:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.644309,40.203338]]}},{"id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"cy+2kiyTzBIkzNJNQb0IVhDlF8Q="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"cy+2kiyTzBIkzNJNQb0IVhDlF8Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"4C6E4QuWJZUCDJITFtY4DxpQiDA="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"cy+2kiyTzBIkzNJNQb0IVhDlF8Q=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"4C6E4QuWJZUCDJITFtY4DxpQiDA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"frmczwmPjKhNZ18jpU0+ETLSKSI="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"4C6E4QuWJZUCDJITFtY4DxpQiDA=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"frmczwmPjKhNZ18jpU0+ETLSKSI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"TEpiV39uMSDOXhnq9coVjtvLFuM="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"frmczwmPjKhNZ18jpU0+ETLSKSI=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"TEpiV39uMSDOXhnq9coVjtvLFuM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"6DpDOMLJR3vWzJlfpNtL0BS6Y7U="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"TEpiV39uMSDOXhnq9coVjtvLFuM=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"6DpDOMLJR3vWzJlfpNtL0BS6Y7U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"wg4BvEqK/5nqOy4w2KJp/1fEVFg="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"6DpDOMLJR3vWzJlfpNtL0BS6Y7U=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"wg4BvEqK/5nqOy4w2KJp/1fEVFg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"WyGE9nRYw5VSCcIwVYI0vXRgOK0="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"wg4BvEqK/5nqOy4w2KJp/1fEVFg=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"WyGE9nRYw5VSCcIwVYI0vXRgOK0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"VHEOai6mGJcu3CEj1tIuvigcZjU="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"WyGE9nRYw5VSCcIwVYI0vXRgOK0=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"VHEOai6mGJcu3CEj1tIuvigcZjU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"RIyB/1sso1+Lhil+fMrLw/a2DAc="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"VHEOai6mGJcu3CEj1tIuvigcZjU=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"RIyB/1sso1+Lhil+fMrLw/a2DAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"fYpvHR3RGCPJ7ptDHjw3beSq+4U="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"RIyB/1sso1+Lhil+fMrLw/a2DAc=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"fYpvHR3RGCPJ7ptDHjw3beSq+4U=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"5y5l6J7oK9p2MzaB/drALRS5s2A="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"fYpvHR3RGCPJ7ptDHjw3beSq+4U=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"5y5l6J7oK9p2MzaB/drALRS5s2A=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="},{"type":"next-occurrence","id":"OHleWbUe7I/062qBezeVuAHbpNA="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"5y5l6J7oK9p2MzaB/drALRS5s2A=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"OHleWbUe7I/062qBezeVuAHbpNA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"vIdDYt8LN2Sr6agnSSnnIRzhcO8="}],"description":"Mowing on I-690 westbound between I-481 (De Witt) and Exit 18 - Midler Avenue (Syracuse) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:53:47Z"},"road_event_id":"OHleWbUe7I/062qBezeVuAHbpNA=","beginning_cross_street":"I-481","ending_cross_street":"Exit 18 - Midler Avenue","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.062073,43.057009]]}},{"id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"deFrFEC8AyHcqFw25fwGbfpESNg="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"deFrFEC8AyHcqFw25fwGbfpESNg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"LfL2wmITSpotuAWSOD2zCRQI1tY="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"deFrFEC8AyHcqFw25fwGbfpESNg=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"LfL2wmITSpotuAWSOD2zCRQI1tY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"UXnRt8JBGQ1J1fWZuh1LsPCOUFI="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"LfL2wmITSpotuAWSOD2zCRQI1tY=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"UXnRt8JBGQ1J1fWZuh1LsPCOUFI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"VfIbOkMscuY1I0EQ0dkVcRJrxg4="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"UXnRt8JBGQ1J1fWZuh1LsPCOUFI=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"VfIbOkMscuY1I0EQ0dkVcRJrxg4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"kGO5zPEE3nfnnQpeqBCOfuZKdy8="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"VfIbOkMscuY1I0EQ0dkVcRJrxg4=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"kGO5zPEE3nfnnQpeqBCOfuZKdy8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"ZdthieRMrZas7LDmNopFqlNdZZg="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"kGO5zPEE3nfnnQpeqBCOfuZKdy8=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"ZdthieRMrZas7LDmNopFqlNdZZg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"zJDhUAMfzVVvc3exmMWLGv2ouQI="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"ZdthieRMrZas7LDmNopFqlNdZZg=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"zJDhUAMfzVVvc3exmMWLGv2ouQI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"UMj+2rjRG3BynJ21OtS41oD5UAc="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"zJDhUAMfzVVvc3exmMWLGv2ouQI=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"UMj+2rjRG3BynJ21OtS41oD5UAc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"K85pyaLVmxs60YALK5TQErom0JA="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"UMj+2rjRG3BynJ21OtS41oD5UAc=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"K85pyaLVmxs60YALK5TQErom0JA=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"GV3oeRgYcNiZhra3hcUJ4RbdnF4="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"K85pyaLVmxs60YALK5TQErom0JA=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"GV3oeRgYcNiZhra3hcUJ4RbdnF4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"Whs06Yh6ohNxgE5SLB3MKpkFaBY="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"GV3oeRgYcNiZhra3hcUJ4RbdnF4=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"Whs06Yh6ohNxgE5SLB3MKpkFaBY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="},{"type":"next-occurrence","id":"QyaORDTXKNadeejGTDeT1xO/WB4="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"Whs06Yh6ohNxgE5SLB3MKpkFaBY=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"QyaORDTXKNadeejGTDeT1xO/WB4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"lZ4HMwBmPXL0xUvmBhRoFgilqK4="}],"description":"Mowing on I-690 eastbound between Exit 7 - Jones Road; CR 118 (Van Buren) and Exit 15 - West Street (Syracuse) Mobile left shoulder closure , Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:49:42Z"},"road_event_id":"QyaORDTXKNadeejGTDeT1xO/WB4=","beginning_cross_street":"Exit 7 - Jones Road; CR 118","ending_cross_street":"Exit 15 - West Street","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.285598,43.111696]]}},{"id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Amvr+lhhvO7c7pQyWdWWT6gAA5k="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T13:00:00Z","end_date":"2026-04-22T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"Amvr+lhhvO7c7pQyWdWWT6gAA5k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"BBM019j6wT+ck7JKnjs9LoUFFTE="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"Amvr+lhhvO7c7pQyWdWWT6gAA5k=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T13:00:00Z","end_date":"2026-04-23T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"BBM019j6wT+ck7JKnjs9LoUFFTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"uy1uMdrH804XLZvC5jLrDmGgNAo="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"BBM019j6wT+ck7JKnjs9LoUFFTE=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T13:00:00Z","end_date":"2026-04-24T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"uy1uMdrH804XLZvC5jLrDmGgNAo=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"7tOx8s5bS+2D8ChGwB8jFUCuVzY="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"uy1uMdrH804XLZvC5jLrDmGgNAo=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T13:00:00Z","end_date":"2026-04-25T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"7tOx8s5bS+2D8ChGwB8jFUCuVzY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"9uxsvsszU7Q9LtrCZOxsI4BpRfc="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"7tOx8s5bS+2D8ChGwB8jFUCuVzY=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T13:00:00Z","end_date":"2026-04-27T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"9uxsvsszU7Q9LtrCZOxsI4BpRfc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"VgCNXtNHPbP5bMIwpvKIXiZG3bE="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"9uxsvsszU7Q9LtrCZOxsI4BpRfc=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T13:00:00Z","end_date":"2026-04-28T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"VgCNXtNHPbP5bMIwpvKIXiZG3bE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"2ERjn7eK5Pe/lziMl+pHldnOCgk="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"VgCNXtNHPbP5bMIwpvKIXiZG3bE=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T13:00:00Z","end_date":"2026-04-29T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"2ERjn7eK5Pe/lziMl+pHldnOCgk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"SQ2nVDWgchf0YNvjnAxbzL89Zs0="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"2ERjn7eK5Pe/lziMl+pHldnOCgk=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T13:00:00Z","end_date":"2026-04-30T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"SQ2nVDWgchf0YNvjnAxbzL89Zs0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"uf2DDKZHmRQAlvrAtmxE291q/9o="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"SQ2nVDWgchf0YNvjnAxbzL89Zs0=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T13:00:00Z","end_date":"2026-05-01T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"uf2DDKZHmRQAlvrAtmxE291q/9o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"OUh6X/D1sh7NGjmi7vddFSHzh28="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"uf2DDKZHmRQAlvrAtmxE291q/9o=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T13:00:00Z","end_date":"2026-05-02T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"OUh6X/D1sh7NGjmi7vddFSHzh28=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"rKbXdxxhhic5Sd7GiGBq4oa176k="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"OUh6X/D1sh7NGjmi7vddFSHzh28=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T13:00:00Z","end_date":"2026-05-04T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"rKbXdxxhhic5Sd7GiGBq4oa176k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="},{"type":"next-occurrence","id":"xk00UZFkpUaQn/B2nzBkMhyLytI="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"rKbXdxxhhic5Sd7GiGBq4oa176k=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T13:00:00Z","end_date":"2026-05-05T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"xk00UZFkpUaQn/B2nzBkMhyLytI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-690"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"kMUPzcOyyyTyo/3+1sM3gkrhBq8="}],"description":"Mowing on I-690 eastbound between Exit 18 - Midler Avenue (Syracuse) and I-481 (De Witt) ; Mobile left shoulder closure, Wednesday April 22nd, 2026 thru Wednesday May 6th, 2026, Monday/Tuesday/Wednesday/Thursday/Friday/Saturday, 09:00 AM thru 03:00 PM All lanes open","update_date":"2026-04-22T13:51:52Z"},"road_event_id":"xk00UZFkpUaQn/B2nzBkMhyLytI=","beginning_cross_street":"Exit 18 - Midler Avenue","ending_cross_street":"I-481","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T13:00:00Z","end_date":"2026-05-06T19:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-76.109114,43.056623]]}},{"id":"itc0iJdWmfKkO0RWygQiy/v1kBg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-87 Northway"],"direction":"unknown","related_road_events":[],"description":"Reconstruction on I-87 Northway northbound END ROUTE I-87; US-Canadian Line (Champlain) 8 car lanes NB reduced to 3 (max) lanes , Continuous Thursday September 25th, 2025 12:00 AM thru Sunday February 28th, 2027 11:59 PM 5 lanes of 8 lanes closed","update_date":"2025-10-20T15:28:45Z"},"road_event_id":"itc0iJdWmfKkO0RWygQiy/v1kBg=","beginning_cross_street":"END ROUTE I-87; US-Canadian Line","ending_cross_street":"END ROUTE I-87; US-Canadian Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-22T04:00:00Z","end_date":"2026-05-07T03:59:59Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.452063,45.008751]]}},{"id":"I/WDnq1Y549jAwffQqHM7FEHLfw=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 54"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 54 Both Directions At CR 561 (Hammonton) Friday April 24, 2026 07:00 AM thru 07:30 AM, All lanes closed and detoured southbound; All lanes closed and detoured northbound","update_date":"2026-04-22T17:27:09Z"},"road_event_id":"I/WDnq1Y549jAwffQqHM7FEHLfw=","beginning_cross_street":"CR 561","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T11:00:00Z","end_date":"2026-04-24T11:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.804962,39.634613]]}},{"id":"eUSBFKUB/HoGIFNxO+YRpqibmOI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 54"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 54 Both Directions At CR 561 (Hammonton) Thursday April 23, 2026 07:00 AM thru 07:30 AM, All lanes closed and detoured southbound; All lanes closed and detoured northbound","update_date":"2026-04-22T17:26:58Z"},"road_event_id":"eUSBFKUB/HoGIFNxO+YRpqibmOI=","beginning_cross_street":"CR 561","ending_cross_street":"","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T11:00:00Z","end_date":"2026-04-23T11:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.804962,39.634613]]}},{"id":"gjHFBsGnjPiHx5Ez9lZk/+Mkl5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["F Line"],"direction":"unknown","related_road_events":[],"description":"Due to Track repairs southbound, F Line from Smith - 9 Sts (New York) to Kings Hwy (New York) Trains stop at 7 Av, Church Av and 18 Av. For 4 Av-9 St, 15 St-Prospect Park and Fort Hamilton Pkwy, take the G line instead. For service to Ditmas Av, Avenue I, Bay Pkwy, Avenue N and Avenue P, take the F line to 18 Av or Kings Hwy and transfer to a Manhattan-bound F line. For service from these stations, take the F line to 18 Av or Church Av and transfer to a Coney Island-bound F line., Continuous Friday May 1st, 2026 09:45 PM thru Monday May 4th, 2026 05:00 AM express only","update_date":"2026-04-22T17:46:50Z"},"road_event_id":"gjHFBsGnjPiHx5Ez9lZk/+Mkl5c=","beginning_cross_street":"Smith - 9 Sts","ending_cross_street":"Kings Hwy","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T01:45:00Z","end_date":"2026-05-04T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.995959,40.67358]]}},{"id":"xpSNX3phmBPYC9Mp1dGzIqIQaTE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"+vHtnFa8zQomjQx3WiYb2RMOr6o="}],"description":"Due to Track replacement both directions, N Line between DeKalb Av (New York) and Canal St (New York) runs local. For Jay St-MetroTech, Court St and Whitehall St-South Ferry, take the R line instead. For Rector St, Cortlandt St and City Hall, use nearby 4 line or J line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 11:45 PM thru 05:00 PM runs via Q line","update_date":"2026-04-22T18:22:35Z"},"road_event_id":"xpSNX3phmBPYC9Mp1dGzIqIQaTE=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T03:30:00Z","end_date":"2026-04-24T20:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"+vHtnFa8zQomjQx3WiYb2RMOr6o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpSNX3phmBPYC9Mp1dGzIqIQaTE="},{"type":"next-occurrence","id":"au1Qu7XoCS5+AQEmWyJw+4VFPXQ="}],"description":"Due to Track replacement both directions, N Line between DeKalb Av (New York) and Canal St (New York) runs local. For Jay St-MetroTech, Court St and Whitehall St-South Ferry, take the R line instead. For Rector St, Cortlandt St and City Hall, use nearby 4 line or J line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 11:45 PM thru 05:00 PM runs via Q line","update_date":"2026-04-22T18:22:35Z"},"road_event_id":"+vHtnFa8zQomjQx3WiYb2RMOr6o=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:30:00Z","end_date":"2026-04-25T20:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"au1Qu7XoCS5+AQEmWyJw+4VFPXQ=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"xpSNX3phmBPYC9Mp1dGzIqIQaTE="}],"description":"Due to Track replacement both directions, N Line between DeKalb Av (New York) and Canal St (New York) runs local. For Jay St-MetroTech, Court St and Whitehall St-South Ferry, take the R line instead. For Rector St, Cortlandt St and City Hall, use nearby 4 line or J line., Wednesday April 22nd, 2026 thru Saturday April 25th, 2026, Wednesday/Thursday/Friday, 11:45 PM thru 05:00 PM runs via Q line","update_date":"2026-04-22T18:22:35Z"},"road_event_id":"au1Qu7XoCS5+AQEmWyJw+4VFPXQ=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:30:00Z","end_date":"2026-04-26T20:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"WvPLhXaEAN10IGgdYJ8olcsdGaI=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"DINz8QfF2lcCi8qgrulhPbsHsYU="}],"description":"Due to Station Renovations northbound, D Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and skips Dekalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T17:33:32Z"},"road_event_id":"WvPLhXaEAN10IGgdYJ8olcsdGaI=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:30:00Z","end_date":"2026-05-03T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"DINz8QfF2lcCi8qgrulhPbsHsYU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WvPLhXaEAN10IGgdYJ8olcsdGaI="},{"type":"next-occurrence","id":"jYS7y2AYloVN+lwDCWRq5kzGY3c="}],"description":"Due to Station Renovations northbound, D Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and skips Dekalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T17:33:32Z"},"road_event_id":"DINz8QfF2lcCi8qgrulhPbsHsYU=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T03:30:00Z","end_date":"2026-05-04T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"jYS7y2AYloVN+lwDCWRq5kzGY3c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WvPLhXaEAN10IGgdYJ8olcsdGaI="},{"type":"next-occurrence","id":"n86SGoWcwBl4gd7YBibNS/vZUI8="}],"description":"Due to Station Renovations northbound, D Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and skips Dekalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T17:33:32Z"},"road_event_id":"jYS7y2AYloVN+lwDCWRq5kzGY3c=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T03:30:00Z","end_date":"2026-05-05T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"n86SGoWcwBl4gd7YBibNS/vZUI8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["D Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"WvPLhXaEAN10IGgdYJ8olcsdGaI="}],"description":"Due to Station Renovations northbound, D Line from 36 St (New York) to Atlantic Av - Barclays Ctr (New York) and skips Dekalb Av. For service to 25 St, Prospect Av, 4 Av-9 St and Union St, take the D line to Atlantic Av-Barclays Ctr and transfer to a local Coney Island-bound D line or N line. For service from these stations, take the D line or N line to 36 St and transfer to a Manhattan-bound D line. For DeKalb Av, take the Q line. Transfer at Atlantic Av-Barclays Ctr or 34 St-Herald Sq., Friday May 1st, 2026 thru Tuesday May 5th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T17:33:32Z"},"road_event_id":"n86SGoWcwBl4gd7YBibNS/vZUI8=","beginning_cross_street":"36 St","ending_cross_street":"Atlantic Av - Barclays Ctr","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T03:30:00Z","end_date":"2026-05-06T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.003549,40.655144]]}},{"id":"wD1b+OoUNY3xrxu4b77Orct4sfg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["L Line"],"direction":"unknown","related_road_events":[],"description":"Due to Repairs both directions, L Line between Myrtle - Wyckoff Avs (New York) and Broadway Jct (New York) L line run in two sections. The first one is between 8 Av and Myrtle-Wyckoff Avs, every 8 minutes (days/evenings). The second one is between Broadway Junction and Canarsie-Rockaway Pkwy, every 10 minutes (days/evenings). Free shuttle buses make stops between Myrtle-Wyckoff Avs and Broadway Junction. Transfer between trains and buses at Myrtle-Wyckoff Avs and/or Broadway Junction. For direct service between Manhattan and Brooklyn, consider A line, C line, and J line via transfer at Broadway Junction., Continuous Friday April 24th, 2026 11:30 PM thru Monday April 27th, 2026 05:00 AM service suspended","update_date":"2026-04-22T17:57:55Z"},"road_event_id":"wD1b+OoUNY3xrxu4b77Orct4sfg=","beginning_cross_street":"Myrtle - Wyckoff Avs","ending_cross_street":"Broadway Jct","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:30:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.911586,40.699814]]}},{"id":"18sptf8OsygYh0tkMlUd17tELH4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"dXwruebnpiHd6vVflFlLeuMUTH8="}],"description":"Due to Track repairs southbound, N Line from Canal St (New York) to 59 St (New York) runs via the Manhattan Bridge and skips DeKalb Av. For City Hall, Cortlandt St, Rector St, Whitehall St-South Ferry, Court St, Jay St-MetroTech and DeKalb Av, take a Coney Island-bound Q line making these stops. Transfer between N line and Q line at 14 St-Union Sq or Atlantic Av-Barclays Ctr. For 25 St?, Prospect Av, 4 Av-9 St and Union St, take a local Manhattan-bound D line or N line. For 45 St and 53 St, take a Manhattan-bound N line instead., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T18:08:06Z"},"road_event_id":"18sptf8OsygYh0tkMlUd17tELH4=","beginning_cross_street":"Canal St","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T03:30:00Z","end_date":"2026-04-26T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001775,40.719527]]}},{"id":"dXwruebnpiHd6vVflFlLeuMUTH8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"18sptf8OsygYh0tkMlUd17tELH4="},{"type":"next-occurrence","id":"OQWkT0YoJ4Iq44XqY84LJm/JLX0="}],"description":"Due to Track repairs southbound, N Line from Canal St (New York) to 59 St (New York) runs via the Manhattan Bridge and skips DeKalb Av. For City Hall, Cortlandt St, Rector St, Whitehall St-South Ferry, Court St, Jay St-MetroTech and DeKalb Av, take a Coney Island-bound Q line making these stops. Transfer between N line and Q line at 14 St-Union Sq or Atlantic Av-Barclays Ctr. For 25 St?, Prospect Av, 4 Av-9 St and Union St, take a local Manhattan-bound D line or N line. For 45 St and 53 St, take a Manhattan-bound N line instead., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T18:08:06Z"},"road_event_id":"dXwruebnpiHd6vVflFlLeuMUTH8=","beginning_cross_street":"Canal St","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T03:30:00Z","end_date":"2026-04-27T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001775,40.719527]]}},{"id":"OQWkT0YoJ4Iq44XqY84LJm/JLX0=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"18sptf8OsygYh0tkMlUd17tELH4="},{"type":"next-occurrence","id":"OoNw3cYKbcnFrc1nd8Mf7ZPqnLc="}],"description":"Due to Track repairs southbound, N Line from Canal St (New York) to 59 St (New York) runs via the Manhattan Bridge and skips DeKalb Av. For City Hall, Cortlandt St, Rector St, Whitehall St-South Ferry, Court St, Jay St-MetroTech and DeKalb Av, take a Coney Island-bound Q line making these stops. Transfer between N line and Q line at 14 St-Union Sq or Atlantic Av-Barclays Ctr. For 25 St?, Prospect Av, 4 Av-9 St and Union St, take a local Manhattan-bound D line or N line. For 45 St and 53 St, take a Manhattan-bound N line instead., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T18:08:06Z"},"road_event_id":"OQWkT0YoJ4Iq44XqY84LJm/JLX0=","beginning_cross_street":"Canal St","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T03:30:00Z","end_date":"2026-04-28T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001775,40.719527]]}},{"id":"OoNw3cYKbcnFrc1nd8Mf7ZPqnLc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"18sptf8OsygYh0tkMlUd17tELH4="}],"description":"Due to Track repairs southbound, N Line from Canal St (New York) to 59 St (New York) runs via the Manhattan Bridge and skips DeKalb Av. For City Hall, Cortlandt St, Rector St, Whitehall St-South Ferry, Court St, Jay St-MetroTech and DeKalb Av, take a Coney Island-bound Q line making these stops. Transfer between N line and Q line at 14 St-Union Sq or Atlantic Av-Barclays Ctr. For 25 St?, Prospect Av, 4 Av-9 St and Union St, take a local Manhattan-bound D line or N line. For 45 St and 53 St, take a Manhattan-bound N line instead., Friday April 24th, 2026 thru Tuesday April 28th, 2026, Sunday/Monday/Friday/Saturday, 11:45 PM thru 05:00 AM express only","update_date":"2026-04-22T18:08:06Z"},"road_event_id":"OoNw3cYKbcnFrc1nd8Mf7ZPqnLc=","beginning_cross_street":"Canal St","ending_cross_street":"59 St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:30:00Z","end_date":"2026-04-29T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.001775,40.719527]]}},{"id":"mM/XZhiH5PoZPLXd89EngD9gtEs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations northbound, N Line between Lexington Av/59 St (New York) and Astoria Blvd (New York) skips 39 Av-Dutch Kills, 36 Av, Broadway and 30 Av. For service to these stations, take the N line to Astoria Blvd and transfer to a Coney Island-bound N line. For service from these stations, take the N line to Queensboro Plaza and transfer to an Astoria-bound N line., Continuous Saturday April 25th, 2026 03:45 AM thru Sunday April 26th, 2026 10:00 PM","update_date":"2026-04-22T18:15:58Z"},"road_event_id":"mM/XZhiH5PoZPLXd89EngD9gtEs=","beginning_cross_street":"Lexington Av/59 St","ending_cross_street":"Astoria Blvd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T07:45:00Z","end_date":"2026-04-27T02:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.967258,40.76266]]}},{"id":"Tkhhs4JH7fzEqiTPm/CfKhOy8Sc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[],"description":"Due to Station Renovations northbound, N Line from 59 St (New York) to DeKalb Av (New York) Late night N line runs local between these stations., Continuous Saturday April 25th, 2026 12:00 AM thru Sunday April 26th, 2026 11:59 PM local service only","update_date":"2026-04-22T18:19:09Z"},"road_event_id":"Tkhhs4JH7fzEqiTPm/CfKhOy8Sc=","beginning_cross_street":"59 St","ending_cross_street":"DeKalb Av","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T04:00:00Z","end_date":"2026-04-27T03:59:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.017881,40.641362]]}},{"id":"s3PvM2FUoP5yrdajX3bRtoXsiZM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NJ 47"],"direction":"unknown","related_road_events":[],"description":"Roadwork on NJ 47 Both Directions between North of NJ 347 (Maurice River Twp) and North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd (Franklin Twp) Thursday April 23, 2026 08:00 PM thru Friday April 24, 2026 06:00 AM, 1 right lane of 2 lanes closed northbound; 1 right lane of 2 lanes closed southbound","update_date":"2026-04-22T18:14:26Z"},"road_event_id":"s3PvM2FUoP5yrdajX3bRtoXsiZM=","beginning_cross_street":"North of NJ 347","ending_cross_street":"North of CR 613/CR 538/Porchtown Rd/Coles Mills Rd","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T00:00:00Z","end_date":"2026-04-24T10:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-74.970321,39.29264]]}},{"id":"EUf6hNLI7Qawu4ypbU5bUcFLx5c=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 275"],"direction":"unknown","related_road_events":[],"description":"Construction on NY 275 northbound Town of Wirt; Town of Bolivar Line (Bolivar) Shoulder Closure, Monday April 27th, 2026, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:00:00Z"},"road_event_id":"EUf6hNLI7Qawu4ypbU5bUcFLx5c=","beginning_cross_street":"Town of Wirt; Town of Bolivar Line","ending_cross_street":"Town of Wirt; Town of Bolivar Line","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.159576,42.081629]]}},{"id":"q5driN4nCBqpm0ZIkZCUbhNdsv4=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"f0SVQWusTiKxD2onWaksw3K4CTk="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"q5driN4nCBqpm0ZIkZCUbhNdsv4=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-23T18:00:00Z","end_date":"2026-04-24T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"f0SVQWusTiKxD2onWaksw3K4CTk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"/WEfDJ6AvMqUWMvqnZoGBSg0ISc="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"f0SVQWusTiKxD2onWaksw3K4CTk=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-24T18:00:00Z","end_date":"2026-04-25T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"/WEfDJ6AvMqUWMvqnZoGBSg0ISc=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"LwH1HnrrunDvCC+wW/4WJxS/KNs="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"/WEfDJ6AvMqUWMvqnZoGBSg0ISc=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T18:00:00Z","end_date":"2026-04-26T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"LwH1HnrrunDvCC+wW/4WJxS/KNs=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"Ho0X3zp78s89+naRGy8+kdqygkU="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"LwH1HnrrunDvCC+wW/4WJxS/KNs=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-26T18:00:00Z","end_date":"2026-04-27T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"Ho0X3zp78s89+naRGy8+kdqygkU=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"zWuex2tXHi3jaRyxOVffKn1wi8w="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"Ho0X3zp78s89+naRGy8+kdqygkU=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-27T18:00:00Z","end_date":"2026-04-28T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"zWuex2tXHi3jaRyxOVffKn1wi8w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"XltWU+LjOqVMS165vEAiZrjoTcE="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"zWuex2tXHi3jaRyxOVffKn1wi8w=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T18:00:00Z","end_date":"2026-04-29T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"XltWU+LjOqVMS165vEAiZrjoTcE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"VaIQjoS8uAAx+Udg6nq9u4aRpQM="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"XltWU+LjOqVMS165vEAiZrjoTcE=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T18:00:00Z","end_date":"2026-04-30T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"VaIQjoS8uAAx+Udg6nq9u4aRpQM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"a+UC29QQLfljFbu7msf12Dt28Ck="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"VaIQjoS8uAAx+Udg6nq9u4aRpQM=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T18:00:00Z","end_date":"2026-05-01T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"a+UC29QQLfljFbu7msf12Dt28Ck=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"ZGi4C6gR22CsxCZsTYxFJqivzls="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"a+UC29QQLfljFbu7msf12Dt28Ck=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T18:00:00Z","end_date":"2026-05-02T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"ZGi4C6gR22CsxCZsTYxFJqivzls=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"tfoTq45Zh7GFRvH1vGcYIk6X62Q="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"ZGi4C6gR22CsxCZsTYxFJqivzls=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T18:00:00Z","end_date":"2026-05-03T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"tfoTq45Zh7GFRvH1vGcYIk6X62Q=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"9QRq/OvLac9zk7Co4Q2Qgau0Lzg="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"tfoTq45Zh7GFRvH1vGcYIk6X62Q=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T18:00:00Z","end_date":"2026-05-04T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"9QRq/OvLac9zk7Co4Q2Qgau0Lzg=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"Nc3DEHQuSYShkQeElmT2YgPcVbY="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"9QRq/OvLac9zk7Co4Q2Qgau0Lzg=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-04T18:00:00Z","end_date":"2026-05-05T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"Nc3DEHQuSYShkQeElmT2YgPcVbY=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="},{"type":"next-occurrence","id":"lJp6dVJXJd9MODw/gjYVMjCxwWE="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"Nc3DEHQuSYShkQeElmT2YgPcVbY=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-05T18:00:00Z","end_date":"2026-05-06T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"lJp6dVJXJd9MODw/gjYVMjCxwWE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["NY 305"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"q5driN4nCBqpm0ZIkZCUbhNdsv4="}],"description":"Culvert repairs on NY 305 both directions JORDAN HILL RD (Clarksville) to HIGBY RD (Clarksville) 2 Lane to 1 lane with temp signal NB, Thursday April 23rd, 2026 thru Wednesday September 30th, 2026, Sunday thru Saturday, 07:00 AM thru 05:00 PM All lanes open","update_date":"2026-04-22T18:08:02Z"},"road_event_id":"lJp6dVJXJd9MODw/gjYVMjCxwWE=","beginning_cross_street":"JORDAN HILL RD","ending_cross_street":"HIGBY RD","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-06T18:00:00Z","end_date":"2026-05-07T04:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-78.25063,42.108973]]}},{"id":"qFldSHMuTs6KM+SgwfBs47ihsKM=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"yxlRUgOIU+lxfacIFimlG4WnXug="}],"description":"Utility work on I-390 southbound between Exit 12 - I-90 (Henrietta) and Erie Station Road; CR 71 (Henrietta) alternating lane closures, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 08:00 AM thru 04:30 PM All lanes closed intermittently","update_date":"2026-04-22T17:57:10Z"},"road_event_id":"qFldSHMuTs6KM+SgwfBs47ihsKM=","beginning_cross_street":"Exit 12 - I-90","ending_cross_street":"Erie Station Road; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-28T20:00:00Z","end_date":"2026-04-29T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.64858,43.047371]]}},{"id":"yxlRUgOIU+lxfacIFimlG4WnXug=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qFldSHMuTs6KM+SgwfBs47ihsKM="},{"type":"next-occurrence","id":"2S4RLEXpYlp7hx+b+Ii+jHWPN0w="}],"description":"Utility work on I-390 southbound between Exit 12 - I-90 (Henrietta) and Erie Station Road; CR 71 (Henrietta) alternating lane closures, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 08:00 AM thru 04:30 PM All lanes closed intermittently","update_date":"2026-04-22T17:57:10Z"},"road_event_id":"yxlRUgOIU+lxfacIFimlG4WnXug=","beginning_cross_street":"Exit 12 - I-90","ending_cross_street":"Erie Station Road; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T20:00:00Z","end_date":"2026-04-30T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.64858,43.047371]]}},{"id":"2S4RLEXpYlp7hx+b+Ii+jHWPN0w=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qFldSHMuTs6KM+SgwfBs47ihsKM="},{"type":"next-occurrence","id":"rrvrZ+6GhwcrGlm9QURc8euX6/k="}],"description":"Utility work on I-390 southbound between Exit 12 - I-90 (Henrietta) and Erie Station Road; CR 71 (Henrietta) alternating lane closures, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 08:00 AM thru 04:30 PM All lanes closed intermittently","update_date":"2026-04-22T17:57:10Z"},"road_event_id":"2S4RLEXpYlp7hx+b+Ii+jHWPN0w=","beginning_cross_street":"Exit 12 - I-90","ending_cross_street":"Erie Station Road; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T20:00:00Z","end_date":"2026-05-01T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.64858,43.047371]]}},{"id":"rrvrZ+6GhwcrGlm9QURc8euX6/k=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["I-390"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"qFldSHMuTs6KM+SgwfBs47ihsKM="}],"description":"Utility work on I-390 southbound between Exit 12 - I-90 (Henrietta) and Erie Station Road; CR 71 (Henrietta) alternating lane closures, Tuesday April 28th, 2026 thru Friday May 1st, 2026, Tuesday/Wednesday/Thursday/Friday, 08:00 AM thru 04:30 PM All lanes closed intermittently","update_date":"2026-04-22T17:57:10Z"},"road_event_id":"rrvrZ+6GhwcrGlm9QURc8euX6/k=","beginning_cross_street":"Exit 12 - I-90","ending_cross_street":"Erie Station Road; CR 71","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T20:00:00Z","end_date":"2026-05-02T04:30:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-77.64858,43.047371]]}},{"id":"YIjsY0SJGdycuM8v3P8XCYuA4rE=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"next-occurrence","id":"Mx7sPPgPPr0qdHXr8F95+hBOTn8="}],"description":"Due to Signal repairs northbound, N Line from DeKalb Av (New York) to Canal St (New York) runs local. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Jay St-MetroTech and Court St. In Manhattan, use nearby 4 line or J line for Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM runs via Q line, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-04-22T18:30:48Z"},"road_event_id":"YIjsY0SJGdycuM8v3P8XCYuA4rE=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-25T03:45:00Z","end_date":"2026-04-27T09:00:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"Mx7sPPgPPr0qdHXr8F95+hBOTn8=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YIjsY0SJGdycuM8v3P8XCYuA4rE="},{"type":"next-occurrence","id":"141345iIet6SDW54hz5SYkSgy3Y="}],"description":"Due to Signal repairs northbound, N Line from DeKalb Av (New York) to Canal St (New York) runs local. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Jay St-MetroTech and Court St. In Manhattan, use nearby 4 line or J line for Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM runs via Q line, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-04-22T18:30:48Z"},"road_event_id":"Mx7sPPgPPr0qdHXr8F95+hBOTn8=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-29T03:30:00Z","end_date":"2026-04-29T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"141345iIet6SDW54hz5SYkSgy3Y=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YIjsY0SJGdycuM8v3P8XCYuA4rE="},{"type":"next-occurrence","id":"0T+S/P2Iv5X9nGXl0H6qwg2Wx3M="}],"description":"Due to Signal repairs northbound, N Line from DeKalb Av (New York) to Canal St (New York) runs local. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Jay St-MetroTech and Court St. In Manhattan, use nearby 4 line or J line for Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM runs via Q line, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-04-22T18:30:48Z"},"road_event_id":"141345iIet6SDW54hz5SYkSgy3Y=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-04-30T03:30:00Z","end_date":"2026-04-30T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"0T+S/P2Iv5X9nGXl0H6qwg2Wx3M=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YIjsY0SJGdycuM8v3P8XCYuA4rE="},{"type":"next-occurrence","id":"kYHuxZCqJk2EA93oo8U+DLevARk="}],"description":"Due to Signal repairs northbound, N Line from DeKalb Av (New York) to Canal St (New York) runs local. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Jay St-MetroTech and Court St. In Manhattan, use nearby 4 line or J line for Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM runs via Q line, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-04-22T18:30:48Z"},"road_event_id":"0T+S/P2Iv5X9nGXl0H6qwg2Wx3M=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-01T03:30:00Z","end_date":"2026-05-01T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"kYHuxZCqJk2EA93oo8U+DLevARk=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YIjsY0SJGdycuM8v3P8XCYuA4rE="},{"type":"next-occurrence","id":"oTyqZTLHCpMUtS+OEGHykBgDF7o="}],"description":"Due to Signal repairs northbound, N Line from DeKalb Av (New York) to Canal St (New York) runs local. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Jay St-MetroTech and Court St. In Manhattan, use nearby 4 line or J line for Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM runs via Q line, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-04-22T18:30:48Z"},"road_event_id":"kYHuxZCqJk2EA93oo8U+DLevARk=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-02T03:30:00Z","end_date":"2026-05-02T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}},{"id":"oTyqZTLHCpMUtS+OEGHykBgDF7o=","type":"Feature","properties":{"core_details":{"event_type":"work-zone","data_source_id":"TRANSCOM","road_names":["N Line"],"direction":"unknown","related_road_events":[{"type":"first-occurrence","id":"YIjsY0SJGdycuM8v3P8XCYuA4rE="}],"description":"Due to Signal repairs northbound, N Line from DeKalb Av (New York) to Canal St (New York) runs local. In Brooklyn, use nearby Borough Hall 2 line or 4 line for Jay St-MetroTech and Court St. In Manhattan, use nearby 4 line or J line for Whitehall St-South Ferry, Rector St, Cortlandt St and City Hall., Continuous Friday April 24th, 2026 11:45 PM thru Monday April 27th, 2026 05:00 AM runs via Q line, Monday April 27th, 2026 thru Saturday May 2nd, 2026, Monday thru Friday, 11:45 PM thru 05:00 AM runs via Q line","update_date":"2026-04-22T18:30:48Z"},"road_event_id":"oTyqZTLHCpMUtS+OEGHykBgDF7o=","beginning_cross_street":"DeKalb Av","ending_cross_street":"Canal St","is_start_position_verified":false,"is_end_position_verified":false,"start_date":"2026-05-03T03:30:00Z","end_date":"2026-05-03T08:45:00Z","is_start_date_verified":false,"is_end_date_verified":false,"location_method":"unknown","vehicle_impact":"unknown","restrictions":[],"types_of_work":[],"lanes":[],"impacted_cds_curb_zones":[]},"geometry":{"type":"MultiPoint","coordinates":[[-73.981824,40.690635]]}}]}